V. UPAH KERJA
1. Mendirikan dan memasang tiang PJU
2. Memasang kabel NYFGBY (4 x 16 mm²)
3. Memasang kabel NYFGBY (4 x 10 mm²)
4. Memasang kabel NYY (2 x 6 mm²)
5. Pemasangan panel MCB
6. Pemasangan batu peringatan kabel
7. Pengeborn kabel bawah tanah (badan jalan)
REKAPITULAS
I PEKERJAAN PENDAHULUAN
II PEKERJAAN UTAMA
III PEKERJAAN KONTRUKSI
IV PENYAMBUNGAN DAYA DARI PT. PLN
V UPAH KERJA
VI SERTIFIKAT LAYAK OPERASI
TOTAL
TERBILANG TOTAL ANGGARAN : SATU MILIYAR TIGA RAT
RAB PENERANGAN JALAN UMUM
JUMLAH II 1,148,991,448.00
REKAPITULASI
18,066,668.21
1,148,991,448.00
78,817,224.75
22,000,000.00
116,924,659.04
4,200,000.00
TOTAL 1,389,000,000.00
AN : SATU MILIYAR TIGA RATUS DELAPAN PULUH SEMBILAN JUTA RUPIAH
ON
BOBOT (%)
0.207%
0.230%
0.004%
0.216%
0.611%
1.301%
42.545%
16.303%
1.072%
11.757%
2.286%
0.012%
2.977%
0.131%
0.983%
0.524%
0.063%
0.723%
0.403%
1.095%
0.598%
0.033%
1.219%
82.721%
1.064%
0.140%
0.148%
1.765%
0.259%
1.315%
0.911%
0.072%
5.674%
0.432%
0.432%
0.720%
1.584%
2.472%
0.234%
3.376%
0.596%
0.648%
0.190%
0.903%
8.418%
0.302%
0.302%
100%
1.301%
82.721%
5.674%
1.584%
8.418%
0.302%
100%
AH