I.

MATERIAL BETON TULANG


NO NAMA BARANG JUMLAH HARGA/UNIT HARGA TOTAL
1 BESI BETON ULIR 30 BATANG 73.000 2.190.000
2 BESI CAKAR AYAM 5 PCS 85.000 425.000
3 BESI KOLOM, PENGIKAT DLL 493.000
4 PASIR COR 6 KIJANG 250.000 1.500.000
5 SPLIT 2 KIJANG 120.000 240.000
TOTAL Rp. 4.848,000

II. MATERIAL LAIN


NO NAMA BARANG JUMLAH HARGA/UNIT HARGA TOTAL
1 SEMEN 60 SAK 53.000 3.180.000
2 HEBEL 10 CM 2,5 KUBIK 510.000 1.275.000
3 HEBEL 7.5 CM 1 KUBIK 520.000 520.000
4 LEM HEBEL 3 SAK 100.000 300.000
5 MILL 8 KARUNG 16.000 128.000
6 PASIR MUNDU 6 KIJANG 240.000 1.440.000
7 PERL, PIPA DLL 378.000
8 BATU ALAM 620.000
TOTAL RP. 7.841.000

III. ATAP DAN PLAFON


N NAMA BARANG JUMLAH HARGA/UNIT HARGA TOTAL
O
1 KASO BAJA RINGAN 5 BATANG 91.000 455.000
2 KASO KAYU 6 IKAT 135.000 810.000
3 BAJA RINGAN HOLLOW 4X4 10 BATANG 23.000 230.000
4 BAJA RINGAN HOLLOW 4X2 15 BATANG 18.000 270.000
5 GRC 4 LEMBAR 47.000 188.000
6 GYPSUM 6 LEMBAR 50.000 300.000
7 COMPOUND 3 SAK 70.000 210.000
8 BAUT, PAKU DLL 272.000
9 SHADOW LINE 14 BATANG 9.000 126.000
TOTAL RP. 2.861.000
IV. LAMPU DAN KELISTRIKAN
NO NAMA BARANG JUMLAH HARGA/UNIT HARGA TOTAL
1 KABEL 3 ROLL 428.000 1.284.000
2 PIPA KABEL, SOLATIP DLL 90.000
3 MCB 2 PCS 34.000 68.000
4 BOX MCB 40.000
5 SAKLAR 3 BARIS 115.000
6 SAKLAR NERO 1 GANG 2 PCS 25.000 50.000
7 SAKLAR SWIMSEIVS 3 GANG 2 PCS 37.500 75.000
8 STOP KONTAK NERO 2 PCS 33.500 67.000
9 STOP KONTAK WITH CP 2PCS 16.000 32.000
10 INBOW 11 PCS 3.000 33.000
11 KABEL DUCT 3 PCS 15.000 45.000
12 LAMPU PAGAR 2 PCS 285.000 570.000
13 LAMPU TAMAN 3 PCS 24.500 73.500
14 OUTBOW LAMPU CARPORT 60.000
15 KAP DOWNLIGHT 2 PCS 16.500 33.000
16 DOWNLIGHT HANNOCHS 3 PCS 35.000 140.000
17 SPOTLIGHT 2 PCS 25.000 50.000
18 LAMPU GANTUNG UTAMA 957.000
19 LED STRIPE 11 m 55.500 60.500
20 SOCKET LED STRIPE 4.000
TOTAL RP. 3.847.000

V. LANTAI
N NAMA BARANG JUMLAH HARGA/UNIT HARGA TOTAL
0
1 KERAMIK CARPORT 13 DUS 97.000 1.261.000
2 GRANIT TERAS 3 DUS 180.000 540.000
3 GRANIT RUANG TAMU 7 DUS 336.000 2.352.000
4 GRANIT KAMAR 14 DUS 153.000 2.142.000
5 LIST PLINT PUTIH 4 BATANG 56.000 224.000
6 KUKU MACAN 28.000
7 SIRTU/URUGAN 1 KIJANG 190.000
TOTAL RP. 6.737.000
VI. KUSEN KAYU
NO NAMA BARANG JUMLAH HARGA/UNIT HARGA TOTAL
1 PINTU DAN KUSEN 2 SET 950.000 1.900.000
2 JENDELA DAN KUSEN 2 SET 750.000 1.500.000
3 ENGSEL 4 inch 4 SET 70.000 280.000
4 ENGSEL 3 inch 4 SET 22.500 90.000
5 HANDLE PINTU UTAMA 93.000
6 BODY KUNCI PINTU UTAMA 109.000
7 HANDLE KAMAR 2 SET 125.000 250.000
8 HAK ANGIN JENDELA 4 10.000 40.000
9 KUNCI JENDELA 4 12.500 50.000
TOTAL RP. 4.312.000

VII. BIAYA LAIN-LAIN


NO DESKRIPSI HARGA
1 JASA TUKANG (BORONGAN) 15.500.000
2 JASA KULI TURUNKAN BARANG 650.000
3 COPOT DAN PASANG AC 250.000
4 PINDAH METERAN LISTRIK 250.000
5 KANOPI DAN PAGAR 14.000.000
TOTAL RP. 30.650.000

TOTAL KESELURUHAN

NO DESKRIPSI TOTAL
I MATRIAL BETON BERTULANG 4.848.000
II MATRIAL LAIN 7.841.000
III ATAP DAN PLAFON 2.861.000
IV LAMPU DAN KELISTRIKAN 3.847.000
V LANTAI 6.737.000
VI KUSEN KAYU 4.312.000
VII BIAYA LAIN-LAIN 30.650.000
GRAND TOTAL RP. 61.096.000

 RENOVASI DI KERJAKAN 2 ORANG ( 1 TUKANG, 1 KENET )


LAMA NYA PENGERJAAN 3,5 BULAN MASA KERJA (TERMASUK LIBUR)
 TOTAL BUDGET DIATAS, TIDAK TERMASUK
1. KONSUMSI TUKANG ( KOPI DAN CAMILAN )
2. BUDGET MENGECAT