REKAP OKNAME ME DAN PLAMBING PONDOK

PESANTREN AZ-ZAHRA2 RIMBO PANJANG

MEKANIKAL DAN ELEKTRIK LANTAI 2


NO URAIAN KUANTITAS TERPASANG SATUAN HARGA SUBTOTAL
KONTRAK KONTRAK
1 LAMPU KAMAR(12 TITIK X9 108 108 TITIK 59,000 6,372,000
KAMAR)
2 LAMPU 42 TITIK 59,000 2,478,000
SELASAR,TANGGADAN 42
RUANG PANEL
3 LAMPU KAMAR MANDI/WC19 38 38 TITIK 59,000 2,242,000
TITIK X2
4 S,KONTAK RUANG PANEL 17 7 TITIK 59,000 413,000
5 S,KUNTAK RUANG KAMAR 90 90 TITIK 59,000 5,310,000
6 PEMASANGAN BOX MCB 9 9 UNIT 82,000 738,000
PERKAMAR
7 PEMASANGAN MCB 7 UNIT X 9 63 63 UNIT 63,000 3,969,000
KAMAR
8 TAREKAN KABEL 14 17 TAREKA 340,000 5,780,000
ASPAN/FEEDER N
9 TAREKAN KABEL 1 TAREKA 500,000 500,000
ASPAN/FEDER DARI MDP KE 3 N
SDP
10 RAKIT+PASANG PANEL SDP 1 1 UNIT 2,500,000 2,500,000
11 PEMASANGAN KABEL 100 84,4 METER 45,000 3,798,000
LEDER/TRAY ELEKTRONIK
12 PEMASANGAN KABEL 87 78,5 METER 45,000 3,532,500
LEADER/TRAY ELEKTRIK
13 TAREKAN KABEL FIRE ALARM 10 10 TITIK 145,000 1,450,000
14 PEMASANGAN DETEKTOR 10 _ UNIT 17,500 _
FIRE ALARM
15 FEDER MANUAL 2 2 TAREKA 145,000 290,000
SWIT,BELL+LAMP N
16 PEMASANGAN ASESORIES 3 _ UNIT 17,500 _
MANUAL SWIT,BELL,LAMP
17 PEMASANGAN+RAKIT PANEL 1 1 UNIT 500,000 500,000
TBFA FIRE ALARM
18 TATA SUARA 14 - TITIK 150,000 -
19 FEDER MANUAL SWIT TATA 10 10 TAREKA 285,000 2,850,000
SUARA N
20 PEMASANGAN+RAKIT PANEL 1 1 UNIT 500,000 500,000
TBTS
21 PASANG CCTV 5 5 TITIK 245,000 1,225,000
22 TAREKAN KABEL SUMBER 5 5 TITIK 190,000 950,000
CCTV
23 KIPAS ANGIN 19 19 UNIT 150,000 2,850,000
23 RAKIT +PEMASANGAN 19 475,000
A GANTUNGAN KIPAS SAAT - UNIT 25,000
PENGECORAN
24 EXHAUSFAN 6 - UNIT 150,000 -
25 PESANGAN 188 144 TITIK 35,000 5,040,000
DOUNLIGHT+BARET
26 PEMASANGAN KABEL BC 1 TAREKA 285,000
GROUNDING DARI MDP KE 2 N 285,000
PANEL SDP
27 PEMOTONGAN
SIKU,MELOBANGI DAN
WELDER,SINGKROMET
HANGGER GANTUNGAN TRAY - 193 UNIT 23,500 4,535,500
SAMPAI BERFUNGSI DENGAN
BAIK,AREA SELASAR DAN
RUANG SHAP DI DALAM R
KANTOR

TOTAL = 58,298,000