MATERIAL
No URAIAN JUMLAH SATUAN HARGA SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6=3x5
B Base Station
1 Radio Base Digital 7 Unit 9,500,000 66,500,000
2 136-174
Omny Mhz +
Directional Antenna VHF Radio Base 7 Buah 7,675,000 53,725,000
3 Kabel Coaxial RG8 600 Meter 55,000 33,000,000
4 Batere SMF 65AH 7 Unit 2,400,000 16,800,000
5 + kepala
Power batere
Supply 7 Unit 3,600,000 25,200,000
6 Kabel Power NYY 2x16 150 Meter 60,000 9,000,000
7 Pipa 6 meter 2 1/2" 2 Unit 600,000 1,200,000
II JASA
1 Jasa Instalasi dan setting repeater Digital 2 Lot 18,500,000 37,000,000
2 Jasa instalasi dan 7 Lot 7,500,000 52,500,000
setting base
Sub Total II 89,500,000
Total RAB (I dan II) 514,391,000
PPN 10% 51,439,100
Total RAB + PPN 10% 565,830,100
Terbilang : Lima Ratus Enam Puluh Lima Ribu Delapan Ratus Tiga Puluh Ribu Seratus Rupiah
SYAMSUL BAHRI
Direktur