I PEKERJAAN PENDAHULUAN
1 Pembersihan Lahan dan Perataan A. 2.2.1.9 126,00 M2 25.200 - 3.175.200 3.175.200
2 Pengukuran dan Pemasagan Bowplank A. 2.2.1.4 46,00 M' 57.800 31.800 2.658.800 1.462.800 4.121.600
IV PEKERJAAN ATAP
1 Pasang Atap Seng Soka A.4.5.2.32 139,87 M2 126.780 44.040 17.732.719 6.159.875 23.892.593
2 Pasang Bubungan Atap Seng Soka A.4.5.2.36 32,69 M' 55.680 62.220 1.820.179 2.033.972 3.854.151
3 Pasang Rangka Atap Gording 5/10 KLAS II A.4.6.1.15 1,14 M3 6.315.000 4.462.200 7.199.100 5.086.908 12.286.008
4 Pemasangan Rangka Atap Kaso 5/7 cm dan reng 2/3 cm kayu KL. II A.4.6.1.16a 88,50 M2 270.000 31.800 23.895.000 2.814.300 26.709.300
5 Pasang Lisplank Papan Klas II 2.5/20 diserut Halus A.4.6.1.21 46,00 M' 68.460 49.200 3.149.160 2.263.200 5.412.360
6 Pasang Plafond Plywood 4 MM A.4.5.1.5 84,00 M2 60.161 31.800 5.053.482 2.671.200 7.724.682
7 Pasang Rangka Plafond 60x60 Balok 5/7 Klas II A.4.6.1.20 84,00 M2 93.910 81.000 7.888.440 6.804.000 14.692.440
RENCANA ANGGARAN BIAYA
NAMA PROYEK : KANTIN ESTATE
PEMILIK PROYEK : BORNEO HIJAU LESTARI
SPESIFIKASI PROYEK : PAPAN
TOTAL LUASAN : 84 M2
LOKASI PROYEK : PT. Nusantara Kalimantan Lestari
KONTRAKTOR PELAKSANA : PT Karya Pribadi Pusaka
HARGA SATUAN JUMLAH HARGA
TOTAL HARGA
NO DESCRIPTION Kode Analisa Volume Satuan MATERIAL UPAH MATERIAL UPAH
(Rp)
(Rp) (Rp) (Rp) (Rp)
V PEKERJAAN PENGECATAN
1 Cat Dinding Bagian Luar dalam termasuk Pintu, Jendela A.4.7.1.4 200,00 M2 70.120 12.444 14.024.000 2.488.800 16.512.800
2 Cat Plafond A.4.7.1.10 84,00 M2 41.900 14.322 3.519.600 1.203.048 4.722.648
VI PEKERJAAN SANITASI
1 Pipa PVC AW 1/2" + Perlengkapan A.5.1.1.25 8,00 M' 15.500 15.672 124.000 125.376 249.376
2 Pipa PVC AW 3" + Perlengkapan A.5.1.1.31 8,00 M' 125.860 35.142 1.006.880 281.136 1.288.016
3 Stop Kran 1/2" A.5.1.1.19 1,00 Buah 120.150 72.120 120.150 72.120 192.270
4 Pasang kitcen ZINK stainless steel + Meja Beton ls 1,00 Unit 4.200.000 1.250.000 4.200.000 1.250.000 5.450.000
5 Meja Dapur Papan dan Balok Dikip dan Serut Halus ls 1,00 Unit 2.000.000 500.000 2.000.000 500.000 2.500.000
VI PEKERJAAN LISTRIK
1 Intalasi Jaringan Listrik ls 20,00 Titik 450.000 180.000 9.000.000 3.600.000 12.600.000
2 Box MCB 4 Phase ls 1,00 Buah 2.000.000 4.500.000 2.000.000 4.500.000 6.500.000
3 MCB 10 A ls 2,00 Buah 90.000 470.000 180.000 940.000 1.120.000
4 Kabel NYM 2x2,5 mm ls 100,00 m 25.000 2.500.000 - 2.500.000
5 Lampu LED 18watt Philips ls 8,00 Pcs 570.000 350.000 4.560.000 2.800.000 7.360.000
6 Saklar tunggal ls - Pcs - - -
7 Saklar Ganda ls 4,00 Pcs 30.400 35.000 121.600 140.000 261.600
8 Stop Contact ls 8,00 Pcs 30.000 35.000 240.000 280.000 520.000
..........................,..............................2019
RENCANA ANGGARAN BIAYA
NAMA PROYEK : KANTIN ESTATE
PEMILIK PROYEK : BORNEO HIJAU LESTARI
SPESIFIKASI PROYEK : PAPAN
TOTAL LUASAN : 84 M2
LOKASI PROYEK : PT. Nusantara Kalimantan Lestari
KONTRAKTOR PELAKSANA : PT Karya Pribadi Pusaka
HARGA SATUAN JUMLAH HARGA
TOTAL HARGA
NO DESCRIPTION Kode Analisa Volume Satuan MATERIAL UPAH MATERIAL UPAH
(Rp)
(Rp) (Rp) (Rp) (Rp)
* Accessories Pintu = Engsel 3 Buah , Kunci Pintu, Kunci Grandel ..........................,..............................2019
* Acessories Jendela = Engsel 2 Buah, Hak Angin, Hadle jendela, Kunci Grandel Diajukan Oleh,
* Kayu Klas I = Ulin, Bangkirai
* Kayu Kelas II = Meranti, kapur
* Perlengkapan Pipa = Tee, Elbow, Sealtape, Lem
(.............................................)
KONTRAKTOR