15.1 M2- PEK.PASANGAN BATA MERAH TRANSRAM 1/2 BATA 1PC: 3PSR
16.1 M2- PEK.PASANGAN BATA MERAH BIASA 1/2 BATA 1PC: 5PSR
NO URAIAN PEKERJAAN SATUAN HARGA SATUAN KUANTITAS JUMLAH HARGA JUMLAH HARGA
A. TENAGA KERJA
1 PEKERJA ORG/HARI 30000.00 0.01 300
2 MANDOR ORG/HARI 42000.00 0.005 210
3 TUKANG LISTRIK ORG/HARI 40000.00 0.100 4000
4 KEPALA TUKANG ORG/HARI 45000.00 0.010 450
JUMLAH 4960
B BAHAN
1 LAMPU PIJAR 25 WATT TITIK 4000.00 0.030 120.00 5,080.00
2 LAMPU TL 60 WATT TITIK 80000.00 0.010 800.00 5,760.00
3 STOP KONTAK BH 14000.00 0.010 140.00 5,100.00
4 SAKLAR GANDA BH 13000.00 0.010 130.00 5,090.00
5 SAKLAR TUNGGAL BH 10000.00 0.020 200.00 5,160.00
6 KOTAK MCB BH 75000.00 0.010 750.00 5,710.00
7 KABEL NYM M 80000.00 2.200 176,000.00 180,960.00
8 FITING PLAFOND BH 12000.00 0.030 360.00 5,320.00
9 PENYA. DAYA PLN UNIT 3000000.00 1.000 3,000,000.00 3,004,960.00
JUMLAH
HARGA ( A+ B ) 3,223,140.00
50. 1M2- PENGECETAN KUSEN PINTU DAN VENTILASI ( P-1, P-2, P-3 ) + ( V-1, V-2)
I PEKERJAAN PLAFOND
1 PEK.RANGKA PLAFOND 5/7 47 M2 30,796.80 1,447,449.60
2 PEK. PEMASANGAN TRIPLEKS 47 M2 9,201.00 432,447.00
3 PEK. LIST PLAFOND KAYU 5 CM DI PROFIL 73 M 20,530.00 1,498,690.00
4 PEK. LIST KAYU 1 x 4 CM 48 M 20,530.00 985,440.00
TOTAL 4,364,026.60
M PEKERJAAN SANITAIR
1 PEK. BAK AIR 1 BH 109,370.00 109,370.00
2 PEK. KLOSED JONGKOK 1 BH 257,420.00 257,420.00
3 PEK. KRAN AIR LUAR & DALAM 1 BH 25,002.50 25,002.50
4 PEK. FLOOR DRAIN 1 BH 38,960.00 38,960.00
5 PAS. TAMPAT SABUN PORSELIN 1 BH 9,960.00 9,960.00
TOTAL 440,712.50
TERBILANG @ LIMA PULUH EMPAT JUTA LIMA RATUS DELAPAN PULUH LIMA RIBU RUPIAH