I. PEKERJAAN PENDAHULUAN
HARGA JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN / PENDAHULUAN
1 Pekerjaan Pembersihan Lokasi 1.00 Unit 25,000,000.00 25,000,000.00
2 Pek. Bangsal Kerja Ls Ls 7,800,000.00 7,800,000.00
3 Pek. Pas. Bowplank 119.00 Unit 150,000.00 17,850,000.00
4 Air Kerja / P3K 119.00 Unit 100,000.00 11,900,000.00
5 Administrasi dan Dokumentasi 119.00 Unit 50,000.00 5,950,000.00
Jumlah 68,500,000.00
1 2 3 4 5 6
I PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi 12.96 m3 22,800.00 295,488.00
2 Pek. Urugan Tanah Eks. Galian Pondasi 3.24 m3 10,930.00 35,413.20
3 Pek. Urugan tanah bawah lantai 12.88 m3 58,500.00 753,597.00
4 Pek. Urugan pasir alas Pondasi 1.44 m3 105,700.00 152,208.00
5 Pek. Urugan pasir alas Lantai 3.39 m3 105,700.00 358,323.00
Jumlah 1,595,029.20
II PEKERJAAN BATU DAN PASANGAN
1 Pas. Batu kosong 4.32 m3 274,455.00 1,185,645.60
2 Pas. Pondasi batu gunung, adukan 1 Pc : 5 Psr 12.24 m3 536,550.00 6,567,372.00
3 Pas. Dinding batako, adukan 1 Pc : 2 Psr 10.80 m2 43,888.50 473,995.80
4 Pas. Dinding batako, adukan 1 Pc : 5 Psr 70.80 m2 42,295.00 2,994,486.00
Jumlah 11,221,499.40
III PEKERJAAN BETON BERTULANG
1 Pek. Sloof Praktis 15 x 20 Beton Bertulang 1 Pc : 2 Psr : 3 Krl 36.00 m' 52,880.00 1,903,680.00
2 Pek. Kolom praktis, 12 x 12 cm Beton Bertulang 1 Pc : 2 Psr : 3 Krl 45.00 m' 45,085.00 2,028,825.00
3 Pek. Ring Balk, Uk.12 x 15 cm Beton Bertulang 1 Pc : 2 Psr : 3 Krl 58.90 m' 52,880.00 3,114,632.00
Jumlah 7,047,137.00
IV PEKERJAAN PLESTERAN
1 Pek. Plesteran Trasram camp. 1 Pc : 2 Ps T. 15 mm 21.60 m2 35,526.00 767,361.60
2 Pek. Plesteran Dinding camp. 1 Pc : 5 Ps T. 15 mm 141.60 m2 30,691.00 4,345,845.60
3 Pek. Plesteran Beton camp. 1 Pc : 3 Ps T. 15 mm 7.20 m2 33,124.00 238,492.80
4 Pek. Pleteran Pondasi camp. 1 Pc : 3 Ps T. 15 mm 22.40 m2 33,124.00 741,977.60
Jumlah 6,093,677.60
V PEKERJAAN PASANGAN LANTAI KERAMIK DAN RABAT BETON
1 Pek. Pasangan keramik 40 x 40 cm 31.65 m2 139,019.00 4,399,951.35
2 Pek. Pasangan keramik 20 x 20 cm 2.25 m2 118,878.00 267,475.50
3 Pek. Pasangan keramik 20 x 25 cm 7.50 m2 144,019.00 1,080,142.50
4 Pek. Lantai Rabat beton 1 Pc : 3 Psr : 5 Krl 2.52 m3 608,125.00 1,532,475.00
Jumlah 7,280,044.35
VI PEKERJAAN KUSEN/JENDELA/KACA
1 Pek. Kosen pintu / jendela kayu Kelas II Uk. 5 x 13,5 cm 0.49 m3 4,131,000.00 2,037,409.20
2 Pek. Pintu panil kayu Jati 5.04 m2 343,250.00 1,729,980.00
3 Pek. Bingkai jendela kaca kayu Jati 2.52 m2 281,800.00 710,136.00
4 Pek. List Kaca 1 x 1 cm 25.20 m' 5,385.00 135,702.00
5 Pek. Pas. Kaca Bening 5 mm 5.04 m2 111,427.50 561,594.60
Jumlah 5,174,821.80
VII PEKERJAAN KAP DAN ATAP
1 Pek. Kuda-kuda, balok jurai dan konsol kayu II 0.52 m3 3,431,000.00 1,797,844.00
2 Pek. Gording dan balok angin kayu kls II 0.66 m3 3,136,000.00 2,082,304.00
3 Pek. Papan listplank papan Kayu Kelas II 20.58 m' 59,125.00 1,216,712.68
4 Pas. Atap seng Soka Jempol 48.00 m2 46,120.00 2,213,760.00
5 Pas. Nok seng Soka Jempol 8.00 m' 25,920.00 207,360.00
Jumlah 7,517,980.68
1 2 3 4 5 6
VIII PEKERJAAN PENGGANTUNG/PENGUNCI
1 Pas. Kunci tanam Anchor 693 LD, 2 x putar 3.00 buah 186,600.00 559,800.00
2 Pas. Engsel pintu dalam type kupu-kupu 6.00 buah 17,431.00 104,586.00
3 Pas. Grendel Pintu 3.00 buah 15,431.00 46,293.00
4 Pas. Engsel jendela type kupu-kupu standard 14.00 buah 12,285.00 171,990.00
5 Pas. Grendel jendela standard 7.00 buah 15,431.00 108,017.00
6 Pas. Kait angin jendela standard 14.00 buah 15,431.00 216,034.00
Jumlah 1,206,720.00
IX PEKERJAAN RANGKA DAN PLAFOND
1 Pek. Rangka Plafond Tripleks kayu kls II 58.90 m2 55,225.00 3,252,752.50
2 Pek. Plafond Tripleks 60 x 120 cm 58.90 m2 29,395.00 1,731,365.50
3 Pas. List Plafond Profil 90.00 m' 5,565.00 500,850.00
Jumlah 5,484,968.00
X PEKERJAAN INSTALASI LISTRIK
1 Pasangan titik instalasi 7.00 buah 50,000.00 350,000.00
2 Pasangan lampu TL 20 watt 1.00 buah 40,000.00 40,000.00
3 Pasangan lampu pijar 25 watt 4.00 buah 20,000.00 80,000.00
4 Pasangan lampu pijar 5 watt 2.00 buah 10,000.00 20,000.00
5 Pas. Stop kontak merk Broco 2.00 buah 10,000.00 20,000.00
6 Pas. Saklar tunggal merk Broco 3.00 buah 7,500.00 22,500.00
7 Pas. Saklar ganda merk Broco 2.00 buah 12,500.00 25,000.00
8 Pas. Box Skring ( MCB ) 1.00 buah 125,000.00 125,000.00
Jumlah 682,500.00
XI PEKERJAAN SANITASI
1 Pek. Instalasi Air bersih Ls Ls 250,000.00 250,000.00
2 Pek. Instalasi Air kotor Ls Ls 150,000.00 150,000.00
3 Pemasangan kran air 2.00 Bh 23,662.50 47,325.00
4 Pemasangan Floor drain 2.00 Bh 18,600.00 37,200.00
5 Pemasangan klosed jongkok 1.00 Bh 399,750.00 399,750.00
6 Pek. Pintu fiber 1.00 Bh 300,000.00 300,000.00
7 Pek. Septick tank dan peresapan 1.00 Unit 2,000,000.00 2,000,000.00
Jumlah 3,184,275.00
XII PEKERJAAN PENGECATAN / FINISHING
1 Pek. Plamur Tembok 163.20 m2 6,956.67 1,135,328.54
2 Pek. Cat tembok 2 x jalan 163.20 m2 7,683.34 1,253,921.09
3 Pek. Cat plafond 2 x jalan 58.90 m2 7,683.34 452,548.73
4 Pek. Cat dasar/kilap kosen 2 x jalan 17.18 m2 12,855.50 220,793.21
5 Pek. Vernis daun pintu/jendela 2 x jalan 15.12 m2 23,425.00 354,186.00
6 Pek. Mengamplas dan Menggosok kayu 32.30 m2 4,020.00 129,825.90
7 Pek. Pembersihan akhir ls ls 150,000.00 150,000.00
Jumlah 3,696,603.47
REKAPITULASI
JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN HARGA
(Rp)
I ###
PEKERJAAN TANAH DAN PASIR . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp 1,595,029.20
II ###
PEKERJAAN BATU DAN PASANGAN . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp 11,221,499.40
III###PEKERJAAN BETON BERTULANG . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp 7,047,137.00
IV### PEKERJAAN PLESTERAN . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp 6,093,677.60
V ###PEKERJAAN PASANGAN LANTAI KERAMIK DAN RABAT BETON . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp 7,280,044.35
VI### PEKERJAAN KUSEN/JENDELA/KACA . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp 5,174,821.80
VII### PEKERJAAN KAP DAN ATAP . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp 7,517,980.68
VIII###PEKERJAAN PENGGANTUNG/PENGUNCI . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp 1,206,720.00
IX PEKERJAAN RANGKA DAN PLAFOND . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp 5,484,968.00
X ###PEKERJAAN INSTALASI LISTRIK . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp 682,500.00
XI PEKERJAAN SANITASI . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp 3,184,275.00
XII PEKERJAAN PENGECATAN / FINISHING . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp 3,696,603.47
A TOTAL . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp 60,185,256.50
B JUMLAH A X 94 UNIT . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp 7,162,045,523.71
HARGA JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6
I PEKERJAAN FASILITAS UMUM
1 Pek. Pintu Gerbang 2.00 Unit 5,000,000.00 10,000,000.00
2 Pek. Pembentukan Badan Jalan 930.00 m' 250,000.00 232,500,000.00
3 Pek. Perkerasan Badan Jalan 930.00 m' 750,000.00 697,500,000.00
4 Pek. Drainace Jalan 1,745.00 m' 150,000.00 261,750,000.00
5 Pek. Selokan Induk 215.00 m' 350,000.00 75,250,000.00
6 Pek. Duicker Plat Beton Bertulang 5.00 Unit 15,000,000.00 75,000,000.00
Jumlah 1,352,000,000.00
TOTAL REKAPITULASI
JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN HARGA
(Rp)
I ###
PEKERJAAN PENDAHULUAN . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp 68,500,000.00
II###
PEMBANGUNAN PERUMAHAN TYPE 36 . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp 7,162,045,523.71
TOTAL . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp 8,582,545,523.71
DIBULATKAN . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp 8,582,545,000.00
TERBILANG : DELAPAN MILYAR LIMA RATUS DELAPAN PULUH DUA JUTA LIMA RATUS EMPAT PULUH LIMA RIBU RUPIAH
I PEKERJAAN MOBILER
HARGA JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6
I PEKERJAAN MOBILER
1 Pengadaan meja 1/2 biro 20.00 buah 600,000.00 12,000,000.00
2 Pengadaan kursi guru 20.00 buah 350,000.00 7,000,000.00
3 Pengadaan meja siswa 160.00 buah 450,000.00 72,000,000.00
4 Pengadaan kursi siswa 160.00 buah 250,000.00 40,000,000.00
5 Pengadaan lemari 10.00 buah 900,000.00 9,000,000.00
6 Pengadaan papan tulis 4.00 buah 300,000.00 1,200,000.00
7 Pengadaan papan absen 4.00 buah 150,000.00 600,000.00
8 Pengadaan bak sampah 7.00 buah 150,000.00 1,050,000.00
9 Pengadaan tiang bendera ruangan 7.00 buah 250,000.00 1,750,000.00
10 Pengadaan rak buku 6.00 buah 700,000.00 4,200,000.00
11 Pengadaan meja dan kursi tamu 1.00 Set 2,400,000.00 2,400,000.00
12 Pengadaan tiang bendera sekolah 1.00 Unit 850,000.00 850,000.00
Jumlah 152,050,000.00
REKAPITULASI
JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN HARGA
(Rp)
TOTAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp 152,050,000.00
TERBILANG : SERATUS LIMA PULUH DUA JUTA LIMA PULUH RIBU RUPIAH
REKAPITULASI
JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN HARGA
(Rp)
TOTAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp 11,291,384.96
DIBULATKAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp 11,291,000.00
TERBILANG : DUA PULUH DUA JUTA TUJUH RATUS TUJUH PULUH TIGA RIBU RUPIAH
REKAPITULASI
JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN HARGA
(Rp)
TOTAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp #VALUE!
DIBULATKAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp #VALUE!
TERBILANG : SEMBILAN BELAS JUTA EMPAT RATUS ENAM PULUH EMPAT RIBU RUPIAH
REKAPITULASI
JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN HARGA
(Rp)
TOTAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp #VALUE!
DIBULATKAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp #VALUE!
TERBILANG : DUA PULUH TIGA JUTA ENAM RATUS DELAPAN PULUH DUA RIBU RUPIAH
REKAPITULASI
JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN HARGA
(Rp)
TOTAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp #VALUE!
DIBULATKAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp #VALUE!
TERBILANG : TUJUH BELAS JUTA TUJUH RATUS LIMA PULUH ENAM RIBU RUPIAH
REKAPITULASI
JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN HARGA
(Rp)
TOTAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp #VALUE!
DIBULATKAN . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp #VALUE!
TERBILANG : EMPAT BELAS JUTA DUA RATUS TUJUH PULUH LIMA RIBU RUPIAH
TOTAL REKAPITULASI
JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN HARGA
(Rp)
12.81
15.25
17.52
49.34
64.14
238.55
33.07
61.95
70.75
21240
12.96
30.24
60185257.35
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
Jumlah A 22,800.00
B Bahan
Jumlah B
Harga Satuan A + B 22,800.00
Jumlah A 10,930.00
B Bahan
Jumlah B
Harga Satuan A + B 10,930.00
A Tenaga Kerja
1 Pekerja Org/Hari 50,000.00 0.3000 15,000.00
2 Mandor Org/Hari 70,000.00 0.0100 700.00
Jumlah A 15,700.00
B Bahan
1 Pasir urug m3 75,000.00 1.2000 90,000.00
Jumlah B 90,000.00
Harga Satuan A + B 105,700.00
A Tenaga Kerja
1 Tukang Batu Org/Hari 70,000.00 0.6000 42,000.00
2 Kepala Tukang Org/Hari 75,000.00 0.0600 4,500.00
3 Pekerja Org/Hari 50,000.00 1.5000 75,000.00
4 Mandor Org/Hari 70,000.00 0.0750 5,250.00
Jumlah A 126,750.00
B Bahan
1 Batu gunung m3 150,000.00 1.1000 165,000.00
2 Semen Portland kg 1,300.00 136.0000 176,800.00
3 Pasir Pasang m3 125,000.00 0.5440 68,000.00
Jumlah B 409,800.00
Harga Satuan A + B 536,550.00
A Tenaga Kerja
1 Tukang Batu Org/Hari 70,000.00 0.3900 27,300.00
2 Kepala Tukang Org/Hari 75,000.00 0.0390 2,925.00
3 Pekerja Org/Hari 50,000.00 0.7800 39,000.00
4 Mandor Org/Hari 70,000.00 0.0390 2,730.00
Jumlah A 71,955.00
B Bahan
1 Batu gunung m3 150,000.00 1.2000 180,000.00
2 Pasir Urug m3 75,000.00 0.3000 22,500.00
Jumlah B 202,500.00
Harga Satuan A + B 274,455.00
A Tenaga Kerja
1 Tukang Batu Org/Hari 70,000.00 0.1000 7,000.00
2 Kepala Tukang Org/Hari 75,000.00 0.0100 750.00
3 Pekerja Org/Hari 50,000.00 0.3200 16,000.00
4 Mandor Org/Hari 70,000.00 0.0150 1,050.00
Jumlah A 24,800.00
B Bahan
1 Batako bh 3,700.00 1.2500 4,625.00
2 Semen Portland kg 1,300.00 1.8950 2,463.50
3 Pasir Pasang m3 125,000.00 0.0960 12,000.00
Jumlah B 19,088.50
Harga Satuan A + B 43,888.50
1 M2 Pek. Pasangan Batako 1 Pc : 5 Psr
Satuan Harga Kuantitas Jumlah
No. Uraian Satuan Harga
A Tenaga Kerja
1 Tukang Batu Org/Hari 70,000.00 0.1500 10,500.00
2 Kepala Tukang Org/Hari 75,000.00 0.0150 1,125.00
3 Pekerja Org/Hari 50,000.00 0.3500 17,500.00
4 Mandor Org/Hari 70,000.00 0.0170 1,190.00
Jumlah A 30,315.00
B Bahan
1 Batako bh 3,700.00 1.2500 4,625.00
2 Semen Portland kg 1,300.00 1.3500 1,755.00
3 Pasir Pasang m3 125,000.00 0.0448 5,600.00
Jumlah B 11,980.00
A Tenaga Kerja
1 Tukang Batu Org/Hari 70,000.00 0.1500 10,500.00
2 Kepala Tukang Org/Hari 75,000.00 0.0150 1,125.00
3 Pekerja Org/Hari 50,000.00 0.2000 10,000.00
4 Mandor Org/Hari 70,000.00 0.0100 700.00
Jumlah A 22,325.00
B Bahan
1 Semen Portland kg 1,300.00 8.5200 11,076.00
2 Pasir Pasang m3 125,000.00 0.0170 2,125.00
Jumlah B 13,201.00
Harga Satuan A + B 35,526.00
A Tenaga Kerja
1 Tukang Batu Org/Hari 70,000.00 0.1500 10,500.00
2 Kepala Tukang Org/Hari 75,000.00 0.0150 1,125.00
3 Pekerja Org/Hari 50,000.00 0.2000 10,000.00
4 Mandor Org/Hari 70,000.00 0.0100 700.00
Jumlah A 22,325.00
B Bahan
1 Semen Portland kg 1,300.00 6.4800 8,424.00
2 Pasir Pasang m3 125,000.00 0.0190 2,375.00
Jumlah B 10,799.00
Harga Satuan A + B 33,124.00
A Tenaga Kerja
1 Tukang Batu Org/Hari 70,000.00 0.1500 10,500.00
2 Kepala Tukang Org/Hari 75,000.00 0.0150 1,125.00
3 Pekerja Org/Hari 50,000.00 0.2000 10,000.00
4 Mandor Org/Hari 70,000.00 0.0100 700.00
Jumlah A 22,325.00
B Bahan
1 Semen Portland kg 1,300.00 4.3200 5,616.00
2 Pasir Pasang m3 125,000.00 0.0220 2,750.00
Jumlah B 8,366.00
A Tenaga Kerja
1 Tukang Batu Org/Hari 70,000.00 0.1500 10,500.00
2 Kepala Tukang Org/Hari 75,000.00 0.0150 1,125.00
3 Pekerja Org/Hari 50,000.00 0.2000 10,000.00
4 Mandor Org/Hari 70,000.00 0.0100 700.00
Jumlah A 22,325.00
B Bahan
1 Semen Portland kg 1,300.00 8.4800 11,024.00
2 Pasir Pasang m3 125,000.00 0.0220 2,750.00
Jumlah B 13,774.00
A Tenaga Kerja
1 Tukang Kayu Org/Hari 70,000.00 18.0000 1,260,000.00
2 Kepala Tukang Org/Hari 75,000.00 2.0000 150,000.00
3 Pekerja Org/Hari 50,000.00 6.0000 300,000.00
4 Mandor Org/Hari 70,000.00 0.3000 21,000.00
Jumlah A 1,731,000.00
B Bahan
1 Kayu KLs II.A (Kelapi) m3 2,000,000.00 1.2000 2,400,000.00
Jumlah B 2,400,000.00
Harga Satuan A + B 4,131,000.00
A Tenaga Kerja
1 Tukang Kayu Org/Hari 70,000.00 2.5000 175,000.00
2 Kepala Tukang Org/Hari 75,000.00 0.2500 18,750.00
3 Pekerja Org/Hari 50,000.00 1.0000 50,000.00
4 Mandor Org/Hari 70,000.00 0.0500 3,500.00
Jumlah A 247,250.00
B Bahan
1 Papan Kayu Kls I m3 2,400,000.00 0.0400 96,000.00
Jumlah B 96,000.00
Harga Satuan A + B 343,250.00
A Tenaga Kerja
1 Tukang Kayu Org/Hari 70,000.00 2.0000 140,000.00
2 Kepala Tukang Org/Hari 75,000.00 0.2000 15,000.00
3 Pekerja Org/Hari 50,000.00 0.8000 40,000.00
4 Mandor Org/Hari 70,000.00 0.0400 2,800.00
Jumlah A 197,800.00
B Bahan
1 Papan Kayu Kls I m3 2,400,000.00 0.0350 84,000.00
Jumlah B 84,000.00
Harga Satuan A + B 281,800.00
A Tenaga Kerja
1 Tukang Kayu Org/Hari 70,000.00 2.0000 140,000.00
2 Kepala Tukang Org/Hari 75,000.00 0.2000 15,000.00
3 Pekerja Org/Hari 50,000.00 0.5000 25,000.00
4 Mandor Org/Hari 70,000.00 0.0250 1,750.00
Jumlah A 181,750.00
B Bahan
1 Papan Kayu Kls II m3 1,800,000.00 0.0600 108,000.00
2 Paku Campur kg 15,000.00 0.1500 2,250.00
Jumlah B 110,250.00
Harga Satuan A + B 292,000.00
A Tenaga Kerja
1 Tukang Kayu Org/Hari 70,000.00 0.1500 10,500.00
2 Kepala Tukang Org/Hari 75,000.00 0.0150 1,125.00
3 Pekerja Org/Hari 50,000.00 0.0150 750.00
4 Mandor Org/Hari 70,000.00 0.0008 52.50
Jumlah A 12,427.50
B Bahan
1 Kaca bening 5 mm m2 90,000.00 1.1000 99,000.00
Jumlah B 99,000.00
A Tenaga Kerja
1 Tukang Kayu Org/Hari 70,000.00 12.0000 840,000.00
2 Kepala Tukang Org/Hari 75,000.00 1.2000 90,000.00
3 Pekerja Org/Hari 50,000.00 4.0000 200,000.00
4 Mandor Org/Hari 70,000.00 0.2000 14,000.00
Jumlah A 1,144,000.00
B Bahan
1 Kayu Kls II m3 2,000,000.00 1.1000 2,200,000.00
2 Beugel/baut/Angker Besi, Besi Streep kg 5,000.00 15.0000 75,000.00
3 Paku 2" - 5" kg 15,000.00 0.8000 12,000.00
Jumlah B 2,287,000.00
Harga Satuan A + B 3,431,000.00
A Tenaga Kerja
1 Tukang Kayu Org/Hari 70,000.00 12.0000 840,000.00
2 Kepala Tukang Org/Hari 75,000.00 1.2000 90,000.00
3 Pekerja Org/Hari 50,000.00 4.0000 200,000.00
4 Mandor Org/Hari 70,000.00 0.2000 14,000.00
Jumlah A 1,144,000.00
B Bahan
1 Kayu Kls II m3 1,800,000.00 1.1000 1,980,000.00
2 Paku 2" - 5" kg 15,000.00 0.8000 12,000.00
Jumlah B 1,992,000.00
Harga Satuan A + B 3,136,000.00
A Tenaga Kerja
1 Tukang Kayu Org/Hari 70,000.00 0.2500 17,500.00
2 Kepala Tukang Org/Hari 75,000.00 0.0250 1,875.00
3 Pekerja Org/Hari 50,000.00 0.1500 7,500.00
4 Mandor Org/Hari 70,000.00 0.0750 5,250.00
Jumlah A 32,125.00
B Bahan
1 Kayu Kls II m3 1,800,000.00 0.0145 26,100.00
2 Paku Campur kg 15,000.00 0.0600 900.00
Jumlah B 27,000.00
Harga Satuan A + B 59,125.00
A Tenaga Kerja
1 Tukang Kayu Org/Hari 70,000.00 0.2500 17,500.00
2 Kepala Tukang Org/Hari 75,000.00 0.0250 1,875.00
3 Pekerja Org/Hari 50,000.00 0.1500 7,500.00
4 Mandor Org/Hari 70,000.00 0.0750 5,250.00
Jumlah A 32,125.00
B Bahan
1 Kayu Kls II m3 1,800,000.00 0.0120 21,600.00
2 Paku Campur kg 15,000.00 0.1000 1,500.00
Jumlah B 23,100.00
A Tenaga Kerja
1 Tukang Kayu Org/Hari 70,000.00 0.1000 7,000.00
2 Kepala Tukang Org/Hari 75,000.00 0.0100 750.00
3 Pekerja Org/Hari 50,000.00 0.0700 3,500.00
4 Mandor Org/Hari 70,000.00 0.0035 245.00
Jumlah A 11,495.00
B Bahan
1 Tripleks tebal 3 mm Lbr 50,000.00 0.3500 17,500.00
2 Paku Tripleks kg 20,000.00 0.0200 400.00
Jumlah B 17,900.00
A Tenaga Kerja
1 Tukang Kayu Org/Hari 70,000.00 0.0210 1,470.00
2 Kepala Tukang Org/Hari 75,000.00 0.0020 150.00
3 Pekerja Org/Hari 50,000.00 0.0210 1,050.00
4 Mandor Org/Hari 70,000.00 0.0010 70.00
Jumlah A 2,740.00
B Bahan
1 List Plafond kayu klas II Uk. 1 x 4 cm m' 2,500.00 1.0500 2,625.00
2 Paku Campur kg 20,000.00 0.0100 200.00
Jumlah B 2,825.00
A Tenaga Kerja
1 Tukang Batu Org/Hari 70,000.00 0.2500 17,500.00
2 Kepala Tukang Org/Hari 75,000.00 0.0250 1,875.00
3 Pekerja Org/Hari 50,000.00 1.6500 82,500.00
4 Mandor Org/Hari 70,000.00 0.0800 5,600.00
Jumlah A 107,475.00
B Bahan
1 Semen kg 1,300.00 218.0000 283,400.00
2 Pasir Beton m3 125,000.00 0.5200 65,000.00
3 Batu Pecah/Kerikil beton m3 175,000.00 0.8700 152,250.00
Jumlah B 500,650.00
Harga Satuan A + B 608,125.00
A Tenaga Kerja
1 Tukang Batu Org/Hari 70,000.00 0.0200 1,400.00
2 Tukang Kayu Org/Hari 70,000.00 0.0200 1,400.00
3 Tukang Besi Org/Hari 70,000.00 0.0200 1,400.00
4 Kepala Tukang Org/Hari 75,000.00 0.0060 450.00
5 Pekerja Org/Hari 50,000.00 0.0600 3,000.00
6 Mandor Org/Hari 70,000.00 0.0030 210.00
Jumlah A 7,860.00
B Bahan
1 Kayu papan m3 900,000.00 0.0020 1,800.00
2 Paku campur kg 15,000.00 0.0100 150.00
3 Besi Beton kg 7,000.00 3.0000 21,000.00
4 Kawat Beton kg 15,000.00 0.4500 6,750.00
5 Semen kg 1,300.00 4.0000 5,200.00
6 Pasir Beton m3 125,000.00 0.0060 750.00
7 Batu Pecah/Kerikil beton m3 175,000.00 0.0090 1,575.00
Jumlah B 37,225.00
Harga Satuan A + B 45,085.00
Jumlah B 500.00
Harga Satuan A + B 6,956.67
Jumlah B 1,226.67
Harga Satuan A + B 7,683.34
A Tenaga Kerja
1 Tukang Cat Org/Hari 70,000.00 0.7000 49,000.00
2 Kepala Tukang Org/Hari 75,000.00 0.0075 562.50
3 Pekerja Org/Hari 50,000.00 0.0500 2,500.00
4 Mandor Org/Hari 70,000.00 0.0025 175.00
Jumlah A 52,237.50
B Bahan
1 Cat Dasar / Meni besi kg 10,000.00 0.1100 1,100.00
2 Cat Antara kg 10,000.00 0.1700 1,700.00
3 Cat Penutup kg 10,000.00 0.0800 800.00
Jumlah B 3,600.00
Jumlah B 3,000.00
B Bahan
1 Grendel jendela bh 3,000.00 1.0000 3,000.00
Jumlah B 3,000.00
Harga Satuan A + B 15,431.00
A Tenaga Kerja
1 Tukang Batu Org/Hari 70,000.00 0.3500 24,500.00
2 Kepala Tukang Org/Hari 75,000.00 0.0350 2,625.00
3 Pekerja Org/Hari 50,000.00 0.6200 31,000.00
4 Mandor Org/Hari 70,000.00 0.0300 2,100.00
Jumlah A 60,225.00
B Bahan
1 Tegel keramik 30 x 30 cm bh 5,000.00 11.0000 55,000.00
2 Semen warna kg 2,500.00 1.5000 3,750.00
3 Semen portland kg 1,300.00 11.3800 14,794.00
4 Pasir Pasang m3 125,000.00 0.0420 5,250.00
Jumlah B 78,794.00
A Tenaga Kerja
1 Tukang Batu Org/Hari 70,000.00 0.0900 6,300.00
2 Kepala Tukang Org/Hari 75,000.00 0.0090 675.00
3 Pekerja Org/Hari 50,000.00 0.9000 45,000.00
4 Mandor Org/Hari 70,000.00 0.0045 315.00
Jumlah A 52,290.00
B Bahan
1 Tegel keramik 15 x 30 cm bh 2,500.00 2.5000 6,250.00
2 Semen warna kg 2,500.00 0.1000 250.00
3 Semen portland kg 1,300.00 1.6500 2,145.00
4 Pasir Pasang m3 125,000.00 0.0032 400.00
Jumlah B 9,045.00
A Tenaga Kerja
1 Tukang Batu Org/Hari 70,000.00 0.3500 15,750.00
2 Kepala Tukang Org/Hari 75,000.00 0.0350 1,925.00
3 Pekerja Org/Hari 50,000.00 0.6200 17,360.00
4 Mandor Org/Hari 70,000.00 0.0300 1,050.00
Jumlah A 36,085.00
B Bahan
1 Tegel keramik 20 x 20 cm bh 2,500.00 25.0000 62,500.00
2 Semen warna kg 2,500.00 1.5000 6,000.00
3 Semen portland kg 1,300.00 11.3800 9,673.00
4 Pasir Pasang m3 125,000.00 0.0420 4,620.00
Jumlah B 82,793.00
Harga Satuan A + B 118,878.00
A Tenaga Kerja
1 Tukang Batu Org/Hari 70,000.00 0.3500 24,500.00
2 Kepala Tukang Org/Hari 75,000.00 0.0350 2,625.00
3 Pekerja Org/Hari 50,000.00 0.6200 31,000.00
4 Mandor Org/Hari 70,000.00 0.0300 2,100.00
Jumlah A 60,225.00
B Bahan
1 Tegel keramik 20 x 25 cm bh 3,000.00 20.0000 60,000.00
2 Semen warna kg 2,500.00 1.5000 3,750.00
3 Semen portland kg 1,300.00 11.3800 14,794.00
4 Pasir Pasang m3 125,000.00 0.0420 5,250.00
Jumlah B 83,794.00
A Tenaga Kerja
1 Tukang Batu Org/Hari 70,000.00 1.4500 101,500.00
2 Kepala Tukang Org/Hari 75,000.00 0.1500 11,250.00
3 Pekerja Org/Hari 50,000.00 1.2000 60,000.00
4 Mandor Org/Hari 70,000.00 0.1000 7,000.00
Jumlah A 179,750.00
B Bahan
1 Wastafel bh 150,000.00 1.0000 150,000.00
2 Perlengkapan ( 12 % harga wastafel ) bh 150,000.00 0.1200 18,000.00
3 Semen portland kg 1,300.00 6.0000 7,800.00
4 Pasir Pasang m3 125,000.00 0.0100 1,250.00
Jumlah B 177,050.00
A Tenaga Kerja
1 Tukang Batu Org/Hari 70,000.00 2.7000 189,000.00
2 Kepala Tukang Org/Hari 75,000.00 0.5400 40,500.00
3 Pekerja Org/Hari 50,000.00 1.8000 90,000.00
4 Mandor Org/Hari 70,000.00 0.1100 7,700.00
Jumlah A 327,200.00
B Bahan
1 Bak fiberglass bh 325,000.00 1.0000 325,000.00
2 Perlengkapan ( 18 % harga bak fiberglass ) bh 325,000.00 0.1800 58,500.00
Jumlah B 383,500.00
A Tenaga Kerja
1 Tukang Batu Org/Hari 70,000.00 1.5000 105,000.00
2 Kepala Tukang Org/Hari 75,000.00 1.5000 112,500.00
3 Pekerja Org/Hari 50,000.00 1.0000 50,000.00
4 Mandor Org/Hari 70,000.00 0.1600 11,200.00
Jumlah A 278,700.00
B Bahan
1 Klosed jongkok bh 110,000.00 1.0000 110,000.00
2 Semen portland kg 1,300.00 6.0000 7,800.00
3 Pasir Pasang m3 325,000.00 0.0100 3,250.00
Jumlah B 121,050.00
A Tenaga Kerja
1 Tukang Batu Org/Hari 70,000.00 0.1000 7,000.00
2 Kepala Tukang Org/Hari 75,000.00 0.0100 750.00
3 Pekerja Org/Hari 50,000.00 0.0100 500.00
4 Mandor Org/Hari 70,000.00 0.0050 350.00
Jumlah A 8,600.00
B Bahan
1 Kran air bh 15,000.00 1.0000 15,000.00
2 Seal tape bh 2,500.00 0.0250 62.50
Jumlah B 15,062.50
A Tenaga Kerja
1 Tukang Batu Org/Hari 70,000.00 0.1000 7,000.00
2 Kepala Tukang Org/Hari 75,000.00 0.0100 750.00
3 Pekerja Org/Hari 50,000.00 0.0100 500.00
4 Mandor Org/Hari 70,000.00 0.0050 350.00
Jumlah A 8,600.00
B Bahan
1 Floor drain bh 10,000.00 1.0000 10,000.00
Jumlah B 10,000.00
HARGA
NO. URAIAN JENIS TENAGA / BAHAN SATUAN ( Rp )
1 2 3 4
I UPAH TENAGA KERJA
1 Pekerja Hari Rp. 50,000.00
2 Mandor Hari Rp. 70,000.00
3 Tukang Batu Hari Rp. 70,000.00
4 Tukang Batu Hari Rp. 70,000.00
5 Tukang Besi Hari Rp. 70,000.00
6 Tukang Cat Hari Rp. 70,000.00
7 Kepala Tukang Batu, Kayu, Besi, Cat Hari Rp. 75,000.00
II HARGA BAHAN
1 Tanah Urug M3 Rp. 25,000.00
2 Pasir Urug M3 Rp. 75,000.00
3 Pasir Pasang M3 Rp. 125,000.00
4 Pasir Beton M3 Rp. 125,000.00
5 Portland Cement (PC) merk Tonasa Kg Rp. 1,300.00
6 Semen Warna Kg Rp. 2,500.00
7 Kerikil Beton M3 Rp. 175,000.00
8 Batu Gunung / Batu Kali M3 Rp. 150,000.00
9 Batako Bh Rp. 500.00
10 Besi Beugel/baut/Angker Kuda-kuda Kg Rp. 5,000.00
11 Besi Beton Kg Rp. 7,000.00
12 Atap Seng Gelombang Besar Merk Kijang KK Rp. 5,500.00
13 Seng Plat BJLS 20 M1 Rp. 15,000.00
14 Kawat Bindrat Kg Rp. 15,000.00
15 Angkur kusen pintu/jendela besi dia. 8 mm Bh Rp. 5,000.00
16 Paku 1/2" - 1" Kg Rp. 15,000.00
17 Paku campur Kg Rp. 15,000.00
18 Paku Tripleks Kg Rp. 20,000.00
19 Paku Seng Kg Rp. 20,000.00
20 Paku Beton kg Rp. 25,000.00
21 Balok Kayu Klas II Kayu Jati M3 Rp. 2,000,000.00
22 Balok Kayu Kls II M3 Rp. 1,800,000.00
23 Papan Kayu Kls I M3 Rp. 2,400,000.00
24 Papan Kayu Klas III (Bekesting) M3 Rp. 900,000.00
25 Dolken Bh Rp. 3,000.00
26 List kaca 1 x 1 cm M1 Rp. 2,500.00
27 Tripleks Tebal 3 mm Lbr Rp. 50,000.00
28 List Plafond 1 x 4 cm M1 Rp. 2,500.00
29 Multipleks tebal 10 mm Lbr Rp. 110,000.00
30 Keramik 30 x 30 cm Lbr Rp. 5,000.00
31 Keramik plint 15 x 30 cm Lbr Rp. 2,500.00
32 Keramik anti slip 20 x 20 cm Lbr Rp. 2,500.00
33 Keramik 20 x 25 cm Lbr Rp. 3,000.00
34 Kaca bening 5 mm M2 Rp. 90,000.00
35 Kapur Tonasa Kg Rp. 5,000.00
36 Plamir Tembok Kg Rp. 5,000.00
37 Amplas Lbr Rp. 2,500.00
38 Cat dasar merk Glotex Kg Rp. 10,000.00
39 Cat kilap kayu merk Avian Kg Rp. 15,000.00
40 Cat Residu Merk EMCO Ltr Rp. 15,000.00
41 Cat Tembok Merk Wintex / INA Kg Rp. 5,000.00
42 Lem Kayu Merk Fox Kg Rp. 10,000.00
43 Lem Kayu Ltr Rp. 5,000.00
1 2 3 4
44 Dempul Kayu Merk EMCO Kg Rp. 5,000.00
45 Seal tape Bh Rp. 2,500.00
46 Kran air Bh Rp. 15,000.00
47 Klosed jongkok Bh Rp. 110,000.00
48 Wastafel Bh Rp. 150,000.00
49 Bak fiber Bh Rp. 325,000.00
50 Floor drain Bh Rp. 10,000.00
51 Pintu fiber Bh Rp. 300,000.00
52 Cat vernis kayu merk Glotex / Platone Kg Rp. 15,000.00
53 Kunci Tanam Anchor 693 LD 2 x putar Bh Rp. 150,000.00
54 Kunci Tanam Kamar Mandi Bh Rp. 100,000.00
55 Engsel Pintu Type H Bh Rp. 6,000.00
56 Engsel Pintu Type Kupu Kupu Bh Rp. 5,000.00
57 Engsel Jendela Type Kupu Kupu Bh Rp. 4,000.00
58 Grendel Jendela Bh Rp. 3,000.00
59 Kait-kait Angin Bh Rp. 3,000.00
60 Grendel Pintu bh Rp. 3,000.00
61 Cat Meny seng/besi Kg Rp. 10,000.00
62 Meny Kayu Kg Rp. 10,000.00
63 Minyak Cat Ltr Rp. 10,000.00
64 Minyak Bekisting Ltr Rp. 5,000.00
65 Kuas 5 " Bh Rp. 10,000.00
66 Pasangan Instalasi Titik Lampu Titik Rp. 50,000.00
67 Lampu SL 23 Watt Bh Rp. 35,000.00
68 Lampu Pijar 20-40 Watt Bh Rp. 10,000.00
69 Stop Kontak Bh Rp. 10,000.00
70 Saklar Tunggal Bh Rp. 7,500.00
71 Saklar Ganda Bh Rp. 12,500.00
###
72 Box Skring ( MCB ) Bh Rp. 125,000.00
73 Pasangan lampu TL 20 watt Bh Rp. 40,000.00
I. PEKERJAAN PENDAHULUAN
HARGA JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6
DIBULATKAN 2,000,000,000.00
TERBILANG : DUA MILYAR RUPIAH
JUMLAH
NO. URAIAN DAN JENIS PEKERJAAN HARGA
(Rp)
######
PEKERJAAN PENDAHULUAN . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp 38,800,000.00
######
PEMBANGUNAN PERUMAHAN TYPE 36 . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp #REF!
III. PEMBANGUNAN FASILITAS UMUM . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp 715,800,000.00
TOTAL . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp #REF!
DIBULATKAN . . . . . . . . . . . . . . . . . . . . . . . . . . . Rp #REF!
TERBILANG : DELAPAN MILYAR LIMA RATUS DELAPAN PULUH DUA JUTA LIMA RATUS EMPAT PULUH LIMA RIBU RUPIAH
Disetujui : -
### -
###
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
I PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi 12.96 m3 22,800.00 295,488.00 0.49 0.49
2 Pek. Urugan Tanah Eks. Galian Pondasi 3.24 m3 10,930.00 35,413.20 0.06 0.06
3 Pek. Urugan tanah bawah lantai 12.88 m3 58,500.00 753,597.00 1.25 1.25
4 Pek. Urugan pasir alas Pondasi 1.44 m3 105,700.00 152,208.00 0.25 0.25
5 Pek. Urugan pasir alas Lantai 3.39 m3 105,700.00 358,323.00 0.60 0.60
Jumlah 1,595,029.20 2.65
II PEKERJAAN BATU DAN PASANGAN
1 Pas. Batu kosong 4.32 m3 274,455.00 1,185,645.60 1.97 1.97
2 Pas. Pondasi batu gunung, adukan 1 Pc : 5 Psr 12.24 m3 536,550.00 6,567,372.00 10.91 10.91
3 Pas. Dinding batako, adukan 1 Pc : 2 Psr 10.80 m2 43,888.50 473,995.80 0.79 0.79
4 Pas. Dinding batako, adukan 1 Pc : 5 Psr 70.80 m2 42,295.00 2,994,486.00 4.98 4.98
Jumlah 11,221,499.40 18.64
III PEKERJAAN BETON BERTULANG
1 Pek. Sloof Praktis 15 x 20 Beton Bertulang 1 Pc : 2 Psr : 3 Krl 36.00 m' 52,880.00 1,903,680.00 3.16 3.16
2 Pek. Kolom praktis, 12 x 12 cm Beton Bertulang 1 Pc : 2 Psr : 3 Krl 45.00 m' 45,085.00 2,028,825.00 3.37 3.37
3 Pek. Ring Balk, Uk.12 x 15 cm Beton Bertulang 1 Pc : 2 Psr : 3 Krl 58.90 m' 52,880.00 3,114,632.00 5.18 5.18
Jumlah 7,047,137.00 11.71
IV PEKERJAAN PLESTERAN
1 Pek. Plesteran Trasram camp. 1 Pc : 2 Ps T. 15 mm 21.60 m2 35,526.00 767,361.60 1.27 1.27
2 Pek. Plesteran Dinding camp. 1 Pc : 5 Ps T. 15 mm 141.60 m2 30,691.00 4,345,845.60 7.22 7.22
3 Pek. Plesteran Beton camp. 1 Pc : 3 Ps T. 15 mm 7.20 m2 33,124.00 238,492.80 0.40 0.40
4 Pek. Pleteran Pondasi camp. 1 Pc : 3 Ps T. 15 mm 22.40 m2 33,124.00 741,977.60 1.23 1.23
Jumlah 6,093,677.60 10.12
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
V PEKERJAAN PASANGAN LANTAI KERAMIK DAN RABAT BETON
1 Pek. Pasangan keramik 40 x 40 cm 31.65 m2 139,019.00 4,399,951.35 7.31 7.31
2 Pek. Pasangan keramik 20 x 20 cm 2.25 m2 118,878.00 267,475.50 0.44 0.44
3 Pek. Pasangan keramik 20 x 25 cm 7.50 m2 144,019.00 1,080,142.50 1.79 1.79
4 Pek. Lantai Rabat beton 1 Pc : 3 Psr : 5 Krl 2.52 m3 608,125.00 1,532,475.00 2.55 2.55
Jumlah 7,280,044.35 12.10
VI PEKERJAAN KUSEN/JENDELA/KACA
1 Pek. Kosen pintu / jendela kayu Kelas II Uk. 5 x 13,5 cm 0.49 m3 4,131,000.00 2,037,409.20 3.39 3.39
2 Pek. Pintu panil kayu Jati 5.04 m2 343,250.00 1,729,980.00 2.87 2.87
3 Pek. Bingkai jendela kaca kayu Jati 2.52 m2 281,800.00 710,136.00 1.18 1.18
4 Pek. List Kaca 1 x 1 cm 25.20 m' 5,385.00 135,702.00 0.23 0.23
5 Pek. Pas. Kaca Bening 5 mm 5.04 m2 111,427.50 561,594.60 0.93 0.93
Jumlah 5,174,821.80 8.60
VII PEKERJAAN KAP DAN ATAP
1 Pek. Kuda-kuda, balok jurai dan konsol kayu II 0.52 m3 3,431,000.00 1,797,844.00 2.99 2.99
2 Pek. Gording dan balok angin kayu kls II 0.66 m3 3,136,000.00 2,082,304.00 3.46 3.46
3 Pek. Papan listplank papan Kayu Kelas II 20.58 m' 59,125.00 1,216,712.68 2.02 2.02
4 Pas. Atap seng Soka Jempol 48.00 m2 46,120.00 2,213,760.00 3.68 3.68
5 Pas. Nok seng Soka Jempol 8.00 m' 25,920.00 207,360.00 0.34 0.34
Jumlah 7,517,980.68 12.49
VIII PEKERJAAN PENGGANTUNG/PENGUNCI
1 Pas. Kunci tanam Anchor 693 LD, 2 x putar 3.00 buah 186,600.00 559,800.00 0.93 0.93
2 Pas. Engsel pintu dalam type kupu-kupu 6.00 buah 17,431.00 104,586.00 0.17 0.17
3 Pas. Grendel Pintu 3.00 buah 15,431.00 46,293.00 0.08 0.08
4 Pas. Engsel jendela type kupu-kupu standard 14.00 buah 12,285.00 171,990.00 0.29 0.29
5 Pas. Grendel jendela standard 7.00 buah 15,431.00 108,017.00 0.18 0.18
6 Pas. Kait angin jendela standard 14.00 buah 15,431.00 216,034.00 0.36 0.36
Jumlah 1,206,720.00 2.01
IX PEKERJAAN RANGKA DAN PLAFOND
1 Pek. Rangka Plafond Tripleks kayu kls II 58.90 m2 55,225.00 3,252,752.50 5.40 5.40
2 Pek. Plafond Tripleks 60 x 120 cm 58.90 m2 29,395.00 1,731,365.50 2.88 2.88
3 Pas. List Plafond Profil 90.00 m' 5,565.00 500,850.00 0.83 0.83
Jumlah 5,484,968.00 9.11
X PEKERJAAN INSTALASI LISTRIK
1 Pasangan titik instalasi 7.00 buah 50,000.00 350,000.00 0.58 0.58
2 Pasangan lampu TL 20 watt 1.00 buah 40,000.00 40,000.00 0.07 0.07
3 Pasangan lampu pijar 25 watt 4.00 buah 20,000.00 80,000.00 0.13 0.13
4 Pasangan lampu pijar 5 watt 2.00 buah 10,000.00 20,000.00 0.03 0.03
5 Pas. Stop kontak merk Broco 2.00 buah 10,000.00 20,000.00 0.03 0.03
6 Pas. Saklar tunggal merk Broco 3.00 buah 7,500.00 22,500.00 0.04 0.04
7 Pas. Saklar ganda merk Broco 2.00 buah 12,500.00 25,000.00 0.04 0.04
8 Pas. Box Skring ( MCB ) 1.00 buah 125,000.00 125,000.00 0.21 0.21
Jumlah 682,500.00 1.13
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
XI PEKERJAAN SANITASI
1 Pek. Instalasi Air bersih Ls Ls 250,000.00 250,000.00 0.42 0.42
2 Pek. Instalasi Air kotor Ls Ls 150,000.00 150,000.00 0.25 0.25
3 Pemasangan kran air 2.00 Bh 23,662.50 47,325.00 0.08 0.08
4 Pemasangan Floor drain 2.00 Bh 18,600.00 37,200.00 0.06 0.06
5 Pemasangan klosed jongkok 1.00 Bh 399,750.00 399,750.00 0.66 0.66
6 Pek. Pintu fiber 1.00 Bh 300,000.00 300,000.00 0.50 0.50
7 Pek. Septick tank dan peresapan 1.00 Unit 2,000,000.00 2,000,000.00 3.32 3.32
Jumlah 3,184,275.00 5.29
XII PEKERJAAN PENGECATAN / FINISHING
1 Pek. Plamur Tembok 163.20 m2 6,956.67 1,135,328.54 1.89 1.89
2 Pek. Cat tembok 2 x jalan 163.20 m2 7,683.34 1,253,921.09 2.08 2.08
3 Pek. Cat plafond 2 x jalan 58.90 m2 7,683.34 452,548.73 0.75 0.75
4 Pek. Cat dasar/kilap kosen 2 x jalan 17.18 m2 12,855.50 220,793.21 0.37 0.37
5 Pek. Vernis daun pintu/jendela 2 x jalan 15.12 m2 23,425.00 354,186.00 0.59 0.59
6 Pek. Mengamplas dan Menggosok kayu 32.30 m2 4,020.00 129,825.90 0.22 0.22
7 Pek. Pembersihan akhir ls ls 150,000.00 150,000.00 0.25 0.25
Jumlah 3,696,603.47 6.14
JUMLAH 100.00 24.08 27.05 25.18 23.69
24.08 51.13 76.31 100.00
ASRIANTO
Direktur WARJONO, A.Md
Coast Estimator
60,185,256.50 4.00 0.06
60,185,256.50 4.00 0.01
60,185,256.50 4.00 0.16
60,185,256.50 4.00 0.03
60,185,256.50 4.00 0.07
4.00 0.33
4.00 -
60,185,256.50 4.00 0.25
60,185,256.50 4.00 1.36
60,185,256.50 4.00 0.10
60,185,256.50 4.00 0.62
4.00 2.33
4.00 -
60,185,256.50 4.00 0.40
60,185,256.50 4.00 0.42
60,185,256.50 4.00 0.65
4.00 1.46
4.00 -
60,185,256.50 4.00 0.16
60,185,256.50 4.00 0.90
60,185,256.50 4.00 0.05
60,185,256.50 4.00 0.15
0.60 4.00 1.27
86.26 4.00 -
21.83 4.00 -
20.70 4.00 -
4.00 -
4.00 -
4.00 -
4.00 -
4.00 -
4.00 -
4.00 -
4.00 -
4.00 -
4.00 -
4.00 -
4.00 -
4.00 -
4.00 -
4.00 -
4.00 -
4.00 0.88
4.00 -
60,185,256.50 4.00 0.91
60,185,256.50 4.00 0.06
60,185,256.50 4.00 0.22
60,185,256.50 4.00 0.32
4.00 1.51
4.00 -
60,185,256.50 4.00 0.42
60,185,256.50 4.00 0.36
60,185,256.50 4.00 0.15
60,185,256.50 4.00 0.03
60,185,256.50 4.00 0.12
5.21 4.00 1.07
4.00 -
60,185,256.50 4.00 0.37
60,185,256.50 4.00 0.43
60,185,256.50 4.00 0.25
60,185,256.50 4.00 0.46
60,185,256.50 4.00 0.04
24.59 4.00 1.56
4.00 -
60,185,256.50 4.00 0.12
60,185,256.50 4.00 0.02
60,185,256.50 4.00 0.01
60,185,256.50 4.00 0.04
60,185,256.50 4.00 0.02
60,185,256.50 4.00 0.04
4.00 0.25
4.00 -
60,185,256.50 4.00 0.68
60,185,256.50 4.00 0.36
60,185,256.50 4.00 0.10
4.00 1.14
4.00 -
60,185,256.50 4.00 0.07
60,185,256.50 4.00 0.01
60,185,256.50 4.00 0.02
60,185,256.50 4.00 0.00
60,185,256.50 4.00 0.00
60,185,256.50 4.00 0.00
60,185,256.50 4.00 0.01
60,185,256.50 4.00 0.03
12.25 4.00 0.14
89.74 4.00 -
3.39 4.00 -
4.00 -
4.00 -
4.00 -
4.00 -
4.00 -
4.00 -
4.00 -
4.00 -
4.00 -
4.00 -
4.00 0.88
4.00 -
60,185,256.50 4.00 0.05
60,185,256.50 4.00 0.03
60,185,256.50 4.00 0.01
60,185,256.50 4.00 0.01
60,185,256.50 4.00 0.08
60,185,256.50 4.00 0.06
60,185,256.50 4.00 0.42
4.00 0.66
4.00 -
60,185,256.50 4.00 0.24
60,185,256.50 4.00 0.26
60,185,256.50 4.00 0.09
60,185,256.50 4.00 0.05
60,185,256.50 4.00 0.07
60,185,256.50 4.00 0.03
60,185,256.50 4.00 0.03
11.43 4.00 0.77
4.00 12.50
16.72 4.00 -