Anda di halaman 1dari 2

RENCANA ANGGARAN BIAYA

SURAT PENGADAAN BARANG DAN JASA


PEKERJAAN PEMASANGAN BARU (PB), PERUBAHAN DAYA (PD),SAMBUNGAN RUMAH (SR) 1 PHASA
ULP KUTACANE
PERIODE : MARET 2022

NO URAIAN STN VOL REALISASI HARGA SATUAN KET


JUMLAH HARGA (RP)
1 2 3 4 5 6 7 8
I MATERIAL UTAMA DISTRIBUSI
1.1 HANTARAN
mtr
1 Kabel Twisted 2 x10 mm
SUTR TIC 3x35 mm mtr
1.2 ALAT UKUR DAN PEMBATAS
1 Kwh Meter 1Phasa 5/20 A 220 V Type Compact set
include MCB
1.3 ACCESSORIES HANTARAN
1 Pipa PVC United 3/4, 4 meter btg 936 136 23,000 3,128,000
2 Klem beton 22 bh 2,808 408 900 367,200
3 Jangkar Jepit type 2 set 936 136 8,000 1,088,000
4 Dead End Service Widge Grip type kabel 2x10 mm bh 1,872 272 6,000 1,632,000
5 Elbow (belokan) PVC 3/4 " bh 1,872 272 4,000 1,088,000
6 Connector SR (Baut) bh 432 118 10,000 1,180,000
7 Compression connector AL 35/70-10mm + Scouth =cover bh 1,440 154 14,000 2,156,000
8 Compression connector AL 16-60 mm + Scouth =cover bh 0 0 10,000 -
9 Compression connector AL 35-70-35/70mm + Scouth =cover bh 0 0 14,000 -
Jumlah I 10,639,200
II JASA
1 Pemasangan Baru 1Phasa plg 936 136 72,000 9,792,000
2 Penyambungan Kembali Exs Tuskar plg 0 0 30,000 0
3 Penyambungan Kembali Exs P2TL plg 0 0 30,000 0
4 Perubahan Daya dan Migrasi 1 Phase (Paska ke pra) plg 328 38 35,000 1,330,000
5 Perubahan Daya dan Migrasi 1 Phase (Pra ke pasca) plg 0 0 35,000 0
6 Sambung Bongkar Layanan Sementara Pelanggan 1 Phasa plg 0 0 1,100 0
7 Perubahan Daya 1 Phase plg 76 18 19,000 342,000
8 Jasa Tappin Poin plg 0 0 10,000 0

Jumlah II 11,464,000
Jumlah I + II 22,103,200
Ppn 11% 2,210,320
Total 24,313,520

Pihak Pertama Pihak Kedua


PT. PLN (Persero) UIW Aceh UP3 Langsa PT.KURNIA ASYIFA SEJATI
ULP Kutacane Direktur
Manager

Mengetahui,
ROBI LESTARI PASARIBU PT.PLN (Persero) UIW Aceh ADNAN AGAM IBRAHIM,ST
UP3 Langsa
Manager

ANDI SENO HENDRIATMOKO


RENCANA ANGGARAN BIAYA
SURAT PENGADAAN BARANG DAN JASA
PEKERJAAN PEMASANGAN BARU (PB), PERUBAHAN DAYA (PD),SAMBUNGAN RUMAH (SR) 1 PHASA
ULP KUTACANE
PERIODE : APRIL 2022

NO URAIAN STN VOL REALISASI HARGA SATUAN KET


JUMLAH HARGA (RP)
1 2 3 4 5 6 7 8
I MATERIAL UTAMA DISTRIBUSI
1.1 HANTARAN
mtr
1 Kabel Twisted 2 x10 mm
SUTR TIC 3x35 mm mtr
1.2 ALAT UKUR DAN PEMBATAS
1 Kwh Meter 1Phasa 5/20 A 220 V Type Compact set
include MCB
1.3 ACCESSORIES HANTARAN
1 Pipa PVC United 3/4, 4 meter btg 936 0 23,000 -
2 Klem beton 22 bh 2,808 0 900 -
3 Jangkar Jepit type 2 set 936 0 8,000 -
4 Dead End Service Widge Grip type kabel 2x10 mm bh 1,872 0 6,000 -
5 Elbow (belokan) PVC 3/4 " bh 1,872 0 4,000 -
6 Connector SR (Baut) bh 432 0 10,000 -
7 Compression connector AL 35/70-10mm + Scouth =cover bh 1,440 0 14,000 -
8 Compression connector AL 16-60 mm + Scouth =cover bh 0 0 10,000 -
9 Compression connector AL 35-70-35/70mm + Scouth =cover bh 0 0 14,000 -
Jumlah I -
II JASA
1 Pemasangan Baru 1Phasa plg 936 0 72,000 0
2 Penyambungan Kembali Exs Tuskar plg 0 0 30,000 0
3 Penyambungan Kembali Exs P2TL plg 0 0 30,000 0
4 Perubahan Daya dan Migrasi 1 Phase (Paska ke pra) plg 328 8 35,000 280,000
5 Perubahan Daya dan Migrasi 1 Phase (Pra ke pasca) plg 0 0 35,000 0
6 Sambung Bongkar Layanan Sementara Pelanggan 1 Phasa plg 0 0 1,100 0
7 Perubahan Daya 1 Phase plg 76 23 19,000 437,000
8 Jasa Tappin Poin plg 0 0 10,000 0

Jumlah II 717,000
Jumlah I + II 717,000
Ppn 11% 78,870
Total 795,870

Pihak Pertama Pihak Kedua


PT. PLN (Persero) UIW Aceh UP3 Langsa PT.KURNIA ASYIFA SEJATI
ULP Kutacane Direktur
Manager

Mengetahui,
ROBI LESTARI
ISKANDAR
PASARIBU PT.PLN (Persero) UIW Aceh ADNAN AGAM IBRAHIM,ST
UP3 Langsa
Manager

ANDI SENO HENDRIATMOKO

Anda mungkin juga menyukai