Anda di halaman 1dari 15

Nomor : 019/TRS.01.

05/380300/2020 11 Maret 2020


Lampiran : 2 Set
Sifat : Segera
Perihal : Permohonan Pemberian Tegangan Kepada
SKTT 150kV Ciledug–Alam Sutera
Sirkit 2 Yth. Manager
PT PLN (Persero)
UPT Duri Kosambi
Jl.Raya Duri Kosambi No.1
Cengkareng – Jakarta Barat

Sehubungan dengan :

1. Surat dari PT PLN (Persero) Pusat Sertifikasi No. 0291/TRS.01.05/300000/2020


tanggal 05 Maret 2020 perihal Rekomendasi Laik Bertegangan dalam rangka
Pengujian Sistem SKTT 150 kV GIS Alam Sutera – GI Ciledug Sirkit II
2. Surat dari PT PLN (Persero) Pusat Sertifikasi No. 0527/TRS.01.05/300000/2020
tanggal 10 Maret 2020 perihal Rekomendasi Laik Bertegangan dalam rangka
Pengujian Sistem Satu Bay Line 150 kV arah Alam Sutera No.2.
3. Berita Acara tanggal 02 Maret 2020 perihal Test Insulation DC Test (Megger test)
SKTT 150 kV Ciledug – Alam Sutera Sirkit 2.
4. Berita Acara tanggal 06 Maret 2020 perihal Inspeksi Bay Line arah Alam Sutera 2 di
GI 150 kV Ciledug.

Dengan ini kami sampaikan permohonan pemberian tegangan pada tanggal 11 Maret 2020
untuk instalasi sebagai berikut :

 GI Ciledug Bay Line Arah Alam Sutera-2


 SKTT 150 kV GI Ciledug – GIS Alam Sutera Sirkit-2

Demikian disampaikan, atas perhatiannya diucapkan terimakasih.

Tembusan :

1. GM PLN UIP ISJ


2. PLN UP2B Jakarta - Banten
3. PLN PUSMANPRO UPMK 1
4. KSO AJG-Primordia SP.

Model No. 1001


Nomor : 0527/TRS.01.05/300000/2020 10 Maret 2020
Lampiran : 1 Set
Sifat : Segera
Hal : Rekomendasi Laik Bertegangan Kepada
dalam rangka Pengujian Sistem
PT PLN (Persero) UIP ISJ

u.p. Yth. GM

Sehubungan dengan telah selesainya pengujian individu dan pengujian fungsi


peralatan sesuai dengan Laporan Tim Inspeksi PT PLN (Persero) Pusat Sertifikasi
No. 002/FPA/91.4D02.020.60/III/2020 tanggal 10 Maret 2020 untuk instalasi GI
150 kV Ciledug dengan lingkup :

Satu Bay Line 150 kV arah Alam Sutera No. 2

Dinyatakan laik diberi tegangan selama 24 jam dan percobaan pembebanan,


sebagai salah satu mata uji dalam rangka penerbitan Sertifikat Laik Operasi (SLO).
 
Untuk keperluan pengujian tersebut mohon bantuan untuk disiapkan SOP (Standard
Operating Procedure) dan setelan relai proteksi yang disetujui oleh PT PLN
(Persero) Unit Induk Transmisi Jawa Bagian Barat.
 
Bila pengujian Bertegangan dan percobaan pembebanan telah dilakukan dan
pending items (jika ada) telah diselesaikan dengan baik, maka dapat diterbitkan
Sertifikat Laik Operasi (SLO).
 
Rekomendasi ini berlaku sampai dengan 7 (tujuh) hari kalender dan apabila tidak
dilakukan Energize maka perlu dilakukan uji fungsi ulang.
 
Demikian, atas perhatian dan kerjasamanya diucapkan terima kasih.

SENIOR MANAGER SISTEM TRANSMISI,


GARDU INDUK DAN DISTRIBUSI,

Tembusan: BAGUS HARYANTO

1. MUP II UPP RING ISJ 3 UPP RING ISJ 3

FAJAR PRANA/11 Maret 2020 07:16:21/ cetakan ke - 2


2. GM UIT JBB
3. MUP II UP2B DKI JAKARTA DAN BANTEN UP2B DKI JAKARTA & BANTEN
4. FAJAR PRANA PUSERTIF

FAJAR PRANA/11 Maret 2020 07:16:21/ cetakan ke - 2


PT. HEKSA ADITAMA
ELECTRICAL SUPPLY AND SERVICE COMMISSIONING REPORT

KSO PT. ALHAS JAYA GROUP DAN PT.


GI 150KV CILEDUG
PRIMORDIA SIPARUP PERKASA

STABILITY TEST LINE DIFFERENTIAL BAY : LINE ALAM SUTERA 2

1. GENERAL DATA : 2. NILAI SETTING :


Relay Manufacture ALSTOM Phase IS1 0.3 A
Type P54591B26M0760M Phase IS2 2 A
Serial No Phase K1 30%
Equipment OMICRON CMC 356 Phase K2 150%
CT Ratio (Lokal) 2000 / 1 A Phase Charact. DT
CT Ratio (Remote) 3200/5A Phase Time Delay 0 sec
VT Ratio 150kV/V3 :100V/V3 PIT Time 0.025 sec

2 CIRCUIT TEST
2000/1 A 3200/5A
GI 150kV GIS 150kV ALAM
CILEDUG SUTERA

TEMPORARY
SHORT

PRIMARY P545
INJECTOR
3 PHASE

3 STABILITY TEST
3.A STABLE
3.A.1 STABLE INJECT 50A
Measurement at relay
GI 150kV CILEDUG (LOKAL) GIS 150kV ALAM SUTERA (REMOTE)
I Diff (A) I Bias (A)
Current (A) Angle (deg) Current (A) Angle (deg)
47.83 A 0 o 43.95 A 178.1 o 0,0 45,89
R = R =
56.34 A 129.6 o 53.71 A -51.97 o 0,00 55.02
S = S =
50.04 A -108 o 43.95 A 70.44 o 0,0 47,00
T = T =
3.A.2 FINAL STABLE INJECT 50A
Measurement at relay
GI 150kV CILEDUG (LOKAL) GIS 150kV ALAM SUTERA (REMOTE)
I Diff (A) I Bias (A)
Current (A) Angle (deg) Current (A) Angle (deg)
49.64 A 0 o 43.95 A 178.8 o 0,0 46.79
R = R =
56.23 A 129.3 o 53.71 A -51.04 o 0,00 54.97
S = S =
48.99 A -108.6 o 48.83 A 70.46 o 0,0 48.91
T = T =
3.B UNSTABLE INJECT 50A
Measurement at relay
GI 150kV CILEDUG (LOKAL) GIS 150kV ALAM SUTERA (REMOTE)
I Diff (A) I Bias (A)
Current (A) Angle (deg) Current (A) Angle (deg)
52.8 A 0 o 48.83 A -1.012 o 101.6 50.81
R = R =
59.39 A 128.1 o 58.89 A 126.3 o 118,00 59.49
S = S =
51.81 A -112.9 o 48.83 A -112 o 100.6 49.27
T = T =
FIELD COMMISIONING TEST
GRID SOLUTIONS INDONESIA
GI 150KV CILEDUG – LINE ALAM PT. KS0 – PRIMORDIA GROUP
a GE and ALSTOM Joint Venture
SUTERA 2

HASIL PENGUJIAN SILIH JATUH (INTERTRIP)

Lokasi : GI 150KV CILEDUG ....................... Bay : LINE ALAM SUTERA 2


Data Teknis
Pabrik : ALSTOM ......................................
Tipe : P54591B26M0760M .................... Rasio CT : 2000/1 A .............................
Arus pengenal (In) : 1A ................................................ Kelas CT : ...........................................
No. seri : .....................................................

1. Pemeriksaan visual :
- Pelat nama : Ada, jelas dan lengkap / Tidak ada / Tidak jelas / Tidak lengkap
- Casing dan modul : Tidak cacat dan lengkap / Cacat / Tidak lengkap
- Pembumian casing : Terhubung dan tidak cacat / Tidak terhubung / Cacat
- Indikator : Ada dan lengkap / Tidak ada / Tidak lengkap

2. Pemeriksaan catu daya


- Polaritas : Sesuai / Tidak sesuai manual pabrikan
- Besaran tegangan : Sesuai / Tidak sesuai manual pabrikan

3. Pengujian
- Pemeriksaan Visual
- Pola pengamanan : PUTT
- Pemeriksaan Sinyal Kerja
- Pengiriman Sinyal Teleproteksi : Sinyal diterima / Sinyal tidak diterima
- Penerimaan Sinyal Teleproteksi : Sinyal diterima / Sinyal tidak diterima
- Pengujian Silih Jatuh

1
FIELD COMMISIONING TEST
GRID SOLUTIONS INDONESIA
GI 150KV CILEDUG – LINE ALAM PT. KS0 – PRIMORDIA GROUP
a GE and ALSTOM Joint Venture
SUTERA 2

No Gangguan Indikasi
GI CILEDUG GIS ALAM SUTERA GI CILEDUG GIS ALAM SUTERA
1 Injeksi Zone 1 Phs Injeksi Zone 2 Phs - Distance Start - Distance Start
R-S R-S Ph-R-S Ph R-S
- Distance Trip - Distance signal
Ph-R-S F21 Received
- Distance start - Aid Dist Trip
Z1,Z2,Z3 - CB Trip
- Distance Trip - Lockout
Zone-1
- CB Trip
- Aid 1 Send
- Lockout

2 Injeksi Zone 2 + Injeksi Zone 1 - Distance Start - Distance Start


Sinyal Recieve Ph R-N Ph R-N Ph-R-N
Ph R-N - Distance signal - Distance Trip
F21 Received Ph-R-N
- Aid Dist Trip - Distance start
- CB Trip Z1,Z2,Z3
- Lockout - Distance Trip
Zone-1
- CB Trip
- Aid 1 Send
- Lockout

Anda mungkin juga menyukai