NO JENIS PEKERJAAN
A JUMLAH
B JUMLAH A X 10 % PPN (Pajak Pertambahan Nilai)
C TOTAL
D TOTAL DIBULATKAN
TERBILANG : SEMBILAN MILYAR TIGA PULUH TIGA JUTA DUA RATUS SEPULUH RIBU RUPIAH
ULASI DAFTAR KUANTITAS DAN HARGA
PERENCANAAN PEMBANGUNAN PENGAMAN TEBING DESA TANJUNG MEDAN
Jumlah Harga
(Rp)
35,000,000.00
585,851,332.60
147,046,116.51
109,009,687.50
516,685,722.55
3,287,181,333.33
4,680,774,192.49
468,077,419.25
5,148,851,611.74
5,148,851,000.00
2 PEKERJAAN TANAH
Timbunan Tanah Didatangkan Dan Dipadatkan Dengan Alat M3
2.1 Berat 2278.93 Rp 131,800 Rp 300,362,315
2.2 Pengadaan Geotex Non-Woven M2 1260.00 Rp 50,500 Rp 63,630,000
2.3 Pemasangan Geotex Non-Woven M2 1260.00 Rp 16,700 Rp 21,042,000
2.4 Galian Tanah Dengan alat Berat M3 1869.62 Rp 63,600 Rp 118,907,578
Timbunan Tanah Bekas Urugan Lama (Bekas Galian Geotex M3
2.5 Dan Tie Rod) 1140.80 Rp 71,800 Rp 81,909,440
3 PEKERJAAN BETON
3.1 Beton K-175 M3 144.62 Rp 1,016,800 Rp 147,046,117
4 PEKERJAAN KAYU
4.1 Bekisting M2 643.13 Rp 169,500 Rp 109,009,688
5 PEKERJAAN BESI
5.1 Pembesian Kg 17617.23 Rp 27,000 Rp 475,665,128
5.2 Pengadaan besi CNP L 200X75X20X3,2 Kg 2271.15 Rp 15,300 Rp 34,748,595
5.3 Pemasangan besi CNP L 200X75X20X3,2 M1 245.00 Rp 25,600 Rp 6,272,000
6 PEKERJAAN PEMANCANGAN
6.1 Pengadaan Sheet Pile Beton W325 B ( 12 m ) M' 2940.00 Rp 803,500 Rp 2,362,290,000
6.2 Pemancangan Sheet Pile Beton W325 B ( 12 m ) M' 2940.00 Rp 111,300 Rp 327,222,000
6.3 Pengadaan Sheet Pile Beton W325 B ( 8 m ) M' 653.33 Rp 803,500 Rp 524,953,333
6.4 Pemancangan Sheet Pile Beton W325 B ( 8 m ) M' 653.33 Rp 111,300 Rp 72,716,000
TOTAL Rp 4,680,774,192
DAFTAR HARGA SATUAN BAHAN DAN UPAH
HARGA SATUAN
NO URAIAN SATUAN KETERANGAN
(Rp)
(1) (2) (3) (4) (5)
I. BAHAN
1. Tanah Timbun M³ 50,000.00
2. Pasir Cor M³ 120,000.00
3. Kerikil M³ 120,000.00
4. Semen Zak 63,000.00
5. Semen Kg 1,260.00
6. Besi U 32 Ulir Kg 20,000.00
7. Besi U 24 Polos Kg 12,235.00
8. Paku 1" s/d 3" Kg 20,000.00
9. Paku 5" s/d 10" Kg 20,000.00
10. Paku Triplek Kg 20,000.00
11. Kawat Beton/Ikat Kg 15,000.00
12. Kayu Kelas I M³ 6,000,000.00
13. Kayu Broti Kelas II M³ 2,800,000.00
14. Kayu Klas III M³ 1,900,000.00
15. Pipa Galvanis Ø 3" P=6 M¹ Btg 900,000.00
16. Pipa Galvanis Ø 2" P=6 M¹ Btg 400,000.00 66,666.67
17. Triplek 9 mm Lbr 135,000.00
18. Minyak Bekisting Liter 12,000.00
19. Solar Liter 7,707.97
20. Bensin Liter 8,399.77
21. Oli Mesin (Pelumas) Liter 35,000.00
22. Tiang Pancang Baja Ø 8" M¹ 600,000.00
23. Geotex Non - Woven M2 45,000.00 harga pekanbaru
24. Plastik Cor M¹ 2,000.00 harga pekanbaru
25. CNP L.200X75X20X3,2 M¹ 13,000.00 harga pekanbaru
25. Batu gerindra Bh 15,000.00 harga pekanbaru
25. Amplas Lbr 2,000.00 harga pekanbaru
25. Cat Meni Kg 30,000.00 harga pekanbaru
25. Minyak Cat Kg 55,000.00 harga pekanbaru
25. SHEET PILE BETON W 325 B M¹ 685,000.00 harga sampai lokasi
26. MINI PILE BETON 20 × 20 M¹ 169,000.00 harga sampai lokasi
27. Rumput M2 10,400.00 harga pekanbaru
28. Batu Koral M³ 350,000.00 harga pekanbaru
29. Lampu Solar Cell Bh 25,000,000.00 harga pekanbaru
30. Pohon Tabeyuya Ø 5 - 6 cm Tgi = 3 - 4 m Btg 750,000.00 harga pekanbaru
31. Pupuk NPK Kg 12,000.00 harga pekanbaru
II. UPAH
1 Pekerja OH 84,000.00 12,000.00
2. Mandor OH 108,500.00 15,500.00
3. Tukang OH 94,500.00 13,500.00
4. Kepala Tukang OH 108,500.00 15,500.00
5. Operator OH 108,500.00 15,500.00
6. Pembantu Operator OH 81,900.00 11,700.00
7. Mekanik OH 108,500.00 15,500.00
8. Pembantu Mekanik OH 84,000.00 12,000.00
9. Sopir OH 94,500.00 13,500.00
10. Pembantu Sopir OH 81,900.00 11,700.00
III. PERALATAN
1. Concrete Mixer Jam 68,541.00
2. Dump Truck Jam 385,041.38
3. Excavator Jam 801,738.87
4. Hammer (Manual) Jam 35,714.00
5. Vibro Roller Jam 500,000.00 Harga Pekanbaru
6. Mesin Las Jam 30,000.00 Harga Pekanbaru
7. Crane Jam 650,000.00 Harga Pekanbaru
8. Pile Driver Hammer Jam 445,000.00 Harga Pekanbaru
DAFTAR HARGA DASAR SATUAN BAHAN TAHUN 2018
HARGA SATUAN
NO URAIAN KODE SATUAN KETERANGAN
(Rp)
(1) (2) (3) (4) (5)
1. Pasir Pasang Sedang M01b M³ Rp 179,258.76
2. Pasir Beton M01a M³ Rp 272,119.35
3. Pasir Halus M01c M³ Rp 228,758.76
4. Pasir Urug M02 M³ Rp 311,983.03
5. Batu Kali M³ Rp 550,000.00
6. Batu Pecah Split M³ Rp 551,700.00
7. Batu Gunung M³ Rp 499,200.00
8. Sirtu M³ Rp 394,200.00
9. Agregat Pecah Kasar untuk Beton M³ Rp 494,449.12
10. Agregat Halus M³ Rp 423,416.62
11. Agregat Lolos #1 M³ Rp 508,116.62
12. Lolos Screen 1 Uk. (0 - 5) M³ Rp 489,500.00
13. Lolos Screen 2 Uk. (0 - 5) M³ Rp 489,500.00
14. Lolos Screen 2 Uk. (5 - 9,5) M³ Rp 489,500.00
15. Lolos Screen 2 Uk. (9,5 - 19) M³ Rp 489,500.00
16. Filler M05 Kg Rp 1,504.12
17. Agregat Kasar (Kerikil) M06 M³ Rp 261,758.76
18. Gravel M07 M³ Rp 179,983.03
19. Bahan Tanah Timbunan M08 M³ Rp 44,000.00
20. Bahan Pilihan M09 M³ Rp 66,000.00
21. Aspal M10 Kg Rp 13,310.00
22. Aspal Curah Kg Rp 2,000.00
23. Aspal Drum Kg Rp 2,000.00
24. Kerosen / Minyak Tanah M11 Liter Rp 9,213.24
25. Semen PC (50 Kg) M12 Zak Rp 75,205.97
26. Semen Pc /Kg M12 Kg Rp 1,504.12
27. Sirtu M16 M³ Rp 258,412.90
28. Cat Marka (Non Thermoplast) M17a Kg Rp 16,500.00
29. Cat Marka (Thermoplast) M17b Kg Rp 63,390.12
30. Kayu Perancah M19 M³ Rp 2,200,000.00
31. Bensin M20 Liter Rp 9,239.75
32. Solar M21 Liter Rp 8,478.77
33. Minyak Pelumas M22 Liter Rp 36,300.00
34. Plastik Filter M23 M2 Rp 20,350.00
35. Agr. Base Kelas A M26 M³ Rp 473,000.00
36. Agr. Base Kelas B M27 M³ Rp 412,500.00
37. Agr. CBR 60% M28 M³ Rp 535,881.03
38. Agr. Base Kelas C2 M29 M³ Rp 385,000.00
39. Agr. Base Kelas S M29 M³ Rp 386,870.00
40. Geotextile M30 M2 Rp 20,900.00
41. Aspal Emulsi M31 Kg Rp 13,442.10
42. Gebalan Rumput M32 M2 Rp 16,500.00
43. Thinner M33 Liter Rp 27,665.00
44. Glass Bead M34 Kg Rp 48,760.12
45. Beton K-250 M37 M³ Rp 2,558,497.29
46. Kapur M40 M³ Rp 9,456.08
47. Cat M42 Kg Rp 66,000.00
48. Arbocell M45 Kg Rp 52,392.47
49. Beton K-125 M47 M³ Rp 888,084.86
50. Minyak Fluks M53 Liter Rp 234.82
51. Bunker Oil M54 Liter Rp 234.82
52. Asbuton Halus M55 Ton Rp 132.10
53. Beton K-300 M59 M³ Rp 2,719,297.69
54. Beton K-175 M60 M³ Rp 1,183,771.36
55. Gorong-gorong dia. 60 cm Bh Rp 275,000.00
56. Gorong-gorong dia. 80 cm Bh Rp 385,000.00
57. Gorong-gorong dia. 100 cm Bh Rp 550,000.00
58. Elastomer M62 cm2 Rp 220.00
59. Mata Kucing M64 Bh Rp 137,500.00
60. Anchorage M65 Bh Rp 4,715.04
61. Anti Stripping Agent M66 Kg Rp 55,330.00
62. Bahan Modifikasi M67 Kg Rp 1,100.00
63. Beton K-500 M68 M³ Rp 3,267,356.12
64. Beton K-400 M69 M³ Rp 3,130,894.08
65. Ducting (Kabel Prestress) M70 M1 Rp 165,000.00
66. Ducting (Stand Prestress) M71 M1 Rp 55,000.00
67. Beton K-350 M72 M³ Rp 3,064,683.38
68. Agr. Pecah Mesin 0-5 mm M91 M³ Rp 565,098.83
69. Agr. Pecah Mesin 5-10 & 10 -20 mm M92 M³ Rp 565,098.83
70. Agr. Pecah Mesin 20 - 30 mm M93 M³ Rp 565,098.83
71. Paving Block M78 M2 Rp 67,320.00
72. Kerb Jenis 1 Bh Rp 40,500.00
73. Kerb Jenis 2 Bh Rp 55,000.00
74. Kerb Jenis 3 Bh Rp 60,500.00
75. Aspal Modifikasi Kg Rp 8,800.00
76. Box Culvert 1x1 T 16 Bh Rp 5,602,771.90
77. Box Culvert 1,5x1 T 17 Bh Rp 6,259,550.00
78. Box Culvert 2x2 T 25 Bh Rp 11,636,900.00
79. Box Culvert 2,5x2 T 26 Bh Rp 12,572,584.20
80. Epoxy Bahan Penutup (Sealant) Kg Rp 66,000.00
81. Aditif Anti Pengelupasan kg Rp 33,000.00
82. Bahan Pengisi (Filler) Tambahan Kg Rp 1,504.12
83. cat Anti Karat M95 Kg Rp 66,000.00
84. Expansion Cap M96 M1 Rp 6,655.00
85. Polytene 125 Mikron M97 Kg Rp 34,485.00
86. Curing Compound M98 Liter Rp 18,700.00
87. Besi Beton Polos Kg Rp 21,000.00
88. Besi Beton Ulir Kg Rp 21,000.00
89. Kawat Beton M14 Kg Rp 20,200.00
90. Kawat Bronjong M15 Kg Rp 55,000.00
91. Kawat Bronjong Pabrikasi Bh Rp 440,000.00
92. Paku Beton Kg Rp 27,300.00
93. Paku Triplek Kg Rp 20,200.00
94. Paku Biasa 1/2 - 1 Kg Rp 20,200.00
95. Baku Biasa 2-5 Kg Rp 20,200.00
96. Besi Plat Kg Rp 25,000.00
97. Kawat Las M51 Dos Rp 28,000.00
98. Besi Strip Kg Rp 23,900.00
99. Baut + Mur Bh Rp 20,500.00
100. Baja Siku Kg Rp 17,800.00
101. Pipa Galvanis dia. 1.6 M24 Batang Rp 156,000.00
102. Pipa Porus M25 M Rp 126,500.00
103. Baja Struktur M48 Kg Rp 11,000.00
104. Tiang Pancang Baja dia 8 M49 Batang Rp 2,310,000.00
105. Tiang Pancang Beton Pratekan dia 30 M50 M Rp 88,000.00
106. Pelat Rambu (Eng. Grade) M35a Bh Rp 152,000.00
107. Pelat Rambu (High 1 Grade) M35b Bh Rp 152,000.00
108. Rel Pengaman M36 M Rp 122.00
109. Expansion Join Baja Siku M75f M Rp 1,925,000.00
110. Joint Sealant M94 Kg Rp 66,000.00
111. Kayu Kelas I M³ Rp 6,600,000.00
112. Kayu Kelas II M³ Rp 3,300,000.00
113. Kayu Kelas III M³ Rp 2,090,000.00
114. Kayu Cerocok dia. 8-10 cm/4 Batang Rp 98,000.00
115. Triplek Tebal 3 mm Lembar Rp 65,500.00
116. TriplekTebal 3,6 mm Lembar Rp 78,900.00
117. Triplek Tebal 4 mm Lembar Rp 91,900.00
118. Triplek Tebal 6 mm Lembar Rp 111,800.00
119. Triplek Tebal 9 mm Lembar Rp 170,800.00
120. Triplek Tebal 12 mm Lembar Rp 203,700.00
SUB JUMLAH I -
II BAHAN / MATERIAL
SUB JUMLAH II -
III PERALATAN
1 ALAT BERAT UNIT 7.0000 2,500,000.00 17,500,000.00
JENIS PEKERJAAN : Timbunan Tanah didatangkan dan Dipadatkan dengan Alat Berat
SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 2.1
SUB JUMLAH I -
II BAHAN / MATERIAL
1 Geotex Non - Woven M2 1.1000 45,000.00 49,500.00
SUB JUMLAH II -
III PERALATAN
1 Alat Bantu Ls 1.0000 1,000.00 1,000.00
SUB JUMLAH II -
III PERALATAN
1 Excavator JAM 0.0109 801,738.87 8,724.71
Dump Truck JAM 0.0844 385,041.38 32,511.52
Alat Bantu Ls 1.0000 1000 1,000.00
JENIS PEKERJAAN : Timbunan Tanah Bekas Urugan Dipadatkan dengan Alat Berat
SATUAN / UNIT : M3
NOMOR PEMBAYARAN : 2.6
SUB JUMLAH II -
III PERALATAN
1 Excavator JAM 0.0109 801,738.87 8,724.71
Dump Truck JAM 0.0991 385,041.38 38,152.61
Vibro Roller JAM 0.0042 500,000.00 2,091.70
Alat Bantu Ls 1.0000 1000 1,000.00
SUB JUMLAH I -
II BAHAN / MATERIAL
1 CNP L.200X75X20X3,2 m' 1.1000 13,000.00 14,300.00
SUB JUMLAH II -
III PERALATAN
1 Mesin Las Jam 0.0500 30,000.00 1,500.00
SUB JUMLAH I -
II BAHAN / MATERIAL
1 SHEET PILE BETON W 325 B m' 1.1000 685,000.00 753,500.00
Sket gambar
18~24
LEMBAR PERHITUNGAN
Sket gambar
Panjang Geotex = 18 m
20~24
LEMBAR PERHITUNGAN
Pekerjaan Beton k_175 Tie Rod 20/20 - Pekerjaan Galian Tie Rod
a. = 0.20 x 0.20 x 8.00 x 82 = 1.50 x 8.00 x 82
= 26.13 M3 = 980.00 M3
Tulangan Pembesian
T.Utama D16 8.00 4.00 8.00 0.38 0.10 8.48 33.92 1.58 53.51
T. Sengkang Ø10 8.00 40.00 0.17 0.17 0.17 0.17 0.05 0.05 0.78 31.20 0.62 19.23
Jumlah 72.74
Bekisting
a. = 0.80 x 245.00
= 196.00 M2
b. = 0.55 x 82
= 44.92 M2
Total Bekisting = 240.92 M2
asumsi 2 kali pakai = 120.46 M2
Tulangan Pembesian
DEPAN
T.Utama D16 245.00 6.00 245.00 13.07 258.07 1548.40 1.58 2442.66
T. Sengkang Ø10 245.00 2,450.00 0.24 0.29 0.24 0.29 0.05 0.05 1.16 2842.00 0.62 1751.31
BELAKANG
T.Utama D12 8.00 0.47 0.05 0.05 0.57 372.40 0.89 330.45
T. Sengkang D12 5.00 0.27 0.27 0.22 0.22 0.05 0.05 1.08 441.00 0.89 391.33
T.Ties D12 5.00 0.22 0.27 0.05 0.05 0.05 0.05 0.69 281.75 0.89 250.01
Jumlah 4193.97
Bekisting
a. = 1.60 x 245.00
= 392.00 M2
Total Bekisting = 392.00 M2
asumsi 2 kali pakai = 196.00 M2
Tulangan Pembesian
T.Utama D16 245.00 10.00 245.00 13.07 258.07 2580.67 1.58 4071.09
T. Sengkang Ø10 245.00 2,450.00 0.49 0.59 0.49 0.59 0.05 0.05 2.26 5537.00 0.62 3412.04
Jumlah 7483.13
= 2271.150 Kg