Anda di halaman 1dari 3

RAB KANOPI POS JAGA ALTERNATIF 1 7/13/2022

lokasi Bank BPRS HIK Parahiyangan


NO JENIS PEKERJAAN VOL SATUAN HARGA SATUAN JUMLAH

I STRUKTUR RANGKA BAJA WF 150 29.8 M2 1,125,000.00 33,525,000.00


a Rangka Utama WF 150
b Rangka balok anak HOLLOW 6X10 cm
c Tiang Utama Pengait sling
d Tatakan plat ke dinding
e Kaitan dan ejaster
f Baud Pengikat dan sling ejaster
g talang galvanis
h Fin : cat duco ( abu milenium )

II PENUTUP ATAP( terpasang ) 30.5 M2 850,000.00 25,925,000.00


a Ex . Solartuff (Solarflat ) 6mm ( 122x600)
b Sambungan"H " 6mm
III ELEKTRIKAL 6 TITIK 586,000.00 3,516,000.00
a Instalasi lampu penerangan
b cashing lampu gantung model minimalis
c Lampu LED 18 watt
d box panel
e MCB
Sub Total 62,966,000.00
IV PEKERJAAN CIVIL POS JAGA DAN REST AREA
A PEKERJAAN PERSIAPAN DAN BONGKARAN POS JAGA
Pek.Bongkaran pos jaga Excisting 1.00 LS 4,410,000.00 4,410,000.00
Pengukuran 17.50 M2 17,500.00 306,250.00
Bowplank 24.00 M1 57,000.00 1,368,000.00
Sub Total 6,084,250.00
B PEKERJAAN GALIAN DAN PONDASI -
pek. Galian pondasi 10.34 M2 94,500.00 977,130.00
Urugan tanah kembali 7.23 M2 45,000.00 325,350.00
Sub Total 1,302,480.00
C PEKERJAAN PEMBESIAN DAN BETON
Pek.sloof 0.45 M2 3,578,500.00 1,610,325.00
Pek.Kolom 1.08 M2 4,128,500.00 4,458,780.00
Pek.balok dan ring balk 0.68 M2 3,578,500.00 2,415,487.50
pek. Kolom praktis 0.24 M2 2,875,500.00 690,120.00
pek.kanopi beton 0.59 M2 3,578,500.00 2,111,315.00
pek.Dak beton penutup atap pos jaga 0.95 M2 3,578,500.00 3,399,575.00
pek,kolom tiang pengait kanopi 0.32 M2 2,875,500.00 920,160.00
Sub Total 15,605,762.50
F PEKERJAAN PASANGAN DINDING
Pek.pasangan bata ringan 45.70 M2 132,500.00 6,055,250.00
Pek.plesteran 124.50 M2 75,435.00 9,391,657.50
Pek.acian 124.50 M2 22,458.00 2,796,021.00
Pek.pasangan kramik dinding K.mandi 7.40 M2 187,500.00 1,387,500.00
Sub Total 19,630,428.50
G PEKERJAAN PENUTUP LANTAI
Pek.pasangan kramik lantai pos jaga 3.40 M2 287,500.00 977,500.00
Pek.pasangan kramik lantai Teras pos jaga 3.90 M2 325,000.00 1,267,500.00
Pek.pasangan kramik lantai Ruang tunggu 5.80 M2 287,500.00 1,667,500.00
Pek.pasangan kramik lantai Kamar mandi 3.20 M2 187,900.00 601,280.00
Pas.Pavin blok bekas bongkaran pos jaga 24.00 M2 149,875.00 3,597,000.00
Sub Total 8,110,780.00
H PEKERJAAN PLAFON
Pek.Plafon area pos jaga dan kamar mandi 6.60 M2 146,750.00 968,550.00
Pek.fin beton kanopi luar 3.90 M2 23,500.00 91,650.00
Sub Total 1,060,200.00
I PEKERJAAN MEKANIKAL ELEKTRIKAL
pas.saklar doubel 2.00 buah 245,800.00 491,600.00
pas.saklar tunggal 2.00 buah 187,900.00 375,800.00
Pas.stop kontak 4.00 buah 245,000.00 980,000.00
Pas.lam[pu down light 4.00 buah 187,500.00 750,000.00
pas lampu out bow luar 4.00 buah 225,400.00 901,600.00
pas.lampu gantung 2.00 buah 325,000.00 650,000.00
Sub Total 4,149,000.00
J PEKERJAAN KUSEN PINTU DAN JENDELA
Pek.Kusen Jendela kaca Alumunium pos jaga 1.00 M1 3,247,500.00 3,247,500.00
Pek.Kusen Pintu dan pintu pos jaga 1.00 M1 2,897,500.00 2,897,500.00
Pek.Kusen Pintu dan pintu Kamar mandi 6.60 M1 950,000.00 6,270,000.00
Pek.Bouvenly 0.69 M2 975,000.00 672,750.00
Sub Total 13,087,750.00
K PEKERJAAN INSTALASI AIR DAN PLAMBING
Pasangan pipa saluran air kotor 16.00 M1 82,500.00 1,320,000.00
Pasangan pipa saluran air Bersih 44.40 M1 71,870.00 3,191,028.00
Pek. Septitank 1.00 unit 5,600,000.00 5,600,000.00
closet jongkok 1.00 SET 425,000.00 425,000.00
Kran jet shower 2.00 SET 225,000.00 450,000.00
Kran air biasa 2.00 SET 175,000.00 350,000.00
Sub Total 11,336,028.00
L PEKERJAAN ATAP area ruang tunggu
penutup atap transparan solarplat 6mm (greey) 6.40 M2 650,000.00 4,160,000.00
rangka hollow 4x6 cm 6.40 M2 425,000.00 2,720,000.00
Sub Total 6,880,000.00
M PEKERJAAN PENGECATAN
Pengecatan Dinding interior 82.30 M2 45,000.00 3,703,500.00
Pengecatan Dinding exterior 29.76 M2 65,000.00 1,934,400.00
Sub Total 5,637,900.00
N PEKERJAAN LAIN LAIN
Backdrof ruang tunggu (digital print ) 6.40 M2 - -
Baner (casing baner stainles steel ) 1.00 unit - -
Lampu emergency 1.00 buah - -
Kursi ruang tunggu stainles 4 SHEET 1.00 UNIT 1,450,000.00 1,450,000.00
Sub Total 1,450,000.00

GRAND TOTAL 157,300,579.00


RAB KANOPI POS JAGA ALTERNATIF 2 7/13/2022
lokasi Bank BPRS HIK Parahiyangan
NO JENIS PEKERJAAN VOL SATUAN HARGA SATUAN JUMLAH

I STRUKTUR RANGKA BAJA WF 150 47 M2 1,125,000.00 52,875,000.00


a Rangka Utama WF 150
b Rangka balok anak HOLLOW 6X10 cm
c Tiang Utama Pengait sling
d Tatakan plat ke dinding
e Kaitan dan ejaster
f Baud Pengikat dan sling ejaster
g talang galvanis
h Fin : cat duco ( abu milenium )

II PENUTUP ATAP( terpasang ) 30.5 M2 850,000.00 25,925,000.00


a Ex . Solartuff (Solarflat ) 6mm ( 122x600)
b Sambungan"H " 6mm
III ELEKTRIKAL 6 TITIK 586,000.00 3,516,000.00
a Instalasi lampu penerangan
b cashing lampu gantung model minimalis
c Lampu LED 18 watt
d box panel
e MCB
- 82,316,000.00