DESA SETIAJAYA
KECAMATAN CABANGBUNGIN KAB. BEKASI
TAHUN ANGGARAN 2022
DAFTAR HARGA MATERIAL DAN UPAH
Program Pembangunan dan Pemberdayaan Masyarakat Desa ( P3MD )
HARGA SATUAN
NO JENIS TENAGA KERJA SATUAN KETERANGAN
( Rp. )
A. UPAH KERJA
1 Tukang Kayu 150,000.00 HOK
2 Tukang Batu 150,000.00 HOK
3 Tukang Besi 150,000.00 HOK
4 Pekerja 120,000.00 HOK
5 Operator terlatih 100,000.00 HOK
6 Pembantu masinis/ sopir 100,000.00 HOK
7 Buruh terampil/terlatih 100,000.00 HOK
8 Masinis/sopir 150,000.00 HOK
9 Buruh tak terlatih 80,000.00 HOK
10 Kepala Tukang 150,000.00 HOK
11 Mandor 150,000.00 HOK
B. MATERIAL
1 Tanah Urug 100,000.00 m3
2 Pasir pasang 350,000.00 m3
3 Pasir Beton/Cor 350,000.00 m3
4 Pasir Urug/Sirtu 175,000.00 m3
5 Base Coarse 320,000.00 m3
6 Semen 65,000.00 zak
7 Batu Kali 365,000.00 m3
8 Batu pecah 5/7 340,000.00 m3
9 Batu pecah 3/5 340,000.00 m3
10 Batu pecah 2/3 340,000.00 m3
11 Batu pecah 0,5 /ciping 200,000.00 m3
12 Batu pecah mesin 1/2 282,500.00 m3
13 Batu split ( 2/3 ) 270,000.00 m3
14 Batu bata 1,000.00 bh
15 Besi F 8 45,000.00 btg
16 Besi F 10 65,000.00 btg
17 Besi F 12 89,000.00 btg
18 Kawat bendrat 20,000.00 kg
19 Kayu 5/7 Klas III @ 3m 18,000.00 btg
20 Papan Cor 50,000.00 lbr
21 Genteng 1,500.00 buah
22 Wuwung 4,500.00 buah
23 Buis Beton F 60 100,000.00 buah
24 Buis Beton F 30 50,000.00 buah
25 Pengeras Beton 35,000.00 lbr
26 Kayu 8/12 150,000.00 btg
27 Kayu 6/12 100,000.00 btg
28 Kaso 5/7 57,000.00 btg
29 Kaso 4/6 36,000.00 btg
30 Reng 3/4 25,000.00 btg
31 ready mix K 300 900,000.00 m3
HARGA SATUAN
NO JENIS TENAGA KERJA SATUAN KETERANGAN
( Rp. )
SARINO ROSIP
Program Pembangunan dan Pemberdayaan Masyarakat
A BAHAN / MATERIAL
1 Semen 50 kg Zak 65,000 6,795 71,800
2 Pasir Pasang M3 350,000 4,773 354,800
3 Pasir Urug M3 175,000 2,386 177,400
4 Batu Kali/Batu Pecah M3 365,000 4,977 370,000
5 Kayu papan 3/20 lbr 50,000 5,227 55,300
6 Kayu Balok 5/7 Btg 57,000 5,959 63,000
7 Paku 2"-3" Kg 20,000 2,091 22,100
B PERALATAN
1 Gerobak Dorong/ Lory Bh 400,000 41,818 441,900
2 Cangkul Bh 90,000 9,409 99,500
3 Sekop Bh 90,000 9,409 99,500
4 Ember Bh 10,000 1,045 11,100
5 Pengki Bh 15,000 1,568 16,600
6 Benang Rol 3,000 314 3,400
7 Selang timbang m 3,000 314 3,400
8 Prasasti Bh 455,000 47,568 502,600
9 Papan Proyek Bh 350,000 36,591 386,600
10 Palu Bh 25,000 2,614 27,700
C UPAH
1 Pekerja HOK 100,000 100,000
2 Tukang HOK 150,000 150,000
3 Kepala Tukang HOK 150,000 150,000
4 Mandor HOK 150,000 150,000
DATA PERHITUNGAN - Panjang Jalan = 49 meter - Tebal Rabat Beton = 0.60 meter
- Lebar Badan Jalan = 0.40 meter
0.2 m
0.4 m
0.05 m
0.4 m
Upah :
Pekerja = 0.300 x 3.92 = 1.18 HOK
Mandor = 0.010 x 3.92 = 0.04 HOK
Upah :
Pekerja = 1.500 x 56.84 = 85.26 HOK
Tukang = 0.750 x 56.84 = 42.63 HOK
Ka. Tukang = 0.075 x 56.84 = 4.26 HOK
Mandor = 0.075 x 56.84 = 4.26 HOK
Upah :
Pekerja = 0.300 x 58.80 = 17.64 HOK
Tukang = 0.150 x 58.80 = 8.82 HOK
Ka. Tukang = 0.015 x 58.80 = 0.88 HOK
Mandor = 0.015 x 58.80 = 0.88 HOK
Harga Satuan
No URAIAN Volume Satuan Jumlah ( Rp )
( Rp )
1 2 3 4 5 6
I BAHAN
1 Semen @ 50 Kg 161 zak 71,800 11,559,800
2 Pasir Pasang 32 m3 354,800 11,353,600
3 Batu Belah 68 m3 370,000 25,160,000
4 Pasir Urug 5 m3 177,400 887,000
SARINO ROSIP
KIRI KANAN
LOKASI :
DIBUAT OLEH :
0.4 m 0.4 m
Pelaksana Kegiatan
………………………………
DIKETAHUI OLEH :
Kepala Desa
SARINO
PROP : Jawa Barat
KAB. : Bekasi
KEC. : Cabangbungin
DESA : Setiajaya
JENIS PRASARANA :
LOKASI :
GAMBAR RENCANA
DETAIL PATOK DAN BEKISTING
DETAIL POTONGAN
DIBUAT OLEH :
Pelaksana Kegiatan
ROSIP
DIPERIKSA OLEH :
………………………………
DISETUJUI OLEH :
Kepala Desa
SARINO
PROP : Jawa Barat
KAB. : Bekasi
KEC. : Cabangbungin
DESA : Setiajaya
JENIS PRASARANA :
0 m LOKASI :
GAMBAR RENCANA
POT. MEMANJANG
POT. MELINTANG
DIBUAT OLEH :
Pelaksana Kegiatan
ROSIP
DIPERIKSA OLEH :
DIKETAHUI OLEH :
Kepala Desa
SARINO