NO. DOKUMEN……………………………….
PT. PERTAMINA NEW AND RENEWABLE ENERGY
-
PT SURYA ENERGI INDOTAMA
DAFTAR ISI
DAFTAR ISI.......................................................................................................................................... 1
1. CUSTOMER DETAILS ................................................................................................................. 2
2. TIM SURVEY ................................................................................................................................ 2
3. CEKLIST PERALATAN SURVEY .............................................................................................. 2
4. TUJUAN SURVEY ........................................................................................................................ 3
5. PELAKSANAAN SURVEY .......................................................................................................... 3
5.1. Perijinan Kerja......................................................................................................................... 3
5.2. Kondisi Atap ........................................................................................................................... 4
5.3. Detail Rooftop ......................................................................................................................... 4
5.4. Elektrikal ............................................................................................................................... 10
5.5. Watering Sistem .................................................................................................................... 15
5.6. Lokasi Penempatan Material/Gudang Sementara ................................................................. 16
5.7. Alternative Gedung Pemasangan PLTS ................................................................................ 17
6. LEMBAR TANDA TANGAN SITE SURVEY .......................................................................... 18
Page 1 of 19
FORM SURVEY PLTS ROOFTOP ONGRID
PT PERTAMINA NEW AND RENEWABLE ENERGY
-
PT SURYA ENERGI INDOTAMA
1. CUSTOMER DETAILS
2. TIM SURVEY
2.1. Pelaksana :
2.1.1. Pihak SEI : _______________________________________
2.1.2. Pihak User : _______________________________________
2.1.3. Pihak Building Owner : _______________________________________
2.2. Tanggal Survey : _______________________________________
2|Page
FORM SURVEY PLTS ROOFTOP ONGRID
PT PERTAMINA NEW AND RENEWABLE ENERGY
-
PT SURYA ENERGI INDOTAMA
4. TUJUAN SURVEY
4.1. Syarat Perijinan Kerja 4.7. Menentukan lokasi penempatan
4.2. Menentukan titik penempatan PV peralatan PLTS.
4.3. Mendapatkan detail/kurva beban 4.8. Menentukan jalur pipa air maintenance
4.4. Menentukan titik interkoneksi dan titik taping air.
4.5. Menentukan nilai dan titik grounding 4.9. Menentukan area penyimpanan
4.6. Menentukan jalur perkabelan material sementara.
5. PELAKSANAAN SURVEY
5.1. Perijinan Kerja
a. Persyaratan Izin Masuk/Kerja
No. Dokumen Persyaratan Keterangan
1
2
3
4
5
3|Page
FORM SURVEY PLTS ROOFTOP ONGRID
PT PERTAMINA NEW AND RENEWABLE ENERGY
-
PT SURYA ENERGI INDOTAMA
❑ Genting
4|Page
FORM SURVEY PLTS ROOFTOP ONGRID
❑ Metal Roof
Pilihan
Atap
o Galvanum
o Kliplock
❑ Dak
❑ __________
5|Page
FORM SURVEY PLTS ROOFTOP ONGRID
6|Page
FORM SURVEY PLTS ROOFTOP ONGRID
2) Tipe Dak
• A= cm
• B= cm
• C= cm
• D= cm
7|Page
FORM SURVEY PLTS ROOFTOP ONGRID
f. Layout (dilampirkan)
❑ Gambar bangunan existing (bila ada)
Foto Layout Luasan Atap 1
8|Page
FORM SURVEY PLTS ROOFTOP ONGRID
9|Page
FORM SURVEY PLTS ROOFTOP ONGRID
5.4. Elektrikal
a. Beban (sesaat) : ______________________________kW
b. Data dari teknisi gedung :
❑ Beban (rata-rata weekday) : _________________________kW
❑ Beban (rata-rata weekend) : _________________________kW
c. Level tegangan 220
: _______________________________V
d. Jumlah Phasa 3 Phase
: ________________________________
e. kWh beban/bulan : _______________________ (bila ada)
f. Tagihan Listrik/bulan : _______________________ (bila ada)
g. Tarif/Golongan PLN Klass bisnis / B1
: ________________________________
h. Sistem Backup Genset : Ada / Tidak Ada
❑ Daya Genset 250 Kva / 200.000
: _____________________________kW
❑ Start Genset : Manual / ATS
i. Nilai Grounding Terpasang : _____________________________Ohm
j. Titik Lokasi Grounding (jika nilai Grounding Existing dibawah 5 Ohm):
Foto Titik Grounding 1 Foto Titik Grounding 2
10 | P a g e
FORM SURVEY PLTS ROOFTOP ONGRID
11 | P a g e
FORM SURVEY PLTS ROOFTOP ONGRID
14 | P a g e
FORM SURVEY PLTS ROOFTOP ONGRID
15 | P a g e
FORM SURVEY PLTS ROOFTOP ONGRID
16 | P a g e
FORM SURVEY PLTS ROOFTOP ONGRID
17 | P a g e
FORM SURVEY PLTS ROOFTOP ONGRID
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 | P a g e