Anda di halaman 1dari 13

PLTU LONTAR EXTENSION

PT PLN (Persero)
Unit Induk Pembangunan Jawa Bagian Barat
UPP PJBB 1
SUMMARY ISSUE

NO ITEM
1 LOKASI
2 DATA PROYEK
3 GENERAL SPESIFICATION
4 BOILER
5 TURBINE
6 GENERATOR
7 COAL HANDLING
LOKASI
1

PLTU 3 Banten Lontar (3 x 315 MW) terletak di daerah pesisir utara yang
menghadap laut Jawa, sekitar 80 km dari Jakarta ke arah barat. Dioperasikan oleh
PT Indonesia Power . Secara administratif, proyek ini terletak di Desa Lontar dan
karang anyar, Kecamatan Kemiri, Kabupaten Tangerang, dan Banten.
DATA PROYEK
2

Desa Lontar, Kecamatan Kemiri, Kabupaten Tangerang-Provinsi


Lokasi :
Banten
No. & Tanggal Kontrak : 207.PJ/121/DIR/2007 Tanggal 7 Agustus 2007

Consortium of:
Nama Kontraktor :
DEC - DE (Dongfang Electric Corporation & PT Dalle Energy)

USD 535,263,626
Nilai Kontrak (tidak termasuk PPn) :
IDR 1,8901,321,27,000
• Unit 1 - 28 Desember 2011
Commercial Operation Date : • Unit 2 - 29 Februari 2012
• Unit 3 - 10 April 2012
GENERAL SPESIFICATION
3

Kapasitas
3 x 315 MW
Pembangkit
Turbine Dong Fang Turbine Co., Ltd
Generator Dongfang
Boiler Dong Fang Boiler Group Co., Ltd
Max. Speed
3000 rpm
Turbine
Spek batubara Low rank coal
Tipe batubara Pulverized coal
Asal batubara Kalimantan dan/ atau Sumatera
Kebutuhan
± 4,273,390 ton/tahun
Batubara
Angkutan
Barge kelas 12.000 DWT atau Vessel 35.000 DWT
Batubara
Dermaga tipe Open “L” kedalaman -13m LWS, dengan Ship
Pelabuhan
Unloader 2 x 1600 t/h, dan Breakwater tipe Harbour
± 22 km ke GI Teluk Naga
Transmisi ± 22 km ke GI Tangerang Baru
Kapasitas 150 kV (SUTT)
BOILER& AUXILIARY
4
Model : DG 1025/17.4 – II 13
Manufacture
: Dong Fang Boiler Group Co., Ltd
r / Designer
BMCR Operating
: Max Continuous evaporation BRL Operating Condition
Condition
Superheated : Rated evaporation 1025 t/h 976.2 t/h
Steam
: Outlet pressure 17.5 Mpa 17.32 Mpa
: Outlet temperature 541 °C 541 °C
Reheated : Flow 839.4 t/h 802 t/h
: Inlet/outlet pressure 3.76 / 3.58 t/h 3.59 /3.41 t/h
: Inlet/outlet temperature 329/’541 °C 324/’541 °C
Steam : Flue gas temperature 131 °C 131 °C
: Feed water temperature 281 °C 178 °C
: Drum pressure 18.77 Mpa 18.58 Mpa
Desain effeciency 93.26 % 93.71 %
BOILER& AUXILIARY
4
TURBINE
5

Model : N 315-16.7/538/538-8 (HP&IP combined casing)


Manufacturer : Dongfang Turbine Co., Ltd
Subcritical, single reheating, condensing turbine with two
Type :
casings and double exhaust-hoods
Rated Output : 315 MW
Initial Steam Pressure : 16.7 Mpa
Initial Steam Temperature : 538 °C
Exhaust Pressure : 5.8 Kpa
Clockwise, when looking from steam turbines to
Direction of rotor rotation :
generator
Steam Distribution method : Throttle governing, nozzle governing
Governing system : DEH
TURBINE
5
GENERATOR
6

Type : QFSN-300-2-20B
Manufacturer : Dongfang

Maximum continuous output : 316 MW (371.7 MVA)

Rated Voltage : 20 Ka
Rated Current : 10.732 kA
Rated Power Factor : Lag 0.85 lead 0.9
Rated Frequency : 50 Hz
Rated Speed : 3000 r/min
Number of Phases : 3
Stator winding connection : Y
Number of Terminal : 6
Insulation class : F (temp. limit in Bclass)
Rated Field voltage : 370 V
Cooling mode : H2O-H2-H2
Rated H2 pressure : 0.3 Mpa (g)
Excitation type : Static Thyristor excitation
GENERATOR
6
COAL HANDLING
7

Ship Unloader capacity : 2 x 2000 t/h


Stacker reclaimer capacity : 2 x 1250 t/h
TERIMA KASIH

Anda mungkin juga menyukai