JUMLAH
NO. URAIAN
HARGA (Rp.)
PEJABAT PENGADAAN
1.00 Org 4.00 Bln 3,190,000 12,760,000 1.00 Org 4.00 Bln 3,190,000 12,760,000
12,760,000 12,760,000
1.00 Org 4.00 Bln 1,500,000 6,000,000 1.00 Org 4.00 Bln 1,500,000 6,000,000
6,000,000 6,000,000
18,760,000 18,760,000
1.00 Unit 4.00 Bln 500,000 2,000,000 1.00 Unit 4.00 Bln 500,000 2,000,000
1.00 Unit 4.00 Bln 500,000 2,000,000 1.00 Unit 4.00 Bln 500,000 2,000,000
4,000,000 4,000,000
7 8 9 10 11 12 13 14
JUMLAH JUMLAH
HARGA (Rp.) HARGA (Rp.)
18,760,000 18,760,000
8,200,000 8,200,000
26,960,000 26,960,000
2,696,000 2,696,000
29,656,000 29,656,000
29,600,000 29,600,000
LA NGKURI
Direktur
ANALISA SATUAN UPAH
SKPD : Dinas Kelautan dan Perikanan
Pekerjaan : Pengawasan Pembangunan Kebun Bibit Rumput Laut
Lokasi : Tersebar di Kabupaten Konawe Selatan
Tahun Anggaran : 2012
Posisi
Prosentase
No. Biaya Personil dari Gaji Ahli Sipil Ahli Geodesi
Dasar (%) Team Leader Wakil Team Leader
(Transportasi) (Geodetik Engineer)
1 2 3 4 5 6 7
1 Gaji Dasar 100.00 1,500,000.00 Err:509 Err:509 Err:509
2 Beban Biaya Sosial 42.14 632,100.00 Err:509 Err:509 Err:509
3 Beban Biaya Umum 30.80 462,000.00 Err:509 Err:509 Err:509
4 Imbalan Jasa 30.00 450,000.00 Err:509 Err:509 Err:509
5 Tunjangan Penugasan Proyek 10.00 150,000.00 Err:509 Err:509 Err:509
Posisi
Presentase
No. Biaya Personil dari Gaji dasar Administrasi dan
(%) Asisten Tenaga Ahli Surveyor Drafter Cad
Keuangan
1 2 3 4 5 6 7
1 Gaji Dasar 100.00 Err:509 1,500,000.00 Err:509 Err:509
2 Beban Biaya Sosial 0.00 - - Err:509 Err:509
3 Beban Biaya Umum 0.00 - - Err:509 Err:509
4 Imbalan Jasa 0.00 - - Err:509 Err:509
5 Tunjangan Penugasan Proyek 0.00 - - Err:509 Err:509
-
Jumlah Beban Biaya Perbulan 100.00 Err:509 1,500,000.00 Err:509 Err:509
Dibulatkan Err:509 1,500,000.00 Err:509 Err:509
I.a. RINCIAN BEBAN BIAYA SOSIAL
Posisi
Prosentase
No. Beban Biaya dari Gaji Ahli Sipil
Dasar (%) Team Leader Wakil Team Leader Ahli Sipil (Struktur)
(Transportasi)
1 2 3 4 5 6 7
1 Tunjangan Cuti Tahunan 0.00 - - - -
2 Tunjangan Asuransi JAMSOSTEK 13.74 206,100.00 Err:509 Err:509 Err:509
3 Tunjangan Pengobatan JAMSOSTEK 0.00 - - - Err:509
4 Tunjangan Sosial Budaya 10.40 156,000.00 Err:509 Err:509 Err:509
5 Housing Allowence 18.00 270,000.00 Err:509 Err:509 Err:509
Posisi
Presentase
No. Beban Biaya dari Gaji dasar Administrasi dan
(%) Asisten Tenaga Ahli Surveyor Drafter Cad
Keuangan
1 2 3 4 5 6 7
1 Tunjangan Cuti Tahunan 0.00 0.00 0.00 0.00 0.00
2 Tunjangan Asuransi JAMSOSTEK 0.00 0.00 0.00 0.00 0.00
3 Tunjangan Pengobatan JAMSOSTEK 0.00 0.00 0.00 0.00 0.00
4 Tunjangan Sosial Budaya 0.00 0.00 0.00 0.00 0.00
5 Housing Allowence 0.00 0.00 0.00 0.00 0.00
Posisi
Prosentase
No. Beban Biaya dari Gaji Ahli Sipil
Dasar (%) Team Leader Wakil Team Leader Ahli Sipil (Struktur)
(Transportasi)
1 2 3 4 5 6 7
1 Managemen dan Administrasi 10.00 150,000.00 Err:509 Err:509 Err:509
2 Operasional Kantor 3.90 58,500.00 Err:509 Err:509 Err:509
3 Biaya Sewa Kontrak Kantor/Perumahan 0.00 - Err:509 Err:509 Err:509
4 Biaya Pas. Listrik, Telepon, telex 0.00 - Err:509 Err:509 Err:509
5 Keuangan 8.90 133,500.00 Err:509 Err:509 Err:509
6 Biaya Pemeliharaan Alat/Perabotan 5.00 75,000.00 Err:509 Err:509 Err:509
7 Gaji Penunjang Staf 0.00 - Err:509 Err:509 Err:509
8 Biaya Umum Lainnya 3.00 45,000.00 Err:509 Err:509 Err:509
Jumlah 30.80 462,000.00 Err:509 Err:509 Err:509
Posisi
Presentase
No. Beban Biaya dari Gaji dasar Administrasi dan
(%) Asisten Tenaga Ahli Surveyor Drafter Cad
Keuangan
1 2 3 4 5 6 7
1 Managemen dan Administrasi 0.00 0.00 0.00 0.00 0.00
2 Operasional Kantor 0.00 0.00 0.00 0.00 0.00
3 Biaya Sewa Kontrak Kantor/Perumahan 0.00 0.00 0.00 0.00 0.00
4 Biaya Pas. Listrik, Telepon, telex 0.00 0.00 0.00 0.00 0.00
5 Keuangan 0.00 0.00 0.00 0.00 0.00
6 Biaya Pemeliharaan Alat/Perabotan 0.00 0.00 0.00 0.00 0.00
7 Gaji Penunjang Staf 0.00 0.00 0.00 0.00 0.00
8 Biaya Umum Lainnya 0.00 0.00 0.00 0.00 0.00
Jumlah 0.00 0.00 0.00 0.00 0.00
ALISA SATUAN UPAH
Posisi
8 9 10
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Posisi
8 9 10
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Posisi
8 9 10
- -
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Posisi
8 9 10
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
Posisi
8 9 10
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Posisi
8 9 10
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
RENCANA ANGGARAN BIAYA (RAB)
SKPD : Dinas Kelautan dan Perikanan
Pekerjaan : Pengawasan Pembangunan Kebun Bibit Rumput Laut
Lokasi : Tersebar di Kabupaten Konawe Selatan
Tahun Anggaran : 2012
Harga Satuan
No. Posisi Satuan/Orang Waktu/Bulan
(Rp.)
1 2 3 4 5
A. BIAYA TENAGA AHLI
1 Team Leader/Ahli Perikanan 1.00 Org 4.00 Bln 3,190,000
Jumlah A
B. BIAYA TENAGA PENDUKUNG
1 Pengawas Lapangan 1.00 Org 4.00 Bln 1,500,000
Jumlah B
Jumlah Biaya Langsung Personil (A+B)
II. RINCIAN BIAYA LANGSUNG NON PERSONIL
Harga Satuan
No. Uraian Satuan Waktu/Bulan
(Rp.)
1 2 3 4 5
1 Biaya Kantor dan Peralatan
a. Biaya Sewa/Pemeliharaan Komputer Set 1.00 Unit 4.00 Bln 500,000
b. Alat Tulis Kantor (Kertas Folio,Tinta Printer) 1.00 Unit 4.00 Bln 500,000
Jumlah ( II.1)
2 Biaya Perjalanan Dinas
a. Biaya Tiket 0.00 Org 0.00 Kali -
b. Uang Harian 0.00 Org 0.00 Ls -
c. Perjalanan Darat (Tenaga Ahli) 1.00 Org 2.00 Kali 150,000
d. Pengawas Lapangan 1.00 Org 6.00 Kali 150,000
Jumlah ( II.2)
3 Biaya Pelaporan
a. Penggandaan Laporan Mingguan 10.00 Buku - - 100,000
b. Penggandaan Laporan Bulanan 10.00 Buku - - 100,000
c. Penggandaan Laporan Akhir 10.00 Set - - 100,000
Jumlah ( II.3)
Jumlah Biaya Langsung Non Personil (1+2+3)
REKAPITULASI
SKPD : Dinas Kelautan dan Perikanan
Pekerjaan : Pengawasan Pembangunan Kebun Bibit Rumput Laut
Lokasi : Tersebar di Kabupaten Konawe Selatan
Tahun Anggaran : 2012
NO. URAIAN
JUMLAH BIAYA
PPN 10%
TO TAL
DIBULATKAN
LA NGKURI
DIREKTUR
A ANGGARAN BIAYA (RAB)
Jumlah Harga
(Rp.)
6 = (3x4x5)
12,760,000
12,760,000
6,000,000
6,000,000
18,760,000
Jumlah Harga
(Rp.)
6 = (3x4x5)
2,000,000
2,000,000
4,000,000
-
-
300,000
900,000
1,200,000
1,000,000
1,000,000
1,000,000
3,000,000
8,200,000
EKAPITULASI
JUMLAH HARGA
(Rp.)
18,760,000
8,200,000
26,960,000
2,696,000
29,656,000
29,600,000
LA NGKURI
DIREKTUR