Anda di halaman 1dari 19

FORM SITE SURVEY

PLTS ROOFTOP – ONGRID


AREA
......................................

NO. DOKUMEN……………………………….
PT. PERTAMINA NEW AND RENEWABLE ENERGY
-
PT SURYA ENERGI INDOTAMA
DAFTAR ISI

DAFTAR ISI.......................................................................................................................................... 1
1. CUSTOMER DETAILS ................................................................................................................. 2
2. TIM SURVEY ................................................................................................................................ 2
3. CEKLIST PERALATAN SURVEY .............................................................................................. 2
4. TUJUAN SURVEY ........................................................................................................................ 3
5. PELAKSANAAN SURVEY .......................................................................................................... 3
5.1. Perijinan Kerja......................................................................................................................... 3
5.2. Kondisi Atap ........................................................................................................................... 4
5.3. Detail Rooftop ......................................................................................................................... 4
5.4. Elektrikal ............................................................................................................................... 10
5.5. Watering Sistem .................................................................................................................... 15
5.6. Lokasi Penempatan Material/Gudang Sementara ................................................................. 16
5.7. Alternative Gedung Pemasangan PLTS ................................................................................ 17
6. LEMBAR TANDA TANGAN SITE SURVEY .......................................................................... 18

Page 1 of 19
FORM SURVEY PLTS ROOFTOP ONGRID
PT PERTAMINA NEW AND RENEWABLE ENERGY
-
PT SURYA ENERGI INDOTAMA

1. CUSTOMER DETAILS

1.1 User/Customer : _______________________________________


1.2 Nama Pekerjaan : _______________________________________
1.3 No. Kontrak : _______________________________________
1.4 Lokasi site
1.4.1 Alamat : _______________________________________
: _______________________________________
1.4.2 Koordinat : _______________________________________
1.5 Contact Person
1.5.1 Nama : _______________________________________
1.5.2 Phone : _______________________________________

2. TIM SURVEY
2.1. Pelaksana :
2.1.1. Pihak SEI : _______________________________________
2.1.2. Pihak User : _______________________________________
2.1.3. Pihak Building Owner : _______________________________________
2.2. Tanggal Survey : _______________________________________

3. CEKLIST PERALATAN SURVEY

❑ Roll meter/Meteran Gulung


❑ Laser Meter
❑ GPS
❑ Kompas
❑ Drone
❑ alat tulis
❑ Kamera
❑ ___________

2|Page
FORM SURVEY PLTS ROOFTOP ONGRID
PT PERTAMINA NEW AND RENEWABLE ENERGY
-
PT SURYA ENERGI INDOTAMA

4. TUJUAN SURVEY
4.1. Syarat Perijinan Kerja 4.7. Menentukan lokasi penempatan
4.2. Menentukan titik penempatan PV peralatan PLTS.
4.3. Mendapatkan detail/kurva beban 4.8. Menentukan jalur pipa air maintenance
4.4. Menentukan titik interkoneksi dan titik taping air.
4.5. Menentukan nilai dan titik grounding 4.9. Menentukan area penyimpanan
4.6. Menentukan jalur perkabelan material sementara.

5. PELAKSANAAN SURVEY
5.1. Perijinan Kerja
a. Persyaratan Izin Masuk/Kerja
No. Dokumen Persyaratan Keterangan
1
2
3
4
5

b. Jam Kerja : ………………..to…………………WIB/WIT/WITA


c. Lembur : Boleh / Tidak.…………..to…………WIB/WIT/WITA
d. Weekend Work : Boleh / Tidak…….……..to…………WIB/WIT/WITA
e. Izin Menggunakan Listrik: Tapping Internal Gedung / Tapping External Gedung
f. Lokasi Tapping Listrik :
Foto Lokasi Tapping Listrik

g. Izin Menggunakan Air : Tapping Internal Gedung / Tapping External Gedung

3|Page
FORM SURVEY PLTS ROOFTOP ONGRID
PT PERTAMINA NEW AND RENEWABLE ENERGY
-
PT SURYA ENERGI INDOTAMA

h. Lokasi Tapping Air :


Foto Lokasi Tapping Air

5.2. Kondisi Atap


a. Titik Kebocoran 2
: Ada (………………titik) / Tidak
Foto Kebocoran

b. Rencana Perbaikan Atap : Ada (Tanggal……………to………..……) / Tidak

5.3. Detail Rooftop


a. Type rooftop
1) Substruktur Informasi, jika clamp penetrasi atap
Reng a= mm
Kasau b= mm

❑ Genting

4|Page
FORM SURVEY PLTS ROOFTOP ONGRID

PT. SURYA ENERGI INDOTAMA

❑ Metal Roof

1) Pilihan Clamp untuk Atap Metal

Pilihan
Atap

Penetrasi (L-Feet) Non Penetrasi (Kliplock)

o Galvanum

2) Ukuran Dari Atap Metal Jenis Galvalum


Tinggi Profile a= mm
Jarak 2 Gundukan b = mm
Lebar Bukit Atas c= mm
Lebar Bukit Bawah d = mm
Nama Pabrikan
Tipe Metal Roof

o Kliplock

3) Ukuran Dari Atap Metal Jenis Kliplock


a= mm e = mm
b= mm f = mm
c= mm g = mm
d= mm h = mm
Nama Pabrikan
Tipe Kliplock

❑ Dak
❑ __________

5|Page
FORM SURVEY PLTS ROOFTOP ONGRID

PT. SURYA ENERGI INDOTAMA

Foto Detail Rooftop 1 Foto Detail Rooftop 2

b. Kemiringan atap : ________________________________


c. Orientation/Azimuth : ________________________________
❑ Utara (0o)
❑ Timur Laut (45o)
❑ Timur (90o)
❑ Tenggara (135o)
❑ Selatan (180o)
❑ Barat Daya (225o)
❑ Barat (270o)
❑ Barat Laut (315o)
Foto Kemiringan & Orientasi Rooftop 1 Foto Kemiringan & Orientasi Rooftop 2

6|Page
FORM SURVEY PLTS ROOFTOP ONGRID

PT. SURYA ENERGI INDOTAMA

d. Luas atap (approx..) 25 m x 7 m x 2 sisi


: ________________________________
e. Sketsa Gambar Gedung :
1) Tipe Genteng/Metal Roof
• A= cm
• B= cm
• C= cm
• D= cm
• E= cm

2) Tipe Dak
• A= cm
• B= cm
• C= cm
• D= cm

7|Page
FORM SURVEY PLTS ROOFTOP ONGRID

PT. SURYA ENERGI INDOTAMA

f. Layout (dilampirkan)
❑ Gambar bangunan existing (bila ada)
Foto Layout Luasan Atap 1

Foto Layout Luasan Atap 2

8|Page
FORM SURVEY PLTS ROOFTOP ONGRID

PT. SURYA ENERGI INDOTAMA

Foto Layout Ketinggian Atap 1 ( Tinggi atap sampai lantai 4,5 M )

Foto Layout Ketinggian Atap 2

9|Page
FORM SURVEY PLTS ROOFTOP ONGRID

PT. SURYA ENERGI INDOTAMA

5.4. Elektrikal
a. Beban (sesaat) : ______________________________kW
b. Data dari teknisi gedung :
❑ Beban (rata-rata weekday) : _________________________kW
❑ Beban (rata-rata weekend) : _________________________kW
c. Level tegangan 220
: _______________________________V
d. Jumlah Phasa 3 Phase
: ________________________________
e. kWh beban/bulan : _______________________ (bila ada)
f. Tagihan Listrik/bulan : _______________________ (bila ada)
g. Tarif/Golongan PLN Klass bisnis / B1
: ________________________________
h. Sistem Backup Genset : Ada / Tidak Ada
❑ Daya Genset 250 Kva / 200.000
: _____________________________kW
❑ Start Genset : Manual / ATS
i. Nilai Grounding Terpasang : _____________________________Ohm
j. Titik Lokasi Grounding (jika nilai Grounding Existing dibawah 5 Ohm):
Foto Titik Grounding 1 Foto Titik Grounding 2

❑ SLD system Existing (bila ada)


❑ Pemasangan Power Analyzer (bila diperlukan)

10 | P a g e
FORM SURVEY PLTS ROOFTOP ONGRID

PT. SURYA ENERGI INDOTAMA

Foto Daya KWH/PM Existing Foto Arus KWH/PM Existing

Foto Nameplate CB Incoming LVMDP Foto Setting CB Incoming LVMDP

Foto Busbar LVMDP Foto SLD System

k. Layout Jalur Kabel (digambarkan pada layout)


❑ Foto jalur kabel existing (tray/cable duct/ladder)
❑ Dapat gabung dengan jalur existing (Bisa / Tidak)

11 | P a g e
FORM SURVEY PLTS ROOFTOP ONGRID

PT. SURYA ENERGI INDOTAMA

Foto Layout Jalur Kabel 1

Foto Layout Layout Jalur Kabel 2

l. Space untuk penempatan Inverter


❑ Tersedia
❑ Tidak Tersedia
❑ Foto dilampirkan
12 | P a g e
FORM SURVEY PLTS ROOFTOP ONGRID

PT. SURYA ENERGI INDOTAMA

m. Space untuk penempatan Panel Distribusi


❑ Tersedia
❑ Tidak Tersedia
Foto Penempatan Inverter 1 Foto Penempatan Inverter 2

Foto Penempatan Panel Distribusi 1 Foto Penempatan Panel Distribusi 2

n. Jarak Inverter ke LVDB PLTS : __________________________


o. Jarak LVDB PLTS ke titik interkoneksi : __________________________
❑ Foto bagian luar Panel distribusi existing (titik interkoneksi)
❑ Foto bagian dalam Panel distribusi existing (titik interkoneksi)
13 | P a g e
FORM SURVEY PLTS ROOFTOP ONGRID

PT. SURYA ENERGI INDOTAMA

❑ Foto area panel distribusi existing (titik interkoneksi)


Foto Jarak Inverter to Panel Interkoneksi Foto Panel Interkoneksi

Foto CB Utama Panel Interkoneksi Foto Busbar Interkoneksi

14 | P a g e
FORM SURVEY PLTS ROOFTOP ONGRID

PT. SURYA ENERGI INDOTAMA

5.5. Watering Sistem


a. Tanki Air (Liter) : ________________________________
b. Terdapat Booster : ________________________________
c. Lokasi titik tapping air : ________________________________
Foto Tanki Air & Pompa Existing (Jika ada):

Foto Titik Taping Air & Lokasi pemasangan pompa Booster:

15 | P a g e
FORM SURVEY PLTS ROOFTOP ONGRID

PT. SURYA ENERGI INDOTAMA

5.6. Lokasi Penempatan Material/Gudang Sementara


a. Lokasi Penyimpanan Material Indoor :___________________________
Foto Penyimpanan Material Indoor (Inverter, Panel AC, Data Logger, Modem, Dll)

b. Penyimpanan Material Outdoor : __________________________


Foto Penyimpanan Material Outdoor (Mounting PV, PV Modul, Cable Tray, Dll)

16 | P a g e
FORM SURVEY PLTS ROOFTOP ONGRID

PT. SURYA ENERGI INDOTAMA

5.7. Alternative Gedung Pemasangan PLTS


a. Lokasi & layout Atap :___________________________
Foto Lokasi & layout Atap

b. Tipe Atap & Luasan Atap : __________________________


Foto Tipe Atap & Luasan Atap

17 | P a g e
FORM SURVEY PLTS ROOFTOP ONGRID

PT. SURYA ENERGI INDOTAMA

6. LEMBAR TANDA TANGAN SITE SURVEY

No Nama Perusahaan TTD

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

18 | P a g e

Anda mungkin juga menyukai