A PEKERJAAN PERSIAPAN
1 Pembersihan lahan m2 816.00 5,000 4,080,000
2 Pengukuran dan Bouwplank m1 130.00 48,800 6,344,000
3 Peralatan,Air ,listrik kerja ls 1.00 1,500,000 1,500,000
4 Peralatan keselamatan kerja ls 1.00 2,500,000 2,500,000
Sub Jumlah Pekerjaan Persiapan Rp.
B PEKERJAAN SIPIL GUDANG DAN PERKANTORAN 48*17 m
1 Galian Pondasi telapak 150*150*150 m3 67.60 51,100 3,454,360
2 Galian Sloof m3 34.20 51,100 1,747,620
3 Galian pondasi batu kali + saluran m3 118.80 51,100 6,070,680
4 Urugan kembali lobang pondasi m3 94.72 25,550 2,420,096
5 Urugan Pasir padat tebal 10 cm m3 92.48 119,100 11,014,368
6 Urugan SIRTU tebal 30 cm m3 691.20 146,300 101,122,560
7 Lean concrete m3 83.10 685,500 56,965,050
14,424,000
587,543,947
51,184,801
157,561,873
###
10,137,002
216,684,093
6,505,133
14,868,361
28,752,000
475,381,343
#NAME?
85,680,040
8,840,000
1,171,869,330
0
1,171,869,330
1,171,000,000
1,435,049
per m2
Rekapitulasi
Pekerjaan Pengembangan Areal Pabrik
PT BIO INDUSTRI NUSANTARA
PURWAKARTA
1 Pekerjaan Land Clearing, Cut & Fill, dan Jalan 6000 #REF! #REF!
2 Bangunan Ruang Produksi 12 * 24 m 288 #REF! #REF!
3 Bangunan Gudang Bahan Baku 54 m * 24 m 1296 1,435,049 1,859,823,529
4 Bangunan Gudang Hasil produksi 48 m * 24 m 1152 #REF! #REF!
#REF!
Terbilang:
Lima milyar seratus tujuh puluh enam juta rupiah