a. Pelat Beton
14
Lantai Atas
- Bekisiting, playwood 9 mm m² 91.5 195,000 153,000 17,840,550 13,997,970 31,838,520
- Beton K250 m³ 12.6 890,000 260,000 11,234,025 3,281,850 14,515,875
- Besi, ST.37 kg 2,474.0 10,100 3,000 24,987,501 7,422,030 32,409,531
a. Pelat Beton
15
Dak Lantai Atap
Harga Sub.Jumlah Harga Jumlah Harga
Keterangan Pekerjaan Sat Vol.
Bahan Upah Bahan Upah (Rp)
- Bekisiting, playwood 9 mm m² 16.7 195,000 153,000 3,256,500 2,555,100 5,811,600
- Beton K250 m³ 2.0 890,000 260,000 1,768,875 516,750 2,285,625
- Besi, ST.37 kg 389.6 10,100 3,000 3,934,455 1,168,650 5,103,105
a. Tangga Beton.
6
- Bekisiting, playwood 9 mm m² 11.1 401,000 105,000 4,439,070 1,162,350 5,601,420
- Beton K250 m³ 1.5 251,000 105,000 370,476 154,980 525,456
- Besi, ST.37 kg 578.6 10,100 3,000 5,843,779 1,735,776 7,579,555
a. Pekerjaan Plafond
4
- Plafond gypsum 9mm rangka hollow m² 91.5 75,000 45,000 6,861,750 4,117,050 10,978,800
- Lis plafond gypsum m' 160.4 12,000 8,000 1,925,280 1,283,520 3,208,800
- Exposed plafond. m² 22.9 55,000 35,000 1,260,600 802,200 2,062,800
a. Pekerjaan Pengecatan
6
- Cat dinding luar m² 218.9 36,000 25,000 7,881,840 5,473,500 13,355,340
- Cat dinding dalam m² 218.9 26,000 25,000 5,692,440 5,473,500 11,165,940
- Cat plafond m² 91.5 26,000 25,000 2,378,740 2,287,250 4,665,990
- Cat plafond Exposed m² 22.9 26,000 25,000 595,920 573,000 1,168,920
a. Pekerjaan Sanitair
7
- Closet duduk Toto bh 2.0 2,400,000 450,000 4,800,000 900,000 5,700,000
- Bak mandi fiber bh 2.0 750,000 250,000 1,500,000 500,000 2,000,000
- Watafel bh 2.0 1,800,000 450,000 3,600,000 900,000 4,500,000
- Kitchen zink bh 1.0 1,750,000 250,000 1,750,000 250,000 2,000,000
- Kran air bh 3.0 95,000 25,000 285,000 75,000 360,000
- Floor drain stainles steel bh 2.0 75,000 83,000 150,000 166,000 316,000
- Jet shower bh 2.0 150,000 25,000 300,000 50,000 350,000
- Tempat sabun bh 2.0 45,000 83,000 90,000 166,000 256,000
Harga Sub.Jumlah Harga Jumlah Harga
Keterangan Pekerjaan Sat Vol.
Bahan Upah Bahan Upah (Rp)
- Pemanas air unit 1.0 1,600,000 350,000 1,600,000 350,000 1,950,000
a. Pekerjaan Pengecatan
6
- Cat dinding luar m² 188.1 31,000 25,000 5,831,100 4,702,500 10,533,600
- Cat dinding dalam m² 188.1 21,000 25,000 3,950,100 4,702,500 8,652,600
- Cat plafond m² 91.5 21,000 25,000 1,921,290 2,287,250 4,208,540
a. Pekerjaan Sanitair
7
- Closet duduk bh 6.0 2,400,000 450,000 14,400,000 2,700,000 17,100,000
- Bak mandi fiber bh 6.0 750,000 250,000 4,500,000 1,500,000 6,000,000
- Kran air bh 6.0 95,000 25,000 570,000 150,000 720,000
- Floor drain stainles steel bh 6.0 75,000 83,000 450,000 498,000 948,000
- Tempat sabun bh 2.0 45,000 83,000 90,000 166,000 256,000
WIYONO
Kepada Yth,
Bp.Wisnu
Rafles Hill-Spring Land Block 8.No.2
Tomang-Jakarta Barat
Dengan hormat,
Setelah mempelajari dengan seksama bagian yang akan di renovasi, maka dengan ini kami menyatakan :
1. Telah menetapkan ketentuan dalam rencana kerja dan syarat, termasuk Unweizing yang dikerjakan.
2. Telah menyediakan bahan-bahan, peralatan dan tenaga kerja yang diperlukan untuk melaksanakan :
Proyek : Pembongkaran & Pembangunan Rumah 3 Lantai
Pekerjaan : Renovasi dan Pasang Baru
Lokasi : Kelurahan Tomang
3. Memahami serta telah memperhitungkan dengan seksama kewajiban kami secara teknis dan financial