Anda di halaman 1dari 55

DAFTAR HARGA SATUAN BAHAN DAN UPAH

TAHUN ANGGARAN 2020

HARGA
NO. URAIAN SATUAN SATUAN KETERANGAN
Rp.
1 2 3 4 5

A. UPAH TENAGA :
1 Pekerja o/h 138,700
2 Mandor o/h 216,300
3 Tukang o/h 173,300
4 Kepala tukang o/h 187,200

B. BAHAN MATERIAL ALAM


1 Pasir Pasang m3 247,500
2 Batu pecah m3 385,000
3 Pasir Urug m3 176,000
4 Sirtu m3 286,000
5 Bata Merah bh 1,100

C. BESI
1 Besi beton polos kg 14,800
2 Besi beton ulir kg 17,500
3 Kawat ikat beton 1 roll 20 kg kg 385,000
4 Paku 5 cm - 10 cm kg 18,700
5 Paku Spandek kg 55,000
6 Paku Skrup kg 66,000

D. BAHAN KAYU
1 Kayu Kelas III M3 2,200,000
2 Kayu Kelas II M3 3,850,000
3 Minyak Bekisting ltr 26,400
4 Dolken Kayu Ø (8-10) cm Panjang 4 m Btg 20,000
5 Multipleks 120x240 cm t 9 mm Lembar 110,000

E. BAHAN LAIN-LAIN
1 Beton mutu K - 300 m3 957,000
2 Sealant m' 35,000
3 Plastik alas cor beton m2 10,000
4 Portland Cemen (PC) kg 1,430
5 Semen Nat Tegel kg 22,000

F. BAHAN FINISHING
1 Soda Api Kg 35,000
2 Plamur Tembok Boyo dan Setara (5kg) Kaleng 49,500
3 Cat Dasar 3.5 Kg Kaleng 130,400
4 Cat Tembok Dulux (luar) 2.5 Kg Kaleng 143,000
5 Cat Kayu Dulux 1kg Kg 58,300
6 Cat Tenner Kg 31,000
7 Kertas Gosok Lembar 5,500
8 Kuas 3" (Eterna) Buah 13,200

G. BAHAN ATAP
1 Besi kanal C 8 cm, 0.75mm P = 6 m Btg 93,500
2 Spandek 0.3 Meter 95,000
3 Kasiplank 8 mm (30x3m) Polos Lembar 72,600
4 Besi Hollow 40.40.2 mm P=6 m/40.40.1.8 P=6 m Btg 209,000
5 Polycarbonite 120x240 tebal 6 mm Lembar 255,000
6 Hollow Aluminium Rangka Plafond 40.40.2mm Btg 33,000

H. BAHAN LANTAI
1 Tegel Keramik Warna 50x50 Dos 125,400
2 Tegel Keramik Warna 30x30 Dos 66,000

I. BAHAN LANTAI
1 Gypsum Board 122x244x tebal 9 mm Lembar 82,500
2 Kalsiboard Lembar 74,800
E. BAHAN INSTALASI LISTRIK
1 Kabel NYM 3 x 2,5 mm meter 9,000.00
2 Pengadaan dan Pemasangan Stop Kontak meter 66,000.00
3 Saklar Engkel In Clipsal Buah 18,000.00
4 Saklar Seri II In Broco Buah 28,500.00
5 Lampu LED Hemat Energi 13 Watt Buah 74,800.00
6 Lampu LED Hemat Energi 10 Watt Buah 62,700.00
LEMBAR PERHITUNGAN VOLUME

PEKERJAAN : #REF!
LOKASI : #REF!
ITEM PEKERJAAN : #REF!
JENIS PEKERJAAN :

SKETSA GAMBAR

PERHITUNGAN
No. URAIAN PEKERJAAN HASIL (m³)
Panjang Lebar Tinggi Volume Jumlah

1 2 3 4 5 6 = 3x4x5 7 8=6x7

A 3.56 3.680 14.881 18.00 267.854


B 3.56 3.680 14.881 1.00 14.881
C 3.56 3.680 14.881 1.00 14.881
D 3.56 3.680 13.101 3.00 39.302
TOTAL 336.918

Lubang Jendela
A 3.56 1.16 4.130 18.00 74.333
B 3.56 1.24 4.414 1.00 4.414
C 3.56 2.56 9.114 1.00 9.114
D 0.92 0.96 0.883 3.00 2.650
TOTAL 90.510
246.408

KUSEN
3.560 0.080 3.00 0.854 18.00 15.379
A
1.160 0.080 5.00 0.464 18.00 8.352
3.560 0.080 3.00 0.854 1.00 0.854
B
1.240 0.080 5.00 0.496 1.00 0.496
3.560 0.080 3.00 0.854 1.00 0.854
C
3.680 0.080 3.00 0.883 1.00 0.883
3.560 0.080 3.00 0.854 3.00 2.563
2.160 0.080 3.00 0.518 3.00 1.555
D
1.000 0.080 3.00 0.240 3.00 0.720
0.400 0.080 3.00 0.096 3.00 0.288
TOTAL 31.946

TOTAL
Makassar, April 2020

LEMBAR PERHITUNGAN VOLUME

PEKERJAAN : #REF!
LOKASI : #REF!
ITEM PEKERJAAN :
JENIS PEKERJAAN :

SKETSA GAMBAR

PERHITUNGAN
No. URAIAN PEKERJAAN HASIL (m³)
Panjang Lebar Tinggi Volume Jumlah

1 2 3 4 5 6 = 3x4x5 7 8=6x7

E 3.56 3.680 13.101 1.00 13.101


F 3.56 3.68 14.881 2.00 29.762
G 3.56 3.68 14.881 24.00 357.139
H 3.56 3.68 13.101 5.00 65.504
TOTAL 465.506
LUBANG JENDELA
E 2.63 2.16 6.491 1.00 6.491
F 1.75 1.10 2.735 2.00 5.470
G 3.26 0.48 3.490 24.00 83.755
H 1.750 1.80 3.150 5.00 15.750
TOTAL 111.466
354.040

KUSEN
2.63 0.080 3.00 0.631 1.00 0.631
E
2.16 0.080 4.00 0.691 1.00 0.691
1.75 0.080 2.00 0.280 2.00 0.560
F
1.10 0.080 3.00 0.264 2.00 0.528
3.26 0.080 4.00 1.043 24.00 25.037
G
0.48 0.080 5.00 0.192 24.00 4.608
1.74 0.080 3.00 0.418 5.00 2.088
H
1.80 0.080 3.00 0.432 5.00 2.160
TOTAL 36.303
TOTAL

Makassar, April 2020


LEMBAR PERHITUNGAN VOLUME

PEKERJAAN : #REF!
LOKASI : #REF!
ITEM PEKERJAAN :
JENIS PEKERJAAN :

SKETSA GAMBAR

PERHITUNGAN
No. URAIAN PEKERJAAN HASIL (m³)
Panjang Lebar Tinggi Volume Jumlah

1 2 3 4 5 6 = 3x4x5 7 8=6x7

I 3.56 3.680 14.525 1.00 14.525


J 3.56 3.68 13.101 5.00 65.504
TOTAL 80.029

LUBANG

J 1.750 0.90 1.575 1.00 1.575


78.454

KUSEN
1.750 0.080 2.00 0.280 1.00 0.280
0.900 0.080 2.00 0.144 1.00 0.144
TOTAL 0.424

TOTAL 78.454

Makassar, April 2020

LEMBAR PERHITUNGAN VOLUME

PEKERJAAN : #REF!
LOKASI : #REF!
ITEM PEKERJAAN :
JENIS PEKERJAAN :

SKETSA GAMBAR
PERHITUNGAN
No. URAIAN PEKERJAAN HASIL (m³)
Panjang Lebar Tinggi Volume Jumlah

1 2 3 4 5 6 = 3x4x5 7 8=6x7

Dinding Pembatas LT. 1 6.860 1.00 6.860 1.00 6.860


Dinding Pembatas LT. 1 21.26 1.00 21.260 1.00 21.260
0.000
Dinding Pembatas LT.2 6.860 1.00 6.860 1.00 6.860
Dinding Pembatas LT.2 21.26 1.00 21.260 1.00 21.260
0.000
Dinding Pembatas LT.3 6.860 1.00 6.860 1.00 6.860
Dinding Pembatas LT.3 21.26 1.00 21.260 1.00 21.260

TOTAL 2 SISI 84.360

Makassar, April 2020

PT. Teknik Eksakta

LEMBAR PERHITUNGAN VOLUME

PEKERJAAN : #REF!
LOKASI : #REF!
ITEM PEKERJAAN :
JENIS PEKERJAAN :

SKETSA GAMBAR

PERHITUNGAN
No. URAIAN PEKERJAAN HASIL (m³)
Panjang Sisi Tinggi Volume Jumlah

1 2 3 4 5 6 = 3x4x5 7 8=6x7

KOLOM 0.45 2 11.480 10.332 30.00 309.960


0.75 2.000 11.48 17.220 30.00 516.600
-
Balok
Lantai 3 6.860 0.40 2.744 1.00 2.744
21.26 0.40 8.504 1.00 8.504
Koridor 3.15 0.40 1.260 1.00 1.260

Lantai 2 6.860 0.40 2.744 1.00 2.744


21.26 0.40 8.504 1.00 8.504
Koridor 3.15 0.40 1.260 1.00 1.260

TOTAL 2 SISI 851.576

Makassar, April 2020

PT. Teknik Eksakta

LEMBAR PERHITUNGAN VOLUME

PEKERJAAN : #REF!
LOKASI : #REF!
ITEM PEKERJAAN : Dinding Samping Gedung Matematika
JENIS PEKERJAAN :

SKETSA GAMBAR

PERHITUNGAN
No. URAIAN PEKERJAAN HASIL (m³)
Panjang Sisi Tinggi Volume Jumlah

1 2 3 4 5 6 = 3x4x5 7 8=6x7

Dinding Samping 12.02 11.45 137.629 1.00 137.629

Kolom 0.40 11.45 4.580 4.00 18.320

TOTAL 155.949

Makassar, April 2020


DAFTAR HARGA SATUAN BAHAN DAN UPAH
TAHUN ANGARAN 2021

HARGA
NO. URAIAN SATUAN SATUAN KETERANGAN
Rp.
1 2 3 4 5

A. UPAH TENAGA :
1 Pekerja o/h 142,424
2 Mandor o/h 213,636
3 Tukang o/h 178,030
4 Kepala tukang o/h 192,272

B. BESI
1 Paku Skrup kg 66,000
HARGA
NO. URAIAN SATUAN SATUAN KETERANGAN
Rp.
C. BAHAN PLAFOND
1 Gypsum Board 122x244x tebal 9 mm Lembar 82,500
2 Besi Hollow Batang 209,000
3 Les Kayu m1 22,000

D. BAHAN INSTALASI LISTRIK


1 Pipa Listik 5/8 btg 11,000.00
2 Kabel NYM 2 x 2,5 mm meter 10,400.00
3 Pengadaan dan Pemasangan Stop Kontak meter 22,000.00
4 Saklar Engkel In Broco Buah 13,800.00
5 T Dus Buah 5,000.00
6 Lampu LED Hemat Energi 13 Watt Buah 74,800.00
7 L Bow Buah 2,000.00
8 klem Buah 5,500.00
9 Lampu TL 18 Watt Buah 41,600.00
10 Kap Lampu TL Buah

E. BAHAN FINISHING
1 Plamur Tembok Boyo dan Setara (5kg) Kg 49,500
2 Cat Dasar 3.5 Kg Kaleng 130,400
3 Cat Tembok Mowilex (luar) 2.5 Kg Kaleng 286,000
4 Cat Meni Glatik 3,5 kg kg 105,600
5 Minyak Cat (Aff Dunner) Liter 8,800
6 Kertas Gosok Lembar 5,500
7 Kuas 3" (Eterna) bh 13,200
DAFTAR HARGA SATUAN BAHAN DAN UPAH
TAHUN ANGGARAN 2021

HARGA
NO. URAIAN SATUAN SATUAN KETERANGAN
Rp.
1 2 3 4 5
A. UPAH TENAGA :
1 Pekerja o/h 142,424
2 Tukang o/h 178,030
3 Kepala tukang o/h 192,272
4 Mandor o/h 213,636

B. BAHAN MATERIAL ALAM


1 Pasir Kasar/Pasir Beton/Pasir Pasangan m3 247,500
2 Sirtu B m3 286,000
3 Pasir Urug m3 176,000
4 Sirtu m3 286,000
5 Batu Kali m3 385,000
6 Batu Merah Standar biji 1,100

C. BESI
1 Besi beton polos kg 14,800
2 Kawat ikat beton 1 roll 20 kg kg 385,000
3 Paku 5 cm - 10 cm kg 18,700
4 Spandek 0,35 Silver M 57,200
5 Baut Skrup buah 6,100
6 Hollow Alumunium btg 26,400

D. BAHAN KAYU
1 Kayu Kelas III M3 2,200,000
2 Bambu btg 33,000
3 Rotan Pengikat ikat 38,500

E. BAHAN LAIN-LAIN
1 Minyak bakesting Ltr 26,400
2 Beton Mutu K - 250 m3 869,000
3 Plastik alas cor beton m2 10,000
4 Portland Cemen (PC) kg 52,800
5 Kansten Pracetak 15x20x40 Buah 24,200
6 Paving Blok 8 cm (K250) Standar m2 75,000
7 Kalsiboard lembar 74,800
HARGA
NO. URAIAN SATUAN SATUAN KETERANGAN
Rp.

F. BAHAN FINISHING
1 Cat Meni Glatik 3,5 kg Kg 105,600
2 Cat Minyak Ex Emco Kg 71,500
4 Kuas 4" (Eterna) Buah 19,800
5 Tenner A ( Ex Avian) super Ltr 35,200
6 Plamur Tembok Boyo Dan Setara (5kg) Kg 49,500
7 Cat Dasar 3,5 kg Kg 130,700
8 Cat Tembok Mowilex (Cat Luar ) 2,5 Kg Kg 286,000
9 Cat Kayu Mowilex 1 Kg kg 46,200
10 Sabun Cuci Kg 28,000
11 Cat Avian kg 69,300

F. BAHAN PIPA DAN SUMUR BOR


1 Pipa GIP ( Galvanis ) 3" (6 m) Btg 715,000
2 Pipa GIP ( Galvanis ) 1 1/2" (6 m) Btg 357,500
3 Pipa GIP ( Galvanis ) 1 1/4" (6 m) Btg 308,000
3 Pipa GIP ( Galvanis ) 3/4" (6 m) Btg 187,000
HARGA SATUAN BAHAN & UPAH KERJA
TRIWULAN I TAHUN ANGGARAN 2021

SATUAN BAHAN/ HASIL SURVEY


NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
A. BAHAN ATAP

1 Genteng Flat Corak / garis/ polos Natural (tidak dicat) 33x39x20 cm - 10 Bh/M2 Buah Rp 4,900.00
2 Genteng Flat Corak / garis/ polos Warna Standar 33x39x20 cm - 10 Bh/M2 Buah Rp 6,400.00
3 Genteng Flat Corak / garis/ polos Warna Spesial 33x39x20 cm - 10 Bh/M2 Buah Rp 7,000.00
4 Genteng Elabana Natural (tidak dicat) 42x33x15 cm - 9 Bh/M2 Buah Rp 4,900.00
5 Genteng Elabana Warna Standar 42x33x15 cm - 9 Bh/M2 Buah Rp 6,400.00
6 Genteng Elabana Warna Spesial 42x33x15 cm - 9 Bh/M2 Buah Rp 7,000.00
7 Genteng Kiat Beton Natural (tidak dicat) 36x32x15 cm - 12 Bh/M2 Buah Rp 4,900.00
8 Genteng Kiat Beton Warna Standar 36x32x15 cm - 12 Bh/M2 Buah Rp 6,400.00
9 Genteng Kiat Beton Warna Spesial 36x32x15 cm - 12 Bh/M2 Buah Rp 7,000.00
10 Genteng Kiat Beton Warna Khusus 36x32x15 cm - 12 Bh/M2 Buah Rp 7,500.00
11 Genteng Garuda Permata Natural (tidak dicat) 42x33x15 cm - 9 Bh/M2 Buah Rp 4,900.00
12 Genteng Garuda Permata Warna Standar 42x33x15 cm - 9 Bh/M2 Buah Rp 6,400.00
13 Genteng Garuda Permata Warna Spesial 42x33x15 cm - 9 Bh/M2 Buah Rp 7,000.00
14 Genteng Royal Permata Natural (tidak dicat) 38x31x15 cm - 12 Bh/M2 Buah Rp 4,900.00
15 Genteng Royal Permata Warna Standar 38x31x15 cm - 12 Bh/M2 Buah Rp 6,400.00
16 Genteng Royal Permata Warna Spesial 38x31x15 cm - 12 Bh/M2 Buah Rp 7,000.00
17 Nok Genteng Biasa tanpa warna Buah Rp 16,500.00
18 Nok Genteng Keramik Buah Rp 18,700.00
19 Atap Genteng Keramik Standar Buah Rp 12,100.00
20 Atap Genteng Keramik Warna Buah Rp 16,500.00
21 Nok Segi Natural (tidak dicat) 35x27x15 cm - 3,3 Bh/M' Buah Rp 15,300.00
22 Nok Segi Warna Standar 35x27x15 cm - 3,3 Bh/M' Buah Rp 20,900.00
23 Nok Segi Warna Spesial 35x27x15 cm - 3,3 Bh/M' Buah Rp 21,100.00
24 Nok Segi Warna Khusus 35x27x15 cm - 3,3 Bh/M' Buah Rp 27,500.00
25 Nok Bulat Natural (tidak dicat) 30x24x15 cm - 3,5 Bh/ M' Buah Rp 16,200.00
26 Nok Bulat Warna Standar 30x24x15 cm - 3,5 Bh/ M' Buah Rp 20,800.00
27 Nok Bulat Warna Spesial 30x24x15 cm - 3,5 Bh/ M' Buah Rp 22,400.00
28 Nok Samping/T.Flat Natural (tidak dicat) 2,5 Bh/ M' Buah Rp 13,800.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 13
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
29 Nok Samping/T.Flat Warna Standar 2,5 Bh/ M' Buah Rp 19,300.00
30 Nok Samping/T.Flat Warna Spesial 2,5 Bh/ M' Buah Rp 19,000.00
31 Nok Samping/T.Flat Warna Khusus 2,5 Bh/ M' Buah Rp 22,000.00
32 Nok Cabang 3/Ujung Natural (tidak dicat) Buah Rp 93,500.00
33 Nok Cabang 3/Ujung Warna Standar Buah Rp 104,500.00
34 Nok Cabang 3/Ujung Warna Spesial Buah Rp 126,500.00
35 Nok Genteng Multi Roof Kasar, pjg 80 cm Buah Rp 63,300.00
36 Nok Genteng Multi Roof Licin, pjg 80 cm Buah Rp 68,800.00
37 Nok Genteng Surya, pjg 80 cm Buah Rp 52,300.00
38 Nok Genteng Sakura, pjg 80 cm Buah Rp 36,300.00
39 Genteng Metal Multi Roof Kasar pjg. 77, lb. 100 cm Lembar Rp 118,800.00
40 Genteng Metal Multi Roof Kasar pjg 77, lb. 80 cm Lembar Rp 118,300.00
41 Genteng Metal Multi Roof Licin pjg 77 lb. 100 cm Lembar Rp 99,000.00
42 Genteng Metal Multi Roof Licin pjg 77 lb. 80 cm Lembar Rp 99,000.00
43 Genteng Metal Surya Licin pjg 77 lb, 80 cm Lembar Rp 60,500.00
44 Genteng Metal Sakura Kasar pjg 77 lb, 80 cm Lembar Rp 83,600.00
45 Genteng Metal Star Licin pjg 77 lb. 80 cm Lembar Rp 33,000.00
46 Seng BWG 33 BJLS 0,20 MM kaki Rp 8,000.00
47 Seng BWG 28 BJLS 0,35 MM kaki Rp 88,000.00
48 Seng Gelombang bjls 0,35 (6 Kaki) Lembar Rp 88,000.00
49 Seng Gelombang bjls 0,30 (6 Kaki) Lembar Rp 77,000.00
50 Seng Gelombang bjls 0,25 (6 Kaki) Lembar Rp 50,200.00
51 Seng Gelombang bjls 0,20 (7 Kaki) Lembar Rp 53,900.00
52 Seng Gelombang bjls 0,20 (10 Kaki) Lembar Rp 79,200.00
53 Seng Plat bjls 0,35 (6 KK) Lembar Rp 93,500.00
54 Seng Plat bjls 0,30 (6 KK) Lembar Rp 82,500.00
55 Seng Plat bjls 0,20 (6 KK) Lembar Rp 58,300.00
56 Seng Fiber KK Rp 19,800.00
57 Fiber Semen Harflex ( 240x105x0,4 ) Lembar Rp 88,000.00
58 Eternit Jibesmen 1 m x 1 m Lembar Rp 16,500.00
59 Eternit Harflex 1 m x 1 m Lembar Rp 19,800.00
60 Eternit Atrisco 1 m x 1 m Lembar Rp 13,200.00
61 Karet Lapis Paku Asbes Biji Rp 8,000.00
62 Karet Talang (50 cm) M Rp 8,300.00
63 Karet Lapisan Genteng ( 50 cm) M Rp 8,800.00
64 Karet Lapisan Genteng ( 90 cm) M Rp 14,300.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 14
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
65 Karet Lapisan Genteng Tipis (110 mm) Uk. 1 x 20 m Rol Rp 385,000.00
66 Karet Lapisan Genteng Tebal (150 mm) Uk. 1 x 20 m Rol Rp 440,000.00
67 Onduline panjang 2 m + baut Lbr Rp 181,500.00
68 Nok onduline 1 m Lbr Rp 86,900.00
69 Ondulclear 95 x 2 m + baut Lbr Rp 352,000.00

B. BAHAN DASAR
1 Batu Kali M3 Rp 385,000.00
2 Batu kali Belah M3 Rp 275,000.00
3 Batu Gunung M3 Rp 385,000.00
4 Batu gunung Belah 10 - 15 cm M3 Rp 275,000.00
5 Batu Pecah 7 - 10 cm M3 Rp 440,000.00
6 Batu Pecah 5 - 7 cm M3 Rp 385,000.00
7 Batu Pecah 3 - 5 cm M3 Rp 385,000.00
8 Batu Pecah 2 - 3 cm M3 Rp 385,000.00
9 Batu Pecah 1- 2 cm M3 Rp 385,000.00
10 Batu Pecah 0,5 - 1 cm M3 Rp 385,000.00
11 Batu Merah Standar Biji Rp 1,100.00
12 Bata Ringan M3 Rp 990,000.00
13 Batako 40x20x10 cm - 13 Bh/M2 @Rp.4950 M2 Rp 70,800.00
14 Roster Beton 20 x 20 cm Biji Rp 27,500.00
15 Roster Keramik 20 x 20 cm Biji Rp 57,200.00
16 Roster Keramik 30 x 30 cm Biji Rp 68,200.00
17 Roster Keramik 20 x 40 cm Biji Rp 68,200.00
18 Glass Block Biji Rp 33,000.00
19 Gravel M3 Rp 165,000.00
20 Pasir Kasar/Pasir Beton/Pasir Pasangan M3 Rp 247,500.00
21 Sirtu A M3 Rp 286,000.00
22 Sirtu B M3 Rp 286,000.00
23 Sirtu C M3 Rp 286,000.00
24 Pasir Timbunan M3 Rp 176,000.00
25 Tanah Timbunan M3 Rp 220,000.00
26 Kerikil Sungai M3 Rp 357,500.00
27 Semen 50 kg (Tonasa) PC Sak Rp 71,500.00
28 Semen 40 kg (Tonasa) PC Sak Rp 52,800.00
29 Semen (Bosowa 40 kg) PC Zak Rp 51,700.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 15
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
30 Semen Tiga Roda 40 Kg PC Zak Rp 51,700.00
31 Semen Holcim 40 Kg PC Zak Rp 49,500.00
32 Semen Putih 40 kg per sak Sak Rp 77,000.00
33 Pigmen Warna Sak Rp 275,000.00
34 Semen Nat Tegel Kg Rp 22,000.00
35 Semen Abu Tiga Roda 40 Kg Kg Rp 49,500.00
36 Semen Abu Tiga Roda 50 Kg Kg Rp 62,200.00
37 Semen Putih Tiga Roda 40 Kg Kg Rp 126,300.00
38 Semen Acian Mortar Putih 40 Kg Kg Rp 121,300.00
39 Water Proofing M2 Rp 54,500.00
40 Paku jembatan kg Rp 33,000.00
41 Plastik untuk beton M2 Rp 88,000.00
42 Batu Kecil Gravel Batu Pecah atau Batu Tumbuk (Batu Gunung) M3 Rp 385,000.00

C. BAHAN BAMBU DAN GORONG - GORONG


1 Bambu - Petung Batang Rp 110,000.00
2 Bambu - Besar Batang Rp 44,000.00
3 Bambu - Sedang Batang Rp 33,000.00
4 Bambu - Kecil Batang Rp 27,500.00
5 Rotan Pengikat Ikat Rp 38,500.00
6 Gorong-gorong ᶲ 30/ m Buah Rp 165,000.00
7 Gorong-gorong ᶲ 40/ m Buah Rp 220,000.00
8 Gorong-gorong ᶲ 70/ m Buah Rp 330,000.00
9 Gorong-gorong ᶲ 80/ m Buah Rp 385,000.00

D 'BAHAN BESI
1 Angker Mur Baut Kecil Bh Rp 9,600.00
2 Angker Baut Tinggi 70 cm Bh Rp 8,000.00
3 Baut Diameter 12 mm x 10 cm (stainless) wf 150 Batang/Biji Rp 14,300.00
4 Baut Diameter 12 mm x 12,50 cm (stainless) Batang Rp 23,100.00
5 Baut Diameter 12 mm x 18 cm Batang Rp 14,800.00
6 Baut Diameter 12 mm x 20 cm Batang Rp 15,500.00
7 Baut Diameter 12 mm x 25 cm Batang Rp 19,200.00
8 Baut Diameter 12 mm x 30 cm Batang Rp 22,000.00
9 Baut Skrup Bh Rp 6,100.00
10 Baut Baja Bh Rp 27,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 16
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
11 Besi Streep 30 x 3 mm M'/ Btg Rp 209,000.00
12 Besi Hollow 40.60.1,2 mm P = 6 m Btg Rp 201,300.00
13 Besi Hollow 40.60.1 mm P = 6 m Btg Rp 203,500.00
14 Besi Hollow 40.40. 2 mm P = 6 m /40.40. 1,8 P = 6 m Btg Rp 209,000.00
15 Besi Hollow 40.40.1,5 mm P = 6 m Btg Rp 176,000.00
16 Besi Hollow 40.20.2 mm P =6 m Btg Rp 148,500.00
17 Besi Hollow 40.20.1,5 mm P =6 m Btg Rp 126,500.00
18 Besi Hollow 40.20.1,2 mm P = 6 m Btg Rp 104,500.00
19 Besi Hollow 20.20.1,5 mm P = 6 m Btg Rp 93,500.00
20 Besi Hollow 2x4 (12x31), 0.25mm P = 4m Btg Rp 19,800.00
21 Besi Hollow 2x4 (15x35), 0.25mm P = 4m Btg Rp 20,900.00
22 Besi Hollow 2x4 (18x38), 0.25mm P = 4m Btg Rp 23,100.00
23 Besi Hollow 2x4 (18x38), 0.30mm P = 4m Btg Rp 26,400.00
24 Besi Hollow 2x4 (18x38), 0.35mm P = 4m Btg Rp 29,700.00
25 Besi Hollow 4x4 (34x37), 0.25mm P = 4m Btg Rp 27,500.00
26 Besi Hollow 4x4 (34x37), 0.30mm P = 4m Btg Rp 31,900.00
27 Besi Hollow 4x4 (34x37), 0.40mm P = 4m Btg Rp 40,700.00
28 Besi Kanal C 8 cm, 0.55mm P = 6m Btg Rp 71,500.00
29 Besi Kanal C 8 cm, 0.60mm P = 6m Btg Rp 78,100.00
30 Besi Kanal C 8 cm, 0.65mm P = 6m Btg Rp 82,500.00
31 Besi Kanal C 8 cm, 0.70mm P = 6m Btg Rp 88,000.00
32 Besi Kanal C 8 cm, 0.75mm P = 6m Btg Rp 93,500.00
33 Besi Kanal C 8 cm, 1mm P = 6m Btg Rp 127,600.00
34 Besi Kanal C 8 cm, 0.55mm P = 5,8m Btg Rp 69,300.00
35 Besi Kanal C 8 cm, 0.60mm P = 5,8m Btg Rp 75,900.00
36 Besi Kanal C 8 cm, 0.65mm P = 5,8m Btg Rp 80,300.00
37 Besi Kanal C 8 cm, 0.70mm P = 5,8m Btg Rp 85,300.00
38 Besi Kanal C 8 cm, 0.75mm P = 5,8m Btg Rp 90,800.00
39 Besi Reng 3 cm, 0,4mm P = 6m Btg Rp 38,500.00
40 Besi Reng 3 cm, 0,45mm P = 6m Btg Rp 40,700.00
41 Besi Reng 3 cm, 0,4mm P = 5,8m Btg Rp 37,400.00
42 Besi Reng 3 cm, 0,45mm P = 5,8m Btg Rp 39,600.00
43 Besi Reng 3,8 cm, 0,4mm P = 6m Btg Rp 51,700.00
44 Besi Reng 3,8 cm, 0,45mm P = 6m Btg Rp 57,200.00
45 Besi Reng 3,8 cm, 0,4mm P = 5,8m Btg Rp 50,600.00
46 Besi Reng 3,8 cm, 0,45mm P = 5,8m Btg Rp 55,600.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 17
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
47 Plat Besi Kembang 2,3 mm M2 Rp 869,000.00
48 Besi Metal Stud L. 76 mm Btg Rp 77,000.00
49 Besi Siku L. 30.30.3/ 2,8 mm banci Btg Rp 112,800.00
50 Besi siku L. 40.40.4/ 3,8 mm Btg Rp 187,000.00
51 Besi siku L. 50.50.5/ 4,8 mm Btg Rp 275,000.00
52 Besi Siku L. 60. 60. 6/ 5,8 mm Btg Rp 495,000.00
53 Besi Siku L. 70. 70. 7 / 6,8 mm Btg Rp 676,500.00
54 Besi Siku L. 70.70.6 / 5 mm Btg Rp 574,200.00
55 Besi Siku L.100.100.10 Btg Rp 1,177,000.00
56 Besi Beton Polos 6 mm ( 0, 22 kg / M' ) (5,7) Btg Rp 30,800.00
57 Besi Beton Polos 8 mm ( 0,39 kg / M' ) (7,8) Btg Rp 52,800.00
58 Besi Beton polos 10 mm ( 0, 62 kg / M' ) (9,8) Btg Rp 71,500.00
59 Besi Beton Polos 12 mm ( 0, 89 kg / M' ) (11,8) Btg Rp 93,500.00
60 Besi Beton 14 mm ( 1, 21 kg / M' ) (13,8) Btg Rp 159,500.00
61 Besi Beton 16 mm ( 1, 39 kg / M' ) (15,8) Btg Rp 204,600.00
62 Besi Beton 19 mm ( 2, 23 kg / M' ) Btg Rp 269,500.00
63 Besi Beton 20 mm ( 2, 46 kg / M' ) Btg Rp 407,000.00
64 Besi Beton Ulir Dia 8 mm ( 0, 39 kg / M' ) ulir 10 full Btg Rp 86,300.00
65 Besi Beton Ulir Dia. 16 mm SNI Btg Rp 211,700.00
66 Besi Plat 1,5mm 1,2 mm M2 Rp 500,500.00
67 Besi Plat 2 mm (1,8) M2 Rp 711,700.00
68 Besi Plat 2,5mm M2 Rp 803,000.00
69 Besi Plat 3 mm (2,8) M2 Rp 1,001,000.00
70 Besi Plat 3,5mm M2 Rp 1,430,000.00
71 Besi Plat 4 mm M2 Rp 1,540,000.00
72 Besi Plat 4,5mm M2 Rp 1,782,000.00
73 Besi Plat 5 mm (4,8) M2 Rp 1,903,000.00
74 Besi Plat 5,5mm M2 Rp 2,145,000.00
75 Besi Plat 6 mm (5,8) M2 Rp 2,255,000.00
76 Besi Plat 8 mm (7,8) M2 Rp 2,871,000.00
77 Besi Plat 9 mm 10 mm (9,8) M2 Rp 3,685,000.00
78 Besi Plat T = 12 mm Ukr. 120x240 Lembar Rp 4,139,600.00
79 Besi Plat T = 16 mm Ukr. 120x240 Lembar Rp 5,482,400.00
80 Besi Plat T = 18 mm Ukr. 120x240 Lembar Rp 6,283,200.00
81 Baja Tulangan ( Polos ) U24 ᶲ 6 Batang Rp 36,900.00
82 Baja Tulangan ( Polos ) U24 ᶲ 8 Batang Rp 48,400.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 18
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
83 Baja Tulangan ( Polos ) U24 ᶲ 10 Batang Rp 72,600.00
84 Baja Tulangan ( Polos ) U24 ᶲ 12 Batang Rp 110,000.00
85 Baja Tulangan ( Polos ) U24 ᶲ 16 Batang Rp 198,000.00
86 Baja Tulangan ( Polos ) U24 ᶲ 16 Batang Rp 172,700.00
87 Baja Tulang ( Ulir ) D32, D39 16 Batang Rp 181,500.00
88 Baja Tulang ( Ulir ) D32, D39 18 Batang Rp 297,000.00
89 Besi Profil H 200x200 P = 12 meter Batang Rp 11,642,400.00
90 Besi Profil H 100x100 P = 12 meter Batang Rp 4,090,300.00
91 Besi IWF 300 P = 12 meter Batang Rp 8,106,600.00
92 Besi IWF 200 P = 12 meter Batang Rp 4,638,500.00
93 Besi UNP 100 P = 6 meter Batang Rp 542,100.00
94 Beugel kap V Plat Besi kg Rp 15,200.00
95 Kawat Ikat Beton 1 roll 20 Kg kg Rp 385,000.00
96 Kawat Dul ( 1 Roll = M ') Roll Rp 192,500.00
97 Kawat Ram Lubang 3,0 cm ( Rang Armonika ) M' Rp 38,500.00
98 Kawat Nyamuk plastik Rang 1 cm L. 1,20 Rang 2 cm M Rp 11,000.00
99 Kawat Nyamuk Aluminium M Rp 27,500.00
100 Kawat Nyamuk Baja M Rp 38,500.00
101 Kawat Las 2,6 nikko Dos Rp 143,000.00
102 Kawat Saringan Pasir / Ayakan M Rp 19,800.00
103 Kawat Bronjong kg Rp 27,500.00
104 Karet Untuk Pintu dan Jendela Aluminium PVC M'/Roll Rp 71,500.00
105 Door Closer Set Unit Rp 203,500.00
106 Kanopi Polycarbonite + Rangka Besi Tempa Biasa 400 per roll M2 Rp 632,500.00
107 Kanopi Polycarbonite + Rangka Besi Tempa Biasa 500 M2 Rp 275,000.00
108 Lem Kayu Dan Karet ( Fox ) Besar ( 800 gr ) Tube Rp 16,500.00
109 Lem Karet ( Fox ) Besar 450 10 kg Tube Rp 203,500.00
110 Lem Seng M Rp 17,600.00
111 Lembaran Atap Ploycarbonite untuk Kanopi Tebal 6 mm Roll Rp 1,622,500.00
112 Lembaran Atap Ploycarbonite untuk Kanopi Tebal 5 mm Roll Rp 3,300,000.00
113 Paku Campuran ( 5-10 cm ) Kg Rp 18,700.00
114 Paku Asbes dan Karet Kg Rp 60,500.00
115 Paku 5 cm 7 cm 10 cm Kg Rp 18,700.00
116 Paku ( 1 1/2 - 2 1/2 cm ) ( setara Paku 2-3 cm ) Kg Rp 22,000.00
117 Paku 4 cm Kg Rp 19,800.00
118 Paku 2-3 cm Kg Rp 20,900.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 19
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
119 Paku Sirap ( Setara Paku 2-3 cm ) Kg Rp 24,200.00
120 Paku Seng ( 1 kg/ Dos ) Kg Rp 55,000.00
121 Paku Skrup 5 cm Biji Rp 275,000.00
122 Paku Skrup Besi Hollow - 1000 Biji Per dos ( bdrilling 450 b = 4,5 cm ) Dos/ Bgks Rp 192,500.00
123 Paku skrup Gyapsum - 500 biji per dos bungkus Dos/ Bgks Rp 66,000.00
124 Paku Jembatan Kg Rp 15,400.00
125 Paku Beton 5 cm Dos Rp 16,500.00
126 Paku Beton 6 cm Dos Rp 16,500.00
127 Paku Beton 7 cm - 10 cm Dos Rp 16,500.00
128 Paku Payung Berulir ( 1 kg/ Dos ) Kg Rp 38,500.00
129 Paku Asbes Berulir Dos Rp 52,300.00
130 Paku Asbes Biasa Dos Rp 55,000.00
131 Paku Tripl ( Setara Paku 2-3 cm) Kg Rp 27,500.00
132 Paku Eter ( Setara Paku 2-3 Cm ) Kg Rp 27,500.00
133 Paku Ripet Biji Rp 1,100.00
134 Skamp ( Paku Tembak Hollow alumunium ) Bh Rp 27,500.00
135 pagar Jadi Besi ( Tinggi 1 M ) M' Rp 440,000.00
136 Pagar Pracetak - 5 panel M' Rp 495,000.00
137 Pagar Pracetak - 6 panel M' Rp 550,000.00
138 Pagar Pracetak - 7 panel M' Rp 631,400.00
139 Tiang Beton untuk 5 Daun Buah Rp 264,000.00
140 Tiang Beton untuk 6 Daun Buah Rp 316,800.00
141 Tiang Beton untuk 7 Daun Buah Rp 369,600.00
142 Rangka Baja Ringan 0,75 M2/ 6 Rp 85,800.00
143 Spandek 0,25 silver M Rp 41,800.00
144 Spandek 0,35 silver M Rp 57,200.00
145 Spandek 0,4 silver M Rp 60,500.00
146 Spandek 0,45 0,35 M Rp 61,600.00
147 Nok Spandek M Rp 49,500.00
148 Hollow Aluminium Rangka Plafond 0,25 (2x4) Btg Rp 20,900.00
149 Hollow Aluminium Rangka Plafond 0,3 2x4/4x4 Btg Rp 33,000.00
150 Hollow Aluminium Rangka Plafond 40 X 20 X 2 mm Btg Rp 26,400.00
151 Hollow Aluminium Rangka Plafond 40 X 40 X 2 mm Btg Rp 23,100.00
152 Hollow Aluminium Rangka Plafond 40 X 20 X 8 mm Btg Rp 71,500.00
153 Kawat Penggantung Hollow Aluminium Kg Rp 33,000.00
154 Aluminium 4'' Brown - 6 Meter Btg Rp 231,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 20
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
155 Aluminium 3'' Brown - 6 Meter Btg Rp 137,500.00
156 Aluminium Slimar 4'' Brown Untuk Daun Jendela Btg Rp 175,500.00
157 Aluminium Slimar 3'' Brown Untuk Daun Jendela Btg Rp 99,900.00
158 Pas. Kusen Aluminium 4' M' Rp 132,000.00
159 Pas. Daun Jendela Alumunium + Kaca Tabel 5 mm + Karet dan Sealent M2 Rp 1,403,200.00
160 Pas. Daun Pintu Aluminium panil Kaca Tebal 5 mm ( Lengkap Accessories ) Unit Rp 302,500.00
161 Pintu KM/WC Alumunium ( lengkap Accessories ) lebar 6 cm Unit Rp 275,000.00
162 Pintu KM/WC PVC kw.1( lengkap Accessories ) lebar 10 cm Unit Rp 253,000.00
163 Pintu fiberglass KM/WC Lembar Rp 242,000.00
164 Pintu KM/WC bahan PVC Lengkap Accessories ex MASPION star Unit Rp 231,000.00

E. BAHAN FINISHING :
1 Cat Minyak Afduner 1kg Liter/botol Rp 5,500.00
2 Cat Kayu Ex Avian (0,9 kg) Kaleng Rp 69,300.00
3 Cat Minyak Ex Emco Kg Rp 71,500.00
4 Cat kKayu Ex Mowilex 1kg Kaleng Rp 46,200.00
5 Cat Minyak Liter Rp 19,800.00
6 Cat Minyak Super klg liter Rp 39,600.00
7 Cat Kayu Dulux 1kg Kg Rp 58,300.00
8 Cat Dasar 3,5 kg Kaleng Rp 130,400.00
9 Cat Dasar Meni 3,5 Kg Kaleng Rp 150,700.00
10 Cat Meni Glatik 3,5 kg Kaleng Rp 105,600.00
11 Cat Tenner Kg Rp 31,000.00
12 Cat Genteng Cap Belmas 1kg Kg Rp 51,700.00
13 Cat Genteng yoko 4kg Kaleng Rp 110,000.00
14 Cat Genteng Biasa AGA (4 kg) Kaleng Rp 203,500.00
15 Cat Genteng Minyak Nippon 2,5 liter Kaleng Rp 220,000.00
16 Cat Residu/ cloter (10 kg) 30.000/ kg Kaleng Rp 330,000.00
17 Cat seng Nippon (2,5 kg) Kaleng Rp 77,000.00
18 Cat Tembok Sahara / Kembang / Postek Aries (25 Kg) Kg Rp 176,000.00
19 Cat Tembok Wintex / Maxilite (5kg) Kaleng Rp 19,800.00
20 Cat Tembok ICI (Dalam) Kaleng Rp 176,000.00
21 Cat Tembok Mowilex (Cat Dalam ) 2,5 Kg soff Kaleng Rp 181,500.00
22 Cat Tembok Mowilex (Cat Luar ) 2,5 Kg gelap & terang Kaleng Rp 286,000.00
23 Cat Tembok Aries 5kg Kaleng Rp 71,500.00
24 Cat Minyak Avian Liter Rp 181,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 21
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
25 Cat Tembok Kimex (5kg) Kaleng Rp 133,100.00
26 Cat Tembok Dulux (luar) 2,5 kg Kaleng Rp 143,000.00
27 Cat Tembok Warna Kuning , Hitam ,Merah (Belmax) kg Rp 88,000.00
28 Vernis/Plitur (24 Klg) kg Rp 62,700.00
29 Cat Altex Kg Rp 145,200.00
30 Cat Anti Lumut (Aquaseal) (Klg 20kg) Nodrop 20 kg Pail Rp 797,500.00
31 Cat Anti Lumut (No drop) (Klg 20 kg) Pail Rp 792,000.00
32 Cat Dasar Glatik kembang 1 kg Kg Rp 33,000.00
33 Plamur Tembok Boyo Dan Setara (5kg) Kaleng Rp 49,500.00
34 Minyak Cat (aff Dunner) Liter Rp 8,800.00
35 Dempul Kayu Cap Kuning / Merah (1 Kg) klg Kg Rp 44,000.00
36 Dempul Ex Impra Kg Rp 44,000.00
37 Dempul Ex Isamu Kg Rp 60,500.00
38 Tenner A ( Ex Avian) super Liter Rp 35,200.00
39 Minyak Te Botol Liter Rp 9,400.00
40 Kertas Gosok Lembar Rp 5,500.00
41 Pewarna Natural Kaleng Rp 104,500.00
42 pewarna brown Kaleng Rp 77,000.00
43 Pewarna Ex Impra Kaleng Rp 71,500.00
44 Wood Filler Ex Impra Kaleng Rp 71,500.00
45 Clear Kaleng Rp 79,500.00
46 Clear ex Impra Ltr Rp 66,000.00
47 Sending kg Rp 66,000.00
48 Sending ex Impra Ltr Rp 66,000.00
49 Cat Kayu Ex Dullux Mengkilap Kg Rp 93,500.00
50 Melamin Ex Impra kg Rp 148,500.00
51 Cat Air Untuk Genteng, Bataco, Paving Block (AGA) kg Rp 214,500.00
52 Cat Minyak Untuk Genteng, Bataco, Paving Block (AGA) kg Rp 111,700.00
53 Kuas 2" (Eterna) Buah Rp 8,800.00
54 Kuas 3" (Eterna) Buah Rp 13,200.00
55 Kuas 4" (Eterna) Buah Rp 19,800.00
56 Bahan Anti Karat Kg Rp 55,000.00
57 Comice - 20 kg (dingding eksterior ) kg Rp 82,500.00
58 Comice - 20 kg (dingding interior) kg Rp 62,700.00
59 Lem Fox Kaleng kg Rp 159,500.00
60 Lem Efoxi ltr Rp 203,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 22
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
61 Perban Conpon Roll/Bh Rp 13,200.00
62 Bubuk + air pelarut Ex Aqugart untuk Waterproofing kg Rp 29,700.00
63 Cat Waterproof eks aquaproo- kw.1 kg Rp 176,000.00
64 Cat waterproof- biasa Liter Rp 145,200.00
65 Cat Marka Jalan (aries gold 5kg) kg Rp 74,300.00
66 Aluminium Composite Panel (ACP) Seven Polyster 0,21 (Indoor) Lembar Rp 522,500.00
67 Aluminium Composite Panel (ACP) Seven PVDF 0,3 Doft Lembar Rp 763,400.00
68 Aluminium Composite Panel (ACP) Seven PVDF 0,3 Glossy Lembar Rp 781,000.00
69 Aluminium Composite Panel (ACP) Seven PVDF 0,3 Metalic Lembar Rp 799,700.00
70 Aluminium Composite Panel (ACP) Seven PVDF 0,3 Sparking, Safron, Olive Brown Lembar Rp 812,900.00
71 Aluminium Composite Panel (ACP) Seven Marble, Wood, Brush Lembar Rp 1,059,300.00

F BAHAN KAYU
1 Kayu Kls. I Bayam (balok) Chain Saw M3 Rp 14,300,000.00
2 Kayu Kls. I Bayam (balok) Sawmill M3 Rp 16,500,000.00
3 Kayu Kls. I Ulin (papan) M3 Rp 26,620,000.00
4 Kayu Kls. I Ulin (tiang) M3 Rp 27,500,000.00
5 Kayu Kls. I Bayam (papan) Shain Saw M3 Rp 22,000,000.00
6 Kayu Kls I Bayam(papan) sawmil M3 Rp 22,000,000.00
7 Kayu Klas. II Samarinda (papan)/ Lokal M3 Rp 4,125,000.00
8 Kayu Klas. II Samarinda (balok)/ Lokal M3 Rp 3,850,000.00
9 Kayu Kls. III Kapur (balok)/ Kemiri M3 Rp 2,200,000.00
10 Kayu Kls. III (papan) M3 Rp 2,200,000.00
11 Kayu Mangga/Kemiri (papan) M3 Rp 2,750,000.00
12 Kayu Kumea Balok M3 Rp 9,350,000.00
13 Kayu Kumea Papan M3 Rp 10,450,000.00
14 Kayu lapis Tripleks Lapis Kayu Lainnya Uk. (0,4 x 122 x 244)cm Lembar Rp 66,000.00
15 Kayu lapis Tripleks Lapis Kayu Lainnya Uk. (0,3 x 122 x 244)cm Lembar Rp 55,000.00
16 Kayu lapis Tripleks Lapis Kayu Lainnya Uk. (0,6 x 122 x 244)cm Lembar Rp 88,000.00
17 Kayu lapis Tripleks Lapis Kayu Lainnya (18 mm) Lembar Rp 308,000.00
18 Kayu lapis Tripleks Lapis Kayu Lainnya (12 mm) Lembar Rp 198,000.00
19 Kayu lapis Tripleks Lapis Kayu Lainnya ( 9 mm) Lembar Rp 132,000.00
20 Kayu lapis Tripleks Lapis Kayu Lainnya 2 mm Lembar Rp 55,000.00
21 Kayu lapis Tripleks Lapis Kayu Mewah jati Teakwood (0,3 x 122 x 244) cm Lembar Rp 220,000.00

G BAHAN PENGGANTUNG

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 23
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
1 Engsel Baja Biji Rp 27,500.00
Engsel Baja (Dumont) Biji Rp 181,500.00
2 Engsel Kuningan 4 Lubang Psg Rp 27,500.00
Engsel Kuningan 4 Lubang (Dumont) Psg Rp 84,700.00
3 Engsel Stainless Steel Psg Rp 49,500.00
4 Engsel H3 Lubang Psg Rp 16,500.00
5 Engsel Kupu-kupu Psg Rp 11,000.00
6 Engsel antik jendela Psg Rp 16,500.00
7 Engsel Pintu Biasa (Merk 777) Psg Rp 16,500.00
Engsel Pintu Biasa (Dumont) Psg Rp 84,700.00
8 Engsel Pintu Lemari Biasa Psg Rp 12,100.00
Engsel Pintu Lemari Biasa (Dakson) Psg Rp 66,000.00
9 Engsel Jendela Biasa (Merk 777) Psg Rp 13,800.00
Engsel Jendela Biasa (Dumont) Psg Rp 57,200.00
10 Engsel Jendela Kuningan (merk Kuningan) Psg Rp 22,000.00
Engsel Jendela Kuningan (Dakson) Psg Rp 63,800.00
11 Engsel Pintu 4" (SES) Bh Rp 38,500.00
Engsel Pintu 4" (Dumont) Bh Rp 58,100.00
12 Engsel Jendela 3"(SES) Bh Rp 27,500.00
Engsel Jendela 3"(Dumont) Bh Rp 57,200.00
13 Engsel Pintu Kuningan SES Psg Rp 84,700.00
Engsel Pintu Kuningan (Dumont) Psg Rp 84,700.00
14 Gagang Pintu Lemari Bh Rp 27,500.00
Gagang Pintu Lemari (Dakson) Bh Rp 37,400.00
15 Grendel jendela Kuningan Bh Rp 52,800.00
Grendel jendela Kuningan (Dakson) Bh Rp 52,800.00
16 Grendel Pintu Biasa Bh Rp 38,500.00
Grendel Pintu Biasa (Dumont) Bh Rp 49,700.00
17 Grendel Pintu Kuningan/ Vertikal Bh Rp 22,000.00
18 Grendel Pintu Besar Bh Rp 72,600.00
19 Grendel Pintu Tanam (Expanyolet) Bh Rp 165,000.00
20 Kunci Tanam Yale 1 x Putar Bh Rp 729,700.00
21 Kunci Tanam Yale 2 x Putar Bh Rp 275,000.00
22 Kunci Tanam Pintu 2 x Putar Besar Biasa Bh Rp 165,000.00
23 Kunci Tanam Pintu 2 x Putar kecil Biasa Bh Rp 110,000.00
24 Kunci Tanam Pintu 2 x Putar SES Bh Rp 321,900.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 24
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
25 Hak Angin Kecil Antik Bh Rp 55,000.00
26 Hak Angin Besar Bh Rp 44,000.00
Hak Angin Besar (Dumont) Bh Rp 74,800.00
27 Hak Angin Kecil Bh Rp 27,500.00
Hak Angin Kecil (Dumont) Bh Rp 122,300.00
28 Kait angin Jendela Alumunium Kualias 1 Bh Rp 17,300.00
Kait angin Jendela Alumunium (Dumont) Bh Rp 188,800.00
29 Kait angin Jendela Alumunium biasa Bh Rp 8,300.00
Kait angin Jendela Alumunium (Dumont) Bh Rp 101,800.00

H BAHAN KACA
1 Kaca Bening 3 mm M2 Rp 121,000.00
2 Kaca Bening 5 mm M2 Rp 148,500.00
3 Kaca Bening 6 mm M2 Rp 275,000.00
4 Kaca Bening 8 mm M2 Rp 363,000.00
5 Kaca Bening 10 mm M2 Rp 484,000.00
6 Kaca Ryben Tebal 5 mm M2 Rp 154,000.00
7 Kaca Ryben Tebal 6 mm M2 Rp 462,000.00
8 Kaca Ryben Tebal 3 mm M2 Rp 121,000.00
9 Kaca Ryben Tebal 8 mm M2 Rp 632,500.00
10 Kaca Ryben Tebal 10 mm M2 Rp 660,000.00
11 Jendela Nako (Rangka+ Kaca Tebal 5mm) 0,8 m x 0,2 m 4 lbr terpasang + Stand M2 Rp 59,400.00
12 Kaca Es Buram 5 mm/ 10 mm M2 Rp 264,000.00
13 Kaca Lembaran Bening Tidak Berwarna FL Tebal 2 MM M2 Rp 71,500.00
14 Kaca Lembaran Bening Tidak Berwarna FL Tebal 3 MM M2 Rp 170,500.00
15 Kaca Lembaran Bening Tidak Berwarna FL Tebal 5 MM M2 Rp 187,000.00
Ukuran (1221 x 153) Lembar Rp 203,500.00
Ukuran (200 x 90) Lembar Rp 203,500.00
Ukuran (200 x 100) Lembar Rp 236,500.00
Ukuran (213 x 122) Lembar Rp 297,000.00
Ukuran (183 x 122) Lembar Rp 236,500.00
Ukuran (244 x 183) Lembar Rp 533,500.00
Kaca Lembaran Bening Tidak Berwarna FL Tebal 10 MM M2 Rp 2,491,500.00
16 Kaca Bening 12 mm M2 Rp 522,500.00
I BAHAN SANITER / SALURAN AIR
1 Kloset Duduk Lengkap(putih) Tangki Batu American standart Unit Rp 1,650,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 25
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
2 Kloset Duduk Ex KIA Lengkap (warna) Tanhki Batu Unit Rp 2,530,000.00
3 Kloset Duduk ex TOTO Lengkap Accessories warna Putih Unit Rp 3,284,600.00
4 Kloset Duduk ex TOTO Lengkap Accessories warna gelap Unit Rp 2,970,000.00
5 Kloset Jongkok KIA Bh Rp 385,000.00
6 Kloset Jongkok Biasa (American Standar) Bh Rp 313,500.00
7 Wastafel polos / putih lengkap Bh Rp 715,000.00
8 Wastafel warna lengkap Bh Rp 726,000.00
9 Slypon Wastafel Biasa Bh Rp 385,000.00
10 Urinoir Polos /Putih American Standart Unit Rp 550,000.00
11 Urinoir ex TOTO (lengkap) Unit Rp 1,540,000.00
12 Bak Tube Fiber Biasa Bh Rp 247,500.00
13 Bak Tube Fiber ex TOTO Bh Rp 3,300,000.00
14 Tangki Air Fiberglass Kap 0,25 M3 Bh Rp 550,000.00
15 Tangki Air Fiberglass Kap 0,50 M3 Bh Rp 825,000.00
16 Tangki Air Fiberglass Kap 1 M3 Bh Rp 1,320,000.00
17 Tangki Air Alumunium Kap 1 M3 Bh Rp 3,685,000.00
18 Kran Air Kuningan DIA 3/4 Biasa Bh Rp 59,400.00
19 Kran Air Kuningan DIA 1/2 Biasa Bh Rp 44,000.00
20 Kran Air Vernrkel DIA 3/4 Biasa Bh Rp 44,000.00
21 Kran Air Antik DIA 1/2 Bh Rp 253,000.00
22 Bak Cuci Piring Stain -Kosong Tanpa Saluran Pembuangan & Kran Air Bh Rp 247,500.00
23 Kran air 2 / Biasa / bisa Bh Rp 121,000.00
24 Seal Tape Bh Rp 5,500.00
25 Bak Mandi Unit Rp 330,000.00
26 Kloset Jongkok Biasa Bh Rp 121,000.00
27 Wallpaper & Penutup Dinding Rol Rp 330,000.00
28 Foil (Kertas Alumunium Foil) M Rp 176,000.00
29 Kloset Duduk (Data) Bh Rp 495,000.00
30 Kloset Jongkok TOTO (Putih) Bh Rp 379,500.00
31 Toilet Portable Fiberglass 400 Liter Unit Rp 23,100,000.00
32 Toilet Portable Fiberglass 400 Liter Unit Rp 29,260,000.00

J BAHAN LANGIT-LANGIT
1 Teakwood 120 x 240 cm t.3mm Lembar Rp 220,000.00
2 Triplex 3 mm 120 x 240 cm Lembar Rp 55,000.00
3 Triplex 4 mm 120 x 240 cm Lembar Rp 66,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 26
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
4 Triplex 5 ml Lembar Rp 93,500.00
5 Triplex 6 mm 120 x 240 cm Lembar Rp 99,000.00
6 Triplex 7 ml Lembar Rp 148,500.00
7 Triplex 10 ml Lembar Rp 209,000.00
8 Triplex 15 ml Lembar Rp 242,000.00
9 Triplex 20 ml Lembar Rp 291,500.00
10 Triplex Ukuran Pintu Lembar Rp 137,500.00
11 Triplex Melamin 120 x 240 cm 3 mm Lembar Rp 121,000.00
12 Teakwood 120 x 240 cm t.4mm Lembar Rp 165,000.00
13 Multiplex 120 x 240 cm t. 6 mm Lembar Rp 77,000.00
14 Multiplex 120 x 240 cm t. 9 mm Lembar Rp 110,000.00
15 Multiplex 120 x 240 cm t. 12 mm Lembar Rp 181,500.00
16 Multiplex 120 x 240 cm t. 18 mm Lembar Rp 291,500.00
17 Gypsum Board 122x244x tebal 9 mm ex Jayaboard untuk Plafond Gpyro Lembar Rp 82,500.00
18 Kalsiboard tebal 3,5 mm Lembar Rp 74,800.00
19 Kalsiboard tebal 4,5 mm Lembar Rp 100,100.00
20 Kalsiboard tebal 6 mm Lembar Rp 139,700.00
21 Kalsiboard tebal 8 mm Lembar Rp 192,500.00
22 Kalsiboard tebal 10 mm Lembar Rp 245,300.00
23 Kalsiboard tebal 20 mm Lembar Rp 653,400.00
24 Kalsiplank 8mm (10cm x 3m) Lembar Rp 29,200.00
25 Kalsiplank 8mm (10cm x 3m) Polos Lembar Rp 49,000.00
26 Kalsiplank 8mm (20cm x 3m) Jati Lembar Rp 51,700.00
27 Kalsiplank 8mm (30cm x 3m) Polos Lembar Rp 72,600.00
28 Kalsiplank 8mm (30cm x 4m) Jati Lembar Rp 74,800.00
29 Kalsiplank 9mm (20cm x 4m) Polos Lembar Rp 70,400.00
30 Kalsiplank 9mm (20cm x 4m) Cedar Lembar Rp 73,700.00
31 Lambriziring t:4mm, (4m') Lembar Rp 49,500.00
32 HPL Lembar Rp 242,000.00
33 Les Kayu Profil Lebar 5 cm ( 4 M' ) Batang Rp 22,000.00
34 Les Kayu Profil Lebar 3 cm ( 4 M' ) Batang Rp 40,300.00
35 Les Kayu Profil Lebar 11/2 cm ( 4 M' ) Batang Rp 22,000.00
36 Les Kayu 1 x 10 x 400 cm Btg Rp 63,300.00
37 Les Kayu Profil 4 x 4 x 400 cm Btg Rp 35,000.00
38 Les Kayu Biasa 0,5 x 3 cm Btg Rp 78,300.00
39 Les Gypsum Polos Batang Rp 22,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 27
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
40 Les Gypsum Polos - Kecil M' Rp 11,000.00
41 Les Gypsum Motif - Kecil - lebar 7 cm/10 cm M' Rp 13,800.00
42 Les Gypsum - Sedang M' Rp 19,300.00
43 Les Gypsum - lebar 10 cm M' Rp 22,000.00
44 Les Gypsum - Besar - lebar 15 cm M' Rp 27,500.00
45 Les Gypsum Profil Batang Rp 27,800.00
46 Beding Gypsum - Kecil M' Rp 11,000.00
47 Beding Gypsum - Sedang M' Rp 16,500.00
48 Beding Gypsum - Besar M' Rp 27,500.00
K BAHAN LANTAI
1 Tegel PC 30 x30 cm Dos Rp 93,500.00
2 Tegel Motif 30 x30 cm Platinum Diego grey / brown 2 Dos Rp 101,200.00
3 Tegel Keramik Putih 10 x 20 cm Dos Rp 63,000.00
4 Tegel Keramik Putih 20 x 20 cm Dos Rp 63,800.00
5 Tegel Keramik Putih 20 x 25 cm Dos Rp 65,600.00
6 Tegel Keramik Putih 30 x 30 cm Dos Rp 54,700.00
7 Tegel Keramik Putih 40 x 40 cm (accura) Dos Rp 117,700.00
8 Tegel Keramik Putih 50 x 50 cm # Platinum (accura motif) Dos Rp 117,700.00
9 Tegel Keramik Putih 60 x 60 cm Ex Granito (granit sandimas mega white) Dos Rp 261,800.00
10 Tegel Keramik Putih 60 x 60 cm Ex Garuda Dos Rp 176,000.00
11 Tegel Keramik Putih 30 x 60 cm Ex Granito (granit eleganza new vorio) Dos Rp 290,300.00
12 Tegel Keramik Warna 60 x 60 cm Ex Granito Top Gress Top Gress Dos Rp 390,500.00
13 Tegel Keramik Warna 60 x 60 cm EX Garuda/Pangress Double wodding (sandimas) Dos Rp 192,500.00
14 Tegel Keramik warna 30 x 60 cm Ex Garuda /Roman (kwalitas LebihBagus) Dos Rp 324,500.00
15 Tegel Keramik Putih 30 x 60 cm Dos Rp 118,700.00
16 Tegel Keramik Warna 20 x 20 cm Dos Rp 96,800.00
17 Tegel Keramik Warna 30 x 30 cm Dos Rp 66,000.00
18 Tegel Keramik Warna 20 x 25 cm M2 Rp 63,800.00
19 Tegel Keramik Warna 40 x 40 cm M2 Rp 71,500.00
20 Tegel Keramik Warna 50 x 50 cm Dos Rp 125,400.00
21 Tegel Keramik Warna 60 x 60 cm Dos Rp 151,800.00
22 Tegel Keramik Warna 30 x 60 cm Dos Rp 220,000.00
23 Tegel Keramik Indogress - Homogeneus Tile Ukur. 60x60 cm (GNS Ruffian) Dos Rp 462,000.00
24 Tegel Keramik Indogress - Homogeneus Tile Ukur. 60x60 cm (Topaz) Dos Rp 350,900.00
25 Tegel Keramik Indogress - Homogeneus Tile Ukur. 60x60 cm (Cottonwood) Dos Rp 379,500.00
26 Granit Uku 60 x 160 x 185 cm Dasar Putih M2 Rp 1,333,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 28
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
27 Granit Uku 60 x 185 cm Dasar Hitam / 63 X 198 cm (sandimas 60x60) M2 Rp 880,000.00
28 Granit ukuran 30 x 30 cm Asia Tile Dos Rp 55,200.00
29 Granit ukuran 40 x 40 cm Granito Asia Tile Dos Rp 74,800.00
30 Granit ukuran 60 x 60 cm (sandimas) Dos Rp 198,000.00
31 Keramik WC 20 x 20 cm Dos Rp 68,200.00
32 Keramik WC 20 x 25 cm Dos Rp 66,000.00
33 Keramik WC 30 x 30 cm Asia Tile Dos Rp 63,800.00
34 Keramik uku 30 x 30 cm Dos Rp 551,100.00
35 Keramik uku 40 x 40 cm Dos Rp 66,000.00
36 Keramik Warna uk. 25 x 40 cm (accura) Dos Rp 84,700.00
37 Batu Alam 10 x 20 cm Polos M2 Rp 176,000.00
38 Batu Alam 20 x 20 cm Polos 10x30 cm M2 Rp 212,800.00
39 Batu Alam Motif Sirip/Garis-garis di pahat 10x30 cm / 1 20x40 cm M2 Rp 264,700.00
40 Batu Alam Motif Sirip/Garis-garis di pahat 20x40 cm Bj Rp 115,500.00
41 Batu Alam ukuran 10 x 20 cm Polos / 30 X 60 CM Polos M2 Rp 192,500.00
42 Marmer Ukuran Slabs(type Burito/acaro/Great I) / 100 x 100 cm Dos Rp 881,700.00
43 Marmer Ukuran Slabs(type Burito/acaro/Great II) Dos Rp 692,800.00
44 Marmer Ukuran Slabs(type Burito/acaro/Great III) Dos Rp 691,900.00
45 Marmer Ukuran 60 x 60 cm (Type Burito/Acaro/Great I) / cream urat kayu Dos Rp 660,000.00
46 Marmer Ukuran 60 x 60 cm (Type Burito/Acaro/Great II) Dos Rp 495,000.00
47 Marmer Ukuran 60 x 60 cm (Type Burito/Acaro/Great III) Dos Rp 377,900.00
48 Marmer Ukuran 30 x 30 cm (Type Burito/Acaro/Great I) Dos Rp 315,000.00
49 Marmer Ukuran 30 x 30 cm (Type Burito/Acaro/Great II) Dos Rp 264,600.00
50 Marmer Ukuran 30 x 30 cm (Type Burito/Acaro/Great III) Dos Rp 189,000.00
51 Ubin Lantai dari Tanah Liat diglazur Accura 40 x 40 cm M2 Rp 74,800.00
52 Ubin Lantai dari Tanah Liat diglazur KIA Polos 40 x 40 cm Dos Rp 80,600.00
53 Ubin Lantai dari Tanah Liat diglazur Keramik Merk Arwana M2 Rp 74,800.00
54 Ubin Lantai dari Tanah Liat diglazur Asiatile Kw 40 x40 cm M2 Rp 80,600.00
55 Ubin Lantai dari Tanah Liat diglazur Impresso uku. 40 x40 cm M2 Rp 74,800.00
56 Ubin Lantai dari Tanah Liat diglazur Masterina Polos uku. 30 x 30 cm M2 Rp 49,500.00
57 Ubin Lantai dari Tanah Liat diglazur Mulia KW 1 uku. 30 x 30 cm M2 Rp 49,500.00
58 Ubin Lantai dari Tanah Liat diglazur Kia Polos uku. 30 x 30 cm M2 Rp 51,900.00
59 Ubin Lantai dari Tanah Liat diglazur Asia Tile Kw 1 uku. 30 x 30 cm M2 Rp 57,600.00
60 Ubin Lantai dari Tanah Liat diglazur Impresso Kw 1 uku. 30 x 30 cm M2 Rp 55,300.00
61 Ubin Lantai dari Tanah Liat diglazur Accura Kw 1 uku. 30 x 30 cm M2 Rp 51,900.00
62 Ubin Lantai dari Tanah Liat diglazur Masterina Kw 1 uku. 30 x 30 cm M2 Rp 48,300.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 29
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
63 Ubin Lantai dari Tanah Liat diglazur Mulia Kw 1 uku. 30 x 30 cm M2 Rp 55,300.00

L BAHAN LAIN-LAIN
1 Paving Blok Segi Empat 6 cm ( K 225 ) M2 Rp 72,400.00
2 Paving Blok Segi Empat 6 cm ( K 250 ) Standar M2 Rp 75,600.00
3 Paving Blok Segi Empat 6 cm ( K 250 ) Warna M2 Rp 154,000.00
4 Paving Blok Segi Empat 6 cm ( K 300 ) Standar M2 Rp 77,800.00
5 Paving Blok Segi Empat 6 cm ( K 300 ) Warna M2 Rp 165,000.00
6 Paving Blok Segi Empat 8 cm ( K 225 ) Standar M2 Rp 92,300.00
7 Paving Blok Segi Empat 8 cm ( K 225 ) Warna M2 Rp 141,900.00
8 Paving Blok Segi Empat 8 cm ( K 250 ) Standar M2 Rp 96,700.00
9 Paving Blok Segi Empat 8 cm ( K 250 ) Warna M2 Rp 186,100.00
10 Paving Blok Segi Empat 8 cm ( K 300 ) Standar M2 Rp 99,300.00
11 Paving Blok Segi Empat 8 cm ( K 300 ) Warna M2 Rp 198,600.00
12 Paving Blok Segi Empat 8 cm ( K 400 ) Standar M2 Rp 107,600.00
13 Paving Blok Segi Empat 8 cm ( K 400 ) Warna M2 Rp 190,300.00
14 Paving Blok Segi Empat 10 cm ( K 300 ) Standar M2 Rp 141,600.00
15 Paving Blok Segi Empat 10 cm ( K 300 ) Warna M2 Rp 197,500.00
16 Paving Blok Segi Empat 10 cm ( K 400 ) Standar M2 Rp 149,400.00
17 Paving Blok Segi Empat 10 cm ( K 400 ) Warna M2 Rp 216,700.00
18 Paving Blok SegiTiga Uskup 6 cm Biji Rp 6,900.00
19 Paving Blok SegiTiga Uskup 8 cm Biji Rp 7,500.00
20 Paving Blok Segi Enam 8 cm ( K 225 ) Standar M2 Rp 96,500.00
21 Paving Blok Segi Enam 8 cm ( K 225 ) Warna M2 Rp 146,100.00
22 Paving Blok Segi Enam 8 cm ( K 300 ) Standar M2 Rp 103,400.00
23 Paving Blok Segi Enam 8 cm ( K 300 ) Warna M2 Rp 173,800.00
24 Paving Blok Segi Enam 8 cm ( K 400 ) Standar M2 Rp 111,800.00
25 Paving Blok Segi Enam 8 cm ( K 400 ) Warna M2 Rp 192,500.00
26 Paving Kombinasi 6 cm ( K 300 ) M2 Rp 105,100.00
27 Paving 20 x 20 8 cm ( K 300 ) M2 Rp 117,700.00
28 1 tegel pedestrian untuk pengarah difabel 30 x 30 Buah Rp 28,900.00
29 Paving Ubin Motif Balok P28 Cm, L 28 Cm, T 7 Cm Standar Buah Rp 18,100.00
30 Paving Ubin Motif Balok P28 Cm, L 28 Cm, T 7 Cm Merah/ Hitam Buah Rp 22,900.00
31 Paving Ubin Motif Balok P28 Cm, L 28 Cm, T 7 Cm Kuning/Hijau/coklat Buah Rp 25,300.00
32 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Standar Buah Rp 18,100.00
33 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Merah/ Hitam Buah Rp 22,900.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 30
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
34 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Kuning/Hijau/coklat Buah Rp 25,300.00
35 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Standar Buah Rp 18,100.00
36 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Merah/ Hitam Buah Rp 22,900.00
37 Paving Ubin Motif Bulat Coin P28 Cm, L 28 Cm, T 7 Cm Kuning/Hijau/coklat Buah Rp 25,300.00
38 Grass Block 8 cm Standar Bj Rp 33,800.00
39 Kanstin Type Segi 10-15 x 3 0 x 40 cm - 2,5 Bh/M' M' Rp 96,200.00
40 Kanstin Type Kotak 10 x 2 0 x 40 cm - 2,5 Bh/M' M' Rp 84,200.00
41 Kanstin Type Kotak 10 x 2 5 x 50 cm - 2 Bh/M' M' Rp 103,000.00
42 Kanstin Pracetak 60 x 25 x 15 cm Buah Rp 62,300.00
43 Kanstin Pracetak Segitiga 40 x 20 x 10 cm Buah Rp 31,600.00
44 Kanstin Pracetak 15 x 20 x 40 cm Buah Rp 24,200.00
45 Kanstin Pracetak 15 x 25 x 40 cm Buah Rp 40,100.00
46 Kanstin Pracetak 15 x 30 x 40 cm Buah Rp 40,100.00
47 Kanstin Pracetak 15 x 30 x 50 cm 15x25x50cm Buah Rp 34,100.00
48 Kanstin Pracetak 12 x 25 x 40 cm Buah Rp 44,200.00
49 Kanstin Pracetak 25 x 30 x 50 cm 20x30x50cm Buah Rp 49,500.00
50 Kanstin Pracetak 22 x 25 x 60 cm Buah Rp 63,100.00
51 U-Ditch K350 kg/cm2
B400 x H600 x L1200; tebal = 50 mm Buah Rp 502,000.00
B500 x H600 x L1200; tebal = 70 mm Buah Rp 548,000.00
B500 x H700 x L1200; tebal = 70 mm Buah Rp 646,000.00
B600 x H400 x L1200; tebal = 70 mm Buah Rp 448,000.00
B600 x H600 x L1200; tebal = 70 mm Buah Rp 558,000.00
B600 x H700 x L1200; tebal = 70 mm Buah Rp 686,000.00
B600 x H800 x L1200; tebal = 70 mm Buah Rp 746,000.00
B800 x H800 x L1200; tebal = 70 mm Buah Rp 809,000.00
B800 x H1000 x L1200; tebal = 70 mm Buah Rp 1,114,000.00
B1000 x H800 x L1200; tebal = 100 mm Buah Rp 1,267,000.00
B1000 x H1000 x L1200; tebal = 100 mm Buah Rp 1,415,000.00
B1000 x H1200 x L1200; tebal = 100 mm Buah Rp 1,837,000.00

52 Cover U-Ditch K-350 kg/cm2


B600 x L600; tebal = 140 mm Buah Rp 335,000.00
B800 x L600; tebal = 140 mm Rp 502,000.00
B1000 x L600; tebal = 200 mm Rp 713,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 31
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
53 Box Culvert
B400 x H400 x L1200; (K350) Rp 1,834,000.00
B500 x H500 x L1200; (K350) Rp 2,216,000.00
B600 x H600 x L1200; (K350) Rp 2,523,000.00
B800 x H800 x L1200; (K350) Rp 3,084,000.00
B1500 x H1500 x L1200; (K400) Rp 10,532,000.00
B2000 x H2000 x L1000; (K400) Rp 20,191,000.00
B3000 x H3500 x L2000; tebal - 250 mm (K500) Rp 44,000,000.00

54 Gutter Crub 2.5 Bh/M' M' Rp 126,000.00


55 Topi Uskup T = 6 cm M' Rp 14,900.00
56 Topi Uskup T = 8 cm 3 Bh/M' M' Rp 16,500.00
57 Tali Nilon Kg Rp 5,500.00
58 Aspal Emulsi Kg Rp 16,400.00
59 Aspal Bitumen Kg Rp 16,400.00
60 Aspal Curah (ton) Kg Rp 16,400.00
61 Aspal Drum 1 Drum. 155 kg / Drum kg Rp 1,375,000.00
62 Aspal cement Kg Rp 16,400.00
63 B.0 M3 Rp 671,000.00
64 Solar Non Industri Ltr Rp 5,700.00
65 Solar Industri Ltr Rp 9,400.00
66 Minyak Pelumas Ltr Rp 44,000.00
67 Bensin Ltr Rp 7,100.00
68 Minyak bakesting Ltr Rp 26,400.00
69 Mortar M3 Rp 792,000.00
70 Filler/abu batu M3 M3 Rp 258,500.00
71 Kerosen/Minyak Tanah Ltr Rp 14,300.00
72 Beton Mutu K500 M3 Rp 1,166,000.00
73 Beton Mutu K450 M2 Rp 1,105,500.00
74 Beton Mutu K400 M3 Rp 1,050,500.00
75 Beton Mutu K350 M3 Rp 1,006,500.00
76 Beton Mutu K300 M3 Rp 957,000.00
77 Beton Mutu K275 M3 Rp 880,000.00
78 Beton Mutu K 250 M3 Rp 869,000.00
79 Beton Mutu K 225 M3 Rp 836,000.00
80 Beton Mutu K175 M3 Rp 786,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 32
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
81 Beton Mutu K125 M3 Rp 704,000.00
82 Box Culvert L 40 Cm, T 50 Cm, P 100 Cm Tebal : 13 cm Besi Single Buah Rp 1,157,800.00
83 Box Culvert L 40 Cm, T 50 Cm, P 100 Cm Tebal : 13 cm Besi Double Buah Rp 1,448,500.00
84 Box Culvert L 50 Cm, T 50 Cm, P 100 Cm Tebal : 14 cm Besi Single Buah Rp 1,351,900.00
85 Box Culvert L 50 Cm, T 50 Cm, P 100 Cm Tebal : 14 cm Besi Double Buah Rp 1,496,000.00
86 Box Culvert L 60 Cm, T 60 Cm, P 100 Cm Tebal : 15 cm 5 TON Besi Single Buah Rp 1,938,200.00
87 Box Culvert L 60 Cm, T 60 Cm, P 100 Cm Tebal : 15 cm Besi Double Buah Rp 1,540,000.00
88 Box Culvert L 80 Cm, T 80 Cm, P 100 Cm Tebal : 16 cm 5 TON Besi Single Buah Rp 4,088,700.00
89 Box Culvert L 200 Cm, T 200 Cm, P 100 Cm Tebal : 25 cm 5 TON Besi Single Buah Rp 11,105,600.00
90 Box Culvert L 200 Cm, T 200 Cm, P 100 Cm Tebal : 25 cm Besi Double Buah Rp 10,920,300.00
91 Deuker T 6 cm, L 60 cm M' Rp 151,400.00
92 Deuker T 6 cm, L 80 cm M' Rp 223,700.00
93 Deuker T 10 cm, L 60 cm M' Rp 257,700.00
94 Deuker T 10 cm, L 80 cm M' Rp 193,300.00
95 Deuker T 12 cm, L 60 cm M' Rp 222,700.00
96 Deuker T 12 cm, L 80 cm M' Rp 296,900.00
97 Deuker T 15 cm, L 60 cm M' Rp 396,800.00
98 Deuker T 15 cm, L 80 cm M' Rp 529,000.00
99 Sewa C. Pump Standard M3 Rp 64,900.00
100 Sewa C. Pump Long Boom M3 Rp 137,500.00
101 Plastik Untuk Beton L.1M P. 40 M =65.000/ L.1,20M P.25 M = 100.000 M2 Rp 2,000.00
102 Kantung Plastik Uk 46 Isi 50 Bungkus Rp 110,000.00
103 Kantung Plastik Uk 15 Isi 10 Ikat Rp 22,000.00
104 Aspal (Asphal grade 60/70) Drum Rp 12,100,000.00
105 Aspal (curah grade 60/70 Lokal) 6 drum 1 Ton Rp 8,250,000.00
106 Exkontainer (Peti Kemas) Ukuran 20 Feet Kondisi 80 % Buah Rp 33,000,000.00
107 Exkontainer (Peti Kemas) Ukuran 40 Feet Kondisi 80 % Buah Rp 49,500,000.00
U-Ditch (ukuran lain)
111 B600 x H400 x L1200 ; tebal = 70 mm 1.2 M Berat 0,360 ton Buah Rp 641,600.00
112 B600 x H500 x L1200 ; tebal = 70 mm 1.2 M Berat 0,400 ton Buah Rp 705,300.00
113 B600 x H600 x L1200 ; tebal = 70 mm 1.2 M Berat 0,440 ton Buah Rp 1,083,500.00
114 B600 x H700 x L1200 ; tebal = 70 mm 1.2 M Berat 0,490 ton Buah Rp 1,182,500.00
115 B600 x H800 x L1200 ; tebal = 70 mm 1.2 M Berat 0,530 ton Buah Rp 1,280,400.00
116 B800 x B600 x L1200 ; tebal = 70 mm 1.2 M Berat 0,490 ton Buah Rp 981,000.00
117 B800 x B700 x L1200 ; tebal = 70 mm 1.2 M Berat 0,540 ton Buah Rp 1,048,900.00
118 B800 x B800 x L1200 ; tebal = 70 mm 1.2 M Berat 0,580 ton Buah Rp 1,665,400.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 33
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
119 B800 x B1000 x L1200 ; tebal = 70 mm 1.2 M Berat 0,670 ton Buah Rp 1,910,700.00
120 B1000 x H800 x L1200 ; tebal =100 mm 1.2 M Berat 0,980 ton Buah Rp 1,702,800.00
121 B1000 x H1000 x L1200 ; tebal =100 mm 1.2 M Berat 1,090 ton Buah Rp 2,718,100.00
Tutup U-Ditch
122 B600 x L600 : Tebal = 70 mm 0,6 M Berat 0,063 Ton Buah Rp 238,400.00
123 B800 x L600 : Tebal = 70 mm 0,6 M Berat 0,084 Ton Buah Rp 287,300.00
124 B1000 x L600 : Tebal = 100 mm 0,6 M Berat 0,150 Ton Buah Rp 365,900.00
B500 x H500 x L1000 : Tebal = 80 mm 1 M Berat 0,468 Buah Rp 1,380,000.00
RC Panel / Pagar Beton
125 Column Precast Kolom 200 x 200 x 4000 4 M Berat 0,400 Ton Buah Rp 495,000.00
126 Wall Precast / Dinding 80 x 2920 x 450 2,9 M Berat 0,260 Ton Buah Rp 509,900.00
127 Paving Blok Segi Empat Ukuran P 21 cm L.10,5 cm 6 cm K 400 M2 Rp 72,500.00
128 Paving Blok Segi Empat Ukuran P 21 cm L.10,5 cm 8 cm K 400 M2 Rp 89,800.00
129 Paving Blok Segi Empat Ukuran P 21 cm L.10,5 cm 10 cm K 400 M2 Rp 158,700.00
130 Hexagon (Segi Enam) Ukuran 6 cm M2 Rp 31,200.00
131 Urug (terima jadi) Ukuran 8 cm M2 Rp 42,400.00
132 Pemasangan M2 Rp 16,500.00

M ALAT BANTU PEMELIHARAAN


1 Sekop Bh Rp 71,500.00
2 Gerobak Dorong Artco Bh Rp 572,000.00
3 Betel Bh Rp 33,000.00
4 Palu Bh Rp 77,000.00
5 Sendok Semen Bh Rp 27,500.00
6 Sikat Baja Bh Rp 16,500.00
7 Cerek Aspal Bh Rp 137,500.00
8 Garu Bh Rp 16,500.00
9 Sapu Lidi Bh Rp 5,500.00
10 Drum Pemasak Aspal Bh Rp 192,500.00
11 Kayu Bakar M3 Rp 60,000.00
12 Cangkul Bh Rp 66,000.00
13 Gergaji Kayu Cap Mata Unit Rp 93,500.00
14 Sekop Sampah Merk VTR Unit Rp 8,300.00
15 Sekop Cap Mata Bh Rp 91,300.00
16 Palu / Martil Uk. 1,5 inci Bh Rp 60,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 34
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
N BAHAN PIPA DAN SUMUR BOR
1.A PIPA PRALON PVC 1/2 Inci -4M Batang Rp 27,500.00
( SII ) 3/4 Inci -4M Batang Rp 35,800.00
1 Inci -4M Batang Rp 46,800.00
1 1/4 Inci - 4 M Batang Rp 63,300.00
1 1/2 Inci - 4 M Batang Rp 52,800.00
2 Inci -4M Batang Rp 81,400.00
2 1/2 Inci - 4 M Batang Rp 99,000.00
3 Inci -4M Batang Rp 121,000.00

1.B. PIPA PRALON uPVC 1/2 " -6M S - 10 Batang Rp 27,500.00


3/4 " -6M S - 10 Batang Rp 49,500.00
1" -6M S - 10 Batang Rp 74,300.00
1 1/4 " -6M S - 10 Batang Rp 111,100.00
1 1/2 " -6M S - 10 Batang Rp 275,000.00
2" -6M S - 10 Batang Rp 269,500.00
3" -6M S - 10 Batang Rp 552,800.00
3" -6M S - 12.5 Batang Rp 451,000.00
4" -6M S - 12.5 Batang Rp 665,500.00

2 1/2 " -6M S - 10 Batang Rp 385,000.00


S - 10 Batang Rp 409,200.00
S - 12.5 Batang Rp 313,500.00
S - 12.5 Batang Rp 338,300.00

3" -6M S - 10 Batang Rp 577,500.00


S - 10 Batang Rp 572,000.00
S - 12.5 Batang Rp 501,100.00
S - 12.5 Batang Rp 467,500.00

4" -6M S - 10 Batang Rp 341,000.00


S - 10 Batang Rp 831,900.00
S - 12.5 Batang Rp 753,500.00
S - 12.5 Batang Rp 673,800.00

1C Pipa SUPRALON PVC 1/2" -6M S-8 Batang Rp 22,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 35
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
S - 10 MOF Batang Rp 27,500.00
S - 12,5 MOF Batang Rp 22,600.00

3/4" -6M S-8 Batang Rp 33,000.00


S - 10 MOF Batang Rp 40,700.00
S - 12,5 MOF Batang Rp 38,500.00

1" -6M S-8 Batang Rp 60,500.00


S - 10 MOF Batang Rp 71,500.00
S - 10 Batang Rp 39,100.00

-6M S-8 Batang Rp 95,700.00


S - 10 MOF Batang Rp 77,000.00
S - 12,5 Batang Rp 69,900.00

1 1/2" -6M S-8 Batang Rp 148,500.00


S - 10 MOF Batang Rp 170,500.00
S - 12,5 MOF Batang Rp 140,300.00
S - 16 Batang Rp 121,000.00

2" -6M S-8 Batang Rp 242,000.00


S - 10 MOF Batang Rp 249,700.00
S - 10 RR Batang Rp 269,500.00
S - 12,5 MOF Batang Rp 203,500.00
S - 12,5 RR Batang Rp 225,500.00
S - 16 Batang Rp 181,500.00

2 1/2" -6M S-8 Batang Rp 338,300.00


S-8 Batang Rp 379,500.00
S - 10 MOF Batang Rp 357,500.00
S - 10 RR Batang Rp 379,500.00
S - 12,5 MOF Batang Rp 289,900.00
S - 12,5 RR Batang Rp 319,000.00
S - 16 Batang Rp 247,500.00
S - 16 Batang Rp 270,100.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 36
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
3" -6M S-8 Batang Rp 478,500.00
S-8 Batang Rp 509,300.00
S - 10 MOF Batang Rp 330,000.00
S - 10 RR Batang Rp 363,000.00
S - 12,5 MOF Batang Rp 264,000.00
S - 12,5 RR Batang Rp 286,000.00
S - 16 Batang Rp 350,400.00
S - 16 Batang Rp 385,600.00

4" -6M S-8 Batang Rp 723,800.00


S-8 Batang Rp 756,800.00
S - 10 MOF Batang Rp 522,500.00
S - 10 RR Batang Rp 561,000.00
S - 12,5 MOF Batang Rp 396,000.00
S - 12,5 RR Batang Rp 423,500.00
S - 16 Batang Rp 528,000.00
S - 16 Batang Rp 561,000.00

1D Pipa MASPION PVC 3/8 " S - 6,3 M' Rp 11,000.00


S-8 M' Rp 8,800.00
S - 10 M' Rp 8,300.00
S - 12,5 M' Rp 5,500.00

1/2" S - 6,3 M' Rp 16,500.00


S-8 M' Rp 9,400.00
S - 10 M' Rp 8,300.00
-6M S - 12,5 M' Rp 6,600.00

3/4" S - 6,3 M' Rp 16,500.00


S-8 M' Rp 11,000.00
S - 10 M' Rp 8,300.00
-6M S - 12,5 M' Rp 13,800.00

1" S - 6,3 M' Rp 22,600.00


S-8 M' Rp 19,800.00
S - 10 M' Rp 16,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 37
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
S - 10 M' Rp 10,500.00
-6M S - 10 Mof M' Rp 11,000.00

1 1/4" S - 6,3 M' Rp 44,600.00


S-8 M' Rp 33,000.00
S - 10 M' Rp 17,100.00
-6M S - 10 Mof M' Rp 14,900.00
S - 12,5 M' Rp 22,000.00

1 1/2" S - 6,3 M' Rp 57,800.00


S-8 M' Rp 41,300.00
S - 10 M' Rp 22,000.00
-6M S - 10 Mof M' Rp 20,400.00
S - 12,5 M' Rp 33,000.00
-6M S - 12,5 Mof M' Rp 24,800.00
S - 16 M' Rp 27,500.00

2" S-8 M' Rp 71,500.00


S-8 M' Rp 66,000.00
S - 10 M' Rp 24,800.00
-6M S - 10 Mof M' Rp 44,600.00
S - 10 M' Rp 250,300.00
-6M S - 10 RR M' Rp 38,500.00
S - 12,5 M' Rp 25,900.00
-6M S - 12,5 Mof M' Rp 46,800.00

2 1/2" S-8 M' Rp 93,500.00


S-8 M' Rp 96,300.00
S - 10 M' Rp 71,500.00
-6M S - 10 Mof M' Rp 55,600.00
S - 10 M' Rp 88,000.00
-6M S - 10 RR M' Rp 52,300.00
S - 12,5 M' Rp 55,000.00
-6M S - 12,5 Mof M' Rp 39,100.00
S - 12,5 M' Rp 66,000.00
-6M S - 12,5 RR M' Rp 44,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 38
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
S - 16 M' Rp 61,100.00
S - 16 M' Rp 46,800.00

3" S-8 M' Rp 121,600.00


S-8 M' Rp 132,000.00
S - 10 M' Rp 1,050,500.00
-6M S - 10 Mof M' Rp 46,800.00
S - 10 M' Rp 126,500.00
-6M S - 10 RR M' Rp 258,500.00
S - 12,5 M' Rp 74,300.00
-6M S - 12,5 M' Rp 90,800.00
-6M S - 12,5 RR M' Rp 60,500.00
S - 16 M' Rp 74,300.00
S - 16 M' Rp 88,000.00

4" S-8 M' Rp 200,200.00


S-8 M' Rp 187,000.00
S - 10 M' Rp 96,300.00
-6M S - 10 Mof M' Rp 63,800.00
S - 10 M' Rp 165,600.00
-6M S - 10 RR M' Rp 71,500.00
S - 12,5 M' Rp 127,100.00
-6M S - 12,5 Mof M' Rp 55,000.00
S - 12,5 M' Rp 129,300.00
-6M S - 12,5 RR M' Rp 374,000.00
S - 16 M' Rp 107,800.00
S - 16 M' Rp 121,600.00

5" -6M S - 10 Mof M' Rp 165,000.00


-6M S - 10 RR M' Rp 163,400.00

6" -6M S - 10 Mof M' Rp 165,000.00


-6M S - 10 RR M' Rp 220,600.00
-6M S - 12,5 RR M' Rp 162,300.00

8" -6M S - 10 Mof M' Rp 330,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 39
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
-6M S - 10 RR M' Rp 336,100.00
-6M S - 12,5 Mof M' Rp 269,500.00
-6M S - 12,5 RR M' Rp 239,300.00

10" -6M S - 10 Mof M' Rp 515,400.00


-6M S - 10 RR M' Rp 537,400.00
-6M S - 12,5 Mof M' Rp 426,800.00
-6M S - 12,5 RR M' Rp 352,000.00

12" -6M S - 10 Mof M' Rp 825,000.00


-6M S - 10 RR M' Rp 847,000.00
-6M S - 12,5 Mof M' Rp 673,800.00

14" -6M S - 10 RR M' Rp 1,098,300.00


-6M S - 12,5 RR M' Rp 658,300.00

16" -6M S - 10 RR M' Rp 1,396,500.00


-6M S - 12,5 RR M' Rp 868,500.00

18" -6M S - 10 RR M' Rp 1,749,000.00


-6M S - 12,5 RR 6M' Rp 1,089,000.00

20" -6M S - 10 RR M' Rp 2,310,600.00


-6M S - 12,5 RR M' Rp 1,430,600.00

24" -6M S - 10 RR M' Rp 2,172,500.00


-6M S - 12,5 RR M' Rp 2,167,600.00

28" -6M S - 12,5 RR M' Rp 3,168,600.00

1 E Pipa Wavin SNI Wavinsafe 1/2" -4M S - 10 / 10 Bar (1,0 Mpa ) Batang Rp 27,000.00
3/4" -4M S - 10 / 10 Bar (1,0 Mpa ) Batang Rp 38,000.00
1" -4M S - 10 / 10 Bar (1,0 Mpa ) Batang Rp 49,500.00
11/4" -4M S - 10 / 10 Bar (1,0 Mpa ) Batang Rp 71,800.00
11/2" -6M S - 10 / 10 Bar (1,0 Mpa ) Batang Rp 123,200.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 40
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
2" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 195,800.00
3" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 393,800.00
4" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 616,000.00
6" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 1,265,000.00

2" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 157,900.00


3" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 328,400.00
4" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 484,000.00
6" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 1,034,000.00

11/2" -6M S - 12,5 / 8 Bar (0,8 Mpa ) Batang Rp 107,800.00

1F Pipa Wavin SNI Wavinlok 2" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 194,200.00
3" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 414,200.00
4" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 623,200.00
6" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 1,294,200.00
8" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 1,998,200.00
10" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 3,099,800.00
12" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 4,936,800.00
16" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 8,126,800.00
20" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 12,669,800.00
24" -6M S - 10 / 12,5 Bar (12,5 Mpa ) Batang Rp 20,955,000.00

2" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 162,800.00


3" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 349,800.00
4" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 492,800.00
6" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 1,064,800.00
8" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 1,625,800.00
10" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 2,549,800.00
12" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 4,056,800.00
16" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 6,502,100.00
20" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 10,183,800.00
24" -6M S - 12,5 / 10 Bar (1,0 Mpa ) Batang Rp 17,008,200.00

1G Pipa GIP ( Galvanis ) 1/2" -6M Batang Rp 192,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 41
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
Med.A Super sni 3/4" -6M Batang Rp 242,000.00
1" -6M Batang Rp 374,000.00
1 1/4" -6M Batang Rp 473,000.00
1 1/2" -6M Batang Rp 550,000.00
2" -6M Batang Rp 742,500.00
21/2" -6M Batang Rp 962,500.00
3" -6M Batang Rp 1,265,000.00
4" -6M Batang Rp 1,980,000.00
5" -6M Batang Rp 1,820,500.00
6" -6M Batang Rp 2,037,200.00
8" -6M Batang Rp 3,140,500.00
10" -6M Batang Rp 6,110,500.00
12" -6M Batang Rp 7,826,500.00
16" -6M Batang Rp 12,237,500.00

1H Pipa GIP ( Galvanis ) 1/2" -6M Batang Rp 143,000.00


Med.A 3/4" -6M Batang Rp 187,000.00
1" -6M Batang Rp 242,000.00
1 1/4" -6M Batang Rp 308,000.00
1 1/2" -6M Batang Rp 357,500.00
2" -6M Batang Rp 440,000.00
21/2" -6M Batang Rp 561,000.00
3" -6M Batang Rp 715,000.00
4" -6M Batang Rp 935,000.00

1I Pipa GIP ( Galvanis ) 1/2" -6M Batang Rp 93,500.00


Med.B 3/4" -6M Batang Rp 121,000.00
1" -6M Batang Rp 192,500.00
1 1/4" -6M Batang Rp 220,000.00
1 1/2" -6M Batang Rp 242,000.00
2" -6M Batang Rp 275,000.00
21/2" -6M Batang Rp 357,500.00
3" -6M Batang Rp 467,500.00
4" -6M Batang Rp 605,000.00

1J Pipa PE 100 1 1/2" -6M SDR 17 PN 14 Batang Rp 30,800.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 42
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
2" -6M SDR 17 PN 15 Batang Rp 49,500.00
21/2" -6M SDR 17 PN 16 Batang Rp 69,300.00
3" -6M SDR 17 PN 17 Batang Rp 101,800.00

2 JENIS "D" UNTUK SALURAN 3/4" -4M Batang Rp 27,500.00


PEMBUANGAN AIR 1" -4M Batang Rp 35,800.00
1 1/2" -4M Batang Rp 38,500.00
2" -4M Batang Rp 44,000.00
21/2" -4M Batang Rp 58,300.00
3" -4M Batang Rp 77,000.00
4" -4M Batang Rp 121,000.00
5" -4M Batang Rp 198,000.00
6" -4M Batang Rp 253,000.00
8" -4M Batang Rp 467,500.00
10" -4M Batang Rp 770,000.00

3 PIPA JENIS "C' UNTUK 5/8 Inci -4M Batang Rp 16,500.00


INSTALASI LISTRIK 3/4 Inci -4M Batang Rp 19,300.00
PIPA PVC 1/2" (M.P.) Batang Rp 33,600.00
PIPA PVC 3/4 " (Maspion) Batang Rp 40,700.00
PIPA PVC 1 " Batang Rp 49,500.00
PIPA PVC 2 " M' Rp 68,800.00
PIPA PVC 2 1/2 M' Rp 88,000.00
PIPA PVC Wavin Kual D(4"x 4 M) Batang Rp 137,500.00
PIPA PVC Winlon Kual D (4"'x 4 M) Batang Rp 148,500.00
PIPA PVC vinilon Kual D (4'' x 4 M) Batang Rp 137,500.00
PIPA PVC Maspion Kual D ( 4"x 4 M) Batang Rp 253,000.00
Plastik Lembaran dari Polimer Etilena (Polos Lebar 1 M) M' Rp 374,000.00
Pipa PVC Wavin Kual D (4 x 4 M) Batang Rp 183,700.00
Pipa PVC Maspion Kual AW ( 4 x 4 M) Batang Rp 456,500.00
Pipa PVC Maspion Kual D( 4 x 4 M) Batang Rp 226,100.00
Pipa PVC Wavin AW ( 4 x 4 M) Batang Rp 352,000.00
Pipa PVC Wavin Kual D (4 x 4 M) Batang Rp 148,500.00
Pipa PVC Maspion Kual (4 x 4 M) Batang Rp 187,000.00
Pipa PVC Pravilon 4 Inci Batang Rp 41,300.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 43
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
Pipa PVC Pravilon End 6 Mi Batang Rp 46,800.00

4 PIPA PVC KLAS B ( PIPA LIMBAH ) SUPRALON


Pipa PVC Klas B RRJ 2" 6M Batang Rp 214,500.00
Pipa PVC Klas B RRJ 3" 6M Batang Rp 302,500.00
Pipa PVC Klas B RRJ 4" 6M Batang Rp 383,400.00

5 AKSESORIS UNTUK PIPA KELAS B SUPRALON


Elbow RRJ 90 2" Bh Rp 41,300.00
Elbow RRJ 90 3" Bh Rp 5,300.00
Elbow RRJ 90 4" Bh Rp 82,500.00
Tee RRJ 2" Bh Rp 53,400.00
Tee RRJ 3" Bh Rp 57,800.00
Tee RRJ 4" Bh Rp 121,000.00
Endcap/ Dop 2" Bh Rp 31,400.00
Endcap/ Dop 3" Bh Rp 52,300.00
Endcap/ Dop 4" Bh Rp 53,400.00

6 Pipa Beton
ᶲ 40 Panjang 110 cm, tebal 7 cm NRCP Pcs Rp 253,000.00
ᶲ 40 Panjang 110 cm, tebal 7 cm RCP Pcs Rp 324,500.00
ᶲ 60 Panjang 110 cm, tebal 8 cm NRCP Pcs Rp 409,200.00
ᶲ 60 Panjang 110 cm, tebal 8 cm RCP Pcs Rp 542,300.00
ᶲ 80 Panjang 110 cm, tebal 9 cm NRCP Pcs Rp 585,200.00
ᶲ 80 Panjang 110 cm, tebal 9 cm RCP Pcs Rp 810,700.00
ᶲ 100 Panjang 110 cm, tebal 10 cm NRCP Pcs Rp 891,000.00
ᶲ 100 Panjang 110 cm, tebal 10 cm RCP Pcs Rp 1,331,000.00

7 Pipa Instalasi 5/8 Batang Rp 14,900.00


8 Pipa Listrik 5/8 Batang Rp 11,000.00
9 Sambungan Pipa Lurus 1/2 Bh Rp 13,200.00
10 Sambungan Pipa L 1/2 Bh Rp 3,300.00
11 Sambungan Pipa Besi 3/4"T Bh Rp 27,500.00
12 Knee 3/4" Bh Rp 17,100.00
13 Knee 1" Bh Rp 19,300.00
14 Knee PVC Diameter 2" Bh Rp 16,500.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 44
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
15 Saringan Pasir M' Rp 30,300.00
16 Saringan Kotoran Bh Rp 27,500.00
17 Saringan Kotoran Kamar Mandi - Bahan Plastik (Floor Drain) Bh Rp 16,500.00
18 Saringan Kotoran Kamar Mandi - Bahan Besi/Kuningan (Floor Drain) Bh Rp 30,300.00
19 Lem FOX Kg Rp 49,500.00
20 Lem Pipa PVC Tube Rp 19,300.00
21 Lem Pipa PVC Kg Rp 79,800.00
22 Lem Besi - kw 1 Tube Rp 38,500.00
23 Lem Besi - biasa Tube Rp 27,500.00
24 Talang PVC Meter Rp 126,500.00
25 Double Nipple GIV 1/2" Buah Rp 8,300.00
26 Double Nipple GIV 3/4" Buah Rp 16,500.00
27 Double Nipple 4" Buah Rp 148,500.00
28 Doubble Nipple 2" Buah Rp 44,600.00
29 Dop PVC 3/4" Buah Rp 3,900.00
30 Dop PVC 1" Buah Rp 8,300.00
31 Dop PVC 2" Buah Rp 16,500.00
32 Dop PVC 4" Buah Rp 30,300.00
33 Elbow GIV 3/4" Buah Rp 22,000.00
34 Elbow GIV 2" Buah Rp 83,100.00

O DAFTAR HARGA UNTUK PIPA DAN ALAT BANTU BESI


1 KNEE BESI 1/2" Buah Rp 11,600.00
3/4" Buah Rp 11,000.00
1" Buah Rp 17,100.00

2 PIPA BESI MEDIUM A. SUPER 1/2" Batang Rp 194,200.00


3/4" Batang Rp 216,200.00
1" Batang Rp 359,200.00
2' Batang Rp 62,200.00
3" Batang Rp 1,338,200.00
4" Batang Rp 1,745,200.00

3 PIPA GALVANISIR A. SUPER 1/2" Batang Rp 159,500.00


3/4" Batang Rp 203,500.00
1" Batang Rp 330,000.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 45
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
2' Batang Rp 688,100.00

4 STOP KRAN - BIASA 1/2" Buah Rp 52,300.00


3/4" Buah Rp 71,500.00
1" Buah Rp 107,300.00

5 STOP KRAN - KW.1 1/2" Buah Rp 231,000.00


3/4" Buah Rp 74,800.00
1" Buah Rp 126,500.00

6 TEE 1/2" Buah Rp 10,500.00


3/4" Buah Rp 18,700.00

7 V. KNIE 3/4" Buah Rp 16,500.00


1" Buah Rp 17,100.00

8 V NEPLE 3/4" Buah Rp 11,000.00


1" Buah Rp 27,500.00

9 WATER MUR 1/2" Buah Rp 30,300.00


10 WATER MUR 3/4" Buah Rp 51,700.00
11 Pipa Gip 1 1/2" (air bersih) Batang Rp 8,800.00
12 Pipa Baja Hitam -6M 1/2" tbl=2 mm Batang Rp 239,800.00
13 Pipa Baja Putih -6M 1/2" tbl=2 mm Batang Rp 308,000.00
14 Pipa Baja Hitam -6M 3/4" tbl=2 mm Batang Rp 305,800.00
15 Pipa Baja Putih -6M 3/4" tbl=2 mm Batang Rp 382,800.00
16 Pipa Baja Hitam -6M 1" tbl=2 mm Batang Rp 381,700.00
17 Pipa Baja Putih -6M 1" tbl=2 mm Batang Rp 487,300.00
18 Pipa Baja Hitam -6M 2" tbl=2 mm Batang Rp 704,000.00
19 Pipa Baja Putih -6M 2" tbl=2 mm Batang Rp 896,500.00
20 Pipa Baja Hitam -6M 3" tbl=2 mm Batang Rp 1,487,000.00
21 Pipa Baja Putih -6M 3" tbl=2 mm Batang Rp 1,889,800.00
22 Pipa Baja Hitam -6M 4" tbl=2 mm Batang Rp 2,010,800.00
23 Pipa Baja Putih -6M 4" tbl=2 mm Batang Rp 2,453,000.00
24 Pipa PVP dlm 2" Resapan Batang Rp 71,500.00
25 Pipa PVP dlm 3" Resapan Batang Rp 172,700.00

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 46
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
26 Pipa PVP dlm 4" Resapan Batang Rp 317,900.00

P MATERIAL POMPA
1 Pompa Air Shimiznu130 ( 125 Watt ) Buah Rp 577,500
2 Pompa Air Shimizu 230 ( 200 Watt ) Buah Rp 990,000
3 Pompa Air Panasonik 130 Jak ( 125 Watt ) Buah Rp 616,000
4 Pompa Air Panasonik 200 Jak Buah Rp 676,500
5 Pompa Air Sanyo 137 AC Buah Rp 621,500
6 Pompa Air Sanyo PH 130 AC Buah Rp 1,336,500
7 Pompa Air Wasser 139 EA Buah Rp 2,876,500
8 Pompa Air Lakoni 129 A Buah Rp 572,000
9 Pompa Air Inoto I Hp + Kabel 50 Meter Buah Rp 2,942,500
10 Pompa Air Evak I Hp Buah Rp 5,692,500
11 Pompa Air Franklin I Hp Buah Rp 11,220,000
12 Pompa Wasser 60 Ea Buah Rp 704,000
13 Pompa Wasser 169 EA Buah Rp 1,056,000
14 Pompa Air Tsutumi 3 Buah Rp 3,850,000
15 Mesin Las Hambatan dari Logam Otomatis (Las Listrik Yanmar TS 155 C 13 H Unit Rp 28,665,200.00
16 Generator SET ABB Mesin Diesel 8,5 PK Yanmar Unit Rp 21,265,800.00
17 Generator SET ABB Mesin Diesel 8,5 PK Kubota Unit Rp 20,576,100.00

Q BAHAN INSTALASI LISTRIK


1 Aram Lampu kap Hijau Bh Rp 82,500
2 Aram Mercury Bh Rp 159,500
3 Balon HPIT 250 W PH Bh Rp 247,500
4 Balon HPIT 400 W PH Bh Rp 275,000
5 Balon HPLN 125 W PH Bh Rp 66,000
6 Balon HQL 80 Watt Osram Bh Rp 55,000
7 Balon Neon panjang TL 40 / 36 W PH Bh Rp 16,500
8 Balon Son T 150 W Bh Rp 165,000
9 Balon Son T 250 W Bh Rp 170,500
10 Balon Son T 400 W Bh Rp 192,500
11 Body HPIT 400 W Lengkap Set Rp 935,000
12 Body Lampu Taman TO-2 Bh Rp 214,500
13 Body Lampu Taman TO-1 Bh Rp 203,500
14 Balon HPLN 250 W Bh Rp 99,000

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 47
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
15 Body Mercury Hannock Bh Rp 770,000
16 Body Balon Son.T Bh Rp 522,500
17 Begel Per Pasang u/ tiang Beton Bh Rp 82,500
18 Begel Per Pasang u/ tiang Besi Bh Rp 82,500
19 Box Panel Meter Bh Rp 24,200
20 Box Panel Distribusi Bh Rp 819,500
21 Contactor 80 A Mitsubishi Bh Rp 1,072,500
22 Contactor 100 A Mitsubishi Bh Rp 1,430,000
23 Fitting Mercury E 27 Bh Rp 11,000
24 Fitting Lampu Elektra segi Empat Bh Rp 5,500
25 Fitting Lampu Taman E 27 Bh Rp 7,700
26 Fitting Lampu E 40 Bh Rp 33,000
27 Fotosell 6 A Bh Rp 110,000
28 Ignitor HPIT 400 W ( SI.51 ) PH Bh Rp 60,500
29 Injektor 3 Kutub Bh Rp 93,500
30 Injektor SN 58 Bh Rp 71,500
31 Isolasi Kabel Tanah (Bahan Karet) Roll Rp 82,500
32 Isolasi Unibell Roll Rp 9,400
33 Kabel NYA - 1 x 1,5 mm (Eterna) Meter Rp 2,800
34 Kabel NYA - 1 x 2,5 mm (Eterna) Meter Rp 5,500
35 Kabel NYA - 1 x 2,5 mm (Extrana) Meter Rp 4,400
36 Kabel NYY 4 x 10 mm Meter Rp 71,500
37 Kabel NYY 4 x 6 mm Meter Rp 44,000
38 Kabel NYY 2 x 2,5 mm Meter Rp 13,800
39 Kabel WLC NYY 3 x 1,5 mm (Untuk Sumur Bor) Meter Rp 12,100
40 Kabel NYM 2 x 1,5 mm Meter Rp 7,200
41 Kabel NYM 2 x 1,5 mm Meter Rp 7,200
42 Kabel NYM 2 x 2,5 mm Meter Rp 9,900
43 Kabel NYM 2 x 2,5 mm Meter Rp 10,400
44 Kabel NYFGBY 4 x 6 mm Meter Rp 82,500
45 Kabel NYFGBY 4 x 10 mm Meter Rp 103,200
46 Kabel NYFGBY 4 x 16 mm Meter Rp 137,500
47 Kabel Twistik 2 x 10 mm Meter Rp 5,200
48 Kabel Twistik 2 x 16 mm Meter Rp 7,700
49 Kap E 27 Hijau Bh Rp 31,100
50 Kapasitor HPIT 250 W PH Bh Rp 60,500

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 48
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
51 Kapasitor HPIT 400 W PH Bh Rp 60,500
52 Kapasitor SON T 400 W Bh Rp 63,300
53 Kapasitor SON T 250 W Bh Rp 63,300
54 Kapasitor SON T 150 W Bh Rp 77,000
55 Kapasitor 8 Mf Bh Rp 33,000
56 Kapasitor 25 Mf Bh Rp 66,000
57 Kapasitor 32 Mf Bh Rp 74,700
58 Konektor Double Baut Bh Rp 29,200
59 Konektor Kedap Air 1 Baut Bh Rp 12,100
60 Kontaktor SN 50/80 Ampere Bh Rp 770,000
61 Klem Service Plastik Bh Rp 5,500
62 Kawat Seng Kg Rp 28,800
63 Lampu Hemat Energi 18 W Bh Rp 38,500
64 Lampu Hemat Energi 23 W Bh Rp 49,500
65 Lampu Hemat Energi 85 W Bh Rp 203,500
66 Lampu Hemat Energi 75 W Bh Rp 148,500
67 Lampu Hemat Energi 70 W Bh Rp 198,000
68 Lampu Hemat Energi 65 W Bh Rp 330,000
69 Lampu Hemat Energi 50 W Bh Rp 173,800
70 Lampu LED Hemat Energi 7 W Bh Rp 51,700
71 Lampu LED Hemat Energi 10 W Bh Rp 62,700
72 Lampu LED Hemat Energi 13 W Bh Rp 74,800
73 Lampu Selang Hias Meter Rp 19,800
74 MCB 1 A MG 1 Phase Bh Rp 77,000
75 MCB 2 - 20 A MG 1 Phase Bh Rp 60,500
76 MCB 25 - 32 A MG 1 Phase Bh Rp 66,000
77 MCB 1 A 1 Phase Bh Rp 49,500
78 MCB 6 A 1 Phase Bh Rp 66,000
79 MCB 16 A 1 Phase Bh Rp 66,000
80 MCB 20 A 1 Phase Bh Rp 66,000
81 MCB 50 A 1 Phase Bh Rp 187,000
82 Mour / Baut Bh Rp 600
83 NFB 75 A Mitsubishi 3 Phase Bh Rp 880,000
84 NFB 80 A Mitsubishi 3 Phase Bh Rp 880,000
85 NFB 100 A Mitsubishi 3 Phase Bh Rp 880,000
86 Pipa Gip 1 1/2" (listrik) Batang Rp 396,500

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 49
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
87 Rang Lampu Taman TO.2 Bh Rp 229,900
88 Relay lampu Selang Bh Rp 28,800
89 Saklar Engkel In Clipsal Bh Rp 18,400
90 Saklar Engkel In Broco Bh Rp 13,800
91 Saklar Seri II In Clipsal Bh Rp 29,200
92 Saklar Seri II In Broco Bh Rp 17,300
93 Skun Kabel 10 mm Bh Rp 2,200
94 Skun Kabel 16 mm Bh Rp 2,800
95 Skun Kabel 25 mm Bh Rp 3,900
96 Skun Kabel 50 mm Bh Rp 6,600
97 Selonsong 10 Bh Rp 3,300
98 Selonsong 16 Bh Rp 5,500
99 Stop Kontak Broco Bh Rp 14,900
100 Stop Kontak Clipsal Bh Rp 36,800
101 Terminal Elegram 25mm Papan Rp 165,000
102 Tiang PJU 9 M Galvanis Single David Bh Rp 4,125,000
103 Tiang PJU 9 M Galvanis Double David Bh Rp 5,390,000
104 Tiang Besi 7 M Bh Rp 2,200,000
105 Tiang Besi 9 M Bh Rp 2,420,000
106 Tiang Lampu Taman Bh Rp 93,500
107 Timer Sweet Thebend Bh Rp 467,500
108 Travo HPIT 400 Watt Philips Bh Rp 286,000
109 Travo HPLN 125 Watt PH / HQL 80 Watt Bh Rp 330,000
110 Travo Son T 400 W Bh Rp 500,500
111 Travo Son T 250 W Bh Rp 291,500
112 Travo Son T 150 W Bh Rp 275,000
113 Travo TL 40 W PH Bh Rp 46,000
114 Bohlam (Lampu Penerangan) TL Simbat 18 W Pcs Rp 13,200
115 Bohlam (Lampu Penerangan) PCC 23 Watt Ecuat Pcs Rp 45,100
116 Kawat Galbani Baja Berlapis Seng (Kawat Beton (Bindrad) Ton Rp 18,100
117 Kawat Non Galbani Lainnya (Kawat Las) Kg Rp 34,600
118 Kawat Galbani Baja Berlapis Seng (Kawat Beton (Bindrad) Kg Rp 18,400
119 Stop Kontak dan Soket (Broco 2 Saklar) Buah Rp 28,800
120 Control Desk / Meja Kontrol KWH METER 450 WATT Buah Rp 130,300
121 Control Desk / Meja Kontrol KWH METER 900 WATT Buah Rp 130,300
122 Kabel Listrik NYM (2 MM x 2.5 MM) M Rp 9,900

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 50
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
123 Kabel Listrik NYA Kabel Listrik NYA ( 1 MM x 2,5 MM) M Rp 5,500
124 Kabel Listrik NYY (3 x 2,5) MM M Rp 22,000

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 51
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
125 Kabel Lainnya Eterna (3 x 2,5) 50 M M Rp 16,500
126 Bohlam (Lampu Penerangan) Philips Pijar 40 Watt Buah Rp 8,300
127 Lampu Neon Philips 40 Watt 100 Buah Buah Rp 16,500
128 Lampu Neon Philips TL 40 Watt Buah Rp 16,500

R ALAT PENUNJANG INSTALASI LISTRIK


1 Accumulater Cell Tester Buah Rp 246,000.00
2 Detektor Kabel Buah Rp 10,173,200.00
3 Helm Proyek Buah Rp 77,000.00
4 Kaos Tangan Kerja Psng Rp 33,000.00
5 Kaos Tangan Tegangan Tinggi 20 KV Psng Rp 440,000.00
6 Kunci Pipa Besar Buah Rp 126,500.00
7 Linggis Buah Rp 60,500.00
8 Mantel Parasut Buah Rp 287,500.00
9 Megger Meter Insulation Tester 3111V Buah Rp 4,719,000.00
10 Mesin Las Listrik Buah Rp 1,045,000.00
11 MultiMeter Sanwa asli Buah Rp 506,000.00
12 Pakaian Kerja (Cattel Pak) Psng Rp 597,800.00
13 Palu-Palu Buah Rp 71,500.00
14 Pisau Cutter Buah Rp 16,500.00
15 Senter Kepala Buah Rp 104,500.00
16 Sepatu Kerja (listrik) Psng Rp 528,000.00
17 Sepatu Tegangan Tinggi 20 KV Psng Rp 550,000.00
18 Skop Buah Rp 93,500.00
19 Solder Buah Rp 16,500.00
20 Tang Ampere 600 A Buah Rp 1,265,000.00
21 Tang Press Skun Besar Buah Rp 1,210,000.00
22 Tang Press Skun Kecil Buah Rp 770,000.00
23 Tangga Aluminium untuk lampu jalan Buah Rp 1,705,000.00
24 Tangga Bambu 2,5 Meter Buah Rp 86,300.00
25 Tangga Bambu 5 Meter Buah Rp 149,500.00
26 Tangga Fiber Buah Rp 6,902,500.00
27 Tools Kit Set Rp 6,083,000.00
28 Topi Buah Rp 33,000.00

S UPAH KERJA

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 52
SATUAN BAHAN/ HASIL SURVEY
NO BAHAN MATERIAL DAN UPAH KERJA
UPAH KERJA TRIWULAN I

1 2 3 4
1 Mandor Lapangan O/H Rp 213,636.00
2 Kepala tukang O/H Rp 192,272.40
3 Kepala Tukang Listrik O/H Rp 192,272.40
4 Tukang Batu /Cat O/H Rp 178,030.00
5 Tukang Kayu / besi O/H Rp 178,030.00
6 Tukang pasang paving O/H Rp 178,030.00
7 Pembantu Sopir O/H Rp 156,666.40
8 Pembantu Mekanik O/H Rp 189,423.92
9 Pembantu Tukang Listrik O/H Rp 156,666.40
10 Pembantu Operator O/H Rp 206,514.80
11 Mekanik O/H Rp 178,030.00
12 Operator Terlatih O/H Rp 213,636.00
13 Pekerja O/H Rp 142,424.00
14 Sopir Terampil O/H Rp 192,272.40
15 Biaya Pasang Canstein /M' Rp 156,666.40
16 Biaya Pasang Paving /M2 Rp 192,272.40

Makassar, Januari 2021

Plt. KEPALA DINAS PEKERJAAN UMUM KEPALA BIDANG BINA TEKNIK


KOTA MAKASSAR DINAS PU KOTA MAKASSAR

Drs. H. IRWAN R. ADNAN, M.Si ANSUARD, ST. M.Si


Pembina Utama Muda Pangkat : Penata Tk. I

Nip. 19710303 199803 1 014 Nip. 19691031 200312 1 001

Harga Satuan Bahan dan Upah Kerja Triwulan I Tahun 2021 Hal. 53
BACKUP VOLUME

II PEKERJAAN STRUKTUR
P Lebar Tinggi Volume Satuan
1 PEKERJAAN BETON K-300 45.31 5 0.2 45.31 m2
24.65 5 0.2 24.65 m2
Jumlah 69.96 m2

2 PEMBESIAN BESI D 12 Polos


Tulangan Dowel P Jumlah Besi Berat Volume Satuan
Arah Melintang 5 4 0.88776 17.7552 Kg
Jumlah 17.7552 Kg

Jumlah Besi
Jumlah Besi Arah Melintang 12 213.0624
6 106.5312
Volume Total 319.5936 Kg

Tulangan Dowel P Jumlah Besi Berat Volume Satuan


Arah Memanjang 45.31 4 0.88776 160.897622 Kg
Arah Memanjang 24.65 4 0.88776 87.533136 Kg
Jumlah 248.430758 Kg

Total Volume Tulangan Dowel 568.02436 Kg

3 PEMBESIAN BESI D 10 Polos


Bangku melintang Panjang Jumlah Berat
Arah Melintang 0.36 21 0.6165 4.66074 Kg
Jumlah 4.66074 Kg

Jumlah Besi Arah Melintang 18 83.89332


Volume Total 83.89332 Kg

Bangku memanjang Panjang Jumlah Berat


Arah Memanjang 1 0.36 182.24 0.6165 40.4463456 Kg
Arah Memanjang 2 0.36 99.6 0.6165 22.105224 Kg
Jumlah 62.5515696 Kg

Total Volume Tulangan Bangku 146.44489 Kg 146.22295

3 Bekisting 2 Kali Pakai


Panjang Lebar Jumlah Volume
143.51 0.2 1 28.702 m2
Volume Total 28.702 m2

4 Joint Sealent Panjang Jumlah Volume m'


5 16 80 m'
Volume Total 80 m2

5 Timbunan Sirtu Panjang Lebar Tebal Volume


39.59 3 0.2 23.754 m3
21.65 4.3 0.2 18.619 m3
45.31 0.75 0.2 6.7965 m3
Volume Total 49.1695 m3

6 Pas. Batu Panjang Lebar Tebal Volume


45.31 0.2 - 9.062 m2
45.31 0.2 - 9.062 m2
Volume Total 18.124 m2

7 Plasteran 3 Sisi Panjang Lebar Sisi Volume


45.31 0.2 3 27.186 m2
Volume Total 27.186 m2

Tambahan
P Lebar Tinggi Volume Satuan
1 PEKERJAAN BETON K-300 5.35 3.9 0.2 4.173 m2
4.8 0.8 0.2 0.768 m2
Jumlah 4.941 m2

2 PEMBESIAN BESI D 12 Polos


Tulangan Dowel P Jumlah Besi Berat Volume Satuan
Arah Melintang 3.9 4 0.88776 13.849056 Kg

Tulangan Dowel P Jumlah Besi Berat Volume Satuan


Arah Memanjang As 5.35 4 0.88776 18.998064 Kg
Arah Memanjang Kanan 5.35 4 0.88776 18.998064 Kg
Jumlah 37.996128 Kg

Total Volume Tulangan Dowel 51.845184 Kg

3 PEMBESIAN BESI D 10 Polos


Bangku melintang Panjang Jumlah Berat
Arah Melintang 0.36 16.6 0.6165 3.684204 Kg
Jumlah 3.684204 Kg

Bangku memanjang Panjang Jumlah Berat


Arah Memanjang 1 0.36 22.4 0.6165 4.971456 Kg
Arah Memanjang 2 0.36 22.4 0.6165 4.971456 Kg
Jumlah 9.942912 Kg

Total Volume Tulangan Bangku 13.627116 Kg 146.22295

87.75 325 412.75

Anda mungkin juga menyukai