PROYEK :
Harga Satuan
No. Uraian Pekerjaan Volume
( Rp )
1 2 3 4
A. PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan lokasi 176.64 M2 3,000.00
2 Pek. Papan nama Proyek 1.00 Ls 350,000.00
3 Pek. Pembongkaran dinding, kosen, plafond & atap 1.00 Ls 2,500,000.00
4 Pek. Bouwplank 40.00 M' 11,525.00
Jumlah
B. PEKERJAAN PONDASI
1 Pek. Galian tanah pondasi 11.220 M3 23,625.00
2 Pek. Urugan pasir dibawah pondasi 1.020 M3 83,812.50
3 Pek. Cor lantai kerja 1 : 3 : 5 1.020 M3 510,910.00
4 Pek. Pasang pondasi bata 1 batu 4.675 M3 583,443.00
5 Pek. Raben pondasi 93.500 M2 15,092.50
6 Pek. Timbunan bekas galian 3.740 M3 11,812.50
Jumlah
C. PEKERJAAN STRUKTUR
1 Pek. Cor sloof 20/25 beton bertulang 1:2:3 1.700 M3 2,550,350.00
2 Pek. Cor reng balok 15/20 beton bertulang 1:2:3 3.000 M3 2,550,350.00
3 Pek. Cor kolom 20/25 beton bertulang 1 : 2 : 3 3.000 M3 2,550,350.00
4 Pek. Cor tiang teras 15/20 beton bertulang 1 : 2 : 3 0.135 M3 2,550,350.00
5 Pek. Cor kolom praktis 13/13 beton bertulang 1 : 2 : 3 0.270 M3 2,550,350.00
Jumlah
D. PEKERJAAN DINDING
1 Pek. Dinding 1/2 bata 1 : 2 1.020 M3 583,443.00
2 Pek. Dinding 1/2 bata 1 : 4 19.223 M3 528,527.00
3 Pek. Plesteran dinding 1 : 2 20.400 M2 26,771.40
4 Pek. Plesteran dinding 1 : 4 384.460 M2 24,505.00
Jumlah
Jumlah
F. PEKERJAAN PLAFOND
1 Pas. Plafond Plywood + Rangka 296.000 M2 65,672.50
2 Pas. Plafond Piri-piri + Rangka 43.680 M2 61,532.50
3 Pas. List Profil Plafond 34.000 M' 2,500.00
Jumlah
G. PEKERJAAN LANTAI
1 Pek. Timbunan tanah urug dibawah lantai 14.400 M3 67,812.50
2 Pek. Pasir urug dibawah lantai 7.200 M3 83,812.50
3 Pek. Cor lantai beton 1 : 3 : 5 144.000 M2 39,300.77
Jumlah
Jumlah
Jumlah
J. PEKERJAAN PENGECATAN
1 Pek. Residu kuda-kuda 1.000 Ls 500,000.00
2 Pek. Meni kusen 1.000 Ls 300,000.00
3 Pek. Cat air untuk dinding 404.860 M2 8,865.00
4 Pek. Cat air untuk plafond 296.000 M2 8,865.00
5 Pek. Cat minyak peri-peri + listplank + papan singap 367.800 M2 30,877.50
Jumlah
K. PEKERJAAN LISTRIK
1 Pas. Instalasi titik lampu 30.00 Ttk 80,000.00
2 Pas. Lampu gantung 100 Watt 25.00 Bh 85,000.00
3 Pas. Lampu pijar 40 watt 3.00 Bh 6,000.00
4 Pas. Sekring box 1.00 Bh 350,000.00
5 Pas. Saklar ganda 9.00 Bh 12,500.00
6 Pas. Stop kontak 2.00 Bh 10,000.00
Jumlah
Jumlah
REKAPITULASI
PROYEK : -
A PEKERJAAN PENDAHULUAN Rp
B PEKERJAAN PONDASI Rp
C PEKERJAAN STRUKTUR Rp
D PEKERJAAN DINDING Rp
E PEKERJAAN RANGKA DAN PENUTUP ATAP Rp
F PEKERJAAN PLAFOND Rp
G PEKERJAAN LANTAI Rp
H PEKERJAAN PINTU DAN JENDELA Rp
I PEKERJAAN PENGGANTUNG / PENGUNCI Rp
J PEKERJAAN PENGECATAN Rp
K PEKERJAAN LISTRIK Rp
L PEKERJAAN LUAR BANGUNAN Rp
JUMLAH FISIK Rp
DIBULATKAN Rp
PERENCANAAN Rp
PENGAWASAN Rp
TOTAL Rp
Terbilang :
Dumai, Me
Disetujui Oleh : Dibuat Oleh
KEPALA SEKOLAH CV. INDRAWATI CONS
MTsN DUMAI
YUSRIZAL, ST
NIP. Direktur
A ANGGARAN BIAYA (R A B)
Jumlah Harga
( Rp )
5
529,920.00
350,000.00
2,500,000.00
461,000.00
------------------------------
3,840,920.00
265,072.50
85,488.75
521,128.20
2,727,596.03
1,411,148.75
44,178.75
------------------------------
5,054,612.98
4,335,595.00
7,651,050.00
7,651,050.00
344,297.25
689,614.64
------------------------------
20,671,606.89
595,111.86
10,159,874.52
546,136.56
9,421,192.30
------------------------------
20,722,315.24
7,403,893.56
10,283,052.21
7,198,136.55
3,084,915.66
2,455,232.50
179,943.75
39,981,432.75
1,331,557.50
1,200,485.00
7,414,960.44
3,510,000.00
-
------------------------------
84,043,609.92
19,439,060.00
2,687,739.60
85,000.00
------------------------------
22,211,799.60
976,500.00
603,450.00
5,659,310.77
------------------------------
7,239,260.77
3,085,106.40
4,500,000.00
3,150,000.00
------------------------------
10,735,106.40
360,000.00
180,000.00
2,250,000.00
180,000.00
270,000.00
------------------------------
3,240,000.00
500,000.00
300,000.00
3,589,083.90
2,624,040.00
11,356,744.50
------------------------------
18,369,868.40
2,400,000.00
2,125,000.00
18,000.00
350,000.00
112,500.00
20,000.00
------------------------------
5,025,500.00
1,716,657.60
1,188,000.00
300,000.00
------------------------------
3,204,657.60
EKAPITULASI
3,840,920.00
5,054,612.98
20,671,606.89
20,722,315.24
84,043,609.92
22,211,799.60
7,239,260.77
10,735,106.40
3,240,000.00
18,369,868.40
5,025,500.00
3,204,657.60
204,359,257.79
204,359,000.00
12,131,000.00
7,984,000.00
224,474,000.00
YUSRIZAL, ST
Direktur
DAFTAR HARGA SATUAN BAHAN DAN UPAH
BAHAN
Pasir cor / M3 Rp. 80,000.00
Pasir pasang / M3 Rp. 60,000.00
Tanah urug / M3 Rp. 40,000.00
Kerikil / M3 Rp. 110,000.00
Batu Mangga / M3 Rp. 180,000.00
Semen / Zak Rp. 34,000.00
Batu bata / Bh Rp. 200.00
Besi beton / Kg Rp. 8,000.00
Kawat ikat / Kg Rp. 11,000.00
Kayu Meranti / M3 Rp. 600,000.00
Kayu kelas I (Kulim / sejenisnya) / M3 Rp. 1,200,000.00
Kayu cerocok / Btg Rp. 14,000.00
Paku biasa / Kg Rp. 7,000.00
Paku Atap / Kg Rp. 14,000.00
Paku Triplek / Kg Rp. 14,000.00
Atap seng gelombang / Lbr Rp. 40,000.00
Perabung seng / Lbr Rp. 8,000.00
Seng Plat / Lbr Rp. 25,000.00
Plywood 3,6 mm / Lbr Rp. 38,000.00
Plamir / Kg Rp. 8,000.00
Amplas / Lbr Rp. 2,500.00
Cat minyak / Kg Rp. 25,000.00
Keramik 30 x 30 / Ktk Rp. 50,000.00
Keramik 20 x 25 / Ktk Rp. 55,000.00
Keramik 20 x 20 / Ktk Rp. 55,000.00
Plin keramik / M' Rp. 12,000.00
Tepung keramik / Kg Rp. 7,500.00
Thiner / Ltr Rp. 12,500.00
Cat air / Kg Rp. 7,500.00
Kuas 4 " / Bh Rp. 10,000.00
Kuas gulung / Bh Rp. 15,000.00
Kran air 1/2 ' / Bh Rp. 25,000.00
Pipa 1/2 " PVC / M' Rp. 3,500.00
Pipa 3/4 " PVC / M' Rp. 8,000.00
Pipa 21/2 " PVC / M' Rp. 15,000.00
Pipa 4 " PVC / M' Rp. 40,000.00
Floordrain / Bh Rp. 30,000.00
Kaca bening 5 mm / M2 Rp. 80,000.00
Bak air fiber / Bh Rp. 200,000.00
Lis Profil Kayu / Btg Rp. 12,000.00
Pintu Panil 82x210 / Bh Rp. 500,000.00
Pintu Panil 72x210 / Bh Rp. 450,000.00
Fiber komplit / Bh Rp. 300,000.00
Kloset jongkok porselin / Bh Rp. 175,000.00
Urinoir / Bh Rp. 250,000.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH
UPAH
Kepala tukang / Hari Rp. 45,000.00
Tukang / Hari Rp. 35,000.00
Pekerja / Hari Rp. 30,000.00
Mandor / Hari Rp. 45,000.00
DAFTAR ANALISA HARGA SATUAN
Harga
No. Uraian Satuan Volume Satuan Jumlah
Rp. Rp.
1 2 3 4 5 6
1 Pembersihan lokasi / M2
Upah :
Pekerja hari 0.0700 30,000 2,100.00
Mandor hari 0.0200 45,000 900.00
Biaya Upah 3,000.00
Bahan :
Kayu Meranti M3 1.1000 600,000.00 660,000.00
Paku Kg 5.0000 7,000.00 35,000.00
Upah :
Kepala tukang hari 1.8000 45,000.00 81,000.00
Tukang kayu hari 18.0000 35,000.00 630,000.00
Pekerja hari 6.0000 30,000.00 180,000.00
Mandor hari 0.3000 45,000.00 13,500.00
Bahan + Upah 1,599,500.00
1 2 3 4 5 6
Bahan :
Papan Meranti M3 0.0334 600,000.00 20,040.00
Paku biasa Kg 0.1334 7,000.00 933.80
Upah :
Kepala tukang hari 0.0267 45,000.00 1,201.50
Tukang kayu hari 0.2667 35,000.00 9,334.50
Pekerja hari 0.0933 30,000.00 2,799.00
Mandor hari 0.0047 45,000.00 211.50
Bahan + Upah 34,520.30