RENCANA ANGGARAN DAN BIAYA


PEKERJAAN PEMBANGUNAN GUDANG 45X75 DAN 45X30
VERSI 3 ( STRUKTUR RANGKA BAJA TANPA PASANGAN BATA)

VOLUME VOLUME VOLUME


NO URAIAN HARGA SATUAN SATUAN JUMLAH HARGA
45X75 45X30 TOTAL

I PEKERJAAN PERSIAPAN
1 Pembersihan dan Perataan Lokasi Pekerjaan 1,500,000.00 Ls 1.00 - 1.00 1,500,000.00
2 Pengukuran dan Pasang Bowplank 1,500,000.00 Ls 1.00 - 1.00 1,500,000.00
3 Pengadaan Air Kerja 1,500,000.00 Ls 1.00 - 1.00 1,500,000.00
4 Listrik dan Penerangan 2,500,000.00 Ls 1.00 - 1.00 2,500,000.00
5 Direksi Keet 7,500,000.00 Ls 1.00 - 1.00 7,500,000.00

SUB TOTAL I 14,500,000.00

II PEKERJAAN TANAH
1 Galian Tanah Pondasi Tapak 68,740.65 M3 182.25 81.00 263.25 18,095,976.11
2 Galian Tanah Sloof 56,009.25 M3 48.38 22.50 70.88 3,969,655.59
3 Urugan Kembali Galian Tanah 18,635.76 M3 57.66 25.88 83.53 1,556,668.33
4 Urugan Pasir Bawah Lantai,sloof dan Pondasi 210,345.30 M3 184.50 74.70 259.20 54,521,501.76
5 Urugan Tanah Peninggian Lantai 116,230.00 M3 843.75 337.50 1,181.25 137,296,687.50

SUB TOTAL II 215,440,489.29

III PEKERJAAN BETON DAN PASANGAN


1 Lantai Kerja Footplate 1,002,366.51 M3 12.15 5.40 17.55 17,591,532.33
2 Lantai kerja Sloof 1,002,366.51 M3 9.68 4.50 14.18 14,208,545.34
3 Lantai kerja Lantai Utama 1,002,366.51 M3 168.75 67.50 236.25 236,809,089.00
4 Plesteran kakilima/rabat 59,572.92 M2 244.00 154.00 398.00 23,710,022.16
5 Pondasi Footplate (K300) 5,394,732.20 M3 62.88 27.95 90.83 490,008,920.46
6 Sloof 30/50 6,729,604.20 M3 96.75 45.00 141.75 953,921,395.35
7 Lantai Utama (K300,besi Wiremesh M8) 1,492,157.43 M3 506.25 202.50 708.75 1,057,566,577.70

SUB TOTAL III 2,793,816,082.33

IV PEKERJAAN STRUKTUR BESI DAN ATAP


1 Kolom IWF 150.75.5.8 38,302.00 Kg 4,536.00 2,016.00 6,552.00 250,954,704.00
- Base Plate, PL#12mm 21,488.50 Kg 915.62 406.94 1,322.57 28,420,002.47
- Rip Plate PL#10mm 21,488.50 Kg 122.08 54.26 176.34 3,789,333.66
- Anchor, RB Ø 19mm 125,000.00 Bh 324.00 324.00 648.00 81,000,000.00
5 RANGKA KUDA-KUDA IWF IWF 150.75.5.8 38,302.00 Kg 1,713.60 1,285.20 2,998.80 114,860,037.60
- Base Plate, PL#12mm 38,302.00 Kg 1,949.94 1,299.96 3,249.90 124,477,669.80
- Top Plate, PL#12mm 38,302.00 Kg 2,649.38 1,766.25 4,415.63 169,127,268.75
- Rip Plate PL#10mm 21,488.50 Kg 127.17 84.78 211.95 4,554,487.58
- Gimbal. IWF 150.75.5.8 38,302.00 Kg 252.00 168.00 420.00 16,086,840.00
- HTB M12 10,000.00 Bh 1,422.00 948.00 2,370.00 23,700,000.00
Page 2 of 8

6 GORDING CNP 125.50.20.3.2 38,302.00 Kg 16,021.08 6,651.20 22,672.28 868,393,591.96


- Besi siku 60 /dudukan Gording 21,488.50 Kg 491.40 196.56 687.96 14,783,228.46
- Bolt & Nut , HTB M12 10,000.00 Kg 1,440.00 576.00 2,016.00 20,160,000.00
7 PENGIKAT IWF 150.75.5.8 38,302.00 Kg 5,292.00 1,680.00 6,972.00 267,041,544.00
- Top Plate,PL#10mm 21,488.50 Kg 7,948.13 3,179.25 11,127.38 239,110,597.69
- HTB M12 10,000.00 Bh 720.00 288.00 1,008.00 10,080,000.00
8 KAIT ANGIN BESI Ø 12 mm 21,488.50 Kg 1,348.24 808.94 2,157.18 46,354,648.38
- Jarum Keras / Tanschor Ø 12 mm 50,000.00 Bh 80.00 48.00 128.00 6,400,000.00
- Sagrod Ø 10 mm 21,488.50 Kg 691.04 259.14 950.18 20,417,942.93

SUB TOTAL IV 2,309,711,897.28

V PEKERJAAN PENUTUP ATAP


1 Atap Spandex Zincalume 65,000.00 M2 3,060.20 1,150.60 4,210.80 273,702,000.00
2 Bubungan zincalume sheet #0,4mm 70,000.00 M' 235.00 96.00 331.00 23,170,000.00
3 Talang Zincalume 70,000.00 m' 192.00 99.00 291.00 20,370,000.00

SUB TOTAL IV 317,242,000.00

VI PEKERJAAN PENGECATAN
1 Pekerjaan Cat Besi Baja 18,000.00 M2 1,247.93 535.54 1,783.47 32,102,460.00

SUB TOTAL V 32,102,460.00

TOTAL PEKERJAAN 5,682,812,928.90


BACK UP DATA
PEKERJAAN PEMBANGUNAN GUDANG 45X75

NO URAIAN PEKERJAAN KET PJG LBR LUAS TINGGI JUML Koef ISI VOLUME SAT

I PEKERJAAN PERSIAPAN
1 Pembersihan dan Perataan Lokasi Pekerjaan 1.000 Unit
2 Pengukuran dan Pasang Bowplank 1.000 Unit
3 Pengadaan Air Kerja 1.000 Unit
4 Listrik dan Penerangan 1.000 Unit
5 Direksi Keet 1.000 Unit

II PEKERJAAN TANAH
1 Galian Tanah Pondasi Tapak 1.500 1.500 1.500 54.000 182.250 182.250
2 Galian Tanah Sloof 645.000 0.300 0.250 1.000 48.375 48.375
3 Urugan Kembali Galian Tanah 0.250 57.656 57.656
4 Urugan Pasir Bawah Lantai,sloof dan Pondasi 184.500
Lantai 45.000 75.000 0.050 1.000 168.750
Sloof 645.000 0.300 0.050 1.000 9.675
Pondasi 1.500 1.500 0.050 54.000 6.075
184.500
5 Urugan Tanah Peninggian Lantai 45.000 75.000 0.250 1.000 843.750 843.750

III PEKERJAAN BETON DAN PASANGAN


1 Lantai Kerja Footplate 1.500 1.500 0.100 54.000 12.150 12.150
2 Lantai kerja Sloof 645.000 0.300 0.050 1.000 9.675 9.675
3 Lantai kerja Lantai Utama 45.000 75.000 0.050 1.000 168.750 168.750
4 Plesteran kakilima/rabat 244.000 1.000 0.050 244.000 244.000
###
### 2533.500
Pasangan Dinding 414.000 6.000 2484.000
Gunungan 15.000 1.500 10.000 0.500 112.500
Saluran 240.000 1.300 1.000 1.000 312.000
2908.500
Kurangi
Pintu Utama 6.000 5.000 5.000 150.000
Jalusi 2.500 1.000 90.000 225.000
375.000
###
### 2.000 5067.000
5 Pondasi Footplate (K300) 62.883
Tapak 1.500 1.500 0.350 54.000 42.525
Kolom 50/50 0.500 0.500 1.400 54.000 18.900
Kolom 30/30 0.300 0.300 0.300 54.000 1.458
62.883

6 Sloof 30/50 645.000 0.300 0.500 1.000 96.750 96.750


###
### 0.100 0.200 6.000 72.000 8.640 8.640
###
### 414.000 0.200 0.100 1.000 8.280 8.280
7 Lantai Utama (K300,besi Wiremesh M8) 45.000 75.000 0.150 1.000 506.250 506.250

IV PEKERJAAN STRUKTUR BESI DAN ATAP


1 Kolom IWF 150.75.5.8 6.000 54.000 14.000 4536.000 4536.000
- - Base Plate, PL#12mm 0.300 0.300 0.012 108.000 7850.000 915.624 915.624
- - Rip Plate PL#10mm 0.180 0.080 0.010 108.000 7850.000 122.083 122.083
- - Anchor, RB Ø 19mm 324.000 324.000
5 RANGKA KUDA-KUDA IWF IWF 150.75.5.8 7.650 16.000 14.000 1713.600 1713.600
- - Base Plate, PL#12mm 0.276 0.010 90.000 7850.000 1949.940 1949.940
- - Top Plate, PL#12mm 0.375 0.010 90.000 7850.000 2649.375 2649.375
- - Rip Plate PL#10mm 0.018 0.010 90.000 7850.000 127.170 127.170
- - Gimbal. IWF 150.75.5.8 1.000 18.000 14.000 252.000 252.000
- - HTB M12 1422.000 1422.000 1422.000
6 GORDING CNP 125.50.20.3.2 47.000 82.000 4.157 16021.078 16021.078
- - Besi siku 60 /dudukan Gording 108.000 4.550 491.400 491.400
- - Bolt & Nut , HTB M12 1440.000 1440.000
7 PENGIKAT IWF 150.75.5.8 378.000 14.000 5292.000 5292.000
- - Top Plate,PL#10mm 0.011 90.000 7850.000 7948.125 7948.125
- - HTB M12 4.000 180.000 720.000 720.000
8 KAIT ANGIN BESI Ø 12 mm 9.500 160.000 0.887 1348.240 1348.240
- - Jarum Keras / Tanschor Ø 12 mm 80.000 80.000 80.000
- - Sagrod Ø 10 mm 1120.000 1.000 0.617 691.040 691.040
- 0 4.800 1.000 22.000 4.550 105.600 105.600
- 0 2.500 1.000 90.000 225.000 225.000
- 0 5.000 6.000 5.000 150.000 150.000
-
-
PEKERJAAN PENUTUP ATAP
1 Atap Spandex Zincalume 3060.200
Atap Utama 2998.200 2998.200
Atap Teras 62.000 62.000
3060.200
2 Bubungan zincalume sheet #0,4mm 235.000 235.000 235.000
3 Talang Zincalume 192.000 192.000 192.000

PEKERJAAN PENGECATAN
1 Pekerjaan Cat Besi Baja 1247.930
Kolom IWF 150.75.5.8 324.000 1.400 453.600
RANGKA KUDA-KUDA IWF IWF 150.75.5.8 122.400 0.300 36.720
GORDING CNP 125.50.20.3.2 3854.000 0.175 674.450
PENGIKAT IWF 150.75.5.8 378.000 0.220 83.160
1247.930
- 0 5067.000
BACK UP DATA

PEKERJAAN PEMBANGUNAN GUDANG 45X30

NO URAIAN PEKERJAAN KET PJG LBR LUAS TINGGI JUML Koef ISI VOLUME SAT

I PEKERJAAN PERSIAPAN
1 Pembersihan dan Perataan Lokasi Pekerjaan 0.000 Unit
2 Pengukuran dan Pasang Bowplank 0.000 Unit
3 Pengadaan Air Kerja 0.000 Unit
4 Listrik dan Penerangan 0.000 Unit
5 Direksi Keet 0.000 Unit

II PEKERJAAN TANAH
1 Galian Tanah Pondasi Tapak 1.500 1.500 1.500 24.000 81.000 81.000
2 Galian Tanah Sloof 300.000 0.300 0.250 1.000 22.500 22.500
3 Urugan Kembali Galian Tanah 0.250 25.875 25.875
4 Urugan Pasir Bawah Lantai,sloof dan Pondasi 74.700
Lantai 45.000 30.000 0.050 1.000 67.500
Sloof 300.000 0.300 0.050 1.000 4.500
Pondasi 1.500 1.500 0.050 24.000 2.700
74.700
5 Urugan Tanah Peninggian Lantai 45.000 30.000 0.250 1.000 337.500 337.500

III PEKERJAAN BETON DAN PASANGAN


1 Lantai Kerja Footplate 1.500 1.500 0.100 24.000 5.400 5.400
2 Lantai kerja Sloof 300.000 0.300 0.050 1.000 4.500 4.500
3 Lantai kerja Lantai Utama 45.000 30.000 0.050 1.000 67.500 67.500
4 Plesteran kakilima/rabat 154.000 1.000 0.050 154.000 154.000
###
### 1332.500
Pasangan Dinding 210.000 6.000 1260.000
Gunungan 15.000 1.500 6.000 0.500 67.500
Saluran 150.000 1.300 1.000 1.000 195.000
1522.500
Kurangi
Pintu Utama 6.000 5.000 3.000 90.000
Jalusi 2.500 1.000 40.000 100.000
190.000
###
### 2.000 2665.000
5 Pondasi Footplate (K300) 27.948
Tapak 1.500 1.500 0.350 24.000 18.900
Kolom 50/50 0.500 0.500 1.400 24.000 8.400
Kolom 30/30 0.300 0.300 0.300 24.000 0.648
27.948

6 Sloof 30/50 300.000 0.300 0.500 1.000 45.000 45.000


###
### 0.100 0.200 6.000 29.000 3.480 3.480
###
### 150.000 0.200 0.100 1.000 3.000 3.000
7 Lantai Utama (K300,besi Wiremesh M8) 45.000 30.000 0.150 1.000 202.500 202.500

IV PEKERJAAN STRUKTUR BESI DAN ATAP


1 Kolom IWF 150.75.5.8 6.000 24.000 14.000 2016.000 2016.000
- - Base Plate, PL#12mm 0.300 0.300 0.012 48.000 7850.000 406.944 406.944
- - Rip Plate PL#10mm 0.180 0.080 0.010 48.000 7850.000 54.259 54.259
- - Anchor, RB Ø 19mm 324.000 324.000
5 RANGKA KUDA-KUDA IWF IWF 150.75.5.8 7.650 12.000 14.000 1285.200 1285.200
- - Base Plate, PL#12mm 0.276 0.010 60.000 7850.000 1299.960 1299.960
- - Top Plate, PL#12mm 0.375 0.010 60.000 7850.000 1766.250 1766.250
- - Rip Plate PL#10mm 0.018 0.010 60.000 7850.000 84.780 84.780
- - Gimbal. IWF 150.75.5.8 1.000 12.000 14.000 168.000 168.000
- - HTB M12 948.000 948.000 948.000
6 GORDING CNP 125.50.20.3.2 32.000 50.000 4.157 6651.200 6651.200
- - Besi siku 60 /dudukan Gording 43.200 4.550 196.560 196.560
- - Bolt & Nut , HTB M12 576.000 576.000
7 PENGIKAT IWF 150.75.5.8 120.000 14.000 1680.000 1680.000
- - Top Plate,PL#10mm 0.011 36.000 7850.000 3179.250 3179.250
- - HTB M12 4.000 72.000 288.000 288.000
8 KAIT ANGIN BESI Ø 12 mm 9.500 96.000 0.887 808.944 808.944
- - Jarum Keras / Tanschor Ø 12 mm 48.000 48.000 48.000
- - Sagrod Ø 10 mm 420.000 1.000 0.617 259.140 259.140
- 0 4.800 1.000 32.000 4.550 698.880 698.880
- 0 2.500 1.000 40.000 100.000 100.000
- 0 5.000 6.000 3.000 90.000 90.000
-
-
PEKERJAAN PENUTUP ATAP
1 Atap Spandex Zincalume 0.000 1150.600
Atap Utama 1058.600 1058.600
Atap Teras 92.000 92.000
1150.600
2 Bubungan zincalume sheet #0,4mm 96.000 96.000 96.000
3 Talang Zincalume 99.000 99.000 99.000

PEKERJAAN PENGECATAN
1 Pekerjaan Cat Besi Baja 535.540
Kolom IWF 150.75.5.8 144.000 1.400 201.600
RANGKA KUDA-KUDA IWF IWF 150.75.5.8 91.800 0.300 27.540
GORDING CNP 125.50.20.3.2 1600.000 0.175 280.000
PENGIKAT IWF 150.75.5.8 120.000 0.220 26.400
535.540