Anda di halaman 1dari 4

PERBAIKAN CCTV, LAMPU JALAN DAN TEMBOK

KOMPLEK MARCOPOLO RESIDENCE

A PERKIRAAN BIAYA
NO PEKERJAAN JMLH BIAYA @ TOTAL BIAYA
1 CCTV 1 8,000,000 8,000,000
2 LAMPU JALAN 1 7,650,000 7,650,000
3 TEMBOK 1 26,464,000 26,464,000
SUB TOTAL 42,114,000
LAIN-LAIN(10%) 4,211,400
TOTAL 46,325,400

B RENCANA PEMASUKAN
1 SISA SALDO PERBAIKAN LAMPU 138,004
2 URUNAN WARGA MARCOPOLO 50 1,000,000 50,000,000
TOTAL 50,138,004

C REALISASI PEMASUKAN
1 SISA SALDO PERBAIKAN LAMPU 138,004
2 URUNAN WARGA MARCOPOLO 37 27,600,000
TOTAL 27,738,004

D REALISASI URUNAN vs TARGET 55.3%


E REALISASI PENGELUARAN
NO PEKERJAAN JMLH BIAYA @ TOTAL BIAYA KETERANGAN
1 PERBAIKAN LAMPU JALAN 1 10,353,740 10,353,740 SET
2 PEMASANGAN CCTV 1 10,891,600 10,891,600
3 LAIN-LAIN 1 1,100,000 1,100,000
4
TOTAL 22,345,340

F SALDO 5,392,664
G RINCIAN PERBAIKAN LAMPU JALAN
NO RINCIAN JMLH BIAYA @ TOTAL BIAYA KETERANGAN
1 TRAFO 250 W BSN 2 268,000 536,000 BON TGL 22/05
2 FITTING BATU DUDUK E40 3 20,000 60,000 BON TGL 22/05
3 KAPASITOR 2 44,000 88,000 BON TGL 22/05
4 SALASIBAN STEELGRIP 1 10,000 10,000 BON TGL 22/05
5 BOLA LAMPU SON-T PHILIPS 250 W 2 127,000 254,000 BON TGL 22/05
6 BOLA LAMPU SON-T PHILIPS 250 W 2 145,000 290,000 BON TGL 23/05
7 TRAFO 250 W BSN 2 280,000 560,000 BON TGL 23/05
8 IGNITOR SN 8 PH 2 50,000 100,000 BON TGL 23/05
9 FITTING BATU E40 2 20,000 40,000 BON TGL 23/05
10 KAP MERCURY SURYA 1 341,440 341,440 BON TGL 23/05
11 SEWA SCAFOLDING 1 BULAN 4 SET 1 200,000 200,000 done
12 TRANSPORTASI 1 100,000 100,000 done
13 KONSUMSI MINGGU 1 160,000 160,000 done
14 KAP MERCURY SURYA 1 262,000 262,000 BON TGL 24/05
15 BOLA LAMPU SON-T PHILIPS 250 W 5 127,000 635,000 BON TGL 24/05
16 TRAFO 250 W BSN 3 268,000 804,000 BON TGL 24/05
17 IGNITOR SN 8 PH 3 44,000 132,000 BON TGL 24/05
18 FOTOCELL 6A 3 40,000 120,000 BON TGL 24/05
19 JASA ANGKAT DAN PASANG SCAFOLDING MINGGU 2 100,000 200,000 done
20 TRAFO 250 W BSN 1 268,000 268,000 BON TGL 25/05
21 IGNITOR SN 8 PH 1 44,000 44,000 BON TGL 25/05
22 BOLA LAMPU SON-T PHILIPS 250 W 1 127,000 127,000 BON TGL 25/05
23 JASA TUKANG LISTRIK 13 125,000 1,625,000 done
24 JASA ANGKAT DAN PASANG SCAFOLDING SELASA 2 100,000 200,000 done
25 JASA BANTU ANGKAT - SATPAM 2 75,000 150,000 done
26 KONSUMSI SELASA 1 200,000 200,000 done
27 2 SET LAMPU TAMAN DAN JALAN 1 500,000 500,000 BON TGL 25/05
28 IGNITOR SN 8 PH 2 44,750 89,500 TOKPED 01/06
29 BOLA LAMPU SON-T PHILIPS 250 W 1 131,000 131,000 TOKPED 05/06
30 TRAFO 250 W BSN 1 303,000 303,000 TOKPED 05/06
31 FOTOCELL 1 91,000 91,000 TOKPED 05/06
32 KONSUMSI 05/06 1 100,000 100,000 TOKPED 05/06
33 JASA PERBAIKAN LAMPU JALAN DEKAT TEMBOK 1 125,000 125,000 done
34 JASA BONGKAR PASANG SCAFOLDING 1 50,000 50,000 done
35 BIAYA ANGKUT PENGEMBALIAN SCAFOLDING 1 100,000 100,000 done
36 BIAYA PARTS PERBAIKAN LAMPU 23 FEB 2022 1 1,057,800 1,057,800 done
37 JASA TEKNISI 1 300,000 300,000 done

10,353,740
H CCTV
NO RINCIAN JMLH BIAYA @ TOTAL BIAYA KETERANGAN
1 PAKET 5 CCTV 5 MP HD, DVR 8 CH, KABEL 1 8,000,000 8,000,000 BON TGL 29/05
2 AKSESORIS LAINNYA 1 117,000 117,000 BON TGL 29/05
3 KONSUMSI 1 100,000 100,000 done
4 JASA 1 1,000,000 1,000,000 done
5 LAYAR MONITOR 1 1,423,700 1,423,700 done
6 BRACKET 1 59,900 59,900 done
7 CCTV SIGN BOARD 1 191,000 191,000 done

10,891,600
I LAIN-LAIN
NO RINCIAN JMLH BIAYA @ TOTAL BIAYA KETERANGAN
1 JASA PERBAIKAN TAMAN 1 400,000 400,000
2 PERBAIKAN SALURAN AIR DEKAT SATPAM 1 550,000 550,000
3 PAPAN BUNGA KEPLING 1 150,000 150,000
TOTAL 1,100,000
REKAPITULASI URUNAN

BLOK NO. RUMAH NOMINAL STATUS NAMA KET KEPEMILIKAN


A 1 - KOSONG
A 2 1,100,000 LUNAS Javerson Simamora PEMILIK
A 3 500,000 Ransiun Banuarea/ Netty Hutabarat PEMILIK
A 5 - Umi PEMILIK
A 6 250,000 Elfredo Hutauruk PEMILIK
A 7 - KOSONG
A 8 - KOSONG
A 9 - KOSONG
A 10 1,000,000 LUNAS BOY ROCKY SIMATUPANG PEMILIK
A 11 - PEMILIK
B 1 - PEMILIK
B 2 - KOSONG
B 3 - KOSONG
B 5 - KOSONG
B 6 - KOSONG
B 7 - KOSONG
B 8 - KOSONG
B 9 1,000,000 LUNAS Geby ario KONTRAK
B 10 - PEMILIK
B 11 - FRIDOLIN SEMBIRING PEMILIK
B 12 - KONTRAK
B 14 - KOSONG
B 15 750,000 R.Tamba/N.br.Silaban PEMILIK
B 16 1,000,000 LUNAS Kaleb E. Simanungkalit PEMILIK
B 17 - KONTRAK
B 18 - KOSONG
B 19 - KOSONG
B 20 1,000,000 LUNAS Herbert Simanjuntak PEMILIK
B 21 - PEMILIK
B 22 - Gidion Saragih PEMILIK
B 23 - KOSONG
B 24 300,000 Reza ramayadi PEMILIK
B 25 1,000,000 LUNAS Eri Ginting ( Bp Evan) PEMILIK
B 26 - KONTRAK
B 27 1,000,000 LUNAS Timbul Simbolon PEMILIK
B 28 - PEMILIK
B 29 500,000 Freddy Purba PEMILIK
B 30 - KOSONG
B 31 - KOSONG
B 32 300,000 Bpk. E sitepu/ br. Siboro PEMILIK
B 33 - KOSONG
B 34 - KONTRAK
B 35 1,000,000 LUNAS Siahaan / Tampubolon 35-36 PEMILIK
B 37 1,000,000 LUNAS Elvipson Sinaga PEMILIK
B 38 1,000,000 LUNAS Roy Sormin/Br. Siahaan PEMILIK
B 39 - KOSONG
B 40 - PEMILIK
B 41 - C.Hutapea KONTRAK
B 42 - PEMILIK
B 43 - PEMILIK
B 44 1,000,000 LUNAS Hendra Agustinus Marbun PEMILIK
B 45 - KOSONG
B 46 - Wilken PEMILIK
B 47 - PEMILIK
B 48 500,000 Mama Naila PEMILIK
B 49 1,000,000 LUNAS SARMAN PEMBER SITOHANG PEMILIK
B 50 - PEMILIK
B 51 - KOSONG
B 52 - KOSONG
B 53 - Nopel arianto hutagalung PEMILIK
B 54 1,000,000 LUNAS R.Simanjuntak/H.Dachi PEMILIK
B 55 300,000 PEMILIK
B 56 - KOSONG
B 57 600,000 B. Pakpahan/R. Sibarani PEMILIK
B 59 1,000,000 LUNAS Aritonang 58-59 PEMILIK
B 60 - PEMILIK
C 1 1,000,000 LUNAS Abram Zofar Nainggolan PEMILIK
C 2 - KOSONG
C 3 500,000 H. MARBUN PEMILIK
REKAPITULASI URUNAN

BLOK NO. RUMAH NOMINAL STATUS NAMA KET KEPEMILIKAN


C 5 - Fikri Rambe PEMILIK
C 6 - KOSONG
C 7 1,000,000 LUNAS Leonardo Edison Sitohang PEMILIK
C 8 - PEMILIK
C 9 - KOSONG
C 10 - sutres 10-11 PEMILIK
C 12 - KOSONG
C 14 500,000 Mario Sianturi PEMILIK
C 15 300,000 KONTRAK
C 16 - PEMILIK
C 17 300,000 Surya Aritonang PEMILIK
C 18 1,000,000 LUNAS Heri Triyono Sinuhaji PEMILIK
C 19 500,000 Imanuel sitepu PEMILIK
C 20 - KONTRAK
C 21 - KOSONG
C 22 - KOSONG
C 23 - KOSONG
C 24 - KOSONG
C 25 300,000 Fernando Pasaribu PEMILIK
C 26 - KONTRAK
C 27 - KOSONG
C 28 - KOSONG
C 29 - KOSONG
C 30 - MAYOR KONTRAK
C 31 - PEMILIK
C 32 - Supardi PEMILIK
C 33 - PEMILIK
C 34 - PEMILIK
C 35 800,000 P. Silalahi (Pak. Axel) PEMILIK
C 36 - Pak Shena Siahaan KONTRAK
C 37 - KONTRAK
C 38 - KONTRAK
C 39 1,000,000 LUNAS Chrisdoni Pasaribu PEMILIK
C 40 1,000,000 LUNAS Hasanul Husni PEMILIK
C 41 - KOSONG
C 42 - KOSONG
C 43 - Andri Ginting PEMILIK
C 44 - PEMILIK
C 45 - KOSONG
C 46 - Donny Pangaribuan PEMILIK
C 47 - KOSONG
C 48 - KOSONG
C 49 - PEMILIK
C 50 - PEMILIK
C 51 - PEMILIK
C 52 300,000 Agus H, Purba PEMILIK
C 53 1,000,000 LUNAS N. Situmorang/n. Br. Siallagan PEMILIK
C 54 - Sahat Christian Simanjuntak/ E br Naibaho (Bpk Shelomitha) KONTRAK
TOTAL 27,600,000

Anda mungkin juga menyukai