I PEKERJAAN PERSIAPAN
II PEKERJAAN PAGAR
A PEKERJAAN TANAH
B PEKERJAAN PASANGAN
C PEKERJAAN BETON
1 Balok Sloof 20/25 5,63 M3 Sloof 20/25 1.293.339,00 7.281.498,57
2 Beton Kolom 40/20 3,86 M3 Beton Kolom 40/20 1.158.633,00 4.472.323,38
3 Ring Balk 10/13 1,57 M3 Ring Balk 10/13 945.026,00 1.483.690,82
Sub Total 13.237.512,77
D PEKERJAAN PENGECATAN
E PEKERJAAN PAGAR