Anda di halaman 1dari 53

RAB JEMBATAN BETON 4 X 4 M

PEKERJAAN SAYAP (/M')


NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SAT. JUMLAH TOTAL

1 Beton cor 1:2:3 m3 3.52 1,352,573 4,761,057


2 Pembesian
a. Besi Ø 8 mm kg 77.95 12,634 984,860
b. Besi Ø 10 mm kg 654.78 12,634 8,272,301
3 Bekisting m2 41.92 155,117 6,502,484
4 Pek. Pasang Cerocok bawah tapak sayap 5 btg /sayap btg 20.00 45,500 910,000
TOTAL SAYAP /M' 21,430,702
DIBULATKAN

PEKERJAAN JEMBATAN BETON

NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SAT. JUMLAH TOTAL

I. PEKERJAAN PERSIAPAN
1 Pek. Barak ls 1.00 10,800,000 10,800,000
2 Pek. Mobdemob ls 1.00 10,000,000 10,000,000
3 Pek. Pengukuran dan Bowplank m' 36.00 59,552 2,143,885
Jumlah 22,943,885

II. PEKERJAAN ABUTMEN


1 Pek. Pemasangan minipile 200 cm x 200 cm x 9 m x 6 titik M' 54.00 215,000 11,610,000
2 Pek. Potong pile cap ttk 6.00 125,000 750,000
3 Pek. Pasir urug m3 0.40 193,600 77,440
4 Pek. Lantai kerja, Cor beton 1:3:5 m3 0.40 975,000 390,000
5 Pek. Abutmen Cor beton 1:2:3 m3 11.87 1,352,573 16,057,745
6 Pembesian
a. Besi Ø 10 mm Beugle kg 171.68 12,634 2,168,966
b. Besi Ø 13 mm (ulir) kg 650.67 12,634 8,220,372
7 Pek. Bekisting, triplek 9 mm m2 52.46 155,117 8,137,412
8 Pek. Finishing cor beton ls 1.00 1,000,000 1,000,000
Jumlah 48,411,935

III. PEKERJAAN PLAT LANTAI PRECAST


1 Pek. Lantai precast Cor beton 1:2:3 m3 5.68 1,352,573 7,682,614
2 Pembesian
a. Besi Ø 8 mm Beugle kg 118.02 12,634 1,491,052
b. Besi Ø 12 mm kg 456.13 12,634 5,762,645
c. Besi Ø 16 mm (ulir) kg 146.50 12,634 1,850,851
d. Besi Ø 19 mm (ulir) kg 206.59 12,634 2,609,990
3 Pek. Bekisting m2 28.50 155,117 4,420,820
Jumlah 23,817,972

TOTAL 95,173,792
DIBULATKAN
PEKERJAAN SAYAP (/M')
Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Jumlah Satuan
(M') (M') (M2) (M') (M3) (Bh) Vol
1 Beton cor 1:2:3
2.00 0.55 1.10 0.2 0.22 4 0.88
2.00 0.15 0.30 2.2 0.66 4 2.64

Total 3.52 (M3)

Perhitungan Volume
No. Item Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat Jlh Berat Satuan
( mm) ( Cm ) (M') (M') (M') (Kg/M) (Kg)
Pembesian
a. Besi Ø 8 mm 8.00 10.00 21.00 1.38 28.98 0.395 11.44

8.00 10.00 8.00 2.55 20.4 0.395 8.05

Total 1 Bh Sayap 19.49 (Kg)


Total 4 Bh Sayap 77.95 (Kg)

Perhitungan Volume
No. Item Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat Jlh Berat Satuan
( mm) ( Cm ) (M') (M') (M') (Kg/M) (Kg)
Pembesian
b. Besi Ø 10 mm 10.00 15.00 28.00 2.65 74.2 0.617 45.76

10.00 15.00 75.00 2.55 191.25 0.617 117.94

Total 1 Bh Sayap 163.69 (Kg)


Total 4 Bh Sayap 654.78 (Kg)

Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Jumlah Satuan
(M') (M') (M2) (M') (M3) (Bh) Vol
3 Bekisting sayap

a 2.00 0.20 0.40 2 0.80


b 0.55 0.20 0.11 2 0.22
c 2.00 2.20 4.40 2 8.80
d 0.15 2.20 0.33 2 0.66

Total 1 Sayap 10.48 (M2)


Total 4 Bh Sayap 41.92 (M2)

Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Jumlah Satuan
(M') (M') (M2) (M') (M3) (Bh) Vol
3 Pek. Pasir urug
- ABT 1 4.00 1.00 4.00 0.05 0.2 1 0.20
- ABT 2 4.00 1.00 4.00 0.05 0.2 1 0.20

Total 0.40 (M3)

Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Jumlah Satuan
(M') (M') (M2) (M') (M3) (Bh) Vol
4 Pek. Lantai kerja, Cor beton 1:3:5
- ABT 1 4.00 1.00 4.00 0.05 0.2 1 0.20
- ABT 2 4.00 1.00 4.00 0.05 0.2 1 0.20

Total 0.40 (M3)

Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Jumlah Satuan
(M') (M') (M2) (M') (M3) (Bh) Vol
5 Pek. Abutmen Cor beton 1:2:3
- ABT 1
4.00 1.00 4.00 0.4 1.6 1 1.60
4.00 0.70 2.80 0.4 1.12 1 1.12
4.00 0.40 1.60 1.75 2.8 1 2.80
0.33 0.40 0.13 0.4 0.052 2 0.10
0.65 0.40 0.26 0.4 0.104 3 0.31

- ABT 2 4.00 1.00 4.00 0.4 1.6 1 1.60


4.00 0.70 2.80 0.4 1.12 1 1.12
4.00 0.40 1.60 1.75 2.8 1 2.80
0.33 0.40 0.13 0.4 0.052 2 0.10
0.65 0.40 0.26 0.4 0.104 3 0.31

Total 11.87 (M3)

Perhitungan Volume
No. Item Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat Jlh Berat Satuan
( mm) ( Cm ) (M') (M') (M') (Kg/M) (Kg)
6 Pembesian
a. Besi Ø 10 mm Beugle
1. 10.00 15.00 8.00 1.35 10.80 0.617 6.66
2. 10.00 15.00 12.00 2.00 24.00 0.617 14.80
3. 10.00 15.00 12.00 8.70 104.40 0.617 64.38

Total Besi Ø 10 mm ABT 1 85.84 (Kg)


Total Besi Ø 10 mm ABT 2 85.84 (Kg)
Total Besi Ø 10 mm ABT 1 + ABT 2 171.68 (Kg)

Perhitungan Volume
No. Item Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat Jlh Berat Satuan
( mm) ( Cm ) (M') (M') (M') (Kg/M) (Kg)
6 Pembesian
b. Besi Ø 13 mm (ulir)
1. 13.00 15.00 27.00 2.83 76.41 1.042 79.63
2. 13.00 14.00 4.08 57.12 1.042 59.53
3. 13.00 16.00 3.08 49.28 1.042 51.36
13.00 42.00 3.08 129.36 1.042 134.81

Total Besi Ø 10 mm ABT 1 325.33 (Kg)


Total Besi Ø 10 mm ABT 2 325.33 (Kg)
Total Besi Ø 10 mm ABT 1 + ABT 2 650.67 (Kg)

Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Jumlah Satuan
(M') (M') (M2) (M') (M3) (Bh) Vol
7 Pek. Bekisting, triplek 9 mm
- ABT 1
Samping
a 0.70 0.65 0.46 2 0.91
b 2.15 0.40 0.86 2 1.72
c 0.40 0.40 0.16 8 1.28

Depan, Belakang
a 4.00 0.40 1.60 2 3.20
b 4.00 0.38 1.52 2 3.04
c 4.00 1.75 7.00 2 14.00
d 0.33 0.40 0.13 4 0.52
e 0.65 0.40 0.26 6 1.56

Total ABT 1 26.23 (M2)


Total ABT 2 26.23 (M2)
Total ABT 1 + ABT 2 52.46 (M2)

III. PEKERJAAN PLAT LANTAI PRECAST


Perhitungan Volume
No. Item Uraian Lebar Tinggi Luas Panjang Volume Jumlah Jumlah Satuan
(M') (M') (M2) (M') (M3) (Bh) Vol
1 Pek. Lantai precast Cor beton 1:2:3
0.35 0.40 0.14 4.00 0.56 4 2.24
1.00 0.20 0.20 4.00 0.80 4 3.20
0.15 0.20 0.03 4.00 0.12 2 0.24

Total 5.68 (M3)

Perhitungan Volume
No. Item Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat Jlh Berat Satuan
( mm) ( Cm ) (M') (M') (M') (Kg/M) (Kg)
6 Pembesian
a. Besi Ø 8 mm Beugle
1. Tumpuan 8.00 7.50 112.00 1.78 199.36 0.395 78.68
2. Lapangan 8.00 15.00 56.00 1.78 99.68 0.395 39.34

Total Besi Ø 8 mm 118.02 (Kg)

Perhitungan Volume
No. Item Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat Jlh Berat Satuan
( mm) ( Cm ) (M') (M') (M') (Kg/M) (Kg)
6 Pembesian
b. Besi Ø 12 mm
1. Melintang 12.00 15.00 54.00 2.32 125.28 0.888 111.25
2. Melintang 12.00 15.00 54.00 2.67 144.18 0.888 128.03
3. Memanjang 12.00 60.00 4.07 244.20 0.888 216.85

Total Besi Ø12 mm 456.13 (Kg)

Perhitungan Volume
No. Item Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat Jlh Berat Satuan
( mm) ( Cm ) (M') (M') (M') (Kg/M) (Kg)
6 Pembesian
c. Besi Ø 16 mm (ulir)
1. 16.00 12.00 4.16 49.92 1.579 78.81
2. 16.00 8.00 5.36 42.88 1.579 67.69

Total Besi Ø16 mm 146.50 (Kg)

Perhitungan Volume
No. Item Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat Jlh Berat Satuan
( mm) ( Cm ) (M') (M') (M') (Kg/M) (Kg)
6 Pembesian
d. Besi Ø 19 mm (ulir)
1. 19.00 12.00 4.16 49.92 2.226 111.13
2. 19.00 8.00 5.36 42.88 2.226 95.46

Total Besi Ø19 mm 206.59 (Kg)

Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Jumlah Satuan
(M') (M') (M2) (M') (M3) (Bh) Vol
3 Pek. Bekisting
a 1.00 0.20 0.20 8 1.60
b 0.325 0.40 0.13 8 1.04
c 1.05 0.20 0.21 2 0.42
d 4.00 0.325 1.30 12 15.60
e 4.00 0.40 1.60 2 3.20
f 4.00 0.23 0.92 2 1.84
g 4.00 0.20 0.80 6 4.80

Total ABT 1 28.50 (M2)


RAB JEMBATAN BETON 4 X 5 M
PEKERJAAN SAYAP (/M')
NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SAT. JUMLAH TOTAL

1 Beton cor 1:2:3 m3 3.52 1,352,573 4,761,057


2 Pembesian
a. Besi Ø 8 mm kg 77.95 12,634 984,860
b. Besi Ø 10 mm kg 654.78 12,634 8,272,301
3 Bekisting m2 41.92 155,117 6,502,484
4 Pek. Pasang Cerocok bawah tapak sayap 5 btg /sayap btg 20.00 45,500 910,000
TOTAL SAYAP /M' 21,430,702
DIBULATKAN

PEKERJAAN JEMBATAN BETON

NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SAT. JUMLAH TOTAL

I. PEKERJAAN PERSIAPAN
1 Pek. Barak ls 1.00 10,800,000 10,800,000
2 Pek. Mobdemob ls 1.00 10,000,000 10,000,000
3 Pek. Pengukuran dan Bowplank m' 36.00 59,552 2,143,885
Jumlah 22,943,885

II. PEKERJAAN ABUTMEN


1 Pek. Pemasangan minipile 200 cm x 200 cm x 9 m x 6 titik M' 54.00 215,000 11,610,000
2 Pek. Potong pile cap ttk 6.00 125,000 750,000
3 Pek. Pasir urug m3 0.40 193,600 77,440
4 Pek. Lantai kerja, Cor beton 1:3:5 m3 0.40 975,000 390,000
5 Pek. Abutmen Cor beton 1:2:3 m3 11.87 1,352,573 16,057,745
6 Pembesian
a. Besi Ø 10 mm Beugle kg 171.68 12,634 2,168,966
b. Besi Ø 13 mm (ulir) kg 650.67 12,634 8,220,372
7 Pek. Bekisting, triplek 9 mm m2 52.46 155,117 8,137,412
8 Pek. Finishing cor beton ls 1.00 1,000,000 1,000,000
Jumlah 48,411,935

III. PEKERJAAN PLAT LANTAI PRECAST


1 Pek. Lantai precast Cor beton 1:2:3 m3 7.10 1,352,573 9,603,267
2 Pembesian
a. Besi Ø 8 mm Beugle kg 143.31 12,634 1,810,563
b. Besi Ø 12 mm kg 571.45 12,634 7,219,517
c. Besi Ø 16 mm (ulir) kg 178.07 12,634 2,249,742
d. Besi Ø 19 mm (ulir) kg 251.11 12,634 3,172,487
3 Pek. Bekisting m2 34.86 155,117 5,407,361
Jumlah 29,462,938

TOTAL 100,818,758
DIBULATKAN
PEKERJAAN SAYAP (/M')
Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Jumlah Satuan
(M') (M') (M2) (M') (M3) (Bh) Vol
1 Beton cor 1:2:3
2.00 0.55 1.10 0.2 0.22 4 0.88
2.00 0.15 0.30 2.2 0.66 4 2.64

Total 3.52 (M3)

Perhitungan Volume
No. Item Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat Jlh Berat Satuan
( mm) ( Cm ) (M') (M') (M') (Kg/M) (Kg)
Pembesian
a. Besi Ø 8 mm 8.00 10.00 21.00 1.38 28.98 0.395 11.44

8.00 10.00 8.00 2.55 20.4 0.395 8.05

Total 1 Bh Sayap 19.49 (Kg)


Total 4 Bh Sayap 77.95 (Kg)

Perhitungan Volume
No. Item Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat Jlh Berat Satuan
( mm) ( Cm ) (M') (M') (M') (Kg/M) (Kg)
Pembesian
b. Besi Ø 10 mm 10.00 15.00 28.00 2.65 74.2 0.617 45.76

10.00 15.00 75.00 2.55 191.25 0.617 117.94

Total 1 Bh Sayap 163.69 (Kg)


Total 4 Bh Sayap 654.78 (Kg)

Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Jumlah Satuan
(M') (M') (M2) (M') (M3) (Bh) Vol
3 Bekisting sayap

a 2.00 0.20 0.40 2 0.80


b 0.55 0.20 0.11 2 0.22
c 2.00 2.20 4.40 2 8.80
d 0.15 2.20 0.33 2 0.66

Total 1 Sayap 10.48 (M2)


Total 4 Bh Sayap 41.92 (M2)

Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Jumlah Satuan
(M') (M') (M2) (M') (M3) (Bh) Vol
3 Pek. Pasir urug
- ABT 1 4.00 1.00 4.00 0.05 0.2 1 0.20
- ABT 2 4.00 1.00 4.00 0.05 0.2 1 0.20

Total 0.40 (M3)

Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Jumlah Satuan
(M') (M') (M2) (M') (M3) (Bh) Vol
4 Pek. Lantai kerja, Cor beton 1:3:5
- ABT 1 4.00 1.00 4.00 0.05 0.2 1 0.20
- ABT 2 4.00 1.00 4.00 0.05 0.2 1 0.20

Total 0.40 (M3)

Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Jumlah Satuan
(M') (M') (M2) (M') (M3) (Bh) Vol
5 Pek. Abutmen Cor beton 1:2:3
- ABT 1
4.00 1.00 4.00 0.4 1.6 1 1.60
4.00 0.70 2.80 0.4 1.12 1 1.12
4.00 0.40 1.60 1.75 2.8 1 2.80
0.33 0.40 0.13 0.4 0.052 2 0.10
0.65 0.40 0.26 0.4 0.104 3 0.31

- ABT 2 4.00 1.00 4.00 0.4 1.6 1 1.60


4.00 0.70 2.80 0.4 1.12 1 1.12
4.00 0.40 1.60 1.75 2.8 1 2.80
0.33 0.40 0.13 0.4 0.052 2 0.10
0.65 0.40 0.26 0.4 0.104 3 0.31

Total 11.87 (M3)

Perhitungan Volume
No. Item Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat Jlh Berat Satuan
( mm) ( Cm ) (M') (M') (M') (Kg/M) (Kg)
6 Pembesian
a. Besi Ø 10 mm Beugle
1. 10.00 15.00 8.00 1.35 10.80 0.617 6.66
2. 10.00 15.00 12.00 2.00 24.00 0.617 14.80
3. 10.00 15.00 12.00 8.70 104.40 0.617 64.38

Total Besi Ø 10 mm ABT 1 85.84 (Kg)


Total Besi Ø 10 mm ABT 2 85.84 (Kg)
Total Besi Ø 10 mm ABT 1 + ABT 2 171.68 (Kg)

Perhitungan Volume
No. Item Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat Jlh Berat Satuan
( mm) ( Cm ) (M') (M') (M') (Kg/M) (Kg)
6 Pembesian
b. Besi Ø 13 mm (ulir)
1. 13.00 15.00 27.00 2.83 76.41 1.042 79.63
2. 13.00 14.00 4.08 57.12 1.042 59.53
3. 13.00 16.00 3.08 49.28 1.042 51.36
13.00 42.00 3.08 129.36 1.042 134.81

Total Besi Ø 10 mm ABT 1 325.33 (Kg)


Total Besi Ø 10 mm ABT 2 325.33 (Kg)
Total Besi Ø 10 mm ABT 1 + ABT 2 650.67 (Kg)

Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Jumlah Satuan
(M') (M') (M2) (M') (M3) (Bh) Vol
7 Pek. Bekisting, triplek 9 mm
- ABT 1
Samping
a 0.70 0.65 0.46 2 0.91
b 2.15 0.40 0.86 2 1.72
c 0.40 0.40 0.16 8 1.28

Depan, Belakang
a 4.00 0.40 1.60 2 3.20
b 4.00 0.38 1.52 2 3.04
c 4.00 1.75 7.00 2 14.00
d 0.33 0.40 0.13 4 0.52
e 0.65 0.40 0.26 6 1.56

Total ABT 1 26.23 (M2)


Total ABT 2 26.23 (M2)
Total ABT 1 + ABT 2 52.46 (M2)

III. PEKERJAAN PLAT LANTAI PRECAST


Perhitungan Volume
No. Item Uraian Lebar Tinggi Luas Panjang Volume Jumlah Jumlah Satuan
(M') (M') (M2) (M') (M3) (Bh) Vol
1 Pek. Lantai precast Cor beton 1:2:3
0.35 0.40 0.14 5.00 0.70 4 2.80
1.00 0.20 0.20 5.00 1.00 4 4.00
0.15 0.20 0.03 5.00 0.15 2 0.30

Total 7.10 (M3)

Perhitungan Volume
No. Item Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat Jlh Berat Satuan
( mm) ( Cm ) (M') (M') (M') (Kg/M) (Kg)
6 Pembesian
a. Besi Ø 8 mm Beugle
1. Tumpuan 8.00 7.50 136.00 1.78 242.08 0.395 95.54
2. Lapangan 8.00 15.00 68.00 1.78 121.04 0.395 47.77

Total Besi Ø 8 mm 143.31 (Kg)

Perhitungan Volume
No. Item Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat Jlh Berat Satuan
( mm) ( Cm ) (M') (M') (M') (Kg/M) (Kg)
6 Pembesian
b. Besi Ø 12 mm
1. Melintang 12.00 15.00 68.00 2.32 157.76 0.888 140.09
2. Melintang 12.00 15.00 68.00 2.67 181.56 0.888 161.23
3. Memanjang 12.00 60.00 5.07 304.20 0.888 270.13

Total Besi Ø12 mm 571.45 (Kg)

Perhitungan Volume
No. Item Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat Jlh Berat Satuan
( mm) ( Cm ) (M') (M') (M') (Kg/M) (Kg)
6 Pembesian
c. Besi Ø 16 mm (ulir)
1. 16.00 12.00 5.16 61.92 1.579 97.75
2. 16.00 8.00 6.36 50.88 1.579 80.32

Total Besi Ø16 mm 178.07 (Kg)

Perhitungan Volume
No. Item Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat Jlh Berat Satuan
( mm) ( Cm ) (M') (M') (M') (Kg/M) (Kg)
6 Pembesian
d. Besi Ø 19 mm (ulir)
1. 19.00 12.00 5.16 61.92 2.226 137.84
2. 19.00 8.00 6.36 50.88 2.226 113.27

Total Besi Ø19 mm 251.11 (Kg)

Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Jumlah Satuan
(M') (M') (M2) (M') (M3) (Bh) Vol
3 Pek. Bekisting
a 1.00 0.20 0.20 8 1.60
b 0.325 0.40 0.13 8 1.04
c 1.05 0.20 0.21 2 0.42
d 5.00 0.325 1.63 12 19.50
e 5.00 0.40 2.00 2 4.00
f 5.00 0.23 1.15 2 2.30
g 5.00 0.20 1.00 6 6.00

Total ABT 1 34.86 (M2)


RAB JEMBATAN BETON 4 X 6 M
PEKERJAAN SAYAP (/M')
NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SAT. JUMLAH TOTAL

1 Beton cor 1:2:3 m3 3.52 1,352,573 4,761,057


2 Pembesian
a. Besi Ø 8 mm kg 77.95 12,634 984,860
b. Besi Ø 10 mm kg 654.78 12,634 8,272,301
3 Bekisting m2 41.92 155,117 6,502,484
4 Pek. Pasang Cerocok bawah tapak sayap 5 btg /sayap btg 20.00 45,500 910,000
TOTAL SAYAP /M' 21,430,702
DIBULATKAN

PEKERJAAN JEMBATAN BETON

NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SAT. JUMLAH TOTAL

I. PEKERJAAN PERSIAPAN
1 Pek. Barak ls 1.00 10,800,000 10,800,000
2 Pek. Mobdemob ls 1.00 10,000,000 10,000,000
3 Pek. Pengukuran dan Bowplank m' 36.00 59,552 2,143,885
Jumlah 22,943,885

II. PEKERJAAN ABUTMEN


1 Pek. Pemasangan minipile 200 cm x 200 cm x 9 m x 6 titik M' 54.00 215,000 11,610,000
2 Pek. Potong pile cap ttk 6.00 125,000 750,000
3 Pek. Pasir urug m3 0.40 193,600 77,440
4 Pek. Lantai kerja, Cor beton 1:3:5 m3 0.40 975,000 390,000
5 Pek. Abutmen Cor beton 1:2:3 m3 11.87 1,352,573 16,057,745
6 Pembesian
a. Besi Ø 10 mm Beugle kg 171.68 12,634 2,168,966
b. Besi Ø 13 mm (ulir) kg 650.67 12,634 8,220,372
7 Pek. Bekisting, triplek 9 mm m2 52.46 155,117 8,137,412
8 Pek. Finishing cor beton ls 1.00 1,000,000 1,000,000
Jumlah 48,411,935

III. PEKERJAAN PLAT LANTAI PRECAST


1 Pek. Lantai precast Cor beton 1:2:3 m3 8.52 1,352,573 11,523,921
2 Pembesian
a. Besi Ø 8 mm Beugle kg 177.03 12,634 2,236,578
b. Besi Ø 12 mm kg 686.76 12,634 8,676,390
c. Besi Ø 16 mm (ulir) kg 209.65 12,634 2,648,632
d. Besi Ø 19 mm (ulir) kg 295.63 12,634 3,734,985
3 Pek. Bekisting m2 41.22 155,117 6,393,902
Jumlah 35,214,408

TOTAL 106,570,228
DIBULATKAN
PEKERJAAN SAYAP (/M')
Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Jumlah Satuan
(M') (M') (M2) (M') (M3) (Bh) Vol
1 Beton cor 1:2:3
2.00 0.55 1.10 0.2 0.22 4 0.88
2.00 0.15 0.30 2.2 0.66 4 2.64

Total 3.52 (M3)

Perhitungan Volume
No. Item Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat Jlh Berat Satuan
( mm) ( Cm ) (M') (M') (M') (Kg/M) (Kg)
Pembesian
a. Besi Ø 8 mm 8.00 10.00 21.00 1.38 28.98 0.395 11.44

8.00 10.00 8.00 2.55 20.4 0.395 8.05

Total 1 Bh Sayap 19.49 (Kg)


Total 4 Bh Sayap 77.95 (Kg)

Perhitungan Volume
No. Item Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat Jlh Berat Satuan
( mm) ( Cm ) (M') (M') (M') (Kg/M) (Kg)
Pembesian
b. Besi Ø 10 mm 10.00 15.00 28.00 2.65 74.2 0.617 45.76

10.00 15.00 75.00 2.55 191.25 0.617 117.94

Total 1 Bh Sayap 163.69 (Kg)


Total 4 Bh Sayap 654.78 (Kg)

Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Jumlah Satuan
(M') (M') (M2) (M') (M3) (Bh) Vol
3 Bekisting sayap

a 2.00 0.20 0.40 2 0.80


b 0.55 0.20 0.11 2 0.22
c 2.00 2.20 4.40 2 8.80
d 0.15 2.20 0.33 2 0.66

Total 1 Sayap 10.48 (M2)


Total 4 Bh Sayap 41.92 (M2)

Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Jumlah Satuan
(M') (M') (M2) (M') (M3) (Bh) Vol
3 Pek. Pasir urug
- ABT 1 4.00 1.00 4.00 0.05 0.2 1 0.20
- ABT 2 4.00 1.00 4.00 0.05 0.2 1 0.20

Total 0.40 (M3)

Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Jumlah Satuan
(M') (M') (M2) (M') (M3) (Bh) Vol
4 Pek. Lantai kerja, Cor beton 1:3:5
- ABT 1 4.00 1.00 4.00 0.05 0.2 1 0.20
- ABT 2 4.00 1.00 4.00 0.05 0.2 1 0.20

Total 0.40 (M3)

Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Jumlah Satuan
(M') (M') (M2) (M') (M3) (Bh) Vol
5 Pek. Abutmen Cor beton 1:2:3
- ABT 1
4.00 1.00 4.00 0.4 1.6 1 1.60
4.00 0.70 2.80 0.4 1.12 1 1.12
4.00 0.40 1.60 1.75 2.8 1 2.80
0.33 0.40 0.13 0.4 0.052 2 0.10
0.65 0.40 0.26 0.4 0.104 3 0.31

- ABT 2 4.00 1.00 4.00 0.4 1.6 1 1.60


4.00 0.70 2.80 0.4 1.12 1 1.12
4.00 0.40 1.60 1.75 2.8 1 2.80
0.33 0.40 0.13 0.4 0.052 2 0.10
0.65 0.40 0.26 0.4 0.104 3 0.31

Total 11.87 (M3)

Perhitungan Volume
No. Item Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat Jlh Berat Satuan
( mm) ( Cm ) (M') (M') (M') (Kg/M) (Kg)
6 Pembesian
a. Besi Ø 10 mm Beugle
1. 10.00 15.00 8.00 1.35 10.80 0.617 6.66
2. 10.00 15.00 12.00 2.00 24.00 0.617 14.80
3. 10.00 15.00 12.00 8.70 104.40 0.617 64.38

Total Besi Ø 10 mm ABT 1 85.84 (Kg)


Total Besi Ø 10 mm ABT 2 85.84 (Kg)
Total Besi Ø 10 mm ABT 1 + ABT 2 171.68 (Kg)

Perhitungan Volume
No. Item Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat Jlh Berat Satuan
( mm) ( Cm ) (M') (M') (M') (Kg/M) (Kg)
6 Pembesian
b. Besi Ø 13 mm (ulir)
1. 13.00 15.00 27.00 2.83 76.41 1.042 79.63
2. 13.00 14.00 4.08 57.12 1.042 59.53
3. 13.00 16.00 3.08 49.28 1.042 51.36
13.00 42.00 3.08 129.36 1.042 134.81

Total Besi Ø 10 mm ABT 1 325.33 (Kg)


Total Besi Ø 10 mm ABT 2 325.33 (Kg)
Total Besi Ø 10 mm ABT 1 + ABT 2 650.67 (Kg)

Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Jumlah Satuan
(M') (M') (M2) (M') (M3) (Bh) Vol
7 Pek. Bekisting, triplek 9 mm
- ABT 1
Samping
a 0.70 0.65 0.46 2 0.91
b 2.15 0.40 0.86 2 1.72
c 0.40 0.40 0.16 8 1.28

Depan, Belakang
a 4.00 0.40 1.60 2 3.20
b 4.00 0.38 1.52 2 3.04
c 4.00 1.75 7.00 2 14.00
d 0.33 0.40 0.13 4 0.52
e 0.65 0.40 0.26 6 1.56

Total ABT 1 26.23 (M2)


Total ABT 2 26.23 (M2)
Total ABT 1 + ABT 2 52.46 (M2)

III. PEKERJAAN PLAT LANTAI PRECAST


Perhitungan Volume
No. Item Uraian Lebar Tinggi Luas Panjang Volume Jumlah Jumlah Satuan
(M') (M') (M2) (M') (M3) (Bh) Vol
1 Pek. Lantai precast Cor beton 1:2:3
0.35 0.40 0.14 6.00 0.84 4 3.36
1.00 0.20 0.20 6.00 1.20 4 4.80
0.15 0.20 0.03 6.00 0.18 2 0.36

Total 8.52 (M3)

Perhitungan Volume
No. Item Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat Jlh Berat Satuan
( mm) ( Cm ) (M') (M') (M') (Kg/M) (Kg)
6 Pembesian
a. Besi Ø 8 mm Beugle
1. Tumpuan 8.00 7.50 168.00 1.78 299.04 0.395 118.02
2. Lapangan 8.00 15.00 84.00 1.78 149.52 0.395 59.01

Total Besi Ø 8 mm 177.03 (Kg)

Perhitungan Volume
No. Item Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat Jlh Berat Satuan
( mm) ( Cm ) (M') (M') (M') (Kg/M) (Kg)
6 Pembesian
b. Besi Ø 12 mm
1. Melintang 12.00 15.00 82.00 2.32 190.24 0.888 168.93
2. Melintang 12.00 15.00 82.00 2.67 218.94 0.888 194.42
3. Memanjang 12.00 60.00 6.07 364.20 0.888 323.41

Total Besi Ø12 mm 686.76 (Kg)

Perhitungan Volume
No. Item Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat Jlh Berat Satuan
( mm) ( Cm ) (M') (M') (M') (Kg/M) (Kg)
6 Pembesian
c. Besi Ø 16 mm (ulir)
1. 16.00 12.00 6.16 73.92 1.579 116.70
2. 16.00 8.00 7.36 58.88 1.579 92.95

Total Besi Ø16 mm 209.65 (Kg)

Perhitungan Volume
No. Item Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat Jlh Berat Satuan
( mm) ( Cm ) (M') (M') (M') (Kg/M) (Kg)
6 Pembesian
d. Besi Ø 19 mm (ulir)
1. 19.00 12.00 6.16 73.92 2.226 164.56
2. 19.00 8.00 7.36 58.88 2.226 131.08

Total Besi Ø19 mm 295.63 (Kg)

Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Jumlah Satuan
(M') (M') (M2) (M') (M3) (Bh) Vol
3 Pek. Bekisting
a 1.00 0.20 0.20 8 1.60
b 0.325 0.40 0.13 8 1.04
c 1.05 0.20 0.21 2 0.42
d 6.00 0.325 1.95 12 23.40
e 6.00 0.40 2.40 2 4.80
f 6.00 0.23 1.38 2 2.76
g 6.00 0.20 1.20 6 7.20

Total ABT 1 41.22 (M2)


PEKERJAAN JEMBATAN KOMPOSIT

NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SAT. JUMLAH TOTAL

I. PEKERJAAN PERSIAPAN
1 Pek. Barak ls 1.00 10,800,000 10,800,000
2 Pek. Mobdemob ls 1.00 10,000,000 10,000,000
3 Pek. Pengukuran dan Bowplank m' 53.60 59,552 3,192,006
Jumlah 23,992,006

II PEKERJAAN ABUTMEN
1 Pek. Pemasangan minipile 200 cm x 200 cm x 9 m x 10 titik M' 90.00 215,000 19,350,000
2 Pek. Potong pile cap ttk 10.00 125,000 1,250,000
3 Pek. Pasir urug m3 1.14 193,600 221,478
4 Pek. Lantai kerja, Cor beton 1:3:5 m3 1.14 975,000 1,115,400
5 Pek. Abutmen Cor beton 1:2:3 m3 36.20 1,352,573 48,960,974
6 Pembesian
a. Besi Ø 10 kg 2,057.66 12,634 25,995,988
7 Pek. Bekisting, triplek 9 mm m2 119.04 155,117 18,465,689
8 Pek. Anchor Bolt M-20 pcs 40.00 53,000 2,120,000
9 Pek. Grouting ls 1.00 2,000,000 2,000,000
Jumlah 119,479,529

III PEKERJAAN KONSTRUKSI BAJA


1 Pek. Gelagar & Pelat lantai, cor beton 1:2:3 m3 7.04 1,352,573 9,522,113
2 Pek. Deck Beton lbr 8.00 -
3 Pek. IWF 400.200.8.13 kg 2,640.00 18,600 49,104,000
4 Pek. IWF 150.75.5.7 kg 504.00 18,600 9,374,400
5 Pek. Pelat Stifner 10mm kg 466.40 18,600 8,675,040
6 Pek. Base Plat 15mm kg 70.00 18,600 1,302,000
7 Pek. Baut 5/8" set 270.00 10,000 2,700,000
8 Pek. Baut 3/4" set 36.00 10,000 360,000
9 Pek. Pembesian
a. Ø 12 mm kg 774.42 12,634 9,783,909
10 Pek. Hand Rail L.70.70.7 kg 493.57 18,600 9,180,402
11 Pek. Begisting, Triplek 9 mm m' 4.80 155,117 744,559
Jumlah 100,746,423
TOTAL 244,217,958
I. PEKERJAAN PERSIAPAN
No. Item Uraian Perhitungan Volume
Panjang Lebar Luas Tinggi Volume Jumlah Satuan
Jumlah Vol
(M') (M') (M2) (M') (M3) (Bh)
1 Pek. Barak 6.00 6.00 36.00 1 36 (M2)

No. Item Uraian Perhitungan Volume


Panjang Lebar Luas Tinggi Volume Jumlah Satuan
Jumlah Vol
(M') (M') (M2) (M') (M3) (Bh)
3 Pek. Pengukuran dan Bowplank
- Bowplank ABT 1 8.20 2 16.40
5.20 2 10.40
- Bowplank ABT 2 8.20 2 16.40
5.20 2 10.40
Total 53.60 (M')

II PEKERJAAN ABUTMEN
Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Satuan
Jumlah Vol
(M') (M') (M2) (M') (M3) (Bh)
1 Pek. Pemasangan minipile 200 cm x 200 cm x 9 m x 10 titik
- ABT 1 9.00 5 45.00
- ABT 2 9.00 5 45.00

Total 90.00 (M')

Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Satuan
Jumlah Vol
(M') (M') (M2) (M') (M3) (Bh)
2 Pek. Potong pile cap
- ABT 1 5.00
- ABT 2 5.00

Total 10.00 (Bh)

Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Satuan
Jumlah Vol
(M') (M') (M2) (M') (M3) (Bh)
3 Pek. Pasir urug
- ABT 1 5.20 2.20 11.44 0.05 0.572 1 0.57
- ABT 2 5.20 2.20 11.44 0.05 0.572 1 0.57

Total 1.14 (M3)

Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Satuan
Jumlah Vol
(M') (M') (M2) (M') (M3) (Bh)
4 Pek. Lantai kerja, Cor beton 1:3:5
- ABT 1 5.20 2.20 11.44 0.05 0.572 1 0.57
- ABT 2 5.20 2.20 11.44 0.05 0.572 1 0.57

Total 1.14 (M3)

Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Satuan
Jumlah Vol
(M') (M') (M2) (M') (M3) (Bh)
5 Pek. Abutmen Cor beton 1:2:3
- ABT 1
a 5.20 1.70 8.84 0.40 3.54 1 3.54
b 5.20 0.50 2.60 0.50 1.30 1 1.30
c 5.20 1.00 5.20 2.40 12.48 1 12.48
d 0.20 0.30 0.06 0.20 0.01 2 0.02
e 5.20 0.20 1.04 0.73 0.76 1 0.76

- ABT 2
a 5.20 1.70 8.84 0.40 3.54 1 3.54
b 5.20 0.50 2.60 0.50 1.30 1 1.30
c 5.20 1.00 5.20 2.40 12.48 1 12.48
d 0.20 0.30 0.06 0.20 0.01 2 0.02
e 5.20 0.20 1.04 0.73 0.76 1 0.76

Total 36.20 (M3)

Perhitungan Volume
No. Item Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat Jlh Berat Satuan
( mm) ( Cm ) (M') (M') (M') (Kg/M) (Kg)
165
50
1 10.00 15.00 35.00 5.22 182.7 0.617 112.73
52

33

212
165
50

52

33
212

53

2 10.00 15.00 35.00 3.41 119.35 0.617 73.64

25 0

290
3 10.00 15.00 35.00 3.81 133.35 0.617 82.28
53

28 28

Ø 10 - 15 Ø 10 - 15
2 3

4 10.00 15.00 105.00 0.62 65.1 0.617 40.17


4.a 10.00 15.00 35.00 1.1 38.5 0.617 23.75
4.b 10.00 15.00 35.00 1.55 54.25 0.617 33.47
4.c 10.00 15.00 35.00 2.00 70 0.617 43.19
4.d 10.00 15.00 35.00 2.00 70 0.617 43.19
4.e 10.00 15.00 35.00 2.45 85.75 0.617 52.91
280
2 35
190
145
10 0
52

Ø 10 - 15 Ø 10 - 15 Ø 10 - 15 Ø 10 - 15 Ø 10 - 15 Ø 10 - 15
4 4.a 4.b 4.c 4.d 4.e

4.f 10.00 15.00 105.00 3.02 317.1 0.617 195.65


4.g 10.00 15.00 35.00 0.61 21.35 0.617 13.17
4.h 10.00 15.00 35.00 0.55 19.25 0.617 11.88
4.i 10.00 15.00 35.00 0.49 17.15 0.617 10.58
29 2

51

45

39

Ø 10 - 15 Ø 10 - 15 Ø 10 - 15 Ø 10 - 15
4.f 4.g 4.h 4.i

5 10.00 15.00 70.00 5.22 365.4 0.617 225.45

512

Ø 10 - 15
5

12 10.00 15.00 35.00 2.43 85.12 0.617 52.52


10.00 15.00 105.00 0.22 23.1 0.617 14.25
111

Ø 10 - 15
6
111
Ø 10 - 15
6

Total Pembesian ABT 1 1028.83 (Kg)


Total Pembesian ABT 2 1028.83 (Kg)
Total Pembesian ABT 1+ABT 2 2057.66 (Kg)

Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Satuan
Jumlah Vol
(M') (M') (M2) (M') (M3) (Bh)
7 Pek. Bekisting, triplek 9 mm
- ABT 1
Samping
a 1.70 0.60 1.02 2 2.04
b 0.50 0.50 0.25 2 0.50
c 1.00 2.40 2.40 2 4.80
d 0.73 0.20 0.15 2 0.29
e 0.30 0.20 0.06 4 0.24
Depan
a 5.00 0.40 2.00 1 2.00
b 5.00 0.54 2.70 1 2.70
c 5.00 2.40 12.00 1 12.00
d 5.00 2.40 12.00 1 12.00
e 5.00 0.73 3.65 1 3.65
Belakang
a 5.00 0.60 3.00 1 3.00
b 5.00 2.53 12.65 1 12.65
c 5.00 0.73 3.65 1 3.65

Total ABT 1 59.52 (M2)


Total ABT 2 59.52 (M2)
Total ABT 1 + ABT 2 119.04 (M2)

III PEKERJAAN KONSTRUKSI BAJA


Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Satuan
Jumlah Vol
(M') (M') (M2) (M') (M3) (Bh)
1 Pek. Gelagar & Pelat lantai, cor beton 1:2:3
8.00 4.00 32.00 0.22 7.04 1 7.04

Total 7.04 (M3)

Perhitungan Volume
No. Item Uraian Panjang Jumlah Jml Pjg Berat Jlh Berat Satuan
(M') (M') (M') (Kg/M) (Kg)
3 Pek. IWF 400.200.8.13 8.00 5.00 40.00 66.00 2640

Total 2640.00 (M')

Perhitungan Volume
No. Item Uraian Panjang Jumlah Jml Pjg Berat Jlh Berat Satuan
(M') (M') (M') (Kg/M) (Kg)
4 Pek. IWF 150.75.5.7 4.00 9.00 36.00 14.00 504

Total 504.00 (M')

Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Jumlah Jml Luas Berat Jlh Berat Satuan
(M') (M') (M2) (M2) (M') (Kg/M2) (Kg)
5 Pek. Pelat Stifner 10mm 0.40 0.10 0.04 100.00 4.00 116.60 466.4

Total 466.40 (Kg)

Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Jumlah Jml Luas Berat Jlh Berat Satuan
(M') (M') (M2) (M2) (M') (Kg/M2) (Kg)
6 Pek. Base Plat 15mm 0.20 0.20 0.04 10.00 0.40 175.00 70

Total 70.00 (Kg)


Perhitungan Volume
No. Item Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat Jlh Berat Satuan
( mm) ( Cm ) (M') (M') (M') (Kg/M) (Kg)

1 12.00 15.00 108.00 4.05 437.4 0.888 388.41

2 12.00 15.00 54.00 8.05 434.7 0.888 386.01

Total 774.42 (Kg)

Perhitungan Volume
No. Item Uraian Panjang Jumlah Jml Pjg Berat Jlh Berat Satuan
(M') (M') (M') (Kg/M) (Kg)
10 Pek. Hand Rail L.70.70.7
0.45 18.00 8.10 7.70 62.37
8.00 4.00 32.00 7.70 246.4
4.00 6.00 24.00 7.70 184.8

Total 493.57 (M')

Perhitungan Volume
No. Item Uraian Panjang Lebar Luas Tinggi Volume Jumlah Satuan
Jumlah Vol
(M') (M') (M2) (M') (M3) (Bh)
7 Pek. Bekisting, triplek 9 mm

a 8.00 0.20 1.60 2 3.20


b
c
d 4.00 0.20 0.80 2 1.60
e
Total 4.80 (M2)
PEKERJAAN WATERGATE 2 PINTU
NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SAT.

I. PEKERJAAN PERSIAPAN
1 Pek. Barak ls 1.00 2,000,000.00
2 Pek. Mobdemob ls 1.00 3,000,000.00
3 Pek. Pengukuran dan Bowplank m' 41.50 59,552.35
Jumlah

II. PEKERJAAN SLOOF & LANTAI WATERGATE


1 Pek. Pemasangan minipile 200 cm x 200 cm x 12 m x 26 titik M' 312.00 215,000.00
2 Pek. Potong pile cap ttk 26.00 125,000.00
3 Pek. Pasir urug m3 2.45 193,600.00
4 Pek. Lantai kerja, Cor beton 1:3:5 m3 2.45 975,000.00
5 Pek. Beton Sloof melintang Cor 1:2:3 m3 1.73 1,352,572.87
6 Pek. Beton sloof memanjang Cor 1:2:3 m3 1.40 1,352,572.87
7 Pek. Lantai Watergate T. 20 cm m3 7.95 1,352,572.87
8 Pek. Dinding watergate samping kanan kiri m3 15.31 1,352,572.87
9 Pek. Dinding tengah watergate m3 5.38 1,352,572.87
10 Pek. Pembesian
a. Besi Ø 10 kg 592.25 12,633.78
11 Pek. Bekisting, triplek 9 mm m2 120.00 155,116.50
12 Pek. Finishing (Acian & Waterproofing) ls 1.00 1,800,000.00
Jumlah

III. PEKERJAAN PINTU AIR


1 Pintu Air (Kontruksi Baja) pcs 2.00 7,000,000.00
2 Cat Minyak (termasuk cat dasar besi) ls 1.00 500,000.00
Jumlah

IV. PEKERJAAN TANGGUL 3.5 M


1 Beton, Cor 1:2:3 m3 2.60 1,352,572.87
2 Pembesian
a. Besi Ø 10 kg 169.71 12,633.78
3 Begisting, Triplek 9mm m2 26.00 155,116.50
Jumlah
TOTAL
JUMLAH TOTAL

2,000,000
3,000,000
2,471,423
7,471,423

67,080,000
3,250,000
473,817
2,386,215
2,345,361
1,893,602
10,747,003
20,710,596
7,271,432

7,482,311
18,613,980
1,800,000
144,054,317

14,000,000
500,000
14,500,000

3,516,689

2,144,036
4,033,029
9,693,754
175,719,494
II.

No. Item

Total

No. Item

Total

No. Item

Total

No. Item

Total
No. Item

Total

No. Item

Total

No. Item

Total

No. Item

10
Total 1 Bh Saya

No. Item

11

Total

No. Item

12

Total

III.

No. Item

Total
No. Item

Total

IV.

No. Item

Total

No. Item

10

Total

No. Item

11
Total
PEKERJAAN SLOOF & LANTAI WATERGATE
Perhitungan Volume
Uraian Panjang Lebar Luas Tinggi Volume Jumlah
(M') (M') (M2) (M') (M3) (Bh)
Pek. Pasir urug
dibawah sloof melintang 9.30 0.20 1.86 0.05 0.09 1
5.60 0.20 1.12 0.05 0.06 3
Dibawah sloof memanjang 7.76 0.20 1.55 0.05 0.08 2
2.24 0.20 0.45 0.05 0.02 2
Dibawah lantai 2.70 5.20 14.04 0.05 0.70 2
2.24 5.20 11.65 0.05 0.58 1

Total

Perhitungan Volume
Uraian Panjang Lebar Luas Tinggi Volume Jumlah
(M') (M') (M2) (M') (M3) (Bh)
Pek. Lantai kerja, Cor beton 1:3:5
dibawah sloof melintang 9.30 0.20 1.86 0.05 0.09 1
5.60 0.20 1.12 0.05 0.06 3
Dibawah sloof memanjang 7.76 0.20 1.55 0.05 0.08 2
2.24 0.20 0.45 0.05 0.02 2
Dibawah lantai 2.70 5.20 14.04 0.05 0.70 2
2.24 5.20 11.65 0.05 0.58 1

Total

Perhitungan Volume
Uraian Panjang Lebar Luas Tinggi Volume Jumlah
(M') (M') (M2) (M') (M3) (Bh)
Pek. Beton Sloof melintang Cor 1:2:3
9.30 0.20 1.86 0.30 0.56 1
5.60 0.20 1.12 0.35 0.39 3

Total

Perhitungan Volume
Uraian Panjang Lebar Luas Tinggi Volume Jumlah
(M') (M') (M2) (M') (M3) (Bh)
Pek. Beton sloof memanjang Cor 1:2:3
Dibawah sloof memanjang 7.76 0.20 1.55 0.35 0.54 2
2.24 0.20 0.45 0.35 0.16 2

Total
Perhitungan Volume
Uraian Panjang Lebar Luas Tinggi Volume Jumlah
(M') (M') (M2) (M') (M3) (Bh)
Pek. Lantai Watergate T. 20 cm
2.70 5.20 14.04 0.20 2.81 2
2.24 5.20 11.65 0.20 2.33 1

Total

Perhitungan Volume
Uraian Panjang Lebar Luas Tinggi Volume Jumlah
(M') (M') (M2) (M') (M3) (Bh)
Pek. Dinding watergate samping kanan kiri
5.00 0.40 2.00 3.00 6.00 2
2.76 0.20 0.55 3.00 1.66 2

Total

Perhitungan Volume
Uraian Panjang Lebar Luas Tinggi Volume Jumlah
(M') (M') (M2) (M') (M3) (Bh)
Pek. Dinding tengah watergate
2.24 0.40 0.90 3.00 2.69 2

Total

Perhitungan Volume
Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat
( mm) (M) (M') (M') (M') (Kg/M)
Pek. Pembesian
a. Besi Ø 10
- besi lantai 10.00 0.20 26.00 2.76 71.76 0.617
10.00 0.20 14.80 5.00 74.00 0.617
10.00 0.20 26.00 2.24 58.24 0.617
10.00 0.20 12.20 5.00 61.00 0.617
10.00 0.20 26.00 2.76 71.76 0.617
10.00 0.20 14.80 5.00 74.00 0.617
- besi Dinding Kiri 10.00 0.20 16.00 7.6 121.60 0.617
10.00 0.20 39.00 3.00 117.00 0.617
- besi Dinding Kanan 10.00 0.20 16.00 7.6 121.60 0.617
10.00 0.20 39.00 3.00 117.00 0.617
- besi Dinding Tengah 10.00 0.20 16.00 2.24 35.84 0.617
10.00 0.20 12.20 3.00 36.60 0.617
Total 1 Bh Sayap

Perhitungan Volume
Uraian Panjang Lebar Luas Tinggi Volume Jumlah
(M') (M') (M2) (M') (M3) (Bh)
Pek. Bekisting, triplek 9 mm

Dinding Kiri 7.76 3.00 23.28 2


Dinding Kanan 7.76 3.00 23.28 2
Dinding Tengah 2.24 3.00 6.72 4

Total

Perhitungan Volume
Uraian Panjang Lebar Luas Tinggi Volume Jumlah
(M') (M') (M2) (M') (M3) (Bh)
Pek. Finishing (Acian & Waterproofing)

Dinding Kiri 7.76 3.00 23.28 1


Dinding Kanan 7.76 3.00 23.28 1
Dinding Tengah 2.24 3.00 6.72 2

Total

PEKERJAAN PINTU AIR


Perhitungan Volume
Uraian Panjang Lebar Luas Tinggi Volume Jumlah
(M') (M') (M2) (M') (M3) (Bh)
Pintu Air (Kontruksi Baja)
- Besi Siku 100x50x8 mm 3.40

Total
Perhitungan Volume
Uraian Panjang Jumlah Jml Pjg Berat
(M') (M') (M') (Kg/M)
Pintu Air (Kontruksi Baja)
- Besi Siku 100x50x8 mm 3.40 4.00 13.60 12.20
0.90 2.00 1.80 12.20

Total

PEKERJAAN TANGGUL 3.5 M


Perhitungan Volume
Uraian Panjang Lebar Luas Tinggi Volume Jumlah
(M') (M') (M2) (M') (M3) (Bh)
Beton, Cor 1:2:3
5.00 2.60 13.00 0.2 2.60 1

Total

Perhitungan Volume
Uraian Diameter Jarak Jumlah Panjang Jml Pjg Berat
( mm) (M) (M') (M') (M') (Kg/M)
Pek. Pembesian
a. Besi Ø 10
- besi Tanggul 10.00 0.20 52.00 2.6 135.20 0.617
10.00 0.20 28.00 5.00 140.00 0.617
Total

Perhitungan Volume
Uraian Panjang Lebar Luas Tinggi Volume Jumlah
(M') (M') (M2) (M') (M3) (Bh)
Pek. Bekisting, triplek 9 mm

5.00 2.60 13.00 2


Total
Jumlah Satuan
Vol

0.09
0.17
0.16
0.04
1.40
0.58

2.45 (M3)

Jumlah Satuan
Vol

0.09
0.17
0.16
0.04
1.40
0.58

2.45 (M3)

Jumlah Satuan
Vol

0.56
1.18

1.73 (M3)

Jumlah Satuan
Vol

1.09
0.31

1.40 (M3)
Jumlah Satuan
Vol

5.62
2.33

7.95 (M3)

Jumlah Satuan
Vol

12.00
3.31

15.31 (M3)

Jumlah Satuan
Vol

5.38

5.38 (M3)

Jlh Berat Satuan


(Kg)

44.25
45.63
35.91
37.62
44.25
45.63
74.99
72.15
74.99
72.15
22.10
22.57
592.25 (Kg)

Jumlah Satuan
Vol

46.56
46.56
26.88

120.00 (M2)

Jumlah Satuan
Vol

23.28
23.28
13.44

60.00 (M2)

Jumlah Satuan
Vol

0.00 (M2)
Jlh Berat Satuan
(Kg)

165.92
21.96

187.88 (M')

Jumlah Satuan
Vol

2.60

2.60 (M3)

Jlh Berat Satuan


(Kg)

83.37
86.33
169.71 (Kg)

Jumlah Satuan
Vol

26.00
26.00 (M2)
PEKERJAAN TITI PANEN
NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SAT.

I. PEKERJAAN TITI PANEN (Harga /m')


1 Beton cor 1:2:3 m3 0.04 1,352,573
2 CNP. 150 kg 29.76 18,600
3 Pek. Pembesian Ø 8 mm, diatas dan dibawah CNP kg 1.49 12,634
4 Pek. Bekisting m2 0.88 155,117
Jumlah

PEKERJAAN TIANG & TAPAK TITI PANEN


NO. URAIAN PEKERJAAN SAT. VOLUME HARGA SAT.

I. TIANG TITI PANEN (Harga per 1 tiang, panjang 4 m)


1 Beton, Cor 1:2:3 0.0314 1,352,573
2 Pek. Pembesian Ø 10 mm, untuk tapak 1.67 12,634
3 Pek. Pembesian Ø 10 mm, 3 btg dalam pipa 9.96 12,634
4 Pipa PVC 4" 4.00 100,000
Jumlah
JUMLAH TOTAL

60,595
553,536
18,771
136,503
769,405

JUMLAH TOTAL

42,471
21,098
125,883
400,000
589,452
Pembuatan 1M' Pengukuran dan Pemasangan Bowplank

Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
Pekerja L.01 OH 0.100 90,000.00
Tukang Kayu L.02 OH 0.100 100,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu 5/7 Lokal m3 0.012 1,600,000.00
Paku Biasa 2" - 5" Kg 0.020 15,300.00
Kayu Papan Kelas III m3 0.007 1,997,500.00

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead + Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

Pengurugan 1 m3 dengan pasir urug

Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
Pekerja L.01 OH 0.300 90,000.00
Mandor L.04 OH 0.010 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug m3 1.200 123,250.00

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead + Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

Membuat 1 m3 Beton 1 : 2 : 3

Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
1 Pekerja OH 0.250 90,000.00
2 Tukang Batu OH 0.100 100,000.00
3 Kepala Tukang OH 0.010 110,000.00
4 Mandor OH 0.004 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
1 Semen Kg 422.300 1,260.00
2 Pasir beton M3 0.541 157,250.00
3 Agregat Kasar M3 0.744 297,500.00
4 Kayu Perancah M3 0.200 1,600,000.00
5 Paku Kg 1.600 15,300.00
JUMLAH HARGA BAHAN
C PERALATAN
1. Con Pan. Mixer Jam 0.100 125,000.00
2. Truck Mixer Jam 0.161 112,500.00
3. Water Tanker Jam 0.038 10,000.00
4. Alat bantu Ls 1.000 1,000.00

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead + Profit 10% x D
F Harga Satuan Pekerjaan (D+E)

Pembesian 1 kg dengan besi polos atau besi ulir

Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
Pekerja L.01 OH 0.070 90,000.00
Tukang Besi L.02 OH 0.070 100,000.00
Kepala Tukang L.03 OH 0.007 110,000.00
Mandor L.04 OH 0.004 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi Beton (Polos/Ulir) Kg 10.500 9,350.00
Kawat Beton Kg 0.150 14,450.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead + Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga per-Kg A.4.1.1.17a

Pemasangan 1 m2 bekisting untuk pondasi (3X Pakai)

Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp)
A TENAGA
Pekerja L.01 OH 0.520 90,000.00
Tukang Kayu L.02 OH 0.260 100,000.00
Kepala Tukang L.03 OH 0.026 110,000.00
Mandor L.04 OH 0.026 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Triplek 120x240x9 mm lbr 0.350 119,000.00
Kayu kelas III, Balok M3 0.010 1,600,000.00
Paku Biasa 5 - 10 cm Kg 0.300 15,300.00
Minyak Bekisting Ltr 0.100 2,550.00
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead + Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah
Harga
(Rp)

9,000.00
10,000.00
1,100.00
550.00
20,650.00

19,200.00
306.00
13,982.50

33,488.50

54,138.50
5,413.85
59,552.35

Jumlah
Harga
(Rp)

27,000.00
1,100.00
28,100.00

147,900.00

147,900.00

-
176,000.00
17,600.00
193,600.00

Jumlah
Harga
(Rp)

22,500.00
10,000.00
1,100.00
440.00
34,040.00

532,098.00
85,103.70
221,340.00
320,000.00
24,480.00
1,183,021.70

12,550.00
18,123.75
382.00
1,000.00
-
12,550.00

1,229,611.70
122,961.17
1,352,572.87

Jumlah
Harga
(Rp)

6,300.00
7,000.00
770.00
440.00
14,510.00

98,175.00
2,167.50
100,342.50

114,852.50
11,485.25
126,337.75
12,633.78

Jumlah
Harga
(Rp)

46,800.00
26,000.00
2,860.00
2,860.00
78,520.00

41,650.00
16,000.00
4,590.00
255.00
62,495.00 0.0035

141,015.00
14,101.50
155,116.50
DAFTAR HARGA SATUAN BAHAN

KEGIATAN : PEMBANGUNAN BARU LPKA KLAS II PEKANBARU


TAHUN ANGGARAN 2018
PEKERJAAN : PEMBANGUNAN BARU LPKA KLAS II PEKANBARU
TAHUN ANGGARAN 2018
LOKASI : KOTA PEKANBARU

NO URAIAN SAT
1 Semen PCC / setara 50kg zak
2 Semen PCC/ setara 1 Kg kg
3 Beton Ready Mix K 250 m3
4 Kerikil m3
5 Split/ batu pecah 1 x 2 m3
6 Pasir urug m3
7 Pasir beton m3
8 Pasir pasang m3
9 Batu bata bh
10 Batu Tempel Andesit m2
11 Tanah urug m3
12 Besi beton kg
13 Bendrat kg
14 Wermesh M10 m2
15 Seng talang galvalum 0.35 mm m'
16 Seng Bjls 20 Lbr
17 Paku Biasa 5 - 10 cm kg
18 Paku sekrup 2 cm kg
19 Paku hak panjang 15 cm kg
20 Penjaga jarak bekisting/spacer bh
21 Dolken dia 8-10 cm - 4 m btg
22 Kayu kelas III, Papan m3
23 Kayu kelas III, Balok m3
24 Kayu kelas II, Papan m3
25 Kayu kelas II, Balok m3
26 Kayu kelas I m3
27 Triplek 120x240x9 mm lbr
28 Triplek 120x240x12 mm lbr
29 Gypsum Board 9 mm lbr
30 PVC panel 8 mm m2
31 List Gypsum m'
32 List PVC m'
33 Metal stud C 36.7x76x4mm m'
34 Keramik 50/50 m2
35 Keramik 30/30 m2
36 Keramik 30/60 m2
37 Granite Tile 60x60 m2
38 step nossing bh
39 Plin Granit Tile 10 X 60 bh
40 Plin Keramik 10 X 50 bh
41 Closet duduk ex.toto bh
42 Closet jongkok ex.toto bh
43 Wastafel + cermin bh
44 Floor drain steinless bh
45 Kran air 1/2 bh
46 Kran Wastafel bh
47 Jet whaser bh
48 Kran Shower bh
49 Bak cuci stainles steel bh
50 Seal tape bh
51 Kaca bening 5 mm m2
52 Kaca Cermin 5 mm m2
53 Arklirik 5 mm m2
54 Dark Green 6 mm m3
55 Kaca Tempered 10 mm m2
56 Cat dasar kg
57 Cat penutup Weather Coat / Wethershield kg
58 Cat Minyak kg
59 Thinner ltr
60 Minyak Bekisting lt
61 Lem kayu kg
62 Air ltr
63 Semen Warna Kg
64 Kusen Alumunium 4" Powder Coating m'
65 Skrup fixer bh
66 Frame Jendela Alumunium Powder Coating m'
67 List Karet m'
68 Handlebar T bar stainless steel ps
69 Pacth Fitting bh
70 Fitting (Kunci Pintu) bh
71 Double cylinder lock set set
72 Floor/top hinges bh
73 Flushbolt bh
74 Bolt Barrel bh
75 Bolt Door Chain bh
76 Rel Jendela Geser set
77 Daun Pintu Rangka Kayu + Plywood 9 mm m2
78 Daun Pintu Piber + Aksesories Unit
79 Lapis HPL m2
80 Engsel Stainles steel 100x75x2 bh
81 Kunci pintu set
82 Casement 8 " bh
83 Casement 12 " bh
84 Rambuncis bh
85 Baja Kontruksi kg
86 Engsel Besi dia 1 " bh
87 Handle Pintu Besi bh
88 Slot Pintu Besi bh
89 Rangka atap baja ringan M2
90 Atap Long Span 0.4 mm lbr
91 Nok Long span 0.4 mm m'
92 Listplank GRC Ganda (9x250x2440 mm) m'
93 Waterprofing m2
94 TP Mini Pile 25 x 25 cm m'
95 Kawat Las kg
96 Relling Tangga Hollow + Kaca Tempered m'
97 Grc Motif Terawang m2
98 Hollow galvanises 4 x 4 cm, 1.5 mm btg
99 Hollow galvanises 2 x 4 cm, 1.2 mm btg
100 Instalasi Penerangan NYM 3 x 2,5 mm2 + PVC Conduit ø 20 mm ttk
101 Instalasi Stop kontak 1P NYM 3 x 2,5 mm2 + PVC Conduit ø 20 mm ttk
102 Instalasi Stop kontak 3 ph NYY 4x 2,5 mm2 + PVC Conduit ø 20 mm ttk
103 Stop Kontak 200 Watt 1 ph bh
104 Stop Kontak AC 1 ph bh
105 Stop Kontak Lantai 1 ph bh
106 Saklar Tunggal bh
107 Saklar Double bh
108 Saklar Triple bh
109 Lampu SE 11 Watt + Fitting (Safe Energy) bh
110 Lampu SE 23 Watt + Fitting (Safe Energy) bh
111 RMO LED 2 x 20 Watt Savy bh
112 Downlight 4 " + Lampu led esl 9 w bh
113 Exhaust Fan kap. 2010 CMH bh
114 Fire Exthinguisher/Racun Api Kap. 3 kg (include dudukan ) Unit
115 Pengadaan dan pemasangan peralatan penyalur petir Radius 100 m lengkap Unit
dengan material dan alat bantu
116 AC split wall Mouted 1 PK + Instalasi Unit
117 Box Panel + Instalasi Unit
118 MCB + BOX Unit
119 Pipa PVC tipe AW dia 3/4" m'
120 Pipa PVC tipe AW dia 1" m'
121 Pipa PVC tipe AW dia 3" m'
122 Pipa PVC tipe AW dia 4" m'
123 Pipa PVC tipe AW dia 6" m'
124 Tanki Air Fiber 2 m3 bh
125 Tanki Air Stainless 1.5 m3 bh
126 Biofil Septik tank Kap.18 m3 Unit
127 Biofil Septik tank Kap.2 m3 Unit
128 Pompa transfer Unit
129 SDP Komplit + acecories Unit
130 Kabel NYFGBY 4* 25 MM m'
131 MDP/Panel Induk KOMPLIT terpasang unit
132 Kabel NYFGBY 4* 16 MM m'
133 Kipas angin unit
134 Karpet Sholat L. 1,2 m'
135 AC split wall Mouted 1 PK + Instalasi unit
136 cassing pipa black steel 6'' t= 3,3mm m'
137 cassing pipa black steel 4'' t= 3,3mm m'
138 pipa hisap gip dia. 2''. Tb. 3,3mm m'
139 gravel pack m3
AN

HARGA SAT KET 0.85


63,000.00 64,000.00
1,260.00 1,280.00
890,000.00 954,940.26
242,250.00 285,000.00
297,500.00 350,000.00
123,250.00 145,000.00
157,250.00 185,000.00
140,250.00 165,000.00
510.00 600.00
140,250.00 165,000.00
63,750.00 75,000.00
9,350.00 11,000.00
14,450.00 17,000.00
46,750.00 55,000.00
51,000.00 60,000.00
51,000.00 60,000.00
15,300.00 18,000.00
51,000.00 60,000.00
51,000.00 60,000.00
1,700.00 2,000.00
25,500.00 30,000.00
1,997,500.00 2,350,000.00
1,600,000.00 2,350,000.00
3,570,000.00 4,200,000.00
3,570,000.00 4,200,000.00
6,800,000.00 8,000,000.00
119,000.00 140,000.00
140,250.00 165,000.00
76,500.00 90,000.00
63,750.00 75,000.00
17,000.00 20,000.00
10,200.00 12,000.00
21,250.00 25,000.00
97,750.00 115,000.00
80,750.00 95,000.00
80,750.00 95,000.00
191,250.00 225,000.00
17,000.00 20,000.00
15,725.00 18,500.00
9,137.50 10,750.00
1,827,500.00 2,150,000.00
382,500.00 450,000.00
1,232,500.00 1,450,000.00
29,750.00 35,000.00
21,250.00 25,000.00
72,250.00 85,000.00
123,250.00 145,000.00
297,500.00 350,000.00
327,250.00 385,000.00
2,550.00 3,000.00
76,500.00 90,000.00
76,500.00 90,000.00
242,250.00 285,000.00
195,500.00 230,000.00
425,000.00 500,000.00
21,250.00 25,000.00
55,250.00 65,000.00
55,250.00 65,000.00
29,750.00 35,000.00
2,550.00 3,000.00
29,750.00 35,000.00
85.00 100.00
12,750.00 15,000.00
72,250.00 85,000.00
1,275.00 1,500.00
59,500.00 70,000.00
2,125.00 2,500.00
722,500.00 850,000.00
157,250.00 185,000.00
191,250.00 225,000.00
72,250.00 85,000.00
722,500.00 850,000.00
29,750.00 35,000.00
12,750.00 15,000.00
42,500.00 50,000.00
212,500.00 250,000.00
267,750.00 315,000.00
157,250.00 185,000.00
153,000.00 180,000.00
29,750.00 35,000.00
191,250.00 225,000.00
38,250.00 45,000.00
42,500.00 50,000.00
29,750.00 35,000.00
13,600.00 16,000.00
29,750.00 35,000.00
38,250.00 45,000.00
29,750.00 35,000.00
148,750.00 175,000.00
51,000.00 60,000.00
29,750.00 35,000.00
46,750.00 55,000.00
12,750.00 15,000.00
199,750.00 235,000.00
25,500.00 30,000.00
637,500.00 750,000.00
552,500.00 650,000.00
110,500.00 130,000.00
80,750.00 95,000.00
212,500.00 250,000.00
212,500.00 250,000.00
246,500.00 290,000.00
25,500.00 30,000.00
55,250.00 65,000.00
297,500.00 350,000.00
21,250.00 25,000.00
29,750.00 35,000.00
38,250.00 45,000.00
38,250.00 45,000.00
55,250.00 65,000.00
382,500.00 450,000.00
148,750.00 175,000.00
531,250.00 625,000.00
395,250.00 465,000.00
17,000,000.00 20,000,000.00

4,122,500.00 4,850,000.00
1,062,500.00 1,250,000.00
127,500.00 150,000.00
8,075.00 9,500.00
11,050.00 13,000.00
49,300.00 58,000.00
80,750.00 95,000.00
178,500.00 210,000.00
2,550,000.00 3,000,000.00
3,825,000.00 4,500,000.00
42,500,000.00 50,000,000.00
4,250,000.00 5,000,000.00
8,075,000.00 9,500,000.00
3,452,912.50 4,062,250.00
151,827.00 178,620.00
12,781,254.50 15,036,770.00
125,052.00 147,120.00
368,050.00 433,000.00
218,025.00 256,500.00
5,143,052.50 6,050,650.00
650,131.00 764,860.00
375,011.50 441,190.00
138,065.50 162,430.00
278,909.65 328,129.00

Jakarta, 28 Juli 2018


Dibuat oleh,
PT. TORUS JAYA
FIANTO SITORUS
Direktur Utama
DAFTAR SATUAN UPAH PEKERJA DAN ALAT

KEGIATAN : PEMBANGUNAN BARU LPKA KLAS II PEKANBARU


TAHUN ANGGARAN 2018
PEKERJAAN : PEMBANGUNAN BARU LPKA KLAS II PEKANBARU
TAHUN ANGGARAN 2018
LOKASI : KOTA PEKANBARU

SATUAN
NO URAIAN TENAGA
( RP )

1 Pekerja Hari
2 Tukang Batu Hari
3 Kepala tukang Batu Hari
4 Tukang Kayu Hari
5 Kepala tukang Kayu Hari
6 Tukang Besi Hari
7 Kepala Tukang Besi Hari
8 Mandor Hari

Jakarta, 28 Juli 2018


Dibuat oleh,
PT. TORUS JAYA

FIANTO SITORUS
Direktur Utama
AN ALAT

JUMLAH HARGA
( RP)
0.89
90,000.00 90,000.00
100,000.00 100,000.00
110,000.00 110,000.00
100,000.00 100,000.00
110,000.00 110,000.00
100,000.00 100,000.00
110,000.00 110,000.00
110,000.00 110,000.00
DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA

No. URAIAN HP KAP.

1 CONCRETE MIXER 0.3-0.6 M3 20 500.0 Liter


2 DUMP TRUCK 3.5 TON 100 3.5 Ton
3 EXCAVATOR 80-140 HP 80 0.9 M3
4 GENERATOR SET 180 135.0 KVA
5 MOTOR GRADER >100 HP 120 10,800.0 -
6 VIBRATORY ROLLER 5-8 T. 82 7.1 Ton
7 CONCRETE VIBRATOR 5.5 25.0 -
8 WATER PUMP 70-100 mm 6 - -
9 WATER TANKER 3000-4500 L. 100 4,000.0 Liter
10 CONCRETE PUMP 100 8.00 M3
11 PILE DRIVER + HAMMER 25 2.50 Ton
12 WELDING SET 40 250.0 Amp
14 CRANE ON TRACK 35 TON 125.0 35.0 Ton
15 CONCRETE PAN MIXER 134 600.0 Liter
16 TRUK MIXER (AGITATOR) 220 5.0 M3
ATAN PER JAM KERJA

BIAYA SEWA
ALAT/JAM KET.
(di luar PPN)

37,500.00
56,250.00
200,000.00
25,000.00
175,000.00
150,000.00
18,750.00
12,500.00
10,000.00
200,000.00
200,000.00
12,500.00
150,000.00
125,000.00
112,500.00