( BASIC PRICE )
BAHAN BANGUNAN, UPAH DAN PERALATAN
JENIS
No. BAHAN, UPAH, SEWA ALAT DAN SATUAN HARGA SATUAN KETERANGAN
PERALATAN LABORATORIUM ( Tidak termasuk Ppn 10 %)
(1) (2) (3) (4) (5)
I UPAH
1 Pasir M3 108,790 78 Kg
2 Pasir Urug M3 104,280
3 Tanah biasa M3 88,880
4 Tanah pilihan M3 104,280
5 Batu Kali/gunung M3 492,140
6 Agregat Kasar/batu pecah M3 534,586
7 Agregat Halus M3 505,256
8 Filler Kg 825
9 Batu Belah M3 495,000
10 Gravel M3 387,640
11 S i r t u / Kerikil M3 280,170 207.53 Kg
12 Kapur M3 22,000
13 Chipping M3 505,256
14 Aspal Cement KG 20,575
15 Kerosen / Minyak Tanah LITER 4,070
16 Kawat Bronjong Kg 18,150
17 Cat Marka (Non Thermoplas) Kg 44,000
18 Cat Marka (Thermoplastic) Kg 55,000
19 Pipa Porus M' 20,240
20 Geotextile M2 66,000
21 Aspal Emulsi Kg 9,900
22 Gebalan Rumput M2 6,050
23 Glass Bead Kg 33,000
24 Pelat Rambu (Eng. Grade) BH 165,000
25 Pelat Rambu (High I. Grade) BH 330,000
26 Rel Pengaman M' 770,000
27 Pemantul Cahaya (Reflector) Bh. 7,700
28 Arbocell Kg. 33,000
29 Baja Bergelombang Kg 15,400
30 Baja Struktur Kg 20,900
31 Tiang Pancang Baja M' 4,500,915
32 T. Pancang Beton Pratekan M3 1,641,750
33 Kawat Las Dos 60,500
34 Pipa Baja Kg 15,400
35 Minyak Fluks Liter 4,400
36 Bunker Oil Liter 4,400
37 Asbuton Halus Ton 346,500
38 Baja Prategang Kg 31,900
39 PCI Girder L=17m Buah 25,025,000
40 PCI Girder L=21m Buah 28,600,000
41 PCI Girder L=26m Buah 37,125,000
42 PCI Girder L=32m Buah 59,785,000
43 PCI Girder L=36m Buah 69,795,000
44 PCI Girder L=41m Buah 90,750,000
45 Semen (50kg) Zak 88,000 1,760 Per Kg
46 Semen Putih / Zak 125,400 2,508 Per Kg
47 Besi beton polos Kg 17,600
48 Besi beton ulir Kg 22,000
49 Kawat Ikat / Kg 22,000
50 Plywood 3 mm / Lbr 60,500
51 Plywood 4 mm / Lbr 84,700
52 Gypsum Board / Lbr 90,750
53 Plywood 18 mm / Lbr 266,200
54 Seng BJLS 20 / Lbr 54,450
55 Seng BJLS 30 / Lbr 70,180
56 Multi Colour / Lbr 96,800
57 Surya Colour / Lbr 66,550
58 Sakura Colour / Lbr 54,450
59 Paku Multi Colour / Bh 242
60 Paku Surya Colour / Bh 242
61 Paku Sakura Colour / Bh 242
62 Bubungan Multi Colour / Lbr 71,390
63 Bubungan Surya Colour / Lbr 48,399
64 Bubungan Sakura Colour / Lbr 43,560
65 Seng Plat BJLS 30 / Lbr 84,700
66 Seng Plat BJLS 20 / Lbr 78,650
67 Seng Profil / Lbr 65,340
68 Paku Biasa / Kg 24,200
69 Paku Seng / Kg 30,250
70 Paku Ulin / Kg 42,350
71 Tegel keramik ( 40 x 40 ) / M2 145,200
72 Tegel keramik ( 30 x 30 ) / M2 106,480
73 Tegel Keramik ( 20 x 20 ) / M2 106,480
74 Tegel Granito / M2 465,850
75 Tegel Maestro / M2 126,445
76 Tegel mozaik ( 20 x 20 ) / M2 199,650
77 Batu Tempel / M2 379,335
78 Cat Kilap Avian / Kg 59,895
79 Cat Air Paragon / Kg 26,620
80 Cat Air Metrolite / Kg 33,275
81 Cat Air Dulux ( ici ) / Ltr 40,596
82 Tear Oil / Kg 19,965
83 Minyak Cat A / Kg 29,948
84 Cat Atap ( Khusus ) / Kg 39,930
85 Meni / Kg 59,895
86 Dempul / plamir / Kg 55,902
87 Amplas / Lbr 13,310
88 Plitur / Kg 6,655
89 Batu Pecah / M3 580,533
90 Batu Gunung / M3 598,950
91 Kerikil / M3 326,894
92 Pasir Pasangan / M3 121,121
93 Tanah Urug / Pasir urug / M3 117,261
94 Batu Bata / Bh 1,664
95 Bata Pres / Bh 1,331
96 Roster ( K ) / Bh 36,300
97 Roster ( B ) / Bh 48,400
98 Paving Bujur sangkar ( t = 8 cm ) / Bh 2,420
99 Paving Bujur sangkar ( t = 10 cm ) / Bh 3,025
100 Paving Segi enam ( B ) / Bh 3,025
101 Paving Segi enam ( K ) / Bh 2,420
102 Batako ( 20 x 30 ) Bata Lubang / Bh 3,025
103 Batako ( 20 x 40 ) Bata Lubang / Bh 3,630
104 Kayu Perancah / M3 3,630,000
105 Kayu Meranti / M3 3,630,000
106 Kayu Kruing / M3 3,872,000
107 Kayu Kapur / Bengkirai / Lembasung / M3 4,840,000
108 Kayu Ulin ( Papan ) / M3 7,260,000
109 Kayu Ulin ( Balok ) / M3 7,865,000
110 Kaca Polos T. 5 mm / M2 151,250
111 Kaca Buram T. 5 mm / M2 211,750
112 Kaca Riben T. 5 mm / M2 242,000
113 Glass Box / Bh 30,250
114 Kunci Tanam Union / Bh 275,000
115 Kunci Tanam Yale / Bh 176,000
116 Espagnolet / Bh 148,500
117 Engsel Kupu-kupu 4" / Psg 66,000
118 Engsel Kupu-kupu 3" / Psg 49,500
119 Engsel Kupu-kupu 2" / Psg 27,500
120 Hak Angin / Bh 22,000
121 Grendel / Bh 27,500
122 Kawat Duri / Rol 49,500
123 Kawat Harmonika 4 x 4 / M2 49,500
124 Kawat Ayam / M2 16,500
125 Kawat nyamuk hitam / M2 27,500
126 Kawat nyamuk putih / M2 25,300
127 Kawat BRC / M2 550,000
128 Pas. Stainlist / M2 797,500
129 Kusen Alumunium Coklat / M1 198,000
130 Kusen Alumunium Silver / M1 159,500
131 Closed Jongkok Non Polos / Bh 313,500
132 Closed Duduk Non Polos / Bh 2,255,000
133 Wastafel Porslint lengkap / Bh 1,100,000
134 Bak Cuci alumunium satu lubang / Bh 550,000
135 Urinoir Porslint / Bh 1,097,250
136 Urinoir Monoblok / Bh 2,695,000
137 Profil 1100 Lt / Bh 2,035,000
138 Profil 2200 Lt / Bh 3,135,000
139 Pipa PVC 1/2 " AW / Btg 41,800
140 Pipa PVC 3/4 " AW / Btg 55,000
141 Pipa PVC 1 " AW / Btg 66,550
142 Pipa PVC 2 " AW / Btg 115,500
143 Elbow 1/2 " - 4 " AW / Bh 4.400 - 55.000
144 Kran Air / Bh 27.500 - 55.000
145 Pipa Galvanis 1/2 " / Btg 99,000
146 Pipa Galvanis 3/4 " / Btg 71,500
147 Pipa Galvanis 1 " / Btg 99,000
148 Pipa Galvanis 1,5 " / Btg 275,000
149 Pipa Galvanis 2 " / Btg 385,000
150 Pipa Galvanis 3 " / Btg 616,000
151 Pipa Galvanis 4 " / Btg 858,000
152 Hollow Galvalum 2 x 4,t = 0,3 p = 4 m / Btg 36,300
153 Hollow Galvalum 2 x 4,t = 0,3 p = 4 m / Btg 42,350
154 Hollow Besi 2 x 4, t = 1.7 mm p = 6 m / Btg 169,400
155 Hollow Besi 4 x 4, t = 1.7 mm p = 6 m / Btg 223,850
156 Pipa Buis Beton dia 30 cm / M1 54,450
157 Pipa Buis Beton dia 50 cm / M1 102,245
158 Pipa Buis Beton dia 75 cm / M1 151,250
159 C-75, 0.8 / M1 27,427
160 C-75, 0.55 / M1 24,523
161 Reng 0.43 / M1 13,552
162 Baut ( screw driver ) Buah 678
163 Dynabolt Buah 6,776
164 Talang jural / M1 92,928
A.4.1.1
CLICK HERE HARGA SATUAN PEKERJAAN BETON
.
CLICK HERE
A.4.1.2 HARGA SATUAN PEKERJAAN BETON
. PRACETAK
CLICK HERE
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN
. ALUMUNIUM
CLICK HERE
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN
. DINDING
A.4.4.2
CLICK HERE HARGA SATUAN PEKERJAAN PLESTERAN
.
CLICK HERE
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP
. LANTAI DAN DINDING
CLICK HERE
A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT
. (PLAFOND)
A.4.5.2
CLICK HERE HARGA SATUAN PEKERJAAN PENUTUP ATAP
.
A.4.6.1
CLICK HERE HARGA SATUAN PEKERJAAN KAYU
.
CLICK HERE
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN
. KACA
A.4.7.1
CLICK HERE HARGA SATUAN PEKERJAAN PENGECATAN
.
CLICK HERE
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI
. DALAM GEDUNG
0070C0CV. MITRA UTAMA KONSULTAN 8
CLICK HERE
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI
. DALAM GEDUNG
CLICK HERE A.2.2.1.15 Pemasangan 1 m pagar kawat jaring galvanis panjang 240 cm
A.4.1.1
BACK HARGA SATUAN PEKERJAAN BETON
.
CLICK HERE A.4.1.1.1. Membuat 1 m beton mutu f ' c = 7,4 Mpa ( K - 100 ), Slump (12 2 ) cm, w/c = 0.87
CLICK HERE A.4.1.1.2. Membuat 1 m beton mutu f ' c = 9,8 Mpa ( K - 125 ), Slump (12 2 ) cm, w/c = 0.78
Bobot isi pasir = 1.400 Kg/m, bobot isi kerikil = 1.350 Kg/m, buckling factor pasir = 20%
CLICK HERE A.4.1.1.4. Membuat 1 m lantai kerja beton mutu f ' c = 7,4 Mpa ( K - 100 ), Slump ( 3 - 6 ) cm, w/c = 0.87
CLICK HERE A.4.1.1.5. Membuat 1 m beton mutu f ' c = 14,5 Mpa ( K - 175 ), Slump ( 12 2 ) cm, w/c = 0.66
CLICK HERE A.4.1.1.6. Membuat 1 m beton mutu f ' c = 16,9 Mpa ( K - 200 ), Slump ( 12 2 ) cm, w/c = 0.61
CLICK HERE A.4.1.1.7. Membuat 1 m beton mutu f ' c = 19,3 Mpa ( K - 225 ), Slump ( 12 2 ) cm, w/c = 0.58
CLICK HERE A.4.1.1.8. Membuat 1 m beton mutu f ' c = 21,7 Mpa ( K - 250 ), Slump ( 12 2 ) cm, w/c = 0.56
CLICK HERE A.4.1.1.9. Membuat 1 m beton mutu f ' c = 24,0 Mpa ( K - 275 ), Slump ( 12 2 ) cm, w/c = 0.53
CLICK HERE A.4.1.1.10. Membuat 1 m beton mutu f ' c = 26,4 Mpa ( K - 300 ), Slump ( 12 2 ) cm, w/c = 0.52
CLICK HERE A.4.1.1.11. Membuat 1 m beton mutu f ' c = 28,8 Mpa ( K - 325 ), Slump ( 12 2 ) cm, w/c = 0.49
CLICK HERE A.4.1.1.12. Membuat 1 m beton mutu f ' c = 31,2 Mpa ( K - 350 ), Slump ( 12 2 ) cm, w/c = 0.48
CLICK HERE A.4.1.1.14. Pemasangan 1 m' PVC Waterstop lebar 150 mm
CLICK HERE A.4.1.1.15. Pemasangan 1 m' PVC Waterstop lebar 200 mm
CLICK HERE A.4.1.1.16. Pemasangan 1 m' PVC Waterstop lebar 230 mm - 320 mm
CLICK HERE A.4.1.1.17. Pembesian 10 Kg dengan besi polos atau besi ulir
CLICK HERE A.4.1.1.18. Pemasangan 10 Kg kabel presstressed polos / strands
CLICK HERE A.4.1.1.19. Pemasangan 10 Kg jaring kawat baja ( wiremesh )
CLICK HERE A.4.1.1.20. Pemasangan 1 m bekisting untuk pondasi
CLICK HERE A.4.1.1.21. Pemasangan 1 m bekisting untuk sloof
CLICK HERE A.4.1.1.22. Pemasangan 1 m bekisting untuk kolom
CLICK HERE A.4.1.1.23. Pemasangan 1 m bekisting untuk balok
CLICK HERE A.4.1.1.24. Pemasangan 1 m bekisting untuk lantai
CLICK HERE A.4.1.1.25. Pemasangan 1 m bekisting untuk dinding
CLICK HERE A.4.1.1.32. Membuat 1 m kolom beton bertulang ( 150 Kg besi + Bekisting )
CLICK HERE A.4.1.1.33. Membuat 1 m dinding beton bertulang ( 150 Kg besi + Bekisting )
CLICK HERE A.4.1.1.34. Membuat 1 m dinding beton bertulang ( 200 Kg besi + Bekisting )
CLICK HERE A.4.1.1.35. Membuat 1 m kolom praktis beton bertulang ( 11 x 11 ) cm
CLICK HERE A.4.1.1.36. Membuat 1 m ring balok beton bertulang ( 10 x 15 ) cm
BACK
A.4.1.2 HARGA SATUAN PEKERJAAN BETON
. PRACETAK
CLICK HERE A.4.1.2.1. Pembuatan 1 m lahan produksi tebal 8 cm beton f ' c 14,5 Mpa ( K - 175 ) slump ( 12 2 ) cm
CLICK HERE A.4.1.2.2. Pembuatan 1 m lahan produksi tebal 10 cm beton f ' c 14,5 Mpa ( K - 175 ) slump ( 12 2 ) cm
CLICK HERE A.4.1.2.3. Pembuatan 1 m lahan produksi tebal 12 cm beton f ' c 14,5 Mpa ( K - 175 ) slump ( 12 2 ) cm
CLICK HERE A.4.1.2.6. Pebuatan 1 m bekisting untuk balok beton pracetak ( 10 - 12 kali pakai )
CLICK HERE A.4.1.2.7. Pebuatan 1 m bekisting untuk kolom beton pracetak ( 10 - 12 kali pakai )
CLICK HERE A.4.1.2.8. Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak
CLICK HERE A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
CLICK HERE A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen kolom beton pracetak
CLICK HERE A.4.1.2.11. Penuangan / menebar beton untuk 1 buah komponen plat pracetak
CLICK HERE A.4.1.2.12. Penuangan / menebar beton untuk 1 buah komponen balok pracetak
CLICK HERE A.4.1.2.13. Penuangan / menebar beton untuk 1 buah komponen kolom pracetak
CLICK HERE A.4.1.2.14. Mendirikan 1 buah komponen plat pracetak
CLICK HERE A.4.1.2.15. Mendirikan 1 buah komponen balok pracetak
BACK
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN
. ALUMUNIUM
CLICK HERE A.4.2.1.1. Pemasangan 1 Kg besi profil
CLICK HERE A.4.2.1.2. Pemasangan 1 Kg rangka kuda-kuda baja I WF
CLICK HERE A.4.2.1.3. Pengerjaan 100 Kg pekerjaan perakitan
CLICK HERE A.4.2.1.4. Pembuatan 1 m pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
CLICK HERE A.4.2.1.5. Pengerjaan 10 cm pengelasan dengan las listrik
CLICK HERE A.4.2.1.6. Pembuatan 1 m rangka jendela besi scuare tube ( 25 x 5 ) cm
CLICK HERE A.4.2.1.19. Pemasangan 1 m talang lingkaran 15 cm, seng plat bjls 30 lebar 45 cm
CLICK HERE A.4.2.1.20. Pemasangan 1 m rangka besi holow 1 x 40 x 40 x 2 mm, modul 60 x 120 cm, dinding partisi
CLICK HERE A.4.2.1.21. Pemasangan 1 m rangka besi holow 1 x 40 x 40 x 2 mm, modul 60 x 60 cm, plafond
BACK
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN
. DINDING
0070C0CV. MITRA UTAMA KONSULTAN 12
BACK
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN
. DINDING
CLICK HERE A.4.4.1.1. Pemasangan 1 m dinding bata merah ( 5 x 11 x 22 ) cm tebal 1 batu campuran 1 SP : 2 PP
CLICK HERE A.4.4.1.2. Pemasangan 1 m dinding bata merah ( 5 x 11 x 22 ) cm tebal 1 batu campuran 1 SP : 3 PP
CLICK HERE A.4.4.1.3. Pemasangan 1 m dinding bata merah ( 5 x 11 x 22 ) cm tebal 1 batu campuran 1 SP : 4 PP
CLICK HERE A.4.4.1.4. Pemasangan 1 m dinding bata merah ( 5 x 11 x 22 ) cm tebal 1 batu campuran 1 SP : 5 PP
CLICK HERE A.4.4.1.5. Pemasangan 1 m dinding bata merah ( 5 x 11 x 22 ) cm tebal 1 batu campuran 1 SP : 6 PP
CLICK HERE A.4.4.1.6. Pemasangan 1 m dinding bata merah ( 5 x 11 x 22 ) cm tebal 1 batu campuran 1 SP : 3 KP : 10 PP
CLICK HERE A.4.4.1.7. Pemasangan 1 m dinding bata merah ( 5 x 11 x 22 ) cm tebal batu campuran 1 SP : 2 PP
CLICK HERE A.4.4.1.8. Pemasangan 1 m dinding bata merah ( 5 x 11 x 22 ) cm tebal batu campuran 1 SP : 3 PP
CLICK HERE A.4.4.1.9. Pemasangan 1 m dinding bata merah ( 5 x 11 x 22 ) cm tebal batu campuran 1 SP : 4 PP
CLICK HERE A.4.4.1.10. Pemasangan 1 m dinding bata merah ( 5 x 11 x 22 ) cm tebal batu campuran 1 SP : 5 PP
CLICK HERE A.4.4.1.11. Pemasangan 1 m dinding bata merah ( 5 x 11 x 22 ) cm tebal batu campuran 1 SP : 6 PP
CLICK HERE A.4.4.1.12. Pemasangan 1 m dinding bata merah ( 5 x 11 x 22 ) cm tebal batu campuran 1 SP : 8 PP
CLICK HERE A.4.4.1.13. Pemasangan 1 m dinding bata merah ( 5 x 11 x 22 ) cm tebal batu campuran 1 SP : 3 KP : 10 PP
A.4.4.2
BACK HARGA SATUAN PEKERJAAN PLESTERAN
.
CLICK HERE A.4.4.2.1. Pemasangan 1 m plesteran 1 SP : 1 PP tebal 15 mm
CLICK HERE A.4.4.2.26. Pemasangan 1 m fhinishing siar pasangan batu kali, campuran 1 SP : 2 PP
CLICK HERE A.4.4.2.27. Pemasangan 1 m acian
BACK
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP
. LANTAI DAN DINDING
CLICK HERE A.4.4.3.37. Pemasangan 1 m lantai keramik ukuran 10 cm x 33 cm atau untuk variasi / border
BACK
A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT
. (PLAFOND)
CLICK HERE A.4.5.1.1. Pemasangan 1 m langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm
A.4.5.2
BACK HARGA SATUAN PEKERJAAN PENUTUP ATAP
.
CLICK HERE A.4.5.2.1. Pemasangan 1 m atap genteng palentong kecil
A.4.6.1
BACK HARGA SATUAN PEKERJAAN KAYU
.
CLICK HERE A.4.6.1.1. Pembuatan dan pemasangan 1 m kusen pintu dan kusen jendela, kayu kelas I
CLICK HERE A.4.6.1.2. Pembuatan dan pemasangan 1 m kusen pintu dan kusen jendela, kayu kelas II & III
CLICK HERE A.4.6.1.3. Pembuatan dan pemasangan 1 m kusen pintu klamp standar, kayu kelas II
CLICK HERE A.4.6.1.4. Pembuatan dan pemasangan 1 m kusen pintu klamp sederhana, kayu kelas III
CLICK HERE A.4.6.1.5. Pembuatan dan pemasangan 1 m daun pintu panel, kayu kelas I atau II
CLICK HERE A.4.6.1.11. Pemasangan 1 m teakwood rangkap, rangka expose kayu kelas I
CLICK HERE A.4.6.1.12. Pemasangan 1 m teakwood rangkap lapis formika, rangka expose kayu kelas II
CLICK HERE A.4.6.1.13. Pemasangan 1 m konstruksi kuda-kuda konvensional, kayu kelas I, II dan III
CLICK HERE A.4.6.1.14. Pemasangan 1 m konstruksi kuda-kuda expose, kayu kelas I
CLICK HERE A.4.6.1.15. Pemasangan 1 m konstruksi gording, kayu kelas II
CLICK HERE A.4.6.1.17. Pemasangan 1 m rangka atap genteng beton, kayu kelas II
CLICK HERE A.4.6.1.18. Pemasangan 1 m rangka atap sirap, kayu kelas II
CLICK HERE A.4.6.1.19. Pemasangan 1 m rangka langit-langit ( 50 x 100 ) cm, kayu kelas II atau III
CLICK HERE A.4.6.1.20. Pemasangan 1 m rangka langit-langit ( 60 x 60 ) cm, kayu kelas II atau III
CLICK HERE A.4.6.1.21. Pemasangan 1 m listplank ukuran ( 3 x 20 ) cm, kayu kelas I atau kelas II
CLICK HERE A.4.6.1.22. Pemasangan 1 m listplank ukuran ( 3 x 30 ) cm, kayu kelas I atau kelas II
CLICK HERE A.4.6.1.23. Pemasangan 1 m rangka dinding pemisah ( 60 x 120 ) cm, kayu kelas II atau III
CLICK HERE A.4.6.1.24. Pemasangan 1 m dinding pemisah rangkap, rangka kayu kelas II
CLICK HERE A.4.6.1.25. Pemasangan 1 m dinding pemisah plywood rangkap, rangka kayu kelas II
CLICK HERE A.4.6.1.28. Pemasangan 1 m dinding bilik, rangka kayu kelas III atau IV
BACK
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN
. KACA
CLICK HERE A.4.6.2.1. Pemasangan 1 buah kunci tanam antik
CLICK HERE A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa
A.4.7.1
BACK HARGA SATUAN PEKERJAAN PENGECATAN
.
CLICK HERE A.4.7.1.1. 1 m pengikisan / pengerokan permukaan cat lama
CLICK HERE A.4.7.1.2. 1 m pencucian bidang permukaan tembok yang pernah dicat
CLICK HERE A.4.7.1.3. 1 m pengerokan karat pada permukaan baja cara manual
CLICK HERE A.4.7.1.4. 1 m pengecatan bidang kayu baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
CLICK HERE A.4.7.1.5. 1 m pengecatan bidang kayu baru ( 1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup )
CLICK HERE A.4.7.1.17. Pengecatan 1 m permukaan baja dengan menie besi dengan perancah
CLICK HERE A.4.7.1.18. Pengecatan 1 m permukaan baja galvanis secara manual 4 lapis
CLICK HERE A.4.7.1.19. Pengecatan 1 m permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
CLICK HERE A.4.7.1.20. Pengecatan 1 m permukaan baja galvanis secara manual sistem 3 lapis
CLICK HERE A.4.7.1.21. Pengecatan 1 m permukaan baja galvanis secara semprot sistem 3 lapis cat
BACK
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI
. DALAM GEDUNG
CLICK HERE A.5.1.1.1. Pemasangan 1 buah closet duduk / monoblock
CLICK HERE A.5.1.1.15. Pemasangan 1 buah bak kontrol pasangan bata 30 x 30 tinggi 35 cm
CLICK HERE A.5.1.1.16. Pemasangan 1 buah bak kontrol pasangan bata 45 x 45 tinggi 50 cm
CLICK HERE A.5.1.1.17. Pemasangan 1 buah bak kontrol pasangan bata 60 x 60 tinggi 65 cm
CLICK HERE A.5.1.1.18. Pemasangan 1 m pipa galvanis "
CLICK HERE A.5.1.1.19. Pemasangan 1 buah kran air " atau "
CLICK HERE A.5.1.1.33. Pemasangan 1 m pipa air limbah jenis pipa tanah 20 cm
CLICK HERE A.5.1.1.34. Pemasangan 1 m pipa air limbah jenis pipa tanah 15 cm
CLICK HERE A.5.1.1.35. Pemasangan 1 m pipa beton 15 - 20 cm
CLICK HERE A.5.1.1.36. Pemasangan 1 m pipa beton 30 - 100 cm
A Tenaga
1 Pekerja L.01 OH 1.050 - -
2 Mandor L.04 OH 0.067 - -
Jumlah Tenaga Kerja -
B Bahan
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A Tenaga
1 Pekerja L.01 OH 1.200 - -
2 Mandor L.04 OH 0.045 - -
Jumlah Tenaga Kerja -
B Bahan
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A Tenaga
1 Pekerja L.01 OH 0.330 - -
2 Mandor L.04 OH 0.010 - -
Jumlah Tenaga Kerja -
B Bahan
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
A Tenaga
1 Pekerja L.01 OH 0.300 - -
A Tenaga
1 Pekerja L.01 OH 0.250 - -
2 Mandor L.04 OH 0.025 - -
Jumlah Tenaga Kerja -
B Bahan
1 Sirrtu m 1.200 - -
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A Tenaga
1 Pekerja L.01 OH 1.500 - -
2 Tukang Batu L.02 OH 0.750 - -
3 Kepala Tukang L.03 OH 0.075 - -
4 Mandor L.04 OH 0.075 - -
A Tenaga
1 Pekerja L.01 OH 1.500 - -
2 Tukang Batu L.02 OH 0.750 - -
3 Kepala Tukang L.03 OH 0.075 - -
4 Mandor L.04 OH 0.075 - -
Jumlah Tenaga Kerja -
B Bahan
1 Batu Belah m 1.200 - -
1 Kapur m 0.131 - -
2 Semen Portland Kg 41.000 - -
3 Pasir Pasang m 0.523 - -
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A Tenaga
A.3.2.1.10 Pemasangan 1 m pondasi siklop, 60% beton campuran 1 SP : 2 PB : 3 Kr dan 40% batu belah
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 3.400 - -
2 Tukang Batu L.02 OH 0.850 - -
3 Kepala Tukang L.03 OH 0.085 - -
4 Mandor L.04 OH 0.170 - -
Jumlah Tenaga Kerja -
B Bahan
1 Batu Belah m 0.480 - -
2 Semen Portland Kg 194.000 - -
3 Pasir Beton m 0.312 - -
4 Kerikil m 0.468 - -
5 Besi Beton Kg 126.000 - -
6 Kawat Beton Kg 1.800 - -
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.1.1
HARGA SATUAN PEKERJAAN BETON
.
A.4.1.1.1. Membuat 1 m beton mutu f ' c = 7,4 Mpa ( K - 100 ), Slump (12 2 ) cm, w/c = 0.87
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 - -
2 Tukang Batu L.02 OH 0.275 - -
3 Kepala Tukang L.03 OH 0.028 - -
4 Mandor L.04 OH 0.083 - -
Jumlah Tenaga Kerja -
B Bahan
1 Semen Portland Kg 247.000 - -
2 Pasir Beton Kg 869.000 - -
3 Kerikil ( Maks 30mm ) Kg 999.000 - -
4 Air Liter 215.000 - -
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
A.4.1.1.2. Membuat 1 m beton mutu f ' c = 9,8 Mpa ( K - 125 ), Slump (12 2 ) cm, w/c = 0.78
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 - -
2 Tukang Batu L.02 OH 0.275 - -
3 Kepala Tukang L.03 OH 0.028 - -
4 Mandor L.04 OH 0.083 - -
Jumlah Tenaga Kerja -
B Bahan
1 Semen Portland Kg 276.000 - -
2 Pasir Beton Kg 828.000 - -
3 Kerikil ( Maks 30mm ) Kg 1,012.000 - -
4 Air Liter 215.000 - -
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.1.1.3. Membuat 1 m beton mutu f ' c = 12,2 Mpa ( K - 150 ), Slump (12 2 ) cm, w/c = 0.72
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 82,500.00 136,125.00
2 Tukang Batu L.02 OH 0.275 88,000.00 24,200.00
3 Kepala Tukang L.03 OH 0.028 88,000.00 2,464.00
4 Mandor L.04 OH 0.083 99,000.00 8,217.00
Jumlah Tenaga Kerja 160,325.00
B Bahan
1 Semen Portland Kg 299.000 1,760.00 526,240.00
2 Pasir Beton Kg 799.000 77.71 62,088.01
3 Kerikil ( Maks 30mm ) Kg 1,017.000 207.53 211,061.40
4 Air Liter 215.000 45.45 9,771.75
Jumlah Harga Bahan 809,161.16
C Peralatan
CATATAN :
Bobot isi pasir = 1.400 Kg/m, bobot isi kerikil = 1.350 Kg/m, buckling factor pasir = 20%
A.4.1.1.4. Membuat 1 m lantai kerja beton mutu f ' c = 7,4 Mpa ( K - 100 ), Slump ( 3 - 6 ) cm, w/c = 0.87
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 - -
2 Tukang Batu L.02 OH 0.275 - -
3 Kepala Tukang L.03 OH 0.028 - -
4 Mandor L.04 OH 0.083 - -
Jumlah Tenaga Kerja -
B Bahan
1 Semen Portland Kg 299.000 - -
2 Pasir Beton Kg 799.000 - -
3 Kerikil ( Maks 30mm ) Kg 1,017.000 - -
4 Air Liter 215.000 - -
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.1.1.5. Membuat 1 m beton mutu f ' c = 14,5 Mpa ( K - 175 ), Slump ( 12 2 ) cm, w/c = 0.66
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 - -
2 Tukang Batu L.02 OH 0.275 - -
3 Kepala Tukang L.03 OH 0.028 - -
4 Mandor L.04 OH 0.083 - -
Jumlah Tenaga Kerja -
A.4.1.1.6. Membuat 1 m beton mutu f ' c = 16,9 Mpa ( K - 200 ), Slump ( 12 2 ) cm, w/c = 0.61
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 - -
2 Tukang Batu L.02 OH 0.275 - -
3 Kepala Tukang L.03 OH 0.028 - -
4 Mandor L.04 OH 0.083 - -
Jumlah Tenaga Kerja -
B Bahan
1 Semen Portland Kg 352.000 - -
2 Pasir Beton Kg 731.000 - -
3 Kerikil ( Maks 30mm ) Kg 1,031.000 - -
4 Air Liter 215.000 - -
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.1.1.7. Membuat 1 m beton mutu f ' c = 19,3 Mpa ( K - 225 ), Slump ( 12 2 ) cm, w/c = 0.58
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 - -
2 Tukang Batu L.02 OH 0.275 - -
A.4.1.1.8. Membuat 1 m beton mutu f ' c = 21,7 Mpa ( K - 250 ), Slump ( 12 2 ) cm, w/c = 0.56
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 - -
2 Tukang Batu L.02 OH 0.275 - -
3 Kepala Tukang L.03 OH 0.028 - -
4 Mandor L.04 OH 0.083 - -
Jumlah Tenaga Kerja -
B Bahan
1 Semen Portland Kg 384.000 - -
2 Pasir Beton Kg 692.000 - -
3 Kerikil ( Maks 30mm ) Kg 1,039.000 - -
4 Air Liter 215.000 - -
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.1.1.9. Membuat 1 m beton mutu f ' c = 24,0 Mpa ( K - 275 ), Slump ( 12 2 ) cm, w/c = 0.53
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
A.4.1.1.10. Membuat 1 m beton mutu f ' c = 26,4 Mpa ( K - 300 ), Slump ( 12 2 ) cm, w/c = 0.52
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.650 - -
2 Tukang Batu L.02 OH 0.275 - -
3 Kepala Tukang L.03 OH 0.028 - -
4 Mandor L.04 OH 0.083 - -
Jumlah Tenaga Kerja -
B Bahan
1 Semen Portland Kg 413.000 - -
2 Pasir Beton Kg 681.000 - -
3 Kerikil ( Maks 30mm ) Kg 1,021.000 - -
4 Air Liter 215.000 - -
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.1.1.11. Membuat 1 m beton mutu f ' c = 28,8 Mpa ( K - 325 ), Slump ( 12 2 ) cm, w/c = 0.49
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
A.4.1.1.12. Membuat 1 m beton mutu f ' c = 31,2 Mpa ( K - 350 ), Slump ( 12 2 ) cm, w/c = 0.48
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 2.100 - -
2 Tukang Batu L.02 OH 0.350 - -
3 Kepala Tukang L.03 OH 0.035 - -
4 Mandor L.04 OH 0.105 - -
Jumlah Tenaga Kerja -
B Bahan
1 Semen Portland Kg 448.000 - -
2 Pasir Beton Kg 667.000 - -
3 Kerikil ( Maks 30mm ) Kg 1,000.000 - -
4 Air Liter 215.000 - -
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A Tenaga
1 Pekerja L.01 OH 0.060 - -
2 Tukang Batu / Pipa L.02 OH 0.030 - -
3 Kepala Tukang L.03 OH 0.003 - -
4 Mandor L.04 OH 0.003 - -
Jumlah Tenaga Kerja -
B Bahan
1 Waterstp lebar 150 mm m' 1.050 - -
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A Tenaga
1 Pekerja L.01 OH 0.050 - -
2 Tukang Besi L.02 OH 0.050 - -
A Tenaga
1 Pekerja L.01 OH 0.660 - -
2 Tukang Kayu L.02 OH 0.330 - -
3 Kepala Tukang L.03 OH 0.033 - -
4 Mandor L.04 OH 0.003 - -
Jumlah Tenaga Kerja -
B Bahan
1 Kayu Kelas III m 0.040 - -
2 Paku 5 - 12 cm Kg 0.400 - -
3 Minyak Bekisting Liter 0.200 - -
4 Balok Kayu Kelas II m 0.018 - -
5 Plywood Tebal 9 mm Lembar 0.350 - -
6 Dolken Kayu 8 - 10 cm -
Batang 2.000 - -
Panjang 4 m
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A Tenaga
1 Pekerja L.01 OH 7.050 - -
2 Tukang Batu L.02 OH 0.275 - -
3 Tukang Kayu L.02 OH 1.650 - -
4 Tukang Besi L.02 OH 2.100 - -
5 Kepala Tukang L.03 OH 0.403 - -
6 Mandor L.04 OH 0.353 - -
Jumlah Tenaga Kerja -
B Bahan
1 Kayu Kelas III m 0.400 - -
A.4.1.2.2. Pembuatan 1 m lahan produksi tebal 10 cm beton f ' c 14,5 Mpa ( K - 175 ) slump ( 12 2 ) cm
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.165 - -
2 Tukang Batu L.02 OH 0.028 - -
3 Kepala Tukang L.03 OH 0.003 - -
4 Mandor L.04 OH 0.008 - -
Jumlah Tenaga Kerja -
B Bahan
1 Semen Portland Kg 32.600 - -
2 Pasir Beton Kg 76.000 - -
3 Kerikil ( Maks 30mm ) Kg 102.900 - -
4 Air Liter 21.500 - -
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.1.2.3. Pembuatan 1 m lahan produksi tebal 12 cm beton f ' c 14,5 Mpa ( K - 175 ) slump ( 12 2 ) cm
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
A.4.1.2.4. Pembuatan 1 m lahan produksi tebal 15 cm beton f ' c 14,5 Mpa ( K - 175 ) slump ( 12 2 ) cm
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.248 - -
2 Tukang Batu L.02 OH 0.041 - -
3 Kepala Tukang L.03 OH 0.004 - -
4 Mandor L.04 OH 0.013 - -
Jumlah Tenaga Kerja -
B Bahan
1 Semen Portland Kg 48.900 - -
2 Pasir Beton Kg 114.000 - -
3 Kerikil ( Maks 30mm ) Kg 154.350 - -
4 Air Liter 32.250 - -
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.1.2.8. Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.053 - -
2 TukangKayu L.02 OH 0.018 - -
4 Mandor L.04 OH 0.005 - -
Jumlah Tenaga Kerja -
B Bahan
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.089 - -
2 TukangKayu L.02 OH 0.030 - -
4 Mandor L.04 OH 0.005 - -
Jumlah Tenaga Kerja -
B Bahan
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen kolom beton pracetak
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.071 - -
2 TukangKayu L.02 OH 0.024 - -
4 Mandor L.04 OH 0.005 - -
Jumlah Tenaga Kerja -
B Bahan
Jumlah Harga Bahan 0
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.2.1.4. Pembuatan 1 m pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A.4.2.1.20. Pemasangan 1 m rangka besi holow 1 x 40 x 40 x 2 mm, modul 60 x 120 cm, dinding partisi
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.250 - -
2 Tukang Besi L.02 OH 0.250 - -
3 Kepala Tukang L.03 OH 0.0250 - -
4 Mandor L.04 OH 0.0130 - -
Jumlah Tenaga Kerja -
B Bahan
1 Rangka Metal Hollow
m 1.050 - -
40.40.2 mm
A.4.4.2
HARGA SATUAN PEKERJAAN PLESTERAN
.
A Tenaga
1 Pekerja L.01 OH 0.270 - -
2 Tukang Batu L.02 OH 0.135 - -
3 Kepala Tukang L.03 OH 0.014 - -
4 Mandor L.04 OH 0.014 - -
Jumlah Tenaga Kerja -
B Bahan
1 Ubin Warna Bh 26.500 - -
2 Semen Portland Kg 10.400 - -
3 Semen Warna Kg 1.620 - -
4 Pasir Pasang m 0.045 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A Tenaga
1 Pekerja L.01 OH 0.700 - -
2 Tukang Batu L.02 OH 0.350 - -
3 Kepala Tukang L.03 OH 0.035 - -
4 Mandor L.04 OH 0.035 - -
Jumlah Tenaga Kerja -
A Tenaga
1 Pekerja L.01 OH 0.700 - -
2 Tukang Batu L.02 OH 0.350 - -
3 Kepala Tukang L.03 OH 0.035 - -
4 Mandor L.04 OH 0.035 - -
Jumlah Tenaga Kerja -
B Bahan
1 Marmer Bh 1.060 - -
2 Semen Portland Kg 8.190 - -
3 Pasir Pasang m 0.045 - -
4 Semen Warna Kg 0.650 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.5.1.5. Pemasangan 1 m langit-langit tripleks ukuran ( 120 x 240 ) cm, tebal 3 mm, 4 mm & 6 mm
A.4.5.1.7. Pemasangan 1 m langit-langit gypsum board ukuran ( 120 x 240 x 9 ) mm, tebal 9 mm
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
A.4.5.1.8. Pemasangan 1 m langit-langit akustik ukuran ( 60 x 120 ) cm, berikut rangka alluminium
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.500 - -
2 Tukang Besi L.02 OH 0.500 - -
3 Kepala Tukang L.03 OH 0.050 - -
4 Mandor L.04 OH 0.025 - -
Jumlah Tenaga Kerja -
B Bahan
1 Profil Alluminium "T" m 3.600 - -
2 Kawat 4 mm Kg 0.150 - -
3 Ramset Buah 1.050 - -
4 Akustik 60 x 120 Lembar 1.500 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.5.2
HARGA SATUAN PEKERJAAN PENUTUP ATAP
.
A.4.5.2.1. Pemasangan 1 m atap genteng palentong kecil
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.150 - -
2 Tukang Kayu L.02 OH 0.075 - -
3 Kepala Tukang L.03 OH 0.0075 - -
4 Mandor L.04 OH 0.008 - -
Jumlah Tenaga Kerja -
B Bahan
1 Genteng Palentong Bh 25.000 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.6.1.2. Pembuatan dan pemasangan 1 m kusen pintu dan kusen jendela, kayu kelas II & III
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 6.000 - -
2 Tukang Kayu L.02 OH 18.000 - -
3 Kepala Tukang L.03 OH 1.8000 - -
4 Mandor L.04 OH 0.300 - -
Jumlah Tenaga Kerja -
B Bahan
1 Balok Kayu m 1.200 - -
2 Paku 10 cm Kg 1.250 - -
3 Lem Kayu Kg 1.000 - -
Jumlah Harga Bahan -
C Peralatan
A.4.6.1.3. Pembuatan dan pemasangan 1 m kusen pintu klamp standar, kayu kelas II
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.350 - -
2 Tukang Kayu L.02 OH 1.050 - -
3 Kepala Tukang L.03 OH 0.1050 - -
4 Mandor L.04 OH 0.018 - -
Jumlah Tenaga Kerja -
B Bahan
1 Papan Kayu m 0.040 - -
2 Paku 5 - 7 cm Kg 0.050 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.6.1.4. Pembuatan dan pemasangan 1 m kusen pintu klamp sederhana, kayu kelas III
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.350 - -
2 Tukang Kayu L.02 OH 1.050 - -
3 Kepala Tukang L.03 OH 0.1050 - -
4 Mandor L.04 OH 0.018 - -
Jumlah Tenaga Kerja -
B Bahan
1 Papan Kayu m 0.040 - -
2 Paku 5 - 7 cm Kg 0.050 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
A.4.6.1.5. Pembuatan dan pemasangan 1 m daun pintu panel, kayu kelas I atau II
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.000 - -
2 Tukang Kayu L.02 OH 3.000 - -
3 Kepala Tukang L.03 OH 0.3000 - -
4 Mandor L.04 OH 0.050 - -
Jumlah Tenaga Kerja -
B Bahan
1 Papan Kayu m 0.040 - -
2 Lem Kayu Kg 0.500 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.6.1.6. Pembuatan dan pemasangan 1 m pintu dan jendela kaca, kayu kelas I atau II
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.800 - -
2 Tukang Kayu L.02 OH 2.400 - -
3 Kepala Tukang L.03 OH 0.2400 - -
4 Mandor L.04 OH 0.040 - -
Jumlah Tenaga Kerja -
B Bahan
1 Papan Kayu m 0.024 - -
2 Lem Kayu Kg 0.300 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.6.1.8. Pembuatan 1 m daun pintu plywood rangkap, rangka kayu kelas II tertutup ( lebar sampai 90 cm )
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.700 - -
2 Tukang Kayu L.02 OH 2.100 - -
3 Kepala Tukang L.03 OH 0.2100 - -
4 Mandor L.04 OH 0.035 - -
Jumlah Tenaga Kerja -
B Bahan
1 Papan Kayu m 0.025 - -
2 Paku 1 cm - 2,5 cm Kg 0.030 - -
3 Lem Kayu Kg 0.500 - -
4 Plywood tebal 4 mm
Lembar 0.035 - -
ukuran ( 90 x 220 ) cm
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
A.4.6.1.9. Pembuatan 1 m pintu plywood rangkap, rangka expose kayu kelas I atau II
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.800 - -
2 Tukang Kayu L.02 OH 2.400 - -
3 Kepala Tukang L.03 OH 0.2400 - -
4 Mandor L.04 OH 0.040 - -
Jumlah Tenaga Kerja -
B Bahan
1 Papan Kayu m 0.0256 - -
2 Paku 1 cm - 2,5 cm Kg 0.030 - -
3 Lem Kayu Kg 0.500 - -
4 Plywood tebal 4 mm
Lembar 1.000 - -
ukuran ( 90 x 220 ) cm
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.6.1.12. Pemasangan 1 m teakwood rangkap lapis formika, rangka expose kayu kelas II
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.850 - -
2 Tukang Kayu L.02 OH 2.550 - -
3 Kepala Tukang L.03 OH 0.2550 - -
4 Mandor L.04 OH 0.043 - -
Jumlah Tenaga Kerja -
B Bahan
1 Papan Kayu m 0.0250 - -
2 Paku 1 cm - 2,5 cm Kg 0.030 - -
3 Lem Kayu Kg 0.800 - -
4 Teakwood tebal 4 mm
Lembar 1.000 - -
ukuran ( 90 x 220 ) cm
A.4.6.1.19. Pemasangan 1 m rangka langit-langit ( 50 x 100 ) cm, kayu kelas II atau III
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.150 - -
2 Tukang Kayu L.02 OH 0.300 - -
3 Kepala Tukang L.03 OH 0.0300 - -
4 Mandor L.04 OH 0.075 - -
Jumlah Tenaga Kerja -
B Bahan
1 Kaso-kaso 5 x 7 cm m 0.0154 - -
2 Paku 7 cm - 10 cm Kg 0.200 - -
Jumlah Harga Bahan -
A.4.6.1.23. Pemasangan 1 m rangka dinding pemisah ( 60 x 120 ) cm, kayu kelas II atau III
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.150 - -
2 Tukang Kayu L.02 OH 0.450 - -
3 Kepala Tukang L.03 OH 0.0450 - -
4 Mandor L.04 OH 0.008 - -
Jumlah Tenaga Kerja -
B Bahan
1 Balok Kayu m 0.0280 - -
2 Paku 5 cm dan 7 cm Kg 0.150 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
A.4.7.1
HARGA SATUAN PEKERJAAN PENGECATAN
.
A.4.7.1.1. 1 m pengikisan / pengerokan permukaan cat lama
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.150 - -
2 Mandor L.04 OH 0.003 - -
Jumlah Tenaga Kerja -
B Bahan
1 Soda Api Kg 0.050 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.7.1.4. 1 m pengecatan bidang kayu baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.070 - -
2 Tukang Cat L.02 OH 0.009 - -
3 Kepala Tukang L.03 OH 0.006 - -
4 Mandor L.04 OH 0.003 - -
Jumlah Tenaga Kerja -
B Bahan
1 Cat Menie Kg 0.200 - -
2 Plamir Kg 0.150 - -
3 Cat Dasar Kg 0.170 - -
4 Cat Penutup Kg 0.260 - -
A.4.7.1.5. 1 m pengecatan bidang kayu baru ( 1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup )
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.070 - -
2 Tukang Cat L.02 OH 0.105 - -
3 Kepala Tukang L.03 OH 0.004 - -
4 Mandor L.04 OH 0.003 - -
Jumlah Tenaga Kerja -
B Bahan
1 Cat Menie Kg 0.200 - -
2 Plamir Kg 0.150 - -
3 Cat Dasar Kg 0.170 - -
4 Cat Penutup Kg 0.350 - -
5 Kuas Buah 0.010 - -
6 Pengencer Kg 0.030 - -
7 Ampelas Lembar 0.200 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.7.1.10. Pengecataan 1 m tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.020 - -
2 Tukang Cat L.02 OH 0.063 - -
3 Kepala Tukang L.03 OH 0.0063 - -
4 Mandor L.04 OH 0.003 - -
A.4.7.1.11. Pengecataan 1 m tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup )
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.028 - -
2 Tukang Cat L.02 OH 0.042 - -
3 Kepala Tukang L.03 OH 0.0042 - -
4 Mandor L.04 OH 0.003 - -
Jumlah Tenaga Kerja -
B Bahan
1 Cat Dasar Kg 0.120 - -
2 Cat Penutup Kg 0.180 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A.4.7.1.19. Pengecatan 1 m permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.060 - -
2 Tukang Cat L.02 OH 0.060 - -
3 Kepala Tukang L.03 OH 0.012 - -
4 Mandor L.04 OH 0.0030 - -
A.4.7.1.21. Pengecatan 1 m permukaan baja galvanis secara semprot sistem 3 lapis cat
Harga Satuan JUMLAH
No. URAIAN KODE Satuan Koefesian
( Rp. ) ( Rp. )
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.400 - -
2 Tukang Cat L.02 OH 0.700 - -
A Tenaga
1 Pekerja L.01 OH 3.300 - -
2 Tukang Batu L.02 OH 1.100 - -
3 Kepala Tukang L.03 OH 0.010 - -
4 Mandor L.04 OH 0.160 - -
Jumlah Tenaga Kerja -
B Bahan
1 Closet Duduk Unit 1.000 - -
2 Perlengkapan Ls 6% x Closet - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A Tenaga
1 Pekerja L.01 OH 3.500 - -
2 Tukang Batu L.02 OH 4.500 - -
3 Kepala Tukang L.03 OH 0.050 - -
4 Mandor L.04 OH 0.018 - -
Jumlah Tenaga Kerja -
B Bahan
1 Beton 1 : 2 : 3 m 0.900 - -
2 Baja Tulangan Kg 180.000 - -
3 Kayu Eksisting m 8.000 - -
4 Ubin Porselen Buah 500.000 - -
5 Perlengkapan % 10.000 0.10 0.10
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A Tenaga
1 Pekerja L.01 OH 2.160 - -
2 Tukang Batu L.02 OH 0.720 - -
3 Kepala Tukang L.03 OH 0.072 - -
4 Mandor L.04 OH 0.011 - -
Jumlah Tenaga Kerja -
B Bahan
1 Bata Merah Buah 40.000 - -
2 Semen Portland Kg 44.000 - -
3 Pasir Pasang m 0.070 - -
4 Pasir Beton m 0.060 - -
5 Kerikil m 0.070 - -
6 Baja Tulangan Kg 1.600 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -
A Tenaga
1 Pekerja L.01 OH 0.081 - -
2 Tukang Batu L.02 OH 0.135 - -
3 Kepala Tukang L.03 OH 0.0135 - -
4 Mandor L.04 OH 0.004 - -
Jumlah Tenaga Kerja -
B Bahan
1 Pipa PVC 3" m 1.200 - -
2 Perlengkapan % 35.000 - -
Jumlah Harga Bahan -
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah Harga Tenaga, Bahan dan Perlatan ( A + B + C ) -
E Overhead + Profit ( Contoh 15% ) 15% x D -
F Harga Satuan Pekerjaan ( D + E ) -