KEBUTUHAN MATERIAL BAHAN & UPAH KERJA PENAMABAHAN
PARKIRAN & SELASAR MASJID BABUL FALAH
Nock -
List Plank -
Papan Kasli Boar 4.00 Lbr 125,000 500,000
Mata Rivet 1.00 dos 70,000 70,000
Canal C 71.00 Btg 98,000 6,958,000
Reng 18.00 Btg 50,000 900,000
Cat Tembok 2.5 Kg 1.00 Gln 180,000 180,000
Screw Reng Pcs 150 -
Screw Atap Pcs 150 - 8,608,000
Upah Kerja Atap + Kusen 1 Ls 5,000,000 5,000,000 5,000,000
TOTAL 13,608,000
-