LAPORAN KEMAJUAN FISIK PEKERJAAN
PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH MAGISTER MANAJEMEN UHO
N0. KONTRAK : 32-1/UN29.PPK-PNBPBLU.09/2018
NILAI KONTRAK : Rp. 3.597.780.000,-
TGL. KONTRAK : 17 SEPTEMBER 2018
KONTRAKTOR PELAKSANA : PT. RAJAWALI LINTAR PERSADA
KONSULTAN PENGAWAS : CV. CITRA JAYA KONSULTANT
V PEKERJAAN KUSEN
1 Pek. Pintu Utama Kaca 10 Mm Frameless floor hinge dorma BTS 84 2.00 Buah 9,000,000.00 0.28 -
2 Pek. Bingkai Pintu Aluminium Swing 11.40 M1 2,731,554.00 0.08 -
3 Pek. Kusen Pintu dan Jendela Aluminium Open Back 4" Ex. Alu Pri 464.80 M1 59,002,527.54 1.80 -
4 Pek. Jendela Kesmen Aluminium Ex. Alu Prima 217.30 M1 25,789,815.90 0.79 -
5 Pek. Daun Pintu Aluminium Spandrell KM/Wc 4.00 Unit 6,000,000.00 0.18 -
6 Pek. Membuat 1 Buah Pintu Bahan Multipleks Fin. Taco HPL 15.00 M2 30,363,645.00 0.93 -
7 Pek. Ventilasi Atap Jalusi Miring Aluminium 2.00 Unit 1,200,000.00 0.04 -
8 Pek. Pasangan Kaca Bening 5 Mm Ex. Asahimas 44.00 M2 8,063,319.26 0.25 -
9 Pek. Pasangan Bingkai Kusen Multipleks Fin. HPL 190.30 M1 22,835,452.80 0.70 -
164,986,314.50 5.04
VI PEKERJAAN LANTAI
Pek. Pasangan Lantai Utama & Tangga, Silver pearls White, Ivory 60x60 Cm
1 579.77 M2 236,277,726.49 7.22 -
2 Pek. Pasangan Lantai Km/WC Keramik Anti Slip 25x25 Cm Ex. Pla 20.62 M2 6,462,390.48 0.20 -
3 Pek. Plint Keramik Lantai 12/60 Cm 359.68 M1 21,984,720.64 0.67 -
4 Pek. Pasangan Dinding Keramik Porselin 25/40 Cm Tinggi 1,6 Meter 61.41 M2 19,395,164.13 0.59 -
5 Pek. Pasangan Dinding Batu Alam 20.00 M2 7,625,240.00 0.23 -
291,745,241.74 8.92
VII PEKERJAAN PLAFOND
1 Pek. Pasangan Rangka Plafond Hollow Galvalum 2/4 dan 4/4 Cm 696.85 M2 94,995,288.85 2.90 -
2 Pek. Pasangan Plafond Ruangan, Gypsum Board 120x240x0,9 Cm 633.55 M2 35,725,884.50 1.09 -
3 Pek. Pasangan Plafond Luar Ruangan, Gypsum Board 120x240x0,9 63.30 M2 3,569,487.00 0.11 -
4 Pek. Pasangan Less Plafond Profil Gypsum Lebar 10 Cm 476.89 M1 17,800,396.14 0.54 -
152,091,056.49 4.65
VIII PEKERJAAN KUDA_KUDA DAN ATAP
1 Pek. Pasangan Rangka Atap Baja Ringan C75.0,75 419.00 M2 110,541,418.00 3.38 -
2 Pek. Pasangan Atap Spandek 0,4 419.00 M2 38,485,150.00 1.18 -
3 Pek. Pasangan Nok/Bubungan Atap Type V 71.83 M1 7,203,170.70 0.22 -
4 Pek. Pasangan Kalsiplank 2x20 Cm 106.84 M1 7,731,262.92 0.24 -
163,961,001.62 5.01
IX PEKERJAAN SANITAIR
1 Pek. Pasangan Pipa Air Bersih PVC 1/2 " 20.00 M1 1,222,320.00 0.04 -
2 Pek. Pasangan Pipa Air Kotor cair PVC 2" 31.00 M1 5,592,400.00 0.17 -
3 Pek. Pasangan Pipa Air kotor padat PVC 4" 8.00 M1 4,521,016.00 0.14 -
4 Pek. Pasangan Pipa Pembuangan Air AC PVC 1/2" 48.00 Buah 2,933,568.00 0.09 -
5 Pek. Pasangan Kran Air 1/2" 8.00 Buah 958,312.00 0.03 -
6 Pek. Pasangan Closed duduk Standart 4.00 Buah 6,309,820.00 0.19 -
7 pek. Pasangan Floor Drain 4.00 Buah 294,284.00 0.01 -
8 Pek. Pasangan Washtafel Ex. American Standart 4.00 Buah 4,545,708.00 0.14 -
9 Pek. Pasangan Cermin 100X80 Cm 1.60 M2 725,217.60 0.02 -
10 Pek. Pembuatan Septiktank 2x3 m dan Resapan 2x2 m 1.00 m2 10,000,000.00 0.31 -
37,102,645.60 1.13
X PEKERJAAN SLURAN KELILING BANGUNAN
1 Pek. Galian Tanah Saluran 21.06 M3 1,516,699.08 0.05 -
2 Pek. Pasangan Batu Bata 1:3 117.94 M2 16,287,669.22 0.50 -
3 Pek. Plesteran Dinding Saluran 1:3 117.94 M2 8,396,807.33 0.26 -
4 Pek. Pembuatan Bak Kontrol Saluran 45x45 Cm Tinggi 50 Cm 12.00 Buah 9,318,720.00 0.28 -
5 Pek. Acian Pasta PC Seluruh Permukaan Dinding dan dasar Saluran 117.94 M2 4,814,737.20 0.15 -
6 Pek. Urugan Pasir Alas Rabat Keliling bangunan 5.57 M3 1,255,890.24 0.04 -
7 Pek. Rabat Beton Keliling Bangunan T. 7 Cm 6.68 M3 7,059,417.75 0.22 -
48,649,940.82 1.49
XI PEKERJAAN PENGGANTUNG DAN KUNCI
1 Pek. Pasangan Kunci Pintu Tanam Antik 9.00 Buah 5,056,128.00 0.15 -
2 Pek. Pasangan Kunci Pintu 2x Putar 4.00 Buah 1,107,792.00 0.03 -
3 Pek. Pasangan Handle Pintu Stainless Steel (Oval) 8.00 Buah 3,200,000.00 0.10 -
4 Pek. Pasangan Rel Pintu Dorong 1.00 Buah 584,792.00 0.02 -
5 Pek. Pasangan Engsel Pintu 54.00 Buah 3,237,516.00 0.10 -
6 Pek. Pasangan grendel Pintu 14.00 Buah 560,000.00 0.02 -
13,746,228.00 0.42
XII PEKERJAAN INSTALASI LISTRIK
1 Pek. Pasangan Titik Lampu 95.00 Titik 35,517,175.00 1.09 -
2 Pek. Pasangan Fitting lampu Downlight Ex. Panasonic Dia. 3 " 36.00 Buah 2,520,000.00 0.08 -
3 Pek. Pasangan Bola Lampu LED Panasonic 13 Watt 21.00 Buah 1,365,000.00 0.04 -
4 Pek. Pasangan Bola Lampu LED Panasonic 11 Watt 15.00 Buah 840,000.00 0.03 -
5 Pek. Pasangan kap Lampu RM 2x18 Watt 21.00 Buah 5,985,000.00 0.18 -
6 Pek. Pasangan Bola Lampu PLC 18 Watt Panasonic 18.00 Buah 614,790.00 0.02 -
7 Pek. Pasangan Saklar Ganda 12.00 Buah 276,000.00 0.01 -
8 Pek. Pasangan Saklar Tunggal 9.00 Buah 181,125.00 0.01 -
9 Pek. Pasangan Stop Kontak 15.00 Buah 258,750.00 0.01 -
10 Pek. Pasangan Stop Kontak AC 10.00 Buah 400,000.00 0.01 -
11 Pek. Pasangan Stop Kontak Data 12.00 Buah 540,000.00 0.02 -
12 Pek. Pasangan Panel Box 1.00 Buah 2,180,339.00 0.07 -
13 Pek. Pasangan Penangkal Petir dan Gorunding+Pentanahan 1.00 Set 16,000,000.00 0.49 -
66,678,179.00 2.04
-
-
-
-
-
-
-
-
- - - - - - -
-
-
-
-
-
-
- - - - - - -
-
-
-
-
-
-
-
-
- - - - - - -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- - - - - - -
-
-
-
-
-
-
-
-
-
- - - - - - -
-
-
-
-
-
- - - - - - -
-
-
-
-
- - - - - - -
-
-
-
-
- - - - - - -
-
-
-
-
-
-
-
-
-
-
- - - - - - -
-
-
-
-
-
-
-
- - - - - - -
-
-
-
-
-
-
- - - - - - -
-
-
-
-
-
-
-
-
-
-
-
-
-
- - - - - - -
-
-
- - - - - - -
-
-
-
-
-
-
-
-
-
NIHIL NIHIL NIHIL NIHIL NIHIL NIHIL NIHIL
8.35
8.35
Oleh :
................
....................
................
.................
Rencana Anggaran Biaya ( R.A.B )
### : #REF!
### : PENGADAAN MOBILER
### : #REF!
### : #REF!
HARGA
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN
( Rp. )
1 2 3 4 5
Mengetahui :
KARO SARPRAS
POLDA SULAWESI TENGGARA
HUZAIDIN AWAPA, SH
KOMBES POL/ NRP 55040554
Rekapitulasi Anggaran Biaya
KEGIATAN : #REF!
PEKERJAAN : PENGADAAN MOBILER
TAHUN ANGGARAN : 2011
LOKASI : POLDA SULAWESI TENGGARA
1 2
REAL COST ( A + B )
PPN (10%)
TOTAL COST
DIBULATKAN
Terbilang :
Tujuh Puluh Delapan Juta Sembilan Ratus Dua Puluh Ribu rupiah
Mengetahui :
KARO SARPRAS
POLDA SULAWESI TENGGARA
HUZAIDIN AWAPA, SH
KOMBES POL/ NRP 55040554
JUMLAH
HARGA
( Rp. )
6
3,500,000.00
5,700,000.00
2,500,000.00
1,200,000.00
4,500,000.00
3,750,000.00
3,750,000.00
5,000,000.00
3,600,000.00
4,250,000.00
7,500,000.00
25,000,000.00
1,500,000.00
71,750,000.00
MUSRIADIN BAHI, ST
Direktur
JUMLAH
HARGA
(Rp.)
3
71,750,000.00
71,750,000.00
7,175,000.00
78,925,000.00
78,920,000.00
bu rupiah
MUSRIADIN BAHI, ST
Direktur
LAPORAN KEMAJUAN FISIK PEKERJA
PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH MAGISTER MANAJEMEN U
N0. KONTRAK : 32-1/UN29.PPK-PNBPBLU.09/2018 MINGGU
NILAI KONTRAK : Rp. 3.597.780.000,- PERIODE
TGL. KONTRAK : 17 SEPTEMBER 2018
KONTRAKTOR PELAKSANA : PT. RAJAWALI LINTAR PERSADA
KONSULTAN PENGAWAS : CV. CITRA JAYA KONSULTANT
1 2 3 4
I. PEKERJAAN PENDAHULUAN / PERSIAPAN
1 Pek. Pembersihan Lokasi & Perataan secara Mekanis 1.00 Ls
2 Pek. Pengukuran & Pemasangan Bowplank 1.00 Ls
3 Pengadaan Air Kerja 1.00 Ls
4 Pembuatan Papan Nama Proyek 1.00 Ls
5 Pembuatan Pagar pengaman Sementara (Seng Gelombang) 112.00 M2
6 Pembuatan Bedeng Buruh 20.00 M2
7 Listrik Kerja 1.00 Ls
8 Administrasi, Foto Dokumentasi Dan P3K 1.00 Ls
Sub Total
II. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Sedalam 1 Meter 147.45 M3
2 Pek. Galian Tanah Sedalam 2 Meter 97.88 M3
3 Pek. Urugan Kembali Bekas Galian Tanah 81.77 M3
4 Pek. Urugan Tanah Timbunan Alas Lantai 368.54 M3
5 Pek. Urugan Pasir Alas Pondasi T. 6 Cm 20.10 M3
6 Pek. Urugan Pasir Alas Lantai T. 7 Cm 23.45 M3
VI PEKERJAAN LANTAI
Pek. Pasangan Lantai Utama & Tangga, Silver pearls White, Ivory 60x60 Cm
1 579.77 M2
2 Pek. Pasangan Lantai Km/WC Keramik Anti Slip 25x25 Cm Ex. Pla 20.62 M2
3 Pek. Plint Keramik Lantai 12/60 Cm 359.68 M1
4 Pek. Pasangan Dinding Keramik Porselin 25/40 Cm Tinggi 1,6 Meter 61.41 M2
5 Pek. Pasangan Dinding Batu Alam 20.00 M2
IX PEKERJAAN SANITAIR
1 Pek. Pasangan Pipa Air Bersih PVC 1/2 " 20.00 M1
2 Pek. Pasangan Pipa Air Kotor cair PVC 2" 31.00 M1
3 Pek. Pasangan Pipa Air kotor padat PVC 4" 8.00 M1
4 Pek. Pasangan Pipa Pembuangan Air AC PVC 1/2" 48.00 Buah
5 Pek. Pasangan Kran Air 1/2" 8.00 Buah
6 Pek. Pasangan Closed duduk Standart 4.00 Buah
7 pek. Pasangan Floor Drain 4.00 Buah
8 Pek. Pasangan Washtafel Ex. American Standart 4.00 Buah
9 Pek. Pasangan Cermin 100X80 Cm 1.60 M2
10 Pek. Pembuatan Septiktank 2x3 m dan Resapan 2x2 m 1.00 m2
REAL COST
PPN 10% X REAL COST
TOTAL COST
JUMLAH TOTAL PEKERJAAN
Di Setujui Oleh : Di Periksa Oleh :
........................... ...................................
.......................................... ............................................
........................................................... ...................................
............................................ .....................................
FISIK PEKERJAAN
GISTER MANAJEMEN UHO
MINGGU : KE TIGA (III)
PERIODE : 1 S/D 7 OKTOBER 2018
236,277,726.49 7.22 - -
6,462,390.48 0.20 - -
21,984,720.64 0.67 - -
19,395,164.13 0.59 - -
7,625,240.00 0.23 - -
291,745,241.74 8.92 -
94,995,288.85 2.90 - -
35,725,884.50 1.09 - -
3,569,487.00 0.11 - -
17,800,396.14 0.54 - -
152,091,056.49 4.65 -
110,541,418.00 3.38 - -
38,485,150.00 1.18 - -
7,203,170.70 0.22 - -
7,731,262.92 0.24 - -
163,961,001.62 5.01 -
1,222,320.00 0.04 - -
5,592,400.00 0.17 - -
4,521,016.00 0.14 - -
2,933,568.00 0.09 - -
958,312.00 0.03 - -
6,309,820.00 0.19 - -
294,284.00 0.01 - -
4,545,708.00 0.14 - -
725,217.60 0.02 - -
10,000,000.00 0.31 - -
37,102,645.60 1.13 -
1,516,699.08 0.05 - -
16,287,669.22 0.50 - -
8,396,807.33 0.26 - -
9,318,720.00 0.28 - -
4,814,737.20 0.15 - -
1,255,890.24 0.04 - -
7,059,417.75 0.22 - -
48,649,940.82 1.49 -
5,056,128.00 0.15 - -
1,107,792.00 0.03 - -
3,200,000.00 0.10 - -
584,792.00 0.02 - -
3,237,516.00 0.10 - -
560,000.00 0.02 - -
13,746,228.00 0.42 -
35,517,175.00 1.09 - -
2,520,000.00 0.08 - -
1,365,000.00 0.04 - -
840,000.00 0.03 - -
5,985,000.00 0.18 - -
614,790.00 0.02 - -
276,000.00 0.01 - -
181,125.00 0.01 - -
258,750.00 0.01 - -
400,000.00 0.01 - -
540,000.00 0.02 - -
2,180,339.00 0.07 - -
16,000,000.00 0.49 - -
66,678,179.00 2.04 -
81,472,831.51 2.49 - -
32,342,202.20 0.99 - -
113,815,033.71 3.48 -
5,000,000.00 0.15 - -
7,247,500.00 0.22 - -
825,000.00 0.03 - -
6,874,800.00 0.21 - -
11,423,770.24 0.35 - -
8,000,000.00 0.24 - -
8,500,000.00 0.26 - -
2,500,000.00 0.08 - -
50,371,070.24 1.54 -
3,270,711,382.63 100.00 11.60
327,071,138.26 RENCANA
3,597,782,520.89 DEVIASI MINUS
3,597,780,000.00
Di Buat Oleh :
...................................
............................................
...................................
.....................................
LAPORAN KEMAJUAN FISIK PEKERJA
PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH MAGISTER MANAJEMEN U
N0. KONTRAK : 32-1/UN29.PPK-PNBPBLU.09/2018 MINGGU
NILAI KONTRAK : Rp. 3.597.780.000,- PERIODE
TGL. KONTRAK : 17 SEPTEMBER 2018
KONTRAKTOR PELAKSANA : PT. RAJAWALI LINTAR PERSADA
KONSULTAN PENGAWAS : CV. CITRA JAYA KONSULTANT
1 2 3 4
I. PEKERJAAN PENDAHULUAN / PERSIAPAN
1 Pek. Pembersihan Lokasi & Perataan secara Mekanis 1.00 Ls
2 Pek. Pengukuran & Pemasangan Bowplank 1.00 Ls
3 Pengadaan Air Kerja 1.00 Ls
4 Pembuatan Papan Nama Proyek 1.00 Ls
5 Pembuatan Pagar pengaman Sementara (Seng Gelombang) 112.00 M2
6 Pembuatan Bedeng Buruh 20.00 M2
7 Listrik Kerja 1.00 Ls
8 Administrasi, Foto Dokumentasi Dan P3K 1.00 Ls
Sub Total
II. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Sedalam 1 Meter 147.45 M3
2 Pek. Galian Tanah Sedalam 2 Meter 97.88 M3
3 Pek. Urugan Kembali Bekas Galian Tanah 81.77 M3
4 Pek. Urugan Tanah Timbunan Alas Lantai 368.54 M3
5 Pek. Urugan Pasir Alas Pondasi T. 6 Cm 20.10 M3
6 Pek. Urugan Pasir Alas Lantai T. 7 Cm 23.45 M3
VI PEKERJAAN LANTAI
Pek. Pasangan Lantai Utama & Tangga, Silver pearls White, Ivory 60x60 Cm
1 579.77 M2
2 Pek. Pasangan Lantai Km/WC Keramik Anti Slip 25x25 Cm Ex. Pla 20.62 M2
3 Pek. Plint Keramik Lantai 12/60 Cm 359.68 M1
4 Pek. Pasangan Dinding Keramik Porselin 25/40 Cm Tinggi 1,6 Meter 61.41 M2
5 Pek. Pasangan Dinding Batu Alam 20.00 M2
IX PEKERJAAN SANITAIR
1 Pek. Pasangan Pipa Air Bersih PVC 1/2 " 20.00 M1
2 Pek. Pasangan Pipa Air Kotor cair PVC 2" 31.00 M1
3 Pek. Pasangan Pipa Air kotor padat PVC 4" 8.00 M1
4 Pek. Pasangan Pipa Pembuangan Air AC PVC 1/2" 48.00 Buah
5 Pek. Pasangan Kran Air 1/2" 8.00 Buah
6 Pek. Pasangan Closed duduk Standart 4.00 Buah
7 pek. Pasangan Floor Drain 4.00 Buah
8 Pek. Pasangan Washtafel Ex. American Standart 4.00 Buah
9 Pek. Pasangan Cermin 100X80 Cm 1.60 M2
10 Pek. Pembuatan Septiktank 2x3 m dan Resapan 2x2 m 1.00 m2
REAL COST
PPN 10% X REAL COST
TOTAL COST
JUMLAH TOTAL PEKERJAAN
Di Setujui Oleh : Di Periksa Oleh :
........................... ...................................
.......................................... ............................................
........................................................... ...................................
............................................ .....................................
FISIK PEKERJAAN
GISTER MANAJEMEN UHO
MINGGU : KE EMPAT (IV)
PERIODE : 8 S/D 14 OKTOBER 2018
236,277,726.49 7.22 - -
6,462,390.48 0.20 - -
21,984,720.64 0.67 - -
19,395,164.13 0.59 - -
7,625,240.00 0.23 - -
291,745,241.74 8.92 -
94,995,288.85 2.90 - -
35,725,884.50 1.09 - -
3,569,487.00 0.11 - -
17,800,396.14 0.54 - -
152,091,056.49 4.65 -
110,541,418.00 3.38 - -
38,485,150.00 1.18 - -
7,203,170.70 0.22 - -
7,731,262.92 0.24 - -
163,961,001.62 5.01 -
1,222,320.00 0.04 - -
5,592,400.00 0.17 - -
4,521,016.00 0.14 - -
2,933,568.00 0.09 - -
958,312.00 0.03 - -
6,309,820.00 0.19 - -
294,284.00 0.01 - -
4,545,708.00 0.14 - -
725,217.60 0.02 - -
10,000,000.00 0.31 - -
37,102,645.60 1.13 -
1,516,699.08 0.05 - -
16,287,669.22 0.50 - -
8,396,807.33 0.26 - -
9,318,720.00 0.28 - -
4,814,737.20 0.15 - -
1,255,890.24 0.04 - -
7,059,417.75 0.22 - -
48,649,940.82 1.49 -
5,056,128.00 0.15 - -
1,107,792.00 0.03 - -
3,200,000.00 0.10 - -
584,792.00 0.02 - -
3,237,516.00 0.10 - -
560,000.00 0.02 - -
13,746,228.00 0.42 -
35,517,175.00 1.09 - -
2,520,000.00 0.08 - -
1,365,000.00 0.04 - -
840,000.00 0.03 - -
5,985,000.00 0.18 - -
614,790.00 0.02 - -
276,000.00 0.01 - -
181,125.00 0.01 - -
258,750.00 0.01 - -
400,000.00 0.01 - -
540,000.00 0.02 - -
2,180,339.00 0.07 - -
16,000,000.00 0.49 - -
66,678,179.00 2.04 -
81,472,831.51 2.49 - -
32,342,202.20 0.99 - -
113,815,033.71 3.48 -
5,000,000.00 0.15 - -
7,247,500.00 0.22 - -
825,000.00 0.03 - -
6,874,800.00 0.21 - -
11,423,770.24 0.35 - -
8,000,000.00 0.24 - -
8,500,000.00 0.26 - -
2,500,000.00 0.08 - -
50,371,070.24 1.54 -
3,270,711,382.63 100.00 13.62
327,071,138.26 RENCANA
3,597,782,520.89 DEVIASI MINUS
3,597,780,000.00
Di Buat Oleh :
...................................
............................................
...................................
.....................................
LAPORAN KEMAJUAN FISIK PEKERJA
PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH MAGISTER MANAJEMEN U
N0. KONTRAK : 32-1/UN29.PPK-PNBPBLU.09/2018 BULAN
NILAI KONTRAK : Rp. 3.597.780.000,- PERIODE
TGL. KONTRAK : 17 SEPTEMBER 2018
KONTRAKTOR PELAKSANA : PT. RAJAWALI LINTAR PERSADA
KONSULTAN PENGAWAS : CV. CITRA JAYA KONSULTANT
1 2 3 4
I. PEKERJAAN PENDAHULUAN / PERSIAPAN
1 Pek. Pembersihan Lokasi & Perataan secara Mekanis 1.00 Ls
2 Pek. Pengukuran & Pemasangan Bowplank 1.00 Ls
3 Pengadaan Air Kerja 1.00 Ls
4 Pembuatan Papan Nama Proyek 1.00 Ls
5 Pembuatan Pagar pengaman Sementara (Seng Gelombang) 112.00 M2
6 Pembuatan Bedeng Buruh 20.00 M2
7 Listrik Kerja 1.00 Ls
8 Administrasi, Foto Dokumentasi Dan P3K 1.00 Ls
Sub Total
II. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Sedalam 1 Meter 147.45 M3
2 Pek. Galian Tanah Sedalam 2 Meter 97.88 M3
3 Pek. Urugan Kembali Bekas Galian Tanah 81.77 M3
4 Pek. Urugan Tanah Timbunan Alas Lantai 368.54 M3
5 Pek. Urugan Pasir Alas Pondasi T. 6 Cm 20.10 M3
6 Pek. Urugan Pasir Alas Lantai T. 7 Cm 23.45 M3
VI PEKERJAAN LANTAI
Pek. Pasangan Lantai Utama & Tangga, Silver pearls White, Ivory 60x60 Cm
1 579.77 M2
2 Pek. Pasangan Lantai Km/WC Keramik Anti Slip 25x25 Cm Ex. Pla 20.62 M2
3 Pek. Plint Keramik Lantai 12/60 Cm 359.68 M1
4 Pek. Pasangan Dinding Keramik Porselin 25/40 Cm Tinggi 1,6 Meter 61.41 M2
5 Pek. Pasangan Dinding Batu Alam 20.00 M2
IX PEKERJAAN SANITAIR
1 Pek. Pasangan Pipa Air Bersih PVC 1/2 " 20.00 M1
2 Pek. Pasangan Pipa Air Kotor cair PVC 2" 31.00 M1
3 Pek. Pasangan Pipa Air kotor padat PVC 4" 8.00 M1
4 Pek. Pasangan Pipa Pembuangan Air AC PVC 1/2" 48.00 Buah
5 Pek. Pasangan Kran Air 1/2" 8.00 Buah
6 Pek. Pasangan Closed duduk Standart 4.00 Buah
7 pek. Pasangan Floor Drain 4.00 Buah
8 Pek. Pasangan Washtafel Ex. American Standart 4.00 Buah
9 Pek. Pasangan Cermin 100X80 Cm 1.60 M2
10 Pek. Pembuatan Septiktank 2x3 m dan Resapan 2x2 m 1.00 m2
REAL COST
PPN 10% X REAL COST
TOTAL COST
JUMLAH TOTAL PEKERJAAN
Di Setujui Oleh : Di Periksa Oleh :
........................... ...................................
.......................................... ............................................
........................................................... ...................................
............................................ .....................................
FISIK PEKERJAAN
GISTER MANAJEMEN UHO
BULAN : KE SATU (I)
PERIODE : 17 SEP. S/D 14 OKTOBER 2018
236,277,726.49 7.22 - -
6,462,390.48 0.20 - -
21,984,720.64 0.67 - -
19,395,164.13 0.59 - -
7,625,240.00 0.23 - -
291,745,241.74 8.92 -
94,995,288.85 2.90 - -
35,725,884.50 1.09 - -
3,569,487.00 0.11 - -
17,800,396.14 0.54 - -
152,091,056.49 4.65 -
110,541,418.00 3.38 - -
38,485,150.00 1.18 - -
7,203,170.70 0.22 - -
7,731,262.92 0.24 - -
163,961,001.62 5.01 -
1,222,320.00 0.04 - -
5,592,400.00 0.17 - -
4,521,016.00 0.14 - -
2,933,568.00 0.09 - -
958,312.00 0.03 - -
6,309,820.00 0.19 - -
294,284.00 0.01 - -
4,545,708.00 0.14 - -
725,217.60 0.02 - -
10,000,000.00 0.31 - -
37,102,645.60 1.13 -
1,516,699.08 0.05 - -
16,287,669.22 0.50 - -
8,396,807.33 0.26 - -
9,318,720.00 0.28 - -
4,814,737.20 0.15 - -
1,255,890.24 0.04 - -
7,059,417.75 0.22 - -
48,649,940.82 1.49 -
5,056,128.00 0.15 - -
1,107,792.00 0.03 - -
3,200,000.00 0.10 - -
584,792.00 0.02 - -
3,237,516.00 0.10 - -
560,000.00 0.02 - -
13,746,228.00 0.42 -
35,517,175.00 1.09 - -
2,520,000.00 0.08 - -
1,365,000.00 0.04 - -
840,000.00 0.03 - -
5,985,000.00 0.18 - -
614,790.00 0.02 - -
276,000.00 0.01 - -
181,125.00 0.01 - -
258,750.00 0.01 - -
400,000.00 0.01 - -
540,000.00 0.02 - -
2,180,339.00 0.07 - -
16,000,000.00 0.49 - -
66,678,179.00 2.04 -
81,472,831.51 2.49 - -
32,342,202.20 0.99 - -
113,815,033.71 3.48 -
5,000,000.00 0.15 - -
7,247,500.00 0.22 - -
825,000.00 0.03 - -
6,874,800.00 0.21 - -
11,423,770.24 0.35 - -
8,000,000.00 0.24 - -
8,500,000.00 0.26 - -
2,500,000.00 0.08 - -
50,371,070.24 1.54 -
3,270,711,382.63 100.00 13.62
327,071,138.26 RENCANA
3,597,782,520.89 DEVIASI MINUS
3,597,780,000.00
Di Buat Oleh :
...................................
............................................
...................................
.....................................
LAPORAN KEMAJUAN FISIK PEKERJA
PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH MAGISTER MANAJEMEN U
N0. KONTRAK : 32-1/UN29.PPK-PNBPBLU.09/2018 MINGGU
NILAI KONTRAK : Rp. 3.597.780.000,- PERIODE
TGL. KONTRAK : 17 SEPTEMBER 2018
KONTRAKTOR PELAKSANA : PT. RAJAWALI LINTAR PERSADA
KONSULTAN PENGAWAS : CV. CITRA JAYA KONSULTANT
1 2 3 4
I. PEKERJAAN PENDAHULUAN / PERSIAPAN
1 Pek. Pembersihan Lokasi & Perataan secara Mekanis 1.00 Ls
2 Pek. Pengukuran & Pemasangan Bowplank 1.00 Ls
3 Pengadaan Air Kerja 1.00 Ls
4 Pembuatan Papan Nama Proyek 1.00 Ls
5 Pembuatan Pagar pengaman Sementara (Seng Gelombang) 112.00 M2
6 Pembuatan Bedeng Buruh 20.00 M2
7 Listrik Kerja 1.00 Ls
8 Administrasi, Foto Dokumentasi Dan P3K 1.00 Ls
Sub Total
II. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Sedalam 1 Meter 147.45 M3
2 Pek. Galian Tanah Sedalam 2 Meter 97.88 M3
3 Pek. Urugan Kembali Bekas Galian Tanah 81.77 M3
4 Pek. Urugan Tanah Timbunan Alas Lantai 368.54 M3
5 Pek. Urugan Pasir Alas Pondasi T. 6 Cm 20.10 M3
6 Pek. Urugan Pasir Alas Lantai T. 7 Cm 23.45 M3
VI PEKERJAAN LANTAI
Pek. Pasangan Lantai Utama & Tangga, Silver pearls White, Ivory 60x60 Cm
1 579.77 M2
2 Pek. Pasangan Lantai Km/WC Keramik Anti Slip 25x25 Cm Ex. Pla 20.62 M2
3 Pek. Plint Keramik Lantai 12/60 Cm 359.68 M1
4 Pek. Pasangan Dinding Keramik Porselin 25/40 Cm Tinggi 1,6 Meter 61.41 M2
5 Pek. Pasangan Dinding Batu Alam 20.00 M2
IX PEKERJAAN SANITAIR
1 Pek. Pasangan Pipa Air Bersih PVC 1/2 " 20.00 M1
2 Pek. Pasangan Pipa Air Kotor cair PVC 2" 31.00 M1
3 Pek. Pasangan Pipa Air kotor padat PVC 4" 8.00 M1
4 Pek. Pasangan Pipa Pembuangan Air AC PVC 1/2" 48.00 Buah
5 Pek. Pasangan Kran Air 1/2" 8.00 Buah
6 Pek. Pasangan Closed duduk Standart 4.00 Buah
7 pek. Pasangan Floor Drain 4.00 Buah
8 Pek. Pasangan Washtafel Ex. American Standart 4.00 Buah
9 Pek. Pasangan Cermin 100X80 Cm 1.60 M2
10 Pek. Pembuatan Septiktank 2x3 m dan Resapan 2x2 m 1.00 m2
REAL COST
PPN 10% X REAL COST
TOTAL COST
JUMLAH TOTAL PEKERJAAN
Di Setujui Oleh : Di Periksa Oleh :
........................... ...................................
.......................................... ............................................
........................................................... ...................................
............................................ .....................................
FISIK PEKERJAAN
GISTER MANAJEMEN UHO
MINGGU : KE LIMA (V)
PERIODE : 15 S/D 21 OKTOBER 2018
236,277,726.49 7.22 - -
6,462,390.48 0.20 - -
21,984,720.64 0.67 - -
19,395,164.13 0.59 - -
7,625,240.00 0.23 - -
291,745,241.74 8.92 -
94,995,288.85 2.90 - -
35,725,884.50 1.09 - -
3,569,487.00 0.11 - -
17,800,396.14 0.54 - -
152,091,056.49 4.65 -
110,541,418.00 3.38 - -
38,485,150.00 1.18 - -
7,203,170.70 0.22 - -
7,731,262.92 0.24 - -
163,961,001.62 5.01 -
1,222,320.00 0.04 - -
5,592,400.00 0.17 - -
4,521,016.00 0.14 - -
2,933,568.00 0.09 - -
958,312.00 0.03 - -
6,309,820.00 0.19 - -
294,284.00 0.01 - -
4,545,708.00 0.14 - -
725,217.60 0.02 - -
10,000,000.00 0.31 - -
37,102,645.60 1.13 -
1,516,699.08 0.05 - -
16,287,669.22 0.50 - -
8,396,807.33 0.26 - -
9,318,720.00 0.28 - -
4,814,737.20 0.15 - -
1,255,890.24 0.04 - -
7,059,417.75 0.22 - -
48,649,940.82 1.49 -
5,056,128.00 0.15 - -
1,107,792.00 0.03 - -
3,200,000.00 0.10 - -
584,792.00 0.02 - -
3,237,516.00 0.10 - -
560,000.00 0.02 - -
13,746,228.00 0.42 -
35,517,175.00 1.09 - -
2,520,000.00 0.08 - -
1,365,000.00 0.04 - -
840,000.00 0.03 - -
5,985,000.00 0.18 - -
614,790.00 0.02 - -
276,000.00 0.01 - -
181,125.00 0.01 - -
258,750.00 0.01 - -
400,000.00 0.01 - -
540,000.00 0.02 - -
2,180,339.00 0.07 - -
16,000,000.00 0.49 - -
66,678,179.00 2.04 -
81,472,831.51 2.49 - -
32,342,202.20 0.99 - -
113,815,033.71 3.48 -
5,000,000.00 0.15 - -
7,247,500.00 0.22 - -
825,000.00 0.03 - -
6,874,800.00 0.21 - -
11,423,770.24 0.35 - -
8,000,000.00 0.24 - -
8,500,000.00 0.26 - -
2,500,000.00 0.08 - -
50,371,070.24 1.54 -
3,270,711,382.63 100.00 21.86
327,071,138.26 RENCANA 62.09
3,597,782,520.89 DEVIASI MINUS 40.23
3,597,780,000.00
Di Buat Oleh :
...................................
............................................
...................................
.....................................
LAPORAN KEMAJUAN FISIK PEKERJA
PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH MAGISTER MANAJEMEN U
N0. KONTRAK : 32-1/UN29.PPK-PNBPBLU.09/2018 MINGGU
NILAI KONTRAK : Rp. 3.597.780.000,- PERIODE
TGL. KONTRAK : 17 SEPTEMBER 2018
KONTRAKTOR PELAKSANA : PT. RAJAWALI LINTAR PERSADA
KONSULTAN PENGAWAS : CV. CITRA JAYA KONSULTANT
1 2 3 4
I. PEKERJAAN PENDAHULUAN / PERSIAPAN
1 Pek. Pembersihan Lokasi & Perataan secara Mekanis 1.00 Ls
2 Pek. Pengukuran & Pemasangan Bowplank 1.00 Ls
3 Pengadaan Air Kerja 1.00 Ls
4 Pembuatan Papan Nama Proyek 1.00 Ls
5 Pembuatan Pagar pengaman Sementara (Seng Gelombang) 112.00 M2
6 Pembuatan Bedeng Buruh 20.00 M2
7 Listrik Kerja 1.00 Ls
8 Administrasi, Foto Dokumentasi Dan P3K 1.00 Ls
Sub Total
II. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Sedalam 1 Meter 147.45 M3
2 Pek. Galian Tanah Sedalam 2 Meter 97.88 M3
3 Pek. Urugan Kembali Bekas Galian Tanah 81.77 M3
4 Pek. Urugan Tanah Timbunan Alas Lantai 368.54 M3
5 Pek. Urugan Pasir Alas Pondasi T. 6 Cm 20.10 M3
6 Pek. Urugan Pasir Alas Lantai T. 7 Cm 23.45 M3
VI PEKERJAAN LANTAI
Pek. Pasangan Lantai Utama & Tangga, Silver pearls White, Ivory 60x60 Cm
1 579.77 M2
2 Pek. Pasangan Lantai Km/WC Keramik Anti Slip 25x25 Cm Ex. Pla 20.62 M2
3 Pek. Plint Keramik Lantai 12/60 Cm 359.68 M1
4 Pek. Pasangan Dinding Keramik Porselin 25/40 Cm Tinggi 1,6 Meter 61.41 M2
5 Pek. Pasangan Dinding Batu Alam 20.00 M2
IX PEKERJAAN SANITAIR
1 Pek. Pasangan Pipa Air Bersih PVC 1/2 " 20.00 M1
2 Pek. Pasangan Pipa Air Kotor cair PVC 2" 31.00 M1
3 Pek. Pasangan Pipa Air kotor padat PVC 4" 8.00 M1
4 Pek. Pasangan Pipa Pembuangan Air AC PVC 1/2" 48.00 Buah
5 Pek. Pasangan Kran Air 1/2" 8.00 Buah
6 Pek. Pasangan Closed duduk Standart 4.00 Buah
7 pek. Pasangan Floor Drain 4.00 Buah
8 Pek. Pasangan Washtafel Ex. American Standart 4.00 Buah
9 Pek. Pasangan Cermin 100X80 Cm 1.60 M2
10 Pek. Pembuatan Septiktank 2x3 m dan Resapan 2x2 m 1.00 m2
REAL COST
PPN 10% X REAL COST
TOTAL COST
JUMLAH TOTAL PEKERJAAN
Di Setujui Oleh : Di Periksa Oleh :
........................... ...................................
.......................................... ............................................
........................................................... ...................................
............................................ .....................................
FISIK PEKERJAAN
GISTER MANAJEMEN UHO
MINGGU : KE ENAM (VI)
PERIODE : 22 S/D 28 OKTOBER 2018
236,277,726.49 7.22 - -
6,462,390.48 0.20 - -
21,984,720.64 0.67 - -
19,395,164.13 0.59 - -
7,625,240.00 0.23 - -
291,745,241.74 8.92 -
94,995,288.85 2.90 - -
35,725,884.50 1.09 - -
3,569,487.00 0.11 - -
17,800,396.14 0.54 - -
152,091,056.49 4.65 -
110,541,418.00 3.38 - -
38,485,150.00 1.18 - -
7,203,170.70 0.22 - -
7,731,262.92 0.24 - -
163,961,001.62 5.01 -
1,222,320.00 0.04 - -
5,592,400.00 0.17 - -
4,521,016.00 0.14 - -
2,933,568.00 0.09 - -
958,312.00 0.03 - -
6,309,820.00 0.19 - -
294,284.00 0.01 - -
4,545,708.00 0.14 - -
725,217.60 0.02 - -
10,000,000.00 0.31 - -
37,102,645.60 1.13 -
1,516,699.08 0.05 - -
16,287,669.22 0.50 - -
8,396,807.33 0.26 - -
9,318,720.00 0.28 - -
4,814,737.20 0.15 - -
1,255,890.24 0.04 - -
7,059,417.75 0.22 - -
48,649,940.82 1.49 -
5,056,128.00 0.15 - -
1,107,792.00 0.03 - -
3,200,000.00 0.10 - -
584,792.00 0.02 - -
3,237,516.00 0.10 - -
560,000.00 0.02 - -
13,746,228.00 0.42 -
35,517,175.00 1.09 - -
2,520,000.00 0.08 - -
1,365,000.00 0.04 - -
840,000.00 0.03 - -
5,985,000.00 0.18 - -
614,790.00 0.02 - -
276,000.00 0.01 - -
181,125.00 0.01 - -
258,750.00 0.01 - -
400,000.00 0.01 - -
540,000.00 0.02 - -
2,180,339.00 0.07 - -
16,000,000.00 0.49 - -
66,678,179.00 2.04 -
81,472,831.51 2.49 - -
32,342,202.20 0.99 - -
113,815,033.71 3.48 -
5,000,000.00 0.15 - -
7,247,500.00 0.22 - -
825,000.00 0.03 - -
6,874,800.00 0.21 - -
11,423,770.24 0.35 - -
8,000,000.00 0.24 - -
8,500,000.00 0.26 - -
2,500,000.00 0.08 - -
50,371,070.24 1.54 -
3,270,711,382.63 100.00 25.05
327,071,138.26 RENCANA 74.86
3,597,782,520.89 DEVIASI MINUS 49.81
3,597,780,000.00
Di Buat Oleh :
...................................
............................................
...................................
.....................................
LAPORAN KEMAJUAN FISIK PEKERJA
PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH MAGISTER MANAJEMEN U
N0. KONTRAK : 32-1/UN29.PPK-PNBPBLU.09/2018 MINGGU
NILAI KONTRAK : Rp. 3.597.780.000,- PERIODE
TGL. KONTRAK : 17 SEPTEMBER 2018
KONTRAKTOR PELAKSANA : PT. RAJAWALI LINTAR PERSADA
KONSULTAN PENGAWAS : CV. CITRA JAYA KONSULTANT
1 2 3 4
I. PEKERJAAN PENDAHULUAN / PERSIAPAN
1 Pek. Pembersihan Lokasi & Perataan secara Mekanis 1.00 Ls
2 Pek. Pengukuran & Pemasangan Bowplank 1.00 Ls
3 Pengadaan Air Kerja 1.00 Ls
4 Pembuatan Papan Nama Proyek 1.00 Ls
5 Pembuatan Pagar pengaman Sementara (Seng Gelombang) 112.00 M2
6 Pembuatan Bedeng Buruh 20.00 M2
7 Listrik Kerja 1.00 Ls
8 Administrasi, Foto Dokumentasi Dan P3K 1.00 Ls
Sub Total
II. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Sedalam 1 Meter 147.45 M3
2 Pek. Galian Tanah Sedalam 2 Meter 97.88 M3
3 Pek. Urugan Kembali Bekas Galian Tanah 81.77 M3
4 Pek. Urugan Tanah Timbunan Alas Lantai 368.54 M3
5 Pek. Urugan Pasir Alas Pondasi T. 6 Cm 20.10 M3
6 Pek. Urugan Pasir Alas Lantai T. 7 Cm 23.45 M3
VI PEKERJAAN LANTAI
Pek. Pasangan Lantai Utama & Tangga, Silver pearls White, Ivory 60x60 Cm
1 579.77 M2
2 Pek. Pasangan Lantai Km/WC Keramik Anti Slip 25x25 Cm Ex. Pla 20.62 M2
3 Pek. Plint Keramik Lantai 12/60 Cm 359.68 M1
4 Pek. Pasangan Dinding Keramik Porselin 25/40 Cm Tinggi 1,6 Meter 61.41 M2
5 Pek. Pasangan Dinding Batu Alam 20.00 M2
IX PEKERJAAN SANITAIR
1 Pek. Pasangan Pipa Air Bersih PVC 1/2 " 20.00 M1
2 Pek. Pasangan Pipa Air Kotor cair PVC 2" 31.00 M1
3 Pek. Pasangan Pipa Air kotor padat PVC 4" 8.00 M1
4 Pek. Pasangan Pipa Pembuangan Air AC PVC 1/2" 48.00 Buah
5 Pek. Pasangan Kran Air 1/2" 8.00 Buah
6 Pek. Pasangan Closed duduk Standart 4.00 Buah
7 pek. Pasangan Floor Drain 4.00 Buah
8 Pek. Pasangan Washtafel Ex. American Standart 4.00 Buah
9 Pek. Pasangan Cermin 100X80 Cm 1.60 M2
10 Pek. Pembuatan Septiktank 2x3 m dan Resapan 2x2 m 1.00 m2
REAL COST
PPN 10% X REAL COST
TOTAL COST
JUMLAH TOTAL PEKERJAAN
Di Setujui Oleh : Di Periksa Oleh :
........................... ...................................
.......................................... ............................................
........................................................... ...................................
............................................ .....................................
FISIK PEKERJAAN
GISTER MANAJEMEN UHO
MINGGU : KE TUJUH (VII)
PERIODE : 29 OKT S/D 4 NOV. 2018
236,277,726.49 7.22 - -
6,462,390.48 0.20 - -
21,984,720.64 0.67 - -
19,395,164.13 0.59 - -
7,625,240.00 0.23 - -
291,745,241.74 8.92 -
94,995,288.85 2.90 - -
35,725,884.50 1.09 - -
3,569,487.00 0.11 - -
17,800,396.14 0.54 - -
152,091,056.49 4.65 -
110,541,418.00 3.38 - -
38,485,150.00 1.18 - -
7,203,170.70 0.22 - -
7,731,262.92 0.24 - -
163,961,001.62 5.01 -
1,222,320.00 0.04 - -
5,592,400.00 0.17 - -
4,521,016.00 0.14 - -
2,933,568.00 0.09 - -
958,312.00 0.03 - -
6,309,820.00 0.19 - -
294,284.00 0.01 - -
4,545,708.00 0.14 - -
725,217.60 0.02 - -
10,000,000.00 0.31 - -
37,102,645.60 1.13 -
1,516,699.08 0.05 - -
16,287,669.22 0.50 - -
8,396,807.33 0.26 - -
9,318,720.00 0.28 - -
4,814,737.20 0.15 - -
1,255,890.24 0.04 - -
7,059,417.75 0.22 - -
48,649,940.82 1.49 -
5,056,128.00 0.15 - -
1,107,792.00 0.03 - -
3,200,000.00 0.10 - -
584,792.00 0.02 - -
3,237,516.00 0.10 - -
560,000.00 0.02 - -
13,746,228.00 0.42 -
35,517,175.00 1.09 - -
2,520,000.00 0.08 - -
1,365,000.00 0.04 - -
840,000.00 0.03 - -
5,985,000.00 0.18 - -
614,790.00 0.02 - -
276,000.00 0.01 - -
181,125.00 0.01 - -
258,750.00 0.01 - -
400,000.00 0.01 - -
540,000.00 0.02 - -
2,180,339.00 0.07 - -
16,000,000.00 0.49 - -
66,678,179.00 2.04 -
81,472,831.51 2.49 - -
32,342,202.20 0.99 - -
113,815,033.71 3.48 -
5,000,000.00 0.15 - -
7,247,500.00 0.22 - -
825,000.00 0.03 - -
6,874,800.00 0.21 - -
11,423,770.24 0.35 - -
8,000,000.00 0.24 - -
8,500,000.00 0.26 - -
2,500,000.00 0.08 - -
50,371,070.24 1.54 -
3,270,711,382.63 100.00 33.92
327,071,138.26 RENCANA 81.64
3,597,782,520.89 DEVIASI MINUS 47.72
3,597,780,000.00
Di Buat Oleh :
...................................
............................................
...................................
.....................................
LAPORAN KEMAJUAN FISIK PEKERJA
PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH MAGISTER MANAJEMEN U
N0. KONTRAK : 32-1/UN29.PPK-PNBPBLU.09/2018 MINGGU
NILAI KONTRAK : Rp. 3.597.780.000,- PERIODE
TGL. KONTRAK : 17 SEPTEMBER 2018
KONTRAKTOR PELAKSANA : PT. RAJAWALI LINTAR PERSADA
KONSULTAN PENGAWAS : CV. CITRA JAYA KONSULTANT
1 2 3 4
I. PEKERJAAN PENDAHULUAN / PERSIAPAN
1 Pek. Pembersihan Lokasi & Perataan secara Mekanis 1.00 Ls
2 Pek. Pengukuran & Pemasangan Bowplank 1.00 Ls
3 Pengadaan Air Kerja 1.00 Ls
4 Pembuatan Papan Nama Proyek 1.00 Ls
5 Pembuatan Pagar pengaman Sementara (Seng Gelombang) 112.00 M2
6 Pembuatan Bedeng Buruh 20.00 M2
7 Listrik Kerja 1.00 Ls
8 Administrasi, Foto Dokumentasi Dan P3K 1.00 Ls
Sub Total
II. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Sedalam 1 Meter 147.45 M3
2 Pek. Galian Tanah Sedalam 2 Meter 97.88 M3
3 Pek. Urugan Kembali Bekas Galian Tanah 81.77 M3
4 Pek. Urugan Tanah Timbunan Alas Lantai 368.54 M3
5 Pek. Urugan Pasir Alas Pondasi T. 6 Cm 20.10 M3
6 Pek. Urugan Pasir Alas Lantai T. 7 Cm 23.45 M3
V PEKERJAAN KUSEN
1 Pek. Pintu Utama Kaca 10 Mm Frameless floor hinge dorma BTS 84 2.00 Buah
2 Pek. Bingkai Pintu Aluminium Swing 11.40 M1
3 Pek. Kusen Pintu dan Jendela Aluminium Open Back 4" Ex. Alu Pri 464.80 M1
4 Pek. Jendela Kesmen Aluminium Ex. Alu Prima 217.30 M1
5 Pek. Daun Pintu Aluminium Spandrell KM/Wc 4.00 Unit
6 Pek. Membuat 1 Buah Pintu Bahan Multipleks Fin. Taco HPL 15.00 M2
7 Pek. Ventilasi Atap Jalusi Miring Aluminium 2.00 Unit
8 Pek. Pasangan Kaca Bening 5 Mm Ex. Asahimas 44.00 M2
9 Pek. Pasangan Bingkai Kusen Multipleks Fin. HPL 190.30 M1
VI PEKERJAAN LANTAI
Pek. Pasangan Lantai Utama & Tangga, Silver pearls White, Ivory 60x60 Cm
1 579.77 M2
2 Pek. Pasangan Lantai Km/WC Keramik Anti Slip 25x25 Cm Ex. Pla 20.62 M2
3 Pek. Plint Keramik Lantai 12/60 Cm 359.68 M1
4 Pek. Pasangan Dinding Keramik Porselin 25/40 Cm Tinggi 1,6 Meter 61.41 M2
5 Pek. Pasangan Dinding Batu Alam 20.00 M2
IX PEKERJAAN SANITAIR
1 Pek. Pasangan Pipa Air Bersih PVC 1/2 " 20.00 M1
2 Pek. Pasangan Pipa Air Kotor cair PVC 2" 31.00 M1
3 Pek. Pasangan Pipa Air kotor padat PVC 4" 8.00 M1
4 Pek. Pasangan Pipa Pembuangan Air AC PVC 1/2" 48.00 Buah
5 Pek. Pasangan Kran Air 1/2" 8.00 Buah
6 Pek. Pasangan Closed duduk Standart 4.00 Buah
7 pek. Pasangan Floor Drain 4.00 Buah
8 Pek. Pasangan Washtafel Ex. American Standart 4.00 Buah
9 Pek. Pasangan Cermin 100X80 Cm 1.60 M2
10 Pek. Pembuatan Septiktank 2x3 m dan Resapan 2x2 m 1.00 m2
REAL COST
PPN 10% X REAL COST
TOTAL COST
JUMLAH TOTAL PEKERJAAN
Di Setujui Oleh : Di Periksa Oleh :
........................... ...................................
.......................................... ............................................
........................................................... ...................................
............................................ .....................................
FISIK PEKERJAAN
GISTER MANAJEMEN UHO
MINGGU : KE DELAPAN (VIII)
PERIODE : 5 S/D 11 NOV. 2018
9,000,000.00 0.28 - -
2,731,554.00 0.08 - -
59,002,527.54 1.80 - -
25,789,815.90 0.79 - -
6,000,000.00 0.18 - -
30,363,645.00 0.93 - -
1,200,000.00 0.04 - -
8,063,319.26 0.25 - -
22,835,452.80 0.70 - -
164,986,314.50 5.04 -
236,277,726.49 7.22 - -
6,462,390.48 0.20 - -
21,984,720.64 0.67 - -
19,395,164.13 0.59 - -
7,625,240.00 0.23 - -
291,745,241.74 8.92 -
94,995,288.85 2.90 - -
35,725,884.50 1.09 - -
3,569,487.00 0.11 - -
17,800,396.14 0.54 - -
152,091,056.49 4.65 -
110,541,418.00 3.38 - -
38,485,150.00 1.18 - -
7,203,170.70 0.22 - -
7,731,262.92 0.24 - -
163,961,001.62 5.01 -
1,222,320.00 0.04 - -
5,592,400.00 0.17 - -
4,521,016.00 0.14 - -
2,933,568.00 0.09 - -
958,312.00 0.03 - -
6,309,820.00 0.19 - -
294,284.00 0.01 - -
4,545,708.00 0.14 - -
725,217.60 0.02 - -
10,000,000.00 0.31 - -
37,102,645.60 1.13 -
1,516,699.08 0.05 - -
16,287,669.22 0.50 - -
8,396,807.33 0.26 - -
9,318,720.00 0.28 - -
4,814,737.20 0.15 - -
1,255,890.24 0.04 - -
7,059,417.75 0.22 - -
48,649,940.82 1.49 -
5,056,128.00 0.15 - -
1,107,792.00 0.03 - -
3,200,000.00 0.10 - -
584,792.00 0.02 - -
3,237,516.00 0.10 - -
560,000.00 0.02 - -
13,746,228.00 0.42 -
35,517,175.00 1.09 - -
2,520,000.00 0.08 - -
1,365,000.00 0.04 - -
840,000.00 0.03 - -
5,985,000.00 0.18 - -
614,790.00 0.02 - -
276,000.00 0.01 - -
181,125.00 0.01 - -
258,750.00 0.01 - -
400,000.00 0.01 - -
540,000.00 0.02 - -
2,180,339.00 0.07 - -
16,000,000.00 0.49 - -
66,678,179.00 2.04 -
81,472,831.51 2.49 - -
32,342,202.20 0.99 - -
113,815,033.71 3.48 -
5,000,000.00 0.15 - -
7,247,500.00 0.22 - -
825,000.00 0.03 - -
6,874,800.00 0.21 - -
11,423,770.24 0.35 - -
8,000,000.00 0.24 - -
8,500,000.00 0.26 - -
2,500,000.00 0.08 - -
50,371,070.24 1.54 -
3,270,711,382.63 100.00 50.90
327,071,138.26 RENCANA 86.78
3,597,782,520.89 DEVIASI MINUS 35.88
3,597,780,000.00
Di Buat Oleh :
...................................
............................................
...................................
.....................................
LAPORAN KEMAJUAN FISIK PEKERJA
PEKERJAAN : PEMBANGUNAN GEDUNG KULIAH MAGISTER MANAJEMEN U
N0. KONTRAK : 32-1/UN29.PPK-PNBPBLU.09/2018 BULAN
NILAI KONTRAK : Rp. 3.597.780.000,- PERIODE
TGL. KONTRAK : 17 SEPTEMBER 2018
KONTRAKTOR PELAKSANA : PT. RAJAWALI LINTAR PERSADA
KONSULTAN PENGAWAS : CV. CITRA JAYA KONSULTANT
1 2 3 4
I. PEKERJAAN PENDAHULUAN / PERSIAPAN
1 Pek. Pembersihan Lokasi & Perataan secara Mekanis 1.00 Ls
2 Pek. Pengukuran & Pemasangan Bowplank 1.00 Ls
3 Pengadaan Air Kerja 1.00 Ls
4 Pembuatan Papan Nama Proyek 1.00 Ls
5 Pembuatan Pagar pengaman Sementara (Seng Gelombang) 112.00 M2
6 Pembuatan Bedeng Buruh 20.00 M2
7 Listrik Kerja 1.00 Ls
8 Administrasi, Foto Dokumentasi Dan P3K 1.00 Ls
Sub Total
II. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Sedalam 1 Meter 147.45 M3
2 Pek. Galian Tanah Sedalam 2 Meter 97.88 M3
3 Pek. Urugan Kembali Bekas Galian Tanah 81.77 M3
4 Pek. Urugan Tanah Timbunan Alas Lantai 368.54 M3
5 Pek. Urugan Pasir Alas Pondasi T. 6 Cm 20.10 M3
6 Pek. Urugan Pasir Alas Lantai T. 7 Cm 23.45 M3
V PEKERJAAN KUSEN
1 Pek. Pintu Utama Kaca 10 Mm Frameless floor hinge dorma BTS 84 2.00 Buah
2 Pek. Bingkai Pintu Aluminium Swing 11.40 M1
3 Pek. Kusen Pintu dan Jendela Aluminium Open Back 4" Ex. Alu Pri 464.80 M1
4 Pek. Jendela Kesmen Aluminium Ex. Alu Prima 217.30 M1
5 Pek. Daun Pintu Aluminium Spandrell KM/Wc 4.00 Unit
6 Pek. Membuat 1 Buah Pintu Bahan Multipleks Fin. Taco HPL 15.00 M2
7 Pek. Ventilasi Atap Jalusi Miring Aluminium 2.00 Unit
8 Pek. Pasangan Kaca Bening 5 Mm Ex. Asahimas 44.00 M2
9 Pek. Pasangan Bingkai Kusen Multipleks Fin. HPL 190.30 M1
VI PEKERJAAN LANTAI
Pek. Pasangan Lantai Utama & Tangga, Silver pearls White, Ivory 60x60 Cm
1 579.77 M2
2 Pek. Pasangan Lantai Km/WC Keramik Anti Slip 25x25 Cm Ex. Pla 20.62 M2
3 Pek. Plint Keramik Lantai 12/60 Cm 359.68 M1
4 Pek. Pasangan Dinding Keramik Porselin 25/40 Cm Tinggi 1,6 Meter 61.41 M2
5 Pek. Pasangan Dinding Batu Alam 20.00 M2
IX PEKERJAAN SANITAIR
1 Pek. Pasangan Pipa Air Bersih PVC 1/2 " 20.00 M1
2 Pek. Pasangan Pipa Air Kotor cair PVC 2" 31.00 M1
3 Pek. Pasangan Pipa Air kotor padat PVC 4" 8.00 M1
4 Pek. Pasangan Pipa Pembuangan Air AC PVC 1/2" 48.00 Buah
5 Pek. Pasangan Kran Air 1/2" 8.00 Buah
6 Pek. Pasangan Closed duduk Standart 4.00 Buah
7 pek. Pasangan Floor Drain 4.00 Buah
8 Pek. Pasangan Washtafel Ex. American Standart 4.00 Buah
9 Pek. Pasangan Cermin 100X80 Cm 1.60 M2
10 Pek. Pembuatan Septiktank 2x3 m dan Resapan 2x2 m 1.00 m2
REAL COST
PPN 10% X REAL COST
TOTAL COST
JUMLAH TOTAL PEKERJAAN
Di Setujui Oleh : Di Periksa Oleh :
........................... ...................................
.......................................... ............................................
........................................................... ...................................
............................................ .....................................
FISIK PEKERJAAN
GISTER MANAJEMEN UHO
BULAN : KE DUA (II)
PERIODE : 15 OKT. S/D 11 NOV. 2018
9,000,000.00 0.28 - -
2,731,554.00 0.08 - -
59,002,527.54 1.80 - -
25,789,815.90 0.79 - -
6,000,000.00 0.18 - -
30,363,645.00 0.93 - -
1,200,000.00 0.04 - -
8,063,319.26 0.25 - -
22,835,452.80 0.70 - -
164,986,314.50 5.04 -
236,277,726.49 7.22 - -
6,462,390.48 0.20 - -
21,984,720.64 0.67 - -
19,395,164.13 0.59 - -
7,625,240.00 0.23 - -
291,745,241.74 8.92 -
94,995,288.85 2.90 - -
35,725,884.50 1.09 - -
3,569,487.00 0.11 - -
17,800,396.14 0.54 - -
152,091,056.49 4.65 -
110,541,418.00 3.38 - -
38,485,150.00 1.18 - -
7,203,170.70 0.22 - -
7,731,262.92 0.24 - -
163,961,001.62 5.01 -
1,222,320.00 0.04 - -
5,592,400.00 0.17 - -
4,521,016.00 0.14 - -
2,933,568.00 0.09 - -
958,312.00 0.03 - -
6,309,820.00 0.19 - -
294,284.00 0.01 - -
4,545,708.00 0.14 - -
725,217.60 0.02 - -
10,000,000.00 0.31 - -
37,102,645.60 1.13 -
1,516,699.08 0.05 - -
16,287,669.22 0.50 - -
8,396,807.33 0.26 - -
9,318,720.00 0.28 - -
4,814,737.20 0.15 - -
1,255,890.24 0.04 - -
7,059,417.75 0.22 - -
48,649,940.82 1.49 -
5,056,128.00 0.15 - -
1,107,792.00 0.03 - -
3,200,000.00 0.10 - -
584,792.00 0.02 - -
3,237,516.00 0.10 - -
560,000.00 0.02 - -
13,746,228.00 0.42 -
35,517,175.00 1.09 - -
2,520,000.00 0.08 - -
1,365,000.00 0.04 - -
840,000.00 0.03 - -
5,985,000.00 0.18 - -
614,790.00 0.02 - -
276,000.00 0.01 - -
181,125.00 0.01 - -
258,750.00 0.01 - -
400,000.00 0.01 - -
540,000.00 0.02 - -
2,180,339.00 0.07 - -
16,000,000.00 0.49 - -
66,678,179.00 2.04 -
81,472,831.51 2.49 - -
32,342,202.20 0.99 - -
113,815,033.71 3.48 -
5,000,000.00 0.15 - -
7,247,500.00 0.22 - -
825,000.00 0.03 - -
6,874,800.00 0.21 - -
11,423,770.24 0.35 - -
8,000,000.00 0.24 - -
8,500,000.00 0.26 - -
2,500,000.00 0.08 - -
50,371,070.24 1.54 -
3,270,711,382.63 100.00 50.90
327,071,138.26 RENCANA 86.78
3,597,782,520.89 DEVIASI MINUS 35.88
3,597,780,000.00
Di Buat Oleh :
...................................
............................................
...................................
.....................................
REKAPITULASI
LAPORAN KEMAJUAN PEKERJAAN FISIK
Konsultan Pengawas
CV. CITRA JAYA KONSULTAN