Anda di halaman 1dari 397

A.

PEKERJAAN PERSIAPAN

1 m2 Pagar Sementara Kayu (T=2M) (RSNI: T-12-2002-6.1)


1 Dolken dia 5 s/d 7 cm p. 4 m 1.250 btg 13,144 16,430
2 Semen PC (50 Kg) 0.110 zak 63,500 6,985
3 Pasir Beton 0.005 m3 145,000 725
4 Batu Split Pecah Mesin 2/3 0.009 m3 145,000 1,305
5 Kaso kelas III 0.072 m3 2,387,000 171,864
6 Paku 4 s/d 7 cm 0.060 kg 36,000 2,160
7 Minyak Pelumas 0.400 Ltr 35,000 14,000
a Tukang Kayu Halus 0.200 Org/Hari 80,000 16,000
b Pekerja 0.400 Org/Hari 60,000 24,000
c Kepala Tukang 0.020 Org/Hari 80,000 1,600
d Mandor 0.020 Org/Hari 95,000 1,900
JUMLAH 256,969
1 m2 Pagar Sementara Seng Gelombang (T=2M) (RSNI: T-12-2002-6.2)
1 Dolken dia 5 s/d 7 cm p. 4 m 1.250 btg 13,144 16,430
2 Semen PC (50 Kg) 2.500 zak 63,500 158,750
3 Seng Gelombang BJLS 0,3 1.200 lbr 100,100 120,120
4 Pasir Beton 0.005 m3 145,000 725
5 Batu Split Pecah Mesin 2/3 0.009 m3 145,000 1,305
6 Kaso kelas III 0.072 m3 2,387,000 171,864
7 Paku 1 s/d 3 cm 0.060 kg 20,020 1,201
8 Cat Dasar / meni besi 0.450 Kg 28,336 12,751
a Tukang Kayu Halus 0.200 Org/Hari 80,000 16,000
b Pekerja 0.400 Org/Hari 60,000 24,000
c Kepala Tukang 0.020 Org/Hari 80,000 1,600
d Mandor 0.020 Org/Hari 95,000 1,900
JUMLAH 526,646
1 m2 Pagar Sementara Kawat Duri (T=1,8M) (RSNI: T-12-2002-6.3)
1 Dolken dia 5 s/d 7 cm p. 4 m 1.250 btg 13,144 16,430
2 Semen PC (50 Kg) 2.000 zak 63,500 127,000
3 Kawat Duri 1.200 m2 27,500 33,000
4 Pasir Beton 0.005 m3 145,000 725
5 Batu Split Pecah Mesin 2/3 0.009 m3 145,000 1,305
6 Paku 4 s/d 7 cm 0.060 kg 36,000 2,160
a Tukang Kayu Halus 0.200 Org/Hari 80,000 16,000
b Pekerja 0.300 Org/Hari 60,000 18,000
c Kepala Tukang 0.020 Org/Hari 80,000 1,600
d Mandor 0.020 Org/Hari 95,000 1,900
JUMLAH 218,120

Nike Naluri (1106587) 1


1 m1 Pengukuran & Pemasangan Bowplank (RSNI: T-12-2002-6.4)
1 Kaso kelas III 0.012 m3 2,387,000 28,644
2 Paku 4 s/d 7 cm 0.020 kg 36,000 720
3 Balok kelas III 0.007 m3 2,387,000 16,709
a Tukang Kayu Kasar 0.100 Org/Hari 80,000 8,000
b Pekerja 0.100 Org/Hari 60,000 6,000
c Kepala Tukang 0.010 Org/Hari 80,000 800
d Mandor 0.005 Org/Hari 95,000 475
JUMLAH 61,348
1 m2 Pembuatan Kantor Proyek Sementara (RSNI: T-12-2002-6.5)
1 Dolken dia 5 s/d 7 cm p. 4 m 1.250 btg 13,144 16,430
2 Kayu Kuat klas III 0.180 m3 2,335,667 420,420
3 Paku 8 s/d 12 cm 0.850 kg 36,000 30,600
4 Besi Plat rata2 1 s/d 5 mm 1.100 Kg 19,717 21,689
5 Semen PC (50 Kg) 0.700 zak 63,500 44,450
6 Pasir Pasang 0.150 m3 135,000 20,250
7 Pasir Beton 0.100 m3 145,000 14,500
8 Batu Split Pecah Mesin 2/3 0.150 m3 145,000 21,750
9 Bata Merah 30.000 bh 600 18,000
10 Seng Plat BJLS 0,30 0.250 m' 84,700 21,175
11 Kaca nako polos 5 mm 0.200 daun 215,000 43,000
12 Kaca Polos 5 mm 0.080 m2 95,000 7,600
13 Triplex t. 4 mm 0.150 lbr 54,000 8,100
14 Handel + Kunci bulat 0.060 bh 125,000 7,500
a Tukang Kayu Kasar 2.000 Org/Hari 80,000 160,000
b Pekerja 1.000 Org/Hari 60,000 60,000
c Kepala Tukang 0.300 Org/Hari 80,000 24,000
d Mandor 0.050 Org/Hari 95,000 4,750
JUMLAH 944,214
1 m2 Pembuatan Gudang Poyek
1 Dolken dia 5 s/d 7 cm p. 4 m 1.700 btg 13,144 22,345
2 Kayu Kuat klas III 0.210 m3 2,335,667 490,490
3 Paku 8 s/d 12 cm 0.300 kg 36,000 10,800
4 Semen PC (50 Kg) 0.210 zak 63,500 13,335
5 Pasir Pasang 0.030 m3 135,000 4,050
6 Pasir Beton 0.050 m3 145,000 7,250
7 Seng Gelombang BJLS 0,3 1.500 lbr 100,100 150,150
a Tukang Kayu Kasar 2.000 Org/Hari 80,000 160,000
b Pekerja 1.000 Org/Hari 60,000 60,000
c Kepala Tukang 0.200 Org/Hari 80,000 16,000

Nike Naluri (1106587) 2


d Mandor 0.050 Org/Hari 95,000 4,750
JUMLAH 939,170
1 m2 Pembuatan Rumah Jaga Sementara Konstruksi Kayu
1 Dolken dia 5 s/d 7 cm p. 4 m 3.000 btg 13,144 39,432
2 Kayu Kuat klas III 0.276 m3 2,335,667 644,644
3 Paku 8 s/d 12 cm 0.700 kg 36,000 25,200
4 Seng Gelombang BJLS 0,3 1.500 lbr 100,100 150,150
a Tukang Kayu Kasar 1.500 Org/Hari 80,000 120,000
b Pekerja 1.000 Org/Hari 60,000 60,000
c Kepala Tukang 0.150 Org/Hari 80,000 12,000
d Mandor 0.050 Org/Hari 95,000 4,750
JUMLAH 1,056,176
1 m2 Membersihkan Lokasi Proyek
a Pekerja 0.100 Org/Hari 60,000 6,000
b Mandor 0.005 Org/Hari 95,000 475
JUMLAH 6,475
1 m2 Pembuatan Bedeng Buruh
1 Dolken dia 5 s/d 7 cm p. 4 m 1.250 btg 13,144 16,430
2 Kayu Kuat klas III 0.186 m3 2,335,667 434,434
3 Paku 8 s/d 12 cm 0.300 kg 36,000 10,800
4 Semen PC (50 Kg) 0.360 zak 63,500 22,860
5 Pasir Beton 0.030 m3 145,000 4,350
6 Batu Split Pecah Mesin 2/3 0.050 m3 145,000 7,250
7 Seng Gelombang BJLS 0,3 1.500 lbr 100,100 150,150
8 Triplex t. 4 mm 1.500 lbr 54,000 81,000
a Tukang Kayu Kasar 2.000 Org/Hari 80,000 160,000
b Pekerja 1.000 Org/Hari 60,000 60,000
c Kepala Tukang 0.200 Org/Hari 80,000 16,000
d Mandor 0.050 Org/Hari 95,000 4,750
JUMLAH 968,024
1 m2 Pembuatan Bak Adukan
1 Kaso kelas III 0.036 m3 2,387,000 85,932
2 Paku 4 s/d 7 cm 0.080 kg 36,000 2,880
3 Balok kelas III 0.014 m3 2,387,000 33,418
a Tukang Kayu Kasar 0.300 Org/Hari 80,000 24,000
JUMLAH 146,230
1 m2 Pembuatan Stegger
1 Kaso kelas III 0.028 m3 2,387,000 66,836
2 Paku 4 s/d 7 cm 0.125 kg 36,000 4,500
a Tukang Kayu Kasar 0.250 Org/Hari 80,000 20,000

Nike Naluri (1106587) 3


b Pekerja 0.002 Org/Hari 60,000 120
c Kepala Tukang 0.013 Org/Hari 80,000 1,040
d Mandor 0.017 Org/Hari 95,000 1,615
JUMLAH 94,111
1 m2 Membersihkan Puing-puing/ Membersihkan tanaman, stripping/ Mecabut pohon
a Pekerja 0.050 Org/Hari 60,000 3,000
b Mandor 0.005 Org/Hari 95,000 475
JUMLAH 3,475
1 m2 Pembuatan Jalan Masuk Proyek Sementara
1 Batu Belah Pondasi 0.150 m3 228,571 34,286
2 Batu Split Pecah Mesin 5/7 0.090 m3 145,000 13,050
3 Pasir Pasang 1.010 m3 135,000 136,350
a Pekerja 1.000 Org/Hari 60,000 60,000
b Mandor 0.050 Org/Hari 95,000 4,750
JUMLAH 248,436
1 m3 Pembongkaran Beton
a Pekerja 6.667 Org/Hari 60,000 400,020
b Mandor 0.333 Org/Hari 95,000 31,635
JUMLAH 431,655
1 m3 Pembongkaran Dinding Bata
a Pekerja 6.667 Org/Hari 60,000 400,020
b Mandor 0.333 Org/Hari 95,000 31,635
JUMLAH 431,655

B.PEKERJAAN TANAH
SNI 2835:2008

1 m3 Galian Tanah Sedalam <1m (SNI:2835:2008-6.1)


a Pekerja 0.750 Org/Hari 60,000 45,000
b Mandor 0.025 Org/Hari 95,000 2,375
JUMLAH 47,375
1 m3 Galian Tanah Sedalam 2m (SNI:2835:2008-6.2)
a Pekerja 0.900 Org/Hari 60,000 54,000
b Mandor 0.045 Org/Hari 95,000 4,275
JUMLAH 58,275
1 m3 Galian Tanah Sedalam 3m (SNI:2835:2008-6.3)
a Pekerja 1.050 Org/Hari 60,000 63,000
b Mandor 0.067 Org/Hari 95,000 6,365
JUMLAH 69,365
1 m3 Galian Tanah Keras Sedalam 1m (SNI:2835:2008-6.4)
a Pekerja 1.000 Org/Hari 60,000 60,000
b Mandor 0.032 Org/Hari 95,000 3,040

Nike Naluri (1106587) 4


JUMLAH 63,040
1 m3 Pekerjaan Pengupasan Tanah Cadas Sedalam 1m (SNI:2835:2008-6.5)
a Pekerja 1.500 Org/Hari 60,000 90,000
b Mandor 0.060 Org/Hari 95,000 5,700
JUMLAH 95,700
1 m3 Pekerjaan Pengupasan Tanah Lumpur Sedalam 1m (SNI:2835:2008-6.6)
a Pekerja 1.200 Org/Hari 60,000 72,000
b Mandor 0.450 Org/Hari 95,000 42,750
JUMLAH 114,750
1 m2 Pekerjaan Stripping Tebing Setinggi 1m (SNI:2835:2008-6.7)
a Pekerja 0.050 Org/Hari 60,000 3,000
b Mandor 0.005 Org/Hari 95,000 475
JUMLAH 3,475
1 m3 Pembuangan Tanah Sejauh 15m (SNI:2835:2008-6.8)
a Pekerja 0.330 Org/Hari 60,000 19,800
b Mandor 0.010 Org/Hari 95,000 950
JUMLAH 20,750
1 m3 Urugan Kembali semua indeks sejumlah 1/3 dari indeks tiap jenis pekerjaan
1 m3 Pemadatan Tanah (per 20cm) (SNI:2835:2008-6.10)
a Pekerja 0.500 Org/Hari 60,000 30,000
b Mandor 0.050 Org/Hari 95,000 4,750
JUMLAH 34,750
1 m3 Urugan Tanah (SNI:2835:2008-6.10)
a Pekerja 0.250 Org/Hari 60,000 15,000
b Mandor 0.025 Org/Hari 95,000 2,375
JUMLAH 17,375
1 m3 Urugan Pasir (SNI:2835:2008-6.11)
1 Pasir Urug 1.050 m3 100,000 105,000
a Pekerja 0.300 Org/Hari 60,000 18,000
b Mandor 0.010 Org/Hari 95,000 950
JUMLAH 123,950
1 m2 Memasang lapisan ijuk t=10cm (utk resapan) (SNI:2835:2008-6.14)
1 Pasir Urug 6.000 kg 100,000 600,000
a Pekerja 0.150 Org/Hari 60,000 9,000
b Mandor 0.015 Org/Hari 95,000 1,425
JUMLAH 10,425
1 m3 Urugan Sirtu (SNI:2835:2008-6.15)
1 Pasir Urug 1.200 m3 100,000 120,000
a Pekerja 0.250 Org/Hari 60,000 15,000
b Mandor 0.025 Org/Hari 95,000 2,375

Nike Naluri (1106587) 5


JUMLAH 137,375

C.PEKERJAAN PONDASI SNI 2836:2008

1 m3 Pasang Pondasi BT Belah 1 Pc : 3 Ps (SNI:2836:2008-6.1)


1 Batu Belah Pondasi 1.200 m3 228,571 274,286
2 Semen PC (50 Kg) 4.040 zak 63,500 256,540
3 Pasir Pasang 0.485 m3 135,000 65,475
a Pekerja 1.500 Org/Hari 60,000 90,000
b Tukang Batu Kasar 0.750 Org/Hari 80,000 60,000
c Kepala Tukang 0.075 Org/Hari 80,000 6,000
d Mandor 0.075 Org/Hari 95,000 7,125
JUMLAH 759,426
1 m3 Pasang Pondasi BT Belah 1 Pc : 4 Ps (SNI:2836:2008-6.2)
1 Batu Belah Pondasi 1.200 m3 228,571 274,286
2 Semen PC (50 Kg) 3.260 zak 63,500 207,010
3 Pasir Pasang 0.520 m3 135,000 70,200
a Pekerja 1.500 Org/Hari 60,000 90,000
b Tukang Batu Kasar 0.750 Org/Hari 80,000 60,000
c Kepala Tukang 0.075 Org/Hari 80,000 6,000
d Mandor 0.075 Org/Hari 95,000 7,125
JUMLAH 714,621
1 m3 Pasang Pondasi BT Belah 1 Pc : 5 Ps (SNI:2836:2008-6.3)
1 Batu Belah Pondasi 1.200 m3 228,571 274,286
2 Semen PC (50 Kg) 2.720 zak 63,500 172,720
3 Pasir Pasang 0.544 m3 135,000 73,440
a Pekerja 1.500 Org/Hari 60,000 90,000
b Tukang Batu Kasar 0.750 Org/Hari 80,000 60,000
c Kepala Tukang 0.075 Org/Hari 80,000 6,000
d Mandor 0.075 Org/Hari 95,000 7,125
JUMLAH 683,571
1 m3 Pasang Pondasi BT Belah 1 Pc : 6 Ps (SNI:2836:2008-6.4)
1 Batu Belah Pondasi 1.200 m3 228,571 274,286
2 Semen PC (50 Kg) 2.340 zak 63,500 148,590
3 Pasir Pasang 0.561 m3 135,000 75,735
a Pekerja 1.500 Org/Hari 60,000 90,000
b Tukang Batu Kasar 0.750 Org/Hari 80,000 60,000
c Kepala Tukang 0.075 Org/Hari 80,000 6,000
d Mandor 0.075 Org/Hari 95,000 7,125
JUMLAH 661,736

Nike Naluri (1106587) 6


1 m3 Pasang Pondasi BT Belah 1 Pc : 8 Ps (SNI:2836:2008-6.5)
1 Batu Belah Pondasi 1.200 m3 228,571 274,286
2 Semen PC (50 Kg) 1.820 zak 63,500 115,570
3 Pasir Pasang 0.584 m3 135,000 78,840
a Pekerja 1.500 Org/Hari 60,000 90,000
b Tukang Batu Kasar 0.750 Org/Hari 80,000 60,000
c Kepala Tukang 0.075 Org/Hari 80,000 6,000
d Mandor 0.075 Org/Hari 95,000 7,125
JUMLAH 631,821

1 m3 Pasang Pondasi BT Kosong (Aanstamping) (SNI:2836:2008-6.9)


1 Batu Belah Pondasi 1.200 m3 228,571 274,286
2 Pasir Urug 0.432 m3 100,000 43,200
a Pekerja 0.780 Org/Hari 60,000 46,800
b Tukang Batu Kasar 0.390 Org/Hari 80,000 31,200
c Kepala Tukang 0.039 Org/Hari 80,000 3,120
d Mandor 0.039 Org/Hari 95,000 3,705
JUMLAH 402,311

1 m3 Pasang Pondasi BT Kali (SNI:2836:2008-6.9)


1 Batu kali 1.200 bh 227,500 273,000
2 Pasir Urug 0.432 m3 100,000 43,200
a Pekerja 0.780 Org/Hari 60,000 46,800
b Tukang Batu Kasar 0.390 Org/Hari 80,000 31,200
c Kepala Tukang 0.039 Org/Hari 80,000 3,120
d Mandor 0.039 Org/Hari 95,000 3,705
JUMLAH 401,025
1 m3 Pondasi Sumuran d=100cm (SNI:2836:2008-6.11)
1 Batu Belah Pondasi 0.450 m3 228,571 102,857
2 Semen PC (50 Kg) 3.880 zak 63,500 246,380
3 Pasir Beton 0.312 m3 145,000 45,240
4 Batu Split Pecah Mesin 2/3 0.468 m3 145,000 67,860
a Pekerja 2.400 Org/Hari 60,000 144,000
b Tukang Batu Kasar 0.800 Org/Hari 80,000 64,000
c Kepala Tukang 0.080 Org/Hari 80,000 6,400
d Mandor 1.119 Org/Hari 95,000 106,305
JUMLAH 783,042
1 m3 Adukan Beton Untuk Pondasi 1Pc : 2 Ps : 3 Kr
a Semen PC (50 Kg) 6.72 zak 63,500 426,720
b Pasir Beton 0.54 m3 145,000 78,300

Nike Naluri (1106587) 7


c Batu Split Pecah Mesin 1/2 0.81 m3 145,000 117,450
d Pekerja 2.00 Org/Hari 60,000 120,000
e Tukang Batu Kasar 0.35 Org/Hari 80,000 28,000
JUMLAH 770,470
1 1 KG Penulangan Beton Pondasi
a Besi Beton rata-rata 1.05 Kg 1,721 1,807
b Kawat Beton Hitam 0.02 kg 27,000 540
c Pekerja 0.01 Org/Hari 60,000 600
d Tukang Batu Kasar 0.01 Org/Hari 80,000 800
JUMLAH 3,747
1 m2 Pekerjaan Bekisting untuk Pondasi
a Kayu Kuat klas III 0.04 m3 2,335,667 93,427
b Paku 4 s/d 7 cm 0.30 kg 36,000 10,800
c Minyak Pelumas 0.10 Ltr 35,000 3,500
d Pekerja 0.30 Org/Hari 60,000 18,000
e Tukang Kayu Kasar 0.26 Org/Hari 80,000 20,800
JUMLAH 146,527
1 m1 Pondasi Tiang Beton Bertulang uk.40x40cm
a Pasir Beton 0.10 m3 145,000 14,500
b Batu Split Pecah Mesin 2/3 0.15 m3 145,000 21,750
c Semen PC (50 Kg) 1.21 zak 63,500 76,835
d Besi Beton rata-rata 45.00 Kg 1,721 77,442
e Kawat Beton Hitam 0.90 kg 27,000 24,300
f Kaso kelas III 0.03 m3 2,387,000 71,610
g Papan kelas III 0.10 m3 2,233,000 223,300
h Paku 4 s/d 7 cm 0.12 kg 36,000 4,320
I Terpentin 0.09 Ltr 7,500 675
j Cat Dasar / meni besi 0.24 Kg 28,336 6,801
k Pekerja 1.00 Org/Hari 60,000 60,000
l Tukang Kayu Kasar 0.67 Org/Hari 80,000 53,600
JUMLAH 635,133
1 m1 Pondasi Tiang Beton Bertulang uk.35x35cm
a Pasir Beton 0.08 m3 145,000 11,600
b Batu Split Pecah Mesin 2/3 0.13 m3 145,000 18,850
c Semen PC (50 Kg) 0.98 zak 63,500 62,230
d Besi Beton rata-rata 34.50 Kg 1,721 59,372
e Kawat Beton Hitam 0.70 kg 27,000 18,900
f Kaso kelas III 0.03 m3 2,387,000 71,610
g Papan kelas III 0.01 m3 2,233,000 22,330
h Paku 4 s/d 7 cm 0.12 kg 36,000 4,320

Nike Naluri (1106587) 8


I Terpentin 0.09 Ltr 7,500 675
j Cat Dasar / meni besi 0.20 Kg 28,336 5,667
k Pekerja 0.80 Org/Hari 60,000 48,000
l Tukang Kayu Kasar 0.50 Org/Hari 80,000 40,000
JUMLAH 363,555
1 m1 Pondasi Tiang Beton Bertulang uk.25x25cm
a Pasir Beton 0.06 m3 145,000 8,700
b Batu Split Pecah Mesin 2/3 0.11 m3 145,000 15,950
c Semen PC (50 Kg) 0.82 zak 63,500 52,070
d Besi Beton rata-rata 34.50 Kg 1,721 59,372
e Kawat Beton Hitam 0.60 kg 27,000 16,200
f Kaso kelas III 0.03 m3 2,387,000 71,610
g Papan kelas III 0.01 m3 2,233,000 22,330
h Paku 4 s/d 7 cm 0.11 kg 36,000 3,960
I Terpentin 0.08 Ltr 7,500 600
j Cat Dasar / meni besi 0.20 Kg 28,336 5,667
k Pekerja 0.80 Org/Hari 60,000 48,000
l Tukang Kayu Kasar 0.50 Org/Hari 80,000 40,000
JUMLAH 344,460
1 m3 Pondasi Plat Beton (Pembesian 125kg + bekisting papan)
1 Papan kelas III 0.20 m3 2,233,000 446,600
2 Paku 4 s/d 7 cm 1.50 kg 36,000 54,000
3 Minyak Pelumas 0.40 Ltr 35,000 14,000
4 Besi Beton rata-rata 125.00 Kg 1,721 215,117
5 Kawat Beton Hitam 2.25 kg 27,000 60,750
6 Semen PC (50 Kg) 6.46 zak 63,500 410,210
7 Pasir Beton 0.52 m3 145,000 75,400
8 Batu Split Pecah Mesin 2/3 0.78 m3 145,000 113,100
a Pekerja 3.90 Org/Hari 60,000 234,000
b Tukang Batu Kasar 0.35 Org/Hari 80,000 28,000
c Tukang Kayu Kasar 1.04 Org/Hari 80,000 83,200
d Tukang Besi Tulangan 1.05 Org/Hari 80,000 84,000
JUMLAH 1,818,377
1 Papan kelas III 0.20 m3 2,233,000 446,600
2 Paku 4 s/d 7 cm 1.50 kg 36,000 54,000
3 Minyak Pelumas 0.40 Ltr 35,000 14,000
4 Besi Beton rata-rata 150.00 Kg 1,721 258,141
5 Kawat Beton Hitam 2.25 kg 27,000 60,750
6 Semen PC (50 Kg) 6.46 zak 63,500 410,210
7 Pasir Beton 0.52 m3 145,000 75,400

Nike Naluri (1106587) 9


8 Batu Split Pecah Mesin 2/3 0.78 m3 145,000 113,100
a Pekerja 4.00 Org/Hari 60,000 240,000
b Tukang Batu Kasar 0.40 Org/Hari 80,000 32,000
c Tukang Kayu Kasar 1.00 Org/Hari 80,000 80,000
d Tukang Besi Tulangan 1.00 Org/Hari 80,000 80,000
JUMLAH 1,864,201
1 m3 Pondasi Beton Borepile (Pembesian 125kg)
1 Besi Beton rata-rata 125.00 Kg 1,721 215,117
2 Kawat Beton Hitam 2.10 kg 27,000 56,700
3 Semen PC (50 Kg) 6.46 zak 63,500 410,210
4 Pasir Beton 0.52 m3 145,000 75,400
5 Batu Split Pecah Mesin 2/3 0.78 m3 145,000 113,100
a Pekerja 3.90 Org/Hari 60,000 234,000
b Tukang Batu Kasar 0.35 Org/Hari 80,000 28,000
c Tukang Kayu Kasar 1.00 Org/Hari 80,000 80,000
d Tukang Besi Tulangan 1.00 Org/Hari 80,000 80,000
JUMLAH 1,292,527
1 m3 Pondasi Beton Borepile (Pembesian 150kg)
1 Besi Beton rata-rata 150.00 Kg 1,721 258,141
2 Kawat Beton Hitam 0.08 kg 27,000 2,160
3 Semen PC (50 Kg) 6.46 zak 63,500 410,210
4 Pasir Beton 0.52 m3 145,000 75,400
5 Batu Split Pecah Mesin 2/3 0.78 m3 145,000 113,100
a Pekerja 4.00 Org/Hari 60,000 240,000
b Tukang Batu Kasar 0.40 Org/Hari 80,000 32,000
c Tukang Kayu Kasar 1.00 Org/Hari 80,000 80,000
d Tukang Besi Tulangan 1.00 Org/Hari 80,000 80,000
JUMLAH 1,291,011

D.PEKERJAAN BETON STRUKTUR & NON STR


D1. PEKERJAAN BETON
1 m3 Pembuatan Beton Non Struktur (1 Pc : 3 Ps : 5 Split)
1 Semen PC (50 Kg) 4.36 zak 63,500 276,860
2 Pasir Beton 0.52 m3 145,000 75,400
3 Batu Split Pecah Mesin 2/3 0.87 m3 145,000 126,150
a Pekerja 2.00 Org/Hari 60,000 120,000
b Tukang Batu Kasar 0.35 Org/Hari 80,000 28,000
JUMLAH 626,410
1 m3 Pembuatan Beton Struktur (1 Pc : 2 Ps : 4 Split)
1 Semen PC (50 Kg) 4.64 zak 63,500 294,640
2 Pasir Beton 0.52 m3 145,000 75,400

Nike Naluri (1106587) 10


3 Batu Split Pecah Mesin 2/3 0.78 m3 145,000 113,100
a Pekerja 2.00 Org/Hari 60,000 120,000
b Tukang Batu Kasar 0.35 Org/Hari 80,000 28,000
JUMLAH 631,140
1 m3 Pembuatan Beton Struktur (1 Pc : 2 Ps : 3 Split)
1 Semen PC (50 Kg) 6.72 zak 63,500 426,720
2 Agregat kasar 0.54 m3 254,800 137,592
3 Batu Split Pecah Mesin 2/3 0.81 m3 145,000 117,450
a Pekerja 2.00 Org/Hari 60,000 120,000
b Tukang Batu Kasar 0.35 Org/Hari 80,000 28,000
1 m3 Pembuatan Beton mutu K=100 (SNI:7394:2008-6.1)
1 Semen PC (50 Kg) 6.460 zak 63,500 410,210
2 Pasir Beton 0.100 m3 145,000 14,500
3 Batu Split Pecah Mesin 2/3 0.780 m3 145,000 113,100
4 Air 215.000 liter 34 7,267
a Pekerja 1.650 Org/Hari 60,000 99,000
b Tukang Batu Kasar 0.275 Org/Hari 80,000 22,000
c Kepala Tukang 0.028 Org/Hari 80,000 2,240
d Mandor 0.083 Org/Hari 95,000 7,885
JUMLAH 676,202
1 m3 Pembuatan Beton mutu K=125 (SNI:7394:2008-6.2)
1 Semen PC (50 Kg) 6.460 zak 63,500 410,210
2 Pasir Beton 0.100 m3 145,000 14,500
3 Batu Split Pecah Mesin 2/3 0.780 m3 145,000 113,100
4 Air 215.000 liter 34 7,267
a Pekerja 1.650 Org/Hari 60,000 99,000
b Tukang Batu Kasar 0.275 Org/Hari 80,000 22,000
c Kepala Tukang 0.028 Org/Hari 80,000 2,240
d Mandor 0.083 Org/Hari 95,000 7,885
JUMLAH 676,202
1 m3 Pembuatan Beton mutu K=150 (SNI:7394:2008-6.3)
1 Semen PC (50 Kg) 6.460 zak 63,500 410,210
2 Pasir Beton 0.100 m3 145,000 14,500
3 Batu Split Pecah Mesin 2/3 0.780 m3 145,000 113,100
4 Air 215.000 liter 34 7,267
a Pekerja 1.650 Org/Hari 60,000 99,000
b Tukang Batu Kasar 0.275 Org/Hari 80,000 22,000
c Kepala Tukang 0.028 Org/Hari 80,000 2,240
d Mandor 0.083 Org/Hari 95,000 7,885
JUMLAH 676,202

Nike Naluri (1106587) 11


1 m3 Pembuatan Lantai Kerja Beton K=100 (SNI:7394:2008-6.4)
1 Semen PC (50 Kg) 0.100 zak 63,500 6,350
2 Pasir Beton 0.780 m3 145,000 113,100
3 Batu Split Pecah Mesin 2/3 215.000 m3 145,000 31,175,000
4 Air 200.000 liter 34 6,760
a Pekerja 1.200 Org/Hari 60,000 72,000
b Tukang Batu Kasar 0.200 Org/Hari 80,000 16,000
c Kepala Tukang 0.020 Org/Hari 80,000 1,600
d Mandor 0.060 Org/Hari 95,000 5,700
JUMLAH 31,396,510
1 m3 Pembuatan Beton mutu K=175 (SNI:7394:2008-6.5)
1 Semen PC (50 Kg) 0.780 zak 63,500 49,530
2 Pasir Beton 215.000 m3 145,000 31,175,000
3 Batu Split Pecah Mesin 2/3 200.000 m3 145,000 29,000,000
4 Air 215.000 liter 34 7,267
a Pekerja 1.650 Org/Hari 60,000 99,000
b Tukang Batu Kasar 0.275 Org/Hari 80,000 22,000
c Kepala Tukang 0.028 Org/Hari 80,000 2,240
d Mandor 0.083 Org/Hari 95,000 7,885
JUMLAH 60,362,922
1 m3 Pembuatan Beton mutu K=200 (SNI:7394:2008-6.6)
1 Semen PC (50 Kg) 215.000 zak 63,500 13,652,500
2 Pasir Beton 200.000 m3 145,000 29,000,000
3 Batu Split Pecah Mesin 2/3 215.000 m3 145,000 31,175,000
4 Air 215.000 liter 34 7,267
a Pekerja 1.650 Org/Hari 60,000 99,000
b Tukang Batu Kasar 0.275 Org/Hari 80,000 22,000
c Kepala Tukang 0.028 Org/Hari 80,000 2,240
d Mandor 0.083 Org/Hari 95,000 7,885
JUMLAH 73,965,892
1 m3 Pembuatan Beton mutu K=225 (SNI:7394:2008-6.7)
1 Semen PC (50 Kg) 200.000 zak 63,500 12,700,000
2 Pasir Beton 215.000 m3 145,000 31,175,000
3 Batu Split Pecah Mesin 2/3 215.000 m3 145,000 31,175,000
4 Air 215.000 liter 34 7,267
a Pekerja 1.650 Org/Hari 60,000 99,000
b Tukang Batu Kasar 0.275 Org/Hari 80,000 22,000
c Kepala Tukang 0.028 Org/Hari 80,000 2,240
d Mandor 0.083 Org/Hari 95,000 7,885
JUMLAH 75,188,392

Nike Naluri (1106587) 12


1 m3 Pembuatan Beton mutu K=250 (SNI:7394:2008-6.8)
1 Semen PC (50 Kg) 215.000 zak 63,500 13,652,500
2 Pasir Beton 215.000 m3 145,000 31,175,000
3 Batu Split Pecah Mesin 2/3 215.000 m3 145,000 31,175,000
4 Air 215.000 liter 34 7,267
a Pekerja 1.650 Org/Hari 60,000 99,000
b Tukang Batu Kasar 0.275 Org/Hari 80,000 22,000
c Kepala Tukang 0.028 Org/Hari 80,000 2,240
d Mandor 0.083 Org/Hari 95,000 7,885
JUMLAH 76,140,892
1 m3 Pembuatan Beton mutu K=275 (SNI:7394:2008-6.9)
1 Semen PC (50 Kg) 215.000 zak 63,500 13,652,500
2 Pasir Beton 215.000 m3 145,000 31,175,000
3 Batu Split Pecah Mesin 2/3 215.000 m3 145,000 31,175,000
4 Air 215.000 liter 34 7,267
a Pekerja 1.650 Org/Hari 60,000 99,000
b Tukang Batu Kasar 0.275 Org/Hari 80,000 22,000
c Kepala Tukang 0.028 Org/Hari 80,000 2,240
d Mandor 0.083 Org/Hari 95,000 7,885
JUMLAH 76,140,892
1 m3 Pembuatan Beton mutu K=300 (SNI:7394:2008-6.10)
1 Semen PC (50 Kg) 215.000 zak 63,500 13,652,500
2 Pasir Beton 215.000 m3 145,000 31,175,000
3 Batu Split Pecah Mesin 2/3 215.000 m3 145,000 31,175,000
4 Air 215.000 liter 34 7,267
a Pekerja 1.650 Org/Hari 60,000 99,000
b Tukang Batu Kasar 0.275 Org/Hari 80,000 22,000
c Kepala Tukang 0.028 Org/Hari 80,000 2,240
d Mandor 0.083 Org/Hari 95,000 7,885
JUMLAH 76,140,892
1 m3 Pembuatan Beton mutu K=325 (SNI:7394:2008-6.11)
1 Semen PC (50 Kg) 215.000 zak 63,500 13,652,500
2 Pasir Beton 215.000 m3 145,000 31,175,000
3 Batu Split Pecah Mesin 2/3 215.000 m3 145,000 31,175,000
4 Air 215.000 liter 34 7,267
a Pekerja 2.100 Org/Hari 60,000 126,000
b Tukang Batu Kasar 0.350 Org/Hari 80,000 28,000
c Kepala Tukang 0.035 Org/Hari 80,000 2,800
d Mandor 0.105 Org/Hari 95,000 9,975
JUMLAH 76,176,542

Nike Naluri (1106587) 13


1 m3 Pembuatan Beton mutu K=350 (SNI:7394:2008-6.12)
1 Semen PC (50 Kg) 215.000 zak 63,500 13,652,500
2 Pasir Beton 215.000 m3 145,000 31,175,000
3 Batu Split Pecah Mesin 2/3 215.000 m3 145,000 31,175,000
4 Air 215.000 liter 34 7,267
a Pekerja 2.100 Org/Hari 60,000 126,000
b Tukang Batu Kasar 0.350 Org/Hari 80,000 28,000
c Kepala Tukang 0.035 Org/Hari 80,000 2,800
d Mandor 0.105 Org/Hari 95,000 9,975
JUMLAH 76,176,542
1 m3 Pembuatan Cor Beton K-250 Readymix (SNI DT-91-0008-6.9-2007)
1 Beton K-250 Readymix Slum 12 cm 1.100 m3 2,168,516 2,385,368
2 Vibrator 1.000 unt 300,000 300,000
3 Sewa Pompa 1.000 unt 3,250,000 3,250,000
a Pekerja 1.650 Org/Hari 60,000 99,000
b Tukang Batu Kasar 0.275 Org/Hari 80,000 22,000
c Kepala Tukang 0.028 Org/Hari 80,000 2,240
d Mandor 0.083 Org/Hari 95,000 7,885
JUMLAH 6,066,493
1 m3 Pembuatan Cor Beton K-300 Readymix (SNI DT-91-0008-6.9-2007)
1 Beton K-300 Readymix Slum 12 cm 1.100 m3 2,400,000 2,640,000
2 Vibrator 1.000 unt 300,000 300,000
3 Sewa Pompa 1.000 unt 3,250,000 3,250,000
a Pekerja 1.650 Org/Hari 60,000 99,000
b Tukang Batu Kasar 0.275 Org/Hari 80,000 22,000
c Kepala Tukang 0.028 Org/Hari 80,000 2,240
d Mandor 0.083 Org/Hari 95,000 7,885
JUMLAH 6,321,125
1 m3 Pembuatan Cor Beton K-350 Readymix (SNI DT-91-0008-6.9-2007)
1 Beton K-300 Readymix Slum 12 cm 1.100 m3 2,710,645 2,981,710
2 Vibrator 1.000 unt 300,000 300,000
3 Sewa Pompa 1.000 unt 3,250,000 3,250,000
a Pekerja 1.650 Org/Hari 60,000 99,000
b Tukang Batu Kasar 0.275 Org/Hari 80,000 22,000
c Kepala Tukang 0.028 Org/Hari 80,000 2,240
d Mandor 0.083 Org/Hari 95,000 7,885
JUMLAH 6,662,835
D2. PEKERJAAN PEMBESIAN
1 1kg Penulangan Beton Pembesian Besi dia. 6mm
1 Besi beton Ø6 1.0500 Kg 10,526 11,053

Nike Naluri (1106587) 14


b Kawat Beton Hitam 0.0150 kg 27,000 405
a Pekerja 0.0070 Org/Hari 60,000 420
b Tukang Batu Kasar 0.0070 Org/Hari 80,000 560
c Kepala Tukang 0.0007 Org/Hari 80,000 56
d Mandor 0.0004 Org/Hari 95,000 38
JUMLAH 12,532
1 1kg Penulangan Beton Pembesian Besi dia. 8mm
1 Besi beton Ø8 1.0500 Kg 14,531 15,258
b Kawat Beton Hitam 0.0150 kg 27,000 405
a Pekerja 0.0070 Org/Hari 60,000 420
b Tukang Batu Kasar 0.0070 Org/Hari 80,000 560
c Kepala Tukang 0.0007 Org/Hari 80,000 56
d Mandor 0.0004 Org/Hari 95,000 38
JUMLAH 16,737
1 1kg Penulangan Beton Pembesian Besi dia. 10mm
1 Besi beton Ø10 1.0500 Kg 9,324 9,791
b Kawat Beton Hitam 0.0150 kg 27,000 405
a Pekerja 0.0070 Org/Hari 60,000 420
b Tukang Batu Kasar 0.0070 Org/Hari 80,000 560
c Kepala Tukang 0.0007 Org/Hari 80,000 56
d Mandor 0.0004 Org/Hari 95,000 38
JUMLAH 11,270
1 1kg Penulangan Beton Pembesian Besi dia. 13mm
1 Besi beton Ø13 1.0500 Kg 8,974 9,423
b Kawat Beton Hitam 0.0150 kg 27,000 405
a Pekerja 0.0070 Org/Hari 60,000 420
b Tukang Batu Kasar 0.0070 Org/Hari 80,000 560
c Kepala Tukang 0.0007 Org/Hari 80,000 56
d Mandor 0.0004 Org/Hari 95,000 38
JUMLAH 10,902
1 1kg Penulangan Beton Pembesian Besi Polos
1 Besi Beton rata-rata 1.0500 Kg 1,721 1,807
b Kawat Beton Hitam 0.0150 kg 27,000 405
a Pekerja 0.0070 Org/Hari 60,000 420
b Tukang Batu Kasar 0.0070 Org/Hari 80,000 560
c Kepala Tukang 0.0007 Org/Hari 80,000 56
d Mandor 0.0004 Org/Hari 95,000 38
JUMLAH 3,286
1 1kg Penulangan Beton Pembesian Besi Ulir
1 Besi Beton rata-rata 1.0500 Kg 1,721 1,807

Nike Naluri (1106587) 15


b Kawat Beton Hitam 0.0150 kg 27,000 405
a Pekerja 0.0070 Org/Hari 60,000 420
b Tukang Batu Kasar 0.0070 Org/Hari 80,000 560
c Kepala Tukang 0.0007 Org/Hari 80,000 56
d Mandor 0.0004 Org/Hari 95,000 38
JUMLAH 3,286
1 1kg Penulangan Besi Beton U-24 & U-39
1 Besi Beton rata-rata 1.0500 Kg 1,721 1,807
b Kawat Beton Hitam 0.0150 kg 27,000 405
a Pekerja 0.0070 Org/Hari 60,000 420
b Tukang Batu Kasar 0.0070 Org/Hari 80,000 560
c Kepala Tukang 0.0007 Org/Hari 80,000 56
d Mandor 0.0004 Org/Hari 95,000 38
JUMLAH 3,286
1 1kg Memasang Besi Kabel Prestressed Polos/Strand
1 Besi Beton rata-rata 1.0500 Kg 1,721 1,807
b Kawat Beton Hitam 0.0150 kg 27,000 405
a Pekerja 0.0050 Org/Hari 60,000 300
b Tukang Batu Kasar 0.0050 Org/Hari 80,000 400
c Kepala Tukang 0.0005 Org/Hari 80,000 40
d Mandor 0.0003 Org/Hari 95,000 29
JUMLAH 2,980
1 1m2 Memasang Wiremesh M5
1 Wiremesh M5 U50 SNI 1.0500 m2 19,577 20,556
b Kawat Beton Hitam 0.0050 kg 27,000 135
a Pekerja 0.0030 Org/Hari 60,000 180
b Tukang Batu Kasar 0.0030 Org/Hari 80,000 240
c Kepala Tukang 0.0030 Org/Hari 80,000 240
d Mandor 0.0001 Org/Hari 95,000 10
JUMLAH 21,360
1 1m2 Memasang Wiremesh M8
1 Wiremesh M8 rata-rata 1.0500 m2 68,318 71,734
b Kawat Beton Hitam 0.0050 kg 27,000 135
a Pekerja 0.0030 Org/Hari 60,000 180
b Tukang Batu Kasar 0.0030 Org/Hari 80,000 240
c Kepala Tukang 0.0030 Org/Hari 80,000 240
d Mandor 0.0001 Org/Hari 95,000 10
JUMLAH 72,538
1 1m2 Memasang Wiremesh M6
1 Wiremesh M6 rata-rata 1.0500 m2 74,750 78,488

Nike Naluri (1106587) 16


2 Kawat Beton Hitam 0.0050 kg 27,000 135
a Pekerja 0.0030 Org/Hari 60,000 180
b Tukang Batu Kasar 0.0030 Org/Hari 80,000 240
c Kepala Tukang 0.0030 Org/Hari 80,000 240
d Mandor 0.0001 Org/Hari 95,000 10
JUMLAH 79,292
D3. PEKERJAAN BEKISTING
1 m2 Pembuatan Bekisiting untuk Pondasi (SNI:7394:2008-6.20)
1 Kayu Kuat klas III 0.0400 m3 2,335,667 93,427
2 Paku 8 s/d 12 cm 0.3000 kg 36,000 10,800
3 Minyak Pelumas 0.1000 Ltr 35,000 3,500
a Pekerja 0.5200 Org/Hari 60,000 31,200
b Tukang Batu Kasar 0.2600 Org/Hari 80,000 20,800
c Kepala Tukang 0.0260 Org/Hari 80,000 2,080
d Mandor 0.0260 Org/Hari 95,000 2,470
JUMLAH 164,277
1 m2 Pembuatan Bekisiting Pondasi Buis Beton Sumuran
1 Buis Beton 2.0000 Bh 71,500 143,000
2 Alat Bantu 1.0000 ls 2,500 2,500
a Pekerja 1.0000 Org/Hari 60,000 60,000
b Mandor 0.0520 Org/Hari 95,000 4,940
JUMLAH 210,440
1 m2 Pembuatan Bekisiting untuk Sloof (SNI:7394:2008-6.21)
1 Kayu Kuat klas III 0.0450 m3 2,335,667 105,105
2 Paku 8 s/d 12 cm 0.3000 kg 36,000 10,800
3 Minyak Pelumas 0.1000 Ltr 35,000 3,500
a Pekerja 0.5200 Org/Hari 60,000 31,200
b Tukang Batu Kasar 0.2600 Org/Hari 80,000 20,800
c Kepala Tukang 0.0260 Org/Hari 80,000 2,080
d Mandor 0.0260 Org/Hari 95,000 2,470
JUMLAH 175,955
1 m2 Pembuatan Bekisiting untuk Kolom (SNI:7394:2008-6.22)
1 Kayu Kuat klas III 0.0400 m3 2,335,667 93,427
2 Paku 8 s/d 12 cm 0.4000 kg 36,000 14,400
3 Minyak Pelumas 0.2000 Ltr 35,000 7,000
4 Kayu Kuat klas II 0.0150 m3 9,500,000 142,500
5 Multiplex t. 9 mm 0.3500 lbr 100,000 35,000
6 Dolken dia 8 s/d 10 cm p. 4 m 2.0000 btg 15,000 30,000
a Pekerja 0.6600 Org/Hari 60,000 39,600
b Tukang Batu Kasar 0.3300 Org/Hari 80,000 26,400

Nike Naluri (1106587) 17


c Kepala Tukang 0.0330 Org/Hari 80,000 2,640
d Mandor 0.0330 Org/Hari 95,000 3,135
JUMLAH 394,102
1 m2 Pembuatan Bekisiting untuk Balok (SNI:7394:2008-6.23)
1 Kayu Kuat klas III 0.0400 m3 2,335,667 93,427
2 Paku 8 s/d 12 cm 0.4000 kg 36,000 14,400
3 Minyak Pelumas 0.2000 Ltr 35,000 7,000
4 Kayu Kuat klas II 0.0180 m3 9,500,000 171,000
5 Multiplex t. 9 mm 0.3500 lbr 100,000 35,000
6 Dolken dia 8 s/d 10 cm p. 4 m 2.0000 btg 15,000 30,000
a Pekerja 0.6600 Org/Hari 60,000 39,600
b Tukang Batu Kasar 0.3300 Org/Hari 80,000 26,400
c Kepala Tukang 0.0330 Org/Hari 80,000 2,640
d Mandor 0.0330 Org/Hari 95,000 3,135
JUMLAH 422,602
1 m2 Pembuatan Bekisiting untuk Plat Lantai (SNI:7394:2008-6.24)
1 Kayu Kuat klas III 0.0400 m3 2,335,667 93,427
2 Paku 8 s/d 12 cm 0.4000 kg 36,000 14,400
3 Minyak Pelumas 0.2000 Ltr 35,000 7,000
4 Kayu Kuat klas II 0.0150 m3 9,500,000 142,500
5 Multiplex t. 9 mm 0.3500 lbr 100,000 35,000
6 Dolken dia 8 s/d 10 cm p. 4 m 6.0000 btg 15,000 90,000
a Pekerja 0.6600 Org/Hari 60,000 39,600
b Tukang Batu Kasar 0.3300 Org/Hari 80,000 26,400
c Kepala Tukang 0.0330 Org/Hari 80,000 2,640
d Mandor 0.0330 Org/Hari 95,000 3,135
JUMLAH 454,102
1 m2 Pembuatan Bekisiting untuk Dinding (SNI:7394:2008-6.25)
1 Kayu Kuat klas III 0.0300 m3 2,335,667 70,070
2 Paku 8 s/d 12 cm 0.4000 kg 36,000 14,400
3 Minyak Pelumas 0.2000 Ltr 35,000 7,000
4 Kayu Kuat klas II 0.0200 m3 9,500,000 190,000
5 Multiplex t. 9 mm 0.3500 lbr 100,000 35,000
6 Dolken dia 8 s/d 10 cm p. 4 m 3.0000 btg 15,000 45,000
7 Formiten/spacer bekisting 4.0000 Bh 14,300 57,200
a Pekerja 0.6600 Org/Hari 60,000 39,600
b Tukang Batu Kasar 0.3300 Org/Hari 80,000 26,400
c Kepala Tukang 0.0330 Org/Hari 80,000 2,640
d Mandor 0.0330 Org/Hari 95,000 3,135
JUMLAH 490,445

Nike Naluri (1106587) 18


1 m2 Pembuatan Bekisiting untuk Tangga (SNI:7394:2008-6.26)
1 Kayu Kuat klas III 0.0300 m3 2,335,667 70,070
2 Paku 8 s/d 12 cm 0.4000 kg 36,000 14,400
3 Minyak Pelumas 0.1500 Ltr 35,000 5,250
4 Kayu Kuat klas II 0.0150 m3 9,500,000 142,500
5 Multiplex t. 9 mm 0.3500 lbr 100,000 35,000
6 Dolken dia 8 s/d 10 cm p. 4 m 2.0000 btg 15,000 30,000
a Pekerja 0.6600 Org/Hari 60,000 39,600
b Tukang Batu Kasar 0.3300 Org/Hari 80,000 26,400
c Kepala Tukang 0.0330 Org/Hari 80,000 2,640
d Mandor 0.0330 Org/Hari 95,000 3,135
JUMLAH 368,995
D4. PEKERJAAN BETON BERTULANG
1 m3 Pekerjaan Pondasi Beton (Besi 150kg + bekisting) (SNI:7394:2008-6.28)
1 Kayu Kuat klas III 0.2000 m3 2,335,667 467,133
2 Paku 8 s/d 12 cm 1.5000 kg 36,000 54,000
3 Minyak Pelumas 0.4000 Ltr 35,000 14,000
4 Besi Beton rata-rata 157.5000 Kg 1,721 271,048
5 Kawat Beton Hitam 2.2500 kg 27,000 60,750
6 Semen PC (50 Kg) 6.7200 zak 63,500 426,720
7 Pasir Beton 0.5400 m3 145,000 78,300
8 Batu Split Pecah Mesin 2/3 0.8100 m3 145,000 117,450
a Pekerja 5.3000 Org/Hari 60,000 318,000
b Tukang Batu Kasar 0.2750 Org/Hari 80,000 22,000
c Tukang Kayu Kasar 1.3000 Org/Hari 80,000 104,000
d Tukang Besi Tulangan 1.0500 Org/Hari 80,000 84,000
e Kepala Tukang 0.2620 Org/Hari 80,000 20,960
f Mandor 0.2650 Org/Hari 95,000 25,175
JUMLAH 2,063,536
1 m3 Pekerjaan Sloof Beton (Besi 200kg + bekisting) (SNI:7394:2008-6.29)
1 Kayu Kuat klas III 0.2700 m3 2,335,667 630,630
2 Paku 8 s/d 12 cm 2.0000 kg 36,000 72,000
3 Minyak Pelumas 0.6000 Ltr 35,000 21,000
4 Besi Beton rata-rata 210.0000 Kg 1,721 361,397
5 Kawat Beton Hitam 3.0000 kg 27,000 81,000
6 Semen PC (50 Kg) 6.7200 zak 63,500 426,720
7 Pasir Beton 0.5400 m3 145,000 78,300
8 Batu Split Pecah Mesin 2/3 0.8100 m3 145,000 117,450
a Pekerja 0.5650 Org/Hari 60,000 33,900
b Tukang Batu Kasar 0.2750 Org/Hari 80,000 22,000

Nike Naluri (1106587) 19


c Tukang Kayu Kasar 1.5600 Org/Hari 80,000 124,800
d Tukang Besi Tulangan 1.4000 Org/Hari 80,000 112,000
e Kepala Tukang 0.3230 Org/Hari 80,000 25,840
f Mandor 0.2830 Org/Hari 95,000 26,885
JUMLAH 2,133,922
1 m3 Pekerjaan Kolom Beton (Besi 300kg + bekisting) (SNI:7394:2008-6.30)
1 Kayu Kuat klas III 0.4000 m3 2,335,667 934,267
2 Paku 8 s/d 12 cm 4.0000 kg 36,000 144,000
3 Minyak Pelumas 2.0000 Ltr 35,000 70,000
4 Besi Beton rata-rata 315.0000 Kg 1,721 542,095
5 Kawat Beton Hitam 4.5000 kg 27,000 121,500
6 Semen PC (50 Kg) 6.7200 zak 63,500 426,720
7 Pasir Beton 0.5400 m3 145,000 78,300
8 Batu Split Pecah Mesin 2/3 0.8100 m3 145,000 117,450
9 Kayu Kuat klas II 0.1500 m3 9,500,000 1,425,000
10 Multiplex t. 9 mm 3.5000 lbr 100,000 350,000
11 Dolken dia 8 s/d 10 cm p. 4 m 20.0000 btg 15,000 300,000
a Pekerja 7.0500 Org/Hari 60,000 423,000
b Tukang Batu Kasar 0.2750 Org/Hari 80,000 22,000
c Tukang Kayu Kasar 1.6500 Org/Hari 80,000 132,000
d Tukang Besi Tulangan 2.1000 Org/Hari 80,000 168,000
e Kepala Tukang 0.4030 Org/Hari 80,000 32,240
f Mandor 0.3530 Org/Hari 95,000 33,535
JUMLAH 5,320,107
1 m3 Pekerjaan Balok Beton (Besi 200kg + bekisting) (SNI:7394:2008-6.31)
1 Kayu Kuat klas III 0.3200 m3 2,335,667 747,413
2 Paku 8 s/d 12 cm 3.2000 kg 36,000 115,200
3 Minyak Pelumas 1.6000 Ltr 35,000 56,000
4 Besi Beton rata-rata 210.0000 Kg 1,721 361,397
5 Kawat Beton Hitam 3.0000 kg 27,000 81,000
6 Semen PC (50 Kg) 6.7200 zak 63,500 426,720
7 Pasir Beton 0.5400 m3 145,000 78,300
8 Batu Split Pecah Mesin 2/3 0.8100 m3 145,000 117,450
9 Kayu Kuat klas II 0.1400 m3 9,500,000 1,330,000
10 Multiplex t. 9 mm 2.8000 lbr 100,000 280,000
11 Dolken dia 8 s/d 10 cm p. 4 m 16.0000 btg 15,000 240,000
a Pekerja 6.3500 Org/Hari 60,000 381,000
b Tukang Batu Kasar 0.2750 Org/Hari 80,000 22,000
c Tukang Kayu Kasar 1.6500 Org/Hari 80,000 132,000
d Tukang Besi Tulangan 1.4000 Org/Hari 80,000 112,000

Nike Naluri (1106587) 20


e Kepala Tukang 0.3330 Org/Hari 80,000 26,640
f Mandor 0.3180 Org/Hari 95,000 30,210
JUMLAH 4,537,330
1 m3 Pekerjaan Plat Beton (Besi 150kg + bekisting) (SNI:7394:2008-6.32)
1 Kayu Kuat klas III 0.3200 m3 2,335,667 747,413
2 Paku 8 s/d 12 cm 3.2000 kg 36,000 115,200
3 Minyak Pelumas 1.6000 Ltr 35,000 56,000
4 Besi Beton rata-rata 157.5000 Kg 1,721 271,048
5 Kawat Beton Hitam 2.2500 kg 27,000 60,750
6 Semen PC (50 Kg) 6.7200 zak 63,500 426,720
7 Pasir Beton 0.5400 m3 145,000 78,300
8 Batu Split Pecah Mesin 2/3 0.8100 m3 145,000 117,450
9 Kayu Kuat klas II 0.1200 m3 9,500,000 1,140,000
10 Multiplex t. 9 mm 2.8000 lbr 100,000 280,000
11 Dolken dia 8 s/d 10 cm p. 4 m 32.0000 btg 15,000 480,000
a Pekerja 5.3000 Org/Hari 60,000 318,000
b Tukang Batu Kasar 0.2750 Org/Hari 80,000 22,000
c Tukang Kayu Kasar 1.3000 Org/Hari 80,000 104,000
d Tukang Besi Tulangan 1.0500 Org/Hari 80,000 84,000
e Kepala Tukang 0.2650 Org/Hari 80,000 21,200
f Mandor 0.2650 Org/Hari 95,000 25,175
JUMLAH 4,347,256
1 m3 Pekerjaan Dinding Beton (Besi 150kg + bekisting) (SNI:7394:2008-6.33)
1 Kayu Kuat klas III 0.2400 m3 2,335,667 560,560
2 Paku 8 s/d 12 cm 3.2000 kg 36,000 115,200
3 Minyak Pelumas 1.6000 Ltr 35,000 56,000
4 Besi Beton rata-rata 157.5000 Kg 1,721 271,048
5 Kawat Beton Hitam 2.2500 kg 27,000 60,750
6 Semen PC (50 Kg) 6.7200 zak 63,500 426,720
7 Pasir Beton 0.5400 m3 145,000 78,300
8 Batu Split Pecah Mesin 2/3 0.8100 m3 145,000 117,450
9 Kayu Kuat klas II 0.1600 m3 9,500,000 1,520,000
10 Multiplex t. 9 mm 2.8000 lbr 100,000 280,000
11 Dolken dia 8 s/d 10 cm p. 4 m 24.0000 btg 15,000 360,000
a Pekerja 5.3000 Org/Hari 60,000 318,000
b Tukang Batu Kasar 0.2750 Org/Hari 80,000 22,000
c Tukang Kayu Kasar 1.3000 Org/Hari 80,000 104,000
d Tukang Besi Tulangan 1.0500 Org/Hari 80,000 84,000
e Kepala Tukang 0.2620 Org/Hari 80,000 20,960
f Mandor 0.2650 Org/Hari 95,000 25,175

Nike Naluri (1106587) 21


JUMLAH 4,420,163
1 m3 Pekerjaan Dinding Beton (Besi 200kg + bekisting) (SNI:7394:2008-6.34)
1 Kayu Kuat klas III 0.2400 m3 2,335,667 560,560
2 Paku 8 s/d 12 cm 3.2000 kg 36,000 115,200
3 Minyak Pelumas 1.6000 Ltr 35,000 56,000
4 Besi Beton rata-rata 210.0000 Kg 1,721 361,397
5 Kawat Beton Hitam 3.0000 kg 27,000 81,000
6 Semen PC (50 Kg) 6.7200 zak 63,500 426,720
7 Pasir Beton 0.5400 m3 145,000 78,300
8 Batu Split Pecah Mesin 2/3 0.8100 m3 145,000 117,450
9 Kayu Kuat klas II 0.1050 m3 9,500,000 997,500
10 Multiplex t. 9 mm 2.5000 lbr 100,000 250,000
11 Dolken dia 8 s/d 10 cm p. 4 m 14.0000 btg 15,000 210,000
a Pekerja 5.6500 Org/Hari 60,000 339,000
b Tukang Batu Kasar 0.2750 Org/Hari 80,000 22,000
c Tukang Kayu Kasar 1.5600 Org/Hari 80,000 124,800
d Tukang Besi Tulangan 1.4000 Org/Hari 80,000 112,000
e Kepala Tukang 0.3230 Org/Hari 80,000 25,840
f Mandor 0.2830 Org/Hari 95,000 26,885
JUMLAH 3,904,652
1 m1 Pekerjaan Kolom Praktis Beton (11x11cm) (SNI:7394:2008-6.35)
1 Kayu Kuat klas III 0.0020 m3 2,335,667 4,671
2 Paku 8 s/d 12 cm 0.0100 kg 36,000 360
3 Besi Beton rata-rata 3.0000 Kg 1,721 5,163
4 Kawat Beton Hitam 0.0450 kg 27,000 1,215
5 Semen PC (50 Kg) 0.0800 zak 63,500 5,080
6 Pasir Beton 0.0050 m3 145,000 725
7 Batu Split Pecah Mesin 2/3 0.0060 m3 145,000 870
a Pekerja 0.1800 Org/Hari 60,000 10,800
b Tukang Batu Kasar 0.0200 Org/Hari 80,000 1,600
c Tukang Kayu Kasar 0.0200 Org/Hari 80,000 1,600
d Tukang Besi Tulangan 0.0200 Org/Hari 80,000 1,600
e Kepala Tukang 0.0060 Org/Hari 80,000 480
f Mandor 0.0090 Org/Hari 95,000 855
JUMLAH 35,019
1 m1 Pekerjaan Ring Balok Beton (10x15cm) (SNI:7394:2008-6.36)
1 Kayu Kuat klas III 0.0030 m3 2,335,667 7,007
2 Paku 8 s/d 12 cm 0.0200 kg 36,000 720
3 Besi Beton rata-rata 3.6000 Kg 1,721 6,195
4 Kawat Beton Hitam 0.0500 kg 27,000 1,350

Nike Naluri (1106587) 22


5 Semen PC (50 Kg) 0.1100 zak 63,500 6,985
6 Pasir Beton 0.0090 m3 145,000 1,305
7 Batu Split Pecah Mesin 2/3 0.0150 m3 145,000 2,175
a Pekerja 0.2970 Org/Hari 60,000 17,820
b Tukang Batu Kasar 0.0330 Org/Hari 80,000 2,640
c Tukang Kayu Kasar 0.0330 Org/Hari 80,000 2,640
d Tukang Besi Tulangan 0.0330 Org/Hari 80,000 2,640
e Kepala Tukang 0.0100 Org/Hari 80,000 800
f Mandor 0.0150 Org/Hari 95,000 1,425
JUMLAH 53,702

E.PEKERJAAN DINDING (SNI 6897:2008)

1 m2 Pasangan Bata Merah 1Bt (1 pc : 2 Ps) (SNI:6897:2008-6.1)


1 Bata Merah 140.0000 bh 600 84,000
2 Semen PC (50 Kg) 0.8700 zak 63,500 55,245
3 Pasir Pasang 0.0800 m3 135,000 10,800
a Pekerja 0.6000 Org/Hari 60,000 36,000
b Tukang Batu Kasar 0.2000 Org/Hari 80,000 16,000
c Kepala Tukang 0.0200 Org/Hari 80,000 1,600
d Mandor 0.0300 Org/Hari 95,000 2,850
JUMLAH 206,495
1 m2 Pasangan Bata Merah 1Bt (1 pc : 3 Ps) (SNI:6897:2008-6.2)
1 Bata Merah 140.0000 bh 600 84,000
2 Semen PC (50 Kg) 0.6590 zak 63,500 41,847
3 Pasir Pasang 0.0910 m3 135,000 12,285
a Pekerja 0.6000 Org/Hari 60,000 36,000
b Tukang Batu Kasar 0.2000 Org/Hari 80,000 16,000
c Kepala Tukang 0.0200 Org/Hari 80,000 1,600
d Mandor 0.0300 Org/Hari 95,000 2,850
JUMLAH 194,582
1 m2 Pasangan Bata Merah 1Bt (1 pc : 4 Ps) (SNI:6897:2008-6.3)
1 Bata Merah 140.0000 bh 600 84,000
2 Semen PC (50 Kg) 0.5310 zak 63,500 33,719
3 Pasir Pasang 0.0930 m3 135,000 12,555
a Pekerja 0.6000 Org/Hari 60,000 36,000
b Tukang Batu Kasar 0.2000 Org/Hari 80,000 16,000
c Kepala Tukang 0.0200 Org/Hari 80,000 1,600
d Mandor 0.0300 Org/Hari 95,000 2,850
JUMLAH 186,724
1 m2 Pasangan Bata Merah 1Bt (1 pc : 5 Ps) (SNI:6897:2008-6.4)

Nike Naluri (1106587) 23


1 Bata Merah 140.0000 bh 600 84,000
2 Semen PC (50 Kg) 0.4440 zak 63,500 28,194
3 Pasir Pasang 0.1020 m3 135,000 13,770
a Pekerja 0.6000 Org/Hari 60,000 36,000
b Tukang Batu Kasar 0.2000 Org/Hari 80,000 16,000
c Kepala Tukang 0.0200 Org/Hari 80,000 1,600
d Mandor 0.0300 Org/Hari 95,000 2,850
JUMLAH 182,414
1 m2 Pasangan Bata Merah 1Bt (1 pc : 6 Ps) (SNI:6897:2008-6.5)
1 Bata Merah 140.0000 bh 600 84,000
2 Semen PC (50 Kg) 0.3700 zak 63,500 23,495
3 Pasir Pasang 0.1220 m3 135,000 16,470
a Pekerja 0.6000 Org/Hari 60,000 36,000
b Tukang Batu Kasar 0.2000 Org/Hari 80,000 16,000
c Kepala Tukang 0.0200 Org/Hari 80,000 1,600
d Mandor 0.0300 Org/Hari 95,000 2,850
JUMLAH 180,415
1 m2 Pasangan Bata Merah 1/2 Bt (1 pc : 2 Ps) (SNI:6897:2008-6.7)
1 Bata Merah 70.0000 bh 600 42,000
2 Semen PC (50 Kg) 0.3790 zak 63,500 24,067
3 Pasir Pasang 0.0380 m3 135,000 5,130
a Pekerja 0.3000 Org/Hari 60,000 18,000
b Tukang Batu Kasar 0.1000 Org/Hari 80,000 8,000
c Kepala Tukang 0.0100 Org/Hari 80,000 800
d Mandor 0.0150 Org/Hari 95,000 1,425
JUMLAH 99,422
1 m2 Pasangan Bata Merah 1/2 Bt (1 pc : 3 Ps) (SNI:6897:2008-6.8)
1 Bata Merah 70.0000 bh 600 42,000
2 Semen PC (50 Kg) 0.2874 zak 63,500 18,250
3 Pasir Pasang 0.0400 m3 135,000 5,400
a Pekerja 0.3000 Org/Hari 60,000 18,000
b Tukang Batu Kasar 0.1000 Org/Hari 80,000 8,000
c Kepala Tukang 0.0100 Org/Hari 80,000 800
d Mandor 0.0150 Org/Hari 95,000 1,425
JUMLAH 93,875
1 m2 Pasangan Bata Merah 1/2 Bt (1 pc : 4 Ps) (SNI:6897:2008-6.9)
1 Bata Merah 70.0000 bh 600 42,000
2 Semen PC (50 Kg) 0.2300 zak 63,500 14,605
3 Pasir Pasang 0.0430 m3 135,000 5,805
a Pekerja 0.3000 Org/Hari 60,000 18,000

Nike Naluri (1106587) 24


b Tukang Batu Kasar 0.1000 Org/Hari 80,000 8,000
c Kepala Tukang 0.0100 Org/Hari 80,000 800
d Mandor 0.0150 Org/Hari 95,000 1,425
JUMLAH 90,635
1 m2 Pasangan Bata Merah 1/2 Bt (1 pc : 5 Ps) (SNI:6897:2008-6.10)
1 Bata Merah 70.0000 bh 600 42,000
2 Semen PC (50 Kg) 0.1936 zak 63,500 12,294
3 Pasir Pasang 0.0450 m3 135,000 6,075
a Pekerja 0.3000 Org/Hari 60,000 18,000
b Tukang Batu Kasar 0.1000 Org/Hari 80,000 8,000
c Kepala Tukang 0.0100 Org/Hari 80,000 800
d Mandor 0.0150 Org/Hari 95,000 1,425
JUMLAH 88,594
1 m2 Pasangan Bata Merah 1/2 Bt (1 pc : 6 Ps) (SNI:6897:2008-6.11)
1 Bata Merah 70.0000 bh 600 42,000
2 Semen PC (50 Kg) 0.1664 zak 63,500 10,566
3 Pasir Pasang 0.0490 m3 135,000 6,615
a Pekerja 0.3000 Org/Hari 60,000 18,000
b Tukang Batu Kasar 0.1000 Org/Hari 80,000 8,000
c Kepala Tukang 0.0100 Org/Hari 80,000 800
d Mandor 0.0150 Org/Hari 95,000 1,425
JUMLAH 87,406
1 m2 Pasangan Batako (1 pc : 3 Ps) t-20cm (SNI:6897:2008-6.16)
1 Batako 12.5000 bh 2,400 30,000
2 Semen PC (50 Kg) 0.6064 zak 63,500 38,506
3 Pasir Pasang 0.7280 m3 135,000 98,280
4 Besi Beton rata-rata 0.0280 Kg 1,721 48
a Pekerja 0.3500 Org/Hari 60,000 21,000
b Tukang Batu Kasar 0.1500 Org/Hari 80,000 12,000
c Kepala Tukang 0.0150 Org/Hari 80,000 1,200
d Mandor 0.0180 Org/Hari 95,000 1,710
JUMLAH 202,745
1 m2 Pasangan Conblock (1 pc : 3 Ps) t-20cm (SNI:6897:2008-6.16)
1 Bata Conblock 12.5000 bh 2,400 30,000
2 Semen PC (50 Kg) 0.6064 zak 63,500 38,506
3 Pasir Pasang 0.7280 m3 135,000 98,280
4 Besi Beton rata-rata 0.0280 Kg 1,721 48
a Pekerja 0.3500 Org/Hari 60,000 21,000
b Tukang Batu Kasar 0.1500 Org/Hari 80,000 12,000
c Kepala Tukang 0.0150 Org/Hari 80,000 1,200

Nike Naluri (1106587) 25


d Mandor 0.0180 Org/Hari 95,000 1,710
JUMLAH 202,745
1 m2 Pasangan Batako (1 pc : 4 Ps) t-20cm (SNI:6897:2008-6.17)
1 Bata Conblock 12.5000 bh 2,400 30,000
2 Semen PC (50 Kg) 0.4852 zak 63,500 30,810
3 Pasir Pasang 0.7720 m3 135,000 104,220
4 Besi Beton rata-rata 0.0280 Kg 1,721 48
a Pekerja 0.3500 Org/Hari 60,000 21,000
b Tukang Batu Kasar 0.1500 Org/Hari 80,000 12,000
c Kepala Tukang 0.0150 Org/Hari 80,000 1,200
d Mandor 0.0180 Org/Hari 95,000 1,710
JUMLAH 200,988
1 m2 Pasangan Batako (1 pc : 3 Ps) t-15 cm (SNI:6897:2008-6.18)
1 Batako 12.5000 bh 2,400 30,000
2 Semen PC (50 Kg) 0.4548 zak 63,500 28,880
3 Pasir Pasang 0.5500 m3 135,000 74,250
4 Besi Beton rata-rata 0.0280 Kg 1,721 48
a Pekerja 0.3200 Org/Hari 60,000 19,200
b Tukang Batu Kasar 0.1200 Org/Hari 80,000 9,600
c Kepala Tukang 0.0120 Org/Hari 80,000 960
d Mandor 0.0160 Org/Hari 95,000 1,520
JUMLAH 164,458
1 m2 Pasangan Conblok (1 pc : 3 Ps) t-15 cm (SNI:6897:2008-6.18)
1 Bata Conblock 12.5000 bh 2,400 30,000
2 Semen PC (50 Kg) 0.4548 zak 63,500 28,880
3 Pasir Pasang 0.5500 m3 135,000 74,250
4 Besi Beton rata-rata 0.0280 Kg 1,721 48
a Pekerja 0.3200 Org/Hari 60,000 19,200
b Tukang Batu Kasar 0.1200 Org/Hari 80,000 9,600
c Kepala Tukang 0.0120 Org/Hari 80,000 960
d Mandor 0.0160 Org/Hari 95,000 1,520
JUMLAH 164,458
1 m2 Pasangan Batako (1 pc : 4 Ps) t-15 cm (SNI:6897:2008-6.19)
1 Batako 12.5000 bh 2,400 30,000
2 Semen PC (50 Kg) 0.3640 zak 63,500 23,114
3 Pasir Pasang 0.5820 m3 135,000 78,570
4 Besi Beton rata-rata 0.0280 Kg 1,721 48
a Pekerja 0.3200 Org/Hari 60,000 19,200
b Tukang Batu Kasar 0.1200 Org/Hari 80,000 9,600
c Kepala Tukang 0.0120 Org/Hari 80,000 960

Nike Naluri (1106587) 26


d Mandor 0.0160 Org/Hari 95,000 1,520
JUMLAH 163,012
1 m2 Pasangan Conblok (1 pc : 4 Ps) t-15 cm (SNI:6897:2008-6.19)
1 Bata Conblock 12.5000 bh 2,400 30,000
2 Semen PC (50 Kg) 0.3640 zak 63,500 23,114
3 Pasir Pasang 0.5820 m3 135,000 78,570
4 Besi Beton rata-rata 0.0280 Kg 1,721 48
a Pekerja 0.3200 Org/Hari 60,000 19,200
b Tukang Batu Kasar 0.1200 Org/Hari 80,000 9,600
c Kepala Tukang 0.0120 Org/Hari 80,000 960
d Mandor 0.0160 Org/Hari 95,000 1,520
JUMLAH 163,012
1 m2 Pasangan Batako (1 pc : 3 Ps) t-10 cm (SNI:6897:2008-6.20)
1 Batako 12.5000 bh 2,400 30,000
2 Semen PC (50 Kg) 0.3032 zak 63,500 19,253
3 Pasir Pasang 0.3640 m3 135,000 49,140
4 Besi Beton rata-rata 0.0280 Kg 1,721 48
a Pekerja 0.3000 Org/Hari 60,000 18,000
b Tukang Batu Kasar 0.1000 Org/Hari 80,000 8,000
c Kepala Tukang 0.0100 Org/Hari 80,000 800
d Mandor 0.0150 Org/Hari 95,000 1,425
JUMLAH 126,666
1 m2 Pasangan Conblok (1 pc : 3 Ps) t-10 cm (SNI:6897:2008-6.20)
1 Bata Conblock 12.5000 bh 2,400 30,000
2 Semen PC (50 Kg) 0.3032 zak 63,500 19,253
3 Pasir Pasang 0.3640 m3 135,000 49,140
4 Besi Beton rata-rata 0.0280 Kg 1,721 48
a Pekerja 0.3000 Org/Hari 60,000 18,000
b Tukang Batu Kasar 0.1000 Org/Hari 80,000 8,000
c Kepala Tukang 0.0100 Org/Hari 80,000 800
d Mandor 0.0150 Org/Hari 95,000 1,425
JUMLAH 126,666
1 m2 Pasangan Batako (1 pc : 4 Ps) t-10 cm (SNI:6897:2008-6.21)
1 Batako 12.5000 bh 2,400 30,000
2 Semen PC (50 Kg) 0.2426 zak 63,500 15,405
3 Pasir Pasang 0.3880 m3 135,000 52,380
4 Besi Beton rata-rata 0.0280 Kg 1,721 48
a Pekerja 0.3000 Org/Hari 60,000 18,000
b Tukang Batu Kasar 0.1000 Org/Hari 80,000 8,000
c Kepala Tukang 0.0100 Org/Hari 80,000 800

Nike Naluri (1106587) 27


d Mandor 0.0150 Org/Hari 95,000 1,425
JUMLAH 126,058
1 m2 Pasangan Conblok (1 pc : 4 Ps) t-10 cm (SNI:6897:2008-6.21)
1 Bata Conblock 12.5000 bh 2,400 30,000
2 Semen PC (50 Kg) 0.2426 zak 63,500 15,405
3 Pasir Pasang 0.3880 m3 135,000 52,380
4 Besi Beton rata-rata 0.0280 Kg 1,721 48
a Pekerja 0.3000 Org/Hari 60,000 18,000
b Tukang Batu Kasar 0.1000 Org/Hari 80,000 8,000
c Kepala Tukang 0.0100 Org/Hari 80,000 800
d Mandor 0.0150 Org/Hari 95,000 1,425
JUMLAH 126,058
1 m2 Pasangan Bata Roster (1 pc : 3 Ps) u.12x11x24 cm (SNI:6897:2008-6.22)
1 Bata Roster 30.0000 bh 7,000 210,000
2 Semen PC (50 Kg) 0.2800 zak 63,500 17,780
3 Pasir Pasang 0.0320 m3 135,000 4,320
a Pekerja 0.3000 Org/Hari 60,000 18,000
b Tukang Batu Kasar 0.1000 Org/Hari 80,000 8,000
c Kepala Tukang 0.0100 Org/Hari 80,000 800
d Mandor 0.0150 Org/Hari 95,000 1,425
JUMLAH 260,325
1 m2 Pasangan Bata Roster (1 pc : 4 Ps) u.12x11x24 cm (SNI:6897:2008-6.23)
1 Bata Roster 30.0000 bh 7,000 210,000
2 Semen PC (50 Kg) 0.2200 zak 63,500 13,970
3 Pasir Pasang 0.0350 m3 135,000 4,725
a Pekerja 0.3000 Org/Hari 60,000 18,000
b Tukang Batu Kasar 0.1000 Org/Hari 80,000 8,000
c Kepala Tukang 0.0100 Org/Hari 80,000 800
d Mandor 0.0150 Org/Hari 95,000 1,425
JUMLAH 256,920

F.PEKERJAAN Plesteran & Aci (SNI 2837:2008)


1 m2 Plesteran tebal= 1,5 (1 pc : 1 Ps) (SNI:2837:2008-6.1)
1 Semen PC (50 Kg) 0.3101 zak 63,500 19,690
2 Pasir Pasang 0.0160 m3 135,000 2,160
a Pekerja 0.3000 Org/Hari 60,000 18,000
b Tukang Batu Kasar 0.1500 Org/Hari 80,000 12,000
c Kepala Tukang 0.0150 Org/Hari 80,000 1,200
d Mandor 0.0150 Org/Hari 95,000 1,425
JUMLAH 54,475
1 m2 Plesteran tebal= 1,5 (1 pc : 2 Ps) (SNI:2837:2008-6.2)

Nike Naluri (1106587) 28


1 Semen PC (50 Kg) 0.2045 zak 63,500 12,984
2 Pasir Pasang 0.0200 m3 135,000 2,700
a Pekerja 0.3000 Org/Hari 60,000 18,000
b Tukang Batu Kasar 0.1500 Org/Hari 80,000 12,000
c Kepala Tukang 0.0150 Org/Hari 80,000 1,200
d Mandor 0.0150 Org/Hari 95,000 1,425
JUMLAH 48,309
1 m2 Plesteran tebal= 1,5 (1 pc : 3 Ps) (SNI:2837:2008-6.3)
1 Semen PC (50 Kg) 0.1555 zak 63,500 9,876
2 Pasir Pasang 0.0230 m3 135,000 3,105
a Pekerja 0.3000 Org/Hari 60,000 18,000
b Tukang Batu Kasar 0.1500 Org/Hari 80,000 12,000
c Kepala Tukang 0.0150 Org/Hari 80,000 1,200
d Mandor 0.0150 Org/Hari 95,000 1,425
JUMLAH 45,606
1 m2 Plesteran tebal= 1,5 (1 pc : 4 Ps) (SNI:2837:2008-6.4)
1 Semen PC (50 Kg) 0.1248 zak 63,500 7,925
2 Pasir Pasang 0.0240 m3 135,000 3,240
a Pekerja 0.3000 Org/Hari 60,000 18,000
b Tukang Batu Kasar 0.1500 Org/Hari 80,000 12,000
c Kepala Tukang 0.0150 Org/Hari 80,000 1,200
d Mandor 0.0150 Org/Hari 95,000 1,425
JUMLAH 43,790
1 m2 Plesteran tebal= 1,5 (1 pc : 5 Ps) (SNI:2837:2008-6.5)
1 Semen PC (50 Kg) 0.1037 zak 63,500 6,584
2 Pasir Pasang 0.0260 m3 135,000 3,510
a Pekerja 0.3000 Org/Hari 60,000 18,000
b Tukang Batu Kasar 0.1500 Org/Hari 80,000 12,000
c Kepala Tukang 0.0150 Org/Hari 80,000 1,200
d Mandor 0.0150 Org/Hari 95,000 1,425
JUMLAH 42,719
1 m2 Plesteran tebal= 1,5 (1 pc : 6 Ps) (SNI:2837:2008-6.6)
1 Semen PC (50 Kg) 0.0883 zak 63,500 5,608
2 Pasir Pasang 0.0270 m3 135,000 3,645
a Pekerja 0.3000 Org/Hari 60,000 18,000
b Tukang Batu Kasar 0.1500 Org/Hari 80,000 12,000
c Kepala Tukang 0.0150 Org/Hari 80,000 1,200
d Mandor 0.0150 Org/Hari 95,000 1,425
JUMLAH 41,878
1 m2 Plesteran tebal= 2cm (1 pc : 2 Ps) (SNI:2837:2008-6.13)

Nike Naluri (1106587) 29


1 Semen PC (50 Kg) 0.2726 zak 63,500 17,313
2 Pasir Pasang 0.0270 m3 135,000 3,645
a Pekerja 0.4000 Org/Hari 60,000 24,000
b Tukang Batu Kasar 0.2000 Org/Hari 80,000 16,000
c Kepala Tukang 0.0200 Org/Hari 80,000 1,600
d Mandor 0.0220 Org/Hari 95,000 2,090
JUMLAH 64,648
1 m2 Plesteran tebal= 2cm (1 pc : 3 Ps) (SNI:2837:2008-6.14)
1 Semen PC (50 Kg) 0.2074 zak 63,500 13,167
2 Pasir Pasang 0.0310 m3 135,000 4,185
a Pekerja 0.4000 Org/Hari 60,000 24,000
b Tukang Batu Kasar 0.2000 Org/Hari 80,000 16,000
c Kepala Tukang 0.0200 Org/Hari 80,000 1,600
d Mandor 0.0220 Org/Hari 95,000 2,090
JUMLAH 61,042
1 Semen PC (50 Kg) 0.1664 zak 63,500 10,566
2 Pasir Pasang 0.0320 m3 135,000 4,320
a Pekerja 0.4000 Org/Hari 60,000 24,000
b Tukang Batu Kasar 0.2000 Org/Hari 80,000 16,000
c Kepala Tukang 0.0200 Org/Hari 80,000 1,600
d Mandor 0.0220 Org/Hari 95,000 2,090
JUMLAH 58,576
1 m2 Plesteran tebal= 2cm (1 pc : 5 Ps) (SNI:2837:2008-6.16)
2 Pasir Pasang 0.0350 m3 135,000 4,725
a Pekerja 0.4000 Org/Hari 60,000 24,000
b Tukang Batu Kasar 0.2000 Org/Hari 80,000 16,000
c Kepala Tukang 0.0200 Org/Hari 80,000 1,600
d Mandor 0.0220 Org/Hari 95,000 2,090
JUMLAH 48,415
1 m1 Plesteran Sekoning 10mm (1 pc : 2 Ps) (SNI:2837:2008-6.20)
1 Semen PC (50 Kg) 0.0100 zak 63,500 635
a Pekerja 0.0800 Org/Hari 60,000 4,800
b Tukang Batu Kasar 0.4000 Org/Hari 80,000 32,000
c Kepala Tukang 0.0400 Org/Hari 80,000 3,200
d Mandor 0.0040 Org/Hari 95,000 380
JUMLAH 41,015
1 m2 Plesteran Granit t=10mm (1 pc : 2 Ps) (SNI:2837:2008-6.21)
1 Semen PC (50 Kg) 0.2000 zak 63,500 12,700
2 Batu granit tumbuk 15.0000 Kg 12,000 180,000
b Tukang Batu Kasar 0.2250 Org/Hari 80,000 18,000

Nike Naluri (1106587) 30


c Kepala Tukang 0.0230 Org/Hari 80,000 1,840
d Mandor 0.0230 Org/Hari 95,000 2,185
JUMLAH 214,725
1 m2 Plesteran Teraso t=10mm (1 pc : 2 Ps) (SNI:2837:2008-6.22)
1 Semen PC (50 Kg) 0.2000 zak 63,500 12,700
2 Batu teraso tumbuk 15.0000 Kg 7,000 105,000
a Pekerja 0.4500 Org/Hari 60,000 27,000
c Kepala Tukang 0.0230 Org/Hari 80,000 1,840
d Mandor 0.0230 Org/Hari 95,000 2,185
JUMLAH 148,725
1 m2 Plesteran Teraso Kamprot (1 pc : 2 Ps) (SNI:2837:2008-6.23)
1 Semen PC (50 Kg) 0.0864 zak 63,500 5,486
2 Pasir Pasang 0.0060 m3 135,000 810
a Pekerja 0.3000 Org/Hari 60,000 18,000
b Tukang Batu Kasar 0.1000 Org/Hari 80,000 8,000
c Kepala Tukang 0.0100 Org/Hari 80,000 800
d Mandor 0.0150 Org/Hari 95,000 1,425
JUMLAH 34,521
1 m2 Finishing siar bata merah (SNI:2837:2008-6.24)
1 Semen PC (50 Kg) 0.0622 zak 63,500 3,947
a Pekerja 0.1500 Org/Hari 60,000 9,000
b Tukang Batu Kasar 0.0750 Org/Hari 80,000 6,000
c Kepala Tukang 0.0080 Org/Hari 80,000 640
d Mandor 0.0080 Org/Hari 95,000 760
JUMLAH 20,347
1 m2 Finishing siar batako/bata conblok (SNI:2837:2008-6.25)
1 Semen PC (50 Kg) 0.0320 zak 63,500 2,032
a Pekerja 0.0700 Org/Hari 60,000 4,200
b Tukang Batu Kasar 0.0350 Org/Hari 80,000 2,800
c Kepala Tukang 0.0040 Org/Hari 80,000 320
d Mandor 0.0040 Org/Hari 95,000 380
JUMLAH 9,732
1 m2 Finishing siar pasangan batu kali ekspos (1PC:2PS) (SNI:2837:2008-6.26)
1 Semen PC (50 Kg) 0.1268 zak 63,500 8,052
2 Pasir Pasang 0.0120 m3 135,000 1,620
a Pekerja 0.3000 Org/Hari 60,000 18,000
b Tukang Batu Kasar 0.1500 Org/Hari 80,000 12,000
c Kepala Tukang 0.0150 Org/Hari 80,000 1,200
d Mandor 0.0150 Org/Hari 95,000 1,425
JUMLAH 42,297

Nike Naluri (1106587) 31


1 m2 Acian (SNI:2837:2008-6.27)
1 Semen PC (50 Kg) 0.0650 zak 63,500 4,128
a Pekerja 0.2000 Org/Hari 60,000 12,000
b Tukang Batu Kasar 0.1000 Org/Hari 80,000 8,000
c Kepala Tukang 0.0100 Org/Hari 80,000 800
d Mandor 0.1000 Org/Hari 95,000 9,500
JUMLAH 34,428

G.PEKERJAAN FINISHING Lantai (SNI 7395:2008)


1 m2 Lantai Ubin PC abu-abu uk. 40X 40 cm (SNI:7395:2008-6.1)
2 Semen PC (50 Kg) 0.1960 zak 63,500 12,446
3 Pasir Pasang 0.0450 m3 135,000 6,075
a Pekerja 0.2500 Org/Hari 60,000 15,000
b Tukang Batu Kasar 0.1250 Org/Hari 80,000 10,000
c Kepala Tukang 0.0130 Org/Hari 80,000 1,040
d Mandor 0.0130 Org/Hari 95,000 1,235
JUMLAH 77,620

NOTE: Analisa harga diatas berlaku untuk material disebut dibawah ini ukuran 40 x 40cm
Ubin PC warna (SNI:7395:2008-6.4)

Ubin warna (SNI:7395:2008-6.7)

Ubin teraso (SNI:7395:2008-6.9)

Ubin granit (SNI:7395:2008-6.11)

Ubin teralux marmer (SNI:7395:2008-6.14)

1 m2 Lantai Keramik (uk. = 20x20 cm) (SNI:7395:2008-6.36)


1 Keramik Lantai 30/30 cm Polished 1.0600 m2 65,000 68,900
2 Semen PC (50 Kg) 0.2080 zak 90,000 18,720
3 Pasir Pasang 0.0450 m3 153,000 6,885
4 Semen Warna 1.5000 kg 8,000 12,000
a Pekerja 0.7000 Org/Hari 75,000 52,500
b Tukang Batu Kasar 0.3500 Org/Hari 100,000 35,000
c Kepala Tukang 0.0350 Org/Hari 115,000 4,025
d Mandor 0.0350 Org/Hari 115,000 4,025
JUMLAH 202,055
1 m2 Lantai Keramik (uk. = 30x30 cm)
1 Keramik Lantai 60/60 cm Unpolished 1.0683 m2 200,000 213,660
2 Semen PC (50 Kg) 0.2000 zak 63,500 12,700
3 Pasir Pasang 0.0450 m3 135,000 6,075
4 Semen Warna 1.5000 kg 12,500 18,750
a Pekerja 0.7000 Org/Hari 60,000 42,000
b Tukang Batu Kasar 0.3500 Org/Hari 80,000 28,000
c Kepala Tukang 0.0350 Org/Hari 80,000 2,800

Nike Naluri (1106587) 32


d Mandor 0.0350 Org/Hari 95,000 3,325
JUMLAH 327,310
1 m2 Lantai Keramik (uk. = 33x33 cm) (SNI:7395:2008-6.34)
1 Keramik Lantai 60/60 cm Unpolished 1.0890 m2 75,000 81,675
2 Semen PC (50 Kg) 0.1638 zak 90,000 14,742
3 Pasir Pasang 0.0450 m3 153,000 6,885
4 Semen Warna 1.5000 kg 8,000 12,000
a Pekerja 0.7000 Org/Hari 75,000 52,500
b Tukang Batu Kasar 0.3500 Org/Hari 100,000 35,000
c Kepala Tukang 0.0350 Org/Hari 115,000 4,025
d Mandor 0.0350 Org/Hari 115,000 4,025
JUMLAH 210,852
1 m2 Lantai Keramik (uk. = 40x40 cm) (dihitung)
1 Keramik Lantai 40/40 cm Polished 1.1000 m2 90,000 99,000
2 Semen PC (50 Kg) 0.1960 zak 90,000 17,640
3 Pasir Pasang 0.0450 m3 153,000 6,885
4 Semen Warna 1.3000 kg 8,000 10,400
a Pekerja 0.7000 Org/Hari 75,000 52,500
b Tukang Batu Kasar 0.3500 Org/Hari 100,000 35,000
c Kepala Tukang 0.0350 Org/Hari 115,000 4,025
d Mandor 0.0350 Org/Hari 115,000 4,025
JUMLAH 229,475
1 m2 Lantai Keramik (uk. = 50x50 cm) (dihitung)
1 Keramik Lantai 50/50 cm Polished 1.1050 m2 51,500 56,908
2 Semen PC (50 Kg) 0.1940 zak 90,000 17,460
3 Pasir Pasang 0.0450 m3 153,000 6,885
4 Semen Warna 1.5000 kg 8,000 12,000
a Pekerja 0.7000 Org/Hari 75,000 52,500
b Tukang Batu Kasar 0.3500 Org/Hari 100,000 35,000
c Kepala Tukang 0.0350 Org/Hari 115,000 4,025
d Mandor 0.0350 Org/Hari 115,000 4,025
JUMLAH 188,803
1 m2 Lantai Keramik (uk. = 60x60 cm) (dihitung)
1 Keramik Lantai 60/60 cm Polished 1.1160 m2 75,000 83,700
2 Semen PC (50 Kg) 0.1920 zak 90,000 17,280
3 Pasir Pasang 0.0450 m3 153,000 6,885
4 Semen Warna 1.5000 kg 8,000 12,000
a Pekerja 0.7000 Org/Hari 75,000 52,500
b Tukang Batu Kasar 0.3500 Org/Hari 100,000 35,000
c Kepala Tukang 0.0350 Org/Hari 115,000 4,025

Nike Naluri (1106587) 33


d Mandor 0.0350 Org/Hari 115,000 4,025
JUMLAH 215,415
1 m2 Lantai Keramik Border (uk. = 10x33cm) bo - NI:7395:2008-6.37)
1 Keramik Lantai 33/33 cm Polished 1.0890 m2 44,400 48,352
2 Semen PC (50 Kg) 0.1960 zak 90,000 17,640
3 Pasir Pasang 0.0450 m3 153,000 6,885
4 Semen Warna 4.3700 kg 8,000 34,960
a Pekerja 1.0500 Org/Hari 75,000 78,750
b Tukang Batu Kasar 0.5250 Org/Hari 100,000 52,500
c Kepala Tukang 0.0530 Org/Hari 115,000 6,095
d Mandor 0.0530 Org/Hari 115,000 6,095
JUMLAH 251,277
1 m2 Lantai Keramik Mozaik (uk. = 30x30 cm) mozaik (SNI:7395:2008-6.38)
1 Keramik Lantai 30/30 cm Polished 1.0683 m2 80,000 85,464
2 Semen PC (50 Kg) 0.2830 zak 90,000 25,470
3 Pasir Pasang 0.0390 m3 153,000 5,967
4 Semen Warna 2.0000 kg 8,000 16,000
a Pekerja 0.7000 Org/Hari 75,000 52,500
b Tukang Batu Kasar 0.3500 Org/Hari 100,000 35,000
c Kepala Tukang 0.0350 Org/Hari 115,000 4,025
d Mandor 0.0350 Org/Hari 115,000 4,025
JUMLAH 228,451
DIBULATKAN 228,400
1 m1 Plint Lantai Keramik (uk. = 10x20 cm) (SNI:7395:2008-6.39)
1 Keramik Lantai 20/20 cm Polished 0.1060 m2 65,000 6,890
2 Semen PC (50 Kg) 0.0228 zak 90,000 2,052
3 Pasir Pasang 0.0030 m3 153,000 459
4 Semen Warna 0.0250 kg 8,000 200
a Pekerja 0.0900 Org/Hari 75,000 6,750
b Tukang Batu Kasar 0.0900 Org/Hari 100,000 9,000
c Kepala Tukang 0.0090 Org/Hari 115,000 1,035
d Mandor 0.0050 Org/Hari 115,000 575
JUMLAH 26,961
1 m1 Plint Lantai Keramik (uk. = 10x10 cm) (SNI:7395:2008-6.40)
1 Keramik Lantai 20/20 cm Polished 0.1060 m2 65,000 6,890
2 Semen PC (50 Kg) 0.0228 zak 90,000 2,052
3 Pasir Pasang 0.0030 m3 153,000 459
4 Semen Warna 0.0500 kg 8,000 400
a Pekerja 0.0900 Org/Hari 75,000 6,750
b Tukang Batu Kasar 0.0900 Org/Hari 100,000 9,000

Nike Naluri (1106587) 34


c Kepala Tukang 0.0090 Org/Hari 115,000 1,035
d Mandor 0.0050 Org/Hari 115,000 575
JUMLAH 27,161
1 m1 Plint Lantai Keramik (uk. = 5X20 cm) (SNI:7395:2008-6.41)
1 Keramik Lantai 20/20 cm Polished 0.0530 m2 65,000 3,445
2 Semen PC (50 Kg) 0.0114 zak 90,000 1,026
3 Pasir Pasang 0.0015 m3 153,000 230
4 Semen Warna 0.0130 kg 8,000 104
a Pekerja 0.0900 Org/Hari 75,000 6,750
b Tukang Batu Kasar 0.0900 Org/Hari 100,000 9,000
c Kepala Tukang 0.0090 Org/Hari 115,000 1,035
d Mandor 0.0050 Org/Hari 115,000 575
JUMLAH 22,165
1 m1 Plint Lantai Keramik (uk. = 10x30 cm) (dihitung)
1 Keramik Lantai 30/30 cm Polished 0.1050 m2 80,000 8,400
2 Semen PC (50 Kg) 0.0228 zak 90,000 2,052
3 Pasir Pasang 0.0030 m3 153,000 459
4 Semen Warna 0.0250 kg 8,000 200
a Pekerja 0.0900 Org/Hari 75,000 6,750
b Tukang Batu Kasar 0.0900 Org/Hari 100,000 9,000
c Kepala Tukang 0.0090 Org/Hari 115,000 1,035
d Mandor 0.0050 Org/Hari 115,000 575
JUMLAH 28,471
1 m1 Plint Lantai Keramik (uk. = 10x33 cm) (dihitung)
1 Keramik Lantai 33/33 cm Polished 0.1056 m2 44,400 4,689
2 Semen PC (50 Kg) 0.0228 zak 90,000 2,052
3 Pasir Pasang 0.0030 m3 153,000 459
4 Semen Warna 0.0250 kg 8,000 200
a Pekerja 0.0900 Org/Hari 75,000 6,750
b Tukang Batu Kasar 0.0900 Org/Hari 100,000 9,000
c Kepala Tukang 0.0090 Org/Hari 115,000 1,035
d Mandor 0.0050 Org/Hari 115,000 575
JUMLAH 24,760
1 m1 Plint Lantai Keramik (uk. = 10x40 cm) (dihitung)
1 Keramik Lantai 40/40 cm Polished 0.1052 m2 90,000 9,468
2 Semen PC (50 Kg) 0.0228 zak 90,000 2,052
3 Pasir Pasang 0.0030 m3 153,000 459
4 Semen Warna 0.0250 kg 8,000 200
a Pekerja 0.0900 Org/Hari 75,000 6,750
b Tukang Batu Kasar 0.0900 Org/Hari 100,000 9,000

Nike Naluri (1106587) 35


c Kepala Tukang 0.0090 Org/Hari 115,000 1,035
d Mandor 0.0050 Org/Hari 115,000 575
JUMLAH 29,539
1 m1 Plint Lantai Keramik (uk. = 10x50 cm) (dihitung)
1 Keramik Lantai 50/50 cm Polished 0.1050 m2 51,500 5,408
2 Semen PC (50 Kg) 0.0228 zak 90,000 2,052
3 Pasir Pasang 0.0030 m3 153,000 459
4 Semen Warna 0.0250 kg 8,000 200
a Pekerja 0.0900 Org/Hari 75,000 6,750
b Tukang Batu Kasar 0.0900 Org/Hari 100,000 9,000
c Kepala Tukang 0.0090 Org/Hari 115,000 1,035
d Mandor 0.0050 Org/Hari 115,000 575
JUMLAH 25,479
1 m1 Plint Lantai Keramik (uk. = 10x60 cm) (dihitung)
1 Keramik Lantai 60/60 cm Polished 0.1050 m2 75,000 7,875
2 Semen PC (50 Kg) 0.0228 zak 90,000 2,052
3 Pasir Pasang 0.0030 m3 153,000 459
4 Semen Warna 0.0250 kg 8,000 200
a Pekerja 0.0900 Org/Hari 75,000 6,750
b Tukang Batu Kasar 0.0900 Org/Hari 100,000 9,000
c Kepala Tukang 0.0090 Org/Hari 115,000 1,035
d Mandor 0.0050 Org/Hari 115,000 575
JUMLAH 27,946
1 m1 Plint Lantai Internal Cove (SNI:2837:2008-6.42)
1 Internal Cove (Plint) 1.0500 m1 27,500 28,875
2 Semen PC (50 Kg) 0.0228 zak 63,500 1,448
3 Pasir Pasang 0.0030 m3 135,000 405
4 Semen Warna 0.1000 kg 12,500 1,250
a Pekerja 0.0750 Org/Hari 60,000 4,500
b Tukang Batu Kasar 0.0750 Org/Hari 80,000 6,000
c Kepala Tukang 0.0075 Org/Hari 80,000 600
d Mandor 0.0038 Org/Hari 95,000 361
JUMLAH 43,439
1 m2 Lantai Marmer (uk. =100x100 cm) (SNI:2837:2008-6.43)
1 Lantai Marmer 1.0600 m2 190,000 201,400
2 Semen PC (50 Kg) 0.1638 zak 63,500 10,401
3 Pasir Pasang 0.0450 m3 135,000 6,075
4 Semen Warna 0.6500 kg 12,500 8,125
a Pekerja 0.7000 Org/Hari 60,000 42,000
b Tukang Batu Kasar 0.3500 Org/Hari 80,000 28,000

Nike Naluri (1106587) 36


c Kepala Tukang 0.0350 Org/Hari 80,000 2,800
d Mandor 0.0350 Org/Hari 95,000 3,325
JUMLAH 302,126
1 m2 Lantai Batu Andesit (uk. =100x100 cm)
1 Batu Andesit 30x30 1.0600 m2 150,000 159,000
2 Semen PC (50 Kg) 0.1638 zak 63,500 10,401
3 Pasir Pasang 0.0450 m3 135,000 6,075
4 Semen Warna 0.6500 kg 12,500 8,125
a Pekerja 0.7000 Org/Hari 60,000 42,000
b Tukang Batu Kasar 0.3500 Org/Hari 80,000 28,000
c Kepala Tukang 0.0350 Org/Hari 80,000 2,800
d Mandor 0.0350 Org/Hari 95,000 3,325
JUMLAH 259,726
1 m2 Lantai Karpet (SNI:2837:2008-6.44)
1 Karpet Lantai Roll 1.0500 m2 76,000 79,800
2 Lem Karpet 0.3500 Kg 27,500 9,625
a Pekerja 0.1700 Org/Hari 60,000 10,200
b Tukang Batu Kasar 0.1700 Org/Hari 80,000 13,600
c Kepala Tukang 0.0170 Org/Hari 80,000 1,360
d Mandor 0.0090 Org/Hari 95,000 855
JUMLAH 115,440
1 m2 Pelapis bawah / Underlayer (SNI:2837:2008-6.45)
1 Underlayer/rubber corrugated 1.0500 m2 12,000 12,600
2 Lem Karpet 0.3500 Kg 27,500 9,625
a Pekerja 0.1200 Org/Hari 60,000 7,200
b Tukang Batu Kasar 0.1200 Org/Hari 80,000 9,600
c Kepala Tukang 0.0120 Org/Hari 80,000 960
d Mandor 0.0060 Org/Hari 95,000 570
JUMLAH 40,555
1 m2 Lantai Parquette Kayu (SNI:2837:2008-6.46)
1 Lantai Parquette Laminated 1.0500 m2 176,000 184,800
2 Lem Kayu 0.6000 Kg 62,500 37,500
a Pekerja 0.7000 Org/Hari 60,000 42,000
b Tukang Batu Kasar 0.3500 Org/Hari 80,000 28,000
c Kepala Tukang 0.0350 Org/Hari 80,000 2,800
d Mandor 0.0350 Org/Hari 95,000 3,325
JUMLAH 298,425
1 m2 Lantai Kayu Gymfloor (SNI:2837:2008-6.47)
1 Lantai Parquette 1.0500 m2 600,000 630,000
2 Lem Kayu 0.6000 Kg 62,500 37,500

Nike Naluri (1106587) 37


a Pekerja 0.7000 Org/Hari 60,000 42,000
b Tukang Batu Kasar 0.3500 Org/Hari 80,000 28,000
c Kepala Tukang 0.0350 Org/Hari 80,000 2,800
d Mandor 0.0350 Org/Hari 95,000 3,325
JUMLAH 743,625
1 m2 Lantai Vinyl (SNI:2837:2008-6.59)
1 Lantai Vinyl Roll 1.0500 m2 35,000 36,750
2 Lem Vinyl 0.3500 Kg 15,000 5,250
a Pekerja 0.1500 Org/Hari 60,000 9,000
b Tukang Batu Kasar 0.1500 Org/Hari 80,000 12,000
c Kepala Tukang 0.0150 Org/Hari 80,000 1,200
d Mandor 0.0080 Org/Hari 95,000 760
JUMLAH 64,960
1 m1 Plint Lantai Vinyl (SNI:2837:2008-6.62)
1 Plint Lantai Vinyl 1.0500 m1 15,000 15,750
2 Lem Vinyl 0.3500 Kg 15,000 5,250
a Pekerja 0.0800 Org/Hari 60,000 4,800
b Tukang Batu Kasar 0.0800 Org/Hari 80,000 6,400
c Kepala Tukang 0.0080 Org/Hari 80,000 640
d Mandor 0.0040 Org/Hari 95,000 380
JUMLAH 33,220
1 m1 Plint Lantai Kayu (tinggi =10 cm, tebal =0.9 – 1,2 cm) (SNI:2837:2008-6.63)
1 Kayu Kuat klas II 0.0013 m3 9,500,000 11,970
2 Paku 1 s/d 3 cm 0.0500 kg 20,020 1,001
a Pekerja 0.1200 Org/Hari 60,000 7,200
b Tukang Batu Kasar 0.1200 Org/Hari 80,000 9,600
c Kepala Tukang 0.0120 Org/Hari 80,000 960
d Mandor 0.0060 Org/Hari 95,000 570
JUMLAH 31,301
1 m2 Lantai floor hardener (SNI:2837:2008-6.61)
1 Floor Hardener 5.0000 Kg 4,480 22,400
a Pekerja 0.1200 Org/Hari 60,000 7,200
b Tukang Batu Kasar 0.1200 Org/Hari 80,000 9,600
c Kepala Tukang 0.0120 Org/Hari 80,000 960
d Mandor 0.0060 Org/Hari 95,000 570
JUMLAH 40,730
1 m2 Lantai Koral Sikat (SNI:2837:2008-6.61)
1 Batu koral sikat terpasang 1.0000 m2 325,000 325,000
a Pekerja 0.1200 Org/Hari 60,000 7,200
b Tukang Batu Kasar 0.1200 Org/Hari 80,000 9,600

Nike Naluri (1106587) 38


c Kepala Tukang 0.0120 Org/Hari 80,000 960
d Mandor 0.0060 Org/Hari 95,000 570
JUMLAH 343,330

H.PEKERJAAN FINISHING DINDING (SNI 7395:2008)


1 m2 Dinding Porselen (uk. = 11x11 cm)P (SNI:7395:2008-6.48)
1 Dinding Porselen 11/11 cm 1.0406 m2 25,000 26,015
2 Semen PC (50 Kg) 0.1860 zak 90,000 16,740
3 Pasir Pasang 0.0180 m3 153,000 2,754
4 Semen Warna 1.5000 kg 8,000 12,000
a Pekerja 0.1000 Org/Hari 75,000 7,500
b Tukang Batu Kasar 0.0500 Org/Hari 100,000 5,000
c Kepala Tukang 0.0050 Org/Hari 115,000 575
d Mandor 0.0050 Org/Hari 115,000 575
JUMLAH 71,159
1 m2 Dinding Porselen (uk. = 10x20 cm)P (SNI:7395:2008-6.49)
1 Dinding Porselen 10/20 cm 1.0600 m2 28,000 29,680
2 Semen PC (50 Kg) 0.1860 zak 90,000 16,740
3 Pasir Pasang 0.0180 m3 153,000 2,754
4 Semen Warna 2.7500 kg 8,000 22,000
a Pekerja 0.0900 Org/Hari 75,000 6,750
b Tukang Batu Kasar 0.0450 Org/Hari 100,000 4,500
c Kepala Tukang 0.0045 Org/Hari 115,000 518
d Mandor 0.0045 Org/Hari 115,000 518
JUMLAH 83,459
1 m2 Dinding Keramik (uk. = 20x20 cm)K (SNI:7395:2008-6.54)
1 Keramik Dinding 20/20 cm Polished 1.0600 m2 100,000 106,000
2 Semen PC (50 Kg) 0.1860 zak 90,000 16,740
3 Pasir Pasang 0.0180 m3 153,000 2,754
4 Semen Warna 1.9400 kg 8,000 15,520
a Pekerja 0.6000 Org/Hari 75,000 45,000
b Tukang Batu Kasar 0.4500 Org/Hari 100,000 45,000
c Kepala Tukang 0.0450 Org/Hari 115,000 5,175
d Mandor 0.0350 Org/Hari 115,000 4,025
JUMLAH 240,214
1 m2 Dinding Keramik Artistik (uk. = 10x20 cm)KA (SNI:7395:2008-6.51)
1 Keramik Dinding Artistik 10/20 cm Polished 1.0600 m2 200,000 212,000
2 Semen PC (50 Kg) 0.1860 zak 90,000 16,740
3 Pasir Pasang 0.0180 m3 153,000 2,754
4 Semen Warna 2.7500 kg 8,000 22,000
a Pekerja 0.0900 Org/Hari 75,000 6,750

Nike Naluri (1106587) 39


b Tukang Batu Kasar 0.0450 Org/Hari 100,000 4,500
c Kepala Tukang 0.0045 Org/Hari 115,000 518
d Mandor 0.0045 Org/Hari 115,000 518
JUMLAH 265,779
1 m2 Dinding Keramik Artistik (uk. = 5x20 cm)KA (SNI:7395:2008-6.52)
1 Keramik Dinding Artistik 5/20 cm Polished 1.0600 m2 240,000 254,400
2 Semen PC (50 Kg) 0.1860 zak 90,000 16,740
3 Pasir Pasang 0.1800 m3 153,000 27,540
4 Semen Warna 2.9000 kg 8,000 23,200
a Pekerja 0.0900 Org/Hari 75,000 6,750
b Tukang Batu Kasar 0.0450 Org/Hari 100,000 4,500
c Kepala Tukang 0.0045 Org/Hari 115,000 518
d Mandor 0.0045 Org/Hari 115,000 518
JUMLAH 334,165
1 m2 Dinding Keramik (uk. = 10x20 cm)K (SNI:7395:2008-6.53)
1 Dinding Porselen 20/20 cm 1.0600 m2 29,500 31,270
2 Semen PC (50 Kg) 0.1860 zak 90,000 16,740
3 Pasir Pasang 0.0180 m3 153,000 2,754
4 Semen Warna 2.7500 kg 8,000 22,000
a Pekerja 0.0900 Org/Hari 75,000 6,750
b Tukang Batu Kasar 0.0450 Org/Hari 100,000 4,500
c Kepala Tukang 0.0045 Org/Hari 115,000 518
115,000 518
JUMLAH 85,049
1 m2 Dinding Keramik (uk. = 20x20 cm)K (SNI:7395:2008-6.54)
1 Keramik Dinding 20/20 cm Polished 1.0600 m2 100,000 106,000
2 Semen PC (50 Kg) 0.1860 zak 90,000 16,740
3 Pasir Pasang 0.0180 m3 153,000 2,754
4 Semen Warna 1.9400 kg 8,000 15,520
a Pekerja 0.6000 Org/Hari 75,000 45,000
b Tukang Batu Kasar 0.4500 Org/Hari 100,000 45,000
c Kepala Tukang 0.0450 Org/Hari 115,000 5,175
d Mandor 0.0350 Org/Hari 115,000 4,025
JUMLAH 240,214
1 m2 Dinding Keramik (uk. = 20x25 cm)K (SNI:7395:2008-6.54)R
1 Keramik Dinding 20/25 cm Polished 1.0600 m2 90,000 95,400
2 Semen PC (50 Kg) 0.1860 zak 90,000 16,740
3 Pasir Pasang 0.0180 m3 153,000 2,754
4 Semen Warna 1.9400 kg 8,000 15,520
a Pekerja 0.0900 Org/Hari 75,000 6,750

Nike Naluri (1106587) 40


b Tukang Batu Kasar 0.0450 Org/Hari 100,000 4,500
c Kepala Tukang 0.0045 Org/Hari 115,000 518
d Mandor 0.0045 Org/Hari 115,000 518
JUMLAH 142,699
1 m2 Dinding Keramik (uk. = 20x25 cm)K (SNI:7395:2008-6.54)R
1 Keramik Dinding 20/25 cm Polished 1.0600 m2 90,000 95,400
2 Semen PC (50 Kg) 0.1860 zak 90,000 16,740
3 Pasir Pasang 0.0180 m3 153,000 2,754
4 Semen Warna 1.9400 kg 8,000 15,520
a Pekerja 0.0900 Org/Hari 75,000 6,750
b Tukang Batu Kasar 0.0450 Org/Hari 100,000 4,500
c Kepala Tukang 0.0045 Org/Hari 115,000 518
d Mandor 0.0045 Org/Hari 115,000 518
JUMLAH 142,699
1 m2 Dinding Keramik (uk. = 30x30 cm)K (SNI:7395:2008-6.54)R
1 Keramik Dinding 30/30 cm Polished 1.0600 m2 90,000 95,400
2 Semen PC (50 Kg) 0.1860 zak 90,000 16,740
3 Pasir Pasang 0.0180 m3 153,000 2,754
4 Semen Warna 1.5000 kg 8,000 12,000
a Pekerja 0.0900 Org/Hari 75,000 6,750
b Tukang Batu Kasar 0.0450 Org/Hari 100,000 4,500
c Kepala Tukang 0.0045 Org/Hari 115,000 518
d Mandor 0.0045 Org/Hari 115,000 518
JUMLAH 139,179
1 m2 Dinding Marmer (uk. = 100x100 cm) (SNI:2835:2008-6.55)
1 Dinding Marmer 100/100 cm 1.0600 m2 280,800 297,648
2 Paku 8 s/d 12 cm 0.0375 kg 36,000 1,351
3 Semen PC (50 Kg) 0.2488 zak 63,500 15,799
4 Pasir Pasang 0.0250 m3 135,000 3,375
5 Semen Warna 0.6500 kg 12,500 8,125
a Pekerja 1.3000 Org/Hari 60,000 78,000
b Tukang Batu Kasar 0.6500 Org/Hari 80,000 52,000
c Kepala Tukang 0.0650 Org/Hari 80,000 5,200
d Mandor 0.0650 Org/Hari 95,000 6,175
JUMLAH 467,673
1 m2 Dinding Batu Bata Pelapis (3x7x24 cm) (SNI:2835:2008-6.56)
1 Bata pelapis (3x7x24cm) 1.0600 m2 117,000 124,020
2 Semen PC (50 Kg) 0.2488 zak 63,500 15,799
3 Pasir Pasang 0.0250 m3 135,000 3,375
4 Semen Warna 2.7500 kg 12,500 34,375

Nike Naluri (1106587) 41


a Pekerja 1.0000 Org/Hari 60,000 60,000
b Tukang Batu Kasar 0.5000 Org/Hari 80,000 40,000
c Kepala Tukang 0.0500 Org/Hari 80,000 4,000
d Mandor 0.0500 Org/Hari 95,000 4,750
JUMLAH 286,319
1 m2 Dinding Batu Paras (SNI:2835:2008-6.57)
1 Batu paras tempel 1.0600 m2 162,500 172,250
2 Semen PC (50 Kg) 0.2350 zak 63,500 14,923
3 Pasir Pasang 0.0350 m3 135,000 4,725
a Pekerja 0.7000 Org/Hari 60,000 42,000
b Tukang Batu Kasar 0.3500 Org/Hari 80,000 28,000
c Kepala Tukang 0.0350 Org/Hari 80,000 2,800
d Mandor 0.0350 Org/Hari 95,000 3,325
JUMLAH 268,023
1 m2 Dinding Batu Tempel (SNI:2835:2008-6.58)
1 Batu Andesit 30x30 1.0600 m2 150,000 159,000
2 Semen PC (50 Kg) 0.2488 zak 63,500 15,799
3 Pasir Pasang 0.0250 m3 135,000 3,375
a Pekerja 1.0000 Org/Hari 60,000 60,000
b Tukang Batu Kasar 0.5000 Org/Hari 80,000 40,000
c Kepala Tukang 0.0500 Org/Hari 80,000 4,000
d Mandor 0.0500 Org/Hari 95,000 4,750
JUMLAH 286,924
1 m2 Wallpaper lebar 50cm (SNI:2835:2008-6.60)
1 Wallpaper artistik 0.4400 roll 123,500 54,340
2 Lem Wallpaper 0.2500 Kg 9,000 2,250
a Pekerja 0.3500 Org/Hari 60,000 21,000
b Tukang Batu Kasar 0.1750 Org/Hari 80,000 14,000
c Kepala Tukang 0.0170 Org/Hari 80,000 1,360
d Mandor 0.0020 Org/Hari 95,000 190
JUMLAH 93,140
Pengecatan
m2 Dinding Glassblock 20x20 cm (SNI:2835:2008-6.58)
1 Glass Block 25.0000 bh 3,000 75,000
2 Semen PC (50 Kg) 0.2200 zak 63,500 13,970
3 Pasir Pasang 0.0350 m3 135,000 4,725
4 Sealant Kaca 0.2488 kg 45,000 11,196
a Pekerja 0.3000 Org/Hari 60,000 18,000
b Tukang Batu Kasar 0.1000 Org/Hari 80,000 8,000
c Kepala Tukang 0.0100 Org/Hari 80,000 800
d Mandor 0.0150 Org/Hari 95,000 1,425

Nike Naluri (1106587) 42


JUMLAH 133,116

I.PEKERJAAN KAYU (SNI 3434:2008)


I.1. PEKERJAAN KUSEN, PINTU & JENDELA
1 m3 Membuat & memasang kusen pintu & jendela Kayu kelas I (SNI:3434:2008-6.1)
1 Kayu Kuat klas I 1.1000 m3 16,000,000 17,600,000
2 Paku 8 s/d 12 cm 1.2500 kg 36,000 45,000
3 Lem Kayu 1.0000 Kg 62,500 62,500
a Pekerja 7.0000 Org/Hari 60,000 420,000
b Tukang Kayu Halus 21.0000 Org/Hari 80,000 1,680,000
c Kepala Tukang 2.1000 Org/Hari 80,000 168,000
d Mandor 0.3500 Org/Hari 95,000 33,250
JUMLAH 20,008,750
1 m3 Membuat & memasang kusen pintu & jendela Kayu kelas II (SNI:3434:2008-6.2)
1 Kayu Kuat klas II 1.2000 m3 9,500,000 11,400,000
2 Paku 8 s/d 12 cm 1.2500 kg 36,000 45,000
3 Lem Kayu 1.0000 Kg 62,500 62,500
a Pekerja 6.0000 Org/Hari 60,000 360,000
b Tukang Kayu Halus 18.0000 Org/Hari 80,000 1,440,000
c Kepala Tukang 1.8000 Org/Hari 80,000 144,000
d Mandor 0.3000 Org/Hari 95,000 28,500
JUMLAH 13,480,000
1 m2 Membuat & memasang daun pintu Klamp Kayu kelas II (SNI:3434:2008-6.3)
1 Kayu Kuat klas II 0.0400 m3 9,500,000 380,000
2 Paku 4 s/d 7 cm 0.0500 kg 36,000 1,800
a Pekerja 0.3500 Org/Hari 60,000 21,000
b Tukang Kayu Halus 1.0500 Org/Hari 80,000 84,000
c Kepala Tukang 0.1050 Org/Hari 80,000 8,400
d Mandor 0.0180 Org/Hari 95,000 1,710
JUMLAH 496,910
1 m2 Membuat & memasang daun pintu Klamp Kayu kelas III (SNI:3434:2008-6.4)
1 Kayu Kuat klas III 0.0400 m3 2,335,667 93,427
2 Paku 4 s/d 7 cm 0.0500 kg 36,000 1,800
a Pekerja 0.3500 Org/Hari 60,000 21,000
b Tukang Kayu Halus 1.0500 Org/Hari 80,000 84,000
c Kepala Tukang 0.1050 Org/Hari 80,000 8,400
d Mandor 0.0180 Org/Hari 95,000 1,710
JUMLAH 210,337
1 m2 Membuat & memasang daun pintu Panel Kayu kelas I (SNI:3434:2008-6.5)
1 Kayu Kuat klas I 0.0400 m3 16,000,000 640,000
2 Lem Kayu 0.0500 Kg 62,500 3,125

Nike Naluri (1106587) 43


a Pekerja 1.0000 Org/Hari 60,000 60,000
b Tukang Kayu Halus 3.0000 Org/Hari 80,000 240,000
c Kepala Tukang 0.3000 Org/Hari 80,000 24,000
d Mandor 0.0500 Org/Hari 95,000 4,750
JUMLAH 971,875
1 m2 Membuat & memasang daun pintu & jendela kaca Kayu kelas I (SNI:3434:2008-6.6)
1 Kayu Kuat klas I 0.0240 m3 16,000,000 384,000
2 Lem Kayu 0.3000 Kg 62,500 18,750
a Pekerja 0.8000 Org/Hari 60,000 48,000
b Tukang Kayu Halus 2.4000 Org/Hari 80,000 192,000
c Kepala Tukang 0.2400 Org/Hari 80,000 19,200
d Mandor 0.0400 Org/Hari 95,000 3,800
JUMLAH 665,750
1 m2 Membuat & memasang daun pintu & jendela jalusi Kayu kelas I (SNI:3434:2008-6.7)
1 Kayu Kuat klas I 0.0640 m3 16,000,000 1,024,000
2 Lem Kayu 0.5000 Kg 62,500 31,250
a Pekerja 1.0000 Org/Hari 60,000 60,000
b Tukang Kayu Halus 3.0000 Org/Hari 80,000 240,000
c Kepala Tukang 0.3000 Org/Hari 80,000 24,000
d Mandor 0.0500 Org/Hari 95,000 4,750
JUMLAH 1,384,000
1 m2 Membuat & memasang daun pintu dobel Plywood, Rangka kelas II (SNI:3434:2008-6.8)
1 Kayu Kuat klas II 0.0250 m3 9,500,000 237,500
2 Paku 1 s/d 3 cm 0.0300 kg 20,020 601
3 Lem Kayu 0.5000 Kg 62,500 31,250
4 Triplex t. 4 mm 1.0000 lbr 54,000 54,000
a Pekerja 0.7000 Org/Hari 60,000 42,000
b Tukang Kayu Halus 2.1000 Org/Hari 80,000 168,000
c Kepala Tukang 0.2100 Org/Hari 80,000 16,800
d Mandor 0.0350 Org/Hari 95,000 3,325
JUMLAH 553,476
1 m2 Membuat & memasang daun pintu dobel Plywood, Rangka Expose kelas
(SNI:3434:2008-6.9)
1 Kayu Kuat klas II 0.0256 m3 9,500,000 243,200
2 Paku 1 s/d 3 cm 0.0300 kg 20,020 601
3 Lem Kayu 0.5000 Kg 62,500 31,250
4 Triplex t. 4 mm 1.0000 lbr 54,000 54,000
a Pekerja 0.8000 Org/Hari 60,000 48,000
b Tukang Kayu Halus 2.4000 Org/Hari 80,000 192,000
c Kepala Tukang 0.2400 Org/Hari 80,000 19,200
d Mandor 0.0400 Org/Hari 95,000 3,800

Nike Naluri (1106587) 44


JUMLAH 592,051
1 m2 Membuat & memasang kusen jalusi Kayu kelas I (SNI:3434:2008-6.10)
1 Kayu Kuat klas I 0.0600 m3 16,000,000 960,000
2 Paku 1 s/d 3 cm 0.1500 kg 20,020 3,003
a Pekerja 0.6700 Org/Hari 60,000 40,200
b Tukang Kayu Halus 2.0000 Org/Hari 80,000 160,000
c Kepala Tukang 0.2000 Org/Hari 80,000 16,000
d Mandor 0.3350 Org/Hari 95,000 31,825
JUMLAH 1,211,028
1 m2 Membuat & memasang Teakwood rangkap, rangka expose Kayu kelas(SNI:3434:2008-6.11)
I
1 Kayu Kuat klas II 0.0250 m3 9,500,000 237,500
2 Paku 1 s/d 3 cm 0.0300 kg 20,020 601
3 Lem Kayu 0.3000 Kg 62,500 18,750
4 Teakwood t. 6 mm 1.0000 lbr 60,000 60,000
a Pekerja 0.8000 Org/Hari 60,000 48,000
b Tukang Kayu Halus 2.4000 Org/Hari 80,000 192,000
c Kepala Tukang 0.2400 Org/Hari 80,000 19,200
d Mandor 0.0400 Org/Hari 95,000 3,800
JUMLAH 579,851
1 m2 Membuat & memasang Teakwood rangkap lapis HPL, rangka expose (SNI:3434:2008-6.12)
Kay
1 Kayu Kuat klas II 0.0250 m3 9,500,000 237,500
2 Paku 1 s/d 3 cm 0.0300 kg 20,020 601
3 Lem Kayu 0.8000 Kg 62,500 50,000
4 Teakwood t. 3 mm 1.0000 lbr 78,000 78,000
5 Finish Melamik 0.5000 m2 110,500 55,250
a Pekerja 0.8500 Org/Hari 60,000 51,000
b Tukang Kayu Halus 2.5500 Org/Hari 80,000 204,000
c Kepala Tukang 0.2550 Org/Hari 80,000 20,400
d Mandor 0.0430 Org/Hari 95,000 4,085
JUMLAH 700,836
I.2. PEKERJAAN ATAP
1 m3 Membuat & memasang Konstruksi kuda-kuda Kayu bentang s/d 6M (SNI:3434:2008-6.13)
1 Kayu Kuat klas II 1.1000 m3 9,500,000 10,450,000
2 Plat Strip 15.0000 Kg 14,690 220,345
3 Paku 8 s/d 12 cm 5.6000 kg 36,000 201,600
a Pekerja 4.0000 Org/Hari 60,000 240,000
b Tukang Kayu Halus 12.0000 Org/Hari 80,000 960,000
c Kepala Tukang 1.2000 Org/Hari 80,000 96,000
d Mandor 0.2000 Org/Hari 95,000 19,000
JUMLAH 12,186,945

Nike Naluri (1106587) 45


1 m3 Membuat & memasang Konstruksi kuda-kuda Kayu Ekspose (SNI:3434:2008-6.14)
1 Kayu Kuat klas I 1.2000 m3 16,000,000 19,200,000
2 Plat Strip 15.0000 Kg 14,690 220,345
3 Paku 8 s/d 12 cm 5.6000 kg 36,000 201,600
a Pekerja 6.7000 Org/Hari 60,000 402,000
b Tukang Kayu Halus 20.1000 Org/Hari 80,000 1,608,000
c Kepala Tukang 2.0100 Org/Hari 80,000 160,800
d Mandor 0.3350 Org/Hari 95,000 31,825
JUMLAH 21,824,570
1 m3 Membuat & memasang Gordeng, Kayu kelas II (SNI:3434:2008-6.15)
1 Kayu Kuat klas II 1.1000 m3 9,500,000 10,450,000
2 Plat Strip 15.0000 Kg 14,690 220,345
3 Paku 8 s/d 12 cm 3.0000 kg 36,000 108,000
a Pekerja 2.4000 Org/Hari 60,000 144,000
b Tukang Kayu Halus 7.2000 Org/Hari 80,000 576,000
c Kepala Tukang 0.7200 Org/Hari 80,000 57,600
d Mandor 0.1200 Org/Hari 95,000 11,400
JUMLAH 11,567,345
1 m2 Membuat & memasang rangka atap genteng Keramik, kayu kelas II (SNI:3434:2008-6.16)
1 Kaso kelas II 0.0140 m3 9,500,000 133,000
2 Kayu Reng 3/4 Kamper Samarinda 0.0036 m3 9,500,000 34,200
3 Paku 4 s/d 7 cm 0.2500 kg 36,000 9,000
a Pekerja 0.1000 Org/Hari 60,000 6,000
b Tukang Kayu Halus 0.1000 Org/Hari 80,000 8,000
c Kepala Tukang 0.0100 Org/Hari 80,000 800
d Mandor 0.0050 Org/Hari 95,000 475
JUMLAH 191,475
1 m2 Membuat & memasang rangka atap genteng Beton, kayu kelas II (SNI:3434:2008-6.17)
1 Kaso kelas II 0.0140 m3 9,500,000 133,000
2 Kayu Reng 3/4 Kamper Samarinda 0.0072 m3 9,500,000 68,400
3 Paku 4 s/d 7 cm 0.2500 kg 36,000 9,000
a Pekerja 0.1000 Org/Hari 60,000 6,000
b Tukang Kayu Halus 0.1000 Org/Hari 80,000 8,000
c Kepala Tukang 0.0100 Org/Hari 80,000 800
d Mandor 0.0050 Org/Hari 95,000 475
JUMLAH 225,675
1 m2 Membuat & memasang rangka atap Sirap, kayu kelas II (SNI:3434:2008-6.18)
1 Kaso kelas II 0.1650 m3 9,500,000 1,567,500
2 Paku 4 s/d 7 cm 0.2000 kg 36,000 7,200
a Pekerja 0.1200 Org/Hari 60,000 7,200

Nike Naluri (1106587) 46


b Tukang Kayu Halus 0.1200 Org/Hari 80,000 9,600
c Kepala Tukang 0.0120 Org/Hari 80,000 960
d Mandor 0.0060 Org/Hari 95,000 570
JUMLAH 1,593,030
1 m1 Membuat & memasang Lisplank (3x20cm), Kayu kelas II (SNI:3434:2008-6.21)
1 Papan kelas II 0.0108 m3 9,500,000 102,600
2 Paku 4 s/d 7 cm 0.1000 kg 36,000 3,600
a Pekerja 0.1000 Org/Hari 60,000 6,000
b Tukang Kayu Halus 0.2000 Org/Hari 80,000 16,000
c Kepala Tukang 0.0200 Org/Hari 80,000 1,600
d Mandor 0.0050 Org/Hari 95,000 475
JUMLAH 130,275
1 m1 Membuat & memasang Lisplank (3x30cm), Kayu kelas II (SNI:3434:2008-6.22)
1 Papan kelas II 0.0110 m3 9,500,000 104,500
2 Paku 4 s/d 7 cm 0.0500 kg 36,000 1,800
a Pekerja 0.1000 Org/Hari 60,000 6,000
b Tukang Kayu Halus 0.2000 Org/Hari 80,000 16,000
c Kepala Tukang 0.0200 Org/Hari 80,000 1,600
d Mandor 0.0050 Org/Hari 95,000 475
JUMLAH 130,375
I.3. PEKERJAAN RANGKA PLAFOND
1 m2 Membuat & memasang rangka plafond (50x100cm), Kayu kelas II (SNI:3434:2008-6.19)
1 Kaso kelas II 0.0154 m3 9,500,000 146,300
2 Paku 4 s/d 7 cm 0.2000 kg 36,000 7,200
a Pekerja 0.1500 Org/Hari 60,000 9,000
b Tukang Kayu Halus 0.3000 Org/Hari 80,000 24,000
c Kepala Tukang 0.0300 Org/Hari 80,000 2,400
d Mandor 0.0750 Org/Hari 95,000 7,125
JUMLAH 196,025
1 m2 Membuat & memasang rangka plafond (60x60cm), Kayu kelas II (SNI:3434:2008-6.20)
1 Kaso kelas II 0.0154 m3 9,500,000 146,300
2 Paku 4 s/d 7 cm 0.2000 kg 36,000 7,200
a Pekerja 0.1500 Org/Hari 60,000 9,000
b Tukang Kayu Halus 0.3000 Org/Hari 80,000 24,000
c Kepala Tukang 0.0300 Org/Hari 80,000 2,400
d Mandor 0.0750 Org/Hari 95,000 7,125
JUMLAH 196,025
I.4. PEKERJAAN RANGKA DINDING
1 m2 Membuat & memasang rangka dinding partisi (60x120cm), Kayu kelas(SNI:3434:2008-6.23)
I
1 Kaso kelas II 0.0280 m3 9,500,000 266,000

Nike Naluri (1106587) 47


2 Paku 4 s/d 7 cm 0.1500 kg 36,000 5,400
a Pekerja 0.1500 Org/Hari 60,000 9,000
b Tukang Kayu Halus 0.4500 Org/Hari 80,000 36,000
c Kepala Tukang 0.0450 Org/Hari 80,000 3,600
d Mandor 0.0080 Org/Hari 95,000 760
JUMLAH 320,760
1 m2 Membuat & memasang rangka dinding partisi dobel teakwood, Kayu kel
(SNI:3434:2008-6.24)
1 Balok kelas II 0.0280 m3 9,500,000 266,000
2 Paku 4 s/d 7 cm 0.1500 kg 36,000 5,400
3 Lem Kayu 0.5600 Kg 62,500 35,000
4 Teakwood t. 6 mm 0.8600 lbr 60,000 51,600
a Pekerja 0.1500 Org/Hari 60,000 9,000
b Tukang Kayu Halus 0.4500 Org/Hari 80,000 36,000
c Kepala Tukang 0.0450 Org/Hari 80,000 3,600
d Mandor 0.0080 Org/Hari 95,000 760
JUMLAH 407,360
1 m2 Membuat & memasang rangka dinding partisi dobel Plywood, Kayu kela
(SNI:3434:2008-6.25)
1 Balok kelas II 0.0280 m3 9,500,000 266,000
2 Paku 4 s/d 7 cm 0.1500 kg 36,000 5,400
3 Lem Kayu 0.5600 Kg 62,500 35,000
4 Plywood 0.8600 lbr 120,000 103,200
a Pekerja 0.2000 Org/Hari 60,000 12,000
b Tukang Kayu Halus 0.6000 Org/Hari 80,000 48,000
c Kepala Tukang 0.0600 Org/Hari 80,000 4,800
d Mandor 0.0100 Org/Hari 95,000 950
JUMLAH 475,350
1 m2 Membuat & memasang rangka dinding Lambisering, Kayu kelas I (SNI:3434:2008-6.26)
1 Kayu Kuat klas I 0.0070 m3 16,000,000 112,000
2 Paku 4 s/d 7 cm 0.1000 kg 36,000 3,600
3 Paku Skrup 0.1500 Kg 20,000 3,000
a Pekerja 0.6000 Org/Hari 60,000 36,000
b Tukang Kayu Halus 1.8000 Org/Hari 80,000 144,000
c Kepala Tukang 0.1800 Org/Hari 80,000 14,400
d Mandor 0.0300 Org/Hari 95,000 2,850
JUMLAH 315,850
1 m2 Membuat & memasang rangka dinding Lambisering Plywood ukuran ((SNI:3434:2008-6.27)
1 Plywood 0.4000 lbr 120,000 48,000
2 Paku 1 s/d 3 cm 0.0500 kg 20,020 1,001
a Pekerja 0.0250 Org/Hari 60,000 1,500
b Tukang Kayu Halus 0.0750 Org/Hari 80,000 6,000

Nike Naluri (1106587) 48


c Kepala Tukang 0.0080 Org/Hari 80,000 640
d Mandor 0.0010 Org/Hari 95,000 95
JUMLAH 57,236
1 m2 Membuat & memasang dinding bilik, Kayu kelas III (SNI:3434:2008-6.28)
1 Bilik bambu 1.5000 m2 6,500 9,750
2 Kaso kelas III 0.0140 m3 2,387,000 33,418
3 Paku 4 s/d 7 cm 0.0120 kg 36,000 432
4 List Kayu 2/4 0.0030 m3 7,500,000 22,500
a Pekerja 0.1000 Org/Hari 60,000 6,000
b Tukang Kayu Halus 0.0500 Org/Hari 80,000 4,000
c Kepala Tukang 0.0050 Org/Hari 80,000 400
d Mandor 0.0050 Org/Hari 95,000 475
JUMLAH 76,975

J.PEKERJAAN BESI, ALUMUNIUM, PINTU dan DEKORASI (SNI 7393:2008)

1 kg Membuat & memasang besi profil (SNI:7393:2008-6.1)


1 Besi Profil 1.1500 Kg 20,000 23,000
a Pekerja 0.0600 Org/Hari 60,000 3,600
b Tukang Kayu Halus 0.0600 Org/Hari 80,000 4,800
c Kepala Tukang 0.0060 Org/Hari 80,000 480
d Mandor 0.0030 Org/Hari 95,000 285
JUMLAH 32,165
1 kg Memasang rangka kuda-kuda baja ringan (SNI:7393:2008-6.2)
1 Roof botton 5.1000 m' 8,500 43,350
a Mobilisasi 1.0000 Ls 9,000 9,000
b Rangka atap baja ringan 1.0000 m2 160,000 160,000
c Self Drilling Screw dia. 6x20 mm 25.0000 bh 375 9,375
d Self Drilling Screw dia. 4x16 mm 35.0000 bh 350 12,250
e Dynabolt 1.0000 bh 1,500 1,500
f Tukang Besi Tulangan 0.0600 Org/Hari 80,000 4,800
g Kepala Tukang 0.0060 Org/Hari 80,000 480
h Mandor 0.0030 Org/Hari 95,000 285
i Pekerja 0.0600 Org/Hari 60,000 3,600
j Tukang Besi Tulangan 0.0600 Org/Hari 80,000 4,800
k Kepala Tukang 0.0060 Org/Hari 80,000 480
l Mandor 0.0030 Org/Hari 95,000 285
JUMLAH 250,205
1 kg Mengerjakan 100kg pekerjaan perkaitan (SNI:7393:2008-6.3)
1 Solar 1.0000 Ltr 5,500 5,500
2 Minyak Pelumas 0.1000 Ltr 35,000 3,500

Nike Naluri (1106587) 49


3 Sewa Alat 0.8000 jam 57,000 45,600
a Pekerja 0.1000 Org/Hari 60,000 6,000
b Tukang Kayu Halus 0.1000 Org/Hari 80,000 8,000
c Kepala Tukang 0.0010 Org/Hari 80,000 80
d Mandor 0.0050 Org/Hari 95,000 475
JUMLAH 69,155
1 m2 Membuat pintu besi plat dobel t=2mm, rangka besi siku (SNI:7393:2008-6.4)
1 Besi Siku Rata-rata 15.0000 Kg 13,840 207,600
2 Besi Plat rata2 1 s/d 5 mm 32.8000 Kg 19,717 646,720
3 Kawat las listrik 0.0500 kg 25,000 1,250
a Pekerja 1.0500 Org/Hari 60,000 63,000
b Tukang Kayu Halus 1.0500 Org/Hari 80,000 84,000
c Kepala Tukang 0.1050 Org/Hari 80,000 8,400
d Mandor 0.0520 Org/Hari 95,000 4,940
JUMLAH 1,015,910
1 cm Mengerjakan 10 cm pengelasan dengan las listrik (SNI:7393:2008-6.5)
1 Kawat las listrik 0.4000 kg 25,000 10,000
2 Solar 0.3000 Ltr 5,500 1,650
3 Minyak Pelumas 0.0400 Ltr 35,000 1,400
4 Sewa Alat Las 0.1700 jam 20,000 3,400
a Pekerja 0.0400 Org/Hari 60,000 2,400
b Tukang Kayu Halus 0.0200 Org/Hari 80,000 1,600
c Kepala Tukang 0.0020 Org/Hari 80,000 160
d Mandor 0.0020 Org/Hari 95,000 190
JUMLAH 20,800
1 m2 Membuat rangka jendela besi Square Tube (25x5)cm (SNI:7393:2008-6.6)
1 Besi Square Tube 0.4000 Kg 20,001 8,000
2 Besi List Kaca 0.3000 Kg 20,002 6,001
3 Pengelasan 0.0400 cm 40 2
a Pekerja 0.0400 Org/Hari 60,000 2,400
b Tukang Kayu Halus 0.0200 Org/Hari 80,000 1,600
c Kepala Tukang 0.0020 Org/Hari 80,000 160
d Mandor 0.0020 Org/Hari 95,000 190
JUMLAH 18,353
1 m2 Pengadaan dan pemasangan pintu rolling door besi (SNI:7393:2008-6.7)
1 Rolling door Plat Besi 1.0000 m2 1,300,000 1,300,000
a Pekerja 1.2000 Org/Hari 60,000 72,000
b Tukang Kayu Halus 1.2000 Org/Hari 80,000 96,000
c Kepala Tukang 0.1200 Org/Hari 80,000 9,600
d Mandor 0.0060 Org/Hari 95,000 570

Nike Naluri (1106587) 50


JUMLAH 1,478,170
1 m2 Pengadaan dan pemasangan pintu lipat plastik/PVC (folding door) (SNI:7393:2008-6.8)
1 Folding Door PVC 1.0000 m2 592,800 592,800
a Pekerja 0.4400 Org/Hari 60,000 26,400
b Tukang Kayu Halus 0.4400 Org/Hari 80,000 35,200
c Kepala Tukang 0.0440 Org/Hari 80,000 3,520
d Mandor 0.0220 Org/Hari 95,000 2,090
JUMLAH 660,010
1 m2 Pengadaan dan pemasangan sunscreen alumunium (SNI:7393:2008-6.9)
1 Sunscreen Alumunium 1.0000 m2 592,800 592,800
a Pekerja 0.0800 Org/Hari 60,000 4,800
b Tukang Kayu Halus 0.8000 Org/Hari 80,000 64,000
c Kepala Tukang 0.0800 Org/Hari 80,000 6,400
d Mandor 0.0040 Org/Hari 95,000 380
JUMLAH 668,380
1 m2 Pengadaan dan pemasangan rolling door alumunium (SNI:7393:2008-6.10)
1 Rolling door Zinkalume/Alumunium 1.0000 m2 1,300,000 1,300,000
a Pekerja 1.0000 Org/Hari 60,000 60,000
b Tukang Kayu Halus 1.0000 Org/Hari 80,000 80,000
c Kepala Tukang 0.1000 Org/Hari 80,000 8,000
d Mandor 0.0500 Org/Hari 95,000 4,750
JUMLAH 1,452,750
1 m2 Pengadaan dan pemasangan kusen pintu alumunium (SNI:7393:2008-6.11)
1 Kusen Alm. 4" CA 1.1000 m' 175,000 192,500
2 Skrup 2.0000 bh 334 667
3 Sealant clear neutral (300 ml) 0.0600 tb 35,000 2,100
a Pekerja 0.0430 Org/Hari 60,000 2,580
b Tukang Kayu Halus 0.0430 Org/Hari 80,000 3,440
c Kepala Tukang 0.0043 Org/Hari 80,000 344
d Mandor 0.0021 Org/Hari 95,000 200
JUMLAH 201,831
1 m2 Pengadaan dan pemasangan daun pintu alumunium strip (SNI:7393:2008-6.12)
1 Kusen Alm. 4" CA 4.4000 m' 175,000 770,000
2 Alumunium Strip 14.6000 m' 45,500 664,300
a Pekerja 0.0850 Org/Hari 60,000 5,100
b Tukang Kayu Halus 0.0850 Org/Hari 80,000 6,800
c Kepala Tukang 0.0085 Org/Hari 80,000 680
d Mandor 0.0042 Org/Hari 95,000 399
JUMLAH 1,447,279
1 m2 Pengadaan dan pemasangan daun pintu kaca rangka alumunium (SNI:7393:2008-6.13)

Nike Naluri (1106587) 51


1 Kusen Alm. 4" CA 4.4000 m' 175,000 770,000
2 Kaca Polos 6 mm 4.5000 m2 125,000 562,500
3 Sealant clear neutral (300 ml) 0.2700 tb 35,000 9,450
a Pekerja 0.0850 Org/Hari 60,000 5,100
b Tukang Kayu Halus 0.0850 Org/Hari 80,000 6,800
c Kepala Tukang 0.0090 Org/Hari 80,000 720
d Mandor 0.0050 Org/Hari 95,000 475
JUMLAH 1,355,045
1 m2 Pengadaan dan pemasangan venetian, horisontal atau vertical blind (SNI:7393:2008-6.14)
1 Vertical Blind 1.0000 m2 123,500 123,500
a Pekerja 0.3500 Org/Hari 60,000 21,000
b Tukang Kayu Halus 0.3500 Org/Hari 80,000 28,000
c Kepala Tukang 0.0350 Org/Hari 80,000 2,800
d Mandor 0.0180 Org/Hari 95,000 1,710
JUMLAH 177,010
1 m2 Pengadaan dan pemasangan teralis besi strip (2x30)mm (SNI:7393:2008-6.15)
1 Plat Strip 6.1770 Kg 14,690 90,738
2 Pengelasan 27.0800 cm 40 1,080
a Pekerja 1.6700 Org/Hari 60,000 100,200
b Tukang Kayu Halus 1.6700 Org/Hari 80,000 133,600
c Kepala Tukang 0.1670 Org/Hari 80,000 13,360
d Mandor 0.0830 Org/Hari 95,000 7,885
JUMLAH 346,863
1 m2 Pengadaan dan pemasangan kawat nyamuk (SNI:7393:2008-6.16)
1 Kawat Nyamuk 1.1000 m2 3,250 3,575
2 Pengelasan 11.1100 cm 40 443
2 Plat Strip 1.7160 Kg 14,690 25,207
a Pekerja 0.1000 Org/Hari 60,000 6,000
b Tukang Kayu Halus 0.1000 Org/Hari 80,000 8,000
c Kepala Tukang 0.0100 Org/Hari 80,000 800
d Mandor 0.0050 Org/Hari 95,000 475
JUMLAH 44,501
1 m2 Pengadaan dan pemasangan jendela nako & tralis (SNI:7393:2008-6.17)
1 Kaca nako t.6 mm + rangka 1.1000 m2 75,000 82,500
2 Paku Skrup 0.1000 Kg 20,000 2,000
2 Plat Strip 7.0000 Kg 14,690 102,828
a Pekerja 0.2000 Org/Hari 60,000 12,000
b Tukang Kayu Halus 0.2000 Org/Hari 80,000 16,000
c Kepala Tukang 0.0200 Org/Hari 80,000 1,600
d Mandor 0.0010 Org/Hari 95,000 95

Nike Naluri (1106587) 52


JUMLAH 217,023
1 m1 Pengadaan dan pemasangan talang datar/jurai Seng BJLS 28 lebar=90
(SNI:7393:2008-6.18)
1 Seng Plat BJLS 0,30 1.0500 m' 84,700 88,935
2 Paku 1 s/d 3 cm 0.0150 kg 20,020 300
2 Papan kelas III 0.0190 m3 2,233,000 42,427
a Pekerja 0.2000 Org/Hari 60,000 12,000
b Tukang Kayu Halus 0.4000 Org/Hari 80,000 32,000
c Kepala Tukang 0.0250 Org/Hari 80,000 2,000
d Mandor 0.0010 Org/Hari 95,000 95
JUMLAH 177,757
1 m1 Pengadaan dan pemasangan talang 1/2 lingkaran Seng BJLS 30 lebar(SNI:7393:2008-6.19)
1 Seng Plat BJLS 0,30 1.0500 m' 84,700 88,935
2 Paku 1 s/d 3 cm 0.0100 kg 20,020 200
2 Plat Strip 0.5000 Kg 14,690 7,345
a Pekerja 0.1500 Org/Hari 60,000 9,000
b Tukang Kayu Halus 0.3000 Org/Hari 80,000 24,000
c Kepala Tukang 0.0300 Org/Hari 80,000 2,400
d Mandor 0.0080 Org/Hari 95,000 760
JUMLAH 132,640

K. Pekerjaan Plafond, Gypsum dan Partisi Gypsum (SNI 2839:2008)


1 m2 Pengadaan dan pemasangan plafond Kalsiboard/GRC t= 4mm, 5mm d(SNI:2839:2008-6.1)
1 Plafon GRC Tiles 1.1000 lbr 180,000 198,000
2 Paku Skrup 0.0100 Kg 20,000 200
a Pekerja 0.0300 Org/Hari 60,000 1,800
b Tukang Kayu Halus 0.0700 Org/Hari 80,000 5,600
c Kepala Tukang 0.0070 Org/Hari 80,000 560
d Mandor 0.0040 Org/Hari 95,000 380
JUMLAH 206,540
1 m2 Pengadaan dan pemasangan plafond akustik (uk. =30x30 cm) (SNI:2839:2008-6.2)
1 Plafond akustik 30x30cm 12.0000 lbr 70,000 840,000
2 Paku Skrup 0.0500 Kg 20,000 1,000
a Pekerja 0.1200 Org/Hari 60,000 7,200
b Tukang Kayu Halus 0.1200 Org/Hari 80,000 9,600
c Kepala Tukang 0.0120 Org/Hari 80,000 960
d Mandor 0.0060 Org/Hari 95,000 570
JUMLAH 859,330
1 m2 Pengadaan dan pemasangan plafond akustik (uk. =30x60 cm) (SNI:2839:2008-6.3)
1 Plafond akustik 30x60cm 5.8000 lbr 70,000 406,000
2 Paku Skrup 0.0500 Kg 20,000 1,000
a Pekerja 0.1000 Org/Hari 60,000 6,000

Nike Naluri (1106587) 53


b Tukang Kayu Halus 0.1000 Org/Hari 80,000 8,000
c Kepala Tukang 0.0100 Org/Hari 80,000 800
d Mandor 0.0050 Org/Hari 95,000 475
JUMLAH 422,275
1 m2 Pengadaan dan pemasangan plafond akustik (uk. =60x120 cm) (SNI:2839:2008-6.4)
1 Plafond akustik 60x120cm 1.5000 lbr 30,000 45,000
2 Paku Skrup 0.0500 Kg 20,000 1,000
a Pekerja 0.1000 Org/Hari 60,000 6,000
b Tukang Kayu Halus 0.1000 Org/Hari 80,000 8,000
c Kepala Tukang 0.0100 Org/Hari 80,000 800
d Mandor 0.0050 Org/Hari 95,000 475
JUMLAH 61,275
1 m2 Pengadaan dan pemasangan plafond triplek (uk. =120x240 cm), t=3m (SNI:2839:2008-6.5)
1 Triplex t. 6 mm 0.3750 lbr 69,000 25,875
2 Paku Skrup 0.0300 Kg 20,000 600
a Pekerja 0.1000 Org/Hari 60,000 6,000
b Tukang Kayu Halus 0.1000 Org/Hari 80,000 8,000
c Kepala Tukang 0.0100 Org/Hari 80,000 800
d Mandor 0.0050 Org/Hari 95,000 475
JUMLAH 41,750
1 m2 Pengadaan dan pemasangan plafond lambisering kayu t=9mm (SNI:2839:2008-6.6)
1 Papan kelas II 0.0150 m3 9,500,000 142,500
2 Paku Skrup 0.0100 Kg 20,000 200
a Pekerja 0.8000 Org/Hari 60,000 48,000
b Tukang Kayu Halus 0.8000 Org/Hari 80,000 64,000
c Kepala Tukang 0.0800 Org/Hari 80,000 6,400
d Mandor 0.0400 Org/Hari 95,000 3,800
JUMLAH 264,900
1 m2 Pengadaan dan pemasangan plafond gypsumboard t=9mm (SNI:2839:2008-6.7)
1 Gypsumboard t.9 mm 0.3640 lbr 62,980 22,925
2 Paku Skrup 0.1100 Kg 20,000 2,200
a Pekerja 0.1000 Org/Hari 60,000 6,000
b Tukang Kayu Halus 0.0500 Org/Hari 80,000 4,000
c Kepala Tukang 0.0050 Org/Hari 80,000 400
d Mandor 0.0050 Org/Hari 95,000 475
JUMLAH 36,000
1 m' Pengadaan dan pemasangan list plafond gypsum profil 10cm (SNI:2839:2008-6.8)
1 List Profil 10 cm Gypsum 1.0500 m1 15,700 16,485
2 Paku Skrup 0.1500 Kg 20,000 3,000
a Pekerja 0.0600 Org/Hari 60,000 3,600

Nike Naluri (1106587) 54


b Tukang Kayu Halus 0.0600 Org/Hari 80,000 4,800
c Kepala Tukang 0.0060 Org/Hari 80,000 480
d Mandor 0.0030 Org/Hari 95,000 285
JUMLAH 28,650
1 m2 Pengadaan dan pemasangan Plafond Akustik + rangka (SNI:2839:2008-6.9)
1 Profil Alumunium “T” 3.6000 m1 19,500 70,200
2 Kawat galvanized 0.1500 m' 130,000 19,500
3 Ramset 1.0500 Bh 11,000 11,550
4 Plafond akustik 60x120cm 1.5000 lbr 30,000 45,000
a Pekerja 0.5000 Org/Hari 60,000 30,000
b Tukang Kayu Halus 0.5000 Org/Hari 80,000 40,000
c Kepala Tukang 0.0500 Org/Hari 80,000 4,000
d Mandor 0.0250 Org/Hari 95,000 2,375
JUMLAH 222,625
1 m2 Pengadaan dan pemasangan list plafond kayu profil (SNI:2839:2008-6.10)
1 List Profil 5 cm Kayu 1.0500 m1 7,500 7,875
2 Paku 1 s/d 3 cm 0.0100 kg 20,020 200
a Pekerja 0.0500 Org/Hari 60,000 3,000
b Tukang Kayu Halus 0.0500 Org/Hari 80,000 4,000
c Kepala Tukang 0.0050 Org/Hari 80,000 400
d Mandor 0.0030 Org/Hari 95,000 285
JUMLAH 15,760
1 m2 Pengadaan dan pemasangan rangka plafond besi hollow 40x40mm & (dihitung)
1 Besi Hollow 40x40mm (Sinchromated) 0.2775 btg 41,600 11,544
2 Besi Hollow 20x40mm (Sinchromated) 0.4681 btg 20,800 9,736
3 Suspension rod 1.2350 Bh 4,550 5,619
a Pekerja 0.1500 Org/Hari 60,000 9,000
b Tukang Kayu Halus 0.3000 Org/Hari 80,000 24,000
c Kepala Tukang 0.0500 Org/Hari 80,000 4,000
d Mandor 0.0100 Org/Hari 95,000 950
JUMLAH 64,850
1 m2 Pengadaan dan pemasangan rangka plafond besi hollow 40x40mm & (dihitung)
1 Besi Hollow 40x40mm (Sinchromated) 0.2775 btg 41,600 11,544
2 Besi Hollow 40x40mm (Sinchromated) 0.4681 btg 41,600 19,473
3 Suspension rod 1.2350 Bh 4,550 5,619
a Pekerja 0.1500 Org/Hari 60,000 9,000
b Tukang Kayu Halus 0.2500 Org/Hari 80,000 20,000
c Kepala Tukang 0.0500 Org/Hari 80,000 4,000
d Mandor 0.0100 Org/Hari 95,000 950
JUMLAH 70,586

Nike Naluri (1106587) 55


1 m2 Pengadaan dan pemasangan rangka plafond besi hollow 60x40mm & (dihitung)
1 Rangka Plafond Akustik 60 x 60 cm 0.2775 m2 124,861 34,649
2 Besi Hollow 40x40mm (Sinchromated) 0.4681 btg 41,600 19,473
3 Suspension rod 1.2350 Bh 4,550 5,619
a Pekerja 0.1500 Org/Hari 60,000 9,000
b Tukang Kayu Halus 0.2500 Org/Hari 80,000 20,000
c Kepala Tukang 0.0500 Org/Hari 80,000 4,000
d Mandor 0.0100 Org/Hari 95,000 950
JUMLAH 93,691
1 m2 Pengadaan dan pemasangan rangka plafond besi hollow 100x50mm (dihitung)
1 Besi Hollow 50x100mm (galvanized) t.0.5mm 0.2775 btg 1,170,000 324,675
2 Besi Hollow 40x60mm (Sinchromated) 0.4681 btg 62,400 29,209
3 Suspension rod 1.2350 Bh 4,550 5,619
a Pekerja 0.1500 Org/Hari 60,000 9,000
b Tukang Kayu Halus 0.2500 Org/Hari 80,000 20,000
c Kepala Tukang 0.0500 Org/Hari 80,000 4,000
d Mandor 0.0100 Org/Hari 95,000 950
JUMLAH 393,454
1 m2 Pengadaan dan pemasangan rangka pipa besi hollow diameter 8cm (dihitung)
1 Besi Hollow 50x100mm (galvanized) t.0.5mm 0.2775 btg 1,170,000 324,675
2 Besi Hollow 40x60mm (Sinchromated) 0.4681 btg 62,400 29,209
3 Suspension rod 1.2350 Bh 4,550 5,619
a Pekerja 0.1500 Org/Hari 60,000 9,000
b Tukang Kayu Halus 0.2500 Org/Hari 80,000 20,000
c Kepala Tukang 0.0500 Org/Hari 80,000 4,000
d Mandor 0.0100 Org/Hari 95,000 950
JUMLAH 393,454
J.PEKERJAAN PENGECATAN & FINISHING DINDING (Pt T-38-2000-C)
1 m2 Mendempul dan Menggosok Kayu
1 Dempul Kayu 0.0800 Kg 24,640 1,971
2 Cat Kayu 0.0200 Kg 30,800 616
3 Batu apung 0.0100 Kg 6,000 60
a Pekerja 0.0400 Org/Hari 60,000 2,400
b Tukang Cat Biasa 0.0400 Org/Hari 80,000 3,200
c Kepala Tukang 0.0040 Org/Hari 80,000 320
d Mandor 0.0025 Org/Hari 95,000 238
JUMLAH 8,805
1 m2 Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup
1 Cat Dasar / meni kayu 0.2000 Kg 28,336 5,667
2 Plamir Kayu 0.1500 Kg 17,890 2,684

Nike Naluri (1106587) 56


3 Dempul Kayu 0.1700 Kg 24,640 4,189
4 Cat Kayu 0.3500 Kg 30,800 10,780
a Pekerja 0.0700 Org/Hari 60,000 4,200
b Tukang Cat Biasa 0.1050 Org/Hari 80,000 8,400
c Kepala Tukang 0.0040 Org/Hari 80,000 320
d Mandor 0.0025 Org/Hari 95,000 238
JUMLAH 30,810
1 m2 Pelaburan Bidang Kayu dengan Teak Oil
1 Teak Oil 0.3600 Ltr 15,000 5,400
a Pekerja 0.0400 Org/Hari 60,000 2,400
b Tukang Cat Biasa 0.0630 Org/Hari 80,000 5,040
c Kepala Tukang 0.0630 Org/Hari 80,000 5,040
d Mandor 0.0025 Org/Hari 95,000 238
JUMLAH 18,118
1 m2 Pelaburan Bidang Kayu dengan Pelitur
1 Politur 0.1500 Ltr 7,000 1,050
2 Politur 0.3720 Ltr 7,000 2,604
3 Amplas Kayu / Besi 2.0000 Lbr 8,624 17,248
a Pekerja 0.0400 Org/Hari 60,000 2,400
b Tukang Cat Biasa 0.0630 Org/Hari 80,000 5,040
c Kepala Tukang 0.0630 Org/Hari 80,000 5,040
d Mandor 0.0025 Org/Hari 95,000 238
JUMLAH 33,620
1 m2 Pelaburan Bidang Kayu dengan Vernis
1 Vernis Kayu 0.1500 Ltr 11,500 1,725
2 Dempul Kayu 0.0500 Kg 24,640 1,232
3 Amplas Kayu / Besi 0.1000 Lbr 8,624 862
4 Kuas Cat rata2 0.0100 Bh 11,211 112
a Pekerja 0.1600 Org/Hari 60,000 9,600
b Tukang Cat Biasa 0.1600 Org/Hari 80,000 12,800
c Kepala Tukang 0.0160 Org/Hari 80,000 1,280
d Mandor 0.0025 Org/Hari 95,000 238
JUMLAH 26,124
1 m2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
1 Plamur Tembok 0.1000 kg 52,000 5,200
2 Cat Tembok (25 kg) 0.1400 kg 22,100 3,094
3 Cat akhir emulsion 0.3640 Ltr 62,500 22,750
4 Amplas Kayu / Besi 0.2000 Lbr 8,624 1,725
a Pekerja 0.0200 Org/Hari 60,000 1,200
b Tukang Cat Biasa 0.0630 Org/Hari 80,000 5,040

Nike Naluri (1106587) 57


c Kepala Tukang 0.0063 Org/Hari 80,000 504
d Mandor 0.0025 Org/Hari 95,000 238
JUMLAH 39,750
1 m2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup Wheather shield )
1 Plamur Tembok 0.1000 kg 52,000 5,200
2 Cat akhir Wheathersield 0.1400 Ltr 100,000 14,000
3 Cat akhir Wheathersield 0.3640 Ltr 100,000 36,400
4 Amplas Kayu / Besi 0.2000 Lbr 8,624 1,725
a Pekerja 0.0200 Org/Hari 60,000 1,200
b Tukang Cat Biasa 0.0630 Org/Hari 80,000 5,040
c Kepala Tukang 0.0063 Org/Hari 80,000 504
d Mandor 0.0025 Org/Hari 95,000 238
JUMLAH 64,306
1 m2 Pengecatan Permukaan Besi/Baja dengan Meni Besi
1 Cat Dasar / meni besi 0.1000 Kg 28,336 2,834
2 Kuas Cat rata2 0.0100 Bh 11,211 112
a Pekerja 0.0200 Org/Hari 60,000 1,200
b Tukang Cat Biasa 0.2000 Org/Hari 80,000 16,000
c Kepala Tukang 0.0200 Org/Hari 80,000 1,600
d Mandor 0.0100 Org/Hari 95,000 950
JUMLAH 22,696
1 m2 Pengecatan Permukaan Besi/Baja dengan Meni Besi (semprot/spray)
1 Cat Dasar / meni besi 0.1000 Kg 28,336 2,834
a Pekerja 0.4000 Org/Hari 60,000 24,000
b Tukang Cat Biasa 0.7000 Org/Hari 80,000 56,000
c Kepala Tukang 0.2000 Org/Hari 80,000 16,000
d Mandor 0.2000 Org/Hari 95,000 19,000
JUMLAH 117,834
1 m2 Pengecatan Permukaan Besi/Baja dengan Meni Besi dengan perancah
1 Cat Dasar / meni besi 0.1000 Kg 28,336 2,834
2 Kuas Cat rata2 0.0100 Bh 11,211 112
3 Kayu Kuat klas III 0.0020 m3 2,335,667 4,671
a Pekerja 0.2500 Org/Hari 60,000 15,000
b Tukang Cat Biasa 0.2250 Org/Hari 80,000 18,000
c Kepala Tukang 0.0225 Org/Hari 80,000 1,800
d Mandor 0.0075 Org/Hari 95,000 713
JUMLAH 43,130
1 m2 Pengecatan Permukaan Besi/Baja dengan Meni Besi dengan perancah (semprot/spray)
1 Cat Dasar / meni besi 0.1000 Kg 28,336 2,834
2 Kayu Kuat klas III 0.0020 m3 2,335,667 4,671

Nike Naluri (1106587) 58


a Pekerja 0.4000 Org/Hari 60,000 24,000
b Tukang Cat Biasa 0.7000 Org/Hari 80,000 56,000
c Kepala Tukang 0.2000 Org/Hari 80,000 16,000
d Mandor 0.2000 Org/Hari 95,000 19,000
JUMLAH 122,505
1 m2 Pengecatan Permukaan Besi/Baja dengan Cat Besi
1 Cat Besi 0.1000 Kg 30,800 3,080
2 Kuas Cat rata2 0.0100 Bh 11,211 112
a Pekerja 0.0200 Org/Hari 60,000 1,200
b Tukang Cat Biasa 0.2000 Org/Hari 80,000 16,000
c Kepala Tukang 0.0200 Org/Hari 80,000 1,600
d Mandor 0.0100 Org/Hari 95,000 950
JUMLAH 22,942
1 m2 Pengecatan Permukaan Besi/Baja dengan Cat Besi dengan perancah
1 Cat Besi 0.1000 Kg 30,800 3,080
2 Kuas Cat rata2 0.0100 Bh 11,211 112
3 Kayu Kuat klas III 0.0020 m3 2,335,667 4,671
a Pekerja 0.2500 Org/Hari 60,000 15,000
b Tukang Cat Biasa 0.2250 Org/Hari 80,000 18,000
c Kepala Tukang 0.0225 Org/Hari 80,000 1,800
d Mandor 0.0075 Org/Hari 95,000 713
JUMLAH 43,376
1 m2 Pengecatan Permukaan Besi/Baja dengan Cat Besi (semprot/spray)
1 Cat Besi 0.3000 Kg 30,800 9,240
a Pekerja 0.4000 Org/Hari 60,000 24,000
b Tukang Cat Biasa 0.7000 Org/Hari 80,000 56,000
c Kepala Tukang 0.2000 Org/Hari 80,000 16,000
d Mandor 0.2000 Org/Hari 95,000 19,000
JUMLAH 124,240
1 m2 Pengecatan Permukaan Besi/Baja Meni & Cat Besi
m2 Pengecatan Permukaan Besi/Baja dengan Meni Besi 22,696
m2 Pengecatan Permukaan Besi/Baja dengan Cat Besi 22,942
JUMLAH 45,638
1 m2 Pengecatan Permukaan Besi/Baja Meni & Cat Besi (semprot/spray)
m2 Pengecatan Permukaan Besi/Baja dengan Meni Besi (semprot/spray) 117,834
m2 Pengecatan Permukaan Besi/Baja dengan Cat Besi (semprot/spray) 124,240
JUMLAH 242,074
K. PEKERJAAN ATAP
1 m2 Pengadaan dan pemasangan Atap Genteng Palentong Kecil
1 Genteng Palentong Kecil 25.0000 Bh 3,500 87,500

Nike Naluri (1106587) 59


a Pekerja 0.1500 Org/Hari 60,000 9,000
b Tukang Kayu Kasar 0.0750 Org/Hari 80,000 6,000
c Kepala Tukang 0.0080 Org/Hari 80,000 640
d Mandor 0.0080 Org/Hari 95,000 760
JUMLAH 103,900
1 m2 Pengadaan dan pemasangan Atap Genteng Kodok/Glazzur
1 Genteng Kodok 25.0000 Bh 4,700 117,500
a Pekerja 0.1500 Org/Hari 60,000 9,000
b Tukang Kayu Kasar 0.0750 Org/Hari 80,000 6,000
c Kepala Tukang 0.0080 Org/Hari 80,000 640
d Mandor 0.0080 Org/Hari 95,000 760
JUMLAH 133,900
1 m2 Pengadaan dan pemasangan Atap Genteng Palentong Super/besar
1 Genteng Palentong Super 12.0000 Bh 11,000 132,000
a Pekerja 0.1500 Org/Hari 60,000 9,000
b Tukang Kayu Kasar 0.0600 Org/Hari 80,000 4,800
c Kepala Tukang 0.0060 Org/Hari 80,000 480
d Mandor 0.0080 Org/Hari 95,000 760
JUMLAH 147,040
1 m1 Pengadaan dan pemasangan Bubung Palentong Kecil
1 Bubungan Genteng Palentong 5.0000 Bh 4,300 21,500
2 Semen PC (50 Kg) 0.1600 zak 63,500 10,160
3 Pasir Pasang 0.0320 m3 135,000 4,320
a Pekerja 0.4000 Org/Hari 60,000 24,000
b Tukang Kayu Kasar 0.2000 Org/Hari 80,000 16,000
c Kepala Tukang 0.0200 Org/Hari 80,000 1,600
d Mandor 0.0020 Org/Hari 95,000 190
JUMLAH 77,770
1 m1 Pengadaan dan pemasangan Bubung Kodok Glazzur
1 Bubungan Genteng Kodok 5.0000 Bh 5,200 26,000
2 Semen PC (50 Kg) 0.1600 zak 63,500 10,160
3 Pasir Pasang 0.0320 m3 135,000 4,320
a Pekerja 0.4000 Org/Hari 60,000 24,000
b Tukang Kayu Kasar 0.2000 Org/Hari 80,000 16,000
c Kepala Tukang 0.0200 Org/Hari 80,000 1,600
d Mandor 0.0020 Org/Hari 95,000 190
JUMLAH 82,270
1 m1 Pengadaan dan pemasangan Bubung Palentong Besar
1 Bubungan Palentong Super 4.0000 Bh 13,400 53,600
2 Semen PC (50 Kg) 0.1600 zak 63,500 10,160

Nike Naluri (1106587) 60


3 Pasir Pasang 0.0320 m3 135,000 4,320
a Pekerja 0.4000 Org/Hari 60,000 24,000
b Tukang Kayu Kasar 0.2000 Org/Hari 80,000 16,000
c Kepala Tukang 0.0200 Org/Hari 80,000 1,600
d Mandor 0.0020 Org/Hari 95,000 190
JUMLAH 109,870
1 m1 Pengadaan dan pemasangan Rooflight Fiberglass
1 Atap Fiberglass 0.6000 Lbr 170,000 102,000
2 Paku Skrup 0.0500 Kg 20,000 1,000
a Pekerja 0.1400 Org/Hari 60,000 8,400
b Tukang Kayu Kasar 0.6700 Org/Hari 80,000 53,600
c Kepala Tukang 0.0070 Org/Hari 80,000 560
d Mandor 0.0070 Org/Hari 95,000 665
JUMLAH 166,225
1 m1 Pengadaan dan pemasangan Asbes gelombang (2.5Mx0.92M) t=5mm
1 Asbes/Harflex gelombang uk. 2500X920x5 mm 0.5000 lbr 49,250 24,625
2 Paku payung 0.1200 bh 500 60
a Pekerja 0.1400 Org/Hari 60,000 8,400
b Tukang Kayu Kasar 0.0750 Org/Hari 80,000 6,000
c Kepala Tukang 0.0080 Org/Hari 80,000 640
d Mandor 0.0080 Org/Hari 95,000 760
JUMLAH 40,485
1 m1 Pengadaan dan pemasangan Asbes gelombang (2.25Mx0.92M) t=5mm
1 Asbes/Harflex gelombang uk. 2250X920x5 mm 0.6000 lbr 36,450 21,870
2 Paku Pancing 0.1200 Kg 18,700 2,244
a Pekerja 0.1400 Org/Hari 60,000 8,400
b Tukang Kayu Kasar 0.0750 Org/Hari 80,000 6,000
c Kepala Tukang 0.0080 Org/Hari 80,000 640
d Mandor 0.0080 Org/Hari 95,000 760
JUMLAH 39,914
1 m1 Pengadaan dan pemasangan Asbes gelombang (2Mx0.92M) t=5mm
1 Asbes/Harflex gelombang uk. 2000X920x5 mm 0.6000 lbr 32,350 19,410
2 Paku Pancing 0.1200 Kg 18,700 2,244
a Pekerja 0.1400 Org/Hari 60,000 8,400
b Tukang Kayu Kasar 0.0700 Org/Hari 80,000 5,600
c Kepala Tukang 0.0070 Org/Hari 80,000 560
d Mandor 0.0070 Org/Hari 95,000 665
JUMLAH 36,879
1 m1 Pengadaan dan pemasangan Asbes gelombang (1.8Mx0.92M) t=5mm
1 Asbes/Harflex gelombang uk. 1800x1080x5 mm 0.7500 lbr 59,150 44,363

Nike Naluri (1106587) 61


2 Paku Pancing 0.1200 Kg 18,700 2,244
a Pekerja 0.1400 Org/Hari 60,000 8,400
b Tukang Kayu Kasar 0.0700 Org/Hari 80,000 5,600
c Kepala Tukang 0.0070 Org/Hari 80,000 560
d Mandor 0.0070 Org/Hari 95,000 665
JUMLAH 61,832
1 m1 Pengadaan dan pemasangan Asbes gelombang (3Mx1.05M) t=4mm
1 Asbes/Harflex gelombang uk. 3000X1050x4 mm 0.3500 lbr 73,000 25,550
2 Paku Pancing 0.1200 Kg 18,700 2,244
a Pekerja 0.1400 Org/Hari 60,000 8,400
b Tukang Kayu Kasar 0.0700 Org/Hari 80,000 5,600
c Kepala Tukang 0.0070 Org/Hari 80,000 560
d Mandor 0.0070 Org/Hari 95,000 665
JUMLAH 43,019
1 m1 Pengadaan dan pemasangan Asbes gelombang (2.7Mx1.05M) t=4mm
1 Asbes/Harflex gelombang uk. 2700X1050x4 mm 0.4200 lbr 65,750 27,615
2 Paku Pancing 0.1200 Kg 18,700 2,244
a Pekerja 0.1400 Org/Hari 60,000 8,400
b Tukang Kayu Kasar 0.0700 Org/Hari 80,000 5,600
c Kepala Tukang 0.0070 Org/Hari 80,000 560
d Mandor 0.0070 Org/Hari 95,000 665
JUMLAH 45,084
1 m1 Pengadaan dan pemasangan Asbes gelombang (2.4Mx1.05M) t=4mm
1 Asbes/Harflex gelombang uk. 2400X1050x4 mm 0.4400 lbr 58,450 25,718
2 Paku Pancing 0.1200 Kg 18,700 2,244
a Pekerja 0.1400 Org/Hari 60,000 8,400
b Tukang Kayu Kasar 0.0670 Org/Hari 80,000 5,360
c Kepala Tukang 0.0070 Org/Hari 80,000 560
d Mandor 0.0070 Org/Hari 95,000 665
JUMLAH 42,947
1 m1 Pengadaan dan pemasangan Asbes gelombang (2.1Mx1.05M) t=4mm
1 Asbes/Harflex gelombang uk. 2100X1050x4 mm 0.5100 lbr 58,450 29,810
2 Paku Pancing 0.1200 Kg 18,700 2,244
a Pekerja 0.1400 Org/Hari 60,000 8,400
b Tukang Kayu Kasar 0.0670 Org/Hari 80,000 5,360
c Kepala Tukang 0.0070 Org/Hari 80,000 560
d Mandor 0.0070 Org/Hari 95,000 665
JUMLAH 47,039
1 m1 Pengadaan dan pemasangan Asbes gelombang (1.5Mx1.05M) t=4mm
1 Asbes/Harflex gelombang uk. 1500X1050x4 mm 0.8000 lbr 36,800 29,440

Nike Naluri (1106587) 62


2 Paku Pancing 0.1200 Kg 18,700 2,244
a Pekerja 0.1400 Org/Hari 60,000 8,400
b Tukang Kayu Kasar 0.0670 Org/Hari 80,000 5,360
c Kepala Tukang 0.0070 Org/Hari 80,000 560
d Mandor 0.0070 Org/Hari 95,000 665
JUMLAH 46,669
1 m1 Pengadaan dan pemasangan Asbes gelombang (3Mx1.08M) t=6mm
1 Asbes/Harflex gelombang uk. 3000X1080x6 mm 0.3700 lbr 116,500 43,105
2 Paku Pancing 0.1200 Kg 18,700 2,244
a Pekerja 0.1400 Org/Hari 60,000 8,400
b Tukang Kayu Kasar 0.0670 Org/Hari 80,000 5,360
c Kepala Tukang 0.0070 Org/Hari 80,000 560
d Mandor 0.0070 Org/Hari 95,000 665
JUMLAH 60,334
1 m1 Pengadaan dan pemasangan Asbes gelombang (2.7Mx1.08M) t=6mm
1 Asbes/Harflex gelombang uk. 2700X1080x6 mm 0.3800 lbr 104,850 39,843
2 Paku Pancing 0.1200 Kg 18,700 2,244
a Pekerja 0.1400 Org/Hari 60,000 8,400
b Tukang Kayu Kasar 0.0670 Org/Hari 80,000 5,360
c Kepala Tukang 0.0070 Org/Hari 80,000 560
d Mandor 0.0070 Org/Hari 95,000 665
JUMLAH 57,072
1 m1 Pengadaan dan pemasangan Asbes gelombang (2.4Mx1.08M) t=6mm
1 Asbes/Harflex gelombang uk. 2400X1080x6 mm 0.4600 lbr 93,250 42,895
2 Paku Pancing 0.1200 Kg 18,700 2,244
a Pekerja 0.1400 Org/Hari 60,000 8,400
b Tukang Kayu Kasar 0.0670 Org/Hari 80,000 5,360
c Kepala Tukang 0.0070 Org/Hari 80,000 560
d Mandor 0.0070 Org/Hari 95,000 665
JUMLAH 60,124
1 m1 Pengadaan dan pemasangan Asbes gelombang (2.1Mx1.08M) t=6mm
1 Asbes/Harflex gelombang uk. 2100X1080x6 mm 0.4900 lbr 93,250 45,693
2 Paku Pancing 0.1200 Kg 18,700 2,244
a Pekerja 0.1400 Org/Hari 60,000 8,400
b Tukang Kayu Kasar 0.0670 Org/Hari 80,000 5,360
c Kepala Tukang 0.0070 Org/Hari 80,000 560
d Mandor 0.0070 Org/Hari 95,000 665
JUMLAH 62,922
1 m1 Pengadaan dan pemasangan Asbes gelombang (1.8Mx1.08M) t=6mm
1 Asbes/Harflex gelombang uk. 1800X1080x6 mm 0.5700 lbr 69,900 39,843

Nike Naluri (1106587) 63


2 Paku Pancing 0.1200 Kg 18,700 2,244
a Pekerja 0.1400 Org/Hari 60,000 8,400
b Tukang Kayu Kasar 0.0670 Org/Hari 80,000 5,360
c Kepala Tukang 0.0070 Org/Hari 80,000 560
d Mandor 0.0070 Org/Hari 95,000 665
JUMLAH 57,072
1 m1 Pengadaan dan pemasangan Bubung Stel Gelombang 0.92m
1 Bubungan stel gelombang 920 mm 2.4000 lbr 7,100 17,040
2 Paku payung 6.0000 bh 500 3,000
a Pekerja 0.0840 Org/Hari 60,000 5,040
b Tukang Kayu Kasar 0.1250 Org/Hari 80,000 10,000
c Kepala Tukang 0.0130 Org/Hari 80,000 1,040
d Mandor 0.0040 Org/Hari 95,000 380
JUMLAH 36,500
1 m1 Pengadaan dan pemasangan Nok Stel Gelombang 0.92m
1 Nok stel gelombang 1050 mm 2.4000 lbr 25,100 60,240
2 Paku payung 6.0000 bh 500 3,000
a Pekerja 0.0840 Org/Hari 60,000 5,040
b Tukang Kayu Kasar 0.1250 Org/Hari 80,000 10,000
c Kepala Tukang 0.0130 Org/Hari 80,000 1,040
d Mandor 0.0040 Org/Hari 95,000 380
JUMLAH 79,700
1 m1 Pengadaan dan pemasangan Nok Stel Gelombang 0.92m
1 Nok stel gelombang 1050 mm 2.4000 lbr 25,100 60,240
2 Paku payung 6.0000 bh 500 3,000
a Pekerja 0.0840 Org/Hari 60,000 5,040
b Tukang Kayu Kasar 0.1250 Org/Hari 80,000 10,000
c Kepala Tukang 0.0130 Org/Hari 80,000 1,040
d Mandor 0.0040 Org/Hari 95,000 380
JUMLAH 79,700
1 m1 Pengadaan dan pemasangan Nok Stel Gelombang 1.05m
1 Nok stel gelombang 1050 mm 2.1000 lbr 25,100 52,710
2 Paku payung 6.0000 bh 500 3,000
a Pekerja 0.0840 Org/Hari 60,000 5,040
b Tukang Kayu Kasar 0.1250 Org/Hari 80,000 10,000
c Kepala Tukang 0.0130 Org/Hari 80,000 1,040
d Mandor 0.0040 Org/Hari 95,000 380
JUMLAH 72,170
1 m1 Pengadaan dan pemasangan Nok Stel Gelombang 1.08m
1 Nok stel gelombang 1080 mm 2.1000 lbr 44,700 93,870

Nike Naluri (1106587) 64


2 Paku payung 6.0000 bh 500 3,000
a Pekerja 0.0840 Org/Hari 60,000 5,040
b Tukang Kayu Kasar 0.1250 Org/Hari 80,000 10,000
c Kepala Tukang 0.0130 Org/Hari 80,000 1,040
d Mandor 0.0040 Org/Hari 95,000 380
JUMLAH 113,330
1 m1 Pengadaan dan pemasangan Atap Genteng Beton
1 Genteng Beton 11.0000 Bh 4,680 51,480
2 Paku 4 s/d 7 cm 0.0300 kg 36,000 1,080
a Pekerja 0.2000 Org/Hari 60,000 12,000
b Tukang Kayu Kasar 0.1000 Org/Hari 80,000 8,000
c Kepala Tukang 0.0100 Org/Hari 80,000 800
d Mandor 0.0100 Org/Hari 95,000 950
JUMLAH 74,310
1 m1 Pengadaan dan pemasangan Nok Atap Genteng Beton
1 Nok Genteng Beton 3.5000 Bh 4,681 16,385
2 Paku 4 s/d 7 cm 0.0500 kg 36,000 1,800
3 Semen PC (50 Kg) 0.2160 zak 63,500 13,716
4 Pasir Pasang 0.0320 m3 135,000 4,320
5 Semen Warna 1.0000 kg 12,500 12,500
a Pekerja 0.4000 Org/Hari 60,000 24,000
b Tukang Kayu Kasar 0.2000 Org/Hari 80,000 16,000
c Kepala Tukang 0.0200 Org/Hari 80,000 1,600
d Mandor 0.0200 Org/Hari 95,000 1,900
JUMLAH 92,221
1 m1 Pengadaan dan pemasangan Atap Genteng Aspal
1 Genteng Aspal 6.9000 Bh 3,602 24,854
2 Triplex t. 4 mm 0.3500 lbr 54,000 18,900
3 Paku 4 s/d 7 cm 0.0300 kg 36,000 1,080
4 Plastic Aerator 0.5000 Bh 3,000 1,500
a Pekerja 0.2000 Org/Hari 60,000 12,000
b Tukang Kayu Kasar 0.3000 Org/Hari 80,000 24,000
c Kepala Tukang 0.0030 Org/Hari 80,000 240
d Mandor 0.0100 Org/Hari 95,000 950
JUMLAH 83,524
1 m1 Pengadaan dan pemasangan Nok Atap Genteng Aspal
1 Nok Genteng aspal 2.0000 Bh 3,603 7,206
2 Paku 1 s/d 3 cm 0.0500 kg 20,020 1,001
3 Kayu Kuat klas III 0.0035 m3 2,335,667 8,175
a Pekerja 0.1250 Org/Hari 60,000 7,500

Nike Naluri (1106587) 65


b Tukang Kayu Kasar 0.2500 Org/Hari 80,000 20,000
c Kepala Tukang 0.0250 Org/Hari 80,000 2,000
d Mandor 0.0060 Org/Hari 95,000 570
JUMLAH 46,452
1 m1 Pengadaan dan pemasangan Atap Genteng Metal
1 Genteng Metal stone chip 1.0200 m2 143,000 145,860
2 Paku 4 s/d 7 cm 0.2000 kg 36,000 7,200
a Pekerja 0.2000 Org/Hari 60,000 12,000
b Tukang Kayu Kasar 0.1000 Org/Hari 80,000 8,000
c Kepala Tukang 0.0100 Org/Hari 80,000 800
d Mandor 0.0100 Org/Hari 95,000 950
JUMLAH 174,810
1 m1 Pengadaan dan pemasangan Nok Atap Genteng Metal
1 Nok Genteng Metal 1.1000 Lbr 65,000 71,500
2 Paku 4 s/d 7 cm 0.0500 kg 36,000 1,800
a Pekerja 0.2500 Org/Hari 60,000 15,000
b Tukang Kayu Kasar 0.1500 Org/Hari 80,000 12,000
c Kepala Tukang 0.0150 Org/Hari 80,000 1,200
d Mandor 0.0130 Org/Hari 95,000 1,235
JUMLAH 102,735
1 m1 Pengadaan dan pemasangan Atap Sirap
1 Atap Sirap 60.0000 Bh 3,606 216,360
2 Triplex t. 4 mm 0.3500 lbr 54,000 18,900
3 Paku 4 s/d 7 cm 0.0300 kg 36,000 1,080
4 Plastic Aerator 0.5000 Bh 3,000 1,500
a Pekerja 0.1660 Org/Hari 60,000 9,960
b Tukang Kayu Kasar 0.2500 Org/Hari 80,000 20,000
c Kepala Tukang 0.0250 Org/Hari 80,000 2,000
d Mandor 0.0080 Org/Hari 95,000 760
JUMLAH 270,560
1 m1 Pengadaan dan pemasangan Nok Atap Sirap
1 Nok Atap Sirap 1.0200 m1 3,607 3,679
2 Paku 1 s/d 3 cm 0.0600 kg 20,020 1,201
3 Paku 4 s/d 7 cm 0.0500 kg 36,000 1,800
4 Papan kelas II 0.0040 m3 9,500,000 38,000
a Pekerja 0.1250 Org/Hari 60,000 7,500
b Tukang Kayu Kasar 0.2500 Org/Hari 80,000 20,000
c Kepala Tukang 0.0250 Org/Hari 80,000 2,000
d Mandor 0.0060 Org/Hari 95,000 570
JUMLAH 74,750

Nike Naluri (1106587) 66


1 m1 Pengadaan dan pemasangan Seng Gelombang
1 Seng Gelombang BJLS 0,3 0.7000 lbr 100,100 70,070
2 Paku 1 s/d 3 cm 0.0200 kg 20,020 400
a Pekerja 0.1200 Org/Hari 60,000 7,200
b Tukang Kayu Kasar 0.0600 Org/Hari 80,000 4,800
c Kepala Tukang 0.0060 Org/Hari 80,000 480
d Mandor 0.0060 Org/Hari 95,000 570
JUMLAH 83,520
1 m1 Pengadaan dan pemasangan Nok Seng Gelombang
1 Seng Gelombang BJLS 0,3 0.3000 lbr 100,100 30,030
2 Paku 1 s/d 3 cm 0.0400 kg 20,020 801
a Pekerja 0.0150 Org/Hari 60,000 900
b Tukang Kayu Kasar 0.0700 Org/Hari 80,000 5,600
c Kepala Tukang 0.0080 Org/Hari 80,000 640
d Mandor 0.0060 Org/Hari 95,000 570
1 m1 Pengadaan dan pemasangan Atap Zincalumn
1 Steel Corregouted Zincalum t. 0,45 mm Colorcoat 1.0500 m2 152,100 159,705
2 Paku Skrup 0.0200 Kg 20,000 400
a Pekerja 0.0150 Org/Hari 60,000 900
b Tukang Kayu Kasar 0.0750 Org/Hari 80,000 6,000
c Kepala Tukang 0.0080 Org/Hari 80,000 640
d Mandor 0.0060 Org/Hari 95,000 570
JUMLAH 168,215
1 m1 Pengadaan dan pemasangan Nok Atap Zincalumn
1 Nok Steel Sheet Zincalum t. 0,45 mm Colorcoat 1.2000 m' 109,850 131,820
2 Paku Skrup 0.0400 Kg 20,000 800
a Pekerja 0.1000 Org/Hari 60,000 6,000
b Tukang Kayu Kasar 1.0000 Org/Hari 80,000 80,000
c Kepala Tukang 0.0100 Org/Hari 80,000 800
d Mandor 0.0100 Org/Hari 95,000 950
JUMLAH 220,370
1 m1 Pengadaan dan pemasangan Alumunium Foil/Insulation
1 Alumunium Foil 1.2000 m2 6,000 7,200
2 Paku Skrup 0.0800 Kg 20,000 1,600
3 Ram Kawat Ayam 1.0200 m2 36,000 36,720
a Pekerja 0.1000 Org/Hari 60,000 6,000
b Tukang Kayu Kasar 1.0000 Org/Hari 80,000 80,000
c Kepala Tukang 0.0100 Org/Hari 80,000 800
d Mandor 0.0100 Org/Hari 95,000 950
JUMLAH 133,270

Nike Naluri (1106587) 67


1 m2 Pengadaan dan pemasangan Railing
1 Cat Besi 1.0000 m2 28,900 28,900
2 Pipa Stainless Steel Ø 1" 0.0800 Btg 240,000 19,200
3 Pipa Stainless Steel Ø 1,5 " 0.0800 Btg 320,000 25,600
4 Pipa Stainless Steel Ø 2" 0.0800 Btg 400,000 32,000
a Pekerja 0.0600 Org/Hari 60,000 3,600
b Tukang Besi Tulangan 0.0600 Org/Hari 80,000 4,800
c Kepala Tukang 0.0060 Org/Hari 80,000 480
d Mandor 0.0030 Org/Hari 95,000 285
JUMLAH 114,865
1 m2 Pengadaan dan pemasangan Listplank Kayu kelas II
1 Cat Besi 1.0000 m2 28,900 28,900
2 Pipa Stainless Steel Ø 1" 0.0800 Btg 240,000 19,200
3 Pipa Stainless Steel Ø 1,5 " 0.0800 Btg 320,000 25,600
4 Pipa Stainless Steel Ø 2" 0.0800 Btg 400,000 32,000
a Pekerja 0.0600 Org/Hari 60,000 3,600
b Tukang Besi Tulangan 0.0600 Org/Hari 80,000 4,800
c Kepala Tukang 0.0060 Org/Hari 80,000 480
d Mandor 0.0030 Org/Hari 95,000 285
JUMLAH 114,865
1 kg Memasang rangka kuda2 baja IWF (SNI:7393:2008-6.2)
1 Besi Profil 1.1500 Kg 20,000 23,000
a Pekerja 0.0600 Org/Hari 60,000 3,600
b Tukang Kayu Halus 0.0600 Org/Hari 80,000 4,800
c Kepala Tukang 0.0060 Org/Hari 80,000 480
d Mandor 0.0030 Org/Hari 95,000 285
JUMLAH 32,165
DIBULATKAN 32,100
1 Pemasangan Kayu Dolken
1 Dolken dia 5 s/d 7 cm p. 4 m 1.0000 btg 13,144 13,144
a Pekerja 0.0600 Org/Hari 75,000 4,500
b Tukang Batu 0.0600 Org/Hari 100,000 6,000
c Kepala Tukang 0.0060 Org/Hari 115,000 690
d Mandor 0.0030 Org/Hari 115,000 345
JUMLAH 24,679
1 m' Pekerjaan Tangga Monyet
a Besi beton Ø13 1.05 Kg 8,974 9,423
c Pekerja 0.01 Org/Hari 60,000 600
d Tukang Batu Kasar 0.01 Org/Hari 80,000 800
JUMLAH 10,823
JUMLAH 21,646
1 m2 Pengadaan dan pemasangan kaca tempered 6mm laminated (SNI:7393:2008-6.17)
1 Kaca Tempered 6 mm 1.1000 m2 250,000 275,000
2 Sealant clear neutral (300 ml) 0.2700 tb 35,000 9,450
a Pekerja 0.2000 Org/Hari 60,000 12,000
b Tukang Kayu Halus 0.2000 Org/Hari 80,000 16,000
c Kepala Tukang 0.0200 Org/Hari 80,000 1,600
d Mandor 0.0010 Org/Hari 95,000 95
JUMLAH 314,145

Nike Naluri (1106587) 68


1 m2 Pengadaan dan pemasangan kaca tempered 10mm laminated (SNI:7393:2008-6.17)
1 Kaca Tempered 10 mm 1.1000 m2 400,000 440,000
2 Sealant clear neutral (300 ml) 0.2700 tb 35,000 9,450
a Pekerja 0.2000 Org/Hari 60,000 12,000
b Tukang Kayu Halus 0.2000 Org/Hari 80,000 16,000
c Kepala Tukang 0.0200 Org/Hari 80,000 1,600
d Mandor 0.0010 Org/Hari 95,000 95
JUMLAH 479,145
1 m2 Pengadaan dan pemasangan rangka pipa stainless 4" (dihitung)
1 Pipa Stainless Steel Ø 4" 0.2500 Btg 585,000 146,250
a Pekerja 0.1500 Org/Hari 60,000 9,000
b Tukang Kayu Halus 0.2500 Org/Hari 80,000 20,000
c Kepala Tukang 0.0500 Org/Hari 80,000 4,000
d Mandor 0.0100 Org/Hari 95,000 950
JUMLAH 180,200
1 m2 Pengadaan dan pemasangan rangka pipa stainless 3" (dihitung)
1 Pipa Stainless Steel Ø 3" 0.2500 Btg 480,000 120,000
a Pekerja 0.1500 Org/Hari 60,000 9,000
b Tukang Kayu Halus 0.2500 Org/Hari 80,000 20,000
c Kepala Tukang 0.0500 Org/Hari 80,000 4,000
d Mandor 0.0100 Org/Hari 95,000 950
JUMLAH 153,950
1 m2 Pekeraan Gutter Lantai (uk. = 40x40 cm) (dihitung)
1 Keramik Lantai 40/40 cm Polished 1.1 m2 90,000 99,000
2 Semen PC (50 Kg) 0.196 zak 90,000 17,640
3 Pasir Pasang 0.045 m3 153,000 6,885
4 Semen warna 1.3 kg 8,000 10,400
a Pekerja 0.7 Org/Hari 75,000 52,500
b Tukang Batu Kasar 0.35 Org/Hari 100,000 35,000
c Kepala Tukang 0.035 Org/Hari 115,000 4,025
d Mandor 0.035 Org/Hari 115,000 4,025
JUMLAH 229,475

Nike Naluri (1106587) 69


Analisa u/
Berat per Breakdown
BERAT BESI Batang (x0,105)

1 Besi Beton :
Besi beton ø 6 mm - 12 m 2.66 kg 2.793 kg
Besi beton ø 8 mm - 12 m 3.20 kg 3.36 kg
Besi beton ø 10 mm - 12 m 7.40 kg 7.77 kg
Besi beton ø 12 mm - 12 m 10.66 kg 11.193 kg
Besi beton ø 13 mm - 12 m 12.48 kg 13.104 kg
Besi beton ø 16 mm - 12 m 18.96 kg 19.908 kg
Besi beton ø 19 mm - 12 m 26.76 kg 28.098 kg
Besi beton ø 22 mm - 12 m 35.76 kg 37.548 kg

2 Besi Bordes Plat :


Plat 4" x 8" tebal 2.3 mm 59.00 kg
Plat 4" x 8" tebal 3.0 mm 75.00 kg
Plat 4" x 8" tebal 3.2 mm 79.60 kg
Plat 4" x 8" tebal 4.5 mm 110.00 kg
Plat 4" x 8" tebal 6.0 mm 145.00 kg
Plat 4" x 8" tebal 8.0 mm 192.00 kg
Plat 4" x 8" tebal 9.0 mm 215.00 kg

3 Besi Kanal "C" / Lip Channel "C"


60 x 30 x 10 x 1.6 mm - 6 M 9.76 kg
75 x 35 x 15 x 1.6 mm - 6 M 12.40 kg
75 x 45 x 15 x 1.6 mm - 6 M 13.93 kg
75 x 45 x 15 x 2.3 mm - 6 M 19.50 kg
100 x 50 x 20 x 1.6 mm - 6 M 17.50 kg
100 x 50 x 20 x 2.3 mm - 6 M 24.40 kg
100 x 50 x 20 x 3.2 mm - 6 M 33.00 kg
125 X 50 X 20 X 2.3 mm - 6 M 27.10 kg
125 X 50 X 20 X 3.2 mm - 6 M 36.80 kg
150 x 50 x 20 x 2.3 mm - 6 M 29.80 kg
150 x 50 x 20 x 3.2 mm - 6 M 40.60 kg
150 x 65 x 20 x 2.3 mm - 6 M 33.00 kg
150 x 65 x 20 x 3.2 mm - 6 M 45.10 kg
200 x 75 x 20 x 3.2 mm - 6 M 55.62 kg

4 Besi Siku / Angle Bars


20 x 20 x 3 mm - 6 M 5.31 kg
25 x 25 x 3 mm - 6 M 6.72 kg
20 x 20 x 5 mm - 6 M 10.60 kg
30 x 30 x 3 mm - 6 M 8.16 kg
40 x 40 x 3 mm - 6 M 11.00 kg
40 x 40 x 4 mm - 6 M 14.50 kg
40 x 40 x 5 mm - 6 M 18.00 kg
45 x 45 x 4 mm - 6 M 16.44 kg
45 x 45 x 5 mm - 6 M 20.50 kg
50 x 50 x 4 mm - 6 M 18.40 kg
50 x 50 x 5 mm - 6 M 22.50 kg
50 x 50 x 6 mm - 6 M 27.58 kg
60 x 60 x 5 mm - 6 M 27.30 kg
60 x 60 x 6 mm - 6 M 32.52 kg
65 x 65 x 6 mm - 6 M 35.46 kg
70 x 70 x 6 mm - 6 M 38.28 kg
70 x 70 x 7 mm - 6 M 44.28 kg
75 x 75 x 6 mm - 6 M 41.22 kg
75 x 75 x 7 mm - 6 M 45.00 kg
75 x 75 x 8 mm - 6 M 54.18 kg
75 x 75 x 9 mm - 6 M 59.80 kg
80 x 80 x 8 mm - 6 M 57.96 kg
90 x 90 x 6.6 mm - 6 M 57.54 kg
90 x 90 x 7 mm - 6 M 57.54 kg
90 x 90 x 9 mm - 6 M 73.20 kg
90 x 90 x 10 mm - 6 M 79.80 kg
100 x 100 x 7 mm - 6 M 64.25 kg
100 x 100 x 10 mm - 6 M 90.60 kg
120 x 120 x 11 mm - 6 M 119.40 kg
120 x 120 x 12 mm - 6 M 130.00 kg
125 x 125 x 12 mm - 6 M 140.00 kg
130 x 130 x 9 mm - 6 M 107.10 kg
130 x 130 x 12 mm - 6 M 140.10 kg
150 x 150 x 12 mm - 6 M 164.00 kg
150 x 150 x 15 mm - 6 M 202.00 kg

5 Besi Wide Flange ex. Jepang


100 x 50 x 5 x 7 mm - 12 M 112.00 kg
125 x 60 x 6 x 8 mm - 12 M 158.40 kg
150 x 75 x 5 x 7 mm - 12 M 168.00 kg
175 x 90 x 5 x 8 mm - 12 M 217.20 kg
200 x 100 x 3.2 x 4.5 mm - 12 M 143.00 kg
200 x 100 x 5.5 x 8 mm - 12 M 256.00 kg
250 x 125 x 6 x 9 mm - 12 M 355.20 kg
300 x 150 x 6.5 x 9 mm - 12 M 440.40 kg
400 x 200 x 8 x 13 mm - 12 M 792.00 kg
400 x 250 x 12 x 19 mm - 12 M 1317.40 kg
450 x 200 x 9 x 14 mm - 12 M 912.00 kg
500 x 200 x 10 x 16 mm - 12 M 1075.00 kg
600 x 200 x 11 x 17 mm - 12 M 1272.00 kg
700 x 300 x 13 x 24 mm - 12 M 2220.00 kg
800 x 300 x 14 x 26 mm - 12 M 2520.00 kg

6 Besi H Beam
100 x 100 x 6 x 8 mm - 12 M 206.00 kg
125 x 125 x 5 x 7 mm - 12 M 222.00 kg
125 x 125 x 6.5 x 9 mm - 12 M 286.00 kg
150 x 150 x 7 x 10 mm - 12 M 378.00 kg
175 x 175 x 7 x 11 mm - 12 M 482.00 kg
200 x 200 x 8 x 12 mm - 12 M 599.00 kg
250 x 250 x 9 x 14 mm - 12 M 869.00 kg
300 x 300 x 10 x 15 mm - 12 M 1128.00 kg
350 x 350 x 12 x 19 mm - 12 M 1644.00 kg
400 x 400 x 13 x 21 mm - 12 M 2064.00 kg

7 Pipa Hitam STK 41


Dia 2 1/2" tebal 2.8 mm - 6 M 30.48 kg
Dia 2 1/2" tebal 3.2 mm - 6 M 34.62 kg
Dia 3" tebal 3.2 mm - 6 M 40.68 kg
Dia 4" tebal 3.5 mm - 6 M 57.36 kg
Dia 4" tebal 4.5 mm - 6 M 73.20 kg
Dia 5" tebal 4.5 mm - 6 M 90.00 kg
Dia 5" tebal 6.0 mm - 6 M 118.80 kg
Dia 6" tebal 4.5 mm - 6 M 106.80 kg
Dia 6" tebal 5.0 mm - 6 M 118.00 kg
Dia 6" tebal 6.0 mm - 6 M 141.60 kg
Dia 7" tebal 5.3 mm - 6 M 145.20 kg
Dia 8" tebal 5.8 mm - 6 M 180.60 kg
Dia 8" tebal 8.2 mm - 6 M 252.60 kg
Dia 10" tebal 6.6 mm - 6 M 254.40 kg
J.PEKERJAAN PIPA dan SANITER

1 Bh Pengadaan dan Pemasangan Kloset Duduk / Monoblok


1 Kloset Duduk Porselen 1.0000 unt
2 Perlengkapan 0.0600 persen
a Pekerja 3.3000 Org/Hari
b Tukang Batu Halus 1.1000 Org/Hari
c Kepala Tukang 0.0010 Org/Hari
d Mandor 0.1600 Org/Hari

1 Bh Pengadaan dan Pemasangan Kloset Type CW 421 J


1 Kloset Duduk Toto CW 421 J 1.0000 unt
2 Perlengkapan 0.0600 persen
a Pekerja 3.3000 Org/Hari
b Tukang Batu Halus 1.1000 Org/Hari
c Kepala Tukang 0.0010 Org/Hari
d Mandor 0.1600 Org/Hari

1 Bh Pengadaan dan Pemasangan Kloset Jongkok Porselen


1 Kloset Jongkok Porselen Putih 1.0000 unt
2 Semen PC (50 Kg) 0.1200 zak
3 Pasir Pasang 0.0100 m3
a Pekerja 1.0000 Org/Hari
b Tukang Batu Halus 1.5000 Org/Hari
c Kepala Tukang 0.1500 Org/Hari
d Mandor 0.1600 Org/Hari

1 Bh Pengadaan dan Pemasangan Kloset Jongkok Keramik


1 Kloset Jongkok Keramik 1.0000 unt
2 Bata Merah 8.2600 bh
3 Semen PC (50 Kg) 0.1200 zak
4 Pasir Pasang 0.0100 m3
a Pekerja 1.0000 Org/Hari
b Tukang Batu Halus 1.5000 Org/Hari
c Kepala Tukang 0.3000 Org/Hari
d Mandor 0.1100 Org/Hari
1 Bh Pengadaan dan Pemasangan Urinoir
1 Urinoir keramik komplit acc 1.0000 unt
2 Perlengkapan 0.3000 persen
3 Semen PC (50 Kg) 0.1200 zak
4 Pasir Pasang 0.0100 m3
a Pekerja 1.0000 Org/Hari
b Tukang Batu Halus 1.0000 Org/Hari
c Kepala Tukang 0.1000 Org/Hari
d Mandor 0.1000 Org/Hari
1 Bh Pengadaan dan Pemasangan Washtafel
1 Washtafel Keramik (lengkap) 1.0000 unt
2 Perlengkapan 0.1200 persen
3 Semen Warna 6.0000 kg
4 Pasir Pasang 0.0100 m3
a Pekerja 1.2000 Org/Hari
b Tukang Batu Halus 1.4500 Org/Hari
c Kepala Tukang 0.1500 Org/Hari
d Mandor 0.1000 Org/Hari

1 bh Pengadaan dan Pemasangan Bak Mandi Teraso


1 Bak mandi Teraso 1.0000 set
2 Semen PC (50 Kg) 0.1200 zak
3 Pasir Pasang 0.0100 m3
a Pekerja 2.1000 Org/Hari
b Tukang Batu Halus 0.7500 Org/Hari
c Kepala Tukang 0.0700 Org/Hari
d Mandor 0.1100 Org/Hari

1 bh Pengadaan dan Pemasangan Bak Mandi Fiberglass vol 0,3 m3


1 Bak air fibreglass uk. 55x55x60 cm 1.0000 bh
2 Perlengkapan 0.1800 persen
a Pekerja 1.8000 Org/Hari
b Tukang Batu Halus 2.7000 Org/Hari
c Kepala Tukang 0.0500 Org/Hari
d Mandor 0.0100 Org/Hari

1 bh Pengadaan dan Pemasangan Bak Mandi Batu Bata vol 0,3 m3


1 Bata Merah 330.4000 bh
2 Semen PC (50 Kg) 2.4000 zak
3 Pasir Pasang 0.3000 m3
4 Dinding Porselen 11/11 cm 3.6000 m2
5 Semen Putih 6.0000 kg
a Pekerja 6.0000 Org/Hari
b Tukang Batu Halus 3.0000 Org/Hari
c Kepala Tukang 0.3000 Org/Hari
d Mandor 0.3000 Org/Hari

1 bh Pengadaan dan Pemasangan Bakdip Porselen


1 Bakdip 1.0000 Bh
2 Perlengkapan 0.2000 persen
a Tukang Batu Halus 0.0750 Org/Hari
b Kepala Tukang 0.7500 Org/Hari
c Mandor 0.2500 Org/Hari
1 bh Pengadaan dan Pemasangan Bak Beton Vol 1 m3 air
1 Beton 0.9000 m3
2 Pembersih 180.0000 kg
3 Kayu cetakan 8.0000 m3
4 Dinding Porselen 11/11 cm 5.0000 m2
5 Perlengkapan 0.1000 ls
a Pekerja 3.5000 Org/Hari
b Tukang Batu Halus 4.5000 Org/Hari
c Kepala Tukang 0.9000 Org/Hari
d Mandor 0.9000 Org/Hari

1 bh Pengadaan dan Pemasangan Bak Mandi Fiberglass vol 1m3


1 Bak air fibreglass uk. 55x55x60 cm 1.0000 bh
2 Perlengkapan 0.1200 persen
a Pekerja 3.0000 Org/Hari
b Tukang Batu Halus 4.5000 Org/Hari
c Kepala Tukang 0.9000 Org/Hari
d Mandor 0.9000 Org/Hari

1 m Pengadaan dan Pemasangan Pipa Penyalur Air Limbah Jenis Pipa Tanah d=20 cm
1 Pipa PVC 1.6000 bh
2 Semen PC (50 Kg) 0.0136 zak
3 Pasir Pasang 0.0130 m3
4 Pasir Urug 0.1100 m3
a Pekerja 0.0600 Org/Hari
b Tukang Batu Halus 0.0300 Org/Hari
c Kepala Tukang 0.0030 Org/Hari
d Mandor 0.0025 Org/Hari

1 m3 Pengadaan dan Pemasangan Pipa Penyalur Air Limbah Jenis Pipa Tanah d=15 cm
1 Pipa PVC 1.6000 bh
2 Semen PC (50 Kg) 0.0174 zak
3 Pasir Pasang 0.0140 m3
4 Pasir Urug 0.0140 m3
a Pekerja 0.0800 Org/Hari
b Tukang Batu Halus 0.0400 Org/Hari
c Kepala Tukang 0.0040 Org/Hari
d Mandor 0.0070 Org/Hari

1 m3 Pengadaan dan Pemasangan Pipa Beton d= 15-20 cm


1 Pipa PVC 1.1000 bh
2 Bata Merah 22.3020 bh
3 Semen PC (50 Kg) 0.0784 zak
4 Pasir Pasang 0.0560 m3
5 Pasir Urug 0.0240 m3
a Pekerja 0.1400 Org/Hari
b Tukang Batu Halus 0.0700 Org/Hari
c Kepala Tukang 0.0070 Org/Hari
d Mandor 0.0070 Org/Hari

1 m3 Pengadaan dan Pemasangan Pipa Beton d= 30-100 cm


1 Pipa PVC 1.1000 bh
2 Bata Merah 454.3000 bh
3 Semen PC (50 Kg) 0.2060 zak
4 Pasir Pasang 0.0610 m3
5 Pasir Urug 0.0690 m3
a Pekerja 0.3800 Org/Hari
b Tukang Batu Halus 0.1900 Org/Hari
c Kepala Tukang 0.0190 Org/Hari
d Mandor 0.0190 Org/Hari
1 bh Pengadaan dan Pemasangan Bak Kontrol pasangan batu bata uk. 30x30x50 cm
1 Bata Merah 119.7700 bh
2 Semen PC (50 Kg) 0.8800 zak
3 Pasir Pasang 0.0700 m3
4 Batu Split Pecah Mesin 1/2 0.0700 m3
5 Besi Beton rata-rata 2.6000 Kg
6 Pasir Beton 0.0900 m3
a Pekerja 1.4200 Org/Hari
b Tukang Batu Halus 0.4730 Org/Hari
c Kepala Tukang 0.0470 Org/Hari
d Mandor 0.0710 Org/Hari

1 bh Pengadaan dan Pemasangan Bak Kontrol pasangan batu bata uk. 45x45x50 cm
1 Bata Merah 206.5000 bh
2 Semen PC (50 Kg) 1.5400 zak
3 Pasir Pasang 0.1300 m3
4 Batu Split Pecah Mesin 1/2 0.0200 m3
5 Besi Beton rata-rata 2.6000 Kg
6 Pasir Beton 0.0900 m3
a Pekerja 1.4200 Org/Hari
b Tukang Batu Halus 0.4730 Org/Hari
c Kepala Tukang 0.0470 Org/Hari
d Mandor 0.0710 Org/Hari

1 bh Pengadaan dan Pemasangan Bak Kontrol pasangan batu bata uk. 60x60x65 cm
1 Bata Merah 306.4460 bh
2 Semen PC (50 Kg) 2.2800 zak
3 Pasir Pasang 0.1840 m3
4 Batu Split Pecah Mesin 1/2 0.0330 m3
5 Besi Beton rata-rata 4.8500 Kg
6 Pasir Beton 0.1200 m3
a Pekerja 2.1600 Org/Hari
b Tukang Batu Halus 0.7200 Org/Hari
c Kepala Tukang 0.0720 Org/Hari
d Mandor 0.1080 Org/Hari
e Tukang Gali 0.1000 Org/Hari

1 m3 Pengadaan dan Pemasangan Pipa Galvanis d = 1/2 "


1 Pipa Galvanis d=1/2 " 1.2000 m1
2 Perlengkapan 0.3500 persen
a Pekerja 0.5400 Org/Hari
b Tukang Batu Halus 0.0900 Org/Hari
c Kepala Tukang 0.0090 Org/Hari
d Mandor 0.0270 Org/Hari

1 m3 Pengadaan dan Pemasangan Pipa Galvanis d = 3/4 "


1 Pipa Galvanis d=3/4 " 1.2000 m1
2 Perlengkapan 0.3500 persen
a Pekerja 0.5400 Org/Hari
b Tukang Batu Halus 0.0900 Org/Hari
c Kepala Tukang 0.0090 Org/Hari
d Mandor 0.0270 Org/Hari

1 m3 Pengadaan dan Pemasangan Pipa Galvanis d = 1"


1 Pipa Galvanis d= 1 " 1.2000 m1
2 Perlengkapan 0.3500 persen
a Pekerja 0.5400 Org/Hari
b Tukang Batu Halus 0.0900 Org/Hari
c Kepala Tukang 0.0090 Org/Hari
d Mandor 0.0270 Org/Hari

1 m3 Pengadaan dan Pemasangan Pipa Galvanis d = 1 1/2"


1 Pipa Galvanis d=1 1/2 " 1.2000 m1
2 Perlengkapan 0.3500 persen
a Pekerja 0.1080 Org/Hari
b Tukang Batu Halus 0.1800 Org/Hari
c Kepala Tukang 0.0180 Org/Hari
d Mandor 0.0054 Org/Hari
1 m3 Pengadaan dan Pemasangan Pipa Galvanis d = 3"
1 Pipa Galvanis d=1 1/2 " 1.2000 m1
2 Perlengkapan 0.3500 persen
a Pekerja 0.1080 Org/Hari
b Tukang Batu Halus 0.1800 Org/Hari
c Kepala Tukang 0.0180 Org/Hari
d Mandor 0.0054 Org/Hari

1 m3 Pengadaan dan Pemasangan Pipa Galvanis d = 4"


1 Pipa Galvanis d=4 " 1.2000 m1
2 Perlengkapan 0.3500 persen
a Pekerja 0.1350 Org/Hari
b Tukang Batu Halus 0.2250 Org/Hari
c Kepala Tukang 0.0225 Org/Hari
d Mandor 0.0068 Org/Hari

1 m3 Pengadaan dan Pemasangan Pipa PVC tipe AW d = 1/2"


1 Pipa PVC d=1/2 " 1.2000 m1
2 Perlengkapan 0.3500 persen
a Pekerja 0.0360 Org/Hari
b Tukang Batu Halus 0.0600 Org/Hari
c Kepala Tukang 0.0060 Org/Hari
d Mandor 0.0018 Org/Hari

1 m3 Pengadaan dan Pemasangan Pipa PVC tipe AW d = 3/4"


1 Pipa PVC d=3/4 " 1.2000 m1
2 Perlengkapan 0.3500 persen
a Pekerja 0.0360 Org/Hari
b Tukang Batu Halus 0.0600 Org/Hari
c Kepala Tukang 0.0060 Org/Hari
d Mandor 0.0018 Org/Hari

1 m3 Pengadaan dan Pemasangan Pipa PVC tipe AW d = 1"


1 Pipa PVC d= 1 " 1.2000 m1
2 Perlengkapan 0.3500 persen
a Pekerja 0.0360 Org/Hari
b Tukang Batu Halus 0.0600 Org/Hari
c Kepala Tukang 0.0060 Org/Hari
d Mandor 0.0018 Org/Hari

1 m3 Pengadaan dan Pemasangan Pipa PVC tipe AW d = 1 1/2"


1 Pipa PVC d= 1 1/2 " 1.2000 m1
2 Perlengkapan 0.3500 persen
a Pekerja 0.0360 Org/Hari
b Tukang Batu Halus 0.0600 Org/Hari
c Kepala Tukang 0.0060 Org/Hari
d Mandor 0.0018 Org/Hari
1 m3 Pengadaan dan Pemasangan Pipa PVC tipe AW d = 2"
1 Pipa PVC d= 2 " 1.2000 m1
2 Perlengkapan 0.3500 persen
a Pekerja 0.0540 Org/Hari
b Tukang Batu Halus 0.0900 Org/Hari
c Kepala Tukang 0.0090 Org/Hari
d Mandor 0.0027 Org/Hari

1 m3 Pengadaan dan Pemasangan Pipa PVC tipe AW d = 2 1/2"


1 Pipa PVC d= 2 1/2 " 1.2000 m1
2 Perlengkapan 0.3500 persen
a Pekerja 0.0360 Org/Hari
b Tukang Batu Halus 0.0600 Org/Hari
c Kepala Tukang 0.0060 Org/Hari
d Mandor 0.0018 Org/Hari
1 m3 Pengadaan dan Pemasangan Pipa PVC tipe AW d = 3"
1 Pipa PVC d= 3 " 1.2000 m1
2 Perlengkapan 0.3500 persen
a Pekerja 0.0810 Org/Hari
b Tukang Batu Halus 0.1350 Org/Hari
c Kepala Tukang 0.1350 Org/Hari
d Mandor 0.0041 Org/Hari

1 m3 Pengadaan dan Pemasangan Pipa PVC tipe AW d = 4"


1 Pipa PVC d= 4 " 1.2000 m1
2 Perlengkapan 0.3500 persen
a Pekerja 0.0810 Org/Hari
b Tukang Batu Halus 0.1350 Org/Hari
c Kepala Tukang 0.1350 Org/Hari
d Mandor 0.0041 Org/Hari

1 Bh Pengadaan dan Pemasangan Bak Cuci Piring Stainless Steel


1 Kitchenzink stainless steel 1 lubang 1.0000 unt
2 Water drain+aksesoris 1.0000 set
a Tukang Batu Halus 0.3000 Org/Hari
b Kepala Tukang 0.0300 Org/Hari

1 Bh Pengadaan dan Pemasangan Bak Cuci Piring Teraso


1 Kitchenzink teraso 1 lubang 1.0000 bh
2 Water drain+aksesoris 1.0000 set
3 Semen PC (50 Kg) 0.4000 zak
4 Pasir Pasang 0.0500 m3
a Tukang Batu Halus 0.5000 Org/Hari
b Kepala Tukang 0.0500 Org/Hari

1 Bh Pengadaan dan Pemasangan Kran Air diameter 3/4" atau 1/2 "
1 Kran dinding 4 jari 1.0000 bh
2 Seal tape 0.0250 roll
a Tukang Batu Halus 0.1000 Org/Hari
b Kepala Tukang 0.0100 Org/Hari

1 Bh Pengadaan dan Pemasangan Floor Drain


1 Floordrain 1.0000 unt
a Tukang Batu Halus 0.1000 Org/Hari
b Kepala Tukang 0.0100 Org/Hari

1 Bh Pengadaan dan Pemasangan Jetwasher


1 Water drain+aksesoris 1.0000 set
2 Seal tape 0.0250 roll
a Tukang Batu Halus 0.1000 Org/Hari
b Kepala Tukang 0.0100 Org/Hari
1 Bh Pengadaan dan Pemasangan Toilet Paper Holder
1 Tempat Tissue Inbow 1.0000 unt
2 Seal tape 0.0250 roll
a Tukang Batu Halus 0.1000 Org/Hari
b Kepala Tukang 0.0100 Org/Hari

1 Bh Pengadaan dan Pemasangan Kran Sink


1 Kran Air 3/4" 1.0000 bh
2 Seal tape 0.0250 roll
a Tukang Batu Halus 0.1000 Org/Hari
b Kepala Tukang 0.0100 Org/Hari

1 Bh Pengadaan dan Pemasangan Roof Drain


1 Roof drain 1.0000 bh
a Tukang Batu Halus 0.1000 Org/Hari
b Kepala Tukang 0.0100 Org/Hari
1 Bh Pengadaan dan Pemasangan Divider
1 Urinoir Partisi Keramik 1.0000 unt
2 Perlengkapan 0.1200 persen
3 Semen Warna 6.0000 kg
4 Pasir Pasang 0.0100 m3
a Pekerja 1.2000 Org/Hari
b Tukang Batu Halus 1.4500 Org/Hari
c Kepala Tukang 0.1500 Org/Hari
d Mandor 0.1000 Org/Hari

1 Bh Pengadaan dan Pemasangan Shower


1 Shower 1.0000 bh
2 Seal tape 0.0250 roll
a Tukang Batu Halus 0.1000 Org/Hari
b Kepala Tukang 0.0100 Org/Hari
(Pt T-38-2000-C)

(Pt T-38-2000-C) 6.1


2,000,000 2,000,000
2,000,000 120,000
60,000 198,000
80,000 88,000
80,000 80
95,000 15,200
JUMLAH 2,406,080

dihitung
3,616,600 3,616,600
3,616,600 216,996
60,000 198,000
80,000 88,000
80,000 80
95,000 15,200
JUMLAH 4,119,676

(Pt T-38-2000-C) 6.2


450,000 450,000
63,500 7,620
135,000 1,350
60,000 60,000
80,000 120,000
80,000 12,000
95,000 15,200
JUMLAH 650,970

(Pt T-38-2000-C) 6.3


425,000 425,000
600 4,956
63,500 7,620
135,000 1,350
60,000 60,000
80,000 120,000
80,000 24,000
95,000 10,450
JUMLAH 642,926

(Pt T-38-2000-C) 6.4


2,120,000 2,120,000
2,120,000 636,000
63,500 7,620
135,000 1,350
60,000 60,000
80,000 80,000
80,000 8,000
95,000 9,500
JUMLAH 2,912,970
(Pt T-38-2000-C) 6.5
750,000 750,000
750,000 90,000
12,500 75,000
135,000 1,350
60,000 72,000
80,000 116,000
80,000 12,000
95,000 9,500
JUMLAH 1,116,350

(Pt T-38-2000-C) 6.6


650,000 650,000
63,500 7,620
135,000 1,350
60,000 126,000
80,000 60,000
80,000 5,600
95,000 10,450
JUMLAH 861,020

(Pt T-38-2000-C) 6.7


916,000 916,000
916,000 164,880
60,000 108,000
80,000 216,000
80,000 4,000
95,000 950
JUMLAH 1,409,830

(Pt T-38-2000-C) 6.8


600 198,240
63,500 152,400
135,000 40,500
32,500 117,000
2,000 12,000
60,000 360,000
80,000 240,000
80,000 24,000
95,000 28,500
JUMLAH 1,172,640

(Pt T-38-2000-C) 6.9


1,950,000 1,950,000
1,950,000 390,000
80,000 6,000
80,000 60,000
95,000 23,750
JUMLAH 2,429,750
(Pt T-38-2000-C) 6.10
2,600,000 2,340,000
4,500 810,000
2,340,000 18,720,000
32,500 162,500
22,032,500 2,203,250
60,000 210,000
80,000 360,000
80,000 72,000
95,000 85,500
JUMLAH 24,963,250

(Pt T-38-2000-C) 6.11


523,900 523,900
523,900 62,868
60,000 180,000
80,000 360,000
80,000 72,000
95,000 85,500
JUMLAH 1,284,268

h Jenis Pipa Tanah d=20 cm (Pt T-38-2000-C) 6.12


65,000 104,000
63,500 864
135,000 1,755
100,000 11,000
60,000 3,600
80,000 2,400
80,000 240
95,000 238
JUMLAH 124,096

h Jenis Pipa Tanah d=15 cm (Pt T-38-2000-C) 6.13


65,000 104,000
63,500 1,105
135,000 1,890
100,000 1,400
60,000 4,800
80,000 3,200
80,000 320
95,000 665
JUMLAH 117,380

(Pt T-38-2000-C) 6.14


65,000 71,500
600 13,381
63,500 4,978
135,000 7,560
100,000 2,400
60,000 8,400
80,000 5,600
80,000 560
95,000 665
JUMLAH 115,045

(Pt T-38-2000-C) 6.15


65,000 71,500
600 272,580
63,500 13,081
135,000 8,235
100,000 6,900
60,000 22,800
80,000 15,200
80,000 1,520
95,000 1,805
JUMLAH 413,621
atu bata uk. 30x30x50 cm (Pt T-38-2000-C) 6.16
600 71,862
63,500 55,880
135,000 9,450
145,000 10,150
1,721 4,474
145,000 13,050
60,000 85,200
80,000 37,840
80,000 3,760
95,000 6,745
JUMLAH 298,411

atu bata uk. 45x45x50 cm (Pt T-38-2000-C) 6.17


600 123,900
63,500 97,790
135,000 17,550
145,000 2,900
1,721 4,474
145,000 13,050
60,000 85,200
80,000 37,840
80,000 3,760
95,000 6,745
JUMLAH 393,209

atu bata uk. 60x60x65 cm (Pt T-38-2000-C) 6.18


600 183,868
63,500 144,780
135,000 24,840
145,000 4,785
1,721 8,347
145,000 17,400
60,000 129,600
80,000 57,600
80,000 5,760
95,000 10,260
75,000 7,500
JUMLAH 587,239

(Pt T-38-2000-C) 6.19


130,000 156,000
130,000 45,500
60,000 32,400
80,000 7,200
80,000 720
95,000 2,565
JUMLAH 244,385

(Pt T-38-2000-C) 6.20


260,000 312,000
260,000 91,000
60,000 32,400
80,000 7,200
80,000 720
95,000 2,565
JUMLAH 445,885

(Pt T-38-2000-C) 6.21


325,000 390,000
325,000 113,750
60,000 32,400
80,000 7,200
80,000 720
95,000 2,565
JUMLAH 546,635

(Pt T-38-2000-C) 6.22


390,000 468,000
390,000 136,500
60,000 6,480
80,000 14,400
80,000 1,440
95,000 513
JUMLAH 627,333
(Pt T-38-2000-C) 6.23
390,000 468,000
390,000 136,500
60,000 6,480
80,000 14,400
80,000 1,440
95,000 513
JUMLAH 627,333

(Pt T-38-2000-C) 6.24


455,000 546,000
455,000 159,250
60,000 8,100
80,000 18,000
80,000 1,800
95,000 646
JUMLAH 733,796

(Pt T-38-2000-C) 6.25


455,000 546,000
455,000 159,250
60,000 2,160
80,000 4,800
80,000 480
95,000 171
JUMLAH 712,861

(Pt T-38-2000-C) 6.26


455,000 546,000
455,000 159,250
60,000 2,160
80,000 4,800
80,000 480
95,000 171
JUMLAH 712,861

(Pt T-38-2000-C) 6.27


455,000 546,000
455,000 159,250
60,000 2,160
80,000 4,800
80,000 480
95,000 171
JUMLAH 712,861

(Pt T-38-2000-C) 6.28


455,000 546,000
455,000 159,250
60,000 2,160
80,000 4,800
80,000 480
95,000 171
JUMLAH 712,861

(Pt T-38-2000-C) 6.29


455,000 546,000
455,000 159,250
60,000 3,240
80,000 7,200
80,000 720
95,000 257
JUMLAH 716,667

(Pt T-38-2000-C) 6.30


455,000 546,000
455,000 159,250
60,000 2,160
80,000 4,800
80,000 480
95,000 171
JUMLAH 712,861
(Pt T-38-2000-C) 6.31
455,000 546,000
455,000 159,250
60,000 4,860
80,000 10,800
80,000 10,800
95,000 390
JUMLAH 732,100

(Pt T-38-2000-C) 6.32


455,000 546,000
455,000 159,250
60,000 4,860
80,000 10,800
80,000 10,800
95,000 390
JUMLAH 732,100

(Pt T-38-2000-C) 6.33


17,500 17,500
195,000 195,000
80,000 24,000
80,000 2,400
JUMLAH 238,900

(Pt T-38-2000-C) 6.34


130,000 130,000
195,000 195,000
63,500 25,400
135,000 6,750
80,000 40,000
80,000 4,000
JUMLAH 401,150

(Pt T-38-2000-C) 6.35


188,000 188,000
314,000 7,850
80,000 8,000
80,000 800
JUMLAH 204,650

(Pt T-38-2000-C) 6.36


367,000 367,000
80,000 8,000
80,000 800
JUMLAH 375,800

(dihitung) 6.35
195,000 195,000
25,000 625
80,000 8,000
80,000 800
JUMLAH 204,425

(dihitung) 6.35
509,600 509,600
25,000 625
80,000 8,000
80,000 800
JUMLAH 519,025

(Pt T-38-2000-C) 6.35


78,000 78,000
161,500 4,038
80,000 8,000
80,000 800
JUMLAH 90,838

(Pt T-38-2000-C) 6.36


234,000 234,000
80,000 8,000
80,000 800
JUMLAH 242,800
(Pt T-38-2000-C) 6.5
961,000 961,000
961,000 115,320
12,500 75,000
135,000 1,350
60,000 72,000
80,000 116,000
80,000 12,000
95,000 9,500
JUMLAH 1,352,670

(Pt T-38-2000-C) 6.35


245,000 245,000
39,470 987
80,000 8,000
80,000 800
JUMLAH 254,787
PEKERJAAN KUNCI,ALAT GANTUNGAN dan KACA

1 Bh Pengadaan dan Pemasangan Kunci Silinder


1 Kunci Silinder 1.0000 bh
a Pekerja 0.0050 Org/Hari
b Tukang Kayu Halus 0.5000 Org/Hari
c Kepala Tukang 0.0050 Org/Hari
d Mandor 0.0003 Org/Hari

1 Bh Pengadaan dan Pemasangan Engsel Pintu


1 Engsel 3" 1.0000 bh
a Pekerja 0.0150 Org/Hari
b Tukang Kayu Halus 0.1500 Org/Hari
c Kepala Tukang 0.0150 Org/Hari
d Mandor 0.0008 Org/Hari

1 Bh Pengadaan dan Pemasangan Engsel Jendela Kupu-kupu


1 Engsel 3" 1.0000 bh
a Pekerja 0.0100 Org/Hari
b Tukang Kayu Halus 0.1000 Org/Hari
c Kepala Tukang 0.0100 Org/Hari
d Mandor 0.0005 Org/Hari

1 Bh Pengadaan dan Pemasangan Engsel Angin


1 Engsel 3" 1.0000 bh
a Pekerja 0.0200 Org/Hari
b Tukang Kayu Halus 0.2000 Org/Hari
c Kepala Tukang 0.0200 Org/Hari
d Mandor 0.0100 Org/Hari

1 Bh Pengadaan dan Pemasangan Spring Knip


1 Spring Knip 1.0000 bh
a Pekerja 0.0150 Org/Hari
b Tukang Kayu Halus 0.1500 Org/Hari
c Kepala Tukang 0.0150 Org/Hari
d Mandor 0.0008 Org/Hari

1 Bh Pengadaan dan Pemasangan Kait Angin


1 Hak Angin 1.0000 Pas
a Pekerja 0.0150 Org/Hari
b Tukang Kayu Halus 0.1500 Org/Hari
c Kepala Tukang 0.0150 Org/Hari
d Mandor 0.0008 Org/Hari
1 Bh Pengadaan dan Pemasangan Door Closer
1 Door Closer 1.0000 bh
a Pekerja 0.0500 Org/Hari
b Tukang Kayu Halus 0.5000 Org/Hari
c Kepala Tukang 0.0500 Org/Hari
d Mandor 0.0025 Org/Hari
1 Bh Pengadaan dan Pemasangan Kunci Selot
1 Slot Tanam 1.0000 bh
a Pekerja 0.0200 Org/Hari
b Tukang Kayu Halus 0.2000 Org/Hari
c Kepala Tukang 0.0200 Org/Hari
d Mandor 0.0010 Org/Hari

1 Bh Pengadaan dan Pemasangan Door Holder / Pegangan Pintu


1 Handle Pintu ex Solid 1.0000 bh
a Pekerja 0.0500 Org/Hari
b Tukang Kayu Halus 0.5000 Org/Hari
c Kepala Tukang 0.0500 Org/Hari
d Mandor 0.0025 Org/Hari

1 Bh Pengadaan dan Pemasangan Door Stop


1 Door Stop 1.0000 bh
a Pekerja 0.0100 Org/Hari
b Tukang Kayu Halus 0.1000 Org/Hari
c Kepala Tukang 0.0100 Org/Hari
d Mandor 0.0005 Org/Hari

1 Bh Pengadaan dan Pemasangan Rel Pintu Dorong


1 Rel Pintu Dorong 1.0000 set
a Pekerja 0.0600 Org/Hari
b Tukang Kayu Halus 0.6000 Org/Hari
c Kepala Tukang 0.0600 Org/Hari
d Mandor 0.0030 Org/Hari

1 Bh Pengadaan dan Pemasangan Kunci Lemari


1 Kunci Silinder 1.0000 bh
a Pekerja 0.0250 Org/Hari
b Tukang Kayu Halus 0.2500 Org/Hari
c Kepala Tukang 0.0250 Org/Hari
d Mandor 0.0013 Org/Hari

1 Bh Pengadaan dan Pemasangan Kaca, tebal 3 mm


1 Kaca Polos 3 mm 1.1000 m2
a Pekerja 0.0150 Org/Hari
b Tukang Kayu Halus 0.1500 Org/Hari
c Kepala Tukang 0.0150 Org/Hari
d Mandor 0.0008 Org/Hari

1 Bh Pengadaan dan Pemasangan Kaca, tebal 5 mm


1 Kaca Polos 5 mm 1.1000 m2
a Pekerja 0.0150 Org/Hari
b Tukang Kayu Halus 0.1500 Org/Hari
c Kepala Tukang 0.0150 Org/Hari
d Mandor 0.0008 Org/Hari

1 Bh Pengadaan dan Pemasangan Kaca, tebal 8 mm


1 Kaca Polos 8 mm 1.1000 m2
a Pekerja 0.0165 Org/Hari
b Tukang Kayu Halus 0.1650 Org/Hari
c Kepala Tukang 0.0165 Org/Hari
d Mandor 0.0008 Org/Hari

1 Bh Pengadaan dan Pemasangan Kaca Buram, tebal 12 mm


1 Kaca Buram 12mm 1.1000 m2
2 Sealant clear neutral (300 ml) 0.0500 tb
a Pekerja 0.0250 Org/Hari
b Tukang Kayu Halus 0.2500 Org/Hari
c Kepala Tukang 0.0250 Org/Hari
d Mandor 0.0001 Org/Hari

1 Bh Pengadaan dan Pemasangan Kaca Cermin, tebal 5 mm


1 Kaca Cermin 5 mm 1.1000 m2
a Pekerja 0.0250 Org/Hari
b Tukang Kayu Halus 0.2500 Org/Hari
c Kepala Tukang 0.0250 Org/Hari
d Mandor 0.0001 Org/Hari

1 Bh Pengadaan dan Pemasangan Kaca Cermin, tebal 6 mm


1 KacaCermin 6 mm 1.1000 m2
a Pekerja 0.0150 Org/Hari
b Tukang Kayu Halus 0.1500 Org/Hari
c Kepala Tukang 0.0150 Org/Hari
d Mandor 0.0008 Org/Hari
(SNI 2002)

(SNI 2002) No.1


13,000 13,000
60,000 300
80,000 40,000
80,000 400
95,000 24
JUMLAH 53,700

(SNI 2002) No.2


22,500 22,500
60,000 900
80,000 12,000
80,000 1,200
95,000 71
JUMLAH 36,600

(SNI 2002) No.3


22,500 22,500
60,000 600
80,000 8,000
80,000 800
95,000 48
JUMLAH 31,900

(SNI 2002) No.4


22,500 22,500
60,000 1,200
80,000 16,000
80,000 1,600
95,000 950
JUMLAH 41,300

(SNI 2002) No.5


15,600 15,600
60,000 900
80,000 12,000
80,000 1,200
95,000 71
JUMLAH 29,700

(SNI 2002) No.6


6,160 6,160
60,000 900
80,000 12,000
80,000 1,200
95,000 71
JUMLAH 20,260
(SNI 2002) No.7
13,000 13,000
60,000 3,000
80,000 40,000
80,000 4,000
95,000 238
JUMLAH 60,000
(SNI 2002) No.8
45,500 45,500
60,000 1,200
80,000 16,000
80,000 1,600
95,000 95
JUMLAH 64,300

(SNI 2002) No.9


125,000 125,000
60,000 3,000
80,000 40,000
80,000 4,000
95,000 238
JUMLAH 172,000

(SNI 2002) No.10


19,500 19,500
60,000 600
80,000 8,000
80,000 800
95,000 48
JUMLAH 28,900

(SNI 2002) No.11


513,500 513,500
60,000 3,600
80,000 48,000
80,000 4,800
95,000 285
JUMLAH 569,900

(SNI 2002) No.12


13,000 13,000
60,000 1,500
80,000 20,000
80,000 2,000
95,000 119
JUMLAH 36,500

(SNI 2002) No.13


70,000 77,000
60,000 900
80,000 12,000
80,000 1,200
95,000 71
JUMLAH 91,100

(SNI 2002) No.14


95,000 104,500
60,000 900
80,000 12,000
80,000 1,200
95,000 71
JUMLAH 118,600

(SNI 2002) No.15


180,000 198,000
60,000 990
80,000 13,200
80,000 1,320
95,000 76
JUMLAH 213,510

(SNI 2002) No.16


390,000 429,000
35,000 1,750
60,000 1,500
80,000 20,000
80,000 2,000
95,000 12
JUMLAH 454,250

(SNI 2002) No.17


- -
60,000 1,500
80,000 20,000
80,000 2,000
95,000 12
JUMLAH 23,500

(SNI 2002) No.18


266,500 293,150
60,000 900
80,000 12,000
80,000 1,200
95,000 71
JUMLAH 307,250
NO HARGA MATERIAL SATUAN HARGA SATUAN

I. BATA, BATU DAN PASIR --------------------


1 Bata Merah biasa bh 600
2 Bata Tela bh 1,350
3 Bata Merah Press bh 750
4 Bata Merah Bojonghaur bh 900
5 Batako Kecil bh 600
6 Batako Lubang bh 4,000
7 Conblock
8 Bata Conblock Standar (lubang 2) bh 2,400
9 Bata Conblock Standar (lubang 3) bh 2,800
10 Bata Conblock Super (lubang 2) bh 3,000
11 Bata Conblock Super (lubang 3) bh 3,500
12 Bata Conblock Decoratif bh 6,000
Roster
13 Roster Beton 20x20 bh 7,000
14 Roster Beton 30x15 bh 10,000
15 Roster Beton 40x20 (wind flow) bh 14,000
16 Roster Beton 25x15 bh 8,000
17 Roster Beton 38x38 bh 25,000
18 Roster Beton Kotak Kosong 24x12 bh 7,000
19 Roster Beton Kotak Kosong 30x15 bh 10,000
20 Roster Beton Kotak Kosong 40x15 bh 14,000
21 Roster Beton Kotak Kosong 45x15 bh 17,500
22 Roster Beton Motih Madina 25x25 bh 12,500
23 Bata Roster 20x20 bh 6,500
24 Bata Roster 10x20 bh 3,000
25 Batu Belah Pondasi m3 228,571
26 Batu granit tumbuk Kg 12,000
27 Batu teraso tumbuk Kg 7,000
28 Batu Split Pecah Mesin 1/2 m3 145,000
29 Batu Split Pecah Mesin 2/3 m3 145,000
30 Batu Split Pecah Mesin 3/5 m3 145,000
31 Batu Split Pecah Mesin 5/7 m3 145,000
32 Abu batu 5mm m3 125,000
33 Sirtu m3 125,000
34 Pasir Beton m3 145,000
35 Pasir Pasang m3 135,000
36 Pasir Urug m3 100,000
37 Pasir putih m3 195,000
38 Tanah Urug m3 92,400
39 Pasir Plester m3 135,000
40 Air liter 34
41 Batu apung Kg 6,000
42 Bata berongga bh 1,500
43 Glass Block bh 3,000
44 HollowB lock (HB.20) bh 1,500
45 Batu kali bh 227,500
46 Batu koral sikat terpasang m2 325,000
47 Agregat kasar m3 254,800
48 Agregat halus m3 201,500

II BAHAN PEREKAT ----------------------------


45 Semen PC (50 Kg) zak 63,500
46 Semen PC (40 Kg) zak 53,000
47 Semen Putih kg 2,000
48 Semen Warna kg 12,500
49 Beton K-250 Readymix Slum 12 cm m3 2,168,516
50 Beton K-300 Readymix Slum 12 cm m3 2,710,645
AM 50 + Micro 1kg White kg 12,350
51 Beton m3 2,600,000

III TIANG PANCANG ---------------------------


52 Triangle 28 m 234,910
53 Triangle 32 m 302,510
54 Square 20 m 260,260
55 Square 25 m 385,320
56 Bulat dia. 30 m
57 SPUN Pile Bulat dia. 30 m 370,000
56 Pemasangan m 253,500
57 Pemotongan bh 126,750
58 Penyambungan bh 253,500
59 Sewa Pompa unt 3,250,000
IV PIPA BETON---------------------------------
60 U - Ditch 300/400 p.1,20 m Bh
61 U - Ditch 400/600 p.1,20 m Bh
62 U - Ditch 300/500 p.1,20 m Bh 70,000
63 U - Ditch 400/500 p.1,20 m Bh 90,000
64 Box culvert BC 400x400 LD p. 1,00 m Bh
65 Greffel U20 p. 1,00 m Bh 24,000
66 Greffel U30 p. 1,00 m Bh 30,000
67 Greffel U40 p. 1,00 m Bh 40,000
68 Greffel U50 p. 1,00 m Bh 65,000
69 Buis Beton 200x1000 Bh 45,000
70 Buis Beton 300x1000 Bh 55,000
71 Buis Beton 400x1000 Bh 75,000
72 Buis Beton 500x1000 Bh 100,000
73 Buis Beton 600x500 Bh 80,000
74 Buis Beton 600x1000 Bh 140,000
75 Buis Beton 700x500 Bh 130,000
76 Buis Beton 800x500 Bh 150,000
77 Buis Beton 1000x500 Bh 210,000
78 Tutup Buis D700 Bh 70,000
79 Tutup Buis D1000 Bh 100,000
80 Tutup Buis D1200 Bh 120,000
81 Buis Beton Bh 71,500
82 Pipa PVC bh 65,000
83 Pipa Galvanis d=1/2 " m1 130,000
84 Pipa Galvanis d=3/4 " m1 260,000
85 Pipa Galvanis d=1 1/2 " m1 390,000
86 Pipa Galvanis d= 1 " m1 325,000
87 Pipa Galvanis d=3 " m1 455,000
88 Pipa Galvanis d=4 " m1 455,000
89 Pipa PVC d=1/2 " m1 455,000
90 Pipa PVC d=3/4 " m1 455,000
91 Pipa PVC d= 1 1/2 " m1 455,000
92 Pipa PVC d= 1 " m1 455,000
93 Pipa PVC d= 2 " m1 455,000
94 Pipa PVC d= 2 1/2 " m1 455,000
95 Pipa PVC d= 3 " m1 455,000
96 Pipa PVC d= 4 " m1 455,000
97 Pipa PVC 3/4" Btg 30,000
98 Pipa PVC 2,5" Btg 125,000
99 Pipa PVC 3" Btg 135,000
100 Pipa PVC 4" Btg 230,000
101 ID. 1/2" - 4m' Btg 20,000
102 ID. 3/4" - 4m' Btg 30,000
103 ID. 1" - 4m' Btg 40,000
104 ID. 3" - 4m' Btg 120,000
105 ID. 4" - 4m' Btg 190,000
106 ID. 5" - 4m' Btg 215,000
107 ID. 6" - 4m' Btg 450,000
108 Talang PVC 4-6" - 4m' Btg 90,000
109 Talang PVC 4-8" - 4m' Btg 325,000
110 Pipa GIP Kelas Medium Btg 110,000
111 ID. 1/2" - 6m' Btg 125,000
112 ID. 1" - 6m' Btg 250,000
113 ID. 1,5" - 6m' Btg 350,000
114 ID. 2" - 6m' Btg 370,000
115 ID. 3" - 6m' Btg 600,000
116 ID. 4" - 6m' Btg 800,000
117 ID. 5" - 6m' Btg 1,200,000
118 ID. 6" - 6m' Btg 1,524,900
119 Pipa Besi Listrik Ø 3/8" Btg 200,000
120 Pipa Besi Listrik Ø 5/8" Btg 400,000
121 Pipa Stainless Steel Ø 1" Btg 240,000
122 Pipa Stainless Steel Ø 4" Btg 585,000
123 Pipa Stainless Steel Ø 1,5 " Btg 320,000
124 Pipa Stainless Steel Ø 2" Btg 400,000
125 Pipa Stainless Steel Ø 3" Btg 480,000
126 Reservoir Fiberglass Cap. 1 m3 bh 1,800,000
127 Pompa Dragon bh 500,000
128 Pompa Sanyo Kecil bh 475,000
129 Pompa Sanyo Besar bh 1,275,000
130 Pompa Air Honda bh 3,500,000
V BAHAN BAJA :
131 Besi Beton rata-rata Kg 1,721
Besi beton Ø6 biasa Kg 6,767
Besi beton Ø6 Kg 10,526
Besi beton Ø8 biasa Kg 11,875
Besi beton Ø8 Kg 14,531
Besi beton Ø10 biasa Kg 7,568
Besi beton Ø10 Kg 9,324
Besi beton Ø12 biasa Kg 7,505
Besi beton Ø12 Kg 8,912
Besi beton Ø13 Kg 8,974
Besi beton Ø16 biasa Kg 8,228
Besi beton Ø16 Kg 9,124
132 Besi Full 8 mm Kg 14,531
133 Besi Full 10 mm Kg 9,324
134 Besi Full 12 mm Kg 8,912
135 Besi Polos 16 mm Kg 9,124
136 Besi Ulir 15 mm Kg 10,000
137 Besi Ulir 16 mm Kg 9,124
138 Besi beton Ø6 biasa kg 6,767
139 Besi beton Ø6 kg 10,526
140 Besi beton Ø13 kg 8,974
1 Cakar Ayam Besi Beton Kg 8,974
141 Wiremesh M6 rata-rata m2 74,750
142 Wiremesh M8 rata-rata m2 68,318
143 Wiremesh M10 rata-rata m2 73,800
144 Wiremesh M4 U50 SNI m2 13,139
145 Wiremesh M5 U50 SNI m2 19,577
146 Wiremesh M6 U50 SNI m2 27,513
147 Wiremesh M7 U50 SNI m2 37,478
148 Wiremesh M8 U50 SNI m2 48,942
149 Wiremesh M9 U50 SNI m2 63,492
150 Wiremesh M10 U50 SNI m2 78,307
151 Wiremesh M12 U50 SNI m2 114,021
152 Wiremesh M4 standar m2 11,905
153 Wiremesh M5 standar m2 15,520
Wiremesh M6 standar m2 24,868
154 Wiremesh M7 standar m2 32,275
155 Wiremesh M12 standar m2 45,326
156 Besi Siku Rata-rata Kg 13,840
157 Besi IWF Rata-rata Kg 14,690
158 Besi UNP Rata-rata Kg 14,690
159 Besi C Rata-rata Kg 14,690
160 Besi Plat rata2 1 s/d 5 mm Kg 19,717
161 Besi Plat rata2 6 s/d 10 mm Kg 19,717
162 Besi Plat rata2 11 s/d 16 mm Kg 19,717
163 Plat Strip Kg 14,690
164 Plat Bordes t=3 mm Kg
165 Besi Profil Kg 20,000
166 Besi Square Tube Kg 20,001
167 Besi List Kaca Kg 20,002
168 Pengelasan cm 40
169 Besi siku 50x50x5 btg 160,000

VI BAHAN KAYU
169 Kayu Kuat klas IV -
170 Kaso kelas IV m3
171 Balok kelas IV m3
172 Papan kelas IV m3
173 Kayu Kuat klas III m3 2,335,667
174 Kaso kelas III m3 2,387,000
175 Balok kelas III m3 2,387,000
176 Papan kelas III m3 2,233,000
177 Kayu Kuat klas II m3 9,500,000
178 Kaso kelas II m3 9,500,000
179 Balok kelas II m3 9,500,000
180 Papan kelas II m3 9,500,000
181 Kayu Kuat klas I m3 16,000,000
182 Kaso kelas I m3 16,000,000
183 Balok kelas I m3 16,000,000
184 Balok kelas I m3 16,000,000
185 Papan kelas I m3 16,000,000
186 Dolken dia 5 s/d 7 cm p. 4 m btg 13,144
187 Dolken dia 8 s/d 10 cm p. 4 m btg 15,000
188 Bambu dia 5 s/d 7 cm p. 4 m btg 6,500
189 Bilik bambu m2 6,500
190 Kayu Reng 3/4 Kamper Samarinda m3 9,500,000
191 List Kayu 2/4 m3 7,500,000
192 Kayu cetakan m3 2,340,000
193 Kayu Bakar/Kayu Putih m3 1,500,000
VII BAHAN ALMUNIUM & PINTU2, JENDELA & BLIND
194 Kusen Alm. 4" CA m' 175,000
195 Kusen Alm. 3" CA m' 145,000
196 Kusen Alm. 4" PC m' 283,000
197 Kusen Alm. 3" PC m' 220,000
198 Kusen Alm. 12 x 6 x 3 m' 27,000
199 Bingkai Pintu Alumunium bh 375,000
200 Rangka Pintu Alm. CA ex Indal m'
201 Rangka Jendela Alm. CA ex Indal m'
202 Almunium frame ex Indal m' 65,000
203 Almunium Hollow 300x500 mm ex Indal m'
204 Alumunium Strip m' 45,500
205 Pintu PVC uk. Standart unt 1,235,000
206 Rolling door Plat Besi m2 1,300,000
207 Rolling door Zinkalume/Alumunium m2 1,300,000
208 Folding Door PVC m2 592,800
209 Sunscreen Alumunium m2 592,800
210 Horisontal Blind Metal Strip m2 110,500
211 Horisontal Wooden Blind m2 240,500
212 Vertical Blind m2 123,500
213 Venetian Blind m2 182,000
214 Kawat Nyamuk m2 3,250
Kawat Galvanis m' 130,000
215 Kusen Alm. 3" (CA silver) m' 50,000
216 Kusen Alm. 3" (CA brown) m' 55,000
217 Kusen Alm. 3" (PC) m' 75,000
218 Kusen Alm. 4" (CA silver) m' 60,000
219 Kusen Alm. 4” (CA brown) m' 65,000
220 Kusen Alm. 4" (PC) m' 80,000
Alexindo
221 Kusen Alm. 3" (CA silver) m' 50,000
222 Kusen Alm. 3" (CA brown/black) m' 65,000
222 Kusen Alm. 3" (PC) m' 85,000
223 Kusen Alm. 4" (CA silver) m' 65,000
223 Kusen Alm. 4” (CA brownblack) m' 75,000
224 Kusen Alm. 4" (PC) m' 95,000
Superex
225 Kusen Alm. 3" (CA silver) m' 70,000
226 Kusen Alm. 3" (CA brown/black) m' 80,000
226 Kusen Alm. 3" (PC) m' 100,000
227 Kusen Alm. 4" (CA silver) m' 80,000
227 Kusen Alm. 4” (CA brownblack) m' 90,000
228 Kusen Alm. 4" (PC) m' 105,000
YKK
229 Kusen Alm. 3" (CA silver) m' 90,000
230 Kusen Alm. 3" (CA brown/black) m' 110,000
230 Kusen Alm. 3" (PC) m' 135,000
231 Kusen Alm. 4" (CA silver) m' 110,000
231 Kusen Alm. 4” (CA brownblack) m' 150,000
232 Kusen Alm. 4" (PC) m' 185,000
232 Jendela Casement 3” (60x120cm) unit 450,000
233 Rangka Jendela Alm. CA ex Indal m'
233 Almunium frame ex Indal m'
234 Almunium Hollow 300x500 mm ex Indal m'
234 Alumunium Strip m' 35,000
235 Pintu PVC uk. Standart unt
235 Rolling door Plat Besi t=0,4mm m2 227,500
236 Rolling door Zinkalume/Alumunium t=0,8mm m2 357,500
236 Rolling door Zinkalume/Alumunium t=1mm m2 422,500
237 Folding Door PVC m2 592,800
237 Folding Door Gate t=0,5mm m2 520,000
238 Folding Door Gate t=0,8mm m2 715,000
238 Folding Door Gate t=1mm m2 1,560,000
239 Folding Door Gate t=1,2mm m2 1,820,000
239 Sunscreen Alumunium m2 592,800
240 Horisontal Blind Metal Strip m2 126,100
240 Horisontal Blind Metal Strip (Perforated) m2 150,800
241 Horisontal Wooden Blind 27 m2 354,835
241 Horisontal Wooden Blind 35 m2 413,400
242 Horisontal Wooden Blind 50 m2 440,960
242 Horisontal Bamboo Blind 25 m2 413,400
243 Horisontal Bamboo Blind 50 m2 586,300
243 Horisontal Blind Metal Strip Gold Series m2 181,350
244 Horisontal Blind Metal Strip (Perforated) Gold Series m2 224,250
244 Horisontal Wooden Blind Gold Series m2 248,950
245 Roller Blind (standar) m2 204,100
245 Roller Blind (semi black out) m2 217,100
246 Roller Blind (black out) m2 283,400
246 Vertical Blind (standar) m2 152,100
247 Vertical Blind (semi black out) m2 165,100
247 Vertical Blind (black out) m2 205,400
248 Venetian Blind (Deluxe) m2 143,000
248 Venetian Blind (Perforated) m2 166,400
249 Venetian Blind (Wood Motif) m2 172,250
249 Kawat Nyamuk m2 221,000
250 Kawat Nyamuk + magnet m2 377,000
Profil 1,5 x 3 Frame m2 54,167

VIII IRONMONGERIES
251 Engsel 3" bh 22,500
252 Engsel 4" bh 38,500
253 Lockcase Kunci ex SES bh
254 Cylinder Doble Slag ex SES bh
255 Engsel Pintu Pas 35,000
256 Engsel Lokal Pas 16,000
257 Engsel H Jendela Pas 15,000
258 Engsel H Pintu Pas 15,000
259 Engsel Kupu2 Ring Nylon Pintu Pas 20,000
260 Engsel Kupu2 Ring Nylon Jendela Pas 15,000
261 Door Closer bh 13,000
262 Door Stop bh 19,500
263 Handle Pintu ex Solid bh 520,000
270 Slot Tanam bh 45,500
271 Hak Angin Biasa Pas 6,160
272 Hak Angin Lipat Pas 25,000
273 Kait Angin bh 30,000
274 Handel + Kunci bulat bh 125,000
275 Pull Handle Pintu set
276 Slot Besi bh 10,780
277 Tarikan jendela bh 7,700
278 Engsel sendok lurus bh 18,000
279 Engsel sendok lurus 1.5 HUK bh 50,000
280 Gembok kecil bh 19,000
281 Rel laci D soen bh 24,000
282 Magnet lemari bh 2,000
283 Kunci bh 160,000
278 Kunci Silinder bh 13,000
279 Spring Knip bh 15,600
280 Rel Pintu Dorong set 513,500
281 Kunci Gembok Globe bh 40,000
282 Kunci Gembok Royal bh 50,000
283 Kunci Tanam 1 Slag bh 90,000
284 Kunci Terbang 2 Slag bh 175,000
285 Kunci Yale 2 Slag bh 140,000
286 Kunci Royal Besar bh 175,000
287 Kunci Royal Kecil bh 90,000
288 Grendel Jendela (Kilip) bh 10,000
289 Grendel Lokal bh 10,000
290 Grendel Kecil bh 10,000
291 Grendel Sedang bh 25,000
292 Grendel Besar bh 45,000
293 Gembok kecil bh

IX BAHAN PELAPIS :
294 Triplex t. 3 mm lbr 43,000
295 Triplex t. 4 mm lbr 54,000
296 Triplex t. 6 mm lbr 69,000
297 Triplex t. 9 mm lbr 98,000
298 Triplex t. 12 mm lbr 143,000
299 Multiplex t. 16 mm lbr 175,000
300 Multiplex t. 18 mm lbr 195,000
301 Blockboard lbr 198,000
302 Teakwood t. 3 mm lbr 78,000
303 Teakwood t. 6 mm lbr 60,000
304 Multiplex t. 4 mm lbr 75,000
305 Multiplex t. 9 mm lbr 100,000
306 Multiplex t. 12 mm lbr 200,000
307 Multiplex t. 18 mm lbr 312,000
308 Teakblock t.18 mm lbr 240,000
308 HPL lbr 145,000
309 HPL motif serat 185,000
310 Melaminto Doff lbr 95,000
311 Melaminto Gloss lbr 85,000
312 Plywood lbr 120,000

X BAHAN LANTAI & DINDING


A LANTAI
313 Keramik Lantai 20/20 cm Polished m2 87,000
314 Keramik Lantai 20/20 cm Unpolished m2 90,000
315 Keramik Lantai 30/30 cm Polished m2 87,000
316 Keramik Lantai 30/30 cm Unpolished m2 90,000
317 Keramik Lantai 33/33 cm Polished m2 87,000
318 Keramik Lantai 33/33 cm Unpolished m2 137,000
319 Keramik Lantai 40/40 cm Polished m2 105,000
320 Keramik Lantai 40/40 cm Unpolished m2 112,000
321 Keramik Lantai 50/50 cm Polished m2 123,500
322 Keramik Lantai 50/50 cm Unpolished m2 150,500
323 Keramik Lantai 60/60 cm Polished m2 155,000
324 Keramik Lantai 60/60 cm Unpolished m2 200,000
Keramik 30/30 IMP Rocky Black m2 48,000
325 Grassblok t. 8 cm (40x40 cm ) Natural bh
326 Marmer Putih 30/30 bh 165,000
327 Marmer Putih 40/60 bh 200,000
328 Marmer Hitam 40/60 bh 300,000
329 Marmer Hitam 40/90 bh 900,000
330 Stepnosing Keramik 10/30 bh 16,000
331 Ubin Porselin 20/20 m2 65,000
332 Ubin Porselin 30/30 m2 85,000
333 Ubin Porselin 40/40 m2 90,000
334 Plint Warna bh 20,000
335 Plint PC 10/20 bh 37,000
ROMAN
336 Roman 20 x 20 Golongan A m2 87,000
337 Roman 20 x 20 Golongan B m2 90,000
338 Roman 20 x 20 Golongan D m2 100,000
339 Roman 30 x 30 Golongan B m2 87,000
340 Roman 30 x 30 Golongan C m2 91,000
341 Roman 33.3 x 33.3 Golongan A m2 97,000
342 Roman 33.3 x 33.3 Golongan C m2 137,500
343 Roman 40 x 40 Golongan A m2 97,000
344 Roman 40 x 40 Golongan B m2 105,000
345 Roman 40 x 40 Golongan C m2 107,000
346 Roman 40 x 40 Golongan D m2 112,000
347 Roman 45 x 45 Golongan A m2 107,000
348 Roman 45 x 45 Golongan B m2 113,000
349 Roman 45 x 45 Golongan E m2 150,000
350 Roman 50 x 50 Golongan A m2 123,500
351 Roman 50 x 50 Golongan B m2 132,500
352 Roman 50 x 50 Golongan C m2 150,500
353 Roman 60 x 60 Golongan A m2 155,000
354 Roman 60 x 60 Golongan B m2 175,000
355 Roman 60 x 60 Golongan C m2 200,000
356 Roman 16.5 x 66.6 Golongan A m2 192,000
357 Roman 33.3 x 66.6 Golongan A m2 172,500
358 Roman 33.3 x 66.6 Golongan B m2 193,000
359 Roman 33.3 x 66.6 Golongan C m2 212,500
360 Roman 8 x 30 Hospital Skirting m2 474,000
361 Roman 10 x 20 Step Nosing m2 515,000
362 Roman 10 x 30 Step Nosing Golongan A m2 521,400
363 Ubin PC abu2 Bh 4,800
364 Ubin PC warna Bh 5,120
365 Ubin warna Bh 5,760
366 Ubin teraso Bh 4,000
367 Ubin granit Bh 4,480
368 Internal Cove (Plint) m1 27,500
369 Lantai Marmer m2 190,000
370 Karpet Lantai Roll m2 76,000
371 Karpet Lantai Tile m2 97,000
372 Underlayer/rubber corrugated m2 12,000
373 Lantai Parquette Laminated m2 176,000
374 Lantai Vynil Tile m2 65,000
375 Lantai Vinyl Roll m2 35,000
Plint Lantai Kayu Jati m1 45,000
376 Plint Lantai Vinyl m1 15,000
377 Floor Hardener Kg 4,480
378 Lantai Tegel Polos m2 55,000
379 Lantai Tegel Warna m2 60,000
380 Paving, Grass & Kanstein Block
381 Paving Block (M) t.6cm Natural m2 45,000
382 Paving Block (M) t.6cm Warna m2 50,000
383 Paving Block KW 2 t.6cm Natural m2 70,000
384 Paving Block KW 2 t.6cm Warna m2 80,000
385 Paving Block KW 2 t.8cm Natural m2 80,000
386 Paving Block KW 2 t.8cm Warna m2 90,000
387 Paving Block KW 1 t.6cm Natural m2 87,000
388 Paving Block KW 1 t.6cm Warna m2 97,000
389 Paving Block KW 1 t.8cm Natural m2 102,000
390 Paving Block KW 1 t.8cm Warna m2 112,000
391 Grass Block (M) t.6cm m2 50,000
392 Grass Block (M) t.7cm m2 60,000
393 Grass Block (M) t.8cm m2 65,000
394 Grass Block KW 2 t.6cm m2 70,000
395 Grass Block KW 2 t.8cm m2 80,000
396 Kanstein Taman 40x15x5/6 Bh 7,000
397 Kanstein Taman 40x17x5/9 Bh 10,000
398 Kanstein Taman 40x17x5/10 Bh 12,000
399 Kanstein Type K3 40x18x5/15 Bh 15,000
400 Kanstein Type K4 40x25x8/13 Bh 18,000
401 Kanstein Type K28 60x28x12/16 Bh 27,000
402 Kanstein Type K28 1/2 60x20x12/16 Bh 17,000
403 Kanstein Type K30 1/2 60x30x22/25 Bh 32,000
404 Kanstein Type K40 1/2 60x40x12/16 Bh 37,000
405 Kanstein Type KS (spoon) 1/2 50x30x10x15 Bh 23,000
406 Marmer slab m2
407 Ubin PC abu2 Bh 4,800
408 Ubin PC warna Bh 5,120
409 Ubin warna Bh 5,760
410 Ubin teraso Bh 4,000
411 Ubin granit Bh 4,480
412 Internal Cove (Plint) m1 27,500
413 Lantai Marmer m2 190,000
414 Karpet Lantai Roll m2 76,000
415 Karpet Lantai Tile m2 97,000
416 Underlayer/rubber corrugated m2 12,000
417 Lantai Parquette m2 176,000
418 Lantai Vynil Tile m2 65,000
419 Lantai Vinyl Roll m2 35,000
420 Plint Lantai Vinyl m1 15,000
421 Floor Hardener Kg 4,480

B DINDING
422 Keramik Dinding 20/20 cm Polished m2 87,000
423 Keramik Dinding 20/25 cm Polished m2 90,000
424 Keramik Dinding 30/30 cm Polished m2 118,000
425 Skirting Keramik 8/30 cm bh -
426 Dinding Porselen 11/11 cm m2 32,500
427 Dinding Porselen 10/20 cm m2 36,400
428 Dinding Porselen 20/20 cm m2 38,350
429 Keramik Dinding Artistik 10/20 cm Polished m2 260,000
430 Keramik Dinding Artistik 5/20 cm Polished m2 312,000
431 Dinding Marmer 100/100 cm m2 280,800
432 Bata pelapis (3x7x24cm) m2 117,000
433 Batu paras tempel m2 162,500
434 Batu tempel m2 45,500
435 Wallpaper standar roll 71,500
436 Wallpaper artistik roll 123,500
437 Wallpaper tebal roll 189,800
438 Ornamen Tempel Minimalis 400x200 (garis Besar) m2 71,500
439 Ornamen Tempel Minimalis 300x150 (garis Sedang) m2 71,500
440 Ornamen Tempel Minimalis 400x200 (garis Kecil) m2 71,500
441 Plint Warna bh 20,000
442 Plint PC 10/20 bh 37,000
443 ROMAN
444 Roman 20 x 20 Golongan A m2 84,000
445 Roman 20 x 20 Golongan B m2 90,000
446 Roman 20 x 25 Golongan A m2 84,000
447 Roman 20 x 25 Golongan B m2 90,000
448 Roman 20 x 25 Golongan C m2 93,500
449 Roman 25 x 25 Golongan A m2 85,000
450 Roman 25 x 25 Golongan B m2 91,500
451 Roman 25 x 25 Golongan C m2 103,000
452 Roman 30 x 30 Golongan B (match 20 x 60) m2 118,000
453 Roman 30 x 30 Golongan C (match 20 x 60) m2 128,000
454 Roman 30 x 30 Golongan D (match 20 x 60) m2 143,000
455 Roman 30 x 30 Golongan A (match 30 x 60) m2 113,000
456 Roman 30 x 30 Golongan B (match 30 x 60) m2 118,000
457 Roman 30 x 30 Golongan C (match 30 x 60) m2 128,000
458 Roman 30 x 30 Golongan D (match 30 x 60) m2 143,000
459 Roman 25 x 33.3 Golongan A m2 84,000
460 Roman 25 x 33.3 Golongan B m2 90,000
461 Roman 25 x 33.3 Golongan C m2 93,500
462 Roman 20 x 40 Golongan A m2 84,000
463 Roman 20 x 40 Golongan B m2 90,000
464 Roman 25 x 45 Golongan A m2 92,500
465 Roman 25 x 45 Golongan B m2 103,500
466 Roman 25 x 45 Golongan D m2 122,500
467 Roman 32.5 x 32.5 Golongan A match 32.5 x 65.6 m2 126,000
468 Roman 32.5 x 32.5 Golongan B match 32.5 x 65.6 m2 131,000
469 Roman 32.5 x 32.5 Golongan A match 32.5 x 97.5 m2 126,000
470 Roman 20 x 60 Golongan A m2 128,500
471 Roman 20 x 60 Golongan B m2 140,000
472 Roman 20 x 60 Golongan C m2 155,000
473 Roman 20 x 60 Golongan D m2 175,000
474 Roman 30 x 60 Golongan A m2 128,500
475 Roman 30 x 60 Golongan B m2 140,000
476 Roman 30 x 60 Golongan C m2 155,000
477 Roman 30 x 60 Golongan D m2 175,000
478 Roman 30 x 60 Golongan E m2 185,000
479 Roman 32.5 x 65.6 Golongan A Rectified m2 191,500
480 Roman 32.5 x 65.6 Golongan B Rectified m2 207,000
481 Roman 32.5 x 65.6 Golongan C Rectified m2 226,000
482 Roman 32.5 x 97.5 Golongan A Rectified m2 283,000
483 Roman 32.5 x 97.5 Golongan B Rectified m2 323,000
443 Skirting Keramik 8/30 cm bh -
Dinding Porselen 11/11 cm m2 25,000
Dinding Porselen 10/20 cm m2 28,000
Dinding Porselen 20/20 cm m2 29,500
Keramik Dinding Artistik 10/20 cm Polished m2 112,000
Keramik Dinding Artistik 5/20 cm Polished m2 123,500
Dinding Marmer 30/60 cm m2 190,000
Bata pelapis (3x7x24cm) m2 90,000
Batu paras tempel m2 125,000
Batu tempel m2 35,000
Wallpaper standar roll 55,000
Wallpaper artistik roll 95,000
Wallpaper tebal roll 146,000
Ornamen Tempel Minimalis 400x200 (garis Besar) m2 55,000
Ornamen Tempel Minimalis 300x150 (garis Sedang) m2 55,000
Ornamen Tempel Minimalis 400x200 (garis Kecil) m2 55,000

XI BAHAN PENUTUP ATAP


484 Steel Corregouted Zincalum t. 0,45 mm Colorcoat m2 152,100
485 Genteng Metal stone chip m2 169,000
486 Nok Metal stone chip bh 71,000
487 Nok Steel Sheet Zincalum t. 0,45 mm Colorcoat m' 109,850
488 Skrup 12 x 45 HWTG bh
489 Zincoated BJLS 30 m2
490 Seng Plat BJLS 0,30 m' 84,700
491 Seng Plat BJLS 0,20 m' 60,060
492 Seng Gelombang BJLS 0,3 lbr 100,100
493 Seng Gelombang BJLS 0,2 lbr 56,210
494 Nok Seng Gelombang Lbr 15,000
495 Metal deck m2 295,750
496 Seng Plat BJLS 0,30 m' 70,000
497 Seng Plat BJLS 0,20 m' 57,000
498 Seng Gelombang BJLS 0,3 lbr 59,000
499 Seng Gelombang BJLS 0,3 lbr 67,000
500 Seng Gelombang BJLS 0,2 lbr 36,000
501 Seng Gelombang BJLS 0,2 lbr 42,000
502 Seng Gelombang BJLS 0,2 lbr 50,000
503 Seng Talang BJLS 0,3 lbr 50,000
Seng Gajah Mas
504 Seng Datar BJLS 30 uk (0,.90 x 1.00) lbr 31,500
505 Seng Gelombang BJLS (180 x 80) lbr 41,100
505 Seng Gelombang BJLS (120 x 80) lbr 47,700
506 Seng Gelombang BJLS (240x 80) lbr 54,300
506 Seng Gelombang BJLS (300 x 80) lbr 67,500
507 Seng Plat BJLS 30 L = 0,45 M M1 34,800
507 Seng Plat BJLS 30 L = 0,60 M M1 39,600
508 Seng Plat BJLS 30 L = 0,90 M M1 49,800
508 Seng Plat BJLS 28 (90 x 180) cm lbr 83,100
509 Bubung Seng Gelombang lbr 93,600
T=3.5 mm
510 Asbes/Harflex gelombang uk. 3000X800x3.5 mm lbr 54,700
511 Asbes/Harflex gelombang uk. 2700X800x3.5 mm lbr 49,250
511 Asbes/Harflex gelombang uk. 2400X800x3.5 mm lbr 36,450
512 Asbes/Harflex gelombang uk. 2000X800x3.5 mm lbr 32,350
512 Asbes/Harflex gelombang uk. 1800X800x3.5 mm lbr 27,450
513 Asbes/Harflex gelombang uk. 1500X800x3.5 mm lbr 23,050
T=4 mm
514 Asbes/Harflex gelombang uk. 3000x1050x4 mm lbr 73,000
515 Asbes/Harflex gelombang uk. 2700x1050x4 mm lbr 65,750
515 Asbes/Harflex gelombang uk. 2400x1050x4 mm lbr 58,450
516 Asbes/Harflex gelombang uk. 2000x1050x4 mm lbr 51,150
516 Asbes/Harflex gelombang uk. 1800x1050x4 mm lbr 43,850
517 Asbes/Harflex gelombang uk. 1500x1050x4 mm lbr 36,800
T=5 mm
518 Asbes/Harflex gelombang uk. 3000x1080x5 mm lbr 98,550
519 Asbes/Harflex gelombang uk. 2700x1080x5 mm lbr 88,700
520 Asbes/Harflex gelombang uk. 2400x1080x5 mm lbr 78,850
521 Asbes/Harflex gelombang uk. 2000x1080x5 mm lbr 69,000
522 Asbes/Harflex gelombang uk. 1800x1080x5 mm lbr 59,150
523 Asbes/Harflex gelombang uk. 1500x1080x5 mm lbr 49,300
T=6 mm
524 Asbes/Harflex gelombang uk. 3000x1080x6 mm lbr 116,500
525 Asbes/Harflex gelombang uk. 2700x1080x6 mm lbr 104,850
526 Asbes/Harflex gelombang uk. 2400x1080x6 mm lbr 93,250
527 Asbes/Harflex gelombang uk. 2000x1080x6 mm lbr 81,600
528 Asbes/Harflex gelombang uk. 1800x1080x6 mm lbr 69,900
529 Asbes/Harflex gelombang uk. 1500x1080x6 mm lbr 58,300
Aksesoris
530 Bubungan stel gelombang 920 mm lbr 7,100
531 Nok stel gelombang 800 mm lbr 19,000
531 Nok stel gelombang 1050 mm lbr 25,100
532 Nok stel gelombang 1080 mm lbr 44,700
532 Nok gel besar l.102 cm pcs 25,000
533 Nok gel kecil l.102 cm pcs 23,000
533 Rangka atap baja ringan m2 180,000
534 Polycarbonate Celar t. 8 mm m2
534 Bubungan stel gelombang 920 mm lbr 9,230
535 Nok stel gelombang 0.92 mm lbr 8,450
535 Nok stel gelombang 1050 mm lbr 8,450
536 Nok stel gelombang 1080 mm lbr 8,710
536 Nok gel besar l.102 cm pcs 32,500
537 Nok gel kecil l.102 cm pcs 29,900
538 Rangka atap baja ringan m2 182,000
539 Polycarbonate Celar t. 8 mm m2 103,048
540 Genteng Palentong Kecil Bh 3,500
541 Genteng Kodok Bh 4,700
542 Genteng Palentong Super Bh 11,000
543 Bubungan Genteng Palentong Bh 4,300
544 Bubungan Genteng Kodok Bh 5,200
545 Bubungan Palentong Super Bh 13,400
546 Atap Fiberglass Lbr 170,000
Genteng Beton Motif Natural Bh 6,000
Genteng Beton Motif Warna Bh 6,500
Genteng Beton Gelombang Natural Bh 5,000
Genteng Beton Gelombang Warna Bh 5,500
Nok Genteng Beton Motif Natural Bh 7,000
Nok Genteng Beton Motif Warna Bh 7,500
Nok Genteng Beton Gelombang Natural Bh 6,000
Nok Genteng Beton Gelombang Warna Bh 6,500
547 Genteng Beton Bh 4,680
548 Nok Genteng Beton Bh 4,681
549 Genteng Aspal Bh 3,602
550 Nok Genteng aspal Bh 3,603
551 Plastic Aerator Bh 3,000
552 Genteng Metal Lbr 78,000
553 Nok Genteng Metal Lbr 65,000
554 Atap Sirap Bh 3,606
555 Nok Atap Sirap m1 3,607
556 besi m2 7,800
557 Atap Plastik Gelombang Besar lbr 55,000
558 Atap Ardek Gelombang Kecil lbr 55,000
559 Atap Ardek Gelombang Besar lbr 52,000
560 Atep Sakura Roof 2 Susun lbr 36,000
561 Atep Sakura Roof 3 Susun bh 50,000
562 Nok Atap Sakura Roof bh 27,500
563 Genteng Plentong Super bh 3,000
564 Nok Genteng Plentong bh 3,000
565 Nok Genteng Kodok bh 2,800
566 Nok Plentong Super bh 3,400
567 Roof Fiberglass 6K bh 35,000
568 Roof Fiberglass 7K lbr 40,000
569 Roof Fiberglass 8K lbr 50,000
570 Nok Atap Alumunium lbr 30,000
571 Alumunium Bondex lbr 140,000
572 Alumunium Sirip m2 175,000
573 Alumunium Foil m2 6,000
574 Listplank m1 78,000
575 Roof Botton R33 Btg 35,750
576 Self Drilling Screw
XII BAHAN PERLINDUNGAN
574 Waterproofing Coating m2 125,000
575 Adukan perekat FK101 kg
576 Adukan perekat FK111 kg
577 Pengisi Nat FS NAT kg
578 Hardener kg 10,140

XIII KAWAT / MESH


579 Kawat Beton Hitam kg 27,000
580 Kawat Galvanisir Kg 32,000
581 Ram Kawat Ayam m2 36,000
582 Kawat Bronjong Galvanisir kg 22,000
583 Kawat Duri m2 27,500
584 Kawat Harmoni m' 85,000
585 Kawat Nyamuk Plastik m' 10,000
586 Kawat Nyamuk Besi m' 28,000
587 Kawat Las 2,6 Kg 27,500
588 Pagar Kawat Jaring Galv. Glg 210,000

XIV BAHAN KACA :


589 Kaca Polos 3 mm m2 70,000
590 Kaca Polos 5 mm m2 95,000
591 Kaca Polos 6 mm m2 125,000
592 Kaca Polos 8 mm m2 180,000
593 Kaca Polos 10 mm m2 260,000
594 Kaca Polos 12 mm m2 290,000
595 Kaca Polos 15 mm m2 1,300,000
596 Kaca Polos 19 mm m2 1,600,000
597 Kaca Rayben 3 mm lbr 133,000
598 Kaca Rayben 5 mm lbr 210,000
599 Kaca Tempered 5 mm m2 200,000
600 Kaca Tempered 6 mm m2 250,000
601 Kaca Tempered 8 mm m2 375,000
602 Kaca Tempered 10 mm m2 400,000
603 Kaca Tempered 12 mm m2 450,000
604 Kaca Tempered 15 mm m2 1,950,000
605 Kaca Tempered 19 mm m2 2,450,000
606 Kaca nako polos 5 mm daun 215,000
607 Kaca nako rayben 5 mm daun 192,500
608 Rangka nako daun 18,000
609 Besi nako m
610 Kaca nako t.6 mm + rangka m2 75,000
611 Kaca Cermin 5 mm m2 162,500
612 KacaCermin 6 mm m2 266,500
613 Kaca Buram 12mm m2 390,000
614 Kaca nako dengan Trali 6 klip Set 195,000
615 Kaca nako dengan Trali 7 klip Set 220,000
616 Kaca nako dengan Trali 8 klip Set 240,000
617 Kaca nako dengan Trali 9 klip Set 270,000
618 Kaca nako dengan Trali 10 klip Set 290,000
619 Stang Lovers 5 klip Pas 75,000
620 Stang Lovers 6 klip Pas 115,000
621 Stang Lovers 7 klip Pas 105,000
622 Stang Lovers 8 klip Pas 120,000
623 Stang Lovers 9 klip Pas 135,000
624 Stang Lovers 10 klip Pas 150,000
625 Besi tralis nako bh 22,000
626 Kaca Lover Bening lbr 12,000
627 Kaca Lover Buram lbr 23,000
628 Kaca Lover Rayben lbr 15,000

XV BAHAN PAKU DAN MUR BAUT :


629 Paku 1 s/d 3 cm kg 20,020
630 Paku 4 s/d 7 cm kg 36,000
631 Paku 8 s/d 12 cm kg 36,000
632 Paku payung bh 500
633 Besi Begel Kuda-kuda kg
634 Duk angker kg
635 Angker Mur Bout 19 mm p. 90 cm bh
636 Mur Baut HTB dia 16 s/d 19 mm p. 5 cm bh
637 Mur Baut Biasa dia 16 s/d 19 mm p. 5 cm bh
638 Wartermur 12 mm bh
639 Klem Alm bh -
640 Skrup bh 334
641 Paku Skrup Kg 20,000
642 Paku Pancing Kg 18,700
643 Paku Biasa kg 15,000
644 Paku Seng kg 25,000
645 Paku Triplex kg 22,500
646 Paku Persegi kg 22,500
647 Paku Ardex kg 25,000
648 Paku Asbes kg 25,000
649 Paku Tembok 7-10 cm kg 25,000
650 Paku Jembatan kg 25,000
651 Mur Baut ID.3/8" - 7" s/d 14" bh 10,000
652 Skrup bh 500
XVI BAHAN FINISHING :
A. Besi:
653 Dempul Besi Kg 24,640
654 Cat Dasar / meni besi Kg 28,336
655 Cat Besi Kg 30,800
656 Thinner Ltr 27,720
657 Terpentin Ltr 7,500

B Kayu :
656 Dempul Kayu Kg 24,640
657 Cat Dasar / meni kayu Kg 28,336
658 Cat Kayu Kg 30,800
659 Plamir Kayu Kg 17,890
660 Teak Oil Ltr 15,000
661 Politur Ltr 7,000
662 Politur Dasar Ltr 5,000
663 Vernis Kayu Ltr 11,500
Edging ED 300L2/2 450,000
664 Cat Alumunium Kg 46,000
665 Cat Atap Ardex Kg 108,000
666 Meni Kayu Kg 28,000
667 Sirlak kg 175,000
668 Plamur Besi kg 78,000
669 Plamur Tembok kg 52,000
670 Plamur Kayu kg 7,800
671 Meni Besi Ltr 36,400
672 Meni Kayu kg 36,400
673 Thinner kg 36,400
674 Residu Ltr 78,000

C. Tembok
668 Cat dasar emulsion Ltr 46,550
669 Cat akhir emulsion Ltr 62,500
670 Cat akhir Wheathersield Ltr 100,000
671 Cat Dasar Alkali Resistant Primer Kg 60,410
672 Plamir Tembok Kg 30,940
673 Soligneum Kg
674 Finish Melamik m2 110,500
675 Cat Tembok (25 kg) kg 22,100
PRODUK NIPPON PAINT
675 MATEX PUTTY Ltr 6,190
676 VINILEX 5180WALL SEALER Ltr 14,229
676 NIPPON ALKALI PRIMER 3 IN 1 Kg 46,200
CAT INTERIOR
677 Q-LUC Ltr 5,714
678 MATEX Ltr 9,200
678 VINILEX 5000 Ltr 12,371
679 SUPER VINILEX 5000 Ltr 14,229
CAT EXTERIOR
680 KIMEX WEATHERBOND Ltr 7,971
NIPPONWEATHERBOND
681 Ltr 53,500
(warna Briliant White)
PRODUK DULUX
682 Dulux Weathershield Pro (std) Ltr 87,750
683 Dulux Weathershield Pro (spc) Ltr 95,000
683 Dulux Weathershield Max (std) Ltr 95,000
684 Dulux Weathershield Max (spc) Ltr 103,750
684 Dulux Weathershield Max (new) Ltr 131,500
685 Dulux Pentalite (std) Ltr 54,900
685 Dulux Pentalite (spc) Ltr 62,250
686 Dulux Easy Clean (std) Ltr 37,000
686 Dulux Easy Clean (spc) Ltr 53,350
687 Dulux Pearl Glo Ltr 69,100
687 Dulux Wallfiller Kg 21,250
688 Dulux Alkali Killer Ltr 60,800
688 Dulux Alkali Killer Ltr 53,250
689 Dulux Alkali Resisting Primer Ltr 43,150
689 Dulux Weathershield Putty Kg 21,250
690 Dulux Weathershield Primer Ltr 49,600
690 Dulux Weathershield Primer Ltr 46,550
PRODUK MOWILEX
691 Mowilex Emulsion (standar) Ltr 49,200
692 Mowilex Emulsion (khusus) Ltr 73,200
692 Mowilex Emulsion (pastel) Ltr 51,600
693 Mowilex Emulsion (VIP) Ltr 51,200
693 Mowilex Weathercoat Ltr 75,200
Mowilex Elastomeric
694 Ltr 76,400
Wall coating

D BAHAN PEMBANTU 6,000


695 Amplas Kayu / Besi Lbr 8,624
696 Kuas Cat rata2 Bh 11,211
697 Kuas Cat 2" Bh 7,000
698 Kuas Cat 3" Bh 12,000
699 Roll Cat Bh 20,713
700 Lem Kayu Kg 62,500
701 Lem Karpet Kg 27,500
702 Lem Vinyl Kg 15,000
703 Lem Wallpaper Kg 9,000
704 Sealant Kaca kg 45,000
XVII BAHAN SANITARI
Kloset duduk TOTO CST412MF unt 6,712,695
705 Kloset Duduk Porselen unt 2,000,000
706 Kloset Jongkok Porselen Putih unt 450,000
707 Kloset Jongkok Keramik unt 425,000
708 Kloset Duduk; Toilet bowl; komplit acc unt 2,140,000
709 Kloset Duduk; Single Toilet bowl; komplit acc unt 2,500,000
710 Kloset Duduk; Single Toilet bowl; 'Euro" komplit acc unt 2,140,000
711 Kloset Duduk; Toilet bowl; komplit acc unt 3,295,500
712 Kloset Duduk; Single Toilet bowl; komplit acc unt 5,695,300
713 Kloset Duduk; Single Toilet bowl; 'Euro" komplit acc unt 3,295,500
714 Kloset Duduk Toto CW 421 J unt 3,616,600
715 Washlet unt 794,300
716 Kloset Jongkok 440x550x280 unt 392,000
717 Kloset Jongkok 400x500x200 unt 215,000
718 Kloset Jongkok + instalasi Flush unt 2,840,000
719 Kloset Jongkok unt 599,950
720 Urinoir keramik komplit acc unt 2,120,000
721 Urinoir Partisi Keramik unt 961,000
722 Wastafel Dinding komplit acc; uk. 430x435 mm unt 189,280
723 Wastafel Console komplit acc; uk. Dia. 430 mm unt 5,468,840
724 Wastafel Topcounter Self Rumming; uk 445x365 mm unt 2,256,150
725 Wastafel Topcounter Semi Recessed; uk 415x485 mm unt 4,765,410
726 Wastafel Undercounter; uk 630x345 mm unt 3,699,410
727 Washtafel Pedestal; uk. 500x350 mm unt 916,000
728 Washtafel Keramik (lengkap) unt 750,000
729 Bak air fibreglass uk. 55x55x60 cm bh 523,900
730 Kran dinding acrilyc bulat bh 196,000
731 Kran dinding 4 jari bh 188,000
732 Kran dinding bh
733 Kran zink lever handle bh 314,000
734 Kran Air 1/2" bh 17,500
735 Kran Air 3/4" bh 35,000
736 Kitchenzink stainless steel 1 lubang unt 450,000
737 Kitchenzink stainless steel 2 lubang unt 600,000
738 Kitchenzink teraso 1 lubang bh 130,000
739 Floordrain unt 367,000
740 Shower bh 245,000
741 Bath Tube fibreglass unt 6,100,000
742 Shower head bh 457,990
743 Mix Shower Set unt 1,499,030
744 Toilet Shower unt 326,000
745 Toilet Shower unt 267,000
746 Tempat Tissue Inbow unt 209,000
747 Tempat Tissue SST outbow TX720ACRB 314,000
unt
748 Tempat Sabun dinding (Kecil) unt 61,000
Tempat Sabun dinding (Panjang) unt 87,000
749 Tempat Sabun wastavel unt 211,250
750 Gantungan baju doble bh 375,000
751 Towel ring unt 304,200
752 Tissue Paper Bh 1,604,937
753 Bakdip Bh 1,950,000
754 Water drain+aksesoris set 195,000
755 Bak mandi Teraso set 650,000
Jet washer bh 347,100
Roof drain bh 234,000
Toilet Partition unt 8,190,000
Kran dan Hand Shower unt 1,275,300
1 Shower tray 745,000
2 Jet washer THX20NB unt 212,000
3 Roof drain 250,000

XVIII BAHAN PARTISI DINDING /PLAFOND


756 Gypsumboard t.9 mm lbr 62,980
757 Gypsumboard t.12 mm lbr 78,000
758 Gypsumboard t.9 mm WR lbr 105,000
759 Gypsumboard t.13 mm WA lbr 158,600
760 Gypsumboard t.13 mm FS lbr 154,000
761 Gypsumboard t.16 mm FS lbr 161,500
762 Kalsium Silikat t. 4,5 mm lbr 111,540
763 Plafon GRC Tiles lbr 180,000
List
764 List Profil 5 cm Gypsum m1
765 List Profil 7 cm Gypsum m1 12,000
765 List Profil 10 cm Gypsum m1 15,700
766 List Profil 5 cm Kayu m1 7,500
Cement& & Silika Board
767 Papan Kalsium Silikat t. 4,5 mm lbr 70,160
768 Papan Kalsium Silikat t. 6 mm lbr 100,120
769 Papan Kalsium Silikat t. 8 mm lbr 141,000
770 KalsiBoard Ling 3.5® lbr 50,350
771 KalsiBoard Ling 4.5® lbr 70,160
772 KalsiBoard Ling 6® lbr 100,120
773 KalsiBoard Ling 6-R1® lbr 102,740
774 KalsiBoard Ling 6-R2® lbr 103,770
775 KalsiBoard Part 8® lbr 136,180
776 KalsiBoard Part 8® R-2 lbr 139,640
777 KalsiBoard Part 8® R-4 lbr 140,100
778 KalsiBoard Clad 10® lbr 171,850
779 KalsiBoard Clad 12® lbr 208,200
780 KalsiPlank 8® lbr 26,220
781 KalsiPlank 8® Jati lbr 27,500
782 KalsiPlank 12® lbr 39,470
GRC
783 GRC Board 6 mm (122x244) lbr 95.000
784 GRC Fiber Flat 4 mm (122x244) lbr 50.000
785 GRC Fiber Lux 5 mm (122x244) lbr 70.000
786 Super Panel 9 mm (122x244) lbr 200.000
787 Superplank 100 9 mm (10x244) lbr 30.000
788 Superplank 200 9 mm (20x244) lbr 46.000
789 Superplank 300 9 mm (30x244) lbr 60.000
790 Elephant Big Flat 4 mm (122x244) lbr 44,500
791 Elephant Big Flat 6 mm (122x244) lbr 72,000
792 Elephant Big Flat 8 mm (122x244) lbr 98,000
793 Elephant Wood Plank 8 mm (100x4.050) lbr 50,000
794 Elephant Wood Plank 8 mm (200x4.050) lbr 65,000
795 Elephant Wood Plank 10 mm (300x4.050) lbr 70,000
Akustik
796 Plafond akustik 60x60cm lbr 17,000
797 Plafond akustik 60x120cm lbr 30,000
798 Plafond Gyptile tipe Deko 60x60cm lbr 9,000
799 Plafond Gyptile tipe Deko 120x60cm lbr 18,000
800 Plafond Gyptile tipe Teksture 60x60cm lbr 10,000
801 Plafond Gyptile tipe Teksture 120x60cm lbr 20,000
802 Plafond Gyptile tipe Dura 60x60cm lbr 14,000
803 Plafond Gyptile tipe Dura 120x60cm lbr 27,500
804 Plafond Gyptile tipe Akustik 60x60cm lbr 14,500
805 Plafond Gyptile tipe Akustik 120x60cm lbr 28,500

XIX FRAME
806 Atap onduline m2 143,000
807 Rangka Plafond Metal furing l. 4 cm; 60 x 60 cm m2 92,950
808 Rangka Partisi Metal furing l. 4 cm; 60 x 60 cm m2 83,132
809 Rangka hollow galvanis t. 0,35 m2 84,500
810 Profil Alumunium “T” m1 19,500
811 Besi Hollow 20x40mm (Sinchromated) btg 20,800
812 Besi Hollow 40x40mm (Sinchromated) btg 41,600
813 Besi Hollow 40x60mm (Sinchromated) btg 62,400
814 Besi Hollow 20x40mm (Galvanized) btg 21,450
815 Besi Hollow 40x40mm (Galvanized) btg 25,350
816 Besi Hollow 40x60mm (Galvanized) btg 47,450
817 Suspension rod Bh 4,550
818 Rangka Plafond Akustik 60 x 60 cm m2 124,861
819 Rangka Plafond Akustik 60 x 120 cm m2 85,417
820 Rangka Plafond Hollow 40x40cm m2 73,132
821 Rangka Partisi Hollow 40x40cm m2 86,400
822 Rangka Partisi Metal Stud m2 87,900
Metal Furring
823 Top Cross btg 34,300
824 Furring Channel btg 34,900
824 Ceiling Batten / C section btg 52,100
825 Wal Angle btg 9,300
825 Top Cross Clip Bh 4,500
826 Suspension rod Bh 9,600
Akustik
827 Cross T 60 btg 5,000
828 Cross T 120 btg 7,500
828 Main T btg 25,000
829 Wal Angle btg 14,000
829 PN Clip Bh 2,900
830 Suspension Rod PN Bh 3,800
Hollow
831 Besi Hollow 20x40mm t.0.35mm btg 16,500
832 Besi Hollow 20x40mm t.0.4mm btg 19,500
833 Besi Hollow 20x40mm t.0.5mm btg 22,000
834 Besi Hollow 40x40mm t.0.35mm btg 21,500
835 Besi Hollow 40x40mm t.0.4mm btg 24,500
836 Besi Hollow 40x40mm t.0.5mm btg 28,500
837 Besi Hollow 40x60mm t.0.6mm btg 85,000
838 Besi Hollow 20x40mm (galvanized) t.0.35mm btg 19,500
839 Besi Hollow 20x40mm (galvanized) t.0.4mm btg 23,500
840 Besi Hollow 20x40mm (galvanized) t.0.5mm btg 27,000
841 Besi Hollow 20x40mm (galvanized) t.0.6mm btg 29,500
842 Besi Hollow 40x40mm (galvanized) t.0.35mm btg 24,500
843 Besi Hollow 40x40mm (galvanized) t.0.4mm btg 28,500
844 Besi Hollow 40x40mm (galvanized) t.0.5mm btg 32,500
845 Besi Hollow 40x40mm (galvanized) t.0.6mm btg 35,500
Metal Stud
846 Metal Stud 51 t.0.45mm btg
847 Metal Stud 76 t.0.45mm btg
848 Metal Stud 100 t.0.45mm btg
849 Metal Track/Runner 51 t.0.45mm btg
850 Metal Track/Runner 76 t.0.45mm btg
851 Metal Track/Runner 100 t.0.45mm btg
Besi Hollow 50x100mm (galvanized) t.0.5mm btg 1,170,000
Pipa si hollow 8cm btg

XX BAHAN SALURAN AIR


852 Greffel U20 p. 1,00 m m' 46,475
853 Kanstien 40x9x19 cm ex Ubin Alpen bh 7,605

XXI PERALATAN / LAIN-LAIN


1 Kikir Nicholson 2 Kikir Lurus Besar bh 225,000
2 Kikir Nicholson 1.5 HUK bh 275,000
3 Kikir Nicholson Gergaji kecil bh 25,000
854 Sewa Alat Las jam 20,000
855 Sewa Stamper jam 32,500
856 Sewa Alat jam 57,000
857 Instalasi Listrik Sementara ttk 97,500
858 Lampu TL bh 97,500
859 Biaya Pemakaian Listrik bln 195,000
860 Excavatot kap. 0,5 m3 jam 500,000
861 Dumptruck kap 3-4 m3 jam 500,000
862 Solar Ltr 5,500
863 Bensin Ltr 6,500
864 Minyak Pelumas Ltr 35,000
865 Minyak Bekisting Ltr 3,000
866 Minyak Panas Ltr 4,500
867 Steiger ls
868 Kawat las listrik kg 25,000
869 Sealant clear neutral (300 ml) tb 35,000
870 Seal tape roll 10,000
871 Lem pipa tb 42,250
872 Formiten/spacer bekisting Bh 14,300
873 Ramset Bh 11,000
874 Pembersih kg 4,500
875 Stempet Pail 480,000
876 Teak Oil kg 35,000
877 Sikat Besi bh 15,000
878 Aquistic Arm Strong Lbr 105,000
879 Panel beton Pra Cetak Lbr 65,000
880 Kolom beton Pra Cetak Btg 44,000
881 Water Stop 150 mm m' 60,000
882 Water Stop 200 mm m' 93,600
883 Vibrator unt 300,000
884 Hager Box MCB Bh 985,500
885 Stop kontak Panasonic AC Bh 28,000
886 Steker Panasonic AC Bh 11,000
887 Kabel 3x1.5 Prima roll 320,000
888 Tarikan Oxford 128-4057 25,000

XXII ELEKTRIKAL
883 Tiang Galvanis Oktagonal 8 m 1 Mikro Btg 3,150,000
884 Tiang Besi Galvanis Oktagonal 8 m 2 Mikro Btg 4,250,000
885 Tiang Galvanis Biasa 8 m 1 Mikro Btg 2,900,000
886 Tiang Galvanis Biasa 8 m 2 Mikro Btg 3,200,000
887 MCB 32A 1 Ph MG bh 95,000
888 MCB 6A 1 Ph MG bh 75,000
889 MCB 32A 3 Ph MG bh 350,000
890 MCB 50A MG bh 350,000
891 Time Switch Legran 30A bh 550,000
892 Kontaktor 3 P 80A LCID50M7 bh 700,000
893 Kontaktor 1 P 40A LCID25M7 bh 550,000
894 Foto Cell Seleon AS 10A bh 200,000
895 Foto Cell Seleon AS 6A bh 175,000
896 Bola Lampu SON T 250 W bh 220,000
897 Bola Lampu SON H 400 W bh 295,000
898 Trafo Philips 250 W bh 300,000
899 Trafo Philips 400 W bh 450,000
900 Lampu TL 20 Watt bh 90,000
901 Lampu TL 2x20 Watt bh 110,000
902 Lampu TL 1x40 Watt bh 100,000
903 Lampu TL 2x40 Watt bh 150,000
904 Lampu Pijar 60 Watt (S) bh 7,000
905 Lampu Pijar 100 Watt bh 9,000
906 Lampu Pijar 25 Watt bh 5,500
907 Lampu Pijar 40 Watt bh 6,000
908 Lampu Pijar 75 Watt bh 8,000
909 Lampu SL 25 Watt bh 61,000
910 Lampu SL 50 Watt bh 135,000
911 Lampu SL 65 Watt bh 150,000
912 Lampu SL 85 Watt bh 180,000
913 Sekring Otomat bh 20,000
914 Stop Kontak (kontak) bh 25,000
915 Saklar Engkel Tanam bh 20,000
916 Saklar Double Tanam bh 25,000
917 Box Sekring Otomat 1 Group bh 22,000
918 Box Sekring Otomat 2 Group bh 45,000
919 Box Sekring Otomat 4 Group bh 50,000
920 Fitting DC bh 55,000
921 Flaser Fire Work Lamp bh 2,000,000
922 Kabel Tanah NYFGBY 4x6mm M' 45,000
923 Kabel SR M' 15,000
924 Lampu Son H 250 W Komplit bh 2,300,000
925 Lampu Son T 400 W Komplit bh 2,500,000
926 Panel Box 30x40x20 cm bh 327,000
927 Kabel Instalasi Listrik 2,5mm 100m' Roll 280,000
928 Kabel NYY 4x4 mm M' 30,000
929 Kabel NYM 2x1,5 mm M' 10,000
930 Kabel NYM 3x1,5 mm M' 15,000
931 Kabel NYM 2x2,5 mm M' 10,000
932 Kabel NYM 3x2,5 mm M' 16,000
933 Kabel NYM 4x3 mm M' 28,000
934 Isolasi Ban Roll 15,000
935 Klem Tarik bh 15,000
936 Konektor bh 10,000
937 Box Meteran Set 80,000
938 Baut ID. 14" s/d 24" bh 10,000
939 Trafo Distribusi 20 KV, 50 KVA, Outdoor Unit
940 Cut Out 20 KV ....kA, Outdoor bh 1,400,000
941 Fuse Link 20 KV, 5A bh 50,000
942 Aresster 20 KV bh 1,200,000
943 Kawat AAAC 70 mm2 M' 20,000
944 Kabel NYY 1x70mm2, TR, untuk OG Trafo M' 175,000
945 Travers untuk dudukan CO & LA bh 325,000
946 Beugels 4" Komplit Mur Baut & Ring bh 40,000
947 Parallel Group 25/150 mm2 u/ Penyambungan bh 35,000
948 Kabel Schoen AL 70 mm untuk CO & LA M' 27,000
949 Kabel Schoen CU 90 mm Untuk Kabel Incoming M' 30,000
950 Pipa Kabel 3" u/ pelindung Kabel Outgoing Btg 175,000
951 Elbow (Knee) pipa 3" bh 20,000
952 Elbow (Knee) pipa 4" bh 53,000
953 Klem Beugels 5"/8" x 3" u/ dudukan pipa kabel bh 30,000
954 Klem Beugels , D 4", 8"x 1" u/ dudukan pipa pelindung Set 57,000
955 Klem Selang D 3/4" bh 53,000
956 Peti Pembagi 220/380 volt 100 A, 4 Group Unit 9,500,000
957 Travers UNP 10 x 2000mm2 u/ dudukan Trafo bh 300,000
958 Beugels 8" Komplit Mur Baut & Ring bh
959 Mur Baut 5/8", 150mm Komplit Ring bh 10,000
960 Kabel Schoen CU 50mm Untuk Kabel Arde M' 15,000
961 Kabel BC Draad 50mm2 M' 70,000
962 Pipa Besi 1" untuk pelindung Btg 135,000
963 Patok Arde Komplit Baut Set 130,000
964 Twisted Cable 3x70mm2 + 1 x 50mm M' 70,000
965 Tension Bracket (klem pemegang) bh 55,000
966 Wedge Type Strain Clamb (klem jepit kbel) Set 15,000
967 Stainless Steel Strip 20x0,7 mm2 (klem pengikat) M' 12,000
968 Stopping Bukle Stainless Steel bh 20,000
969 Plastic Strap R12 (Pengikat TC) bh 2,000
970 Trap Connector 35-070/35-70mm bh
971 Suspension Bracket (klem pemegang) bh 80,000
972 Kabel Twisted 2x10mm M' 18,000
973 MCB 1 Phasa, 220V, 1 s/d 35 A bh 250,000
974 KWH Meter 1 Phasa, 4 W, 220V, 5/20 A bh
975 Kotak APP. OK bh 75,000
976 Piercing (TAP) Connector,/.mm2 bh 13,000
977 Two Way Pole Bracket bh 20,000
978 Mobilisasi Ls 15,600
979 Paket pekerjaan hotmix 2cm m2 160,550
980 Plastik Cor m2 6,500
981 Harga Torn Air Stainless 2500 ltr unt 7,800,000
982 Holder Kaca bh 25,000
983 Batu Andesit 30x30 m2 150,000
984 Buis beton 1/2 m1 71,500
985 Plat bondek m2 139,100
UPDATED

Int – 22 may 2013


sorong jan-juni 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013

Int – 22 may 2013


Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013

Boy – 22 may 2013


Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Boy – 28 may 2013

Int – 22 may 2013


Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
sorong jan-juni 2013
Boy – 22 may 2013

sorong jan-juni 2013


sorong jan-juni 2013
sorong jan-juni 2013

Int – 22 may 2013


Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
sorong jan-juni 2013
sorong jan-juni 2013

Boy – 22 may 2013


Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013

Boy – 22 may 2013


Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013

sorong jan-juni 2013


sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
Int – 11 June 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
link E92
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
sorong jan-juni 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
link E92

Boy – 22 may 2013


Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013

sorong jan-juni 2013


Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
sorong jan-juni 2013
sorong jan-juni 2013

Int – 19 Juni 2013

Int – 19 Juni 2013

Int – 22 may 2013


Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013

Int – 22 may 2013


Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013

Int – 22 may 2013


Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013

Int – 22 may 2013


Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013

Int – 22 may 2013


Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Huge

sorong jan-juni 2013


sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013

Int – 07 Jun 2013


sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
ex setara Alfa

Int – 22 may 2006


Int – 22 may 2007
Int – 22 may 2008
Int – 22 may 2009
Int – 22 may 2010
Int – 22 may 2011
Int – 22 may 2012
Int – 22 may 2013

Int-19 Juni 2013


sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013

Int – 22 may 2013


Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 18 okt 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
sorong jan-juni 2013

Int – 22 may 2013


Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013

sorong jan-juni 2013


sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013

Int – 22 may 2013


Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013

Boy – 22 may 2013


Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013

Boy – 22 may 2013


Boy – 22 may 2013
Boy – 22 may 2013
sorong jan-juni 2013
sorong jan-juni 2013

Int – 22 may 2013


Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013

sorong jan-juni 2013


sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013

Int – 22 may 2013


Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013

Int – 22 may 2013


Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013

Int – 22 may 2013


Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013

Int – 22 may 2013


Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013

Int – 22 may 2013


Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013

Int – 22 may 2013


Int – 22 may 2013
Int – 22 may 2013

Int – 28 may 2013


Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
Boy – 22 may 2013
sorong jan-juni 2013
sorong jan-juni 2013

sorong jan-juni 2013


sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
Int-17 Jun 2013
sorong jan-juni 2013

sorong jan-juni 2013


sorong jan-juni 2013
sorong jan-juni 2013

sorong jan-juni 2013

Int – 22 may 2013


Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
sorong jan-juni 2013
sorong jan-juni 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013
Int – 22 may 2013

Int – 07 Juni 2013


sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013

sorong jan-juni 2013


sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013

Int – 25 may 2013


Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013

Int – 19 Juni 2013


sorong jan-juni 2013

Int – 25 may 2013


Int – 25 may 2013
Int – 25 may 2013

Int – 25 may 2013


Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013

Int – 25 may 2013

Int – 25 may 2013

Int – 25 may 2013


Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013

Int – 25 may 2013


Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013

Int – 25 may 2013

sorong jan-juni 2013


sorong jan-juni 2013
sorong jan-juni 2013

sorong jan-juni 2013


sorong jan-juni 2013

sorong jan-juni 2013


Int – 25 nov 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013

sorong jan-juni 2013


Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
Int – 25 may 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
Int – 25 may 2013
Int – 25 may 2013
sorong jan-juni 2013

Int – 25 may 2013


Int – 25 may 2013
Int – 25 may 2013

Int – 25 may 2013


Int – 25 may 2013
sorong jan-juni 2013
Int – 25 may 2013
sorong jan-juni 2013
sorong jan-juni 2013

Int – 07 Jun 2013


Int – 11 Jun 2013
Int – 07 Jun 2013

Int – 24 may 2013


Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
sorong jan-juni 2013

Int – 24 may 2013


Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013

Int – 24 may 2013


Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013

Int – 24 may 2013


Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013

sorong jan-juni 2013


Int – 24 may 2013
sorong jan-juni 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013

Int – 24 may 2013


Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013

Int – 24 may 2013


Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013

Int – 24 may 2013


Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
Int – 24 may 2013
sorong jan-juni 2013
sorong jan-juni 2013

sorong jan-juni 2013


sorong jan-juni 2013

sorong jan-juni 2013


sorong jan-juni 2013
sorong jan-juni 2013

sorong jan-juni 2013


sorong jan-juni 2013

sorong jan-juni 2013


sorong jan-juni 2013

sorong jan-juni 2013

sorong jan-juni 2013


sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
Int-11 Jun 2013

sorong jan-juni 2013


sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
sorong jan-juni 2013
KETERANGAN

###
###
###
###
###
###

lokal, lubang 2, uk. 40X9x20


lokal, lubang 3, uk. 40X10x20
lokal, lubang 2, uk. 40X9x20
lokal, lubang 3, uk. 40X10x20
lokal, permukaan motif uk. 40X10x20

lokal
lokal
lokal
lokal
lokal
lokal
lokal
lokal
lokal
lokal
###
###
lokal JKT
###
###
###
###
###
###
###
###
###
###
###
###
###
###
harga PDAM bdg per mobil 500 liter
###
###
20x20 cm
###
###
###
###
###

ex.Tiga Roda
ex.Tiga Roda
ex.Tiga Roda 1 zak = 40 kg
ex.Lemkra, daya sebar 8-10m2/kg
###
###

###

Concrete Quality : K-450


Steel Quality : U-39
Spiral Reinforcement : Ø 5mm with 0.2mm tolerance
Standard Connection : Welded steel plate
Installation System : Drop Hammer & Jacked Pile
###
###
###
###
###
lokal bdg
lokal bdg

lokal bdg
lokal bdg
lokal bdg
lokal bdg
lokal bdg
lokal bdg
lokal bdg
lokal bdg
lokal bdg
lokal bdg
lokal bdg
lokal bdg
lokal bdg
lokal bdg
lokal bdg
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Biasa
SNI, full, 12 meter
biasa, ukuran banci
SNI, full, 12 meter
biasa, ukuran banci
SNI, full, 12 meter
biasa, ukuran banci
SNI, full, 12 meter
SNI, full, 12 meter, ulir
biasa, ukuran banci
SNI, full, 12 meter, ulir
###
###
###
###
###
###
Biasa
SNI, full, 12 meter
SNI, full, 12 meter, ulir

###
###
###
ex.BRC, U50 spc 15x15cm, 1 lbr uk.2,1x5.4m, 1 roll 155 kg/54m
ex.BRC, U50 spc 15x15cm, 1 lbr uk.2,1x5.4m, 1 roll 242 kg/54m
ex.BRC, U50 spc 15x15cm, 1 lbr uk.2,1x5.4m, 1 roll 347.6bkg/54m
ex.BRC, U50 spc 15x15cm, 1 lbr uk.2,1x5.4m, 1 roll 473.1 kg/54m
ex.BRC, U50 spc 15x15cm, 1 lbr uk.2,1x5.4m, 1 roll 617.9 kg/54m
ex.BRC, U50 spc 15x15cm, 1 lbr uk.2,1x5.4m, 1 roll 782.1 kg/54m
ex.BRC, U50 spc 15x15cm, 1 lbr uk.2,1x5.4m, 1 roll 965.5 kg/54m
ex.BRC, U50 spc 15x15cm, 1 lbr uk.2,1x5.4m, 1 roll 1155.7 kg/54m
ex.BRC, spc 15x15cm, 1 lbr uk.2,1x5.4m, 1 roll 155 kg/54m
ex.BRC, spc 15x15cm, 1 lbr uk.2,1x5.4m, 1 roll 242 kg/54m
ex.BRC, spc 15x15cm, 1 lbr uk.2,1x5.4m, 1 roll 347.6bkg/54m
ex.BRC, spc 15x15cm, 1 lbr uk.2,1x5.4m, 1 roll 473.1 kg/54m
ex.BRC, spc 15x15cm, 1 lbr uk.2,1x5.4m, 1 roll 1155.7 kg/54m
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
uk. 5/7 & 5/10 panjang 3,80 m'

uk. 3/20 & 3/30 panjang 3,80 m'


###
uk. 5/7 & 5/10 panjang 3,80 m'
###
uk. 3/20 & 3/30 panjang 3,80 m'
###
uk. 5/7 & 5/10 panjang 3,80 m'
uk. 6/12, 6/15, 8/12 & 8/15 panjang 3,80 m'
uk. 3/20 & 3/30 panjang 3,80 m'
###
###
###
###
###
###
###
###
###
###
###
###
###
setara Indal
setara Indal
setara Indal
setara Indal
###
###

###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###

###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

lokal
lokal

###
###
###
###
###
###
###
###
###
###
###
###
###
ex setara Alfa

###
###
Ferrari
Ferrari

paloma
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

Uk 120x240 cm
Uk 120x240 cm
###
###
###
Uk 122x244 cm
Uk 122x244 cm
Uk 122x244 cm
Uk 120x240 cm
###
Uk 120x240 cm
Uk 120x240 cm
Uk 120x240 cm
Uk 120x240 cm
Uk 122x244 cm
###
ex.Violam
Uk 122x244 cm
Uk 122x244 cm
###

setara Roman
setara Roman
setara Roman
setara Roman
###
###
setara Roman
setara Roman
###
###
setara Roman
setara Roman

###
###
###
###
###
###
###
###
###
###

1 m2 = (25/dos)
1 m2 = (25/dos)
1 m2 = (20/dos)
1 m2 = (11/dos)
1 m2 = (11/dos)
1 m2 = (9/dos)
1 m2 = (9/dos)
1 m2 = (6/dos)
1 m2 = (6/dos)
1 m2 = (6/dos)
1 m2 = (6/dos)
1 m2 = (5/dos)
1 m2 = (5/dos)
1 m2 = (5/dos)
1 m2 = (4/dos)
1 m2 = (4/dos)
1 m2 = (4/dos)
1 m2 = (3/dos)
1 m2 = (3/dos)
1 m2 = (3/dos)
1 m2 = (10/dos)
1 m2 = (5/dos)
1 m2 = (5/dos)
1 m2 = (5/dos)
1 m2 = (30/dos)
1 m2 = (50/dos)
1 m2 = (33/dos)
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
lokal bdg
lokal bdg

lokal, press manual


lokal, press manual
lokal, press hidraulik, setara K-200
lokal, press hidraulik, setara K-200
lokal, press hidraulik, setara K-250
lokal, press hidraulik, setara K-250
lokal, press hidraulik, setara K-300
lokal, press hidraulik, setara K-300
lokal, press hidraulik, setara K-300
lokal, press hidraulik, setara K-300
lokal, press manual, uk.45x30
lokal, press manual, uk.33x33
lokal, press manual, uk.30x30
lokal, press hidraulik, setara K-250
lokal, press hidraulik, setara K-250
lokal, ukuran standar PU
lokal, ukuran standar PU
lokal, ukuran standar PU
lokal, ukuran standar PU
lokal, ukuran standar PU
lokal, ukuran standar PU
lokal, ukuran standar PU
lokal, ukuran standar PU
lokal, ukuran standar PU
lokal, ukuran standar PU
setara Citatah
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

setara Roman
setara Roman
setara Roman
setara Roman
###
###
###
###
###
###
###
###
###
###
###
###
lokal bdg
lokal bdg
lokal bdg
###
###

1 m2 = (25/dos)
1 m2 = (25/dos)
1 m2 = (20/dos)
1 m2 = (20/dos)
1 m2 = (20/dos)
1 m2 = (16/dos)
1 m2 = (16/dos)
1 m2 = (16/dos)
1 m2 = (11/dos)
1 m2 = (11/dos)
1 m2 = (11/dos)
1 m2 = (11/dos)
1 m2 = (11/dos)
1 m2 = (11/dos)
1 m2 = (11/dos)
1 m2 = (12/dos)
1 m2 = (12/dos)
1 m2 = (12/dos)
1 m2 = (12/dos)
1 m2 = (12/dos)
1 m2 = (9/dos)
1 m2 = (9/dos)
1 m2 = (9/dos)
1 m2 = (9/dos)
1 m2 = (9/dos)
1 m2 = (9/dos)
1 m2 = (8/dos)
1 m2 = (8/dos)
1 m2 = (8/dos)
1 m2 = (8/dos)
1 m2 = (6/dos)
1 m2 = (6/dos)
1 m2 = (6/dos)
1 m2 = (6/dos)
1 m2 = (6/dos)
1 m2 = (5/dos)
1 m2 = (5/dos)
1 m2 = (5/dos)
1 m2 = (5/dos)
1 m2 = (5/dos)
setara Roman
lokal bdg
lokal bdg
lokal bdg

setara Bluescope
setara Surya roof
setara Surya roof
setara Bluescope

L. 90 cm
###
Uk. 80 x 180 cm
###
###
###
L. 90 cm
(0,2 x 0,45 m')
6" (0,6 x 1,80 m')
7" (0,7 x 1,80 m')
6" (0,6 x 1,80 m')
7" (0,6 x 1,80 m')
8" (0,6 x 1,80 m')
L. 30 cm

ex.Gajah Mas atau setara


ex.Gajah Mas atau setara
ex.Gajah Mas atau setara
ex.Gajah Mas atau setara
ex.Gajah Mas atau setara
ex.Gajah Mas atau setara
ex.Gajah Mas atau setara
ex.Gajah Mas atau setara
ex.Gajah Mas atau setara
ex.Gajah Mas atau setara

setara Jabesmen/Harflex non asbes (harga 2011)


setara Jabesmen/Harflex non asbes (harga 2011)
setara Jabesmen/Harflex non asbes (harga 2011)
setara Jabesmen/Harflex non asbes (harga 2011)
setara Jabesmen/Harflex non asbes (harga 2011)
setara Jabesmen/Harflex non asbes (harga 2011)

setara Jabesmen/Harflex non asbes (harga 2011)


setara Jabesmen/Harflex non asbes (harga 2011)
setara Jabesmen/Harflex non asbes (harga 2011)
setara Jabesmen/Harflex non asbes (harga 2011)
setara Jabesmen/Harflex non asbes (harga 2011)
setara Jabesmen/Harflex non asbes (harga 2011)

setara Jabesmen/Harflex non asbes (harga 2011)


setara Jabesmen/Harflex non asbes (harga 2011)
setara Jabesmen/Harflex non asbes (harga 2011)
setara Jabesmen/Harflex non asbes (harga 2011)
setara Jabesmen/Harflex non asbes (harga 2011)
setara Jabesmen/Harflex non asbes (harga 2011)

setara Jabesmen/Harflex non asbes (harga 2011)


setara Jabesmen/Harflex non asbes (harga 2011)
setara Jabesmen/Harflex non asbes (harga 2011)
setara Jabesmen/Harflex non asbes (harga 2011)
setara Jabesmen/Harflex non asbes (harga 2011)
setara Jabesmen/Harflex non asbes (harga 2011)

###
setara Jabesmen/Harflex non asbes (harga 2011)
setara Jabesmen/Harflex non asbes (harga 2011)
setara Jabesmen/Harflex non asbes (harga 2011)
setara Djabesnok
setara Djabesnok
setara Blue Scope
setara Solartuff
###
###
###
###
setara Djabesnok
setara Djabesnok
setara Sakura roof
setara Solartuff
###
###
###
###
###
###
###
lokal bdg
lokal bdg
lokal bdg
lokal bdg
lokal bdg
lokal bdg
lokal bdg
lokal bdg
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
setara Lemkra
setara Lemkra
setara Lemkra

setara Sika

###
###
###
###
###
###
###
###
###
###

1,22 x 1,82 m'


1,22 x 1,82 m'
ex.Asahimas (harga 2012)
ex.Asahimas (harga 2012)
ex.Asahimas (harga 2012)
ex.Asahimas (harga 2012)
ex.Asahimas (harga 2012)
ex.Asahimas (harga 2012)
###
###
ex.Asahimas (harga 2012)
ex.Asahimas (harga 2012)
ex.Asahimas (harga 2012)
ex.Asahimas (harga 2012)
ex.Asahimas (harga 2012)
ex.Asahimas (harga 2012)
ex.Asahimas (harga 2012)
###
###
setara Globe

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
setara Seiv
###
###

setara Vinilex
setara Vinilex
setara Vinilex
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###

setara Vinilex
setara Vinilex
setara Vinilex
###
setara Sanlex

###
###
ex.Nipponpaint
ex.Nipponpaint
ex.Nipponpaint
###
ex.Nipponpaint
ex.Nipponpaint
ex.Nipponpaint
ex.Nipponpaint
###
ex.Nipponpaint
ex.Nipponpaint

###

ex.Dulux
ex.Dulux
ex.Dulux
ex.Dulux
ex.Dulux
ex.Dulux
ex.Dulux
ex.Dulux
ex.Dulux
ex.Dulux
ex.Dulux
ex.Dulux
ex.Dulux
ex.Dulux
ex.Dulux
ex.Dulux
ex.Dulux
###
ex.Mowilex
ex.Mowilex
ex.Mowilex
ex.Mowilex
ex.Mowilex
ex.Mowilex

###

###
###
###
###
###
###
###
###
###
###
Ex. Kia
###
###
CW702J/SW784JP ex.Toto
CW660J/SW660J ex.Toto
CW 420 J/SW 420 JP
CW 705/TV 150 NSV7
CW 660 J
ex KIA
TGB 500 AZRV24
CE 6 ex Toto
CE 7 ex Toto
CE 9/TV150NWV12J ex.Toto
CE 6 ex Toto
###
A 100 ex Toto
L 529 V1 / T 205 MCB
LW 523 J / TX 116 LE
LW 565 / TX 109 LD
LW 642 CJ / TX 115 LESN
LW 549 J / TX 108 LJ
LW 240 CJ / LW 240 HFJ
###
###
T 23 B13V7NB ex Toto
T 23 B13 ex Toto
T 205 MC
T 30 ARQ13N ex Toto
###
###
Hwaco 1L
Hwaco 2L
###
TX 1B ex Toto
###
###
TX 438 SZ
TR 309 S ex Toto
TX 403 S PIV ex Toto
TX 403 SMCR ex Toto
TX 720 ACR
TS 116 R
###

TS 126 AR

TS 118 WS
TS 115 SB
###
###
###
###
Toto THX20MCRB
 H0 1-4' SAN-EI
###
###
###
Filippo
White

uk 120 x 240 cm
uk 120 x 240 cm
ex.Jaya Board, tipe Wet Area
ex.Jaya Board, tipe Fire Stop
ex.Jaya Board, tipe Fire Stop
###
###
###

###
###
###
###
ex.Kalsiboard atau setara
ex.Kalsiboard atau setara
ex.Kalsiboard atau setara
ex.Kalsiboard uk.3.5 x 1200 x 2400
ex.Kalsiboard uk.4.5 x 1200 x 2400
ex.Kalsiboard uk.6 x 1200 x 2400
ex.Kalsiboard uk.6 x 1200 x 2400, resesed 2 sisi
ex.Kalsiboard uk.6 x 1200 x 2400, resesed 4 sisi
ex.Kalsiboard uk.8 x 1200 x 2400
ex.Kalsiboard uk.8 x 1200 x 2400, resesed 2 sisi
ex.Kalsiboard uk.8 x 1200 x 2400, resesed 4 sisi
ex.Kalsiboard uk.10 x 1200 x 2400
ex.Kalsiboard uk.12 x 1200 x 2400
ex.Kalsiboard uk.8 x 200 x 2400
ex.Kalsiboard uk.8 x 200 x 2400, motif jati
ex.Kalsiboard uk.12 x 200 x 2400, motif jati
###
ex.GRC (harga 2011)
ex.GRC (harga 2011)
ex.GRC (harga 2011)
ex.GRC (harga 2011)
ex.GRC (harga 2011)
ex.GRC (harga 2011)
ex.GRC (harga 2011)
ex.Elephant (harga 2011)
ex.Elephant (harga 2011)
ex.Elephant (harga 2011)
ex.Elephant (harga 2011)
ex.Elephant (harga 2011)
ex.Elephant (harga 2011)
###
ex.Jayaboard atau setara, t=9mm
ex.Jayaboard atau setara, t=12mm
ex. Jayaboard, t=9mm, polos
ex. Jayaboard, t=12mm, polos
ex. Jayaboard, t=9mm, motif bintik
ex. Jayaboard, t=12mm, motif bintik
ex. Jayaboard, t=9mm, motif teksture
ex. Jayaboard, t=12mm, motif moyif teksture
ex. Jayaboard, t=9mm, motif grid
ex. Jayaboard, t=12mm, motif grid
###

###
###
###
###
###
###
###
###
###
###
###
ex.Jayaboard atau setara
ex.Jayaboard atau setara
ex.Jayaboard atau setara
ex.Jayaboard atau setara
ex.Jayaboard atau setara
###
ex.Jayaboard atau setara, panjang 3.6 m
ex.Jayaboard atau setara, panjang 4.8 m
ex.Jayaboard atau setara, panjang 4.8 m
ex.Jayaboard atau setara, panjang 3 m
ex.Jayaboard atau setara
ex.Jayaboard atau setara, panjang 3.6 m
###
ex.Jayaboard atau setara, panjang 60 cm
ex.Jayaboard atau setara, panjang 1,2 m
ex.Jayaboard atau setara, panjang 3.6 m
ex.Jayaboard atau setara, panjang 3 m
ex.Jayaboard atau setara
ex.Jayaboard atau setara, panjang 2.4 m
###
ex.lokal, panjang 4m, belum dimeni
ex.lokal, panjang 4m, belum dimeni
ex.lokal, panjang 4m, belum dimeni
ex.lokal, panjang 4m, belum dimeni
ex.lokal, panjang 4m, belum dimeni
ex.lokal, panjang 4m, belum dimeni
ex.lokal, panjang 4m
ex.lokal, panjang 4m
ex.lokal, panjang 4m
ex.lokal, panjang 4m
ex.lokal, panjang 4m
ex.lokal, panjang 4m
ex.lokal, panjang 4m
ex.lokal, panjang 4m
ex.lokal, panjang 4m
###
uk.51x35x10
uk.76x35x10
uk.100x35x10
uk.51x35
uk.76x35
uk.100x35

###

###
###

Ferrari
Ferrari

###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###

###
###
###

###
###
###
###
###
###
###

###
NO HARGA MATERIAL SATUAN HARGA SATUAN
XXIII UPAH PEKERJA :
A Pengukuran :
1 Juru Ukur Org/Hari

2 Pembantu Juru Ukur Org/Hari

B Pembesian :
3 Tukang Besi Konstruksi Org/Hari 80,000
4 Tukang Besi Tulangan Org/Hari 80,000
5 Kepala Tukang Besi Org/Hari 95,000

C Kayu
6 Tukang Kayu Kasar Org/Hari 80,000
7 Tukang Kayu Halus Org/Hari 80,000
8 Kepala Tukang Kayu Org/Hari 95,000

D Tembok / batu
9 Tukang Batu Kasar Org/Hari 80,000
10 Tukang Batu Halus Org/Hari 80,000
11 Kepala Tukang Batu Org/Hari 95,000

E Cat:

12 Tukang Cat Biasa Org/Hari 80,000


13 Tukang Cat Duco Org/Hari 80,000
14 Kepala Tukang Cat Org/Hari 95,000

F Lain-Lain :
15 Pekerja Org/Hari 60,000
16 Kepala Tukang Org/Hari 80,000
17 Tukang Gali Org/Hari 75,000

18 Mandor Org/Hari 95,000


19 Penjaga Malam Org/Hari 121,000
20 Pengemudi Org/Hari 135,828
21 Operator Org/Hari 155,232
22 Pembantu Operator Org/Hari 121,968
23 Operator Alat Berat Org/Hari 155,232
24 Mekanik Org/Hari 152,888
25 Pembantu Operator Org/Hari 121,968
26 Operator Alat Berat Org/Hari 152,888
27 Mekanik Org/Hari 152,888
18,000 btg
28,000 btg
38,000 btg
46,500 btg
56,000 btg
69,000 btg
80,000 btg
95,000 btg
112,000 btg
156,000 btg

120,000.00

173,000 btg
135,000.00
KETERANGAN

(Plafond , Kuda/Gording, R.Atap)


(Kusen)

Tukang Batu Kasar


Tukang Batu Halus (Bata,Plester,Acian list2)
1.PEKERJAAN PERSIAPAN
m2 Pagar Sementara Seng Gelombang (T=2M) (RSNI: T-12-2002-6.2)
1 Dolken dia 5 s/d 7 cm p. 4 m 1.250 btg Rp 13,144 Rp 16,430
2 Semen PC (50 Kg) 2.500 zak Rp 63,500 Rp 158,750
3 Seng Gelombang BJLS 0,3 1.200 lbr Rp 100,100 Rp 120,120
4 Pasir Beton 0.005 m3 Rp 145,000 Rp 725
5 Batu Split Pecah Mesin 2/3 0.009 m3 Rp 145,000 Rp 1,305
6 Kaso kelas III 0.072 m3 Rp 2,387,000 Rp 171,864
1.1
7 Paku 1 s/d 3 cm 0.060 kg Rp 20,020 Rp 1,201
8 Cat Dasar / meni besi 0.450 Kg Rp 28,336 Rp 12,751
a Tukang Kayu Halus 0.200 Org/Hari Rp 80,000 Rp 16,000
b Pekerja 0.400 Org/Hari Rp 60,000 Rp 24,000
c Kepala Tukang 0.020 Org/Hari Rp 80,000 Rp 1,600
d Mandor 0.020 Org/Hari Rp 95,000 Rp 1,900
JUMLAH Rp 526,646
m' Pengukuran & Pemasangan Bowplank (RSNI: T-12-2002-6.4)
1 Kaso kelas III 0.012 m3 Rp 2,387,000 Rp 28,644
2 Paku 4 s/d 7 cm 0.020 kg Rp 36,000 Rp 720
3 Balok kelas III 0.007 m3 Rp 2,387,000 Rp 16,709
1.2 a Tukang Kayu Kasar 0.100 Org/Hari Rp 80,000 Rp 8,000
b Pekerja 0.100 Org/Hari Rp 60,000 Rp 6,000
c Kepala Tukang 0.010 Org/Hari Rp 80,000 Rp 800
d Mandor 0.005 Org/Hari Rp 95,000 Rp 475
JUMLAH Rp 61,348
m2 Pembuatan Kantor Proyek Sementara (RSNI: T-12-2002-6.5)
1 Dolken dia 5 s/d 7 cm p. 4 m 1.250 btg Rp 13,144 Rp 16,430
2 Kayu Kuat klas III 0.180 m3 Rp 2,335,667 Rp 420,420
3 Paku 8 s/d 12 cm 0.850 kg Rp 36,000 Rp 30,600
4 Besi Plat rata2 1 s/d 5 mm 1.100 Kg Rp 19,717 Rp 21,689
5 Semen PC (50 Kg) 0.700 zak Rp 63,500 Rp 44,450
6 Pasir Pasang 0.150 m3 Rp 135,000 Rp 20,250
7 Pasir Beton 0.100 m3 Rp 145,000 Rp 14,500
8 Batu Split Pecah Mesin 2/3 0.150 m3 Rp 145,000 Rp 21,750
9 Bata Merah 30.000 bh Rp 600 Rp 18,000
1.3
10 Seng Plat BJLS 0,30 0.250 m' Rp 84,700 Rp 21,175
11 Kaca nako polos 5 mm 0.200 daun Rp 215,000 Rp 43,000
12 Kaca Polos 5 mm 0.080 m2 Rp 95,000 Rp 7,600
13 Triplex t. 4 mm 0.150 lbr Rp 54,000 Rp 8,100
14 Handel + Kunci bulat 0.060 bh Rp 125,000 Rp 7,500
a Tukang Kayu Kasar 2.000 Org/Hari Rp 80,000 Rp 160,000
b Pekerja 1.000 Org/Hari Rp 60,000 Rp 60,000
c Kepala Tukang 0.300 Org/Hari Rp 80,000 Rp 24,000
d Mandor 0.050 Org/Hari Rp 95,000 Rp 4,750
JUMLAH Rp 944,214
m2 Pembuatan Gudang Poyek (Los Kerja)
1 Dolken dia 5 s/d 7 cm p. 4 m 1.700 btg Rp 13,144 Rp 22,345
2 Kayu Kuat klas III 0.210 m3 Rp 2,335,667 Rp 490,490
3 Paku 8 s/d 12 cm 0.300 kg Rp 36,000 Rp 10,800
4 Semen PC (50 Kg) 0.210 zak Rp 63,500 Rp 13,335
5 Pasir Pasang 0.030 m3 Rp 135,000 Rp 4,050
1.4 6 Pasir Beton 0.050 m3 Rp 145,000 Rp 7,250
7 Seng Gelombang BJLS 0,3 1.500 lbr Rp 100,100 Rp 150,150
a Tukang Kayu Kasar 2.000 Org/Hari Rp 80,000 Rp 160,000
b Pekerja 1.000 Org/Hari Rp 60,000 Rp 60,000
c Kepala Tukang 0.200 Org/Hari Rp 80,000 Rp 16,000
d Mandor 0.050 Org/Hari Rp 95,000 Rp 4,750
JUMLAH Rp 939,170

Nike Naluri (1106587) 229


m2 Membersihkan Lokasi Proyek
a Pekerja 0.100 Org/Hari Rp 60,000 Rp 6,000
1.5
b Mandor 0.005 Org/Hari Rp 95,000 Rp 475
JUMLAH Rp 6,475
2.PEKERJAAN TANAH
m3 Galian Tanah Sedalam <1m (SNI:2835:2008-6.1)
a Pekerja 0.750 Org/Hari Rp 60,000 Rp 45,000
2.1
b Mandor 0.025 Org/Hari Rp 95,000 Rp 2,375
JUMLAH Rp 47,375
m3 Galian Tanah Sedalam 3m (SNI:2835:2008-6.3)
a Pekerja 1.050 Org/Hari Rp 60,000 Rp 63,000
2.2
b Mandor 0.067 Org/Hari Rp 95,000 Rp 6,365
JUMLAH Rp 69,365
m3 Urugan Tanah (SNI:2835:2008-6.10)
a Pekerja 0.250 Org/Hari Rp 60,000 Rp 15,000
2.3
b Mandor 0.025 Org/Hari Rp 95,000 Rp 2,375
JUMLAH Rp 17,375
3.PEKERJAAN PONDASI
m3 Pasang Pondasi BT Kali (SNI:2836:2008-6.9)
1 Batu kali 1.200 bh Rp 227,500 Rp 273,000
2 Pasir Urug 0.432 m3 Rp 100,000 Rp 43,200
a Pekerja 0.780 Org/Hari Rp 60,000 Rp 46,800
3.1.1.5
b Tukang Batu Kasar 0.390 Org/Hari Rp 80,000 Rp 31,200
c Kepala Tukang 0.039 Org/Hari Rp 80,000 Rp 3,120
d Mandor 0.039 Org/Hari Rp 95,000 Rp 3,705
JUMLAH Rp 401,025
m3 Adukan Beton Untuk Pondasi 1Pc : 2 Ps : 3 Kr
a Semen PC (50 Kg) 6.72 zak Rp 63,500 Rp 426,720
b Pasir Beton 0.54 m3 Rp 145,000 Rp 78,300
3.1.1.2 c Batu Split Pecah Mesin 1/2 0.81 m3 Rp 145,000 Rp 117,450
d Pekerja 2.00 Org/Hari Rp 60,000 Rp 120,000
e Tukang Batu Kasar 0.35 Org/Hari Rp 80,000 Rp 28,000
JUMLAH Rp 770,470
1 KG Penulangan Beton Pondasi
a Besi Beton rata-rata 1.05 Kg Rp 1,721 Rp 1,807
b Kawat Beton Hitam 0.02 kg Rp 27,000 Rp 540
3.1.1.3
c Pekerja 0.01 Org/Hari Rp 60,000 Rp 600
d Tukang Batu Kasar 0.01 Org/Hari Rp 80,000 Rp 800
JUMLAH Rp 3,747
m2 Pekerjaan Bekisting untuk Pondasi
a Kayu Kuat klas III 0.04 m3 Rp 2,335,667 Rp 93,427
b Paku 4 s/d 7 cm 0.30 kg Rp 36,000 Rp 10,800
3.1.1.4 c Minyak Pelumas 0.10 Ltr Rp 35,000 Rp 3,500
d Pekerja 0.30 Org/Hari Rp 60,000 Rp 18,000
e Tukang Kayu Kasar 0.26 Org/Hari Rp 80,000 Rp 20,800
JUMLAH Rp 146,527
m3 Urugan Pasir (SNI:2835:2008-6.11)
1 Pasir Urug 1.050 m3 Rp 100,000 Rp 105,000
3.2.2 a Pekerja 0.300 Org/Hari Rp 60,000 Rp 18,000
b Mandor 0.010 Org/Hari Rp 95,000 Rp 950
JUMLAH Rp 123,950
m2 Pasangan Bata Merah 1Bt (1 pc : 6 Ps) (SNI:6897:2008-6.5)
1 Bata Merah 140.0000 bh Rp 600 Rp 84,000
2 Semen PC (50 Kg) 0.3700 zak Rp 63,500 Rp 23,495
3 Pasir Pasang 0.1220 m3 Rp 135,000 Rp 16,470
3.2.1 a Pekerja 0.6000 Org/Hari Rp 60,000 Rp 36,000
b Tukang Batu Kasar 0.2000 Org/Hari Rp 80,000 Rp 16,000

Nike Naluri (1106587) 230


3.2.1

c Kepala Tukang 0.0200 Org/Hari Rp 80,000 Rp 1,600


d Mandor 0.0300 Org/Hari Rp 95,000 Rp 2,850
JUMLAH Rp 180,415
4.PEKERJAAN BETON STRUKTUR & NON STR
m3 Pembuatan Beton Struktur (1 Pc : 2 Ps : 3 Split)
1 Semen PC (50 Kg) 6.72 zak Rp 63,500 Rp 426,720
2 Agregat kasar 0.54 m3 Rp 254,800 Rp 137,592
4.1.1 3 Batu Split Pecah Mesin 2/3 0.81 m3 Rp 145,000 Rp 117,450
a Pekerja 2.00 Org/Hari Rp 60,000 Rp 120,000
b Tukang Batu Kasar 0.35 Org/Hari Rp 80,000 Rp 28,000
JUMLAH Rp 829,762
1kg Penulangan Beton Pembesian Besi dia. 8mm
1 Besi beton Ø8 1.0500 Kg Rp 14,531 Rp 15,258
b Kawat Beton Hitam 0.0150 kg Rp 27,000 Rp 405
a Pekerja 0.0070 Org/Hari Rp 60,000 Rp 420
4.1.2.1
b Tukang Batu Kasar 0.0070 Org/Hari Rp 80,000 Rp 560
c Kepala Tukang 0.0007 Org/Hari Rp 80,000 Rp 56
d Mandor 0.0004 Org/Hari Rp 95,000 Rp 38
JUMLAH Rp 16,737
1kg Penulangan Beton Pembesian Besi dia. 10mm
1 Besi beton Ø10 1.0500 Kg Rp 9,324 Rp 9,791
b Kawat Beton Hitam 0.0150 kg Rp 27,000 Rp 405
a Pekerja 0.0070 Org/Hari Rp 60,000 Rp 420
4.1.2.2
b Tukang Batu Kasar 0.0070 Org/Hari Rp 80,000 Rp 560
c Kepala Tukang 0.0007 Org/Hari Rp 80,000 Rp 56
d Mandor 0.0004 Org/Hari Rp 95,000 Rp 38
JUMLAH Rp 11,270
1kg Penulangan Beton Pembesian Besi dia. 12mm
1 Besi beton Ø12 1.0500 Kg Rp 8,912 Rp 9,357
b Kawat Beton Hitam 0.0150 kg Rp 27,000 Rp 405
a Pekerja 0.0070 Org/Hari Rp 60,000 Rp 420
4.1.2.3
b Tukang Batu Kasar 0.0070 Org/Hari Rp 80,000 Rp 560
c Kepala Tukang 0.0007 Org/Hari Rp 80,000 Rp 56
d Mandor 0.0004 Org/Hari Rp 95,000 Rp 38
JUMLAH Rp 10,836
1kg Penulangan Beton Pembesian Besi dia. 13mm
1 Besi beton Ø13 1.0500 Kg Rp 8,974 Rp 9,423
b Kawat Beton Hitam 0.0150 kg Rp 27,000 Rp 405
a Pekerja 0.0070 Org/Hari Rp 60,000 Rp 420
4.4.2.4
b Tukang Batu Kasar 0.0070 Org/Hari Rp 80,000 Rp 560
c Kepala Tukang 0.0007 Org/Hari Rp 80,000 Rp 56
d Mandor 0.0004 Org/Hari Rp 95,000 Rp 38
JUMLAH Rp 10,902
1kg Penulangan Beton Pembesian Besi Ulir D 13
1 Besi Beton rata-rata 1.0500 Kg Rp 1,721 Rp 1,807
b Kawat Beton Hitam 0.0150 kg Rp 27,000 Rp 405
a Pekerja 0.0070 Org/Hari Rp 60,000 Rp 420
4.2.2.4
b Tukang Batu Kasar 0.0070 Org/Hari Rp 80,000 Rp 560
c Kepala Tukang 0.0007 Org/Hari Rp 80,000 Rp 56
d Mandor 0.0004 Org/Hari Rp 95,000 Rp 38
JUMLAH Rp 3,286
m1 Pekerjaan Kolom Praktis Beton (13x13cm) (SNI:7394:2008-6.35)
1 Kayu Kuat klas III 0.0020 m3 Rp 2,335,667 Rp 4,671
2 Paku 8 s/d 12 cm 0.0100 kg Rp 36,000 Rp 360
3 Besi Beton rata-rata 3.0000 Kg Rp 1,721 Rp 5,163
4 Kawat Beton Hitam 0.0450 kg Rp 27,000 Rp 1,215
5 Semen PC (50 Kg) 0.0800 zak Rp 63,500 Rp 5,080

4.1.3
Nike Naluri (1106587) 231
6 Pasir Beton 0.0050 m3 Rp 145,000 Rp 725
4.1.3 7 Batu Split Pecah Mesin 2/3 0.0060 m3 Rp 145,000 Rp 870
a Pekerja 0.1800 Org/Hari Rp 60,000 Rp 10,800
b Tukang Batu Kasar 0.0200 Org/Hari Rp 80,000 Rp 1,600
c Tukang Kayu Kasar 0.0200 Org/Hari Rp 80,000 Rp 1,600
d Tukang Besi Tulangan 0.0200 Org/Hari Rp 80,000 Rp 1,600
e Kepala Tukang 0.0060 Org/Hari Rp 80,000 Rp 480
f Mandor 0.0090 Org/Hari Rp 95,000 Rp 855
JUMLAH Rp 35,019
m2 Pembuatan Bekisiting untuk Kolom (SNI:7394:2008-6.22)
1 Kayu Kuat klas III 0.0400 m3 Rp 2,335,667 Rp 93,427
2 Paku 8 s/d 12 cm 0.4000 kg Rp 36,000 Rp 14,400
3 Minyak Pelumas 0.2000 Ltr Rp 35,000 Rp 7,000
4 Kayu Kuat klas II 0.0150 m3 Rp 9,500,000 Rp 142,500
5 Multiplex t. 9 mm 0.3500 lbr Rp 100,000 Rp 35,000
4.1.4
6 Dolken dia 8 s/d 10 cm p. 4 m 2.0000 btg Rp 15,000 Rp 30,000
a Pekerja 0.6600 Org/Hari Rp 60,000 Rp 39,600
b Tukang Batu Kasar 0.3300 Org/Hari Rp 80,000 Rp 26,400
c Kepala Tukang 0.0330 Org/Hari Rp 80,000 Rp 2,640
d Mandor 0.0330 Org/Hari Rp 95,000 Rp 3,135
JUMLAH Rp 394,102
m2 Pembuatan Bekisiting untuk Balok (SNI:7394:2008-6.23)
1 Kayu Kuat klas III 0.0400 m3 Rp 2,335,667 Rp 93,427
2 Paku 8 s/d 12 cm 0.4000 kg Rp 36,000 Rp 14,400
3 Minyak Pelumas 0.2000 Ltr Rp 35,000 Rp 7,000
4 Kayu Kuat klas II 0.0180 m3 Rp 9,500,000 Rp 171,000
5 Multiplex t. 9 mm 0.3500 lbr Rp 100,000 Rp 35,000
4.2.3
6 Dolken dia 8 s/d 10 cm p. 4 m 2.0000 btg Rp 15,000 Rp 30,000
a Pekerja 0.6600 Org/Hari
Rp 60,000 Rp 39,600
b Tukang Batu Kasar 0.3300 Org/Hari
Rp 80,000 Rp 26,400
c Kepala Tukang 0.0330 Org/Hari
Rp 80,000 Rp 2,640
d Mandor 0.0330 Org/Hari
Rp 95,000 Rp 3,135
JUMLAH Rp 422,602
m3 Pekerjaan Sloof Beton (Besi 200kg + bekisting) (SNI:7394:2008-6.29)
1 Kayu Kuat klas III 0.2700 m3 Rp 2,335,667 Rp 630,630
2 Paku 8 s/d 12 cm 2.0000 kg Rp 36,000 Rp 72,000
3 Minyak Pelumas 0.6000 Ltr Rp 35,000 Rp 21,000
4 Besi Beton rata-rata 210 Kg Rp 1,721 Rp 361,397
5 Kawat Beton Hitam 3.0000 kg Rp 27,000 Rp 81,000
6 Semen PC (50 Kg) 6.7200 zak Rp 63,500 Rp 426,720
7 Pasir Beton 0.5400 m3 Rp 145,000 Rp 78,300
4.3.3
8 Batu Split Pecah Mesin 2/3 0.8100 m3 Rp 145,000 Rp 117,450
a Pekerja 0.5650 Org/Hari Rp 60,000 Rp 33,900
b Tukang Batu Kasar 0.2750 Org/Hari Rp 80,000 Rp 22,000
c Tukang Kayu Kasar 1.5600 Org/Hari Rp 80,000 Rp 124,800
d Tukang Besi Tulangan 1.4000 Org/Hari Rp 80,000 Rp 112,000
e Kepala Tukang 0.3230 Org/Hari Rp 80,000 Rp 25,840
f Mandor 0.2830 Org/Hari Rp 95,000 Rp 26,885
JUMLAH Rp 2,133,922
m2 Pembuatan Bekisiting untuk Tangga (SNI:7394:2008-6.26)
1 Kayu Kuat klas III 0.0300 m3 Rp 2,335,667 Rp 70,070
2 Paku 8 s/d 12 cm 0.4000 kg Rp 36,000 Rp 14,400
3 Minyak Pelumas 0.1500 Ltr Rp 35,000 Rp 5,250
4 Kayu Kuat klas II 0.0150 m3 Rp 9,500,000 Rp 142,500
5 Multiplex t. 9 mm 0.3500 lbr Rp 100,000 Rp 35,000
4.4.3
6 Dolken dia 8 s/d 10 cm p. 4 m 2.0000 btg Rp 15,000 Rp 30,000
a Pekerja 0.6600 Org/Hari Rp 60,000 Rp 39,600

Nike Naluri (1106587) 232


4.4.3

b Tukang Batu Kasar 0.3300 Org/Hari Rp 80,000 Rp 26,400


c Kepala Tukang 0.0330 Org/Hari Rp 80,000 Rp 2,640
d Mandor 0.0330 Org/Hari Rp 95,000 Rp 3,135
JUMLAH Rp 368,995
m2 Pembuatan Bekisiting untuk Plat Lantai (SNI:7394:2008-6.24)
1 Kayu Kuat klas III 0.0400 m3 Rp 2,335,667 Rp 93,427
2 Paku 8 s/d 12 cm 0.4000 kg Rp 36,000 Rp 14,400
3 Minyak Pelumas 0.2000 Ltr Rp 35,000 Rp 7,000
4 Kayu Kuat klas II 0.0150 m3 Rp 9,500,000 Rp 142,500
5 Multiplex t. 9 mm 0.3500 lbr Rp 100,000 Rp 35,000
4.4.4 6 Dolken dia 8 s/d 10 cm p. 4 m 6.0000 btg Rp 15,000 Rp 90,000
a Pekerja 0.6600 Org/Hari Rp 60,000 Rp 39,600
b Tukang Batu Kasar 0.3300 Org/Hari Rp 80,000 Rp 26,400
c Kepala Tukang 0.0330 Org/Hari Rp 80,000 Rp 2,640
d Mandor 0.0330 Org/Hari Rp 95,000 Rp 3,135
JUMLAH Rp 454,102
5.PEKERJAAN DINDING
m2 Pasangan Bata Merah 1/2 Bt (1 pc : 4 Ps) (SNI:6897:2008-6.9)
1 Bata Merah 70.0000 bh Rp 600 Rp 42,000
2 Semen PC (50 Kg) 0.2300 zak Rp 63,500 Rp 14,605
3 Pasir Pasang 0.0430 m3 Rp 135,000 Rp 5,805
5.1 a Pekerja 0.3000 Org/Hari Rp 60,000 Rp 18,000
b Tukang Batu Kasar 0.1000 Org/Hari Rp 80,000 Rp 8,000
c Kepala Tukang 0.0100 Org/Hari Rp 80,000 Rp 800
d Mandor 0.0150 Org/Hari Rp 95,000 Rp 1,425
JUMLAH Rp 90,635
m2 Plesteran tebal= 2cm (1 pc : 3 Ps) (SNI:2837:2008-6.14)
1 Semen PC (50 Kg) 0.2074 zak Rp 63,500 Rp 13,167
2 Pasir Pasang 0.0310 m3 Rp 135,000 Rp 4,185
a Pekerja 0.4000 Org/Hari Rp 60,000 Rp 24,000
5.2
b Tukang Batu Kasar 0.2000 Org/Hari Rp 80,000 Rp 16,000
c Kepala Tukang 0.0200 Org/Hari Rp 80,000 Rp 1,600
d Mandor 0.0220 Org/Hari Rp 95,000 Rp 2,090
JUMLAH Rp 61,042
m2 Acian (SNI:2837:2008-6.27)
1 Semen PC (50 Kg) 0.0650 zak Rp 63,500 Rp 4,128
a Pekerja 0.2000 Org/Hari Rp 60,000 Rp 12,000
5.3 b Tukang Batu Kasar 0.1000 Org/Hari Rp 80,000 Rp 8,000
c Kepala Tukang 0.0100 Org/Hari Rp 80,000 Rp 800
d Mandor 0.1000 Org/Hari Rp 95,000 Rp 9,500
JUMLAH Rp 34,428
m2 Dinding Keramik (SNI:7395:2008-6.54)
1 Keramik Dinding 20/20 cm Polished 1.06 m2 Rp 87,000 Rp 92,220
2 Semen PC (50 Kg) 0.186 zak Rp 63,500 Rp 11,811
3 Pasir Pasang 0.018 m3 Rp 135,000 Rp 2,430
4 Semen Warna 1.94 kg Rp 12,500 Rp 24,250
5.4
a Pekerja 0.6 Org/Hari Rp 60,000 Rp 36,000
b Tukang Batu Kasar 0.45 Org/Hari Rp 80,000 Rp 36,000
c Kepala Tukang 0.045 Org/Hari Rp 80,000 Rp 3,600
d Mandor 0.035 Org/Hari Rp 95,000 Rp 3,325
JUMLAH Rp 209,636
m2 Pasangan Bata Roster (1 pc : 3 Ps) u.12x11x24 cm (SNI:6897:2008-6.22)
1 Bata Roster 30.0000 bh Rp 3,000 Rp 90,000
2 Semen PC (50 Kg) 0.2800 zak Rp 63,500 Rp 17,780
3 Pasir Pasang 0.0320 m3 Rp 135,000 Rp 4,320
5.5 a Pekerja 0.3000 Org/Hari Rp 60,000 Rp 18,000
b Tukang Batu Kasar 0.1000 Org/Hari Rp 80,000 Rp 8,000

Nike Naluri (1106587) 233


5.5

c Kepala Tukang 0.0100 Org/Hari Rp 80,000 Rp 800


d Mandor 0.0150 Org/Hari Rp 95,000 Rp 1,425
JUMLAH Rp 140,325
6.PEKERJAAN LANTAI
m2 Lantai Keramik (uk. = 20x20 cm) (SNI:7395:2008-6.36)
1 Keramik Lantai 20/20 cm Polished 1.0600 m2 Rp 87,000 Rp 92,220
2 Semen PC (50 Kg) 0.2080 zak Rp 63,500 Rp 13,208
3 Pasir Pasang 0.0450 m3 Rp 135,000 Rp 6,075
4 Semen Warna 1.5000 kg Rp 12,500 Rp 18,750
6.1.1
a Pekerja 0.7000 Org/Hari Rp 60,000 Rp 42,000
b Tukang Batu Kasar 0.3500 Org/Hari Rp 80,000 Rp 28,000
c Kepala Tukang 0.0350 Org/Hari Rp 80,000 Rp 2,800
d Mandor 0.0350 Org/Hari Rp 95,000 Rp 3,325
JUMLAH Rp 206,378
m2 Lantai Keramik (uk. = 30x30 cm)
1 Keramik Lantai 30/30 cm Polished 1.0683 m2 Rp 87,000 Rp 92,942
2 Semen PC (50 Kg) 0.2000 zak Rp 63,500 Rp 12,700
3 Pasir Pasang 0.0450 m3 Rp 135,000 Rp 6,075
4 Semen Warna 1.5000 kg Rp 12,500 Rp 18,750
6.1.2
a Pekerja 0.7000 Org/Hari Rp 60,000 Rp 42,000
b Tukang Batu Kasar 0.3500 Org/Hari Rp 80,000 Rp 28,000
c Kepala Tukang 0.0350 Org/Hari Rp 80,000 Rp 2,800
d Mandor 0.0350 Org/Hari Rp 95,000 Rp 3,325
JUMLAH Rp 206,592
m2 Lantai Keramik (uk. = 33x33 cm) (SNI:7395:2008-6.34)
1 Keramik Lantai 33/33 cm Polished 1.0890 m2 Rp 87,000 Rp 94,743
2 Semen PC (50 Kg) 0.1638 zak Rp 63,500 Rp 10,401
3 Pasir Pasang 0.0450 m3 Rp 135,000 Rp 6,075
4 Semen Warna 1.5000 kg Rp 12,500 Rp 18,750
6.1.3
a Pekerja 0.7000 Org/Hari Rp 60,000 Rp 42,000
b Tukang Batu Kasar 0.3500 Org/Hari Rp 80,000 Rp 28,000
c Kepala Tukang 0.0350 Org/Hari Rp 80,000 Rp 2,800
d Mandor 0.0350 Org/Hari Rp 95,000 Rp 3,325
JUMLAH Rp 206,094
m2 Lantai Keramik (uk. = 50x50 cm) (dihitung)
1 Keramik Lantai 50/50 cm Polished 1.1050 m2 Rp 123,500 Rp 136,468
2 Semen PC (50 Kg) 0.1940 zak Rp 63,500 Rp 12,319
3 Pasir Pasang 0.0450 m3 Rp 135,000 Rp 6,075
4 Semen Warna 1.5000 kg Rp 12,500 Rp 18,750
6.1.4
a Pekerja 0.7000 Org/Hari Rp 60,000 Rp 42,000
b Tukang Batu Kasar 0.3500 Org/Hari Rp 80,000 Rp 28,000
c Kepala Tukang 0.0350 Org/Hari Rp 80,000 Rp 2,800
d Mandor 0.0350 Org/Hari Rp 95,000 Rp 3,325
JUMLAH Rp 249,737
m1 Plint Lantai Keramik (uk. = 10x20 cm) (SNI:7395:2008-6.39)
1 Keramik Lantai 20/20 cm Polished 0.1060 m2 Rp 87,000 Rp 9,222
2 Semen PC (50 Kg) 0.0228 zak Rp 63,500 Rp 1,448
3 Pasir Pasang 0.0030 m3 Rp 135,000 Rp 405
4 Semen Warna 0.0250 kg Rp 12,500 Rp 313
6.2.1
a Pekerja 0.0900 Org/Hari Rp 60,000 Rp 5,400
b Tukang Batu Kasar 0.0900 Org/Hari Rp 80,000 Rp 7,200
c Kepala Tukang 0.0090 Org/Hari Rp 80,000 Rp 720
d Mandor 0.0050 Org/Hari Rp 95,000 Rp 475
JUMLAH Rp 25,182
m1 Plint Lantai Keramik (uk. = 10x30 cm) (dihitung)
1 Keramik Lantai 30/30 cm Polished 0.1050 m2 Rp 87,000 Rp 9,135
2 Semen PC (50 Kg) 0.0228 zak Rp 63,500 Rp 1,448

6.2.2
Nike Naluri (1106587) 234
3 Pasir Pasang 0.0030 m3 Rp 135,000 Rp 405
4 Semen Warna 0.0250 kg Rp 12,500 Rp 313
6.2.2
a Pekerja 0.0900 Org/Hari Rp 60,000 Rp 5,400
b Tukang Batu Kasar 0.0900 Org/Hari Rp 80,000 Rp 7,200
c Kepala Tukang 0.0090 Org/Hari Rp 80,000 Rp 720
d Mandor 0.0050 Org/Hari Rp 95,000 Rp 475
JUMLAH Rp 25,095
m1 Plint Lantai Keramik (uk. = 10x33 cm) (dihitung)
1 Keramik Lantai 33/33 cm Polished 0.1056 m2 Rp 87,000 Rp 9,187
2 Semen PC (50 Kg) 0.0228 zak Rp 63,500 Rp 1,448
3 Pasir Pasang 0.0030 m3 Rp 135,000 Rp 405
4 Semen Warna 0.0250 kg Rp 12,500 Rp 313
6.2.3
a Pekerja 0.0900 Org/Hari Rp 60,000 Rp 5,400
b Tukang Batu Kasar 0.0900 Org/Hari Rp 80,000 Rp 7,200
c Kepala Tukang 0.0090 Org/Hari Rp 80,000 Rp 720
d Mandor 0.0050 Org/Hari Rp 95,000 Rp 475
JUMLAH Rp 25,148
m1 Plint Lantai Keramik (uk. = 10x50 cm) (dihitung)
1 Keramik Lantai 50/50 cm Polished 0.1050 m2 Rp 123,500 Rp 12,968
2 Semen PC (50 Kg) 0.0228 zak Rp 63,500 Rp 1,448
3 Pasir Pasang 0.0030 m3 Rp 135,000 Rp 405
4 Semen Warna 0.0250 kg Rp 12,500 Rp 313
6.2.4
a Pekerja 0.0900 Org/Hari Rp 60,000 Rp 5,400
b Tukang Batu Kasar 0.0900 Org/Hari Rp 80,000 Rp 7,200
c Kepala Tukang 0.0090 Org/Hari Rp 80,000 Rp 720
d Mandor 0.0050 Org/Hari Rp 95,000 Rp 475
JUMLAH Rp 28,928
m2 Lantai Kayu Gymfloor (SNI:2837:2008-6.47)
1 Lantai Parquette 1.0500 m2 Rp 176,000 Rp 184,800
2 Lem Kayu 0.6000 Kg Rp 62,500 Rp 37,500
a Pekerja 0.7000 Org/Hari Rp 60,000 Rp 42,000
6.1.5
b Tukang Batu Kasar 0.3500 Org/Hari Rp 80,000 Rp 28,000
c Kepala Tukang 0.0350 Org/Hari Rp 80,000 Rp 2,800
d Mandor 0.0350 Org/Hari Rp 95,000 Rp 3,325
JUMLAH Rp 298,425
m1 Plint Lantai Kayu (tinggi =10 cm, tebal =0.9 – 1,2 cm) (SNI:2837:2008-6.63)
1 Kayu Kuat klas II 0.0013 m3 Rp 9,500,000 Rp 11,970
2 Paku 1 s/d 3 cm 0.0500 kg Rp 20,020 Rp 1,001
a Pekerja 0.1200 Org/Hari Rp 60,000 Rp 7,200
6.2.5
b Tukang Batu Kasar 0.1200 Org/Hari Rp 80,000 Rp 9,600
c Kepala Tukang 0.0120 Org/Hari Rp 80,000 Rp 960
d Mandor 0.0060 Org/Hari Rp 95,000 Rp 570
JUMLAH Rp 31,301
7.PEKERJAAN KUSEN, PINTU & JENDELA
m3 Membuat & memasang kusen pintu & jendela Kayu kelas II (SNI:3434:2008-6.2)
1 Kayu Kuat klas II 1.2000 m3 Rp 9,500,000 Rp 11,400,000
2 Paku 8 s/d 12 cm 1.2500 kg Rp 36,000 Rp 45,000
3 Lem Kayu 1.0000 Kg Rp 62,500 Rp 62,500
7.1.1 a Pekerja 6.0000 Org/Hari Rp 60,000 Rp 360,000
b Tukang Kayu Halus 18.0000 Org/Hari Rp 80,000 Rp 1,440,000
c Kepala Tukang 1.8000 Org/Hari Rp 80,000 Rp 144,000
d Mandor 0.3000 Org/Hari Rp 95,000 Rp 28,500
JUMLAH Rp 13,480,000
m2 Membuat & memasang daun pintu dan jendela Klamp Kayu kelas II (SNI:3434:2008-6.3)
1 Kayu Kuat klas II 0.0400 m3 Rp 9,500,000 Rp 380,000
2 Paku 4 s/d 7 cm 0.0500 kg Rp 36,000 Rp 1,800
a Pekerja 0.3500 Org/Hari Rp 60,000 Rp 21,000
7.1.2

Nike Naluri (1106587) 235


7.1.2
b Tukang Kayu Halus 1.0500 Org/Hari Rp 80,000 Rp 84,000
c Kepala Tukang 0.1050 Org/Hari Rp 80,000 Rp 8,400
d Mandor 0.0180 Org/Hari Rp 95,000 Rp 1,710
JUMLAH Rp 496,910
m2 Membuat & memasang Teakwood rangkap, rangka expose Kayu kelas I (SNI:3434:2008-6.11)
1 Kayu Kuat klas II 0.0250 m3 Rp 9,500,000 Rp 237,500
2 Paku 1 s/d 3 cm 0.0300 kg Rp 20,020 Rp 601
3 Lem Kayu 0.3000 Kg Rp 62,500 Rp 18,750
4 Teakwood t. 6 mm 1.0000 lbr Rp 60,000 Rp 60,000
7.1.3
a Pekerja 0.8000 Org/Hari Rp 60,000 Rp 48,000
b Tukang Kayu Halus 2.4000 Org/Hari Rp 80,000 Rp 192,000
c Kepala Tukang 0.2400 Org/Hari Rp 80,000 Rp 19,200
d Mandor 0.0400 Org/Hari Rp 95,000 Rp 3,800
JUMLAH Rp 579,851
m2 Membuat rangka pintu besi Square Tube (SNI:7393:2008-6.6)
1 Besi Square Tube 0.4000 Kg Rp 20,001 Rp 8,000
2 Besi List Kaca 0.3000 Kg Rp 20,002 Rp 6,001
3 Pengelasan 0.0400 cm Rp 40 Rp 2
7.1.7 a Pekerja 0.0400 Org/Hari Rp 60,000 Rp 2,400
b Tukang Kayu Halus 0.0200 Org/Hari Rp 80,000 Rp 1,600
c Kepala Tukang 0.0020 Org/Hari Rp 80,000 Rp 160
d Mandor 0.0020 Org/Hari Rp 95,000 Rp 190
JUMLAH Rp 18,353
m2 Pengadaan dan pemasangan pintu rolling door besi (SNI:7393:2008-6.7)
1 Rolling door Plat Besi 1.0000 m2 Rp 1,300,000 Rp 1,300,000
a Pekerja 1.2000 Org/Hari Rp 60,000 Rp 72,000
7.3.1 b Tukang Kayu Halus 1.2000 Org/Hari Rp 80,000 Rp 96,000
c Kepala Tukang 0.1200 Org/Hari Rp 80,000 Rp 9,600
d Mandor 0.0060 Org/Hari Rp 95,000 Rp 570
JUMLAH Rp 1,478,170
m2 Pengadaan dan pemasangan kusen pintu dan jendela alumunium (SNI:7393:2008-6.11)
1 Kusen Alm. 4" CA 1.1000 m' Rp 175,000 Rp 192,500
2 Skrup 2.0000 bh Rp 334 Rp 667
3 Sealant clear neutral (300 ml) 0.0600 tb Rp 35,000 Rp 2,100
7.1.4 a Pekerja 0.0430 Org/Hari Rp 60,000 Rp 2,580
b Tukang Kayu Halus 0.0430 Org/Hari Rp 80,000 Rp 3,440
c Kepala Tukang 0.0043 Org/Hari Rp 80,000 Rp 344
d Mandor 0.0021 Org/Hari Rp 95,000 Rp 200
JUMLAH Rp 201,831
m2 Pengadaan dan pemasangan daun pintu dan jendela alumunium strip (SNI:7393:2008-6.12)
1 Kusen Alm. 4" CA 4.4000 m' Rp 175,000 Rp 770,000
2 Alumunium Strip 14.6000 m' Rp 45,500 Rp 664,300
a Pekerja 0.0850 Org/Hari Rp 60,000 Rp 5,100
7.1.5
b Tukang Kayu Halus 0.0850 Org/Hari Rp 80,000 Rp 6,800
c Kepala Tukang 0.0085 Org/Hari Rp 80,000 Rp 680
d Mandor 0.0042 Org/Hari Rp 95,000 Rp 399
JUMLAH Rp 1,447,279
m2 Pengadaan dan pemasangan daun pintu kaca rangka alumunium (SNI:7393:2008-6.13)
1 Kusen Alm. 4" CA 4.4000 m' Rp 175,000 Rp 770,000
2 Kaca Polos 5 mm 4.5000 m2 Rp 95,000 Rp 427,500
3 Sealant clear neutral (300 ml) 0.2700 tb Rp 35,000 Rp 9,450
7.1.6 a Pekerja 0.0850 Org/Hari Rp 60,000 Rp 5,100
b Tukang Kayu Halus 0.0850 Org/Hari Rp 80,000 Rp 6,800
c Kepala Tukang 0.0090 Org/Hari Rp 80,000 Rp 720
d Mandor 0.0050 Org/Hari Rp 95,000 Rp 475
JUMLAH Rp 1,220,045
Bh Pengadaan dan Pemasangan Engsel Pintu (SNI 2002) No.2

7.8Naluri (1106587)
Nike 236
1 Engsel 3" 1.0000 bh 22,500 22,500
a Pekerja 0.0150 Org/Hari 60,000 900
7.8 b Tukang Kayu Halus 0.1500 Org/Hari 80,000 12,000
c Kepala Tukang 0.0150 Org/Hari 80,000 1,200
d Mandor 0.0008 Org/Hari 95,000 71
JUMLAH 36,600
Bh Pengadaan dan Pemasangan Engsel Jendela Kupu-kupu (SNI 2002) No.3
1 Engsel 3" 1.0000 bh Rp 22,500 Rp 22,500
a Pekerja 0.0100 Org/Hari Rp 60,000 Rp 600
7.9 b Tukang Kayu Halus 0.1000 Org/Hari Rp 80,000 Rp 8,000
c Kepala Tukang 0.0100 Org/Hari Rp 80,000 Rp 800
d Mandor 0.0005 Org/Hari Rp 95,000 Rp 48
JUMLAH Rp 31,900
Bh Pengadaan dan Pemasangan Kunci Selot (SNI 2002) No.8
1 Slot Besi 1.0000 bh Rp 10,780 Rp 10,780
a Pekerja 0.0200 Org/Hari Rp 60,000 Rp 1,200
7.10 b Tukang Kayu Halus 0.2000 Org/Hari Rp 80,000 Rp 16,000
c Kepala Tukang 0.0200 Org/Hari Rp 80,000 Rp 1,600
d Mandor 0.0010 Org/Hari Rp 95,000 Rp 95
JUMLAH Rp 29,580
Bh Pengadaan dan Pemasangan Door Holder / Pegangan Pintu (SNI 2002) No.9
1 Handel + Kunci bulat 1.0000 bh Rp 125,000 Rp 125,000
a Pekerja 0.0500 Org/Hari Rp 60,000 Rp 3,000
7.11 b Tukang Kayu Halus 0.5000 Org/Hari Rp 80,000 Rp 40,000
c Kepala Tukang 0.0500 Org/Hari Rp 80,000 Rp 4,000
d Mandor 0.0025 Org/Hari Rp 95,000 Rp 238
JUMLAH Rp 172,000
Bh Pengadaan dan Pemasangan Rel Pintu Dorong (SNI 2002) No.11
1 Rel Pintu Dorong 1.0000 set Rp 513,500 Rp 513,500
a Pekerja 0.0600 Org/Hari Rp 60,000 Rp 3,600
7.12 b Tukang Kayu Halus 0.6000 Org/Hari Rp 80,000 Rp 48,000
c Kepala Tukang 0.0600 Org/Hari Rp 80,000 Rp 4,800
d Mandor 0.0030 Org/Hari Rp 95,000 Rp 285
JUMLAH Rp 569,900
m2 Pengadaan dan Pemasangan Kaca, tebal 5 mm (SNI 2002) No.14
1 Kaca Polos 5 mm 1.1000 m2 Rp 95,000 Rp 104,500
a Pekerja 0.0150 Org/Hari Rp 60,000 Rp 900
7.13 b Tukang Kayu Halus 0.1500 Org/Hari Rp 80,000 Rp 12,000
c Kepala Tukang 0.0150 Org/Hari Rp 80,000 Rp 1,200
d Mandor 0.0008 Org/Hari Rp 95,000 Rp 71
JUMLAH Rp 118,600
m2 Dinding Glassblock 20x20 cm (SNI:2835:2008-6.58)
1 Glass Block 25.0000 bh 3,000 75,000
2 Semen PC (50 Kg) 0.2200 zak 63,500 13,970
3 Pasir Pasang 0.0350 m3 135,000 4,725
4 Sealant Kaca 0.2488 kg 45,000 11,196
7.14
a Pekerja 0.3000 Org/Hari 60,000 18,000
b Tukang Batu Kasar 0.1000 Org/Hari 80,000 8,000
c Kepala Tukang 0.0100 Org/Hari 80,000 800
d Mandor 0.0150 Org/Hari 95,000 1,425
JUMLAH 133,116
Bh Pengadaan dan Pemasangan Kait Angin (SNI 2002) No.6
1 Hak Angin Lipat 1.0000 Pas 25,000 25,000
a Pekerja 0.0150 Org/Hari 60,000 900
7.15 b Tukang Kayu Halus 0.1500 Org/Hari 80,000 12,000
c Kepala Tukang 0.0150 Org/Hari 80,000 1,200
d Mandor 0.0008 Org/Hari 95,000 71

Nike Naluri (1106587) 237


7.15

JUMLAH 39,171
8.PEKERJAAN ATAP
m3 Membuat & memasang Konstruksi kuda-kuda Kayu bentang s/d 6M (SNI:3434:2008-6.13)
1 Kayu Kuat klas II 1.1000 m3 Rp 9,500,000 Rp 10,450,000
2 Plat Strip 15.0000 Kg Rp 14,690 Rp 220,345
3 Paku 8 s/d 12 cm 5.6000 kg Rp 36,000 Rp 201,600
8.1 a Pekerja 4.0000 Org/Hari Rp 60,000 Rp 240,000
b Tukang Kayu Halus 12.0000 Org/Hari Rp 80,000 Rp 960,000
c Kepala Tukang 1.2000 Org/Hari Rp 80,000 Rp 96,000
d Mandor 0.2000 Org/Hari Rp 95,000 Rp 19,000
JUMLAH Rp 12,186,945
m3 Membuat & memasang Gording, Kayu kelas II (SNI:3434:2008-6.15)
1 Kayu Kuat klas II 1.1000 m3 Rp 9,500,000 Rp 10,450,000
2 Plat Strip 15.0000 Kg Rp 14,690 Rp 220,345
3 Paku 8 s/d 12 cm 3.0000 kg Rp 36,000 Rp 108,000
8.2 a Pekerja 2.4000 Org/Hari Rp 60,000 Rp 144,000
b Tukang Kayu Halus 7.2000 Org/Hari Rp 80,000 Rp 576,000
c Kepala Tukang 0.7200 Org/Hari Rp 80,000 Rp 57,600
d Mandor 0.1200 Org/Hari Rp 95,000 Rp 11,400
JUMLAH Rp 11,567,345
m2 Membuat & memasang rangka atap genteng Beton, kayu kelas II (SNI:3434:2008-6.17)
1 Kaso kelas II 0.0140 m3 Rp 9,500,000 Rp 133,000
2 Kayu Reng 3/4 Kamper Samarinda 0.0072 m3 Rp 9,500,000 Rp 68,400
3 Paku 4 s/d 7 cm 0.2500 kg Rp 36,000 Rp 9,000
8.3 a Pekerja 0.1000 Org/Hari Rp 60,000 Rp 6,000
b Tukang Kayu Halus 0.1000 Org/Hari Rp 80,000 Rp 8,000
c Kepala Tukang 0.0100 Org/Hari Rp 80,000 Rp 800
d Mandor 0.0050 Org/Hari Rp 95,000 Rp 475
JUMLAH Rp 225,675
m1 Membuat & memasang Lisplank (3x20cm), Kayu kelas II (SNI:3434:2008-6.21)
1 Papan kelas II 0.0108 m3 Rp 9,500,000 Rp 102,600
2 Paku 4 s/d 7 cm 0.1000 kg Rp 36,000 Rp 3,600
a Pekerja 0.1000 Org/Hari Rp 60,000 Rp 6,000
8.4
b Tukang Kayu Halus 0.2000 Org/Hari Rp 80,000 Rp 16,000
c Kepala Tukang 0.0200 Org/Hari Rp 80,000 Rp 1,600
d Mandor 0.0050 Org/Hari Rp 95,000 Rp 475
JUMLAH Rp 130,275
m1 Membuat & memasang Lisplank (3x30cm), Kayu kelas II (SNI:3434:2008-6.22)
1 Papan kelas II 0.0110 m3 Rp 9,500,000 Rp 104,500
2 Paku 4 s/d 7 cm 0.0500 kg Rp 36,000 Rp 1,800
a Pekerja 0.1000 Org/Hari Rp 60,000 Rp 6,000
8.5
b Tukang Kayu Halus 0.2000 Org/Hari Rp 80,000 Rp 16,000
c Kepala Tukang 0.0200 Org/Hari Rp 80,000 Rp 1,600
d Mandor 0.0050 Org/Hari Rp 95,000 Rp 475
JUMLAH Rp 130,375
m1 Pengadaan dan pemasangan Atap Genteng Beton
1 Genteng Beton 11.0000 Bh Rp 4,680 Rp 51,480
2 Paku 4 s/d 7 cm 0.0300 kg Rp 36,000 Rp 1,080
a Pekerja 0.2000 Org/Hari Rp 60,000 Rp 12,000
8.6
b Tukang Kayu Kasar 0.1000 Org/Hari Rp 80,000 Rp 8,000
c Kepala Tukang 0.0100 Org/Hari Rp 80,000 Rp 800
d Mandor 0.0100 Org/Hari Rp 95,000 Rp 950
JUMLAH Rp 74,310
9.PEKERJAAN PLAFOND
m2 Membuat & memasang rangka plafond (50x100cm), Kayu kelas II (SNI:3434:2008-6.19)
1 Kaso kelas II 0.0154 m3 Rp 9,500,000 Rp 146,300
2 Paku 4 s/d 7 cm 0.2000 kg Rp 36,000 Rp 7,200
9.1

Nike Naluri (1106587) 238


a Pekerja 0.1500 Org/Hari Rp 60,000 Rp 9,000
9.1
b Tukang Kayu Halus 0.3000 Org/Hari Rp 80,000 Rp 24,000
c Kepala Tukang 0.0300 Org/Hari Rp 80,000 Rp 2,400
d Mandor 0.0750 Org/Hari Rp 95,000 Rp 7,125
JUMLAH Rp 196,025
m2 Pengadaan dan pemasangan plafond gypsumboard t=9mm (SNI:2839:2008-6.7)
1 Gypsumboard t.9 mm 0.3640 lbr Rp 62,980 Rp 22,925
2 Paku Skrup 0.1100 Kg Rp 20,000 Rp 2,200
a Pekerja 0.1000 Org/Hari Rp 60,000 Rp 6,000
9.2
b Tukang Kayu Halus 0.0500 Org/Hari Rp 80,000 Rp 4,000
c Kepala Tukang 0.0050 Org/Hari Rp 80,000 Rp 400
d Mandor 0.0050 Org/Hari Rp 95,000 Rp 475
JUMLAH Rp 36,000
m' Pengadaan dan pemasangan list plafond gypsum profil 10cm (SNI:2839:2008-6.8)
1 List Profil 10 cm Gypsum 1.0500 m1 Rp 15,700 Rp 16,485
2 Paku Skrup 0.1500 Kg Rp 20,000 Rp 3,000
a Pekerja 0.0600 Org/Hari Rp 60,000 Rp 3,600
9.3
b Tukang Kayu Halus 0.0600 Org/Hari Rp 80,000 Rp 4,800
c Kepala Tukang 0.0060 Org/Hari Rp 80,000 Rp 480
d Mandor 0.0030 Org/Hari Rp 95,000 Rp 285
JUMLAH Rp 28,650
10.PEKERJAAN PENGECATAN
m2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
1 Plamur Tembok 0.1000 kg Rp 52,000 Rp 5,200
2 Cat Tembok (25 kg) 0.1400 kg Rp 22,100 Rp 3,094
3 Cat akhir emulsion 0.3640 Ltr Rp 62,500 Rp 22,750
4 Amplas Kayu / Besi 0.2000 Lbr Rp 8,624 Rp 1,725
10.1.1
a Pekerja 0.0200 Org/Hari Rp 60,000 Rp 1,200
b Tukang Cat Biasa 0.0630 Org/Hari Rp 80,000 Rp 5,040
c Kepala Tukang 0.0063 Org/Hari Rp 80,000 Rp 504
d Mandor 0.0025 Org/Hari Rp 95,000 Rp 238
JUMLAH Rp 39,750
m2 Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup
1 Cat Dasar / meni kayu 0.2000 Kg Rp 28,336 Rp 5,667
2 Plamir Kayu 0.1500 Kg Rp 17,890 Rp 2,684
3 Dempul Kayu 0.1700 Kg Rp 24,640 Rp 4,189
4 Cat Kayu 0.3500 Kg Rp 30,800 Rp 10,780
10.2.1
a Pekerja 0.0700 Org/Hari Rp 60,000 Rp 4,200
b Tukang Cat Biasa 0.1050 Org/Hari Rp 80,000 Rp 8,400
c Kepala Tukang 0.0040 Org/Hari Rp 80,000 Rp 320
d Mandor 0.0025 Org/Hari Rp 95,000 Rp 238
JUMLAH Rp 30,810
11.PEKERJAAN PIPA dan SANITER
Bh Pengadaan dan Pemasangan Kloset Duduk / Monoblok (Pt T-38-2000-C) 6.1
1 Kloset Duduk Porselen 1.0000 unt Rp 2,000,000 Rp 2,000,000
2 Perlengkapan 0.0600 persen Rp 2,000,000 Rp 120,000
a Pekerja 3.3000 Org/Hari Rp 60,000 Rp 198,000
11.1
b Tukang Batu Halus 1.1000 Org/Hari Rp 80,000 Rp 88,000
c Kepala Tukang 0.0010 Org/Hari Rp 80,000 Rp 80
d Mandor 0.1600 Org/Hari Rp 95,000 Rp 15,200
JUMLAH Rp 2,406,080
Bh Pengadaan dan Pemasangan Kloset Jongkok Porselen (Pt T-38-2000-C) 6.2
1 Kloset Jongkok Porselen Putih 1.0000 unt Rp 450,000 Rp 450,000
2 Semen PC (50 Kg) 0.1200 zak Rp 63,500 Rp 7,620
3 Pasir Pasang 0.0100 m3 Rp 135,000 Rp 1,350
11.2 a Pekerja 1.0000 Org/Hari Rp 60,000 Rp 60,000
b Tukang Batu Halus 1.5000 Org/Hari Rp 80,000 Rp 120,000

Nike Naluri (1106587) 239


11.2

c Kepala Tukang 0.1500 Org/Hari Rp 80,000 Rp 12,000


d Mandor 0.1600 Org/Hari Rp 95,000 Rp 15,200
JUMLAH Rp 650,970
Bh Pengadaan dan Pemasangan Washtafel (Pt T-38-2000-C) 6.5
1 Washtafel Keramik (lengkap) 1.0000 unt Rp 750,000 Rp 750,000
2 Perlengkapan 0.1200 persen Rp 750,000 Rp 90,000
3 Semen Warna 6.0000 kg Rp 12,500 Rp 75,000
4 Pasir Pasang 0.0100 m3 Rp 135,000 Rp 1,350
11.3
a Pekerja 1.2000 Org/Hari Rp 60,000 Rp 72,000
b Tukang Batu Halus 1.4500 Org/Hari Rp 80,000 Rp 116,000
c Kepala Tukang 0.1500 Org/Hari Rp 80,000 Rp 12,000
d Mandor 0.1000 Org/Hari Rp 95,000 Rp 9,500
JUMLAH Rp 1,116,350
bh Pengadaan dan Pemasangan Septic tank (Pt T-38-2000-C) 6.18
1 Bata Merah 306.4460 bh Rp 600 Rp 183,868
2 Semen PC (50 Kg) 2.2800 zak Rp 63,500 Rp 144,780
3 Pasir Pasang 0.1840 m3 Rp 135,000 Rp 24,840
4 Batu Split Pecah Mesin 1/2 0.0330 m3 Rp 145,000 Rp 4,785
5 Besi Beton rata-rata 4.8500 Kg Rp 1,721 Rp 8,347
11.4 6 Pasir Beton 0.1200 m3 Rp 145,000 Rp 17,400
a Pekerja 2.1600 Org/Hari Rp 60,000 Rp 129,600
b Tukang Batu Halus 0.7200 Org/Hari Rp 80,000 Rp 57,600
c Kepala Tukang 0.0720 Org/Hari Rp 80,000 Rp 5,760
d Mandor 0.1080 Org/Hari Rp 95,000 Rp 10,260
e Tukang Gali 0.1000 Org/Hari Rp 75,000 Rp 7,500
JUMLAH Rp 594,739
bh Pengadaan dan Pemasangan Bak Kontrol pasangan batu bata uk.60x60 (Pt T-38-2000-C) 6.18
1 Bata Merah 306.4460 m2 Rp 600 Rp 183,868
2 Semen PC (50 Kg) 2.2800 zak Rp 63,500 Rp 144,780
3 Pasir Pasang 0.1840 m3 Rp 135,000 Rp 24,840
4 Batu Split Pecah Mesin 1/2 0.0330 m3 Rp 145,000 Rp 4,785
5 Besi Beton rata-rata 4.8500 Kg Rp 1,721 Rp 8,347
11.5 6 Pasir Beton 0.1200 m3 Rp 145,000 Rp 17,400
a Pekerja 2.1600 Org/Hari Rp 60,000 Rp 129,600
b Tukang Batu Halus 0.7200 Org/Hari Rp 80,000 Rp 57,600
c Kepala Tukang 0.0720 Org/Hari Rp 80,000 Rp 5,760
d Mandor 0.1080 Org/Hari Rp 95,000 Rp 10,260
e Tukang Gali 0.1000 Org/Hari Rp 75,000 Rp 7,500
JUMLAH Rp 594,739
m' Pengadaan dan Pemasangan Pipa PVC tipe AW d = 1/2" (Pt T-38-2000-C) 6.25
1 Pipa PVC d=1/2 " 1.2000 m1 Rp 455,000 Rp 546,000
2 Perlengkapan 0.3500 persen Rp 455,000 Rp 159,250
a Pekerja 0.0360 Org/Hari Rp 60,000 Rp 2,160
11.6.1
b Tukang Batu Halus 0.0600 Org/Hari Rp 80,000 Rp 4,800
c Kepala Tukang 0.0060 Org/Hari Rp 80,000 Rp 480
d Mandor 0.0018 Org/Hari Rp 95,000 Rp 171
JUMLAH Rp 712,861
m' Pengadaan dan Pemasangan Pipa PVC tipe AW d = 3/4" (Pt T-38-2000-C) 6.26
1 Pipa PVC d=3/4 " 1.2000 m1 Rp 455,000 Rp 546,000
2 Perlengkapan 0.3500 persen Rp 455,000 Rp 159,250
a Pekerja 0.0360 Org/Hari Rp 60,000 Rp 2,160
11.6.2
b Tukang Batu Halus 0.0600 Org/Hari Rp 80,000 Rp 4,800
c Kepala Tukang 0.0060 Org/Hari Rp 80,000 Rp 480
d Mandor 0.0018 Org/Hari Rp 95,000 Rp 171
JUMLAH Rp 712,861
m' Pengadaan dan Pemasangan Pipa PVC tipe AW d = 1" (Pt T-38-2000-C) 6.27
1 Pipa PVC d= 1 " 1.2000 m1 Rp 455,000 Rp 546,000

11.6.3
Nike Naluri (1106587) 240
2 Perlengkapan 0.3500 persen Rp 455,000 Rp 159,250
a Pekerja 0.0360 Org/Hari Rp 60,000 Rp 2,160
11.6.3
b Tukang Batu Halus 0.0600 Org/Hari Rp 80,000 Rp 4,800
c Kepala Tukang 0.0060 Org/Hari Rp 80,000 Rp 480
d Mandor 0.0018 Org/Hari Rp 95,000 Rp 171
JUMLAH Rp 712,861
m' Pengadaan dan Pemasangan Pipa PVC tipe AW d = 2" (Pt T-38-2000-C) 6.29
1 Pipa PVC d= 2 " 1.2000 m1 Rp 455,000 Rp 546,000
2 Perlengkapan 0.3500 persen Rp 455,000 Rp 159,250
a Pekerja 0.0540 Org/Hari Rp 60,000 Rp 3,240
11.6.4
b Tukang Batu Halus 0.0900 Org/Hari Rp 80,000 Rp 7,200
c Kepala Tukang 0.0090 Org/Hari Rp 80,000 Rp 720
d Mandor 0.0027 Org/Hari Rp 95,000 Rp 257
JUMLAH Rp 716,667
m' Pengadaan dan Pemasangan Pipa PVC tipe AW d = 3" (Pt T-38-2000-C) 6.31
1 Pipa PVC d= 3 " 1.2000 m1 Rp 455,000 Rp 546,000
2 Perlengkapan 0.3500 persen Rp 455,000 Rp 159,250
a Pekerja 0.0810 Org/Hari Rp 60,000 Rp 4,860
11.6.5
b Tukang Batu Halus 0.1350 Org/Hari Rp 80,000 Rp 10,800
c Kepala Tukang 0.1350 Org/Hari Rp 80,000 Rp 10,800
d Mandor 0.0041 Org/Hari Rp 95,000 Rp 390
JUMLAH Rp 732,100
m' Pengadaan dan Pemasangan Pipa PVC tipe AW d = 4" (Pt T-38-2000-C) 6.32
1 Pipa PVC d= 4 " 1.2000 m1 Rp 455,000 Rp 546,000
2 Perlengkapan 0.3500 persen Rp 455,000 Rp 159,250
a Pekerja 0.0810 Org/Hari Rp 60,000 Rp 4,860
11.6.6
b Tukang Batu Halus 0.1350 Org/Hari Rp 80,000 Rp 10,800
c Kepala Tukang 0.1350 Org/Hari Rp 80,000 Rp 10,800
d Mandor 0.0041 Org/Hari Rp 95,000 Rp 390
JUMLAH Rp 732,100
m' Pengadaan dan Pemasangan Pipa Galvanis d = 1/2 " (Pt T-38-2000-C) 6.19
1 Pipa Galvanis d=1/2 " 1.2000 m1 Rp 130,000 Rp 156,000
2 Perlengkapan 0.3500 persen Rp 130,000 Rp 45,500
a Pekerja 0.5400 Org/Hari Rp 60,000 Rp 32,400
11.6.7
b Tukang Batu Halus 0.0900 Org/Hari Rp 80,000 Rp 7,200
c Kepala Tukang 0.0090 Org/Hari Rp 80,000 Rp 720
d Mandor 0.0270 Org/Hari Rp 95,000 Rp 2,565
JUMLAH Rp 244,385
Bh Pengadaan dan Pemasangan Bak Cuci Piring Stainless Steel (Pt T-38-2000-C) 6.33
1 Kitchenzink stainless steel 1 lubang 1.0000 unt Rp 450,000 Rp 450,000
2 Water drain+aksesoris 1.0000 set Rp 195,000 Rp 195,000
11.7
a Tukang Batu Halus 0.3000 Org/Hari Rp 80,000 Rp 24,000
b Kepala Tukang 0.0300 Org/Hari Rp 80,000 Rp 2,400
JUMLAH Rp 671,400
Bh Pengadaan dan Pemasangan Kran Air diameter 3/4" atau 1/2 " (Pt T-38-2000-C) 6.35
1 Kran dinding 4 jari 1.0000 bh Rp 188,000 Rp 188,000
2 Seal tape 0.0250 roll Rp 10,000 Rp 250
11.8
a Tukang Batu Halus 0.1000 Org/Hari Rp 80,000 Rp 8,000
b Kepala Tukang 0.0100 Org/Hari Rp 80,000 Rp 800
JUMLAH Rp 197,050
Bh Pengadaan dan Pemasangan Floor Drain (Pt T-38-2000-C) 6.36
1 Floordrain 1.0000 unt Rp 367,000 Rp 367,000
11.9 a Tukang Batu Halus 0.1000 Org/Hari Rp 80,000 Rp 8,000
b Kepala Tukang 0.0100 Org/Hari Rp 80,000 Rp 800
JUMLAH Rp 375,800
Bh Pengadaan dan Pemasangan Jetwasher (dihitung) 6.35
1 Jet washer 1.0000 bh Rp 347,100 Rp 347,100
11.10

Nike Naluri (1106587) 241


2 Seal tape 0.0250 roll Rp 10,000 Rp 250
11.10
a Tukang Batu Halus 0.1000 Org/Hari Rp 80,000 Rp 8,000
b Kepala Tukang 0.0100 Org/Hari Rp 80,000 Rp 800
JUMLAH Rp 356,150
Bh Pengadaan dan Pemasangan Kran Sink (Pt T-38-2000-C) 6.35
1 Kran Air 3/4" 1.0000 bh Rp 35,000 Rp 35,000
2 Seal tape 0.0250 roll Rp 10,000 Rp 250
11.11
a Tukang Batu Halus 0.1000 Org/Hari Rp 80,000 Rp 8,000
b Kepala Tukang 0.0100 Org/Hari Rp 80,000 Rp 800
JUMLAH Rp 44,050
Bh Pengadaan dan Pemasangan Shower (Pt T-38-2000-C) 6.35
1 Shower 1.0000 bh Rp 245,000 Rp 245,000
2 Seal tape 0.0250 roll Rp 10,000 Rp 250
11.12
a Tukang Batu Halus 0.1000 Org/Hari Rp 80,000 Rp 8,000
b Kepala Tukang 0.0100 Org/Hari Rp 80,000 Rp 800
JUMLAH Rp 254,050
bh Pengadaan dan Pemasangan Bathtube (Pt T-38-2000-C) 6.7
1 Bath Tube fibreglass 1.0000 unt Rp 6,100,000 Rp 6,100,000
2 Perlengkapan 0.1800 persen Rp 6,100,000 Rp 1,098,000
a Pekerja 1.8000 Org/Hari Rp 60,000 Rp 108,000
11.13
b Tukang Batu Halus 2.7000 Org/Hari Rp 80,000 Rp 216,000
c Kepala Tukang 0.0500 Org/Hari Rp 80,000 Rp 4,000
d Mandor 0.0100 Org/Hari Rp 95,000 Rp 950
JUMLAH Rp 7,526,950
12.PEKERJAAN LAIN-LAIN
m2 Pengadaan dan pemasangan Railing
1 Cat Besi 1.0000 m2 Rp 28,900 Rp 28,900
2 Pipa Stainless Steel Ø 1" 0.0800 Btg Rp 240,000 Rp 19,200
3 Pipa Stainless Steel Ø 1,5 " 0.0800 Btg Rp 320,000 Rp 25,600
4 Pipa Stainless Steel Ø 2" 0.0800 Btg Rp 400,000 Rp 32,000
12.1
a Pekerja 0.0600 Org/Hari Rp 60,000 Rp 3,600
b Tukang Besi Tulangan 0.0600 Org/Hari Rp 80,000 Rp 4,800
c Kepala Tukang 0.0060 Org/Hari Rp 80,000 Rp 480
d Mandor 0.0030 Org/Hari Rp 95,000 Rp 285
JUMLAH Rp 114,865
m2 Dinding Batu Tempel (SNI:2835:2008-6.58)
1 Batu Andesit 30x30 1.0600 m2 Rp 150,000 Rp 159,000
2 Semen PC (50 Kg) 0.2488 zak Rp 63,500 Rp 15,799
3 Pasir Pasang 0.0250 m3 Rp 135,000 Rp 3,375
12.3 a Pekerja 1.0000 Org/Hari Rp 60,000 Rp 60,000
b Tukang Batu Kasar 0.5000 Org/Hari Rp 80,000 Rp 40,000
c Kepala Tukang 0.0500 Org/Hari Rp 80,000 Rp 4,000
d Mandor 0.0500 Org/Hari Rp 95,000 Rp 4,750
JUMLAH Rp 286,924
13.PEKERJAAN LISTRIK
TTK Pasang Stop Kontak
a Stop Kontak 1.00 bh Rp 25,000 Rp 25,000
b Kabel Listrik NYM 3 x 2,5 mm 0.25 rol Rp 16,000 Rp 4,000
13.1 c Accecories ( 20 % material ) 1.00 ls Rp 8,200 Rp 8,200
d Pekerja 0.20 org Rp 60,000 Rp 12,000
e Kepala Tukang 0.60 org Rp 80,000 Rp 48,000
JUMLAH Rp 97,200
TTK Pasang saklar
a Saklar 1.00 bh Rp 25,000 Rp 25,000
b Kabel Listrik NYM 2 x 2,5 mm 0.25 rol Rp 10,000 Rp 2,500
13.2 c Accecories ( 20 % material ) 1.00 ls Rp 7,000 Rp 7,000
d Pekerja 0.20 org Rp 60,000 Rp 12,000

Nike Naluri (1106587) 242


13.2

e Kepala Tukang 0.60 org Rp 80,000 Rp 48,000


JUMLAH Rp 94,500
BH Pasang Lampu TL
a Lampu TL 1.00 bh Rp 97,500 Rp 97,500
13.3 b Accecories ( 1 % ) 1.00 ls Rp 1,575 Rp 1,575
c Pekerja 0.12 org Rp 60,000 Rp 7,200
JUMLAH Rp 106,275
BH Pasang Lampu Taman
a Lampu Pijar 75 Watt 1.00 bh Rp 8,000 Rp 8,000
13.4 b Accecories ( 1 % ) 1.00 ls Rp 680 Rp 680
c Pekerja 0.35 org Rp 60,000 Rp 21,000
JUMLAH Rp 29,680
UNIT Pasang Panel
a Panel Listrik standart untuk Rumah 1.00 bh Rp 327,000 Rp 327,000
13.5 b Accecories ( 10 % ) 1.00 ls Rp 38,700 Rp 38,700
c Pekerja 1.00 org Rp 60,000 Rp 60,000
JUMLAH Rp 425,700
BH Pasang Lampu Pijar
a Lampu Pijar 75 Watt 1.00 bh Rp 8,000 Rp 8,000
13.6 b Accecories ( 1 % ) 1.00 ls Rp 680 Rp 680
c Pekerja 0.10 org Rp 60,000 Rp 6,000
JUMLAH Rp 14,680

Nike Naluri (1106587) 243


Rp 42,525

Nike Naluri (1106587) 244


VOLUME PEKERJAAN PERSIAPAN
KODE JENIS PEKERJAAN
5
1.1 Pagar Sementara Seng Gelombang (T=2M)
Luas Tanah
P= 14 M
4 6,85 1,15 2

2 2

L= 2 M
1,2
1.2 Pengukuran & Pemasangan Bowplank
Jumlah Titik Pemasangan Bouwplank
1,07

8
2

P= 90.4 M'
L= 83.47 M'
6,8

1.3 Pembuatan Kantor Proyek Sementara


Luas Bangunan
1

30

1,38

4
3 P= 3 M'
0,9 1,5
0,6

1
L= 3 M'
1,8 1,8
1.4 Pembuatan Gudang Poyek (Los Kerja)
0,7
Luas Bangunan
2,2
P= 4 M'
2,2

2
1,5
L= 4 M'
1.5 Membersihkan Lokasi Proyek
0,28 0,5
1
0,5
1
1,5
1 2

0,6 Luas Bangunan


5

2,9
P= 30 M'
0,6 2 0,6
L= 14 M'
2,2 1,8 1,6 3 5,4

14

RENCANA ANGGARAN BIAYA


HARGA SATUAN JUMLAH HARGA
NO KODE JENIS PEKERJAAN VOLUME SATUAN
MATERIAL UPAH MATERIAL UPAH
1.PEKERJAAN PERSIAPAN
1.1 Pagar Sementara Seng Gelombang (T=2M) 28 M2 483,146 43,500 Rp 13,528,099 Rp 1,218,000
1.2 Pengukuran & Pemasangan Bowplank 173.87 M' 46,073 15,275 Rp 8,010,713 Rp 2,655,864
1.3 Pembuatan Kantor Proyek Sementara 9 M2 695,464 248,750 Rp 6,259,174 Rp 2,238,750
1.4 Pembuatan Gudang Poyek (Los Kerja) 16 M2 698,420 240,750 Rp 11,174,717 Rp 3,852,000

Nike Naluri (1106587) 245


1.5 Membersihkan Lokasi Proyek 420 M2 - 6,475 - Rp 2,719,500
JUMLAH 1,923,103 554,750 Rp 38,972,702 Rp 12,684,114
TABEL DAFTAR KEBUTUHAN MATERIAL DAN UPAH PEKERJA
1.PEKERJAAN PERSIAPAN KEBUTUHAN
KOEFISIEN SATUAN HARGA SATUAN VOLUME
m2 Pagar Sementara Seng Gelombang (T=2M) MATERIAL UPAH
1 Dolken dia 5 s/d 7 cm p. 4 m 1.250 btg 13,144 35.000
2 Semen PC (50 Kg) 2.500 zak 63,500 70.000
3 Seng Gelombang BJLS 0,3 1.200 lbr 100,100 33.600
4 Pasir Beton 0.005 m3 145,000 0.140
5 Batu Split Pecah Mesin 2/3 0.009 m3 145,000 0.252
6 Kaso kelas III 0.072 m3 2,387,000 2.016
1.1 28
7 Paku 1 s/d 3 cm 0.060 kg 20,020 1.680
8 Cat Dasar / meni besi 0.450 Kg 28,336 12.600
a Tukang Kayu Halus 0.200 Org/Hari 80,000 5.600
b Pekerja 0.400 Org/Hari 60,000 11.200
c Kepala Tukang 0.020 Org/Hari 80,000 0.560
d Mandor 0.020 Org/Hari 95,000 0.560
JUMLAH 28 155.288 17.920
m' Pengukuran & Pemasangan Bowplank
1 Kaso kelas III 0.012 m3 2,387,000 2.086
2 Paku 4 s/d 7 cm 0.020 kg 36,000 3.477
3 Balok kelas III 0.007 m3 2,387,000 1.217
1.2 a Tukang Kayu Kasar 0.100 Org/Hari 80,000 173.87 17.387
b Pekerja 0.100 Org/Hari 60,000 17.387
c Kepala Tukang 0.010 Org/Hari 80,000 1.739
d Mandor 0.005 Org/Hari 95,000 0.869
JUMLAH 173.87 6.781 37.382
m2 Pembuatan Kantor Proyek Sementara
1 Dolken dia 5 s/d 7 cm p. 4 m 1.250 btg 13,144 11.250
2 Kayu Kuat klas III 0.180 m3 2,335,667 1.620
3 Paku 8 s/d 12 cm 0.850 kg 36,000 7.650
4 Besi Plat rata2 1 s/d 5 mm 1.100 Kg 19,717 9.900
5 Semen PC (50 Kg) 0.700 zak 63,500 6.300
6 Pasir Pasang 0.150 m3 135,000 1.350
7 Pasir Beton 0.100 m3 145,000 0.900
8 Batu Split Pecah Mesin 2/3 0.150 m3 145,000 1.350
9 Bata Merah biasa 30.000 bh 600 270.000
1.3 9
10 Seng Plat BJLS 0,30 0.250 m' 84,700 2.250

Nike Naluri (1106587) 246


1.3 9
11 Kaca nako polos 5 mm 0.200 daun 215,000 1.800
12 Kaca Polos 5 mm 0.080 m2 95,000 0.720
13 Triplex t. 4 mm 0.150 lbr 54,000 1.350
14 Handel + Kunci bulat 0.060 bh 125,000 0.540
a Tukang Kayu Kasar 2.000 Org/Hari 80,000 18.000
b Pekerja 1.000 Org/Hari 60,000 9.000
c Kepala Tukang 0.300 Org/Hari 80,000 2.700
d Mandor 0.050 Org/Hari 95,000 0.450
JUMLAH 9 316.980 30.150
m2 Pembuatan Gudang Poyek (Los Kerja)
1 Dolken dia 5 s/d 7 cm p. 4 m 1.700 btg 13,144 27.200
2 Kayu Kuat klas III 0.210 m3 2,335,667 3.360
3 Paku 8 s/d 12 cm 0.300 kg 36,000 4.800
4 Semen PC (50 Kg) 0.210 zak 63,500 3.360
5 Pasir Pasang 0.030 m3 135,000 0.480
1.4 6 Pasir Beton 0.050 m3 145,000 16 0.800
7 Seng Gelombang BJLS 0,3 1.500 lbr 100,100 24.000
a Tukang Kayu Kasar 2.000 Org/Hari 80,000 32.000
b Pekerja 1.000 Org/Hari 60,000 16.000
c Kepala Tukang 0.200 Org/Hari 80,000 3.200
d Mandor 0.050 Org/Hari 95,000 0.800
JUMLAH 25 64 52
m2 Membersihkan Lokasi Proyek
a Pekerja 0.100 Org/Hari 60,000 42.000
1.5 420
b Mandor 0.005 Org/Hari 95,000 2.100
JUMLAH 420 0.000 44.100
TOTAL

1.PEKERJAAN PERSIAPAN HARGA


SATUAN KEBUTUHAN JUMLAH TITIK AS
NO JENIS SATUAN
1 Balok kelas III m3 2,387,000 1.217 Rp 2,905,194 G1-F1
2 Bata Merah biasa bh 600 270 Rp 162,000 F1-D1
ULASI KEBUTUHAN MATERIAL

3 Batu Split Pecah Mesin 2/3 m3 145,000 2 Rp 232,290 D1-C2


4 Besi Plat rata2 1 s/d 5 mm Kg 19,717 10 Rp 195,199 C2-A2
5 Cat Dasar / meni besi Kg 28,336 13 Rp 357,034 D3-C3
6 Dolken dia 5 s/d 7 cm p. 4 m btg 13,144 73 Rp 965,427 G4-F4
7 Handel + Kunci bulat bh 125,000 1 Rp 67,500 G3-F3

Nike Naluri (1106587) 247


TABEL REKAPITULASI KEBUTUHAN MATER 8 Kaca nako polos 5 mm daun 215,000 1.8 Rp 387,000 D4-C4
9 Kaca Polos 5 mm m2 95,000 0.720 Rp 68,400 D5-C5
10 Kaso kelas III m3 2,387,000 4.102 Rp 9,792,524 C5-A5
11 Kayu Kuat klas III m3 2,335,667 4.980 Rp 11,631,620 A6-B6
12 Paku 1 s/d 3 cm kg 20,020 1.680 Rp 33,634 A7-B7
13 Paku 4 s/d 7 cm kg 36,000 3.477 Rp 125,186 B7-C7
14 Paku 8 s/d 12 cm kg 36,000 12.450 Rp 448,200 C7-E7
15 Pasir Beton m3 145000 1.840 Rp 266,800 G7-E7
16 Pasir Pasang m3 135,000 1.830 Rp 247,050 A8-B8
17 Semen PC (50 Kg) zak 63500 79.660 Rp 5,058,410 A9-B9
18 Seng Gelombang BJLS 0,3 lbr 100100 57.600 Rp 5,765,760 E9-G9
19 Seng Plat BJLS 0,30 m' 84,700 2.250 Rp 190,575 E10-G10
20 Triplex t. 4 mm lbr 54000 1.350 Rp 72,900 A10-B10
JUMLAH 8,425,784 543 Rp 38,972,702 A11-G11
LEBAR
Bowplank P7
P
3

1.PEKERJAAN PERSIAPAN HARGA


SATUAN KEBUTUHAN JUMLAH
TABEL REKAPITULASI

SATUAN
KEBUTUHAN UPAH

NO JENIS
1 Mandor Org/Hari 95000 4.779 Rp 454,038
2 Pekerja Org/Hari 60000 95.587 Rp 5,735,220
3 Kepala Tukang Org/Hari 80000 8.199 Rp 655,896
4 Tukang Kayu Halus Org/Hari 80000 5.600 Rp 448,000
5 Tukang Kayu Kasar Org/Hari 80000 67.387 Rp 5,390,960
JUMLAH 395,000 182 Rp 12,684,114

Nike Naluri (1106587) 248


AN PERSIAPAN
IS PEKERJAAN

V= PxL
V= 28 M2

P= (P + L)
P= 173.87 M'

V= PxL
V= 9 M2

V= PxL
V= 16 M2

V= PxL
V= 420 M2

TOTAL

Rp 14,746,099
Rp 10,666,577
Rp 8,497,924
Rp 15,026,717

Nike Naluri (1106587) 249


Rp 2,719,500
Rp 51,656,817

HARGA
TOTAL
MATERIAL UPAH
Rp 460,040
Rp 4,445,000
Rp 3,363,360
Rp 20,300
Rp 36,540

Rp14,746,099
Rp 4,812,192
Rp 33,634
Rp 357,034
Rp 448,000
Rp 672,000
Rp 44,800
Rp 53,200
Rp 13,528,099 Rp 1,218,000

Rp 4,980,332
Rp 125,186
Rp10,666,577

Rp 2,905,194
Rp 1,390,960
Rp 1,043,220
Rp 139,096
Rp 82,588
Rp 8,010,713 Rp 2,655,864

Rp 147,870
Rp 3,783,780
Rp 275,400
Rp 195,199
Rp 400,050
Rp 182,250
Rp 130,500
Rp8,497,924

Rp 195,750
Rp 162,000
Rp 190,575

Nike Naluri (1106587) 250


Rp8,497,924
Rp 387,000
Rp 68,400
Rp 72,900
Rp 67,500
Rp 1,440,000
Rp 540,000
Rp 216,000
Rp 42,750
Rp 6,259,174 Rp 2,238,750

Rp 357,517
Rp 7,847,840
Rp 172,800
Rp 213,360

Rp15,026,717
Rp 64,800
Rp 116,000
Rp 2,402,400
Rp 2,560,000
Rp 960,000
Rp 256,000
Rp 76,000
Rp 11,174,717 Rp 3,852,000
2,719,500

Rp 2,520,000
Rp 199,500
Rp - Rp 2,719,500
Rp 38,972,702 Rp 12,684,114 Rp 51,656,817

PANJANG (M) TITIK AS PANJANG (M)


2.2 11A-10A 5
2.4 10A-9A 2
3.12 9A-8A 1.2
5.4 8A-7A 6.8
3 7A-6A 3
2.2 6A-5A 1
2.2 5A-4A 1.8

Nike Naluri (1106587) 251


3 4A-3A 2.2
3 3A-2A 1.5
5.4 10B-9B 2
3 9B-7B 8
3 7B-6B 3
2.5 6B-5B 1
4.6 4C-3C 2.2
4 3C-2C 1.5
3.15 5D-4D 1.8
3.15 4D-3D 2.2
4 3D-1D 2
4 10E-9E 2
3.15 9E-7E 8
14 4F-1F 4.2
80.47 11G-10G 5
Bowplank P7 10G-9G 2
L 9G-7G 8
3 7G-5G 4
5G-4G 1.8
4G-1G 4.2
PANJANG 87.4

Nike Naluri (1106587) 252


TABEL VOLUME PEKERJAAN TANAH
JENIS PEKERJAAN
Galian Tanah Sedalam <1m
Luas Galian Tanah Pondasi Batu Kali P1
A= 1.9475 M2 V= AxP
P= 20.00 M' V= 38.950 M3
Luas Galian Tanah Pondasi Batu Kali P2
A= 1.22075 M2 V= AxP
P= 27.15 M' V= 33.143 M3
Luas Galian Tanah Pondasi Batu Kali P3
A= 1.9475 M2 V= AxP
P= 26.50 M' V= 51.609 M3
Luas Galian Tanah Pondasi Batu Kali P4
A= 1.1875 M2 V= AxP
2,3

P= 10.35 M' V= 12.291 M3


Luas Galian Tanah Pondasi Batu Kali P5
A= 0.12 M2 V= AxP
1 ,8
2,3
P= 13.30 M' V= 1.596 M3
2 ,6

Luas Galian Tanah Pondasi Batu Kali P7


2 ,9

A= 0.88 M2 V= AxP
P= 6.00 M' V= 5.280 M3
TOTAL 142.869 M3
0,6

0,14
0,1

0,13 0,1
0,13
0,21
0,45
2,3 0,32
1,5 0,3
0,15 0,15
0,4 1,1
0,2
0,4

0,8 0,3
0,95

0,1 0,8 0,1


0,8
0,1
0,05
1

0,35 0,6

Nike Naluri (1106587) 0,5 253


0,35 0,6
TABEL VOLUME PEKERJAAN TANAH
0,5
JENIS PEKERJAAN
Urugan Tanah
Urugan Kembali semua indeks sejumlah 1/3 dari
0,8
0,8
indeks tiap jenis pekerjaan
1
Pondasi Batu Kali P1
0,4 0,5 0,5 V= 38.950 M3 V= 12.9833333333
Pondasi Batu Kali P2
V= 33.143 M3 V= 11.0477875
3 1
Pondasi Batu Kali P3
0,5
V= 51.609 M3 V= 17.2029166667
0,5 0,5
Pondasi Batu Kali P4
0,5
0,3 0,5 0,3 0,5 V= 12.291 M3 V= 4.096875
0,8 0,8
Pondasi Batu Kali P5
1
V= 1.596 M3 V= 0.532
Pondasi Batu Kali P7
V= 5.280 M3 V= 1.76
0,14
Pondasi Sumuran W2
1 V= 2.763 M3 V= 0.9211625
0,2
TABEL VOLUME PEKERJAAN TANAH TOTAL 48.544 M3
JENIS PEKERJAAN
0,25 0,12

0,25
Galian Tanah Sedalam 3m
Pondasi Pile cap PC1 n
3 1
0,65
V1 = 0.1 M3 V= V1 + V2 11
V2 = 0.29 M 3
V= 0.388 M3 4.273363
0,25

0,25
0,45 Pondasi Pile cap PC2 n
0,5 V1 = 0.2 M3 V= V1 + V2 8
1 0,7
V2 = 0.29 M 3
V= 0.488 M3 3.9079
Pondasi Pile cap PC2A n
V1 = 0.2 M3 V= V1 + V2 2
V2 = 0.29 M 3
V= 0.488 M3 0.976975
Pondasi Sumuran W2
V1 = 2.475 M3 V= V1 + V2
V2 = 0.29 M 3
V= 2.763 M3

Nike Naluri (1106587) 254


TOTAL 11.922 M3

Nike Naluri (1106587) 255


RENCANA ANGGARAN BIAYA
HARGA SATUAN JUMLAH HARGA
NO KODE JENIS PEKERJAAN VOLUME SATUAN TOTAL
MATERIAL UPAH MATERIAL UPAH
2. PEKERJAAN TANAH
2.1 Galian Tanah Sedalam <1m (Galian Pondasi Batu K 142.869 M2 - Rp 47,375 - Rp 6,768,406 Rp6,768,406
2.2 Galian Tanah Sedalam 3m (Galian Pondasi pile ca 11.922 M2 - Rp 69,365 - Rp 826,950 Rp 826,950
2.3 Urugan Tanah 48.544 m2 - Rp 17,375 - Rp 843,453 Rp 843,453
JUMLAH 0 Rp134,115 0 Rp8,438,810 Rp8,438,810

TABEL DAFTAR KEBUTUHAN MATERIAL DAN UPAH PEKERJA


2.PEKERJAAN TANAH HARGA KEBUTUHAN HARGA TOTAL
KOEFISIEN SATUAN VOLUME
m3 Galian Tanah Sedalam <1m SATUAN MATERIAL UPAH MATERIAL UPAH

Rp826,950 Rp6,768,406
a Pekerja 0.750 Org/Hari Rp 60,000 107.152 Rp 6,429,093
2.1 142.869
b Mandor 0.025 Org/Hari Rp 95,000 3.572 Rp 339,313
JUMLAH 142.869 0 111 0 Rp6,768,406
m3 Galian Tanah Sedalam 3m
a Pekerja 1.050 Org/Hari Rp 60,000 12.518 Rp 751,069
2.2 11.922
b Mandor 0.067 Org/Hari Rp 95,000 0.799 Rp 75,882
JUMLAH 11.922 0 13.317 0 Rp 826,950
m3 Urugan Tanah

Rp843,453
a Pekerja 0.250 Org/Hari Rp 60,000 12.136 Rp 728,161
2.3 48.544
b Mandor 0.025 Org/Hari Rp 95,000 1.214 Rp 115,292
JUMLAH 48.544 0 13 0 Rp 843,453
TOTAL 0 Rp8,438,810 Rp8,438,810
0,1

0,21
TABEL REKAPITULASI KEBUTUHAN UPAH
2.PEKERJAAN TANAH HARGA KEBUTUH
AN
JUMLAH
NO JENIS SATUAN SATUAN
1 Mandor Org/Hari Rp95,000 6 Rp 530,487
2 Pekerja Org/Hari Rp60,000 132 Rp 7,908,323
JUMLAH Rp155,000 137 Rp 8,438,810

Nike Naluri (1106587) 256


volume plafond & list plafond lantai bawah volume plafond & list plafond lantai atas
NO
RUANG P L A 2x(P+L) RUANG P L A 2x(P+L)
teras 3.00 2.00 6.00 10.00 R. Tidur 1 4.00 4.00 16.00 16.00 9. PEKERJAAN P
garasi 5.00 5.40 27.00 20.80 R. Tidur 2 4.60 4.00 18.40 17.20
tangga 3.15 1.00 3.15 8.30 R. Tidur 3 5.80 5.40 31.32 22.40
dapur 3.15 3.00 9.45 12.30 toilet 1 3.15 2.20 6.93 10.70
R. Makan 5.40 4.00 21.60 18.80 toilet 2 2.25 2.20 4.95 8.90
R. Keluarga 5.80 5.60 32.48 22.80 R. Keluarga 6.00 4.60 27.60 21.20
R. Tamu 4.20 3.40 14.28 15.20 hall 6.00 4.00 24.00 20.00
foyer 3.00 2.20 6.60 10.40 TOTAL 129.2 116.4 9. PEKERJAAN P
KM/WC 3.00 1.80 5.40 9.60
KM utama 4.00 2.00 8.00 12.00
R. Tidur 8.00 4.00 32.00 24.00
10.00 0.80 8.00 21.60
9.1
taman belakang 4.00 0.50 2.00 9.00
TOTAL 175.96 194.8

9.2

9.3

Nike Naluri (1106587) 257


RENCANA ANGGARAN BIAYA
HARGA SATUAN JUMLAH HARGA
KODE JENIS PEKERJAAN VOLUME SATUAN TOTAL
MATERIAL UPAH MATERIAL UPAH
9. PEKERJAAN PLAFOND
9.1 Membuat & memasang rangka plafond (50x100305.16 M2 Rp153,500 Rp42,525 Rp46,842,060 Rp12,976,929 Rp59,818,989
9.2 Pengadaan dan pemasangan plafond gypsu 305.16 M2 Rp25,125 Rp10,875 Rp7,667,060 Rp3,318,615 Rp10,985,675
9.3 Pengadaan dan pemasangan list plafond gyp 311.2 M' Rp19,485 Rp9,165 Rp6,063,732 Rp2,852,148 Rp8,915,880
JUMLAH Rp198,110 Rp62,565 Rp60,572,852 Rp19,147,692 Rp79,720,544

TABEL DAFTAR KEBUTUHAN MATERIAL DAN UPAH PEKERJA


9. PEKERJAAN PLAFOND HARGA KEBUTUHAN HARGA
KOEFISIEN SATUAN VOLUME TOTAL
m2 Membuat & memasang rangka plafond (50 SATUAN MATERIAL UPAH MATERIAL UPAH
1 Kaso kelas II 0.0154 m3 Rp9,500,000 4.699 Rp 44,644,908

59,818,989
2 Paku 4 s/d 7 cm 0.2000 kg Rp36,000 61.032 Rp 2,197,152
a Pekerja 0.1500 Org/Hari Rp60,000 45.774 Rp 2,746,440
305.16
b Tukang Kayu Halus 0.3000 Org/Hari Rp80,000 91.548 Rp 7,323,840
c Kepala Tukang 0.0300 Org/Hari Rp80,000 9.155 Rp 732,384
d Mandor 0.0750 Org/Hari Rp95,000 22.887 Rp 2,174,265

Rp
JUMLAH 305 65.731 169.364 Rp46,842,060 Rp12,976,929
m2 Pengadaan dan pemasangan plafond gypsumboard t=9mm

10,985,675
1 Gypsumboard t.9 mm 0.3640 lbr Rp 62,980 111.078 Rp 6,995,708
2 Paku Skrup 0.1100 Kg Rp 20,000 33.568 Rp 671,352
a Pekerja 0.1000 Org/Hari Rp 60,000 305.16 30.516 Rp 1,830,960
b Tukang Kayu Halus 0.0500 Org/Hari Rp 80,000 15.258 Rp 1,220,640
c Kepala Tukang 0.0050 Org/Hari Rp 80,000 1.526 Rp 122,064
d Mandor 0.0050 Org/Hari Rp 95,000 1.526 Rp 144,951

Rp
JUMLAH 305 144.646 48.826 Rp 7,667,060 Rp 3,318,615
m' Pengadaan dan pemasangan list plafond gypsum profil 10cm

8,915,880
1 List Profil 10 cm Gypsum 1.0500 m1 Rp 15,700 326.760 Rp 5,130,132
2 Paku Skrup 0.1500 Kg Rp 20,000 46.680 Rp 933,600
a Pekerja 0.0600 Org/Hari Rp 60,000 311.2 18.672 Rp 1,120,320
b Tukang Kayu Halus 0.0600 Org/Hari Rp 80,000 18.672 Rp 1,493,760
c Kepala Tukang 0.0060 Org/Hari Rp 80,000 1.867 Rp 149,376
d Mandor 0.0030 Org/Hari Rp 95,000 0.934 Rp 88,692

Rp
JUMLAH 311 373.440 40.145 Rp 6,063,732 Rp 2,852,148
TOTAL Rp 60,572,852 Rp 19,147,692
Rp 79,720,544

Nike Naluri (1106587) 258


TABEL REKAPITULASI KEBUTUHAN MATERIAL
9. PEKERJAAN PLAFOND HARGA
SATUAN KEBUTUHAN JUMLAH
NO JENIS SATUAN
1 Gypsumboard t.9 mm lbr Rp62,980 111.078 Rp 6,995,708
2 Kaso kelas II m3 Rp9,500,000 4.699 Rp 44,644,908
3 List Profil 10 cm Gypsum m1 Rp15,700 326.760 Rp 5,130,132
4 Paku 4 s/d 7 cm kg Rp36,000 61.032 Rp 2,197,152
5 Paku Skrup Kg Rp20,000 80.248 Rp 1,604,952
JUMLAH Rp9,634,680 583.817 Rp 60,572,852

TABEL REKAPITULASI KEBUTUHAN UPAH


9. PEKERJAAN PLAFOND HARGA
SATUAN KEBUTUHAN JUMLAH
NO JENIS SATUAN
1 Mandor Org/Hari Rp 95,000 25.346 Rp 2,407,908
2 Pekerja Org/Hari Rp 60,000 94.962 Rp 5,697,720
3 Tukang Kayu Halus Org/Hari Rp 80,000 125.478 Rp 10,038,240
4 Kepala Tukang Org/Hari Rp 80,000 12.548 Rp 1,003,824
JUMLAH Rp 315,000 258.334 Rp 19,147,692

Nike Naluri (1106587) 259


RENCANA ANGGARAN BIAYA
HARGA SATUAN JUMLAH HARGA
NO KODEJENIS PEKERJAAN VOLUME SATUAN
MATERIAL UPAH MATERIAL UPAH TOTAL HARGA
6. PEKERJAAN LANTAI
6.1 Lantai
6.1.1 Lantai Keramik Ukuran 20x20 cm 51.930 M2 Rp130,253 Rp76,125 Rp6,764,038 Rp3,953,171 Rp10,717,210
6.1.2 Lantai Keramik Ukuran 30x30 cm 27.000 M2 Rp130,467 Rp76,125 Rp3,522,612 Rp2,055,375 Rp5,577,987
6.1.3 Lantai Keramik Ukuran 33,3x33,3 cm 20.810 M2 Rp129,969 Rp76,125 Rp2,704,609 Rp1,584,131 Rp4,288,740
6.1.4 Lantai Keramik Ukuran 50x50 cm 72.770 M2 Rp173,612 Rp76,125 Rp12,633,709 Rp5,539,616 Rp18,173,325
6.1.5 Lantai Kayu Gymfloor 97.720 M2 Rp222,300 Rp76,125 Rp21,723,156 Rp7,438,935 Rp29,162,091
6.2 Plin
6.2.1 Plin Keramik Ukuran 10x 20 cm 29.900 M' Rp11,387 Rp13,795 Rp340,480 Rp412,471 Rp752,951
6.2.2 Plin Keramik Ukuran 10x 30 cm 20.800 M' Rp11,300 Rp13,795 Rp235,046 Rp286,936 Rp521,982
6.2.3 Plin Keramik Ukuran 10x 33 cm 24.580 M' Rp11,353 Rp13,795 Rp279,044 Rp339,081 Rp618,126
6.2.4 Plin Keramik Ukuran 10x 50 cm 66.700 M' Rp15,133 Rp13,795 Rp1,009,358 Rp920,127 Rp1,929,484
6.2.5 Plint Lantai Kayu (tinggi =10 cm, tebal 79.600 M' Rp12,971 Rp18,330 Rp1,032,492 Rp1,459,068 Rp2,491,560
JUMLAH Rp848,745 Rp454,135 Rp50,244,544 Rp23,988,910 Rp74,233,455

TABEL DAFTAR KEBUTUHAN MATERIAL DAN UPAH PEKERJA


6.PEKERJAAN LANTAI KEBUTUHAN HARGA
KOEFISIEN SATUAN HARGA SATUAN VOLUME TOTAL
m2 Lantai Keramik MATERIAL UPAH MATERIAL UPAH
1 Keramik Lantai 20/20 cm Polished 1.060 m2 Rp 87,000 55.046 Rp 4,788,985
2 Semen PC (50 Kg) 0.208 zak Rp 63,500 10.801 Rp 685,891
3 Pasir Pasang 0.045 m3 Rp 135,000 2.337 Rp 315,475

Rp10,717,210
4 Semen Warna 1.500 kg Rp 12,500 77.895 Rp 973,688
6.1.1 51.930
a Pekerja 0.700 Org/Hari Rp 60,000 36.351 Rp 2,181,060
b Tukang Batu Kasar 0.350 Org/Hari Rp 80,000 18.176 Rp 1,454,040
c Kepala Tukang 0.035 Org/Hari Rp 80,000 1.818 Rp 145,404
d Mandor 0.035 Org/Hari Rp 95,000 1.818 Rp 172,667
JUMLAH 51.930 146.079 58.162 Rp 6,764,038 Rp 3,953,171
m2 Lantai Keramik (uk. = 30x30 cm)
1 Keramik Lantai 30/30 cm Polished 1.068 m2 Rp 87,000 28.844 Rp 2,509,437
2 Semen PC (50 Kg) 0.200 zak Rp 63,500 5.400 Rp 342,900
3 Pasir Pasang 0.045 m3 Rp 135,000 1.215 Rp 164,025

Rp5,577,987
4 Semen Warna 1.500 kg Rp 12,500 40.500 Rp 506,250
6.1.2 27.000
a Pekerja 0.700 Org/Hari Rp 60,000 18.900 Rp 1,134,000

Nike Naluri (1106587) 260


Rp5,577,987
6.1.2 27.000
b Tukang Batu Kasar 0.350 Org/Hari Rp 80,000 9.450 Rp 756,000
c Kepala Tukang 0.035 Org/Hari Rp 80,000 0.945 Rp 75,600
d Mandor 0.035 Org/Hari Rp 95,000 0.945 Rp 89,775
JUMLAH 27.000 75.959 30.240 Rp 3,522,612 Rp 2,055,375
m2 Lantai Keramik (uk. = 33x33 cm)
1 Keramik Lantai 33/33 cm Polished 1.089 m2 Rp 87,000 22.662 Rp 1,971,564
2 Semen PC (50 Kg) 0.164 zak Rp 63,500 3.409 Rp 216,447
3 Pasir Pasang 0.045 m3 Rp 135,000 0.936 Rp 126,418

Rp4,288,740
4 Semen Warna 1.500 kg Rp 12,500 31.214 Rp 390,180
6.1.3 20.810
a Pekerja 0.700 Org/Hari Rp 60,000 14.567 Rp 874,003
b Tukang Batu Kasar 0.350 Org/Hari Rp 80,000 7.283 Rp 582,669
c Kepala Tukang 0.035 Org/Hari Rp 80,000 0.728 Rp 58,267
d Mandor 0.035 Org/Hari Rp 95,000 0.728 Rp 69,192
JUMLAH 20.810 58.221 23.307 Rp 2,704,609 Rp 1,584,131
m2 Lantai Keramik (uk. = 50x50 cm)
1 Keramik Lantai 50/50 cm Polished 1.105 m2 Rp 123,500 80.411 Rp 9,930,740
2 Semen PC (50 Kg) 0.194 zak Rp 63,500 14.117 Rp 896,454
3 Pasir Pasang 0.045 m3 Rp 135,000 3.275 Rp 442,078

Rp18,173,325
4 Semen Warna 1.500 kg Rp 12,500 109.155 Rp 1,364,438
6.1.4 72.770
a Pekerja 0.700 Org/Hari Rp 60,000 50.939 Rp 3,056,340
b Tukang Batu Kasar 0.350 Org/Hari Rp 80,000 25.470 Rp 2,037,560
c Kepala Tukang 0.035 Org/Hari Rp 80,000 2.547 Rp 203,756
d Mandor 0.035 Org/Hari Rp 95,000 2.547 Rp 241,960
JUMLAH 72.770 206.958 81.502 Rp 12,633,709 Rp 5,539,616
m1 Plint Lantai Keramik (uk. = 10x20 cm)
1 Keramik Lantai 20/20 cm Polished 0.106 m2 Rp 87,000 3.169 Rp 275,738
2 Semen PC (50 Kg) 0.023 zak Rp 63,500 0.682 Rp 43,289
3 Pasir Pasang 0.003 m3 Rp 135,000 0.090 Rp 12,110

Rp752,951
4 Semen Warna 0.025 kg Rp 12,500 0.748 Rp 9,344
6.2.1 29.900
a Pekerja 0.090 Org/Hari Rp 60,000 2.691 Rp 161,460
b Tukang Batu Kasar 0.090 Org/Hari Rp 80,000 2.691 Rp 215,280
c Kepala Tukang 0.009 Org/Hari Rp 80,000 0.269 Rp 21,528
d Mandor 0.005 Org/Hari Rp 95,000 0.150 Rp 14,203
JUMLAH 29.900 4.688 5.801 Rp 340,480 Rp 412,471
m1 Plint Lantai Keramik (uk. = 10x30 cm)
1 Keramik Lantai 30/30 cm Polished 0.105 m2 Rp 87,000 2.184 Rp 190,008
2 Semen PC (50 Kg) 0.023 zak Rp 63,500 0.474 Rp 30,114

Rp521,982
6.2.2 20.800
Nike Naluri (1106587) 261
3 Pasir Pasang 0.003 m3 Rp 135,000 0.062 Rp 8,424

Rp521,982
4 Semen Warna 0.025 kg Rp 12,500 0.520 Rp 6,500
6.2.2 20.800
a Pekerja 0.090 Org/Hari Rp 60,000 1.872 Rp 112,320
b Tukang Batu Kasar 0.090 Org/Hari Rp 80,000 1.872 Rp 149,760
c Kepala Tukang 0.009 Org/Hari Rp 80,000 0.187 Rp 14,976
d Mandor 0.005 Org/Hari Rp 95,000 0.104 Rp 9,880
JUMLAH 20.800 3.241 4.035 Rp 235,046 Rp 286,936
m1 Plint Lantai Keramik (uk. = 10x33 cm)
1 Keramik Lantai 33/33 cm Polished 0.106 m2 Rp 87,000 2.596 Rp 225,821
2 Semen PC (50 Kg) 0.023 zak Rp 63,500 0.560 Rp 35,587
3 Pasir Pasang 0.003 m3 Rp 135,000 0.074 Rp 9,955

Rp618,126
4 Semen Warna 0.025 kg Rp 12,500 0.615 Rp 7,681
6.2.3 24.580
a Pekerja 0.090 Org/Hari Rp 60,000 2.212 Rp 132,732
b Tukang Batu Kasar 0.090 Org/Hari Rp 80,000 2.212 Rp 176,976
c Kepala Tukang 0.009 Org/Hari Rp 80,000 0.221 Rp 17,698
d Mandor 0.005 Org/Hari Rp 95,000 0.123 Rp 11,676
JUMLAH 24.580 3.844 4.769 Rp 279,044 Rp 339,081
m1 Plint Lantai Keramik (uk. = 10x50 cm)
1 Keramik Lantai 50/50 cm Polished 0.105 m2 Rp 123,500 7.004 Rp 864,932
2 Semen PC (50 Kg) 0.023 zak Rp 63,500 1.521 Rp 96,568
3 Pasir Pasang 0.003 m3 Rp 135,000 0.200 Rp 27,014

Rp1,929,484
4 Semen Warna 0.025 kg Rp 12,500 1.668 Rp 20,844
6.2.4 66.700
a Pekerja 0.090 Org/Hari Rp 60,000 6.003 Rp 360,180
b Tukang Batu Kasar 0.090 Org/Hari Rp 80,000 6.003 Rp 480,240
c Kepala Tukang 0.009 Org/Hari Rp 80,000 0.600 Rp 48,024
d Mandor 0.005 Org/Hari Rp 95,000 0.334 Rp 31,683
JUMLAH 66.700 10.392 12.940 Rp 1,009,358 Rp 920,127
m2 Lantai Kayu Gymfloor
1 Lantai Parquette 1.050 m2 Rp 176,000 102.606 Rp 18,058,656
2 Lem Kayu 0.600 Kg Rp 62,500 58.632 Rp 3,664,500

Rp29,162,091
a Pekerja 0.700 Org/Hari Rp 60,000 68.404 Rp 4,104,240
6.1.5 97.720
b Tukang Batu Kasar 0.350 Org/Hari Rp 80,000 34.202 Rp 2,736,160
c Kepala Tukang 0.035 Org/Hari Rp 80,000 3.420 Rp 273,616
d Mandor 0.035 Org/Hari Rp 95,000 3.420 Rp 324,919
JUMLAH 97.720 161.238 109.446 Rp 21,723,156 Rp 7,438,935
m1 Plint Lantai Kayu (tinggi =10 cm, tebal =0.9 – 1,2 cm)
1 Kayu Kuat klas II 0.001 m3 Rp 9,500,000 0.100 Rp 952,812
2 Paku 1 s/d 3 cm 0.050 kg Rp 20,020 3.980 Rp 79,680

Rp2,491,560
6.2.5 79.600
Nike Naluri (1106587) 262
Rp2,491,560
a Pekerja 0.120 Org/Hari Rp 60,000 9.552 Rp 573,120
6.2.5 79.600
b Tukang Batu Kasar 0.120 Org/Hari Rp 80,000 9.552 Rp 764,160
c Kepala Tukang 0.012 Org/Hari Rp 80,000 0.955 Rp 76,416
d Mandor 0.006 Org/Hari Rp 95,000 0.478 Rp 45,372
JUMLAH 79.600 4.080 20.537 Rp 1,032,492 Rp 1,459,068
TOTAL Rp 50,244,544 Rp 23,988,910 74,233,455

TABEL REKAPITULASI KEBUTUHAN MATERIAL


6.PEKERJAAN LANTAI HARGA
SATUAN KEBUTUHAN JUMLAH
NO JENIS SATUAN
1 Kayu Kuat klas II m3 9,500,000 0.100 Rp 952,812
2 Keramik Lantai 20/20 cm Polished m2 87,000 55.046 Rp 4,788,985
3 Keramik Lantai 30/30 cm Polished m2 87,000 28.844 Rp 2,509,437
4 Keramik Lantai 33/33 cm Polished m2 87,000 22.662 Rp 1,971,564
5 Keramik Lantai 50/50 cm Polished m2 123,500 80.411 Rp 9,930,740
6 Lem Kayu Kg 62,500 58.632 Rp 3,664,500
7 Paku 1 s/d 3 cm kg 20,020 3.980 Rp 79,680
8 Pasir Pasang m3 135,000 8.189 Rp 1,105,498
9 Plint Keramik Lantai 20/20 cm Polishe m2 87,000 3.169 Rp 275,738
10 Plint Keramik Lantai 30/30 cm Polishe m2 87,000 2.184 Rp 190,008
11 Plint Keramik Lantai 33/33 cm Polishe m2 87,000 2.596 Rp 225,821
12 Plint Keramik Lantai 50/50 cm Polishe m2 123,500 7.004 Rp 864,932
13 Semen PC (50 Kg) zak 63,500 36.965 Rp 2,347,251
14 Semen Warna kg 12,500 262.314 Rp 3,278,924
15 Lantai Parquette m2 176,000 102.606 Rp 18,058,656
JUMLAH 10,562,520 572.095 Rp 50,244,544

TABEL REKAPITULASI KEBUTUHAN UPAH


6.PEKERJAAN LANTAI HARGA
SATUAN KEBUTUHAN JUMLAH
NO JENIS SATUAN
1 Mandor Org/Hari 95,000 10.646 Rp 1,011,326
2 Kepala Tukang Org/Hari 80,000 11.691 Rp 935,284
3 Pekerja Org/Hari 60,000 211.491 Rp 12,689,455
4 Tukang Batu Kasar Org/Hari 80,000 116.911 Rp 9,352,845
JUMLAH 315,000 350.738 Rp 23,988,910

Nike Naluri (1106587) 263


Plint dan Lantai Kayu Gymfloor
RUANG P L A 2x(P+L)
R. Tidur 8.00 4.00 32.000 24.000
R. Tidur 1 4.00 4.00 16.000 16.000
R. Tidur 2 4.60 4.00 18.400 17.200
R. Tidur 3 5.80 5.40 31.320 22.400
TOTAL 97.720 79.600

Plint dan Lantai Keramik Ukuran 50x50 cm


RUANG P L A 2x(P+L)
gudang 4.20 2.20 9.240 12.800
dapur 3.15 3.00 9.450 12.300
R. Makan 5.40 4.00 21.600 18.800
R. Keluarga 5.80 5.60 32.480 22.800
R. Tamu 4.20 3.40 14.280 15.200
foyer 3.00 2.20 6.600 10.400
R. Keluarga 6.00 4.60 27.600 21.200
hall 6.00 4.00 24.000 20.000
tangga 4.20 2.20 3.150 8.300
TOTAL 72.770 66.700

Lantai Keramik Ukuran 33,3x33,3 cm


RUANG P L A 2x(P+L)
KM utama 4.00 2.00 8.000 0.000
Lantai Keramik Ukuran 20x20 cm teras 3.00 3.10 9.300 12.200
RUANG P L A 2x(P+L) 3.52 0.80 2.816 8.640
balkon
lt 1 bag. Bel 10.00 3.15 31.500 10.300 1.36 0.51 0.694 3.740
tangga 3.15 1.00 3.150 0.000 total balkon 3.510 12.380
KM/WC 3.00 1.80 5.400 0.000 TOTAL 20.810 24.580
toilet 1 3.15 2.20 6.930 10.700
toilet 2 2.25 2.20 4.950 8.900 Lantai Keramik Ukuran 30x30 cm
TOTAL 51.930 29.900 RUANG P L A 2x(P+L)
garasi 5.00 5.40 27.000 20.800
TOTAL 27.000 20.800

Nike Naluri (1106587) 264


RENCANA ANGGARAN BIAYA
HARGA SATUAN JUMLAH HARGA
NO KODE JENIS PEKERJAAN VOLUME SATUAN TOTAL
MATERIAL UPAH MATERIAL UPAH
1 11.1 Pemasangan Kloset Duduk / Monoblo 4 Bh Rp 2,120,000 Rp 301,280 Rp 8,480,000 Rp 1,205,120 Rp 9,685,120
2 11.2 Pemasangan Kloset Jongkok Porsele 1 Bh Rp 458,970 Rp 207,200 Rp 458,970 Rp 207,200 Rp 666,170
3 11.3 Pemasangan Washtafel 4 Bh Rp 916,350 Rp 209,500 Rp 3,665,400 Rp 838,000 Rp 4,503,400
4 11.4 Pemasangan Septic tank 1 Bh Rp 384,019 Rp 210,720 Rp 384,019 Rp 210,720 Rp 594,739
5 11.5 Bak Kontrol pasangan batu bata uk.6 4 Bh Rp 384,019 Rp 210,720 Rp 1,536,077 Rp 842,880 Rp 2,378,957
6 11.6.1 Pemasangan Pipa PVC tipe AW d = 1 8.65 m' Rp 705,250 Rp 7,611 Rp 6,100,413 Rp 65,835 Rp 6,166,248
7 11.6.2 Pemasangan Pipa PVC tipe AW d = 3 28.66 m' Rp 705,250 Rp 7,611 Rp 20,212,465 Rp 218,131 Rp 20,430,596
8 11.6.3 Pemasangan Pipa PVC tipe AW d = 1 37.27 m' Rp 705,250 Rp 7,611 Rp 26,284,668 Rp 283,662 Rp 26,568,329
9 11.6.4 Pemasangan Pipa PVC tipe AW d = 2 21.2 m' Rp 705,250 Rp 11,417 Rp 14,951,300 Rp 242,030 Rp 15,193,330
10 11.6.5 Pemasangan Pipa PVC tipe AW d = 3 45.33 m' Rp 705,250 Rp 26,850 Rp 31,968,983 Rp 1,217,088 Rp 33,186,070
11 11.6.6 Pemasangan Pipa PVC tipe AW d = 4 54.31 m' Rp 705,250 Rp 26,850 Rp 38,302,128 Rp 1,458,196 Rp 39,760,324
12 11.6.7 Pemasangan Pipa Galvanis d = 1/2" 16.74 m' Rp 201,500 Rp 42,885 Rp 3,373,110 Rp 717,895 Rp 4,091,005
13 11.7 Pemasangan Bak Cuci Piring Stainless 1 Bh Rp 645,000 Rp 26,400 Rp 645,000 Rp 26,400 Rp 671,400
14 11.8 Pemasangan Kran Air diameter 13 Bh Rp 188,250 Rp 8,800 Rp 2,447,250 Rp 114,400 Rp 2,561,650
15 11.9 Pemasangan Floor Drain 5 Bh Rp 367,000 Rp 8,800 Rp 1,835,000 Rp 44,000 Rp 1,879,000
16 11.10 Pemasangan Jetwasher 4 Bh Rp 347,350 Rp 8,800 Rp 1,389,400 Rp 35,200 Rp 1,424,600
17 11.11 Pemasangan Kran Sink 1 Bh Rp 35,250 Rp 8,800 Rp 35,250 Rp 8,800 Rp 44,050
18 11.12 Pemasangan Shower 2 Bh Rp 245,250 Rp 8,800 Rp 490,500 Rp 17,600 Rp 508,100
19 11.13 Pemasangan Bathtube 2 Bh Rp 7,198,000 Rp 328,950 Rp 14,396,000 Rp 657,900 Rp 15,053,900
JUMLAH Rp 17,722,458 Rp1,669,604 Rp176,955,931 Rp8,411,057 Rp 185,366,988

TABEL DAFTAR KEBUTUHAN MATERIAL DAN UPAH PEKERJA


11.PEKERJAAN PIPA dan SANITER KEBUTUHAN HARGA
KOEFISIEN SATUAN HARGA SATUAN VOLUME TOTAL
Bh Pemasangan Kloset Duduk / Mono MATERIAL UPAH MATERIAL UPAH
1 Kloset Duduk Porselen 1.0000 unt Rp 2,000,000 4 Rp 8,000,000
2 Perlengkapan 0.0600 persen Rp 2,000,000 0.24 Rp 480,000

Rp9,685,120
a Pekerja 3.3000 Org/Hari Rp 60,000 13.2 Rp 792,000
11.1 4
b Tukang Batu Halus 1.1000 Org/Hari Rp 80,000 4.4 Rp 352,000
c Kepala Tukang 0.0010 Org/Hari Rp 80,000 0.004 Rp 320
d Mandor 0.1600 Org/Hari Rp 95,000 0.64 Rp 60,800
JUMLAH 4 4.240 18.244 Rp 8,480,000 Rp1,205,120
Bh Pemasangan Kloset Jongkok Porselen
1 Kloset Jongkok Porselen Putih 1.0000 unt Rp 450,000 1 Rp 450,000
2 Semen PC (50 Kg) 0.1200 zak Rp 63,500 0.12 Rp 7,620

Rp666,170
3 Pasir Pasang 0.0100 m3 Rp 135,000 0.01 Rp 1,350
1
11.2

Nike Naluri (1106587) 265


Rp666,170
1
11.2 a Pekerja 1.0000 Org/Hari Rp 60,000 1 Rp 60,000
b Tukang Batu Halus 1.5000 Org/Hari Rp 80,000 1.5 Rp 120,000
c Kepala Tukang 0.1500 Org/Hari Rp 80,000 0.15 Rp 12,000
d Mandor 0.1600 Org/Hari Rp 95,000 0.16 Rp 15,200
JUMLAH 1 1.130 2.810 Rp 458,970 Rp 207,200
Bh Pemasangan Washtafel
1 Washtafel Keramik (lengkap) 1.0000 unt Rp 750,000 4 Rp 3,000,000
2 Perlengkapan 0.1200 persen Rp 750,000 0.48 Rp 360,000

Rp4,503,400
3 Semen Warna 6.0000 kg Rp 12,500 24 Rp 300,000
4 Pasir Pasang 0.0100 m3 Rp 135,000 4 0.04 Rp 5,400
11.3
a Pekerja 1.2000 Org/Hari Rp 60,000 4.8 Rp 288,000
b Tukang Batu Halus 1.4500 Org/Hari Rp 80,000 5.8 Rp 464,000
c Kepala Tukang 0.1500 Org/Hari Rp 80,000 0.6 Rp 48,000
d Mandor 0.1000 Org/Hari Rp 95,000 0.4 Rp 38,000
JUMLAH 4 28.520 11.600 Rp 3,665,400 Rp 838,000
bh Pemasangan Septic tank
1 Bata Merah 306.4460 m3 Rp 600 306.446 Rp 183,868
2 Semen PC (50 Kg) 2.2800 zak Rp 63,500 2.28 Rp 144,780
3 Pasir Pasang 0.1840 m3 Rp 135,000 0.184 Rp 24,840
4 Batu Split Pecah Mesin 1/2 0.0330 m3 Rp 145,000 0.033 Rp 4,785

Rp594,739
5 Besi Beton rata-rata 4.8500 Kg Rp 1,721 4.85 Rp 8,347
1
11.4 6 Pasir Beton 0.1200 m3 Rp 145,000 0.12 Rp 17,400
a Pekerja 2.1600 Org/Hari Rp 60,000 2.16 Rp 129,600
b Tukang Batu Halus 0.7200 Org/Hari Rp 80,000 0.72 Rp 57,600
c Kepala Tukang 0.0720 Org/Hari Rp 80,000 0.072 Rp 5,760
d Mandor 0.1080 Org/Hari Rp 95,000 0.108 Rp 10,260
e Tukang Gali 0.1000 Org/Hari Rp 75,000 0.1 Rp 7,500
JUMLAH 1 313.913 3.160 Rp 384,019 Rp 210,720
bh Bak Kontrol pasangan batu bata uk.60x60x65 cm
1 Bata Merah 306.4460 m1 Rp 600 1225.784 Rp 735,470
2 Semen PC (50 Kg) 2.2800 zak Rp 63,500 9.12 Rp 579,120
3 Pasir Pasang 0.1840 m3 Rp 135,000 0.736 Rp 99,360
4 Batu Split Pecah Mesin 1/2 0.0330 m3 Rp 145,000 0.132 Rp 19,140

Rp2,378,957
5 Besi Beton rata-rata 4.8500 Kg Rp 1,721 19.4 Rp 33,386
4
11.5 6 Pasir Beton 0.1200 m3 Rp 145,000 0.48 Rp 69,600
a Pekerja 2.1600 Org/Hari Rp 60,000 8.64 Rp 518,400
b Tukang Batu Halus 0.7200 Org/Hari Rp 80,000 2.88 Rp 230,400
c Kepala Tukang 0.0720 Org/Hari Rp 80,000 0.288 Rp 23,040

Nike Naluri (1106587) 266


4
11.5

Rp2,37
d Mandor 0.1080 Org/Hari Rp 95,000 0.432 Rp 41,040
e Tukang Gali 0.1000 Org/Hari Rp 75,000 0.4 Rp 30,000
JUMLAH 4 1,255.652 12.640 Rp 1,536,077 Rp 842,880
m' Pemasangan Pipa PVC tipe AW d = 1/2"
1 Pipa PVC d=1/2 " 1.2000 m1 Rp 455,000 10.38 Rp 4,722,900

Rp6,166,248
2 Perlengkapan 0.3500 persen Rp 455,000 3.0275 Rp 1,377,513
a Pekerja 0.0360 Org/Hari Rp 60,000 8.65 0.3114 Rp 18,684
11.6.1
b Tukang Batu Halus 0.0600 Org/Hari Rp 80,000 0.519 Rp 41,520
c Kepala Tukang 0.0060 Org/Hari Rp 80,000 0.0519 Rp 4,152
d Mandor 0.0018 Org/Hari Rp 95,000 0.01557 Rp 1,479
JUMLAH 8.65 13.408 0.898 Rp 6,100,413 Rp 65,835
m' Pemasangan Pipa PVC tipe AW d = 3/4"
1 Pipa PVC d=3/4 " 1.2000 m1 Rp 455,000 34.392 Rp 15,648,360

Rp20,430,596
2 Perlengkapan 0.3500 persen Rp 455,000 10.031 Rp 4,564,105
a Pekerja 0.0360 Org/Hari Rp 60,000 28.66 1.03176 Rp 61,906
11.6.2
b Tukang Batu Halus 0.0600 Org/Hari Rp 80,000 1.7196 Rp 137,568
c Kepala Tukang 0.0060 Org/Hari Rp 80,000 0.17196 Rp 13,757
d Mandor 0.0018 Org/Hari Rp 95,000 0.051588 Rp 4,901
JUMLAH 28.66 44.423 2.975 Rp 20,212,465 Rp 218,131
m' Pemasangan Pipa PVC tipe AW d = 1"
1 Pipa PVC d= 1 " 1.2000 m1 Rp 455,000 44.724 Rp 20,349,420

Rp26,568,329
2 Perlengkapan 0.3500 persen Rp 455,000 13.0445 Rp 5,935,248
a Pekerja 0.0360 Org/Hari Rp 60,000 37.27 1.34172 Rp 80,503
11.6.3
b Tukang Batu Halus 0.0600 Org/Hari Rp 80,000 2.2362 Rp 178,896
c Kepala Tukang 0.0060 Org/Hari Rp 80,000 0.22362 Rp 17,890
d Mandor 0.0018 Org/Hari Rp 95,000 0.067086 Rp 6,373
JUMLAH 37.27 57.769 3.869 Rp 26,284,668 Rp 283,662
m' Pemasangan Pipa PVC tipe AW d = 2"
1 Pipa PVC d= 2 " 1.2000 m1 Rp 455,000 25.44 Rp 11,575,200

Rp15,193,330
2 Perlengkapan 0.3500 persen Rp 455,000 7.42 Rp 3,376,100
a Pekerja 0.0540 Org/Hari Rp 60,000 21.2 1.1448 Rp 68,688
11.6.4
b Tukang Batu Halus 0.0900 Org/Hari Rp 80,000 1.908 Rp 152,640
c Kepala Tukang 0.0090 Org/Hari Rp 80,000 0.1908 Rp 15,264
d Mandor 0.0027 Org/Hari Rp 95,000 0.05724 Rp 5,438
JUMLAH 21.2 32.860 3.301 Rp 14,951,300 Rp 242,030
m' Pemasangan Pipa PVC tipe AW d = 3"
1 Pipa PVC d= 3 " 1.2000 m1 Rp 455,000 54.396 Rp 24,750,180

Rp33,186,070
2 Perlengkapan 0.3500 persen Rp 455,000 15.8655 Rp 7,218,803
45.33
11.6.5
Nike Naluri (1106587) 267
Rp33,186,070
a Pekerja 0.0810 Org/Hari Rp 60,000 45.33 3.67173 Rp 220,304
11.6.5
b Tukang Batu Halus 0.1350 Org/Hari Rp 80,000 6.11955 Rp 489,564
c Kepala Tukang 0.1350 Org/Hari Rp 80,000 6.11955 Rp 489,564
d Mandor 0.0041 Org/Hari Rp 95,000 0.185853 Rp 17,656
JUMLAH 45.33 70.262 16.097 Rp 31,968,983 Rp1,217,088
m' Pemasangan Pipa PVC tipe AW d = 4"
1 Pipa PVC d= 4 " 1.2000 m1 Rp 455,000 65.172 Rp 29,653,260

Rp39,760,324
2 Perlengkapan 0.3500 persen Rp 455,000 19.0085 Rp 8,648,868
a Pekerja 0.0810 Org/Hari Rp 60,000 54.31 4.39911 Rp 263,947
11.6.6
b Tukang Batu Halus 0.1350 Org/Hari Rp 80,000 7.33185 Rp 586,548
c Kepala Tukang 0.1350 Org/Hari Rp 80,000 7.33185 Rp 586,548
d Mandor 0.0041 Org/Hari Rp 95,000 0.222671 Rp 21,154
JUMLAH 54.31 84.181 19.285 Rp 38,302,128 Rp1,458,196
m' Pemasangan Pipa Galvanis d = 1/2"
1 Pipa Galvanis d=1/2 " 1.2000 m1 Rp 130,000 20.088 Rp 2,611,440

Rp4,091,005
2 Perlengkapan 0.3500 persen Rp 130,000 5.859 Rp 761,670
a Pekerja 0.5400 Org/Hari Rp 60,000 16.74 9.0396 Rp 542,376
11.6.7
b Tukang Batu Halus 0.0900 Org/Hari Rp 80,000 1.5066 Rp 120,528
c Kepala Tukang 0.0090 Org/Hari Rp 80,000 0.15066 Rp 12,053
d Mandor 0.0270 Org/Hari Rp 95,000 0.45198 Rp 42,938
JUMLAH 16.74 25.947 11.149 Rp 3,373,110 Rp 717,895
Bh Pemasangan Bak Cuci Piring Stainless Steel
1 Rp 450,000

Rp671,400
1 Kitchenzink stainless steel 1 lubang 1.0000 unt Rp 450,000
2 Water drain+aksesoris 1.0000 set Rp 195,000 1 1 Rp 195,000
11.7
a Tukang Batu Halus 0.3000 Org/Hari Rp 80,000 0.3 Rp 24,000
b Kepala Tukang 0.0300 Org/Hari Rp 80,000 0.03 Rp 2,400
JUMLAH 1 2.000 0.330 Rp 645,000 Rp 26,400
Bh Pemasangan Kran Air diameter 3/4" atau 1/2 "

Rp2,561,650
1 Kran dinding 4 jari 1.0000 bh Rp 188,000 13 Rp 2,444,000
2 Seal tape 0.0250 roll Rp 10,000 13 0.325 Rp 3,250
11.8
a Tukang Batu Halus 0.1000 Org/Hari Rp 80,000 1.3 Rp 104,000
b Kepala Tukang 0.0100 Org/Hari Rp 80,000 0.13 Rp 10,400
JUMLAH 13 13.325 1.430 Rp 2,447,250 Rp 114,400
Bh Pemasangan Floor Drain

Rp1,879,000
1 Floordrain 1.0000 unt Rp 367,000 5 Rp 1,835,000
5
11.9 a Tukang Batu Halus 0.1000 Org/Hari Rp 80,000 0.5 Rp 40,000
b Kepala Tukang 0.0100 Org/Hari Rp 80,000 0.05 Rp 4,000
JUMLAH 5 5.000 0.550 Rp 1,835,000 Rp 44,000

Nike Naluri (1106587) 268


Bh Pemasangan Jetwasher

Rp1,424,600
1 Jet washer 1.0000 bh Rp 347,100 4 Rp 1,388,400
2 Seal tape 0.0250 roll Rp 10,000 4 0.1 Rp 1,000
11.10
a Tukang Batu Halus 0.1000 Org/Hari Rp 80,000 0.4 Rp 32,000
b Kepala Tukang 0.0100 Org/Hari Rp 80,000 0.04 Rp 3,200
JUMLAH 4 4.100 0.440 Rp 1,389,400 Rp 35,200
Bh Pemasangan Kran Sink
1 Kran Air 3/4" 1.0000 bh Rp 35,000 1 Rp 35,000

Rp44,050
2 Seal tape 0.0250 roll Rp 10,000 1 0.025 Rp 250
11.11
a Tukang Batu Halus 0.1000 Org/Hari Rp 80,000 0.1 Rp 8,000
b Kepala Tukang 0.0100 Org/Hari Rp 80,000 0.01 Rp 800
JUMLAH 1 1.025 0.110 Rp 35,250 Rp 8,800
Bh Pemasangan Shower
2 Rp 490,000

Rp508,100
1 Shower 1.0000 bh Rp 245,000
2 Seal tape 0.0250 roll Rp 10,000 2 0.05 Rp 500
11.12
a Tukang Batu Halus 0.1000 Org/Hari Rp 80,000 0.2 Rp 16,000
b Kepala Tukang 0.0100 Org/Hari Rp 80,000 0.02 Rp 1,600
JUMLAH 2 2.050 0.220 Rp 490,500 Rp 17,600
bh Pemasangan Bathtube
1 Bath Tube fibreglass 1.0000 unt Rp 6,100,000 2 Rp 12,200,000

Rp15,053,900
2 Perlengkapan 0.1800 persen Rp 6,100,000 0.36 Rp 2,196,000
a Pekerja 1.8000 Org/Hari Rp 60,000 2 3.6 Rp 216,000
11.13
b Tukang Batu Halus 2.7000 Org/Hari Rp 80,000 5.4 Rp 432,000
c Kepala Tukang 0.0500 Org/Hari Rp 80,000 0.1 Rp 8,000
d Mandor 0.0100 Org/Hari Rp 95,000 0.02 Rp 1,900
JUMLAH 2 2.360 9.120 Rp 14,396,000 Rp 657,900
TOTAL Rp 176,955,931 Rp8,411,057
TOTAL Rp 185,366,988

TABEL REKAPITULASI KEBUTUHAN MATERIAL


11.PEKERJAAN PIPA dan SANITER HARGA
SATUAN KEBUTUHAN JUMLAH
NO JENIS SATUAN
1 Bata Merah m3 Rp600 1532.230 Rp 919,338
2 Bath Tube fibreglass unt Rp6,100,000 2 Rp 12,200,000
3 Batu Split Pecah Mesin 1/2 m3 Rp145,000 0.165 Rp 23,925
4 Besi Beton rata-rata Kg Rp1,721 24.250 Rp 41,733
5 Floordrain unt Rp367,000 5 Rp 1,835,000
6 Jet washer bh Rp347,100 4 Rp 1,388,400

Nike Naluri (1106587) 269


7 Kitchenzink stainless steel 1 lubang unt Rp450,000 1 Rp 450,000
8 Kloset Duduk Porselen unt Rp2,000,000 4 Rp 8,000,000
9 Kloset Jongkok Porselen Putih unt Rp450,000 1 Rp 450,000
10 Kran Air 3/4" bh Rp35,000 1 Rp 35,000
11 Kran dinding 4 jari bh Rp188,000 13 Rp 2,444,000
12 Pasir Beton m3 Rp145,000 0.600 Rp 87,000
13 Pasir Pasang m3 Rp135,000 0.970 Rp 130,950
14 Pipa Galvanis d=1/2 " m1 Rp130,000 20 Rp 2,611,440
15 Pipa PVC d= 1 " m1 Rp455,000 45 Rp 20,349,420
16 Pipa PVC d= 2 " m1 Rp455,000 25 Rp 11,575,200
17 Pipa PVC d= 3 " m1 Rp455,000 54 Rp 24,750,180
18 Pipa PVC d= 4 " m1 Rp455,000 65 Rp 29,653,260
19 Pipa PVC d=1/2 " m1 Rp455,000 10 Rp 4,722,900
20 Pipa PVC d=3/4 " m1 Rp455,000 34 Rp 15,648,360
21 Seal tape roll Rp10,000 1 Rp 5,000
22 Semen PC (50 Kg) zak Rp63,500 12 Rp 731,520
23 Semen Warna kg Rp12,500 24 Rp 300,000
24 Shower bh Rp245,000 2 Rp 490,000
25 Washtafel Keramik (lengkap) unt Rp750,000 4 Rp 3,000,000
26 Water drain+aksesoris set Rp195,000 1 Rp 195,000
Perlengkapan
27 Kloset Duduk Porselen persen Rp2,000,000 0.240 Rp 480,000
28 Washtafel Keramik (lengkap) persen Rp750,000 0.480 Rp 360,000
29 Pipa PVC d=1/2 " persen Rp455,000 3.028 Rp 1,377,513
30 Pipa PVC d=3/4 " persen Rp455,000 10.031 Rp 4,564,105
31 Pipa PVC d= 1 " persen Rp455,000 13.045 Rp 5,935,248
32 Pipa PVC d= 2 " persen Rp455,000 7.420 Rp 3,376,100
33 Pipa PVC d= 3 " persen Rp455,000 15.866 Rp 7,218,803
34 Pipa PVC d= 4 " persen Rp455,000 19.009 Rp 8,648,868
35 Pipa Galvanis d=1/2 " persen Rp130,000 5.859 Rp 761,670
36 Bath Tube fibreglass persen Rp6,100,000 0.360 Rp 2,196,000
JUMLAH Rp26,210,421 1962.163 Rp 176,955,931
TABEL REKAPITULASI KEBUTUHAN UPAH
11.PEKERJAAN PIPA dan SANITER HARGA
SATUAN KEBUTUHAN JUMLAH
NO JENIS SATUAN
1 Kepala Tukang Org/Hari Rp 80,000 15.734 Rp 1,258,747
2 Mandor Org/Hari Rp 95,000 2.812 Rp 267,139
3 Pekerja Org/Hari Rp 60,000 54.340 Rp 3,260,407

Nike Naluri (1106587) 270


4 Tukang Batu Halus Org/Hari Rp 80,000 44.841 Rp 3,587,264
5 Tukang Gali Org/Hari Rp 75,000 0.500 Rp 37,500
JUMLAH Rp390,000 118.227 Rp 8,411,057

Nike Naluri (1106587) 271


Nike Naluri (1106587) 272
RENCANA ANGGARAN BIAYA
HARGA SATUAN JUMLAH HARGA
NO KODE JENIS PEKERJAAN VOLUME SATUAN TOTAL
MATERIAL UPAH MATERIAL UPAH
5. PEKERJAAN DINDING
1 5.1 Pasangan Bata Merah 1/2 Bt (1 pc : 4 Ps)786.441 m2 Rp 62,410 28,225 Rp 49,081,770 Rp 22,197,292 Rp 71,279,062
2 5.2 Plesteran tebal= 2cm (1 pc : 3 Ps) 1922.181 m2 Rp 17,352 43,690 Rp 33,354,383 Rp 83,980,105 Rp 117,334,488
3 5.3 Acian 1922.181 m2 Rp 4,128 30,300 Rp 7,933,804 Rp 58,242,096 Rp 66,175,900
4 5.4 Dinding keramik 122.752 m2 Rp 130,711 78,925 Rp 16,044,986 Rp 9,688,171 Rp 25,733,157
5 5.5 Pasangan Bata Roster (1pc:3pc) uk. 12x1 0.072 m2 Rp 112,100 28,225 Rp 8,071 Rp 2,032 Rp 10,103
JUMLAH Rp 326,701 209,365 Rp106,423,014 Rp174,109,696 Rp280,532,710
TABEL DAFTAR KEBUTUHAN MATERIAL DAN UPAH PEKERJA
5.PEKERJAAN DINDING HARGA KEBUTUHAN HARGA
KOEFISIEN SATUAN VOLUME TOTAL
m2 Pasangan Bata Merah 1/2 Bt (1 pc : 4 SATUAN MATERIAL UPAH MATERIAL UPAH
1 Bata Merah 70 bh Rp 600 55050.856 Rp 33,030,514
2 Semen PC (50 Kg) 0.2300 zak Rp 63,500 180.881 Rp 11,485,968

71,279,062
3 Pasir Pasang 0.0430 m3 Rp 135,000 33.817 Rp 4,565,289
5.1 a Pekerja 0.3000 Org/Hari Rp 60,000 786.441 235.932 Rp 14,155,934
b Tukang Batu Kasar 0.1000 Org/Hari Rp 80,000 78.644 Rp 6,291,526
c Kepala Tukang 0.0100 Org/Hari Rp 80,000 7.864 Rp 629,153

Rp
d Mandor 0.0150 Org/Hari Rp 95,000 11.797 Rp 1,120,678
JUMLAH 786.441 55265.554 334.237 Rp 49,081,770 Rp 22,197,292
m2 Plesteran tebal= 2cm (1 pc : 3 Ps)
1 Semen PC (50 Kg) 0.2074 zak Rp 63,500 398.584 Rp 25,310,054

117,334,488
2 Pasir Pasang 0.0310 m3 Rp 135,000 59.588 Rp 8,044,329
a Pekerja 0.4000 Org/Hari Rp 60,000 768.873 Rp 46,132,353
5.2 1922.181
b Tukang Batu Kasar 0.2000 Org/Hari Rp 80,000 384.436 Rp 30,754,902
c Kepala Tukang 0.0200 Org/Hari Rp 80,000 38.444 Rp 3,075,490
d Mandor 0.0220 Org/Hari Rp 95,000 42.288 Rp 4,017,359

Rp
JUMLAH 1922.181 458.171 1234.040 Rp 33,354,383 Rp 83,980,105
m2 Acian
1 Semen PC (50 Kg) 0.0650 zak Rp 63,500 124.942 Rp 7,933,804

66,175,900
a Pekerja 0.2000 Org/Hari Rp 60,000 384.436 Rp 23,066,177
5.3 b Tukang Batu Kasar 0.1000 Org/Hari Rp 80,000 1922.181 192.218 Rp 15,377,451
c Kepala Tukang 0.0100 Org/Hari Rp 80,000 19.222 Rp 1,537,745
d Mandor 0.1000 Org/Hari Rp 95,000 192.218 Rp 18,260,723

Rp
JUMLAH 1922.181 124.94179035 788.0943699 Rp 7,933,804 Rp 58,242,096
m2 Dinding Keramik

Nike Naluri (1106587) 273


5.4
1 Keramik Dinding 20/20 cm Polished 1.06 m2 Rp 87,000 130.117 Rp 11,320,153
2 Semen PC (50 Kg) 0.186 zak Rp 63,500 22.832 Rp 1,449,819

25,733,157
3 Pasir Pasang 0.018 m3 Rp 135,000 2.210 Rp 298,286
4 Semen Warna 1.94 kg Rp 12,500 238.138 Rp 2,976,727
5.4 122.752
a Pekerja 0.6 Org/Hari Rp 60,000 73.651 Rp 4,419,058
b Tukang Batu Kasar 0.45 Org/Hari Rp 80,000 55.238 Rp 4,419,058
c Kepala Tukang 0.045 Org/Hari Rp 80,000 5.524 Rp 441,906

Rp
d Mandor 0.035 Org/Hari Rp 95,000 4.296 Rp 408,149
JUMLAH 122.752 393.29615844 138.7093193 Rp 16,044,986 Rp 9,688,171
m2 Pasangan Bata Roster (1 pc : 3 Ps) u
1 Bata Roster 30.0000 bh Rp 3,000 2.160 Rp 6,480
2 Semen PC (50 Kg) 0.2800 zak Rp 63,500 0.020 Rp 1,280

10,103
3 Pasir Pasang 0.0320 m3 Rp 135,000 0.002 Rp 311
5.5 a Pekerja 0.3000 Org/Hari Rp 60,000 0.072 0.022 Rp 1,296
b Tukang Batu Kasar 0.1000 Org/Hari Rp 80,000 0.007 Rp 576
c Kepala Tukang 0.0100 Org/Hari Rp 80,000 0.001 Rp 58

Rp
d Mandor 0.0150 Org/Hari Rp 95,000 0.001 Rp 103
JUMLAH 0.072 2.182464 0.0306 Rp 8,071 Rp 2,032
TOTAL Rp106,423,014 Rp174,109,696
TOTAL Rp280,532,710

Nike Naluri (1106587) 274


TABEL REKAPITULASI KEBUTUHAN MATERIAL
5.PEKERJAAN DINDING HARGA
SATUAN KEBUTUHAN JUMLAH
NO JENIS SATUAN
1 Bata Merah bh Rp 600 55050.856 Rp 33,030,514
2 Bata Roster bh Rp 3,000 2.160 Rp 6,480
3 Keramik Dinding 20/20 cm Polished m2 Rp 87,000 130.117 Rp 11,320,153
4 Pasir Pasang m3 Rp 135,000 95.616 Rp 12,908,215
5 Semen PC (50 Kg) zak Rp 63,500 727.259 Rp 46,180,925
6 Semen Warna kg Rp 12,500 238.138 Rp 2,976,727
JUMLAH Rp 301,600 56244.146 Rp 106,423,014
TABEL REKAPITULASI KEBUTUHAN UPAH
5.PEKERJAAN DINDING HARGA
SATUAN KEBUTUHAN JUMLAH
NO JENIS SATUAN
1 Kepala Tukang Org/Hari Rp 80,000 71.054 Rp 5,684,351.372
2 Mandor Org/Hari Rp 95,000 250.600 Rp 23,807,012.153
3 Pekerja Org/Hari Rp 60,000 1462.914 Rp 87,774,818.400
4 Tukang Batu Kasar Org/Hari Rp 80,000 710.544 Rp 56,843,513.720
JUMLAH Rp 315,000 2495.112 Rp 174,109,696

Nike Naluri (1106587) 275


kolom lubang kolom lubang kolom lubang
TITIK AS LUAS (M2) TITIK AS LUAS (M2) TITIK AS LUAS (M2)
(M2) kusen (M2) kusen (M2) kusen
G1-F1 8.316 0.945 0.276 10E-9E 7.560 0.491 0.360 G1-F1 9.328 1.060 2.280
F1-D1 12.852 0.945 0.230 9E-7E 30.240 1.928 4.420 F1-D1 14.416 1.060 2.210 2

C2-A2 20.412 0.491 11.800 4F-1F 15.876 1.474 0.000 D2-C2 12.720 1.124 4.970
D3-C3 11.340 0.718 6.125 11G-10G 18.900 1.247 0.000 C3-B3 9.540 0.806 0.390 8

D4-C4 11.340 0.718 0.000 10G-9G 7.560 0.491 0.000 B3-A3 13.356 0.551 1.170
D5-C5 11.340 1.814 0.000 9G-7G 30.240 1.928 0.000 C4-B4 9.540 0.551 0.000 30
1

7G-5G 15.120 0.000


1,38

C5-B5 8.505 0.718 0.000 0.907 B4-A4 13.356 0.551 1.935 4

A6-B6 11.907 0.813 2.250 5G-4G 6.804 1.040 0.000 G5-E5 16.960 0.551 2.250 0 ,9 1 ,5

0.000
1 ,8

A7-B7 11.907 1.040 3.875 4G-1G 15.876 1.569 E5-C5 19.504 2.078 2.250 2 ,2
0,7

B7-E7 25.893 1.890 7.845 4C'-5C' 6.804 0.491 0.276 G7-E7 16.960 0.912 2.210 2

G7-E7 15.120 1.436 2.250 4D'-5D' 6.804 0.491 1.720 E7-C7 19.504 2.226 2.210 1
1 ,5
0 ,5

1
1
0 ,28

A8-A'8 7.560 0.718 0.000 9A'-8A' 4.536 0.491 1.720 C7-A7 22.896 0.806 2.210 0 ,6

A9-B9 11.907 0.491 1.935 TOTAL 603.288 52.372 54.972 7A-4A 24.592 2.226 0.000
2 ,9

0 ,6 2 0 ,6

E9-G9 15.120 1.928 1.935 VOL. LT.BAWAH 495.945 4A-3A 9.328 1.060 0.000 2 ,2 1 ,8 1 ,6 3

14
5 ,4

E10-G10 15.120 0.945 2.250 dinding keramik (WC) 4B-3B 9.328 0.700 0.000
A10-B10 11.907 0.945 0.000 4C'-5C' 6.181 0.446 0.276 4C-3C 9.328 0.551 1.720
A11-G11 52.920 2.457 0.000 4D'-5D' 6.181 0.446 1.720 4C-5C 7.632 0.551 2.250
11A-10A 18.900 1.247 0.000 4C'-4D' 10.302 0.446 0.000 5C-7C 16.960 0.551 0.000
10A-9A 7.560 0.491 0.000 5C'-5D' 10.302 0.446 0.000 2D-1D 2.120 0.551 0.000
9A-8A 4.536 0.491 0.000 E9-G9 11.936 1.522 2.000 7E-5E 16.960 0.551 0.000
8A-7A 25.704 2.192 0.000 E10-G10 11.936 0.746 0.000 4F-1F 15.900 1.654 0.000
7A-6A 11.340 0.491 0.000 10G-9G 5.968 0.388 0.000 1G-1'G 4.240 0.551 0.000
6A-5A 3.780 0.718 0.000 10E-9E 5.968 0.388 0,6*0,6 1G-5G 25.440 3.032 0.000
5A-4A 6.804 1.134 0.000 A8-A'8 3.500 0.333 0.000 5G-7G 16.960 1.272 0.000
4A-3A 8.316 1.323 0.000 A9-A'9 3.500 0.228 0.000 7A-7'A 4.240 0.636 0.000
3A-2A 5.670 1.229 0.000 9A-8A 2.100 0.228 0.000 7G-7'G 4.240 0.636 0.000
10B-9B 7.560 0.491 1.190 9A'-8A' 2.100 0.228 1.720 TOTAL 345.348 26.80 28.055
9B-7B 30.240 3.629 4.515 C3-B3 5.783 0.488 0.380 VOL. LT.ATAS 290.50
2A-1'A 9.450 1.304 0.000 B3-A3 8.096 0.334 1.140 VOLUME VOL
6B-5B 3.780 0.756 0.000 C4-B4 5.783 0.334 0.000 pasangan bata 786.441
4C-3C 8.316 1.229 0.000 B4-A4 8.096 0.334 1.720 plesteran & acian 1922.181
3C-2C 5.670 1.229 0.000 4A-3A 5.654 0.643 0.000 dinding keramik 122.752
5D-4D 2.646 0.491 0.000 4B-3B 5.654 0.424 0.000 bata roster 2 BH 0.072
2C-1'C 3.780 1.115 0.000 4C-3C 5.654 0.334 1.720
3D-1'D 9.450 1.247 0.000 TOTAL 124.692 8.736 10.676

Nike Naluri (1106587) 276


VOLUME ATAP
NO
TIPE satuan 1/2 KD1 KD1 KD2 1/2 KD2 KD3 jumlah
1 Konstruksi kuda-kuda Kayu m3 0.235392 0.437376 0.182016 0.095904 0.567936 1.519
2 Gordeng m3 0.245376 0.481056 0.234528 0.089472 0.400512 1.451
3 rangka atap m2 38.4341 61.7568 35.1792 14.43825 57.5736 207.382
4 Lisplank (3x20cm) m1 16.46 16.53 6.98 7.13 10.43 57.530
5 Lisplank (3x30cm) m1 16.46 16.53 6.98 7.13 10.43 57.530
6 Penutup Atap Genteng Beton m1 39.74 46.94 34.12 17.21 31.9 169.910

RENCANA ANGGARAN BIAYA


HARGA SATUAN JUMLAH HARGA
NO KODE JENIS PEKERJAAN VOLUME SATUAN TOTAL
MATERIAL UPAH MATERIAL UPAH
1 8.1 Membuat & memasang Konstruksi kuda-kud 1.518624 m3 Rp 10,871,945 Rp 1,315,000 Rp 16,510,396 Rp 1,996,991 Rp 18,507,387
2 8.2 Membuat & memasang Gording, Kayu kelas 1.450944 m3 Rp 10,778,345 Rp 789,000 Rp 15,638,775 Rp 1,144,795 Rp 16,783,570
3 8.3 Membuat & memasang rangka atap genteng 2B07.38195 m2 Rp 210,400 Rp 15,275 Rp 43,633,162 Rp 3,167,759 Rp 46,800,922
4 8.4 Membuat & memasang Lisplank (3x20cm), Ka 57.53 m1 Rp 106,200 Rp 24,075 Rp 6,109,686 Rp 1,385,035 Rp 7,494,721
5 8.5 Membuat & memasang Lisplank (3x30cm), Ka 57.53 m1 Rp 106,300 Rp 24,075 Rp 6,115,439 Rp 1,385,035 Rp 7,500,474
6 8.6 Penutup Atap Genteng Beton 169.91 m1 Rp 52,560 Rp 21,750 Rp 8,930,470 Rp 3,695,543 Rp 12,626,012
JUMLAH Rp22,125,750 Rp2,189,175 Rp96,937,928 Rp12,775,157 Rp109,713,085

TABEL DAFTAR KEBUTUHAN MATERIAL DAN UPAH PEKERJA


8.PEKERJAAN ATAP HARGA KEBUTUHAN HARGA
KOEFISIEN SATUAN VOLUME TOTAL
m3 Membuat & memasang Konstruksi kuda- SATUAN MATERIAL UPAH MATERIAL UPAH
1 Kayu Kuat klas II 1.1000 m3 Rp 9,500,000 1.670 Rp 15,869,621

18,507,387
2 Plat Strip 15.0000 Kg Rp 14,690 22.779 Rp 334,621
3 Paku 8 s/d 12 cm 5.6000 kg Rp 36,000 8.504 Rp 306,155
8.1 a Pekerja 4.0000 Org/Hari Rp 60,000 1.519 6.074 Rp 364,470
b Tukang Kayu Halus 12.0000 Org/Hari Rp 80,000 18.223 Rp 1,457,879
c Kepala Tukang 1.2000 Org/Hari Rp 80,000 1.822 Rp 145,788
d Mandor 0.2000 Org/Hari Rp 95,000 0.304 Rp 28,854

Rp
JUMLAH 1.519 32.954 26.424 Rp 16,510,396 Rp 1,996,991
m3 Membuat & memasang Gordeng, Kayu kelas II
1 Kayu Kuat klas II 1.1000 m3 Rp 9,500,000 1.596 Rp 15,162,365

16,783,570
2 Plat Strip 15.0000 Kg Rp 14,690 21.764 Rp 319,708
3 Paku 8 s/d 12 cm 3.0000 kg Rp 36,000 4.353 Rp 156,702
1.451
8.2 a Pekerja 2.4000 Org/Hari Rp 60,000 3.482 Rp 208,936
b Tukang Kayu Halus 7.2000 Org/Hari Rp 80,000 10.447 Rp 835,744
c Kepala Tukang 0.7200 Org/Hari Rp 80,000 1.045 Rp 83,574

Rp
Nike Naluri (1106587) 277
16,783
1.451
8.2

Rp
d Mandor 0.1200 Org/Hari Rp 95,000 0.174 Rp 16,541
JUMLAH 1.451 27.713 15.148 Rp 15,638,775 Rp 1,144,795
m2 Membuat & memasang rangka atap genteng Beton, kayu kelas II
1 Kaso kelas II 0.0140 m3 Rp 9,500,000 2.903 Rp 27,581,799

46,800,922
2 Kayu Reng 3/4 Kamper Samarinda 0.0072 m3 Rp 9,500,000 1.493 Rp 14,184,925
3 Paku 4 s/d 7 cm 0.2500 kg Rp 36,000 51.845 Rp 1,866,438
207.382
8.3 a Pekerja 0.1000 Org/Hari Rp 60,000 20.738 Rp 1,244,292
b Tukang Kayu Halus 0.1000 Org/Hari Rp 80,000 20.738 Rp 1,659,056
c Kepala Tukang 0.0100 Org/Hari Rp 80,000 2.074 Rp 165,906

Rp
d Mandor 0.0050 Org/Hari Rp 95,000 1.037 Rp 98,506
JUMLAH 207.382 56.242 44.587 Rp 43,633,162 Rp 3,167,759
m1 Membuat & memasang Lisplank (3x20cm), Kayu kelas II
1 Papan kelas II 0.0108 m3 Rp 9,500,000 0.621 Rp 5,902,578

7,494,721
2 Paku 4 s/d 7 cm 0.1000 kg Rp 36,000 5.753 Rp 207,108
a Pekerja 0.1000 Org/Hari Rp 60,000 57.530 5.753 Rp 345,180
8.4
b Tukang Kayu Halus 0.2000 Org/Hari Rp 80,000 11.506 Rp 920,480
c Kepala Tukang 0.0200 Org/Hari Rp 80,000 1.151 Rp 92,048

Rp
d Mandor 0.0050 Org/Hari Rp 95,000 0.288 Rp 27,327
JUMLAH 57.530 6.374 18.697 Rp 6,109,686 Rp 1,385,035
m1 Membuat & memasang Lisplank (3x30cm), Kayu kelas II
1 Papan kelas II 0.0110 m3 Rp 9,500,000 0.633 Rp 6,011,885

7,500,474
2 Paku 4 s/d 7 cm 0.0500 kg Rp 36,000 2.877 Rp 103,554
a Pekerja 0.1000 Org/Hari Rp 60,000 57.530 5.753 Rp 345,180
8.5
b Tukang Kayu Halus 0.2000 Org/Hari Rp 80,000 11.506 Rp 920,480
c Kepala Tukang 0.0200 Org/Hari Rp 80,000 1.151 Rp 92,048

Rp
d Mandor 0.0050 Org/Hari Rp 95,000 0.288 Rp 27,327
JUMLAH 57.530 3.509 18.697 Rp 6,115,439 Rp 1,385,035
m1 Pengadaan dan pemasangan Atap Genteng Beton

12,626,012
1 Genteng Beton 11.0000 Bh Rp 4,680 1869.010 Rp 8,746,967
2 Paku 4 s/d 7 cm 0.0300 kg Rp 36,000 5.097 Rp 183,503
a Pekerja 0.2000 Org/Hari Rp 60,000 169.910 33.982 Rp 2,038,920
8.6
b Tukang Kayu Kasar 0.1000 Org/Hari Rp 80,000 16.991 Rp 1,359,280
c Kepala Tukang 0.0100 Org/Hari Rp 80,000 1.699 Rp 135,928
d Mandor 0.0100 Org/Hari Rp 95,000 1.699 Rp 161,415

Rp
JUMLAH 169.910 1,874.107 54.371 Rp 8,930,470 Rp 3,695,543
TOTAL Rp 96,937,928 Rp12,775,157
TOTAL Rp109,713,085
TABEL REKAPITULASI KEBUTUHAN MATERIAL

Nike Naluri (1106587) 278


8.PEKERJAAN ATAP HARGA
SATUAN KEBUTUHAN JUMLAH
NO JENIS SATUAN
1 Genteng Beton Bh Rp 4,680 1869.0100 Rp 8,746,967
2 Kaso kelas II m3 Rp 9,500,000 2.9033 Rp 27,581,799
3 Kayu Kuat klas II m3 Rp 9,500,000 3.2665 Rp 31,031,986
4 Kayu Reng 3/4 Kamper Samarinda m3 Rp 9,500,000 1.4932 Rp 14,184,925
5 Paku 4 s/d 7 cm kg Rp 36,000 65.5723 Rp 2,360,602
6 Paku 8 s/d 12 cm kg Rp 36,000 12.8571 Rp 462,857
7 Papan kelas II m3 Rp 9,500,000 1.2542 Rp 11,914,463
8 Plat Strip Kg Rp 14,690 44.5435 Rp 654,329
JUMLAH Rp38,091,370 2000.9001 Rp 96,937,928

TABEL REKAPITULASI KEBUTUHAN UPAH


8.PEKERJAAN ATAP HARGA
SATUAN KEBUTUHAN JUMLAH
NO JENIS SATUAN
1 Kepala Tukang Org/Hari Rp 80,000 8.9411 Rp 715,292
2 Mandor Org/Hari Rp 95,000 3.7891 Rp 359,969
3 Pekerja Org/Hari Rp 60,000 75.7830 Rp 4,546,977
4 Tukang Kayu Halus Org/Hari Rp 80,000 72.4205 Rp 5,793,638
5 Tukang Kayu Kasar Org/Hari Rp 80,000 16.9910 Rp 1,359,280
JUMLAH Rp 395,000 177.9247 Rp 12,775,157

Nike Naluri (1106587) 279


RENCANA ANGGARAN BIAYA
HARGA SATUAN JUMLAH HARGA
NO KODE JENIS PEKERJAAN VOLUME SATUAN TOTAL
MATERIAL UPAH MATERIAL UPAH
1 13.1 Pasang Stop Kontak 42 TTK Rp 37,200 Rp 60,000 Rp 1,562,400 Rp 2,520,000 Rp 4,082,400
2 13.2 Pasang saklar 21 TTK Rp 34,500 Rp 60,000 Rp 724,500 Rp 1,260,000 Rp 1,984,500
3 13.3 Pasang Lampu TL 2 BH Rp 99,075 Rp 7,200 Rp 198,150 Rp 14,400 Rp 212,550
4 13.4 Pasang Lampu Taman 2 BH Rp 8,680 Rp 21,000 Rp 17,360 Rp 42,000 Rp 59,360
5 13.5 Pasang Panel 1 UNIT Rp 365,700 Rp 60,000 Rp 365,700 Rp 60,000 Rp 425,700
6 13.6 Pasang Lampu Pijar 29 BH Rp 8,680 Rp 6,000 Rp 251,720 Rp 174,000 Rp 425,720
JUMLAH Rp 553,835 Rp214,200 Rp3,119,830 Rp4,070,400 Rp7,190,230

TABEL DAFTAR KEBUTUHAN MATERIAL DAN UPAH PEKERJA


13.PEKERJAAN LISTRIK HARGA KEBUTUHAN HARGA
KOEFISIEN SATUAN VOLUME TOTAL
TTK Pasang Stop Kontak SATUAN MATERIAL UPAH MATERIAL UPAH
a Stop Kontak 1.000 bh Rp 25,000 42.000 Rp 1,050,000

Rp4,082,400
b Kabel Listrik NYM 3 x 2,5 0.250 rol Rp 16,000 10.500 Rp 168,000
13.1 c Accecories ( 20 % material 1.000 ls Rp 8,200 42 42.000 Rp 344,400
d Pekerja 0.200 org Rp 60,000 8.400 Rp 504,000
e Kepala Tukang 0.600 org Rp 80,000 25.200 Rp 2,016,000
JUMLAH 42 94.500 33.600 Rp1,562,400 Rp2,520,000
TTK Pasang saklar
a Saklar 1.00 bh Rp 25,000 21 Rp 525,000

Rp1,984,500
b Kabel Listrik NYM 2 x 2,5 0.25 rol Rp 10,000 5 Rp 52,500
21
13.2 c Accecories ( 20 % material 1.00 ls Rp 7,000 21 Rp 147,000
d Pekerja 0.20 org Rp 60,000 4 Rp 252,000
e Kepala Tukang 0.60 org Rp 80,000 13 Rp 1,008,000
JUMLAH 21 47.250 16.800 Rp 724,500 Rp1,260,000
BH Pasang Lampu TL

Rp212,550
a Lampu TL 1.00 bh Rp 97,500 2.000 Rp 195,000
2
13.3 b Accecories ( 1 % ) 1.00 ls Rp 1,575 2.000 Rp 3,150
c Pekerja 0.12 org Rp 60,000 0.240 Rp 14,400
JUMLAH 2 4.000 0.240 Rp 198,150 Rp 14,400
BH Pasang Lampu Taman

Rp59,360
a Lampu Pijar 75 Watt 1.00 bh Rp 8,000 2.000 Rp 16,000
2
13.4 b Accecories ( 1 % ) 1.00 ls Rp 680 2.000 Rp 1,360
c Pekerja 0.35 org Rp 60,000 0.700 Rp 42,000
JUMLAH 2 4.000 0.700 Rp 17,360 Rp 42,000
UNIT Pasang Panel

Rp425,700
1
13.5
Nike Naluri (1106587) 280
Rp425,700
a Panel Listrik standart untu 1.00 bh Rp 327,000 1.000 Rp 327,000
1
13.5 b Accecories ( 10 % ) 1.00 ls Rp 38,700 1.000 Rp 38,700
c Pekerja 1.00 org Rp 60,000 1.000 Rp 60,000
JUMLAH 1 2.000 1.000 Rp 365,700 Rp 60,000
BH Pasang Lampu Pijar

Rp425,720
a Lampu Pijar 75 Watt 1.00 bh Rp 8,000 29.000 Rp 232,000
29
13.6 b Accecories ( 1 % ) 1.00 ls Rp 680 29.000 Rp 19,720
c Pekerja 0.10 org Rp 60,000 2.900 Rp 174,000
JUMLAH 29 58.000 2.900 Rp 251,720 Rp 174,000
TOTAL Rp3,119,830 Rp4,070,400
TOTAL Rp7,190,230
TABEL REKAPITULASI KEBUTUHAN MATERIAL
13.PEKERJAAN LISTRIK HARGA KEBUTUHA
SATUAN JUMLAH
NO JENIS SATUAN N
1 Stop Kontak bh Rp 25,000 42.000 Rp 1,050,000
2 Kabel Listrik NYM 3 x 2,5 rol Rp 16,000 10.500 Rp 168,000
3 Accecories stop kontak ls Rp 8,200 42.000 Rp 344,400
4 Saklar bh Rp 25,000 21 Rp 525,000
5 Kabel Listrik NYM 2 x 2,5 rol Rp 10,000 5 Rp 52,500
6 Accecories saklar ls Rp 7,000 21 Rp 147,000
7 Lampu TL bh Rp 97,500 2.000 Rp 195,000
8 Accecories lampu TL ls Rp 1,575 2.000 Rp 3,150
9 Lampu Pijar 75 Watt bh Rp 8,000 31.000 Rp 248,000
10 Accecories lampu taman ls Rp 680 2.000 Rp 1,360
11 Panel Listrik standart untu bh Rp 327,000 1.000 Rp 327,000
12 Accecories panel ls Rp 38,700 1.000 Rp 38,700
13 Accecories lampu pijar ls Rp 680 29.000 Rp 19,720
JUMLAH Rp 565,335 209.750 Rp 3,119,830

TABEL REKAPITULASI KEBUTUHAN UPAH


13.PEKERJAAN LISTRIK HARGA KEBUTUHA
SATUAN JUMLAH
NO JENIS SATUAN N
1 Pekerja org Rp 60,000 17.440 Rp 1,046,400
2 Kepala Tukang org Rp 80,000 37.800 Rp 3,024,000
JUMLAH Rp 140,000 55.240 Rp 4,070,400

Nike Naluri (1106587) 281


VOLUME PONDASI BATU KALI
Plat Beton (M3)
TIPE P (M) Rabat Beton (M 3) Penulangan φ 8 - 300 mm (1 Batu Kali (M 3)
Adukan
KG) Bekisting (m 2)
Beton (M 3) Pokok Sengkang
P1 20.00 1.81 3.6 32 33.564444444 4 19.2
P2 27.15 1.371075 2.715 28.96 26.257066667 5.43 13.032
P3 26.50 2.39825 4.77 42.4 44.472888889 5.3 25.44
P4 10.35 0.522675 1.035 11.04 10.0096 2.07 4.968
P7 6.00 0 0 0 0 0 1.92
JUMLAH 6.102 12.12 114.4 114.304 16.8 64.56

VOLUME PONDASI BATU P5


TIPE P (m) Bata (M 2) Pasir (M 3)
P5 13.30 6.916 0.1995
0,13

0,3
0,14 0,4
0,1

1,57
0,13
0,3
0,32 0,15 0,15
0,4

0,8
0,95
0,6
0,1 0,8 0,1

0,1
0,05
1

0,14
0,1
0,1

0,13 0,21
0,45 1,5
0,32
0,15 0,15 1,1
2,3
0,4
0,2

0,8
0,95

0,1 0,8 0,1

0,1
0,05
1

0,8

Nike Naluri (1106587) 282


VOLUME PILE CAP TIEBEAM
Penulangan D13 (1 KG) PENULANGAN PILE SQUARE
TIPE n Adukan Beton (M 3) Sengkang φ 8 Bekisting (m 2)
Pokok Sengkang Pokok φ 12 (1 KG)
(1 KG)
PC1 11 4.2733625 45.76 43.9296 57.75088 234.52 8.8
PC2 8 3.9079 49.92 69.888 42.00064 170.56 10.4
PC2A 2 0.976975 12.48 17.472 10.50016 42.64 2.6
JUMLAH 9.1582375 108.16 131.2896 110.25168 447.72 21.8

VOLUME PONDASI SUMURAN W2


Penulangan (1 KG) PENULANGAN PILE SQUARE
P (m) Adukan Beton (M 3) Sengkang φ 8 Bekisting (m 2)
Pokok φ 12 Sengkang φ 8 Pokok φ 12 (1 KG)
(1 KG)
11.00 2.7634875 58.63 17.9911111111 5.25008 21.32 15.4

0,14

0,35

0,2

0,8
0,25 0,12
0,8

1
0,25
0,4 0,5 0,5

0,65

3 1

0,5
0,5 0,5
0,25
0,5 0,45
0,3 0,5 0,3 0,5 0,25
0,8 0,8

0,5
1
0,7

RENCANA ANGGARAN BIAYA

Nike Naluri (1106587) 283


HARGA SATUAN JUMLAH HARGA
NO KODE JENIS PEKERJAAN VOLUME SATUAN TOTAL
MATERIAL UPAH MATERIAL UPAH
3. PEKERJAAN PONDASI
3.1.1 Rabat Beton/Urugan Pa 6.302 M3 Rp 105,000 Rp 18,950 Rp 661,658 Rp 119,413 Rp 781,071
3.1.2 Adukan Beton Untuk P 24.042 M3 Rp 622,470 Rp 148,000 Rp 14,965,253 Rp 3,558,175 Rp 18,523,428
3.1.3 Penulangan Beton Pon 1129.316 1 KG Rp 2,347 Rp 1,400 Rp 2,650,489 Rp 1,581,043 Rp 4,231,532
3.1.4 Pekerjaan Bekisting un 54.000 M2 Rp 107,727 Rp 38,800 Rp 5,817,240 Rp 2,095,200 Rp 7,912,440
3.1.5 Pondasi Batu Kali 64.56 M3 Rp 316,200 Rp 84,825 Rp 20,413,872 Rp 5,476,302 Rp 25,890,174
3.2.1 bata 6.916 M2 Rp 123,965 Rp 56,450 Rp 857,342 Rp 390,408 Rp 1,247,750
JUMLAH Rp1,277,709 Rp 348,425 Rp45,365,853 Rp13,220,542 Rp58,586,395

TABEL DAFTAR KEBUTUHAN MATERIAL DAN UPAH PEKERJA


3.PEKERJAAN PONDASI HARGA KEBUTUHAN HARGA
KOEFISIEN SATUAN VOLUME TOTAL
m3 Pasang Pondasi BT K SATUAN MATERIAL UPAH MATERIAL UPAH
1 Batu kali 1.200 bh Rp 227,500 77.472 Rp 17,624,880
2 Pasir Urug 0.432 m3 Rp 100,000 27.890 Rp 2,788,992

Rp25,890,174
a Pekerja 0.780 Org/Hari Rp 60,000 50.357 Rp 3,021,408
3.1.5
b Tukang Batu Kasar 0.390 Org/Hari Rp 80,000 64.560 25.178 Rp 2,014,272
c Kepala Tukang 0.039 Org/Hari Rp 80,000 2.518 Rp 201,427
d Mandor 0.039 Org/Hari Rp 95,000 2.518 Rp 239,195
JUMLAH 105.362 80.571 Rp 20,413,872 Rp 5,476,302
m3 Adukan Beton Untuk Pondasi 1Pc : 2 Ps : 3 Kr
a Semen PC (50 Kg) 6.72 zak Rp 63,500 161.560 Rp 10,259,085

Rp18,523,428
b Pasir Beton 0.54 m3 Rp 145,000 12.983 Rp 1,882,467
3.1.2 c Batu Split Pecah Mesin 0.81 m3 Rp 145,000 19.474 Rp 2,823,701
24.042
d Pekerja 2.00 Org/Hari Rp 60,000 48.083 Rp 2,885,007
e Tukang Batu Kasar 0.35 Org/Hari Rp 80,000 8.415 Rp 673,168
JUMLAH 194.017 56.498 Rp 14,965,253 Rp 3,558,175
1 KG Penulangan Beton Pondasi
a Besi Beton rata-rata 1.05 Kg Rp 1,721 1185.782 Rp 2,040,658

Rp4,231,532
b Kawat Beton Hitam 0.02 kg Rp 27,000 22.586 Rp 609,831
3.1.3
c Pekerja 0.01 Org/Hari Rp 60,000 1129.316 11.293 Rp 677,590
d Tukang Batu Kasar 0.01 Org/Hari Rp 80,000 11.293 Rp 903,453
JUMLAH 1208.369 22.586 Rp 2,650,489 Rp 1,581,043
m2 Pekerjaan Bekisting untuk Pondasi
a Kayu Kuat klas III 0.04 m3 Rp 2,335,667 2.160 Rp 5,045,040

Rp7,912,440
b Paku 4 s/d 7 cm 0.30 kg Rp 36,000 16.200 Rp 583,200
3.1.4
54.000
Nike Naluri (1106587) 284
Rp7,912,440
3.1.4 c Minyak Pelumas 0.10 Ltr Rp 35,000 5.400 Rp 189,000
54.000
d Pekerja 0.30 Org/Hari Rp 60,000 16.200 Rp 972,000
e Tukang Kayu Kasar 0.26 Org/Hari Rp 80,000 14.040 Rp 1,123,200
JUMLAH 23.760 30.240 Rp 5,817,240 Rp 2,095,200
m3 Urugan Pasir
1 Pasir Urug 1.050 m3 Rp 100,000 6.617 Rp 661,658

Rp781,071
3.1.1 a Pekerja 0.300 Org/Hari Rp 60,000 1.890 Rp 113,427
6.302
b Mandor 0.010 Org/Hari Rp 95,000 0.063 Rp 5,986
JUMLAH 6.617 1.953 Rp 661,658 Rp 119,413
m2 Pasangan Bata Merah 1Bt (1 pc : 6 Ps)
1 Bata Merah 140.0000 bh Rp 600 968.240 Rp 580,944
2 Semen PC (50 Kg) 0.3700 zak Rp 63,500 2.559 Rp 162,491

Rp1,247,750
3 Pasir Pasang 0.1220 m3 Rp 135,000 0.844 Rp 113,907
3.2.1 a Pekerja 0.6000 Org/Hari Rp 60,000 4.150 Rp 248,976
6.916
b Tukang Batu Kasar 0.2000 Org/Hari Rp 80,000 1.383 Rp 110,656
c Kepala Tukang 0.0200 Org/Hari Rp 80,000 0.138 Rp 11,066
d Mandor 0.0300 Org/Hari Rp 95,000 0.207 Rp 19,711
JUMLAH 971.643 5.879 Rp 857,342 Rp 390,408
TOTAL Rp45,365,853 Rp13,220,542 Rp58,586,395

TABEL REKAPITULASI KEBUTUHAN MATERIAL


3. PEKERJAAN PONDASI HARGA
SATUAN KEBUTUHAN JUMLAH
NO JENIS SATUAN
1 Bata Merah bh Rp 600 968.240 Rp 580,944.000
2 Batu kali bh Rp 227,500 77.472 Rp 17,624,880.000
3 Batu Split Pecah Mesin m3 Rp 145,000 19.474 Rp 2,823,700.601
4 Besi Beton rata-rata Kg Rp 1,721 1185.782 Rp 2,040,657.796
5 Kawat Beton Hitam kg Rp 27,000 22.586 Rp 609,830.894
6 Kayu Kuat klas III m3 Rp 2,335,667 2.160 Rp 5,045,040.000
7 Minyak Pelumas Ltr Rp 35,000 5.400 Rp 189,000.000
8 Paku 4 s/d 7 cm kg Rp 36,000 16.200 Rp 583,200.000
9 Pasir Beton m3 Rp 145,000 12.983 Rp 1,882,467.068
10 Pasir Pasang m3 Rp 135,000 0.844 Rp 113,906.520
11 Pasir Urug m3 Rp 100,000 34.506 Rp 3,450,649.500
12 Semen PC (50 Kg) zak Rp 63,500 164.119 Rp 10,421,576.312
JUMLAH Rp3,251,988 2509.767 Rp 45,365,853

TABEL REKAPITULASI KEBUTUHAN UPAH

Nike Naluri (1106587) 285


3. PEKERJAAN PONDASI HARGA
SATUAN KEBUTUHAN JUMLAH
NO JENIS SATUAN
1 Kepala Tukang Org/Hari Rp 80,000 2.656 Rp 212,492.800
2 Mandor Org/Hari Rp 95,000 2.788 Rp 264,891.825
3 Pekerja Org/Hari Rp 60,000 131.973 Rp 7,918,407.883
4 Tukang Batu Kasar Org/Hari Rp 80,000 46.269 Rp 3,701,549.477
5 Tukang Kayu Kasar Org/Hari 80000 14.040 Rp 1,123,200.000
JUMLAH Rp 315,000 197.727 Rp 13,220,541.985

Nike Naluri (1106587) 286


RENCANA ANGGARAN BIAYA
HARGA SATUAN JUMLAH HARGA
NO KODE JENIS PEKERJAAN VOLUME SATUAN TOTAL
MATERIAL UPAH MATERIAL UPAH
1 7.1.1 Kusen pintu & jendela Kayu 0.3696 m3 Rp 11,507,500 Rp 1,972,500 Rp 4,253,172 Rp 729,036 Rp 4,982,208
2 7.1.2 rangka pintu dan jendela 19.5492 m2 Rp 381,800 Rp 115,110 Rp 7,463,885 Rp 2,250,308 Rp 9,714,193
3 7.1.3 daun Teakwood 19.46 m2 Rp 316,851 Rp 263,000 Rp 6,165,913 Rp 5,117,980 Rp 11,283,893
4 7.1.7 Rangka pintu besi Square Tube 22.02 m2 Rp 14,003 Rp 4,350 Rp 308,337 Rp 95,787 Rp 404,124
5 7.3.1 Pintu rolling door besi 12.036 m2 Rp 1,300,000 Rp 178,170 Rp 15,646,800 Rp 2,144,454 Rp 17,791,254
6 7.1.4 Kusen pintu dan jendela alumun 154.646 m2 Rp 195,267 Rp 6,564 Rp 30,197,312 Rp 1,015,019 Rp 31,212,331
7 7.1.5 rangka pintu dan jendela alumun 74.886 m2 Rp 1,434,300 Rp 12,979 Rp 107,408,990 Rp 971,945 Rp 108,380,935
8 7.1.6 rangka pintu kaca alumunium 17.4 m2 Rp 1,206,950 Rp 13,095 Rp 21,000,930 Rp 227,853 Rp 21,228,783
9 7.8 Engsel Pintu 48 bh Rp 22,500 Rp 14,171 Rp 1,080,000 Rp 680,220 Rp 1,760,220
10 7.9 Engsel Jendela Kupu-kupu 40 bh Rp 22,500 Rp 9,448 Rp 900,000 Rp 377,900 Rp 1,277,900
11 7.10 Kunci Selot 10 bh Rp 10,780 Rp 18,895 Rp 107,800 Rp 188,950 Rp 296,750
12 7.11 Door Holder / Pegangan Pintu 15 bh Rp 125,000 Rp 47,238 Rp 1,875,000 Rp 708,563 Rp 2,583,563
13 7.12 Rel Pintu Dorong 2 bh Rp 513,500 Rp 56,685 Rp 1,027,000 Rp 113,370 Rp 1,140,370
14 7.13 Kaca, tebal 5 mm 24.7008 m2 Rp 104,500 Rp 14,171 Rp 2,581,234 Rp 350,041 Rp 2,931,275
15 7.14 Dinding Glassblock 0.32 m2 Rp 104,891 Rp 28,225 Rp 33,565 Rp 9,032 Rp 42,597
16 7.15 Pemasangan Kait Angin (Ramska 40 Bh Rp 25,000 Rp 14,171 Rp 1,000,000 Rp 566,850 Rp 1,566,850
JUMLAH Rp17,285,342 Rp2,768,771 Rp201,049,937 Rp15,547,309 Rp216,597,246

TABEL DAFTAR KEBUTUHAN MATERIAL DAN UPAH PEKERJA


7.PEKERJAAN KUSEN, PINTU & JENDEL HARGA KEBUTUHAN HARGA
KOEFISIEN SATUAN VOLUME TOTAL
m3 Membuat & memasang kusen pi SATUAN MATERIAL UPAH MATERIAL UPAH
1 Kayu Kuat klas II 1.2000 m3 Rp 9,500,000 0.4435 Rp 4,213,440
2 Paku 8 s/d 12 cm 1.2500 kg Rp 36,000 0.4620 Rp 16,632

Rp4,982,208
3 Lem Kayu 1.0000 Kg Rp 62,500 0.3696 Rp 23,100
7.1.1 a Pekerja 6.0000 Org/Hari Rp 60,000 0.3696 2.2176 Rp 133,056
b Tukang Kayu Halus 18.0000 Org/Hari Rp 80,000 6.6528 Rp 532,224
c Kepala Tukang 1.8000 Org/Hari Rp 80,000 0.6653 Rp 53,222
d Mandor 0.3000 Org/Hari Rp 95,000 0.1109 Rp 10,534
JUMLAH 0.3696 1.275 9.647 Rp 4,253,172 Rp 729,036
m2 Membuat & memasang rangka pintu dan jendela Klamp Kayu kelas II
1 Kayu Kuat klas II 0.0400 m3 Rp 9,500,000 0.7820 Rp 7,428,696

Rp9,714,193
2 Paku 4 s/d 7 cm 0.0500 kg Rp 36,000 0.9775 Rp 35,189
a Pekerja 0.3500 Org/Hari Rp 60,000 19.5492 6.8422 Rp 410,533
7.1.2
b Tukang Kayu Halus 1.0500 Org/Hari Rp 80,000 20.5267 Rp 1,642,133
c Kepala Tukang 0.1050 Org/Hari Rp 80,000 2.0527 Rp 164,213

Nike Naluri (1106587) 287


Rp9,714,193
19.5492
7.1.2

d Mandor 0.0180 Org/Hari Rp 95,000 0.3519 Rp 33,429


JUMLAH 19.5492 1.759 29.773 Rp 7,463,885 Rp 2,250,308
m2Membuat & memasang daun Teakwood rangkap, rangka expose Kayu kelas I
1 Kayu Kuat klas II 0.0250 m3 Rp 9,500,000 0.487 Rp 4,621,750
2 Paku 1 s/d 3 cm 0.0300 kg Rp 20,020 0.584 Rp 11,688

Rp11,283,893
3 Lem Kayu 0.3000 Kg Rp 62,500 5.838 Rp 364,875
4 daun Teakwood t. 6 mm 1.0000 lbr Rp 60,000 19.46 19.460 Rp 1,167,600
7.1.3
a Pekerja 0.8000 Org/Hari Rp 60,000 15.568 Rp 934,080
b Tukang Kayu Halus 2.4000 Org/Hari Rp 80,000 46.704 Rp 3,736,320
c Kepala Tukang 0.2400 Org/Hari Rp 80,000 4.670 Rp 373,632
d Mandor 0.0400 Org/Hari Rp 95,000 0.778 Rp 73,948
JUMLAH 19.5 26.368 67.721 Rp 6,165,913 Rp 5,117,980
m2 Membuat rangka pintu besi Square Tube
1 Besi Square Tube 0.4000 Kg Rp 20,001 8.808 Rp 176,169
2 Besi List Kaca 0.3000 Kg Rp 20,002 6.606 Rp 132,133

Rp404,124
3 Pengelasan 0.0400 cm Rp 40 0.881 Rp 35
22.02
7.1.7 a Pekerja 0.0400 Org/Hari Rp 60,000 0.881 Rp 52,848
b Tukang Kayu Halus 0.0200 Org/Hari Rp 80,000 0.440 Rp 35,232
c Kepala Tukang 0.0020 Org/Hari Rp 80,000 0.044 Rp 3,523
d Mandor 0.0020 Org/Hari Rp 95,000 0.044 Rp 4,184
JUMLAH 22.02 16.295 1.409 Rp 308,337 Rp 95,787
m2 Pengadaan dan pemasangan pintu rolling door besi
1 Rolling door Plat Besi 1.0000 m2 Rp 1,300,000 12.036 Rp 15,646,800

Rp17,791,254
a Pekerja 1.2000 Org/Hari Rp 60,000 14.443 Rp 866,592
12.036
7.3.1 b Tukang Kayu Halus 1.2000 Org/Hari Rp 80,000 14.443 Rp 1,155,456
c Kepala Tukang 0.1200 Org/Hari Rp 80,000 1.444 Rp 115,546
d Mandor 0.0060 Org/Hari Rp 95,000 0.072 Rp 6,861
JUMLAH 12.04 12.036 30.403 Rp 15,646,800 Rp 2,144,454
m2 Pengadaan dan pemasangan kusen pintu dan jendela alumunium
1 Kusen Alm. 4" CA 1.1000 m' Rp 175,000 170.111 Rp 29,769,355
2 Skrup 2.0000 bh Rp 334 309.292 Rp 103,200

Rp31,212,331
3 Sealant clear neutral (300 ml) 0.0600 tb Rp 35,000 9.279 Rp 324,757
154.646
7.1.4 a Pekerja 0.0430 Org/Hari Rp 60,000 6.650 Rp 398,987
b Tukang Kayu Halus 0.0430 Org/Hari Rp 80,000 6.650 Rp 531,982
c Kepala Tukang 0.0043 Org/Hari Rp 80,000 0.665 Rp 53,198
d Mandor 0.0021 Org/Hari Rp 95,000 0.325 Rp 30,852
JUMLAH 154.646 488.681 14.289 Rp 30,197,312 Rp 1,015,019
m2 Pengadaan dan pemasangan rangka pintu dan jendela alumunium strip

08,380,935
Nike Naluri (1106587) 74.886 288
7.1.5
1 Kusen Alm. 4" CA 4.4000 m' Rp 175,000 329.4984 Rp 57,662,220

Rp108,380,935
2 Alumunium Strip 14.6000 m' Rp 45,500 1093.3356 Rp 49,746,770
a Pekerja 0.0850 Org/Hari Rp 60,000 74.886 6.3653 Rp 381,919
7.1.5
b Tukang Kayu Halus 0.0850 Org/Hari Rp 80,000 6.3653 Rp 509,225
c Kepala Tukang 0.0085 Org/Hari Rp 80,000 0.6365 Rp 50,922
d Mandor 0.0042 Org/Hari Rp 95,000 0.3145 Rp 29,880
JUMLAH 74.88600 1,422.834 13.682 Rp107,408,990 Rp 971,945
m2 Pengadaan dan pemasangan rangka pintu kaca alumunium
1 Kusen Alm. 4" CA 4.4000 m' Rp 175,000 76.560 Rp 13,398,000
2 Kaca Polos 5 mm 4.5000 m2 Rp 95,000 78.300 Rp 7,438,500

Rp21,228,783
3 Sealant clear neutral (300 ml) 0.2700 tb Rp 35,000 4.698 Rp 164,430
17.4
7.1.6 a Pekerja 0.0850 Org/Hari Rp 60,000 1.479 Rp 88,740
b Tukang Kayu Halus 0.0850 Org/Hari Rp 80,000 1.479 Rp 118,320
c Kepala Tukang 0.0090 Org/Hari Rp 80,000 0.157 Rp 12,528
d Mandor 0.0050 Org/Hari Rp 95,000 0.087 Rp 8,265
JUMLAH 17.4000 159.558 3.202 Rp 21,000,930 Rp 227,853
Bh Pengadaan dan Pemasangan Engsel Pintu
1 Engsel 3" 1.0000 bh Rp 22,500 48.000 Rp 1,080,000

Rp1,760,220
a Pekerja 0.0150 Org/Hari Rp 60,000 0.720 Rp 43,200
48
7.8 b Tukang Kayu Halus 0.1500 Org/Hari Rp 80,000 7.200 Rp 576,000
c Kepala Tukang 0.0150 Org/Hari Rp 80,000 0.720 Rp 57,600
d Mandor 0.0008 Org/Hari Rp 95,000 0.036 Rp 3,420
JUMLAH 48 48.000 8.676 Rp 1,080,000 Rp 680,220
Bh Pengadaan dan Pemasangan Engsel Jendela Kupu-kupu
1 Engsel 3" 1.0000 bh Rp 22,500 40.000 Rp 900,000

Rp1,277,900
a Pekerja 0.0100 Org/Hari Rp 60,000 0.400 Rp 24,000
40
7.9 b Tukang Kayu Halus 0.1000 Org/Hari Rp 80,000 4.000 Rp 320,000
c Kepala Tukang 0.0100 Org/Hari Rp 80,000 0.400 Rp 32,000
d Mandor 0.0005 Org/Hari Rp 95,000 0.020 Rp 1,900
JUMLAH 40 40.000 4.820 Rp 900,000 Rp 377,900
Bh Pengadaan dan Pemasangan Kunci Selot
1 Slot Tanam 1.0000 bh Rp 10,780 10.000 Rp 107,800

Rp296,750
a Pekerja 0.0200 Org/Hari Rp 60,000 0.200 Rp 12,000
10
7.10 b Tukang Kayu Halus 0.2000 Org/Hari Rp 80,000 2.000 Rp 160,000
c Kepala Tukang 0.0200 Org/Hari Rp 80,000 0.200 Rp 16,000
d Mandor 0.0010 Org/Hari Rp 95,000 0.010 Rp 950
JUMLAH 10 10.000 2.410 Rp 107,800 Rp 188,950
Bh Pengadaan dan Pemasangan Door Holder / Pegangan Pintu

p2,583,563
Nike 15
7.11 Naluri (1106587) 289
1 Handel + Kunci bulat 1.0000 bh Rp 125,000 15.000 Rp 1,875,000

Rp2,583,563
a Pekerja 0.0500 Org/Hari Rp 60,000 0.750 Rp 45,000
15
7.11 b Tukang Kayu Halus 0.5000 Org/Hari Rp 80,000 7.500 Rp 600,000
c Kepala Tukang 0.0500 Org/Hari Rp 80,000 0.750 Rp 60,000
d Mandor 0.0025 Org/Hari Rp 95,000 0.038 Rp 3,563
JUMLAH 15 15.000 9.038 Rp 1,875,000 Rp 708,563
Bh Pengadaan dan Pemasangan Rel Pintu Dorong
1 Rel Pintu Dorong 1.0000 set Rp 513,500 2.000 Rp 1,027,000

Rp1,140,370
a Pekerja 0.0600 Org/Hari Rp 60,000 0.120 Rp 7,200
2
7.12 b Tukang Kayu Halus 0.6000 Org/Hari Rp 80,000 1.200 Rp 96,000
c Kepala Tukang 0.0600 Org/Hari Rp 80,000 0.120 Rp 9,600
d Mandor 0.0030 Org/Hari Rp 95,000 0.006 Rp 570
JUMLAH 2 2.000 1.446 Rp 1,027,000 Rp 113,370
m2 Pengadaan dan Pemasangan Kaca, tebal 5 mm
1 Kaca Polos 5 mm 1.1000 m2 Rp 95,000 27.171 Rp 2,581,234

Rp2,931,275
a Pekerja 0.0150 Org/Hari Rp 60,000 0.371 Rp 22,231
24.7008
7.13 b Tukang Kayu Halus 0.1500 Org/Hari Rp 80,000 3.705 Rp 296,410
c Kepala Tukang 0.0150 Org/Hari Rp 80,000 0.371 Rp 29,641
d Mandor 0.0008 Org/Hari Rp 95,000 0.019 Rp 1,760
JUMLAH 24.701 27.171 4.465 Rp 2,581,234 Rp 350,041
m2 Dinding Glassblock 20x20 cm
1 Glass Block 25.0000 bh Rp 3,000 8.000 Rp 24,000
2 Semen PC (50 Kg) 0.2200 zak Rp 63,500 0.070 Rp 4,470
3 Pasir Pasang 0.0350 m3 Rp 135,000 0.011 Rp 1,512

Rp42,597
4 Sealant Kaca 0.2488 kg Rp 45,000 0.32 0.080 Rp 3,583
7.14
a Pekerja 0.3000 Org/Hari Rp 60,000 0.096 Rp 5,760
b Tukang Batu Kasar 0.1000 Org/Hari Rp 80,000 0.032 Rp 2,560
c Kepala Tukang 0.0100 Org/Hari Rp 80,000 0.003 Rp 256
d Mandor 0.0150 Org/Hari Rp 95,000 0.005 Rp 456
JUMLAH 0.320 8.161 0.136 Rp 33,565 Rp 9,032
Bh Pengadaan dan Pemasangan Kait Angin (Ramskar)
1 Hak Angin Lipat 1 Pas Rp 25,000 40.00 Rp 1,000,000

Rp1,566,850
a Pekerja 0.0150 Org/Hari Rp 60,000 0.60 Rp 36,000
40
7.15 b Tukang Kayu Halus 0.1500 Org/Hari Rp 80,000 6.00 Rp 480,000
c Kepala Tukang 0.0150 Org/Hari Rp 80,000 0.60 Rp 48,000
d Mandor 0.0008 Org/Hari Rp 95,000 0.03 Rp 2,850
JUMLAH 40.000 40.000 7.230 Rp 1,000,000 Rp 566,850
TOTAL Rp 201,049,937 Rp 15,547,309

Nike Naluri (1106587) 290


TOTAL Rp 216,597,246

TABEL REKAPITULASI KEBUTUHAN MATERIAL


7.PEKERJAAN KUSEN, PINTU & JE HARGA
SATUAN KEBUTUHAN JUMLAH
NO JENIS SATUAN
1 Alumunium Strip m' Rp 45,500 1093.3356 Rp 49,746,769.8000
2 Besi List Kaca Kg Rp 20,002 6.606 Rp 132,133.2120
3 Besi Square Tube Kg Rp 20,001 8.808 Rp 176,168.8080
4 Engsel 3" bh Rp 22,500 88.000 Rp 1,980,000.0000
5 Handel + Kunci bulat bh Rp 125,000 15.000 Rp 1,875,000.0000
6 Kaca Polos 5 mm m2 Rp 95,000 105.471 Rp 10,019,733.6000
7 Kayu Kuat klas II m3 Rp 9,500,000 1.7120 Rp 16,263,886.0000
8 Kusen Alm. 4" CA m' Rp 175,000 576.1690 Rp 100,829,575.0000
9 Lem Kayu Kg Rp 62,500 6.2076 Rp 387,975.0000
10 Paku 1 s/d 3 cm kg Rp 20,020 0.584 Rp 11,687.6760
11 Paku 4 s/d 7 cm kg Rp 36,000 0.9775 Rp 35,188.5600
12 Paku 8 s/d 12 cm kg Rp 36,000 0.4620 Rp 16,632.0000
13 Pengelasan cm Rp 40 0.881 Rp 35.1439
14 Rel Pintu Dorong set Rp 513,500 2.000 Rp 1,027,000.0000
15 Rolling door Plat Besi m2 Rp 1,300,000 12.036 Rp 15,646,800.0000
16 Sealant clear neutral (300 ml) tb Rp 35,000 13.977 Rp 489,186.6000
17 Skrup bh Rp 334 309.292 Rp 103,200.4307
18 Slot Tanam bh Rp 10,780 10.000 Rp 107,800.0000
19 daun Teakwood t. 6 mm lbr Rp 60,000 19.460 Rp 1,167,600.0000
20 Glass Block bh Rp 3,000 8.000 Rp 24,000.0000
21 Semen PC (50 Kg) zak Rp 63,500 0.070 Rp 4,470.4000
22 Pasir Pasang m3 Rp 135,000 0.011 Rp 1,512.0000
23 Sealant Kaca kg Rp 45,000 0.080 Rp 3,582.7200
24 Hak Angin Lipat Pas Rp 25,000 40.000 Rp 1,000,000
JUMLAH Rp12,348,677 2319.139 Rp 201,049,937

TABEL REKAPITULASI KEBUTUHAN UPAH


7.PEKERJAAN KUSEN, PINTU & JE HARGA
SATUAN KEBUTUHAN JUMLAH
NO JENIS SATUAN
1 Kepala Tukang Org/Hari Rp 80,000 13.4985 Rp 1,079,882.1440
2 Mandor Org/Hari Rp 95,000 2.2465 Rp 213,419.8750
3 Pekerja Org/Hari Rp 60,000 57.7024 Rp 3,462,145.2000

Nike Naluri (1106587) 291


4 Tukang Kayu Halus Org/Hari Rp 80,000 134.8663 Rp 10,789,301.4400
5 Tukang Batu Kasar Org/Hari Rp 80,000 0.0320 Rp 2,560.0000
JUMLAH Rp 395,000 208.346 Rp 15,547,309

1 Bh Pengadaan dan Pemasangan Spring Knip (SNI 2002) No.5


1 Spring Knip 1.0000 bh 15,600 15,600
a Pekerja 0.0150 Org/Hari 60,000 900
b Tukang Kayu Halus 0.1500 Org/Hari 80,000 12,000
c Kepala Tukang 0.0150 Org/Hari 80,000 1,200
d Mandor 0.0008 Org/Hari 95,000 71
JUMLAH 29,700

Nike Naluri (1106587) 292


VOLUME KUSEN, PINTU DAN JENDELA
UKURAN DAUN UKURAN TIANG UKURAN AMBANG VOLUME
TIPE Σ
P L P L T P L T DAUN TIANG AMBANG
P1 4 2.1 0.8 0.14 0.05 2.5 0.14 0.05 0.9 6.72 0.14 0.0504
P2 3 2.1 0.7 0.14 0.05 2.15 0.14 0.05 0.8 4.41 0.0903 0.0168
2.1 0.725 - - 2.3 - - 0.5 1.5225 4.6 3
PJ2 1 2.15 0.45 - - 2.5 - - 0.75 - 5 3
2.15 0.68 - - 0.4 - - - - 0.4 -
P2* 1 2.1 0.7 0.14 0.05 2.15 0.14 0.05 0.8 1.47 0.0301 0.0056
1.082 0.6 - - 2.5 - - 0.7 0.6492 5 2.1
PJ3 1
2.1 0.8 - - 1.5 - - 0.9 1.68 1.5 1.8
P3 1 2.1 0.8 - - 2.5 - - 0.9 1.68 5 1.8
J4 1 1.3 0.6 - - 1.7 - - 0.7 0.78 3.4 2.1
J3 1 1.9 0.611 - - 2.3 - - 1.3 2.3218 5 3.9
J7 4 - - - - 1.267 - - 0.3 - 10.136 3.6
PJ4 1 2.1 1.4 - - 2.5 - - 2.5 2.94 5.86 9
P4 1 2.1 0.8 0.14 0.05 2.15 0.14 0.05 0.9 1.68 0.0301 0.0063
PB 1 - - - - 2.15 - - 0.89 - 19.35 2.67
J2 1 - - - - 3.8 - - 0.6 - 7.6 2.4
J1 7 1.286 0.636 - - 1.7 - - 1.35 11.450544 24.15 28.35
J5 1 1.277 0.636 - - 1.7 - - 1.93 0.812172 5.1 8.45
BV 1 0.536 0.536 - - 0.6 - - 0.6 0.287296 1.2 1.2
GB 2 - - - - 0.4 - - 0.4 - 1.6 1.6
PG 1 2.31 0.625 2.36 5.1 11.55 4.72 5.1
Σ pengecatan

Nike Naluri (1106587) 293


VOLUME KUSEN, PINTU DAN JENDELA
VOLUME CAT TIPE KUSEN TIPE KUSEN
Satuan
DAUN TIANG AMBANG Banyaknya P1 P2 PJ2 P2* PJ3 P3 J4 J3 J7 PJ4 P4
13.44 4.8 2.232 1 Kusen pintu & jendela Kayu m3 0.1904 0.1071 0.0357 0.0364
8.82 3.096 0.576 2 rangka pintu dan jendela m2 6.72 4.41 1.47 2.3292 2.94 1.68
- - - 3 daun Teakwood m2 6.72 4.41 1.47 1.68 3.5 1.68
- - - 4 Rangka pintu besi Square Tube m2
- - - 5 Pintu rolling door besi m2
2.94 1.032 0.192 6 Kusen pintu dan jendela alumunium m2 16 10.4 6.8 5.5 8.9 13.736 14.86
1.2984 - - 7 rangka pintu dan jendela alumunium m2 4.8 10.044
3.36 - - 8 rangka pintu kaca alumunium m2 11.6 5.8
- - - 9 Engsel Pintu bh 12 9 6 3 3 3 6 3
- - - 10 Engsel Jendela Kupu-kupu bh 2 2 4
- - - 11 Kunci Selot bh 4 3 1 1 1
- - - 12 Door Holder / Pegangan Pintu bh 4 3 2 1 1 1 2 1
5.88 - - 13 Rel Pintu Dorong bh
3.36 1.032 0.216 14 Kaca, tebal 5 mm m2 0.96 4.3776 0.4426 1.1648 0.5405 1.5605 3.268 1.632
- - - 15 Dinding Glassblock m2
- - - 16 Pemasangan Kait Angin (Ramskar) Bh 2 2 4
- - -
- - -
- - -
- - -
- - -
39.0984 9.96 3.216

Nike Naluri (1106587) 294


A
SEN
Σ
PB J2 J1 J5 BV GB PG
0.3696
19.5492
19.46
22.02 22.02
12.036 12.036
10 52.5 13.55 2.4 154.646
53.816 3.826 2.4 74.886
17.4
3 48
28 2 2 40
10
15
2 2
1.8 7.5037 1.3099 0.1414 24.7008
0.32 0.32
28 2 2 40

Nike Naluri (1106587) 295


RENCANA ANGGARAN BIAYA
HARGA SATUAN JUMLAH HARGA
NO KODE JENIS PEKERJAAN VOLUME SATUAN
MATERIAL UPAH MATERIAL UPAH
1 10.1.1 Pengecatan Tembok Bar 1922.181 m2 Rp 32,769 Rp 6,982 Rp 62,987,578 Rp 13,419,709
2 10.2.1 Mengecatan Bidang Kayu81.42139 m2 Rp 23,320 Rp 13,158 Rp 1,898,706 Rp 1,071,302
JUMLAH Rp56,088 Rp20,139 Rp64,886,284 Rp14,491,011

TABEL DAFTAR KEBUTUHAN MATERIAL DAN UPAH PEKERJA


10.PEKERJAAN PENGECATAN HARGA KEBUTUHAN
KOEFISIEN SATUAN VOLUME
m2 Pengecatan Tembok Baru SATUAN MATERIAL UPAH
1 Plamur Tembok 0.1000 kg Rp 52,000 192.218
2 Cat Tembok (25 kg) 0.1400 kg Rp 22,100 269.105
3 Cat akhir emulsion 0.3640 Ltr Rp 62,500 699.674
4 Amplas Kayu / Besi 0.2000 Lbr Rp 8,624 384.436
10.1.1 1922.181
a Pekerja 0.0200 Org/Hari Rp 60,000 38.444
b Tukang Cat Biasa 0.0630 Org/Hari Rp 80,000 121.097
c Kepala Tukang 0.0063 Org/Hari Rp 80,000 12.110
d Mandor 0.0025 Org/Hari Rp 95,000 4.805
JUMLAH ### 1,545.434 176.456
Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat
m2
Dasar, 3 Lapis Cat Penutup
1 Cat Dasar / meni kayu 0.2000 Kg Rp 28,336 16.284
2 Plamir Kayu 0.1500 Kg Rp 17,890 12.213
3 Dempul Kayu 0.1700 Kg Rp 24,640 13.842
4 Cat Kayu 0.3500 Kg Rp 30,800 28.497
10.2.1 81.421
a Pekerja 0.0700 Org/Hari Rp 60,000 5.699
b Tukang Cat Biasa 0.1050 Org/Hari Rp 80,000 8.549
c Kepala Tukang 0.0040 Org/Hari Rp 80,000 0.326
d Mandor 0.0025 Org/Hari Rp 95,000 0.204
JUMLAH 81.4214 70.837 14.778
TOTAL

TABEL REKAPITULASI KEBUTUHAN MATERIAL


10.PEKERJAAN PENGECATAN HARGA KEBUTUH
SATUAN JUMLAH
NO JENIS SATUAN AN
1 Amplas Kayu / Besi Lbr Rp 8,624 384.436 Rp 3,315,378.461
2 Cat akhir emulsion Ltr Rp 62,500 699.674 Rp 43,729,626.623
3 Cat Dasar / meni kayu Kg Rp 28,336 16.284 Rp 461,431.295
4 Cat Kayu Kg Rp 30,800 28.497 Rp 877,722.571
5 Cat Tembok (25 kg) kg Rp 22,100 269.105 Rp 5,947,229.221
6 Dempul Kayu Kg Rp 24,640 13.842 Rp 341,057.913
7 Plamir Kayu Kg Rp 17,890 12.213 Rp 218,494.297
8 Plamur Tembok kg Rp 52,000 192.218 Rp 9,995,343.228
JUMLAH Rp246,890 1616.270 Rp 64,886,284

TABEL REKAPITULASI KEBUTUHAN UPAH


10.PEKERJAAN PENGECATAN HARGA KEBUTUH
SATUAN JUMLAH
NO JENIS SATUAN AN
1 Kepala Tukang Org/Hari Rp 80,000 12.435 Rp 994,834.265
2 Mandor Org/Hari Rp 95,000 5.009 Rp 475,855.660
3 Pekerja Org/Hari Rp 60,000 44.143 Rp 2,648,587.501
4 Tukang Cat Biasa Org/Hari Rp 80,000 129.647 Rp 10,371,733.872
JUMLAH Rp315,000 191.234 Rp 14,491,011
volume Pengecatan
dinding 1922.181 m2
TOTAL TIPE
kusen 52.6563888 m2
Rp 76,407,287 lisplank 28.765 m2 P1
Rp 2,970,008 P2
Rp79,377,295
PJ2
PEKERJA
HARGA P2*
TOTAL
MATERIAL UPAH
PJ3
Rp 9,995,343
Rp 5,947,229 P3
Rp 43,729,627 J4
Rp76,407,287

Rp 3,315,378 J3
Rp 2,306,618 J7
Rp 9,687,794 PJ4
Rp 968,779 P4
Rp 456,518 PB
Rp62,987,578 Rp13,419,709 J2
J1
Rp 461,431 J5
Rp 218,494 BV
Rp2,970,008

Rp 341,058 GB
Rp 877,723 PG
Rp 341,970
Rp 683,940
Rp 26,055
Rp 19,338
Rp 1,898,706 Rp 1,071,302
Rp64,886,284 Rp14,491,011
TOTAL Rp 79,377,295
VOLUME KUSEN, PINTU DAN JENDELA
UKURAN DAUN UKURAN TIANG UKURAN AMBANG VOLUME
Σ
P L P L T P L T DAUN
4 2.1 0.8 0.14 0.05 2.5 0.14 0.05 0.9 6.72
3 2.1 0.7 0.14 0.05 2.15 0.14 0.05 0.8 4.41
2.1 0.725 - - 2.3 - - 0.5 1.5225
1 2.15 0.45 - - 2.5 - - 0.75 -
2.15 0.68 - - 0.4 - - - -
1 2.1 0.7 0.14 0.05 2.15 0.14 0.05 0.8 1.47
1.082 0.6 - - 2.5 - - 0.7 0.7024344
1
2.1 0.8 - - 1.5 - - 0.9 1.81776
1 2.1 0.8 - - 2.5 - - 0.9 1.68
1 1.3 0.6 - - 1.7 - - 0.7 0.78
1 1.9 0.611 - - 2.3 - - 1.3 2.3218
4 - - - - 1.267 - - 0.3 -
1 2.1 1.4 - - 2.5 - - 2.5 2.94
1 2.1 0.8 0.14 0.05 2.15 0.14 0.05 0.9 1.68
1 - - - - 2.15 - - 0.89 -
1 - - - - 3.8 - - 0.6 -
7 1.286 0.636 - - 1.7 - - 1.35 11.450544
1 1.277 0.636 - - 1.7 - - 1.93 0.812172
1 0.536 0.536 - - 0.6 - - 0.6 0.287296
2 - - - - 0.4 - - 0.4 -
1 2.31 0.625 2.36 5.1 11.55
lubang
TITIK AS LUAS (M2) kolom (M2)
VOLUME VOLUME CAT kusen
TIANG AMBANG DAUN TIANG AMBANG G1-F1 8.316 0.945 0.276
0.14 0.0504 13.44 4.8 2.232 F1-D1 12.852 0.945 0.230
0.0903 0.0168 8.82 3.096 0.576 C2-A2 20.412 0.491 11.800
9.66 6.3 - - - D3-C3 11.340 0.718 6.125
10.5 6.3 - - - D4-C4 11.340 0.718 0.000
0.84 - - - - D5-C5 11.340 1.814 0.000
0.0301 0.0056 2.94 1.032 0.192 C5-B5 8.505 0.718 0.000
5.41 2.2722 1.4048688 - - A6-B6 11.907 0.813 2.250
1.623 1.9476 3.63552 - - A7-B7 11.907 1.040 3.875
10.5 3.78 - - - B7-E7 25.893 1.890 7.845
3.4 2.1 - - - G7-E7 15.120 1.436 2.250
5 3.9 - - - A8-A'8 7.560 0.718 0.000
10.136 3.6 - - - A9-B9 11.907 0.491 1.935
5.86 9 5.88 - - E9-G9 15.120 1.928 1.935
0.0301 0.0063 3.36 1.032 0.216 E10-G10 15.120 0.945 2.250
19.35 2.67 - - - A10-B10 11.907 0.945 0.000
7.6 2.4 - - - A11-G11 52.920 2.457 0.000
24.15 28.35 - - - 11A-10A 18.900 1.247 0.000
5.1 8.45 - - - 10A-9A 7.560 0.491 0.000
1.2 1.2 - - - 9A-8A 4.536 0.491 0.000
1.6 1.6 - - - 8A-7A 25.704 2.192 0.000
4.72 5.1 - - - 7A-6A 11.340 0.491 0.000
Σ pengecatan 39.4803888 9.96 3.216 6A-5A 3.780 0.718 0.000
5A-4A 6.804 1.134 0.000
4A-3A 8.316 1.323 0.000
3A-2A 5.670 1.229 0.000
10B-9B 7.560 0.491 1.190
9B-7B 30.240 3.629 4.515
2A-1'A 9.450 1.304 0.000
6B-5B 3.780 0.756 0.000
4C-3C 8.316 1.229 0.000
3C-2C 5.670 1.229 0.000
5D-4D 2.646 0.491 0.000
2C-1'C 3.780 1.115 0.000
3D-1'D 9.450 1.247 0.000
lubang lubang
TITIK AS LUAS (M2) kolom (M2) TITIK AS LUAS (M2) kolom (M2) NO
kusen kusen
10E-9E 7.560 0.491 0.360 G1-F1 9.328 1.060 2.280 1
9E-7E 30.240 1.928 4.420 F1-D1 14.416 1.060 2.210 2
4F-1F 15.876 1.474 0.000 D2-C2 12.720 1.124 4.970 3
11G-10G 18.900 1.247 0.000 C3-B3 9.540 0.806 0.390 4
10G-9G 7.560 0.491 0.000 B3-A3 13.356 0.551 1.170 5
9G-7G 30.240 1.928 0.000 C4-B4 9.540 0.551 0.000 6
7G-5G 15.120 0.907 0.000 B4-A4 13.356 0.551 1.935
5G-4G 6.804 1.040 0.000 G5-E5 16.960 0.551 2.250
4G-1G 15.876 1.569 0.000 E5-C5 19.504 2.078 2.250
4C'-5C' 6.804 0.491 0.276 G7-E7 16.960 0.912 2.210
4D'-5D' 6.804 0.491 1.720 E7-C7 19.504 2.226 2.210
9A'-8A' 4.536 0.491 1.720 C7-A7 22.896 0.806 2.210
TOTAL 603.288 52.372 54.972 7A-4A 24.592 2.226 0.000
VOL. LT.BAWAH 495.945 4A-3A 9.328 1.060 0.000
dinding keramik (WC) 4B-3B 9.328 0.700 0.000
4C'-5C' 6.181 0.446 0.276 4C-3C 9.328 0.551 1.720
4D'-5D' 6.181 0.446 1.720 4C-5C 7.632 0.551 2.250
4C'-4D' 10.302 0.446 0.000 5C-7C 16.960 0.551 0.000
5C'-5D' 10.302 0.446 0.000 2D-1D 2.120 0.551 0.000
E9-G9 11.936 1.522 2.000 7E-5E 16.960 0.551 0.000
E10-G10 11.936 0.746 0.000 4F-1F 15.900 1.654 0.000
10G-9G 5.968 0.388 0.000 1G-1'G 4.240 0.551 0.000
10E-9E 5.968 0.388 0,6*0,6 1G-5G 25.440 3.032 0.000
A8-A'8 3.500 0.333 0.000 5G-7G 16.960 1.272 0.000
A9-A'9 3.500 0.228 0.000 7A-7'A 4.240 0.636 0.000
9A-8A 2.100 0.228 0.000 7G-7'G 4.240 0.636 0.000
9A'-8A' 2.100 0.228 1.720 TOTAL 345.348 26.80 28.055
C3-B3 5.783 0.488 0.380 VOL. LT.ATAS 290.50
B3-A3 8.096 0.334 1.140 VOLUME VOL
C4-B4 5.783 0.334 0.000 pasangan bata 786.441
B4-A4 8.096 0.334 1.720 plesteran & acian 1922.181
4A-3A 5.654 0.643 0.000 dinding keramik 122.752
4B-3B 5.654 0.424 0.000 bata roster 2 BH 0.072
4C-3C 5.654 0.334 1.720
TOTAL 124.692 8.736 10.676
VOLUME ATAP
TIPE satuan 1/2 KD1 KD1 KD2 1/2 KD2 KD3 jumlah
Konstruksi kuda-kuda Kayu 0 0.235392 0.437376 0.182016 0.095904 0.567936 1.519
Gordeng 0 0.245376 0.481056 0.234528 0.089472 0.400512 1.451
rangka atap 0 38.4341 61.7568 35.1792 14.43825 57.5736 207.382
Lisplank (3x20cm) 0 16.46 16.53 6.98 7.13 10.43 57.530
Lisplank (3x30cm) 0 16.46 16.53 6.98 7.13 10.43 57.530
Penutup Atap Genteng Beton m1 39.74 46.94 34.12 17.21 31.9 169.910
volume
pengecatan

11.506
17.259
volume kolom lantai bawah
tipe tul.pokok tul.sengkang jumlah panjang Σ tulangan (kg) beton (M3) bekisting (M2) Kolom
4.1.1 Kolom K1
4φ12 φ8-100 pokok sengkang 4.1.1.1
Σ tulangan (bh) 4.1.1.2
4 38.8 15 3.78 1.4742 37.422
201.474 55.2512
panjang
226.8 207.192 4.1.1.3
4.1.2 Kolom K2A
4φ12 φ8-100 pokok sengkang 4.1.2.1
Σ tulangan (bh) 4.1.2.2
4 38.8 18 3.78 2.2113 51.7104
241.7688 84.92544
panjang
272.16 318.4704 4.1.2.3
4.1.3 Kolom K2B
6φ12 φ8-100 pokok sengkang 4.1.3.1
Σ tulangan (bh) 4.1.3.2
6 38.8 3 3.78 0.36855 8.6184
60.4422 14.15424
panjang
68.04 53.0784 4.1.3.3
4.1.4 Kolom K3
6φ12 φ8-150 pokok sengkang 4.1.4.1
Σ tulangan (bh) 4.1.4.2
6 26.2 4 3.78 0.58968 13.0032
80.5896 15.538347
panjang

Nike Naluri (1106587) 303


4 3.78 0.58968 13.0032
80.5896 15.538347
90.72 58.2688 4.1.4.3
4.1.5 Kolom K4A
6D13 φ8-150 pokok sengkang 4.1.5.1
Σ tulangan (bh) 4.1.5.2
6 26.2 3 3.78 0.51597 10.8864
70.7616 13.74976
panjang
68.04 51.5616 4.1.5.3
4.1.6 Kolom K4B
4.1.6.1
8D13 φ8-150 pokok sengkang 4.1.6.2
Σ tulangan (bh)
8 26.2 2 3.78 0.34398 7.2576
62.8992 9.1665067
panjang 4.1.6.3
60.48 34.3744 4.1.7 Kolom Praktis ukuran 130 x 130
4.1.7.1
4.1.7.2
4φ10 φ6-150 pokok sengkang
Σ tulangan (bh)
4 26.2 19 3.78 1.213758 37.3464 4.1.7.3
177.156 21.186368
panjang
287.28 95.5776
71.82

ketebalan selimut beton = 50 mm

volume kolom lantai atas


tipe tul.pokok tul.sengkang jumlah panjang Σ tulangan (kg) beton (M3) bekisting (M2)

4φ12 φ8-100 pokok sengkang


Σ tulangan (bh)
4 43.4 5 4.24 0.5512 13.992
382.872 265.36062
panjang
84.8 77.252

4φ12 φ8-100 pokok sengkang


Σ tulangan (bh)
12 4.24 1.6536 38.6688
918.8928 815.76029

Nike Naluri (1106587) 304


4 43.4 12 4.24 1.6536 38.6688
918.8928 815.76029
panjang
203.52 237.4848

6φ12 φ8-100 pokok sengkang


Σ tulangan (bh)
6 43.4 2 4.24 0.2756 6.4448
45.1984 10.55488
panjang
50.88 39.5808

6φ12 φ8-150 pokok sengkang


Σ tulangan (bh)
6 29.266666667 4 4.24 0.66144 14.5856
90.3968 17.357084
panjang
101.76 65.089066667

6D13 φ8-150 pokok sengkang


Σ tulangan (bh)
6 29.266666667 3 4.24 0.57876 12.2112
79.3728 15.359147
panjang
76.32 57.5968

8D13 φ8-150 pokok sengkang


Σ tulangan (bh)
8 29.266666667 2 4.24 0.38584 8.1408
70.5536 10.239431
panjang
67.84 38.397866667

4φ10 φ6-150 pokok sengkang


Σ tulangan (bh)
4 29.266666667 10 4.24 0.71656 22.048
636 207.34848
panjang
169.6 56.192
42.4

Nike Naluri (1106587) 305


Nike Naluri (1106587) 306
RENCANA ANGGARAN BIAYA
HARGA SATUAN
NO KODE JENIS PEKERJAAN VOLUME SATUAN
MATERIAL
1 4.1.1 Beton Struktur (1 Pc : 2 Ps : 3 Split) 9.61012 m3 Rp 681,762
2 4.1.2.1 Besi dia. 8 mm 1327.4169 1kg Rp 15,663
3 4.1.2.3 Besi dia. 12 mm 2021.6346 1kg Rp 9,762
4 4.2.2.4 Besi Ulir D 13 283.5872 1kg Rp 2,212
5 4.1.3 Kolom Praktis Beton (13x13cm) 114.22 m1 Rp 18,084
6 4.1.4 Bekisiting untuk Kolom 222.9412 m2 Rp 322,327
JUMLAH Rp 1,049,810

TABEL DAFTAR KEBUTUHAN MATERIAL DAN UPAH PEK


Kolom 4.PEKERJAAN BETON STRUKTUR & NON STR
KOEFISIEN SATUAN HARGA SATUAN
m3 Pembuatan Beton Struktur (1 Pc : 2 Ps : 3
Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr 1 Semen PC (50 Kg) 6.72 zak Rp 63,500
Penulangan Beton 2 Agregat kasar 0.54 m3 Rp 254,800
4.1.1.2.1 Penulangan Beton Pembesian Besi dia. 8mm 4.1.1 3 Batu Split Pecah Mesin 2/3 0.81 m3 Rp 145,000
4.1.1.2.2 Penulangan Beton Pembesian Besi dia. 12mm a Pekerja 2.00 Org/Hari Rp 60,000
Pekerjaan Bekisting untuk Kolom b Tukang Batu Kasar 0.35 Org/Hari Rp 80,000
JUMLAH
Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr 1kg Penulangan Beton Pembesian Besi dia. 8mm
Penulangan Beton 1 Besi beton Ø8 1.0500 Kg Rp 14,531
4.1.2.2.1 Penulangan Beton Pembesian Besi dia. 8mm b Kawat Beton Hitam 0.0150 kg Rp 27,000
4.1.2.2.2 Penulangan Beton Pembesian Besi dia. 12mm a Pekerja 0.0070 Org/Hari Rp 60,000
4.1.2.1
Pekerjaan Bekisting untuk Kolom b Tukang Batu Kasar 0.0070 Org/Hari Rp 80,000
c Kepala Tukang 0.0007 Org/Hari Rp 80,000
Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr d Mandor 0.0004 Org/Hari Rp 95,000
Penulangan Beton JUMLAH
4.1.3.2.1 Penulangan Beton Pembesian Besi dia. 8mm 1kg Penulangan Beton Pembesian Besi dia. 12mm
4.1.3.2.2 Penulangan Beton Pembesian Besi dia. 12mm 1 Besi beton Ø12 1.0500 Kg Rp 8,912
Pekerjaan Bekisting untuk Kolom b Kawat Beton Hitam 0.0150 kg Rp 27,000
a Pekerja 0.0070 Org/Hari Rp 60,000
4.1.2.3
Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr b Tukang Batu Kasar 0.0070 Org/Hari Rp 80,000
Penulangan Beton c Kepala Tukang 0.0007 Org/Hari Rp 80,000
4.1.4.2.1 Penulangan Beton Pembesian Besi dia. 8mm d Mandor 0.0004 Org/Hari Rp 95,000
4.1.4.2.2 Penulangan Beton Pembesian Besi dia. 12mm JUMLAH

Nike Naluri (1106587) 307


Pekerjaan Bekisting untuk Kolom 1kg Penulangan Beton Pembesian Besi Ulir D 13
1 Besi Beton rata-rata 1.0500 Kg Rp 1,721
Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr b Kawat Beton Hitam 0.0150 kg Rp 27,000
Penulangan Beton a Pekerja 0.0070 Org/Hari Rp 60,000
4.2.2.4
4.1.5.2.1 Penulangan Beton Pembesian Besi dia. 8mm b Tukang Batu Kasar 0.0070 Org/Hari Rp 80,000
4.1.5.2.2 Penulangan Beton Pembesian Besi Ulir D 13 c Kepala Tukang 0.0007 Org/Hari Rp 80,000
Pekerjaan Bekisting untuk Kolom d Mandor 0.0004 Org/Hari Rp 95,000
JUMLAH
Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr m1 Pekerjaan Kolom Praktis Beton (13x13cm)
Penulangan Beton 1 Kayu Kuat klas III 0.0020 m3 Rp 2,335,667
4.1.6.2.1 Penulangan Beton Pembesian Besi dia. 8mm 2 Paku 8 s/d 12 cm 0.0100 kg Rp 36,000
4.1.6.2.2 Penulangan Beton Pembesian Besi Ulir D 13 3 Besi Beton rata-rata 3.0000 Kg Rp 1,721
Pekerjaan Bekisting untuk Kolom 4 Kawat Beton Hitam 0.0450 kg Rp 27,000
Kolom Praktis ukuran 130 x 130 5 Semen PC (50 Kg) 0.0800 zak Rp 63,500
Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr 6 Pasir Beton 0.0050 m3 Rp 145,000
Penulangan Beton 4.1.3 7 Batu Split Pecah Mesin 2/3 0.0060 m3 Rp 145,000
4.1.7.2.1 Penulangan Beton Pembesian Besi dia. 6mm a Pekerja 0.1800 Org/Hari Rp 60,000
4.1.7.2.2 Penulangan Beton Pembesian Besi dia. 10mm b Tukang Batu Kasar 0.0200 Org/Hari Rp 80,000
Pekerjaan Bekisting untuk Kolom c Tukang Kayu Kasar 0.0200 Org/Hari Rp 80,000
d Tukang Besi Tulangan 0.0200 Org/Hari Rp 80,000
e Kepala Tukang 0.0060 Org/Hari Rp 80,000
f Mandor 0.0090 Org/Hari Rp 95,000
JUMLAH
m2 Pembuatan Bekisiting untuk Kolom
1 Kayu Kuat klas III 0.0400 m3 Rp 2,335,667
2 Paku 8 s/d 12 cm 0.4000 kg Rp 36,000
3 Minyak Pelumas 0.2000 Ltr Rp 35,000
4 Kayu Kuat klas II 0.0150 m3 Rp 9,500,000
5 Multiplex t. 9 mm 0.3500 lbr Rp 100,000
4.1.4
6 Dolken dia 8 s/d 10 cm p. 4 m 2.0000 btg Rp 15,000
a Pekerja 0.6600 Org/Hari Rp 60,000
b Tukang Batu Kasar 0.3300 Org/Hari Rp 80,000
c Kepala Tukang 0.0330 Org/Hari Rp 80,000
d Mandor 0.0330 Org/Hari Rp 95,000
JUMLAH

Nike Naluri (1106587) 308


TABEL REKAPITULASI KEBUTUHAN MATERIAL
4.PEKERJAAN BETON STRUKTUR & NON STR
SATUAN HARGA SATUAN KEBUTUHAN
NO JENIS
1 Agregat kasar m3 Rp 254,800 5.189
2 Batu Split Pecah Mesin 2/3 m3 Rp 145,000 8.470
3 Besi beton Ø12 Kg Rp 8,912 2122.716
4 Besi beton Ø8 Kg Rp 14,531 1393.788
5 Besi Beton rata-rata Kg Rp 1,721 640.427
6 Dolken dia 8 s/d 10 cm p. 4 m btg Rp 15,000 445.882
7 Kawat Beton Hitam kg Rp 27,000 59.629
8 Kayu Kuat klas II m3 Rp9,500,000 3.344
9 Kayu Kuat klas III m3 Rp2,335,667 9.146
10 Minyak Pelumas Ltr Rp 35,000 44.588
11 Multiplex t. 9 mm lbr Rp 100,000 78.029
12 Paku 8 s/d 12 cm kg Rp 36,000 90.319
13 Pasir Beton m3 Rp 145,000 0.571
14 Semen PC (50 Kg) zak Rp 63,500 73.718
JUMLAH Rp12,682,131 4975.817

TABEL REKAPITULASI KEBUTUHAN UPAH


4.PEKERJAAN BETON STRUKTUR & NON STR
SATUAN HARGA SATUAN KEBUTUHAN
NO JENIS
1 Kepala Tukang Org/Hari Rp 80,000 10.585
2 Mandor Org/Hari Rp 95,000 9.838
3 Pekerja Org/Hari Rp 60,000 212.350
4 Tukang Batu Kasar Org/Hari Rp 80,000 104.647
5 Tukang Besi Tulangan Org/Hari Rp 80,000 2.284
6 Tukang Kayu Kasar Org/Hari Rp 80,000 2.284
JUMLAH Rp 475,000 341.989

Nike Naluri (1106587) 309


AN BIAYA
HARGA SATUAN JUMLAH HARGA
TOTAL
UPAH MATERIAL UPAH
Rp 148,000 Rp 6,551,815 Rp 1,422,298 Rp 7,974,112
Rp 1,074 Rp 20,791,083 Rp 1,425,646 Rp 22,216,728
Rp 1,074 Rp 19,736,028 Rp 2,171,236 Rp 21,907,263
Rp 1,074 Rp 627,291 Rp 304,573 Rp 931,863
Rp 16,935 Rp 2,065,571 Rp 1,934,316 Rp 3,999,887
Rp 71,775 Rp 71,859,894 Rp 16,001,605 Rp 87,861,498
Rp 239,932 Rp 121,631,681 Rp 23,259,672 Rp 144,891,353

UHAN MATERIAL DAN UPAH PEKERJA


KEBUTUHAN HARGA
VOLUME TOTAL
MATERIAL UPAH MATERIAL UPAH

7,974,112
64.580 Rp 4,100,830
5.189 Rp 1,322,276
9.61012 7.784 Rp 1,128,709
19.220 Rp 1,153,214
3.364 Rp 269,083

Rp
9.6101 77.554 22.584 Rp 6,551,815 Rp 1,422,298

1393.788 Rp 20,253,479

22,216,728
19.911 Rp 537,604
9.292 Rp 557,515
1327.417
9.292 Rp 743,353
0.929 Rp 74,335
0.531 Rp 50,442
1,327.4169 1,413.699 20.044 Rp 20,791,083 Rp 1,425,646 Rp

2122.716 Rp 18,917,266
21,907,263

30.325 Rp 818,762
14.151 Rp 849,087
2021.635
14.151 Rp 1,132,115
1.415 Rp 113,212
0.809 Rp 76,822
Rp

2,021.6346 2,153.041 30.527 Rp 19,736,028 Rp 2,171,236

Nike Naluri (1106587) 310


297.767 Rp 512,438

931,863
4.254 Rp 114,853
1.985 Rp 119,107
283.5872
1.985 Rp 158,809
0.199 Rp 15,881

Rp
0.113 Rp 10,776
283.5872 302.020 4.282 Rp 627,291 Rp 304,573

0.228 Rp 533,560
1.142 Rp 41,119
342.660 Rp 589,697
5.140 Rp 138,777

3,999,887
9.138 Rp 580,238
0.571 Rp 82,810
114.220 0.685 Rp 99,371
20.560 Rp 1,233,576
2.284 Rp 182,752

Rp
2.284 Rp 182,752
2.284 Rp 182,752
0.685 Rp 54,826
1.028 Rp 97,658
114.220 359.565 29.126 Rp 2,065,571 Rp 1,934,316

8.918 Rp 20,828,653
89.176 Rp 3,210,353

87,861,498
44.588 Rp 1,560,588
3.344 Rp 31,769,121
78.029 Rp 7,802,942
222.941
445.882 Rp 6,688,236
147.141 Rp 8,828,472
73.571 Rp 5,885,648
Rp

7.357 Rp 588,565
7.357 Rp 698,921
222.9412 669.938 235.426 Rp 71,859,894 Rp 16,001,605
TOTAL Rp 121,631,681 Rp 23,259,672
TOTAL Rp 144,891,353

Nike Naluri (1106587) 311


RIAL
JUMLAH
Rp 1,322,275.631
Rp 1,228,079.994
Rp 18,917,265.605
Rp 20,253,478.834
Rp 1,102,134.396
Rp 6,688,236.000
Rp 1,609,995.991
Rp 31,769,121.000
Rp 21,362,212.872
Rp 1,560,588.400
Rp 7,802,942.000
Rp 3,251,472.480
Rp 82,809.500
Rp 4,681,068.006
Rp 121,631,681

H
JUMLAH
Rp 846,818.138
Rp 934,619.034
Rp 12,740,970.192
Rp 8,371,760.736
Rp 182,752.000
Rp 182,752.000
Rp 23,259,672

Nike Naluri (1106587) 312


Sloof
Sloof TB1
4.3.1.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
4.3.1 Penulangan Beton
4.3.1.2 4.3.1.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.3.1.2.2 Penulangan Beton Pembesian Besi dia. 12mm
4.3.1.3 Pekerjaan Bekisting untuk Sloof
Sloof TB2A
4.3.2.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
Penulangan Beton vol
4.3.2
4.3.2.2 4.3.2.2.1 Penulangan Beton Pembesian Besi dia. 8mm tipe tul.pokok
4.3.2.2.2 Penulangan Beton Pembesian Besi dia. 12mm
4.3.2.3 Pekerjaan Bekisting untuk Sloof φ12
Sloof TB2B Σ tulangan (bh)
4.3.3.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr 12
4.3.3 Penulangan Beton panjang
4.3.3.2 4.3.3.2.1 Penulangan Beton Pembesian Besi dia. 8mm 43.2
4.3.3.2.2 Penulangan Beton Pembesian Besi dia. 12mm
4.3.3.3 Pekerjaan Bekisting untuk Sloof
Sloof TB3A φ12
4.3.4.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr Σ tulangan (bh)
4.3.4 Penulangan Beton 12
4.3.4.2 4.3.4.2.1 Penulangan Beton Pembesian Besi dia. 8mm panjang
4.3.4.2.2 Penulangan Beton Pembesian Besi dia. 12mm 164.4
4.3.4.3 Pekerjaan Bekisting untuk Sloof
Sloof TB4
4.3.5.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr φ12
Penulangan Beton Σ tulangan (bh)
4.3.5
4.3.5.2 4.3.5.2.1 Penulangan Beton Pembesian Besi dia. 8mm 15
4.3.5.2.2 Penulangan Beton Pembesian Besi dia. 12mm panjang
4.3.5.3 Pekerjaan Bekisting untuk Sloof 372
Sloof TB5A
4.3.6.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
Penulangan Beton φ12
4.3.6
4.3.6.2 4.3.6.2.1 Penulangan Beton Pembesian Besi dia. 8mm Σ tulangan (bh)
4.3.6.2.2 Penulangan Beton Pembesian Besi Ulir D 13 19
4.3.6.3 Pekerjaan Bekisting untuk Sloof panjang
264.1

φ12
Σ tulangan (bh)
23
panjang
197.8

φ12
Σ tulangan (bh)
15
panjang
231
ketebalan selimut beton = 50 mm
NO KODE

1 4.3.3

4.PEKERJAAN BETON STRU


m3
volume sloof 1
tul.sengkang panjang Σ tulangan (kg) beton (M3) bekisting (M2) 2
3
φ8-150 pokok sengkang 4
Σ tulangan (bh) 5
24 3.6 0.108 2.52 6
38.376 2.5344
panjang 7
4.3.3
9.504 8
a
b
φ8-150 pokok sengkang c
Σ tulangan (bh) d
91.333333333 13.7 0.51375 10.96 e
146.042 12.080356
panjang f
45.301333333

φ8-150 pokok sengkang


Σ tulangan (bh) 4.PEKERJAAN BETON
165.33333333 24.8 0.93 19.84 NO
330.46 21.868089
panjang 1
82.005333333 2
3
4
φ8-150 pokok sengkang 5
Σ tulangan (bh) 6
92.666666667 13.9 0.6255 12.51 7
234.609 14.727822
panjang 8
55.229333333 JUML

4.PEKERJAAN BETON
φ8-150 pokok sengkang NO
Σ tulangan (bh) 1
57.333333333 8.6 0.4515 8.6 2
175.712 10.641067
panjang 3
39.904 4
5
6
JUML
φ8-150 pokok sengkang
Σ tulangan (bh)
102.66666667 15.4 1.078 16.94
205.205 21.792711
panjang
81.722666667
ton = 50 mm
RENCANA ANGGARAN BIAYA
HARGA SATUAN JUMLAH HARGA
JENIS PEKERJAAN VOLUME SATUAN
MATERIAL UPAH MATERIAL UPAH
Sloof Beton 3.70675 m3 Rp 1,788,497 Rp345,425 Rp 6,629,511 Rp 1,280,404
JUMLAH Rp 1,788,497 Rp 345,425 Rp 6,629,511 Rp 1,280,404

TABEL DAFTAR KEBUTUHAN MATERIAL DAN UPAH PEKERJA


4.PEKERJAAN BETON STRUKTUR & N KEBUTUHAN
KOEFISIEN SATUAN HARGA SATUAN VOLUME
Pekerjaan Sloof Beton (Bes MATERIAL UPAH
Kayu Kuat klas III 0.2700 m3 Rp 2,335,667 1.001
Paku 8 s/d 12 cm 2.0000 kg Rp 36,000 7.414
Minyak Pelumas 0.6000 Ltr Rp 35,000 2.224
Besi Beton rata-rata 210 Kg Rp 1,721 778.418
Kawat Beton Hitam 3.0000 kg Rp 27,000 11.120
Semen PC (50 Kg) 6.7200 zak Rp 63,500 24.909
Pasir Beton 0.5400 m3 Rp 145,000 2.002
3.707
Batu Split Pecah Mesin 2/3 0.8100 m3 Rp 145,000 3.002
Pekerja 0.5650 Org/Hari Rp 60,000 2.094
Tukang Batu Kasar 0.2750 Org/Hari Rp 80,000 1.019
Tukang Kayu Kasar 1.5600 Org/Hari Rp 80,000 5.783
Tukang Besi Tulangan 1.4000 Org/Hari Rp 80,000 5.189
Kepala Tukang 0.3230 Org/Hari Rp 80,000 1.197
Mandor 0.2830 Org/Hari Rp 95,000 1.049
JUMLAH 3.7068 830.090 16.332

TABEL REKAPITULASI KEBUTUHAN MATERIAL


4.PEKERJAAN BETON STRUKTU HARGA
SATUAN KEBUTUHAN JUMLAH
JENIS SATUAN
Batu Split Pecah Mesin 2/3 m3 Rp 145,000 3.002 Rp 435,357.788
Besi Beton rata-rata Kg Rp 1,721 778.418 Rp 1,339,608.246
Kawat Beton Hitam kg Rp 27,000 11.120 Rp 300,246.750
Kayu Kuat klas III m3 Rp2,335,667 1.001 Rp 2,337,587.753
Minyak Pelumas Ltr Rp 35,000 2.224 Rp 77,841.750
Paku 8 s/d 12 cm kg Rp 36,000 7.414 Rp 266,886.000
Pasir Beton m3 Rp 145,000 2.002 Rp 290,238.525
Semen PC (50 Kg) zak Rp 63,500 24.909 Rp 1,581,744.360
JUMLAH Rp2,788,888 830.090 Rp 6,629,511

TABEL REKAPITULASI KEBUTUHAN UPAH


4.PEKERJAAN BETON STRUKTU HARGA
SATUAN KEBUTUHAN JUMLAH
JENIS SATUAN
Kepala Tukang Org/Hari Rp 80,000 1.197 Rp 95,782.420
Mandor Org/Hari Rp 95,000 1.049 Rp 99,655.974
Pekerja Org/Hari Rp 60,000 2.094 Rp 125,658.825
Tukang Batu Kasar Org/Hari Rp 80,000 1.019 Rp 81,548.500
Tukang Besi Tulangan Org/Hari Rp 80,000 5.189 Rp 415,156.000
Tukang Kayu Kasar Org/Hari Rp 80,000 5.783 Rp 462,602.400
JUMLAH Rp 475,000 16.332 Rp 1,280,404
TOTAL

Rp 7,909,915
Rp 7,909,915

JA
HARGA
TOTAL
MATERIAL UPAH
Rp 2,337,587.753
Rp 266,886.000
Rp 77,841.750
Rp 1,339,608.246
Rp 300,246.750
Rp 1,581,744.360
Rp 290,238.525
Rp 435,357.788
Rp 125,658.825
7,909,915

Rp 81,548.500
Rp 462,602.400
Rp 415,156.000
Rp 95,782.420
Rp 99,655.974
Rp

Rp 6,629,511 Rp 1,280,404
anak tangga
dimensi
panjang lebar tinggi
1 0.27 0.18

tul. pokok 3φ8


112.236 63 m
46.7296 16.8 kg

dimensi
panjang lebar tinggi
2.2 0.13 0.25
tul. pokok 7φ12
15.4 m
1
13.68033 kg

dimensi
3 panjang lebar tinggi
3.12 1 0.1

3
3
volume tangga
anak tangga bordes
NO KODE
Σ anak volume dimensi volume
tangga cor bekisting panjang lebar tinggi cor bekisting 1 4.4.1
21 1.0206 4.8006 2.2 1.34 0.15 0.44055 2.937 2 4.4.2.1
tulangan 3 4.4.2.2
tul. sengkang 8φ150 tul. pokok 12φ150 tul. sengkang 12φ150 4 4.4.2.3
141 buah 8.9 buah 15.6666667 buah 5 4.4.3
29.930 kg 11.693 kg 32.622 kg
balok bordes
volume dimensi volume
cor bekisting panjang lebar tinggi cor bekisting
0.0715 2.112 1.34 0.13 0.25 0.0433875 1.2816
tul. sengkang 8φ200 tul. pokok 7φ12 tul. sengkang 8φ200 4.PEKERJAAN BETON STRUKTUR & NON
12 buah 9.345 buah 7.675 buah m3
7.347 kg 8.30148 kg 2.929 kg 1
bawah tangga 2
volume tul. pokok 10φ200 tul. sengkang 12φ150 4.1.1 3
cor bekisting 15.6 buah 6 buah a
0.624 7.488 21.549 kg 34.794 kg b
JU
1kg
1
b
a
4.1.2.1
b
c
d
JU
1kg
1
b
a
4.1.2.2
b
c
d
JU
1kg
1
b
a
4.1.2.3
b
c
d
JU
m2
1
2
3
4
5
4.4.3
6
a
b
c
d
JU
TABEL
4.PEKERJAAN BETON STRUKTUR
NO
1
2
3
4
5
6
7
8
9
10
11
12
13
JUMLAH

TAB
4.PEKERJAAN BETON STRUKTUR
NO
1
2
3
4
JUMLAH
RENCANA ANGGARAN BIAYA
HARGA SATUAN JUMLAH HARGA
JENIS PEKERJAAN VOLUME SATUAN
MATERIAL UPAH MATERIAL UPAH
Beton Struktur 2.2000 m3 Rp 681,762 Rp 148,000 Rp 1,499,902 Rp 325,606
Besi dia. 8mm 57.006 1kg Rp 15,663 Rp 1,074 Rp 892,868 Rp 61,224
Besi dia. 10mm 21.549 1kg Rp 10,196 Rp 1,074 Rp 219,702 Rp 23,143
Besi dia. 12mm 101.091 1kg Rp 9,762 Rp 1,074 Rp 986,894 Rp 108,572
Bekisting untuk Tangga 18.6192 m2 Rp 297,220 Rp 71,775 Rp 5,533,999 Rp 1,336,393
JUMLAH Rp1,014,603 Rp 222,997 Rp 9,133,364 Rp 1,854,938

TABEL DAFTAR KEBUTUHAN MATERIAL DAN UPAH PEKERJA


PEKERJAAN BETON STRUKTUR & NON HARGA KEBUTUHAN
KOEFISIEN SATUAN VOLUME
Pembuatan Beton Struktur (1 SATUAN MATERIAL UPAH
Semen PC (50 Kg) 6.72 zak Rp 63,500 14.7843
Agregat kasar 0.54 m3 Rp 254,800 1.1880
Batu Split Pecah Mesin 2/3 0.81 m3 Rp 145,000 2.2 1.7820
Pekerja 2.00 Org/Hari Rp 60,000 4.4001
Tukang Batu Kasar 0.35 Org/Hari Rp 80,000 0.7700
JUMLAH 2.2 17.754 5.170
Penulangan Beton Pembesian Besi dia. 8mm
Besi beton Ø8 1.0500 Kg Rp 14,531 59.8559
Kawat Beton Hitam 0.0150 kg Rp 27,000 0.8551
Pekerja 0.0070 Org/Hari Rp 60,000 0.3990
57.0056
Tukang Batu Kasar 0.0070 Org/Hari Rp 80,000 0.3990
Kepala Tukang 0.0007 Org/Hari Rp 80,000 0.0399
Mandor 0.0004 Org/Hari Rp 95,000 0.0228
JUMLAH 57.0056 60.711 0.861
Penulangan Beton Pembesian Besi dia. 10mm
Besi beton Ø10 1.0500 Kg Rp 9,324 22.6262
Kawat Beton Hitam 0.0150 kg Rp 27,000 0.3232
Pekerja 0.0070 Org/Hari Rp 60,000 0.1508
21.5488
Tukang Batu Kasar 0.0070 Org/Hari Rp 80,000 0.1508
Kepala Tukang 0.0007 Org/Hari Rp 80,000 0.0151
Mandor 0.0004 Org/Hari Rp 95,000 0.0086
JUMLAH 21.5488 22.949 0.325
Penulangan Beton Pembesian Besi dia. 12mm
Besi beton Ø12 1.0500 Kg Rp 8,912 106.146
Kawat Beton Hitam 0.0150 kg Rp 27,000 1.516
Pekerja 0.0070 Org/Hari Rp 60,000 0.708
101.0912
Tukang Batu Kasar 0.0070 Org/Hari Rp 80,000 0.708
Kepala Tukang 0.0007 Org/Hari Rp 80,000 0.071
Mandor 0.0004 Org/Hari Rp 95,000 0.040
JUMLAH 101.0912 107.662 1.526
Pembuatan Bekisiting untuk Tangga
Kayu Kuat klas III 0.0300 m3 Rp 2,335,667 0.5586
Paku 8 s/d 12 cm 0.4000 kg Rp 36,000 7.4477
Minyak Pelumas 0.1500 Ltr Rp 35,000 2.7929
Kayu Kuat klas II 0.0150 m3 Rp 9,500,000 0.2793
Multiplex t. 9 mm 0.3500 lbr Rp 100,000 6.5167
18.619
Dolken dia 8 s/d 10 cm p. 4 m 2.0000 btg Rp 15,000 37.2384
Pekerja 0.6600 Org/Hari Rp 60,000 12.2887
Tukang Batu Kasar 0.3300 Org/Hari Rp 80,000 6.1443
Kepala Tukang 0.0330 Org/Hari Rp 80,000 0.6144
Mandor 0.0330 Org/Hari Rp 95,000 0.6144
JUMLAH 18.6192 54.834 19.662
TOTAL

TABEL REKAPITULASI KEBUTUHAN MATERIAL


4.PEKERJAAN BETON STRUKTUR HARGA
SATUAN KEBUTUHAN JUMLAH
JENIS SATUAN
Agregat kasar m3 Rp 254,800 1.1880 Rp 302,707.560
Batu Split Pecah Mesin 2/3 m3 Rp 145,000 1.7820 Rp 258,394.404
Besi beton Ø10 Kg Rp 9,324 22.6262 Rp 210,974.400
Besi beton Ø12 Kg Rp 8,912 106.146 Rp 945,952.248
Besi beton Ø8 Kg Rp 14,531 59.8559 Rp 869,780.451
Dolken dia 8 s/d 10 cm p. 4 m btg Rp 15,000 37.2384 Rp 558,576.000
Kawat Beton Hitam kg Rp 27,000 2.6947 Rp 72,756.475
Kayu Kuat klas II m3 Rp 9,500,000 0.2793 Rp 2,653,236.000
Kayu Kuat klas III m3 Rp 2,335,667 0.5586 Rp 1,304,647.344
Minyak Pelumas Ltr Rp 35,000 2.7929 Rp 97,750.800
Multiplex t. 9 mm lbr Rp 100,000 6.5167 Rp 651,672.000
Paku 8 s/d 12 cm kg Rp 36,000 7.4477 Rp 268,116.480
Semen PC (50 Kg) zak Rp 63,500 14.7843 Rp 938,800.002
JUMLAH Rp 12,544,734 263.910 Rp 9,133,364

TABEL REKAPITULASI KEBUTUHAN UPAH


4.PEKERJAAN BETON STRUKTUR HARGA
SATUAN KEBUTUHAN JUMLAH
JENIS SATUAN
Kepala Tukang Org/Hari Rp 80,000 0.7402 Rp 59,214.843
Mandor Org/Hari Rp 95,000 0.6863 Rp 65,197.725
Pekerja Org/Hari Rp 60,000 17.9463 Rp 1,076,775.979
Tukang Batu Kasar Org/Hari Rp 80,000 8.1719 Rp 653,749.476
JUMLAH Rp 315,000 27.545 Rp 1,854,938
TOTAL
Rp 1,825,508
Rp 954,092
Rp 242,845
Rp 1,095,466
Rp 6,870,392
Rp 10,988,302

HARGA
TOTAL
MATERIAL UPAH
1,825,508

Rp 938,800
Rp 302,708
Rp 258,394
Rp 264,005
Rp 61,601
Rp

Rp 1,499,902 Rp 325,606

Rp 869,780
954,092

Rp 23,087
Rp 23,942
Rp 31,923
Rp 3,192
Rp

Rp 2,166
Rp 892,868 Rp 61,224

Rp 210,974
242,845

Rp 8,727
Rp 9,050
Rp 12,067
Rp 1,207
Rp

Rp 819
Rp 219,702 Rp 23,143
1,095,466

Rp 945,952
Rp 40,942
Rp 42,458
Rp 56,611
Rp 5,661
Rp

Rp 3,841
Rp 986,894 Rp 108,572

Rp 1,304,647
Rp 268,116
6,870,392

Rp 97,751
Rp 2,653,236
Rp 651,672
Rp 558,576
Rp 737,320
Rp

Rp 491,547
Rp 49,155
Rp 58,371
Rp 5,533,999 Rp 1,336,393
Rp 9,133,364 Rp 1,854,938
TOTAL Rp 10,988,302
Ring Balok volume ring balo
Ring Balok RB1 tipe tulangan
4.5.1.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr pokok
Penulangan Beton 4φ12
4.5.1
4.5.1.2 4.5.1.2.1 Penulangan Beton Pembesian Besi dia. 8mm Σ tulangan (bh)
4.5.1.2.2 Penulangan Beton Pembesian Besi dia. 12mm 4
4.5.1.3 Pekerjaan Bekisting untuk Balok panjang
Ring Balok RB2 8.8
4.5.2.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
Penulangan Beton 4φ12
4.5.2
4.5.2.2 4.5.2.2.1 Penulangan Beton Pembesian Besi dia. 8mm Σ tulangan (bh)
4.5.2.2.2 Penulangan Beton Pembesian Besi dia. 12mm 4
4.5.2.3 Pekerjaan Bekisting untuk Balok panjang
Ring Balok RB3 239.2
4.5.3.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
Penulangan Beton 5φ12
4.5.3
4.5.3.2 4.5.3.2.1 Penulangan Beton Pembesian Besi dia. 8mm Σ tulangan (bh)
4.5.3.2.2 Penulangan Beton Pembesian Besi dia. 12mm 5
4.5.3.3 Pekerjaan Bekisting untuk Balok panjang
Ring Balok RB4 256
4.5.4.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
Penulangan Beton 6φ12
4.5.4
4.5.4.2 4.5.4.2.1 Penulangan Beton Pembesian Besi dia. 8mm Σ tulangan (bh)
4.5.4.2.2 Penulangan Beton Pembesian Besi dia. 12mm 6
4.5.4.3 Pekerjaan Bekisting untuk Balok panjang
144
volume ring balok
tulangan panjang Σ tulangan (kg) bekisting
beton (M 3) NO KODE
sengkang (m) pokok sengkang (M 2)
φ8-100 1 4.1.1
Σ tulangan (bh) 2 4.1.2.1
23 2.2 7.8173333 2.183466667 0.0572 0.88 3 4.1.2.3
panjang 4 4.2.3
8.188

φ8-150
Σ tulangan (bh)
399.6666666667 59.8 212.48933 48.59946667 1.9435 29.9 4.PEKERJAAN BETON STRUKTUR & NON ST
panjang m3
182.248 1
2
φ8-150 4.1.1 3
Σ tulangan (bh) a
342.3333333333 51.2 227.41333 50.75662222 1.9968 30.72 b
panjang JUMLAH
190.3373333333 1kg
1
φ8-150 b
Σ tulangan (bh) a
4.1.2.1
161 24 127.92 28.16426667 1.092 16.8 b
panjang c
105.616 d
JUMLAH
1kg
1
b
a
4.1.2.3
b
c
d
JUMLAH
m2
1
2
3
4
5
4.2.3
6
a
b
c
d
JUMLAH

TABEL REKA
4.PEKERJAAN BETON STRUKTUR &
NO
1
2
3
4
5
6
7
8
9
10
11
12
JUMLAH

TABEL REK
4.PEKERJAAN BETON STRUKTUR &
NO
1
2
3
4
JUMLAH
RENCANA ANGGARAN BIAYA
HARGA SATUAN JUMLAH HARGA
JENIS PEKERJAAN VOLUME SATUAN
MATERIAL UPAH MATERIAL
Beton Struktur 5.0895 m3 Rp 681,762 Rp 148,000 Rp 3,469,828
Pembesian Besi dia. 8mm 129.704 1kg Rp 15,663 Rp 1,074 Rp 2,031,527
Pembesian Besi dia. 12mm 575.640 1kg Rp 9,762 Rp 1,074 Rp 5,619,634
Bekisiting untuk Balok 78.300 m2 Rp 350,827 Rp 71,775 Rp 27,469,728
JUMLAH Rp1,058,014 Rp 221,923 Rp 38,590,717

TABEL DAFTAR KEBUTUHAN MATERIAL DAN UPAH PEKERJA


EKERJAAN BETON STRUKTUR & NON ST HARGA KEBUTUHAN
KOEFISIEN SATUAN VOLUME
Pembuatan Beton Struktur (1 Pc SATUAN MATERIAL
Semen PC (50 Kg) 6.72 zak Rp 63,500 34.201
Agregat kasar 0.54 m3 Rp 254,800 2.748
Batu Split Pecah Mesin 2/3 0.81 m3 Rp 145,000 5.0895 4.122
Pekerja 2.00 Org/Hari Rp 60,000
Tukang Batu Kasar 0.35 Org/Hari Rp 80,000
JUMLAH 5.0895 41.072
Penulangan Beton Pembesian Besi dia. 8mm
Besi beton Ø8 1.0500 Kg Rp 14,531 136.189
Kawat Beton Hitam 0.0150 kg Rp 27,000 1.946
Pekerja 0.0070 Org/Hari Rp 60,000
129.7038
Tukang Batu Kasar 0.0070 Org/Hari Rp 80,000
Kepala Tukang 0.0007 Org/Hari Rp 80,000
Mandor 0.0004 Org/Hari Rp 95,000
JUMLAH 129.7038 138.135
Penulangan Beton Pembesian Besi dia. 12mm
Besi beton Ø12 1.0500 Kg Rp 8,912 604.422
Kawat Beton Hitam 0.0150 kg Rp 27,000 8.635
Pekerja 0.0070 Org/Hari Rp 60,000
575.64
Tukang Batu Kasar 0.0070 Org/Hari Rp 80,000
Kepala Tukang 0.0007 Org/Hari Rp 80,000
Mandor 0.0004 Org/Hari Rp 95,000
JUMLAH 575.64 613.057
Pembuatan Bekisiting untuk Balok
Kayu Kuat klas III 0.0400 m3 Rp 2,335,667 3.132
Paku 8 s/d 12 cm 0.4000 kg Rp 36,000 31.320
Minyak Pelumas 0.2000 Ltr Rp 35,000 15.660
Kayu Kuat klas II 0.0180 m3 Rp 9,500,000 1.409
Multiplex t. 9 mm 0.3500 lbr Rp 100,000 27.405
78.30
Dolken dia 8 s/d 10 cm p. 4 m 2.0000 btg Rp 15,000 156.600
Pekerja 0.6600 Org/Hari Rp 60,000
Tukang Batu Kasar 0.3300 Org/Hari Rp 80,000
Kepala Tukang 0.0330 Org/Hari Rp 80,000
Mandor 0.0330 Org/Hari Rp 95,000
JUMLAH 78.3 235.526
TOTAL

TABEL REKAPITULASI KEBUTUHAN MATERIAL


4.PEKERJAAN BETON STRUKTUR & HARGA
SATUAN KEBUTUHAN JUMLAH
JENIS SATUAN
Agregat kasar m3 Rp 254,800 2.748 Rp 700,274.484
Batu Split Pecah Mesin 2/3 m3 Rp 145,000 4.122 Rp 597,761.775
Besi beton Ø12 Kg Rp 8,912 604.422 Rp 5,386,500.000
Besi beton Ø8 Kg Rp 14,531 136.189 Rp 1,978,996.600
Dolken dia 8 s/d 10 cm p. 4 m btg Rp 15,000 156.600 Rp 2,349,000.000
Kawat Beton Hitam kg Rp 27,000 10.580 Rp 285,664.248
Kayu Kuat klas II m3 Rp 9,500,000 1.409 Rp 13,389,300.000
Kayu Kuat klas III m3 Rp 2,335,667 3.132 Rp 7,315,308.000
Minyak Pelumas Ltr Rp 35,000 15.660 Rp 548,100.000
Multiplex t. 9 mm lbr Rp 100,000 27.405 Rp 2,740,500.000
Paku 8 s/d 12 cm kg Rp 36,000 31.320 Rp 1,127,520.000
Semen PC (50 Kg) zak Rp 63,500 34.201 Rp 2,171,791.440
JUMLAH Rp12,535,410 1027.790 Rp 38,590,717

TABEL REKAPITULASI KEBUTUHAN UPAH


4.PEKERJAAN BETON STRUKTUR & HARGA
SATUAN KEBUTUHAN JUMLAH
JENIS SATUAN
Kepala Tukang Org/Hari Rp 80,000 3.078 Rp 246,211.254
Mandor Org/Hari Rp 95,000 2.866 Rp 272,273.565
Pekerja Org/Hari Rp 60,000 66.794 Rp 4,007,664.405
Tukang Batu Kasar Org/Hari Rp 80,000 32.558 Rp 2,604,618.540
JUMLAH Rp 315,000 105.296 Rp 7,130,768
JUMLAH HARGA
TOTAL
UPAH
Rp 753,246 Rp 4,223,074
Rp 139,302 Rp 2,170,829
Rp 618,237 Rp 6,237,872
Rp 5,619,983 Rp 33,089,711
Rp 7,130,768 Rp 45,721,484

PAH PEKERJA
KEBUTUHAN HARGA
TOTAL
UPAH MATERIAL UPAH
Rp 2,171,791.440

4,223,074
Rp 700,274.484
Rp 597,761.775
10.179 Rp 610,740.000
1.781 Rp 142,506.000
Rp
11.960 Rp 3,469,828 Rp 753,246

Rp 1,978,996.600
2,170,829

Rp 52,530.048
0.908 Rp 54,475.605
0.908 Rp 72,634.140
0.091 Rp 7,263.414
Rp

0.052 Rp 4,928.745
1.959 Rp 2,031,527 Rp 139,302

Rp 5,386,500
6,237,872

Rp 233,134
4.029 Rp 241,769
4.029 Rp 322,358
0.403 Rp 32,236
Rp

0.230 Rp 21,874
8.692 Rp 5,619,634 Rp 618,237

Rp 7,315,308
Rp 1,127,520
Rp 548,100
33,089,711

Rp 13,389,300
Rp 2,740,500
Rp 2,349,000
51.678 Rp 3,100,680
25.839 Rp 2,067,120
Rp

2.584 Rp 206,712
2.584 Rp 245,471
82.685 Rp 27,469,728 Rp 5,619,983
TOTAL Rp 38,590,717 Rp 7,130,768
TOTAL Rp 45,721,484
volume pekerjaan lain-lain RENCANA ANGGARAN BIAYA
1. pemasangan Railing Tangga HARGA SATUAN
NO KODE JENIS PEKERJAAN VOLUME SATUAN
panjang lebar volume MATERIAL
0.61 0.91 0.5551 1 12.1 pemasangan Railing 13.2827 m2 Rp 105,700
3.38 0.91 6.1516 2 12.3 Dinding Batu Tempel 17.152 m2 Rp 178,174
2. pemasangan Railing Balkon JUMLAH Rp 283,874
4.55 0.8 3.64
2.8 0.8 2.24 TABEL DAFTAR KEBUTUHAN MATERIAL
0.87 0.8 0.696 12. PEKERJAAN LAIN-LAIN HARGA
KOEFISIEN SATUAN
3. Dinding Batu Tempel m2 pemasangan Railing SATUAN
3 1.15 3.45 1 Cat Besi 1.0000 m2 Rp 28,900
6.92 2.2 15.224 2 Pipa Stainless Steel Ø 1" 0.0800 Btg Rp 240,000
luas kusen tipe J2 13.7015 3 Pipa Stainless Steel Ø 1,5 " 0.0800 Btg Rp 320,000
4 Pipa Stainless Steel Ø 2" 0.0800 Btg Rp 400,000
12.1
a Pekerja 0.0600 Org/Hari Rp 60,000
b Tukang Besi Tulangan 0.0600 Org/Hari Rp 80,000
c Kepala Tukang 0.0060 Org/Hari Rp 80,000
d Mandor 0.0030 Org/Hari Rp 95,000
JUMLAH
m2 Dinding Batu Tempel
1 Batu Andesit 30x30 1.0600 m2 Rp 150,000
2 Semen PC (50 Kg) 0.2488 zak Rp 63,500
3 Pasir Pasang 0.0250 m3 Rp 135,000
12.3 a Pekerja 1.0000 Org/Hari Rp 60,000
b Tukang Batu Kasar 0.5000 Org/Hari Rp 80,000
c Kepala Tukang 0.0500 Org/Hari Rp 80,000
d Mandor 0.0500 Org/Hari Rp 95,000
JUMLAH

TABEL REKAPITULASI KEBUTUHAN MATERIAL


12. PEKERJAAN LAIN-LAIN HARGA
SATUAN KEBUTUHAN
NO JENIS SATUAN
1 Batu Andesit 30x30 m2 Rp 150,000 18.181
2 Cat Besi m2 Rp 28,900 13.283
3 Pasir Pasang m3 Rp 135,000 0.429
4 Pipa Stainless Steel Ø 1" Btg Rp 240,000 1.063
5 Pipa Stainless Steel Ø 1,5 " Btg Rp 320,000 1.063
6 Pipa Stainless Steel Ø 2" Btg Rp 400,000 1.063
7 Semen PC (50 Kg) zak Rp 63,500 4.267
JUMLAH Rp1,337,400 39.347

TABEL REKAPITULASI KEBUTUHAN UPAH


12. PEKERJAAN LAIN-LAIN HARGA
SATUAN KEBUTUHAN
NO JENIS SATUAN
1 Kepala Tukang Org/Hari Rp 80,000 0.937
2 Mandor Org/Hari Rp 95,000 0.897
3 Pekerja Org/Hari Rp 60,000 17.948
4 Tukang Batu Kasar Org/Hari Rp 80,000 8.576
5 Tukang Besi Tulangan Org/Hari Rp 80,000 0.7970
JUMLAH Rp 395,000 29.156
A ANGGARAN BIAYA
HARGA SATUAN JUMLAH HARGA
TOTAL
UPAH MATERIAL UPAH
Rp 9,165 Rp 1,403,981 Rp 121,736 Rp 1,525,717
Rp 108,750 Rp 3,055,948 Rp 1,865,226 Rp 4,921,174
Rp 117,915 Rp 4,459,929 Rp 1,986,962 Rp 6,446,891

R KEBUTUHAN MATERIAL DAN UPAH PEKERJA


KEBUTUHAN HARGA
VOLUME TOTAL
MATERIAL UPAH MATERIAL UPAH
13.2827 Rp 383,870
1.0626 Rp 255,028

1,525,717
1.0626 Rp 340,037
1.0626 Rp 425,046
13.2827
0.7970 Rp 47,818
0.7970 Rp 63,757
0.0797 Rp 6,376

Rp
0.0398 Rp 3,786
13.2827 16.471 1.713 Rp 1,403,981 Rp 121,736

18.1806 Rp 2,727,089

4,921,174
4.2673 Rp 270,973
0.4288 Rp 57,886
17.1515 17.1515 Rp 1,029,090
8.5758 Rp 686,060
0.8576 Rp 68,606

Rp
0.8576 Rp 81,470
17.1515 22.877 27.442 Rp 3,055,948 Rp 1,865,226
TOTAL Rp 4,459,929 Rp 1,986,962
TOTAL Rp 6,446,891

AN MATERIAL
JUMLAH
Rp 2,727,088.500
Rp 383,870.030
Rp 57,886.313
Rp 255,027.840
Rp 340,037.120
Rp 425,046.400
Rp 270,973.118
Rp 4,459,929

UHAN UPAH
JUMLAH
Rp 74,981.696
Rp 85,255.195
Rp 1,076,907.720
Rp 686,060.000
Rp 63,756.960
Rp 1,986,962
Dak Beton volume dak beton
Dak Beton BC1 tipe tulangan panjang Σ tulangan (kg) beton bekisting
NO
4.7.1.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr pokok sengkang (m) pokok sengkang (M 3) (M 2)
Penulangan Beton 4φ10 φ8-150 1
4.7.1
4.7.1.2 4.7.2.1 Penulangan Beton Pembesian Besi dia. 8mm Σ tulangan (bh) 2
4.7.2.2 Penulangan Beton Pembesian Besi dia. 10mm 4 51.666666667 7.6 37.493 9.2586667 0.76 5.52 3
4.7.1.3 Pekerjaan Bekisting untuk balok panjang 4
Plat Lantai 30.4 17.36
4.6.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
Penulangan Beton
4.7.2 4.6.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.6.2
4.6.2.2 Penulangan Beton Pembesian Besi dia. 10mm 4.PEKERJAAN BETON S
4.6.2.3 Penulangan Beton Pembesian Besi dia. 12mm
4.6.3 Pekerjaan Bekisting untuk Plat Lantai

4.1.1

4.1.2.1

4.1.2.2

4.2.3
4.2.3
RENCANA ANGGARAN BIAYA
HARGA SATUAN JUMLAH HARGA
KODE JENIS PEKERJAAN VOLUME SATUAN TOTAL
MATERIAL UPAH MATERIAL UPAH
4.1.1 Beton Struktur 0.7600 m3 Rp 681,762 Rp 148,000 Rp 518,139 Rp 112,480 Rp 630,619
4.1.2.1 Pembesian Besi dia. 8mm 9.259 1kg Rp 15,663 Rp 1,074 Rp 145,017 Rp 9,944 Rp 154,961
4.1.2.2 Pembesian Besi dia. 10mm 37.493 1kg Rp 10,196 Rp 1,074 Rp 382,265 Rp 40,268 Rp 422,533
4.2.3 Bekisiting untuk balok 5.520 m2 Rp 350,827 Rp 71,775 Rp 1,936,563 Rp 396,198 Rp 2,332,761
JUMLAH Rp1,058,447 Rp 221,923 Rp 2,981,984 Rp 558,890 Rp 3,540,874

TABEL DAFTAR KEBUTUHAN MATERIAL DAN UPAH PEKERJA


4.PEKERJAAN BETON STRUKTUR & NON HARGA KEBUTUHAN HARGA
KOEFISIEN SATUAN VOLUME TOTAL
m3 Pembuatan Beton Struktur (1 SATUAN MATERIAL UPAH MATERIAL UPAH
1 Semen PC (50 Kg) 6.72 zak Rp 63,500 5.1072 Rp 324,307

630,619
2 Agregat kasar 0.54 m3 Rp 254,800 0.4104 Rp 104,570
3 Batu Split Pecah Mesin 2/3 0.81 m3 Rp 145,000 0.7600 0.6156 Rp 89,262
a Pekerja 2.00 Org/Hari Rp 60,000 1.5200 Rp 91,200
b Tukang Batu Kasar 0.35 Org/Hari Rp 80,000 0.2660 Rp 21,280

Rp
JUMLAH 0.7600 6.133 1.786 Rp 518,139 Rp 112,480
1kg Penulangan Beton Pembesian Besi dia. 8mm
1 Besi beton Ø8 1.0500 Kg Rp 14,531 9.72160 Rp 141,267
b Kawat Beton Hitam 0.0150 kg Rp 27,000 0.13888 Rp 3,750

154,961
a Pekerja 0.0070 Org/Hari Rp 60,000 0.06481 Rp 3,889
9.2587
b Tukang Batu Kasar 0.0070 Org/Hari Rp 80,000 0.06481 Rp 5,185
c Kepala Tukang 0.0007 Org/Hari Rp 80,000 0.00648 Rp 518
d Mandor 0.0004 Org/Hari Rp 95,000 0.00370 Rp 352

Rp
JUMLAH 9.2587 9.860 0.140 Rp 145,017 Rp 9,944
1kg Penulangan Beton Pembesian Besi dia. 10mm
1 Besi beton Ø10 1.0500 Kg Rp 9,324 39.3680 Rp 367,080
b Kawat Beton Hitam 0.0150 kg Rp 27,000 0.5624 Rp 15,185

422,533
a Pekerja 0.0070 Org/Hari Rp 60,000 0.2625 Rp 15,747
37.4933
b Tukang Batu Kasar 0.0070 Org/Hari Rp 80,000 0.2625 Rp 20,996
c Kepala Tukang 0.0007 Org/Hari Rp 80,000 0.0262 Rp 2,100
d Mandor 0.0004 Org/Hari Rp 95,000 0.0150 Rp 1,425

Rp
JUMLAH 37.4933 39.930 0.566 Rp 382,265 Rp 40,268
m2 Pembuatan Bekisiting untuk Balok
1 Kayu Kuat klas III 0.0400 m3 Rp 2,335,667 0.2208 Rp 515,715

5.5200

61
2 Paku 8 s/d 12 cm 0.4000 kg Rp 36,000 2.2080 Rp 79,488
3 Minyak Pelumas 0.2000 Ltr Rp 35,000 1.1040 Rp 38,640
4 Kayu Kuat klas II 0.0180 m3 Rp 9,500,000 0.0994 Rp 943,920
5 Multiplex t. 9 mm 0.3500 lbr Rp 100,000 1.9320 Rp 193,200
5.5200
6 Dolken dia 8 s/d 10 cm p. 4 m 2.0000 btg Rp 15,000 11.0400 Rp 165,600

2,332,761
a Pekerja 0.6600 Org/Hari Rp 60,000 3.6432 Rp 218,592
b Tukang Batu Kasar 0.3300 Org/Hari Rp 80,000 1.8216 Rp 145,728
c Kepala Tukang 0.0330 Org/Hari Rp 80,000 0.1822 Rp 14,573
d Mandor 0.0330 Org/Hari Rp 95,000 0.1822 Rp 17,305

Rp
JUMLAH 5.5200 16.604 5.829 Rp 1,936,563 Rp 396,198
TOTAL Rp 2,981,984 Rp 558,890
TOTAL Rp 3,540,874

TABEL REKAPITULASI KEBUTUHAN MATERIAL


#REF! HARGA
SATUAN KEBUTUHAN JUMLAH
NO JENIS SATUAN
1 Agregat kasar m3 Rp 254,800 0.410 Rp 104,569.920
2 Batu Split Pecah Mesin 2/3 m3 Rp 145,000 0.616 Rp 89,262.000
3 Besi beton Ø10 Kg Rp 9,324 39.368 Rp 367,080.000
4 Besi beton Ø8 Kg Rp 14,531 9.722 Rp 141,267.000
5 Dolken dia 8 s/d 10 cm p. 4 m btg Rp 15,000 11.040 Rp 165,600.000
6 Kawat Beton Hitam kg Rp 27,000 0.701 Rp 18,934.560
7 Kayu Kuat klas II m3 Rp 9,500,000 0.099 Rp 943,920.000
8 Kayu Kuat klas III m3 Rp 2,335,667 0.221 Rp 515,715.200
9 Minyak Pelumas Ltr Rp 35,000 1.104 Rp 38,640.000
10 Multiplex t. 9 mm lbr Rp 100,000 1.932 Rp 193,200.000
11 Paku 8 s/d 12 cm kg Rp 36,000 2.208 Rp 79,488.000
12 Semen PC (50 Kg) zak Rp 63,500 5.107 Rp 324,307.200
JUMLAH Rp12,535,822 72.528 Rp 2,981,984

TABEL REKAPITULASI KEBUTUHAN UPAH


#REF! HARGA
SATUAN KEBUTUHAN JUMLAH
NO JENIS SATUAN
1 Kepala Tukang Org/Hari Rp 80,000 0.215 Rp 17,190.912
2 Mandor Org/Hari Rp 95,000 0.201 Rp 19,081.776
3 Pekerja Org/Hari Rp 60,000 5.490 Rp 329,427.840
4 Tukang Batu Kasar Org/Hari Rp 80,000 2.415 Rp 193,189.120
JUMLAH Rp 315,000 8.321 Rp 558,890
volume plat lantai RENCANA ANGGARAN BIAYA
Σ tulangan (bh) Σ tulangan (kg) beton bekisting
ruangan panjang lebar tebal NO KODE JENIS PEKERJAAN VOLUME SATUAN
pokok sengkang pokok sengkang (M 3) (M 2)
4.2 3.15 0.12 35.8 25.333333 1 4.6.1 Beton Struktur 21.5800 m3
kamar pembantu 53.099 25.954844 1.6461 13.815
1.17 0.5 0.1 199.12 97.330667 2 4.6.2.1 Pembesian Besi dia. 8mm 585.026 1kg
3.15 2 0.12 71.75 20.5 3 4.6.2.2 Pembesian Besi dia. 10mm 1158.862 1kg
teras belakang 6.6 0.9 0.12 panjang 280.07 22.8944 2.3888 16.84 4 4.6.2.3 Pembesian Besi dia. 12mm 45.967 1kg
4.6 1 0.2 1050.3 85.854 5 4.6.3 Bekisiting untuk Plat Lantai 177.022 m2
8.6 5.8 0.12 57.333 39.666667 JUMLAH
bagian 1 308.3 144.80978 5.9856 49.88
499.95 234.82667
5.8 5.4 0.12 38.667 37 TABEL DAFTAR KEBUTUHAN MAT
bagian 2 60.794 125.948 3.7584 31.32
227.98 204.24 4.PEKERJAAN BETON STRUKTUR & NON
KOEFISIEN SATUAN
5.4 2.2 0.12 36 15.666667 m3 Pembuatan Beton Struktur (1
bagian 3 122.54 22.413778 1.4256 11.88
198.72 36.346667 1 Semen PC (50 Kg) 6.72 zak
6.4 4.2 0.12 42.667 29 2 Agregat kasar 0.54 m3
bagian 4 171.55 77.256 3.2256 26.88
278.19 125.28 4.6.1 3 Batu Split Pecah Mesin 2/3 0.81 m3
4.18 3.5 0.12 43.65 27.666667 a Pekerja 2.00 Org/Hari
bagian 5 103.85 30.927644 2.0286 16.905
4.55 0.5 0.12 389.45 115.97867 b Tukang Batu Kasar 0.35 Org/Hari
3 1.22 0.12 42.2 12.466667 JUMLAH
bagian 6 170.97 15.068044 0.639 5.325
3.33 0.5 0.12 277.25 24.434667 1kg Penulangan Beton Pembesian Besi dia. 8mm
2.2 1.467 0.12 14.667 10.78 1 Besi beton Ø8 1.0500 Kg
bagian 7 30.54 15.427312 0.3873 3.2274
34.379 17.36658 b Kawat Beton Hitam 0.0150 kg
1.9 0.5 0.1 12.667 4.3333333 a Pekerja 0.0070 Org/Hari
kanopi depan 6.742 0.6887111 0.095 0.95 4.6.2.1
25.283 2.5826667 b Tukang Batu Kasar 0.0070 Org/Hari
c Kepala Tukang 0.0007 Org/Hari
d Mandor 0.0004 Org/Hari
51.745247 JUMLAH
4.3121039 1kg Penulangan Beton Pembesian Besi dia. 10mm
45.967027 45.967027 1 Besi beton Ø10 1.0500 Kg
b Kawat Beton Hitam 0.0150 kg
a Pekerja 0.0070 Org/Hari
4.6.2.2
b Tukang Batu Kasar 0.0070 Org/Hari
c Kepala Tukang 0.0007 Org/Hari
d Mandor 0.0004 Org/Hari
JUMLAH
1kg Penulangan Beton Pembesian Besi dia. 12mm
1 Besi beton Ø12 1.0500 Kg

4.6.2.3
b Kawat Beton Hitam 0.0150 kg
a Pekerja 0.0070 Org/Hari
4.6.2.3
b Tukang Batu Kasar 0.0070 Org/Hari
c Kepala Tukang 0.0007 Org/Hari
d Mandor 0.0004 Org/Hari
JUMLAH
m2 Pembuatan Bekisiting untuk Plat Lantai
1 Kayu Kuat klas III 0.0400 m3
2 Paku 8 s/d 12 cm 0.4000 kg
3 Minyak Pelumas 0.2000 Ltr
4 Kayu Kuat klas II 0.0150 m3
5 Multiplex t. 9 mm 0.3500 lbr
4.6.3
6 Dolken dia 8 s/d 10 cm p. 4 m 6.0000 btg
a Pekerja 0.6600 Org/Hari
b Tukang Batu Kasar 0.3300 Org/Hari
c Kepala Tukang 0.0330 Org/Hari
d Mandor 0.0330 Org/Hari
JUMLAH

TABEL REKAPITULASI KEBUTUHAN MATERIAL


4.PEKERJAAN BETON STRUKTUR HARGA
SATUAN
NO JENIS SATUAN
1 Agregat kasar m3 Rp 254,800
2 Batu Split Pecah Mesin 2/3 m3 Rp 145,000
3 Besi beton Ø10 Kg Rp 9,324
4 Besi beton Ø8 Kg Rp 14,531
5 Dolken dia 8 s/d 10 cm p. 4 m btg Rp 15,000
6 Kawat Beton Hitam kg Rp 27,000
7 Kayu Kuat klas II m3 Rp 9,500,000
8 Kayu Kuat klas III m3 Rp 2,335,667
9 Minyak Pelumas Ltr Rp 35,000
10 Multiplex t. 9 mm lbr Rp 100,000
11 Paku 8 s/d 12 cm kg Rp 36,000
12 Semen PC (50 Kg) zak Rp 63,500
13 Besi beton Ø12 Kg Rp 8,912
JUMLAH Rp12,544,734
TABEL REKAPITULASI KEBUTUHAN UPAH
4.PEKERJAAN BETON STRUKTUR HARGA
SATUAN
NO JENIS SATUAN
1 Kepala Tukang Org/Hari Rp 80,000
2 Mandor Org/Hari Rp 95,000
3 Pekerja Org/Hari Rp 60,000
4 Tukang Batu Kasar Org/Hari Rp 80,000
JUMLAH Rp 315,000
RENCANA ANGGARAN BIAYA
HARGA SATUAN JUMLAH HARGA
TOTAL
MATERIAL UPAH MATERIAL UPAH
Rp 681,762 Rp 148,000 Rp 14,712,416 Rp 3,193,838 Rp 17,906,254
Rp 15,663 Rp 1,074 Rp 9,163,158 Rp 628,318 Rp 9,791,476
Rp 10,196 Rp 1,074 Rp 11,815,222 Rp 1,244,618 Rp 13,059,840
Rp 9,762 Rp 1,074 Rp 448,749 Rp 49,369 Rp 498,118
Rp 382,327 Rp 71,775 Rp 67,680,384 Rp 12,705,783 Rp 80,386,167
Rp1,099,709 Rp222,997 Rp103,819,929 Rp17,821,925 Rp121,641,854

BEL DAFTAR KEBUTUHAN MATERIAL DAN UPAH PEKERJA


HARGA KEBUTUHAN HARGA
VOLUME TOTAL
SATUAN MATERIAL UPAH MATERIAL UPAH

17,906,254
Rp 63,500 145.0175 Rp 9,208,612
Rp 254,800 11.6532 Rp 2,969,234
Rp 145,000 21.5800 17.4798 Rp 2,534,570
Rp 60,000 43.1600 Rp 2,589,599
Rp 80,000 7.5530 Rp 604,240

Rp
21.5800 174.151 50.713 Rp 14,712,416 Rp 3,193,838
Besi dia. 8mm
Rp 14,531 614.27765 Rp 8,926,222
Rp 27,000 8.77539 Rp 236,936

9,791,476
Rp 60,000 4.09518 Rp 245,711
585.0263
Rp 80,000 4.09518 Rp 327,615
Rp 80,000 0.40952 Rp 32,761
Rp 95,000 0.23401 Rp 22,231

Rp
585.0263 623.053 8.834 Rp 9,163,158 Rp 628,318
Besi dia. 10mm
Rp 9,324 1216.8049 Rp 11,345,883

13,059,840
Rp 27,000 17.3829 Rp 469,339
Rp 60,000 8.1120 Rp 486,722
1158.8618
Rp 80,000 8.1120 Rp 648,963
Rp 80,000 0.8112 Rp 64,896
Rp 95,000 0.4635 Rp 44,037
Rp

1,158.8618 1,234.188 17.499 Rp 11,815,222 Rp 1,244,618


Besi dia. 12mm
Rp 8,912 48.2654 Rp 430,132
498,118

45.967
Rp 27,000 0.6895 Rp 18,617

498,118
Rp 60,000 0.3218 Rp 19,306
45.967
Rp 80,000 0.3218 Rp 25,742
Rp 80,000 0.0322 Rp 2,574
Rp 95,000 0.0184 Rp 1,747

Rp
45.9670 48.955 0.694 Rp 448,749 Rp 49,369

Rp 2,335,667 7.0809 Rp 16,538,613


Rp 36,000 70.8090 Rp 2,549,123
Rp 35,000 35.4045 Rp 1,239,157
Rp 9,500,000 2.6553 Rp 25,225,692
Rp 100,000 61.9578 Rp 6,195,784
177.0224

80,386,167
Rp 15,000 1062.1344 Rp 15,932,016
Rp 60,000 116.8348 Rp 7,010,087
Rp 80,000 58.4174 Rp 4,673,391
Rp 80,000 5.8417 Rp 467,339
Rp 95,000 5.8417 Rp 554,965

Rp
177.0224 1,240.042 186.936 Rp 67,680,384 Rp 12,705,783
TOTAL Rp103,819,929 Rp 17,821,925
TOTAL Rp 121,641,854

ASI KEBUTUHAN MATERIAL


KEBUTUHAN JUMLAH
11.653 Rp 2,969,233.709
17.480 Rp 2,534,569.591
1216.805 Rp 11,345,883.325
614.278 Rp 8,926,222.034
1062.134 Rp 15,932,016.000
26.848 Rp 724,891.334
2.655 Rp 25,225,692.000
7.081 Rp 16,538,612.757
35.404 Rp 1,239,156.800
61.958 Rp 6,195,784.000
70.809 Rp 2,549,122.560
145.018 Rp 9,208,612.479
48.2654 Rp 430,132.363
3320.388 Rp 103,819,929
LASI KEBUTUHAN UPAH
KEBUTUHAN JUMLAH
7.095 Rp 567,571.024
6.558 Rp 622,979.720
172.524 Rp 10,351,424.761
78.499 Rp 6,279,949.905
264.675 Rp 17,821,925
volume balok ketebalan selimut beton = 50 mm
Potongan B1 B2A B2B B3A B3B B4A B4B B5B B6A B6B volume balok
as 1 9.29 3.4 3 tipe tulangan tulangan Σ tulangan (kg) beton
panjang
as 2 3 10.68 pokok sengkang pokok sengkang (M 3)
as 3 3 5.33 5.33 4φ12 φ8-150
as 4 5.54 3 5.33 Σ tulangan (bh)
as 5 5.34 8.54 4 175.13333 26.12 92.813 16.625991 0.6791
as 7 6.91 13.87 panjang
as 9 3.09 3.94 104.48 62.347467
as 10 3.09 7.03
as A 14.94 12.2 4 5.8 4φ12 φ8-150
as C 2.5 5.24 5.8 Σ tulangan (bh)
as D 1.7 4 6.54 4 233.46667 34.87 123.9 28.389547 1.1333
as G 5 10 1.59 4 7 panjang
Jumlah 26.12 34.87 17.88 24.98 14.14 14.68 22.15 25 8.54 10.66 139.48 106.4608

10φ12 φ8-150
Σ tulangan (bh)
10 120.2 17.88 158.83 14.61632 0.5811
panjang
178.8 54.8112

10φ12 φ8-150
Σ tulangan (bh)
10 167.53333 24.98 221.91 24.839609 0.9742
panjang
249.8 93.148533

6φ12 φ8-150
Σ tulangan (bh)
6 95.266667 14.14 75.366 14.124871 0.5515
panjang
84.84 52.968267

10φ12 φ8-150
Σ tulangan (bh)
10 98.866667 14.68 130.41 17.295076 0.6679
14.68 130.41 17.295076 0.6679
panjang
146.8 64.856533

6φ12 φ8-150
Σ tulangan (bh)
6 148.66667 22.15 118.06 26.006756 1.0078
panjang
132.9 97.525333

11D13 φ8-150
Σ tulangan (bh)
11 167.66667 25 286 35.590044 1.75
panjang
275 133.46267

12D13 φ8-150
Σ tulangan (bh)
12 57.933333 8.54 106.58 13.842204 0.6832
panjang
102.48 51.908267

10D13 φ8-150
Σ tulangan (bh)
10 72.066667 10.66 110.86 17.219129 0.8528
panjang
106.6 64.571733
Balok RENCANA ANGGARAN BIAYA
4.2.1 Balok B1 HARGA SATUAN
NO KODE JENIS PEKERJAAN VOLUME SATUAN
bekisting 4.2.1.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr MATERIAL
(M 2) 4.2.1.2 Penulangan Beton 1 4.2.1.1 Beton Struktur (1 Pc : 2 Ps : 3 8.88094 m3 Rp 681,762
4.2.1.2.1 Penulangan Beton Pembesian Besi dia. 8mm 2 4.2.1.2.1 Besi dia. 8 mm 208.5495467 1kg Rp 15,663
4.2.1.2.2 Penulangan Beton Pembesian Besi dia. 12mm 3 4.2.1.2.2 Besi dia. 12 mm 921.2905 1kg Rp 9,762
13.8436 4.2.1.3 Pekerjaan Bekisting untuk Balok 4 4.2.8.2.2 Besi Ulir D 13 503.4432 1kg Rp 9,828
4.2.2 Balok B2A 5 4.2.1.3 Bekisting untuk Balok 147.9026 m2 Rp 350,827
4.2.2.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr JUMLAH Rp1,067,842
4.2.2.2 Penulangan Beton
4.2.2.2.1 Penulangan Beton Pembesian Besi dia. 8mm TABEL DAFTAR KEBUTUHAN MATERIAL DA
4.2.2.2.2 Penulangan Beton Pembesian Besi dia. 12mm 4.PEKERJAAN BETON STRUKTUR & NON HARGA
KOEFISIEN SATUAN
21.9681 4.2.2.3 Pekerjaan Bekisting untuk Balok m3 Pembuatan Beton Struktur (1 SATUAN
4.2.3 Balok B2B 1 Semen PC (50 Kg) 6.72 zak Rp 63,500
4.2.3.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr 2 Agregat kasar 0.54 m3 Rp 254,800
4.2.3.2 Penulangan Beton 4.2.1.1 3 Batu Split Pecah Mesin 2/3 0.81 m3 Rp 145,000
4.2.3.2.1 Penulangan Beton Pembesian Besi dia. 8mm a Pekerja 2.00 Org/Hari Rp 60,000
4.2.3.2.2 Penulangan Beton Pembesian Besi dia. 12mm b Tukang Batu Kasar 0.35 Org/Hari Rp 80,000
11.2644 4.2.3.3 Pekerjaan Bekisting untuk Balok JUMLAH
4.2.4 Balok B3A 1kg Penulangan Beton Pembesian Besi dia. 8mm
4.2.4.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr 1 Besi beton Ø8 1.0500 Kg Rp 14,531
4.2.4.2 Penulangan Beton b Kawat Beton Hitam 0.0150 kg Rp 27,000
4.2.4.2.1 Penulangan Beton Pembesian Besi dia. 8mm a Pekerja 0.0070 Org/Hari Rp 60,000
4.2.1.2.2
4.2.4.2.2 Penulangan Beton Pembesian Besi dia. 12mm b Tukang Batu Kasar 0.0070 Org/Hari Rp 80,000
18.2354 4.2.4.3 Pekerjaan Bekisting untuk Balok c Kepala Tukang 0.0007 Org/Hari Rp 80,000
4.2.5 Balok B3B d Mandor 0.0004 Org/Hari Rp 95,000
4.2.5.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr JUMLAH
4.2.5.2 Penulangan Beton 1kg Penulangan Beton Pembesian Besi dia. 12mm
4.2.5.2.1 Penulangan Beton Pembesian Besi dia. 8mm 1 Besi beton Ø12 1.0500 Kg Rp 8,912
4.2.5.2.2 Penulangan Beton Pembesian Besi dia. 12mm b Kawat Beton Hitam 0.0150 kg Rp 27,000
10.3222 4.2.5.3 Pekerjaan Bekisting untuk Balok a Pekerja 0.0070 Org/Hari Rp 60,000
4.2.1.2.2
4.2.6 Balok B4A b Tukang Batu Kasar 0.0070 Org/Hari Rp 80,000
4.2.6.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr c Kepala Tukang 0.0007 Org/Hari Rp 80,000
4.2.6.2 Penulangan Beton d Mandor 0.0004 Org/Hari Rp 95,000
4.2.6.2.1 Penulangan Beton Pembesian Besi dia. 8mm JUMLAH
4.2.6.2.2 Penulangan Beton Pembesian Besi dia. 12mm 1kg Penulangan Beton Pembesian Besi Ulir D 13
12.1844 4.2.6.3 Pekerjaan Bekisting untuk Balok 1 Besi beton Ø13 1.0500 Kg Rp 8,974

4.2.8.2.2
12.1844
4.2.7 Balok B4B b Kawat Beton Hitam 0.0150 kg Rp 27,000
4.2.7.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr a Pekerja 0.0070 Org/Hari Rp 60,000
4.2.8.2.2
4.2.7.2 Penulangan Beton b Tukang Batu Kasar 0.0070 Org/Hari Rp 80,000
4.2.7.2.1 Penulangan Beton Pembesian Besi dia. 8mm c Kepala Tukang 0.0007 Org/Hari Rp 80,000
4.2.7.2.2 Penulangan Beton Pembesian Besi dia. 12mm d Mandor 0.0004 Org/Hari Rp 95,000
18.3845 4.2.7.3 Pekerjaan Bekisting untuk Balok JUMLAH
4.2.8 Balok B5B m2 Pembuatan Bekisiting untuk Balok
4.2.8.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr 1 Kayu Kuat klas III 0.0400 m3 Rp 2,335,667
4.2.8.2 Penulangan Beton 2 Paku 8 s/d 12 cm 0.4000 kg Rp 36,000
4.2.8.2.1 Penulangan Beton Pembesian Besi dia. 8mm 3 Minyak Pelumas 0.2000 Ltr Rp 35,000
4.2.8.2.2 Penulangan Beton Pembesian Besi Ulir D 13 4 Kayu Kuat klas II 0.0180 m3 Rp 9,500,000
22.5 4.2.8.3 Pekerjaan Bekisting untuk Balok 5 Multiplex t. 9 mm 0.3500 lbr Rp 100,000
4.2.1.3
4.2.9 Balok B6A 6 Dolken dia 8 s/d 10 cm p. 4 m 2.0000 btg Rp 15,000
4.2.9.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr a Pekerja 0.6600 Org/Hari Rp 60,000
4.2.9.2 Penulangan Beton b Tukang Batu Kasar 0.3300 Org/Hari Rp 80,000
4.2.9.2.1 Penulangan Beton Pembesian Besi dia. 8mm c Kepala Tukang 0.0330 Org/Hari Rp 80,000
4.2.9.2.2 Penulangan Beton Pembesian Besi Ulir D 13 d Mandor 0.0330 Org/Hari Rp 95,000
8.54 4.2.9.3 Pekerjaan Bekisting untuk Balok JUMLAH
4.2.10 Balok B6B
4.2.10.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
4.2.10.2 Penulangan Beton
4.2.10.2.1 Penulangan Beton Pembesian Besi dia. 8mm TABEL REKAPITULASI KEBUTUHAN MATERIAL
4.2.10.2.2 Penulangan Beton Pembesian Besi Ulir D 13 4.PEKERJAAN BETON STRUKTUR HARGA
SATUAN KEBUTUHAN
10.66 4.2.10.3 Pekerjaan Bekisting untuk Balok NO JENIS SATUAN
1 Agregat kasar m3 Rp 254,800 4.796
2 Batu Split Pecah Mesin 2/3 m3 Rp 145,000 7.194
3 Besi beton Ø12 Kg Rp 8,912 967.355
4 Besi beton Ø13 Kg Rp 8,974 528.615
5 Besi beton Ø8 Kg Rp 14,531 218.977
6 Dolken dia 8 s/d 10 cm p. 4 m btg Rp 15,000 295.805
7 Kawat Beton Hitam kg Rp 27,000 24.499
8 Kayu Kuat klas II m3 Rp 9,500,000 2.662
9 Kayu Kuat klas III m3 Rp 2,335,667 5.916
10 Minyak Pelumas Ltr Rp 35,000 29.581
11 Multiplex t. 9 mm lbr Rp 100,000 51.766
12 Paku 8 s/d 12 cm kg Rp 36,000 59.161
13 Semen PC (50 Kg) zak Rp 63,500 59.680
JUMLAH Rp12,544,384 2256.007
TABEL REKAPITULASI KEBUTUHAN UPAH
4.PEKERJAAN BETON STRUKTUR HARGA
SATUAN KEBUTUHAN
NO JENIS SATUAN
1 Kepala Tukang Org/Hari Rp 80,000 6.024
2 Mandor Org/Hari Rp 95,000 5.534
3 Pekerja Org/Hari Rp 60,000 126.811
4 Tukang Batu Kasar Org/Hari Rp 80,000 63.349
JUMLAH Rp 315,000 201.718
GGARAN BIAYA
HARGA SATUAN JUMLAH HARGA
TOTAL
UPAH MATERIAL UPAH
Rp 148,000 Rp 6,054,687 Rp 1,314,379 Rp 7,369,067
Rp 1,074 Rp 3,266,472 Rp 223,982 Rp 3,490,455
Rp 1,074 Rp 8,994,016 Rp 989,466 Rp 9,983,482
Rp 1,074 Rp 4,947,878 Rp 540,698 Rp 5,488,576
Rp 71,775 Rp 51,888,176 Rp 10,615,709 Rp 62,503,885
Rp222,997 Rp75,151,231 Rp13,684,234 Rp88,835,465

KEBUTUHAN MATERIAL DAN UPAH PEKERJA


KEBUTUHAN HARGA
VOLUME TOTAL
MATERIAL UPAH MATERIAL UPAH

7,369,067
59.680 Rp 3,789,675
4.796 Rp 1,221,946
8.88094 7.194 Rp 1,043,066
17.762 Rp 1,065,713
3.108 Rp 248,666

Rp
8.8809 71.669 20.870 Rp 6,054,687 Rp 1,314,379

218.977 Rp 3,182,010

3,490,455
3.128 Rp 84,463
1.460 Rp 87,591
208.550
1.460 Rp 116,788
0.146 Rp 11,679
0.083 Rp 7,925
208.5495 222.105 3.149 Rp 3,266,472 Rp 223,982 Rp

967.355 Rp 8,620,894
9,983,482

13.819 Rp 373,123
6.449 Rp 386,942
921.291
6.449 Rp 515,923
0.645 Rp 51,592
0.369 Rp 35,009
Rp

921.2905 981.174 13.911 Rp 8,994,016 Rp 989,466


5,488,576

528.615 Rp 4,743,984

503.4432
p
5,488,576
7.552 Rp 203,894
3.524 Rp 211,446
503.4432
3.524 Rp 281,928
0.352 Rp 28,193
0.201 Rp 19,131

Rp
503.4432 536.167 7.602 Rp 4,947,878 Rp 540,698

5.916 Rp 13,818,047
59.161 Rp 2,129,797

62,503,885
29.581 Rp 1,035,318
2.662 Rp 25,291,345
51.766 Rp 5,176,591
147.9026
295.805 Rp 4,437,078
97.616 Rp 5,856,943
48.808 Rp 3,904,629

Rp
4.881 Rp 390,463
4.881 Rp 463,675
147.9026 444.891 156.185 Rp51,888,176 Rp 10,615,709
TOTAL Rp75,151,231 Rp 13,684,234
TOTAL Rp 88,835,465

N MATERIAL
JUMLAH
Rp 1,221,946.296
Rp 1,043,066.403
Rp 8,620,893.750
Rp 4,743,984.000
Rp 3,182,009.880
Rp 4,437,078.000
Rp 661,479.715
Rp 25,291,344.600
Rp 13,818,046.909
Rp 1,035,318.200
Rp 5,176,591.000
Rp 2,129,797.440
Rp 3,789,674.717
Rp 75,151,231
HAN UPAH
JUMLAH
Rp 481,926.726
Rp 525,739.414
Rp 7,608,634.724
Rp 5,067,933.578
Rp 13,684,234
RENCANA ANGGARAN BIAYA
HARGA SATUAN JUMLAH HARGA
NO KODE JENIS PEKERJAAN
MATERIAL UPAH MATERIAL UPAH
1 4.1 kolom Rp 1,049,810 Rp 239,932 Rp 121,631,681 Rp 23,259,672
2 4.2 balok Rp 1,067,842 Rp 222,997 Rp 75,151,231 Rp 13,684,234
3 4.3 sloof Rp 1,788,497 Rp 345,425 Rp 6,629,511 Rp 1,280,404
4 4.4 tangga Rp 1,014,603 Rp 222,997 Rp 9,133,364 Rp 1,854,938
5 4.5 ring balok Rp 1,058,014 Rp 221,923 Rp 38,590,717 Rp 7,130,768
6 4.6 plat lantai Rp 1,099,709 Rp 222,997 Rp 103,819,929 Rp 17,821,925
7 4.7 dak beton Rp 1,058,447 Rp 221,923 Rp 2,981,984 Rp 558,890
JUMLAH Rp 8,136,922 Rp 1,698,194 Rp 357,938,416 Rp 65,590,832
TABEL REKAPITULASI KEBUTUHAN MATERIAL
4. PEKERJAAN BETON
TOTAL SATUAN HARGA SATUAN KEBUTUHAN
NO JENIS
Rp 144,891,353 1 Agregat kasar m3 Rp 254,800 25.985
Rp 88,835,465 2 Batu Split Pecah Mesin 2/3 m3 Rp 145,000 42.665
Rp 7,909,915 3 Besi beton Ø10 Kg Rp 9,324 1278.799
Rp 10,988,302 4 Besi beton Ø12 Kg Rp 8,912 3848.905
Rp 45,721,484 5 Besi beton Ø13 Kg Rp 8,974 528.615
Rp 121,641,854 6 Besi beton Ø8 Kg Rp 14,531 2432.809
Rp 3,540,874 7 Besi Beton rata-rata Kg Rp 1,721 1418.844
Rp 423,529,248 8 Dolken dia 8 s/d 10 cm p. 4 m btg Rp 15,000 2008.700
9 Kawat Beton Hitam kg Rp 27,000 136.073
10 Kayu Kuat klas II m3 Rp 9,500,000 10.450
11 Kayu Kuat klas III m3 Rp 2,335,667 27.055
12 Minyak Pelumas Ltr Rp 35,000 131.354
13 Multiplex t. 9 mm lbr Rp 100,000 227.607
14 Paku 8 s/d 12 cm kg Rp 36,000 268.678
15 Pasir Beton m3 Rp 145,000 2.573
16 Semen PC (50 Kg) zak Rp 63,500 357.417
JUMLAH Rp 12,700,429 12746.530

TABEL REKAPITULASI KEBUTUHAN UPAH


4. PEKERJAAN BETON
SATUAN HARGA SATUAN KEBUTUHAN
NO JENIS
1 Kepala Tukang Org/Hari Rp 80,000 28.934
2 Mandor Org/Hari Rp 95,000 26.732
3 Pekerja Org/Hari Rp 60,000 604.009
4 Tukang Batu Kasar Org/Hari Rp 80,000 290.659
5 Tukang Besi Tulangan Org/Hari Rp 80,000 7.474
6 Tukang Kayu Kasar Org/Hari Rp 80,000 8.067
JUMLAH Rp 475,000 965.875
ERIAL
JUMLAH
Rp 6,621,008
Rp 6,186,492
Rp 11,923,938
Rp 34,300,744
Rp 4,743,984
Rp 35,351,755
Rp 2,441,743
Rp 30,130,506
Rp 3,673,969
Rp 99,272,614
Rp 63,192,131
Rp 4,597,396
Rp 22,760,689
Rp 9,672,403
Rp 373,048
Rp 22,695,998
Rp 357,938,416

PAH
JUMLAH
Rp 2,314,715
Rp 2,539,547
Rp 36,240,557
Rp 23,252,750
Rp 597,908
Rp 645,354
Rp 65,590,832
TABEL REKAPITULASI KEBUTUHAN UPAH
4. PEKERJAAN BETON
SATUAN
NO JENIS
1 Kepala Tukang Org/Hari
2 Kepala Tukang Org/Hari
3 Kepala Tukang Org/Hari
4 Kepala Tukang Org/Hari
5 Kepala Tukang Org/Hari
6 Kepala Tukang Org/Hari
7 Kepala Tukang Org/Hari
8 Mandor Org/Hari
9 Mandor Org/Hari
10 Mandor Org/Hari
11 Mandor Org/Hari
12 Mandor Org/Hari
13 Mandor Org/Hari
14 Mandor Org/Hari
15 Pekerja Org/Hari
16 Pekerja Org/Hari
17 Pekerja Org/Hari
18 Pekerja Org/Hari
19 Pekerja Org/Hari
20 Pekerja Org/Hari
21 Pekerja Org/Hari
22 Tukang Batu Kasar Org/Hari
23 Tukang Batu Kasar Org/Hari
24 Tukang Batu Kasar Org/Hari
25 Tukang Batu Kasar Org/Hari
26 Tukang Batu Kasar Org/Hari
27 Tukang Batu Kasar Org/Hari
28 Tukang Batu Kasar Org/Hari
29 Tukang Besi Tulangan Org/Hari
30 Tukang Besi Tulangan Org/Hari
31 Tukang Kayu Kasar Org/Hari
32 Tukang Kayu Kasar Org/Hari
JUMLAH
BEL REKAPITULASI KEBUTUHAN UPAH TABEL REKAPITULASI KEBUTUHAN MATE
4. PEKERJAAN BETON
HARGA SATUAN KEBUTUHAN JUMLAH SATUAN
NO JENIS
Rp 80,000 10.585 Rp 846,818 1 Agregat kasar m3
Rp 80,000 1.197 Rp 95,782 2 Agregat kasar m3
Rp 80,000 0.740 Rp 59,215 3 Agregat kasar m3
Rp 80,000 3.078 Rp 246,211 4 Agregat kasar m3
Rp 80,000 0.215 Rp 17,191 5 Agregat kasar m3
Rp 80,000 7.095 Rp 567,571 6 Agregat kasar m3
Rp 80,000 6.024 Rp 481,927 7 Batu Split Pecah Mesin 2/3 m3
Rp 95,000 9.838 Rp 934,619 8 Batu Split Pecah Mesin 2/3 m3
Rp 95,000 1.049 Rp 99,656 9 Batu Split Pecah Mesin 2/3 m3
Rp 95,000 0.686 Rp 65,198 10 Batu Split Pecah Mesin 2/3 m3
Rp 95,000 2.866 Rp 272,274 11 Batu Split Pecah Mesin 2/3 m3
Rp 95,000 0.201 Rp 19,082 12 Batu Split Pecah Mesin 2/3 m3
Rp 95,000 6.558 Rp 622,980 13 Batu Split Pecah Mesin 2/3 m3
Rp 95,000 5.534 Rp 525,739 14 Besi beton Ø10 Kg
Rp 60,000 212.350 Rp 12,740,970 15 Besi beton Ø10 Kg
Rp 60,000 2.094 Rp 125,659 16 Besi beton Ø10 Kg
Rp 60,000 17.946 Rp 1,076,776 17 Besi beton Ø12 Kg
Rp 60,000 66.794 Rp 4,007,664 18 Besi beton Ø12 Kg
Rp 60,000 5.490 Rp 329,428 19 Besi beton Ø12 Kg
Rp 60,000 172.524 Rp 10,351,425 20 Besi beton Ø12 Kg
Rp 60,000 126.811 Rp 7,608,635 21 Besi beton Ø12 Kg
Rp 80,000 104.647 Rp 8,371,761 22 Besi beton Ø13 Kg
Rp 80,000 1.019 Rp 81,549 23 Besi beton Ø8 Kg
Rp 80,000 8.172 Rp 653,749 24 Besi beton Ø8 Kg
Rp 80,000 32.558 Rp 2,604,619 25 Besi beton Ø8 Kg
Rp 80,000 2.415 Rp 193,189 26 Besi beton Ø8 Kg
Rp 80,000 78.499 Rp 6,279,950 27 Besi beton Ø8 Kg
Rp 80,000 63.349 Rp 5,067,934 28 Besi beton Ø8 Kg
Rp 80,000 2.284 Rp 182,752 29 Besi Beton rata-rata Kg
Rp 80,000 5.189 Rp 415,156 30 Besi Beton rata-rata Kg
Rp 80,000 2.284 Rp 182,752 31 Dolken dia 8 s/d 10 cm p. 4 m btg
Rp 80,000 5.783 Rp 462,602 32 Dolken dia 8 s/d 10 cm p. 4 m btg
Rp 2,525,000 965.875 Rp 65,590,832 33 Dolken dia 8 s/d 10 cm p. 4 m btg
34 Dolken dia 8 s/d 10 cm p. 4 m btg
35 Dolken dia 8 s/d 10 cm p. 4 m btg
36 Dolken dia 8 s/d 10 cm p. 4 m btg
37 Kawat Beton Hitam kg
38 Kawat Beton Hitam kg
39 Kawat Beton Hitam kg
40 Kawat Beton Hitam kg
41 Kawat Beton Hitam kg
42 Kawat Beton Hitam kg
43 Kawat Beton Hitam kg
44 Kayu Kuat klas II m3
45 Kayu Kuat klas II m3
46 Kayu Kuat klas II m3
47 Kayu Kuat klas II m3
48 Kayu Kuat klas II m3
49 Kayu Kuat klas II m3
50 Kayu Kuat klas III m3
51 Kayu Kuat klas III m3
52 Kayu Kuat klas III m3
53 Kayu Kuat klas III m3
54 Kayu Kuat klas III m3
55 Kayu Kuat klas III m3
56 Kayu Kuat klas III m3
57 Minyak Pelumas Ltr
58 Minyak Pelumas Ltr
59 Minyak Pelumas Ltr
60 Minyak Pelumas Ltr
61 Minyak Pelumas Ltr
62 Minyak Pelumas Ltr
63 Minyak Pelumas Ltr
64 Multiplex t. 9 mm lbr
65 Multiplex t. 9 mm lbr
66 Multiplex t. 9 mm lbr
67 Multiplex t. 9 mm lbr
68 Multiplex t. 9 mm lbr
69 Multiplex t. 9 mm lbr
70 Paku 8 s/d 12 cm kg
71 Paku 8 s/d 12 cm kg
72 Paku 8 s/d 12 cm kg
73 Paku 8 s/d 12 cm kg
74 Paku 8 s/d 12 cm kg
75 Paku 8 s/d 12 cm kg
76 Paku 8 s/d 12 cm kg
77 Pasir Beton m3
78 Pasir Beton m3
79 Semen PC (50 Kg) zak
80 Semen PC (50 Kg) zak
81 Semen PC (50 Kg) zak
82 Semen PC (50 Kg) zak
83 Semen PC (50 Kg) zak
84 Semen PC (50 Kg) zak
85 Semen PC (50 Kg) zak
JUMLAH
EKAPITULASI KEBUTUHAN MATERIAL
HARGA SATUAN KEBUTUHAN JUMLAH
Rp 254,800 5.189 Rp 1,322,276
Rp 254,800 4.796 Rp 1,221,946
Rp 254,800 1.188 Rp 302,708
Rp 254,800 2.748 Rp 700,274
Rp 254,800 11.653 Rp 2,969,234
Rp 254,800 0.410 Rp 104,570
Rp 145,000 8.470 Rp 1,228,080
Rp 145,000 7.194 Rp 1,043,066
Rp 145,000 3.002 Rp 435,358
Rp 145,000 1.782 Rp 258,394
Rp 145,000 4.122 Rp 597,762
Rp 145,000 17.480 Rp 2,534,570
Rp 145,000 0.616 Rp 89,262
Rp 9,324 22.626 Rp 210,974
Rp 9,324 1216.805 Rp 11,345,883
Rp 9,324 39.368 Rp 367,080
Rp 8,912 2122.716 Rp 18,917,266
Rp 8,912 967.355 Rp 8,620,894
Rp 8,912 106.146 Rp 945,952
Rp 8,912 604.422 Rp 5,386,500
Rp 8,912 48.265 Rp 430,132
Rp 8,974 528.615 Rp 4,743,984
Rp 14,531 1393.788 Rp 20,253,479
Rp 14,531 218.977 Rp 3,182,010
Rp 14,531 59.856 Rp 869,780
Rp 14,531 136.189 Rp 1,978,997
Rp 14,531 614.278 Rp 8,926,222
Rp 14,531 9.722 Rp 141,267
Rp 1,721 640.427 Rp 1,102,134
Rp 1,721 778.418 Rp 1,339,608
Rp 15,000 445.882 Rp 6,688,236
Rp 15,000 295.805 Rp 4,437,078
Rp 15,000 37.238 Rp 558,576
Rp 15,000 156.600 Rp 2,349,000
Rp 15,000 1062.134 Rp 15,932,016
Rp 15,000 11.040 Rp 165,600
Rp 27,000 59.629 Rp 1,609,996
Rp 27,000 24.499 Rp 661,480
Rp 27,000 11.120 Rp 300,247
Rp 27,000 2.695 Rp 72,756
Rp 27,000 10.580 Rp 285,664
Rp 27,000 26.848 Rp 724,891
Rp 27,000 0.701 Rp 18,935
Rp 9,500,000 3.344 Rp 31,769,121
Rp 9,500,000 2.662 Rp 25,291,345
Rp 9,500,000 0.279 Rp 2,653,236
Rp 9,500,000 1.409 Rp 13,389,300
Rp 9,500,000 2.655 Rp 25,225,692
Rp 9,500,000 0.099 Rp 943,920
Rp 2,335,667 9.146 Rp 21,362,213
Rp 2,335,667 5.916 Rp 13,818,047
Rp 2,335,667 1.001 Rp 2,337,588
Rp 2,335,667 0.559 Rp 1,304,647
Rp 2,335,667 3.132 Rp 7,315,308
Rp 2,335,667 7.081 Rp 16,538,613
Rp 2,335,667 0.221 Rp 515,715
Rp 35,000 44.588 Rp 1,560,588
Rp 35,000 29.581 Rp 1,035,318
Rp 35,000 2.224 Rp 77,842
Rp 35,000 2.793 Rp 97,751
Rp 35,000 15.660 Rp 548,100
Rp 35,000 35.404 Rp 1,239,157
Rp 35,000 1.104 Rp 38,640
Rp 100,000 78.029 Rp 7,802,942
Rp 100,000 51.766 Rp 5,176,591
Rp 100,000 6.517 Rp 651,672
Rp 100,000 27.405 Rp 2,740,500
Rp 100,000 61.958 Rp 6,195,784
Rp 100,000 1.932 Rp 193,200
Rp 36,000 90.319 Rp 3,251,472
Rp 36,000 59.161 Rp 2,129,797
Rp 36,000 7.414 Rp 266,886
Rp 36,000 7.448 Rp 268,116
Rp 36,000 31.320 Rp 1,127,520
Rp 36,000 70.809 Rp 2,549,123
Rp 36,000 2.208 Rp 79,488
Rp 145,000 0.571 Rp 82,810
Rp 145,000 2.002 Rp 290,239
Rp 63,500 73.718 Rp 4,681,068
Rp 63,500 59.680 Rp 3,789,675
Rp 63,500 24.909 Rp 1,581,744
Rp 63,500 14.784 Rp 938,800
Rp 63,500 34.201 Rp 2,171,791
Rp 63,500 145.018 Rp 9,208,612
Rp 63,500 5.107 Rp 324,307
Rp 78,176,102 12746.530 Rp 357,938,416
RENCANA ANGGARAN BIAYA

REKAP RAB
BIAYA PROSENTASE
NO PEKERJAAN TOTAL BIAYA
BAHAN UPAH BAHAN UPAH NO
1 Persiapan Rp 38,972,702 Rp 12,684,114 Rp 51,656,817 75% 25% 1
2 Tanah - Rp 8,438,810 Rp 8,438,810 - 100% 2
3 Pondasi Rp 45,365,853 Rp 13,220,542 Rp 58,586,395 77% 23% 3
4 Beton Rp 357,938,416 Rp 65,590,832 Rp 423,529,248 85% 15% 4
5 Dinding Rp 106,423,014 Rp 174,109,696 Rp 280,532,710 38% 62% 5
6 Lantai Rp 50,244,544 Rp 23,988,910 Rp 74,233,455 68% 32% 6
7 Kusen Rp 201,049,937 Rp 15,547,309 Rp 216,597,246 93% 7% 7
8 Atap Rp 96,937,928 Rp 12,775,157 Rp 109,713,085 88% 12% 8
9 Plafond Rp 60,572,852 Rp 19,147,692 Rp 79,720,544 76% 24% 9
10 Pengecatan Rp 64,886,284 Rp 14,491,011 Rp 79,377,295 82% 18% 10
11 Sanitasi Rp 176,955,931 Rp 8,411,057 Rp 185,366,988 95% 5% 11
12 Listrik Rp 3,119,830 Rp 4,070,400 Rp 7,190,230 43% 57% 12
13 Lain-Lain Rp 4,459,929 Rp 1,986,962 Rp 6,446,891 69% 31% 13
JUMLAH Rp 1,206,927,220 Rp 374,462,491 Rp 1,581,389,712 76% 24% 14
15
BID PRICE 16
NO PEKERJAAN TOTAL BIAYA 17
1 Persiapan Rp 51,656,817 18
2 Tanah Rp 8,438,810 19
3 Pondasi Rp 58,586,395 20
4 Beton Rp 423,529,248 21
5 Dinding Rp 280,532,710 22
6 Lantai Rp 74,233,455 23
7 Kusen Rp 216,597,246 24
8 Atap Rp 109,713,085 25
9 Plafond Rp 79,720,544 26
10 Pengecatan Rp 79,377,295 27
11 Sanitasi Rp 185,366,988 28
12 Listrik Rp 7,190,230 29
13 Lain-Lain Rp 6,446,891 30
JUMLAH Rp 1,581,389,712 31
10% KEUNTUNGAN Rp 158,138,971 32
JUMLAH Rp 1,739,528,683 33
10% PAJAK Rp 173,952,868 34
JUMLAH Rp 1,913,481,551 35
PEMBULATAN Rp 1,913,481,600 36
TERBILANG satu miliar sembilan ratus tiga belas juta empat ratus delapan puluh satu ribu 37
enam ratus rupiah 38
39
luas bangunan : 40
lantai 1 284 m2 41
lantai 2 225 m2 42
Σ luas bangunan 509 m2 43
Σ biaya Rp 1,913,481,600 44
harga per m 2
Rp 3,759,296 45
46
47
48
49
50
51
52
53

Nike Naluri (1106587) 361


RENCANA ANGGARAN BIAYA

54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110

Nike Naluri (1106587) 362


RENCANA ANGGARAN BIAYA

111
112
113
114
115
JUMLAH

NO
1
2
3
4
5
6
7
8
9
10
JUMLAH

Nike Naluri (1106587) 363


RENCANA ANGGARAN BIAYA

REKAP BAHAN
RINCIAN SATUAN HARGA SATUAN KEBUTUHAN JUMLAH
Accecories lampu pijar ls Rp 680 29.000 Rp 19,720
Accecories lampu taman ls Rp 680 2.000 Rp 1,360
Accecories lampu TL ls Rp 1,575 2.000 Rp 3,150
Accecories panel ls Rp 38,700 1.000 Rp 38,700
Accecories saklar ls Rp 7,000 21.000 Rp 147,000
Accecories stop kontak ls Rp 8,200 42.000 Rp 344,400
Agregat kasar m3 Rp 254,800 25.985 Rp 6,621,008
Alumunium Strip m' Rp 45,500 1093.336 Rp 49,746,770
Amplas Kayu / Besi Lbr Rp 8,624 384.436 Rp 3,315,378
Balok kelas III m3 Rp 2,387,000 1.217 Rp 2,905,194
Bata Merah bh Rp 600 57821.326 Rp 34,692,796
Bata Roster bh Rp 3,000 2.160 Rp 6,480
Bath Tube fibreglass unt Rp 6,100,000 2.360 Rp 14,396,000
Batu Andesit 30x30 m2 Rp 150,000 18.181 Rp 2,727,089
Batu kali bh Rp 227,500 77.472 Rp 17,624,880
Batu Split Pecah Mesin 1/2 m3 Rp 145,000 19.639 Rp 2,847,626
Batu Split Pecah Mesin 2/3 m3 Rp 145,000 44.267 Rp 6,418,782
Besi beton Ø10 Kg Rp 9,324 1278.799 Rp 11,923,938
Besi beton Ø12 Kg Rp 8,912 3848.905 Rp 34,300,744
Besi beton Ø13 Kg Rp 8,974 528.615 Rp 4,743,984
Besi beton Ø8 Kg Rp 14,531 2432.809 Rp 35,351,755
Besi Beton rata-rata Kg Rp 1,721 2628.876 Rp 4,524,133
Besi List Kaca Kg Rp 20,002 6.606 Rp 132,133
Besi Plat rata2 1 s/d 5 mm Kg Rp 19,717 9.900 Rp 195,199
Besi Square Tube Kg Rp 20,001 8.808 Rp 176,169
Cat akhir emulsion Ltr Rp 62,500 699.674 Rp 43,729,627
Cat Besi m2 Rp 28,900 13.283 Rp 383,870
Cat Dasar / meni besi Kg Rp 28,336 12.600 Rp 357,034
Cat Dasar / meni kayu Kg Rp 28,336 16.284 Rp 461,431
Cat Kayu Kg Rp 30,800 28.497 Rp 877,723
Cat Tembok (25 kg) kg Rp 22,100 269.105 Rp 5,947,229
daun Teakwood t. 6 mm lbr Rp 60,000 19.460 Rp 1,167,600
Dempul Kayu Kg Rp 24,640 13.842 Rp 341,058
Dolken dia 5 s/d 7 cm p. 4 m btg Rp 13,144 73.450 Rp 965,427
Dolken dia 8 s/d 10 cm p. 4 m btg Rp 15,000 2008.700 Rp 30,130,506
Engsel 3" bh Rp 22,500 88.000 Rp 1,980,000
Floordrain unt Rp 367,000 5.000 Rp 1,835,000
Genteng Beton Bh Rp 4,680 1869.010 Rp 8,746,967
Glass Block bh Rp 3,000 8.000 Rp 24,000
Gypsumboard t.9 mm lbr Rp 62,980 111.078 Rp 6,995,708
Hak Angin Lipat Pas Rp 25,000 40.000 Rp 1,000,000
Handel + Kunci bulat bh Rp 125,000 15.540 Rp 1,942,500
Jet washer bh Rp 347,100 4.000 Rp 1,388,400
Kabel Listrik NYM 2 x 2,5 mm rol Rp 10,000 5.250 Rp 52,500
Kabel Listrik NYM 3 x 2,5 mm rol Rp 16,000 10.500 Rp 168,000
Kaca nako polos 5 mm daun Rp 215,000 1.800 Rp 387,000
Kaca Polos 5 mm m2 Rp 95,000 106.191 Rp 10,088,134
Kaso kelas II m3 Rp 9,500,000 7.603 Rp 72,226,707
Kaso kelas III m3 Rp 2,387,000 4.102 Rp 9,792,524
Kawat Beton Hitam kg Rp 27,000 158.659 Rp 4,283,800
Kayu Kuat klas II m3 Rp 9,500,000 15.529 Rp 147,521,297
Kayu Kuat klas III m3 Rp 2,335,667 34.195 Rp 79,868,791
Kayu Reng 3/4 Kamper Samarin m3 Rp 9,500,000 1.493 Rp 14,184,925

Nike Naluri (1106587) 364


RENCANA ANGGARAN BIAYA

Keramik Dinding 20/20 cm Polis m2 Rp 87,000 130.117 Rp 11,320,153


Keramik Lantai 20/20 cm Polish m2 Rp 87,000 55.046 Rp 4,788,985
Keramik Lantai 30/30 cm Polish m2 Rp 87,000 28.844 Rp 2,509,437
Keramik Lantai 33/33 cm Polish m2 Rp 87,000 22.662 Rp 1,971,564
Keramik Lantai 50/50 cm Polish m2 Rp 123,500 80.411 Rp 9,930,740
Kitchenzink stainless steel 1 lu unt Rp 450,000 1.000 Rp 450,000
Kloset Duduk Porselen unt Rp 2,000,000 4.240 Rp 8,480,000
Kloset Jongkok Porselen Putih unt Rp 450,000 1.000 Rp 450,000
Kran Air 3/4" bh Rp 35,000 1.000 Rp 35,000
Kran dinding 4 jari bh Rp 188,000 13.000 Rp 2,444,000
Kusen Alm. 4" CA m' Rp 175,000 576.169 Rp 100,829,575
Lampu Pijar 75 Watt bh Rp 8,000 31.000 Rp 248,000
Lampu TL bh Rp 97,500 2.000 Rp 195,000
Lantai Parquette m2 Rp 176,000 102.606 Rp 18,058,656
Lem Kayu Kg Rp 62,500 64.840 Rp 4,052,475
List Profil 10 cm Gypsum m1 Rp 15,700 326.760 Rp 5,130,132
Minyak Pelumas Ltr Rp 35,000 136.754 Rp 4,786,396
Multiplex t. 9 mm lbr Rp 100,000 227.607 Rp 22,760,689
Paku 1 s/d 3 cm kg Rp 20,020 6.244 Rp 125,001
Paku 4 s/d 7 cm kg Rp 36,000 147.259 Rp 5,301,329
Paku 8 s/d 12 cm kg Rp 36,000 294.447 Rp 10,600,092
Paku Skrup Kg Rp 20,000 80.248 Rp 1,604,952
Panel Listrik standart untuk Ru bh Rp 327,000 1.000 Rp 327,000
Papan kelas II m3 Rp 9,500,000 1.254 Rp 11,914,463
Pasir Beton m3 Rp 145,000 17.995 Rp 2,609,315
Pasir Pasang m3 Rp 135,000 107.889 Rp 14,565,018
Pasir Urug m3 Rp 100,000 34.506 Rp 3,450,650
Pengelasan cm Rp 40 0.881 Rp 35
Pipa Galvanis d=1/2 " m1 Rp 130,000 25.947 Rp 3,373,110
Pipa PVC d= 1 " m1 Rp 455,000 57.769 Rp 26,284,668
Pipa PVC d= 2 " m1 Rp 455,000 32.860 Rp 14,951,300
Pipa PVC d= 3 " m1 Rp 455,000 70.262 Rp 31,968,983
Pipa PVC d= 4 " m1 Rp 455,000 84.181 Rp 38,302,128
Pipa PVC d=1/2 " m1 Rp 455,000 13.408 Rp 6,100,413
Pipa PVC d=3/4 " m1 Rp 455,000 44.423 Rp 20,212,465
Pipa Stainless Steel Ø 1" Btg Rp 240,000 1.063 Rp 255,028
Pipa Stainless Steel Ø 1,5 " Btg Rp 320,000 1.063 Rp 340,037
Pipa Stainless Steel Ø 2" Btg Rp 400,000 1.063 Rp 425,046
Plamir Kayu Kg Rp 17,890 12.213 Rp 218,494
Plamur Tembok kg Rp 52,000 192.218 Rp 9,995,343
Plat Strip Kg Rp 14,690 44.544 Rp 654,329
Plint Keramik Lantai 20/20 cm P m2 Rp 87,000 3.169 Rp 275,738
Plint Keramik Lantai 30/30 cm P m2 Rp 87,000 2.184 Rp 190,008
Plint Keramik Lantai 33/33 cm P m2 Rp 87,000 2.596 Rp 225,821
Plint Keramik Lantai 50/50 cm P m2 Rp 123,500 7.004 Rp 864,932
Rel Pintu Dorong set Rp 513,500 2.000 Rp 1,027,000
Rolling door Plat Besi m2 Rp 1,300,000 12.036 Rp 15,646,800
Saklar bh Rp 25,000 21.000 Rp 525,000
Seal tape roll Rp 10,000 0.500 Rp 5,000
Sealant clear neutral (300 ml) tb Rp 35,000 13.977 Rp 489,187
Sealant Kaca kg Rp 45,000 0.080 Rp 3,583
Semen PC (50 Kg) zak Rp 63,500 1381.278 Rp 87,711,124
Semen Warna kg Rp 12,500 524.452 Rp 6,555,650
Seng Gelombang BJLS 0,3 lbr Rp 100,100 57.600 Rp 5,765,760
Seng Plat BJLS 0,30 m' Rp 84,700 2.250 Rp 190,575
Shower bh Rp 245,000 2.000 Rp 490,000
Skrup bh Rp 334 309.292 Rp 103,200

Nike Naluri (1106587) 365


RENCANA ANGGARAN BIAYA

Slot Tanam bh Rp 10,780 10.000 Rp 107,800


Stop Kontak bh Rp 25,000 42.000 Rp 1,050,000
Triplex t. 4 mm lbr Rp 54,000 1.350 Rp 72,900
Washtafel Keramik (lengkap) unt Rp 750,000 4.480 Rp 3,360,000
Water drain+aksesoris set Rp 195,000 1.000 Rp 195,000
JUMLAH Rp 66,825,478 81449.579 Rp1,206,927,220

REKAP UPAH
RINCIAN SATUAN HARGA SATUAN KEBUTUHAN JUMLAH
Kepala Tukang Org/Hari Rp 80,000 224 Rp 17,954,301
Mandor Org/Hari Rp 95,000 341 Rp 32,416,849
Pekerja Org/Hari Rp 60,000 3000 Rp 180,005,926
Tukang Batu Halus Org/Hari Rp 80,000 45 Rp 3,587,264
Tukang Batu Kasar Org/Hari Rp 80,000 1173 Rp 93,839,278
Tukang Besi Tulangan Org/Hari Rp 80,000 8 Rp 661,665
Tukang Cat Biasa Org/Hari Rp 80,000 130 Rp 10,371,734
Tukang Gali Org/Hari Rp 75,000 1 Rp 37,500
Tukang Kayu Halus Org/Hari Rp 80,000 338 Rp 27,069,180
Tukang Kayu Kasar Org/Hari Rp 80,000 106 Rp 8,518,794
JUMLAH Rp 790,000 5366.856 Rp 374,462,491

Nike Naluri (1106587) 366


RENCANA ANGGARAN BIAYA

REKAP BAHAN
NO RINCIAN SATUAN HARGA SATUAN
1 Accecories lampu pijar ls Rp 680
2 Accecories lampu taman ls Rp 680
3 Accecories lampu TL ls Rp 1,575
4 Accecories panel ls Rp 38,700
5 Accecories saklar ls Rp 7,000
6 Accecories stop kontak ls Rp 8,200
7 Agregat kasar m3 Rp 254,800
8 Agregat kasar m3 Rp 254,800
9 Agregat kasar m3 Rp 254,800
10 Agregat kasar m3 Rp 254,800
11 Agregat kasar m3 Rp 254,800
12 Agregat kasar m3 Rp 254,800
13 Alumunium Strip m' Rp 45,500
14 Amplas Kayu / Besi Lbr Rp 8,624
15 Balok kelas III m3 Rp 2,387,000
16 Bata Merah bh Rp 600
17 Bata Merah bh Rp 600
18 Bata Merah m3 Rp 600
19 Bata Merah biasa bh Rp 600
20 Bata Roster bh Rp 3,000
21 Bath Tube fibreglass unt Rp 6,100,000
22 Bath Tube fibreglass persen Rp 6,100,000
23 Batu Andesit 30x30 m2 Rp 150,000
24 Batu kali bh Rp 227,500
25 Batu Split Pecah Mesin 1/2 m3 Rp 145,000
26 Batu Split Pecah Mesin 1/2 m3 Rp 145,000
27 Batu Split Pecah Mesin 2/3 m3 Rp 145,000
28 Batu Split Pecah Mesin 2/3 m3 Rp 145,000
29 Batu Split Pecah Mesin 2/3 m3 Rp 145,000
30 Batu Split Pecah Mesin 2/3 m3 Rp 145,000
31 Batu Split Pecah Mesin 2/3 m3 Rp 145,000
32 Batu Split Pecah Mesin 2/3 m3 Rp 145,000
33 Batu Split Pecah Mesin 2/3 m3 Rp 145,000
34 Batu Split Pecah Mesin 2/3 m3 Rp 145,000
35 Besi beton Ø10 Kg Rp 9,324
36 Besi beton Ø10 Kg Rp 9,324
37 Besi beton Ø10 Kg Rp 9,324
38 Besi beton Ø12 Kg Rp 8,912
39 Besi beton Ø12 Kg Rp 8,912
40 Besi beton Ø12 Kg Rp 8,912
41 Besi beton Ø12 Kg Rp 8,912
42 Besi beton Ø12 Kg Rp 8,912
43 Besi beton Ø13 Kg Rp 8,974
44 Besi beton Ø8 Kg Rp 14,531
45 Besi beton Ø8 Kg Rp 14,531
46 Besi beton Ø8 Kg Rp 14,531
47 Besi beton Ø8 Kg Rp 14,531
48 Besi beton Ø8 Kg Rp 14,531
49 Besi beton Ø8 Kg Rp 14,531
50 Besi Beton rata-rata Kg Rp 1,721
51 Besi Beton rata-rata Kg Rp 1,721
52 Besi Beton rata-rata Kg Rp 1,721
53 Besi Beton rata-rata Kg Rp 1,721

Nike Naluri (1106587) 367


RENCANA ANGGARAN BIAYA

54 Besi List Kaca Kg Rp 20,002


55 Besi Plat rata2 1 s/d 5 mm Kg Rp 19,717
56 Besi Square Tube Kg Rp 20,001
57 Cat akhir emulsion Ltr Rp 62,500
58 Cat Besi m2 Rp 28,900
59 Cat Dasar / meni besi Kg Rp 28,336
60 Cat Dasar / meni kayu Kg Rp 28,336
61 Cat Kayu Kg Rp 30,800
62 Cat Tembok (25 kg) kg Rp 22,100
63 daun Teakwood t. 6 mm lbr Rp 60,000
64 Dempul Kayu Kg Rp 24,640
65 Dolken dia 5 s/d 7 cm p. 4 m btg Rp 13,144
66 Dolken dia 8 s/d 10 cm p. 4 m btg Rp 15,000
67 Dolken dia 8 s/d 10 cm p. 4 m btg Rp 15,000
68 Dolken dia 8 s/d 10 cm p. 4 m btg Rp 15,000
69 Dolken dia 8 s/d 10 cm p. 4 m btg Rp 15,000
70 Dolken dia 8 s/d 10 cm p. 4 m btg Rp 15,000
71 Dolken dia 8 s/d 10 cm p. 4 m btg Rp 15,000
72 Engsel 3" bh Rp 22,500
73 Floordrain unt Rp 367,000
74 Genteng Beton Bh Rp 4,680
75 Glass Block bh Rp 3,000
76 Gypsumboard t.9 mm lbr Rp 62,980
77 Hak Angin Lipat Pas Rp 25,000
78 Handel + Kunci bulat bh Rp 125,000
79 Handel + Kunci bulat bh Rp 125,000
80 Jet washer bh Rp 347,100
81 Kabel Listrik NYM 2 x 2,5 mm rol Rp 10,000
82 Kabel Listrik NYM 3 x 2,5 mm rol Rp 16,000
83 Kaca nako polos 5 mm daun Rp 215,000
84 Kaca Polos 5 mm m2 Rp 95,000
85 Kaca Polos 5 mm m2 Rp 95,000
86 Kaso kelas II m3 Rp 9,500,000
87 Kaso kelas II m3 Rp 9,500,000
88 Kaso kelas III m3 Rp 2,387,000
89 Kawat Beton Hitam kg Rp 27,000
90 Kawat Beton Hitam kg Rp 27,000
91 Kawat Beton Hitam kg Rp 27,000
92 Kawat Beton Hitam kg Rp 27,000
93 Kawat Beton Hitam kg Rp 27,000
94 Kawat Beton Hitam kg Rp 27,000
95 Kawat Beton Hitam kg Rp 27,000
96 Kawat Beton Hitam kg Rp 27,000
97 Kayu Kuat klas II m3 Rp 9,500,000
98 Kayu Kuat klas II m3 Rp 9,500,000
99 Kayu Kuat klas II m3 Rp 9,500,000
100 Kayu Kuat klas II m3 Rp 9,500,000
101 Kayu Kuat klas II m3 Rp 9,500,000
102 Kayu Kuat klas II m3 Rp 9,500,000
103 Kayu Kuat klas II m3 Rp 9,500,000
104 Kayu Kuat klas II m3 Rp 9,500,000
105 Kayu Kuat klas II m3 Rp 9,500,000
106 Kayu Kuat klas III m3 Rp 2,335,667
107 Kayu Kuat klas III m3 Rp 2,335,667
108 Kayu Kuat klas III m3 Rp 2,335,667
109 Kayu Kuat klas III m3 Rp 2,335,667
110 Kayu Kuat klas III m3 Rp 2,335,667

Nike Naluri (1106587) 368


RENCANA ANGGARAN BIAYA

111 Kayu Kuat klas III m3 Rp 2,335,667


112 Kayu Kuat klas III m3 Rp 2,335,667
113 Kayu Kuat klas III m3 Rp 2,335,667
114 Kayu Kuat klas III m3 Rp 2,335,667
115 Kayu Reng 3/4 Kamper Sama m3 Rp 9,500,000
116 Keramik Dinding 20/20 cm Po m2 Rp 87,000
117 Keramik Lantai 20/20 cm Poli m2 Rp 87,000
118 Keramik Lantai 30/30 cm Poli m2 Rp 87,000
119 Keramik Lantai 33/33 cm Poli m2 Rp 87,000
120 Keramik Lantai 50/50 cm Poli m2 Rp 123,500
121 Kitchenzink stainless steel 1 unt Rp 450,000
122 Kloset Duduk Porselen unt Rp 2,000,000
123 Kloset Duduk Porselen persen Rp 2,000,000
124 Kloset Jongkok Porselen Puti unt Rp 450,000
125 Kran Air 3/4" bh Rp 35,000
126 Kran dinding 4 jari bh Rp 188,000
127 Kusen Alm. 4" CA m' Rp 175,000
128 Lampu Pijar 75 Watt bh Rp 8,000
129 Lampu TL bh Rp 97,500
130 Lantai Parquette m2 Rp 176,000
131 Lem Kayu Kg Rp 62,500
132 Lem Kayu Kg Rp 62,500
133 List Profil 10 cm Gypsum m1 Rp 15,700
134 Minyak Pelumas Ltr Rp 35,000
135 Minyak Pelumas Ltr Rp 35,000
136 Minyak Pelumas Ltr Rp 35,000
137 Minyak Pelumas Ltr Rp 35,000
138 Minyak Pelumas Ltr Rp 35,000
139 Minyak Pelumas Ltr Rp 35,000
140 Minyak Pelumas Ltr Rp 35,000
141 Minyak Pelumas Ltr Rp 35,000
142 Multiplex t. 9 mm lbr Rp 100,000
143 Multiplex t. 9 mm lbr Rp 100,000
144 Multiplex t. 9 mm lbr Rp 100,000
145 Multiplex t. 9 mm lbr Rp 100,000
146 Multiplex t. 9 mm lbr Rp 100,000
147 Multiplex t. 9 mm lbr Rp 100,000
148 Paku 1 s/d 3 cm kg Rp 20,020
149 Paku 1 s/d 3 cm kg Rp 20,020
150 Paku 1 s/d 3 cm kg Rp 20,020
151 Paku 4 s/d 7 cm kg Rp 36,000
152 Paku 4 s/d 7 cm kg Rp 36,000
153 Paku 4 s/d 7 cm kg Rp 36,000
154 Paku 4 s/d 7 cm kg Rp 36,000
155 Paku 4 s/d 7 cm kg Rp 36,000
156 Paku 8 s/d 12 cm kg Rp 36,000
157 Paku 8 s/d 12 cm kg Rp 36,000
158 Paku 8 s/d 12 cm kg Rp 36,000
159 Paku 8 s/d 12 cm kg Rp 36,000
160 Paku 8 s/d 12 cm kg Rp 36,000
161 Paku 8 s/d 12 cm kg Rp 36,000
162 Paku 8 s/d 12 cm kg Rp 36,000
163 Paku 8 s/d 12 cm kg Rp 36,000
164 Paku 8 s/d 12 cm kg Rp 36,000
165 Paku 8 s/d 12 cm kg Rp 36,000
166 Paku Skrup Kg Rp 20,000
167 Panel Listrik standart untuk bh Rp 327,000

Nike Naluri (1106587) 369


RENCANA ANGGARAN BIAYA

168 Papan kelas II m3 Rp 9,500,000


169 Pasir Beton m3 Rp 145,000
170 Pasir Beton m3 Rp 145,000
171 Pasir Beton m3 Rp 145,000
172 Pasir Beton m3 Rp 145,000
173 Pasir Beton m3 Rp 145,000
174 Pasir Pasang m3 Rp 135,000
175 Pasir Pasang m3 Rp 135,000
176 Pasir Pasang m3 Rp 135,000
177 Pasir Pasang m3 Rp 135,000
178 Pasir Pasang m3 Rp 135,000
179 Pasir Pasang m3 Rp 135,000
180 Pasir Pasang m3 Rp 135,000
181 Pasir Urug m3 Rp 100,000
182 Pengelasan cm Rp 40
183 Pipa Galvanis d=1/2 " m1 Rp 130,000
184 Pipa Galvanis d=1/2 " persen Rp 130,000
185 Pipa PVC d= 1 " m1 Rp 455,000
186 Pipa PVC d= 1 " persen Rp 455,000
187 Pipa PVC d= 2 " m1 Rp 455,000
188 Pipa PVC d= 2 " persen Rp 455,000
189 Pipa PVC d= 3 " m1 Rp 455,000
190 Pipa PVC d= 3 " persen Rp 455,000
191 Pipa PVC d= 4 " m1 Rp 455,000
192 Pipa PVC d= 4 " persen Rp 455,000
193 Pipa PVC d=1/2 " m1 Rp 455,000
194 Pipa PVC d=1/2 " persen Rp 455,000
195 Pipa PVC d=3/4 " m1 Rp 455,000
196 Pipa PVC d=3/4 " persen Rp 455,000
197 Pipa Stainless Steel Ø 1" Btg Rp 240,000
198 Pipa Stainless Steel Ø 1,5 " Btg Rp 320,000
199 Pipa Stainless Steel Ø 2" Btg Rp 400,000
200 Plamir Kayu Kg Rp 17,890
201 Plamur Tembok kg Rp 52,000
202 Plat Strip Kg Rp 14,690
203 Plint Keramik Lantai 20/20 cm m2 Rp 87,000
204 Plint Keramik Lantai 30/30 cm m2 Rp 87,000
205 Plint Keramik Lantai 33/33 cm m2 Rp 87,000
206 Plint Keramik Lantai 50/50 cm m2 Rp 123,500
207 Rel Pintu Dorong set Rp 513,500
208 Rolling door Plat Besi m2 Rp 1,300,000
209 Saklar bh Rp 25,000
210 Seal tape roll Rp 10,000
211 Sealant clear neutral (300 ml) tb Rp 35,000
212 Sealant Kaca kg Rp 45,000
213 Semen PC (50 Kg) zak Rp 63,500
214 Semen PC (50 Kg) zak Rp 63,500
215 Semen PC (50 Kg) zak Rp 63,500
216 Semen PC (50 Kg) zak Rp 63,500
217 Semen PC (50 Kg) zak Rp 63,500
218 Semen PC (50 Kg) zak Rp 63,500
219 Semen PC (50 Kg) zak Rp 63,500
220 Semen PC (50 Kg) zak Rp 63,500
221 Semen PC (50 Kg) zak Rp 63,500
222 Semen PC (50 Kg) zak Rp 63,500
223 Semen PC (50 Kg) zak Rp 63,500
224 Semen PC (50 Kg) zak Rp 63,500

Nike Naluri (1106587) 370


RENCANA ANGGARAN BIAYA

225 Semen PC (50 Kg) zak Rp 63,500


226 Semen PC (50 Kg) zak Rp 63,500
227 Semen Warna kg Rp 12,500
228 Semen Warna kg Rp 12,500
229 Semen Warna kg Rp 12,500
230 Seng Gelombang BJLS 0,3 lbr Rp 100,100
231 Seng Plat BJLS 0,30 m' Rp 84,700
232 Shower bh Rp 245,000
233 Skrup bh Rp 334
234 Slot Tanam bh Rp 10,780
235 Stop Kontak bh Rp 25,000
236 Triplex t. 4 mm lbr Rp 54,000
237 Washtafel Keramik (lengkap) unt Rp 750,000
238 Washtafel Keramik (lengkap) persen Rp 750,000
239 Water drain+aksesoris set Rp 195,000
JUMLAH Rp 189,328,766

Nike Naluri (1106587) 371


RENCANA ANGGARAN BIAYA

BAHAN REKAP UPAH


KEBUTUHAN JUMLAH NO RINCIAN SATUAN HARGA SATUAN KEBUTUHAN
29 Rp 19,720 1 Kepala Tukang Org/Hari Rp 80,000 8.199
2 Rp 1,360 2 Kepala Tukang Org/Hari Rp 80,000 2.656
2 Rp 3,150 3 Kepala Tukang Org/Hari Rp 80,000 10.585
1 Rp 38,700 4 Kepala Tukang Org/Hari Rp 80,000 1.197
21 Rp 147,000 5 Kepala Tukang Org/Hari Rp 80,000 0.740
42 Rp 344,400 6 Kepala Tukang Org/Hari Rp 80,000 3.078
5 Rp 1,322,276 7 Kepala Tukang Org/Hari Rp 80,000 0.215
1 Rp 302,708 8 Kepala Tukang Org/Hari Rp 80,000 7.095
3 Rp 700,274 9 Kepala Tukang Org/Hari Rp 80,000 6.024
12 Rp 2,969,234 10 Kepala Tukang Org/Hari Rp 80,000 71.054
0 Rp 104,570 11 Kepala Tukang Org/Hari Rp 80,000 11.691
5 Rp 1,221,946 12 Kepala Tukang Org/Hari Rp 80,000 13.499
1093 Rp 49,746,770 13 Kepala Tukang Org/Hari Rp 80,000 8.941
384 Rp 3,315,378 14 Kepala Tukang Org/Hari Rp 80,000 12.548
1 Rp 2,905,194 15 Kepala Tukang Org/Hari Rp 80,000 12.435
968 Rp 580,944 16 Kepala Tukang Org/Hari Rp 80,000 15.734
55051 Rp 33,030,514 17 Kepala Tukang org Rp 80,000 37.800
1532 Rp 919,338 18 Kepala Tukang Org/Hari Rp 80,000 0.937
270 Rp 162,000 19 Mandor Org/Hari Rp 95,000 4.779
2 Rp 6,480 20 Mandor Org/Hari Rp 95,000 5.584
2 Rp 12,200,000 21 Mandor Org/Hari Rp 95,000 2.788
0 Rp 2,196,000 22 Mandor Org/Hari Rp 95,000 9.838
18 Rp 2,727,089 23 Mandor Org/Hari Rp 95,000 1.049
77 Rp 17,624,880 24 Mandor Org/Hari Rp 95,000 0.686
19 Rp 2,823,701 25 Mandor Org/Hari Rp 95,000 2.866
0 Rp 23,925 26 Mandor Org/Hari Rp 95,000 0.201
2 Rp 232,290 27 Mandor Org/Hari Rp 95,000 6.558
8 Rp 1,228,080 28 Mandor Org/Hari Rp 95,000 5.534
3 Rp 435,358 29 Mandor Org/Hari Rp 95,000 250.600
2 Rp 258,394 30 Mandor Org/Hari Rp 95,000 10.646
4 Rp 597,762 31 Mandor Org/Hari Rp 95,000 2.247
17 Rp 2,534,570 32 Mandor Org/Hari Rp 95,000 3.789
1 Rp 89,262 33 Mandor Org/Hari Rp 95,000 25.346
7 Rp 1,043,066 34 Mandor Org/Hari Rp 95,000 5.009
23 Rp 210,974 35 Mandor Org/Hari Rp 95,000 2.812
1217 Rp 11,345,883 36 Mandor Org/Hari Rp 95,000 0.897
39 Rp 367,080 37 Pekerja Org/Hari Rp 60,000 95.587
2123 Rp 18,917,266 38 Pekerja Org/Hari Rp 60,000 131.805
106 Rp 945,952 39 Pekerja Org/Hari Rp 60,000 131.973
604 Rp 5,386,500 40 Pekerja Org/Hari Rp 60,000 212.350
48 Rp 430,132 41 Pekerja Org/Hari Rp 60,000 2.094
967 Rp 8,620,894 42 Pekerja Org/Hari Rp 60,000 17.946
529 Rp 4,743,984 43 Pekerja Org/Hari Rp 60,000 66.794
1394 Rp 20,253,479 44 Pekerja Org/Hari Rp 60,000 5.490
60 Rp 869,780 45 Pekerja Org/Hari Rp 60,000 172.524
136 Rp 1,978,997 46 Pekerja Org/Hari Rp 60,000 126.811
614 Rp 8,926,222 47 Pekerja Org/Hari Rp 60,000 1462.914
10 Rp 141,267 48 Pekerja Org/Hari Rp 60,000 211.491
219 Rp 3,182,010 49 Pekerja Org/Hari Rp 60,000 57.702
1186 Rp 2,040,658 50 Pekerja Org/Hari Rp 60,000 75.783
640 Rp 1,102,134 51 Pekerja Org/Hari Rp 60,000 94.962
778 Rp 1,339,608 52 Pekerja Org/Hari Rp 60,000 44.143
24 Rp 41,733 53 Pekerja Org/Hari Rp 60,000 54.340

Nike Naluri (1106587) 372


RENCANA ANGGARAN BIAYA

7 Rp 132,133 54 Pekerja org Rp 60,000 17.440


10 Rp 195,199 55 Pekerja Org/Hari Rp 60,000 17.948
9 Rp 176,169 56 Tukang Batu Halus Org/Hari Rp 80,000 44.841
700 Rp 43,729,627 57 Tukang Batu Kasar Org/Hari Rp 80,000 46.269
13 Rp 383,870 58 Tukang Batu Kasar Org/Hari Rp 80,000 104.647
13 Rp 357,034 59 Tukang Batu Kasar Org/Hari Rp 80,000 1.019
16 Rp 461,431 60 Tukang Batu Kasar Org/Hari Rp 80,000 8.172
28 Rp 877,723 61 Tukang Batu Kasar Org/Hari Rp 80,000 32.558
269 Rp 5,947,229 62 Tukang Batu Kasar Org/Hari Rp 80,000 2.415
19 Rp 1,167,600 63 Tukang Batu Kasar Org/Hari Rp 80,000 78.499
14 Rp 341,058 64 Tukang Batu Kasar Org/Hari Rp 80,000 63.349
73 Rp 965,427 65 Tukang Batu Kasar Org/Hari Rp 80,000 710.544
446 Rp 6,688,236 66 Tukang Batu Kasar Org/Hari Rp 80,000 116.911
37 Rp 558,576 67 Tukang Batu Kasar Org/Hari Rp 80,000 0.032
157 Rp 2,349,000 68 Tukang Batu Kasar Org/Hari Rp 80,000 8.576
1062 Rp 15,932,016 69 Tukang Besi Tulangan Org/Hari Rp 80,000 2.284
11 Rp 165,600 70 Tukang Besi Tulangan Org/Hari Rp 80,000 5.189
296 Rp 4,437,078 71 Tukang Besi Tulangan Org/Hari Rp 80,000 0.797
88 Rp 1,980,000 72 Tukang Cat Biasa Org/Hari Rp 80,000 129.647
5 Rp 1,835,000 73 Tukang Gali Org/Hari Rp 75,000 0.500
1869 Rp 8,746,967 74 Tukang Kayu Halus Org/Hari Rp 80,000 5.600
8 Rp 24,000 75 Tukang Kayu Halus Org/Hari Rp 80,000 134.866
111 Rp 6,995,708 76 Tukang Kayu Halus Org/Hari Rp 80,000 72.420
40 Rp 1,000,000 77 Tukang Kayu Halus Org/Hari Rp 80,000 125.478
1 Rp 67,500 78 Tukang Kayu Kasar Org/Hari Rp 80,000 67.387
15 Rp 1,875,000 79 Tukang Kayu Kasar Org/Hari Rp 80,000 14.040
4 Rp 1,388,400 80 Tukang Kayu Kasar Org/Hari Rp 80,000 2.284
5 Rp 52,500 81 Tukang Kayu Kasar Org/Hari Rp 80,000 5.783
11 Rp 168,000 82 Tukang Kayu Kasar Org/Hari Rp 80,000 16.991
2 Rp 387,000 JUMLAH Rp 6,445,000 5366.856
1 Rp 68,400
105 Rp 10,019,734
3 Rp 27,581,799
5 Rp 44,644,908
4 Rp 9,792,524
23 Rp 609,831
60 Rp 1,609,996
11 Rp 300,247
3 Rp 72,756
11 Rp 285,664
27 Rp 724,891
1 Rp 18,935
24 Rp 661,480
3 Rp 31,769,121
0 Rp 2,653,236
1 Rp 13,389,300
3 Rp 25,225,692
0 Rp 943,920
3 Rp 25,291,345
0 Rp 952,812
2 Rp 16,263,886
3 Rp 31,031,986
5 Rp 11,631,620
2 Rp 5,045,040
9 Rp 21,362,213
1 Rp 2,337,588
1 Rp 1,304,647

Nike Naluri (1106587) 373


RENCANA ANGGARAN BIAYA

3 Rp 7,315,308
7 Rp 16,538,613
0 Rp 515,715
6 Rp 13,818,047
1 Rp 14,184,925
130 Rp 11,320,153
55 Rp 4,788,985
29 Rp 2,509,437
23 Rp 1,971,564
80 Rp 9,930,740
1 Rp 450,000
4 Rp 8,000,000
0 Rp 480,000
1 Rp 450,000
1 Rp 35,000
13 Rp 2,444,000
576 Rp 100,829,575
31 Rp 248,000
2 Rp 195,000
103 Rp 18,058,656
59 Rp 3,664,500
6 Rp 387,975
327 Rp 5,130,132
5 Rp 189,000
45 Rp 1,560,588
2 Rp 77,842
3 Rp 97,751
16 Rp 548,100
35 Rp 1,239,157
1 Rp 38,640
30 Rp 1,035,318
78 Rp 7,802,942
7 Rp 651,672
27 Rp 2,740,500
62 Rp 6,195,784
2 Rp 193,200
52 Rp 5,176,591
2 Rp 33,634
4 Rp 79,680
1 Rp 11,688
3 Rp 125,186
16 Rp 583,200
1 Rp 35,189
66 Rp 2,360,602
61 Rp 2,197,152
12 Rp 448,200
90 Rp 3,251,472
7 Rp 266,886
7 Rp 268,116
31 Rp 1,127,520
71 Rp 2,549,123
2 Rp 79,488
59 Rp 2,129,797
0 Rp 16,632
13 Rp 462,857
80 Rp 1,604,952
1 Rp 327,000

Nike Naluri (1106587) 374


RENCANA ANGGARAN BIAYA

1 Rp 11,914,463
2 Rp 266,800
13 Rp 1,882,467
1 Rp 82,810
2 Rp 290,239
1 Rp 87,000
2 Rp 247,050
1 Rp 113,907
96 Rp 12,908,215
8 Rp 1,105,498
0 Rp 1,512
1 Rp 130,950
0 Rp 57,886
35 Rp 3,450,650
1 Rp 35
20 Rp 2,611,440
6 Rp 761,670
45 Rp 20,349,420
13 Rp 5,935,248
25 Rp 11,575,200
7 Rp 3,376,100
54 Rp 24,750,180
16 Rp 7,218,803
65 Rp 29,653,260
19 Rp 8,648,868
10 Rp 4,722,900
3 Rp 1,377,513
34 Rp 15,648,360
10 Rp 4,564,105
1 Rp 255,028
1 Rp 340,037
1 Rp 425,046
12 Rp 218,494
192 Rp 9,995,343
45 Rp 654,329
3 Rp 275,738
2 Rp 190,008
3 Rp 225,821
7 Rp 864,932
2 Rp 1,027,000
12 Rp 15,646,800
21 Rp 525,000
1 Rp 5,000
14 Rp 489,187
0 Rp 3,583
80 Rp 5,058,410
164 Rp 10,421,576
74 Rp 4,681,068
25 Rp 1,581,744
15 Rp 938,800
34 Rp 2,171,791
145 Rp 9,208,612
5 Rp 324,307
60 Rp 3,789,675
727 Rp 46,180,925
37 Rp 2,347,251
0 Rp 4,470

Nike Naluri (1106587) 375


RENCANA ANGGARAN BIAYA

12 Rp 731,520
4 Rp 270,973
238 Rp 2,976,727
262 Rp 3,278,924
24 Rp 300,000
58 Rp 5,765,760
2 Rp 190,575
2 Rp 490,000
309 Rp 103,200
10 Rp 107,800
42 Rp 1,050,000
1 Rp 72,900
4 Rp 3,000,000
0 Rp 360,000
1 Rp 195,000
81450 Rp1,206,927,220

Nike Naluri (1106587) 376


RENCANA ANGGARAN BIAYA

REKAP BAHAN
JUMLAH NO RINCIAN SATUAN HARGA SATUAN KEBUTUHAN
Rp 655,896 1 Accecories lampu pijar ls 680 29
Rp 212,493 2 Accecories lampu taman ls 680 2
Rp 846,818 3 Accecories lampu TL ls 1575 2
Rp 95,782 4 Accecories panel ls 38700 1
Rp 59,215 5 Accecories saklar ls 7000 21
Rp 246,211 6 Accecories stop kontak ls 8200 42
Rp 17,191 7 Agregat kasar m3 254800 5.1894648
Rp 567,571 8 Agregat kasar m3 254800 1.18802025
Rp 481,927 9 Agregat kasar m3 254800 2.74833
Rp 5,684,351 10 Agregat kasar m3 254800 11.65319352
Rp 935,284 11 Agregat kasar m3 254800 0.4104
Rp 1,079,882 12 Agregat kasar m3 254800 4.7957076
Rp 715,292 25.98511617
Rp 1,003,824 13 Alumunium Strip m' 45500 1093.3356
Rp 994,834 14 Amplas Kayu / Besi Lbr 8624 384.436278
Rp 1,258,747 15 Balok kelas III m3 2387000 1.21709
Rp 3,024,000 16 Bata Merah bh 600 968.24
Rp 74,982 17 Bata Merah bh 600 55050.856
Rp 454,038 18 Bata Merah m3 600 1532.23
Rp 530,487 19 Bata Merah biasa bh 600 270
Rp 264,892 57821.326
Rp 934,619 20 Bata Roster bh 3000 2.16
Rp 99,656 21 Bath Tube fibreglass unt 6100000 2
Rp 65,198 22 Bath Tube fibreglass persen 6100000 0.36
Rp 272,274 2.36
Rp 19,082 23 Batu Andesit 30x30 m2 150000 18.18059
Rp 622,980 24 Batu kali bh 227500 77.472
Rp 525,739 25 Batu Split Pecah Mesin 1/2 m3 145000 19.47379725
Rp 23,807,012 26 Batu Split Pecah Mesin 1/2 m3 145000 0.165
Rp 1,011,326 19.63879725
Rp 213,420 27 Batu Split Pecah Mesin 2/3 m3 145000 1.602
Rp 359,969 28 Batu Split Pecah Mesin 2/3 m3 145000 8.4695172
Rp 2,407,908 29 Batu Split Pecah Mesin 2/3 m3 145000 3.0024675
Rp 475,856 30 Batu Split Pecah Mesin 2/3 m3 145000 1.782030375
Rp 267,139 31 Batu Split Pecah Mesin 2/3 m3 145000 4.122495
Rp 85,255 32 Batu Split Pecah Mesin 2/3 m3 145000 17.47979028
Rp 5,735,220 33 Batu Split Pecah Mesin 2/3 m3 145000 0.6156
Rp 7,908,323 34 Batu Split Pecah Mesin 2/3 m3 145000 7.1935614
Rp 7,918,408 44.267461755
Rp 12,740,970 35 Besi beton Ø10 Kg 9324.3243243243 22.62624
Rp 125,659 36 Besi beton Ø10 Kg 9324.3243243243 1216.8048783
Rp 1,076,776 37 Besi beton Ø10 Kg 9324.3243243243 39.368
Rp 4,007,664 1278.7991183
Rp 329,428 38 Besi beton Ø12 Kg 8911.8198874297 2122.71633
Rp 10,351,425 39 Besi beton Ø12 Kg 8911.8198874297 106.14579961
Rp 7,608,635 40 Besi beton Ø12 Kg 8911.8198874297 604.422
Rp 87,774,818 41 Besi beton Ø12 Kg 8911.8198874297 48.265378828
Rp 12,689,455 42 Besi beton Ø12 Kg 8911.8198874297 967.355025
Rp 3,462,145 3848.9045334
Rp 4,546,977 43 Besi beton Ø13 Kg 8974.358974359 528.61536
Rp 5,697,720 44 Besi beton Ø8 Kg 14531.25 1393.7877907
Rp 2,648,588 45 Besi beton Ø8 Kg 14531.25 59.855859
Rp 3,260,407 46 Besi beton Ø8 Kg 14531.25 136.18901333

Nike Naluri (1106587) 377


RENCANA ANGGARAN BIAYA

Rp 1,046,400 47 Besi beton Ø8 Kg 14531.25 614.27764533


Rp 1,076,908 48 Besi beton Ø8 Kg 14531.25 9.7216
Rp 3,587,264 49 Besi beton Ø8 Kg 14531.25 218.977024
Rp 3,701,549 2432.8089324
Rp 8,371,761 50 Besi Beton rata-rata Kg 1720.9379878836 1185.7822947
Rp 81,549 51 Besi Beton rata-rata Kg 1720.9379878836 640.42656
Rp 653,749 52 Besi Beton rata-rata Kg 1720.9379878836 778.4175
Rp 2,604,619 53 Besi Beton rata-rata Kg 1720.9379878836 24.25
Rp 193,189 2628.8763547
Rp 6,279,950 54 Besi List Kaca Kg 20002 6.606
Rp 5,067,934 55 Besi Plat rata2 1 s/d 5 mm Kg 19717.0645446508 9.9
Rp 56,843,514 56 Besi Square Tube Kg 20001 8.808
Rp 9,352,845 57 Cat akhir emulsion Ltr 62500 699.67402596
Rp 2,560 58 Cat Besi m2 28900 13.2827
Rp 686,060 59 Cat Dasar / meni besi Kg 28336 12.6
Rp 182,752 60 Cat Dasar / meni kayu Kg 28336 16.28427776
Rp 415,156 61 Cat Kayu Kg 30800 28.49748608
Rp 63,757 62 Cat Tembok (25 kg) kg 22100 269.1053946
Rp 10,371,734 63 daun Teakwood t. 6 mm lbr 60000 19.46
Rp 37,500 64 Dempul Kayu Kg 24640 13.841636096
Rp 448,000 65 Dolken dia 5 s/d 7 cm p. 4 m btg 13144 73.45
Rp 10,789,301 66 Dolken dia 8 s/d 10 cm p. 4 btg 15000 445.8824
Rp 5,793,638 67 Dolken dia 8 s/d 10 cm p. 4 btg 15000 37.2384
Rp 10,038,240 68 Dolken dia 8 s/d 10 cm p. 4 btg 15000 156.6
Rp 5,390,960 69 Dolken dia 8 s/d 10 cm p. 4 btg 15000 1062.1344
Rp 1,123,200 70 Dolken dia 8 s/d 10 cm p. 4 btg 15000 11.04
Rp 182,752 71 Dolken dia 8 s/d 10 cm p. 4 btg 15000 295.8052
Rp 462,602 2008.7004
Rp 1,359,280 72 Engsel 3" bh 22500 88
Rp 374,462,491 73 Floordrain unt 367000 5
74 Genteng Beton Bh 4680 1869.01
75 Glass Block bh 3000 8
76 Gypsumboard t.9 mm lbr 62980 111.07824
77 Hak Angin Lipat Pas 25000 40
78 Handel + Kunci bulat bh 125000 0.54
79 Handel + Kunci bulat bh 125000 15
15.54
80 Jet washer bh 347100 4
81 Kabel Listrik NYM 2 x 2,5 mm rol 10000 5.25
82 Kabel Listrik NYM 3 x 2,5 mm rol 16000 10.5
83 Kaca nako polos 5 mm daun 215000 1.8
84 Kaca Polos 5 mm m2 95000 0.72
85 Kaca Polos 5 mm m2 95000 105.47088
106.19088
86 Kaso kelas II m3 9500000 2.9033473
87 Kaso kelas II m3 9500000 4.699464
7.6028113
88 Kaso kelas III m3 2387000 4.10244
89 Kawat Beton Hitam kg 27000 22.586329422
90 Kawat Beton Hitam kg 27000 59.629481153
91 Kawat Beton Hitam kg 27000 11.12025
92 Kawat Beton Hitam kg 27000 2.6946842658
93 Kawat Beton Hitam kg 27000 10.580157333
94 Kawat Beton Hitam kg 27000 26.847827179
95 Kawat Beton Hitam kg 27000 0.70128
96 Kawat Beton Hitam kg 27000 24.4992487
158.65925805

Nike Naluri (1106587) 378


RENCANA ANGGARAN BIAYA

97 Kayu Kuat klas II m3 9500000 3.344118


98 Kayu Kuat klas II m3 9500000 0.279288
99 Kayu Kuat klas II m3 9500000 1.4094
100 Kayu Kuat klas II m3 9500000 2.655336
101 Kayu Kuat klas II m3 9500000 0.09936
102 Kayu Kuat klas II m3 9500000 2.6622468
103 Kayu Kuat klas II m3 9500000 0.100296
104 Kayu Kuat klas II m3 9500000 1.711988
105 Kayu Kuat klas II m3 9500000 3.2665248
15.5285576
106 Kayu Kuat klas III m3 2335666.66666667 4.98
107 Kayu Kuat klas III m3 2335666.66666667 2.16
108 Kayu Kuat klas III m3 2335666.66666667 9.146088
109 Kayu Kuat klas III m3 2335666.66666667 1.0008225
110 Kayu Kuat klas III m3 2335666.66666667 0.558576
111 Kayu Kuat klas III m3 2335666.66666667 3.132
112 Kayu Kuat klas III m3 2335666.66666667 7.080896
113 Kayu Kuat klas III m3 2335666.66666667 0.2208
114 Kayu Kuat klas III m3 2335666.66666667 5.916104
34.1952865
115 Kayu Reng 3/4 Kamper Sama m3 9500000 1.49315004
116 Keramik Dinding 20/20 cm Po m2 87000 130.1167066
117 Keramik Lantai 20/20 cm Pol m2 87000 55.0458
118 Keramik Lantai 30/30 cm Pol m2 87000 28.8441
119 Keramik Lantai 33/33 cm Pol m2 87000 22.6616544
120 Keramik Lantai 50/50 cm Pol m2 123500 80.41085
121 Kitchenzink stainless steel 1 unt 450000 1
122 Kloset Duduk Porselen unt 2000000 4
123 Kloset Duduk Porselen persen 2000000 0.24
4.24
124 Kloset Jongkok Porselen Puti unt 450000 1
125 Kran Air 3/4" bh 35000 1
126 Kran dinding 4 jari bh 188000 13
127 Kusen Alm. 4" CA m' 175000 576.169
128 Lampu Pijar 75 Watt bh 8000 31
129 Lampu TL bh 97500 2
130 Lantai Parquette m2 176000 102.606
131 Lem Kayu Kg 62500 58.632
132 Lem Kayu Kg 62500 6.2076
64.8396
133 List Profil 10 cm Gypsum m1 15700 326.76
134 Minyak Pelumas Ltr 35000 5.4
135 Minyak Pelumas Ltr 35000 44.58824
136 Minyak Pelumas Ltr 35000 2.22405
137 Minyak Pelumas Ltr 35000 2.79288
138 Minyak Pelumas Ltr 35000 15.66
139 Minyak Pelumas Ltr 35000 35.40448
140 Minyak Pelumas Ltr 35000 1.104
141 Minyak Pelumas Ltr 35000 29.58052
136.75417
142 Multiplex t. 9 mm lbr 100000 78.02942
143 Multiplex t. 9 mm lbr 100000 6.51672
144 Multiplex t. 9 mm lbr 100000 27.405
145 Multiplex t. 9 mm lbr 100000 61.95784
146 Multiplex t. 9 mm lbr 100000 1.932
147 Multiplex t. 9 mm lbr 100000 51.76591
227.60689

Nike Naluri (1106587) 379


RENCANA ANGGARAN BIAYA

148 Paku 1 s/d 3 cm kg 20020 1.68


149 Paku 1 s/d 3 cm kg 20020 3.98
150 Paku 1 s/d 3 cm kg 20020 0.5838
6.2438
151 Paku 4 s/d 7 cm kg 36000 3.4774
152 Paku 4 s/d 7 cm kg 36000 16.2
153 Paku 4 s/d 7 cm kg 36000 0.97746
154 Paku 4 s/d 7 cm kg 36000 65.5722875
155 Paku 4 s/d 7 cm kg 36000 61.032
147.2591475
156 Paku 8 s/d 12 cm kg 36000 12.45
157 Paku 8 s/d 12 cm kg 36000 90.31868
158 Paku 8 s/d 12 cm kg 36000 7.4135
159 Paku 8 s/d 12 cm kg 36000 7.44768
160 Paku 8 s/d 12 cm kg 36000 31.32
161 Paku 8 s/d 12 cm kg 36000 70.80896
162 Paku 8 s/d 12 cm kg 36000 2.208
163 Paku 8 s/d 12 cm kg 36000 59.16104
164 Paku 8 s/d 12 cm kg 36000 0.462
165 Paku 8 s/d 12 cm kg 36000 12.8571264
294.4469864
166 Paku Skrup Kg 20000 80.2476
167 Panel Listrik standart untuk bh 327000 1
168 Papan kelas II m3 9500000 1.254154
169 Pasir Beton m3 145000 1.84
170 Pasir Beton m3 145000 12.9825315
171 Pasir Beton m3 145000 0.5711
172 Pasir Beton m3 145000 2.001645
173 Pasir Beton m3 145000 0.6
17.9952765
174 Pasir Pasang m3 135000 1.83
175 Pasir Pasang m3 135000 0.843752
176 Pasir Pasang m3 135000 95.61641047
177 Pasir Pasang m3 135000 8.188872
178 Pasir Pasang m3 135000 0.0112
179 Pasir Pasang m3 135000 0.97
180 Pasir Pasang m3 135000 0.4287875
107.88902197
181 Pasir Urug m3 100000 34.506495
182 Pengelasan cm 39.9 0.8808
183 Pipa Galvanis d=1/2 " m1 130000 20.088
184 Pipa Galvanis d=1/2 " persen 130000 5.859
25.947
185 Pipa PVC d= 1 " m1 455000 44.724
186 Pipa PVC d= 1 " persen 455000 13.0445
57.7685
187 Pipa PVC d= 2 " m1 455000 25.44
188 Pipa PVC d= 2 " persen 455000 7.42
32.86
189 Pipa PVC d= 3 " m1 455000 54.396
190 Pipa PVC d= 3 " persen 455000 15.8655
70.2615
191 Pipa PVC d= 4 " m1 455000 65.172
192 Pipa PVC d= 4 " persen 455000 19.0085
84.1805
193 Pipa PVC d=1/2 " m1 455000 10.38
194 Pipa PVC d=1/2 " persen 455000 3.0275

Nike Naluri (1106587) 380


RENCANA ANGGARAN BIAYA

13.4075
195 Pipa PVC d=3/4 " m1 455000 34.392
196 Pipa PVC d=3/4 " persen 455000 10.031
44.423
197 Pipa Stainless Steel Ø 1" Btg 240000 1.062616
198 Pipa Stainless Steel Ø 1,5 " Btg 320000 1.062616
199 Pipa Stainless Steel Ø 2" Btg 400000 1.062616
200 Plamir Kayu Kg 17890 12.21320832
201 Plamur Tembok kg 52000 192.218139
202 Plat Strip Kg 14689.6551724138 44.54352
203 Plint Keramik Lantai 20/20 c m2 87000 3.1694
204 Plint Keramik Lantai 30/30 c m2 87000 2.184
205 Plint Keramik Lantai 33/33 c m2 87000 2.595648
206 Plint Keramik Lantai 50/50 c m2 123500 7.0035
207 Rel Pintu Dorong set 513500 2
208 Rolling door Plat Besi m2 1300000 12.036
209 Saklar bh 25000 21
210 Seal tape roll 10000 0.5
211 Sealant clear neutral (300 ml) tb 35000 13.97676
212 Sealant Kaca kg 45000 0.079616
213 Semen PC (50 Kg) zak 63500 79.66
214 Semen PC (50 Kg) zak 63500 164.119312
215 Semen PC (50 Kg) zak 63500 73.7176064
216 Semen PC (50 Kg) zak 63500 24.90936
217 Semen PC (50 Kg) zak 63500 14.784252
218 Semen PC (50 Kg) zak 63500 34.20144
219 Semen PC (50 Kg) zak 63500 145.01751936
220 Semen PC (50 Kg) zak 63500 5.1072
221 Semen PC (50 Kg) zak 63500 59.6799168
222 Semen PC (50 Kg) zak 63500 727.25866684
223 Semen PC (50 Kg) zak 63500 36.96457648
224 Semen PC (50 Kg) zak 63500 0.0704
225 Semen PC (50 Kg) zak 63500 11.52
226 Semen PC (50 Kg) zak 63500 4.2672932
1381.2775431
227 Semen Warna kg 12500 238.1381234
228 Semen Warna kg 12500 262.3139
229 Semen Warna kg 12500 24
524.4520234
230 Seng Gelombang BJLS 0,3 lbr 100100 57.6
231 Seng Plat BJLS 0,30 m' 84700 2.25
232 Shower bh 245000 2
233 Skrup bh 333.6666666667 309.292
234 Slot Tanam bh 10780 10
235 Stop Kontak bh 25000 42
236 Triplex t. 4 mm lbr 54000 1.35
237 Washtafel Keramik (lengkap) unt 750000 4
238 Washtafel Keramik (lengkap) persen 750000 0.48
4.48
239 Water drain+aksesoris set 195000 1
JUMLAH Rp 189,328,766 155145

Nike Naluri (1106587) 381


RENCANA ANGGARAN BIAYA

REKAP UPAH
JUMLAH NO RINCIAN SATUANHARGA SATUANKEBUTUHAN JUMLAH
19720 1 Kepala Tukang Org/Hari 80000 8.1987 655896
1360 2 Kepala Tukang Org/Hari 80000 2.65616 212492.8
3150 3 Kepala Tukang Org/Hari 80000 10.585227 846818.13763911
38700 4 Kepala Tukang Org/Hari 80000 1.1972803 95782.42
147000 5 Kepala Tukang Org/Hari 80000 0.7401855 59214.842592445
344400 6 Kepala Tukang Org/Hari 80000 3.0776407 246211.25404445
1322275.63104 7 Kepala Tukang Org/Hari 80000 0.2148864 17190.912
302707.5597 8 Kepala Tukang Org/Hari 80000 7.0946378 567571.02413307
700274.484 9 Kepala Tukang Org/Hari 80000 6.0240841 481926.72581333
2969233.708896 10 Kepala Tukang Org/Hari 80000 71.054392 5684351.372
104569.92 11 Kepala Tukang Org/Hari 80000 11.691056 935284.48
1221946.29648 12 Kepala Tukang Org/Hari 80000 13.498527 1079882.144
6621007.600116 13 Kepala Tukang Org/Hari 80000 8.941148 715291.8384
49746769.8 14 Kepala Tukang Org/Hari 80000 12.5478 1003824
3315378.461472 15 Kepala Tukang Org/Hari 80000 12.435428 994834.264976
2905193.83 16 Kepala Tukang Org/Hari 80000 15.73434 1258747.2
580944 17 Kepala Tukang org 80000 37.8 3024000
33030513.6 18 Kepala Tukang Org/Hari 80000 0.9372712 74981.696
919338 224.42876 17954301.111598
162000 19 Mandor Org/Hari 95000 4.77935 454038.25
34692795.6 20 Mandor Org/Hari 95000 5.5840759 530487.2093125
6480 21 Mandor Org/Hari 95000 2.788335 264891.825
12200000 22 Mandor Org/Hari 95000 9.8380951 934619.03425511
2196000 23 Mandor Org/Hari 95000 1.0490103 99655.97375
14396000 24 Mandor Org/Hari 95000 0.6862918 65197.725473445
2727088.5 25 Mandor Org/Hari 95000 2.8660375 272273.56524445
17624880 26 Mandor Org/Hari 95000 0.2008608 19081.776
2823700.60125 27 Mandor Org/Hari 95000 6.5576813 622979.71951887
23925 28 Mandor Org/Hari 95000 5.5340991 525739.41437333
2847625.60125 29 Mandor Org/Hari 95000 250.60013 23807012.15335
232290 30 Mandor Org/Hari 95000 10.645536 1011325.92
1228079.994 31 Mandor Org/Hari 95000 2.246525 213419.875
435357.7875 32 Mandor Org/Hari 95000 3.7891478 359969.04385
258394.404375 33 Mandor Org/Hari 95000 25.3464 2407908
597761.775 34 Mandor Org/Hari 95000 5.0090069 475855.659965
2534569.5906 35 Mandor Org/Hari 95000 2.811988 267138.86
89262 36 Mandor Org/Hari 95000 0.8974231 85255.1945
1043066.403 341.22999 32416849.199593
6418781.954475 37 Pekerja Org/Hari 60000 95.587 5735220
210974.4 38 Pekerja Org/Hari 60000 131.80538 7908322.9875
11345883.325 39 Pekerja Org/Hari 60000 131.97346 7918407.8826667
367080 40 Pekerja Org/Hari 60000 212.3495 12740970.192293
11923937.725 41 Pekerja Org/Hari 60000 2.0943138 125658.825
18917265.6050657 42 Pekerja Org/Hari 60000 17.946266 1076775.9794433
945952.247916667 43 Pekerja Org/Hari 60000 66.794407 4007664.4053333
5386500 44 Pekerja Org/Hari 60000 5.490464 329427.84
430132.362916667 45 Pekerja Org/Hari 60000 172.52375 10351424.760998
8620893.75 46 Pekerja Org/Hari 60000 126.81058 7608634.7236
34300743.965899 47 Pekerja Org/Hari 60000 1462.9136 87774818.4
4743984 48 Pekerja Org/Hari 60000 211.49092 12689455.2
20253478.8340937 49 Pekerja Org/Hari 60000 57.70242 3462145.2
869780.45109375 50 Pekerja Org/Hari 60000 75.782957 4546977.396
1978996.6 51 Pekerja Org/Hari 60000 94.962 5697720

Nike Naluri (1106587) 382


RENCANA ANGGARAN BIAYA

8926222.03375 52 Pekerja Org/Hari 60000 44.143125 2648587.50096


141267 53 Pekerja Org/Hari 60000 54.34012 3260407.2
3182009.88 54 Pekerja org 60000 17.44 1046400
35351754.7989375 55 Pekerja Org/Hari 60000 17.948462 1076907.72
2040657.79625161 3000.0988 180005926.2138
1102134.39555359 56 Tukang Batu Halus Org/Hari 80000 44.8408 3587264
1339608.24618335 57 Tukang Batu Kasar Org/Hari 80000 46.269368 3701549.4768889
41732.7462061764 58 Tukang Batu Kasar Org/Hari 80000 104.64701 8371760.7363911
4524133.18419473 59 Tukang Batu Kasar Org/Hari 80000 1.0193563 81548.5
132133.212 60 Tukang Batu Kasar Org/Hari 80000 8.1718684 653749.47592445
195198.938992042 61 Tukang Batu Kasar Org/Hari 80000 32.557732 2604618.5404445
176168.808 62 Tukang Batu Kasar Org/Hari 80000 2.414864 193189.12
43729626.6225 63 Tukang Batu Kasar Org/Hari 80000 78.499374 6279949.9053307
383870.03 64 Tukang Batu Kasar Org/Hari 80000 63.34917 5067933.5781333
357033.6 65 Tukang Batu Kasar Org/Hari 80000 710.54392 56843513.72
461431.29460736 66 Tukang Batu Kasar Org/Hari 80000 116.91056 9352844.8
877722.571264 67 Tukang Batu Kasar Org/Hari 80000 0.032 2560
5947229.22066 68 Tukang Batu Kasar Org/Hari 80000 8.57575 686060
1167600 1172.991 93839277.853113
341057.91340544 69 Tukang Besi Tulangan Org/Hari 80000 2.2844 182752
965426.8 70 Tukang Besi Tulangan Org/Hari 80000 5.18945 415156
6688236 71 Tukang Besi Tulangan Org/Hari 80000 0.796962 63756.96
558576 8.270812 661664.96
2349000 72 Tukang Cat Biasa Org/Hari 80000 129.64667 10371733.87152
15932016 73 Tukang Gali Org/Hari 75000 0.5 37500
165600 74 Tukang Kayu Halus Org/Hari 80000 5.6 448000
4437078 75 Tukang Kayu Halus Org/Hari 80000 134.86627 10789301.44
30130506 76 Tukang Kayu Halus Org/Hari 80000 72.42048 5793638.384
1980000 77 Tukang Kayu Halus Org/Hari 80000 125.478 10038240
1835000 338.36475 27069179.824
8746966.8 78 Tukang Kayu Kasar Org/Hari 80000 67.387 5390960
24000 79 Tukang Kayu Kasar Org/Hari 80000 14.04 1123200
6995707.5552 80 Tukang Kayu Kasar Org/Hari 80000 2.2844 182752
1000000 81 Tukang Kayu Kasar Org/Hari 80000 5.78253 462602.4
67500 82 Tukang Kayu Kasar Org/Hari 80000 16.991 1359280
1875000 106.48493 8518794.4
1942500 JUMLAH Rp 6,445,000 10558.725 Rp 726,409,691
1388400
52500
168000
387000
68400
10019733.6
10088133.6
27581799.35
44644908
72226707.35
9792524.28
609830.8944
1609995.99114
300246.75
72756.4751775
285664.248
724891.3338195
18934.56
661479.7149
4283799.967437

Nike Naluri (1106587) 383


RENCANA ANGGARAN BIAYA

31769121
2653236
13389300
25225692
943920
25291344.6
952812
16263886
31031985.6
147521297.2
11631620
5045040
21362212.872
2337587.7525
1304647.344
7315308
16538612.7573333
515715.2
13818046.9093333
79868790.8351667
14184925.38
11320153.4742
4788984.6
2509436.7
1971563.9328
9930739.975
450000
8000000
480000
8480000
450000
35000
2444000
100829575
248000
195000
18058656
3664500
387975
4052475
5130132
189000
1560588.4
77841.75
97750.8
548100
1239156.8
38640
1035318.2
4786395.95
7802942
651672
2740500
6195784
193200
5176591
22760689

Nike Naluri (1106587) 384


RENCANA ANGGARAN BIAYA

33633.6
79679.6
11687.676
125000.876
125186.4
583200
35188.56
2360602.35
2197152
5301329.31
448200
3251472.48
266886
268116.48
1127520
2549122.56
79488
2129797.44
16632
462856.5504
10600091.5104
1604952
327000
11914463
266800
1882467.0675
82809.5
290238.525
87000
2609315.0925
247050
113906.52
12908215.41345
1105497.72
1512
130950
57886.3125
14565017.96595
3450649.5
35.14392
2611440
761670
3373110
20349420
5935247.5
26284667.5
11575200
3376100
14951300
24750180
7218802.5
31968982.5
29653260
8648867.5
38302127.5
4722900
1377512.5

Nike Naluri (1106587) 385


RENCANA ANGGARAN BIAYA

6100412.5
15648360
4564105
20212465
255027.84
340037.12
425046.4
218494.2968448
9995343.228
654328.948965517
275737.8
190008
225821.376
864932.25
1027000
15646800
525000
5000
489186.6
3582.72
5058410
10421576.312
4681068.0064
1581744.36
938800.002
2171791.44
9208612.47936
324307.2
3789674.7168
46180925.3443654
2347250.60648
4470.4
731520
270973.1182
87711123.9856054
2976726.5425
3278923.75
300000
6555650.2925
5765760
190575
490000
103200.430666667
107800
1050000
72900
3000000
360000
3360000
195000
Rp2,016,165,890

Nike Naluri (1106587) 386


WORK BREAKDOWN STRUCTURE (WBS)
PEKERJAAN PERSIAPAN
1.1 Pagar Sementara Seng Gelombang (T=2M)
1.2 Pengukuran & Pemasangan Bowplank
1.
1.3 Pembuatan Kantor Proyek Sementara (direksi keet)
1.4 Pembuatan Gudang Poyek (Los Kerja)
1.5 Membersihkan Lokasi Proyek
PEKERJAAN TANAH
Galian Tanah Sedalam <1m (Galian Pondasi Batu Kali)
2.1.1 Pondasi Batu Kali P1
2.1.2 Pondasi Batu Kali P2
2.1 2.1.3 Pondasi Batu Kali P3
2.1.4 Pondasi Batu Kali P4
2.1.5 Pondasi Batu Kali P5
2. 2.1.6 Pondasi Batu Kali P7
Galian Tanah Sedalam 3m (Galian Pondasi pile cap dan sumuran)
2.2.1 Pondasi Pile cap PC1
2.2 2.2.2 Pondasi Pile cap PC2
2.2.3 Pondasi Pile cap PC2A
2.2.4 Pondasi Sumuran W2
2.3 Urugan Tanah
PEKERJAAN PONDASI
Pasang Pondasi BT Kali
Pondasi Batu Kali P1
3.1.1.1 Rabat Beton
3.1.1.2 Adukan Beton Untuk Pondasi
3.1.1
3.1.1.3 Penulangan Beton Pondasi
3.1.1.4 Pekerjaan Bekisting untuk Pondasi
3.1.1.5 Pondasi Batu Kali
3.1.2 Pondasi Batu Kali P2
3.1.2.1 Rabat Beton
3.1.2.2 Adukan Beton Untuk Pondasi
3.1.2.3 Penulangan Beton Pondasi
3.1.2.4 Pekerjaan Bekisting untuk Pondasi
3.1.2.5 Pondasi Batu Kali
3.1 3.1.3 Pondasi Batu Kali P3
3.1.3.1 Rabat Beton
3.1.3.2 Adukan Beton Untuk Pondasi
3.1.3.3 Penulangan Beton Pondasi
3.1.3.4 Pekerjaan Bekisting untuk Pondasi
3.1.3.5 Pondasi Batu Kali
3.1.4 Pondasi Batu Kali P4
3.1.4.1 Rabat Beton
3.1.4.2 Adukan Beton Untuk Pondasi

3.
Nike Naluri (1106587) 387
3.1.4.3 Penulangan Beton Pondasi
3. 3.1.4.4 Pekerjaan Bekisting untuk Pondasi
3.1.4.5 Pondasi Batu Kali
Pondasi Batu Kali P7
3.1.5
3.1.5.3 Pondasi Batu Kali
Pondasi Batu P5
3.2 3.2.1 bata
3.2.2 Urugan Pasir
Pile Cap Tiebeam
Pondasi Pile cap PC1
3.3.1.1 Adukan Beton Untuk Pondasi
3.3.1
3.3.1.2 Penulangan Beton Pondasi
3.3.1.3 Pekerjaan Bekisting untuk Pondasi
Pondasi Pile cap PC2
3.3 3.3.2.1 Adukan Beton Untuk Pondasi
3.3.2
3.3.2.2 Penulangan Beton Pondasi
3.3.2.3 Pekerjaan Bekisting untuk Pondasi
Pondasi Pile cap PC2A
3.3.3.1 Adukan Beton Untuk Pondasi
3.3.3
3.3.3.2 Penulangan Beton Pondasi
3.3.3.3 Pekerjaan Bekisting untuk Pondasi
Pondasi Sumuran W2
3.4.1.1 Adukan Beton Untuk Pondasi
3.4 3.4.1
3.4.1.2 Penulangan Beton Pondasi
3.4.1.3 Pekerjaan Bekisting untuk Pondasi
PEKERJAAN BETON STRUKTUR & NON STR
Kolom
4.1.1 Kolom K1
4.1.1.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
4.1.1.2 Penulangan Beton
4.1.1.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.1.1.2.2 Penulangan Beton Pembesian Besi dia. 12mm
4.1.1.3 Pekerjaan Bekisting untuk Kolom
4.1.2 Kolom K2A
4.1.2.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
4.1.2.2 Penulangan Beton
4.1.2.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.1.2.2.2 Penulangan Beton Pembesian Besi dia. 12mm
4.1.2.3 Pekerjaan Bekisting untuk Kolom
4.1.3 Kolom K2B
4.1.3.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
4.1.3.2 Penulangan Beton
4.1.3.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.1.3.2.2 Penulangan Beton Pembesian Besi dia. 12mm

Nike Naluri (1106587) 388


4.1
4.1.3.3 Pekerjaan Bekisting untuk Kolom
4.1.4 Kolom K3
4.1 4.1.4.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
4.1.4.2 Penulangan Beton
4.1.4.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.1.4.2.2 Penulangan Beton Pembesian Besi dia. 12mm
4.1.4.3 Pekerjaan Bekisting untuk Kolom
4.1.5 Kolom K4A
4.1.5.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
4.1.5.2 Penulangan Beton
4.1.5.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.1.5.2.2 Penulangan Beton Pembesian Besi Ulir D 13
4.1.5.3 Pekerjaan Bekisting untuk Kolom
4.1.6 Kolom K4B
4.1.6.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
4.1.6.2 Penulangan Beton
4.1.6.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.1.6.2.2 Penulangan Beton Pembesian Besi Ulir D 13
4.1.6.3 Pekerjaan Bekisting untuk Kolom
4.1.7 Kolom Praktis ukuran 130 x 130
4.1.7.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
4.1.7.2 Penulangan Beton
4.1.7.2.1 Penulangan Beton Pembesian Besi dia. 6mm
4.1.7.2.2 Penulangan Beton Pembesian Besi dia. 10mm
4.1.7.3 Pekerjaan Bekisting untuk Kolom
Balok
4.2.1 Balok B1
4.2.1.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
4.2.1.2 Penulangan Beton
4.2.1.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.2.1.2.2 Penulangan Beton Pembesian Besi dia. 12mm
4.2.1.3 Pekerjaan Bekisting untuk Balok
4.2.2 Balok B2A
4.2.2.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
4.2.2.2 Penulangan Beton
4.2.2.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.2.2.2.2 Penulangan Beton Pembesian Besi dia. 12mm
4.2.2.3 Pekerjaan Bekisting untuk Balok
4.2.3 Balok B2B
4.2.3.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
4.2.3.2 Penulangan Beton
4.2.3.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.2.3.2.2 Penulangan Beton Pembesian Besi dia. 12mm
4.2.3.3 Pekerjaan Bekisting untuk Balok
4.2.4 Balok B3A
4.2.4.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
4.2.4.2 Penulangan Beton

Nike Naluri (1106587) 389


4.2.4.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.2.4.2.2 Penulangan Beton Pembesian Besi dia. 12mm
4.2.4.3 Pekerjaan Bekisting untuk Balok
4.2.5 Balok B3B
4.2.5.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
4.2.5.2 Penulangan Beton
4. 4.2.5.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.2.5.2.2 Penulangan Beton Pembesian Besi dia. 12mm
4.2.5.3 Pekerjaan Bekisting untuk Balok
4.2
4.2.6 Balok B4A
4.2.6.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
4.2.6.2 Penulangan Beton
4.2.6.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.2.6.2.2 Penulangan Beton Pembesian Besi dia. 12mm
4.2.6.3 Pekerjaan Bekisting untuk Balok
4.2.7 Balok B4B
4.2.7.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
4.2.7.2 Penulangan Beton
4.2.7.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.2.7.2.2 Penulangan Beton Pembesian Besi dia. 12mm
4.2.7.3 Pekerjaan Bekisting untuk Balok
4.2.8 Balok B5B
4.2.8.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
4.2.8.2 Penulangan Beton
4.2.8.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.2.8.2.2 Penulangan Beton Pembesian Besi Ulir D 13
4.2.8.3 Pekerjaan Bekisting untuk Balok
4.2.9 Balok B6A
4.2.9.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
4.2.9.2 Penulangan Beton
4.2.9.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.2.9.2.2 Penulangan Beton Pembesian Besi Ulir D 13
4.2.9.3 Pekerjaan Bekisting untuk Balok
4.2.10 Balok B6B
4.2.10.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
4.2.10.2 Penulangan Beton
4.2.10.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.2.10.2.2 Penulangan Beton Pembesian Besi Ulir D 13
4.2.10.3 Pekerjaan Bekisting untuk Balok
Sloof
Sloof TB1
4.3.1.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
Penulangan Beton
4.3.1
4.3.1.2 4.3.1.2.1 Penulangan Beton Pembesian Besi dia. 8mm

Nike Naluri (1106587) 390


4.3.1
4.3.1.2
4.3.1.2.2 Penulangan Beton Pembesian Besi dia. 12mm
4.3.1.3 Pekerjaan Bekisting untuk Sloof
Sloof TB2A
4.3.2.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
Penulangan Beton
4.3.2
4.3.2.2 4.3.2.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.3.2.2.2 Penulangan Beton Pembesian Besi dia. 12mm
4.3.2.3 Pekerjaan Bekisting untuk Sloof
Sloof TB2B
4.3.3.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
Penulangan Beton
4.3.3
4.3.3.2 4.3.3.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.3.3.2.2 Penulangan Beton Pembesian Besi dia. 12mm
4.3 4.3.3.3 Pekerjaan Bekisting untuk Sloof
Sloof TB3A
4.3.4.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
Penulangan Beton
4.3.4
4.3.4.2 4.3.4.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.3.4.2.2 Penulangan Beton Pembesian Besi dia. 12mm
4.3.4.3 Pekerjaan Bekisting untuk Sloof
Sloof TB4
4.3.5.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
Penulangan Beton
4.3.5
4.3.5.2 4.3.5.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.3.5.2.2 Penulangan Beton Pembesian Besi dia. 12mm
4.3.5.3 Pekerjaan Bekisting untuk Sloof
Sloof TB5A
4.3.6.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
Penulangan Beton
4.3.6
4.3.6.2 4.3.6.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.3.6.2.2 Penulangan Beton Pembesian Besi Ulir D 13
4.3.6.3 Pekerjaan Bekisting untuk Sloof
Tangga
4.4.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
Penulangan Beton
4.4. 4.4.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.4.2
4.4.2.2 Penulangan Beton Pembesian Besi dia. 10mm
4.4.2.3 Penulangan Beton Pembesian Besi dia. 12mm
4.4.3 Pekerjaan Bekisting untuk Tangga
Ring Balok
Ring Balok RB1
4.5.1.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
Penulangan Beton
4.5.1 4.5.1.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.5.1.2

Nike Naluri (1106587) 391


4.5.1
4.5.1.2

4.5.1.2.2 Penulangan Beton Pembesian Besi dia. 12mm


4.5.1.3 Pekerjaan Bekisting untuk Balok
Ring Balok RB2
4.5.2.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
Penulangan Beton
4.5.2
4.5.2.2 4.5.2.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.5.2.2.2 Penulangan Beton Pembesian Besi dia. 12mm
4.5
4.5.2.3 Pekerjaan Bekisting untuk Balok
Ring Balok RB3
4.5.3.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
Penulangan Beton
4.5.3
4.5.3.2 4.5.3.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.5.3.2.2 Penulangan Beton Pembesian Besi dia. 12mm
4.5.3.3 Pekerjaan Bekisting untuk Balok
Ring Balok RB4
4.5.4.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
Penulangan Beton
4.5.4
4.5.4.2 4.5.4.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.5.4.2.2 Penulangan Beton Pembesian Besi dia. 12mm
4.5.4.3 Pekerjaan Bekisting untuk Balok
Plat Lantai
4.6.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
Penulangan Beton
4.6 4.6.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.6.2
4.6.2.2 Penulangan Beton Pembesian Besi dia. 10mm
4.6.2.3 Penulangan Beton Pembesian Besi dia. 12mm
4.6.3 Pekerjaan Bekisting untuk Plat Lantai
Dak Beton
Dak Beton BC1
4.7.1.1 Pembuatan Beton Struktur 1Pc : 2 Ps : 3 Kr
4.7 Penulangan Beton
4.7.1
4.7.1.2 4.7.2.1 Penulangan Beton Pembesian Besi dia. 8mm
4.7.2.2 Penulangan Beton Pembesian Besi dia. 10mm
4.7.1.3 Pekerjaan Bekisting untuk balok
PEKERJAAN DINDING
5.1 Pasangan Bata Merah 1/2 Bt (1 pc : 4 Ps)
5.2 Plesteran tebal= 2cm (1 pc : 3 Ps)
5.3 Acian
Dinding KM/WC
5.4.1 Dinding keramik uk.20x20 cm
5.
5.4.2 Dinding keramik uk.25x33,3 cm
5.4 5.4.3 Dinding keramik uk.32,5x49 cm
5.4.4 List Dinding keramik uk.33,5x25 cm

Nike Naluri (1106587) 392


5.

5.4

5.4.5 List Dinding keramik uk.3x25 cm


5.4.6 List Dinding keramik uk.6x33,3 cm
5.5 Pasangan Bata Roster (1pc:3pc) uk. 12x11x24 cm
PEKERJAAN LANTAI
Lantai
6.1.1 Lantai Keramik Ukuran 20x20 cm
6.1.2 Lantai Keramik Ukuran 30x30 cm
6.1.3 Lantai Keramik Ukuran 33,3x33,3 cm
6.1.4 Lantai Keramik Ukuran 50x50 cm
6.1
6.1.5 Lantai Kayu Gymfloor
Lantai KM/WC
6. 6.1.6 6.1.6.1 Lantai Keramik Ukuran 20x20 cm
6.1.6.2 Lantai Keramik Ukuran 33,3x33,3 cm
6.1.7 Lantai tangga Keramik Ukuran 50x50 cm
Plin
6.2.1 Plin Keramik Ukuran 10x 20 cm

6.2 6.2.2 Plin Keramik Ukuran 10x 30 cm


6.2.3 Plin Keramik Ukuran 10x 33 cm
6.2.4 Plin Keramik Ukuran 10x 50 cm
6.2.5 Plint Lantai Kayu (tinggi =10 cm, tebal =0.9 – 1,2 cm)
PEKERJAAN KUSEN, PINTU & JENDELA
Pintu
P1
7.1.1 7.1.1.1 Membuat & memasang kusen pintu & jendela Kayu kelas II
7.1.1.2 Membuat & memasang Teakwood rangkap, rangka expose Kayu kelas I
P2
7.1.2 7.1.2.1 Membuat & memasang kusen pintu & jendela Kayu kelas II
7.1 7.1.2.2 Membuat & memasang Teakwood rangkap, rangka expose Kayu kelas I
P3
7.1.3 7.1.3.1 Pengadaan dan pemasangan kusen pintu dan jendela alumunium
7.1.3.2 Pengadaan dan pemasangan daun pintu dan jendela alumunium strip
P4
7.1.4 7.1.4.1 Membuat & memasang kusen pintu & jendela Kayu kelas II
7.1.4.2 Membuat & memasang Teakwood rangkap, rangka expose Kayu kelas I
Jendela
J1
7.2.1 7.2.1.1 Pengadaan dan pemasangan kusen pintu dan jendela alumunium
7.2.1.2 Pengadaan dan pemasangan daun pintu dan jendela alumunium strip
J2
7.2.2 7.2.2.1 Pengadaan dan pemasangan kusen pintu dan jendela alumunium
7.2.2.2 Pengadaan dan pemasangan daun pintu dan jendela alumunium strip
J3
7.2.3 7.2.3.1 Pengadaan dan pemasangan kusen pintu dan jendela alumunium
7.2 7.2.3.2 Pengadaan dan pemasangan daun pintu dan jendela alumunium strip

Nike Naluri (1106587) 393


7.2
J4
7.2.4 7.2.4.1 Pengadaan dan pemasangan kusen pintu dan jendela alumunium
7.2.4.2 Pengadaan dan pemasangan daun pintu dan jendela alumunium strip
J5
7.2.5 7.2.3.1 Pengadaan dan pemasangan kusen pintu dan jendela alumunium
7.2.3.2 Pengadaan dan pemasangan daun pintu dan jendela alumunium strip
7. J7
7.2.6 7.2.4.1 Pengadaan dan pemasangan kusen pintu dan jendela alumunium
7.2.4.2 -
Pintu dan Jendela
PJ2
7.3.1 7.1.1.1 Pengadaan dan pemasangan kusen pintu dan jendela alumunium
7.1.1.2 Pengadaan dan pemasangan daun pintu dan jendela alumunium strip
PJ2*
7.3.2 7.1.2.1 Membuat & memasang kusen pintu & jendela Kayu kelas II
7.3 7.1.2.2 Membuat & memasang Teakwood rangkap, rangka expose Kayu kelas I
PJ3
7.3.3 7.1.3.1 Pengadaan dan pemasangan kusen pintu dan jendela alumunium
7.1.3.2 Membuat & memasang Teakwood rangkap, rangka expose Kayu kelas I
PJ4
7.3.4 7.1.4.1 Pengadaan dan pemasangan kusen pintu dan jendela alumunium
7.1.4.2 Membuat & memasang daun pintu dan jendela Klamp Kayu kelas II
Pintu Gerbang
7.4
7.4.1 Pengadaan dan pemasangan pintu rolling door besi
Bouvenlight
7.5 7.5.1 Pengadaan dan pemasangan kusen pintu dan jendela alumunium
7.5.2 Pengadaan dan pemasangan daun pintu dan jendela alumunium strip
Pintu Belakang
7.6
7.6.1 Membuat rangka pintu besi Square Tube
Glass Blok
7.7
7.7.1 Pengadaan dan pemasangan daun pintu kaca rangka alumunium
7.8 Pengadaan dan Pemasangan Engsel Pintu
7.9 Pengadaan dan Pemasangan Engsel Jendela Kupu-kupu
7.10 Pengadaan dan Pemasangan Kunci Selot
7.11 Pengadaan dan Pemasangan Door Holder / Pegangan Pintu
7.12 Pengadaan dan Pemasangan Rel Pintu Dorong
7.13 Pengadaan dan Pemasangan Kaca, tebal 5 mm
PEKERJAAN ATAP
8.1 Membuat & memasang Konstruksi kuda-kuda Kayu bentang s/d 6M
8.2 Membuat & memasang Gordeng, Kayu kelas II
8. 8.3 Membuat & memasang rangka atap genteng Beton, kayu kelas II
8.4 Membuat & memasang Lisplank (3x20cm), Kayu kelas II
8.5 Membuat & memasang Lisplank (3x30cm), Kayu kelas II
8.6 Penutup Atap Genteng Beton

Nike Naluri (1106587) 394


PEKERJAAN PLAFOND
9.1 Membuat & memasang rangka plafond (50x100cm), Kayu kelas II
9.
9.2 Pengadaan dan pemasangan plafond gypsumboard t=9mm
9.3 Pengadaan dan pemasangan list plafond gypsum profil 10cm
PEKERJAAN PENGECATAN
Dinding
10.1
10.1.1 Pengecatan Tembok Baru
10. Kusen
10.2
10.2.1 Mengecatan Bidang Kayu Baru
Lisplank
10.3
10.3.1 Mengecatan Bidang Kayu Baru
PEKERJAAN PIPA dan SANITER
11.1Pengadaan dan Pemasangan Kloset Duduk / Monoblok
11.2Pengadaan dan Pemasangan Kloset Jongkok Porselen
11.3Pengadaan dan Pemasangan Washtafel
11.4Pengadaan dan Pemasangan Bak Mandi Fiberglass vol 0,3 m3
11.5Pengadaan dan Pemasangan Bak Kontrol pasangan batu bata uk. 60x60x65 cm
Pipa
11.6.1 Pengadaan dan Pemasangan Pipa PVC tipe AW d = 1/2"
11.6.2 Pengadaan dan Pemasangan Pipa PVC tipe AW d = 3/4"
11.6.3 Pengadaan dan Pemasangan Pipa PVC tipe AW d = 1"
11.6
11.6.4 Pengadaan dan Pemasangan Pipa PVC tipe AW d = 2"
11.
11.6.5 Pengadaan dan Pemasangan Pipa PVC tipe AW d = 3"
11.6.6 Pengadaan dan Pemasangan Pipa PVC tipe AW d = 4"
11.6.7 Pengadaan dan Pemasangan Pipa Galvanis d = 1/2 "
11.7Pengadaan dan Pemasangan Bak Cuci Piring Stainless Steel
11.8Pengadaan dan Pemasangan Kran Air diameter 3/4" atau 1/2 "
11.9Pengadaan dan Pemasangan Floor Drain
11.10Pengadaan dan Pemasangan Jetwasher
11.11Pengadaan dan Pemasangan Kran Sink
11.12Pengadaan dan Pemasangan Shower
11.13Pengadaan dan Pemasangan Bathtube
11.14Pengadaan dan Pemasangan Septic tank
PEKERJAAN LAIN-LAIN
12.1Pengadaan dan pemasangan Railing Tangga
12.
12.2Pengadaan dan pemasangan Railing Balkon
12.3Dinding Batu Tempel
PEKERJAAN LISTRIK
13.1Pasang Stop Kontak
13.2Pasang saklar
13 13.3Pasang Lampu TL
13.4 Pasang Lampu Taman
13.5 Pasang Panel
13.6 Pasang Lampu Pijar

Nike Naluri (1106587) 395


Hitunglah kebutuhan biaya yang diperlukan untuk melakukan pengecatan pada
bangunan,dengan volume 1922,81 untuk pekerjaan tembok, dan pengecatan b
81,421

TABEL DAFTAR KEBUTUHAN MATERIAL DAN UPAH PEKE


10.PEKERJAAN PENGECATAN HARGA
KOEFISIEN (A)SATUAN (B)
m2 Pengecatan Tembok Baru ( 1 Plamir, 1 La SATUAN (C)
1 Plamur Tembok 0.1000 kg Rp 52,000
2 Cat Tembok (25 kg) 0.1400 kg Rp 22,100
3 Cat akhir emulsion 0.3640 Ltr Rp 62,500
4 Amplas Kayu / Besi 0.2000 Lbr Rp 8,624
10.1.1
a Pekerja 0.0200 Org/Hari Rp 60,000
b Tukang Cat Biasa 0.0630 Org/Hari Rp 80,000
c Kepala Tukang 0.0063 Org/Hari Rp 80,000
d Mandor 0.0025 Org/Hari Rp 95,000
JUMLAH
m2 Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup
1 Cat Dasar / meni kayu 0.2000 Kg Rp 28,336
2 Plamir Kayu 0.1500 Kg Rp 17,890
3 Dempul Kayu 0.1700 Kg Rp 24,640
4 Cat Kayu 0.3500 Kg Rp 30,800
10.2.1
a Pekerja 0.0700 Org/Hari Rp 60,000
b Tukang Cat Biasa 0.1050 Org/Hari Rp 80,000
c Kepala Tukang 0.0040 Org/Hari Rp 80,000
d Mandor 0.0025 Org/Hari Rp 95,000
JUMLAH

ANALISIS HARGA SATUAN


HARGA SATUAN
NO KODE JENIS PEKERJAAN VOLUME SATUAN
MATERIAL
1 10.1.1 Pengecatan Tembok Baru 0.000 0 Rp -
2 10.2.1 Mengecatan Bidang Kayu Baru 0 0 Rp -
JUMLAH Rp -
kan pengecatan pada
ok, dan pengecatan bidang kayu

HAN MATERIAL DAN UPAH PEKERJA


KEBUTUHAN HARGA
VOLUME (D) TOTAL
MATERIAL E (DXA)
UPAH F (DXA) MATERIAL (CXE) UPAH (CXF)
Rp -
Rp -
Rp -
Rp -

Rp0
Rp -
Rp -
Rp -
Rp -
0.0000 0.000 0.000 Rp - Rp -
, 3 Lapis Cat Penutup
Rp -
Rp -
Rp -
Rp -

Rp0
Rp -
Rp -
Rp -
Rp -
0.0000 0.000 0.000 Rp - Rp -
TOTAL Rp - Rp -
TOTAL Rp -

UAN
HARGA SATUAN JUMLAH HARGA
TOTAL
UPAH MATERIAL UPAH
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -
Rp - Rp - Rp - Rp -

Anda mungkin juga menyukai