Anda di halaman 1dari 29

PT PEMBANGKITAN JAWA BALI SERVICES

DAFTAR PERMINTAAN PENGADAAN BARANG DAN JASA

NO. PRK : 22TP0001


NO. PR : 135.PR/OM1/PJBS/2022
PROJECT OWNER : O&M 1

TANGGAL
NO. NAMA BARANG DAN JASA JUMLAH SATUAN HARGA SATUAN JUMLAH HARGA NAMA ANGGARAN KETERANGAN
DIBUTUHKAN
1 2 3 4 5 6 7 9 10
- Inc. PPN
Variable Cost PLTU
1 JASA REPAIR VALVE AREA TURBIN UNIT 1 PLTU KETAPANG 1 LOT Rp 469.645.000 Rp 469.645.000 09 Mei 2022 - TOR Terlampir
Ketapang
- RAB Terlampir

JUMLAH Rp469.645.000
PPN Rp51.660.950
TOTAL Rp521.305.950

Sidoarjo, 9 Maret 2022


Menyetujui, Pemohon,
Direktur O & M Manajer Anggaran Manajer O&M 1

(PURWONO JATI AGUNG) (RAYSA SANGSTHITA ADIANTARI) ( BAHRUDIN ISHAK )

DISPOSISI :

FORM-04.2.02.001-Rev0-06 Feb 2019


Nomor : AACI0286150 Ketapang, 9 Maret 2022
Sifat : Segera
Lampiran : 1 File

Kepada
Pjs Manajer Operation dan Maintenance 1 PJB Services

Perihal : Permohonan Pengadaan Jasa Additional Scope ME Repair Valve Area Turbin Unit
1 PLTU Ketapang - (Variable Cost)

Menindaklanjuti rencana Overhaul Mean Inspection (ME) Unit 1 PLTU Ketapang yang akan
diagendakan pelaksanaannya pada bulan Mei 2022 dan demi menunjang pekerjaan repair valve
area turbin bisa terlaksana sesuai schedule pada saat overhaul ME unit 1, maka bersama ini kami
sampaikan "Permohonan Pengadaan Jasa Additional Scope ME Repair Valve Area Turbin
Unit 1 PLTU Ketapang". Sebagai bahan pertimbangan kami lampirkan usulan permintaan
pengadaan jasa & RAB.

Demikian disampaikan, atas perhatian dan kerjasamanya diucapkan terima kasih.

PJS MANAJER UNIT PLTU KETAPANG

MAHYA TAUHIDIYA NUR

Tembusan :

1. Direktur Operation dan Maintenance PJB Services


2. Kepala Divisi Perencanaan dan Evaluasi Operasi Pemeliharaan-2
PT PLN (Persero)
UNITINDUK PEMBANGKITAN DAN PENYALURAN KALIMANTAN UNIT PELAKSANA PEMBANGK1TAN SINGKAWANG
PLTU KETAPANG

Form Usulan Peingadaan


N o m o r: PR 1755

D e sc rip tio n : PERMINTAAN PENGADAAN JASA A D D IT IO N A L SCOPE ME REPAIR VALVE AREA TU R BIN U N IT 1 PLTU KETAPANG Reimbusable

S ite : KA R equested Date: 07 Mar 2022


S ta tu s: APPR R eq uired Date: 30 Jun 2022
P rio rity: NORMAL Ty p e : SRV

■ . ■■■ « p p ü ,/k
Une It e m D escriptio n Lortgdes Mfg M odel # Q ty U nits
1 Jasa R e p a ir V a lv e A rea T u rb in U n it 1 PLTU K e tapa ng 1 LOT

A p p ro v e d Date; 0^ 'IX J l'l

A p p ro v e d B y:

Mengetahui
PtT SPV RENDAL JASA O&M KETAPANG S u p e rvis o r R e n D a lH a r A p jriA H AW f-lP1
PT PLN (PERSERO) UPK SINGKAWANG

D e p u ti M a n a je r Pe m e liha raan

M a n a je r U n it

A iokasi A n g g a ra n : ( * ) P e m b ia ya a n : ( * )
| | O pe ra s! Q InvesLasi Fixed Cost
R eim b u rs a b le Cost

Proses P engadaan O leh : ( * )

O P T P JB S P L T U K E TA P A N G

O P T P JB S S U B O IT SCM K A N T O R P U S A T

O P T P JB U B J O & M L U A R J A W A

Q P T PLN (P e rs e ro )

(~~1 R ekom endasi

(* ) Diisi oleh P T P JB S P L TU K E TA P A N G

Page: 1
•no. uoKumen
INTEGRATED MANAGEMEN SYSTEM Tgl. Terbit ; 7-Mar-22
£ R Í B PLTU KETAPANG 2 X 10 MW Revisi
UBJOM PLTU KETAPANG FORMULIR RENCANA ANGGARAN BIAYA Halaman
Jenis Pekerjaan : PERMINTAAN PENGADAAN JASA ADDITIONAL SCOPE ME REPAJR VALVE AREA TURBIN UNIT 1 PLTU KETAPANG
Type : VARIABLE COST
No Uratan Ite m Cade | Jumlah | Satuars Harga Satuan Sub Total Keterangan

1 Valve Line Drain Inlet Outlet Condensor


- Globe Valve DN 32 , Class 150, PN 16, Flange to Flange 178 mm, PCD 100
- W051594 4 Ea Rp 5,600,000 Rp 22,400,000 Mekanik
mm, Jumlah Baut 4 M16 Panjang 60 mm, Temp. ± 100° C, Material SUS 304
- Bolt & Nut, SS 304 - W051594 32 Ea Rp 40,000 Rp 1,280,000 Mekanlk
- SWG UN W(Jblb94 6 ha RP 1UU,UUU Kp 8UU,UUU ¡viekanlk
- Flange Line DN 32, SS 304 - W051594 8 Lot Rp 480,000 Rp 3,840,000 Mekanik
- Pipa SS 304, Uk. 1,1/4 Inch, Sch.40, 1 Batang = 6 meter - W051594 1 Batang Rp 4,600,000 Rp 4,600,000 Mekanlk
- Elbow 90°, SS 304, Uk. 1,1/4 Inch, Sch.40 - W051594 4 Ea Rp 250,000 Rp 1,000,000 Mekanik
- Repaintlng Marine Coating, Warna Blue RAL 0129 - W051594 1 Lot Rp 800,000 Rp 800,000 Mekanik
2 Valve Line Venting Condensor

- Gate Valve DN 25, Class 150, PN 16, Flange to Flange 155 mm, PCD 80
- W051594 2 Ea Rp 5,100,000 Rp 10,200,000 Mekanik
mm, Jumlah Baut 4 M12 Panjang 60 mm, Temp. ± 100° C, Material SS 304

- Bolt & Nut, SS 304 - W051594 16 Ea Rp 40,000 Rp 640,000 Mekanlk


- SWG DN 25 - W051594 4 Ea Rp 100,000 Rp 400,000 Mekanik
- Flange Line DN 25, SS 304 - W051594 4 Ea Rp 400,000 Rp 1,600,000 Mekanik
- Pipa SS 304, Uk.1 Inch, Sch.40 1 Batang = 6meter - W051594 3 Batang Rp 4,000,000 Rp 12,000,000 Mekanik
-Elbow 90°, SS 304, Uk.1 Inch, Sch.40 - W051594 4 Ea Rp 220,000 Rp 880,000 Mekanik
- Repainting Marine Coating, Warna Blue RAL 0129 - W051594 1 Lot Rp 400,000 Rp 400,000 Mekanik
- Scaffolding - W051594 1 Lot Rp 2,500,000 Rp 2,500,000 Mekanik
3 Manual Valve Exhaust Turbine
- Globe Valve DN 65 , Class 600, PN 100,Flange To Flange 440 mm, Jumlah
- W051594 2 Ea Rp 5,850,000 Rp 11,700,000 Mekanik
Baut 8, Temp. ± 425° C, Material A105
- Bolt & Nut - W051594 32 Ea Rp 40,000 Rp 1,280,000 Mekanik
- SWG DN 65 - W051594 4 Ea Rp 400,000 Rp 1,600,000 Mekanik
- Flange Line DN 65 - W051594 4 Ea Rp 1,000,000 Rp 4,000,000 Mekanik
- Insulatíon (Glasswool, Píate Aluminium, Screw) - W051594 1 Lot Rp 800,000 Rp 800,000 Mekanik
4 Manual Valve Drain Steam Turbine
- Globe Valve DN 40 , Class 600, PN 100,Flange To Flange 490 mm, Jumlah
- W051594 2 Ea Rp 2,500,000 Rp 5,000,000 Mekanik
Baut 8, Temp. ± 425° C, Material A105
- Bolt & Nut - W051594 32 Ea Rp 30,000 Rp 960,000 Mekanik
- SWG DN 40 - W051594 4 Ea Rp 120,000 Rp 480,000 Mekanik
- Flange Line DN 40 - W051594 4 Ea Rp 400,000 Rp 1,600,000 Mekanik
- Insulatíon (Glasswool, Píate Aluminium, Screw) - W051594 1 Lot Rp 800,000 Rp 800,000 Mekanlk
PT PEMBANGKITAN JAWA BALI No. Dokumen :
INTEGRATED MANAGEMEN SYSTEM Tgl. Terbit
a &r Pu í ó
ís PLTU KETAPANG 2 X 10 MW Revísi
: 7 -M a r-2 2

UBJOM PLTU KETAPANG FORMULIR RENCANA ANGGARAN BIAYA Halaman


Jenis Pekerjaan : PERMINTAAN PENGADAAN JASA ADDITIONAL SCOPE ME REPAIR VALVE AREA TURBIN UNIT 1 PITÜ KETAPANG
Type__________________ : VARIABLE COST_____________________________________________________________________________
No Uraian | Ite m Cade r wo Jumlah Satuan Harga Satuan Sub Total Keterangan
I Number
5 Manual Valve Drain Equalization
- Globe Valve DN 25 , Class 150, PN 16,Flange To Flange 190 mm, Jumlah
- W051594 1 Ea Rp 1,600,000 Rp 1,600,000 Mekanik
Baut 4, Temp. ± 425° C, Material A105
- Bolt & Nut - W051594 8 Ea Rp 20,000 Rp 160,000 Mekanik
- SWG DN 25 ~ W051S94 2 Ea np 100,000 i\p 200,000 Mekanik
- Flange Une DN 25 - W051S94 2 Ea Rp 120,000 Rp 240,000 Mekanik
- Insulation (Glasswool, Píate Alumlnium, Screw) - WOS1594 1 Lot Rp 400,000 Rp 400,000 Mekanik
6 Manual Valve Drain Hotwell
- Globe Valve DN 25 , Class 150, PN 16,Flange To Flange 160 mm, Jumlah
- W051594 1 Ea Rp 1,600,000 Rp 1,600,000 Mekanik
Baut 4, Temp. ± 425° C, Material A105
- Bolt & Nut - W051594 8 Ea Rp 20,000 Rp 160,000 Mekanik
- SWG DN 25 - W051594 2 Ea Rp 100,000 Rp 200,000 Mekanik
- Flange Une DN 25 - W051594 2 Ea Rp 120,000 Rp 240,000 Mekanik
- Insulation (Glasswool, Píate Aluminium, Screw) - W051594 1 Lot Rp 400,000 Rp 400,000 Mekanik
7 Valve 8 MOV Cióse Cooling Mekanik
- Globe Valve DN 65 , Class 150, PN 16,Flange To Flange 190 mm, Temp. ±
- WOS1594 3 Ea Rp 12,400,000 Rp 37,200,000 Mekanik
100° C, Material SS 304
- Globe Valve DN 65 , Class 150, PN 16,Flange To Flange 190 mm, Temp. ±
100° C, Material SS304
- MOV, Electric regulating valve, Model ZDLP-40P, Nominal diameter 25 mm, - W051594 1 Set Rp 58,000,000 Rp 58,000,000 Mekanik
Nominal pressure 4.0 Mpa, Temperatur < 100 °C, Voltage 220V/50 Hz, Input
signal 4-20 mA or 1-5 V*DC, Output signal 4-20 mA*DC, IP55, Material SS 304

- Bolt & Nut, SS 304 - W051594 48 Ea Rp 40,000 Rp 1,920,000 Mekanik


- SWG DN 65 - W051594 6 Ea Rp 170,000 Rp 1,020,000 Mekanik
- Flange Une DN 65, SS 304 - W051594 6 Ea Rp 1,300,000 Rp 7,800,000 Mekanik
- Repainting Marine Signal Green Ral 6032 - W051594 1 Lot Rp 1,000,000 Rp 1,000,000 Mekanik
8 Valve Drain Kolam Cooling Tower
- Butterfly DN 150 , Class 150, PN 16,Flange To Flange 110 mm, Jumlah Baut
- W051594 2 Ea Rp 11,700,000 Rp 23,400,000 Mekanik
8 M20, Temp. ± 100° C, Material SS 304
- Bolt & Nut, SS 304 - W051594 32 Ea Rp 70,000 Rp 2,240,000 Mekanik
-SWG DN 150 - WOS1594 4 Ea Rp 550,000 Rp 2,200,000 Mekanik
- Flange Line DN 150, SS 304 - W051594 4 Ea Rp 2,500,000 Rp 10,000,000 Mekanik
- Repainting Marine Coating, Warna Blue RAL 0129 - W051594 1 Lot Rp 800,000 Rp 800,000 Mekanik
- Butterfly DN 100 , Class 150, PN 16,Flange To Flange 40 mm, Jumlah Baut 8
- WOS1594 2 Ea Rp 8,800,000 Rp 17,600,000 Mekanik
M20, Temp. ± 100° C, Material SS 304
PT PEMBANGKITAN JAWA BALI No. Dokumen :
h P i k INTEGRATED MANAGEMEN SYSTEM
PLTU KETAPANG 2 X 10 MW
Tgl. Terbit : 7-Mar-22
Revisi
UBJOM PLTU KETAPANG FORMULIR RENCANA ANGGARAN BIAYA Halaman :
Jenis Pekerjaan : PERMINTAAN PENGADAAN JASA ADDITIONAL SCOPE ME REPAIR VALVE AREA TURBIN UNIT 1 PLTU KETAPANG
Type__________________ : VARIABLE COST_____________________________________________________________________________
w o
No Uraian Ite m Code Jumlah Satuan Harga Satuan Sub Total Keterangan

- Bolt & Nut, SS 304 - W051S94 32 Ea Rp 70,000 Rp 2,240,000 Mekanik


- SWG DN 100 - W051594 4 Ea Rp 450,000 Rp 1,800,000 Mekanik
- Flange Une DN 100, SS 304 - W051594 4 Ea Rp 1,800,000 Rp 7,200,000 Mekanik
- Repainting Marine Coating, Warna Blue RAL 0129 - W051594 1 Lot Rp 800,000 Rp 800,000 Mekanik
9 Valve Make UP & Line WEP
- Globe Valve DN 50, PN 40, Flange to Flange 230 mm, Jumlah Baut 4 M16
- W051594 1 Ea Rp 9,650,000 Rp 9,650,000 Mekanik
Panjang 65 mm, Temp. < 100 °C, Material SS 304
- Pipa SS 304, Uk.2 Inch, Sch.40, 1 Batang = 6meter - W051S94 3 Batang Rp 5,800,000 Rp 17,400,000 Mekanik
- Elbow 90”, SS 304, Uk.2 Inch, Sch.40 - W051594 4 Ea Rp 300,000 Rp 1,200,000 Mekanik
- Flange Line DN 50, SS 304 - W051594 2 Ea Rp 1,300,000 Rp 2,600,000 Mekanik
- SWG DN 50 - W051594 2 Ea Rp 140,000 Rp 280,000 Mekanik

- Bolt & Nut, SS 304 - W051594 8 Ea Rp 70,000 Rp 560,000 Mekanik

-Globe Valve DN 25, PN 40, Flange to Flange 170 mm, Jumlah Baut 4 M14
- W051594 2 Ea Rp 7,200,000 Rp 14,400,000 Mekanik
Panjang 60 mm, Temp. < 100 °C, Material SS 304
- Pipa SS 304, Uk.1 Inch, Sch.40, 1 Batang = 6meter - W051594 2 Batang Rp 4,000,000 Rp 8,000,000 Mekanik
- Elbow 90", SS 304, Uk.1 Inch, Sch.40 - W051594 8 Ea Rp 200,000 Rp 1,600,000 Mekanik
- Flange Line DN 25, SS 304 - W051594 4 Ea Rp 800,000 Rp 3,200,000 Mekanik
-Tee, Uk.1 Inch, SS 304 - W051594 1 Ea Rp 500,000 Rp 500,000 Mekanik
- SWG DN 25 - W051594 4 Ea Rp 100,000 Rp 400,000 Mekanik
- Bolt & Nut, SS 304 - W051594 8 Ea Rp 40,000 Rp 320,000 Mekanik
- Repainting Marine Coating, Warna Signal Green RAL 6032 - W051594 1 Lot Rp 1,000,000 Rp 1,000,000 Mekanik
10 Valve Cióse Coolíng Tank
-Gate Valve DN 25, Class 150, PN 16,Flange To Flange 150 mm, Temp. +
- W051594 1 Ea Rp 4,200,000 Rp 4,200,000 Mekanik
100° C, Material SS304
- Bolt & Nut, SS 304 - W051594 8 Ea Rp 40,000 Rp 320,000 Mekanik
- SWG DN 25 - W051594 2 Ea Rp 100,000 Rp 200,000 Mekanik
- Flange Line DN 25, SS 304 - W051594 2 Ea Rp 400,000 Rp 800,000 Mekanik
- Repainting Marine Coating, Warna Signal Green RAL 6032 - W051594 1 Lot Rp 300,000 Rp 300,000 Mekanik
11 Man Power Jasa :
- Supervisor, 1 orang - W051594 15 Mandays Rp 475,000 Rp 7,125,000 Mekanik
- Quality control, 1 orang - W051594 15 Mandays Rp 400,000 Rp 6,000,000 Mekanik
- Teknisi, 1 orang - W051594 15 Mandays Rp 400,000 Rp 6,000,000 Mekanik
- Welder, 2 orang - W051594 30 Mandays Rp 400,000 Rp 12,000,000 Mekanik
PT PEMBANGKITAN JAWA BALI No. Dokumen
h D ík INTEGRATED MANAGEMEN SYSTEM Tgl. Terbit : 7 -M a r-2 2

u lu PLTU KETAPANG 2 X 10 MW Revisi


UBJOM PLTU KETAPANG FORMULIR RENCANA ANGGARAN BIAYA Halaman
Je n is Pekerjaan : PERMINTAAN PENGADAAN JASA ADDITIONAL SCOPE ME REPAIR VALVE AREA TURBIN UNIT 1 PLTU KETAPANG
Type _____ w - k , ,;. - j . . y J ___ ____ _ _ _ _ ____ ..........................................................................................................

«o Uraian Item Code JumSah Satuan Harga Satuan Sub Tota! Keterangan

- Helper, 6 orang - W051594 90 Mandays Rp 250,000 Rp 22,500,000 Mekanik


- Safety advisor, 1 orang - W051594 15 Wlandays Rp 350,000 Rp 5,250,000 Mekanik
Material Consumable (Kawat Las, mata gerínda cutting & grinding, spotcheck,
12 - W051594 1 Lot Rp 9,000,000 Rp 9,000,000 Mekanik
majun, dll)

13 peraiatan K3 WOS1594 i Lot Kp 4,5UU,UUU Rp 4,5UU,Ü0U Mekanik


14 Mob-Demob (Tools) - W051594 1 Lot Rp 13,500,000 Rp 13,500,000 Mekanik
15 Mob-Demob (Man Power) - W051594 1 Lot Rp 18,000,000 Rp 18,000,000 Mekanik
16 Transportasi & Akomodasi Lokal :
- Penginapan - W051594 1 Lot Rp 2,800,000 Rp 2,800,000 Mekanik
- Sewa Kendaraan - W051594 1 Lot Rp 5,500,000 Rp 5,500,000 Mekanik
- Konsumsi - W051594 1 Lot Rp 14,000,000 Rp 14,000,000 Mekanik
17 Test PCR/Swab Antigen :
- Test PCR Keberangkatan - W051594 6 Orang Rp 300,000 Rp 1,800,000 Mekanik
- Test Antigen Masuk Unit - W051594 12 Orang Rp 80,000 Rp 960,000 Mekanik
- Test PCR Pulang - W051594 6 Orang Rp 300,000 Rp 1,800,000 Mekanik
JUMLAH Rp 469,645,000
PPN 10% Rp 46,964,500
TOTAL BIAYA 516,609,500
Ketapang, 07 Maret 2022

DM PEMELiHARAAN SPV RENDAL PEMELIHARAAN


PT. VN V MANDIRI VAL VE
Ruko Kapuk Kencana B, No.2
Kompleks Vikamas 2
SALES QUOTATION
Kapuk - Jakarta Barat DATE 05-Mar-22
Em ail: vnwalveindo@gmail.com VAUDATION DATE 19-Mar-22
NPWP : 95.673.614.4-C32.000 SALES QUOTATION NO 348/Q-VMV/III/2022
CUSTOMER INFORMATION
CUSTOMER ÑAME:

Pembangkitan Jawa Bali Service, PT


ADDRESS

Raya Juanda No. 17 Sidoarjo, Jawa Timur - Indonesia 61253


CONTACT N O : CONTACT PERSON :

(+6231) 855 7909_____________________Mr. Arman & Mr. Asril__________________________________________________________


Item No. DetaiIs_________________ SIZE QTY UNIT PRICE TOTAL
PERMINTAAN PENGADAAN JASA ADDITIONAL SCOPE ME REPAIR VALVE AREA TURBIN UNIT 1 PLTU KETAPANG
1) Valve line Drain Inlet Outlet Condensor
* GLOBE VALVE, DN 32 PN 16 1 1/4" 4 Ea Rp 5.600.000,00 Rp 22.400.000,00
BODY: SS 304
DISC: SS 304
SEAT: SS 304
BRAND: VNV
FLANGE TO FLANGE = 178 MM, TEMP 100 C
PCD 100,4 X M16 PANJANG 60 MM SS 304
* BOLT & NUT , SS 304 M16x60 32 Ea Rp 40.000,00 Rp 1.280.000,00
* SWG DN 32 , SS 304 1 1/4" 8 Ea Rp 100.000,00 Rp 800.000,00
* FLANGE WELDING NECK, SS 304 1 1/4" 8 Ea Rp 480.000,00 Rp 3.840.000,00
* PIPA SS 304, SEAMLESS, SCH 40 1 1/4" 1 BTG Rp 4.600.000,00 Rp 4.600.000,00
* ELBOW 90 , SEAMLESS SS 304 , SCH 40 1 1/4" 4 Ea Rp 250.000,00 Rp 1.000.000,00
* REPAINTING MARINE COATING, WARNA BIRU RAL 0129 1 LOT Rp 800.000,00 Rp 800.000,00

2) Valve Line Venting Condensor


*GATE VALVE DN 25PN16 1” 2 Ea Rp 5.100.000,00 Rp 10.200.000,00
BODY: SS 304
SEAT:SS 304, DISC: SS 304
FLANGE TO FLANGE = 155 MM, PCD = 80 MM, TEMP 100 C
BRAND: VNV
* BOLT & NUT, SS 304 M12x60 16 Ea Rp 40.000,00 Rp 640.000,00
* SWG , SS 304 1" 4 Ea Rp 100.000,00 Rp 400.000,00
* FLANGE WELDING NECK PN 16, SS 304 1" 4 Ea Rp 400.000,00 Rp 1.600.000,00
1 PIPA SEAMLES, SCH 40, SS 304 1” 3 BTG Rp 4.000.000,00 Rp 12.000.000,00
* ELBOW 90 , SEAMLESS SS 304 , SCH 40 1” 4 Ea Rp 220.000,00 Rp 880.000,00
* REPAINTING MARINE COATING, WARNA BIRU RAL 0129 1 LOT Rp 400.000,00 Rp 400.000,00
* SEWA SCAFOLDING 1 LOT Rp 2.500.000,00 Rp 2.500.000,00

3) Manual Valve Exhaust Turbine


* GLOBE VALVE DN 65, PN 100 2,5” 2 Ea Rp 5.850.000,00 Rp 11.700.000,00
BODY: 105
DISC: A 105
SEAT: A 105
FTO F = 440 MM, 425 C
BRAND: VNV
* Bolt - Nut, Carbón Steel M18x80 32 Ea Rp 40.000,00 Rp 1.280.000,00
* SWG PN 100, SS 304 2,5" 4 Ea Rp 400.000,00 Rp 1.600.000,00
* FLANGE PN 100, CARBON STEEL 2,5" 4 Ea Rp 1.000.000,00 Rp 4.000.000,00
* INSULATION ( GLASSWOOL, PLATE ALUMUNIUM, SCREW) 1 LOT Rp 800.000,00 Rp 800.000,00

4) Manual Valve Drain Steam Turbina


* GLOBE VALVE DN 40 , PN 100 1,5" 2 Ea Rp 2.500.000,00 Rp 5.000.000,00
BODY: A 105
DISC: A 105
SEAT: A 105
FTOF = 490 MM.425C
BRAND: VNV
* Bolt - Nut, Carbón Steel M16x65 32 Ea Rp 30.000,00 Rp 960.000,00
* SWG PN 40, A 105 1,5" 4 Ea Rp 120.000,00 Rp 480.000,00
* FLANGE PN 40, CARBON STEEL 1,5" 4 Ea Rp 400.000,00 Rp 1.600.000,00
* INSULATION ( GLASSWOOL, PLATE ALUMUNIUM, SCREW) 1 LOT Rp 800.000,00 Rp 800.000,00

Manual Valve Drain Equalization


‘ Globe valve 1 inch.PN 16 1" 1 Ea Rp 1.600.000,00 Rp 1.600.000,00
Body: A105
Seat: A 105
Disc: A 105
FTOF = 190 MM.425C
BRAND: VNV
* Bolt - Nut, Carbón Steel M12x60 8 Ea Rp 20.000,00 Rp 160.000,00
* SWG PN 16, SS 304 1" 2 Ea Rp 100.000,00 Rp 200.000,00
1 FLANGE PN 16, CARBON STEEL r 2 Ea Rp 120,000,00 Rp 240.000,00
* INSULATION ( GLASSWOOL, PLATE ALUMUNIUM, SCREW) 1 LOT Rp 400.000,00 Rp 400.000,00

Manual Valve Drain Hotwell


* Globe valve 1 inch.PN 16 r 1 Ea Rp 1.600.000,00 Rp 1.600.000,00
B ody:A 105
Seat :A 105
Disc: A 105
FTOF = 190 MM , 425 C
BRAND: VNV
* Bolt - Nut, Carbón Steel M12x60 8 Ea Rp 20.000,00 Rp 160.000,00
* SWG PN 16, SS 304 1" 2 Ea Rp 100.000,00 Rp 200.000,00
* FLANGE PN 16, CARBON STEEL r 2 Ea Rp 120.000,00 Rp 240.000,00
* INSULATION ( GLASSWOOL, PLATE ALUMUNIUM, SCREW) 1 LOT Rp 400.000,00 Rp 400.000,00

Valve & MOV Closed Cooling


3 Ea Rp 12.400.000,00 Rp 37.200.000,00
* Globe Valve DN 65, PN 16, Body: SS 304 , Seat: SS 304,
Disc: SS 304, Brand : VNV F to F = 190 mm, Temp 100 C
* MOV Electric Regulating Valve, 1 FASE , 220 VAC, IP55 2,5" 1 Ea Rp 58.000.000,00 Rp 58.000.000,00
INPUT SIGNAL : 4-20 mA, OUTPUT SIGNAL : 4-20 mA
C/W Globe Valve, DN 65, PN 16
Body: SS 304
Seat: SS 304
Disc: SS 304
FTOF = 440 MM, TEMP 425 C
BRAND: VNV
* Bolt-Nut, SS 304 M16x65 48 Ea Rp 40.000,00 Rp 1.920.000,00
* SWG PN 16, SS 304 2,5" 6 Ea Rp 170.000,00 Rp 1.020.000,00
* FLANGE PN 16, SS 304 2,5" 6 Ea Rp 1.300.000,00 Rp 7.800.000,00
* REPAINTING MARINE COATING, WARNA SIGNAL GREEN 1 LOT Rp 1.000.000,00 Rp 1.000.000,00
RAL 6032

Valve Drain Kolam Cooling Tower


* Butterfly valve, DN 150, PN 16 6" 2 Ea Rp 11.700.000,00 Rp 23.400.000,00
Body: SS304
Seat: PTFE
Disc: SS 316
Brand: VNV
F toF = 110 mm , Temp 100 (
* Bolt - Nut, SS 304 M20x100 32 Ea Rp 70.000,00 Rp 2.240.000,00
* SWG PN 16, SS 304 6' 4 Ea Rp 550.000,00 Rp 2.200.000,00
* FLANGE PN 16, SS 304 6' 4 Ea Rp 2.500.000,00 Rp 10.000.000,00
* REPAINTING MARINE COATING, WARNA BIRU RAL 0129 1 LOT Rp 800.000,00 Rp 800.000,00

* Butterfly valve, DN 100, PN 16 4’ 2 Ea Rp 8.800.000,00 Rp 17.600.000,00


Body: SS304
Seat: PTFE
Disc: SS 316
Brand: VNV
FtoF = 110 mm , Temp 100 C
* Bolt - Nut, SS 304 M20x100 32 Ea Rp 70.000,00 Rp 2.240.000,00
* SWG PN 16, SS 304 4' 4 Ea Rp 450.000,00 Rp 1.800.000,00
* FLANGE PN 16, SS 304 4' 4 Ea Rp 1.800.000,00 Rp 7.200.000,00
* REPAINTING MARINE COATING, WARNA BIRU RAL 0129 1 LOT Rp 800.000,00 Rp 800.000,00

9) Valve Make Up & Line WEP


* GLOBE VALVE DN 50, PN 40 2" 1 Ea Rp 9.650.000,00 Rp 9.650.000,00
BODY: SS 304
SEAT :SS 304
DISC :SS 304
BRAND: VNV
FLANGE TO FLANGE = 230 MM, TEMP 100 C
* BOLT & NUT, SS 304 M16x65 8 Ea Rp 70.000,00 Rp 560.000,00
1 SWG PN 16 , SS 304 2’ 2 Ea Rp 140.000,00 Rp 280.000,00
* FLANGE WELDING NECK PN 40 , SS 304 2" 2 Ea Rp 1.300.000,00 Rp 2.600.000,00
* PIPA SEAMLES, SCH 40, SS 304 2" 3 BTG Rp 5.800.000,00 Rp 17.400.00000
* ELBOW 90 , SEAMLESS SS 304 , SCH 40 2" 4 Ea Rp 300.000,00 Rp 1.200.000,00

* GLOBE VALVE DN 25, PN 40 1” 2 Ea Rp 7.200.000,00 Rp 14.400.000,00


BODY: SS 304
SEAT :SS 304
DISC: SS 304
BRAND: VNV
FLANGE TO FLANGE = 170 MM, TEMP 100 C
* BOLT & NUT, SS 304 M12x65 8 Ea Rp 40.000,00 Rp 320.000,00
* SWG PN 16 , SS 304 1" 4 Ea Rp 100.000,00 Rp 400.000,00
* FLANGE WELDING NECK PN 40 , SS 304 1" 4 Ea Rp 800.000,00 Rp 3.200,000,00
* PIPA SEAMLES, SCH 40, SS 304 V 2 BTG Rp 4,000.000,00 Rp 8,000.000,00
* ELBOW90, SEAMLESS SS 304 , SCH 40 1* 8 Ea Rp 200.000,00 Rp 1.600.000,00
* TEE SEAMLES , SCH 40, SS 304 V 1 Ea Rp 500.000,00 Rp 500.000,00
* REPAINTING MARINE COATING, WARNA SIGNAL GREEN 1 LOT Rp 1.000.000,00 Rp 1.000.000,00
RAL 6032

10) Valve Cióse Cooling Tank


* GATE VALVE DN 25 PN 16 1* 1 Ea Rp 4.200.000,00 Rp 4.200.000,00
BODY: SS 304
SEAT: SS 304, DISC: SS 304
FLANGE TO FLANGE = 150 MM, TEMP 100 C
BRAND: VNV
* BOLT & NUT , SS 304 M12x60 8 Ea Rp 40.000,00 Rp 320.000,00
* SWG, SS 304 1" 2 Ea Rp 100.000,00 Rp 200.000,00
‘ FLANGE WELDING NECK PN 16, SS 304 1* 2 Ea Rp 400.000,00 Rp 800.000,00
* REPAINTING MARINE COATING, WARNA SIGNAL GREEN RAL 6032 1 LOT Rp 300.000,00 Rp 300.000,00

11) Man Power jasa :


- Supervisor, 1 Orang 15 Hari Rp 475.000,00 Rp 7.125.000,00
- Quaüty Control, 1 Orang 15 Han Rp 400.000,00 Rp 6.000.000,00
-Teknisi, 1 Orang 15 Hari Rp 400.000,00 Rp 6.000.000,00
- Wetder, 2 Orang 30 Hari Rp 400.000,00 Rp 12.000.000,00
- H elper , 8 O ra n g 90 Lot Rp 250.000,00 Rp 22.500.000,00
- Safety Advisor, 1 Orang 15 Lot Rp 350.000,00 Rp 5.250.000,00
12) Materia! Consumable { Kawat Las, Mata Gerinda, Cutting & Grinding, 1 Lot Rp 9.000.000,00 Rp 9.000.000,00
Spotcheck, Majun , Dll)

13) Peralatan K3 1 Lot Rp 4.500.000,00 Rp 4.500.000,00

14) Mob-Demob ( Tools) 1 Lot Rp 13.500.000,00 Rp 13.500.000,00

15) Mob-Demob ( Man Power) 1 Lot Rp 18.000.000,00 Rp 18.000.000,00

16) Transportas! & Akomodasi Lokal


- Pengínapan 1 Lot Rp 2.800.000,00 Rp 2.800.000,00
- Sewa kendaraan 1 Lot Rp 5.500.000,00 Rp 5.500.000,00
- Konsumsi 1 Lot Rp 14.000.000,00 Rp 14.000.000,00

17) Test PCR/Swab Antigen


- Test PCR Keberangkatan 6 ORG Rp 300.000,00 Rp 1.800.000,00
- Test SWAB Antigen Masuk Ke Unit 12 ORG Rp 80.000,00 Rp 960.000,00
- Test PCR Pulang 6 ORG Rp 300.000,00 Rp 1.800.000,00

Subtotal Rp 469.645.000,00
In Number # Lima Ratus Enam Belas Juta Enam Ratus Sembilan Ribu Lima Ratus Rupiah #
Discount (%) Rp
Total Rp 469.645.000,00
Term & Condition: Taxes(%) Rp 10,00 Rp 46.964.500,00
1. Harga Granel Total sudah termasuk PPN 10°/ Grand Total Rp 516.609.500,00
2. Franco: Ketapang
3. Pembayaran : 30 hari setelah penerimaan Invoice & Faktur Hormat Kami
4. Delivery : 30 hari Jakarta, 05fclaret 2022
5. Garansi 6 Bulan
6. Brand: VNV
\ \

P h ilip T o m y H ( D ir e c to r)
HP : 0 8 11 1 0 1 8 8 7 1
S ALE S Q U O T A T IO N

TANGGAL :04 Mar 22


f 'T .W V K T A M A T E K M K M AM O H U
DUE DATE : 18 Mar 22
O H»c* G«mSv n q LTC U U G B io k B-7 N o 8 41 H « y«m W u iu k N o 100
Telp 021 84331786, F»« : 021 54331102 NO. QUOTATION : 013/SQWTM/III/2022
W a re h o u s e P e rg u d a n g a n G re co S e ü a y u B r/p a rk Blofc 0 -1 2 No. 82
J a k a rta B u ra t
ÑAMA CUTOMER:
PT PLN ( Persero ) PLTU KETAPANG
A LA M A T:
JL. HAYAM WURUK PESA SUKANAMGUN DALAM KEC. DELTA PAWAN KAB. KETAPANG 78813__________________________________
No. | Ñama Barang/Jasa | Unit | Qty | Price | Total
Permintaan Pengadaan Jasa Additional Scope ME Repair Valve Area Turbin Unit 1 PLTU Ketapang
Vaive Line Drain iniet Outlet Condensor
- Globe Valve DN 32 , Class 150, PN 16, Flange to Flange 178 4 Rp 7.540.000 Rp 30.160.000
Ea
mm, PCD 100 mm, Jurnlah Baut 4 M16 Panjang 60 mm, Temp. +
100° C, Material SUS 304

1) - Bolt & Nut, SS 304 Ea 32 Rp 65.000,00 Rp 2.080.000


- SWG DN 32 Ea 8 Rp 150.150,00 Rp 1.201.200
- Flange Une DN 32, SS 304 Ea 8 Rp 623.000,00 Rp 4.984.000
- Pipa SS 304, Uk.1,1/4 Ineh, Sch.40,1 Batang = 6 meter BTG 1 Rp 5.980.000,00 Rp 5.980.000
- Elbow 90°, SS 304, Uk.1,1/4 Inch, Sch.40 Ea 4 Rp 325.000,00 Rp 1.300.000
- Repainting Marine Coating, Wama Blue RAL 0129 LOT 1 Rp 1.300.000,00 Rp 1.300.000
Valve Line Venting Condensor
- Globe Valve DN 25, Class 150, PN 16, Flange to Flange 155 Rp 13.624.000
Ea 2 Rp 6.812.000
mm, PCD 80 mm, Jurnlah Baut4 M12 Panjang 60 mm, Temp. +
100° C, Material SS 304
- Bolt & Nut, SS 304 Ea 16 Rp 58.500,00 Rp 936.000
2) - SWG DN 25 Ea 4 Rp 134.550,00 Rp 538.200
- Flange Line DN 25, SS 304 Ea 4 Rp 533.000,00 Rp 2.132.000
- Pipa SS 304, Uk.1 Inch, Sch.401 Batang - 6meter BTG 3 Rp 5.200.000,00 Rp 15.600.000
- Elbow 90°, SS 304, Uk.1,1/4 Inch, Sch.40 Ea 4 Rp 299.000,00 Rp 1.196.000
- Elbow 90°, SS 304, Uk.1 Inch, Sch.40 LOT 1 Rp 650.000,00 Rp 650.000
- SEWA SCAFOLDING LOT 1 Rp 3.900.000,00 Rp 3.900.000
Penggantian Manual Valve Exhaust Turbine
-Globe Valve DN 65, Class 600, PN 100,Flange To Flange 440 Ea 2 Rp 7.800.000 Rp 15.600.000
mm, Jurnlah Baut 8, Temp. ± 425° C, Material A105
3) - Bolt & Nut Ea 32 Rp 58.500,00 Rp 1.872.000
- SWG DN 65 Ea 4 Rp 520.000,00 Rp 2.080.000
- Flange Line DN 65 Ea 4 Rp 1.300.000,00 Rp 5.200.000
- Insulation {Glasswoo , Píate Aluminium, Screw) LOT 1 Rp 1.300.000,00 Rp 1.300.000
Manual Valve Drain Steam Turbine
- Globe Valve DN 40 , Class 600, PN 100,Flange To Flange 490 Ea 2 Rp 3.250.000 Rp 6.500.000
mm, Jurnlah Baut 8, Temp. + 425° C, Material A105
4) - Bolt & Nut Ea 32 Rp 39.000,00 Rp 1.248.000
- SWG DN 40 Ea 4 Rp 167.700,00 Rp 670.800
- Flange Line DN 40 Ea 4 Rp 520.000,00 Rp 2.080.000
- Insulation (Glasswoo , Píate Aluminium, Screw) LOT 1 Rp 1.300.000,00 Rp 1.300.000
Manual Valve Drain Equalization

- Globe Valve DN 25, Class 150, PN 16,Flange To Flange 190 Ea 1 Rp 2.340.000 Rp 2.340.000
mm, Jurnlah Baut 4, Temp. ± 425° C, Material A105
5) - Bolt & Nut Ea 8 Rp 26.000,00 Rp 208.000
-SWG DN 25 Ea 2 Rp 134.550,00 Rp 269.100
- Flange Line DN 25 Ea 2 Rp 325.000,00 Rp 650.000
- Insulation (Glasswoo , Píate Aluminium, Screw) LOT 1 Rp 650.000,00 Rp 650.000
Manual Valve Drain Híotwell
- Globe Valve DN 25, Class 150, PN 16,Flange To Flange 160 Ea 1 Rp 2.340.000 Rp 2.340.000
mm, Jurnlah Baut 4, Temp. ±425° C, Material A105
6) - Bolt & Nut Ea 8 Rp 26.000,00 Rp 208.000
- SWG DN 25 Ea 2 Rp 134.550,00 RP 269.100
- Flange Line DN 25 Ea 2 Rp 325.000,00 Rp 650.000
- Insulation (Glasswool, Píate Aluminium, Screw) LOT 1 Rp 650.000,00 Rp 650.000
Valve & MOV Glose Cooling
- Globe Valve DN 65, Class 150, PN 16,Flange To Flange 190 Ea 3 Rp 16.250.000 Rp 48.750.000
mm, Temp. + 100° C, Material SS 304
- Globe Valve DN 65 , Class 150, PN 16,Flange To Flange 190
mm, Temp. ± 100° C, Material SS 304
- MOV, Electric regulating valve, Model ZDLP-40P, Nominal
Ea 1 Rp 76.271.000,00 Rp 76.271.000
7) diameter 25 mm, Nominal pressure 4.0 Mpa, Temperatur < 100
°C, Voltage 220V/50 Hz, Input signal 4-20 mA or 1-5 V*DC,
Output signal 4-20 mA'DC, IP55, Material SS 304
- Bolt & Nut Ea 48 Rp 65.000,00 Rp 3.120.000
- SWG DN 40 Ea 6 Rp 269.100,00 Rp 1.614.600
- Flange Line DN 40 Ea 6 Rp 1.885.000,00 Rp 11.310.000
- Insulation (Glasswool, Píate Aluminium, Screw) LOT 1 Rp 1.300.000,00 Rp 1.300.000
Valve Drain Kolam Cooling Tower
- Butterfly ND150, Class 150, PN 16,Flange To Flange 110 mm, Ea 2 Rp 15,470.000 Rp 30.940.000
Jumlah Baut 8 M20, Temp. ± 100° C, Material SS 304
- Bolt & Nut, SS 304 Ea 32 Rp 104.000,00 Rp 3.328.000
-SWG DN 150 Ea 4 Rp 780.000,00 Rp 3.120.000
-Flange Line DN 150, SS 304 Ea 4 Rp 3.380.000,00 Rp 13.520.000
8) - Repainting Marine Coating, Warna Blue RAL 0129 LOT 1 Rp 1.300.000,00 Rp 1.300.000
- Butterfly ND 100, Class 150, PN 16,Flange To Flange 40 mm,
Ea 2 Rp 23.712.000
Jumlah Baut 8 M20, Temp. + 100° C, Material SS 304 Rp 11.856.000,00
- Bolt & Nut, SS 304 Ea 32 Rp 104.000,00 Rp 3.328.000
-SWG DN 100 Ea 4 Rp 585.000,00 Rp 2.340.000
-Flange Line DN 100, SS 304 Ea 4 Rp 2.600.000,00 Rp 10.400.000
- Repainting Marine Coating, Warna Blue RAL 0129 LOT 1 Rp 1.300.000,00 Rp 1.300.000
Valve MakeUPS Une WEP

Ea 1 Rp 12.740.000 Rp 12.740.000
- Globe Valve DN 50, PN 40, Flange to Flange 230 mm, Jumlah
Baut4 M16 Panjang 65 mm, Temp. < 100 °C, Material SS 304
- Bolt & Nut, SS 304 Ea 8 Rp 104.000,00 Rp 832.000
-SWG DN 50 Ea 2 Rp 183.300,00 Rp 366.600
- Flange Line DN 50, SS 304 Ea 2 Rp 1.768.000,00 Rp 3.536.000
- Pipa SS 304, Uk.2 Inch, Sch.40,1 Batang = 6meter BTG 3 Rp 7.540.000,00 Rp 22.620.000
- Elbow 90°, SS 304, Uk.2 Inch, Sch.40 Ea 4 Rp 455.000,00 Rp 1.820.000
9)

- Globe Valve DN 25, PN 40, Flange to Flange 170 mm, Jumlah Ea 2 Rp 9.659.000,00 Rp 19.318.000
Baut 4 M14 Panjang 60 mm, Temp. < 100 °C, Material SS 304
- Pipa SS 304, Uk.1 Inch, Sch.40,1 Batang = 6meter BTG 2 Rp 5.200.000,00 Rp 10.400.000
- Elbow 90°, SS 304, Uk.1 Inch, Sch.40 Ea 8 Rp 299.000,00 Rp 2.392.000
- Bolt & Nut, SS 304 Ea 8 Rp 65.000,00 Rp 520.000
-SWG DN 100 Ea 4 Rp 134.550,00 Rp 538.200
-Flange Line DN 100, SS 304 Ea 4 Rp 1.092.000,00 Rp 4.368.000
- Repainting Marine Coating, Warna Signal Green RAL 6032 LOT 1 Rp 1.300.000,00 Rp 1.300.000
Valve Cióse Cooling Tank
- Gate Valve DN 25, Class 150, PN 16,Flange To Flange 150 Ea 1 Rp 5.707.000 Rp 5.707.000
mm, Temp. ± 100° C, Material SS 304
10) - Bolt & Nut, SS 304 Ea 8 Rp 58.500,00 Rp 468.000
- SWG DN 25 Ea 2 Rp 134.550,00 Rp 269.100
- Flange Line DN 25, SS 304 Ea 2 Rp 533.000,00 Rp 1.066.000
- Repainting Marine Coating, Warna Signal Green RAL 6032 Ea 1 Rp 650.000,00 Rp 650.000
JASA BONGKAR & PASANG VALVE :
* TRANSPORTASI & AKOMODASI
- KONSUMSI LOT 1 Rp 18.000.000 Rp 18.000.000
U)
-TRANSPORTASI LOKAL LOT 1 Rp 8.000.000 Rp 8.000.000
- PENGINAPAN LOT 1 Rp 5.000.000 Rp 5.000.000
* PERALATAN K3
12)
- PERALATAN K3 LOT 1 Rp 7.500.000 Rp 7.500.000
* PCR & ANTIGEN
- PCR DATANG ORG 6 Rp 350.000 Rp 2.100.000
13)
- PCR PULANG ORG 12 Rp 350.000 Rp 4.200.000
- ANTIGEN MASUK KE PLTU ORG 6 Rp 100.000 Rp 600.000
* MANPOWER
- SUPERVISOR HARI 15 Rp 635.000 Rp 9.525.000
- LEADER HARI 15 Rp 535.000 Rp 8.025.000
14) - TEKNISI HARI 15 Rp 535.000 Rp 8.025.000
- WELDER HARI 30 Rp 535.000 Rp 16.050.000
- HELPER HARI 90 Rp 335.000 Rp 30.150.000
- Safety advisor HARI 15 Rp 490.000 Rp 7.350.000
*CONSUMABLE
15)
- CONSUMABLE ( GRINDING, KAWAT LAS, DLL) LOT 1 Rp 19.500.000 Rp 19.500.000
*MOB - DEMOB
16) - MOB-DEMOB TOOI.S LOT 1 Rp 18.000.000 Rp 18.000.000
17) - MOB-DEMOB MANPOWER LOT 1 Rp 20.000.000 Rp 20.000.000

Syarat & Ketentuan : DPP Rp 638.255.900


1. Harga Grand Total Termasuk RPN 10% PPN Rp 63.825.590
2. Sudah Termasuk Pengiriman GRANDTOTAL Rp 702.081.490
3. Pembayaran : 30 Hari Setelah Tukar Faktur
4. Pengiriman : 8 Minggu Setelah Menerima PO

Hormat Kami,

R o b e rt N .G
HP: 0821-1497-7222
FTTSHPnnOOEOfnHDHH---------------
GENERAL CONTRACTOR, MECHA NICA L , ELECTRICAL

Riiko Taman Modera, Jl. Palem Raya No. 05, Rt. 01/Rw. 06, Kel. Ujung Menteng, Kec. Cakung - Jakarta Timur

_________________Tdp. 021-22132907, Hp. 085282750311. Fmaü : saUoiuk.uxl^^maH.com______________________


PENAWARAN HARGA
Ñam a Pelanggan : PT. PJB SE RVIC ES No. Penawaran : 188/PH /SDISP/III/2022
Alam at : JL. Raya Bandara Juanda No. 17, Sem am bung , Sidoarjo , Kab. Sidoarjo, T a n g g a l: 07 M aret 2022
Jawa Tim ur 61253
No. Telphone : (+ 6231 )85 4 8391
SYARAT& KETENTUAN PENAWARAN HARGA
1. Harga sudah term asuk Biaya Pengiñm an Ke Site PLTU Ketapang 4. Harga TO TAL Sudah term asuk PPN 10%
2. Harga sudah Term asuk Jasa Pem asangan 5. Pengirim an Barang 8 M inggu Setelah T erim a PO /SPK
3. Harga Sudah Term asuk Biaya A la t & Consum able 6. Lam a Pengerjaan 15 hari Setelah terim a Perintah Kerja
Jenis Pekerj : PERMINTAAN PENGADAAN JASA ADDITIONAL SCOPE ME REPAIR VALVE AREA TURBIN ÜNIT 1 PLTU KETAPANG

No U raían Jum lah Satuan Harga Satuan Sub Total

1 Va Ive L in e D ra in In le t O utlei: C o n d e n s o r

- Giobe V alve DN 32 , C lass 150, PN 16, Flange to Flange 178 mm, PC D 100
4 Ea Rp 10.416.000 Rp 41.664.000
mm, Jum lah B a u t4 M16 Panjang 60 mm, Tem p. ± 100° C, M aterial SUS 304

- Bolt & Nut, SS 304 32 Ea Rp 74.400 Rp 2.380.800

- SW G DN 32 8 Ea Rp 186.000 Rp 1.488.000

- Flange Line DN 32, SS 304 8 Lot Rp 892.800 Rp 7.142.400

- Pipa SS 304, Uk.1,1/4 Inch, S c h .4 0 ,1 Batang = 6 meter 1 Batang Rp 8.556.000 Rp 8.556.000

- Elbow 90*, S S 3 0 4 , U k.1,1/4 Inch, Sch.40 4 Ea Rp 465.000 Rp 1.860.000

- Repaínting M arine Coating, W a m a Biue RAL 0129 1 Lot Rp 1.488.000 Rp 1,488.000

2 V a lve L in e V e n tin g C o n d e n s o r Rp -

- Gate V alve DN 25 , C lass 150, PN 16, Flange to Flange 155 m m, PCD 80 mm,
2 Ea Rp 9.486.000 Rp 18.972.000
Jum lah B a u t4 M 12 Panjang 60 mm, Temp. ± 100° C, M aterial SS 304

- Bolt 8, Nut, SS 304 16 Ea Rp 74.400 Rp 1.190.400

- SW G DN 25 4 Ea Rp 186.000 Rp 744.000

- Flange Line DN 25, SS 304 4 Ea Rp 744.000 Rp 2.976.000

- Pipa SS 304, Uk.1 Inch, Sch.40 1 Batang = 6m eter 3 Batang Rp 7.440.000 Rp 22.320.000

- Elbow 90°, SS 304, Uk.1 Inch, Sch.40 4 Ea Rp 409.200 Rp 1.636.800

- Repainting M arine Coating, W a m a Blue RAL 0129 1 Lot Rp 744.000 Rp 744,000

- Scaffolding 1 Lot Rp 4.650.000 Rp 4.650.000

3 Manual Valve Exhaust Turbine Rp -


- G iobe V a lve DN 65 , C lass 600, PN 100,Flange To Flange 440 m m, Jumlah
2 Ea Rp 10.881.000 Rp 21.762.000
Baut 8, Tem p. ± 425° C, M aterial A105
- Bolt & Nut 32 Ea Rp 74.400 Rp 2.380.800
- SW G DN 65 4 Ea Rp 744,000 Rp 2.976.000

- Flange Line DN 65 4 Ea Rp 1.860.000 Rp 7.440.000

- Insulation (G lasswool, Píate Aluminium, Screw) 1 Lot Rp 1.488.000 Rp 1.488,000

4 Manual Valve Drain Steam Turbíne Rp -


- Giobe V alve DN 40 , C lass 600, PN 100,Flange To Flange 490 m m, Jumlah
Baut 8, Tem p. ± 425° C, M aterial A105
2 Ea Rp 4.650.000 Rp 9.300.000

- Bolt & Nut 32 Ea RP 55.800 Rp 1.785.600


- SW G DN 40 4 Ea Rp 223.200 Rp 892.800

- Flange Line DN 40 4 Ea Rp 744.000 Rp 2.976.000

- Insulation (G lasswool, Píate Alum inium , Screw ) 1 Lot Rp 1.488.000 Rp 1.488.000

5 Manual Valve Drain Equalization Rp -

- Giobe V a lve DN 25 , C lass 150, PN 16,Flange To Flange 190 mm, Jum lah Baut
1 Ea Rp 2.976.000 Rp 2.976.000
4, Tem p. + 425° C, M aterial A105

- Bolt & Nut 8 Ea Rp 37.200 Rp 297.600


- SW G DN 25 2 Ea Rp 186.000 Rp 372.000
- Flange Line DN 25 2 Ea Rp 223,200 Rp 446.400

- Insulation (Glasswool, Píate Alurninium , Screw ) 1 Lot Rp 744.000 Rp 744.000

6 Manual Valve Drain Hotweli Rp -


- G iobe V a lve DN 25 , C lass 150, PN 16,Flange To Flange 160 mm, Jum lah Baut
1 Ea Rp 2.976.000 Rp 2.976.000
4, Temp. ± 425° C, M aterial A105

- Bolt & Nut 8 Ea Rp 37.200 Rp 297.600

- SW G DN 25 2 Ea Rp 186.000 Rp 372.000
- Flange Line DN 25 2 Ea Rp 223.200 Rp 446.400

- Insulation (Glasswool, Píate Alum lm um, Screw) 1 Lot Rp 744.000 Rp 744.000

7 Valve & MOV Cióse Cooling Rp -


- Globe V alve DN 65 , C lass 150, PN 16,Flange T o Flange 190 m m, Tem p. ±
3 Ea Rp 23.064.000 Rp 69.192.000
100° C, M aterial SS 304

- G lobe Valve DN 65 , C lass 150, PN 16,Flange T o Flange 190 mm, Tem p. ±


1 0 0 ° C, Material S S 3 04
- MOV, Electric regulating valve, Model ZDLP-40P, Nominal diam eter 25 mm, 1 Set Rp 107.880.000 Rp 107.880.000
Nominal pressure 4.0 M pa, Tem peratur < 1 0 0 °C, Voltage 220V/50 Hz, Input
signal 4-20 m A o r 1-5 V*D C, Output signal 4-20 mA*DC, IP55, M aterial SS 304

- Bolt & Nut, SS 304 48 Ea Rp 74.400 Rp 3.571.200

- SW G DN 65 6 Ea Rp 316.200 Rp 1.897.200

- Flange Line DN 65, SS 304 6 Ea Rp 2.418.000 Rp 14.508.000

- Repainting M arine Signal Green Ral 6032 1 Lot Rp 1.860.000 Rp i . 860.000

8 Valve Drain Kolam Cooling Tower Rp -

- Butterfly DN 150 , Class 150, PN 16,Flange To Flange 110 m m, Jum lah Baut 8
2 Ea Rp 21.762.000 Rp 43.524.000
M20, Tem p. ± 100° C, M aterial SS 304

- Bolt & Nut, SS 304 32 Ea Rp 130.200 Rp 4.166.400

- SW G DN 150 4 Ea Rp 1.023.000 Rp 4.092.000

- Flange Line DN 150, SS 304 4 Ea Rp 4.650.000 Rp 18.600.000

- Repainting M arine Coating, VVama Blue RAL 0129 1 Lot Rp 1.488.000 Rp 1.488.000
- Butterfly DN 100 , C lass 150, PN 16,Flange To Flange 40 mm, Jum lah Baut 8
2 Ea Rp 16.368.000 Rp 32.736.000
M20, Tem p. ± 100° C, M aterial SS 304

- Bolt & Nut, SS 304 32 Ea Rp 130.200 Rp 4.166.400

-S W G DN 100 4 Ea Rp 837.000 Rp 3.348.000

- Flange Line DN 100, SS 304 4 Ea Rp 3.348.000 Rp 13.392.000

- Repainting M arine Coating, W a m a Blue RAL 0129 1 Lot Rp 1.488.000 Rp 1.488.000

9 Valve Make UP & Line WEP Rp -


- G lobe V alve DN 50, PN 40, Flange to Flange 230 m m, Jum lah Baut 4 M 16
1 Ea Rp 17.949.000 Rp 17.949.000
Panjang 65 m m, Temp. < 1 0 0 °C, M aterial SS 304

- Pipa SS 304, Uk.2 Inch, Sch.40, 1 Batang = 6m eter 3 Batang Rp 10.788.000 Rp 32.364.000

- E lbow 90*, SS 304, Uk.2 Inch, Sch-40 4 Ea Rp 5 5 8 .0 0 0 R.p 2.232.000

- Flange Line DN 50, SS 304 2 Ea Rp 2.418.000 Rp 4.836.000

- SW G DN 50 2 Ea Rp 260.400 Rp 520.800

- Bolt & N u t, SS 304 8 Ea Rp 130.200 Rp 1.041.600

- Globe V alve DN 25, PN 40, Flange to Flange 170 m m, Jum lah Baut 4 M14
2 Ea Rp 13.392.000 Rp 26.784.000
Panjang 60 m m, Tem p. < 100 °C, M aterial SS 304

- Pipa SS 304, Uk.1 Inch, Sch.40, 1 Batang = 6m eter 2 Batang Rp 7.440.000 Rp 14.880.000

- Elbow 90‘ , SS 304, Uk-1 Inch, Sch.40 8 Ea Rp 372.000 Rp 2.976.000

- Flange Line DN 25, SS 304 4 Ea Rp 1.488.000 Rp 5.952.000

-T e e , Uk.1 Inch, SS 304 1 Ea Rp 930.000 Rp 930.000

- SW G DN 25 4 Ea Rp 186.000 Rp 744.000

- Bolt & Nut, SS 304 8 Ea Rp 74.400 Rp 595.200

- Repainting M arine Coating, W arna Signa! Green RAL 6032 1 Lot Rp 1.860.000 Rp 1.860.000

10 Valve Cióse Cooling Tank Rp -

- Gate V a lve DN 25 , C lass 150, PN 16,Flange T o Flange 150 m m, Tem p. ± 100°


1 Ea Rp 7.812.000 Rp 7.812.000
C, M aterial SS 304

- Bolt & N u t , SS 304 8 Ea Rp 74.400 Rp 595.200

- SW G DN 25 2 Ea Rp 186.000 Rp 372.000

- Flange Line DN 25, SS 304 2 Ea Rp 744.000 Rp 1.488.000

- Repainting M arine Coating, W am a Signal Green RAL 6032 1 Lot Rp 558.000 Rp 558.000

11 Man Power Jasa : Rp -


- Supervisor, 1 orang 15 M andays Rp 883.500 Rp 13.252.500

- Q uality control, 1 orang 15 M andays Rp 744.000 Rp 11.160.000

- Teknisi, 1 orang 15 M andays Rp 744.000 Rp 11.160.000

- W e ld e r, 2 o ra n g 30 M andays Rp 7 4 4 .0 0 0 Rp 2 2 .3 2 0 .0 0 0

- Helper, 6 orang 90 M andays Rp 465.000 Rp 41.850.000

- Safety advisor, 1 orang 15 Mandays Rp 651.000 Rp 9.765.000

Material Consumabie (Kawat Las, mata gerinda cutting & grinding, spotcheck,
12 1 Lot Rp 16.740.000 Rp 16.740.000
majun, dll)
13 Peratatan K3 1 Lot Rp 8.370.000 Rp 8.370.000

14 Mob-Demob (Tools) 1 Lot Rp 25.110.000 Rp 25.110.000

15 Mob-Demob (Man Power) 1 Lot Rp 33.480.000 Rp 33.480.000

16 Transportasi & Ákomodasí L ok ai: Rp -

- Penginapan 1 Lot Rp 5.208.000 Rp 5.208.000

- Sewa Kendaraan 1 Lot Rp 10.230.000 Rp 10.230.000

- Konsumsi 1 Lot Rp 26.040.000 Rp 26.040.000

17 Test PCR/Swab Antigen : Rp -

- Test PC R Keberangkatan 6 Orang Rp 558.000 Rp 3.348.000

- Test Antigen Masuk U nit 12 Orang Rp 148.800 Rp 1.785.600

- Test PCR Pulang 6 Orang Rp 558.000 Rp 3.348.000


JUMLAH Rp 873.539.700
Horm at K a m i, PPN 10% Rp 87.353.970
PT. S A P IT DOLOR IN D A H TOTAL BIAYA -R E _ 960.893.670

( Deni Simarmata )
Sales & Operation Manager
HP : 085282750311
SISTEM MANAJEMEN UB JASA O&M PLTU KETAPANG No. Dokumen : FM -KP-4.1.7.08
TanggalTerbit : 8 Februari 2022
-RIB
DRAFT TERM OF REFERENCE (TOR)
Revisi : 00
JASA REPAIR VALVE AREA TURBIN UNIT 1
U B JO M PLTU KETAPANG Halaman :1 dari 12
PLTU KETAPANG

JASA REPAIR VAL VE AREA TURBIN UNIT 1 PLTU KETAPANG

I. Maksud & Tujuam

Mean Inspection (ME) unit 1 PLTU Ketapang merupakan pemeliharaan periodik overhaul yang
dilaksanakan untuk mengembalikan performa peralatan pembangkit dan menunjang keandalan
operasional unit 1 PLTU Ketapang. Salah satu peralatan critical di unit 1 yang harus tetap dijaga
performa operasinya adalah Valve. Valve merupakan salah satu peralatan penting di PLTU Ketapang
yang berfungsi sebagai peralatan yang mengatur, mengarahkan atau mengontrol aliran dari suatu cairan
atau fluida (air, uap, udara dll) dengan cara membuka, menutup atau menutup sebagian dari jalan
alirannya. Saat ini kondisi beberapa valve existing di area turbin unit 1 PLTU Ketapang susah untuk
dimanuver (open/close) & terjadi leakstrough sehingga mengganggu performa operasional turbin serta
kehandalan unit 1 PLTU Ketapang jika tidak segera ditindaklanjuti. Untuk itu demi menunjang dan
mendukung performa valve di area turbin unit 1 PLTU Ketapang tetap terjaga, aman dan handal, maka
dibutuhkan pekerjaan “Pengadaan Jasa Repair Valve Area Turbin Unit 1 PLTU Ketapang”.

II. Data Spesifikasi Pekerjaan


Berikut data spesifikasi pekerjaan “Pengadaan Jasa Repair Valve Area Turbin Unit 1 PLTU
Ketapang”:

No. Nama Peralatan Spesifikasi Gambar

- Globe Valve DN 32, Class 150, PN


16, Flange to Flange 178 mm, PCD
100 mm, Jumlah Baut 4 M16 Panjang
60 mm, Temp. ± 100° C, Material SUS | B . H k '. Bar m
lg f' *
304 (4 Ea)
- Bolt & Nut, SS 304(32 Ea)
- SWG DN 32 (8 Ea)
- Flange Line DN 32, SS 304 (8 Ea)
- Pipa SS 304, Uk.1,1/4 Inch, Sch.40,
1. Globe Valve Line Drain 1 Batang = 6meter (1 Batang)
Inlet Outlet Condensor - Elbow 90°, SS 304, Uk.1,1/4 Inch,
Sch.40 (4 Ea)
- Bongkar, Pasang, NDT & Cleaning (1
Lot)
- Repainting Marine Coating, Warna
Blue RAL 0129 (1 Lot)
SISTEM MANAJEMEN UB JASA O&M PLTU KETAPANG No. Dokumen : FM-KP-4.1.7.08
DRAFT TERM OF REFERENCE (TOR) TanggalTerbit : 8 Februari 2022
~frJD JASA REPAIR VALVE AREA TURBIN UNIT 1 Revisi : 00

UBJO M PLTU KETAPANG Halaman : 2 dari 12


PLTU KETAPANG

- Globe Vaive DN 25, Class 150, PN


16, Flange to Flange 155 mm, PCD 80
mm, Jumlah Baut 4 M12 Panjang 60
mm, Temp. ± 100° C, Material SS 304
(2 Ea)
- Bolt & Nut, SS 304 (16 Ea)
- SWG DN 25 (4 Ea)
- Flange Line DN 25, SS 304 (4 Ea)
2 Globe Vaive Line Venting
- Pipa SS 304, U k.l Inch, Sch.40,1
Condensor
Batang = 6meter (3 Batang)
- Elbow 90°, SS 304, U k.l Inch, Sch.40
(4 Ea)
- Bongkar, Pasang, NDT & Cleaning (1
Lot)
- Repainting Marine Coating, Warna
Blue RAL0129 (1 Lot)
Scaffolding (1 Lot)

- Globe Vaive DN 65 , Class 300, PN


40,Flange To Flange 440 mm,Jumlah
Baut 8, Temp. ± 425° C, Material
A105 (2 Ea)
Globe Vaive Exhaust
- Bolt & Nut (32 Ea)
Turbine
- SWG DN 65 (4 Ea)
- Flange Line DN 65, (4 Ea)
- Insulation (Glasswool, Plate
Aluminium, Screw) (1 Lot)

- Globe Vaive DN 40, Class 600, PN


100,Flange To Flange 490 mm,
Jumlah Baut 8, Temp. ± 425° C,
Material A105 (2 Ea)
- Bolt & Nut (32 Ea)
Globe Vaive Drain Steam
- SWG DN 40 (4 Ea)
Turbine
- Flange Line DN 40 (4 Ea)
- Bongkar, Pasang, NDT &. Cleaning (1
Lot)
- Insulation (Glasswool, Plate
Aluminium, Screw) (1 Lot)
- Globe Vaive DN 25, Class 150, PN
16,Flange To Flange 190 mm, Jumlah
Baut 4, Temp. ± 425° C, Material
A105 (1 Ea)
- Bolt & Nut (8 Ea)
Globe Vaive Drain
- SWG DN 25 (2 Ea)
Equalization
- Flange Line DN 25 (2 Ea)
- Bongkar, Pasang, NDT 8t Cleaning (1
Lot)
- Insulation (Glasswool, Plate
Aluminium, Screw) (1 Lot)
wwmk. SISTEM MANAJEMEN UB JASA O&M PLTU KETAPANG No. Dokumen : FM-KP-4.1.7.08
*p 2S2 DRAFT TERM OF REFERENCE (TOR) TanggalTerbit
Revisi
: 8 Februari 2022
: 00
JASA REPAIR VALVE AREA TURBIN UNIT 1
UBJOM PLTU KETAPANG Halaman : 3 dari 12
PLTU KETAPANG

- Globe Valve DN 25, Class 150, PN


16,Flange To Flange 160 mm, Jumlah
Baut 4, Temp. ± 425° C, Material
A105 (1 Ea)
- Bolt & Nut (8 Ea)
Globe Valve Drain
- SWG DN 25 (2 Ea)
Hotwell
- Flange Line DN 25 (2 Ea)
- Bongkar, Pasang, NDT & Cleaning (1
Lot)
- Insulation (Glasswool, Plate
Aluminium, Screw) (1 Lot)
- Globe Valve DN 65, Class 150, PN
16,Flange To Flange 190 mm, Temp.
± 100° C, Material SS 304 (3 Ea)
- Globe Valve DN 65 , Class 150, PN
16,Flange To Flange 190 mm, Temp.
± 100° C, Material SS 304 & MOV,
Electric regulating valve, Model
ZDLP-40P, Nominal diameter 25 mm,
Nominal pressure 4.0 Mpa,
Globe Valve & MOV Temperatur < 100 °C, Voltage
Close Cooling 220V/50 Hz, input Signal 4-20 mA or
1-5 V*DC, Output Signal 4-20
mA*DC, IP55, Material SS 304 (1 Set)
- Bolt & Nut (48 Ea)
- SWG DN 65 (6 Ea)
- Flange Line DN 65 (6 Ea)
- Bongkar, Pasang, NDT & Cleaning (1
Lot)
- Repainting Marine Signal Green Rai
6032 (1 Lot)
- Butterfly ND 150, Class 150, PN
16,Flange To Flange 110 mm, Jumlah
Baut 8 M20, Temp. ± 100° C,
Material SS 304 (2 Ea)
- Bolt & Nut, SS 304 (32 Ea)
- SWG DN 150 (4 Ea)
- Flange Line DN 150, SS 304 (4 Ea)
- Bongkar, Pasang, NDT & Cleaning (1
Lot)
Butterfly Valve Drain - Repainting Marine Coating, Warna
Kolam Cooling Tower Blue RAL 0129(1 Lot)
- Butterfly DN 100 , Class 150, PN
16,Flange To Flange 40 mm, Jumlah
Baut 8 M20, Temp. ± 100° C,
Material SS 304 (2 Ea)
- Bolt & Nut, SS 304 (32 Ea)
- SWG DN 100 (4 Ea)
- Flange Line DN 100, SS 304 (4 Ea)
- Bongkar, Pasang, NDT 8t Cleaning (1
Lot)
SISTEIVI MANAJEMEN UB JASA O&M PLTU KETAPANG No. Dokumen : FM -KP-4.1.7.08

«KID
- D

UBJOM
U DRAFT TERM OF REFERENCE (TOR)
3ASA REPAIR VALVE AREA TURBIN UNIT 1
PLTU KETAPANG
TanggalTerbit
Revisi

Halaman
: 8 Februari 2022
: 00

: 4 dari 12
PLTU K ETA PA N G

- Repainting Marine Coating, Warna


Blue RAL 0129(1 Lot)
- Globe Valve DN 50, PN 40, Flange
to Flange 230 mm, Jumlah Baut 4
M16 Panjang 65 mm, Temp. < 100
°C, Material SS 304 (1 Ea)
- Pipa SS 304, Uk.2 Inch, Sch.40,1
Batang = 6meter (3 Batang)
- Elbow 90°, SS 304, Uk.2 Inch, Sch.40
(4 Ea)
- Bolt & Nut, SS 304 (8 Ea)
- SWG DN 50 (2 Ea)
- Flange Line DN 50, SS 304 (2 Ea)
- Globe Valve DN 25, PN 40, Flange
to Flange 170 mm, Jumlah Baut 4
9. Globe Valve Make UP &
M14 Panjang 60 mm, Temp. < 100
Line WEP
°C, Material SS 304 (2 Ea)
- Pipa SS 304, U k.l Inch, Sch.40,1
Batang = 6meter (2 Batang)
- Elbow 90°, SS 304, U k.l Inch, Sch.40 mm 1
(8 Ea)
-Tee, U k.l Inch, SS 304 (1 Ea)
- Bolt & Nut, SS 304 (16 Ea)
- SWG DN 25 (4 Ea)
- Flange Line DN 25, SS 304 (4 Ea)
- Bongkar, Pasang, NDT & Cleaning (1
Lot) BF
- Repainting Marine Coating, Warna
Signal Green RAL 6032 (1 Lot)
- Gate Valve DN 25 , Class 150, PN
16,Flange To Flange 150 mm, Temp.
B ak Vit
± 100° C, Material SS 304 (1 Ea)
- Bolt 8t Nut, SS 304 (8 Ea)
- SWG DN 25 (2 Ea)
10. Gate Vaive Close Cooling
- Flange Line DN 25, SS 304 (2 Ea)
Tank
- Bongkar, Pasang, NDT 8t Cleaning (1
Lot)
- Repainting Marine Coating, Warna
Signal Green RAL 6032 (1 Lot)

- Supervisor, 1 orang (15 mandays)


- Quality control, 1 orang (15 mandays)
- Teknisi, 1 orang (15 mandays)
- Welder, 2 orang (30 mandays)
- Helper, 6 orang (90 mandays)
11. Jasa Penggantian Valve - - Safety advisor, 1 orang (15 mandays)
Valve Area Turbin Unit 1 - Material Consumable (Kawat Las, mata gerinda cutting 8t grinding,
spotcheck, majun, dll) (1 Lot)
- Peralatan K3 (1 Lot)
- Mob-Demob (Tools) (1 Lot)
- Mob-Demob (Man Power) (1 Lot)
- Transportasi 8t Akomodasi Lokal (1 Lot)
SISTEIVI MANAJEMEN UB JASA O&M PLTU KETAPANG No.Dokumen : FM-KP-4.1.7.08
DRAFT TERM OF REFERENCE (TOR) TanggalTerbit : 8 Februari 2022
JASA REPAIR VALVE AREA TURBIN UNIT 1 Revisi : 00

UBJOM PLTU KETAPANG Halaman : 5 dari 12


PLTU KETAPANG
..... ...... ................... .............................-- ------- , --------...---

- Test PCR/Swab Antigen (1 Lot)

in. Lingkup Pekerjaan


Lingkup detail pekerjaan “Pengadaan Jasa Repair Valve Area Turbin Unit 1 PLTU
Ketapang” meliputi:

3.1, Lingkup Detail Pekerjaan


1. Pelaksana pekerjaan sudah berpengalaman melakukan pekerjaan jasa repair valve PLTU
minimal 1 (satu) pekerjaan serupa pada 1 (satu) perusahaan dibuktikan dengan
menunjukkan copy SPK/PO atau BA list pekerjaan tersebut.
2. Pelaksana pekerjaan merupakan perusahaan yang mempunyai pengalaman penyedia
material pendukung untuk pekerjaan repair valve PLTU minimal 1 (satu) pekerjaan serupa
pada 1 (satu) perusahaan dibuktikan dengan menunjukkan copy SPK/PO atau BA list
pekerjaan tersebut.
3. Pelaksana pekerjaan memiliki tenaga kerja yang kompeten meliputi Supervisor (1 orang),
Quality control (1 orang), Teknisi (1 orang), Welder (2 orang), Safety advisor (1 orang) dan
Helper (6 orang) yang dibuktikan dengan copy sertifrkat atau surat pengalaman kerja yang
dimiliki (welder bersertifikasi & ahli NDT).
4. Pelaksana pekerjaan memiliki tools yang memadai (kondisi baik & layak pakai) untuk
mendukung pekerjaan jasa repair valve area turbin PLTU unit 1.
5. Pelaksana pekerjaan bekerja sesuai dengan kaidah K3.
6. Lingkup pelaksana pekerjaan yaitu pengadaan jasa repair valve area turbin PLTU unit 1
dimulai semenjak diterbitkannya SPMK (Surat Perintah Mulai Kerja).
1. Mobilisasi barang dan jasa merupakan tanggung jawab pelaksana pekerjaan.
8. Pelaksana pekerjaan bertanggung jawab melakukan performance test atas pekerjaan yang
telah dilakukan.
9. Pelaksana pekerjaan wajib menyediakan WBS dan prosedur kerja sebelum pekerjaan
dimulai.
10. Pelaksana pekerjaan wajib menyediakan APD (safety helmet, safety shoes, wearpack,
masker, sarung tangan) secara mandiri.
11. Pelaksana pekerjaan wajib berkoordinasi dengan subdit Rendal Har untuk pengurusan
WO/Job Card pekerjaan, subdit K3 untuk pengurusan dokumen Safety Permit dan
Working Permit serta Permit To Work (PTW) ke subdit operasi sebelum melakukan
pekerjaan.
SISTEM MANAJEMEN UB JASA O&M PLTU KETAPANG No. Dokumen FM -KP-4.1.7.08
DRAFT TERM OF REFERENCE (TOR) TanggalTerbit 8 Februari 2022
JASA REPAIR VALVE AREA TURBIN UNIT 1 Revisi 00
- r o ß
UBJO M PLTU KETAPANG Halaman : 6 dari 12
F LTU K ETA PA N G

12. Pelaksana pekeijaan wajib berkoordinasi dengan subdit Lingkungan dan bertanggung
jawab melakukan penanganan terhadap semua limbah yang dihasilkan selama proses
pekerjaan termasuk proses pembuangan/pengeluaran limbah tersebut dari area PLTU
Ketapang.
13. Pelaksana pekerjaan harus membuat laporan harian dan dokumentasi pekeijaan setiap
hari selama pekerjaan masih berlangsung.
14. Pelaksana pekeijaan wajib melakukan pembersihan area keija setelah pekerjaan
dinyatakan telah selesai.

3.2 Klasifikasi Minimum Pelaksana Pekerjaan


1. Pelaksana pekerjaan sudah berpengalaman melakukan pekeijaan jasa repair valve PLTU
minimal 1 (satu) pekerjaan serupa pada 1 (satu) perusahaan dibuktikan dengan
menunjukkan copy SPK/PO atau BA list pekeijaan tersebut.
2. Pelaksana pekeijaan merupakan perusahaan yang mempunyai pengalaman penyedia
material pendukung untuk pekerjaan repair valve PLTU minimal 1 (satu) pekerjaan serupa
pada 1 (satu) perusahaan dibuktikan dengan menunjukkan copy SPK/PO atau BA list
pekerjaan tersebut.
3. Pelaksana pekeijaan memiliki tenaga kerja yang kompeten meliputi Supervisor (1 orang),
Quality control (1 orang), Teknisi (1 orang), Welder (2 orang), Safety advisor (1 orang) dan
Helper (6 orang) yang dibuktikan dengan copy sertifikat atau surat pengalaman keija yang
dimiliki (welder bersertifikasi & ahli NDT).
4. Pelaksana pekerjaan memiliki tools yang memadai (kondisi baik & layak pakai) untuk
mendukung pekeijaan jasa repair valve area turbin PLTU unit 1.
5. Pelaksana pekerjaan bekerja sesuai dengan kaidah K3.
6. Mempunyai jam terbang yang banyak (ditunjukkan dengan Copy SPK/PO atau BA).
7. Semua pekerjaan dilaksanakan setelah mendapatkan SPK/PO, SPMK, WO/Job card,
working permit ,safety permit, dan permit to work (PTW) dari PT. PJB UBJOM PLTU
Ketapang.
8. Semua pekerjaan, berikut tool yang diperlukan selama proses pekeijaan menjadi
tanggung jawab pelaksana pekerjaan.
9. Pekerjaan jasa repair valve area turbin PLTU Unit 1 harus disaksikan oleh direksi
pekerjaan dan atau wakil dari PT.PJB UBJOM PLTU Ketapang, selanjutnya apabila telah
diterima / memenuhi syarat akan dibuatkan Berita Acaranya Pemeriksaan Pekeijaan.
SISTEM MANAJEMEN UB JASA O&M PLTU KETAPANG No.Dokumen : FM-KP-4.1.7.08

*PJÖUBJO M
.
DRAFT TERM OF REFERENCE (TOR)
IASA REPAIR VALVE AREA TURBIN UNIT 1
PLTU KETAPANG
TanggalTerbit
Revisi

Halaman
: 8 Februari 2022
: 00

. 7 dari 12
PLTU KETAPANG

10. Laporan hasil pekerjaan ditandatangani tim pemeriksa kualitas pekerjaan dari PT. PJB
UBJOM PLTU Ketapang dan pelaksana pekerjaan sebagai dasar penerbitan Berita Acara
Penyelesaian Pekeijaan.

3.3 Tahap Persiapan Pekerjaan


1. Pelaksana pekeijaan wajib melakukan survei lokasi ke site sebelum melaksanakan
pekerjaan (witness untuk verifikasi dimensi valve area turbin PLTU unit 1).
2. Penyediaan barang dan jasa pekerjaan harus sesuai dengan ketentuan dalam TOR ini.
3. Pelakasana pekeijaan wajib menyampaikan metode pekerjaan yang digunakan.
4. Pelaksana pekerjaan bekerja berdasarkan approval drawing, data teknik dan prosedur yang
telah ditentukan.
5. Mobilisasi material/barang, tools dan man power menjadi tanggung jawab pelaksana
pekerjaan.
6. Pemeriksaan kesesuaian pekeijaan dilakukan bersama oleh pelaksana pekeijaan dan
direksi pekerjaan PT. PJB UBJOM PLTU Ketapang.
7. Pelaksana pekerjaan wajib menyediakan peralatan keselamatan keija yang memadai
sesuai dengan jenis pekerjaan yang dilakukan serta ketentuan K3 yang berlaku.
8. Pelaksana pekerjaan wajib menyediakan dokumen :
• Data man power/personil, hasil tes PCR/Antigen, fotocopy KTP/SIM, Asuransi
Ketenagakerj aan/B PJ S
• List material/barang dan tools yang digunakan
• SPK/PO, SPMK, WO/Job card, safety permit, working permit, JSA, PTW (permit
to work)

3.4 Tahap Pelaksanaan Pekerjaan


1. Melakukan pekerjaan pengadaan jasa repair valve area turbin PLTU Unit 1 sesuai dimensi
dan spesifikasi teknik yang sudah di verifikasi.
2. Melakukan pekerjaan pembongkaran valve existing area turbin PLTU unit 1.
3. Melakukan pekerjaan pemasangan valve area turbin PLTU unit 1 yang baru.
4. Melakukan Uji NDT pada flange maupun line pipe valve area turbin PLTU Unit 1 yang
sudah di las.
5. Melakukan pemasangan isolasi pada valve area turbin PLTU Unit 1 dengan menggunakan
glass wool, kawat & plate aluminium, dan screw.
SISTEM MANAJEMEN UB JASA O&M PLTU KETAPANG No. Dokumen : FM -KP-4.1.7.08

*PJBUBJO M
DRAFT TERM OF REFERENCE (TOR)
JASA REPAIR VALVE AREA TURBIN UNIT 1
PLTU KETAPANG
TanggalTerbit
Revisi

Halaman
: 8 Februari 2022
: 00

: 8 dari 12
PLTU KETAPANG

6. Membuat report progress & hasil serta dokumentasi pekerjaan jasa repair valve area turbin
PLTUUnitl.
7. Melakukan pembersihan area pekeijaan.
8. Melakukan pengelolaan limbah bekas pekeijaan.

3.5 Prosedur Pengujian Kualitas Hasil Pekerjaan


1. Pengujian kualitas hasil pekerjaan harus sesuai dengan prosedur SOP/IK
2. Hasil pekerjaan jasa repair valve area turbin PLTU Unit 1 tidak mengalami kebocoran
(Leakstrough & Leakout) saat peralatan beroperasi.
3. Hasil pekerjaan jasa repair valve area turbin PLTU Unit 1 tidak mengalami crack dan cacat
fisik pada material.
4. Hasil uji NDT pada pekerjaan jasa repair valve area turbin PLTU Unit 1 tidak ditemukan
crack dan kondisi baik.
5. Melakukan pemasangan isolasi pada valve sudah sesuai standart dan disetujui oleh direksi
pekerjaan sesuai dengan point 3.4 no 5.
6. Menyampaikan report hasil pekerjaan yang telah dilakukan.
7. Tidak melakukan kegiatan yang melanggar peraturan yang berlaku di lingkungan PLTU
Ketapang.
8. Tidak ada sampah (berbagai macam jenis sampah) di area pelaksanaan pekerjaan.
9. Jika saat pengujian kualitas hasil pekerjaan ditemukan ketidaksesuaian atau masih abnormal
maka hasil pekeijaaan dinyatakan tidak diterima/ditolak.

IV. Prosedur Keselamatan dan Kesehatan Kerja (K3)


1. Semua pelaksanaan pekerjaan harus memenuhi aspek dan norma K3 sesuai regulasi
Depnaker dan Undang-Undang Keselamatan Kerja No.l Tahun 1970 yang berlaku di
Indonesia serta aturan / kebijakan K3 dan 5S di PT. PJB UBJOM PLTU KETAPANG.
2. Sebelum melakukan pekeijaan, penanggung jawab pelaksana pekeijaan harus meminta ijin
ke petugas safety/K3 PT.PJB UBJOM PLTU Ketapang untuk diadakan safety induction.
3. Sebelum melakukan pekerjaan, pihak pelaksana pekerjaan wajib menunjukkan ke
perwakilan PT. PJB UBJOM PLTU Ketapang daftar APD yang digunakan (Safety shoes,
safety helmet, wearpack, sarung tangan), daftar alat/tool yang digunakan, asuransi
ketenagakeijaan dan daftar tenaga kerja.
4. Pelaksana pekerjaan harus menjaga ketertiban / keamanan selama pekeijaan dilaksanakan
sehingga lingkungan sekitamya selalu tertib / aman.
SISTEM MANAJEMEN UB JASA O&M PLTU KETAPANG No. Dokumen : FM -KP-4.1.7.08

*PJBU B JO M
DRAFT TERM OF REFERENCE (TOR)
IASA REPA1R VALVE AREA TURBIN UNIT 1
PLTU KETAPANG
TanggalTerbit
Revisi

Halaman
: 8 Februari 2022
: 00

: 9 dari 12
PLTU KETAPANG

5. Mengingat pekerjaan dilaksanakan didaerah instalasi PLTU, maka Pelaksana pekerjaan


harus memperhatikan petunjuk-petunjuk tentang keselamatan kerja dan menyediakan
peralatan keselamatan kerja yang memadai lingkup pekerjaannya.
6. Pelaksana pekerjaan wajib mendaftarkan karyawannya yang melaksanakan pekeijaan diarea
PLTU ke bagian K3 . Karyawan yang tidak terdaftar tidak diijinkan melaksanakan
pekerjaan diarea PT. PJB UBJOM PLTU KETAPANG. Bila terjadi perubahan nama
karyawaan, maka harus dilaporkan terlebih dahulu.
7. Pihak pelaksana pekerjaan wajib mematuhi semua peraturan yang berkaitan masalah
keselamatan kerja dan lingkungan hidup yang telah ditentukan oleh PT. PJB UBJOM PLTU
Ketapang
8. Pihak pelaksana pekerjaan wajib bertanggung jawab atas adanya kecelakaan kerja saat
melakukan pekerjaan.
9. Setiap pekeijaan yang menggunakan api, bahan kimia berbahaya dan area confined space
harus dalam pengawasan petugas safety/K3 PT. PJB UBJOM PLTU Ketapang.
10. Pelaksana pekerjaan wajib mematuhi protokol kesehatan COVID -19 yang berlaku di unit
PLTU Ketapang (sebelum memasuki area PLTU, saat berada di dalam area PLTU dan
setelah keluar dari area PLTU).

V. Kebutuhan Material dan Jasa

No Material & Jasa PJB Pihak ke-3


1. Material & Jasa - V
2. Tools - V
3. APD - V
4. Consumable - V
5. Power supply V -

1. Pemakaian material/peralatan yang berada di lokasi unit kerja harus atas ijin/ sepengetahuan
direksi pekerjaan yang ditunjuk oleh PT. PJB UBJOM PLTU Ketapang atau sesuai dengan
kesepakatan didalam kontrak.
2. Material dan peralatan kerja disimpan pada tempat khusus dilokasi yang telah ditentukan
oleh PT. PJB UBJOM PLTU Ketapang.
3. Segala bentuk kehilangan dan kerusakan material/peralatan menjadi tanggung jawab penuh
pihak pelaksana pekerjaan.
4. Setiap kegiatan mobilisasi barang di lokasi unit, maka pihak pelaksana wajib memenuhi
persyaratan administrasi yang telah ditentukan oleh PT. PJB UBJOM PLTU Ketapang.
S1STEM MANAJEMEN UB JASA O&M PLTU KETAPANG No.Dokumen : FM -KP-4.1.7.08

*R)B
DRAFT TERM OF REFERENCE (TOR) TanggalTerbit : 8 Februari 2022
JASA REPA1R VALVE AREA TURJBIN UNIT 1 Revisi : 00
UBJOM PLTU KETAPANG Halaman : 10 dari 12
PLTU KETAPANG

VI. Quality Acceptance


1. Seluruh penyediaan barang/jasa sesuai yang tercantum dal am TOR ini.
2. Semua performance desain harus terpenuhi.
3. Pelaksanaan pengujian quality sepenuhnya menjadi tanggungjawab pelaksana pekerjaan
4. Keputusan atas kualitas hasil pekerjaan yaitu accept/rework dilakukan oleh Quality Control
PT.PJB UBJOM PLTU Ketapang
5. Peralatan, material dan benda asing (sampah) sebagai akibat pelaksanaan pekerjaan sudah
tidak ada di area pelaksanaan pekerjaan PT.PJB UBJOM PLTU Ketapang.
6. Laporan hasil pekerjaan sudah diterima dan disetujui PT.PJB UBJOM PLTU Ketapang.

VII. Laporan Hasil Pekerjaan


1. Laporan hasil pekerjaan dinyatakan selesai dan diterima apabila telah disepakati bersama
antara pelaksana pekerjaan dan pemberi pekerjaan yang tercantum dalam Berita Acara yang
dilengkapi oleh dokumen hasil pekerjaan yang dilakukan.
2. Berita Acara Penyelesaian Pekerjaan (BAPP) akan diterbitkan oleh pemberi pekerjaan
(PT.PJB UBJOM PLTU Ketapang) jika semua persyaratan di SPK sudah terpenuhi.

VIII. Waktu Penyelesaian Pekerjaan


Jadwal pelaksanaan dan penyelesaian pekerjaan pengadaan material selama 30 hari
kalender & jasa selama 15 hari kalender yang dimulai sejak terbitnya dokumen PO/SPK dan
SPMK (Surat Perintah Mulai Kerjd). hingga pekerjaan dinyatakan diterima di Unit PLTU
Ketapang.

IX. Garansi Pekerjaan


1. Jaminan performance (hasil pekerjaan) dan peralatan selama 12 (dua belas) bulan terhitung
setelah terbitnya BAPP.
2. Pekerjaan dinyatakan diterima dengan diterbitkannya Berita Acara Penyelesaian Pekerjaan
(BAPP).
3. Semua biaya yang ditimbulkan selama masa garansi ditanggung oleh pihak pelaksana.

X. Persyaratan Umum

a. Safety ; Pelaksana pekerjaan harus mematuhi peraturan Kesehatan dan Keselamatan Kerja
(K3) yang berlaku dilingkungan PT. PJB UBJOM PLTU Ketapang dan menyediakan
peralatan keselamatan kerja yang memadai lingkup pekerjaannya. Pelaksana pekerjaan wajib
SISTEM MANAJEMEN UB JASA O&M PLTU KETAPANG No.Dokumen : FM-KP-4.1.7.08

«rciD
UBJOM
DRAFT TERM OF REFERENCE (TOR)
JASA REPAIR VALVE AREA TURBIN UNIT 1
PLTU KETAPANG
TanggalTerbit
Revisi

Halaman
: 8 Februari 2022
: 00

: 11 dari 12
PLTU KETAPANG

mendaftarkan karyawannya yang melaksanakan pekeijaan di area PLTU ke bagian K3.


Karyawan yang tidak terdaftar tidak diijinkan melaksanakan pekeijaan di area PLTU
Ketapang.
b. Keamanan ; Pelaksana pekerjaan harus menjaga ketertiban/keamanan selama pekeijaan
dilaksanakan sehingga lingkungan sekitamya selalu tertib/aman.
c. Peralatan Kerja ; Pelaksanaan pekerjaan ini diselenggarakan secara lengkap termasuk
mendatangkan peralatan keija yang diperlukan, menyediakan tenaga kerja berikut
pengawasannya, dan hal-hal yang dianggap perlu lainnya (misalnya: lampu, kabel, rolkabel,
dll). Pekerjaan harus diselesaikan dengan lengkap, sempuma dan sesuai dengan permintaan
direksi pekerjaan, termasuk perbaikan-perbaikan yang timbul akibat pelaksanaan pada
lingkungan pekerjaan, termasuk pembersihan lingkungan kerja.

d. Resiko ; Pelaksana pekeijaan dianggap telah mempertimbangkan semua resiko yang


mungkin terjadi akibat letak daerah pekeijaan, asuransi bila terjadi kecelakaan kerja dan
memperhitungkan termasuk kerusakan peralatan kerja.
e. Lain Lain ; Apabila terdapat ketidaksesuaian pada saat pelaksanaan pekerjaan ini, maka
TOR akan ditinjau dan diperbaiki kembali sebagaimana mestinya.
S IS T E M M A N A J E M E N U B J A S A O & M P L T U K E T A P A N G No. Dokumen : FM-KP-4.1.7.08
&D D
Z5 D R A F T T E R M O F R E F E R E N C E (T O R ) TanggalTerbit : 8 Februari 2022
K ID JASA REPAIR VALVE AREA TURBIN UNIT 1 Revisi : 00

UBJO M PLTU KETAPANG Halaman : 12 dari 12


PLTU KETAPANG

LEMBAR PENGESAHAN
TERM OF REFERENCE

”JASA REPAIR VALVE AREA TURBIN UNIT 1 PLTU KETAPANG”

Ketapang, 04 Maret 2022

Disusun oleh:
Staff Perencanaan &
Pengendalian Pemeliharaan Outage

Diperiksa oleh,

SPV Perencanaan Dan SPV Pemeliharaan SPV Pemeliharaan


Pengendalian Pemeliharaan Instrument & Control Mekanik

Marsosen Rikky R.H. Alpianus Apin

Disetujui oleh,

Deputi Manager Pemeliharaan

Anggrita Candravanto

Anda mungkin juga menyukai