1 GEDUNG A 3
A.1 INSTALASI GAWAT DARURAT 1,546 7,000,000 1.00 10,822,000,000.00 4,328,800,000.00 Rp. 15,150,800,000
A.2 INSTALASI BEDAH SENTRAL, DAN CSSD 1,546 7,000,000 1.09 11,795,980,000.00 4,718,392,000.00 Rp. 16,514,372,000
A.3 INSTALASI 1,546 7,000,000 1.12 12,120,640,000.00 4,848,256,000.00 Rp. 16,968,896,000
A.4 MAINTENACE DAN ROOF GARDEN 624 7,000,000 1.20 5,241,600,000.00 2,096,640,000.00 Rp. 7,338,240,000
2 GEDUGEDUNG B 3 -
B.1 POLIKLINIK, REKAM MEDIK, INSTALASI FARMASI 1,546 7,000,000 1.00 10,822,000,000.00 4,328,800,000.00 Rp. 15,150,800,000
B.2 INSTALASI RADIOLOGI 1,546 7,000,000 1.09 11,795,980,000.00 4,718,392,000.00 Rp. 16,514,372,000
B.3 INSTALASI LABORATORIUM 1,546 7,000,000 1.12 12,120,640,000.00 4,848,256,000.00 Rp. 16,968,896,000
B.4 MAINTENACE DAN ROOF GARDEN 624 7,000,000 1.20 5,241,600,000.00 2,096,640,000.00 Rp. 7,338,240,000
3 GEDUNG C 3 -
C.1 INSTALASI KEBIDANAN DAN INSTALASI REHAB MEDIK 1,607 7,000,000 1.00 11,249,000,000.00 4,499,600,000.00 Rp. 15,748,600,000
C.2 RAWAT INAP KEBIDANAN 1,607 7,000,000 1.09 12,261,410,000.00 4,904,564,000.00 Rp. 17,165,974,000
C.3 INSTALASI PERAWATAN INTENSIF 1,607 7,000,000 1.12 12,598,880,000.00 5,039,552,000.00 Rp. 17,638,432,000
C.4 MAINTENACE DAN ROOF GARDEN 624 7,000,000 1.20 5,241,600,000.00 2,096,640,000.00 Rp. 7,338,240,000
13 GEDUNG K- KAMAR JENAZAH 1 416 7,000,000 1.00 2,913,120,000.00 1,165,248,000.00 Rp. 4,078,368,000
NO luas/pcs Jumlah
URAIAN
Jumlah 965,671,217,740
Pembulatan 965,671,217,000
Perencanaan 18,347,753,123
Pengawasan 8,594,473,831
TOTAL 992,613,443,954.3
RENCANA KEBUTUHAN BIAYA
PEMBANGUNAN KAWASAN TERPADU
UNIVERSITAS MUMMANDIYAH SUKABUMI
INDEX JUMLAH PEKERJAAN
NO LANTAI LM2 HARGA SATUAN NON STANDAR
GEDUNG LANTAI STANDAR Jumlah
LANTAI 1 40%
4 GEDUNG D - RAWAT INAP 4 5,445 7,000,000 1.10 42,021,787,500.00 16,808,715,000.00 Rp. 58,830,502,500
5 GEDUNG E FAKULTAS KEDOKTERAN 3 1,932 7,000,000 1.07 14,470,680,000.00 5,788,272,000.00 Rp. 20,258,952,000
6 GEDUNG F FAKULTAS KEDOKTERAN 3 2,928 7,000,000 1.07 21,930,720,000.00 8,772,288,000.00 Rp. 30,703,008,000
-
7 GEDUNG G - LABORATORIUM TERPADU FK 2 1,445 7,000,000 1.05 10,567,395,300.00 4,226,958,120.00 Rp. 14,794,353,420
9 GEDUNG I - IPSRS DAN WORKSHOP 2 820 7,000,000 1.05 5,998,300,000.00 2,399,320,000.00 Rp. 8,397,620,000
12 GEDUNG K- KAMAR JENAZAH 1 416 7,000,000 1.00 2,913,120,000.00 1,165,248,000.00 Rp. 4,078,368,000
13 GEDUNG L VVIP LOUNGE 4 2,564 7,000,000 1.10 19,787,670,000.00 7,915,068,000.00 Rp. 27,702,738,000
17 GEDUNG P - AREA KOMERSIL (MALL) 4 16,800 7,000,000 1.10 129,654,000,000.00 51,861,600,000.00 Rp. 181,515,600,000
18 GEDUNG P - AREA KOMERSIL (RUKO) 3 810 7,000,000 1.07 6,066,900,000.00 2,426,760,000.00 Rp. 8,493,660,000
19 GEDUNG Q - AREA PERUMAHAN Type Studio 3 9,558 7,000,000 1.07 71,589,420,000.00 28,635,768,000.00 Rp. 100,225,188,000