RENCANA ANGGARAN BIAYA PEMASANGAN RANGKA & ATAP

MASJID ISTIQLAL BARAS KOMPLEK KSU, DESA MOTU KEC.PASANGKAYU

KEBUTUHAN MATERIAL BAHAN & UPAH KERJA


Nock Panjang 3 m 44 15.00 Lbr 70,000 1,050,000
List Plank 56 19.00 Lbr 70,000 1,330,000
Atap Spandek p = 8 m (Hijau ) 233 36.00 Lbr 680,000 24,480,000
Canal C 233 131.00 Btg 135,000 17,685,000
Reng 233 124.00 Btg 65,000 8,060,000
Dinabolt 47.00 Pcs 6,000 282,000
Screw Reng 4,075.65 Pcs 400 1,630,259
Screw Atap 36 3,456.00 Pcs 400 1,382,400 55,899,659
Upah Kerja Atap 233 233 M2 45,000 10,480,239
Pasang Listplank 44 44 M 1
10,000 440,000 10,920,239
Mobilisasi 1 Ls 2,000,000 2,000,000
Jumlah Total 68,819,898
Dibulatkan 68,819,000
Terbilang Enam puluh delapan juta delapan ratus sembilan belas ribu
LUAS ATAP
PANJANG LEBAR TINGGI KOEFISIEN VOLUME VOLUME
(M) (M) (M) (M2) (M3)

14.2 14.2 1.155 233

233

233

TINGGI KUDA-KUDA & PANJANG JURAI

0.577 6 3.464102

144 144 16.970562749 8.48528137


12 72 84.000000001 9.16515139 36.66061

0.577 2.5 1.443376


25 25 7.0710678119 3.53553391
2.0833333 12.5 14.583333334 3.81881308 15.27525

12 1.35 8.8888888889 4 35.55556 36


12 1.35 8.8888888889 4 35.55556 71
107

Panjang List Plank

20 4 80
5 4 20
100 33.33333 Lbr
KETERANGAN

Luasan Sdah Termasuk Teras

TINGGI KUDA-KUDA <300

PANJANG JURAI

TINGGI KUDA-KUDA <300

PANJANG JURAI

Bh
60.2
KEBUTUHAN MATERIAL BAHAN & UPAH KERJA PENAMABAHAN
PARKIRAN & SELASAR MASJID BABUL FALAH
Nock -
List Plank -
Papan Kasli Boar 4.00 Lbr 125,000 500,000
Mata Rivet 1.00 dos 70,000 70,000
Canal C 71.00 Btg 98,000 6,958,000
Reng 18.00 Btg 50,000 900,000
Cat Tembok 2.5 Kg 1.00 Gln 180,000 180,000
Screw Reng Pcs 150 -
Screw Atap Pcs 150 - 8,608,000
Upah Kerja Atap + Kusen 1 Ls 5,000,000 5,000,000 5,000,000

TOTAL 13,608,000

KEBUTUHAN MATERIAL BAHAN & UPAH KERJA


Nock -
List Plank -
Papan Kasli Boar 4.00 Lbr 125,000 500,000
Mata Rivet 1.00 dos 70,000 70,000
Canal C 71.00 Btg 98,000 6,958,000
Reng 18.00 Btg 50,000 900,000
Cat Tembok 2.5 Kg 1.00 Gln 180,000 180,000
Screw Reng Pcs 150 -
Screw Atap Pcs 150 - 8,608,000
Upah Kerja Atap + Kusen 78 M 2
40,000 3,120,000 3,120,000

-
11,728,000
13 4 8 24.13333
0.883333 3.016667
2.133333
pagar 8
1

56 16 72 78
1.428571 13.33333

13 4 8 24.13333
0.883333 3.016667
2.133333
pagar 8
1

56 16 72
1.428571 13.33333

Anda mungkin juga menyukai