SPESIFIKASI TEKNIS
KEGIATAN :
0
PEKERJAAN :
0.00
LOKASI
KABUPATEN SINTANG
TA. 2016
PEMERINTAH PROVINSI KALIMANTAN BARAT
DINAS LINGKUNGAN HIDUP DAN KEHUTANAN
UNIT PELAKSANA TEKNIS
KESATUAN PENGELOLAAN HUTAN
WILAYAH SINTANG TIMUR
KEGIATAN :
0
SUB KEGIATAN :
0
PEKERJAAN :
0.00
LOKASI
KABUPATEN SINTANG
TA. 2021
GAMBAR KERJA
MASJID AL-FALAH
PEKERJAAN :
PEMBANGUNAN MASJID AL-FALAH
LOKASI
KABUPATEN SINTANG
KONSULTAN PERENCANAAN
KK STUDIO
DAFTAR HARGA SATUAN UPAH DAN BAHAN
KEGIATAN : 0
0
PEKERJAAN : 0
LOKASI : KABUPATEN SINTANG
TAHUN ANGGARAN : 2021
UPAH
1 Mandor Pekerja Kasar ( Tk. Batu, Tk. Gali, Tk. Pembesian) Org/hari 155,000.00 155,000.00
2 Mandor Pekerja Halus ( Tk. Batu tempel, Tk. Kozyin Lambressiring). Org/hari 165,000.00 165,000.00
3 Mekanik Terlatih Org/hari 175,000.00 175,000.00
4 Mekanik Semi Terlatih Org/hari 120,000.00 120,000.00
5 Kepala Tukang Pekerja Kasar ( Tk. Batu, Tk. Gali, Tk. Pembesian) Org/hari 155,000.00 155,000.00
6 Kepala Tukang Pekerja Halus ( Tk. Batu tempel, Tk. Kozyin Lambressiring) Org/hari 165,000.00 165,000.00
7 Tukang Pekerja Kasar (Tk. Batu, Tk. Gali, Tk. Pembesian) Org/hari 110,000.00 110,000.00
8 Tukang Pekerja Halus ( Tk. Batu tempel, Tk. Kozyin Lambressiring) Org/hari 125,000.00 125,000.00
9 Operator Terlatih Org/hari 185,000.00 185,000.00
10 Operator Semi Terlatih Org/hari 140,000.00 140,000.00
11 Pembantu Operator Org/hari 95,000.00 95,000.00
12 Supir Org/hari 160,000.00 160,000.00
13 Pembantu Supir/Kenek Org/hari 95,000.00 95,000.00
14 Buruh Lapangan Tak Terlatih Org/hari 95,000.00 95,000.00
15 Buruh Lapangan Semi Terlatih Org/hari 105,000.00 105,000.00
16 Buruh Lapangan Terlatih (Pekerja) Org/hari 110,000.00 110,000.00
BAHAN PENGISI
18 Semen PC 50 Kg Zak 81,382.66 81,382.66
19 Semen Putih 40 Kg Zak 150,706.13 150,706.13
33 Batu Pecah 3/5 cm m3 462,077.80 462,077.80
34 Batu Pecah 2/3 cm m3 487,077.80 487,077.80
35 Batu Pecah 1/2 cm m3 517,077.80 517,077.80
36 Batu Pecah 0,5/1 cm m3 532,077.80 532,077.80
38 Pasir Pasang/Merah m3 135,291.30 135,291.30
39 Pasir Urug/Kotor m3 98,291.30 98,291.30
40 Pasir Beton/Putih m3 130,291.30 130,291.30
41 Sirtu m3 118,291.30 118,291.30
42 Kerikil Sungai (tidak Tersaring) m3 225,291.30 225,291.30
43 Kerikil Sungai ( Tersaring) m3 245,291.30 245,291.30
44 Tanah Timbunan Pilihan m3 98,291.30 98,291.30
45 Tanah Setempat m3 63,291.30 63,291.30
50 Bataco 7 x 15 x 30 cm Bh 1,718.22 1,718.22
51 Bataco 8 x 20 x 40 cm ( press ) Bh 3,546.26 3,546.26
52 Bata Merah 5 x 11 x 22 cm Bh 1,018.22 1,018.22
BAHAN KAYU
64 Balok Kayu Klas I 15/15 m3 8,888,266.48 8,888,266.48
65 Balok Kayu Klas I tdk Ketam 9/9. m3 3,988,266.48 3,988,266.48
66 Balok Kayu Klas I Ketam 8/8. m3 5,548,266.48 5,548,266.48
67 Kayu Klas I 4/8 m3 5,938,266.48 5,938,266.48
68 Balok Kayu Klas II tdk Ketam 9/9 m3 3,388,266.48 3,388,266.48
69 Balok Kayu Klas II Ketam 8/8 m3 4,768,266.48 4,768,266.48
70 Kayu Klas II 4/8 m3 4,768,266.48 4,768,266.48
71 Papan Kayu Klas I (tdk Ketam) m3 4,768,266.48 4,768,266.48
72 Papan Kayu Klas I (Ketam) m3 6,288,266.48 6,288,266.48
73 Papan Kayu Klas II tdk Ketam m3 3,498,266.48 3,498,266.48
74 Papan Kayu Klas II Ketam m3 4,768,266.48 4,768,266.48
75 Papan Mal Klas III m3 2,168,266.48 2,168,266.48
76 Renglat 1,5/4 m3 5,704,266.48 5,704,266.48
77 Kayu 4/4 kelas Biasa m3 3,208,266.48 3,208,266.48
78 Kayu Reng kelas Biasa m3 3,076,266.48 3,076,266.48
79 Kayu Kasau kelas Biasa m3 2,218,266.48 2,218,266.48
80 Perancah 4 m diameter ≤ 4 cm Btg 10,002.07 10,002.07
81 Cerucuk/Dolken 4 m diameter 8-10 cm Btg 25,002.58 25,002.58
82 Cerucuk 4 m diameter ≥ 12 cm Btg 30,003.10 30,003.10
83 Kayu Simpiran ikat 22,942.22 22,942.22
84 Alas Kayu Hutan Btg 25,002.58 25,002.58
85 Kayu Bakar m3 134,133.24 134,133.24
BAHAN PENUTUP
94 Triplek t = 3 mm Kpg 55,778.51 55,778.51
95 Triplek t = 6 mm Kpg 106,557.02 106,557.02
96 Triplek t = 9 mm Kpg 167,335.53 167,335.53
97 Multiplex 12 mm Kpg 223,114.04 223,114.04
98 Plafon PVC 20cm x 5cm x 9mm Motif Timbul Bh 182,233.20 182,233.20
99 Plafon PVC 25cm x 5cm x 7mm Bh 167,573.24 167,573.24
100 Plafon PVC 20cm x 5cm x 8mm Shunda PL 08037 Bh 188,726.56 188,726.56
101 Plafon PVC 20cm x 4cm x 10mm Shunda Bh 213,283.20 213,283.20
102 List Plafon PVC 4m Bh 121,794.81 121,794.81
103 Hollow Plafon PVC Bh 20,294.81 20,294.81
104 Plywood Kpg 151,557.02 151,557.02
105 Gypsum Board Lbr 92,335.53 92,335.53
106 GRC 4 mm Lbr 79,557.02 79,557.02
107 List Profil Gypsum m' 27,424.36 27,424.36
108 Acrylic 4 mm Lbr 420,778.51 420,778.51
BAHAN FINISHING
109 Amplas Lbr 4,019.24 4,019.24
110 Kuas 4" Standar Bh 25,019.24 25,019.24
111 Minyak Cat/Pengencer Ltr 55,035.31 55,035.31
112 Meni Kaleng 40,035.31 40,035.31
113 Cat Dasar (Alkali) Kg 60,035.31 60,035.31
114 Cat Besi Kg 60,035.31 60,035.31
115 Cat Kilat setara Avian Kg 65,035.31 65,035.31
116 Cat Interior setara Vinilex, Catylac Kg 35,035.31 35,035.31
117 Cat Akhir Eksterior (weather shield) setara Dulux Ltr 100,035.31 100,035.31
118 Sealent ( Lem Kaca ) Tube 35,010.59 35,010.59
119 Soda Api Kg 25,035.31 25,035.31
120 Dempul 4 Kg Kaleng 55,035.31 55,035.31
121 Residu Kg 16,035.31 16,035.31
122 Thiner ND Ltr 20,035.31 20,035.31
123 Melamic Ltr 72,035.31 72,035.31
124 Oker Bgks 15,035.31 15,035.31
125 Plamur setara Kingkong Kg 35,035.31 35,035.31
126 Aquaproof Kg 57,035.31 57,035.31
BAHAN BESI
127 Besi tulangan Beton Polos ( batang ) Kg 10,570.15 10,570.15
128 Besi tulangan Beton Polos SNI (sekelas Karakatau Steel) Kg 11,988.30 11,988.30
129 Besi Beton Ulir ( batang ) Kg 10,840.28 10,840.28
130 Besi Beton Ulir SNI (sekelas Karakatau Steel) Kg 11,991.65 11,991.65
131 Kawat Baja/Bendrat Kg 23,035.31 23,035.31
132 Besi Konstruksi Kg 11,991.65 11,991.65
133 Kawat Simpai Kg 25,035.31 25,035.31
134 Baut Ø5/8".panjang 20 cm Bh 6,007.06 6,007.06
135 Besi Wiremesh Ø 6 L2,1m m' 77,886.17 77,886.17
136 Kawat Harmonika m' 28,028.81 28,028.81
137 Plat 1,2 x 120 x 240 Kpg 330,957.85 330,957.85
138 Kawat Las RB-26 Kg 30,503.71 30,503.71
139 Hollow Pagar 2/2 Btg 50,463.79 50,463.79
140 Hollow Pagar 2/4 Btg 56,927.57 56,927.57
141 Hollow Pagar 4/4 Btg 78,855.15 78,855.15
142 Hollow Pagar 4/6 Btg 117,782.72 117,782.72
143 Pagar BRC Jadi (Tinggi 1,2 m) m' 339,207.85 339,207.85
144 Besi Teralis Ulir Tempa 10mm x 2,7meter Btg 39,095.33 39,095.33
145 Hollow Gypsum 2/4 Btg 20,927.57 20,927.57
146 Hollow Gypsum 4/4 Btg 28,855.15 28,855.15
147 Baja Ringan Kanal C Profil Truss 0,65 6m Btg 78,178.32 78,178.32
148 Baja Ringan Kanal C Profil Truss 0,75 6m Btg 90,205.75 90,205.75
149 Baja Ringan Kanal C Profil Truss 0,80 6m Btg 103,219.47 103,219.47
150 Baja Ringan Kanal C Profil Truss 1,00 6m Btg 117,274.33 117,274.33
151 Baja Ringan Reng 0,45 Btg 45,123.45 45,123.45
152 Baut Kuda2 12x12 Bh 351.77 351.77
153 Baut Reng 10x19 Bh 301.77 301.77
BAHAN PENGANTUNG
154 Kait Angin Bh 15,007.06 15,007.06
155 Handle Jendela Bh 15,007.06 15,007.06
156 Handle Pintu Double / Antik / Mewah Set 260,017.65 260,017.65
157 Engsel Jendela Bh 25,007.06 25,007.06
158 Engsel Pintu Bh 35,007.06 35,007.06
159 Engsel Angin Bh 15,007.06 15,007.06
160 Engsel Tanam Pintu Bh 20,017.65 20,017.65
161 Grendel untuk Gembok Bh 20,017.65 20,017.65
162 Slot Pintu Bh 20,007.06 20,007.06
163 Slot Jendela Bh 15,007.06 15,007.06
164 Kunci Tanam Biasa Bh 135,007.06 135,007.06
165 Kunci Tanam Mewah Bh 240,035.31 240,035.31
166 Door Closer Set 300,035.31 300,035.31
167 Silinder Kunci Pintu (Anak Kunci) Bh 60,017.65 60,017.65
168 Baut Ø1/2".panjang 12 cm Bh 4,207.06 4,207.06
169 Baut Ø1/2".panjang 20 cm Bh 5,514.83 5,514.83
170 Paku Beton Ktk 35,035.31 35,035.31
171 Paku Seng Kg 30,035.31 30,035.31
172 Paku Campuran 2"- 6" Kg 18,035.31 18,035.31
173 Paku Atap Kg 40,035.31 40,035.31
174 Paku Triplek Kg 40,035.31 40,035.31
175 Paku Simpai 1 1/2" Kg 20,035.31 20,035.31
176 Paku GRC Ktk 30,035.31 30,035.31
177 Sekrup Gypsum Ktk 55,007.06 55,007.06
178 Fischer Ktk 12,007.06 12,007.06
179 Lem PVC kaleng besar Kaleng 40,035.31 40,035.31
BAHAN ATAP
180 Genteng Metal Lbr 58,222.43 58,222.43
181 Seng Gelombang BJLS 30 Lbr 70,333.65 70,333.65
182 Seng Gelombang BJLS 20 Lbr 50,222.43 50,222.43
183 Seng Plat BJLS 30 Lbr 76,333.65 76,333.65
184 Seng Plat BJLS 20 Lbr 50,222.43 50,222.43
BAHAN KACA
195 Kaca Polos t = 5 mm m2 200,455.28 200,455.28
196 Kaca Polos t = 10 mm m2 650,910.56 650,910.56
197 Kaca Cermin 3 mm m2 300,273.17 300,273.17
198 Kaca Rayben t = 5 mm m2 220,455.28 220,455.28
199 Kaca Clear Tempered T = 8 mm m2 700,728.45 700,728.45
200 Kaca Clear Tempered T = 12 mm m2 1,001,092.67 1,001,092.67
ALUMINIUM SET + PASANG
201 Kusen Alum tanpa kaca 3x11/2 silver + Pasang m' 80,455.28 80,455.28
202 Kusen Alum tanpa kaca 3x11/2 warna + Pasang m' 85,455.28 85,455.28
203 Jendela Alum tanpa kaca 11/2x11/2 silver + Pasang m' 80,455.28 80,455.28
204 Jendela Alum tanpa kaca 11/2x11/2 warna + Pasang m' 85,455.28 85,455.28
BAHAN MINYAK
249 Minyak Solar Industri Ltr 12,103.60 12,103.60
250 Bensin Premium Industri Ltr 8,603.60 8,603.60
251 Minyak Tanah Industri Ltr 10,803.60 10,803.60
252 Minyak Diesel Ltr 12,103.60 12,103.60
253 Minyak Bakar Ltr 9,903.60 9,903.60
254 Oli SAE 40 Ltr 30,103.60 30,103.60
255 Grease/Minyak Gemuk/Cerbi Kg 25,103.60 25,103.60
PEKERJAAN : 0
LOKASI : KABUPATEN SINTANG
TAHUN ANGGARAN : 2021
1 M3 GALIAN TANAH BIASA SEDALAM 1 M + URUGAN KEMBALI + PEMADATAN (P.T. 01+P.T. 09+P.T. 12)
HARGA BIAYA
NO. URAIAN SATUAN KOEFISIEN SATUAN SATUAN
RP. RP.
A. Tenaga Kerja
1 Mandor Hari/Orang 0.083 155,000.00 12,916.67
2 Pekerja Hari/Orang 1.500 105,000.00 157,500.00
Jumlah 170,416.67
B. Bahan
Jumlah -
C. Jumlah A+B 170,416.67
A. Tenaga Kerja
1 Mandor OH 0.0030 155,000.00 465.00
2 Kepala Tukang OH 0.0063 155,000.00 976.50
3 Tukang Cat OH 0.0630 125,000.00 7,875.00
4 Pekerja OH 0.0200 105,000.00 2,100.00
Jumlah 11,416.50
B. Bahan
1 Plamur 1 x Kg 0.100 35,035.31 3,503.53
2 Cat Dasar Alkali 1 x Kg 0.120 60,035.31 7,204.24
3 Cat Penutup Setara ICI 2 x Kg 0.260 100,035.31 26,009.18
Jumlah 36,716.95
C. Jumlah A+B 48,133.45
A. Tenaga Kerja
1 Mandor OH 0.0030 155,000.00 465.00
2 Kepala Tukang OH 0.0063 155,000.00 976.50
3 Tukang Cat OH 0.0630 125,000.00 7,875.00
4 Pekerja OH 0.0200 105,000.00 2,100.00
Jumlah 11,416.50
B. Bahan
1 Plamur 2 x Kg 0.100 35,035.31 3,503.53
2 Cat Dasar 1 x Kg 0.120 60,035.31 7,204.24
3 Cat Penutup 2 x Kg 0.260 35,035.31 9,109.18
Jumlah 19,816.95
C. Jumlah A+B 31,233.45
U P A H
B A H A N
NO. URAIAN HARGA SATUAN (Rp.)
1. Semen / PC 1,627.65 /Kg
2. Pasir Urug 98,291.30 /M3
3. Tanah urug 98,291.30 /M3
4. Pasir Merah 135,291.30 /M3
5. Pasir Putih 130,291.30 /M3
6. Batu Pecah 1/2 - 2/3 517,077.80 /M3
7. Besi Beton Polos 11,988.30 /Kg
8 Besi Beton Ulir 11,991.65 /Kg
9. Kawat Beton 23,035.31 /Kg
10 . Besi Strip 11,550.26 /Kg
11 . Batako 7x20x40 1,718.22 /Bh
12 . Balok Kayu Kls II (Tidak Ketam) 2,400,000.00 /M3
13 Kayu Reng Kelas biasa 3,740,149.71 /M3
14 Triplek t = 3 mm 55,777.48 /Lbr
15 . Papan Mall Kayu Kls III 2,168,149.71 /M3
16 . Perancah dia 4 - 4 m 8,000.00 /Btg
17 Gipsum 77,332.44 /Lbr
18 . GRC Board 79,554.96 /Lbr
19 . Paku campuran 1 " - 5 " 18,000.00 /Kg
20 Paku Gypsum 1,000.00 /Kg
21 Paku GRC 25,000.00 /Kg
22 . Atap Spandek Zinkalume 0,30 mm 43,000.00 /Lbr
23 . Perabung Atap 40,000.00 /M1
24 . Seng Datar BJLS 57,000.00 /Lbr
25 . Keramik 40x40 11,743.00 /Kpg
26 . Keramik Uk 20x20 Cm 2,900.00 /Kpg
27 . Keramik Dinding Uk 20x25 Cm 2,900.00 /Kpg
BAHAN
KEGIATAN :
SUB KEGIATAN :
PEKERJAAN :
LOKASI : KABUPATEN SINTANG
TAHUN ANGGARAN : 2021
KEGIATAN : 0
SUB KEGIATAN : PENGADAAN GEDUNG KANTOR ATAU BANGUNAN LAINNYA
PEKERJAAN : 0
LOKASI : KABUPATEN SINTANG
TAHUN ANGGARAN : 2021
DIBULATKAN 175,323,000.00
TERBILANG : SERATUS TUJUH PULUH LIMA JUTA TIGA RATUS DUA PULUH TIGA RIBU RUPIAH
A.4.6.1.6 Pembuatan dan Pemasangan 1 M2 Pintu dan Jendela Kaca, Kayu Klas I atau II
a Tenaga
Pekerja L.01 OH 0.800 105,000.00 84,000.00
Tukang Kayu L.02 OH 2.400 125,000.00 300,000.00
Kepala Tukang L.03 OH 0.240 155,000.00 37,200.00
Mandor L.04 OH 0.040 155,000.00 6,200.00
Jumlah Tenaga Kerja 427,400.00
b Bahan
Papan Kayu Klas I M3 0.024 4,768,266.48 114,438.40
Lem Kayu Kg 0.300 25,000.00 7,500.00
Jumlah Harga Bahan 121,938.40
c Peralatan
-
Jumlah Harga Alat -
d Jmlh (a+b+c) 549,338.40
A.4.6.1.2 Pembuatan dan Pemasangan 1 M3 Kusen Pintu dan Kusen Jendela, Kayu Klas II atau III
a Tenaga
Pekerja L.01 OH 6.000 105,000.00 630,000.00
Tukang Kayu L.02 OH 18.000 125,000.00 2,250,000.00
Kepala Tukang L.03 OH 1.800 155,000.00 279,000.00
Mandor L.04 OH 0.300 155,000.00 46,500.00
Jumlah Tenaga Kerja 3,205,500.00
b Bahan
Balok Kayu Klas II M3 1.100 4,768,266.48 5,245,093.12
Paku 10 Cm Kg 1.250 18,035.31 22,544.13
Lem Kayu Kg 1.000 25,000.00 25,000.00
Jumlah Harga Bahan 5,292,637.26
c Peralatan
-
Jumlah Harga Alat -
d Jmlh (a+b+c) 8,498,137.26
KEGIATAN : 0
SUB KEGIATAN : PENGADAAN GEDUNG KANTOR ATAU BANGUNAN LAINNYA
PEKERJAAN : 0
LOKASI : KABUPATEN SINTANG
TAHUN ANGGARAN : 2021
KEGIATAN : 0
SUB KEGIATAN : 0
PEKERJAAN : 0
LOKASI : KABUPATEN SINTANG
TAHUN ANGGARAN : 2021
1 BH VENTILASI TYPE V1
Kusen Kayu Kelas II 0.46 m2 691,174.52 317,940.28
Kaca Bening 5 mm 0.23 m2 200,455.28 45,603.58
Jumlah 363,543.85
Dibulatkan 363,000.00
REKAPITULASI
JUMLAH TOTAL BIAYA REHABILITASI GEDUNG KANTOR INSPEKTORAT
KEGIATAN : 0
PEKERJAAN : 0
LOKASI : KABUPATEN SINTANG
TAHUN ANGGARAN : 2021
TERBILANG : DUA PULUH SATU MILIYAR DUA RATUS JUTA RUPIAH RUPIAH
MUSLIMIN, ST
DIREKTUR
Berat/Btg Berat/M1 Harga/Btg Harga/Kg
Dia 25 0.005888 46.21688 3.851406 50 2310.844
Dia 21 0.004154 32.61063 2.717552
Dia 19 0.003401 26.69487 2.224572 200 5338.973
Dia 16 0.002412 18.93043 1.577536 300 5679.13
Dia 13 0.001598 12.54511 1.045426 0
Dia 12 0.001356 10.64837 0.887364 500 5324.184
Dia 10 0.000942 7.3947 0.616225 100 739.47
Dia 8 0.000603 4.732608 0.394384
Dia 6 0.000339 2.662092 0.221841
19392.6 10000
11269.33
Rp193,926,007.50
TYPE spasi Lembar lembar ROLL ROLL
(mm) m Kg m Kg
M4 150x150 5.4 x 2.1 15.46 54 x 2.1 1.546
M5 150x150 5.4 x 2.1 24.14 54 x 2.1 2.414
M6 150x150 5.4 x 2.2 34.76 54 x 2.1 3.476
M7 150x150 5.4 x 2.3 47.31 4.731
M8 150x150 5.4 x 2.4 61.79 6.179
M9 150x150 5.4 x 2.5 78.21 7.821
M10 150x150 5.4 x 2.6 96.55 9.655
Berat/1 m2 = 3.064903 Kg
ROL Berat/1 m2
kg kg
154.6 1.363316
241.4 2.128748
347.6 3.065256
473.1 4.171958
617.9 5.448854
782.1 6.896825
965.5 8.514109
DAFTAR ANALISA BIAYA PEKERJAAN BOW
KABUPATEN :
A
KECAMATAN :
KODE UPAH
PEKERJAAN TANAH
ANL. ( Rp. )
BAHAN JUMLAH
( Rp. ) ( Rp. )
- 1,155,000.00
- 155,000.00
4,342,760.30 4,342,760.30
180,000.00 180,000.00
236,147.95 236,147.95
204,703.75 204,703.75
41,018.72 41,018.72
5,004,630.71 6,314,630.71
50,046.31 63,146.31
1,613.79 4,891.06
51,660.10 68,037.36
- 4,389,502.50
- 2,018,162.00
- 15,750,000.00
- 2,421,794.40
12,103,460.00 12,103,460.00
12,103,460.00 36,682,918.90
1,613.79 4,891.06