Anda di halaman 1dari 2

PENAWARAN HARGA

KHS JASA KONSTRUKSI SR APP 1 PHASA DAN 3 PHASA


PT PLN (PERSERO) UNIT INDUK DISTRIBUSI SUMATERA BARAT

HPS
NO. URAIAN PEKERJAAN STN PENAWARAN TKDN JASA KETERANGAN
MAT JASA
97.000%
A PENARIKAN KABEL SR
1 Pasang LVTC 2x10 mm² Meter NT 1,364 1,323 100%
2 Bongkar LVTC 2x10 mm² Meter RETUR 754 731 100%
3 Pasang LVTC 2x16 mm² Meter NT 1,506 1,461 100%
4 Bongkar LVTC 2x16 mm² Meter RETUR 833 808 100%
5 Pasang LVTC 4x10 mm² Meter NT 1,812 1,758 100%
6 Bongkar LVTC 4x10 mm² Meter RETUR 1,002 972 100%
7 Pasang LVTC 4x16 mm² Meter NT 2,416 2,344 100%
8 Bongkar LVTC 4x16 mm² Meter RETUR 1,355 1,314 100%
9 Pasang LVTC 3 x 35 + 1 x 25 mm² Meter NT 4,978 4,829 100%
10 Bongkar LVTC 3 x 35 + 1 x 25 mm² Meter RETUR 2,987 2,897 100%

B PEKERJAAN APP
1 Pasang Kwh meter 1 Phasa Buah NT 41,415 40,173 100%
2 Bongkar Kwh meter 1 Phasa Buah RETUR 24,159 23,434 100%
3 Pasang Kwh meter 3 Phasa Buah NT 52,710 51,129 100%
4 Bongkar Kwh meter 3 Phasa Buah RETUR 30,516 29,601 100%
5 Pasang MCB 1 Phasa Buah NT 25,209 24,453 100%
6 Bongkar MCB 1 Phasa Buah RETUR 15,258 14,800 100%
7 Pasang MCB 3 Phasa Buah NT 30,516 29,601 100%
8 Bongkar MCB 3 Phasa Buah RETUR 18,119 17,575 100%
9 Pasang Box APP s.d Daya 41,5 kVA Set NT 96,635 93,736 100%
10 Bongkar Box APP s.d Daya 41,5 kVA Set RETUR 65,887 63,910 100%
11 Pasang MCCB Buah NT 30,516 29,601 100%
12 Bongkar MCCB Buah RETUR 21,474 20,830 100%
13 Penggantian APP 1 Phasa Buah - 64,423 62,490 100% Distribusi
14 Pemindahan APP 1 Phasa Tinggi Buah - 72,476 70,302 100% Distribusi
15 Pemindahan APP 1 Phasa dalam Bangunan Buah - 96,635 93,736 100% Distribusi
16 Penyambungan Kembali ex. P2TL 1 Phasa Buah - 64,423 62,490 100% Distribusi

C LAINNYA
1 Dynabolt Buah 6,909 6,702
2 Jumper Conector AL 16-35/35-70 & Heat Shrink Buah NT 18,123 17,579 100%
3 Pole Breaket 3"- 3 Way Buah NT 2,029 1,968 100%
4 Pipa Galvanis 1,5" x 1,5 mtr, tebal 2 mm2 Btg NT 4,894 4,747 100%
5 Beugel Dack Standart 1,5" Buah NT 3,058 2,966 100%
6 Service Wedge Clamp 10 - 16 mm2 , 2 sumpit Buah NT 2,802 2,718 100%
7 Strain Hook & Clamp 1 1/2" Buah NT 2,855 2,769 100%
8 Clamp Plastik No.12 Buah 301 490 292 475 100%
9 Clamp Plastik No.24 Buah 301 490 292 475 100%
10 Segel Puntir transparan Buah NT 1,713 1,662 100%
11 Indikator Phasa (tanda phasa 4 warna) set 38,184 25,756 37,038 24,983 100%
12 Paku+Isolasi+Semen ls 2,343 1,198 2,273 1,162 100%
13 Fixed Dead End Assembly 25 - 35 Buah 85,798 36,567 83,224 35,470 100%
14 Tagging Pelanggan plgn - 2,316 2,247 100%

D TRANSPORTASI
1 Transportasi SR 1 PHASA
- Zona I (0 - 10 km) plgn - 6,673 6,473 100%
- Zona II (11 - 25 km) plgn - 10,933 10,605 100%
- Zona III (26 - 40 km) plgn - 15,193 14,737 100%
- Zona IV (> 40 km) plgn - 18,033 17,492 100%
2 Transportasi SR 3 PHASA
- Zona I (0 - 10 km) plgn - 10,505 10,190 100%
- Zona II (11 - 25 km) plgn - 14,765 14,322 100%
- Zona III (26 - 40 km) plgn - 19,025 18,454 100%
- Zona IV (> 40 km) plgn - 21,865 21,209 100%
PENAWARAN HARGA
KHS JASA KONSTRUKSI SR APP 1 PHASA DAN 3 PHASA
PT PLN (PERSERO) UP3 BUKITTINGGI

PERKIRAAN VOLUME
PENAWARAN HARGA TOTAL PER UP3
PASANG BARU PERUBAHAN DAYA MULTIGUNA MIGRASI
NO. URAIAN PEKERJAAN STN PENGGANTIA
TOTAL 1 PH DAYA 3 PH DAYA 3 PH DAYA N & HAR
1 PH DAYA 3 PH DAYA
7700 - 11000 6600 - 13200 16500 - 33000 1 PH KE 1 PH 1 PH KE 3 PH 3 PH KE 3 PH 3 PH KE 1 PH NON PLGN PLGN 1 PHASA 3 PHASA METER MAT/ACC JASA MAT/ACC JASA
450 - 5500 VA 41500 VA
VA VA VA
1 LVTC 2 x10 mm
- Pasang Meter 706,118 704,433 1,685 1,323 - 934,250,611
- Bongkar Meter 2,422 2,422 731 - 1,771,402
2 LVTC 2 x16 mm - - -
- Pasang Meter 28,010 850 27,160 1,461 - 40,917,785
- Bongkar Meter 27,160 27,160 808 - 21,945,552
3 LVTC 4 x10 mm - - -
- Pasang Meter 11,205 8,783 2,422 1,758 - 19,695,197
- Bongkar Meter 1,685 1,685 972 - 1,637,497
4 LVTC 4 x16 mm - - -
- Pasang Meter 1,662 1,662 2,344 - 3,894,319
- Bongkar Meter - 1,314 - -
5 LVTC 3 x 35 + 1 x 25 mm - - -
- Pasang Meter 475 475 4,829 - 2,292,564
- Bongkar Meter - 2,897 - -
6 Box APP s.d Daya 41,5 kVA - -
- Pasang Buah 381 251 47 14 69 93,736 - 35,732,144
- Bongkar Buah 37 37 63,910 - 2,392,765
- Dynabolt Buah 1,525 1,004 190 54 277 6,702 10,218,798 -
7 Kwh meter 1 ph - -
- Pasang Buah 31,373 23,481 19 37 2,716 5,120 40,173 - 1,260,351,062
- Bongkar 7,905 69 2,716 5,120 23,434 - 185,252,275
8 Kwh meter 3 ph - - -
- Pasang buah 442 251 47 14 69 61 51,129 - 22,609,111
- Bongkar 98 37 61 29,601 - 2,913,857
9 MCB 3 ph - - -
- Pasang Buah 532 251 47 69 104 61 29,601 - 15,760,346
- Bongkar 202 104 37 61 17,575 - 3,554,444
10 MCB 1 ph - -
- Pasang Buah 42,707 23,481 19 8,123 37 2,716 3,211 5,120 24,453 - 1,044,294,589
- Bongkar Buah 19,238 8,123 69 2,716 3,211 5,120 14,800 - 284,733,726
11 MCCB - -
- Pasang Buah 14 14 29,601 - 401,537
- Bongkar Buah - 20,830 - -
12 Jumper Conector AL 16-35/35-70 & Heat Shrink Buah 16,743 16,437 13 176 33 9 48 26 17,579 - 294,331,223
13 Pole Breaket 3"- 3 Way Buah 704 704 1,968 - 1,385,564
14 Pipa Galvanis 1,5" x 1,5 mtr, tebal 2 mm2 Btg 704 704 4,747 - 3,342,015
15 Beugel Dack Standart 1,5" Buah 1,408 1,408 2,966 - 4,176,494
16 Service Wedge Clamp 10 - 16 mm2 , 2 sumpit Buah 53,029 46,962 38 502 95 5,432 2,718 - 144,129,286
17 Strain Hook & Clamp 1 1/2" Buah 704 704 2,769 - 1,949,622
18 Clamp Plastik No.12 Buah 79,721 70,443 57 753 208 112 8,148 292 475 23,276,078 37,891,290
19 Clamp Plastik No.24 Buah 183 142 41 292 475 53,469 87,042
20 Segel Puntir transparan Buah 43,868 23,481 19 502 95 27 8,123 208 208 37 2,716 3,211 5,120 122 1,662 - 72,891,286
21 Indikator Phasa (tanda phasa 4 warna) set 704 704 37,038 24,983 26,075,090 17,588,257
22 Paku+Isolasi+Semen ls 704 704 2,273 1,162 1,599,988 818,090
23 Fixed Dead End Assembly 25 - 35 Buah 27 27 83,224 35,470 2,257,905 962,316
24 Transportasi SR 1 Ph - -
- Zona I (0 - 10 km) plgn 16,640 5,870 5 2,031 9 679 803 1,280 5,963 6,473 - 107,705,940
- Zona II (11 - 25 km) plgn 16,640 5,870 5 2,031 9 679 803 1,280 5,963 10,605 - 176,464,715
- Zona III (26 - 40 km) plgn 16,640 5,870 5 2,031 9 679 803 1,280 5,963 14,737 - 245,223,490
- Zona IV (> 40 km) plgn 16,638 5,871 4 2,030 10 679 802 1,280 5,963 17,492 - 291,039,351
25 Transportasi SR 3 Ph - -
- Zona I (0 - 10 km) plgn 136 63 12 3 17 26 15 10,190 - 1,385,820
- Zona II (11 - 25 km) plgn 136 63 12 3 17 26 15 14,322 - 1,947,799
- Zona III (26 - 40 km) plgn 136 63 12 3 17 26 15 18,454 - 2,509,778
- Zona IV (> 40 km) plgn 138 62 11 5 18 26 16 21,209 - 2,926,849
26 Tagging Pelanggan plgn 67,104 23,481 19 251 47 14 8,123 69 104 37 2,716 3,211 5,120 61 23,851 2,247 - 150,749,729
27 Penggantian APP 1 Phasa Buah 17,420 17,420 62,490 - 1,088,581,200
28 Pemindahan APP 1 Phasa Tinggi Buah 3,478 3,478 70,302 - 244,509,382
29 Pemindahan APP 1 Phasa dalam Bangunan Buah 2,318 2,318 93,736 - 217,279,932
30 Penyambungan Kembali ex. P2TL 1 Phasa Buah 635 635 62,490 - 39,681,347
63,481,328 7,033,958,601
JUMLAH
7,097,439,929
PPN 11% 780,718,392
JUMLAH PENAWARAN 7,878,158,321
Terbilang : tujuh milyar delapan ratus tujuh puluh delapan juta seratus lima puluh delapan ribu tiga ratus dua puluh satu rupiah

Padang, XX Januari 2023


Dibuat Oleh,
XXXXXXXXX

XXXXXXXXXXXXXXX