Anda di halaman 1dari 30

Rencana Anggaran Biaya

Pekerjaan : Pembuatan jembatan plat decker type U-ditch 3 ; L =8,00m

Harga satuan Jumlah harga


No. Item Pekerjaan Satuan Volume
Bahan Upah Bahan Upah
1 Bekisting (multiplek rangka kayu) ls 1 - 1,090,969.23 - 1,090,969.23
2 Plat beton bertulang spesi.1:2:3, besi m3 5.1 1,907,632.50 295,700.00 9,728,925.75 1,508,070.00
d.13mm
3 Pasangan batu belah pondasi sps.1:4 m3 1.73 310,700.00 100,050.00 537,511.00 173,086.50
4 Plester & aci ad.1:3 M2 8.98 6,952.00 22,600.00 62,428.96 202,948.00

Sub total 10,328,865.71 2,975,073.73

TOTAL 13,303,939.44
Rencana Anggaran Biaya

Pekerjaan : Pembuatan jembatan plat decker 60x60 ; L =6,00m

Harga satuan Jumlah harga


No. Item Pekerjaan Satuan Volume
Bahan Upah Bahan Upah
1 Bongkaran bangunan eksisting ls 1 - 1,073,310.00 - 1,073,310.00
2 Galian pondasi m3 2.88 - 34,400.00 - 99,072.00
3 Pasangan batu belah pondasi m3 4.02 310,700.00 180,750.00 1,249,014.00 726,615.00
4 Plester & aci ad.1:3 M2 12.8 6,952.00 31,100.00 88,985.60 398,080.00

5 Plat beton bertulang m3 0.6 1,907,632.50 295,700.00 1,144,579.50 177,420.00

Sub total 2,482,579.10 2,474,497.00

TOTAL 4,957,076.10
Rencana Anggaran Biaya

Pekerjaan : Pembuatan jembatan plat decker 60x60 ; L =6,00m

Harga satuan Jumlah harga


No. Item Pekerjaan Satuan Volume
Bahan Upah Bahan Upah

1 Bongkaran bangunan eksisting ls 1 - 673,260.00 - 673,260.00


2 Galian pondasi m3 2.88 - 25,400.00 - 73,152.00
3 Pasangan batu belah pondasi m3 4.02 310,700.00 100,000.00 1,249,014.00 402,000.00
4 Plester & aci ad.1:3 M2 12.8 6,952.00 22,500.00 88,985.60 288,000.00

5 Plat beton bertulang m3 0.9 1,907,632.50 295,700.00 1,716,869.25 266,130.00

Sub total 3,054,868.85 1,702,542.00

TOTAL 4,757,410.85

37.5
Rencana Anggaran Biaya

Pekerjaan : Pembuatan jembatan plat decker 1,20x1,20 ; L =10,00m

Harga satuan Jumlah harga


No. Item Pekerjaan Satuan Volume
Bahan Upah Bahan Upah

1 Pasangan batu belah pondasi ad.1:4 m3 17.63 310,700.00 100,000.00 5,477,641.00 1,763,000.00
2 Plester & aci ad.1:3 M2 42.78 6,952.00 22,500.00 297,406.56 962,550.00

3 Plat beton bertulang d.12mm, ad.1:2:3 , m3 2.7 1,927,284.49 273,200.00 5,203,668.13 737,640.00
trmsk.begisting

Sub total 10,978,715.69 3,463,190.00

TOTAL 14,441,905.69
Rencana Anggaran Biaya

Pekerjaan : Pembuatan jembatan plat decker 0,50x0,50 ; L =8,00m

Harga satuan Jumlah harga


No. Item Pekerjaan Satuan Volume
Bahan Upah Bahan Upah

1 Pasangan batu belah pondasi ad.1:4 m3 4.73 310,700.00 100,000.00 1,469,611.00 473,000.00
2 Plester & aci ad.1:3 M2 17.2 6,952.00 22,500.00 119,574.40 387,000.00

3 Plat beton bertulang d.10mm, ad.1:2:3 , m3 1.6 1,884,924.87 273,200.00 3,015,879.79 437,120.00
trmsk.begisting

Sub total 4,605,065.19 1,297,120.00


TOTAL 5,902,185.19

737,773.15 /m1
Rencana Anggaran Biaya

Pekerjaan : Pembuatan jembatan plat decker 1,20x0,90 ; L =8,00m

Harga satuan Jumlah harga


No. Item Pekerjaan Satuan Volume
Bahan Upah Bahan Upah

1 Pasangan batu belah pondasi ad.1:4 m3 13.5465 310,700.00 100,000.00 4,208,897.55 1,354,650.00
2 Plester & aci ad.1:3 M2 43.24 6,952.00 22,500.00 300,604.48 972,900.00

3 Plat beton bertulang d.10mm, ad.1:2:3 , m3 2.64 1,927,284.49 273,200.00 5,088,031.06 721,248.00
trmsk.begisting

Sub total 9,597,533.09 3,048,798.00

TOTAL 12,646,331.09

1,580,791.39 /m1
Rencana Anggaran Biaya

Pekerjaan : Pembuatan jembatan plat decker V 0,60x0,40 ; L =10,00m

Harga satuan Jumlah harga


No. Item Pekerjaan Satuan Volume
Bahan Upah Bahan Upah

1 Pasangan batu belah pondasi ad.1:4 m3 8.92 310,700.00 100,000.00 2,770,325.48 891,640.00
2 Plester & aci ad.1:3 M2 24.60 6,952.00 22,500.00 171,019.20 553,500.00

3 Plat beton bertulang d.10mm, ad.1:2:3 , m3 2.3 2,124,731.73 273,200.00 4,886,882.98 628,360.00
trmsk.begisting

Sub total 7,828,227.66 2,073,500.00


TOTAL 9,901,727.66
Rencana Anggaran Biaya

Pekerjaan : Pembuatan jembatanbox culvert 60cmx60cm; L =10,00m (2 jalur)

Harga satuan Jumlah harga


No. Item Pekerjaan Satuan Volume
Bahan Upah Bahan Upah

1 Pasangan batu belah pondasi ad.1:4 m3 10.35 310,700.00 100,000.00 3,216,987.80 1,035,400.00
2 Plester & aci ad.1:3 M2 34.54 6,952.00 22,500.00 240,122.08 777,150.00

3 Box beton bertulang t.12mm, ad.1:2:3 , m3 7.40 2,124,731.73 273,200.00 15,723,014.81 2,021,680.00
trmsk.begisting

Sub total 19,180,124.69 3,834,230.00


TOTAL 23,014,354.69

1,150,717.73 /m1
11,507,177.34
18,411,483.75

0.24
4.17
200,000.00

833,333.33
250,000.00
1,850,000.00
RRRRRRR RRRRRRRR RRRRR

RRRRRRRRR : RRRRRRRRR RRRRR RRRR


RRR : RRR RRRRR

RRRRRRRRR RRRRR RRRRRR (RR) RRRRRR RRRRR (RR)


RR. RRRR RRRRRRRRR
RRRRR RRRRR RRRR RRRRR RRRR

R RRRRRRRRR R R,RRR.RR R,RRR.RR R,RRR.RR RRR.RR


R RRRRRRR & RRR RR.R:R R.RRR R R,RRR.RR R,RRR.RR R,RRR.RR R,RRR.RR

R RRRRR RRRRRRRRR R.RRRR, RR.R:R:R , R RR,RRR.RR R,RRR.RR RR,RRR.RR R,RRR.RR


RRRRR.RRRRRRRRR

RR,RRR.RR RR,RRR.RR
RRR RRRRR
RR,RRR.RR
RRRRR R RRR.RR R,RRR,RRR.RR
RRRRRRRRRR R,RRR,RRR.RR
RRRRRRRRR :
R RR RRRRRR RRRRRRR RRRR RRRR, R RR : R RR RRR,RRR.RR

R. RRRRR RRR,RRR.RR
R.RRR R R
RRRR RRRRR RR/RR RR RR,RRR.RR RR,RRR.RR
RRR R.RR RRR.RRR RR RRRRR RRRRRRRR R,RRR.RR RRR,RRR.RR
R.RRR RR RRRRR RRRRRR RRR,RRR.RR RR,RRR.RR

R. RRRRRR RRR,RRR.RR
R.RR R.RRR RR RRRRRRR RR,RRR.RR RRR,RRR.RR
R.RRR R.RRR RR RRRRRR RRRR RRR,RRR.RR RR,RRR.RR
R.RRR RR RRRRRR RRRRRR
R.RR R.RRR RR RRRRRR RRR,RRR.RR R,RRR.RR

R RR R R R R R R R R R R R R : R R R , R R R R R R R R R RR,RRR.RR

R. RRRRR R,RRR.RR
R.RRR RR RRRRR RRRRRRRR R,RRR.RR R,RRR.RR
R.RRR RR RRRRR RRRRRR RRR,RRR.RR R,RRR.RR

R. RRRRRR RR,RRR.RR
R.RR R.RRR RR RRRRRRR RR,RRR.RR RR,RRR.RR
R.RR R.RRR RR RRRRRR RRRR RRR,RRR.RR RR,RRR.RR
R.RRR RR RRRRRR RRRRRR
R.RR R.RRR RR RRRRRR RRR,RRR.RR R,RRR.RR

R R R R R R R R R R R -R R R R R R ; R R R R R R R R R R R R R R , R R R : R R R : R R R R,RRR,RRR.RR

R. RRRRR R,RRR,RRR.RR
R.RR RRR.RRR RR RRRRR RRRRRRRR R,RRR.RR RRR,RRR.RR
R.RRR RR RRRRR RRRRR RRR,RRR.RR RR,RRR.RR
R.RRR R R
RRRRR RRRRR RRR,RRR.RR RRR,RRR.RR
RRR.RRR RR RRRR RRRRR R,RRR.RR R,RRR,RRR.RR
R.RRR RR RRRRR RRRRR RR,RRR.RR RRR.RR

R. RRRRRR RRR,RRR.RR
R.RRR RR RRRRRRR RR,RRR.RR RRR,RRR.RR
R.RRR RR RRRRRR RRRR RRR,RRR.RR RR,RRR.RR
R.RRR RR RRRRRR RRRR RRR,RRR.RR RRR.RR

R.RRR RR RRRRRR RRR,RRR.RR RRR,RRR.RR


R RR R R R R R R R R R R R R R R R R R R R R R R R RRR,RRR.RR

R. RRRRRR RRR,RRR.RR
R.RRR RR RRRRRRR RR,RRR.RR RRR,RRR.RR
R.RRR RR RRRRRR RRR,RRR.RR RR,RRR.RR

R RR R R R R R R R R R R R R R R R R R R R R R R R RR,RRR.RR

R. RRRRRR RR,RRR.RR
R.RRR RR RRRRRRR RR,RRR.RR RR,RRR.RR
R.RRR RR RRRRRR RRR,RRR.RR R,RRR.RR

R RR R R R R R R R R R R R R R R R R -R R R R R R R R R R RRR,RRR.RR

R. RRRRR RRR,RRR.RR
R.RRR RR RRRR RRRRR RRR RR RRRRRRR RRR,RRR.RR
R.RRR RR RRRR RRRRR R"- R" RR,RRR.RR R,RRR.RR

R.RRR RR RRRR RR.R/R RRRRRRR RR,RRR.RR


R.RRR RRR RRRRRRR RRRRR R RR RRRRRR RR,RRR.RR

R. RRRRRR RR,RRR.RR
R.RRR RR RRRRRRR RR,RRR.RR RR,RRR.RR
R.RRR RR RRRRRR RRRR RRR,RRR.RR RR,RRR.RR

R.RRR RR RRRRRR RRR,RRR.RR RRR.RR

R RRRR , RRRRRRRRR RRRRR RRRR RR,RRR.RR

R. RRRRR RR,RRR.RR

R.RRR RR RRRR RRRRR R"- R" RR,RRR.RR R,RRR.RR


R.RRR RR
RRRR RR.R/R R,RRR,RRR.RR R,RRR.RR
R.RRR RRR RRRRRRR RRRRR R RR RR,RRR.RR R,RRR.RR
RR.RRR RR RRRRR RRRRRRRR R,RRR.RR RR,RRR.RR
R.RRR RR
RRRRR RRRRR RRR,RRR.RR R,RRR.RR
R.RRR RR RRRRR RRRRR RRR,RRR.RR RR,RRR.RR
R.RRR RR RRRR RRRRR R,RRR.RR RR,RRR.RR
R.RRR RR RRRRR RRRRR RR,RRR.RR RR.RR

R. RRRRRR RR,RRR.RR
R.RRR RR RRRRRRR RR,RRR.RR R,RRR.RR
R.RRR RR RRRRRR RRRR RRR,RRR.RR R,RRR.RR

R.RRR RR RRRRRR RRR,RRR.RR RRR.RR

R R R R R R R R R R R R R R R R R ,R R R .R R (R .R R ) R,RRR,RRR.RR
; RRRRR RRRRRRRRR , R RR : R RR : R RR
R. RRRRR R,RRR,RRR.RR
R.RR RRR.RRR RR RRRRR RRRRRRRR R,RRR.RR RRR,RRR.RR
R.RRR RR RRRRR RRRRR RRR,RRR.RR RR,RRR.RR
R.RRR RR
RRRRR RRRRR RRR,RRR.RR RRR,RRR.RR
RR.RRR RR RRRR RRRRR R,RRR.RR RRR,RRR.RR
R.RRR RR RRRRR RRRRR RR,RRR.RR RRR.RR
R.RRR RR RRRRR R,RRR,RRR.RR RRR,RRR.RR
R.RRR RR RRRRR R/R R,RRR,RRR.RR RRR,RRR.RR
R.RRR RR RRRR RRRRR R"- R" RR,RRR.RR R,RRR.RR

R. RRRRRR RRR,RRR.RR
R.RRR RR RRRRRRR RR,RRR.RR RRR,RRR.RR
R.RRR RR RRRRRR RRRR RRR,RRR.RR RR,RRR.RR
R.RRR RR RRRRRR RRRR RRR,RRR.RR RRR.RR
R.RRR RR RRRRRR RRRR RRR,RRR.RR R,RRR.RR
R.RRR RR RRRRRR RRR,RRR.RR RR,RRR.RR

R R R RRR RRRR RRRRRR R,RRR.RR(R.RR) R,RRR,RRR.RR


; RRRRR RRRRRRRRR , R RR : R RR : R RR
R. RRRRR R,RRR,RRR.RR
R.RR RRR.RRR RR RRRRR RRRRRRRR R,RRR.RR RRR,RRR.RR
R.RRR RR
RRRRR RRRRR RRR,RRR.RR RR,RRR.RR
R.RRR RR RRRRR RRRRR RRR,RRR.RR RRR,RRR.RR
RR.RRR RR RRRR RRRRR R,RRR.RR RRR,RRR.RR
R.RRR RR RRRRR RRRRR RR,RRR.RR RRR.RR
R.RRR RR RRRRR R,RRR,RRR.RR RRR,RRR.RR
R.RRR RR RRRRR R/R R,RRR,RRR.RR RRR,RRR.RR
R.RRR RR RRRR RRRRR R"- R" RR,RRR.RR R,RRR.RR

R. RRRRRR RRR,RRR.RR
R.RRR RR RRRRRRR RR,RRR.RR RRR,RRR.RR
R.RRR RR RRRRRR RRRR RRR,RRR.RR RR,RRR.RR
R.RRR RR RRRRRR RRRR RRR,RRR.RR RRR.RR
R.RRR RR RRRRRR RRRR RRR,RRR.RR R,RRR.RR
R.RRR RR RRRRRR RRR,RRR.RR RR,RRR.RR

R R R R R R R R R R R R R R R R R R ,R R R .R R (R .R R ) R,RRR,RRR.RR
; RRRRR RRRRRRRRR , R RR : R RR : R RR
R. RRRRR R,RRR,RRR.RR
R.RR RRR.RRR RR RRRRR RRRRRRRR R,RRR.RR RRR,RRR.RR
R.RRR RR RRRRR RRRRR RRR,RRR.RR RR,RRR.RR
R.RRR RR RRRRR RRRRR RRR,RRR.RR RRR,RRR.RR
RRR.RRR RR RRRR RRRRR R,RRR.RR RRR,RRR.RR
R.RRR RR RRRRR RRRRR RR,RRR.RR RRR.RR
R.RRR RR RRRRR R,RRR,RRR.RR RRR,RRR.RR
R.RRR RR RRRRR R/R R,RRR,RRR.RR RRR,RRR.RR
R.RRR RR RRRR RRRRR R"- R" RR,RRR.RR R,RRR.RR

R. RRRRRR RRR,RRR.RR
R.RRR RR RRRRRRR RR,RRR.RR RRR,RRR.RR
R.RRR RR RRRRRR RRRR RRR,RRR.RR RR,RRR.RR
R.RRR RR RRRRRR RRRR RRR,RRR.RR RRR.RR
R.RRR RR RRRRRR RRRR RRR,RRR.RR R,RRR.RR
R.RRR RR RRRRRR RRR,RRR.RR RR,RRR.RR
RRRRRR

RRRRRR RRR,RRR.RR
RRRRR
RRRRR
R
RRRR

RR,RRR.RR
RRRRR
RRRRR
R
RRRR

RR.RRRRRRRRRR

R.RRR R
RRRR.RRRRRRR

RR.RRRRRRRRRR
RR.RRRRRRRRRR
RRRRRR

RRRRR

RR

R,RRR.RR

R,RRR.RR RRRRRRR
RR,RRR.RR R,RRR,RRR.RR RRRRR
RRRR.RRRRRRRR
R,RRR,RRR.RR

RR.R
RR.RRRRR
RRRRR RRRR.RRRRRRRR
R
R.RR R.RRRRRRRRRR
R RR/RR
RRR/RR
PEMERIKSAAN FISIK HASIL PEKERJAAN

Maksud & tujuan : kontrol kualitas dan kuantitas, sebagai syarat pembayaran pekerjaan
Pekerjaan : Renovasi 1 unit jembatan plat decker
Lokasi : Jalan desa air putih (jalur lingkar menuju lokasi proyek PGE bukit daun)
Sistem pelaksanaan : Borong Bahan & Upah

Dimensi
Luas penampang
No. Item pekerjaan Panjang (l) Isi (V) Keterangan tambahan
(A)
m2 M1 M3

1 Pondasi 0.33 12.00 3.90


bt.belah ad.1:4

2 Parapet 0.09 1.80 0.16


bt.belah ad.1:4

3 Plat beton bertulang 0.15 6.00 0.90

catatan :
Pemeriksaan dilakukan bersama pengawas dan pelaksana pekerjaan.

Diperiksa, Diketahui,
pengawas pek.sipil pelaksana pekerjaan, Site manager

................................ ................................ .............................................


PEMERIKSAAN FISIK HASIL PEKERJAAN

Maksud & tujuan : kontrol kualitas dan kuantitas, sebagai syarat pembayaran pekerjaan
Pekerjaan : Pembangunan 1 unit jembatan plat decker
Lokasi : STA 5+025
Sistem pelaksanaan : Borong Bahan & Upah

Dimensi
No. Item pekerjaan Luas penampang Panjang (l) Isi (V) Keterangan tambahan
(A)
m2 M1 M3

1 Pondasi, lantai,& bak 1.69 8.00 13.50


kontrol
bt.belah ad.1:4
2 Parapet 0.22 1.80 0.79
bt.belah ad.1:4

3 Plat beton bertulang 0.36 8.00 2.88

catatan :

Pemeriksaan dilakukan bersama pengawas dan pelaksana pekerjaan.

Diperiksa, Diketahui,
pengawas pek.sipil pelaksana pekerjaan, Site manager

................................ ................................ .............................................

Gambar terlampir
DOKUMENTASI PEMERIKSAAN FISIK HASIL PEKERJAAN

A B

C D

Diperiksa, Diketahui,
pengawas pek.sipil pelaksana Site manager
pekerjaan,

.............................................
................................ ...............................
.
DOKUMENTASI PEMERIKSAAN FISIK HASIL PEKERJAAN

A B

C D

Diperiksa, Diketahui,
pengawas pek.sipil pelaksana Site manager
pekerjaan,

.............................................
................................ ...............................
.
VOLUME PERENCANAAN PEMBUATAN SALURAN AIR
TYPE PIPE & BOX CULVERT

Lokasi : Jalan masuk lokasi pengeboran


STA 2+200 - 7+800

No. ITEM PEKERJAAN SATUAN KUANTITAS

I GORONG GORONG TYPE PIPE CULVERT (crossing jalan eksisting)


STA 2+200
1 Pas. Bouplank m1 10.00
2 Galian tanah m3 9.60
3 Landasan pasir m2 0.80
4 Lantai kerja m2 6.40
5 Buis beton Ø 60 m1 8.00
6 Pas. Batu belah ad. 1:4 m3 3.20
7 Plester + aci m2 12.92

II GORONG-GORONG TYPE PLAT DECKER , W=10,00m1


STA 2+200
1 Pas. Bouplank m1 14.00
2 Galian tanah m3 15.30
3 Landasan pasir m2 1.80
4 Lantai kerja m2 0.90
5 Pas. Batu belah ad. 1:4 m3 8.92
6 Plester + aci m2 24.60
7 Pemb. Begisting plat beton m2 10.80
8 Pembesian kg 288.00
9 Cor beton ad. 1:2:3 m3 2.40

III GORONG GORONG TYPE PIPE CULVERT


STA 2+550
1 Pas. Bouplank m1 10.00
2 Galian tanah m3 16.80
3 Landasan pasir m2 1.00
4 Lantai kerja m2 8.00
5 Buis beton Ø 60 m1 8.00
6 Pas. Batu belah ad. 1:4 m3 3.50
7 Plester + aci m2 13.50
No. ITEM PEKERJAAN SATUAN KUANTITAS

IV A GORONG-GORONG TYPE BOX CULVERT , W=8,00m1 (2 jalur)


STA 2+450 & 2+925
1 Pas. Bouplank m1 8.80
2 Galian tanah m3 17.00
3 Landasan pasir m2 14.40
4 Lantai kerja m2 11.20
5 Pas. Batu belah ad. 1:4 m3 2.99
6 Plester + aci m2 10.96
7 Pemb. Cetakan box culvert m2 67.80
8 Pembesian kg 616.00
9 Cor beton ad. 1:2:3 m3 5.60

B GORONG-GORONG TYPE BOX CULVERT , W=6,00m1 (2 jalur)


STA 2+650 & 2+850
1 Pas. Bouplank m1 8.80
2 Galian tanah m3 12.75
3 Landasan pasir m2 10.80
4 Lantai kerja m2 8.40
5 Pas. Batu belah ad. 1:4 m3 2.99
6 Plester + aci m2 10.96
7 Pemb. Cetakan box culvert m2 49.80
8 Pembesian kg 462.00
9 Cor beton ad. 1:2:3 m3 4.20

V GORONG-GORONG TYPE BOX CULVERT , W=10,00m1 ( 2 jalur)


STA 5+350 & 5+425

1 Pas. Bouplank m1 44.00


2 Galian tanah m3 60.00
3 Landasan pasir m2 18.00
4 Lantai kerja m2 16.00
5 Pas. Batu belah ad. 1:4 m3 10.35
6 Plester + aci m2 34.54
7 Pemb. Cetakan box culvert m2 113.20
8 Cor beton ad. 1:2:3 m3 7.40
9 Pembesian kg 814.00
10 Pemb. Cetakan U-ditch m2 11.20
No. ITEM PEKERJAAN SATUAN KUANTITAS
11 Cor beton ad. 1:2:3 m3 0.56
12 Pembesian wiremesh m6 kg 15.42

VI GORONG-GORONG TYPE BOX CULVERT , W=10,00m1


STA 5+425

1 Pas. Bouplank m1 22.00


2 Galian tanah m3 30.00
3 Landasan pasir m2 9.00
4 Lantai kerja m2 8.00
5 Pas. Batu belah ad. 1:4 m3 5.18
6 Plester + aci m2 17.27
7 Pemb. Cetakan box culvert m2 56.60
8 Cor beton ad. 1:2:3 m3 3.70
9 Pembesian kg 407.00
10 Pemb. Cetakan U-ditch m2 5.60
11 Cor beton ad. 1:2:3 m3 0.28
12 Pembesian wiremesh m6 kg 7.71

w=9,00m 20.00
27.00
8.10
7.20
5.18
17.27
50.94
3.33
366.30
5.60
0.28
7.71
100,000.00 100.00 10,000,000.00
30,000.00 100.00 3,000,000.00

13,000,000.00

kolam 12.00
wps 10.00
skiding 15.00
U ditch 15.00

52.00 5,200,000.00
1,560,000.00

6,760,000.00
7.398 10
4.73472 8
10.65312 12
18.93888 16

254.28
3.05996473

254.28

3.05996473
0
bat m3 14 60,000.00
pc sack 40 65,000.00
psr m3 12 150,000.00
krl m3 3 300,000.00
214.542 bsi btg 29 6,100.00
ppn kpg 12 30,000.00
71.42857 ks btg 6 28,169.01
pku kg 1 15,000.00
bdrt kg 2 18,000.00

jasa rp 1
840,000.00
2,600,000.00
1,800,000.00
900,000.00
176,900.00
360,000.00
169,014.08
15,000.00
36,000.00
0.00
3,200,000.00

10,096,914.08

Anda mungkin juga menyukai