BAKUMPAI
II MATERIAL
1 Ornamen / Cap Lampu mercury 150 watt Set 14 2,775,000 38,850,000
2 Pipa Besi Galvanis (U / tangkai PJU) Btg 14 365,000 5,110,000
3 Klem Baugel Set 28 95,000 2,660,000
4 kabel Twiested NFA 2x10 mm2 1 KV Mtr 750 7,250 5,437,500
5 Kabel NYY 2 x 2,5mm Mtr 75 30,250 2,268,750
6 Ajusstable Assembly Bh 2 75,000 150,000
7 Suspensinon Assembly Mtr 12 85,140 1,021,680
8 Staintless Steel Strip Mtr 30 24,750 742,500
9 Stoping Buckle / yoke Bh 28 2,970 83,160
10 Box Panel 40 x 80 cm Bh 1 945,000 945,000
11 Contactor 65 Amp SN 18 220 V Set 1 1,800,000 1,800,000
12 Fotocell 10 Amp Bh 1 475,000 475,000
13 Mcb 25 Amp 220/240 V Bh 4 115,000 460,000
14 Mcb 4 Amp 220/240 V Bh 14 75,000 1,050,000
15 Tab Connector Bh 32 7,920 253,440
SUB TOTAL III 61,307,030
INVOICE TAHAP II
NO URAIAN SAT VOL HARGA STN JUMLAH
I BIAYA PENYAMBUNGAN KWH METER
1 Biaya SLO ( Sertipikat Laik Operasi ) VA 555,000 175 97,125,000
SUB TOTAL I 97,125,000
II MATERIAL
1 Trafo 800 KVA 20kv (Trafindo) Set 1 245,000,000 245,000,000
2 Panel Incoming PLN Acb 1250 A Mccb 4P/160-400A uk 200 x 80 cm Set 1 137,500,000 137,500,000
3 Panel Incoming genset Acb 1250 A Mccb 4P/160-400A uk 200 x 80 cm Set 1 137,500,000 137,500,000
4 Cubicle Incoming LBS Manual 20 kv 630 A 16 KA (schneider) Set 1 175,000,000 175,000,000
5 Cubicle Out Going CB 20 kv 630 A 16 KA (schneider) Set 1 145,000,000 145,000,000
6 Kabel tanah NA2XSY. 1X150 mm ( Single Core ). Mtr 85 735,000 62,475,000
7 Kabel NYAF 1x300 mm single core Mtr 57 901,100 51,362,700
8 Terminating Raychem Out Door ( 150-240 mm ). Bh 9 4,500,000 40,500,000
9 Terminating Raychem In Door ( 150-240 mm ). Bh 9 5,500,000 49,500,000
10 Arde 5,5 mtr Set 3 2,200,000 6,600,000
SUB TOTAL II 1,050,437,700