I MATERIAL DASAR
1 TANAH URUG M3 100,000.00
2 PASIR URUG M3 450,000.00
3 PASIR PASANGAN M3 450,000.00
4 PASIR BETON M3 450,000.00
5 SIRTU URUG M3 100,000.00
6 BATU BELAH/KALI/GUNUNG M3 450,000.00
7 BATU KARANG M3 450,000.00
8 SPLIT/KORAL/KRICAK PECAH M3 450,000.00
9 KAPUR PASANG M3 75,000.00
II BAHAN UTAMA
1 SEMEN PORTLAND (PC) KG 2,500.00
2 BATU BATA BH 1,000.00
3 BATACO BH 2,000.00
4 BESI BETON KG 24,000.00
5 KAWAT BETON KG 25,000.00
6 SENG GELOMBANG BJLS 0 30 LBR 75,000.00
7 SENG PLAT BJLS 0 30 LBR 35,000.00
8 SENG GELOMBANG BJLS 0 20 LBR 52,000.00
9 SENG PLAT BJLS 0 20 LBR 20,000.00
10 SENG PLAT ALMUNIUM 0 20 LBR 40,000.00
11 SENG ALUMINIUM 0.20 LBR 70,000.00
12 KERAMIK 20X20 BH 4,600.00
13 KERAMIK 25 X 25 BH 4,600.00
14 KERAMIK 30 X 30 BH 4,600.00
15 KERAMIK 40 X 40 BH 5,000.00
16 MOZAIK 30 X 30 BH 2,750.00
17 MOZAIK 20 X 20 BH 2,500.00
18 PORSELIN 11X11 BH 1,000.00
19 SEMEN WARNA KG 10,000.00
IV BAHAN SEKUNDER
1 ENGSEL DAUN PINTU BH 12,000.00
2 ENGSEL DAUN JENDELA BH 10,000.00
3 GRENDEL TANAM PINTU BH 8,000.00
4 GRENDEL TANAM JENDELA BH 8,000.00
5 HAK / KAIT ANGIN BH 12,000.00
6 KUNCI TANAM 2 SLAAG ex YALLE (KUNING) BH 110,000.00
7 KUNCI TANAM KM/WC BH 80,000.00
8 PAKU BESAR KG 17,000.00
9 PAKU KECIL KG 20,000.00
10 PAKU SENG KG 25,000.00
11 LEM KAYU/WEBBER/AICA AIBON KG 30,000.00
V BAHAN FINISHING
1 CAT TEMBOK/DINDING KG 8,000.00
2 DEMPUL TEMBOK/DINDING KG 15,000.00
3 CAT KAYU KG 25,000.00
4 CAT MENIE KG 20,000.00
5 CAT SENG KG 30,000.00
6 MINYAK CAT LTR 15,000.00
7 MINYAK BEKESTING LTR 10,000.00
8 RESIDU LTR 12,000.00
9 TEAK OIL LTR 40,000.00
10 POLITUR LTR 40,000.00
11 POLITUR JADI LTR 40,000.00
12 AMPLAS / KERTAS GOSOK LBR 4,000.00
13 DEMPUL KAYU KG 30,000.00
14 KUAS BH 6,000.00
VI BAHAN SANITAIR
1 PIPA SPIRAL 1.5 " M` 100,000.00
2 PIPA GIP 0 3/4" MED B M` 18,000.00
3 PIPA GIP 0 1" MED B M` 25,000.00
4 PIPA GIP 0 11/2" MED B M` 35,000.00
5 PIPA SPIRAL 2 " M` 25,000.00
6 PIPA PRALON PVC 1.5 M` 50,000.00
7 PIPA PRALON PVC 0 3" AW M` 27,000.00
8 PIPA PRALON PVC 0 4" AW M` 32,000.00
9 PIPA PRALON PVC 2" AW M` 25,000.00
10 CLOSET JONGKOK MERK INA BH 80,000.00
11 STOP KRAN 0 1/2" BH 25,000.00
12 SEAL TAPE BH 2,000.00
13 FLOOR DRAIN BH 20,000.00
14 PENGURAS BAK DARI KUNINGAN BH 20,000.00
15 IJUK M3 65,000.00
16 PAS. SOCKET dia 1/2" BH 1,750.00
17 PAS. SOCKET dia 3/4" BH 2,000.00
18 PAS. REDUSER dia 3/4" - 1/2" BH 2,500.00
19 PAS. WATER MOOR 1/2" BH 3,000.00
1 2 3 4
VII BAHAN LISTRIK
1 KABEL NYM 2,5 mm M1 12,000.00
2 PIPA PVC 0,5" M1 5,000.00
3 T DOS BH 2,250.00
4 ISOLASI BH 2,500.00
5 BENANG ISOLASI ROL 3,000.00
6 ISOLATOR CAP BH 7,500.00
7 ISOLATOR KECIL BH 6,500.00
8 GROUDING DARI KUNINGAN/TEMBAGA BH 38,500.00
9 KABEL GROUND 2X5 mm M1 22,500.00
10 SAKLAR TUNGGAL BH 12,500.00
11 SAKLAR GANDA BH 15,000.00
12 STOP KONTAK BH 14,000.00
13 BOX SEKRING 1 FASE UNIT 50,000.00
14 BOX SEKRING 2 FASE UNIT 60,000.00
15 LAMPU TL 40 WATT (KOMPLIT) UNIT 55,000.00
16 LAMPU TL 20 WATT (KOMPLIT) UNIT 35,000.00
17 VITTING/CAP LAMPU PIJAR BH 7,500.00
18 LAMPU PHILIPS 23 WATT BH 40,000.00
19 LAMPU PHILIPS 18 WATT BH 32,000.00
20 PAGAR BRC M1 350,000.00
REKAPITULASI UMUM
RENCANA ANGGARAN BIAYA
( RAB )
Jumlah 141,000,000.00
Dibulatkan 141,000,000.00
###
Kalabahi, September 2018
Mengetahui, Dibuat Oleh,
Pejabat Pembuat Komitmen ( PPK ) Konsultan Perencana
CV.KARYA CIPTA
luas kusen
-pintu
-jendela
-gewel
24 plesteran tembok
luas tembok
-kiri
-kanan
- tengah
-depan
-belakang
-gewel kiri
-gewel kanan
-kolom teras
25 plesteran pondasi
luas pondasi
-kiri 9.10 9.20
-kanan 9.10 9.20
- tengah 16.30 16.30
-depan 16.30 16.40
-belakang 16.30 16.40
26 lisplank 18.00 12.40
27 plafon
- RKB
- Selasar depan 16.20 2.80
- Selasar belakang 16.20 0.80
- Kiri 6.20 0.90
- Kanan 6.20 0.90
27 listplafon
- RKB 7.85 7.85 6.85 6.85
- Selasar depan 18.00 15.85 - -
- Selasar belakang 18.00 15.85
- Kiri 6.20 6.20
- Kanan 6.20 6.20
29.40
33.85
33.85
12.40
12.40
121.90 121.90
15.00 7.00 105.00
1.00 7.00 7.00
1.00 2.00 2.00
4.00 2.00 8.00
3.00 2.00 6.00
6.00 10.00 60.00
3.00 10.00 30.00
3.00 10.00 30.00
pintu gewel
133.26 29.29 14.046
96.6
13.44
12.7764 0.34
KONSULTAN PERENCANA
CV.KARYA CIPTA
Kedelang, Kalabahi - Timur
PEMERINTAH KABUPATEN ALOR
DINAS PENDIDIKAN
Jl. Soekarno Hatta Telp. (0386) 21103
K A L A B A H I - ALOR
REKAPITULASI
RENCANA ANGGARAN BIAYA
( RAB )
### 0
0
0 0
0 : SD IMPRES LUBALA - Kec. ATU
0 0
I 0 0.00
II 0 0.00
III 0 0.00
IV 0 0.00
V 0 0.00
VI 0 0.00
VII 0 0.00
VIII 0 0.00
VIII 0 0.00
Jumlah 0.00
Dibulatkan 0.00
###
Kalabahi, Oktober 2008
Konsultan Perencana
CV. DWIPA MITRA Perwkl. Alor
AGUS PLAITUKA, ST
Ka. Perwakilan
PEMERINTAH KABUPATEN ALOR
DINAS PENDIDIKAN
Jl. Soekarno Hatta Telp. (0386) 21103
K A L A B A H I - ALOR
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT VOL
SATUAN HARGA
I PEKERJAAN PERSIAPAN
R E KAP I T U LAS I
RENCANA ANGGARAN BIAYA
( RAB )
AGUS PLAITUKA, ST
Ka. Perwakilan
PEMERINTAH KABUPATEN ALOR
DINAS PENDIDIKAN
Jl. Soekarno Hatta Telp. (0386) 21103
K A L A B A H I - ALOR
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT VOL
SATUAN HARGA
I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi ls 1.00 700,000.00 700,000.00
2 Pengukuran & pas. bouplank ls 1.00 750,000.00 750,000.00
3 Pengadaan air kerja ls 1.00 2,539,738.00 2,539,738.00
sub jumlah I 3,989,738.00
II PEKERJAAN TANAH DAN URUGAN
1 Galian tanah pondasi m3 3.84 46,875.00 180,000.00
2 Urugan bekas tanah galian m3 1.28 14,400.00 18,432.00
3 Urugan pasir bawah pondasi t = 5 cm m3 0.80 562,500.00 450,000.00
4 Urugan pasir bawah lantai t = 10 cm m3 1.60 562,500.00 900,000.00
5 Urugan Sirtu Peninggian Lantai m3 4.80 138,750.00 666,000.00
sub jumlah II 2,214,432.00
III PEK. PASANGAN & BETON
1 Pek. Pasangan Batu Kosong / Aanstamping m3 3.20 766,650.00 2,453,280.00
2 Pek. Pasangan pondasi Batu Kali 1 Pc : 5 Psr m3 16.70 1,243,300.00 20,763,110.00
3 Pek. Pas Tembok 1/2 bata 1 pc : 5 psr m2 24.00 146,950.00 3,526,800.00
4 Pek. Beton sloof 15/20 m3 0.48 4,898,600.00 2,351,328.00
5 Pek. Beton kolom praktis 15/15 m3 0.36 5,658,500.00 2,037,060.00
6 Pek. Beton ringbalk 15/20 m3 0.48 5,759,400.00 2,764,512.00
sub jumlah III 33,896,090.00
IV PEK. LANTAI DAN PLESTERAN
1 Pek. Rabat beton untuk lantai bangunan m3 1,315,500.00 -
2 Pek. Speci + Acian m2 16.00 134,100.00 2,145,600.00
3 Pek. Plesteran dinding tembok 1 : 5 m2 48.00 48,450.00 2,325,600.00
4 Pek. Plesteran pondasi m2 4.80 48,450.00 232,560.00
5 Pek. Acian tembok, beton dan pondasi m2 48.00 9,625.00 462,000.00
sub jumlah IV 5,165,760.00
VIII PEK. SANITAIR
1 Pas. Kran air 1/5 bh 2.00 34,750.00 69,500.00
sub jumlah VIII 69,500.00
IX PEK. PENGECATAN & PEK. LAIN - LAIN
1 Pek. Cat dinding tembok m2 48.00 9,885.00 474,480.00
10 Pek. Pembersihan menyeluruh ls 1.00 1,190,000.00 1,190,000.00
. sub jumlah VIIII 1,664,480.00
PEMERINTAH KABUPATEN ALOR
DINAS PENDIDIKAN
Jl. Soekarno Hatta Telp. (0386) 21103
K A L A B A H I - ALOR
REKAPITULASI
RENCANA ANGGARAN BIAYA
( RAB )
I 0 3,989,738.00
II 0 2,214,432.00
III 0 33,896,090.00
IV 0 5,165,760.00
V 0 69,500.00
VI 0 1,664,480.00
Jumlah 47,000,000.00
Dibulatkan 47,000,000.00
###
Kalabahi, September 2018
Konsultan Perencana
CV.KARYA CIPTA
NAJAMUDIN BEKA
Ka. Perwakilan
PEMERINTAH KABUPATEN ALOR
DINAS PENDIDIKAN
Jl. Soekarno Hatta Telp. (0386) 21103
K A L A B A H I - ALOR
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT VOL
SATUAN HARGA
PEMBANGUNAN RUMAH MESIN
I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi ls 1.00 700,000.00 700,000.00
2 Pengukuran & pas. bouplank ls 1.00 750,000.00 750,000.00
3 Pengadaan air kerja ls 1.00 1,371,816.90 1,371,816.90
sub jumlah I 2,821,816.90
II PEKERJAAN TANAH DAN URUGAN
1 Galian tanah pondasi m3 2.94 46,875.00 137,812.50
2 Urugan bekas tanah galian m3 0.98 14,400.00 14,112.00
3 Urugan pasir bawah pondasi t = 5 cm m3 562,500.00 -
4 Urugan pasir bawah lantai t = 10 cm m3 562,500.00 -
5 Urugan Sirtu Peninggian Lantai m3 0.68 138,750.00 93,656.25
sub jumlah II 245,580.75
III PEK. PASANGAN & BETON
1 Pek. Pasangan Anstamping m3 766,650.00 -
2 Pek. Pasangan pondasi Batu Kali 1 Pc : 5 Psr m3 1.35 1,243,300.00 1,678,455.00
3 Pek. Pas Tembok 1/2 bata 1 pc : 5 psr m2 10.75 146,950.00 1,579,712.50
4 Pek. Beton sloof 15/20 m3 4,898,600.00 -
5 Pek. Beton kolom praktis 15/15 m3 0.16 5,658,500.00 891,213.75
6 Pek. Beton ringbalk 15/20 m3 5,759,400.00 -
7 Pek. Balok Beton gewel 15/15 m3 0.06 5,759,400.00 322,526.40
sub jumlah III 4,471,907.65
IV PEK. LANTAI DAN PLESTERAN
1 Pek. Rabat beton untuk lantai bangunan m3 1,315,500.00 -
2 Pek. Speci + Acian m2 2.25 134,100.00 301,725.00
3 Pek. Plesteran dinding tembok 1 : 5 m2 21.50 48,450.00 1,041,675.00
4 Pek. Plesteran pondasi m2 1.80 48,450.00 87,210.00
5 Pek. Acian tembok, beton dan pondasi m2 23.30 9,625.00 224,262.50
sub jumlah IV 1,654,872.50
V PEK. KUSEN, DAUN PINTU & JENDELA LENGKAP
1 Pek. Kusen kayu klas I m3 0.03 5,450,000.00 163,500.00
2 Pek. daun pintu panil m2 1.60 407,500.00 652,000.00
3 Pek. engsel pintu bh 2.00 25,875.00 51,750.00
4 Pek. Kunci tanam pintu bh 1.00 153,250.00 153,250.00
sub jumlah V 1,020,500.00
VI PEK. KUDA-KUDA DAN GORDING
1 Pek. Kuda-kuda Kayu Kls II 6/12 m3 0.04 4,821,100.00 173,559.60
2 Pek. Gording kayu kls. II 6/12 m3 0.15 4,662,500.00 704,970.00
3 Pek. Lisplank 2 x 3/20 kayu Kls II m1 77,020.00 -
sub jumlah VI 878,529.60
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT VOL
SATUAN HARGA
VII PEK. ATAP DAN PLAFOND
1 Pek. Atap seng gelombang BJLS 0.20 m2 14.00 56,200.00 786,800.00
sub jumlah VII 786,800.00
VIII PEK. PENGECATAN & PEK. LAIN - LAIN
1 Pek. Cat dinding tembok m2 21.50 9,885.00 212,527.50
2 Pek. Menie kusen pintu, jendela dan Boven m2 20,560.00 -
3 Pek. Cat kusen pintu dan jendela m2 1.44 33,425.00 48,132.00
4 Pek. Politur daun pintu dan jendela m2 1.60 22,755.00 36,408.00
6 Pek. Cat atap seng m2 14,550.00 -
7 Pek. Menie listplank m2 Err:522 20,560.00 Err:522
8 Pek. Cat listplank m2 3.00 33,425.00 100,275.00
9 Pek. Residu kuda-kuda dan gording ls 300,000.00 -
10 Pek. Pembersihan menyeluruh ls 300,000.00 -
. sub jumlah VIIII 1,620,149.71
RENCANA ANGGARAN BIAYA
( RAB )
HARGA JUMLAH
NO URAIAN PEKERJAAN SAT VOL
SATUAN HARGA
I 0 2,821,816.90
II 0 245,580.75
III 0 4,471,907.65
IV 0 1,654,872.50
V 0 1,020,500.00
VI 0 878,529.60
VII 0 786,800.00
VIII 0 1,620,149.71
Jumlah 13,500,157.11
Dibulatkan 13,500,000.00
Terbilang : Delapan Puluh Satu Juta Seratus Sembilan Puluh Ribu rupiah
###
Kalabahi, September 2018
Konsultan Perencana
CV.KARYA CIPTA
NAJAMUDIN BEKA
Ka. Perwakilan
REKAPITULASI
RENCANA ANGGARAN BIAYA
( RAB )
Jumlah 80,500,000.00
Dibulatkan 80,500,000.00
Terbilang : Delapan Puluh Satu Juta Seratus Sembilan Puluh Ribu rupiah
###
Kalabahi, September 2018
Konsultan Perencana
CV.KARYA CIPTA
NAJAMUDIN BEKA
Ka. Perwakilan