No Uraian Kode Satuan Koefisien rga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 81,500.00 8,150.00
Tukang Kayu L.02 OH 0.1000 96,500.00 9,650.00
Kepala Tukang L.03 OH 0.0100 107,000.00 1,070.00
Mandor L.04 OH 0.0050 107,000.00 535.00
JUMLAH TENAGA KERJA 19,405.00
B BAHAN
Kayu balok 5/7 m³ 0.1200 7,500,000.00 900,000.00
Paku 2”-3” Kg 0.0200 23,000.00 460.00
Kayu papan 3/20 m³ 0.0070 7,800,000.00 54,600.00
JUMLAH HARGA BAHAN 955,060.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 974,465.00
E Overhead & Profit 10% x D 97,446.50
F Harga Satuan Pekerjaan (D+E) A.2.2.1.4 1,071,911.50
No Uraian Kode Satuan Koefisien rga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 2.0000 81,500.00 163,000.00
Tukang Kayu L.02 OH 2.0000 96,500.00 193,000.00
Tukang batu L.02 OH 1.0000 96,500.00 96,500.00
Kepala Tukang L.03 OH 0.3000 107,000.00 32,100.00
Mandor L.04 OH 0.0500 107,000.00 5,350.00
JUMLAH TENAGA KERJA 489,950.00
B BAHAN
Dolken bambu Batang 1.2500 25,000.00 31,250.00
Kayu m 0.1800 7,500,000.00 1,350,000.00
Paku biasa Kg 0.0800 23,000.00 1,840.00
Besi strip Kg 1.1000 15,200.00 16,720.00
Semen Portland Kg 35.0000 1,250.00 43,750.00
Pasir pasang m³ 0.1500 350,000.00 52,500.00
Pasir beton m³ 0.1000 350,000.00 35,000.00
Koral beton m³ 0.1500 215,000.00 32,250.00
Bata merah Bh 30.0000 600.00 18,000.00
Seng plat Lbr 0.2500 28,000.00 7,000.00
Jendela naco Bh 0.2000 16,000.00 3,200.00
Kaca polos m² 0.0800 115,000.00 9,200.00
Kunci tanam Bh 0.1500 160,000.00 24,000.00
Plywood 4mm Lbr 0.0600 56,000.00 3,360.00
JUMLAH HARGA BAHAN 1,628,070.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 2,118,020.00
E Overhead & Profit 10% x D 211,802.00
F Harga Satuan Pekerjaan (D+E) A.2.2.1.5.a 2,329,822.00
No Uraian Kode Satuan Koefisien rga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 81,500.00 81,500.00
Tukang Kayu L.02 OH 2.0000 96,500.00 193,000.00
Kepala Tukang L.03 OH 0.2000 107,000.00 21,400.00
Mandor L.04 OH 0.0500 107,000.00 5,350.00
JUMLAH TENAGA KERJA 301,250.00
B BAHAN
Dolken bambu Batang 1.7000 25,000.00 42,500.00
Kayu m 0.2100 7,500,000.00 1,575,000.00
Paku biasa Kg 0.3000 23,000.00 6,900.00
Semen Portland Kg 10.5000 1,250.00 13,125.00
Pasir beton m³ 0.0300 350,000.00 10,500.00
Koral beton m³ 0.0500 215,000.00 10,750.00
Seng gelombang Lbr 1.5000 54,000.00 81,000.00
Seng plat Lbr 0.2500 28,000.00 7,000.00
JUMLAH HARGA BAHAN 1,746,775.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 2,048,025.00
E Overhead & Profit 10% x D 204,802.50
F Harga Satuan Pekerjaan (D+E) A.2.2.1.7.a 2,252,827.50
No Uraian Kode Satuan Koefisien rga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 81,500.00 8,150.00
Mandor L.04 OH 0.0500 107,000.00 5,350.00
JUMLAH TENAGA KERJA 13,500.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,500.00
E Overhead & Profit 10% x D 1,350.00
F Harga Satuan Pekerjaan (D+E) A.2.2.1.9 14,850.00
No Uraian Kode Satuan Koefisien rga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 81,500.00 81,500.00
Tukang Kayu L.02 OH 2.0000 96,500.00 193,000.00
Kepala Tukang L.03 OH 0.2000 107,000.00 21,400.00
Mandor L.04 OH 0.0500 107,000.00 5,350.00
JUMLAH TENAGA KERJA 301,250.00
B BAHAN
Bambu diameter 6-8/600 cm Batang 1.2500 25,000.00 31,250.00
Tali ijuk kg 0.1860 16,000.00 2,976.00
JUMLAH HARGA BAHAN 34,226.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 335,476.00
E Overhead & Profit 10% x D 33,547.60
F Harga Satuan Pekerjaan (D+E) A.2.2.1.10 369,023.60
No Uraian Kode Satuan Koefisien rga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 13.3340 81,500.00 1,086,721.00
Mandor L.04 0.6660 107,000.00 71,262.00
JUMLAH TENAGA KERJA 1,157,983.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,157,983.00
E Overhead & Profit 10% x D 115,798.30
F Harga Satuan Pekerjaan (D+E) A.2.2.1.13 1,273,781.30
No Uraian Kode Satuan Koefisien rga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 6.6670 81,500.00 543,360.50
Mandor L.04 0.3330 107,000.00 35,631.00
JUMLAH TENAGA KERJA 578,991.50
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 578,991.50
E Overhead & Profit 10% x D 57,899.15
F Harga Satuan Pekerjaan (D+E) A.2.2.1.14 636,890.65
63,689.07 /M2
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
A. 2.2.1.1.a Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 81,500.00 8,150.00
Tukang Kayu L.02 OH 0.1000 96,500.00 9,650.00
Kepala Tukang L.03 OH 0.0100 107,000.00 1,070.00
Mandor L.04 OH 0.0050 107,000.00 535.00
JUMLAH TENAGA KERJA 19,405.00
B BAHAN
Kayu balok 5/7 m³ 0.1200 7,500,000.00 900,000.00
Paku 2”-3” Kg 0.0200 23,000.00 460.00
Kayu papan 3/20 m³ 0.0070 7,800,000.00 54,600.00
JUMLAH HARGA BAHAN 955,060.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 974,465.00
E Overhead & Profit 10% x D 97,446.50
F Harga Satuan Pekerjaan (D+E) A.2.2.1.4 1,071,911.50
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 2.0000 81,500.00 163,000.00
Tukang Kayu L.02 OH 2.0000 96,500.00 193,000.00
Tukang batu L.02 OH 1.0000 96,500.00 96,500.00
Kepala Tukang L.03 OH 0.3000 107,000.00 32,100.00
Mandor L.04 OH 0.0500 107,000.00 5,350.00
JUMLAH TENAGA KERJA 489,950.00
B BAHAN
Dolken bambu Batang 1.2500 25,000.00 31,250.00
Kayu m 0.1800 7,500,000.00 1,350,000.00
Paku biasa Kg 0.0800 23,000.00 1,840.00
Besi strip Kg 1.1000 15,200.00 16,720.00
Semen Portland Kg 35.0000 1,250.00 43,750.00
Pasir pasang m³ 0.1500 350,000.00 52,500.00
Pasir beton m³ 0.1000 350,000.00 35,000.00
Koral beton m³ 0.1500 215,000.00 32,250.00
Bata merah Bh 30.0000 600.00 18,000.00
Seng plat Lbr 0.2500 28,000.00 7,000.00
Jendela naco Bh 0.2000 16,000.00 3,200.00
Kaca polos m² 0.0800 115,000.00 9,200.00
Kunci tanam Bh 0.1500 160,000.00 24,000.00
Plywood 4mm Lbr 0.0600 56,000.00 3,360.00
JUMLAH HARGA BAHAN 1,628,070.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 2,118,020.00
E Overhead & Profit 10% x D 211,802.00
F Harga Satuan Pekerjaan (D+E) A.2.2.1.5.a 2,329,822.00
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 81,500.00 81,500.00
Tukang Kayu L.02 OH 2.0000 96,500.00 193,000.00
Kepala Tukang L.03 OH 0.2000 107,000.00 21,400.00
Mandor L.04 OH 0.0500 107,000.00 5,350.00
JUMLAH TENAGA KERJA 301,250.00
B BAHAN
Dolken bambu Batang 1.7000 25,000.00 42,500.00
Kayu m 0.2100 7,500,000.00 1,575,000.00
Paku biasa Kg 0.3000 23,000.00 6,900.00
Semen Portland Kg 10.5000 1,250.00 13,125.00
Pasir beton m³ 0.0300 350,000.00 10,500.00
Koral beton m³ 0.0500 215,000.00 10,750.00
Seng gelombang Lbr 1.5000 54,000.00 81,000.00
Seng plat Lbr 0.2500 28,000.00 7,000.00
JUMLAH HARGA BAHAN 1,746,775.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 2,048,025.00
E Overhead & Profit 10% x D 204,802.50
F Harga Satuan Pekerjaan (D+E) A.2.2.1.7.a 2,252,827.50
A. 2.2.1.9. Pembersihan 1 m² lapangan dan peralatan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 81,500.00 8,150.00
Mandor L.04 OH 0.0500 107,000.00 5,350.00
JUMLAH TENAGA KERJA 13,500.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,500.00
E Overhead & Profit 10% x D 1,350.00
F Harga Satuan Pekerjaan (D+E) A.2.2.1.9 14,850.00
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.0000 81,500.00 81,500.00
Tukang Kayu L.02 OH 2.0000 96,500.00 193,000.00
Kepala Tukang L.03 OH 0.2000 107,000.00 21,400.00
Mandor L.04 OH 0.0500 107,000.00 5,350.00
JUMLAH TENAGA KERJA 301,250.00
B BAHAN
Bambu diameter 6-8/600 cm Batang 1.2500 25,000.00 31,250.00
Tali ijuk kg 0.1860 16,000.00 2,976.00
JUMLAH HARGA BAHAN 34,226.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 335,476.00
E Overhead & Profit 10% x D 33,547.60
F Harga Satuan Pekerjaan (D+E) A.2.2.1.10 369,023.60
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 13.3340 81,500.00 1,086,721.00
Mandor L.04 0.6660 107,000.00 71,262.00
JUMLAH TENAGA KERJA 1,157,983.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,157,983.00
E Overhead & Profit 10% x D 115,798.30
F Harga Satuan Pekerjaan (D+E) A.2.2.1.13 1,273,781.30
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 6.6670 81,500.00 543,360.50
Mandor L.04 0.3330 107,000.00 35,631.00
JUMLAH TENAGA KERJA 578,991.50
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 578,991.50
E Overhead & Profit 10% x D 57,899.15
F Harga Satuan Pekerjaan (D+E) A.2.2.1.14 636,890.65
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
A. 2.2.1.1.a Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E) A.2.2.1.1.a
A TENAGA
Pekerja L.01 OH 2.0000 81,500.00
Tukang Kayu L.02 OH 2.0000 96,500.00
Tukang batu L.02 OH 1.0000 96,500.00
Kepala Tukang L.03 OH 0.3000 107,000.00
Mandor L.04 OH 0.0500 107,000.00
JUMLAH TENAGA KERJA
B BAHAN
Dolken bambu Batang 1.2500 25,000.00
Kayu m 0.1800 7,500,000.00
Paku biasa Kg 0.0800 23,000.00
Besi strip Kg 1.1000 15,200.00
Semen Portland Kg 35.0000 1,250.00
Pasir pasang m³ 0.1500 350,000.00
Pasir beton m³ 0.1000 350,000.00
Koral beton m³ 0.1500 215,000.00
Bata merah Bh 30.0000 600.00
Seng plat Lbr 0.2500 28,000.00
Jendela naco Bh 0.2000 16,000.00
Kaca polos m² 0.0800 115,000.00
Kunci tanam Bh 0.1500 160,000.00
Plywood 4mm Lbr 0.0600 56,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E) A.2.2.1.5.a
A TENAGA
Pekerja L.01 OH 1.0000 81,500.00
Tukang Kayu L.02 OH 2.0000 96,500.00
Kepala Tukang L.03 OH 0.2000 107,000.00
Mandor L.04 OH 0.0500 107,000.00
JUMLAH TENAGA KERJA
B BAHAN
Dolken bambu Batang 1.7000 25,000.00
Kayu m 0.2100 7,500,000.00
Paku biasa Kg 0.3000 23,000.00
Semen Portland Kg 10.5000 1,250.00
Pasir beton m³ 0.0300 350,000.00
Koral beton m³ 0.0500 215,000.00
Seng gelombang Lbr 1.5000 54,000.00
Seng plat Lbr 0.2500 28,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E) A.2.2.1.7.a
A TENAGA
Pekerja L.01 OH 0.1000 81,500.00
Mandor L.04 OH 0.0500 107,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E) A.2.2.1.9
A TENAGA
Pekerja L.01 OH 1.0000 81,500.00
Tukang Kayu L.02 OH 2.0000 96,500.00
Kepala Tukang L.03 OH 0.2000 107,000.00
Mandor L.04 OH 0.0500 107,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bambu diameter 6-8/600 cm Batang 1.2500 25,000.00
Tali ijuk kg 0.1860 16,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E) A.2.2.1.10
A TENAGA
Pekerja L.01 13.3340 81,500.00
Mandor L.04 0.6660 107,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E) A.2.2.1.13
A TENAGA
Pekerja L.01 6.6670 81,500.00
Mandor L.04 0.3330 107,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E) A.2.2.1.14
Jumlah Harga (Rp)
32,600.00
19,300.00
2,140.00
2,140.00
56,180.00
31,250.00
6,250.00
1,750.00
1,935.00
540,000.00
1,380.00
108,000.00
690,565.00
746,745.00
74,674.50
821,419.50
8,150.00
9,650.00
1,070.00
535.00
19,405.00
900,000.00
460.00
54,600.00
955,060.00
974,465.00
97,446.50
1,071,911.50
163,000.00
193,000.00
96,500.00
32,100.00
5,350.00
489,950.00
31,250.00
1,350,000.00
1,840.00
16,720.00
43,750.00
52,500.00
35,000.00
32,250.00
18,000.00
7,000.00
3,200.00
9,200.00
24,000.00
3,360.00
1,628,070.00
2,118,020.00
211,802.00
2,329,822.00
81,500.00
193,000.00
21,400.00
5,350.00
301,250.00
42,500.00
1,575,000.00
6,900.00
13,125.00
10,500.00
10,750.00
81,000.00
7,000.00
1,746,775.00
2,048,025.00
204,802.50
2,252,827.50
8,150.00
5,350.00
13,500.00
13,500.00
1,350.00
14,850.00
81,500.00
193,000.00
21,400.00
5,350.00
301,250.00
31,250.00
2,976.00
34,226.00
335,476.00
33,547.60
369,023.60
1,086,721.00
71,262.00
1,157,983.00
1,157,983.00
115,798.30
1,273,781.30
543,360.50
35,631.00
578,991.50
578,991.50
57,899.15
636,890.65