DAFTAR HARGA BAHAN BANGUNAN

NO NAMA BAHAN SAT HARGA SATUAN


(Rp.)

I MATERIAL DASAR
1 TANAH URUG M3 100,000.00
2 PASIR URUG M3 450,000.00
3 PASIR PASANGAN M3 450,000.00
4 PASIR BETON M3 450,000.00
5 SIRTU URUG M3 100,000.00
6 BATU BELAH/KALI/GUNUNG M3 450,000.00
7 BATU KARANG M3 450,000.00
8 SPLIT/KORAL/KRICAK PECAH M3 450,000.00
9 KAPUR PASANG M3 75,000.00

II BAHAN UTAMA
1 SEMEN PORTLAND (PC) KG 2,500.00
2 BATU BATA BH 1,000.00
3 BATACO BH 2,000.00
4 BESI BETON KG 24,000.00
5 KAWAT BETON KG 25,000.00
6 SENG GELOMBANG BJLS 0 30 LBR 75,000.00
7 SENG PLAT BJLS 0 30 LBR 35,000.00
8 SENG GELOMBANG BJLS 0 20 LBR 52,000.00
9 SENG PLAT BJLS 0 20 LBR 20,000.00
10 SENG PLAT ALMUNIUM 0 20 LBR 40,000.00
11 SENG ALUMINIUM 0.20 LBR 70,000.00
12 KERAMIK 20X20 BH 4,600.00
13 KERAMIK 25 X 25 BH 4,600.00
14 KERAMIK 30 X 30 BH 4,600.00
15 KERAMIK 40 X 40 BH 5,000.00
16 MOZAIK 30 X 30 BH 2,750.00
17 MOZAIK 20 X 20 BH 2,500.00
18 PORSELIN 11X11 BH 1,000.00
19 SEMEN WARNA KG 10,000.00

III BAHAN KAYU DAN KACA


1 PAPAN KAYU KLAS I M3 3,000,000.00
2 KAYU KLAS I M3 3,000,000.00
3 PAPAN KAYU KLAS II M3 2,000,000.00
4 KAYU KLAS II M3 3,000,000.00
5 BALOK KAYU BEGESTING M3 2,000,000.00
6 KAYU BAKISTING M3 1,500,000.00
7 KAYU DOLKEN dia 8 - 10 / 4m BTG 4,000.00
8 FROMTIE/PENJAGA JARAK BEKISTING/SPACER BH 2,000.00
9 TRIPLEX 2.8 MM LBR 54,000.00
10 TRIPLEX 6 MM LBR 90,000.00
11 MULTIPLEX 9 MM LBR 120,000.00
12 TEAKWOOD LBR 90,000.00
13 KACA BENING 3 MM M2 100,000.00
14 KACA BENING 5 MM M2 130,000.00
15 KACA CERMIN 5 MM M2 125,000.00
16 RANGKA NAKO UNIT 25,000.00
1 2 3 4
16 BESI TRALI NAKO M' 5,000.00
17 KAWAT RAM-RAM M2 75,000.00
18 BESI STRIP BH 12,500.00
19 BEUGEL U BH 15,000.00
20 ANGKER BESI BH 7,000.00
21 BAUT DIA 12 BH 7,000.00

IV BAHAN SEKUNDER
1 ENGSEL DAUN PINTU BH 12,000.00
2 ENGSEL DAUN JENDELA BH 10,000.00
3 GRENDEL TANAM PINTU BH 8,000.00
4 GRENDEL TANAM JENDELA BH 8,000.00
5 HAK / KAIT ANGIN BH 12,000.00
6 KUNCI TANAM 2 SLAAG ex YALLE (KUNING) BH 110,000.00
7 KUNCI TANAM KM/WC BH 80,000.00
8 PAKU BESAR KG 17,000.00
9 PAKU KECIL KG 20,000.00
10 PAKU SENG KG 25,000.00
11 LEM KAYU/WEBBER/AICA AIBON KG 30,000.00

V BAHAN FINISHING
1 CAT TEMBOK/DINDING KG 8,000.00
2 DEMPUL TEMBOK/DINDING KG 15,000.00
3 CAT KAYU KG 25,000.00
4 CAT MENIE KG 20,000.00
5 CAT SENG KG 30,000.00
6 MINYAK CAT LTR 15,000.00
7 MINYAK BEKESTING LTR 10,000.00
8 RESIDU LTR 12,000.00
9 TEAK OIL LTR 40,000.00
10 POLITUR LTR 40,000.00
11 POLITUR JADI LTR 40,000.00
12 AMPLAS / KERTAS GOSOK LBR 4,000.00
13 DEMPUL KAYU KG 30,000.00
14 KUAS BH 6,000.00

VI BAHAN SANITAIR
1 PIPA SPIRAL 1.5 " M` 100,000.00
2 PIPA GIP 0 3/4" MED B M` 18,000.00
3 PIPA GIP 0 1" MED B M` 25,000.00
4 PIPA GIP 0 11/2" MED B M` 35,000.00
5 PIPA SPIRAL 2 " M` 25,000.00
6 PIPA PRALON PVC 1.5 M` 50,000.00
7 PIPA PRALON PVC 0 3" AW M` 27,000.00
8 PIPA PRALON PVC 0 4" AW M` 32,000.00
9 PIPA PRALON PVC 2" AW M` 25,000.00
10 CLOSET JONGKOK MERK INA BH 80,000.00
11 STOP KRAN 0 1/2" BH 25,000.00
12 SEAL TAPE BH 2,000.00
13 FLOOR DRAIN BH 20,000.00
14 PENGURAS BAK DARI KUNINGAN BH 20,000.00
15 IJUK M3 65,000.00
16 PAS. SOCKET dia 1/2" BH 1,750.00
17 PAS. SOCKET dia 3/4" BH 2,000.00
18 PAS. REDUSER dia 3/4" - 1/2" BH 2,500.00
19 PAS. WATER MOOR 1/2" BH 3,000.00
1 2 3 4
VII BAHAN LISTRIK
1 KABEL NYM 2,5 mm M1 12,000.00
2 PIPA PVC 0,5" M1 5,000.00
3 T DOS BH 2,250.00
4 ISOLASI BH 2,500.00
5 BENANG ISOLASI ROL 3,000.00
6 ISOLATOR CAP BH 7,500.00
7 ISOLATOR KECIL BH 6,500.00
8 GROUDING DARI KUNINGAN/TEMBAGA BH 38,500.00
9 KABEL GROUND 2X5 mm M1 22,500.00
10 SAKLAR TUNGGAL BH 12,500.00
11 SAKLAR GANDA BH 15,000.00
12 STOP KONTAK BH 14,000.00
13 BOX SEKRING 1 FASE UNIT 50,000.00
14 BOX SEKRING 2 FASE UNIT 60,000.00
15 LAMPU TL 40 WATT (KOMPLIT) UNIT 55,000.00
16 LAMPU TL 20 WATT (KOMPLIT) UNIT 35,000.00
17 VITTING/CAP LAMPU PIJAR BH 7,500.00
18 LAMPU PHILIPS 23 WATT BH 40,000.00
19 LAMPU PHILIPS 18 WATT BH 32,000.00
20 PAGAR BRC M1 350,000.00

DAFTAR HARGA UPAH KERJA

NO NAMA PROFESI SAT HARGA SATUAN


(Rp.)

1 Tukang Batu Org/Hari 85,000.00


2 Tukang Kayu Org/Hari 85,000.00
3 Tukan Besi Org/Hari 85,000.00
4 Tukan Cat Org/Hari 85,000.00
5 Pekerja Org/Hari 75,000.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

NO URAIAN PEKERJAAN SAT VOLUME HARGA/UPAH HARGA SAT


BHN/ORG ( Rp ) ( Rp )
PEKERJAAN TANAH
1 Galian tanah keras dalam 1 m /m3
Pekerja org/hr 0.6250 75,000.00 46,875.00
46,875.00
2 Urug tanah bekas galian /m3
Pekerja org/hr 0.1920 75,000.00 14,400.00
14,400.00
3 Urug pasir bawah pondasi/lantai /m3
Pasir urug m3 1.2000 450,000.00 540,000.00
Pekerja org/hr 0.3000 75,000.00 22,500.00
562,500.00
4 Urug sirtu/kerikil /m3
Kerikil m3 1.2000 450,000.00 540,000.00
Sirtu m3 1.2000 100,000.00 120,000.00
Pekerja org/hr 0.2500 75,000.00 18,750.00
kerikil 558,750.00
sirtu 138,750.00
5 Urug batu karang /m3
Batu karang m3 1.2000 450,000.00 540,000.00
Pekerja org/hr 0.2500 75,000.00 18,750.00
558,750.00
6 Pemasangan lapisan ijuk /m3
ijuk m3 1.2000 100,000.00 120,000.00
Pekerja org/hr 0.1500 75,000.00 11,250.00
131,250.00
PEKERJAAN PONDASI
1 Pasang batu kosong/anstamping /m3
Batu gunung/kali m3 1.2000 450,000.00 540,000.00
Batu karang m3 1.2000 450,000.00 540,000.00
Pasir urug m3 0.3000 450,000.00 135,000.00
Tukang batu org/hr 0.3900 85,000.00 33,150.00
Pekerja org.hr 0.7800 75,000.00 58,500.00
batu kali 766,650.00
batu karang 766,650.00
2 Pasang pondasi batu karang/kali/gunung ad 1:5 /m3
Batu belah/kali/gunung m3 1.1000 450,000.00 495,000.00
Batu karang m3 1.1000 450,000.00 495,000.00
Semen/Pc kg 136.0000 2,500.00 340,000.00
Pasir m3 0.5440 450,000.00 244,800.00
Tukang batu org/hr 0.6000 85,000.00 51,000.00
Pekerja org/hr 1.5000 75,000.00 112,500.00
batu kali 1,243,300.00
batu karang 1,243,300.00
PEKERJAAN DINDING
1 Pasang 1/2 bata adukan 1:3 /m2
Batu bata bh 70.0000 1,000.00 70,000.00
Semen/Pc kg 14.3700 2,500.00 35,925.00
Pasir pasang m3 0.0400 450,000.00 18,000.00
Tukang batu org/hr 0.1000 85,000.00 8,500.00
Pekerja org/hr 0.3200 75,000.00 24,000.00
156,425.00
1 2 3 4 5 6
2 Pasangan 1/2 bata adukan 1:5 /m2
Batu bata bh 70.0000 1,000.00 70,000.00
Semen /Pc kg 9.6800 2,500.00 24,200.00
Pasir pasang m3 0.0450 450,000.00 20,250.00
Tukang batu org/hr 0.1000 85,000.00 8,500.00
Pekerja org/hr 0.3200 75,000.00 24,000.00
146,950.00
3 Plesteran campuran 1:3 tebal 1,5 cm /m2
Semen/Pc kg 6.4800 2,500.00 16,200.00
Pasir pasang m3 0.0190 450,000.00 8,550.00
Tukang batu org/hr 0.1500 85,000.00 12,750.00
Pekerja org/hr 0.2000 75,000.00 15,000.00
52,500.00
4 Plesteran campuran 1:5 tebal 1,5 cm /m2
Semen/Pc kg 4.3200 2,500.00 10,800.00
Pasir pasang m3 0.0220 450,000.00 9,900.00
Tukang batu org/hr 0.1500 85,000.00 12,750.00
Pekerja org/hr 0.2000 75,000.00 15,000.00
48,450.00
PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pasangan lantai keramik 30x30 /m3
Keramik 30x30 bh 12.0000 4,600.00 55,200.00
Semen /Pc kg 11.3800 2,500.00 28,450.00
Pasir pasang m3 0.0420 450,000.00 18,900.00
Semen warna kg 1.5000 10,000.00 15,000.00
Tukang batu org/hr 0.3500 85,000.00 29,750.00
Pekerja org/hr 0.6200 75,000.00 46,500.00
193,800.00
2 Pasang lantai mozaik 20x20 /m2
Tegel Mosaik 20x20 bh 25.0000 2,500.00 62,500.00
Semen/Pc kg 11.3800 2,500.00 28,450.00
Pasir pasang m3 0.0420 450,000.00 18,900.00
Semen warna kg 1.5000 10,000.00 15,000.00
Tukang batu org/hr 0.3500 85,000.00 29,750.00
Pekerja org/hr 0.6200 75,000.00 46,500.00
201,100.00
3 Pasang plin keramik 10x30 /m`
Keramik 10/30 bh 3.3333 1,750.00 5,833.28
Semen/Pc kg 9.3000 2,500.00 23,250.00
Pasir pasang m3 0.0180 450,000.00 8,100.00
Semen warna kg 1.5000 10,000.00 15,000.00
Tukang batu org/hr 0.3500 85,000.00 29,750.00
Pekerja org/hr 0.6200 75,000.00 46,500.00
128,433.28
4 Pasangan lantai spesi t = 3 cm + acian /m2
Semen /Pc kg 15.0400 2,500.00 37,600.00
Pasir pasang m3 0.0450 450,000.00 20,250.00
Tukang batu org/hr 0.3500 85,000.00 29,750.00
Pekerja org/hr 0.6200 75,000.00 46,500.00
134,100.00
5 Pasang porselin 11/11 /m2
Porselin 11/11 bh 83.0000 1,000.00 83,000.00
Semen/Pc kg 11.3800 2,500.00 28,450.00
Semen warna kg 1.5000 10,000.00 15,000.00
Pasir pasang m3 0.0420 450,000.00 18,900.00
Tukang batu org/hr 0.5000 85,000.00 42,500.00
Pekerja org/hr 0.6200 75,000.00 46,500.00
234,350.00
1 2 3 4 5 6
PEKERJAAN BETON
1 Pek.Beton rabat 1:3:5 /m3
Semen/Pc kg 218.0000 2,500.00 545,000.00
Pasir beton m3 0.5200 450,000.00 234,000.00
Splait/kerikil/koral m3 0.8700 450,000.00 391,500.00
Tukang batu org/hr 0.2500 85,000.00 21,250.00
Pekerja org/hr 1.6500 75,000.00 123,750.00
1,315,500.00
2 Pek. Sloof beton bertulang /m3
Kayu bekisting m3 0.2700 1,500,000.00 405,000.00
Paku kg 2.0000 17,000.00 34,000.00
Minyak bekisting ltr 0.6000 10,000.00 6,000.00
Besi beton kg 100.0000 24,000.00 2,400,000.00
Kawat beton kg 3.0000 25,000.00 75,000.00
Semen/Pc kg 280.0000 2,500.00 700,000.00
Pasir beton m3 0.5200 450,000.00 234,000.00
Split/kerikil/koral m3 0.7800 450,000.00 351,000.00
Pekerja org/hr 4.8500 85,000.00 412,250.00
Tukang batu org/hr 0.3500 85,000.00 29,750.00
Tukang kayu org/hr 1.5600 85,000.00 132,600.00
Tukang besi org/hr 1.4000 85,000.00 119,000.00
4,898,600.00
3 Pek. kolom beton bertulang /m3
Kayu bekisting m3 0.3000 1,500,000.00 450,000.00
Paku kg 4.0000 17,000.00 68,000.00
Minyak bekisting ltr 2.0000 10,000.00 20,000.00
Balok kayu m3 0.1500 2,000,000.00 300,000.00
Tripleks 9 mm lbr 0.3500 120,000.00 42,000.00
Kayu dolken dia 8 - 10/4 m btg 20.0000 4,000.00 80,000.00
Besi beton kg 100.0000 24,000.00 2,400,000.00
Kawat beton kg 4.5000 25,000.00 112,500.00
Semen/Pc kg 280.0000 2,500.00 700,000.00
Pasir beton m3 0.5200 450,000.00 234,000.00
Split/kerikil/koral m3 0.7800 450,000.00 351,000.00
Pekerja org/hr 4.8500 85,000.00 412,250.00
Tukang batu org/hr 0.3500 85,000.00 29,750.00
Tukang kayu org/hr 3.3000 85,000.00 280,500.00
Tukang besi org/hr 2.1000 85,000.00 178,500.00
5,658,500.00
4 Pek. balok beton bertulang /m3
Kayu bekisting m3 0.3000 1,500,000.00 450,000.00
Paku kg 3.2000 17,000.00 54,400.00
Minyak bekisting ltr 1.6000 10,000.00 16,000.00
Balok kayu m3 0.1400 2,000,000.00 280,000.00
Tripleks 9 mm lbr 2.8000 120,000.00 336,000.00
Kayu dolken dia 8 - 10/4 m btg 16.0000 4,000.00 64,000.00
Besi beton kg 100.0000 24,000.00 2,400,000.00
Kawat beton kg 3.0000 25,000.00 75,000.00
Semen/Pc kg 280.0000 2,500.00 700,000.00
Pasir beton m3 0.5200 450,000.00 234,000.00
Split/kerikil/koral m3 0.7800 450,000.00 351,000.00
Pekerja org/hr 4.8500 85,000.00 412,250.00
Tukang batu org/hr 0.3500 85,000.00 29,750.00
Tukang kayu org/hr 2.8000 85,000.00 238,000.00
Tukang besi org/hr 1.4000 85,000.00 119,000.00
5,759,400.00
1 2 3 4 5 6
5 Pek. balok beton bertulang /m3
Kayu bekisting m3 0.3000 1,500,000.00 450,000.00
Paku kg 3.2000 17,000.00 54,400.00
Minyak bekisting ltr 1.6000 10,000.00 16,000.00
Balok kayu m3 0.1200 2,000,000.00 240,000.00
Tripleks 9 mm lbr 2.8000 120,000.00 336,000.00
Kayu dolken dia 8 - 10/4 m btg 32.0000 4,000.00 128,000.00
Besi beton kg 100.0000 24,000.00 2,400,000.00
Kawat beton kg 2.2500 25,000.00 56,250.00
Semen/Pc kg 280.0000 2,500.00 700,000.00
Pasir beton m3 0.5200 450,000.00 234,000.00
Split/kerikil/koral m3 0.7800 450,000.00 351,000.00
Pekerja org/hr 4.8500 85,000.00 412,250.00
Tukang batu org/hr 0.3500 85,000.00 29,750.00
Tukang kayu org/hr 2.8000 85,000.00 238,000.00
Tukang besi org/hr 1.0500 85,000.00 89,250.00
5,734,900.00
6 Pek. dinding beton bertulang /m3
Kayu bekisting m3 0.2400 1,500,000.00 360,000.00
Paku kg 3.2000 17,000.00 54,400.00
Minyak bekisting ltr 1.6000 10,000.00 16,000.00
Balok kayu m3 0.1600 2,000,000.00 320,000.00
Tripleks 9 mm lbr 2.8000 120,000.00 336,000.00
Kayu dolken dia 8 - 10/4 m btg 24.0000 4,000.00 96,000.00
Besi beton kg 100.0000 24,000.00 2,400,000.00
Kawat beton kg 0.7800 25,000.00 19,500.00
Semen/Pc kg 280.0000 2,500.00 700,000.00
Pasir beton m3 0.5200 450,000.00 234,000.00
Split/kerikil/koral m3 0.7800 450,000.00 351,000.00
Pekerja org/hr 4.8500 85,000.00 412,250.00
Tukang batu org/hr 0.3500 85,000.00 29,750.00
Tukang kayu org/hr 2.6400 85,000.00 224,400.00
Tukang besi org/hr 1.0500 85,000.00 89,250.00
5,642,550.00
PEKERJAAN KAYU
1 Pekerjaan kusen kayu /m3
Kayu klas I m3 1.1000 3,000,000.00 3,300,000.00
Kayu klas II m3 1.1000 3,000,000.00 3,300,000.00
Tukang kayu org/hr 20.0000 85,000.00 1,700,000.00
Pekerja org/hr 6.0000 75,000.00 450,000.00
klas I 5,450,000.00
klas II 5,450,000.00
2 Pas.daun pintu panil kayu /m2
Papan kayu klas I m3 0.0400 3,000,000.00 120,000.00
Tukang org/hr 2.5000 85,000.00 212,500.00
Pekerja org/hr 1.0000 75,000.00 75,000.00
407,500.00
3 Pas.daun pintu dan jendela panil kaca /m2
Rangka kayu + papan kayu klas 1 m3 0.0350 3,000,000.00 105,000.00
Kaca bening 5 mm m2 1.0000 130,000.00 130,000.00
Tukang org/hr 2.0000 85,000.00 170,000.00
Pekerja org/hr 0.8000 75,000.00 60,000.00
465,000.00
4 Pasang jelusi/sopi-sopi /m2
Kayu klas I m3 0.0600 3,000,000.00 180,000.00
Kayu klas II m3 0.0600 2,000,000.00 120,000.00
Paku kg 0.1500 17,000.00 2,550.00
Tukang org/hr 2.0000 85,000.00 170,000.00
Pekerja org/hr 0.5000 75,000.00 37,500.00
klas I 390,050.00
klas II 330,050.00
1 2 3 4 5 6
5 Pasang daun pintu double teakwood /m2
Rangka kayu klas I m3 0.0196 3,000,000.00 58,800.00
Teakwood lbr 0.7000 90,000.00 63,000.00
Lem kayu kg 0.3000 30,000.00 9,000.00
Paku kecil kg 0.3000 20,000.00 6,000.00
Tukang org/hr 2.5000 85,000.00 212,500.00
Pekerja org/hr 0.8000 75,000.00 60,000.00
409,300.00
6 Pas.daun pintu double teawood lapis seng /m2
Rangka kayu klas I m3 0.0170 3,000,000.00 51,000.00
Teakwood lbr 0.3500 90,000.00 31,500.00
Seng licin lbr 0.7000 20,000.00 14,000.00
Lem aibon kg 0.2500 30,000.00 7,500.00
Paku kecil kg 0.3000 20,000.00 6,000.00
Tukang org/hr 2.5000 85,000.00 212,500.00
Pekerja org/hr 0.8000 75,000.00 60,000.00
382,500.00
7 Pekerjaan Kuda-kuda kayu /m3
Kayu klas I m3 1.1000 3,000,000.00 3,300,000.00
Kayu klas II m3 1.1000 3,000,000.00 3,300,000.00
Besi strip kg 15.0000 12,500.00 187,500.00
Paku kg 0.8000 17,000.00 13,600.00
Tukang kayu org/hr 12.0000 85,000.00 1,020,000.00
Pekerja org/hr 4.0000 75,000.00 300,000.00
klas I 4,821,100.00
klas II 4,821,100.00
8 Pekerjaan gording /m3
Kayu klas I m3 1.1000 3,000,000.00 3,300,000.00
Kayu klas II m3 1.1000 3,000,000.00 3,300,000.00
Paku kg 2.5000 17,000.00 42,500.00
Tukang kayu org/hr 12.0000 85,000.00 1,020,000.00
Pekerja org/hr 4.0000 75,000.00 300,000.00
klas I 4,662,500.00
klas II 4,662,500.00
9 Pas. Rangka plafond (0,6 x 1,2 m) /m2
Kayu rangka plafond m3 0.0120 3,000,000.00 36,000.00
Paku kg 0.1000 17,000.00 1,700.00
Tukang kayu org/hr 0.2500 85,000.00 21,250.00
Pekerja org/hr 0.1500 75,000.00 11,250.00
70,200.00
10 Pasang lisplank kayu 2 x (3x20) /m1
Papan kayu klas I m3 0.0145 3,000,000.00 43,500.00
Papan kayu klas II m3 0.0145 3,000,000.00 43,500.00
Paku kg 0.0600 17,000.00 1,020.00
Tukang org/hr 0.2500 85,000.00 21,250.00
Pekerja org/hr 0.1500 75,000.00 11,250.00
Kals I 77,020.00
Kals II 77,020.00
11 Pasang list plafond /m1
Tripleks 3 mm lbr 0.0500 54,000.00 2,700.00
Tukang org/hr 0.0210 85,000.00 1,785.00
Pekerja org/hr 0.0210 75,000.00 1,575.00
6,060.00
1 2 3 4 5 6
PEKERJAAN LANGIT - LANGIT
1 Pasang plafon tripleks 3 mm (0,6 x 1,20m) /m2
Triplex 3 mm lbr 0.3750 54,000.00 20,250.00
Paku kecil kg 0.1000 20,000.00 2,000.00
Tukang org/hr 0.1000 85,000.00 8,500.00
Pekerja org/hr 0.0700 75,000.00 5,250.00
36,000.00
PEKERJAAN ATAP
1 Pasang atap seng gelombang /m2
Seng BJLS 0,30 Lbr 0.8000 75,000.00 60,000.00
Seng BJLS 0,20 Lbr 0.8000 52,000.00 41,600.00
Seng Almunium 0,20 Lbr 0.8000 70,000.00 56,000.00
Paku seng kg 0.0200 25,000.00 500.00
Tukang org/hr 0.0600 85,000.00 5,100.00
Pekerja org/hr 0.1200 75,000.00 9,000.00
Seng BJLS 0.30 74,600.00
Seng BJLS 0.20 56,200.00
Seng Almunium 0.20 70,600.00
2 Pasang seng bubungan atap seng /m`
Seng bubungan BJLS 0,30 Lbr 0.4000 35,000.00 14,000.00
Seng bubungan BJLS 0,20 Lbr 0.4000 20,000.00 8,000.00
Seng bubungan Almunium 0,20 Lbr 0.4000 40,000.00 16,000.00
Paku seng kg 0.0400 25,000.00 1,000.00
Tukang org/hr 0.0700 85,000.00 5,950.00
Pekerja org/hr 0.1500 75,000.00 11,250.00
Seng BJLS 0.30 32,200.00
Seng BJLS 0.20 26,200.00
Seng Almunium 0.20 34,200.00
3 Pasang jurai dalam / jurai luar /m2
Seng plat BJLS 0,30 Lbr 0.8000 35,000.00 28,000.00
Seng plat BJLS 0,20 Lbr 0.8000 20,000.00 16,000.00
Paku seng kg 0.0200 25,000.00 500.00
Tukang org/hr 0.0600 85,000.00 5,100.00
Pekerja org/hr 0.1200 75,000.00 9,000.00
Seng BJLS 0.30 42,600.00
Seng BJLS 0.20 30,600.00
4 Pasang talang datar seng plat BJLS 0.20 /m2
Seng plat BJLS 0,20 Lbr 0.5000 35,000.00 17,500.00
Paku kecil Lbr 0.0150 20,000.00 300.00
Kayu klas II m3 0.0090 3,000,000.00 27,000.00
Cat meni kg 0.2500 20,000.00 5,000.00
Tukang org/hr 0.4000 85,000.00 34,000.00
Pekerja org/hr 0.1500 75,000.00 11,250.00
95,050.00
PEKERJAAN KUNCI DAN KACA
1 Pasang engsel pintu /bh
Engsel pintu bh 1.0000 12,000.00 12,000.00
Tukang org/hr 0.1500 85,000.00 12,750.00
Pekerja org/hr 0.0150 75,000.00 1,125.00
25,875.00
2 Pasang engsel jendela kupu-kupu /bh
Engsel jendela bh 1.0000 10,000.00 10,000.00
Tukang org/hr 0.1000 85,000.00 8,500.00
Pekerja org/hr 0.0100 75,000.00 750.00
19,250.00
3 Pas.kunci tanam 3 slaag (3 anak kunci) /bh
kunci 3 slaag ex yale bh 1.0000 110,000.00 110,000.00
Tukang org/hr 0.5000 85,000.00 42,500.00
Pekerja org/hr 0.0100 75,000.00 750.00
153,250.00
1 2 3 4 5 6
4 Pasang grendel pintu /bh
Grendel bh 1.0000 8,000.00 8,000.00
Tukang org/hr 0.1500 85,000.00 12,750.00
Pekerja org/hr 0.0150 75,000.00 1,125.00
21,875.00
5 Pasang grendel jendela /bh
Grendel bh 1.0000 8,000.00 8,000.00
Tukang org/hr 0.1500 85,000.00 12,750.00
Pekerja org/hr 0.0150 75,000.00 1,125.00
21,875.00
6 Pasang hak/kait angin /bh
Hak/kait angin bh 1.0000 12,000.00 12,000.00
Tukang org/hr 0.1500 85,000.00 12,750.00
Pekerja org/hr 0.0150 75,000.00 1,125.00
25,875.00
7 Pasang kaca mati 5 mm /m2
Kaca bening 5 mm m2 1.1000 130,000.00 143,000.00
Tukang kayu org/hr 0.1500 85,000.00 12,750.00
Pekerja org/hr 0.0150 75,000.00 1,125.00
156,875.00
PEKERJAAN PENGECATAN
1 Cat dinding baru (3 kali cat) /m2
Dempul/plamir kg 0.1000 15,000.00 1,500.00
Cat dasar kg 0.1000 8,000.00 800.00
Cat penutup 2x kg 0.2600 8,000.00 2,080.00
Tukang cat org/hr 0.0630 85,000.00 5,355.00
Pekerja org/hr 0.0020 75,000.00 150.00
9,885.00
2 Cat kayu/cat kilap baru 3x cat /m2
Dempul kg 0.1500 15,000.00 2,250.00
Cat meni kg 0.2000 20,000.00 4,000.00
Cat dasar kg 0.1700 25,000.00 4,250.00
Cat penutup 3 x kg 0.3500 25,000.00 8,750.00
Tukang cat org/hr 0.1050 85,000.00 8,925.00
Pekerja org/hr 0.0700 75,000.00 5,250.00
33,425.00
3 Menie besi/kayu /m2
Menie kg 0.1000 20,000.00 2,000.00
Kuas bh 0.0100 6,000.00 60.00
Tukang cat org/hr 0.2000 85,000.00 17,000.00
Pekerja org/hr 0.0200 75,000.00 1,500.00
20,560.00
4 Cat atap seng /m2
Cat upox/resin (MOVILEX) kg 0.3000 30,000.00 9,000.00
Tukang cat org/hr 0.0600 85,000.00 5,100.00
Pekerja org/hr 0.0060 75,000.00 450.00
14,550.00
5 Teak oil bidang kayu /m2
Teak oil ltr 0.3600 40,000.00 14,400.00
Tukang cat org/hr 0.0630 85,000.00 5,355.00
Pekerja org/hr 0.0400 75,000.00 3,000.00
22,755.00
1 2 3 4 5 6
6 Pekerjaan acian /m2
Semen Pc zak 1.4000 2,500.00 3,500.00
Tukang batu org/hr 0.0500 85,000.00 4,250.00
Pekerja org/hr 0.0250 75,000.00 1,875.00
9,625.00
PEKERJAAN SANITAIR
1 Pasang kran air 1/2 atau 3/4 /bh
Kran air bh 1.0000 25,000.00 25,000.00
Seal tape bh 0.2500 2,000.00 500.00
Tukang org/hr 0.1000 85,000.00 8,500.00
Pekerja org/hr 0.0100 75,000.00 750.00
34,750.00
2 Pasang pipa Spiral dia 11/2" /m`
Pipa Spiral dia 11/2" m` 1.2000 100,000.00 120,000.00
Perlengkapan 0.3500 5,000.00 1,750.00
Tukang org/hr 0.0900 85,000.00 7,650.00
Pekerja org/hr 0.0540 75,000.00 4,050.00
133,450.00
3 Pasang pipa Spiral dia 2" /m`
Pipa Spiral dia 2" m` 1.2000 25,000.00 30,000.00
Perlengkapan 0.3500 5,000.00 1,750.00
Tukang org/hr 0.0900 85,000.00 7,650.00
Pekerja org/hr 0.0540 75,000.00 4,050.00
43,450.00
4 Pasang pipa PVC 1 1/2" /m`
Pipa PVC 11/2" m` 1.2000 50,000.00 60,000.00
Perlengkapan 0.3500 5,000.00 1,750.00
Tukang org/hr 0.0900 85,000.00 7,650.00
Pekerja org/hr 0.0540 75,000.00 4,050.00
73,450.00
5 Pasang pipa PVC 3" /m`
Pipa PVC 3" m` 1.2000 27,000.00 32,400.00
Perlengkapan 0.3500 5,000.00 1,750.00
Tukang org/hr 0.0135 85,000.00 1,147.50
Pekerja org/hr 0.0810 75,000.00 6,075.00
41,372.50
6 Pasang kloset jongkok /bh
Kloset jongkok bh 1.0000 80,000.00 80,000.00
Pasir pasang m3 0.0100 450,000.00 4,500.00
Semen/PC kg 6.0000 2,500.00 15,000.00
Tukang org/hr 1.5000 85,000.00 127,500.00
Pekerja org/hr 1.0000 75,000.00 75,000.00
302,000.00
7 Pasang bak WC vol. 0,30 m3 /bh
Batu bata bh 317.0000 1,000.00 317,000.00
Porselin 11 x 11 bh 360.0000 1,000.00 360,000.00
Pasir pasang m3 0.3000 450,000.00 135,000.00
Semen/Pc kg 120.0000 2,500.00 300,000.00
Semen warna kg 6.0000 10,000.00 60,000.00
Tukang org/hr 3.0000 85,000.00 255,000.00
Pekerja org/hr 6.0000 75,000.00 450,000.00
1,877,000.00
1 2 3 4 5 6
8 Pasang floor drain /bh
Floor drain bh 1.0000 20,000.00 20,000.00
Tukang org/hr 0.1000 85,000.00 8,500.00
Pekerja org/hr 0.0100 75,000.00 750.00
29,250.00
9 Pasang penguras bak dari kuningan /bh
Penguras bak bh 1.0000 20,000.00 20,000.00
Tukang org/hr 0.1000 85,000.00 8,500.00
Pekerja org/hr 0.0100 75,000.00 750.00
29,250.00
10 Pek. Septictank dan peresapan /unit
Galian tanah m3 6.7600 46,875.00 316,875.00
Urugan tanah kembali m3 2.2533 14,400.00 32,447.95
Urugan pasir m3 0.2000 562,500.00 112,500.00
Urugan kerikil pada bak peresapan m3 0.3000 558,750.00 167,625.00
Urugan batu gunung m3 0.4000 558,750.00 223,500.00
Pas. Trasram 1:3 m2 17.9200 156,425.00 2,803,136.00
Plesteran trasram m2 16.0000 52,500.00 840,000.00
Cor lantai rabat septictank 1:3:5 m3 0.1500 1,315,500.00 197,325.00
Cor plat penutup beton septictank 1:2:3 m3 0.4100 5,642,550.00 2,313,445.50
Pipa hawa GIP 2" m1 1.0000 43,450.00 43,450.00
Pas, pipa PVC 2" m1 3.0000 73,450.00 220,350.00
Pas, pipa PVC 3" m1 8.0000 41,372.50 330,980.00
7,601,634.45
11 Pasang kloset duduk /bh
Kloset duduk bh 1.0000 1,000,000.00 1,000,000.00
Perlengkapan 0.0600 50,000.00 3,000.00
Tukang org/hr 1.1000 85,000.00 93,500.00
Pekerja org/hr 3.3000 75,000.00 247,500.00
1,344,000.00
12 Pasang Wastafel /bh
Wastafel bh 1.0000 650,000.00 650,000.00
Perlengkapan 0.1200 50,000.00 6,000.00
Pasir pasang m3 0.0100 450,000.00 4,500.00
Semen/Pc kg 6.0000 2,500.00 15,000.00
Tukang org/hr 1.4500 562,500.00 815,625.00
Pekerja org/hr 1.2000 558,750.00 670,500.00
2,161,625.00
PEKERJAAN INSTALASI LISTRIK
1 Pek.titik sambungan lampu /Titik
Kabel NYM 1,5 mm m` 7.5000 12,000.00 90,000.00
Pvc 0,5 m` 1.5000 5,000.00 7,500.00
T dos bh 1.0000 2,250.00 2,250.00
Isolasi bh 0.3000 2,500.00 750.00
Benang isolasi m` 0.8000 3,000.00 2,400.00
Isolator cap bh 6.0000 7,500.00 45,000.00
Isolator kecil bh 5.0000 6,500.00 32,500.00
Tukang listrik org/hr 0.3000 85,000.00 25,500.00
Pekerja org/hr 0.1000 75,000.00 7,500.00
213,400.00
2 Pas.bok sekring /bh
Box sekring bh 1.0000 60,000.00 60,000.00
Tukang listrik org/hr 0.2500 85,000.00 21,250.00
Pekerja org/hr 0.1500 75,000.00 11,250.00
92,500.00
1 2 3 4 5 6
3 Pasangan saklar/stop kontak /bh
Saklar tunggal bh 1.0000 12,500.00 12,500.00
Saklar ganda bh 1.0000 15,000.00 15,000.00
Stop kontak bh 1.0000 14,000.00 14,000.00
Tukang listrik org/hr 0.2000 85,000.00 17,000.00
S. tunggal 29,500.00
S. ganda 32,000.00
Stop kontak 31,000.00
4 Pas.lampu TL /bh
Lammpu Tl 20 watt bh 1.0000 35,000.00 35,000.00
Lampu Tl 40 watt bh 1.0000 55,000.00 55,000.00
Tukang listrik org/hr 0.2000 85,000.00 17,000.00
TL 20 52,000.00
TL 40 72,000.00
5 Pasangan lampu pijar /bh
Viting cap bh 1.0000 7,500.00 7,500.00
Lampu philips 23 wat bh 1.0000 40,000.00 40,000.00
Lampu philips 18 wat bh 1.0000 32,000.00 32,000.00
Tukang listrik org/hr 0.2000 85,000.00 17,000.00
Philips 23 watt 64,500.00
Philips 18 watt 56,500.00
6 Pasangan gronding / arde /bh
Kabel grond 2x5 mm bh 4.0000 22,500.00 90,000.00
Gronding dari tembaga /kuningan 1,2 m bh 1.0000 38,500.00 38,500.00
Tukang listrik org/hr 0.3000 85,000.00 25,500.00
Pekerja org/hr 0.1000 75,000.00 7,500.00
161,500.00
PEMERINTAH KABUPATEN ALOR
DINAS PENDIDIKAN
Jl. Soekarno Hatta Telp. (0386) 21103
K A L A B A H I - ALOR

REKAPITULASI UMUM
RENCANA ANGGARAN BIAYA
( RAB )

### : PENYEDIAAN SARANA PRODUKSI PERTANIAN /


PERKEBUNAN
0 : PEMBANGUNAN 2 UNIT BAK PENAMPUNG
: PEMBANGUNAN RUMAH MESIN
0 : TANGLAPUI
0 : 2018

NO URAIAN PEKERJAAN JUMLAH

I PEMBANGUNAN 1 BUAH BAK PENAMPUNG 47,000,000.00

II PEMBANGUNAN RUMAH MESIN 13,500,000.00

III PEK.PEMASANGAN JARINGAN PIPA 80,500,000.00

Jumlah 141,000,000.00
Dibulatkan 141,000,000.00

Terbilang : SERATUS EMPAT PULUH SATU JUTA RUPIAH

###
Kalabahi, September 2018
Mengetahui, Dibuat Oleh,
Pejabat Pembuat Komitmen ( PPK ) Konsultan Perencana
CV.KARYA CIPTA

YAPI N. HINGLIR,SP NAJAMUDIN BEKA


NIP.197903172006041012 Ka. Perwakilan
panjang lebar
no item
B. INDUK TERAS B. INDUK TERAS
1 0 49.50 9.50 1.00 0.25
2 0 - - - -
3 0 49.50 - 1.00 -
4 0 - - - -
5 0 - - - -
6 0 49.50 - 1.00 -
7 0 49.50 9.50 0.53 0.25
8 0 - - - -
9 CV.KARYA CIPTA 49.50 - 3.00 -
10 0 0.15 - 0.20 -
11 0 0.15 - 0.15 -
12 0 0.15 - 0.20 -
13 0 0.15 - 0.15 -
14 0 0.15 - 0.15 -
15 0 - - - -
16 0 - - - -
17 0 - - - -
18 0 - - - -
19 0 - - - -
20 0 - - - -
21 0 - - - -
22 0
22 0 - - - -
23 0 - - - -
24 0 - - - -
25 0 - - - -
26 0 - - - -
27 0 - - - -
28 0 - - - -
29 0 - - - -
30 0
31 0 - - - -
32 0 - - - -
33 0 - - - -
34 0 - - - -
35 0 - - - -
36 0 - - - -
37 0 - - - -
38 0 - - - -
39 0 - - - -
40 0 - - - -

17 kusen kayu klas II


- pintu 10.40 0.11
- jendela 16.80 0.11
- gewel 1.75 0.11

18 jelusi papan klas II


- pintu 0.60 0.11
- jendela 0.72 0.11
- gewel 0.25 0.11

19 daun pintu panel klas II 1.00 1.60


20 daun jend kaca klas II 1.00 0.72
19 kuda-kuda 32.76 0.08
20 gording 18.00 0.06
21 atap seng 18.20 6.40
22 bubungan 18.20
23 pas tembok
luas tembok
-kiri
-kanan
- tengah
-depan
-belakang
-gewel kiri
-gewel kanan

luas kusen
-pintu
-jendela
-gewel

24 plesteran tembok
luas tembok
-kiri
-kanan
- tengah
-depan
-belakang
-gewel kiri
-gewel kanan
-kolom teras

25 plesteran pondasi
luas pondasi
-kiri 9.10 9.20
-kanan 9.10 9.20
- tengah 16.30 16.30
-depan 16.30 16.40
-belakang 16.30 16.40
26 lisplank 18.00 12.40
27 plafon
- RKB
- Selasar depan 16.20 2.80
- Selasar belakang 16.20 0.80
- Kiri 6.20 0.90
- Kanan 6.20 0.90

27 listplafon
- RKB 7.85 7.85 6.85 6.85
- Selasar depan 18.00 15.85 - -
- Selasar belakang 18.00 15.85
- Kiri 6.20 6.20
- Kanan 6.20 6.20

28 baut mur kuda Ø 12


29 beugel U
30 pas kunci pintu
engsel pintu
grendel
31 engsel jendela
grendel jendela
kait angin jendela
Luas tinggi Volume
Total
B. INDUK TERAS B. INDUK TERAS B. INDUK TERAS
49.50 2.38 0.75 0.15 37.13 0.36 37.48
- - - - - - 9.37
49.50 - 0.05 - 2.48 - 2.48
42.96 12.87 0.10 0.07 4.30 0.90 5.20
42.96 12.87 0.20 0.20 8.59 2.57 11.17
0.10 - 0.10 0.10 4.95 - 4.95
25.99 2.38 0.80 0.15 20.79 0.36 21.15 21.43
- 0.11 - 2.65 - 0.29 0.29
133.26 - - - - - 133.26
0.03 - 49.50 - 1.49 - 1.49 148.5
0.02 - 3.40 - 0.08 - 1.38 18
0.03 - 54.50 - 1.64 - 1.64
0.02 - 17.36 - 0.39 - 0.39
0.02 - 3.32 - 0.07 - 0.07
42.96 12.87 0.07 0.05 3.01 0.64 3.65
42.96 16.32 - - 59.28 3.445
- - - - - - 313.20 328.44
- - - - - - 13.81
- - - - - - 327.00
- - - - - - 0.63 105.45
- - - - - - 3.43
4.94
- - - - - - 1.51
- - - - - - 12.70
- - - - - - 6.32 33.28 5.92
- - - - - - 0.70
- - - - - - 1.16
- - - - - - 82.00
- - - - - - 101.08
- - - - - - 10.00
82.21 42.9625 21.476
- - - - - - 82.21
- - - - - - 132.64
- - - - - - 313.20
- - - - - - 23.66
- - - - - - 23.66
- - - - - - 16.13
- - - - - - 82.21
- - - - - - 101.08
- - - - - - 37.72
- - - - - - 37.72
0.01 0.05 0.06 2.00 0.11 20.80
0.01 0.05 0.09 10.00 0.92 168.00
0.01 0.05 0.01 4.00 0.04 7.00
1.08 195.80 0.21

0.11 1.00 0.07 20.00 1.32


0.11 1.00 0.08 150.00 11.88
0.11 1.00 0.03 16.00 0.44
13.64
3.39 2.12 3.39 2.00 6.78
0.86 1.20 0.86 10.00 8.64
0.01 0.12 0.31 7.00 2.20
0.01 0.12 0.13 18.00 2.33
116.48 2.00 232.96
18.20

22.00 1.00 22.00


22.00 1.00 22.00
22.00 1.00 22.00
23.94 1.00 23.94
23.44 1.00 23.44
6.00 1.00 6.00
6.00 1.00 6.00
125.38 0.12 15.05
2.00 250.76

3.64 2.00 7.28


3.91 10.00 39.10
0.18 4.00 0.72
47.10

22.00 1.00 22.00


22.00 1.00 22.00
22.00 1.00 22.00
23.94 1.00 23.94
23.44 1.00 23.44
6.00 1.00 6.00
6.00 1.00 6.00
3.12 - -
125.38 2.00 250.76

1.83 1.00 0.20 1.83


1.83 1.00 0.20 1.83
0.82 1.00 0.05 0.82
3.27 1.00 0.20 3.27
3.27 1.00 0.20 3.27
11.02 1.00 11.02
2.00 60.80

53.80 2.00 107.60


45.36 1.00 45.36
12.96 1.00 12.96
5.58 2.00 11.16
5.58 2.00 11.16
188.24 188.24

29.40
33.85
33.85
12.40
12.40
121.90 121.90
15.00 7.00 105.00
1.00 7.00 7.00
1.00 2.00 2.00
4.00 2.00 8.00
3.00 2.00 6.00
6.00 10.00 60.00
3.00 10.00 30.00
3.00 10.00 30.00
pintu gewel
133.26 29.29 14.046

96.6

9.65 4.1 15.1 5.9 14.55 6.9 6.7 6.7


38.6 13.8

13.44

12.7764 0.34

3.281 1.394 5.134 2.006 4.947 2.346 2.278 2.278


41.12
PEMERINTAH KABUPATEN ALOR
DINAS PERTANIAN DAN PERKEBUNAN
Jl. Eltari No.12 Kalabahi - Alor
K A L A B A H I - ALOR

RENCANA ANGGARAN BIAYA


( RAB )

PROGRAM : PENINGKATAN PRODUKSI PERTANIAN


KEGIATAN : PENYEDIAAN SARANA PRODUKSI PERTANIAN / PERKEBUNA
PEKERJAAN : PEMBANGUNAN 1 BH BAK PENAMPUNG
: PEMBANGUNAN RUMAH MESIN
: PEMASANGAN JARINGAN PIPA

KONSULTAN PERENCANA

CV.KARYA CIPTA
Kedelang, Kalabahi - Timur
PEMERINTAH KABUPATEN ALOR
DINAS PENDIDIKAN
Jl. Soekarno Hatta Telp. (0386) 21103
K A L A B A H I - ALOR

REKAPITULASI
RENCANA ANGGARAN BIAYA
( RAB )

### 0
0
0 0
0 : SD IMPRES LUBALA - Kec. ATU
0 0

NO URAIAN PEKERJAAN JUMLAH

I 0 0.00
II 0 0.00
III 0 0.00

IV 0 0.00
V 0 0.00

VI 0 0.00
VII 0 0.00
VIII 0 0.00

VIII 0 0.00

Jumlah 0.00
Dibulatkan 0.00

Terbilang : Seratus Tiga Puluh Delapan Juta Rupiah

###
Kalabahi, Oktober 2008
Konsultan Perencana
CV. DWIPA MITRA Perwkl. Alor

AGUS PLAITUKA, ST
Ka. Perwakilan
PEMERINTAH KABUPATEN ALOR
DINAS PENDIDIKAN
Jl. Soekarno Hatta Telp. (0386) 21103
K A L A B A H I - ALOR

RENCANA ANGGARAN BIAYA


( RAB )

Kegiatan : Pembangunan/Rehabilitasi Gedung SD/MI Dana Alokasi Khusus


(DAK) Bidang Pendidikan Kabupaten Alor TA. 2008
Pekerjaan : Pengadaan Meubelair
Lokasi : SD IMPRES LUBALA - Kec. ATU
Tahun Anggaran : 2008

HARGA JUMLAH
NO URAIAN PEKERJAAN SAT VOL
SATUAN HARGA

I PEKERJAAN PERSIAPAN

1 Pengangkutan ls 1.00 1,000,000.00 1,000,000.00


sub jumlah I 1,000,000.00
II PEKERJAAN MEUBILAIR

1 Pekerjaan Kursi Guru bh 2.00 300,000.00 600,000.00

2 Pekerjaan Meja Guru bh 2.00 800,000.00 1,600,000.00

3 Pekerjaan Kursi Murid bh 30.00 250,000.00 7,500,000.00

4 Pekerjaan Meja Murid bh 30.00 360,000.00 10,800,000.00

5 Pekerjaan Papan Tulis bh 2.00 250,000.00 500,000.00


sub jumlah II 21,000,000.00
PEMERINTAH KABUPATEN ALOR
DINAS PENDIDIKAN
Jl. Soekarno Hatta Telp. (0386) 21103
K A L A B A H I - ALOR

R E KAP I T U LAS I
RENCANA ANGGARAN BIAYA
( RAB )

Kegiatan : Pembangunan/Rehabilitasi Gedung SD/MI Dana Alokasi Khusus


(DAK) Bidang Pendidikan Kabupaten Alor TA. 2008
Pekerjaan : Pengadaan Meubelair
Lokasi : SD IMPRES LUBALA - Kec. ATU
Tahun Anggaran : 2008

NO URAIAN PEKERJAAN JUMLAH

I PEKERJAAN PERSIAPAN 1,000,000.00

II PEKERJAAN MEUBILAIR 21,000,000.00


Jumlah 22,000,000.00
Dibulatkan 22,000,000.00

Terbilang : Dua Puluh Dua Juta Rupiah

Kalabahi, Oktober 2008


Konsultan Perencana
CV. DWIPA MITRA Perwkl. Alor

AGUS PLAITUKA, ST
Ka. Perwakilan
PEMERINTAH KABUPATEN ALOR
DINAS PENDIDIKAN
Jl. Soekarno Hatta Telp. (0386) 21103
K A L A B A H I - ALOR

RENCANA ANGGARAN BIAYA


( RAB )

Kegiatan : PENYEDIAAN SARANA PRODUKSI PERTANIAN /


PERKEBUNAN
Pekerjaan : PEMBANGUNAN 2 UNIT BAK PENAMPUNG
Lokasi : TANGLAPUI
Tahun Anggaran : 2018

HARGA JUMLAH
NO URAIAN PEKERJAAN SAT VOL
SATUAN HARGA
I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi ls 1.00 700,000.00 700,000.00
2 Pengukuran & pas. bouplank ls 1.00 750,000.00 750,000.00
3 Pengadaan air kerja ls 1.00 2,539,738.00 2,539,738.00
sub jumlah I 3,989,738.00
II PEKERJAAN TANAH DAN URUGAN
1 Galian tanah pondasi m3 3.84 46,875.00 180,000.00
2 Urugan bekas tanah galian m3 1.28 14,400.00 18,432.00
3 Urugan pasir bawah pondasi t = 5 cm m3 0.80 562,500.00 450,000.00
4 Urugan pasir bawah lantai t = 10 cm m3 1.60 562,500.00 900,000.00
5 Urugan Sirtu Peninggian Lantai m3 4.80 138,750.00 666,000.00
sub jumlah II 2,214,432.00
III PEK. PASANGAN & BETON
1 Pek. Pasangan Batu Kosong / Aanstamping m3 3.20 766,650.00 2,453,280.00
2 Pek. Pasangan pondasi Batu Kali 1 Pc : 5 Psr m3 16.70 1,243,300.00 20,763,110.00
3 Pek. Pas Tembok 1/2 bata 1 pc : 5 psr m2 24.00 146,950.00 3,526,800.00
4 Pek. Beton sloof 15/20 m3 0.48 4,898,600.00 2,351,328.00
5 Pek. Beton kolom praktis 15/15 m3 0.36 5,658,500.00 2,037,060.00
6 Pek. Beton ringbalk 15/20 m3 0.48 5,759,400.00 2,764,512.00
sub jumlah III 33,896,090.00
IV PEK. LANTAI DAN PLESTERAN
1 Pek. Rabat beton untuk lantai bangunan m3 1,315,500.00 -
2 Pek. Speci + Acian m2 16.00 134,100.00 2,145,600.00
3 Pek. Plesteran dinding tembok 1 : 5 m2 48.00 48,450.00 2,325,600.00
4 Pek. Plesteran pondasi m2 4.80 48,450.00 232,560.00
5 Pek. Acian tembok, beton dan pondasi m2 48.00 9,625.00 462,000.00
sub jumlah IV 5,165,760.00
VIII PEK. SANITAIR
1 Pas. Kran air 1/5 bh 2.00 34,750.00 69,500.00
sub jumlah VIII 69,500.00
IX PEK. PENGECATAN & PEK. LAIN - LAIN
1 Pek. Cat dinding tembok m2 48.00 9,885.00 474,480.00
10 Pek. Pembersihan menyeluruh ls 1.00 1,190,000.00 1,190,000.00
. sub jumlah VIIII 1,664,480.00
PEMERINTAH KABUPATEN ALOR
DINAS PENDIDIKAN
Jl. Soekarno Hatta Telp. (0386) 21103
K A L A B A H I - ALOR

REKAPITULASI
RENCANA ANGGARAN BIAYA
( RAB )

### : PENYEDIAAN SARANA PRODUKSI PERTANIAN /


PERKEBUNAN
0 : PEMBANGUNAN 2 UNIT BAK PENAMPUNG
0 : TANGLAPUI
0 : 2018

NO URAIAN PEKERJAAN JUMLAH

I 0 3,989,738.00
II 0 2,214,432.00
III 0 33,896,090.00

IV 0 5,165,760.00
V 0 69,500.00

VI 0 1,664,480.00

Jumlah 47,000,000.00
Dibulatkan 47,000,000.00

Terbilang : Empat Puluh Tujuh Juta Rupiah

###
Kalabahi, September 2018
Konsultan Perencana
CV.KARYA CIPTA

NAJAMUDIN BEKA
Ka. Perwakilan
PEMERINTAH KABUPATEN ALOR
DINAS PENDIDIKAN
Jl. Soekarno Hatta Telp. (0386) 21103
K A L A B A H I - ALOR

RENCANA ANGGARAN BIAYA


( RAB )

Kegiatan : PENYEDIAAN SARANA PRODUKSI PERTANIAN /


PERKEBUNAN
Pekerjaan : PEMBANGUNAN RUMAH MESIN
Lokasi : TANGLAPUI
Tahun Anggaran : 2018

HARGA JUMLAH
NO URAIAN PEKERJAAN SAT VOL
SATUAN HARGA
PEMBANGUNAN RUMAH MESIN
I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi ls 1.00 700,000.00 700,000.00
2 Pengukuran & pas. bouplank ls 1.00 750,000.00 750,000.00
3 Pengadaan air kerja ls 1.00 1,371,816.90 1,371,816.90
sub jumlah I 2,821,816.90
II PEKERJAAN TANAH DAN URUGAN
1 Galian tanah pondasi m3 2.94 46,875.00 137,812.50
2 Urugan bekas tanah galian m3 0.98 14,400.00 14,112.00
3 Urugan pasir bawah pondasi t = 5 cm m3 562,500.00 -
4 Urugan pasir bawah lantai t = 10 cm m3 562,500.00 -
5 Urugan Sirtu Peninggian Lantai m3 0.68 138,750.00 93,656.25
sub jumlah II 245,580.75
III PEK. PASANGAN & BETON
1 Pek. Pasangan Anstamping m3 766,650.00 -
2 Pek. Pasangan pondasi Batu Kali 1 Pc : 5 Psr m3 1.35 1,243,300.00 1,678,455.00
3 Pek. Pas Tembok 1/2 bata 1 pc : 5 psr m2 10.75 146,950.00 1,579,712.50
4 Pek. Beton sloof 15/20 m3 4,898,600.00 -
5 Pek. Beton kolom praktis 15/15 m3 0.16 5,658,500.00 891,213.75
6 Pek. Beton ringbalk 15/20 m3 5,759,400.00 -
7 Pek. Balok Beton gewel 15/15 m3 0.06 5,759,400.00 322,526.40
sub jumlah III 4,471,907.65
IV PEK. LANTAI DAN PLESTERAN
1 Pek. Rabat beton untuk lantai bangunan m3 1,315,500.00 -
2 Pek. Speci + Acian m2 2.25 134,100.00 301,725.00
3 Pek. Plesteran dinding tembok 1 : 5 m2 21.50 48,450.00 1,041,675.00
4 Pek. Plesteran pondasi m2 1.80 48,450.00 87,210.00
5 Pek. Acian tembok, beton dan pondasi m2 23.30 9,625.00 224,262.50
sub jumlah IV 1,654,872.50
V PEK. KUSEN, DAUN PINTU & JENDELA LENGKAP
1 Pek. Kusen kayu klas I m3 0.03 5,450,000.00 163,500.00
2 Pek. daun pintu panil m2 1.60 407,500.00 652,000.00
3 Pek. engsel pintu bh 2.00 25,875.00 51,750.00
4 Pek. Kunci tanam pintu bh 1.00 153,250.00 153,250.00
sub jumlah V 1,020,500.00
VI PEK. KUDA-KUDA DAN GORDING
1 Pek. Kuda-kuda Kayu Kls II 6/12 m3 0.04 4,821,100.00 173,559.60
2 Pek. Gording kayu kls. II 6/12 m3 0.15 4,662,500.00 704,970.00
3 Pek. Lisplank 2 x 3/20 kayu Kls II m1 77,020.00 -
sub jumlah VI 878,529.60
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT VOL
SATUAN HARGA
VII PEK. ATAP DAN PLAFOND
1 Pek. Atap seng gelombang BJLS 0.20 m2 14.00 56,200.00 786,800.00
sub jumlah VII 786,800.00
VIII PEK. PENGECATAN & PEK. LAIN - LAIN
1 Pek. Cat dinding tembok m2 21.50 9,885.00 212,527.50
2 Pek. Menie kusen pintu, jendela dan Boven m2 20,560.00 -
3 Pek. Cat kusen pintu dan jendela m2 1.44 33,425.00 48,132.00
4 Pek. Politur daun pintu dan jendela m2 1.60 22,755.00 36,408.00
6 Pek. Cat atap seng m2 14,550.00 -
7 Pek. Menie listplank m2 Err:522 20,560.00 Err:522
8 Pek. Cat listplank m2 3.00 33,425.00 100,275.00
9 Pek. Residu kuda-kuda dan gording ls 300,000.00 -
10 Pek. Pembersihan menyeluruh ls 300,000.00 -
. sub jumlah VIIII 1,620,149.71
RENCANA ANGGARAN BIAYA
( RAB )

Kegiatan : PENYEDIAAN SARANA PRODUKSI PERTANIAN /


PERKEBUNAN
Pekerjaan : PEMASANGAN JARINGAN PIPA
Lokasi : TANGLAPUI
Tahun Anggaran : 2018

HARGA JUMLAH
NO URAIAN PEKERJAAN SAT VOL
SATUAN HARGA

I PEK. GALIAN TANAH


1 Galian Tanah Ls 1.00 4,500,000.00 4,500,000.00
sub jumlah 1 4,500,000.00
II PEK. PENGADAAN MESIN POMPA + GENSET
1 Pek. Pembelian Mesin Pompa Air ( Yanmar ) Bh 1.00 48,400,000.00 48,400,000.00
2 Pembelian Genset Bh 1.00 2,600,000.00 2,600,000.00
sub jumlah 2 51,000,000.00
III PEK. PEMASANGAN JARINGAN PIPA
1 Assesories Pipa Ls 1.00 1,976,100.00 1,976,100.00
2 Pemasangan Pipa Distributor PVC Power 1.5 " Bh 199.00 73,450.00 14,616,550.00
3 Pemasangan Pipa Spiral 1,5 " Bh 63.00 133,450.00 8,407,350.00
sub jumlah 3 25,000,000.00
REKAPITULASI
RENCANA ANGGARAN BIAYA
( RAB )

### : PENYEDIAAN SARANA PRODUKSI PERTANIAN /


PERKEBUNAN
0 : PEMBANGUNAN RUMAH MESIN
0 : TANGLAPUI
0 : 2018

NO URAIAN PEKERJAAN JUMLAH

I 0 2,821,816.90
II 0 245,580.75
III 0 4,471,907.65

IV 0 1,654,872.50
V 0 1,020,500.00

VI 0 878,529.60
VII 0 786,800.00
VIII 0 1,620,149.71

Jumlah 13,500,157.11
Dibulatkan 13,500,000.00

Terbilang : Delapan Puluh Satu Juta Seratus Sembilan Puluh Ribu rupiah

###
Kalabahi, September 2018
Konsultan Perencana
CV.KARYA CIPTA

NAJAMUDIN BEKA
Ka. Perwakilan
REKAPITULASI
RENCANA ANGGARAN BIAYA
( RAB )

### : PENYEDIAAN SARANA PRODUKSI PERTANIAN /


PERKEBUNAN
0 : PEMASANGAN JARINGAN PIPA
0 : TANGLAPUI
0 : 2018

NO URAIAN PEKERJAAN JUMLAH

I PEK. GALIAN TANAH 4,500,000.00

II PEK. PENGADAAN MESIN POMPA + GENSET 51,000,000.00

III PEK. PEMASANGAN JARINGAN PIPA 25,000,000.00

Jumlah 80,500,000.00
Dibulatkan 80,500,000.00

Terbilang : Delapan Puluh Satu Juta Seratus Sembilan Puluh Ribu rupiah

###
Kalabahi, September 2018
Konsultan Perencana
CV.KARYA CIPTA

NAJAMUDIN BEKA
Ka. Perwakilan