REKAPITULASI RENCAN

PEMBANGUNAN : YONKAV 12/BC KODAM XII/TPR


LOKASI : KAB. MEMPAWAH
TA. : 2017

NO PEKERJAAN VOLUME SAT

1 2 3 4

I KONTRUKSI
1 - Poliklinik 314.00 M2
2 - Garasi Tank 400.00 M2

II PRASARANA
1 - BP. Listrik 1300 watt 2.00 bh
2 - Instalasi Air Bersih
- Rumah Pompa 4.00 Bh
- Ground Tank 50.000 liter 2.00 Bh
3 - Pipa Distribusi 1.00 Ls
4 - Pematangan lahan 1.00 Pkt
5 - Penyiapan Badan Jalan 4,169.05 M2
6 - Pas. Plat deuker Uk. 8 x 1 M tbl. 18 cm (10 Bh) 19.01 M3
7 - Urugan Sirtu + Pemadatan Tbl 30 Cm 1,737.11 M3

TOTAL

DIBULATKAN

Terbilang : LIMA MILIAR DELAPAN RATUS DELAPA


APITULASI RENCANA ANGGARAN BIAYA
12/BC KODAM XII/TPR
MPAWAH

HARGA HARGA HARGA


PAJAK
SATUAN SATUAN SEBELUM
(Rp) (Rp) (Rp) (Rp)
5 5 6 7

4,124,000.00 3,421,714.70 1,074,418,415.91 107,441,841.59


4,050,000.00 3,391,027.70 1,356,411,079.44 135,641,107.94
Sub total I Sub total I 2,430,829,495.34 243,082,949.53

2,500,000.00 3,500,000.00 7,000,000.00 700,000.00

87,500,000.00 87,500,000.00 350,000,000.00 35,000,000.00


86,058,824.00 86,058,824.00 172,117,648.00 17,211,764.80
650,000,000.00 650,000,000.00 650,000,000.00 65,000,000.00
248,820,000.00 248,820,000.00 248,820,000.00 24,882,000.00
150,800.00 150,800.00 628,693,403.52 62,869,340.35
4,615,500.00 4,615,500.00 87,731,424.00 8,773,142.40
444,600.00 444,600.00 772,317,327.60 77,231,732.76
Jumlah Sub total II 2,916,679,803.12 291,667,980.31

LIAR DELAPAN RATUS DELAPAN PULUH DUA JUTA DUA RATUS ENAM PULUH RUPIAH

Pontianak, 11 April 2017


Nama Perusahaan

Nama Direktur
Jabatan
HARGA
SESUDAH
(Rp)
8

1,181,860,257.50
1,492,052,187.38
2,673,912,444.88

7,700,000.00

385,000,000.00
189,329,412.80
715,000,000.00
273,702,000.00
691,562,743.87
96,504,566.40
849,549,060.36
3,208,347,783.43
5,882,260,228.31

5,882,260,000.00

April 2017
RENCANA ANGGARAN BIAYA

PEMBANGUNAN : POLIKLINIK YONKAV 12/BC


LOKASI : MEMPAWAH
LUAS : 314 M2
TA. : 2017

HARGA
NO PEKERJAAN VOLUME SAT
(Rp)
1 2 3 4 5

I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 463.00 M2 9,600.00
2 Pengukuran bouwplank 153.00 M1 37,900.00
Sub Total
II PEKERJAAN TANAH
1 Galian tanah pondasi 106.08 M3 70,200.00
2 Urugan tanah kembali 36.47 M3 23,400.00
3 Urugan pasir bwh pondasi/lantai 24.54 M3 134,400.00
4 Urugan tanah bawah lantai 157.00 M3 146,900.00
5 Pancang kayu bulat 8 - 10 panj. 4 M 628.00 Btg 24,700.00
Sub Total
III PEKERJAAN PASANGAN
1 Pondasi bt kosong/aanstamping 15.47 M3 486,000.00
2 Pondasi batu gunung 59.67 M3 831,200.00
3 Pasang bataco trasram 1:2 190.57 M2 88,200.00
4 Pasang bataco 1:4 495.31 M2 88,200.00
5 Kolom 15/15 5.76 M3 3,984,500.00
7 Sloof beton 15/20 6.63 M3 4,615,500.00
8 Ring balk beton 10/20 4.42 M3 4,970,000.00
9 Plester dinding 1:2 381.13 M2 71,100.00
10 Plester dinding 1:4 990.62 M2 59,900.00
11 Pas. Batu tempel alam 78.47 M2 349,400.00
Sub Total
IV PENUTUP ATAP BJ. RINGAN
1 Kuda-kuda atap baja Ringan 534.64 M2 226,000.00
2 Pasang atap genteng metal 534.64 M2 100,900.00
3 Pasang Nok genteng metal 105.30 M1 82,900.00
4 Talang jurai 18.74 M1 77,400.00
Sub Total
V PEKERJAAN KAYU
1 Kusen pintu / jendela / BV ky. Klas I 1.35 M3 11,221,700.00
2 Lysplank GRC Uk. 0.8/20 153.00 M1 106,100.00
3 Daun pintu km/wc aluminium 7.00 Bh 800,000.00
4 Pintu panil papan 16.70 M2 737,600.00
5 Jendela kaca panil 36.86 M2 639,000.00
6 Pas. Rangka plafond metal furing 463.00 M2 201,500.00
7 Penutup Plafond Gypsum 463.00 M2 42,800.00
8 List plafond gypsum 442.00 M1 72,100.00
9 Ventilasi Kaca / BV km/wc 2.34 M2 255,600.00
Sub Total
VI PEKERJAAN LANTAI
1 Lantai cor beton 29.92 M3 983,600.00
2 Pas. Keramik lantai 40/40 436.00 M2 189,900.00
3 Pas. Keramik km/wc 20/20 27.00 M2 194,300.00
4 Krmk dndng km/wc 20/25 t.1,5 69.60 M2 194,300.00
5 Cor lantai rabatz selasar beton 14.90 M3 983,600.00
6 Parit cucuran atap 153.00 M1 72,200.00
Sub Total
VII PEKERJAAN SANITASI
1 Closet jongkok 7.00 Bh 452,700.00
2 Bak air fibreglass uk. 55x55x60 cm 7.00 Bh 1,030,700.00
3 Pipa PVC @ 4" 56.00 M1 197,000.00
4 Pipa PVC @ 2" 56.00 M1 119,900.00
5 Floor drain 9.00 Bh 28,600.00
6 Washtafel 7.00 Bh 597,600.00
7 Septictank+resapan kap. 3 M3 3.00 Unit 10,253,300.00
Sub Total
VIII PEK. ALAT GANTUNG
1 Kunci pintu 9.00 Bh 221,300.00
2 Engsel pintu 27.00 Psg 29,200.00
3 Engsel jendela 96.00 Psg 21,300.00
4 Hak angin 48.00 Bh 26,200.00
5 Grendel jendela 48.00 Bh 32,700.00
6 Handle jendela 48.00 Bh 41,900.00
Sub Total
IX PEKERJAAN LISTRIK + AIR
1 Instalasi titik mata lampu 34.00 Ttk 106,200.00
2 Instalasi stop kontak 30.00 Ttk 106,200.00
3 Stop Kontak 30.00 Bh 39,100.00
4 Saklat tunggal 14.00 Bh 51,500.00
5 Saklar ganda 10.00 Bh 51,400.00
6 Lampu XL 18 watt 34.00 Bh 76,400.00
7 Kast zekering 4 group 3.00 Bh 46,000.00
8 Arde BC draad 6 mm 18.00 M1 34,000.00
9 Kran air 14.00 Ttk 26,300.00
Sub Total
X PEKERJAAN PENGECATAN
1 Cat dinding tembok+plafond 1,722.92 M2 32,200.00
2 Cat kayu / kilap 109.199 M2 51,200.00
Sub Total
JUMLAH I s/d XI
PPN 10 %
TOTAL
DIBULATKAN

Pontianak, 11 April 2017


Nama Perusahaan

Nama Direktur
Jabatan
JUMLAH
(Rp)
6

4,444,800.00
5,798,700.00
Panjang Dinding
10,243,500.00 C
Tembok Kotor
7,446,816.00 ##
853,281.00 ##
3,298,176.00 ##
23,063,300.00 ##
15,511,600.00 ##
50,173,173.00 ##
##
7,518,420.00 ##
49,597,704.00 #
16,807,833.00 total p tembok
43,686,342.00 ##
22,950,720.00 ##
30,600,765.00 total p tembok
21,967,400.00 TOTAL L tembok
27,098,343.00
59,338,138.00
27,418,291.50###
306,983,956.50

120,829,099.31###
53,945,381.06
8,729,436.32
1,450,476.00
184,954,392.69

15,104,408.20
16,233,300.00
5,600,000.00
12,314,232.00
23,550,345.00
93,294,500.00
19,816,400.00
31,868,200.00
598,104.00
218,379,489.20
29,432,207.72
82,796,400.00
5,246,100.00
13,523,280.00
14,655,640.00
11,046,600.00
156,700,227.72

3,168,900.00
7,214,900.00
11,032,000.00
6,714,400.00
257,400.00
4,183,200.00
30,759,900.00
63,330,700.00

1,991,700.00
788,400.00
2,044,800.00
1,257,600.00
1,569,600.00
2,011,200.00
9,663,300.00

3,610,800.00
3,186,000.00
1,173,000.00
721,000.00
514,000.00
2,597,600.00
138,000.00
612,000.00
368,200.00
12,920,600.00

55,478,088.00
5,590,988.80
61,069,076.80
1,074,418,415.91
107,441,841.59
1,181,860,257.50
1,287,753,000.00

, 11 April 2017
usahaan

ektur
RENCANA ANGGARAN BIAYA

PEMBANGUNAN : GARASI TANK


LUAS : 400 M2
LOKASI : YONKAV 2 / BC KAB MEMPAWAH

NO PEKERJAAN VOLUME SAT


1 2 3 4

I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 550.40 M
2 Pengukuran / bowplank 122.00 M

II PEKERJAAN PONDASI
1 Galian Tanah Pondasi 99.88 M
2 Urugan tanah kembali 33.29 M
3 Urugan tanah bawah lantai 373.77 M
4 Urugan Pasir bawah pondasi 55.63 M
5 Lantai kerja pondasi tbl. 5 cm 1.42 M
6 Aanstamping 12.58 M
7 Pancang ky bulat dia. 8-10 panj. 4 m 322.00 Btg
8 Pancang cerucuk ky bulat dia. 15 panj. 12 m 360.00 Btg
9 Pondasi plat setempat P1 14.20 M
10 Pondasi plat setempat P2 5.44 M
11 Pondasi batu gunung 30.51 M
12 Sloof uk. 20 x 40 cm 17.60 M

III PEKERJAAN BETON


1 Kolom praktis uk. 12 x 12 0.35 M
2 Balok uk. 12 x 15 3.96 M

IV PEKERJAAN RANGKA BAJA


1 Tiang Baja WF uk. 125 x 60 x 6 x 8 950.40 Kg
2 Kuda-kuda baja WF 125 x 60 x 6 x 8 1,800.21 Kg
3 Ring balok WF uk. 100 x 50 x 5 x 7 744.00 Kg
4 Gording baja C uk. 100 x 50 x 20 x 3.2 2,772.00 Kg
5 Penahan gording baja siku uk. 75x75x6 44.39 Kg
6 Trektang dia. 19 mm 447.78 Kg
7 Sogrok dia. 12 mm 394.56 Kg
8 Plat simpul 10 mm 179.58 Kg
9 Baut dia. 20 mm - 50 mm 468.00 Btg
10 Baut angkur uk. 20 mm - 400 mm 72.00 Btg
V PEKERJAAN KAYU
1 Kusen Pintu / Jendela 0.11 M3
2 Daun Pintu Panil 1.89 M2
3 Daun Pintu Dobel Panil 3.78 M2
4 Daun Jendela Panil 1.96 M2

VI PEKERJAAN ATAP
1 Atap genteng spandek zincalume 588.00 M
2 Bubungan/ nok spandek zincalume 43.00 M
3 Lisplank kalsiplank lbr. 20 cm 12 mm 113.84 M

VII PEKERJAAN DINDING


1 Pasang bataco 1:3 24.00 M
2 Dinding bataco 1:4 320.62 M
3 Plester dinding 1:2 48.00 M
4 Plester dinding 1:4 641.24 M

VIII PEKERJAAN LANTAI


1 Cor lantai beton bertulang t. 25 cm 100.00 M
2 Cor Selasar depan beton bertulang t. 23 cm 21.03 M
3 Cor kel. rabat beton t. 10 cm 6.46 M
4 Parit cucuran atap pasangan bata 114.00 M

IX PEK. ALAT GANTUNG


1 Kunci pintu 3.00 Bh
2 Engsel pintu 9.00 Psg
3 Engsel jendela 4.00 Psg
4 Hak angin 2.00 Bh
5 Grendel jendela 2.00 Bh
6 Handle jendela 2.00 Bh

X PEKERJAAN LISTRIK
1 Instalasi titik mata lampu 27.00 Ttk
2 Instalasi stop kontak 2.00 Ttk
3 Stop kontak 2.00 Bh
4 Kast Zekreng 1.00 Bh
5 Lampu TL 2 x 18 watt grille 18.00 Bh
6 Lampu XL 18 watt 6.00 Bh
7 Arde BC Draad 1.00 Set

XI PEKERJAAN PENGECATAN
1 Cat dinding tembok 712.30 M
2 Cat kilat besi 437.99 M

TOTAL
PPN 10 %
JUMLAH
DIBULATKAN
N BIAYA

2 / BC KAB MEMPAWAH

HARGA SAT JUMLAH


( Rp ) ( Rp )
5 6

9,600.00 5,283,840.00
37,900.00 4,623,800.00
Sub total 9,907,640.00

70,200.00 7,011,226.62
23,400.00 779,025.18
146,900.00 54,907,506.48
134,400.00 7,476,321.48
983,600.00 1,393,649.10
486,000.00 6,113,743.99
24,700.00 7,953,400.00
108,400.00 39,024,000.00
3,582,900.00 50,890,788.09
3,582,900.00 19,492,767.45
831,200.00 25,362,889.98###
4,615,500.00 81,232,800.00###
Sub total 301,638,118.36 #

3,984,500.00 1,377,043.20###
4,970,000.00 19,681,200.00
Sub total 21,058,243.20

33,400.00 31,743,360.00
33,400.00 60,127,014.00
33,400.00 24,849,600.00
33,400.00 92,584,800.00
33,400.00 1,482,626.00
33,400.00 14,955,852.00###
33,400.00 13,178,304.00
33,400.00 5,997,972.00
5,150.00 2,410,200.00
8,400.00 604,800.00 #
Sub total 247,934,528.00
11,221,700.00 1,239,997.85
737,600.00 1,394,064.00
737,600.00 2,788,128.00
639,000.00 1,252,440.00
Sub total 6,674,629.85

98,200.00 57,741,600.00
44,700.00 1,922,100.00
106,100.00 12,078,424.00
Sub total 71,742,124.00
###
88,200.00 2,116,800.00
88,200.00 28,278,860.40
71,100.00 3,412,800.00
59,900.00 38,410,515.60
Sub total 72,218,976.00
#
4,615,500.00 461,529,691.80###
4,615,500.00 97,071,626.73
983,600.00 6,358,584.30###
72,200.00 8,230,800.00
Sub total 573,190,702.83

221,300.00 663,900.00
29,200.00 262,800.00
21,300.00 85,200.00
26,200.00 52,400.00
32,700.00 65,400.00
41,900.00 83,800.00
Sub total 1,213,500.00###

106,200.00 2,867,400.00
106,200.00 212,400.00
39,100.00 78,200.00 ###
46,000.00 46,000.00
98,600.00 1,774,800.00
76,400.00 458,400.00
34,000.00 34,000.00
Sub total 5,471,200.00###

32,200.00 22,936,124.40
51,200.00 22,425,292.80
Sub total 45,361,417.20
1,356,411,079.44###
135,641,107.94
1,492,052,187.38
1,492,052,000.00###
###

Pontianak, 11 April 2017


Nama Perusahaan
Nama Direktur
Jabatan
RENCANA ANGGARAN BIAYA

PEMBANGUNAN : PRASARANA
LUAS : 1 PAKET

LOKASI : YONKAV 12/BC MEMPAWAH


TA. : 2017

NO PEKERJAAN VOLUME SAT


1 2 3 4
PEKERJAAN PRASARANA
1 BP Listrik 1300Kwh 2.00 bh
PPN 10%
Sub Total-1

2 Instalasi Air Bersih


a. Rumah Pompa 4.00 Bh
PPN 10%
Sub Total-2

b. Ground Tank 50.000 liter (2 Buah)


- Pembersihan lokasi 49.00 M2
- Pengukuran bouwplank 28.00 M'
- Galian Tanah 51.00 M3
- Lantai kerja tbl. 5 cm 1.25 M3
- Urugan pasir bwh pondasi/lantai tbl. 15 cm 3.75 M3
- Cerucuk kayu bulat 121.00 Btg
- Cor lantai beton tbl. 20 cm 4.61 M3
- Cor dinding beton tbl. 15 cm 6.00 M3
- Cor beton dak beton tbl. 12 cm 3.00 M3
- Plesteran dinding+lantai camp. 1:2 105.00 M2
- Pipa hawa galvansis dia 2.5" - 20 cm+Acc 2.00 Bh
- Tangga turun besi galvanis 1.00 Unt
- Cat waterproof take coat 105.00 M2
- Pompa air jet pump+Acc 1.00 Bh

PPN 10%
Sub Total-3

3 Pipa Distribusi 1.00 Ls


PPN 10%
Sub Total-4

4 Pematangan lahan 1,650.00 m3


PPN 10%
Sub Total-5

5 Penyiapan Badan Jalan 4,169.05 m3


6 Pas. Plat deuker Uk. 8 x 1 M tbl. 18 cm (6 Bh) 19.01 m3

PPN 10%
Sub Total-6

7 Urugan Sirtu + Pemadatan Tbl 30 Cm 1,737.11 m3


PPN 10%
Sub Total-7

TOTAL 1 - 7
DIBULATKAN
N BIAYA

12/BC MEMPAWAH ###


##

HARGA BIAYA ###


( Rp.) ( Rp.) ###
5 6 ###
###
3,500,000 7,000,000###
700,000
7,700,000

###
87,500,000 350,000,000
35,000,000
385,000,000###

9,600.00 470,400###
37,900.00 1,061,200###
70,200.00 3,580,200###
983,600.00 1,229,500###
134,400.00 504,000
24,700.00 2,988,700
4,615,500.00 21,268,224 #
3,984,500.00 23,907,000 ##
4,721,700.00 14,165,100
71,100.00 7,465,500
500,000.00 1,000,000
1,500,000.00 1,500,000
27,800.00 2,919,000
4,000,000.00 4,000,000
Total 1 Bh 86,058,824
Total 2 Bh 172,117,648###
17,211,765
189,329,413

650,000,000 650,000,000###
65,000,000
715,000,000

150,800 248,820,000
24,882,000
273,702,000
###
150,800 628,693,403.52 ###
4,615,500 87,731,424
Total 716,424,828
71,642,483
788,067,310
###
444,600 772,317,328###
77,231,733
849,549,060
###
3,208,347,783.43###
3,208,347,000.00###
###

Pontianak, 11 April 2017


Nama Perusahaan

Nama Direktur
Jabatan
PEMBANGUNAN :
LOKASI :
TA. :

NO. URAIAN PEKERJAAN

I KONTRUKSI
1 - Poliklinik
2 - Garasi Tank
II PRASARANA
1 - BP. Listrik 1300 watt
2 - Instalasi Air Bersih
- Rumah Pompa
- Ground Tank 50.000 liter
3 - Pipa Distribusi
4 - Pematangan lahan
5 - Penyiapan Badan Jalan
6 - Pas. Plat deuker Uk. 8 x 1 M tbl. 18 cm (10 Bh)
7 - Urugan Sirtu + Pemadatan Tbl 30 Cm

TOTAL
Bobot Kumulatif Rencana
Bobot Realisasi Per Minggu

NOTE :
JANGKA WAKTU PELAKSANAAN 210 HARI KALENDER KERJA
YONKAV 12/BC KODAM XII/TPR
KAB MEMPAWAH
2017

BOBOT
URAIAN PEKERJAAN
% 1

20.09
25.37

0.13

6.55
3.22
12.16
4.65 1.16
11.76
cm (10 Bh) 1.64
14.44

100.00
### 1.16
### 1.16

10 HARI KALENDER KERJA


TIME SCHE

2 3 4 5 6 7 8 9

1.16 1.16 1.16


1.96 1.96 1.96 1.96 1.96 1.96
0.82 0.82
1.20 1.20

1.16 1.16 3.12 1.96 1.96 1.96 3.98 3.98


2.33 3.49 6.61 8.57 10.53 12.49 16.47 20.46
IME SCHEDULE

MINGGU
10 11 12 13 14 15 16 17

1.26 1.26 1.26


1.59 1.59 1.59

0.82 0.82 0.82 0.82 0.82


0.80
1.01

1.20 1.20 1.20 1.20 1.20 1.20 1.20 1.20

1.20 1.20 1.20 2.02 2.02 4.86 4.86 6.68


21.66 22.86 24.07 26.09 28.11 32.97 37.84 44.52
18 19 20 21 22 23 24 25

1.26 1.26 1.26 1.26 1.26 1.26 1.26 1.26


1.59 1.59 1.59 1.59 1.59 1.59 1.59 1.59

0.82 0.82 0.82


0.80 0.80 0.80
1.01 1.01 1.01 1.01 1.01 1.01 1.01 1.01

1.20 1.20

6.68 6.68 5.48 3.85 3.85 3.85 3.85 3.85


51.20 57.88 63.35 67.21 71.06 74.92 78.77 82.62

Pontianak, 11 April 2017


Nama Perusahaan

Nama Direktur
Jabatan
KET.
26 27 28 29 30

1.26 1.26 1.26 1.26 1.26 100%


1.59 1.59 1.59 1.59 1.59

0.07 0.07

1.01 1.01 1.01

100%

3.85 3.85 3.85 2.91 2.91


86.48 90.33 94.19 97.09 100.00

ontianak, 11 April 2017


ama Perusahaan

ama Direktur
F BENTUK PRA RENCANA KESELAMATAN DAN KESEHATAN KERJA KONTRAK ( PRA - RK3K )

1 KEBIJAKAN K3
Adalah untuk mencegah kecelakaan kerja, melaksanakan k3 konstruksi, mengembangkan kesehata
dan memeriksa pelaksanaan konstruksi K3 kontruksi
Penerapan K3 dalam pekerjaan konstruksi sangat diperlukan hal ini untuk mencegah kecelakaan da
dan kelancaran dalam pekerjaan dan memberikan kesehatan pada pekerja tersebut.
Dalam hal ini pihak kontraktor berkomitmen untuk menerapkan k3
tujuan dari k3 dalam pelaksanaan pekerjaan adalah sebagai berikut;
1 Mengidentifikasi dan mengantipasi kecelakaan kerja
2 Menyusun dan menetapkan program k3 konstruksi
3 Membuat instruksi kerja
4 Memberikan penyuluhan dan pelatihan k3 konstruksi
5 Melakukan pengawasan pelaksanaan k3 konstruksi
6 Mengenalkan dan mengusulkan peningkatan metode kerja ditinjau dari K3 konstruksi
7 Mengadakan penyellidikan kecelakaan kerja dan penanggulangan keadaann daruruta
8 memeriksa pelaksanaan keselamatan dan kesehatan kerja ( Audit K3 )

2 PERENCANAAN
1) Identifikasi Bahaya dan Pengendalian Resiko Bahaya

NO JENIS TYPE PEKERJAAN

I KONTRUKSI
1 - Poliklinik
2 - Garasi Tank

II PRASARANA
1 - BP. Listrik 1300 watt
2 - Instalasi Air Bersih
- Rumah Pompa
- Ground Tank 50.000 liter
3 - Pipa Distribusi
4 - Pematangan lahan
5 - Penyiapan Badan Jalan
6 - Pas. Plat deuker Uk. 8 x 1 M tbl. 18 cm (10 Bh)
7 - Urugan Sirtu + Pemadatan Tbl 30 Cm

2) Pemenuhan Perundang - Undangan Dan Persyaratan Lainnya


Daftar Peraturan Perundang - Undangan dan Persyaratan K3 yang wajib dipunyai dan
melaksanakan paket pekerjaan ini adalah ;
a. UU No 1 Tahaun 1970 Tentang Keselamtan Kerja
b. UU No 18 Tahun 1999 Tentang Jasa Konstruksi
c. Peraturan Menteri PU No 09/PRT/M/2008 Tentang Pedoman Sistem Manajemen Kes
Konstruksi Bidang PU
c.Dst

3) Sasaran K3 dan Program K3

Sasaran K3
a Tidak ada kecelakaan kerja yang berdampak korban jiwa ( Zero Fatal Accident )
b. Tingkat penerapan elemen SMK3 minimal 80%
c Semua pekerja wajib memakai APD yang sesuai bahaya dan resiko pekerjaannya m
d Dstnya

Program K3
a Melaksanakan rencana K3 dengan menyediakan sumber daya K3 (APD,Rambu-ram
Jaring Pengaman, Dsb ) secara konsisten
b Melakukan inspeksi secara rutin terhadap kondisi dan cara kerja berbahaya
c Memastikan semua pekerja untuk mematuhi peraturan yang telah ditetapkan
d. dst
RAK ( PRA - RK3K )

PRA RENCANA KESELAMATAN DAN KESEHATAN KERJA KONTRAK

( PRA - RK3K )

embangkan kesehatan kerja

ncegah kecelakaan dalam bekerja

onstruksi
daruruta

IDENTIFIKASI
JENIS & BAHAYA RESIKO K3

JENIS BAHAYA DAN RESIKO


a.Kena paku = luka ringan
b.tangan luka = luka ringan
c.kepala luka = luka ringan
d.Luka sedang
e.Luka berat

JENIS BAHAYA DAN RESIKO


a.Kena paku = luka ringan
b.tangan luka = luka ringan
c.kepala luka = luka ringan
d.Luka sedang
e.Luka berat

ang wajib dipunyai dan dipenuhi dalam

istem Manajemen Keselamtan dan Kesehatan Kerja (SMK3)

ero Fatal Accident )

resiko pekerjaannya masing - masing

a K3 (APD,Rambu-rambu,Spanduk,Poster,Pagar Pengaman,

erja berbahaya
telah ditetapkan
AMATAN DAN KESEHATAN KERJA KONTRAK

( PRA - RK3K )

PENGENDALIAN RESIKO K3

PENGENDALIAN RESIKO K3
a. Menggunakan Sepatu Bot
b.Menggunakan sarung tangan
c.Menggunakan Helm
d.Memasang Spanduk & Petunjuk K3
e.Melengkapi Pekerja dengan APD
f.Menggunakan Safety Bell pada Ketinggian

PENGENDALIAN RESIKO K3
a. Menggunakan Sepatu Bot
b.Menggunakan sarung tangan
c.Menggunakan Helm
d.Memasang Spanduk & Petunjuk K3
e.Melengkapi Pekerja dengan APD
f.Menggunakan Safety Bell pada Ketinggian

rja (SMK3)

engaman,

Pontianak, 11 April 2017


Nama Perusahaan

Nama Direktur
Jabatan
DIAGRAM K3
Hasil Analisis Intruksional

Prosedur
Keselamatan & Kesehatan Kerja
( K3 )

Mengikuti
Prosedur Keselamatan Kerja

Mengidentifikasi
Macam-Macam Prosedur
Keselamatan

Keselamatan dari Keselamtan dari


Keselamatan Kerja
Perlengkapan / Mesin Benda Kerja

Diagram Alir Prosedur Identifikasi Bahaya, Penilaian &


Petugas K3

Mulai

Persiapan Data ; Denah Lokasi, Jenis Pekerjaan,


Mesin - Mesin, Bahan - Bahan yang digunakan,
Jam Kerja dll
( Lihat Daftarnya Pada Prosedur Nomor
P/SOP/K3/001 bab I.1 )

Melakukan Observasi ke tempat kerja


sesuai petunjuk data

Melakukan penilaian bahaya K3 berdasarkan


5 faktor bahaya K3 ( dapat dilakukan dengan
pengamatan / interview )

Melakukan penilaian resiko berdasarkan


tabel matrik resiko K3

Menentukan langkah pengendalian berdasarkan


hierarki pengendalian K3

Formulir identifikasi bahaya, Melapo


Penilaian dengan pengendalian resiko K3 bahaya, penilai
( P/FRM/K3/001 ) kepada

Menindaklanjuti k
terkait hasil pen
# TUGAS & TANGGUNG JAWAB #
PENGAWAS K3 ;

- Memeriksa kondisi petugas sebelum bekerja


- Mengawasi kondisi / tempat - tempat yang berbahaya ( Unsafe Condition )
- Mengawasi tingkah laku / sikap yang berbahaya ( Unsafe Act )
- Menyiapakan / mengawasi pemakaian alat - alat pelindung diri
- Memasang rambu - rambu pengaman ( bertanggung jawab terhadap pemasangan / pelepasan rambu )
- Inspeksi keselamtan dan kesehatan kerja
- Pemeriksaan / penyelidikan kecelakaan
- Pemeriksaan / penyelidikan bahaya kerja
- Pengujian kelayakan sarana & peralatan
- Pengujian kondisi lingkungan kerja
- Mengadakan koordinasi dengan pengawas lainnya.

Tujuan dan Sasaran


Berdasarkan telaan awal ditetapkan target atau tujuan serta sasaran yang akan dicapai dalam bidang K3. Dis
perusahaan dan tingkat yang ada.

Sasaran penerapan SMK3 meliputi :


- Sasaran daya manusia
- Sistem dan prosedure
- Sarana dan fasilitas
- Pencapaian prespektif dilingkungan internal dan eksternal
- Pemberdayaan, pertumbuhan dalam penerapan K3

Organisasi harus menyusun planning KESELAMATAN DAN KESEHATAN KERJA yang meliputi
a Identifikasi bahaya ( hazard identiication ) penilaian dan pengendalian resiko ( risk assessment and risk
b Pemenuhan terhadap peraturan perundangan - perundangan dan persyaratan lainnya
c Penentuan tujuan dan sasaran
d Program kerja secara umum dan program kerja secara khusus
e Indikator kinerja sebagai dasar penilaian kinerja K3

Perancanaan Identifikasi Bahaya, Penilaian dan Pengendalian Resiko


Organisasi harus menyusun dan memelihara prosedur tentang perencanaan identifikasi bahaya, penilaian dan
dalam memenuhi kebijakan K3 yang ditetapkan.

Prosedur perencanaan, identifikasi bahaya, penilaian resiko dan pngendaliannya, dikendalikan dan didokumen

Assesment dan pngendalian resiko ini harus telah dipertimbangkan dalam penetapan target K3
Beberapa hal perlu diperhatikan dalam menyusun identifikasi bahaya :
a. Identifikasi bahaya, penilaian resiko dan pengedaliannya bersifat proaktif bukan reaktif.
b. Buat identifikasi dan klasifikasi resiko kemudian dikontrol dan diminimalisir, dikaitkan dengan objective
c. konsisten diterapkan
d. Bisa memberikan masukan dalam penentuan fasilitas fasilitas yang diperlukan oleh organisasi, identifik
pengembangan kontrol terhadap organisasi.
e. Bisa menjadi alat pemantau terhadap tindakan - tindakan yang diperlukan, sehingga terwujud efektifita

Peraturan dan Perundang - Undangan dan Persyaratan Laiinya.


Organisasi harus menyusun dan memelihara prosedur tentang identifikasi peraturan perundangan dan persya
yang diperlukan dalam kegiatan organisasi
Organisasi tersebut harus memelihara ketersedian dokumen - dokumen ini, mensosialisasikan kepada karyaw
Organisasi harus memastikan dapat mengendalikan tinjauan peraturan dan perundang - undangan, standar /
kebijakan pemerintah, perubahan keadaan / peralatan / teknologi yang terjadi diluar organisasi.

Tujuan dan Sasaran


Organisasi harus menyusun dan memelihara tujuan dan sasaran K3, bila memungkinkan berupa tujuan dan sa
setiap fungsi dan level dalam organisasi
Ketika menetapkan maupun meninjau kembali tujuan dan sasaran ini, organisasi harus mempertimbangkan p
lainnya, bahaya dan resiko, teknologi yang digunakan, kemampuan keuangan, persyaratan dalam pengoperas
Dalam menetapkan tujuan dan sasaran sekurang - kurangnya harus memenuhi kualifikasi :
a Dapat diukur
b Satuan / Indikator pengukuran
c Sasaran pencapaian
d Jangka waktu pencapaiannya

Penetapan tujuan dan sasaran kebijakan K3 harus dikonsultasikan dengan wakil tenaga kerja, Ahli K3 dan piha
pekerjaan.
Tujuan dan sasaran ini harus konsisten terhadap kebijakan K3 termasuk kebijakan tentang perbaikan berkelan

Indikator Kinerja
Dalam menetapkan tujuan dan sasaran kebijakan keselamatan dan kesehatan kerja perusahaan harus mengg
Kinerja Keselamatan dan kesehatan kerja, yang sekaligus merupakan informasi mengenai keberhasilan menca
kesehatan kerja.

Program - program manajemen K3


Program manajemen keselamatan dan keselamatan kerja meliputi perencanaan awal dan perencanaan k
Dalam rangka opencapaian tujuan dan sasaran, maka organisasi harus menyusun dan memelihara program k
Disesuaikan dengan kondisi , sumber daya yang tersedia dan tingkat prioritasnya.

Program kerja memuat penanggung jawab dan otoritas pada fungsi-fugsi dan level dalam organisasi dan targe
organisasi tersebut.

Program kerja ini harus dievaluasi secara periodik dan terencana, bila diperlukan, bisa diamandemen sehubun
hasil jasa atau kondisi operasi dalam organisasi.

Elemen Program K3
a. Untuk menerapkan dan mengembangkan sistem manajemen keselamatan dan kesehatan kerja disusun pro
kesehatan kerja, dengan menetapkan system pertanggung jawaban dalam pencapaian tujuan da
tingkatan manajemen perusahaan yang bersangkutan
b. Elemen keselamatan dan kesehatan kerja disesuaikan dengan kebutuhan masing-masing perusahaan berd
sasaran yang ingin dicapai perusahaan termasuk dalam menetapkan sarana dan jangka waktu untuk

PENERAPAN RENCANA K3
Secara efektif dengan Mengembangkan Kemampuan dan Mekanisme Pendukung yang diperlukan untuk Menc
dan kesehatan kerja.
Jaminan Kemampuan
Sumber Daya Manusia, Sarana dan Dana
Organisasi (Perusahaan) harus menyediakan Sumber Daya Manusia (SDM), sarana dan dana yang memadai u
persyaratan system SMK3 yang ditetapkan.
Dalam memenuhi ketentuan diatas, organisasi harus membuat prosedur dan menyediakan biaya, sehingga da
a. Sumber daya yang memadai sesuai dengan tingkat keperluannya.
b. Melakukan identifikasi kompetensi kerja termasuk pelaksanaan pelatihan yang dibutuhkan,
c. Membuat ketentuan untuk mengkomunikasikan informasi K3 secara efektif.
d. Membuat ketentuan / Peraturan untuk mendapatkan saran-saran dari para ahli
e. Membuat ketentuan / Peraturan untuk pelaksanaan konsultasi dan keterlibatan pekerja.

Integrasi
Organisasi menjamin system SMK3 yang dilaksanakan dapat terintegrasi dengan system manajemen perusah
nal

Menerapkan Perilaku Aman


Dalam Bekerja

Pengendalaian

Keselamtan Kerja

Penerapan Tanda / Simbol


Penggunaan APD Keselamatan Kerja dan
Tanda Bahaya

haya, Penilaian & Pengendalian Resiko K3


ugas K3

Pekerjaan,
digunakan,

Nomor

t kerja
rdasarkan
an dengan

asarkan

erdasarkan

Melaporkan hasil identifikasi


bahaya, penilaian dan pengendalian resiko K3
kepada pimpinan perusahaan

Menindaklanjuti keputusan pimpinan perusahaan,


terkait hasil penilaian & pengendalian resiko K3

Selesai
ngan / pelepasan rambu )

apai dalam bidang K3. Disesuaikan dengan kemampuan

A yang meliputi
( risk assessment and risk control ) yang dapat diukur

kasi bahaya, penilaian dan pengendaliannya

kendalikan dan didokumentasikan.

n target K3

ikaitkan dengan objective dan program kerja.

n oleh organisasi, identifikasi pelatihan dan

ehingga terwujud efektifitas dan efisiensi.

n perundangan dan persyaratan - persyaratan lainnya


ialisasikan kepada karyawan maupun kepada pihak luar terkait.
ang - undangan, standar / acauan terkini sebagai akibat perubahan
r organisasi.

nkan berupa tujuan dan sasaran K3 yang telah dikuntifisir, pada

rus mempertimbangkan peraturan perundangan dan persyaratan


yaratan dalam pengoperasian organisasi dan pihak luar terkait.

aga kerja, Ahli K3 dan pihak - pihak terkait dengan pelaksanaan

entang perbaikan berkelanjutan.

perusahaan harus menggunakan indikator kinerja yang dapat diukur sebagai dasar penilaia
ngenai keberhasilan mencapai system manajemen keselamatan dan

wal dan perencanaan kegiatan yang sedang berlangsung.


an memelihara program kerja keselamatan dan kesehatan kerja.

dalam organisasi dan target waktu dalam pencapaian tujuan dan sasaran

sa diamandemen sehubungan dengan pergeseran aktifitas, hasil produksi,

esehatan kerja disusun program implementasi atau elemen keselamatan dan


m pencapaian tujuan dan sasaran sesuai dengan fungsi dan tujuan dari

-masing perusahaan berdasarkan hasil telaah awal dan penetapan tujuan dan
dan jangka waktu untuk pencapaian tujuan dan sasaran tersebut.

ang diperlukan untuk Mencapai Kebijakan, Tujuan dan Sasaran Keselamatan

dan dana yang memadai untuk menjamin pelaksanaan SMK3 sesuai dengan

ediakan biaya, sehingga dapat dipantau keefektifannya, diantaranya :


stem manajemen perusahaan secara selaras dan seimbang.
STRUKTUR ORGANISASI LAPANGAN KO

Project Manager

Site Manager

Kepala Administrasi Kepala Lapangan

Kurir

Kepala Pelaksana Kepala Pelaksana


Bag. ME Bag. Struktur

Pelaksana Pelaksana
Bag. ME Bag. Struktur
I LAPANGAN KONTRAKTOR

ct Manager

anager Q/C Supervisor

Lapangan Kepala Logistik

Gudang

Pelaksana Kepala Pelaksana


truktur Bag. Arsitektur

ksana Pelaksana
truktur Bag. Arsitektur
REKAPITULASI PERHITUN

NILAI GABUNGAN BA
Dalam
URAIAN PEKERJAAN Negeri
(Rp.)
[ DN ]
x a

I. BARANG
1). Material Langsung (bahan baku) 3,989,241,937
2). Peralatan Barang Jadi -
Sub Total I 3,989,241,937

II. JASA
3). Menejemen proyek dan perekayasaan -
4). Alat kerja/ Fasilitas kerja -
5). Konstruksi dan fabrikasi 823,516,432
6). Jasa umum 534,750,930
Sub Total II 1,358,267,362

TOTAL BIAYA ( I + II ) 5,347,509,298.46


ASI PERHITUNGAN TKDN

NILAI GABUNGAN BARANG/JASA TKDN


Luar Total
Negeri (Rp.) %KDN Barang/Jasa Gabungan
(Rp.) (%) (%)
[ LN ]
b c d e f

- 3,989,241,937 100.00% 100.00% 74.60%


- - 0.00% 0.00% 0.00%
- 3,989,241,937 100.00% 100.00% 74.60%

- - 0.00% 0.00% 0.00%


- - 0.00% 0.00% 0.00%
- 823,516,432 100.00% 60.63% 15.40%
- 534,750,930 0.00% 39.37% 10.00%
- 1,358,267,362 100.00% 100.00% 25.40%

- 5,347,509,298 100.00% 100.00% 100.00%

Pontianak, 11 April 2017


Nama Perusahaan

Nama Direktur
Jabatan
ANALISA TEKNIS
Analisa Teknis Pekerjaan Tentang
Yang Menguraikan Tentang Kebutuhan Bahan, Tenaga Kerja, Peralatan d

PEMBANGUNAN : YONKAV 12/BC KODAM XII/TPR


LOKASI : KAB MEMPAWAH
TA. : 2017

I Data Lapangan / Asumsi / Anggapan : Data Lapangan Teknis Berdasarkan dari hasil survei
perencanaan konsultan perencana yang telah mendapat persetujuan dari Pejabat Pembua
Kepala Satuan Daerah Tugas Pembantuan ( SKPD - TP )

II Urutan Kerja : Sesuai Dengan Bestek Kontrak, Spesifikasi Gambar & Metode Pe

III Pemakaian Bahan / Alat dan Tenaga

1 Perhitungan Bahan : Sesuai Dengan Item Pekerjaan yang Dikerjakan dan Pekerjaan
Sesuai Dengan Volume Kontrak yang ada

2 Perhitungan Alat : Sesuai Dengan Item Pekerjaan yang Dikerjakan dan Pekerjaan
Sesuai Dengan Volume Kontrak yang ada

3 Perhitungan Tenaga : Sesuai Dengan Item Pekerjaan yang Dikerjakan dan Pekerjaan
Sesuai Dengan Volume Kontrak yang ada

IV Harga Satuan Pekerjaan ; Berdasarkan Analisa Harga Satuan

V Waktu Pelaksanaan yang Diperlukan : 210 Hari Sesuai Dengan Kontrak

VI Kuantitas Pekerjaan yang Diperlukan : Sesuai Dengan Kontrak


LISA TEKNIS
knis Pekerjaan Tentang
Bahan, Tenaga Kerja, Peralatan dan Waktu Kegiatan

Berdasarkan dari hasil survei dan


setujuan dari Pejabat Pembuat Komitmen

esifikasi Gambar & Metode Pelaksanaan

ang Dikerjakan dan Pekerjaan Dikerjakan

ang Dikerjakan dan Pekerjaan Dikerjakan

ang Dikerjakan dan Pekerjaan Dikerjakan

an Kontrak

Pontianak, 11 April 2017


Nama Perusahaan
Nama Direktur
Jabatan
DAFTAR USULAN PEKERJAAN YANG DIS

NAMA KEGIATAN : PEMBANGUNAN RUMAH SAKIT PRATAMA


LOKASI : KECAMATAN SUKADANA, KABUPATEN KAYONG UTARA
TAHUN ANGGARAN : 2017
SUMBER DANA : APBD

No. Mata
Pembayaran Jenis Pekerjaan

DEVISI STRUKTUR

TOTAL %
DAFTAR USULAN PEKERJAAN YANG DISUB - KONTRAKKAN

PEMBANGUNAN RUMAH SAKIT PRATAMA


KECAMATAN SUKADANA, KABUPATEN KAYONG UTARA
2017
APBD

Persentase dari
Jenis Pekerjaan Total harga Mata
Pembayaran

DEVISI STRUKTUR 100.00

TOTAL %
KKAN

Persentase
Total Harga Nama Sub
Penawaran ( % ) Kontraktor

29.79

29.792

Pontianak, 11 April 2017


Nama Perusahaan

Nama Direktur
Jabatan
Berdasarkan SNI 2007 / 2008

SUMBER DATA UNIT KOEF. SAT.

I.

RSNI T-12-2002 M2 PEMBERSIHAN LAPANGAN & PERATAAN TANAH


0.100 org/hr
0.005 org/hr

RSNI T-12-2002 M1 PE NGUKURAN DAN PASANG BOUWPLANK


0.006 m3
0.004 m3
0.020 kg
0.080 org/hr
0.040 org/hr
0.010 org/hr
0.005 org/hr

M2 Pembuatan Direksi Keet / Gudang Bahan Bangunan dan Alat / Bede


1.250 Btg
0.186 M3
0.300 Kg
1.500 Lbr
1.3500 Lbr
2.000 org/hr
1.000 org/hr
0.200 org/hr
0.050 org/hr

SNI DT 91-0006-2007 M2 STRIPPING TANAH TEBAL 20 CM


0.050 org/hr
0.005 org/hr

SNI -2008.02.1 1 M3 MENGGALI TANAH BIASA SEDALAM 1 METER


0.7500 org/hr
0.0250 org/hr
1 M3 GALIAN TANAH BANYAK BATU s/d 1 m
1.5 org/hr
0.05 org/hr

SNI -2008.02.9 MENGURUG KEMBALI 1 M3 GALIAN


0.2500 org/hr
0.0083 org/hr

SNI -2008.02.10 MEMADATKAN 1 M3 TANAH (PER 20 CM)


0.5000 org/hr
0.0500 org/hr

SNI -2008.02.11 1 M3 MENGURUG PASIR URUG


0.3000 org/hr
0.0100 org/hr
1.2000 M3

1 M3 URUGAN TANAH TIMBUN


1.2 M3
0.25 org/hr
0.01 org/hr

1 M3 URUGAN SIRTU + PEMADATAN


1.2 m3
0.3 org/hr
0.02 org/hr
1 m3

1 M3 GALIAN TANAH DENGAN EXCAVATOR


0.0085 Org/Hr
0.0043 Org/Hr
0.0298 Jam
0.4219 Jam

1 M3 URUGAN TANAH DIPADATKAN DENGAN ALAT BERAT


0.2500 Org/Hr
0.0250 Org/Hr
1.2000 M3
0.0076 Jam
0.0071 Jam

1 M3 URUGAN SIRTU ( AGREGAT KELAS C ) DIPADATKAN


0.2500 Org/Hr
0.0250 Org/Hr
1.2000 M3
0.0215 Jam
0.0071 Jam

1 TTK PANCANG KAYU BULAT / MERAH / DOLKEN


1.0000 Btg
0.1000 Org/Hr
0.0100 Org/Hr

1 TTK PANCANG KAYU BULAT / MERAH / DOLKEN


1.0000 Btg
0.1000 Org/Hr
0.0100 Org/Hr

M PAS. TIANG PANCANG Mini Pile Segitiga Ukuran 28 x 28 CM K 350, Pj


1.000 m
0.100 bh
1.250 kg
0.002 unt

1M MEMANCANG MINI PILE (P.TP. 01)


0.3300 Jam
1.0000 Lsm
0.180 org/hr
0.040 org/hr
0.004 org/hr
0.043 org/hr

10 Bh MEMBOBOK KEPALA TIANG PANCANG (P.BBK.01 / 10 BH)


1.00 Lsm
0.20 org/hr
0.10 org/hr
1.00 org/hr
4.00 org/hr

1 TTK PEKERJAAN PENYAMBUNGAN TIANG PANCANG /3 SAMBUNGAN


16.00 Btg
1.00 Set
0.13 Hari
0.01 org/hr
0.03 org/hr
0.25 org/hr
0.10 org/hr
1 M2 Bongkar atap seng/ asbes
0.0500 Org/Hr
0.0250 Org/Hr

1 M2 Bongkar rangka plafon


0.1000 Org/Hr
0.0050 Org/Hr

1 M2 Bongkar penutup plafon


0.0300 Org/Hr
0.0030 Org/Hr

1 M2 Bongkar kaso dan reng kayu tdk dipakai lagi


0.1000 Org/Hr
0.0050 Org/Hr

SNI -2008.03.1 1 M3 PAS. PONDASI BATU KALI 1 :2


0.60 org/hr
0.06 org/hr
2.25 org/hr
0.02 org/hr
1.20 m3
3.52 Zak
0.38 m3

SNI -2008.03.2 1 M3 MEMASANG PONDASI BATU BELAH CAMP. 1 PC : 4 PSR


1.50 org/hr
0.75 org/hr
0.08 org/hr
0.08 org/hr
1.20 M3
163.00 Kg
0.52 M3

SNI -2008.03.3 1 M3 MEMASANG PONDASI BATU BELAH CAMP. 1 PC : 5 PSR


1.500 org/hr
0.750 org/hr
0.075 org/hr
0.075 org/hr
1.200 M3
136.000 Kg
0.544 M3

SNI -2008.03.9 1 M3 MEMASANG PONDASI BATU KOSONG (ANSTAMPENG)


0.780 org/hr
0.390 org/hr
0.039 org/hr
0.039 org/hr
1.200 M3
0.432 M3

SNI -2008.07.28 MEMBUAT 1 M3 PONDASI BETON BERTULANG (150 KG BESI + BEGESTING


5.3000 org/hr
0.2750 org/hr
1.3000 org/hr
1.0500 org/hr
0.2620 org/hr
0.2650 org/hr
0.2000 M3
1.5000 Kg
0.4000 Liter
157.5000 Kg
2.2500 Kg
336.0000 Kg
0.5400 M3
0.8100 M3

SNI -2008.07.28 MEMBUAT 1 M3 PONDASI BETON BERTULANG (100 KG BESI + BEGESTING


5.3000 org/hr
0.2750 org/hr
1.3000 org/hr
1.0500 org/hr
0.2620 org/hr
0.2650 org/hr
0.2000 M3
1.5000 Kg
0.4000 Liter
105.0000 Kg
2.2500 Kg
336.0000 Kg
0.5400 M3
0.8100 M3

SNI -2008.07.29 MEMBUAT 1 M3 SLOOF BETON BERTULANG (150 KG BESI + BEGESTING)


5.650 org/hr
0.275 org/hr
1.560 org/hr
1.400 org/hr
0.323 org/hr
0.283 org/hr
0.270 M3
2.000 Kg
0.600 Liter
157.500 Kg
3.000 Kg
336.000 Kg
0.540 M3
0.810 M3

Membuat balok beton bertulang (150 kg besi + bekisting) tiap 1m


5.80 org/hr
0.35 org/hr
2.80 org/hr
1.05 org/hr
0.42 org/hr
0.19 org/hr
0.210 m
3.200 kg
1.600 lt
150.000 kg
2.250 kg
323.000 kg
0.520 m
0.780 m
0.121 m
16.000 btg

SNI -2008.07.30 UNTUK 1 M3 KOLOM BETON DENGAN BESI 200 KG/M3 ADALAH :
7.0500 org/hr
0.2750 org/hr
1.6500 org/hr
1.4000 org/hr
0.4030 org/hr
0.3530 org/hr
0.4000 M3
4.0000 Kg
2.0000 Liter
210.0000 Kg
3.0000 Kg
336.0000 Kg
0.5400 M3
0.8100 M3

UNTUK 1 M3 KOLOM BETON DENGAN BESI 150 KG/M3 ADALAH :


7.050 org/hr
0.275 org/hr
1.650 org/hr
1.050 org/hr
0.403 org/hr
0.353 org/hr
0.400 M3
4.000 Kg
2.000 Liter
157.500 Kg
2.250 Kg
336.000 Kg
0.540 M3
0.810 M3

UNTUK 1 M3 KOLOM BETON DENGAN BESI 100 KG/M3 ADALAH :


7.0500 org/hr
0.2750 org/hr
1.6500 org/hr
0.7000 org/hr
0.4030 org/hr
0.3530 org/hr
0.4000 M3
4.0000 Kg
2.0000 Liter
105.0000 Kg
1.5000 Kg
336.0000 Kg
0.5400 M3
0.8100 M3

SNI -2008.07.32 Membuat tangga beton bertulang (150 kg besi + bekisting) tiap 1m
5.6 org/hr
0.35 org/hr
2.3 org/hr
1.4 org/hr
0.405 org/hr
0.202 org/hr
0.250 m
3.000 kg
1.200 lt
150.000 kg
3.000 kg
323.000 kg
0.520 m
0.780 m
0.105 m
0.108 m
14.000 btg
Membuat pelat lantai beton bertulang tebal 12 cm tiap 1 m
0.647 org/hr
0.330 org/hr
0.087 org/hr
0.042 org/hr
0.046 org/hr
0.022 org/hr
0.040 m
0.015 m
0.400 kg
0.200 lt
4.500 btg
12.950 kg
0.185 kg
42.000 kg
0.058 m
0.087 m

Pekerjaan Plat Lantai Beton tebal 12 cm, tiap 1 m3


8.3333 M2

SNI -2008.07.35 MEMBUAT 1 M' KOLOM PRAKTIS BETON BERTULANG (12 X 12 CM)
0.1800 org/hr
0.0200 org/hr
0.0200 org/hr
0.0200 org/hr
0.0060 org/hr
0.0090 org/hr
0.0020 M3
0.0100 Kg
1.8000 Kg
0.4500 Kg
4.0000 Kg
0.0060 M3
0.0090 M3

Pekerjaan Kolom Praktis 12x12 cm tiap 1 m3


69.4400 M1

SNI -2008.07.36 MEMBUAT 1 M' RING BALOK BETON BERTULANG (10 X 15 CM)
0.2970 org/hr
0.0330 org/hr
0.0330 org/hr
0.0330 org/hr
0.0100 org/hr
0.0150 org/hr
0.0030 M3
0.0200 Kg
3.6000 Kg
0.0500 Kg
5.5000 Kg
0.0090 M3
0.0150 M3

1 M2 MEMBUAT PLAT MEJA BETON BERTULANG TBL. 8 cm


0.3470 Org/Hr
0.01220 Org/Hr
0.02150 Org/Hr
0.0270 Org/Hr
0.1650 Org/Hr
0.0280 Org/Hr
0.0040 M3
0.1800 Kg
4.1500 Kg
0.0600 Kg
0.5600 Zak
0.0390 M3
0.0580 M3

SNI.-2007.07.5 1 M3 MEMBUAT BETON CAMP. 1PC : 2 PSR : 3 KRL


0.080 org/hr
0.025 org/hr
0.250 org/hr
1.650 org/hr
232.000 Kg
0.520 M3
0.780 M3

SNI.-2007.07.2 1 M3 BETON TUMBUK CAMP. 1 PC : 3 PSR : 6 KRL


0.080 org/hr
0.025 org/hr
0.250 org/hr
1.650 org/hr
0.940 M3
197.000 Kg
0.470 M3

SNI DT 91-0006-2007 Kg TULANGAN BESI BETON U-24


1.050 kg
0.015 kg
0.007 org/hr
0.007 org/hr
0.001 org/hr
0.004 org/hr

SNI DT 91-0006-2007 Kg TULANGAN BESI BETON U-39


1.050 kg
0.015 kg
0.007 org/hr
0.007 org/hr
0.001 org/hr
0.004 org/hr

SNI DT 91-0006-2007 100 kg TULANGAN BESI BETON U-24 TIAP 100 KG


105.00 kg
1.50 kg
0.70 org/hr
0.70 org/hr
0.07 org/hr
0.00 org/hr

SNI DT 91-0006-2007 M3 BETON K - 175


6.520 zak
0.543 m3
0.762 m3
1.650 org/hr
0.275 org/hr
0.028 org/hr
0.083 org/hr

SNI DT 91-0006-2007 M3 BETON K - 200


7.040 zak
0.522 m3
0.753 m3
1.650 org/hr
0.275 org/hr
0.028 org/hr
0.083 org/hr

SNI DT 91-0006-2007 M3 BETON K - 225


7.680 zak
0.499 m3
0.776 m3
1.650 org/hr
0.275 org/hr
0.028 org/hr
0.083 org/hr

SNI DT 91-0006-2007 M3 BETON K - 250


7.880 zak
0.494 m3
0.770 m3
1.650 org/hr
0.275 org/hr
0.028 org/hr
0.083 org/hr

M2 PAS. LANTAI KERJA BETON TUMBUK 1:3:5 TEBAL 10 cm


0.300 zak
0.063 m3
0.083 m3
0.130 org/hr
0.100 org/hr
0.010 org/hr
0.010 org/hr

M2 PAS. RABATZ BETON , FINISH ACIAN


0.454 zak
0.054 m3
0.091 m3
0.300 org/hr
0.100 org/hr
0.010 org/hr
0.010 org/hr

1 M2 Pasang Batako uk. 15/30/7


22.000 Bh
7.500 Kg
0.027 M3
0.32 org/hr
0.10 org/hr
0.01 org/hr
0.015 org/hr

1 M2 Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps


140 Bh
43.5 Kg
0.08 M3
0.6 org/hr
0.2 org/hr
0.02 org/hr
0.03 org/hr
1 M2 DINDING RABITZ TEBAL . 3 cm
0.350 zak
0.020 m3
2.000 kg
0.150 org/hr
0.015 org/hr
0.200 org/hr
0.010 org/hr

1 M2 PAS. KAWAT SIMPAI DINDING RABITZ


2.000 kg
0.050 org/hr
0.005 org/hr
0.100 org/hr
0.005 org/hr

M2 Pas. Dinding partisi gypsumboard Rangka Kayu


0.028 m3
0.150 kg
0.860 lbr
0.560 kg
0.028 org/hr
0.150 org/hr
0.860 org/hr
0.560 org/hr

M2 Pas. Dinding partisi gypsumboard Rangka Metal Furing


1.000 m2
0.860 lbr
0.028 org/hr
0.150 org/hr
0.860 org/hr
0.560 org/hr

M2 Dinding triplek 4 mm untuk dinding pemisah


0.0500 Kg
0.4000 Lbr
0.0250 Org/Hr
0.0013 Org/Hr
0.0750 Org/Hr
0.0075 Org/Hr

M2 Dinding pemisah rangka kayu


0.1500 Kg
0.0280 M3
0.1500 Org/Hr
0.0080 Org/Hr
0.4500 Org/Hr
0.0450 Org/Hr

M2 Pas. Rangka besi hollow 1x40.40.2 mm modul 60x120 cm, dind. Spa
3.5000 M1
1.0000 Ls
1.0500 M2
0.2500 Org/Hr
0.2500 Org/Hr
0.0250 Org/Hr
0.0130 Org/Hr

M2 Pas. Rangka besi hollow 1x40.40.2 mm modul 60x120 cm, dind. Kaw
3.5000 M1
1.0000 Ls
1.0500 M2
0.2500 Org/Hr
0.2500 Org/Hr
0.0250 Org/Hr
0.0130 Org/Hr

SNI -2008.05.2 1 M2 PLESTERAN TEBAL 15 MM CAMP. 1 PC : 2 PSR


0.300 org/hr
0.150 org/hr
0.015 org/hr
0.015 org/hr
15.504
0.016

SNI -2008.05.4 1 M2 PLESTERAN TEBAL 15 MM CAMP. 1 PC : 4 PSR


0.300 org/hr
0.150 org/hr
0.015 org/hr
0.015 org/hr
6.240
0.024

SNI -2008.05.5 1 M2 PLESTERAN TEBAL 15 MM CAMP. 1 PC : 5 PSR


0.300 org/hr
0.150 org/hr
0.015 org/hr
0.015 org/hr
5.184
0.026
1 M2 BRAPEN PONDASI 1:4
0.085 zak
0.017 m3
0.09 org/hr
0.009 org/hr
0.18 org/hr
0.009 org/hr

SNI -2008.05.27 1 M2 MEMBUAT ACIAN


0.2000 org/hr
0.1000 org/hr
0.0100 org/hr
0.0100 org/hr
3.2500

1 M2 PLESTERAN CIPRAT/KAMPROT 1 Pc : 2 Ps
0.250 Oh
0.100 Oh
0.010 Oh
0.015 Oh
0.108 zak
0.016 m3

M2 PAS. LANTAI KERAMIK 600 x 600


1.068 m2
0.200 zak
0.045 m3
1.500 kg
0.620 org/hr
0.350 org/hr
0.035 org/hr
0.030 org/hr

SNI -2008.13.35 1 M2 MEMASANG KERAMIK 40X40 CM


0.6200 org/hr
0.3500 org/hr
0.0350 org/hr
0.0300 org/hr
6.6300
9.8000
0.0450

SNI -2008.13.35 1 M2 MEMASANG LANTAI KERAMIK 30X30 CM


0.6200 org/hr
0.3500 org/hr
0.0350 org/hr
0.0300 org/hr
11.8700
10.0000
0.0450

SNI -2008.13.36 1 M2 MEMASANG LANTAI KERAMIK 20X20 CM


0.6200 org/hr
0.3500 org/hr
0.0350 org/hr
0.0300 org/hr
26.5000
10.4000
0.0450

SNI -2008.13.39a 1 M' MEMASANG PLINT KERAMIK 10X30 CM


0.0900 org/hr
0.0900 org/hr
0.0090 org/hr
0.0050 org/hr
1.0000
1.1400
0.0030
0.0250

SNI T-2008.13.54a 1 M2 MEMASANG DINDING KERAMIK 20X20 CM


0.6000 org/hr
0.4500 org/hr
0.0450 org/hr
0.0300 org/hr
25.0000
9.3000
0.0180
2.7500

SNI DT 91-0012-2007 M2 PAS. DINDING BATU TEMPEL


1.100 m2
0.235 zak
0.035 m3
0.620 org/hr
0.350 org/hr
0.035 org/hr
0.030 org/hr

1 M'2 MEMASANG LANTAI KERAMIK ARTISTIK 10 X 40 CM


0.7000 org/hr
0.3500 org/hr
0.0350 org/hr
0.0350 org/hr
25.0000 Bh
8.1900 Kg
0.0450 M3
2.7500 Kg

1 M2 PLESTERAN CIPRAT / KAMPROT 1 Pc : 2 Ps


0.108 zak
0.016 m3
0.250 Oh
0.100 Oh
0.010 Oh
0.015 Oh

M2 Pas. Rangka Plafond Metal furing


1.050 m2
8.000 bh
0.200 org/hr
0.300 org/hr
0.030 org/hr
0.010 org/hr

SNI -2008.06.20 1 M2 MEMASANG RANGKA LANGIT-LANGIT KAYU KLAS II (60X120 CM)


0.2000 org/hr
0.3000 org/hr
0.0300 org/hr
0.0100 org/hr
0.0163
0.2500

SNI -2008.09.5 1 M2 PENUTUP LANGIT-LANGIT PLYWOOD 3 MM


0.0035 org/hr
0.0100 org/hr
0.1000 org/hr
0.0700 org/hr
0.0300
0.3750

SNI -2008.09.5 1 M2 PENUTUP LANGIT-LANGIT TRIPLEKS 3 MM


0.0035 org/hr
0.0100 org/hr
0.1000 org/hr
0.0700 org/hr
0.0300
0.3750

SNI -2008.09.7 1 M2 PENUTUP LANGIT-LANGIT GYPSUM


0.0050 org/hr
0.0050 org/hr
0.0500 org/hr
0.1000 org/hr
0.1100
0.3640

1 M2 PENUTUP LANGIT-LANGIT GRC


0.0050 org/hr
0.0050 org/hr
0.0500 org/hr
0.1000 org/hr
0.1100
0.3640

SNI -2008.09.10 1 M' LIS LANGIT-LANGIT KAYU PROFIL


0.0030 org/hr
0.0050 org/hr
0.0500 org/hr
0.0500 org/hr
0.0100
1.0500

SNI -2008.09.10a 1 M' LIS LANGIT-LANGIT GYPSUM


0.0030 org/hr
0.0050 org/hr
0.0500 org/hr
0.0500 org/hr
0.0100
1.0500

1 M2 RANGKA DAN PLAFOND GRC 4 x 8ft, 4 MM


( grid 50x100 cm)
0.004 m3
0.014 m3
0.25 kg
0.4 lbr
0.12 kg
0.3 org/hr
0.05 org/hr
0.25 org/hr
0.014 org/hr
1 M2 Penutup plafon Gypsum 9 mm + rangka hollow tb. 0
0.2600 Org/Hr
0.0130 Org/Hr
0.0500 Org/Hr
0.2600 Org/Hr
0.0310 Org/Hr
0.3900 Bh
0.4590 btg
0.4310 btg
0.0100 Kg
14.0000 Bh
0.3640 Lbr
21.0000 Bh
0.02400 Rol
0.02000 Zak
0.10000 Lbr

1 M2 Penutup plafon GRC 4 mm + rangka hollow tb. 0,3 m


0.2600 Org/Hr
0.0130 Org/Hr
0.0500 Org/Hr
0.2600 Org/Hr
0.0310 Org/Hr
0.3900 Bh
0.4590 btg
0.4310 btg
0.0100 Kg
14.0000 Bh
0.3640 Lbr
21.0000 Bh
0.02400 Rol
0.02000 Zak
0.10000 Lbr

1 M2 RANGKA ATAP BAJA RINGAN TERPASANG TERMASUK PAKU RIPE


DAN ACC EX SMART TRUESS, PRIMA TRUSS

SNI. -2007.08.32 1 M2 PENUTUP ATAP GENTENG METAL


1.0200 M2
0.2000 Kg
0.0010 org/hr
0.0100 org/hr
0.1000 org/hr
0.2000 org/hr

SNI -2007.08.36 M1 BUBUNGAN ATAP GENTENG METAL


1.100 bh
0.050 kg
0.250 org/hr
0.150 org/hr
0.015 org/hr
0.013 org/hr

10m1 Talang Cucuran Atap 1/2 Lingkaran 15cm Aluminium 0.3


5.000 org/hr
0.500 org/hr
3.000 org/hr
0.150 org/hr
3.000 Lbr
9.000 Bh

10m1 Pasang Pipa Pembuangan dari Talang Atap 8cm aluminium


3.750 org/hr
0.375 org/hr
2.250 org/hr
0.110 org/hr
2.500 Lbr

SNI. -2007.08.32 1 M2 PENUTUP ATAP SENG GELOMBANG


0.0050 org/hr
0.0050 org/hr
0.0600 org/hr
0.1200 org/hr
0.7000
0.0200

SNI -2007.08.36 1 M' BUBUNGAN ATAP SENG RATA


0.0060 org/hr
0.0080 org/hr
0.0700 org/hr
0.1500 org/hr
0.3000 Lbr
0.0400 Kg

SNI. -2007.08.32 1 M2 PENUTUP ATAP ZINCALUMEE GELOMBANG 0,30 COLOR


0.0050 org/hr
0.0050 org/hr
0.0600 org/hr
0.1200 org/hr
0.7000 Lbr
8.0000 Bh

SNI -2007.08.36 1 M' BUBUNGAN ATAP PLAT ALUMUNIUM 0,30


0.0060 org/hr
0.0080 org/hr
0.0700 org/hr
0.1500 org/hr
0.3000 Lbr
6.0000 Kg

NEW M1
0.450 m2
0.100 kg
0.100 org/hr
0.200 org/hr
0.020 org/hr
0.005 org/hr

NEW M1
0.900 m2
0.100 kg
0.100 org/hr
0.200 org/hr
0.020 org/hr
0.005 org/hr

M3 Pek. Membuat Kayu Sandaran Jembatan, Balok Pemikul, Balok Air P


Angin dan Balok Tarahan Kayu-kayu Penahan Menggunakan Kayu B
24.000 org/hr
8.000 org/hr
2.400 org/hr
0.400 org/hr
1.100 M3
3.000 Kg

M3 Pekerjaan Rangka Badan Kayu Belian Uk. 8/8


36.000 org/hr
12.000 org/hr
3.600 org/hr
0.600 org/hr
1.100 M3
6.000 Kg

M3 Pekerjaan Rangka Badan Kayu Kelas I Uk. 8/8


36.000 org/hr
12.000 org/hr
3.600 org/hr
0.600 org/hr
1.100 M3
6.000 Kg

SNI -2008.06.1 1 M3 MEMBUAT DAN MEMASANG KOSEN PINTU/JENDELA KAYU ULIN


7.0000 org/hr
21.0000 org/hr
2.1000 org/hr
0.3500 org/hr
1.1000
1.2500

SNI -2008.06.2 1 M3 MEMBUAT DAN MEMASANG KOSEN PINTU/JENDELA KAYU KLAS I


6.0000 org/hr
18.0000 org/hr
1.8000 org/hr
0.3000 org/hr
1.2000
1.2500

SNI -2008.06.13 1 M3 MEMBUAT & MEMASANG KUDA-KUDA KONVENSIONAL KY. KLAS II


4.0000 org/hr
12.0000 org/hr
1.2000 org/hr
0.2000 org/hr
1.1000
15.0000
5.6000

SNI -2008.06.15 1 M3 MEMBUAT DAN MEMASANG KONSTRUKSI GORDENG KAYU KLAS II


2.4000 org/hr
7.2000 org/hr
0.7200 org/hr
0.1200 org/hr
1.1000
3.0000
15.0000

SNI -2008.06.17 1 M2 RANGKA ATAP KASAU 5/7 DAN RENG 3/5 KAYU KLAS II
UNTUK GENTENG METAL ROOF
0.1000 org/hr
0.1000 org/hr
0.0100 org/hr
0.0050 org/hr
0.0140
0.0072
0.2500

SNI -2008.06.21 1 M' LISPLANK 3/20 CM PAPAN KAYU KLAS. I ATAU KLAS. II
0.0500 org/hr
0.0200 org/hr
0.0200 org/hr
0.1000 org/hr
0.0108
0.1000
0.0108
0.1000

1 M1 Mengerjakan lisplank kalsiplank


0.1000 Org/Hr
0.0050 Org/Hr
0.1000 Org/Hr
0.0100 Org/Hr
1.1000 M1
0.0600 Kg

SNI -2008.06.5 1 M2 MEMBUAT & MEMASANG DAUN PINTU PANEL KY KLAS I / KLAS II
1.0000 org/hr
3.0000 org/hr
0.3000 org/hr
0.0500 org/hr
0.0400
0.0400
0.5000

SNI -2008.06.6 1 M2 MEMBUAT DAN MEMASANG DAUN PINTU PANEL KACA KAYU KLAS I
0.8000 org/hr
2.4000 org/hr
0.2400 org/hr
0.0400 org/hr
0.0240
0.0240
0.3000
0.7500

SNI DT 91-0011-2007 M2 Daun Pintu double teakwood; rangka kayu KW.II tertutup
0.025 m3
0.500 kg
0.030 kg
2.000 lbr
0.600 org/hr
2.000 org/hr
0.200 org/hr
0.300 org/hr

SNI DT 91-0011-2007 M2 Daun Pintu double triplex; rangka kayu KW.II tertutup
0.025 m3
0.500 kg
0.030 kg
2.000 lbr
0.800 org/hr
2.400 org/hr
0.240 org/hr
0.040 org/hr

1 M2 DAUN JENDELA KACA 5 MM KAYU KLS II


0.035 m3
0.05 kg
0.75 m2
2.00 org/hr
0.20 org/hr
0.80 org/hr
0.04 org/hr

SNI3 -2008.06.10 1 M2 MEMBUAT DAN MEMASANG JALUSI KAYU KLAS II


0.6700 org/hr
2.0000 org/hr
0.2000 org/hr
0.3350 org/hr
0.0600
0.1500

1 M3 PEKERJAAN RANGKA BADAN KAYU KLAS.I ATAU KLAS.II


1.100 m3
1.100 m3
6.000 kg
24.000 org/hr
8.000 org/hr
2.400 org/hr
0.400 org/hr

SNI.-2002.14.9 1 M2 MENGECAT KILAP KAYU (1 LPS PLAMIR, 1 LPS CAT DASAR DAN 2 LP
0.0025 org/hr
0.0040 org/hr
0.1050 org/hr
0.0700 org/hr
0.2000
0.1500
0.1700
0.2600

M2 Cat bidang kayu lama


0.1500 kg
0.5000 lbr
0.1700 kg
0.1700 kg
0.2000 ltr
0.0500 bh
0.0750 org/hr
0.0075 org/hr
0.0700 org/hr
0.0025 org/hr

SNI.-2002.14.14 1 M2 MENGECAT TEMBOK (1 LPS PLAMIR, 1 LPS CAT DASAR DAN


0.0025 org/hr
0.0063 org/hr
0.0630 org/hr
0.0200 org/hr
0.1000
0.1000
0.2600

M2 Cat permukaan baja dgn menie besi


0.0200 Org/Hr
0.0010 Org/Hr
0.2000 Org/Hr
0.0200 Org/Hr
0.0100 Bh
0.1000 Kg
0.4000 Lbr

1 M2 Pengecatan water profing (coating)


0.0200 Org/Hr
0.0025 Org/Hr
0.0630 Org/Hr
0.0063 Org/Hr
0.3000 Kg
0.2000 Lbr

SNI.-2002.14.12 1 M2 MENGETER BIDANG KAYU DENGAN RESIDU


0.0060
0.1000
0.3500

SNI.-2007.12.2 1 BH MEMASANG KUNCI TANAM BIASA


1.0000
0.0050 org/hr
0.0100 org/hr
0.5000 org/hr
0.0100 org/hr

1 BH Pas. Kunci knob pintu kamar mandi


1.000 bh
0.000 org/hr
0.600 org/hr
0.060 org/hr
0.000 org/hr

SNI.-2007.12.5 MEMASANG 1 BH ENGSEL PINTU


1.0000
0.0008 org/hr
0.0150 org/hr
0.1500 org/hr
0.0150 org/hr

SNI.-2007.12.6 MEMASANG 1 BH ENGSEL JENDELA


1.0000
0.0005 org/hr
0.0100 org/hr
0.1000 org/hr
0.0100 org/hr

SNI.-2007.12.9 MEMASANG 1 BH HAK ANGIN


0.0080 org/hr
0.0150 org/hr
0.1500 org/hr
0.0150 org/hr
1.0000

SNI.-2007.12.11 MEMASANG 1 BH KUNCI SELOT (GRENDEL)


0.0010 org/hr
0.0200 org/hr
0.2000 org/hr
0.0200 org/hr
1.0000

SNI.-2007.12.12 MEMASANG 1 BH PEGANGAN JENDELA ATAU PINTU


0.0010 org/hr
0.0200 org/hr
0.2000 org/hr
0.0200 org/hr
1.0000 Bh

MEMASANG 1 BH PEGANGAN HANDLE PINTU BESAR


0.0010 org/hr
0.0200 org/hr
0.2000 org/hr
0.0200 org/hr
1.0000 Bh

PT T-30-2000-C BH
1.000 bh
0.000 org/hr
0.500 org/hr
0.050 org/hr
0.000 org/hr

BH
1.000 bh
0.000 org/hr
0.600 org/hr
0.060 org/hr
0.000 org/hr
BH
1.000 bh
0.000 org/hr
0.600 org/hr
0.060 org/hr
0.000 org/hr

SNI.-2007.12.17 MEMASANG 1 M2 KACA TEBAL 5 MM


0.0008 org/hr
0.0150 org/hr
0.1500 org/hr
0.0150 org/hr
1.0000
1.0000

PT T-30-2000-C BH PAS. KACA 8 mm


1.050 m2
0.160 org/hr
0.160 org/hr
0.016 org/hr
0.008 org/hr

RSNI T-15-2002 BH
1.000 bh
1.000 bh
1.200 org/hr
1.450 org/hr
0.150 org/hr
0.100 org/hr

RSNI T-15-2002 BH
1.000 bh
1.000 tb
3.300 org/hr
1.100 org/hr
0.110 org/hr
0.016 org/hr

RSNI T-15-2002 BH
1.000 bh
1.000 tb
3.300 org/hr
1.100 org/hr
0.110 org/hr
0.016 org/hr

RSNI T-15-2002 BH
1.000 bh
0.120 zak
0.000 org/hr
1.100 org/hr
0.110 org/hr
0.016 org/hr

1 Bh Memasang bak cuci piring stenlis steel


0.0300 Org/Hr
0.3000 Org/Hr
0.0015 Org/Hr
0.0300 Org/Hr
1.0000 Bh
1.0000 Set

RSNI T-15-2002 BH
1.000 bh
1.800 org/hr
2.700 org/hr
0.540 org/hr
0.110 org/hr
0.180 harga

1 Bh Pasang bak mandi bata lapis keramik volume 0,3 m3


6.000 Org/Hr
0.300 Org/Hr
3.000 Org/Hr
0.300 Org/Hr
196.000 Bh
2.400 Zak
0.300 M3
110.000 Bh
6.000 Kg

RSNI T-15-2002 BH
1.000 bh
0.025 bh
0.000 org/hr
0.100 org/hr
0.010 org/hr
0.000 org/hr

RSNI T-15-2002 BH
1.000 bh
0.025 bh
0.000 org/hr
1.100 org/hr
0.110 org/hr
0.016 org/hr

RSNI T-15-2002 BH
1.000 bh
0.025 bh
0.000 org/hr
0.100 org/hr
0.010 org/hr
0.000 org/hr

1.000 bh
0.100 org/hr
0.010 org/hr
0.010 org/hr
0.005 org/hr

RSNI T-15-2002 M1
1.200 m
0.350 m
0.081 org/hr
0.135 org/hr
0.014 org/hr
0.004 org/hr

RSNI T-15-2002 M1
1.200 m
0.350 m
0.081 org/hr
0.135 org/hr
0.014 org/hr
0.004 org/hr
RSNI T-15-2002 M1
1.200 m
0.350 m
0.054 org/hr
0.090 org/hr
0.009 org/hr
0.003 org/hr

RSNI T-15-2002 M1
1.200 m
0.350 m
0.036 org/hr
0.060 org/hr
0.006 org/hr
0.002 org/hr

RSNI T-15-2002 M1
1.200 m
0.350 m
0.036 org/hr
0.060 org/hr
0.006 org/hr
0.002 org/hr

RSNI T-15-2002 M1
1.200 m
0.350 m
0.036 org/hr
0.060 org/hr
0.006 org/hr
0.002 org/hr

M1
1.000 bh
0.350 bh
0.036 org/hr
0.060 org/hr
0.006 org/hr
0.002 org/hr

1 Ttk
12.0000 M1
12.0000 M1
1.0000 Bh
1.0000 Bh
3.0000 Bh
9.0000 Bh
3.0000 Bh
1.0000 M1
10.0000 %
2.0000 Bh
0.3000 Org/Hr
0.1500 Org/Hr
0.0150 Org/Hr

1 Ttk

12.0000 Ml
12.0000 Ml
1.0000 Bh
1.0000 Bh
3.0000 Bh
9.0000 Bh
3.0000 Bh
10.0000 %
2.0000 Bh
0.3000 Org/Hr
0.1500 Org/Hr
0.0150 Org/Hr

TTK TTK
6.000 m
0.500 bh
3.000 bh
0.050 org/hr
0.020 org/hr
0.100 org/hr
0.100 org/hr

TTK TTK
6.000 m
0.500 bh
3.000 bh
0.050 org/hr
0.020 org/hr
0.100 org/hr
0.100 org/hr

BH BH
1.000 bh
1.000 bh
0.250 bh
0.100 org/hr
0.100 org/hr
0.050 org/hr
0.025 org/hr

BH BH
1.000 bh
1.000 bh
0.250 bh
0.100 org/hr
0.100 org/hr
0.050 org/hr
0.025 org/hr

BH
1.000 bh
1.000 bh
0.250 bh
0.100 org/hr
0.100 org/hr
0.050 org/hr
0.025 org/hr

BH BH
1.000 bh
1.000 bh
0.250 bh
0.100 org/hr
0.100 org/hr
0.050 org/hr
0.025 org/hr

BH BH
1.000 bh
0.250 bh
0.100 org/hr
0.100 org/hr
0.050 org/hr
0.025 org/hr

BH BH
1.000 bh
0.250 bh
0.100 org/hr
0.100 org/hr
0.050 org/hr
0.025 org/hr

1 Kg PASANG BESI PROFIL


0.0600 Org/Hr
0.0030 Org/Hr
0.0600 Org/Hr
0.0060 Org/Hr
1.1500 Kg

1 Kg PEKERJAAN BAJA WF
1.025 kg
0.025 kg
0.02 ltr
0.0025 ltr
0.0025 uit
0.02 org/hr
0.005 org/hr
0.075 org/hr
0.0015 org/hr

1 Kg PEKERJAAN BAJA SIKU


1.025 kg
0.04 kg
0.03 ltr
0.004 ltr
0.0015 uit
0.03 org/hr
0.008 org/hr
0.075 org/hr
0.0015 org/hr

1 M2 Pasang kawat nyamuk/kasa


1.1000 M2
0.0200 Kg
0.0018 M3
0.1000 Org/Hr
0.1000 Org/Hr
0.0100 Org/Hr
0.0005 Org/Hr

SNI.-2002.6.13 1 M2 MEMASANG KAWAT SIMPAI


0.0005
0.0100
0.1000
0.1000
2.0000 Kg
0.0200

MEMASANG 1 M2 TERALIS BESI


3.4667 m2
27.0800 cm
0.0830 org/hr
0.1670 org/hr
1.6700 org/hr
1.6700 org/hr

1 CM Pengelasan las listrik


0.0400 Kg
0.0300 Ltr
0.0040 Ltr
0.0170 Jam
0.0040 Org/Hr
0.0002 Org/Hr
0.0020 Org/Hr
0.0002 Org/Hr

NEW M Railing Tangga Besi Hollow


15.000 kg
6.000 bh
1.000 m
0.150 org/hr
0.075 org/hr
0.008 org/hr
0.008 org/hr

M2 Pintu besi plat baja t. 2 mm rangkap; rangka besi sik


15.000 kg
32.800 kg
0.050 kg
1.050 org/hr
1.050 org/hr
0.105 org/hr
0.052 org/hr

M2
25.000 kg
0.050 kg
1.050 org/hr
1.050 org/hr
0.105 org/hr
0.052 org/hr

M2
1.200 m2
0.050 kg
1.050 org/hr
1.050 org/hr
0.105 org/hr
0.052 org/hr

M 133.333
1.050 m
1.000 bh
0.045 org/hr
0.135 org/hr
0.014 org/hr
0.002 org/hr

M 133.333
1.050 m
1.000 bh
0.045 org/hr
0.135 org/hr
0.014 org/hr
0.002 org/hr

unt 133.333
1.000 m
6.000 bh
0.045 org/hr
0.135 org/hr
0.014 org/hr
0.002 org/hr
M1 Parit cucuran atap pasang bata
0.16 M3
0.008 M2
0.80 M2

M1 Parit pasangan 60 x/60 x 40 tebal 20 cm


1.000
1.000
1.000

M1 Parit cor beton tebal 20 cm


1.000
1.000
1.000
1.000

M1 Saluran air bt kali lbr bwh 80 cm tinggi 100 cm


2.98348 Org/Hr
0.21855 Org/Hr
0.6920 Org/Hr
0.0862 Org/Hr
1.0120 M3
3.8680 Zak
0.46440 M3
0.092640 jam

M1 Saluran air bt kali lbr bwh 100 cm tinggi 120 cm


4.10480 Org/Hr
0.30945 Org/Hr
0.8620 Org/Hr
0.0862 Org/Hr
1.2870 M3
4.8996 Zak
0.58825 M3
0.104220 jam

M1 Pekerjaan kansteen
0.070 m3
0.100 m1
0.018 m3
2.500 bh
0.015 m3
0.100 zak
0.050 m3
0.100 org/hr
0.005 org/hr

NEW M2 Pas. Pavingblock t. 6 cm


25.000 bh
0.100 m3
1.500 kg
0.620 org/hr
0.350 org/hr
0.035 org/hr
0.030 org/hr

1 M2 Pekerjaan Paving jalan setapak


( warna abu ; T 16 ; uk 8 x 10,5 x 21 )
+ Urugan pasir 5 cm dan urugan sirtu 20 cm
0.25 m3
0.06 m3
0.5 m2
0.2 m3
25 m2
0.027 m3
0.24 org/hr
0.024 org/hr
0.16 org/hr
0.008 org/hr

M2 Pek. Paving parkir kendaraan


(warna abu; T 16 ; 8x10.5x21, urugan pasir 5 cm dan urugan sirtu 20 cm
0.1350 Jam
0.0337 Jam
0.2400 M3
0.0180 M3
1.1000 M2
0.0600 M3
0.1200 org/hr
0.0120 org/hr
0.2125 org/hr
0.01625 org/hr

M2 Pekerjaan gebalan rumput


0.05000 Org/Hr
0.02500 Org/Hr
0.2000 Btg
1.0000 M2

M1 Parit cucuran atap pasang bata


0.1500 M3
0.0250 M3
0.4000 M2
0.6000 M2
0.0500 M3

1 M1 PEK. TURAP BATU KALI (tinggi 2 M)


0.64 m3
0.12 m3
0.4 m3
0.74 m3
2.4 m2
0.45 m2
1 ls

M2 Jembatan beton uk 1 x 1 m tebal 10 cm


1.0000
1.0000
1.0000
1.0000

M2 Jembatan beton uk 1,5 x 1,5 m tebal 10 cm


1.0000
1.0000
1.0000
1.0000

RSNI T-12-2002 M2 Pembuatan direksi keet


0.050 m3
0.800 lbr
0.700 lbr
0.500 kg
9.000 bh
0.060 m2
1.000 m2
1.200 org/hr
0.400 org/hr
0.040 org/hr
0.060 org/hr

Bh Pembuatan papan nama proyek


0.025 m3
0.090 m3
0.600 kg
0.750 kg
0.300 kg
2.000 lbr
0.200 bh
0.400 kg
0.500 zak
0.060 m3
0.100 m3
0.630 org/hr
1.000 org/hr
0.500 org/hr
0.100 org/hr
0.100 org/hr

1 M1 Pemb. Kawat duri, T=1,8m (pondasi cor beton 1:3:5,


30x30x40 tiap jarak 1,5 m)
0.200 zak
0.026 m3
0.044 m3
0.330 btg
2.000 kg
0.200 kg
0.250 org/hr
0.500 org/hr

unt Pas. Meja Pantry uk. 600x 1500 mm


0.090 m3
9.000 kg
0.990 m2
0.990 m2

RSNI T-15-2002 M1 Roofdrain


1.200 m
0.120 zak
0.000 org/hr
1.100 org/hr
0.110 org/hr
0.016 org/hr

M1 Mesin Jet Pump kap.250 watt


1.200 m
1.000 org/hr
0.500 org/hr
0.110 org/hr
0.016 org/hr

M1 Mesin pompa kap.150 watt


1.200 m
1.000 org/hr
0.500 org/hr
0.110 org/hr
0.016 org/hr

M1 Tangki air 1000 liter


1.000 bh
1.000 bh
1.000 org/hr
0.500 org/hr
0.110 org/hr
0.016 org/hr

M1 Tangki air 500 liter


1.000 bh
1.000 bh
1.000 org/hr
0.500 org/hr
0.110 org/hr
0.016 org/hr

M1 Dudukan tangki air


70.000 kg
1.000 org/hr
0.500 org/hr
0.110 org/hr
0.016 org/hr

UNIT Septictank Buis beton + Rembesan


2.000 m3
0.200 m3
1.766 m2
2.000 bh
0.203 m3
5.400 m'
1.200 m'
3.375 m3
5.400 m2
1.050 m3
9.000 m'
1.125 m3

UNIT Septictank Pas. Bata kap. 3,00 m3 + Rembesan


3.000 m3
0.300 m3
3.000 m2
10.500 m2
12.000 m2
0.360 m3
5.400 m'
1.200 m'
3.375 m3
5.400 m2
1.050 m3
9.000 m'
1.125 m3

UNIT Septictank Pas. Bata + Rembesan kap. 6,00 m3


6.000 m3
0.300 m3
3.000 m2
17.000 m2
20.000 m2
0.360 m3
5.400 m'
1.200 m'
3.375 m3
5.400 m2
1.050 m3
9.000 m'
1.125 m3

1 Unit Resapan dia 80 m (digali 1m), dalam 1m (digali 1,9 m


1.0500 Org/Hr
0.2700 Org/Hr
0.0969 Org/Hr
0.0270 Org/Hr
0.6030 m3
0.7160 Kg
2.0000 M1

M1 Pagar bata merah t. 2m + plester dan cat tembok


2.6610 Org/Hr
0.1860 Org/Hr
0.1120 Org/Hr
1.0290 Org/Hr
0.2520 Org/Hr
0.1580 Org/Hr
0.1520 Org/Hr
0.3600 M3
0.0600 M3
100.0000 Biji
2.1094 Zak
0.0280 M3
0.2650 M3
0.0380 M3
0.0140 M3
0.1670 Kg
14.7000 Kg
0.8680 Kg
0.4000 Kg
0.4000 Kg
1.0400 Kg
0.03474 jam

M1 Pagar BRC 0,9m t. jadi 1,2 m (pond. bt kali,sloof beton, 1/2 bata 30 c
1.1880 Org/Hr
0.1040 Org/Hr
0.0720 Org/Hr
0.3410 Org/Hr
0.07245 Org/Hr
0.0590 Org/Hr
0.0710 Org/Hr
0.2740 M3
0.0022 M3
15.0000 Biji
0.8752 Zak
0.0250 M3
0.1200 M3
0.0146 M3
0.0060 M3
0.1200 Kg
4.4400 Kg
0.0640 Kg
1.0000 M1
0.5550 Bh
0.1150 Kg
0.1150 Kg
0.2990 Kg

M2 Penyiapan badan jalan / tanah dasar (subgrade)


0.0250 Org/Hr
0.0004 Org/Hr
0.0033 Jam
0.0071 Jam

M2 Lapis Pondasi bawah kelas C sirtu tb. 10 cm


0.0250 Org/Hr
0.0025 Org/Hr
0.1200 M3
0.0033 Jam
0.0022 Jam

M2 Lapis Pondasi jalan tanpa penutup aspal Macadam


1.0000 Org/Hr
0.0340 Org/Hr
0.9350 M3
0.1650 M3
0.0268 Jam
0.0211 Jam

M2 Lapis pondasi atas Agregat kelas A


1.0000 Org/Hr
0.0340 Org/Hr
0.7680 m3
0.4320 M3
0.0268 Jam
0.0211 Jam

M2 Aspal untuk palaburan


0.0022 Org/Hr
0.00022 Org/Hr
1.1000 Kg
0.0520 Ltr
0.0015 Jam
0.0031 Jam
0.0015 Jam

M2 Lapisan penetrasi (lapen) permukaan macadam 5 cm


0.1415 Org/Hr
0.0043 Org/Hr
0.0043 Org/Hr
0.0400 m3
0.0220 m3
0.0110 m3
0.0025 m3
4.8000 Kg
0.3220 Ltr

M2 Lapisan tipis aspal beton tbl. 3 cm


0.0024 Org/Hr
0.0003 Org/Hr
0.0122 m3
0.0233 m3
4.7975 Kg
5.2991 Kg
0.0010 Jam
0.0017 Jam
0.0017 Jam
0.0183 Jam
0.0021 Jam
0.0018 Jam
0.0013 Jam

M2 Lapisan permukaan aspal beton (Laston/AC aspal concrete) tbl. 5 c


0.0039 Org/Hr
0.0004 Org/Hr
0.0421 m3
0.0186 m3
6.0019 Kg
8.2688 Kg
0.0016 Jam
0.0028 Jam
0.0028 Jam
0.0305 Jam
0.0034 Jam
0.0017 Jam
0.0019 Jam

M2 Pembuatan jalan aspal biasa


Sirtu tb. 10 cm, Agregat kelas A tb. 20 cm & Permukaan macadam
0.3915 Org/Hr
0.0140 Org/Hr
0.0043 Org/Hr
0.1200 m3
0.0400 m3
0.1756 m3
0.0110 m3
0.0025 m3
4.8000 Kg
0.0864 M3
0.3220 Ltr
0.0066 Jam
0.01352 Jam
0.0081 Jam
0.0144 Jam
0.0305 Jam
M2 Pembuatan jalan aspal beton tb. 5 cm
(Sirtu tb. 10 cm, Agregat kelas A tb. 20 cm, Laston AC tb. 5 cm)
0.25734 Org/Hr
0.0109 Org/Hr
0.1200 m3
0.1536 m3
0.0864 M3
8.78216 Kg
0.39112 Ltr
0.0421 m3
0.0186 m3
6.0019 Kg
0.0066 Jam
0.01352 Jam
0.00536 Jam
0.0024 Jam
0.00248 Jam
0.0329 Jam
0.0016 Jam
0.0028 Jam
0.0028 Jam
0.0034 Jam
0.0017 Jam
0.0019 Jam
ANALISA HARSA SATUAN
( UNIT PRICE )

URAIAN HARGA

PEKERJAAN PERSIAPAN :

APANGAN & PERATAAN TANAH


Pekerja 89,100
Mandor 133,700

AN PASANG BOUWPLANK
Kayu klas III 5/7 2,514,200
Papan klas III 2,095,300
Paku 4 s/d 7 cm 18,600
Pekerja 89,100
Tukang Kayu Kasar 115,900
Kepala Tukang Kayu 133,700
Mandor 133,700

si Keet / Gudang Bahan Bangunan dan Alat / Bedeng Pekerja


Kayu Pancang (Dolken) d = 10cm, p = 4m 10,200
Kayu Kelas III 1,964,400
Paku 18,600
Seng Gelombang BJLS 0.20 42,400
Triplek 4mm 65,500
Tukang Kayu 115,900
Pekerja 89,100
Kepala Tukang 133,700
Mandor 133,700

PEKERJAAN TANAH :

H TEBAL 20 CM
Pekerja 89,100
Mandor 133,700

IASA SEDALAM 1 METER


Pekerja 89,100
Mandor 133,700
ANYAK BATU s/d 1 m
pekerja 89,100
mandor 133,700

M3 GALIAN
Pekerja 89,100
Mandor 133,700

H (PER 20 CM)
Pekerja 89,100
Mandor 133,700

Pekerja 89,100
Mandor 133,700
Pasir urug 88,600

Tanah timbun 102,700


pekerja 89,100
mandor 133,700

PEMADATAN
sirtu 303,300
pekerja 89,100
mandor 133,700
pemadatan 51,200

ENGAN EXCAVATOR
Pekerja 89,100
Mandor 133,700
Excavator 80-140 HP 783,993
Dump Truck 3-4m3/ 6 ton 189,896

DIPADATKAN DENGAN ALAT BERAT


Pekerja 89,100
Mandor 133,700
Tanah urug 102,700
Vibrating roller 6-8 ton 44,575
Water tank truck 3000-4500 ltr 219,631

AGREGAT KELAS C ) DIPADATKAN


Pekerja 89,100
Mandor 133,700
Sirtu 303,300
Vibrating roller 6-8 ton 44,575
Water tank truck 3000-4500 ltr 219,631

PEKERJAAN PANCANG / PEMBONGKARAN

BULAT / MERAH / DOLKEN


Kayu bulat/dolken 8-10cm panj. 4 m 14,442
Pekerja 89,100
Mandor 133,700

BULAT / MERAH / DOLKEN


Kayu bulat/dolken 12-15cm panj. 12 m 98,200
Pekerja 89,100
Mandor 133,700

CANG Mini Pile Segitiga Ukuran 28 x 28 CM K 350, Pj = 6 m


Mini Pile Segitiga Ukuran 28 x 28 CM K 350, Pj = 6 m -
Pemotongan tiang -
Plat joint 25x25 -
Mobilisasi drop Hummer -

NI PILE (P.TP. 01)


Mesin Lier 19,685
Alat Bantu Pancang dan gueide beem 15,000
Pekerja 89,100
Mandor 133,700
Tukang Batu 115,900
Kepala Tukang Batu 133,700

ALA TIANG PANCANG (P.BBK.01 / 10 BH)


Alat Bantu 15,000
Pekerja 89,100
Mandor 133,700
Tukang Batu 115,900
Kepala Tukang Batu 133,700

YAMBUNGAN TIANG PANCANG /3 SAMBUNGAN


Kawat Las 3,514
Alat Bantu 15,000
Mesin las 57,826
Pekerja 89,100
Mandor 133,700
Tukang Batu 115,900
Kepala Tukang Batu 133,700
Pekerja 89,100
Tukang besi 115,900

Pekerja 89,100
Mandor 133,700

Tukang kayu 100,000


Kepala tukang 115,000

n reng kayu tdk dipakai lagi


Pekerja 89,100
Mandor 133,700
PEKERJAAN PONDASI :

AS. PONDASI BATU KALI 1 :2


tukang batu 115,900
kepala tukang batu 133,700
pekerja 89,100
mandor 133,700
batu kali 248,100
semen 66,500
pasir pasang 146,200

SI BATU BELAH CAMP. 1 PC : 4 PSR


Pekerja 89,100
Tukang batu 115,900
Kepala Tukang batu 133,700
Mandor 133,700
batu belah 248,100
Semen PC 1,330
Pasir pasang 146,200

SI BATU BELAH CAMP. 1 PC : 5 PSR


Pekerja 89,100
Tukang batu 115,900
Kepala Tukang batu 133,700
Mandor 133,700
batu belah 248,100
Semen PC 1,330
Pasir pasang 146,200

SI BATU KOSONG (ANSTAMPENG)


Pekerja 89,100
Tukang batu 115,900
Kepala Tukang batu 133,700
Mandor 133,700
batu belah 248,100
Pasir urug 146,200

PEKERJAAN BETON :

BETON BERTULANG (150 KG BESI + BEGESTING)


Pekerja 89,100
Tukang batu 115,900
Tukang kayu 115,900
Tukang besi 115,900
Kepala Tukang 133,700
Mandor 133,700
Kayu Begesting 859,900
Paku kayu 18,600
Minyak Begesting 7,000
Besi beton 15,900
Kawat beton 19,400
Semen PC 1,330
Pasir Beton 146,200
Kerikil 363,300

BETON BERTULANG (100 KG BESI + BEGESTING)


Pekerja 89,100
Tukang batu 115,900
Tukang kayu 115,900
Tukang besi 115,900
Kepala Tukang 133,700
Mandor 133,700
Kayu Begesting 859,900
Paku kayu 18,600
Minyak Begesting 7,000
Besi beton 15,900
Kawat beton 19,400
Semen PC 1,330
Pasir Beton 146,200
Kerikil 363,300

ETON BERTULANG (150 KG BESI + BEGESTING)


Pekerja 89,100
Tukang batu 115,900
Tukang kayu 115,900
Tukang besi 115,900
Kepala Tukang 133,700
Mandor 133,700
Kayu Begesting 859,900
Paku kayu 18,600
Minyak Begesting 7,000
Besi beton 15,900
Kawat beton 19,400
Semen PC 1,330
Pasir Beton 146,200
Kerikil 363,300

ulang (150 kg besi + bekisting) tiap 1m


Pekerja 89,100
Tukang batu 115,900
Tukang kayu 115,900
Tukang besi 115,900
Kepala tukang 133,700
Mandor 133,700
Kayu Begesting 859,900
Paku biasa 2"-5" 18,600
Minyak Bekisting 7,000
Besi beton polos 15,900
Kawat beton 19,400
Semen portland 1,330
Pasir beton 146,200
Batu pecah/split 2/3 363,300
Papan mall 2,095,300
Kayu dolken 8-10/400 cm 10,200

ON DENGAN BESI 200 KG/M3 ADALAH :


Pekerja 89,100
Tukang batu 115,900
Tukang kayu 115,900
Tukang besi 115,900
Kepala Tukang 133,700
Mandor 133,700
Kayu Begesting 859,900
Paku kayu 18,600
Minyak Begesting 7,000
Besi beton 15,900
Kawat beton 19,400
Semen PC 1,330
Pasir Beton 146,200
Kerikil 363,300

ON DENGAN BESI 150 KG/M3 ADALAH :


Pekerja 89,100
Tukang batu 115,900
Tukang kayu 115,900
Tukang besi 115,900
Kepala Tukang 133,700
Mandor 133,700
Kayu Begesting 859,900
Paku kayu 18,600
Minyak Begesting 7,000
Besi beton 15,900
Kawat beton 19,400
Semen PC 1,330
Pasir Beton 146,200
Kerikil 363,300

ON DENGAN BESI 100 KG/M3 ADALAH :


Pekerja 89,100
Tukang batu 115,900
Tukang kayu 115,900
Tukang besi 115,900
Kepala Tukang 133,700
Mandor 133,700
Kayu Begesting 859,900
Paku kayu 18,600
Minyak Begesting 7,000
Besi beton 15,900
Kawat beton 19,400
Semen PC 1,330
Pasir Beton 146,200
Kerikil 363,300

rtulang (150 kg besi + bekisting) tiap 1m


Pekerja 89,100
Tukang batu 115,900
Tukang kayu 115,900
Tukang besi 115,900
Kepala tukang 133,700
Mandor 133,700
Kayu Begesting 859,900
Paku biasa 2"-5" 18,600
Minyak Bekisting 7,000
Besi beton polos 15,100
Kawat beton 19,400
Semen portland 1,330
Pasir beton 146,200
Batu pecah/split 2/3 363,300
Kayu Begesting 859,900
Papan mall 2,095,300
Kayu dolken 8-10/400 cm 10,200
n bertulang tebal 12 cm tiap 1 m
Pekerja 89,100
Tukang kayu 115,900
Tukang besi 115,900
Tukang batu 115,900
Kepala tukang 133,700
Mandor 133,700
Papan mall 3 cm 2,095,300
Kayu Begesting 859,900
Paku biasa 2"-5" 18,600
Minyak Bekisting 7,000
Kayu dolken 8-10/400 cm 10,200
Besi beton polos 15,100
Kawat beton 19,400
Semen portland 1,330
Pasir beton 146,200
Batu pecah/split 2/3 363,300

n tebal 12 cm, tiap 1 m3


Pek. Plat Lantai Beton tebal 12 cm 566,600

RAKTIS BETON BERTULANG (12 X 12 CM)


Pekerja 89,100
Tukang batu 115,900
Tukang kayu 115,900
Tukang besi 115,900
Kepala Tukang 133,700
Mandor 133,700
Kayu Begesting 859,900
Paku kayu 18,600
Besi beton 15,100
Kawat beton 19,400
Semen PC 1,330
Pasir Beton 146,200
Kerikil 363,300

2x12 cm tiap 1 m3
Kolom Penguat/praktis beton bertulang 12x12 72,300

OK BETON BERTULANG (10 X 15 CM)


Pekerja 89,100
Tukang batu 115,900
Tukang kayu 115,900
Tukang besi 115,900
Kepala Tukang 133,700
Mandor 133,700
Kayu Begesting 859,900
Paku kayu 18,600
Besi beton 15,100
Kawat beton 19,400
Semen PC 1,330
Pasir Beton 146,200
Kerikil 363,300

MEJA BETON BERTULANG TBL. 8 cm


Pekerja 89,100
Mandor 133,700
Kepala tukang 133,700
Tukang besi 115,900
Tukang kayu 115,900
Tukang batu 115,900
Kayu papan 859,900
Paku 18,600
Besi beton polos 15,100
Kawat beton 19,400
Semen 1,330
Pasir pasang 146,200
Kerikil 363,300

AMP. 1PC : 2 PSR : 3 KRL


Mandor 133,700
Kepala Tukang batu 133,700
Tukang Batu 115,900
Pekerja (Pembantu tukang) 89,100
semen PC 1,330
Pasir beton 146,200
Kerikil beton 363,300

MP. 1 PC : 3 PSR : 6 KRL


Mandor 133,700
Kepala Tukang 133,700
Tukang Batu 115,900
Pembantu Tukang batu 89,100
kerikil 363,300
semen Portland 1,330
Pasir Beton 146,200

BETON U-24
Besi Beton U-24 15,100
Kawat Benrat 19,400
Pekerja 89,100
Tukang Besi Tulangan 115,900
Kepala Tukang Besi 133,700
Mandor 133,700

BETON U-39
Besi Beton U-39 15,900
Kawat Benrat 19,400
Pekerja 89,100
Tukang Besi Tulangan 115,900
Kepala Tukang Besi 133,700
Mandor 133,700

BETON U-24 TIAP 100 KG


Besi Beton U-24 15,100
Kawat Benrat 19,400
Pekerja 89,100
Tukang Besi Tulangan 115,900
Kepala Tukang Besi 133,700
Mandor 133,700

Sitemix
Semen PC 66,500
Pasir Beton 146,200
Batu Split Pecah Mesin 1/2 363,300
Pekerja 89,100
Tukang Batu Kasar 115,900
Kepala Tukang Batu 133,700
Mandor 133,700

Sitemix
Semen PC 66,500
Pasir Beton 146,200
Batu Split Pecah Mesin 1/2 363,300
Pekerja 89,100
Tukang Batu Kasar 115,900
Kepala Tukang Batu 133,700
Mandor 133,700

Sitemix
Semen PC 66,500
Pasir Beton 146,200
Batu Split Pecah Mesin 1/2 363,300
Pekerja 89,100
Tukang Batu Kasar 115,900
Kepala Tukang Batu 133,700
Mandor 133,700

Sitemix
Semen PC 66,500
Pasir Beton 146,200
Batu Split Pecah Mesin 1/2 363,300
Pekerja 89,100
Tukang Batu Kasar 115,900
Kepala Tukang Batu 133,700
Mandor 133,700

JA BETON TUMBUK 1:3:5 TEBAL 10 cm


Semen PC 66,500
Pasir Beton 146,200
Batu Split Pecah Mesin 1/2 363,300
Pekerja 89,100
Tukang Batu Kasar 115,900
Kepala Tukang Batu 133,700
Mandor 133,700

TON , FINISH ACIAN beton 1:3:5, t. 10 cm


Semen PC 66,500
Pasir Beton 146,200
Batu Split Pecah Mesin 1/2 363,300
Pekerja 89,100
Tukang Batu Kasar 115,900
Kepala Tukang Batu 133,700
Mandor 133,700

PEKERJAAN DINDING

Batako 15/30/7 (cetak mesin) 1,400


Semen Portland 1,330
Pasir Beton / Pasang 146,200
Pekerja 89,100
Tukang Batu Kasar 115,900
Kepala Tukang Batu 133,700
Mandor 133,700

erah tebal 1 bata, 1 Pc : 2 Ps


Bata merah 2,600
Semen portland 1,330
Pasir pasang 146,200
Pekerja 89,100
Tukang batu 115,900
Kepala tukang 133,700
Mandor 133,700
TEBAL . 3 cm
semen 66,500
pasir pasang 146,200
Kawat anyam / simpai 18,600
tukang batu 115,900
kepala tukang batu 133,700
pekerja 89,100
mandor 133,700

PAI DINDING RABITZ


Kawat anyam / simpai 18,600
tukang batu 115,900
kepala tukang batu 133,700
pekerja 89,100
mandor 133,700

si gypsumboard Rangka Kayu


Balok kayu klas II 3,481,400
Paku 8 s/d 12 cm 18,600
Gypsumboard t.9 mm ex Jayaboard 66,800
Lem Kayu 15,700
Pekerja 89,100
Tukang Kayu Halus 115,900
Kepala Tukang Kayu 133,700
Mandor 133,700

si gypsumboard Rangka Metal Furing


Rangka plafond Metal furing termasuk ripet 132,900
Gypsumboard t.9 mm ex Jayaboard 66,800
Pekerja 89,100
Tukang Kayu Halus 115,900
Kepala Tukang Kayu 133,700
Mandor 133,700

mm untuk dinding pemisah


Paku biasa 18,600
Triplek 4 mm 65,500
Pekerja 89,100
Mandor 133,700
Tukang kayu 115,900
Kepala tukang 133,700

rangka kayu
Paku biasa 18,600
Balok kayu 2,769,300
Pekerja 89,100
Mandor 133,700
Tukang kayu 115,900
Kepala tukang 133,700

hollow 1x40.40.2 mm modul 60x120 cm, dind. Spandek


Rangka metal hollow 40.40.2 mm 42,083.33
Assesoris (perkuatan,baut,las dll) 44,187.50
Zinkcalum spandek 106,300.00
Pekerja 89,100.00
Tukang Besi 115,900.00
Kepala tukang 133,700.00
Mandor 133,700.00

hollow 1x40.40.2 mm modul 60x120 cm, dind. Kawat harmonika


Rangka metal hollow 40.40.2 mm 42,083
Assesoris (perkuatan,baut,las dll) 44,188
Kawat harmonika 55 x 55 mm 23,800
Pekerja 89,100
Tukang Besi 115,900
Kepala tukang 133,700
Mandor 133,700

PEKERJAAN PLESTERAN :

BAL 15 MM CAMP. 1 PC : 2 PSR


Pekerja 89,100
Tukang batu 115,900
Kepala tukang 133,700
Mandor 133,700
Kg Semen PC 1,330
M3 Pasir pasang 146,200

AL 15 MM CAMP. 1 PC : 4 PSR
Pekerja 89,100
Tukang batu 115,900
Kepala tukang 133,700
Mandor 133,700
Kg Semen PC 1,330
M3 Pasir pasang 146,200

15 MM CAMP. 1 PC : 5 PSR
Pekerja 89,100
Tukang batu 115,900
Kepala tukang 133,700
Mandor 133,700
Kg Semen PC 1,330
M3 Pasir pasang 146,200
semen 66,500
pasir pasang 146,200
tukang batu 115,900
kepala tukang batu 133,700
pekerja 89,100
mandor 133,700

Pekerja 89,100
Tukang batu 115,900
Kepala tukang 133,700
Mandor 133,700
Kg Semen PC 1,330

CIPRAT/KAMPROT 1 Pc : 2 Ps
Pekerja 89,100
Tukang batu 115,900
Kepala tukang 133,700
Mandor 133,700
Semen 66,500
Pasir pasang 146,200

PEKERJAAN LANTAI / DINDING KERAMIK

AMIK 600 x 600


Keramik 60/60 cm KW1 ex Masterina 208,200
Semen PC 66,500
Pasir Pasang 146,200
Semen Warna 2,990
Pekerja 89,100
Tukang Batu Kasar 115,900
Kepala Tukang Batu 133,700
Mandor 133,700

KERAMIK 40X40 CM
Pekerja 89,100
Tukang batu 115,900
Kepala tukang 133,700
Mandor 133,700
Buah Keramik 40x40 cm 9,920
Kg Semen PC 1,330
M3 Pasir pasang 146,200

LANTAI KERAMIK 30X30 CM


Pekerja 89,100
Tukang batu 115,900
Kepala tukang 133,700
Mandor 133,700
Buah Keramik 30x30 cm 4,779
Kg Semen PC 1,330
M3 Pasir pasang 146,200

LANTAI KERAMIK 20X20 CM


Pekerja 89,100
Tukang batu 115,900
Kepala tukang 133,700
Mandor 133,700
buah Keramik 20x20 cm 2,620
Kg Semen PC 1,330
M3 Pasir pasang 146,200

PLINT KERAMIK 10X30 CM


Pekerja 89,100
Tukang batu 115,900
Kepala tukang 133,700
Mandor 133,700
M' Plint keramik 10 x 30 cm 41,333
Kg Semen PC 1,330
M3 Pasir pasang 146,200
Kg Semen Warna 2,990

DINDING KERAMIK 20X20 CM


Pekerja 89,100
Tukang batu 115,900
Kepala tukang 133,700
Mandor 133,700
Bh keramik 20 X 20 cm 2,620
Kg Semen PC 1,330
M3 Pasir pasang 146,200
Kg Semen Warna 2,990

TU TEMPEL
Batu tempel 203,800
Semen PC 66,500
Pasir Pasang 146,200
Pekerja 89,100
Tukang Batu Kasar 115,900
Kepala Tukang Batu 133,700
Mandor 133,700

G LANTAI KERAMIK ARTISTIK 10 X 40 CM


Pekerja 89,100
Tukang batu 115,900
Kepala tukang 133,700
Mandor 133,700
Keramik 10 x 40 cm 15,900
Semen PC 1,330
Pasir pasang 146,200
Semen Warna 2,990

RAT / KAMPROT 1 Pc : 2 Ps
Semen Portland 66,500
Pasir pasang 146,200
Pekerja 89,100
Tukang batu 115,900
Kepala tukang 133,700
Mandor 133,700

PEKERJAAN LANGIT-LANGIT

ond Metal furing


Rangka plafond Metal furing 132,900
Paku ripet 500
Pekerja 89,100
Tukang Besi Konstruksi 115,900
Kepala Tukang Besi 133,700
Mandor 133,700

A LANGIT-LANGIT KAYU KLAS II (60X120 CM)


Pekerja 89,100
Tukang kayu 115,900
Kepala tukang 133,700
Mandor 133,700
M3 Kayu klas II 2,769,300
Kg paku kayu 18,600

ANGIT PLYWOOD 3 MM
Mandor 133,700
Kepala tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
Kg paku plywood 26,500
Lbr Plywood 3 mm 102,600

ANGIT TRIPLEKS 3 MM
Mandor 133,700
Kepala tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
Kg paku tripleks 26,500
Lbr Tripleks 3 mm 62,800

ANGIT GYPSUM
Mandor 133,700
Kepala tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
Kg paku skerup 22,100
Lbr papan gypsum 66,800

ANGIT GRC
Mandor 133,700
Kepala tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
Kg paku skerup 22,100
GRC 71,300

KAYU PROFIL
Mandor 133,700
Kepala tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
Kg paku plywood 18,600
m' list profil 6,325

Mandor 133,700
Kepala tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
Kg paku skrup 22,100
m' list profil Gypsum 57,700

AFOND GRC 4 x 8ft, 4 MM

balok 2,095,300
kaso 5/7 2,514,200
paku rata-rata 18,600
GRC 4x8 ft, 4 mm 71,300
paku triplek 26,500
tukang kayu 115,900
kepala tukang kayu 133,700
pekerja 89,100
mandor 133,700
nutup plafon Gypsum 9 mm + rangka hollow tb. 0,3 mm
Pekerja 89,100
Mandor 133,700
Tukang Gypsum 115,900
Tukang Alumunium 115,900
Kepala tukang 133,700
Paku peluru ramset 5,000
Hollow 4x4 cm tb. 0,35 mm 252,500
Hollow 2x4 cm tb. 0,35 mm 188,300
Paku beton 28,300
Sekrup 6 x 1-1,5 300
Gypsum board 120x240 9 mm 66,800
Sekrup Gypsum 300
Textile tape 25,000
Compound Gypsum 54,000
Amplas 6,200

nutup plafon GRC 4 mm + rangka hollow tb. 0,3 mm


Pekerja 89,100
Mandor 133,700
Tukang GRC 115,900
Tukang Alumunium 115,900
Kepala tukang 133,700
Paku peluru ramset 5,000
Hollow 4x4 cm tb. 0,35 mm 252,500
Hollow 2x4 cm tb. 0,35 mm 188,300
Paku beton 28,300
Sekrup 6 x 1-1,5 300
GRC 4 mm 71,380
Sekrup GRC 300
Textile tape 25,000
Compound GRC 54,000
Amplas 6,200

PEKERJAAN PENUTUP ATAP

AJA RINGAN TERPASANG TERMASUK PAKU RIPET-


ART TRUESS, PRIMA TRUSS

TENG METAL
Genteng Metal 51,524
paku anti karat 11,300
Mandor Prima 0,35 mm 133,700
Kepala tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100

P GENTENG METAL
Nok/Bumbungan Genteng Metal 1/2 lingk 35,400
Paku 11,300
Pekerja 89,100
Tukang Kayu 115,900
Kepala Tukang Kayu 133,700
Mandor 133,700

Atap 1/2 Lingkaran 15cm Aluminium 0.3


Tukang Kayu 115,900
Kepala Tukang Kayu 133,700
Pekerja 89,100
Mandor 133,700
Aluminium plat 0.3 124,000
Besi Penahan 11,000
Untuk I M' Pek. Talang

buangan dari Talang Atap 8cm aluminium


Tukang Kayu 115,900
Kepala Tukang Kayu 133,700
Pekerja 89,100
Mandor 133,700
Aluminium plat 0.3 124,000
Untuk I M' Pek. Pipa Pembuangan

G GELOMBANG
Mandor 133,700
Kepala tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
Lbr Seng Gelombang BJLS 0.3 57,100
Paku seng 20,300

Mandor 133,700
Kepala tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
Seng Plat 42,400
paku kayu 20,300

ZINCALUMEE GELOMBANG 0,30 COLOR


Mandor 133,700
Kepala tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
Zincalume 0,3 106,300
Baut skrup 1" 600

AT ALUMUNIUM 0,30
Mandor 133,700
Kepala tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
Seng Plat Alumunium 59,200
Baut skrup 1" 600

Pas. Fleshing seng plat


Seng Plat BJLS 30 uk. 3/20 44,600
Paku 4 s/d 7 cm 18,600
Pekerja 89,100
Tukang Kayu Kasar 115,900
Kepala Tukang Kayu 133,700
Mandor 133,700

Pas. Talang seng plat


Seng Plat BJLS 30 uk. 3/20 44,600
Paku 4 s/d 7 cm 18,600
Pekerja 89,100
Tukang Kayu Kasar 115,900
Kepala Tukang Kayu 133,700
Mandor 133,700

PEKERJAAN KAYU

yu Sandaran Jembatan, Balok Pemikul, Balok Air Pada Barau, Topangan


Tarahan Kayu-kayu Penahan Menggunakan Kayu Belian Uk. 9/9
Tukang Kayu 115,900
Pekerja 89,100
Kepala Tukang 133,700
Mandor 133,700
Kayu Belian (Tidak Ketam uk. 9/9) 8,355,800
Paku beton 28,300

a Badan Kayu Belian Uk. 8/8


Tukang Kayu 115,900
Pekerja 89,100
Kepala Tukang 133,700
Mandor 133,700
Kayu Belian (Ketam uk. 8/8) 9,000,200
Paku belian 28,300

a Badan Kayu Kelas I Uk. 8/8


Tukang Kayu 115,900
Pekerja 89,100
Kepala Tukang 133,700
Mandor 133,700
Kayu Kelas I (Ketam Uk. 8/8) 6,230,900
Paku 18,600

ASANG KOSEN PINTU/JENDELA KAYU ULIN


Pekerja 89,100
Tukang kayu 115,900
Kepala tukang 133,700
Mandor 133,700
M3 Kayu ulin 9,504,200
Kg Paku ulin 28,300

ASANG KOSEN PINTU/JENDELA KAYU KLAS I


Pekerja 89,100
Tukang kayu 115,900
Kepala tukang 133,700
Mandor 133,700
M3 Kayu klas I 6,914,100
Kg Paku Kayu 18,600

ANG KUDA-KUDA KONVENSIONAL KY. KLAS II


Pekerja 89,100
Tukang kayu 115,900
Kepala tukang 133,700
Mandor 133,700
M3 Balok Kayu klas II 3,115,500
Kg Besi strip 15,100
Kg Paku kayu 18,600

ASANG KONSTRUKSI GORDENG KAYU KLAS II


Pekerja 89,100
Tukang kayu 115,900
Kepala tukang 133,700
Mandor 133,700
M3 Balok Kayu klas II 5,538,500
Kg Paku kayu 18,600
Kg Besi strip 15,100

AU 5/7 DAN RENG 3/5 KAYU KLAS II


G METAL ROOF
Pekerja 89,100
Tukang kayu 115,900
Kepala tukang kayu 133,700
Mandor 133,700
M3 Kasau 5/7 cm 3,481,400
M3 Reng 3/4 cm 2,954,000
Kg paku kayu 18,600
kasaunya saja 1/2 dari SNI -2008.06.17
rengnya saja 1/2 dari SNI -2008.06.17

M PAPAN KAYU KLAS. I ATAU KLAS. II


Mandor 133,700
Kepala tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
M3 Kayu papan kelas Kuat I 6,914,100
Kg paku ulin 18,600
M3 Kayu papan kelas Kuat II 6,154,000
Kg paku kayu 18,600
Untuk Lysplank papan kayu klas I =
Untuk Lysplank papan kayu klas II =

ank kalsiplank
Pekerja 89,100
Mandor 133,700
Tukang 115,900
Kepala tukang 133,700
Kalsiplank 20 cm 75,000
Paku 18,600

ANG DAUN PINTU PANEL KY KLAS I / KLAS II


Pekerja 89,100
Tukang kayu 115,900
Kepala tukang 133,700
Mandor 133,700
M3 Papan Kayu klas I 6,914,100
M3 Papan Kayu klas II 6,154,000
Lem kayu 15,700
Untuk Daun pintu panel kayu klas I =
Untuk Daun pintu panel kayu klas II =

ASANG DAUN PINTU PANEL KACA KAYU KLAS I ATAU KLAS II


Pekerja 89,100
Tukang kayu 115,900
Kepala tukang 133,700
Mandor 133,700
M3 Papan Kayu klas I 6,914,100
M3 Papan Kayu klas II 6,154,000
Lem kayu 15,700
M2 Kaca Polos 5 mm 132,900
Untuk Daun pintu panel kaca kayu klas I =
Untuk Daun pintu panel kaca kayu klas II =

e teakwood; rangka kayu KW.II tertutup


Papan Kayu klas II Mabang 6,154,000
Lem Kayu 15,700
Paku 1 s/d 3 cm 18,600
Teakwood t. 3 mm uk. 90x220 124,800
Pekerja 89,100
Tukang Kayu Halus 115,900
Kepala Tukang Kayu 133,700
Mandor 133,700

e triplex; rangka kayu KW.II tertutup


Papan Kayu klas II Mabang 6,154,000
Lem Kayu 15,700
Paku 1 s/d 3 cm 18,600
Triplex t. 4 mm uk. 90x220 65,500
Pekerja 89,100
Tukang Kayu Halus 115,900
Kepala Tukang Kayu 133,700
Mandor 133,700

KACA 5 MM KAYU KLS II


Balok kayu klas. II 6,203,200
paku 18,600
kaca 5 mm 132,900
tukang kayu 115,900
kepala tukang kayu 133,700
pekerja 89,100
mandor 133,700

ASANG JALUSI KAYU KLAS II


Pekerja 89,100
Tukang kayu 115,900
Kepala tukang 133,700
Mandor 133,700
M3 Papan Kayu klas II 6,154,000
Kg Paku kayu 18,600

NGKA BADAN KAYU KLAS.I ATAU KLAS.II


Kayu Kelas I (Ketam Uk. 8/8) 6,230,900
Kayu Kelas II (Ketam Uk. 8/8) 3,807,800
Paku 18,600
Tukang Kayu 115,900
Pekerja 89,100
Kepala Tukang 133,700
Mandor 133,700
Untuk Rangka badan kayu klas I =
Untuk Rangka badan kayu klas II =

PEKERJAAN PENGECATAN

AYU (1 LPS PLAMIR, 1 LPS CAT DASAR DAN 2 LPS CAT KILAP)
Mandor 133,700
Kepala tukang cat 133,700
Tukang cat 115,900
Pembantu tukang cat 89,100
Kg cat menie kayu 48,700
Kg plamur kayu 29,700
Kg cat dasar 23,000
Kg Cat Kilap 53,100

dempul kayu 33,500


amplas 6,200
cat dasar 23,000
cat kayu 53,100
thinner 23,500
kuas 21,200
tukang cat 115,900
kepala tukang cat 133,700
pekerja 89,100
mandor 133,700

TEMBOK (1 LPS PLAMIR, 1 LPS CAT DASAR DAN 2 LPS CAT TEMBOK)
Mandor 133,700
Kepala tukang cat 133,700
Tukang cat 115,900
Pembantu tukang cat 89,100
Kg plamur tembok 29,700
Kg cat dasar tembok 23,000
Kg cat tembok 64,100

aja dgn menie besi


Pekerja 89,100
Mandor 133,700
Tukang cat 115,900
Kepala tukang 133,700
Kuas 21,200
Cat meni besi 48,700
Amplas 3,500

ngecatan water profing (coating)


Pekerja 89,100
Mandor 133,700
Tukang cat 115,900
Kepala tukang 133,700
Waterprofing (coating) 44,300
Kuas 21,200

BIDANG KAYU DENGAN RESIDU


Mandor 133,700
Pembantu tukang cat 89,100
Kg Ter/residu 53,500

PEKERJAAN KUNCI DAN PENGGANTUNG

NCI TANAM BIASA


Kunci tanam 2 slag (setaraf Belluci) 160,500
Mandor 133,700
kepala Tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100

pintu kamar mandi


Handel knob + Kunci ex Alpha 55,700
Pekerja 89,100
Tukang Kayu Halus 115,900
Kepala Tukang Kayu 133,700
Mandor 133,700

ENGSEL PINTU
Engsel pintu 4" 8,400
Mandor 133,700
kepala Tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100

ENGSEL JENDELA
Engsel jendela 3" 7,500
Mandor 133,700
kepala Tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100

HAK ANGIN
Mandor 133,700
kepala Tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
Bh Hak angin 4,400

KUNCI SELOT (GRENDEL)


Mandor 133,700
kepala Tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
Bh kunci selot (Grendel) 4,900

PEGANGAN JENDELA ATAU PINTU


Mandor 133,700
kepala Tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
Pegangan jendela/pintu 14,100

PEGANGAN HANDLE PINTU BESAR


Mandor 133,700
kepala Tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
Pegangan handle pintu besar 132,900

Pas. Kunci pintu ruangan


Handle Pintu ex Solid; termasuk Kunci 145,700
Pekerja 89,100
Tukang Kayu Halus 115,900
Kepala Tukang Kayu 133,700
Mandor 133,700

Pas. Door Stoper


Door Stoper 79,700
Pekerja 89,100
Tukang Kayu Halus 115,900
Kepala Tukang Kayu 133,700
Mandor 133,700
Pas. Door Closer
Door closer 199,400
Pekerja 89,100
Tukang Kayu Halus 115,900
Kepala Tukang Kayu 133,700
Mandor 133,700

PEKERJAAN KACA

KACA TEBAL 5 MM
Mandor 133,700
kepala Tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
m2 kaca bening tebal 5mm 132,900
m2 kaca ryben tebal 5mm 203,800
1 M2 PASANG KACA POLOS
1 M2 PASANG KACA RAYBEN

Kaca Polos 8 mm 334,500


Pekerja 89,100
Tukang Kayu Halus 115,900
Kepala Tukang Kayu 133,700
Mandor 133,700

PEKERJAAN SANITASI

Pas. Washtafel keramik


Wastafel LW 240 CJ ex Toto 310,100
Seal tape 2,200
Pekerja 89,100
Tukang Batu Halus 100,000
Kepala Tukang Batu 133,700
Mandor 133,700

Pas. Kloset Duduk Keramik


Kloset duduk CW 600 J / SW 660 J ex Toto 1,995,500
Sealant clear neutral (300 ml) 44,300
Pekerja 89,100
Tukang Batu Halus 115,900
Kepala Tukang Batu 133,700
Mandor 133,700

Pas. Urinoir Keramik


Urinoir type U 57 M ex Toto 1,668,900
Sealant clear neutral (300 ml) 44,300
Pekerja 89,100
Tukang Batu Halus 115,900
Kepala Tukang Batu 133,700
Mandor 133,700

Pas. Kloset Jongkok Keramik


Kloset Jongkok type CE 6 ex Toto 300,400
Semen PC Gresik (50 Kg) 66,500
Pekerja 89,100
Tukang Batu Halus 115,900
Kepala Tukang Batu 133,700
Mandor 133,700
Perlengkapan

emasang bak cuci piring stenlis steel


Pekerja 89,100
Tukang 115,900
Mandor 133,700
Kepala tukang 133,700
Bak cuci stenlis steel 265,800
Water drain + asesories 93,030

Pas. Bak Air Fiberglass


Bak air fibreglass uk. 55x55x60 cm 398,700
Pekerja 89,100
Tukang Batu Halus 115,900
Kepala Tukang Batu 133,700
Mandor 133,700
Perlengkapan 398,700

sang bak mandi bata lapis keramik volume 0,3 m3


Pekerja 89,100
Mandor 133,700
Tukang batu 115,900
Kepala tukang 133,700
Bata merah 2,600
Semen 66,500
Pasir 146,200
Ubin keramik 20 x20 2,620
Semen warna/ putih 2,990

Pas. Shower spray


Shower Spray type THX 20 NBPIV ex Toto 300,400
Seal tape 2,200
Pekerja 89,100
Tukang Batu Halus 115,900
Kepala Tukang Batu 133,700
Mandor 133,700

Pas. Shower set


Shower Set type TX 423 SZ ex Toto 1,471,000
Seal tape 2,200
Pekerja 89,100
Tukang Batu Halus 115,900
Kepala Tukang Batu 133,700
Mandor 133,700

Pas. Kran dinding


Kran dinding type T 23 B13V7N ex Toto 13,300
Seal tape 2,200
Pekerja 89,100
Tukang Batu Halus 115,900
Kepala Tukang Batu 133,700
Mandor 133,700

Pasang 1 bh fool drain stenlist


fool drain stenlist 14,100
tukang 115,900
kep. Tukang kayu 133,700
pekerja 89,100
Mandor 133,700

PEKERJAAN PIPA

Pipa PVC dia. 4" AW


Pipa PVC dia 4" AW ex Wavin 110,800
Perlengkapan 110,800
Pekerja 89,100
Tukang Batu Halus 115,900
Kepala Tukang Batu 133,700
Mandor 133,700

Pipa PVC dia. 3" AW


Pipa PVC dia 3" AW ex Wavin 110,800
Perlengkapan 110,800
Pekerja 89,100
Tukang Batu Halus 115,900
Kepala Tukang Batu 133,700
Mandor 133,700
Pipa PVC dia. 2" AW
Pipa PVC dia 2" AW ex Wavin 66,500
Perlengkapan 66,500
Pekerja 89,100
Tukang Batu Halus 115,900
Kepala Tukang Batu 133,700
Mandor 133,700

Pipa PVC dia. 1" AW


Pipa PVC dia 1" AW ex Wavin 28,300
Perlengkapan 28,300
Pekerja 89,100
Tukang Batu Halus 115,900
Kepala Tukang Batu 133,700
Mandor 133,700

Pipa PVC dia. 3/4" AW


Pipa PVC dia 3/4" AW ex Wavin 21,200
Perlengkapan 21,200
Pekerja 89,100
Tukang Batu Halus 115,900
Kepala Tukang Batu 133,700
Mandor 133,700

Pipa PVC dia. 1/2" AW


Pipa PVC dia 1/2" AW ex Wavin 16,800
Perlengkapan 16,800
Pekerja 89,100
Tukang Batu Halus 115,900
Kepala Tukang Batu 133,700
Mandor 133,700

Stop kran dia. 1/2"


Stop kran dia 1/2" ex onda 13,300
Perlengkapan 13,300
Pekerja 89,100
Tukang Batu Halus 115,900
Kepala Tukang Batu 133,700
Mandor 133,700

PEKERJAAN ELEKTRIKAL

Pasang instalasi lampu dgn NYM 3x2,5 mm (tdk termasuk fiting,sakelar+lampu)


Catatan : Asumsi tinggi plafon 4 m, bentang ruang 8 m, uk. Kabel standart PUIL 2000
Kabel NYM 3 x 2,5 mm 11,500
Conduit pipa PVC dia 5/8" C 2,083
Tee dos 900
Inbow doos 3,960
Sock 1,100
Klem conduit 1,100
Lastdop 1,650
Fleksible pipa 2,083
Paku,sekrup,fisher(10% hrg conduit) 2,083
Elbow 660
Instalator 115,900
Pekerja 89,100
Mandor 133,700

Pasang instalasi Stop kontak (tdk termasuk stop kontak)


Stop kontak tdk dimasukan dlm analis tergantung merk dll
Kabel NYM 3 x 2,5 mm 11,500
Conduit PVC ex. EGA clipsal 2,083
Tee dos 900
Inbow doos 3,960
Sock 1,100
Klem conduit 1,100
Lasdop 1,650
Paku,sekrup,fisher(10% hrg conduit 2,083
Elbow 660
Instalator 115,900
Pekerja 89,100
Mandor 133,700

Pas. Instalasi stop kontak


Kabel NYM 2 x 2,5 mm2 9,100
Isolasi 6,700
Klem 4,900
Pekerja 89,100
Tukang Listrik 115,900
Kepala Tukang listrik 133,700
Mandor 133,700

Pas. Instalasi lampu


Kabel NYM 2 x 2,5 mm2 9,100
Isolasi 6,700
Klem 4,900
Pekerja 89,100
Tukang Listrik 115,900
Kepala Tukang listrik 133,700
Mandor 133,700

Pas. Saklar engkel


Saklar Tunggal 16,800
Mangkok Listrik 2,500
Isolasi 6,700
Pekerja 89,100
Tukang Listrik 115,900
Kepala Tukang listrik 133,700
Mandor 133,700

Pas. Saklar doble


Saklar Ganda 16,700
Mangkok Listrik 2,500
isolasi 6,700
Pekerja 89,100
Tukang Listrik 115,900
Kepala Tukang listrik 133,700
Mandor 133,700

Pas. Saklar triple


Saklar triple 17,300
Mangkok Listrik 2,500
isolasi 6,700
Pekerja 89,100
Tukang Listrik 115,900
Kepala Tukang listrik 133,700
Mandor 133,700

Pas. Stop kontak


Stopkontak 4,400
Mangkok Listrik 2,500
isolasi 6,700
Pekerja 89,100
Tukang Listrik 115,900
Kepala Tukang listrik 133,700
Mandor 133,700

Pas. Fitting plafond + Lampu SL


Fitting plafond + lampu SL ex 44,200
isolasi 6,700
Pekerja 89,100
Tukang Listrik 115,900
Kepala Tukang listrik 133,700
Mandor 133,700

Pas. Lampu TL 2 x 18 watt grille


Lampu TL 2 x 18 watt grille ex 66,400
isolasi 6,700
Pekerja 89,100
Tukang Listrik 115,900
Kepala Tukang listrik 133,700
Mandor 133,700

PEKERJAAN BESI BAJA / KUSEN ALUMUNIUM

Pekerja 89,100
Mandor 133,700
Tukang las 115,900
Kepala tukang 133,700
Besi profil 15,900

baja WF 20,200
kawat las 101,900
solar 4,600
oli / pelumas 25,700
sewa alat 57,826
tukang las 115,900
kepala tukang besi 133,700
pekerja 89,100
mandor 133,700

baja siku 20,200


kawat las 101,900
solar 4,600
oli / pelumas 25,700
sewa alat 57,826
tukang las 115,900
kepala tukang besi 133,700
pekerja 89,100
mandor 133,700

sang kawat nyamuk/kasa


Kawat nyamuk 15,900
Paku 18,600
Kayu 2,514,200
Tukang kayu 115,900
Pekerja 89,100
Kepala tukang 133,700
Mandor 133,700

Mandor 133,700
Kepala tukang Batu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
Kawat simpai 18,600
Kg Paku Kayu 18,600

TERALIS BESI
besi hollow 20 x 20 mm 55,400
Pengelasan 5,942
Mandor 133,700
kepala Tukang las 133,700
Tukang las 115,900
Pembantu tukang besi 89,100

ngelasan las listrik


Kawat las listrik 101,900
Solar 4,600
Pelumas 25,700
Sewa alat 57,826
Pekerja 89,100
Mandor 133,700
Tukang las 115,900
Kepala tukang 133,700

ailing Tangga Besi Hollow


Besi Hollow 40.40.4 mm 15,900
Murboud 500
Cat besi synthetic 48,700
Pekerja 89,100
Tukang Batu Kasar 115,900
Kepala Tukang Batu 133,700
Mandor 133,700

ntu besi plat baja t. 2 mm rangkap; rangka besi siku


Besi Siku Rata-rata 30.30.3 mm 20,200
Besi Plat rata2 1 s/d 5 mm 20,200
Kawat Benrat 19,400
Pekerja 89,100
Tukang Besi Konstruksi 115,900
Kepala Tukang Besi 133,700
Mandor 133,700

Pagar Besi Hollow


Besi Hollow 40.40.4 mm 15,900
Kawat Benrat 19,400
Pekerja 89,100
Tukang Besi Konstruksi 115,900
Kepala Tukang Besi 133,700
Mandor 133,700

Pagar Besi Tempa


Besi tempa 15,900
Kawat Benrat 19,400
Pekerja 89,100
Tukang Besi Konstruksi 115,900
Kepala Tukang Besi 133,700
Mandor 133,700

Kusen Pintu dan Jendela Alumunium CA


Kusen Alm. 3" PC 110,800
Paku ripet 500
Pekerja 89,100
Tukang Kayu Halus 115,900
Kepala Tukang Kayu 133,700
Mandor 133,700

Kusen Pintu dan Jendela Alumunium PC


Kusen Alm. 4" PC 115,200
Paku ripet 500
Pekerja 89,100
Tukang Kayu Halus 115,900
Kepala Tukang Kayu 133,700
Mandor 133,700

Kusen & Pintu PVC toilet


Kusen & Pintu PVC toilet 375,000
Paku ripet 500
Pekerja 89,100
Tukang Kayu Halus 115,900
Kepala Tukang Kayu 133,700
Mandor 133,700

PEKERJAAN PRASARANA
p pasang bata
Galian tanah 70,200
Pas batu bata 1:2 516,900
plesteran 1:2 71,100

0 x/60 x 40 tebal 20 cm
Galian tanah ( 0,35 x L 29 ) 24,570
Pas batu gunung ( 0,32X L.186 ) 277,664
plesteran 1:2 ( 2 X L. 624 ) 142,200

Galian tanah ( 0,35 x L 29 ) -


Pas batu gunung ( 0,32X Beton K.175 ) -
plesteran 1:2 ( 2 X L. 624 ) -
Besi dia. 8 - 15 cm (8.418 X L 411) -

lbr bwh 80 cm tinggi 100 cm


Pekerja -
Mandor -
Tukang -
Kepala tukang -
Batu belah -
Semen -
Pasir pasang -
Tamper hand/ compactor -

lbr bwh 100 cm tinggi 120 cm


Pekerja -
Mandor -
Tukang -
Kepala tukang -
Batu belah -
Semen -
Pasir pasang -
Tamper hand/ compactor -

pek.galian tanah 70,200


pek.bouwplank 37,900
pek.urugan pasir 5 cm padat 134,400
beton kansteen 31,475
adukan 1:4 utk penahan 58,800
semen utk pengikat 75,281
urugan tanah kembali 23,400
pekerja 89,100
mandor 133,700

t. 6 cm
Paving Blok Type Segi Enam t. 6 cm ( 20x20 cm ) Natural 2,300
Pasir Pasang 146,200
Semen Warna 2,990
Pekerja 89,100
Tukang Batu Kasar 115,900
Kepala Tukang Batu 133,700
Mandor 133,700

jalan setapak
; uk 8 x 10,5 x 21 )
cm dan urugan sirtu 20 cm
Pekerjaan galian tanah 70,200
Pekerjaan urugan pasir urug 5 cm 134,400
Pek. Urugan sirtu 20 cm 88,920
Pemadatan 51,200
Paving block 2,300
Pasir pasang untuk pengisian 146,200
tukang batu 115,900
Kepala tukang batu 133,700
Pekerja 89,100
Mandor 133,700

ir kendaraan
; 8x10.5x21, urugan pasir 5 cm dan urugan sirtu 20 cm)
Tamper/ Hand compactor -
Plate compactor -
Sirtu -
Abu batu -
Paving -
Pasir urug -
Tukang -
Kepala tukang -
Pekerja -
Mandor -

Pekerja -
Mandor -
Bambu panjang 4 m -
Gebalan rumput -

p pasang bata
Pek. galian tanah -
Pek. Urugan pasir -
Pek. Pasangan bata 1 : 4 -
Plesteran 1 : 4 -
Urugan tanah kembali -

U KALI (tinggi 2 M)
pek. galian tanah -
pek.urugan pasir -
pondasi batu kali 1:3 -
dinding turap batu kali 1:3 -
brapen 1:4 -
plesteran 1:4 -
alat bantu -

uk 1 x 1 m tebal 10 cm
Galian tanah ( 0,32 x B.1a ) 22,464
Pas. Batu gunung ( 0,8 x D.2 ) 664,960
Plat beton ( 0,1 x SUV.E.3b ) 441,760
Plesteran 1 : 2 ( 0,6 x D.6b ) 42,660
Jumlah
uk 1,5 x 1,5 m tebal 10 cm
Galian tanah ( 0,62 x B.Ia ) 43,524
Pas. Batu gunung ( 1,1 x D.2 ) 914,320
Plat beton ( 0,4 x SUV.E.3b ) 1,767,040
Plesteran 1 : 2 ( 0.9 x D.6b ) 63,990
6 mm+ atap
asbes
Kayu klas III 5/7 gelombang+ 2,514,200
Triplex t. 4 mm plafond
Dinding asbes 65,500
Triplex t. 4 mm Plafond 65,500
Paku 4 s/d 7 cm 18,600
Paku payung 20,300
Triplex t. 9 mm Pintu 137,300
Cat plafond acrylic emulsion KW.III 64,100
Pekerja 89,100
Tukang Kayu Kasar 115,900
Kepala Tukang Kayu 133,700
Mandor 133,700

n nama proyek
Papan kayu klas II -
Balok Kayu klas II -
Paku 4 s/d 7 cm -
Meni kayu ex Nippon -
Plamir Kayu -
Amplas Kayu -
Kwas cat -
Cat kayu synthetic -
Semen PC Gresik (50 Kg) -
Pasir Beton -
Batu Split Pecah Mesin 3/5 -
Pekerja -
Tukang Kayu Kasar -
Tukang Cat Biasa -
Kepala Tukang Kayu -
Mandor -

, T=1,8m (pondasi cor beton 1:3:5,

semen 66,500
pasir pasang 146,200
Batu splite 2/3 288,000
besi siku 50.50.5 76,154
kawat duri 20,200
paku rata-rata 18,600
tukang batu 115,900
pekerja 89,100

uk. 600x 1500 mm


Beton K - 200 -
Tulangan besi beton U-24 -
Bekisting beton plat lantai -
Pas. Dinding Keramik 200x200 -

Roof Drain Metal 1


Semen PC Gresik (50 Kg) 1
Pekerja -
Tukang Batu Halus -
Kepala Tukang Batu -
Mandor -

ap.250 watt
Mesin Jet Pump kap.250 watt 1
Pekerja -
Tukang Listrik -
Kepala Tukang Listrik -
Mandor -

Mesin Pompa tekan kap. 150 watt 1


Pekerja -
Tukang Listrik -
Kepala Tukang Listrik -
Mandor -

Tangki air 1000 liter -


Pelampung otomatis 1
Pekerja -
Tukang Listrik -
Kepala Tukang Listrik -
Mandor -

Tangki air 500 liter 1


Pelampung otomatis 1
Pekerja -
Tukang Listrik -
Kepala Tukang Listrik -
Mandor -

Besi Siku Rata-rata Besi siku 50.50.5 1


Pekerja -
Tukang Listrik -
Kepala Tukang Listrik -
Mandor -

eton + Rembesan ukuran 1,2X 1,5 m + Rembesan


Galian tanah, dalam s/d 1 m 70,200
Pas. Urugan pasir 88,600
Pas. Lantai kerja beton tumbuk 1:3:5 85,200
Buis beton dia. 1,2 m p. 1,0 m 1,200,000
Beton K - 200 Balok & Tutup ma 1,011,800
Pipa PVC dia. 4" AW 197,000
Pipa PVC dia. 1" AW 55,100
Galian tanah, dalam s/d 1 m 70,200
Pasangan injuk 6,500
Batu Kerikil urugan 314,985
Pipa PVC dia. 4" AW berlobang 197,000
Urugan tanah kembali 23,400

ata kap. 3,00 m3 + Rembesan uk. 2 X 1,5 X 1 m + Rembesan


Galian tanah, dalam s/d 1 m 3 70,200
Pas. Urugan pasir 88,600
Pas. Lantai kerja beton tumbuk 1:3:5 85,200
Pas. Dinding batu bata; ad 1:2 516,900
Pas. Plester acian; ad. 1:2 36,400
Beton K - 200 Balok & Tutup ma 1,011,800
Pipa PVC dia. 4" AW 197,000
Pipa PVC dia. 1" AW 55,100
Galian tanah, dalam s/d 1 m 70,200
Pasangan injuk 6,500
Batu Kerikil urugan 314,985
Pipa PVC dia. 4" AW perforated 197,000
Urugan tanah kembali 23,400

ata + Rembesan kap. 6,00 m3 uk. 2 X 1,5 X 2 m + Rembesan


Galian tanah, dalam s/d 1 m 6 70,200
Pas. Urugan pasir 88,600
Pas. Lantai kerja beton tumbuk 1:3:5 85,200
Pas. Dinding batu bata; ad 1:2 516,900
Pas. Plester acian; ad. 1:2 36,400
Beton K - 200 Balok & Tutup ma 1,011,800
Pipa PVC dia. 4" AW 197,000
Pipa PVC dia. 1" AW 55,100
Galian tanah, dalam s/d 1 m 70,200
Pasangan injuk 6,500
Batu Kerikil urugan 314,985
Pipa PVC dia. 4" AW berlobang 197,000
Urugan tanah kembali 23,400

esapan dia 80 m (digali 1m), dalam 1m (digali 1,9 m) kap. 0,5 m3


Pekerja -
Tukang -
Mandor -
Kepala tukang -
Kerikil -
Ijuk -
Pipa PVC dia 4" -

t. 2m + plester dan cat tembok


Pekerja -
Tukang kayu -
Tukang besi -
Tukang batu -
Tukang cat -
Kepala tukang -
Mandor -
Batu belah -
Batu pecah split 2/3 -
Bata merah -
Semen -
Pasir urug -
Pasir pasang -
Pasir beton -
Kayu balok -
Paku -
Besi beton polos -
Kawat -
Plamir tembok -
Cat tembok (cat dasar) -
Cat tembok (cat penutup) -
Tamper hand/ compactor -

. jadi 1,2 m (pond. bt kali,sloof beton, 1/2 bata 30 cm, plester dan cat)
Pekerja -
Tukang kayu -
Tukang besi -
Tukang batu -
Tukang cat -
Kepala tukang -
Mandor -
Batu belah -
Batu pecah split 2/3 -
Bata merah -
Semen -
Pasir urug -
Pasir pasang -
Pasir beton -
Kayu balok -
Paku -
Besi beton polos -
Kawat -
Pagar BRC tinggi 0,9m
Tiang pagar BRC t. 0,9m
Plamir tembok -
Cat tembok (cat dasar) -
Cat tembok (cat penutup) -

PEKERJAAN JALAN

jalan / tanah dasar (subgrade)


Pekerja -
Mandor -
Vibrating roller 6-8 ton -
Water tank truck 3000-4500 Ltr -

wah kelas C sirtu tb. 10 cm


Pekerja -
Mandor -
Sirtu -
Vibrating roller 6-8 ton -
Water tank truck 3000-4500 Ltr -

an tanpa penutup aspal Macadam


Pekerja -
Mandor -
Batu pecah 5/7 -
Pasir urug -
Three wheel roller 8-10 ton -
Water tank truck 3000-4500 Ltr -

s Agregat kelas A
Pekerja -
Mandor -
Batu pecah 2/3 -
Pasir urug -
Three wheel roller 8-10 ton -
Water tank truck 3000-4500 Ltr -

Pekerja -
Mandor -
Aspal polimer lokal -
Minyak tanah -
Asphalt Sprayer -
Air Compressor -
Dump Truck 3-4 M2 / 6 Ton -

(lapen) permukaan macadam 5 cm


Pekerja -
Mandor -
Tukang aspal -
Batu pecah/ split 3/5 -
Batu pecah/ split 2/3 -
Batu pecah/ split 1/2 -
Abu batu -
Aspal polimer lokal -
Minyak tanah -

al beton tbl. 3 cm
Pekerja -
Mandor -
Batu pecah / split 1/2 -
Abu batu -
Filler utk hotmix (semen) -
Aspal polimer lokal -
Wheel Loader 1,0 - 1,6 M3 -
Asphalt Mixing Plant (AMP) -
Generator Set 125 KVA -
Dump Truck 3-4 M2 / 6 Ton -
Asphalt Finisher -
Tandem roller 6-8 Ton -
Pneumatic Tyre Roller 8 - 12 Ton -

an aspal beton (Laston/AC aspal concrete) tbl. 5 cm


Pekerja -
Mandor -
Batu pecah / split 1/2 -
Abu batu -
Filler utk hotmix (semen) -
Aspal polimer lokal -
Wheel Loader 1,0 - 1,6 M3 -
Asphalt Mixing Plant (AMP) -
Generator Set 125 KVA -
Dump Truck 3-4 M2 / 6 Ton -
Asphalt Finisher -
Tandem roller 6-8 Ton -
Pneumatic Tyre Roller 8 - 12 Ton -

aspal biasa
gregat kelas A tb. 20 cm & Permukaan macadam tb. 5 cm
Pekerja -
Mandor -
Tukang aspal -
Sirtu -
Batu pecah / split 3/5 -
Batu pecah / split 2/3 -
Batu pecah / split 1/2 -
Abu batu -
Aspal polimer lokal -
Pasir urug -
Minyak tanah -
Vibrating roller 6-8 ton -
Water tank truck 3000-4500 ltr -
Three wheel roller 8-10 ton -
Asphalt Sprayer -
Dump Truck 3-4 M2 / 6 Ton -
aspal beton tb. 5 cm
Agregat kelas A tb. 20 cm, Laston AC tb. 5 cm)
Pekerja -
Mandor -
Sirtu -
Batu pecah / split 2/3 -
Pasir urug -
Aspal polimer lokal -
Minyak tanah -
Batu pecah / split 1/2 -
Abu batu -
Filler utk hotmix (semen) -
Vibrating roller 6-8 ton -
Water tank truck 3000-4500 ltr -
Three wheel roller 8-10 ton -
Asphalt Sprayer -
Air Compressor -
Dump Truck 3-4 M2 / 6 Ton -
Wheel Loader 1,0 - 1,6 M3 -
Asphalt Mixing Plant (AMP) -
Generator Set 125 KVA -
Asphalt Finisher -
Tandem roller 6-8 Ton -
Pneumatic Tyre Roller 8 - 12 Ton -
AN

JUMLAH HARGA
TOTAL
Material Upah

- 9,579 9,579
8,910
669

24,111 13,770 37,880


14,520
9,219
372
7,128
4,636
1,337
669

535,733 354,325 890,058


12,750
365,378
5,580
63,600
88,425
231,800
89,100
26,740
6,685

5,124 5,124
4,455
669

70,168 70,168
66,825
3,343
-
140,335 140,335
133,650
6,685

23,389 23,389
22,275
1,114
-
51,235 51,235
44,550
6,685
-
106,320 28,067 134,387
26,730
1,337
106,320
-
123,240 23,612 146,852
123,240
22,275
1,337
-
363,960 80,604 444,564
363,960
26,730
2,674
51,200

103,480 1,332 104,812


757
575
23,363
80,117
-
125,138 25,618 150,756
22,275
3,343
123,240
339
1,559
-
366,478 25,618 392,095
22,275
3,343
363,960
958
1,559

14,442 10,247 24,689


14,442
8,910
1,337

98,200 10,247 108,447


98,200
8,910
1,337

- - -
-
-
-
-

21,496 27,599 49,095


6,496
15,000
16,038
5,348
464
5,749
-
-
15,000 681,890 696,890
15,000
17,820
13,370
115,900
534,800
-
-
78,449 46,133 124,582
56,221
15,000
7,228
446
3,343
28,975
13,370
7,353 7,353
4,455
2,898

9,579 9,579
8,910
669

3,345 3,345
3,000
345

9,579 9,579
8,910
669

587,356 280,310 867,666


69,540
8,022
200,475
2,273
297,720
234,080
55,556

590,534 240,630 831,164


133,650
86,925
10,028
10,028
297,720
216,790
76,024
-
558,133 240,630 798,763
133,650
86,925
10,028
10,028
297,720
180,880
79,533
-
360,878 125,128 486,006
69,498
45,201
5,214
5,214
297,720
63,158

3,570,681 846,927 4,417,608


472,230
31,873
150,670
121,695
35,029
35,431
171,980
27,900
2,800
2,504,250
43,650
446,880
78,948
294,273

2,735,931 846,927 3,582,858


472,230
31,873
150,670
121,695
35,029
35,431
171,980
27,900
2,800
1,669,500
43,650
446,880
78,948
294,273

3,656,124 959,374 4,615,498


503,415
31,873
180,804
162,260
43,185
37,837
232,173
37,200
4,200
2,504,250
58,200
446,880
78,948
294,273

3,885,584 1,084,449 4,970,033


516,780
40,565
324,520
121,695
56,154
24,735
180,579
59,520
11,200
2,385,000
43,650
429,590
76,024
283,374
253,447
163,200

4,649,661 1,114,600 5,764,261


628,155
31,873
191,235
162,260
53,881
47,196
343,960
74,400
14,000
3,339,000
58,200
446,880
78,948
294,273

3,800,361 1,074,035 4,874,396


628,155
31,873
191,235
121,695
53,881
47,196
343,960
74,400
14,000
2,504,250
43,650
446,880
78,948
294,273

2,951,061 1,033,470 3,984,531


628,155
31,873
191,235
81,130
53,881
47,196
343,960
74,400
14,000
1,669,500
29,100
446,880
78,948
294,273

3,850,745 1,049,511 4,900,256


498,960
40,565
266,570
162,260
54,149
27,007
214,975
55,800
8,400
2,265,000
58,200
429,590
76,024
283,374
90,290
226,292
142,800
446,669 119,884 566,553
57,648
38,247
10,083
4,868
6,137
2,901
83,812
12,899
7,440
1,400
45,900
195,545
3,589
55,860
8,509
31,716

4,721,667 - 4,721,667
4,721,667

47,283 24,998 72,280


16,038
2,318
2,318
2,318
802
1,203
1,720
186
27,180
8,730
5,320
877
3,270

5,020,512 - 5,020,512
5,020,512

72,362 41,279 113,641


26,463
3,825
3,825
3,825
1,337
2,006
2,580
372
54,360
970
7,315
1,316
5,450

98,135 60,921 159,056


30,918
1,631
2,875
3,129
19,124
3,245
3,440
3,348
62,665
1,164
745
5,702
21,071

667,958 190,029 857,987


10,696
3,343
28,975
147,015
308,560
76,024
283,374

672,226 190,029 862,255


10,696
3,343
28,975
147,015
341,502
262,010
68,714

16,146 2,063 18,209


15,855
291
624
811
94
535

16,986 2,063 19,049


16,695
291
624
811
94
535

1,614,600 153,394 1,767,994


1,585,500
29,100
62,370
81,130
9,359
535

789,874 193,728 983,602


433,580
79,387
276,907
147,015
31,873
3,744
11,097

818,041 193,728 1,011,770


468,160
76,316
273,565
147,015
31,873
3,744
11,097

865,370 193,728 1,059,099


510,720
72,891
281,759
147,015
31,873
3,744
11,097

875,891 193,728 1,069,619


524,020
72,265
279,606
147,015
31,873
3,744
11,097

59,315 25,847 85,162


19,950
9,211
30,154
11,583
11,590
1,337
1,337

71,146 40,994 112,140


30,191
7,895
33,060
26,730
11,590
1,337
1,337

44,722 43,445 88,167


30,800
9,975
3,947
28,512
11,590
1,337
2,006

433,551 83,325 516,876


364,000
57,855
11,696
53,460
23,180
2,674
4,011
63,399 38,548 101,947
23,275
2,924
37,200
17,385
2,006
17,820
1,337

37,200 16,042 53,242


37,200
5,795
669
8,910
669

166,509 209,734 376,243


97,479
2,790
57,448
8,792
2,495
17,385
114,982
74,872

190,348 209,734 400,082


132,900
57,448
2,495
17,385
114,982
74,872

27,130 12,097 39,227


930
26,200
2,228
174
8,693
1,003

80,330 72,606 152,937


2,790
77,540
13,365
1,070
52,155
6,017

303,094 56,331 359,425


147,292
44,188
111,615
22,275
28,975
3,343
1,738

216,469 56,331 272,800


147,292
44,188
24,990
22,275
28,975
3,343
1,738

22,960 48,126 71,086


26,730
17,385
2,006
2,006
20,620
2,339

11,808 48,126 59,934


26,730
17,385
2,006
2,006
8,299
3,509

10,696 48,126 58,822


26,730
17,385
2,006
2,006
6,895
3,801
8,138 28,876 37,014
5,653
2,485
10,431
1,203
16,038
1,203

4,323 32,084 36,407


17,820
11,590
1,337
1,337
4,323

9,521 37,208 46,729


22,275
11,590
1,337
2,006
7,182
2,339

246,784 104,498 351,282


222,420
13,300
6,579
4,485
55,242
40,565
4,680
4,011

85,383 104,498 189,880


55,242
40,565
4,680
4,011
65,770
13,034
6,579

76,611 104,498 181,109


55,242
40,565
4,680
4,011
56,732
13,300
6,579

89,841 104,498 194,339


55,242
40,565
4,680
4,011
69,430
13,832
6,579
-
43,363 20,322 63,685
8,019
10,431
1,203
669
41,333
1,516
439
75

88,723 115,643 204,366


53,460
52,155
6,017
4,011
65,500
12,369
2,632
8,223

244,925 104,498 349,422


224,180
15,628
5,117
55,242
40,565
4,680
4,011

423,194 112,294 535,488


62,370
40,565
4,680
4,680
397,500
10,893
6,579
8,223

9,521 37,208 46,729


7,182
2,339
22,275
11,590
1,337
2,006

143,545 57,938 201,483


139,545
4,000
17,820
34,770
4,011
1,337

49,790 57,938 107,726


17,820
34,770
4,011
1,337
45,140
4,650

39,270 19,632 58,902


468
1,337
11,590
6,237
795
38,475

24,345 19,632 43,977


468
1,337
11,590
6,237
795
23,550

26,746 16,042 42,788


669
669
5,795
8,910
2,431
24,315

28,384 16,042 44,426


669
669
5,795
8,910
2,431
25,953

6,827 11,320 18,147


401
669
5,795
4,455
186
6,641

60,806 11,320 72,126


401
669
5,795
4,455
221
60,585

79,930 65,602 145,532


8,381
35,199
4,650
28,520
3,180
34,770
6,685
22,275
1,872
236,403 64,978 301,381
23,166
1,738
5,795
30,134
4,145
1,950
115,898
81,157
283
4,200
24,315
6,300
600
1,080
620
-
238,070 64,978 303,048
23,166
1,738
5,795
30,134
4,145
1,950
115,898
81,157
283
4,200
25,982
6,300
600
1,080
620

70,055 30,881 100,936


67,795
2,260
134
1,337
11,590
17,820

39,505 43,404 82,909


38,940
565
22,275
17,385
2,006
1,738

471,000 933,705 1,404,705


579,500
66,850
267,300
20,055
372,000
99,000
140,470

310,000 699,945 1,009,945


434,625
50,138
200,475
14,707
310,000
100,990

40,376 18,983 59,359


669
669
6,954
10,692
39,970
406
-
13,532 23,350 36,882
802
1,070
8,113
13,365
12,720
812

79,210 18,983 98,193


669
669
6,954
10,692
74,410
4,800

21,360 23,350 44,710


802
1,070
8,113
13,365
17,760
3,600

21,930 35,433 57,363


20,070
1,860
8,910
23,180
2,674
669

42,000 35,433 77,433


40,140
1,860
8,910
23,180
2,674
669

9,276,280 3,868,760 13,145,040


2,781,600
712,800
320,880
53,480
9,191,380
84,900

10,070,020 5,803,140 15,873,160


4,172,400
1,069,200
481,320
80,220
9,900,220
169,800

6,965,590 5,803,140 12,768,730


4,172,400
1,069,200
481,320
80,220
6,853,990
111,600

10,489,995 3,385,165 13,875,160


623,700
2,433,900
280,770
46,795
10,454,620
35,375

8,320,170 2,901,570 11,221,740


534,600
2,086,200
240,660
40,110
8,296,920
23,250

3,757,710 1,934,380 5,692,090


356,400
1,390,800
160,440
26,740
3,427,050
226,500
104,160

6,374,650 1,160,628 7,535,278


213,840
834,480
96,264
16,044
6,092,350
55,800
226,500

74,658 22,506 97,164

8,910
11,590
1,337
669
48,740
21,269
4,650
37,329.20 11,252.75 48,581.95
37,329.20 11,252.75 48,581.95

6,685
2,674
2,318
8,910
74,672
1,860
66,463
1,860
20,587.00 78,392.28 98,979.28
20,587.00 70,183.20 90,770.20

22,506 83,616 106,122


8,910
669
11,590
1,337
82,500
1,116

89,100
347,700
40,110
6,685
276,564
246,160
7,850
483,595.00 284,414.00 768,009.00
483,595.00 254,010.00 737,605.00

71,280
278,160
32,088
5,348
165,938
147,696
4,710
99,675
386,876.00 270,323.40 657,199.40
386,876.00 252,081.00 638,957.00

411,858 352,110 763,968


153,850
7,850
558
249,600
53,460
231,800
26,740
40,110

293,258 386,876 680,134


153,850
7,850
558
131,000
71,280
278,160
32,088
5,348

335,168 317,717 652,885


217,112
930
99,675
231,800
26,740
71,280
5,348

363,027 372,030 735,057


59,697
231,800
26,740
44,790
369,240
2,790

6,853,990
4,188,580
111,600
2,781,600
712,800
320,880
53,480
6,965,590.00 3,868,760.00 10,834,350.00
4,300,180.00 3,868,760.00 8,168,940.00

334.25
534.80
12,169.50
6,237.00
9,740.00
4,455.00
3,910.00
13,806.00
19,276 31,911.00 51,187

26,822 16,267 43,089


5,025
3,100
3,910
9,027
4,700
1,060
8,693
1,003
6,237
334

334.25
842.31
7,301.70
1,782.00
2,970.00
2,300.00
16,666.00
10,260 21,936.00 32,196

6,482 27,770 34,252


1,782
134
23,180
2,674
212
4,870
1,400

17,530 10,260 27,790


1,782
334
7,302
842
13,290
4,240

9,712 18,725.00 28,437


802.20
8,910.00
18,725.00

160,500 60,847 221,347


160,500
669
1,337
57,950
891

55,700 77,562 133,262


55,700
-
69,540
8,022
-

8,400 20,827 29,227


8,400
100
2,006
17,385
1,337

7,500 13,885 21,385


7,500
67
1,337
11,590
891

4,400 21,797 26,197


1,070
2,006
17,385
1,337
4,400
-
4,900 27,770 32,670
134
2,674
23,180
1,782
4,900
-
14,100 27,770 41,870
134
2,674
23,180
1,782
14,100

132,900 27,770 160,670


134
2,674
23,180
1,782
132,900

145,700 64,635 210,335


145,700
-
57,950
6,685
-

79,700 77,562 157,262


79,700
-
69,540
8,022
-
199,400 77,562 276,962
199,400
-
69,540
8,022
-

132,900 20,834 153,734


107
2,006
17,385
1,337
132,900
203,800
SANG KACA POLOS 153,734
SANG KACA RAYBEN 224,634

351,225 36,009 387,234


351,225
14,256
18,544
2,139
1,070

312,300 285,345 597,645


310,100
2,200
106,920
145,000
20,055
13,370

2,039,800 438,366 2,478,166


1,995,500
44,300
294,030
127,490
14,707
2,139

1,713,200 438,366 2,151,566


1,668,900
44,300
294,030
127,490
14,707
2,139

308,380 144,336 452,716


300,400
7,980
-
127,490
14,707
2,139

358,830 41,655 400,485


2,673
34,770
201
4,011
265,800
93,030

398,700 631,981 1,030,681


398,700
160,380
312,930
72,198
14,707
71,766

1,019,200 962,520 1,981,720


534,600
40,110
347,700
40,110
509,600
159,600
43,860
288,200
17,940

300,455 12,927 313,382


300,400
55
-
11,590
1,337
-

1,471,055 144,336 1,615,391


1,471,000
55
-
127,490
14,707
2,139

13,355 12,927 26,282


13,300
55
-
11,590
1,337
-

14,100 14,487 28,587


14,100
11,590
1,337
891
669

171,740 25,217 196,957


132,960
38,780
7,217
15,647
1,805
548

171,740 25,203 196,943


132,960
38,780
7,217
15,647
1,805
535
103,075 16,807 119,882
79,800
23,275
4,811
10,431
1,203
361

43,865 11,204 55,069


33,960
9,905
3,208
6,954
802
241

32,860 11,204 44,064


25,440
7,420
3,208
6,954
802
241

26,040 11,204 37,244


20,160
5,880
3,208
6,954
802
241

17,955 11,204 29,159


13,300
4,655
3,208
6,954
802
241
138,000
25,000
900
3,960
3,300
9,900
4,950
2,083
20,833
1,320
34,770
13,365
2,006
245,017 15,371 260,387

138,000
25,000
900
3,960
3,300
9,900
4,950
20,833
1,320
34,770
13,365
2,006
208,163 50,141 258,304

72,650 33,513 106,163


54,600
3,350
14,700
4,455
2,318
13,370
13,370

72,650 33,513 106,163


54,600
3,350
14,700
4,455
2,318
13,370
13,370

20,975 30,528 51,503


16,800
2,500
1,675
8,910
11,590
6,685
3,343

20,875 30,528 51,403


16,700
2,500
1,675
8,910
11,590
6,685
3,343

21,475 30,528 52,003


17,300
2,500
1,675
8,910
11,590
6,685
3,343

8,575 30,528 39,103


4,400
2,500
1,675
8,910
11,590
6,685
3,343

45,875 30,528 76,403


44,200
1,675
8,910
11,590
6,685
3,343

68,075 30,528 98,603


66,400
1,675
8,910
11,590
6,685
3,343

-
18,285 13,503 31,788
5,346
401
6,954
802
18,285
-
23,553 9,870 33,423
20,705
2,548
92
64
145
2,318
669
6,683
201

25,108.54 11,429.65 36,538.19


20,705.00
4,076.00
138.00
102.80
86.74
3,477.00
1,069.60
6,682.50
200.55

22,388 21,904 44,291


17,490
372
4,526
11,590
8,910
1,337
67

37,572 21,904 59,476


67
1,337
11,590
8,910
37,200
372

352,950 375,775 728,725


192,053
160,896
11,097
22,328
193,553
148,797

5,300 642 5,942


4,076
138
103
983
356
27
232
27

290,200 24,197 314,397


238,500
3,000
48,700
13,365
8,693
1,070
1,070

966,530 236,241 1,202,771


303,000
662,560
970
93,555
121,695
14,039
6,952

398,470 236,241 634,711


397,500
970
93,555
121,695
14,039
6,952
-
20,050 236,241 256,291
19,080
970
93,555
121,695
14,039
6,952

116,840 21,762 138,602


116,340
500
4,010
15,647
1,805
301

121,460 21,762 143,222


120,960
500
4,010
15,647
1,805
301

378,000 21,762 399,762


375,000
3,000
4,010
15,647
1,805
301
72,247 - 72,247
11,232
4,135
56,880

444,434 - 444,434
24,570
277,664
142,200

- - -
-
-
-
-

- - -
-
-
-
-
-
-
-
-
-
- - -
-
-
-
-
-
-
-
-

99,391 9,579 108,970


4,914
3,790
2,419
78,688
882
7,528
1,170
8,910
669

76,605 104,498 181,103


57,500
14,620
4,485
55,242
40,565
4,680
4,011

141,761 46,350 188,112

17,550
8,064
44,460
10,240
57,500
3,947
27,816
3,209
14,256
1,070

- - -
-
-
-
-
-
-
-
-
-
-
-
- - -
-
-
-
-
-
- - -
-
-
-
-
-

- - -
-
-
-
-
-
-
-

1,171,844 - 1,171,844
22,464
664,960
441,760
42,660

2,788,874 - 2,788,874
43,524
914,320
1,767,040
63,990

488,298 166,650 654,948


125,710
52,400
45,850
9,300
182,700
8,238
64,100
106,920
46,360
5,348
8,022

- - -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

99,024 73,525 172,549

13,300
3,801
12,672
25,131
40,400
3,720
28,975
44,550

- - -
-
-
-
-

1 - 1
1

-
-
-
-

1 - 1
1
-
-
-
-

1 - 1
1
-
-
-
-

- - -
-

-
-
-
-

1 - 1
1

-
-
-
-

58 - 58
58
-
-
-
-

6,445,983 - 6,445,983
140,400
17,720
150,463
2,400,000
205,395
1,063,800
66,120
236,925
35,100
330,734
1,773,000
26,325

10,253,282 - 10,253,282
210,600
26,580
255,600
5,427,450
436,800
364,248
1,063,800
66,120
236,925
35,100
330,734
1,773,000
26,325

14,114,932 - 14,114,932
421,200
26,580
255,600
8,787,300
728,000
364,248
1,063,800
66,120
236,925
35,100
330,734
1,773,000
26,325

-
-
-
-
-
-
-
- - -

- - -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- - -

- - -
-
-
-
-
-
- - -
-
-
-
-
-
-
- - -
-
-
-
-
-
-
-
- - -
-
-
-
-
-
-
-
- - -
-
-
-
-
-
-
-
-
- - -
-
-
-
-
-
-
-
-
-
-
- - -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- - -
-
-
-
-
-
-
-
-
-
-
-
-
-
-

- - -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

- - -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
DIBULATKAN

9,600

37,900

890,100

###
5,100

70,200
140,300

23,400

51,200

134,400

146,900

444,600

104,800

150,800

392,100
24,700
###

108,400
###

49,100

696,900

124,600
7,400

9,600

3,300

9,600

867,700

831,200

798,800

486,000
4,417,600

###
###
###

3,582,900

###
###
###

4,615,500
4,970,000

###

5,764,300

4,874,400
3,984,500

4,900,300

#
566,600

4,721,700

72,300

5,020,500

113,600###
###
159,100

858,000

862,300

18,200
19,000

1,768,000

983,600

1,011,800

1,059,100

1,069,600
85,200

112,100

88,200

516,900
101,947

53,242

376,200

400,100

39,227

152,937
359,400

272,800

71,100

59,900

58,800
37,000

36,400

46,700

351,300

189,900

###

181,100
###

194,300

63,700

204,400

349,400

535,500
#

46,700

201,500

107,700

58,900

44,000###
42,800

44,400

18,100

72,100

145,500
301,400

303,000

226,000.00

100,900 SNI. -2007.08.32


###
###
###
###
###
###

82,900 SNI -2007.08.36


###
###
###
###
###
###

1,404,700

140,500

1,009,900

101,000

59,400

36,900

98,200
###

44,700

###

57,400

77,400

13,145,000

15,873,200
12,768,700

13,875,200

11,221,700

5,692,100

7,535,300

97,200
48,600.00
48,600.00

99,000.00
90,800.00

106,100

768,000.00
737,600.00
657,200.00
639,000.00

764,000

680,100

652,900.00

735,100.00
10,834,400.00
8,168,900.00

51,200

43,100

32,200

34,300
27,800

28,400

221,300

133,300

29,200

21,300
26,200
-

32,700

41,900

160,700

210,300

157,300
277,000

153,700
-

153,700
224,600

387,200

597,600

2,478,200

2,151,600
452,700

400,500

1,030,700

1,981,700

313,400
1,615,400

26,300

28,600

197,000

196,900
119,900

55,100

44,100

37,200

29,200
260,400

258,300

106,200

106,200
51,500

51,400

52,000

39,100

76,400
98,600

31,800

33,400

36,500

44,300
59,500

728,725

5,942

314,400

1,202,800
634,700

256,300

138,600

143,200

399,800
72,200

444,400

###

109,000

###
181,100

188,100

-
-

1,171,800

2,788,900

654,900

-
172,500

-
-

100

6,446,000

10,253,300
14,114,900

-
-

-
-

-
-

-
-
STANDAR HARGA SATUAN UPAH DAN BAHAN
WILAYAH I

PROVINSI KALIMANTAN BARAT


KABUPATEN MEMPAWAH

NO JENIS PEKERJA KODE SATUAN HARGA


(Rp)

1 2 3 4 5

A. UPAH
1 Mandor Lapangan L 061 Hari 133,700.00
2 Mekanik L 071 Hari 120,400.00
3 Mekanik Pembantu L 072 Hari 89,100.00
4 Kepala Tukang L 073 Hari 133,700.00
5 Tukang L 079 Hari 115,900.00
6 Operator Terlatih *) L 081 Hari 133,700.00
7 Operator Kurang Terlatih **) L 082 Hari 98,100.00
8 Pembantu Operator L 083 Hari 89,100.00
9 Supir Material / Truck L 091 Hari 107,000.00
10 Supir Personil L 092 Hari 107,000.00
11 Pembantu Supir / Kernet L 099 Hari 89,100.00
12 Buruh Lapangan Terlatih L 106 Hari 107,000.00
13 Buruh Lapangan Agak Terlatih L 103 Hari 98,100.00
14 Buruh Lapangan Tak Terlatih L 101 Hari 89,100.00
15 Penjaga Api - Hari 80,200.00
16 Penjaga Malam - Hari 80,200.00
Catatan : *) Operator yang sudah biasa dan terampil mengoperasikan
jenis peralatan untuk melayani pekerjaan berat
Misal : Bulldozer, Grader, Wheel, Loader, Asphalt Finisher, dll

yang agak ringan


Misal : Steel Wheeled Roller, Stamper, Concrete Mixer/Mesin pe
NO JENIS BAHAN KODE SATUAN HARGA
(Rp)

1 2 3 4 5

B. BAHAN PENGISI
1 Batu Kong M.101 M 174,600.00
2 Batu Sap Pinang - M 194,900.00
3 Batu pecah 15-20 cm - M 240,100.00
4 Batu pecah 10-15 cm M.020 M 248,100.00
5 Batu pecah 5-7 cm M.022 M 310,100.00
6 Batu pecah 3-5 cm M.023 M 256,900.00
7 Batu pecah 2-3 cm M.024 M 288,000.00
8 Batu pecah 1-2 cm M.025 M 363,300.00
9 Batu pecah 0,5 - 1 cm M.026 M 398,700.00
10 Stone Dust - M 303,300.00
11 Aspal Bitumen 60/70 - Kg 12,900.00
12 Pasir Urug M.040 M 88,600.00
13 Pasir Ayak Untuk Beton (Pasir Kasar/Merah) M.041 M 146,200.00
14 Semen PC (50 Kg) M.080 Zak 66,500.00
15 Semen Putih (40 Kg) - Zak 119,600.00
16 Timbunan Tanah Biasa M 69,100.00
17 Timbunan Tanah Pilihan M.050.a M 102,700.00
18 Paving Block - Buah 2,300.00
19 Batu Bata 5 cm x 11 cm x 22 cm Buah 2,600.00
20 Batako 7 cm x 15 cm x 30 cm - Buah 1,400.00
21 Batako 6 cm x 15 cm x 30 cm - Buah 1,300.00
1 2 3 4 5
22 Batako 7 cm x 20 cm x 40 cm (press) - Buah 2,300.00
23 Batako 9 cm x 20 cm x 40 cm (press) - Buah 2,400.00
24 Kerawang ( roster ) uk.18 x 18 cm - Buah 22,100.00
25 Kerawang press (roster) uk.30 x 30 cm - Buah 47,800.00
26 Keramik uk. 10 cm x 20 cm - Kotak 54,900.00
27 Keramik uk. 20 cm x 20 cm (polos) - Kotak 65,500.00
1 2 3 4 5
28 Keramik uk. 20 cm x 20 cm ( Corak ) - Kotak 68,200.00
29 Keramik uk. 25 cm x 33 cm Kotak 69,500.00
30 Keramik uk. 30 cm x 30 cm (polos biasa) - Kotak 53,100.00
31 Keramik uk. 30 cm x 30 cm (corak biasa) - Kotak 60,200.00
32 Keramik uk. 30 cm x 30 cm Artistik (setaraf Decogress) Kotak 108,100.00
33 Keramik uk. 40 cm x 40 cm (polos biasa) - Kotak 62,000.00
34 Keramik uk. 40 cm x 40 cm (corak biasa) - Kotak 74,400.00
35 Keramik uk. 40 cm x 40 cm (granite tile) - Kotak 199,400.00
36 Keramik uk. 60 cm x 60 cm Polished (setaraf Indogress) - Kotak 287,100.00
37 Keramik uk. 60 cm x 60 cm Polished (setaraf Decogress) - Kotak 208,200.00
38 Plint Keramik 10 x 30 cm - Bh 12,400.00
39 Plint Keramik 10 x 40 cm - Bh 15,900.00
40 Wood Flooring - M 261,400.00
41 List Keramik uk 2 cm x 10 cm - Bh 900.00
42 List Keramik WC. Uk. 8 cm x 20 cm - Bh 10,600.00
43 Plint Kayu uk. 2 cm x 10 cm - Bh 54,900.00
44 Batu Tempel Hitam uk.5 x 10 cm - M 203,800.00
45 Batu Paras uk. 5 x 10 cm - M 203,800.00
46 Floor Hardener - Kg 14,700.00
47 Beton Ready Mix B 0 - M 837,400.00
48 Beton Ready Mix K-125 - M 886,100.00
49 Beton Ready Mix K-150 - M 908,300.00
50 Beton Ready Mix K-175 - M 939,300.00
51 Beton Ready Mix K-200 - M 1,004,900.00
52 Beton Ready Mix K-225 - M 1,027,900.00
53 Beton Ready Mix K-250 - M 1,085,600.00
54 Beton Ready Mix K-275 - M 1,098,800.00
1 2 3 4 5
55 Beton Ready Mix K-300 - M 1,116,500.00
56 Beton Ready Mix K-325 - M 1,157,800.00
57 Beton Ready Mix K-350 - M 1,178,600.00
1 2 3 4 5
58 Beton Ready Mix K-375 - M 1,220,700.00
59 Beton Ready Mix K-400 - M 1,246,400.00
60 Beton Ready Mix K-425 - M 1,269,400.00
61 Beton Ready Mix K-450 - M 1,284,900.00
62 Beton Ready Mix K-475 - M 1,332,800.00
63 Beton Ready Mix K-500 - M 1,361,600.00
64 Additive Ready Mix - Liter 44,300.00
65 Karung Goni Curing Beton ( 0.7m ) - Lembar 12,100.00
66 Mini Pile Segi Empat Ukuran 20 x 20 CM K 350, Pj = 6 m - M' 1,156,400.00
67 Mini Pile Segi Empat Ukuran 25 x 25 CM K 350, Pj = 6 m - M' 1,513,200.00
68 Mini Pile Segitiga Ukuran 28 x 28 CM K 350, Pj = 6 m - M' 838,700.00
69 Mini Pile Segitiga Ukuran 32 x 32 CM K 350, Pj = 6 m - M' 951,900.00
70 Sewa Pompa Ready Mix (Min. 100 M) - M 35,400.00
71 Bahan Plastik Cor Beton - M 3,800.00
-
C. BAHAN KAYU -
1 Kayu Belian Tidak Ketam uk. 4 cm x 8 cm x 4 m - M 8,550,200.00
2 Kayu Belian Tidak Ketam uk. 6 cm x 6 cm x 4 m - M 12,000,300.00
3 Kayu Belian Tidak Ketam uk. 7 cm x 7 cm x 4 m - M 9,698,200.00
4 Kayu Belian Tidak Ketam uk. 8 cm x 8 cm x 4 m - M 8,325,200.00
5 Kayu Belian Tidak Ketam uk. 8 cm x 16 cm x 4 m - M 6,490,600.00
6 Kayu Belian Tidak Ketam uk. 9 cm x 9 cm x 4 m - M 8,355,800.00
7 Kayu Belian Tidak Ketam uk.10 cm x 10 cm x 4 m - M 9,360,200.00
8 Kayu Belian Tidak Ketam uk.12 cm x 12 cm x 4 m - M 11,963,300.00
9 Kayu Belian Tidak Ketam uk.15 cm x 15 cm x 4 m - M 14,178,700.00
10 Kayu Belian Tidak Ketam uk.5 cm x 10 cm x 4 m - M 8,773,100.00
11 Kayu Belian Ketam uk. 6 cm x 6 cm x 4 m - M 13,200,300.00
1 2 3 4 5
12 Kayu Belian Ketam uk. 7 cm x 7 cm x 4 m - M 10,579,900.00
13 Kayu Belian Ketam uk. 8 cm x 8 cm x 4 m - M 9,000,200.00
14 Kayu Belian Ketam uk. 3 cm x 7 cm x 4 m - M 12,765,200.00
15 Kayu Belian Ketam uk. 4 cm x 8 cm x 4 m - M 9,900,200.00
16 Kayu Belian Ketam uk. 5 cm x 10 cm x 4 m - M 9,504,200.00
17 Papan Belian Tidak Ketam uk.2,5 cm x 16 cm x 4 m M.181.d M 11,908,000.00
1 2 3 4 5
18 Papan Belian Ketam uk. 2 cm x 16 cm x 4 m M.181.e M 15,231,100.00
19 Kayu kls I Bengkirai Tidak Ketam uk. 7 cm x 7 cm x 4 m - M 5,877,800.00
20 Kayu kls I Bengkirai Tidak Ketam uk. 8 cm x 8 cm x 4 m M.181.g M 6,057,800.00
21 Papan kls I Tidak Ketam - M 8,307,900.00
22 Kayu kls I Bengkirai Ketam uk. 7 cm x 7 cm x 4 m - M 6,103,800.00
23 Kayu kls I Bengkirai Ketam uk. 8 cm x 8 cm x 4 m M.181.f M 6,230,900.00
24 Papan kls I Ketam - M 6,914,100.00
25 Kayu kls I Bengkirai Ketam uk. 5 cm x 10 cm x 4 m - M 6,203,200.00
26 Kayu kls II Tidak Ketam uk.3 cm x 5 cm x 4 m - M 2,954,000.00
27 Kayu kls II Tidak Ketam uk.4 cm x 6 cm x 4 m - M 2,769,300.00
28 Kayu kls II Tidak Ketam uk.4 cm x 8 cm x 4 m - M 3,461,700.00
29 Kayu kls II Tidak Ketam uk.5 cm x 7 cm x 4 m - M 3,481,400.00
30 Kayu kls II Tidak Ketam uk.5 cm x 10 cm x 4 m - M 5,538,500.00
31 Kayu kls II Tidak Ketam uk.6 cm x 10 cm x 4 m - M 4,984,700.00
32 Kayu kls II Tidak Ketam uk.6 cm x 12 cm x 4 m - M 4,153,900.00
33 Kayu kls II Tidak Ketam uk.7 cm x 7 cm x 4 m - M 4,069,200.00
34 Kayu kls II Tidak Ketam uk.8 cm x 8 cm x 4 m - M 3,288,600.00
35 Kayu kls II Tidak Ketam uk.8 cm x 12 cm x 4 m - M 3,115,500.00
36 Kayu kls II Tidak Ketam uk.8 cm x 15 cm x 4 m - M 3,230,900.00
37 Kayu kls II Tidak Ketam uk.10 cm x 10 cm x 4 m - M 3,142,900.00
38 Papan kls II Tidak Ketam uk.2,5 cm x 20 cm x 4 m M.181.j M 6,646,300.00
39 Kayu kls II Ketam uk.5 cm x 10 cm x 4 m - M 6,203,200.00
40 Kayu kls II Ketam uk.8 cm x 8 cm x 4 m - M 3,807,800.00
41 Kayu kls II Ketam uk.7 cm x 7 cm x 4 m - M 4,521,400.00
42 Kayu kls II Ketam uk.6 cm x 6 cm x 4 m - M 5,230,900.00
43 Kayu kls II Ketam uk.3 cm x 7 cm x 4 m - M 6,857,300.00
44 Kayu kls II Ketam uk.3 cm x 5 cm x 4 m - M 5,907,900.00
1 2 3 4 5
45 Papan kls II Ketam uk.1,8 cm x 18 cm x 4 m M.181.k M 6,154,000.00
46 Papan kls II Ketam uk.1 cm x 7 cm x 4 m M.181.k M 7,279,300.00
47 Kayu kls III Tidak Ketam uk.3 cm x 5 cm x 4 m - M 2,514,200.00
48 Kayu kls III Tidak Ketam uk.4 cm x 6 cm x 4 m - M 2,095,300.00
49 Kayu kls III Tidak Ketam uk.5 cm x 7 cm x 4 m - M 2,514,200.00
1 2 3 4 5
50 Kayu kls III Tidak Ketam uk.5 cm x 10 cm x 4 m - M 2,765,700.00
51 Kayu kls III Tidak Ketam uk.6 cm x 12 cm x 4 m - M 1,781,000.00
52 Kayu kls III Tidak Ketam uk.8 cm x 8 cm x 4 m - M 1,964,400.00
53 Kayu kls III Tidak Ketam uk.8 cm x 12 cm x 4 m - M 2,095,300.00
54 Papan kls III Tidak Ketam uk.2 cm x 18 cm x 4 m M.181.l M 2,095,300.00
55 Papan Simpiran - M 963,900.00
56 Kayu Profil - Batang 25,300.00
57 Kayu cerucuk /dolken 4 - 6 - Pj. 4 M - Batang 7,200.00
58 Kayu cerucuk /dolken 6 - 8 - Pj. 4 M - Batang 10,200.00
59 Kayu cerucuk /dolken 8 - 10 - Pj. 4 M - Batang 13,200.00
60 Kayu cerucuk /dolken 10 - 12 - Pj. 12 M - Batang 80,200.00
61 Kayu cerucuk /dolken 12 - 15 Pj. 12 M - Batang 98,200.00
62 Kayu untuk Perancah - M 859,900.00
63 Kayu Simpiran - M 177,200.00
64 Kayu Bakar - M 79,300.00
65 Alat-alat Bantu M. 170 Set 89,500.00
66 Alas laci - Btg 15,200.00
-
D. BAHAN CAT -
1 Amplas Besi - Lembar 3,500.00
2 Amplas Kayu - Lembar 6,200.00
3 Plamur - Kg 29,700.00
4 Cat Dasar - Kg 23,000.00
5 Cat Kilat - Kg 53,100.00
6 Cat Tembok - Kg 64,100.00
7 Cat tembok type weather shield - Kg 88,900.00
8 Cat tembok type weather coat (acrylic) - Kg 85,500.00
1 2 3 4 5
9 Cat seng - Kg 40,600.00
10 Cat Marka Jalan - Kg 59,300.00
11 Cat Weatherbond - Kg 36,300.00
12 Cat Water Proofing - Kg 44,300.00
13 Dempul - Kg 33,500.00
14 Plitur - Kg 47,800.00
1 2 3 4 5
15 Thiner M.090.f Ltr 23,500.00
16 Cat Melamic - Ltr 57,100.00
17 Cat Pilox - Klg 23,100.00
18 Meni - Kg 48,700.00
19 Teer - Liter 53,500.00
20 Oker Warna ( Induk ) - Kg 66,500.00
21 Oker Warna ( Biasa ) - Kg 12,400.00
22 Lem Fox ( Putih ) - Kg 15,700.00
23 Lem Fox ( Kuning ) - Kg 42,100.00
24 Sealent - Tube 44,300.00
25 Soda Api - Kg 20,400.00
26 Sabun / cream pembersih kotoran - Kg 19,400.00
27 Teak Oil - Liter 54,900.00
28 Kuas 4" - Buah 21,200.00
-
E. BAHAN BESI DAN ALUMINIUM -
1 Besi Beton Polos - Kg 15,100.00
2 Besi Beton Ulir - Kg 15,900.00
3 Besi wire mesh 5 - Kg 10,600.00
4 Kawat baja/bendrat M.168 Kg 19,400.00
5 Kawat Simpai Roll - Kg 18,600.00
6 Kawat Nyamuk Besi - M 15,900.00
7 Kawat Nyamuk Plastik - M 8,800.00
8 Kawat Saringan Pasir - M 10,600.00
9 Kawat harmonika - M 23,800.00
10 Kawat Kasa - M 14,600.00
11 Baut Baja 4" Panjang 20 cm - Buah 4,900.00
1 2 3 4 5
12 Baut Baja 4" Panjang 30 cm - Buah 6,700.00
13 Baut Baja 4" Panjang 40 cm - Buah 8,400.00
14 Beugel plat L. 3 cm - bh 15,900.00
15 Besi Penahan Buah 15,900.00
16 Besi Plat Tebal 2 mm - Lembar 407,600.00
17 Besi Plat Tebal 2,5 mm - Lembar 451,900.00
1 2 3 4 5
18 Besi Konstruksi (I, H) - Kg 20,400.00
19 Besi Konstruksi ( C ) - Kg 20,200.00
20 Besi Konstruksi (Siku ) - Kg 20,200.00
21 Kawat Las - Kg 101,900.00
22 Folding gate - M 620,300.00
23 Kusen Alumunium 3" - M' 110,800.00
24 Kusen Alumunium 4" - M' 115,200.00
25 Kusen dan Pintu PVC Toilet - Unit 310,100.00
26 Pintu Alumunium + Engsel Tanam - uk. 90 x 215 cm - Unit 2,481,200.00
27 Pintu Alumunium + Engsel Kupu-kupu - uk. 90 x 215 cm - Unit 1,595,100.00
28 Rangka Baja Ringan Zincalume (truss/color) (Tanpa Jurai Dalam - Bentang s/d 16 m) - M 212,900.00
29 Rangka Baja Ringan Zincalume (truss/color) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m) - M 250,800.00
30 Rangka Baja Ringan Zincalume (truss/color) (Dengan Jurai Dalam - Bentang s/d 16m) - M 226,000.00
31 Rangka Baja Ringan Zincalume (truss/color) (Dengan Jurai Dalam - Bentang 17 m s/d 30 m) - M 285,300.00
32 Rangka Baja Ringan Zincalume (truss/polos) (Tanpa Jurai Dalam - Bentang s/d 16 m) - M 167,500.00
33 Rangka Baja Ringan Zincalume (truss/polos) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m) - M 211,800.00
34 Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang s/d 16m) - M 177,200.00
35 Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang 17 m s/d 30 m) - M 232,100.00
36 Alumunium Komposit + Rangka Besi - M 886,100.00
37 Rangka Plafond Metal Furing + Pemasangan - M 132,900.00
38 Besi Hollow stainless steel 20 x 20 - Batang 132,900.00
39 Besi Hollow stainless steel 30 x 30 - Batang 188,300.00
40 Besi Hollow stainless steel 20 x 40 - Batang 194,900.00
41 Besi Hollow stainless steel 40 x 40 - Batang 252,500.00
42 Besi Hollow biasa 20 x 20 - Batang 55,400.00
43 Besi Hollow biasa 30 x 30 - Batang 83,100.00
44 Besi Hollow biasa 20 x 40 - Batang 69,300.00
1 2 3 4 5
45 Besi Hollow biasa 40 x 40 - Batang 98,600.00
46 Besi Pipa Stainless Stell /2 "
1
- Batang 61,000.00
47 Besi Pipa Stainless Stell 3/4 " - Batang 90,800.00
48 Besi Pipa Stainless Stell 1 " - Batang 117,400.00
1 2 3 4 5
49 Besi Pipa Stainless Stell 1 1/2 " - Batang 182,800.00
50 Besi Pipa Stainless Stell 2 " - Batang 239,200.00
51 Besi Pipa Stainless Stell 2 1/2 " - Batang 318,000.00
52 Besi Pipa Stainless Stell 3 " - Batang 387,700.00
-
F. BAHAN PENGANTUNG -
1 Engsel Kupu-kupu 3" ( biasa ) - Kotak 7,500.00
2 Engsel Kupu-kupu 3" ( Stainles ) - Kotak 13,300.00
3 Engsel Kupu-kupu 4" ( biasa ) - Kotak 8,400.00
4 Engsel Kupu-kupu 4" ( Stainles ) - Kotak 26,100.00
5 Slot Jendela ( Biasa ) - Buah 5,700.00
6 Slot Jendela ( Stainles ) - Buah 7,500.00
7 Slot Pintu ( Biasa ) - Buah 4,900.00
8 Slot Pintu ( Stainles ) - Buah 16,800.00
9 Kunci tanam 2 slag (setaraf Belluci) - Buah 160,500.00
10 Kunci tanam 1 slag - Buah 145,700.00
11 Kunci silinder - Buah 55,700.00
12 Kunci Tanam Kecil - Buah 53,100.00
13 Door Closer - Buah 199,400.00
14 Door Stoper - Buah 79,700.00
15 Pegangan Pintu ( Biasa ) - Buah 75,300.00
16 Pegangan Pintu ( Stainles ) - Buah 132,900.00
17 Pegangan Jendela ( Biasa ) - Buah 4,400.00
18 Pegangan Jendela ( Stainles ) - Buah 14,100.00
19 Kait Angin ( Biasa ) - Buah 4,400.00
20 Kait Angin ( Stainles ) - Buah 17,700.00
21 Paku Campuran M.166.b Kg 18,600.00
1 2 3 4 5
22 Paku Seng M.166.a Kg 20,300.00
23 Paku Atap Metal - Kg 11,300.00
24 Paku GRC - kg 22,100.00
25 Paku / sekrup Gypsum - Buah 300.00
26 Paku Triplek - Kg 26,500.00
27 Paku Beton - Kg 28,300.00
1 2 3 4 5
28 Sekrup Fixer - Buah 2,200.00
29 Sekrup Steel Sheet - Buah 500.00
30 Sekrup Zincalume Buah 600.00
-
G. BAHAN ATAP -
1 Genteng Metal Permata 0,25 mm (720 mm x 770 mm) Lembar 46,200.00
2 Genteng Metal Permata 0,30 mm (720 mm x 770 mm) Lembar 56,300.00
3 Genteng Metal Permata 0,35 mm (720 mm x 770 mm) Lembar 52,000.00
4 Genteng Metal Classic 0,25 mm (800 mm x 770 mm) Lembar 31,000.00
5 Genteng Metal Classic 0,30 mm (800 mm x 770 mm) Lembar 39,900.00
6 Genteng Metal Classic 0,35 mm (800 mm x 770 mm) Lembar 45,200.00
7 Genteng Metal Stone Permata 2 x 5 (875 mm x 770 mm) Lembar 93,000.00
8 Genteng Metal Color Permata 2 x 5 (875 mm x 770 mm) Lembar 78,900.00
9 Genteng Metal Stone Classic 2 x 5 (1000 mm x 770 mm) Lembar 86,400.00
10 Genteng Metal Stone Royal 2 x 4 (760 mm x 770 mm) Lembar 69,800.00
11 Genteng Metal Color Royal 2 x 4 (760 mm x 770 mm) Lembar 51,000.00
12 Genteng Metal Stone Permata 2 x 4 (720 mm x 770 mm) Lembar 69,800.00
13 Genteng Metal Color Permata 2 x 4 (720 mm x 770 mm) Lembar 51,000.00
14 Genteng Metal Stone Classic 2 x 4 (800 mm x 770 mm) Lembar 63,400.00
15 Genteng Metal ColorClassic 2 x 4 (800 mm x 770 mm) Lembar 46,300.00
16 Nok Genteng Metal Raja stone panjang 104 cm Lembar 48,700.00
17 Nok Genteng Metal Raja color panjang 104 cm Lembar 42,500.00
18 Nok Genteng Metal Ratu stone panjang 91 cm Lembar 42,500.00
19 Nok Genteng Metal Ratu color panjang 91 cm Lembar 37,200.00
20 Nok Genteng Metal Putri stone panjang 109 cm Lembar 40,700.00
21 Nok Genteng Metal Putri color panjang 109 cm Lembar 35,400.00
22 Seng Gelombang Bjls 20 - Lembar 42,400.00
1 2 3 4 5
23 Seng Gelombang Bjls 30 - Lembar 57,100.00
24 Seng Plat Bjls 20 - Lembar 44,600.00
25 Seng Plat Bjls 30 - Lembar 59,200.00
26 Zincalume Gelombang Persegi 0.35 (polos) - M 119,600.00
27 Zincalume Gelombang Persegi 0.30 (polos) - M 106,300.00
28 Zincalume Gelombang Persegi 0.35 (color) - M 137,300.00
1 2 3 4 5
29 Zincalume Gelombang Persegi 0.30 (color) - M 106,300.00
30 Zincalume Plat 0.2 - Lembar 124,000.00
31 Aluminium Foil - M 53,100.00
32 Atap Plastik Gelombang - Lembar 62,000.00
-
H. BAHAN KACA -
1 Kaca Bening uk 8 mm - M 334,500.00
2 Kaca Bening uk. 5 mm - M 132,900.00
3 Kaca Bening uk. 3 mm - M 119,600.00
4 Kaca Bening uk. 2 mm - M 62,000.00
5 Kaca Rayban uk. 5 mm - M 203,800.00
6 Kaca Rayban uk. 3 mm - M 181,700.00
7 Kaca Cermin uk. 2 mm - M 230,400.00
-
I. BAHAN TRIPLEK -
1 Triplek t uk 3 mm - Lembar 62,800.00
2 Triplek t uk 4 mm - Lembar 65,500.00
3 Triplek t uk 6 mm - Lembar 128,500.00
4 Triplek t uk 9 mm - Lembar 137,300.00
5 Multiplek t uk 10 mm - Lembar 247,100.00
6 Multiplek t uk 12 mm - Lembar 250,700.00
7 Poliwood uk 4 mm x 122 cm x 244 cm - Lembar 102,600.00
8 Teakwood uk 3 mm x 122 cm x 244 cm - Lembar 124,800.00
9 Papan GRC uk 4 mm x 122 cm x 244 cm - Lembar 53,100.00
10 Panel GRC 120 x 240 x 40 - Lembar 71,300.00
11 Gypsum Board uk. 9 x 120 x 240 cm - Lembar 66,800.00
12 Tepung Gypsum - Kg 5,400.00
1 2 3 4 5
13 List profil gypsum - M' 57,700.00
1 2 3 4 5
-
J. BAHAN SANITASI -
1 Kloset duduk monoblok - Buah 2,629,900.00
2 Kloset duduk (setaraf TOTO) - Buah 1,995,500.00
3 Kloset jongkok (setaraf TOTO) - Buah 300,400.00
4 Kloset jongkok (setaraf INA) - Buah 169,900.00
5 Urinoir (setaraf TOTO) - Buah 1,668,900.00
6 Wastafel Alumunium - Buah 221,500.00
7 Wastafel Keramik - Buah 310,100.00
8 Bak Cuci Stainles 1 Lubang - Buah 265,800.00
9 Bak Cuci Stainles 2 lubang - Buah 443,000.00
10 Keran air 1/2" (RRC) - Buah 31,000.00
11 Keran air 1/2" (Lokal) - Buah 13,300.00
12 Shower Spray (setaraf TOTO) - Buah 300,400.00
13 Shower Set - Buah 1,471,000.00
14 Seal Tape - Buah 2,200.00
15 Lem PVC - Tube 6,200.00
16 Floor Drain - Buah 14,100.00
17 Bak air fibreglass uk. 55x55x60 cm - Buah 398,700.00
18 Pipa GIV Dia 1/2" Panjang 6 m - Batang 97,400.00
19 Pipa GIV Dia 3/4" Panjang 6 m - Batang 128,500.00
20 Pipa GIV Dia 1 " Panjang 6 m - Batang 163,900.00
21 Pipa GIV Dia 1 1/2" Panjang 6 m - Batang 239,200.00
22 Pipa GIV 2"/Btg - 6 M Tebal 1,8 - Batang 274,700.00
23 Pipa GIV 2 1/2"/Btg - 6 M Tebal 2 - Batang 302,200.00
24 Pipa GIV 3"/Btg - 6 M Tebal 2,3 - Batang 526,300.00
25 Pipa GIV 4"/Btg - 6 M Tebal 2,3 - Batang 682,300.00
1 2 3 4 5
26 Pipa Paralon PVC uk. 1/2" (AW) Panjang : 4 M - Batang 16,800.00
27 Pipa paralon PVC uk. 3/4" (AW)Panjang : 4 M - Batang 21,200.00
28 Pipa Paralon PVC uk.1" (AW) Panjang : 4 M - Batang 28,300.00
29 Pipa Paralon PVC uk.1 1/2" (AW) Panjang : 4 M - Batang 47,800.00
30 Pipa Paralon PVC uk.2" (AW) Panjang : 4 M - Batang 66,500.00
1 2 3 4 5
31 Pipa Paralon PVC uk.2 1/2" (AW) Panjang :4 M - Batang 88,600.00
32 Pipa Paralon PVC uk.3" (AW) Panjang : 4 M - Batang 110,800.00
33 Pipa Paralon PVC uk.4" (AW) Panjang : 4 M - Batang 186,000.00
34 Pipa Paralon PVC uk.1/2" ( C ) Panjang : 4 M - Batang 12,000.00
35 Pipa Paralon PVC uk.3/4" ( C ) Panjang : 4 M - Batang 14,600.00
36 Pipa Paralon PVC uk.1" ( C ) Panjang : 4 M - Batang 18,600.00
37 Pipa Paralon PVC uk.1 1/2" ( D ) Panjang : 4 M - Batang 39,900.00
38 Pipa Paralon PVC uk.2" ( D ) Panjang : 4 M - Batang 50,500.00
39 Pipa Paralon PVC uk.2.5" ( D ) Panjang : 4 M - Batang 60,200.00
40 Pipa Paralon PVC uk.3" ( D ) Panjang : 4 M - Batang 75,300.00
41 Pipa Paralon PVC uk.4" ( D ) Panjang : 4 M - Batang 110,800.00
42 Piber Glas 0,5 M3 - Buah 797,500.00
43 Piber Glas 1 M3 - Buah 1,284,900.00
44 Piber Glas 1,5 M3 - Buah 2,082,500.00
45 Piber Glas 2 M3 - Buah 2,747,100.00
46 Piber Glas 3 M3 - Buah 4,076,400.00
47 Ball Valve 16 mm - Buah 19,400.00
48 Double Niple GI 16 mm - Buah 6,000.00
49 F. Elbouw PVC 16 mm - Buah 10,600.00
50 Elbouw PVC 16 mm - Buah 3,500.00
51 Reducer PVC 20 x 16 mm - Buah 5,300.00
52 DOV PVC 16 mm - Buah 1,700.00
-
K. BAHAN MINYAK -
1 Minyak Tanah Non Subsidi M 065 Liter 8,500.00
2 Minyak Diesel/Solar (Industri) M 183 Liter 4,600.00
3 Bensin Premium (Industri) M 184 Liter 5,700.00
1 2 3 4 5
4 Minyak Pelumas M 185 Liter 25,700.00
5 Oli BEO 154W40/Cat - Liter 50,500.00
6 Gas Elpiji - Kg 15,900.00
7 Sewa Alat Untuk Pengelasan - Set 67,300.00
8 Sewa kuali termasuk angkutan - Set 69,100.00
1 2 3 4 5
-
L. BAHAN ALAT-ALAT LISTRIK -
1 Tiang Besi ukuran 5,4,3 Inchi tebal 3 mm Panjang 9 M - Batang 2,658,500.00
2 Tiang Besi ukuran 4,3,2.5 Inchi tebal 3 mm Panjang 7 M - Batang 2,304,000.00
3 Fourt Clamp - Buah 2,200.00
4 Traffo HPiT 250 watt - Buah 230,400.00
5 Capasitor HPI 250 watt - Buah 37,700.00
6 Bola Lampu HPI 250 watt - Buah 172,300.00
7 Traffo TL 10 Watt - Buah 35,400.00
8 HPL 400 Watt - Buah 77,900.00
9 HPL 250 Watt - Buah 62,000.00
10 HPL 125 Watt - Buah 32,800.00
11 SOX 135 Watt - Buah 443,000.00
12 SOX 180 Watt - Buah 567,100.00
13 MLL 160 Watt - Buah 44,300.00
14 SON T 400 Watt - Buah 114,300.00
15 SON T 250 Watt - Buah 106,300.00
16 SON T 150 Watt - Buah 94,800.00
17 SON T 70 Watt - Buah 73,500.00
18 Box Besi Ukuran 50 x 40 x 20 - Buah 221,500.00
19 Pijar 5 Watt - Buah 2,400.00
20 Pijar 20 Watt - Buah 3,900.00
21 Pijar 25 Watt - Buah 3,900.00
22 Pijar 40 Watt - Buah 3,900.00
23 Pijar 60 Watt - Buah 5,500.00
24 Pijar 75 Watt - Buah 5,500.00
25 Pijar 80 Watt - Buah 4,400.00
1 2 3 4 5
26 Pijar 100 Watt - Buah 6,900.00
27 Pijar 200 Watt - Buah 15,100.00
28 Lampu XL 14 Watt - Buah 34,100.00
29 Lampu Sorot 300 Watt - Buah 28,300.00
30 Lampu Mercury 125 Watt - Buah 57,600.00
31 Lampu Mercury 250 Watt - Buah 124,000.00
1 2 3 4 5
32 Lampu LX Ukuran 11 Watt - Buah 31,900.00
33 Lampu LX Ukuran 18 Watt - Buah 35,400.00
34 Lampu LX (Spiral)Uk. 19 Watt - Buah 43,400.00
35 Lampu LX (Spiral)Uk. 25 Watt - Buah 47,400.00
36 Lampu LX (Spiral)Uk. 32 Watt - Buah 55,400.00
37 Lampu LX (Spiral)Uk. 42 Watt - Buah 66,500.00
38 Lampu Neon (TL Panjang) 10 Watt - Buah 8,800.00
39 Lampu Neon (TL Panjang) 20 Watt - Buah 11,500.00
40 Lampu Neon (TL Panjang) 40 Watt - Buah 13,300.00
41 Lampu Neon Essential 5 watt - Buah 23,400.00
42 Lampu Neon Essential 8 watt - Buah 25,500.00
43 Lampu Neon Essential 11 watt - Buah 29,800.00
44 Lampu Neon Essential 14 watt - Buah 31,900.00
45 Lampu Neon Essential 18 watt - Buah 32,900.00
46 Lampu Neon Essential 23 watt - Buah 39,300.00
47 Lampu Hologen 500 Watt - Buah 53,100.00
48 Lampu Hologen 1.000 Watt - Buah 110,800.00
49 Lampu Hologen 1.500 Watt - Buah 124,000.00
50 Lampu Spot Light - Buah 70,800.00
51 Kap Lampu Kobra Bahan Besi Cor - Buah 354,400.00
52 Kap Lampu Kobra Bahan Fiber Buah 177,200.00
53 NYY 1 x 1.5 mm - Meter 3,600.00
54 NYY 1 x 2.5 mm - Meter 2,900.00
55 NYY 1 x 4 mm - Meter 4,400.00
56 NYY 1 x 6 mm - Meter 6,300.00
57 NYY 2 x 2.5 mm - Meter 11,600.00
58 NYY 2 x 4 mm - Meter 15,300.00
1 2 3 4 5
59 NYY 2 x 6 mm - Meter 19,900.00
60 NYY 3 x 4 mm - Meter 20,800.00
61 NYY 4 x 2.5 mm - Meter 15,900.00
62 NYY 4 x 4 mm - Meter 24,800.00
63 NYY 4 x 6 mm - Meter 37,600.00
64 NYY 4 x 10 mm - Meter 52,500.00
1 2 3 4 5
65 NYY 4 x 16 mm - Meter 78,400.00
66 NYY 4 x 25 mm - Meter 123,200.00
67 NYY 4 x 35 mm - Meter 159,900.00
68 NYY 4 x 50 mm - Meter 220,200.00
69 NYA 1 x 1,5 mm - Meter 3,100.00
70 NYA 1 x 2,5 mm - Meter 4,400.00
71 NYA 1 x 4 mm - Meter 5,700.00
72 NYA 1 x 6 mm - Meter 9,500.00
73 NYM 4 mm - Meter 5,100.00
74 NYM 3 x 4 mm - Meter 16,600.00
75 NYM 2 x 2 mm - Meter 8,400.00
76 NYM 2 x 4 mm - Meter 12,800.00
77 NYM 2 x 2,5 mm - Meter 9,100.00
78 NYM 2 x 1,5 mm - Meter 7,500.00
79 NYM 3 x 1,5 mm - Meter 8,800.00
80 NYM 3 x 2,5 mm - Meter 11,500.00
81 NYM 3 x 10 mm - Meter 38,100.00
82 NYM 4 x 2,5 mm - Meter 13,700.00
83 NYM 4 x 4 mm - Meter 21,200.00
84 Kabel Senur - Roll 57,600.00
85 Kabel Tester - Meter 28,800.00
86 Kabel Box - Box 56,700.00
87 Kabel Mic Transparan - Roll 177,200.00
88 Kabel Antena - Roll 106,300.00
89 Kabel Telepon - Meter 1,700.00
90 Kabel TC 2 x 10 mm - Meter 4,200.00
91 Kabel TC 2 x 16 mm - Meter 6,200.00
1 2 3 4 5
92 Box TL 20 Watt - Buah 33,200.00
93 Box MCB 1 Group - Buah 3,500.00
94 Magnetick Contactor 25 A - Buah 221,500.00
95 Magnetick Contactor 50 A - Buah 309,300.00
96 Magnetick Contactor 100 A - Buah 596,200.00
97 Fitting Gantung E 27 - Buah 13,300.00
1 2 3 4 5
98 Fitting Duduk (Plafond) - Buah 8,800.00
99 Fitting Kombinasi - Buah 7,000.00
100 Fitting Hologen - Buah 28,300.00
101 Icnitor SN 58 - Buah 50,000.00
102 Insulock - Buah 500.00
103 Kapasitor - Buah 159,500.00
104 Kap Hijau E 27 - Buah 12,400.00
105 Kap Hijau E 40 - Buah 15,900.00
106 Kap Lampu - Buah 100,100.00
107 k. Skum 10-8 - Buah 1,000.00
108 MCB 1 A - Buah 32,800.00
109 MCB 2 A - Buah 29,800.00
110 MCB 4 A - Buah 46,000.00
111 MCB 6 A - Buah 54,000.00
112 MCB 10 A - Buah 56,700.00
113 MCB 16 A - Buah 61,100.00
114 MCB 25 A - Buah 27,500.00
115 MCB 32 A - Buah 75,800.00
116 MCB 45 A - Buah 77,500.00
117 MCB 50 A - Buah 81,900.00
118 MCB 63 A - Buah 56,800.00
119 MCB Box - Buah 3,500.00
120 Multi Tester - Buah 99,200.00
121 Full Bracket - Buah 15,900.00
122 Ornamen Gantung - Buah 49,600.00
123 Obeng Plus - Buah 36,300.00
124 Obeng Minus - Buah 36,300.00
1 2 3 4 5
125 Opstic 1/2" lengkap klem - Batang 221,500.00
126 Pipa Besi - Batang 85,900.00
127 Pipa Ornamen dia 1,25" x 1 m - Batang 54,000.00
128 Pipa Ornamen dia 1,5" x 2 m - Batang 132,900.00
129 Pipa Ornamen dia 2" x 3 m - Batang 155,100.00
130 Pipa Ornamen dia 2" x 4 m - Batang 168,300.00
1 2 3 4 5
131 Pipa Ornamen dia 2" x 6 m Batang 177,200.00
132 Pres Conector - Buah 3,100.00
133 Rangka Ring 32 Watt - Buah 14,100.00
134 Rel MCB - Buah 21,200.00
135 Saklar Double - Buah 16,700.00
136 Saklar Engkel - Buah 16,800.00
137 Saklar Tripel - Buah 17,300.00
138 Terminal Blok 25 amp - Buah 9,500.00
139 Solder Pistol - Buah 316,800.00
140 Solder - Buah 21,700.00
141 Stop Kontak - Buah 4,400.00
142 Steker Arde - Buah 8,700.00
143 Steker T - Buah 10,200.00
144 Steker PH - Buah 3,100.00
145 Sadel No. 6 - Bungkus 4,400.00
146 Sadel No. 8 - Bungkus 4,900.00
147 Sadel No. 9 - Bungkus 5,700.00
148 Sadel No. 10 - Bungkus 6,200.00
149 Sadel No. 12 - Bungkus 7,300.00
150 Sadel No. 14 - Bungkus 11,500.00
151 Sadel No. 19 - Bungkus 16,800.00
152 Sadel No. 22 - Bungkus 12,800.00
153 Skun RS-16 - Buah 1,500.00
154 Stater - Buah 3,700.00
155 Tedus Hitam - Buah 900.00
156 Tali Tester - Buah 21,700.00
157 Tang Amper - Buah 886,100.00
1 2 3 4 5
158 Tang Buaya - Buah 28,300.00
159 Tang Potong - Buah 28,300.00
160 Tang Kombinasi - Buah 28,300.00
161 Tang Jepit - Buah 28,300.00
162 Tang Skun - Buah 265,800.00
163 Time Swicht Theben - Buah 354,400.00
1 2 3 4 5
164 Taping Conector 1 baut - Buah 17,100.00
165 Taping Conector 2 baut - Buah 24,100.00
166 Tespen - Buah 18,100.00
167 Timah Solder - Buah 21,200.00
168 Terminal 25 ml - Buah 35,400.00
169 Wait Clam - Buah 6,200.00
170 Klem Tiang uk. Lebar 1,5" x dia 3" lengkap - Set 37,200.00
171 Klem Tiang uk. Lebar 1,5" x dia 5" lengkap - Set 41,600.00
172 Fhoto Shell 10 A merk Selcon - Buah 123,200.00
173 Dead And - Buah 5,300.00
174 Isolasi - Buah 6,700.00
175 Rel Alumunium (dudukan MCB) - Meter 30,100.00
-
N. TANAMAN HIAS -
1 Palm Ponik - Batang 39,900.00
2 Palm Raja 2,5 m - Batang 345,600.00
3 Palm Raja 2 m - Batang 310,100.00
4 Palm Raja 1 m - Batang 234,800.00
5 Palm Raja 1,5 m - Batang 150,600.00
6 Palm Raja 0,5 m - Batang 115,200.00
7 Palm Ekor Tupai 2,5 m - Batang 491,800.00
8 Palm Ekor Tupai 2 m - Batang 389,900.00
9 Palm Ekor Tupai 1 m - Batang 372,100.00
10 Palm Ekor Tupai 0,5 m - Batang 217,100.00
11 Palm Kamdoria 1 m - Batang 132,900.00
12 Palm Kamdoria - Batang 75,300.00
13 Palm Putri 1,5 m - Batang 323,400.00
1 2 3 4 5
14 Serut 2 m - Batang 3,544,600.00
15 Serut 1,5 m - Batang 2,215,400.00
16 Serut 1 m - Batang 1,152,000.00
17 Cemara Udang 2 m - Batang 3,633,300.00
1 2 3 4 5
18 Cemara Udang 1,5 m - Batang 2,215,400.00
19 Cemara Udang 1 m - Batang 1,152,000.00
20 Cemara Tiang 2 m - Batang 194,400.00
21 Cemara Tiang 1,5 m - Batang 147,400.00
22 Cemara Tiang 1 m - Batang 112,000.00
23 Cemara Mas 80 cm - Batang 312,300.00
24 Cemara Mas 50 cm - Batang 100,200.00
25 Cemara Norflok 70 cm - Batang 100,200.00
26 Cemara Norflok 1 m - Batang 170,900.00
27 Cemara Pinus 1,5 m - Batang 194,400.00
28 Cemara Pinus 1 m - Batang 123,800.00
29 Bougenvil - Batang 135,600.00
30 Nolima 2 m - Batang 771,700.00
31 Nolima 1 m - Batang 382,900.00
32 Sirlon 120 cm - Batang 265,100.00
33 Sirlon 60 cm - Batang 83,700.00
34 Tri Color - Batang 35,400.00
35 Asoka - Batang 17,800.00
36 Sambangdara - Batang 53,000.00
37 Pedang - Pedangan - Batang 14,800.00
38 Ki Hujan Bongkol - Batang 135,600.00
39 Ki Hujan Bulat - Batang 24,100.00
40 Nusa Indah - Batang 13,000.00
41 Sikas 1 m - Batang 1,655,100.00
42 Sikas 50 cm - Batang 1,066,100.00
43 Sikas 30 cm - Batang 536,000.00
44 Agave - Batang 82,500.00
1 2 3 4 5
45 Wali Songo - Batang 653,800.00
46 Lantana - Batang 10,600.00
47 Rambusa - Batang 41,300.00
48 Miramta - Batang 17,800.00
49 Asam Keranji - Batang 23,700.00
50 Heli Konia - Batang 11,900.00
51 Song Of India - Batang 53,000.00
52 Beringin Korea - Batang 2,597,400.00
53 Tombak Raja - Batang 217,900.00
54 Pandan Bali Persit - Batang 335,800.00
55 Pandan Bali Cabang - Batang 653,800.00
56 Pandan Kuning - Batang 16,600.00
57 Tanjung 1 m - Batang 15,300.00
58 Tanjung 2 m - Batang 82,500.00
59 Tanjung 3 m - Batang 194,400.00
60 Sapu Tangan 2 m - Batang 112,000.00
61 Kasia Golden 1,5 m - Batang 94,300.00
62 Rumput Golf - M2 20,800.00
63 Rumput Manila - M2 23,700.00
64 Puring - Batang 20,200.00
65 Melati Kosta - Batang 94,300.00
66 Anggrek Tanah - Batang 16,600.00
67 Lili Bombai - Batang 17,800.00
68 Lili Bakung - Batang 16,600.00
69 Lili Paris Putih - Batang 13,000.00
70 Nanas Merah - Batang 23,700.00
71 Amander - Batang 17,800.00
1 2 3 4 5
72 Puring Z - Batang 23,700.00
73 Anjuang - Batang 11,900.00
74 Pakis Kelabang - Batang 11,900.00
75 Lidah Mertua - Batang 11,900.00
76 Lapender - Batang 17,800.00
77 Batavia - Batang 23,700.00
78 Sambang Dara - Batang 29,500.00
79 Pillo Denrum - Batang 17,800.00
80 Evorria - Batang 23,700.00
81 Bayam - bayaman - Batang 9,600.00
82 Aglonema Lokal - Batang 29,500.00
1 2 3 4 5
83 Katus Kodok - Batang 10,600.00
84 Kipranrus - Batang 29,500.00
85 Siklok Besar - Batang 100,200.00
86 Siklok Kecil - Batang 53,000.00
87 Helokomin - Batang 11,900.00
88 Pisang Betet - Batang 17,800.00
89 Kana - Batang 11,900.00
90 Adenium - Batang 64,800.00
91 Bromedia - Batang 11,900.00
92 Echinacea/pucuk merah 50 cm - Batang 49,300.00
-
M. LAIN-LAIN -
1 Pintu Air Sorong Uk. 0,40 s/d 0,60 m - Unit 2,835,700.00
2 Pintu Air Ulir Uk. 0,60 s/d 0,80 m - Unit 6,380,400.00
3 Pintu Air Ulir Uk. 0,90 s/d 1,20 m - Unit 7,621,000.00
4 Gorong2 Beton 40 cm Tanpa Tulang - M1 163,900.00
5 Gorong2 Beton 60 cm Tanpa Tulang M 031 M1 261,400.00
6 Gorong2 Beton 80 cm Tanpa Tulang M 033 M1 354,400.00
7 Gorong2 Beton 100 cm Tanpa Tulang M 035 M1 483,000.00
AR HARGA SATUAN UPAH DAN BAHAN
WILAYAH I

KETERANGAN

1. Harga Tahun 2017


Harga Belum Termasuk
PPn

2. Harga Sudah Termasuk


Keuntungan dan Overhead
*) Operator yang sudah biasa dan terampil mengoperasikan
jenis peralatan untuk melayani pekerjaan berat
Misal : Bulldozer, Grader, Wheel, Loader, Asphalt Finisher, dll

yang agak ringan


Misal : Steel Wheeled Roller, Stamper, Concrete Mixer/Mesin pengaduk beton dll
KETERANGAN

1. Harga Tahun 2017


Harga Belum Termasuk
PPn

2. Harga Sudah Termasuk


Keuntungan dan Overhead

3. Harga ini berlaku untuk


Wilayah I :
Kec. Sungai Kunyit
Kec. Mempawah Hilir
Kec. Mempawah Timur
Kec. Sungai Pinyuh
Kec.Segedong
Kec.Siantan
dan daerah lain yang
memiliki kesamaan
karakteristik wilayah yang
mempengaruhi harga
satuan.
6

4. Harga satuan merupakan


harga on side (di lapangan)

5. Untuk penentuan harga


satuan yang dipergunakan
6
dipengaruhi oleh asumsi
perencanaan yang dipakai.

6. Untuk Daerah yang me-


miliki karakteristik tertentu
dapat digunakan inter-
polasi
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
DAFTAR HARGA PERALATAN
PROPINSI : KALIMANTAN BARAT ( 61 )
KABUPATEN : MEMPAWAH ( 02 )

UMUR OWNERSHIP COST (Rp.)


KAPASITAS ALAT THN JAM HARGA POKOK (Rp.) CRF
NILAI SISA
(A )
NO KODE JENIS ALAT D=
HP Th W B i(1+i)A C = 10 % x B
(1+i)A-1
1 2 4 5 6 7 8 9

1 E 001 Bulldozer 100 8 1,200 2,147,446,000.00 0.204832 214,744,600.00


2 E 052 Wheel Loader 115 8 1,500 1,272,054,000.00 0.204832 127,205,400.00
3 E 010 Motor Grader 115 8 1,500 2,256,870,000.00 0.204832 225,687,000.00
4 E 080 Roller 3 Wheel 8 - 10 T 51 10 1,500 508,607,000.00 0.180622 50,860,700.00
5 E 081 Tandem Roller 6 - 10 T 40 10 1,500 1,391,736,500.00 0.180622 139,173,650.00
6 E 082 Seil Vibrator Roller 10 T 35 8 1,500 412,296,000.00 0.204832 41,229,600.00
7 E 083 Towed Vibrator Roller 2 - 3 T 6 8 1,500 421,282,400.00 0.204832 42,128,240.00
8 E 084 Pneumatic Roller 8 - 15 T 95 10 1,500 977,977,000.00 0.180622 97,797,700.00
9 E 087 Vibrator Roller 600 Kg - 1 T 7 6 1,200 86,940,000.00 0.246680 8,694,000.00
10 E 088 Plate Vibrator Tamper 4 6 750 13,932,000.00 0.246680 1,393,200.00
11 E 089 Concrete Vibrator 4 HP 4 5 600 8,152,000.00 0.280854 815,200.00
12 E 153 Asphalt Sprayer Towed 350 L 7 6 1,200 80,000,000.00 0.246680 8,000,000.00
13 E 155 Asphalt Mixing Plant 30 t/h 125 10 1,200 3,500,000,000.00 0.180622 350,000,000.00
14 E 182 Water Tank Truck 115 6 1,500 204,704,000.00 0.246680 20,470,400.00
15 E 191 Trailer, Towed 1 Ton 4 12 750 28,968,000.00 0.165194 2,896,800.00
16 E 211 Dump Truck 3.5 T 106 6 1,500 150,000,000.00 0.246680 15,000,000.00
17 E 212 Dump Truck 5 T 145 6 1,500 188,328,000.00 0.246680 18,832,800.00
18 E 221 Flat Bad Truck 4 T 80 6 1,500 163,764,000.00 0.246680 16,376,400.00
19 E 252 Concrete Mixer 0.25 M3 10 5 1,500 49,572,000.00 0.280854 4,957,200.00
20 E 341 Water Pumpdiameter 5 Cm 8 4 750 4,208,000.00 0.332708 420,800.00
21 E 020 Excavator 143 8 1,200 1,586,579,610.00 0.204832 158,657,961.00
22 - Asphal Finisher 72 10 1,200 2,820,403,600.00 0.180622 282,040,360.00
23 - Electric Welding Machine 40 5 2,000 17,500,000.00 0.280854 1,750,000.00
24 - Alat Penumbuk Sayang 12 5 2,100 15,000,000.00 0.280854 1,500,000.00

BENSIN
SOLAR
CRF pada i PELUMAS
sebesar 12,5 % i
HARGA PERALATAN
Wilayah I

OWNERSHIP COST (Rp.) OVERATING COST (Rp.) EQUIPMENT COST


BAHAN BAKAR (H) PERBAIKAN & BIAYA
BIAYA PASTI PER JAM WORK SHOP JAM
DIESEL BENSIN PELUMAS SPAREPARTS LANGSUNG
E= 15 % x HP x 15 % x HP x F= G=
( B - C ) x D + 0.002 x B Harga Bahan Harga Bahan 0.025 x HP x Harga 12.5 s/d 17.5 x B 6.25 s/d 8.75 x B T=F+G+H TC = E + T
Pelumas
W Bakar Bakar 100 X W 100 X W
10 11 12 13 14 15 16 17

333,478.62 69,000.00 - 64,250.00 313,169.21 156,584.60 603,003.81 936,482.43


158,030.63 79,350.00 - 73,887.50 148,406.30 74,203.15 375,846.95 533,877.58
280,376.93 79,350.00 - 73,887.50 263,301.50 131,650.75 548,189.75 828,566.68
55,797.44 35,190.00 - 32,767.50 59,337.48 29,668.74 156,963.73 212,761.17
152,682.40 27,600.00 - 25,700.00 162,369.26 81,184.63 296,853.89 449,536.29
51,220.62 24,150.00 - 22,487.50 48,101.20 24,050.60 118,789.30 170,009.92
52,337.03 4,140.00 - 3,855.00 49,149.61 24,574.81 81,719.42 134,056.45
107,290.34 65,550.00 - 61,037.50 114,097.32 57,048.66 297,733.48 405,023.81
16,229.66 4,830.00 - 4,497.50 12,678.75 6,339.38 28,345.63 44,575.28
4,161.24 - 3,420.00 2,570.00 3,250.80 1,625.40 10,866.20 15,027.44
3,461.46 - 3,420.00 2,570.00 2,377.67 1,188.83 9,556.50 13,017.96
14,934.12 4,830.00 - 4,497.50 11,666.67 5,833.33 26,827.50 41,761.62
479,965.51 1,245,450.00 - 80,312.50 510,416.67 255,208.33 2,091,387.50 2,571,353.01
30,570.74 79,350.00 - 73,887.50 23,882.13 11,941.07 189,060.70 219,631.44
5,819.67 2,760.00 - 2,570.00 6,759.20 3,379.60 15,468.80 21,288.47
22,401.18 73,140.00 - 68,105.00 17,500.00 8,750.00 167,495.00 189,896.18
28,125.13 100,050.00 - 93,162.50 21,971.60 10,985.80 226,169.90 254,295.03
24,456.71 55,200.00 - 51,400.00 19,105.80 9,552.90 135,258.70 159,715.41
8,419.59 6,900.00 - 6,425.00 5,783.40 2,891.70 22,000.10 30,419.69
1,691.26 - 6,840.00 5,140.00 981.87 490.93 13,452.80 15,144.06
246,381.23 98,670.00 - 91,877.50 231,376.19 115,688.10 537,611.79 783,993.02
386,770.42 49,680.00 - 46,260.00 411,308.86 205,654.43 712,903.29 1,099,673.70
2,229.23 27,600.00 - 25,700.00 1,531.25 765.63 55,596.88 57,826.10
1,819.78 8,280.00 - 7,710.00 1,250.00 625.00 17,865.00 19,684.78

5,700.00
4,600.00 CATATAN :
25,700.00 - HARGA BAHAN BAKAR DAN PELUMAS MENGIKUTI PEDOMAN HARGA SK BUPATI (PER WILAYAH)
12.5% - KONSTANTA MENGIKUTI PANDUAN ANALISIS HARGA SATUAN 008/BM/2008 (NOPEMBER 2008)
PENDUKUNG SPESIFIKASI UMUM EDISI DESEMBER 2006 (kolom 9 s/d 15)
- ANALISA HARGA ALAT PER JAM INI DIGUNAKAN UNTUK PERHITUNGAN HARGA SATUAN
PEKERJAAN DENGAN ANALISA K ( PETUNJUK TEKNIK NOMOR : 015/T/Bt/1995)
- KHUSUS ALAT ASPHALT MIXING PLANT DITAMBAH BIAYA BAHAN BAKAR PEMANASAN MATERIAL
DENGAN RUMUS 12 X 0,7 X KAPASITAS X BAHAN BAKAR
STANDAR HARGA SATUAN UPAH DAN BAHAN
WILAYAH II

PROVINSI KALIMANTAN BARAT


KABUPATEN MEMPAWAH

NO JENIS PEKERJA KODE SATUAN HARGA


(Rp)

1 2 3 4 5

A. UPAH
1 Mandor Lapangan L 061 Hari 172,500.00
2 Mekanik L 071 Hari 155,250.00
3 Mekanik Pembantu L 072 Hari 115,000.00
4 Kepala Tukang L 073 Hari 172,500.00
5 Tukang L 079 Hari 149,500.00
6 Operator Terlatih *) L 081 Hari 172,500.00
7 Operator Kurang Terlatih **) L 082 Hari 126,500.00
8 Pembantu Operator L 083 Hari 115,000.00
9 Supir Material / Truck L 091 Hari 138,000.00
10 Supir Personil L 092 Hari 138,000.00
11 Pembantu Supir / Kernet L 099 Hari 115,000.00
12 Buruh Lapangan Terlatih L 106 Hari 138,000.00
13 Buruh Lapangan Agak Terlatih L 103 Hari 126,500.00
14 Buruh Lapangan Tak Terlatih L 101 Hari 115,000.00
15 Penjaga Api - Hari 103,500.00
16 Penjaga Malam - Hari 103,500.00
Catatan : *) Operator yang sudah biasa dan terampil mengoperasikan
jenis peralatan untuk melayani pekerjaan berat
Misal : Bulldozer, Grader, Wheel, Loader, Asphalt Finisher, dll

yang agak ringan


Misal : Steel Wheeled Roller, Stamper, Concrete Mixer/Mesin pe
NO JENIS BAHAN KODE SATUAN HARGA
(Rp)

1 2 3 4 5

B. BAHAN PENGISI
1 Batu Kong M.101 M 232,300.00
2 Batu Sap Pinang - M 259,400.00
3 Batu pecah 15-20 cm - M 319,500.00
4 Batu pecah 10-15 cm M.020 M 330,100.00
5 Batu pecah 5-7 cm M.022 M 412,700.00
6 Batu pecah 3-5 cm M.023 M 341,900.00
7 Batu pecah 2-3 cm M.024 M 383,200.00
8 Batu pecah 1-2 cm M.025 M 483,400.00
9 Batu pecah 0,5 - 1 cm M.026 M 530,500.00
10 Stone Dust - M 403,400.00
11 Aspal Bitumen 60/70 - Kg 17,300.00
12 Pasir Urug M.040 M 117,900.00
13 Pasir Ayak Untuk Beton (Pasir Kasar/Merah) M.041 M 194,600.00
14 Semen PC (50 Kg) M.080 Zak 88,500.00
15 Semen Putih (40 Kg) - Zak 159,200.00
16 Timbunan Tanah Biasa M 92,000.00
17 Timbunan Tanah Pilihan M.050.a M 136,800.00
18 Paving Block - Buah 3,200.00
19 Batu Bata 5 cm x 11 cm x 22 cm Buah 3,500.00
20 Batako 7 cm x 15 cm x 30 cm - Buah 2,000.00
21 Batako 6 cm x 15 cm x 30 cm - Buah 1,900.00
22 Batako 7 cm x 20 cm x 40 cm (press) - Buah 3,200.00
1 2 3 4 5
23 Batako 9 cm x 20 cm x 40 cm (press) - Buah 3,300.00
24 Kerawang ( roster ) uk.18 x 18 cm - Buah 29,600.00
25 Kerawang press (roster) uk.30 x 30 cm - Buah 63,800.00
26 Keramik uk. 10 cm x 20 cm - Kotak 73,200.00
27 Keramik uk. 20 cm x 20 cm (polos) - Kotak 87,300.00
28 Keramik uk. 20 cm x 20 cm ( Corak ) - Kotak 90,900.00
1 2 3 4 5
29 Keramik uk. 25 cm x 33 cm Kotak 92,600.00
30 Keramik uk. 30 cm x 30 cm (polos biasa) - Kotak 70,800.00
31 Keramik uk. 30 cm x 30 cm (corak biasa) - Kotak 80,200.00
32 Keramik uk. 30 cm x 30 cm Artistik (setaraf Decogress) Kotak 143,900.00
33 Keramik uk. 40 cm x 40 cm (polos biasa) - Kotak 82,600.00
34 Keramik uk. 40 cm x 40 cm (corak biasa) - Kotak 99,100.00
35 Keramik uk. 40 cm x 40 cm (granite tile) - Kotak 265,400.00
36 Keramik uk. 60 cm x 60 cm Polished (setaraf Indogress) - Kotak 382,000.00
37 Keramik uk. 60 cm x 60 cm Polished (setaraf Decogress) - Kotak 277,100.00
38 Plint Keramik 10 x 30 cm - Bh 16,600.00
39 Plint Keramik 10 x 40 cm - Bh 21,300.00
40 Wood Flooring - M 347,800.00
41 List Keramik uk 2 cm x 10 cm - Bh 1,300.00
42 List Keramik WC. Uk. 8 cm x 20 cm - Bh 14,200.00
43 Plint Kayu uk. 2 cm x 10 cm - Bh 73,200.00
44 Batu Tempel Hitam uk.5 x 10 cm - M 271,200.00
45 Batu Paras uk. 5 x 10 cm - M 271,200.00
46 Floor Hardener - Kg 19,700.00
47 Beton Ready Mix B 0 - M 1,114,100.00
48 Beton Ready Mix K-125 - M 1,178,800.00
49 Beton Ready Mix K-150 - M 1,208,400.00
50 Beton Ready Mix K-175 - M 1,249,500.00
51 Beton Ready Mix K-200 - M 1,336,800.00
52 Beton Ready Mix K-225 - M 1,367,400.00
53 Beton Ready Mix K-250 - M 1,444,100.00
54 Beton Ready Mix K-275 - M 1,461,700.00
55 Beton Ready Mix K-300 - M 1,485,300.00
1 2 3 4 5
56 Beton Ready Mix K-325 - M 1,540,100.00
57 Beton Ready Mix K-350 - M 1,567,800.00
58 Beton Ready Mix K-375 - M 1,623,800.00
59 Beton Ready Mix K-400 - M 1,658,000.00
60 Beton Ready Mix K-425 - M 1,688,700.00
61 Beton Ready Mix K-450 - M 1,709,300.00
1 2 3 4 5
62 Beton Ready Mix K-475 - M 1,772,900.00
63 Beton Ready Mix K-500 - M 1,811,300.00
64 Additive Ready Mix - Liter 59,000.00
65 Karung Goni Curing Beton ( 0.7m ) - Lembar 16,300.00
66 Mini Pile Segi Empat Ukuran 20 x 20 CM K 350, Pj = 6 m - M' 1,538,400.00
67 Mini Pile Segi Empat Ukuran 25 x 25 CM K 350, Pj = 6 m - M' 2,012,800.00
68 Mini Pile Segitiga Ukuran 28 x 28 CM K 350, Pj = 6 m - M' 1,115,800.00
69 Mini Pile Segitiga Ukuran 32 x 32 CM K 350, Pj = 6 m - M' 1,266,200.00
70 Sewa Pompa Ready Mix (Min. 100 M) - M 47,200.00
71 Bahan Plastik Cor Beton - M 5,200.00

C. BAHAN KAYU
1 Kayu Belian Tidak Ketam uk. 4 cm x 8 cm x 4 m - M 11,373,200.00
2 Kayu Belian Tidak Ketam uk. 6 cm x 6 cm x 4 m - M 15,962,400.00
3 Kayu Belian Tidak Ketam uk. 7 cm x 7 cm x 4 m - M 12,900,200.00
4 Kayu Belian Tidak Ketam uk. 8 cm x 8 cm x 4 m - M 11,073,900.00
5 Kayu Belian Tidak Ketam uk. 8 cm x 16 cm x 4 m - M 8,633,600.00
6 Kayu Belian Tidak Ketam uk. 9 cm x 9 cm x 4 m - M 11,114,600.00
7 Kayu Belian Tidak Ketam uk.10 cm x 10 cm x 4 m - M 12,450,600.00
8 Kayu Belian Tidak Ketam uk.12 cm x 12 cm x 4 m - M 15,913,200.00
9 Kayu Belian Tidak Ketam uk.15 cm x 15 cm x 4 m - M 18,860,000.00
10 Kayu Belian Tidak Ketam uk.5 cm x 10 cm x 4 m - M 11,669,700.00
11 Kayu Belian Ketam uk. 6 cm x 6 cm x 4 m - M 17,558,600.00
12 Kayu Belian Ketam uk. 7 cm x 7 cm x 4 m - M 14,072,900.00
13 Kayu Belian Ketam uk. 8 cm x 8 cm x 4 m - M 11,971,800.00
14 Kayu Belian Ketam uk. 3 cm x 7 cm x 4 m - M 16,979,700.00
15 Kayu Belian Ketam uk. 4 cm x 8 cm x 4 m - M 13,168,900.00
1 2 3 4 5
16 Kayu Belian Ketam uk. 5 cm x 10 cm x 4 m - M 12,642,200.00
17 Papan Belian Tidak Ketam uk.2,5 cm x 16 cm x 4 m M.181.d M 15,839,600.00
18 Papan Belian Ketam uk. 2 cm x 16 cm x 4 m M.181.e M 20,259,800.00
19 Kayu kls I Bengkirai Tidak Ketam uk. 7 cm x 7 cm x 4 m - M 7,818,300.00
1 2 3 4 5
20 Kayu kls I Bengkirai Tidak Ketam uk. 8 cm x 8 cm x 4 m M.181.g M 8,058,000.00
21 Papan kls I Tidak Ketam - M 11,050,900.00
22 Kayu kls I Bengkirai Ketam uk. 7 cm x 7 cm x 4 m - M 8,119,000.00
23 Kayu kls I Bengkirai Ketam uk. 8 cm x 8 cm x 4 m M.181.f M 8,288,200.00
24 Papan kls I Ketam - M 9,196,900.00
25 Kayu kls I Bengkirai Ketam uk. 5 cm x 10 cm x 4 m - M 8,251,300.00
26 Kayu kls II Tidak Ketam uk.3 cm x 5 cm x 4 m - M 3,929,300.00
27 Kayu kls II Tidak Ketam uk.4 cm x 6 cm x 4 m - M 3,683,700.00
28 Kayu kls II Tidak Ketam uk.4 cm x 8 cm x 4 m - M 4,604,600.00
29 Kayu kls II Tidak Ketam uk.5 cm x 7 cm x 4 m - M 4,630,900.00
30 Kayu kls II Tidak Ketam uk.5 cm x 10 cm x 4 m - M 7,367,300.00
31 Kayu kls II Tidak Ketam uk.6 cm x 10 cm x 4 m - M 6,630,600.00
32 Kayu kls II Tidak Ketam uk.6 cm x 12 cm x 4 m - M 5,525,500.00
33 Kayu kls II Tidak Ketam uk.7 cm x 7 cm x 4 m - M 5,412,800.00
34 Kayu kls II Tidak Ketam uk.8 cm x 8 cm x 4 m - M 4,374,400.00
35 Kayu kls II Tidak Ketam uk.8 cm x 12 cm x 4 m - M 4,144,200.00
36 Kayu kls II Tidak Ketam uk.8 cm x 15 cm x 4 m - M 4,297,600.00
37 Kayu kls II Tidak Ketam uk.10 cm x 10 cm x 4 m - M 4,180,600.00
38 Papan kls II Tidak Ketam uk.2,5 cm x 20 cm x 4 m M.181.j M 8,840,700.00
39 Kayu kls II Ketam uk.5 cm x 10 cm x 4 m - M 8,251,300.00
40 Kayu kls II Ketam uk.8 cm x 8 cm x 4 m - M 5,065,000.00
41 Kayu kls II Ketam uk.7 cm x 7 cm x 4 m - M 6,014,100.00
42 Kayu kls II Ketam uk.6 cm x 6 cm x 4 m - M 6,958,000.00
43 Kayu kls II Ketam uk.3 cm x 7 cm x 4 m - M 9,121,400.00
44 Kayu kls II Ketam uk.3 cm x 5 cm x 4 m - M 7,858,500.00
45 Papan kls II Ketam uk.1,8 cm x 18 cm x 4 m M.181.k M 8,185,900.00
46 Papan kls II Ketam uk.1 cm x 7 cm x 4 m M.181.k M 9,682,700.00
1 2 3 4 5
47 Kayu kls III Tidak Ketam uk.3 cm x 5 cm x 4 m - M 3,344,400.00
48 Kayu kls III Tidak Ketam uk.4 cm x 6 cm x 4 m - M 2,787,200.00
49 Kayu kls III Tidak Ketam uk.5 cm x 7 cm x 4 m - M 3,344,400.00
50 Kayu kls III Tidak Ketam uk.5 cm x 10 cm x 4 m - M 3,678,900.00
51 Kayu kls III Tidak Ketam uk.6 cm x 12 cm x 4 m - M 2,369,200.00
1 2 3 4 5
52 Kayu kls III Tidak Ketam uk.8 cm x 8 cm x 4 m - M 2,613,000.00
53 Kayu kls III Tidak Ketam uk.8 cm x 12 cm x 4 m - M 2,787,200.00
54 Papan kls III Tidak Ketam uk.2 cm x 18 cm x 4 m M.181.l M 2,787,200.00
55 Papan Simpiran - M 1,282,200.00
56 Kayu Profil - Batang 33,700.00
57 Kayu cerucuk /dolken 4 - 6 - Pj. 4 M - Batang 9,600.00
58 Kayu cerucuk /dolken 6 - 8 - Pj. 4 M - Batang 13,600.00
59 Kayu cerucuk /dolken 8 - 10 - Pj. 4 M - Batang 17,600.00
60 Kayu cerucuk /dolken 10 - 12 - Pj. 12 M - Batang 106,800.00
61 Kayu cerucuk /dolken 12 - 15 Pj. 12 M - Batang 135,600.00
62 Kayu untuk Perancah - M 1,144,000.00
63 Kayu Simpiran - M 235,800.00
64 Kayu Bakar - M 105,600.00
65 Alat-alat Bantu M. 170 Set 119,200.00
66 Alas laci - Btg 20,300.00

D. BAHAN CAT
1 Amplas Besi - Lembar 4,800.00
2 Amplas Kayu - Lembar 8,300.00
3 Plamur - Kg 39,600.00
4 Cat Dasar - Kg 30,800.00
5 Cat Kilat - Kg 70,800.00
6 Cat Tembok - Kg 85,500.00
7 Cat tembok type weather shield - Kg 118,400.00
8 Cat tembok type weather coat (acrylic) - Kg 113,900.00
9 Cat seng - Kg 54,200.00
10 Cat Marka Jalan - Kg 78,977.00
1 2 3 4 5
11 Cat Weatherbond - Kg 48,500.00
12 Cat Water Proofing - Kg 59,000.00
13 Dempul - Kg 44,800.00
14 Plitur - Kg 63,800.00
15 Thiner M.090.f Ltr 31,300.00
16 Cat Melamic - Ltr 76,100.00
1 2 3 4 5
17 Cat Pilox - Klg 30,900.00
18 Meni - Kg 64,900.00
19 Teer - Liter 71,300.00
20 Oker Warna ( Induk ) - Kg 88,500.00
21 Oker Warna ( Biasa ) - Kg 16,600.00
22 Lem Fox ( Putih ) - Kg 21,100.00
23 Lem Fox ( Kuning ) - Kg 56,100.00
24 Sealent - Tube 59,000.00
25 Soda Api - Kg 27,300.00
26 Sabun / cream pembersih kotoran - Kg 26,000.00
27 Teak Oil - Liter 73,200.00
28 Kuas 4" - Buah 28,300.00

E. BAHAN BESI DAN ALUMINIUM


1 Besi Beton Polos - Kg 20,100.00
2 Besi Beton Ulir - Kg 21,300.00
3 Besi wire mesh 5 - Kg 14,200.00
4 Kawat baja/bendrat M.168 Kg 26,000.00
5 Kawat Simpai Roll - Kg 24,900.00
6 Kawat Nyamuk Besi - M 21,300.00
7 Kawat Nyamuk Plastik - M 11,900.00
8 Kawat Saringan Pasir - M 14,200.00
9 Kawat harmonika - M 31,700.00
10 Kawat Kasa - M 19,600.00
11 Baut Baja 4" Panjang 20 cm - Buah 6,600.00
12 Baut Baja 4" Panjang 30 cm - Buah 8,900.00
13 Baut Baja 4" Panjang 40 cm - Buah 11,300.00
1 2 3 4 5
14 Beugel plat L. 3 cm - bh 21,300.00
15 Besi Penahan Buah 21,300.00
16 Besi Plat Tebal 2 mm - Lembar 542,300.00
17 Besi Plat Tebal 2,5 mm - Lembar 601,300.00
18 Besi Konstruksi (I, H) - Kg 27,200.00
1 2 3 4 5
19 Besi Konstruksi ( C ) - Kg 23,600.00
20 Besi Konstruksi (Siku ) - Kg 23,600.00
21 Kawat Las - Kg 135,600.00
22 Folding gate - M 825,200.00
23 Kusen Alumunium 3" - M' 147,500.00
24 Kusen Alumunium 4" - M' 153,300.00
25 Kusen dan Pintu PVC Toilet - Unit 412,700.00
26 Pintu Alumunium + Engsel Tanam - uk. 90 x 215 cm - Unit 3,300,500.00
27 Pintu Alumunium + Engsel Kupu-kupu - uk. 90 x 215 cm - Unit 2,121,800.00
28 Rangka Baja Ringan Zincalume (truss/color) (Tanpa Jurai Dalam - Bentang s/d 16 m) - M 283,300.00
29 Rangka Baja Ringan Zincalume (truss/color) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m) - M 333,700.00
30 Rangka Baja Ringan Zincalume (truss/color) (Dengan Jurai Dalam - Bentang s/d 16m) - M 300,700.00
31 Rangka Baja Ringan Zincalume (truss/color) (Dengan Jurai Dalam - Bentang 17 m s/d 30 m) - M 379,700.00
32 Rangka Baja Ringan Zincalume (truss/polos) (Tanpa Jurai Dalam - Bentang s/d 16 m) - M 222,900.00
33 Rangka Baja Ringan Zincalume (truss/polos) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m) - M 281,800.00
34 Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang s/d 16m) - M 235,800.00
35 Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang 17 m s/d 30 m) - M 308,900.00
36 Alumunium Komposit + Rangka Besi - M 1,178,800.00
37 Rangka Plafond Metal Furing + Pemasangan - M 176,900.00
38 Besi Hollow stainless steel 20 x 20 - Batang 176,900.00
39 Besi Hollow stainless steel 30 x 30 - Batang 250,600.00
40 Besi Hollow stainless steel 20 x 40 - Batang 259,400.00
41 Besi Hollow stainless steel 40 x 40 - Batang 336,100.00
42 Besi Hollow biasa 20 x 20 - Batang 73,800.00
43 Besi Hollow biasa 30 x 30 - Batang 110,600.00
44 Besi Hollow biasa 20 x 40 - Batang 92,200.00
45 Besi Hollow biasa 40 x 40 - Batang 131,300.00
1 2 3 4 5
46 Besi Pipa Stainless Stell 1/2 " - Batang 81,100.00
47 Besi Pipa Stainless Stell /4 "
3
- Batang 120,900.00
48 Besi Pipa Stainless Stell 1 " - Batang 156,300.00
1 2 3 4 5
49 Besi Pipa Stainless Stell 1 1/2 " - Batang 243,300.00
50 Besi Pipa Stainless Stell 2 " - Batang 318,400.00
51 Besi Pipa Stainless Stell 2 1/2 " - Batang 423,000.00
52 Besi Pipa Stainless Stell 3 " - Batang 515,800.00

F. BAHAN PENGANTUNG
1 Engsel Kupu-kupu 3" ( biasa ) - Kotak 10,200.00
2 Engsel Kupu-kupu 3" ( Stainles ) - Kotak 17,800.00
3 Engsel Kupu-kupu 4" ( biasa ) - Kotak 11,300.00
4 Engsel Kupu-kupu 4" ( Stainles ) - Kotak 34,900.00
5 Slot Jendela ( Biasa ) - Buah 7,800.00
6 Slot Jendela ( Stainles ) - Buah 10,200.00
7 Slot Pintu ( Biasa ) - Buah 6,600.00
8 Slot Pintu ( Stainles ) - Buah 22,500.00
9 Kunci tanam 2 slag (setaraf Belluci) - Buah 213,600.00
10 Kunci tanam 1 slag - Buah 194,100.00
11 Kunci silinder - Buah 74,100.00
12 Kunci Tanam Kecil - Buah 70,800.00
13 Door Closer - Buah 265,400.00
14 Door Stoper - Buah 106,200.00
15 Pegangan Pintu ( Biasa ) - Buah 100,300.00
16 Pegangan Pintu ( Stainles ) - Buah 176,900.00
17 Pegangan Jendela ( Biasa ) - Buah 6,000.00
18 Pegangan Jendela ( Stainles ) - Buah 18,800.00
19 Kait Angin ( Biasa ) - Buah 6,000.00
20 Kait Angin ( Stainles ) - Buah 23,600.00
21 Paku Campuran M.166.b Kg 24,900.00
1 2 3 4 5
22 Paku Seng M.166.a Kg 27,100.00
23 Paku Atap Metal - Kg 15,100.00
24 Paku GRC - kg 29,600.00
25 Paku / sekrup Gypsum - Buah 500.00
26 Paku Triplek - Kg 35,500.00
27 Paku Beton - Kg 37,800.00
1 2 3 4 5
28 Sekrup Fixer - Buah 3,000.00
29 Sekrup Steel Sheet - Buah 900.00
30 Sekrup Zincalume Buah 1,000.00

G. BAHAN ATAP
1 Genteng Metal Permata 0,25 mm (720 mm x 770 mm) Lembar 61,600.00
2 Genteng Metal Permata 0,30 mm (720 mm x 770 mm) Lembar 74,900.00
3 Genteng Metal Permata 0,35 mm (720 mm x 770 mm) Lembar 69,300.00
4 Genteng Metal Classic 0,25 mm (800 mm x 770 mm) Lembar 41,300.00
5 Genteng Metal Classic 0,30 mm (800 mm x 770 mm) Lembar 53,200.00
6 Genteng Metal Classic 0,35 mm (800 mm x 770 mm) Lembar 60,200.00
7 Genteng Metal Stone Permata 2 x 5 (875 mm x 770 mm) Lembar 123,900.00
8 Genteng Metal Color Permata 2 x 5 (875 mm x 770 mm) Lembar 105,000.00
9 Genteng Metal Stone Classic 2 x 5 (1000 mm x 770 mm) Lembar 115,000.00
10 Genteng Metal Stone Royal 2 x 4 (760 mm x 770 mm) Lembar 92,900.00
11 Genteng Metal Color Royal 2 x 4 (760 mm x 770 mm) Lembar 67,900.00
12 Genteng Metal Stone Permata 2 x 4 (720 mm x 770 mm) Lembar 92,900.00
13 Genteng Metal Color Permata 2 x 4 (720 mm x 770 mm) Lembar 67,900.00
14 Genteng Metal Stone Classic 2 x 4 (800 mm x 770 mm) Lembar 84,300.00
15 Genteng Metal ColorClassic 2 x 4 (800 mm x 770 mm) Lembar 61,700.00
16 Nok Genteng Metal Raja stone panjang 104 cm Lembar 64,900.00
17 Nok Genteng Metal Raja color panjang 104 cm Lembar 56,600.00
18 Nok Genteng Metal Ratu stone panjang 91 cm Lembar 56,600.00
19 Nok Genteng Metal Ratu color panjang 91 cm Lembar 49,600.00
20 Nok Genteng Metal Putri stone panjang 109 cm Lembar 54,300.00
21 Nok Genteng Metal Putri color panjang 109 cm Lembar 47,200.00
22 Seng Gelombang Bjls 20 - Lembar 56,500.00
1 2 3 4 5
23 Seng Gelombang Bjls 30 - Lembar 76,200.00
24 Seng Plat Bjls 20 - Lembar 59,500.00
25 Seng Plat Bjls 30 - Lembar 78,800.00
26 Zincalume Gelombang Persegi 0.35 (polos) - M 159,200.00
27 Zincalume Gelombang Persegi 0.30 (polos) - M 141,500.00
28 Zincalume Gelombang Persegi 0.35 (color) - M 182,800.00
1 2 3 4 5
29 Zincalume Gelombang Persegi 0.30 (color) - M 161,600.00
30 Zincalume Plat 0.2 - Lembar 165,100.00
31 Aluminium Foil - M 70,800.00
32 Atap Plastik Gelombang - Lembar 82,600.00

H. BAHAN KACA
1 Kaca Bening uk 8 mm - M 445,100.00
2 Kaca Bening uk. 5 mm - M 176,900.00
3 Kaca Bening uk. 3 mm - M 159,200.00
4 Kaca Bening uk. 2 mm - M 82,600.00
5 Kaca Rayban uk. 5 mm - M 271,200.00
6 Kaca Rayban uk. 3 mm - M 241,800.00
7 Kaca Cermin uk. 2 mm - M 306,500.00

I. BAHAN TRIPLEK
1 Triplek t uk 3 mm - Lembar 83,500.00
2 Triplek t uk 4 mm - Lembar 87,300.00
3 Triplek t uk 6 mm - Lembar 171,100.00
4 Triplek t uk 9 mm - Lembar 182,800.00
5 Multiplek t uk 10 mm - Lembar 328,700.00
6 Multiplek t uk 12 mm - Lembar 333,500.00
7 Poliwood uk 4 mm x 122 cm x 244 cm - Lembar 136,600.00
8 Teakwood uk 3 mm x 122 cm x 244 cm - Lembar 166,100.00
9 Papan GRC uk 4 mm x 122 cm x 244 cm - Lembar 70,800.00
10 Panel GRC 120 x 240 x 40 - Lembar 95,000.00
11 Gypsum Board uk. 9 x 120 x 240 cm - Lembar 88,900.00
12 Tepung Gypsum - Kg 7,300.00
1 2 3 4 5

J. BAHAN SANITASI
1 Kloset duduk monoblok - Buah 3,498,200.00
2 Kloset duduk (setaraf TOTO) - Buah 2,654,400.00
3 Kloset jongkok (setaraf TOTO) - Buah 399,700.00
1 2 3 4 5
4 Kloset jongkok (setaraf INA) - Buah 226,100.00
5 Urinoir (setaraf TOTO) - Buah 2,220,000.00
6 Wastafel Alumunium - Buah 294,800.00
7 Wastafel Keramik - Buah 412,700.00
8 Bak Cuci Stainles 1 Lubang - Buah 353,700.00
9 Bak Cuci Stainles 2 lubang - Buah 589,400.00
10 Keran air 1/2" (RRC) - Buah 41,300.00
11 Keran air 1/2" (Lokal) - Buah 17,800.00
12 Shower Spray (setaraf TOTO) - Buah 399,700.00
13 Shower Set - Buah 1,956,800.00
14 Seal Tape - Buah 3,000.00
15 Lem PVC - Tube 8,300.00
16 Floor Drain - Buah 18,900.00
17 Bak air fibreglass uk. 55x55x60 cm - Buah 530,500.00
18 Pipa GIV Dia 1/2" Panjang 6 m - Batang 129,800.00
19 Pipa GIV Dia 3/4" Panjang 6 m - Batang 171,100.00
20 Pipa GIV Dia 1 " Panjang 6 m - Batang 218,200.00
21 Pipa GIV Dia 1 1/2" Panjang 6 m - Batang 318,400.00
22 Pipa GIV 2"/Btg - 6 M Tebal 1,8 - Batang 365,500.00
23 Pipa GIV 2 1/2"/Btg - 6 M Tebal 2 - Batang 402,100.00
24 Pipa GIV 3"/Btg - 6 M Tebal 2,3 - Batang 700,300.00
25 Pipa GIV 4"/Btg - 6 M Tebal 2,3 - Batang 907,700.00
26 Pipa Paralon PVC uk. 1/2" (AW) Panjang : 4 M - Batang 22,500.00
27 Pipa paralon PVC uk. 3/4" (AW)Panjang : 4 M - Batang 28,300.00
28 Pipa Paralon PVC uk.1" (AW) Panjang : 4 M - Batang 37,800.00
29 Pipa Paralon PVC uk.1 1/2" (AW) Panjang : 4 M - Batang 63,800.00
30 Pipa Paralon PVC uk.2" (AW) Panjang : 4 M - Batang 88,500.00
1 2 3 4 5
31 Pipa Paralon PVC uk.2 1/2" (AW) Panjang :4 M - Batang 117,900.00
32 Pipa Paralon PVC uk.3" (AW) Panjang : 4 M - Batang 147,500.00
33 Pipa Paralon PVC uk.4" (AW) Panjang : 4 M - Batang 247,600.00
34 Pipa Paralon PVC uk.1/2" ( C ) Panjang : 4 M - Batang 16,000.00
35 Pipa Paralon PVC uk.3/4" ( C ) Panjang : 4 M - Batang 19,600.00
36 Pipa Paralon PVC uk.1" ( C ) Panjang : 4 M - Batang 24,900.00
1 2 3 4 5
37 Pipa Paralon PVC uk.1 1/2" ( D ) Panjang : 4 M - Batang 53,200.00
38 Pipa Paralon PVC uk.2" ( D ) Panjang : 4 M - Batang 67,300.00
39 Pipa Paralon PVC uk.2.5" ( D ) Panjang : 4 M - Batang 80,200.00
40 Pipa Paralon PVC uk.3" ( D ) Panjang : 4 M - Batang 100,300.00
41 Pipa Paralon PVC uk.4" ( D ) Panjang : 4 M - Batang 147,500.00
42 Piber Glas 0,5 M3 - Buah 1,060,900.00
43 Piber Glas 1 M3 - Buah 1,709,300.00
44 Piber Glas 1,5 M3 - Buah 2,770,200.00
45 Piber Glas 2 M3 - Buah 3,654,200.00
46 Piber Glas 3 M3 - Buah 5,422,300.00
47 Ball Valve 16 mm - Buah 26,000.00
48 Double Niple GI 16 mm - Buah 8,000.00
49 F. Elbouw PVC 16 mm - Buah 14,200.00
50 Elbouw PVC 16 mm - Buah 4,800.00
51 Reducer PVC 20 x 16 mm - Buah 7,200.00
52 DOV PVC 16 mm - Buah 2,500.00

K. BAHAN MINYAK
1 Minyak Tanah Non Subsidi M 065 Liter 11,400.00
2 Minyak Diesel/Solar (Industri) M 183 Liter 6,100.00
3 Bensin Premium (Industri) M 184 Liter 7,800.00
4 Minyak Pelumas M 185 Liter 34,300.00
5 Oli BEO 154W40/Cat - Liter 67,300.00
6 Gas Elpiji - Kg 21,300.00
7 Sewa Alat Untuk Pengelasan - Set 89,600.00
8 Sewa kuali termasuk angkutan - Set 92,000.00
1 2 3 4 5

L. BAHAN ALAT-ALAT LISTRIK


1 Tiang Besi ukuran 5,4,3 Inchi tebal 3 mm Panjang 9 M - Batang 3,536,300.00
2 Tiang Besi ukuran 4,3,2.5 Inchi tebal 3 mm Panjang 7 M - Batang 3,064,800.00
3 Fourt Clamp - Buah 3,000.00
4 Traffo HPiT 250 watt - Buah 306,500.00
5 Capasitor HPI 250 watt - Buah 50,300.00
6 Bola Lampu HPI 250 watt - Buah 229,200.00
7 Traffo TL 10 Watt - Buah 47,200.00
8 HPL 400 Watt - Buah 103,800.00
9 HPL 250 Watt - Buah 82,600.00
10 HPL 125 Watt - Buah 43,700.00
11 SOX 135 Watt - Buah 589,400.00
12 SOX 180 Watt - Buah 754,400.00
13 MLL 160 Watt - Buah 59,000.00
14 SON T 400 Watt - Buah 152,200.00
15 SON T 250 Watt - Buah 141,500.00
16 SON T 150 Watt - Buah 126,200.00
17 SON T 70 Watt - Buah 97,900.00
18 Box Besi Ukuran 50 x 40 x 20 - Buah 294,800.00
19 Pijar 5 Watt - Buah 3,300.00
20 Pijar 20 Watt - Buah 5,300.00
21 Pijar 25 Watt - Buah 5,300.00
22 Pijar 40 Watt - Buah 5,300.00
23 Pijar 60 Watt - Buah 7,400.00
24 Pijar 75 Watt - Buah 7,400.00
25 Pijar 80 Watt - Buah 6,000.00
1 2 3 4 5
26 Pijar 100 Watt - Buah 9,200.00
27 Pijar 200 Watt - Buah 20,300.00
28 Lampu XL 14 Watt - Buah 45,500.00
29 Lampu Sorot 300 Watt - Buah 37,800.00
30 Lampu Mercury 125 Watt - Buah 76,800.00
31 Lampu Mercury 250 Watt - Buah 165,100.00
1 2 3 4 5
32 Lampu LX Ukuran 11 Watt - Buah 42,500.00
33 Lampu LX Ukuran 18 Watt - Buah 47,200.00
34 Lampu LX (Spiral)Uk. 19 Watt - Buah 57,900.00
35 Lampu LX (Spiral)Uk. 25 Watt - Buah 63,200.00
36 Lampu LX (Spiral)Uk. 32 Watt - Buah 73,800.00
37 Lampu LX (Spiral)Uk. 42 Watt - Buah 88,500.00
38 Lampu Neon (TL Panjang) 10 Watt - Buah 11,900.00
39 Lampu Neon (TL Panjang) 20 Watt - Buah 15,500.00
40 Lampu Neon (TL Panjang) 40 Watt - Buah 17,800.00
41 Lampu Neon Essential 5 watt - Buah 31,200.00
42 Lampu Neon Essential 8 watt - Buah 34,100.00
43 Lampu Neon Essential 11 watt - Buah 39,700.00
44 Lampu Neon Essential 14 watt - Buah 42,500.00
45 Lampu Neon Essential 18 watt - Buah 44,000.00
46 Lampu Neon Essential 23 watt - Buah 52,500.00
47 Lampu Hologen 500 Watt - Buah 70,800.00
48 Lampu Hologen 1.000 Watt - Buah 147,500.00
49 Lampu Hologen 1.500 Watt - Buah 165,100.00
50 Lampu Spot Light - Buah 94,300.00
51 Kap Lampu Kobra Bahan Besi Cor - Buah 471,500.00
52 Kap Lampu Kobra Bahan Fiber Buah 235,800.00
53 NYY 1 x 1.5 mm - Meter 4,900.00
54 NYY 1 x 2.5 mm - Meter 4,000.00
55 NYY 1 x 4 mm - Meter 6,000.00
56 NYY 1 x 6 mm - Meter 8,600.00
57 NYY 2 x 2.5 mm - Meter 15,600.00
58 NYY 2 x 4 mm - Meter 20,400.00
1 2 3 4 5
59 NYY 2 x 6 mm - Meter 26,600.00
60 NYY 3 x 4 mm - Meter 27,800.00
61 NYY 4 x 2.5 mm - Meter 21,300.00
62 NYY 4 x 4 mm - Meter 33,100.00
63 NYY 4 x 6 mm - Meter 50,200.00
64 NYY 4 x 10 mm - Meter 70,000.00
1 2 3 4 5
65 NYY 4 x 16 mm - Meter 104,500.00
66 NYY 4 x 25 mm - Meter 163,900.00
67 NYY 4 x 35 mm - Meter 212,900.00
68 NYY 4 x 50 mm - Meter 293,100.00
69 NYA 1 x 1,5 mm - Meter 4,200.00
70 NYA 1 x 2,5 mm - Meter 5,900.00
71 NYA 1 x 4 mm - Meter 7,600.00
72 NYA 1 x 6 mm - Meter 12,700.00
73 NYM 4 mm - Meter 6,900.00
74 NYM 3 x 4 mm - Meter 22,100.00
75 NYM 2 x 2 mm - Meter 11,300.00
76 NYM 2 x 4 mm - Meter 17,200.00
77 NYM 2 x 2,5 mm - Meter 12,200.00
78 NYM 2 x 1,5 mm - Meter 10,200.00
79 NYM 3 x 1,5 mm - Meter 11,900.00
80 NYM 3 x 2,5 mm - Meter 15,500.00
81 NYM 3 x 10 mm - Meter 50,800.00
82 NYM 4 x 2,5 mm - Meter 18,200.00
83 NYM 4 x 4 mm - Meter 28,300.00
84 Kabel Senur - Roll 76,800.00
85 Kabel Tester - Meter 38,500.00
86 Kabel Box - Box 75,500.00
87 Kabel Mic Transparan - Roll 235,800.00
88 Kabel Antena - Roll 141,500.00
89 Kabel Telepon - Meter 2,500.00
90 Kabel TC 2 x 10 mm - Meter 5,700.00
91 Kabel TC 2 x 16 mm - Meter 8,300.00
1 2 3 4 5
92 Box TL 20 Watt - Buah 44,300.00
93 Box MCB 1 Group - Buah 4,800.00
94 Magnetick Contactor 25 A - Buah 294,800.00
95 Magnetick Contactor 50 A - Buah 411,500.00
96 Magnetick Contactor 100 A - Buah 793,200.00
97 Fitting Gantung E 27 - Buah 17,800.00
1 2 3 4 5
98 Fitting Duduk (Plafond) - Buah 11,900.00
99 Fitting Kombinasi - Buah 9,500.00
100 Fitting Hologen - Buah 37,800.00
101 Icnitor SN 58 - Buah 66,700.00
102 Insulock - Buah 900.00
103 Kapasitor - Buah 212,200.00
104 Kap Hijau E 27 - Buah 16,600.00
105 Kap Hijau E 40 - Buah 21,300.00
106 Kap Lampu - Buah 133,300.00
107 k. Skum 10-8 - Buah 1,500.00
108 MCB 1 A - Buah 43,700.00
109 MCB 2 A - Buah 39,800.00
110 MCB 4 A - Buah 61,300.00
111 MCB 6 A - Buah 72,000.00
112 MCB 10 A - Buah 75,500.00
113 MCB 16 A - Buah 81,500.00
114 MCB 25 A - Buah 36,600.00
115 MCB 32 A - Buah 100,900.00
116 MCB 45 A - Buah 103,200.00
117 MCB 50 A - Buah 109,200.00
118 MCB 63 A - Buah 75,600.00
119 MCB Box - Buah 4,800.00
120 Multi Tester - Buah 132,100.00
121 Full Bracket - Buah 21,300.00
122 Ornamen Gantung - Buah 66,100.00
123 Obeng Plus - Buah 48,500.00
124 Obeng Minus - Buah 48,500.00
1 2 3 4 5
125 Opstic 1/2" lengkap klem - Batang 294,800.00
126 Pipa Besi - Batang 114,500.00
127 Pipa Ornamen dia 1,25" x 1 m - Batang 72,000.00
128 Pipa Ornamen dia 1,5" x 2 m - Batang 176,900.00
129 Pipa Ornamen dia 2" x 3 m - Batang 206,400.00
130 Pipa Ornamen dia 2" x 4 m - Batang 224,100.00
131 Pipa Ornamen dia 2" x 6 m Batang 235,800.00
132 Pres Conector - Buah 4,200.00
133 Rangka Ring 32 Watt - Buah 18,900.00
134 Rel MCB - Buah 28,300.00
135 Saklar Double - Buah 22,200.00
136 Saklar Engkel - Buah 22,500.00
137 Saklar Tripel - Buah 23,000.00
138 Terminal Blok 25 amp - Buah 12,700.00
139 Solder Pistol - Buah 421,500.00
140 Solder - Buah 29,000.00
141 Stop Kontak - Buah 6,000.00
142 Steker Arde - Buah 11,800.00
143 Steker T - Buah 13,600.00
144 Steker PH - Buah 4,200.00
145 Sadel No. 6 - Bungkus 6,000.00
146 Sadel No. 8 - Bungkus 6,600.00
147 Sadel No. 9 - Bungkus 7,800.00
148 Sadel No. 10 - Bungkus 8,300.00
149 Sadel No. 12 - Bungkus 9,800.00
150 Sadel No. 14 - Bungkus 15,500.00
151 Sadel No. 19 - Bungkus 22,500.00
1 2 3 4 5
152 Sadel No. 22 - Bungkus 17,200.00
153 Skun RS-16 - Buah 2,100.00
154 Stater - Buah 5,100.00
155 Tedus Hitam - Buah 1,300.00
156 Tali Tester - Buah 29,000.00
157 Tang Amper - Buah 1,178,800.00
1 2 3 4 5
158 Tang Buaya - Buah 37,800.00
159 Tang Potong - Buah 37,800.00
160 Tang Kombinasi - Buah 37,800.00
161 Tang Jepit - Buah 37,800.00
162 Tang Skun - Buah 353,700.00
163 Time Swicht Theben - Buah 471,500.00
164 Taping Conector 1 baut - Buah 22,800.00
165 Taping Conector 2 baut - Buah 32,200.00
166 Tespen - Buah 24,300.00
167 Timah Solder - Buah 28,300.00
168 Terminal 25 ml - Buah 47,200.00
169 Wait Clam - Buah 8,300.00
170 Klem Tiang uk. Lebar 1,5" x dia 3" lengkap - Set 49,600.00
171 Klem Tiang uk. Lebar 1,5" x dia 5" lengkap - Set 55,500.00
172 Fhoto Shell 10 A merk Selcon - Buah 163,900.00
173 Dead And - Buah 7,200.00
174 Isolasi - Buah 8,900.00
175 Rel Alumunium (dudukan MCB) - Meter 40,200.00

N. TANAMAN HIAS
1 Palm Ponik - Batang 53,200.00
2 Palm Raja 2,5 m - Batang 459,800.00
3 Palm Raja 2 m - Batang 412,700.00
4 Palm Raja 1 m - Batang 312,500.00
5 Palm Raja 1,5 m - Batang 200,500.00
6 Palm Raja 0,5 m - Batang 153,300.00
7 Palm Ekor Tupai 2,5 m - Batang 654,300.00
1 2 3 4 5
8 Palm Ekor Tupai 2 m - Batang 518,700.00
9 Palm Ekor Tupai 1 m - Batang 495,100.00
10 Palm Ekor Tupai 0,5 m - Batang 288,900.00
11 Palm Kamdoria 1 m - Batang 176,900.00
12 Palm Kamdoria - Batang 100,300.00
13 Palm Putri 1,5 m - Batang 430,400.00
1 2 3 4 5
14 Serut 2 m - Batang 4,715,000.00
15 Serut 1,5 m - Batang 2,946,900.00
16 Serut 1 m - Batang 1,532,400.00
17 Cemara Udang 2 m - Batang 4,832,900.00
18 Cemara Udang 1,5 m - Batang 2,946,900.00
19 Cemara Udang 1 m - Batang 1,532,400.00
20 Cemara Tiang 2 m - Batang 258,700.00
21 Cemara Tiang 1,5 m - Batang 196,100.00
22 Cemara Tiang 1 m - Batang 149,100.00
23 Cemara Mas 80 cm - Batang 415,500.00
24 Cemara Mas 50 cm - Batang 133,400.00
25 Cemara Norflok 70 cm - Batang 133,400.00
26 Cemara Norflok 1 m - Batang 227,500.00
27 Cemara Pinus 1,5 m - Batang 258,700.00
28 Cemara Pinus 1 m - Batang 164,700.00
29 Bougenvil - Batang 180,500.00
30 Nolima 2 m - Batang 1,026,500.00
31 Nolima 1 m - Batang 509,500.00
32 Sirlon 120 cm - Batang 352,800.00
33 Sirlon 60 cm - Batang 111,500.00
34 Tri Color - Batang 47,200.00
35 Asoka - Batang 23,900.00
36 Sambangdara - Batang 70,700.00
37 Pedang - Pedangan - Batang 19,800.00
38 Ki Hujan Bongkol - Batang 180,500.00
39 Ki Hujan Bulat - Batang 32,200.00
40 Nusa Indah - Batang 17,400.00
1 2 3 4 5
41 Sikas 1 m - Batang 2,201,600.00
42 Sikas 50 cm - Batang 1,418,100.00
43 Sikas 30 cm - Batang 713,200.00
44 Agave - Batang 109,900.00
45 Wali Songo - Batang 869,800.00
1 2 3 4 5
46 Lantana - Batang 14,200.00
47 Rambusa - Batang 55,000.00
48 Miramta - Batang 23,900.00
49 Asam Keranji - Batang 31,600.00
50 Heli Konia - Batang 15,900.00
51 Song Of India - Batang 70,700.00
52 Beringin Korea - Batang 3,455,100.00
53 Tombak Raja - Batang 290,100.00
54 Pandan Bali Persit - Batang 446,700.00
55 Pandan Bali Cabang - Batang 869,800.00
56 Pandan Kuning - Batang 22,100.00
57 Tanjung 1 m - Batang 20,500.00
58 Tanjung 2 m - Batang 109,900.00
59 Tanjung 3 m - Batang 258,700.00
60 Sapu Tangan 2 m - Batang 149,100.00
61 Kasia Golden 1,5 m - Batang 125,500.00
62 Rumput Golf - M2 27,600.00
63 Rumput Manila - M2 31,600.00
64 Puring - Batang 27,000.00
65 Melati Kosta - Batang 125,500.00
66 Anggrek Tanah - Batang 22,100.00
67 Lili Bombai - Batang 23,900.00
68 Lili Bakung - Batang 22,100.00
69 Lili Paris Putih - Batang 17,400.00
70 Nanas Merah - Batang 31,600.00
71 Amander - Batang 23,900.00
72 Puring Z - Batang 31,600.00
1 2 3 4 5
73 Anjuang - Batang 15,900.00
74 Pakis Kelabang - Batang 15,900.00
75 Lidah Mertua - Batang 15,900.00
76 Lapender - Batang 23,900.00
77 Batavia - Batang 31,600.00
78 Sambang Dara - Batang 39,400.00
1 2 3 4 5
79 Pillo Denrum - Batang 23,900.00
80 Evorria - Batang 31,600.00
81 Bayam - bayaman - Batang 12,800.00
82 Aglonema Lokal - Batang 39,400.00
83 Katus Kodok - Batang 14,200.00
84 Kipranrus - Batang 39,400.00
85 Siklok Besar - Batang 133,400.00
86 Siklok Kecil - Batang 70,700.00
87 Helokomin - Batang 15,900.00
88 Pisang Betet - Batang 23,900.00
89 Kana - Batang 15,900.00
90 Adenium - Batang 86,400.00
91 Bromedia - Batang 15,900.00
92 Echinacea/pucuk merah 50 cm - Batang 65,700.00

M. LAIN-LAIN
1 Pintu Air Sorong Uk. 0,40 s/d 0,60 m - Unit 3,772,000.00
2 Pintu Air Ulir Uk. 0,60 s/d 0,80 m - Unit 8,487,000.00
3 Pintu Air Ulir Uk. 0,90 s/d 1,20 m - Unit 10,137,300.00
4 Gorong2 Beton 40 cm Tanpa Tulang - M1 218,200.00
5 Gorong2 Beton 60 cm Tanpa Tulang M 031 M1 347,800.00
6 Gorong2 Beton 80 cm Tanpa Tulang M 033 M1 471,500.00
7 Gorong2 Beton 100 cm Tanpa Tulang M 035 M1 642,600.00
AR HARGA SATUAN UPAH DAN BAHAN
WILAYAH II

KETERANGAN

1. Harga Tahun 2017


Harga Belum Termasuk
PPn

2. Harga Sudah Termasuk


Keuntungan dan Overhead
*) Operator yang sudah biasa dan terampil mengoperasikan
jenis peralatan untuk melayani pekerjaan berat
Misal : Bulldozer, Grader, Wheel, Loader, Asphalt Finisher, dll

yang agak ringan


Misal : Steel Wheeled Roller, Stamper, Concrete Mixer/Mesin pengaduk beton dll
KETERANGAN

1. Harga Tahun 2017


Harga Belum Termasuk
PPn

2. Harga Sudah Termasuk


Keuntungan dan Overhead

3. Harga ini berlaku untuk


Wilayah II :
Kec. Anjungan
Kec. Toho
Kec. Sadaniang
dan daerah lain yang
memiliki kesamaan
karakteristik wilayah yang
mempengaruhi harga
satuan.

4. Harga satuan merupakan


harga on side (di lapangan)

5. Untuk penentuan harga


6
satuan yang dipergunakan
dipengaruhi oleh asumsi
perencanaan yang dipakai.

6. Untuk Daerah yang me-


miliki karakteristik tertentu
6
dapat digunakan inter-
polasi
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
DAFTAR HARGA PERALATAN
PROPINSI : KALIMANTAN BARAT ( 61 )
KABUPATEN : MEMPAWAH ( 02 )

UMUR OWNERSHIP COST (Rp.)


KAPASITAS ALAT THN JAM HARGA POKOK (Rp.) CRF
NILAI SISA
(A )
NO KODE JENIS ALAT
D=
HP Th W B i(1+i)A C = 10 % x B
(1+i)A-1
1 2 4 5 6 7 8 9

1 E 001 Bulldozer 100 8 1,200 2,147,446,000.00 0.204832 214,744,600.00


2 E 052 Wheel Loader 115 8 1,500 1,272,054,000.00 0.204832 127,205,400.00
3 E 010 Motor Grader 115 8 1,500 2,256,870,000.00 0.204832 225,687,000.00
4 E 080 Roller 3 Wheel 8 - 10 T 51 10 1,500 508,607,000.00 0.180622 50,860,700.00
5 E 081 Tandem Roller 6 - 10 T 40 10 1,500 1,391,736,500.00 0.180622 139,173,650.00
6 E 082 Seil Vibrator Roller 10 T 35 8 1,500 412,296,000.00 0.204832 41,229,600.00
7 E 083 Towed Vibrator Roller 2 - 3 T 6 8 1,500 421,282,400.00 0.204832 42,128,240.00
8 E 084 Pneumatic Roller 8 - 15 T 95 10 1,500 977,977,000.00 0.180622 97,797,700.00
9 E 087 Vibrator Roller 600 Kg - 1 T 7 6 1,200 86,940,000.00 0.246680 8,694,000.00
10 E 088 Plate Vibrator Tamper 4 6 750 13,932,000.00 0.246680 1,393,200.00
11 E 089 Concrete Vibrator 4 HP 4 5 600 8,152,000.00 0.280854 815,200.00
12 E 153 Asphalt Sprayer Towed 350 L 7 6 1,200 80,000,000.00 0.246680 8,000,000.00
13 E 155 Asphalt Mixing Plant 30 t/h 125 10 1,200 3,500,000,000.00 0.180622 350,000,000.00
14 E 182 Water Tank Truck 115 6 1,500 204,704,000.00 0.246680 20,470,400.00
15 E 191 Trailer, Towed 1 Ton 4 12 750 28,968,000.00 0.165194 2,896,800.00
16 E 211 Dump Truck 3.5 T 106 6 1,500 150,000,000.00 0.246680 15,000,000.00
17 E 212 Dump Truck 5 T 145 6 1,500 188,328,000.00 0.246680 18,832,800.00
18 E 221 Flat Bad Truck 4 T 80 6 1,500 163,764,000.00 0.246680 16,376,400.00
19 E 252 Concrete Mixer 0.25 M3 10 5 1,500 49,572,000.00 0.280854 4,957,200.00
20 E 341 Water Pumpdiameter 5 Cm 8 4 750 4,208,000.00 0.332708 420,800.00
21 E 020 Excavator 143 8 1,200 1,586,579,610.00 0.204832 158,657,961.00
22 - Asphal Finisher 72 10 1,200 2,820,403,600.00 0.180622 282,040,360.00
23 - Electric Welding Machine 40 5 2,000 17,500,000.00 0.280854 1,750,000.00
24 - Alat Penumbuk Sayang 12 5 2,100 15,000,000.00 0.280854 1,500,000.00

BENSIN
SOLAR
CRF pada i PELUMAS
sebesar 12,5 % i
HARGA PERALATAN
Wilayah II

OWNERSHIP COST (Rp.) OVERATING COST (Rp.) EQUIPMENT COST


BAHAN BAKAR (H) PERBAIKAN & BIAYA
BIAYA PASTI PER JAM WORK SHOP JAM
DIESEL BENSIN PELUMAS SPAREPARTS LANGSUNG
E= 15 % x HP x 15 % x HP x F= G=
0.025 x HP x Harga
( B - C ) x D + 0.002 x B Harga Bahan Harga Bahan 12.5 s/d 17.5 x B 6.25 s/d 8.75 x B T=F+G+H TC = E + T
Pelumas
W Bakar Bakar 100 X W 100 X W
10 11 12 13 14 15 16 17

333,478.62 91,500.00 - 85,750.00 313,169.21 156,584.60 647,003.81 980,482.43


###
158,030.63 105,225.00 - 98,612.50 148,406.30 74,203.15 426,446.95 584,477.58
###
280,376.93 105,225.00 - 98,612.50 263,301.50 131,650.75 598,789.75 879,166.68
###
55,797.44 46,665.00 - 43,732.50 59,337.48 29,668.74 179,403.73 235,201.17
###
152,682.40 36,600.00 - 34,300.00 162,369.26 81,184.63 314,453.89 467,136.29
###
51,220.62 32,025.00 - 30,012.50 48,101.20 24,050.60 134,189.30 185,409.92
###
52,337.03 5,490.00 - 5,145.00 49,149.61 24,574.81 84,359.42 136,696.45
###
107,290.34 86,925.00 - 81,462.50 114,097.32 57,048.66 339,533.48 446,823.81
###
16,229.66 6,405.00 - 6,002.50 12,678.75 6,339.38 31,425.63 47,655.28
###
4,161.24 - 4,680.00 3,430.00 3,250.80 1,625.40 12,986.20 17,147.44
###
3,461.46 - 4,680.00 3,430.00 2,377.67 1,188.83 11,676.50 15,137.96
###
14,934.12 6,405.00 - 6,002.50 11,666.67 5,833.33 29,907.50 44,841.62
###
479,965.51 1,651,575.00 - 107,187.50 510,416.67 255,208.33 2,524,387.50 3,004,353.01
###
30,570.74 105,225.00 - 98,612.50 23,882.13 11,941.07 239,660.70 270,231.44
###
5,819.67 3,660.00 - 3,430.00 6,759.20 3,379.60 17,228.80 23,048.47
###
22,401.18 96,990.00 - 90,895.00 17,500.00 8,750.00 214,135.00 236,536.18
###
28,125.13 132,675.00 - 124,337.50 21,971.60 10,985.80 289,969.90 318,095.03
###
24,456.71 73,200.00 - 68,600.00 19,105.80 9,552.90 170,458.70 194,915.41
###
8,419.59 9,150.00 - 8,575.00 5,783.40 2,891.70 26,400.10 34,819.69
###
1,691.26 - 9,360.00 6,860.00 981.87 490.93 17,692.80 19,384.06
###
246,381.23 130,845.00 - 122,622.50 231,376.19 115,688.10 600,531.79 846,913.02
###
386,770.42 65,880.00 - 61,740.00 411,308.86 205,654.43 744,583.29 1,131,353.70
2,229.23 36,600.00 - 34,300.00 1,531.25 765.63 73,196.88 75,426.10
1,819.78 10,980.00 - 10,290.00 1,250.00 625.00 23,145.00 24,964.78
###

7,800.00
6,100.00 CATATAN :
34,300.00 - HARGA BAHAN BAKAR DAN PELUMAS MENGIKUTI PEDOMAN HARGA SK BUPATI (PER WILAYAH)
12.5% - KONSTANTA MENGIKUTI PANDUAN ANALISIS HARGA SATUAN 008/BM/2008 (NOPEMBER 2008)
PENDUKUNG SPESIFIKASI UMUM EDISI DESEMBER 2006 (kolom 9 s/d 15)
- ANALISA HARGA ALAT PER JAM INI DIGUNAKAN UNTUK PERHITUNGAN HARGA SATUAN
PEKERJAAN DENGAN ANALISA K ( PETUNJUK TEKNIK NOMOR : 015/T/Bt/1995)
- KHUSUS ALAT ASPHALT MIXING PLANT DITAMBAH BIAYA BAHAN BAKAR PEMANASAN MATERIAL
DENGAN RUMUS 12 X 0,7 X KAPASITAS X BAHAN BAKAR
STANDAR HARGA SATUAN UPAH DAN BAHAN
WILAYAH III

PROVINSI KALIMANTAN BARAT


KABUPATEN MEMPAWAH

NO JENIS PEKERJA KODE SATUAN HARGA


(Rp)

1 2 3 4 5

A. UPAH
1 Mandor Lapangan L 061 Hari 172,500.00
2 Mekanik L 071 Hari 155,250.00
3 Mekanik Pembantu L 072 Hari 115,000.00
4 Kepala Tukang L 073 Hari 172,500.00
5 Tukang L 079 Hari 149,500.00
6 Operator Terlatih *) L 081 Hari 172,500.00
7 Operator Kurang Terlatih **) L 082 Hari 126,500.00
8 Pembantu Operator L 083 Hari 115,000.00
9 Supir Material / Truck L 091 Hari 138,000.00
10 Supir Personil L 092 Hari 138,000.00
11 Pembantu Supir / Kernet L 099 Hari 115,000.00
12 Buruh Lapangan Terlatih L 106 Hari 138,000.00
13 Buruh Lapangan Agak Terlatih L 103 Hari 126,500.00
14 Buruh Lapangan Tak Terlatih L 101 Hari 115,000.00
15 Penjaga Api - Hari 103,500.00
16 Penjaga Malam - Hari 103,500.00
Catatan : *) Operator yang sudah biasa dan terampil mengoperasikan
jenis peralatan untuk melayani pekerjaan berat
Misal : Bulldozer, Grader, Wheel, Loader, Asphalt Finisher, dll

yang agak ringan


Misal : Steel Wheeled Roller, Stamper, Concrete Mixer/Mesin pe
NO JENIS BAHAN KODE SATUAN HARGA
(Rp)

1 2 3 4 5

B. BAHAN PENGISI
1 Batu Kong M.101 M 238,000.00
2 Batu Sap Pinang - M 265,700.00
3 Batu pecah 15-20 cm - M 327,300.00
4 Batu pecah 10-15 cm M.020 M 338,100.00
5 Batu pecah 5-7 cm M.022 M 422,700.00
6 Batu pecah 3-5 cm M.023 M 350,200.00
7 Batu pecah 2-3 cm M.024 M 392,500.00
8 Batu pecah 1-2 cm M.025 M 495,100.00
9 Batu pecah 0,5 - 1 cm M.026 M 543,400.00
10 Stone Dust - M 413,200.00
11 Aspal Bitumen 60/70 - Kg 17,600.00
12 Pasir Urug M.040 M 120,800.00
13 Pasir Ayak Untuk Beton (Pasir Kasar/Merah) M.041 M 199,300.00
14 Semen PC (50 Kg) M.080 Zak 90,700.00
15 Semen Putih (40 Kg) - Zak 163,100.00
16 Timbunan Tanah Biasa M 94,200.00
17 Timbunan Tanah Pilihan M.050.a M 140,100.00
18 Paving Block - Buah 3,300.00
19 Batu Bata 5 cm x 11 cm x 22 cm Buah 3,600.00
20 Batako 7 cm x 15 cm x 30 cm - Buah 2,000.00
21 Batako 6 cm x 15 cm x 30 cm - Buah 1,900.00
22 Batako 7 cm x 20 cm x 40 cm (press) - Buah 3,300.00
1 2 3 4 5
23 Batako 9 cm x 20 cm x 40 cm (press) - Buah 3,400.00
24 Kerawang ( roster ) uk.18 x 18 cm - Buah 30,300.00
1 2 3 4 5
25 Kerawang press (roster) uk.30 x 30 cm - Buah 65,300.00
26 Keramik uk. 10 cm x 20 cm - Kotak 74,900.00
27 Keramik uk. 20 cm x 20 cm (polos) - Kotak 89,400.00
28 Keramik uk. 20 cm x 20 cm ( Corak ) - Kotak 93,100.00
29 Keramik uk. 25 cm x 33 cm Kotak 94,900.00
30 Keramik uk. 30 cm x 30 cm (polos biasa) - Kotak 72,500.00
31 Keramik uk. 30 cm x 30 cm (corak biasa) - Kotak 82,200.00
32 Keramik uk. 30 cm x 30 cm Artistik (setaraf Decogress) Kotak 147,400.00
33 Keramik uk. 40 cm x 40 cm (polos biasa) - Kotak 84,600.00
34 Keramik uk. 40 cm x 40 cm (corak biasa) - Kotak 101,500.00
35 Keramik uk. 40 cm x 40 cm (granite tile) - Kotak 271,800.00
36 Keramik uk. 60 cm x 60 cm Polished (setaraf Indogress) - Kotak 391,300.00
37 Keramik uk. 60 cm x 60 cm Polished (setaraf Decogress) - Kotak 283,900.00
38 Plint Keramik 10 x 30 cm - Bh 17,000.00
39 Plint Keramik 10 x 40 cm - Bh 21,800.00
40 Wood Flooring - M 356,300.00
41 List Keramik uk 2 cm x 10 cm - Bh 1,300.00
42 List Keramik WC. Uk. 8 cm x 20 cm - Bh 14,500.00
43 Plint Kayu uk. 2 cm x 10 cm - Bh 74,900.00
44 Batu Tempel Hitam uk.5 x 10 cm - M 277,800.00
45 Batu Paras uk. 5 x 10 cm - M 277,800.00
46 Floor Hardener - Kg 20,200.00
47 Beton Ready Mix B 0 - M 1,141,200.00
48 Beton Ready Mix K-125 - M 1,207,500.00
49 Beton Ready Mix K-150 - M 1,237,800.00
50 Beton Ready Mix K-175 - M 1,280,000.00
51 Beton Ready Mix K-200 - M 1,369,400.00
1 2 3 4 5
52 Beton Ready Mix K-225 - M 1,400,700.00
1 2 3 4 5
53 Beton Ready Mix K-250 - M 1,479,300.00
54 Beton Ready Mix K-275 - M 1,497,300.00
55 Beton Ready Mix K-300 - M 1,521,500.00
56 Beton Ready Mix K-325 - M 1,577,700.00
57 Beton Ready Mix K-350 - M 1,606,000.00
58 Beton Ready Mix K-375 - M 1,663,400.00
59 Beton Ready Mix K-400 - M 1,698,500.00
60 Beton Ready Mix K-425 - M 1,729,900.00
61 Beton Ready Mix K-450 - M 1,750,900.00
62 Beton Ready Mix K-475 - M 1,816,100.00
63 Beton Ready Mix K-500 - M 1,855,500.00
64 Additive Ready Mix - Liter 60,400.00
65 Karung Goni Curing Beton ( 0.7m ) - Lembar 16,600.00
66 Mini Pile Segi Empat Ukuran 20 x 20 CM K 350, Pj = 6 m - M' 1,575,900.00
67 Mini Pile Segi Empat Ukuran 25 x 25 CM K 350, Pj = 6 m - M' 2,061,900.00
68 Mini Pile Segitiga Ukuran 28 x 28 CM K 350, Pj = 6 m - M' 1,143,000.00
69 Mini Pile Segitiga Ukuran 32 x 32 CM K 350, Pj = 6 m - M' 1,297,100.00
70 Sewa Pompa Ready Mix (Min. 100 M) - M 48,300.00
71 Bahan Plastik Cor Beton - M 5,300.00

C. BAHAN KAYU
1 Kayu Belian Tidak Ketam uk. 4 cm x 8 cm x 4 m - M 11,650,600.00
2 Kayu Belian Tidak Ketam uk. 6 cm x 6 cm x 4 m - M 16,351,700.00
3 Kayu Belian Tidak Ketam uk. 7 cm x 7 cm x 4 m - M 13,214,800.00
4 Kayu Belian Tidak Ketam uk. 8 cm x 8 cm x 4 m - M 11,344,000.00
5 Kayu Belian Tidak Ketam uk. 8 cm x 16 cm x 4 m - M 8,844,100.00
6 Kayu Belian Tidak Ketam uk. 9 cm x 9 cm x 4 m - M 11,385,600.00
1 2 3 4 5
7 Kayu Belian Tidak Ketam uk.10 cm x 10 cm x 4 m - M 12,754,400.00
1 2 3 4 5
8 Kayu Belian Tidak Ketam uk.12 cm x 12 cm x 4 m - M 16,301,300.00
9 Kayu Belian Tidak Ketam uk.15 cm x 15 cm x 4 m - M 19,320,000.00
10 Kayu Belian Tidak Ketam uk.5 cm x 10 cm x 4 m - M 11,954,300.00
11 Kayu Belian Ketam uk. 6 cm x 6 cm x 4 m - M 17,986,900.00
12 Kayu Belian Ketam uk. 7 cm x 7 cm x 4 m - M 14,416,200.00
13 Kayu Belian Ketam uk. 8 cm x 8 cm x 4 m - M 12,263,800.00
14 Kayu Belian Ketam uk. 3 cm x 7 cm x 4 m - M 17,393,800.00
15 Kayu Belian Ketam uk. 4 cm x 8 cm x 4 m - M 13,490,100.00
16 Kayu Belian Ketam uk. 5 cm x 10 cm x 4 m - M 12,950,500.00
17 Papan Belian Tidak Ketam uk.2,5 cm x 16 cm x 4 m M.181.d M 16,225,900.00
18 Papan Belian Ketam uk. 2 cm x 16 cm x 4 m M.181.e M 20,754,000.00
19 Kayu kls I Bengkirai Tidak Ketam uk. 7 cm x 7 cm x 4 m - M 8,009,000.00
20 Kayu kls I Bengkirai Tidak Ketam uk. 8 cm x 8 cm x 4 m M.181.g M 8,254,500.00
21 Papan kls I Tidak Ketam - M 11,320,400.00
22 Kayu kls I Bengkirai Ketam uk. 7 cm x 7 cm x 4 m - M 8,317,100.00
23 Kayu kls I Bengkirai Ketam uk. 8 cm x 8 cm x 4 m M.181.f M 8,490,400.00
24 Papan kls I Ketam - M 9,421,200.00
25 Kayu kls I Bengkirai Ketam uk. 5 cm x 10 cm x 4 m - M 8,452,500.00
26 Kayu kls II Tidak Ketam uk.3 cm x 5 cm x 4 m - M 4,025,000.00
27 Kayu kls II Tidak Ketam uk.4 cm x 6 cm x 4 m - M 3,773,500.00
28 Kayu kls II Tidak Ketam uk.4 cm x 8 cm x 4 m - M 4,716,900.00
29 Kayu kls II Tidak Ketam uk.5 cm x 7 cm x 4 m - M 4,743,800.00
30 Kayu kls II Tidak Ketam uk.5 cm x 10 cm x 4 m - M 7,546,900.00
31 Kayu kls II Tidak Ketam uk.6 cm x 10 cm x 4 m - M 6,792,300.00
32 Kayu kls II Tidak Ketam uk.6 cm x 12 cm x 4 m - M 5,660,200.00
33 Kayu kls II Tidak Ketam uk.7 cm x 7 cm x 4 m - M 5,544,800.00
34 Kayu kls II Tidak Ketam uk.8 cm x 8 cm x 4 m - M 4,481,000.00
1 2 3 4 5
35 Kayu kls II Tidak Ketam uk.8 cm x 12 cm x 4 m - M 4,245,300.00
1 2 3 4 5
36 Kayu kls II Tidak Ketam uk.8 cm x 15 cm x 4 m - M 4,402,500.00
37 Kayu kls II Tidak Ketam uk.10 cm x 10 cm x 4 m - M 4,282,600.00
38 Papan kls II Tidak Ketam uk.2,5 cm x 20 cm x 4 m M.181.j M 9,056,300.00
39 Kayu kls II Ketam uk.5 cm x 10 cm x 4 m - M 8,452,500.00
40 Kayu kls II Ketam uk.8 cm x 8 cm x 4 m - M 5,188,600.00
41 Kayu kls II Ketam uk.7 cm x 7 cm x 4 m - M 6,160,800.00
42 Kayu kls II Ketam uk.6 cm x 6 cm x 4 m - M 7,127,700.00
43 Kayu kls II Ketam uk.3 cm x 7 cm x 4 m - M 9,343,800.00
44 Kayu kls II Ketam uk.3 cm x 5 cm x 4 m - M 8,050,000.00
45 Papan kls II Ketam uk.1,8 cm x 18 cm x 4 m M.181.k M 8,385,500.00
46 Papan kls II Ketam uk.1 cm x 7 cm x 4 m M.181.k M 9,918,800.00
47 Kayu kls III Tidak Ketam uk.3 cm x 5 cm x 4 m - M 3,425,900.00
48 Kayu kls III Tidak Ketam uk.4 cm x 6 cm x 4 m - M 2,855,200.00
49 Kayu kls III Tidak Ketam uk.5 cm x 7 cm x 4 m - M 3,425,900.00
50 Kayu kls III Tidak Ketam uk.5 cm x 10 cm x 4 m - M 3,768,700.00
51 Kayu kls III Tidak Ketam uk.6 cm x 12 cm x 4 m - M 2,426,900.00
52 Kayu kls III Tidak Ketam uk.8 cm x 8 cm x 4 m - M 2,676,700.00
53 Kayu kls III Tidak Ketam uk.8 cm x 12 cm x 4 m - M 2,855,200.00
54 Papan kls III Tidak Ketam uk.2 cm x 18 cm x 4 m M.181.l M 2,855,200.00
55 Papan Simpiran - M 1,313,300.00
56 Kayu Profil - Batang 34,500.00
57 Kayu cerucuk /dolken 4 - 6 - Pj. 4 M - Batang 9,800.00
58 Kayu cerucuk /dolken 6 - 8 - Pj. 4 M - Batang 14,000.00
59 Kayu cerucuk /dolken 8 - 10 - Pj. 4 M - Batang 18,000.00
60 Kayu cerucuk /dolken 10 - 12 - Pj. 12 M - Batang 109,400.00
61 Kayu cerucuk /dolken 12 - 15 Pj. 12 M - Batang 139,000.00
62 Kayu untuk Perancah - M 1,171,900.00
1 2 3 4 5
63 Kayu Simpiran - M 241,500.00
1 2 3 4 5
64 Kayu Bakar - M 108,100.00
65 Alat-alat Bantu M. 170 Set 122,100.00
66 Alas laci - Btg 20,700.00

D. BAHAN CAT
1 Amplas Besi - Lembar 4,900.00
2 Amplas Kayu - Lembar 8,600.00
3 Plamur - Kg 40,500.00
4 Cat Dasar - Kg 31,400.00
5 Cat Kilat - Kg 72,500.00
6 Cat Tembok - Kg 87,600.00
7 Cat tembok type weather shield - Kg 121,300.00
8 Cat tembok type weather coat (acrylic) - Kg 116,700.00
9 Cat seng - Kg 55,500.00
10 Cat Marka Jalan - Kg 80,903.00
11 Cat Weatherbond - Kg 49,600.00
12 Cat Water Proofing - Kg 60,400.00
13 Dempul - Kg 45,800.00
14 Plitur - Kg 65,300.00
15 Thiner M.090.f Ltr 32,100.00
16 Cat Melamic - Ltr 77,900.00
17 Cat Pilox - Klg 31,700.00
18 Meni - Kg 66,500.00
19 Teer - Liter 73,100.00
20 Oker Warna ( Induk ) - Kg 90,700.00
21 Oker Warna ( Biasa ) - Kg 17,000.00
22 Lem Fox ( Putih ) - Kg 21,600.00
1 2 3 4 5
23 Lem Fox ( Kuning ) - Kg 57,400.00
1 2 3 4 5
24 Sealent - Tube 60,400.00
25 Soda Api - Kg 28,000.00
26 Sabun / cream pembersih kotoran - Kg 26,600.00
27 Teak Oil - Liter 74,900.00
28 Kuas 4" - Buah 29,000.00

E. BAHAN BESI DAN ALUMINIUM


1 Besi Beton Polos - Kg 20,500.00
2 Besi Beton Ulir - Kg 21,800.00
3 Besi wire mesh 5 - Kg 14,500.00
4 Kawat baja/bendrat M.168 Kg 26,600.00
5 Kawat Simpai Roll - Kg 25,500.00
6 Kawat Nyamuk Besi - M 21,800.00
7 Kawat Nyamuk Plastik - M 12,100.00
8 Kawat Saringan Pasir - M 14,500.00
9 Kawat harmonika - M 32,500.00
10 Kawat Kasa - M 20,100.00
11 Baut Baja 4" Panjang 20 cm - Buah 6,700.00
12 Baut Baja 4" Panjang 30 cm - Buah 9,100.00
13 Baut Baja 4" Panjang 40 cm - Buah 11,500.00
14 Beugel plat L. 3 cm - bh 21,800.00
15 Besi Penahan Buah 21,800.00
16 Besi Plat Tebal 2 mm - Lembar 555,500.00
17 Besi Plat Tebal 2,5 mm - Lembar 615,900.00
18 Besi Konstruksi (I, H) - Kg 27,900.00
19 Besi Konstruksi ( C ) - Kg 24,200.00
20 Besi Konstruksi (Siku ) - Kg 24,200.00
1 2 3 4 5
21 Kawat Las - Kg 139,000.00
22 Folding gate - M 845,300.00
23 Kusen Alumunium 3" - M' 151,000.00
24 Kusen Alumunium 4" - M' 157,000.00
25 Kusen dan Pintu PVC Toilet - Unit 422,700.00
26 Pintu Alumunium + Engsel Tanam - uk. 90 x 215 cm - Unit 3,381,000.00
27 Pintu Alumunium + Engsel Kupu-kupu - uk. 90 x 215 cm - Unit 2,173,500.00
28 Rangka Baja Ringan Zincalume (truss/color) (Tanpa Jurai Dalam - Bentang s/d 16 m) - M 290,200.00
29 Rangka Baja Ringan Zincalume (truss/color) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m) - M 341,800.00
30 Rangka Baja Ringan Zincalume (truss/color) (Dengan Jurai Dalam - Bentang s/d 16m) - M 308,000.00
31 Rangka Baja Ringan Zincalume (truss/color) (Dengan Jurai Dalam - Bentang 17 m s/d 30 m) - M 388,900.00
32 Rangka Baja Ringan Zincalume (truss/polos) (Tanpa Jurai Dalam - Bentang s/d 16 m) - M 228,300.00
33 Rangka Baja Ringan Zincalume (truss/polos) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m) - M 288,700.00
34 Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang s/d 16m) - M 241,500.00
35 Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang 17 m s/d 30 m) - M 316,400.00
36 Alumunium Komposit + Rangka Besi - M 1,207,500.00
37 Rangka Plafond Metal Furing + Pemasangan - M 181,200.00
38 Besi Hollow stainless steel 20 x 20 - Batang 181,200.00
39 Besi Hollow stainless steel 30 x 30 - Batang 256,700.00
40 Besi Hollow stainless steel 20 x 40 - Batang 265,700.00
41 Besi Hollow stainless steel 40 x 40 - Batang 344,200.00
42 Besi Hollow biasa 20 x 20 - Batang 75,600.00
43 Besi Hollow biasa 30 x 30 - Batang 113,300.00
44 Besi Hollow biasa 20 x 40 - Batang 94,500.00
45 Besi Hollow biasa 40 x 40 - Batang 134,500.00
46 Besi Pipa Stainless Stell /2 "
1
- Batang 83,100.00
47 Besi Pipa Stainless Stell 3/4 " - Batang 123,900.00
1 2 3 4 5
48 Besi Pipa Stainless Stell 1 " - Batang 160,100.00
1 2 3 4 5
49 Besi Pipa Stainless Stell 1 1/2 " - Batang 249,100.00
50 Besi Pipa Stainless Stell 2 " - Batang 326,100.00
51 Besi Pipa Stainless Stell 2 1/2 " - Batang 433,300.00
52 Besi Pipa Stainless Stell 3 " - Batang 528,400.00

F. BAHAN PENGANTUNG
1 Engsel Kupu-kupu 3" ( biasa ) - Kotak 10,400.00
2 Engsel Kupu-kupu 3" ( Stainles ) - Kotak 18,200.00
3 Engsel Kupu-kupu 4" ( biasa ) - Kotak 11,500.00
4 Engsel Kupu-kupu 4" ( Stainles ) - Kotak 35,700.00
5 Slot Jendela ( Biasa ) - Buah 8,000.00
6 Slot Jendela ( Stainles ) - Buah 10,400.00
7 Slot Pintu ( Biasa ) - Buah 6,700.00
8 Slot Pintu ( Stainles ) - Buah 23,000.00
9 Kunci tanam 2 slag (setaraf Belluci) - Buah 218,800.00
10 Kunci tanam 1 slag - Buah 198,800.00
11 Kunci silinder - Buah 75,900.00
12 Kunci Tanam Kecil - Buah 72,500.00
13 Door Closer - Buah 271,800.00
14 Door Stoper - Buah 108,700.00
15 Pegangan Pintu ( Biasa ) - Buah 102,700.00
16 Pegangan Pintu ( Stainles ) - Buah 181,200.00
17 Pegangan Jendela ( Biasa ) - Buah 6,100.00
18 Pegangan Jendela ( Stainles ) - Buah 19,300.00
19 Kait Angin ( Biasa ) - Buah 6,100.00
20 Kait Angin ( Stainles ) - Buah 24,200.00
21 Paku Campuran M.166.b Kg 25,500.00
1 2 3 4 5
22 Paku Seng M.166.a Kg 27,800.00
1 2 3 4 5
23 Paku Atap Metal - Kg 15,500.00
24 Paku GRC - kg 30,300.00
25 Paku / sekrup Gypsum - Buah 500.00
26 Paku Triplek - Kg 36,300.00
27 Paku Beton - Kg 38,700.00
28 Sekrup Fixer - Buah 3,200.00
29 Sekrup Steel Sheet - Buah 900.00
30 Sekrup Zincalume Buah 1,000.00

G. BAHAN ATAP
1 Genteng Metal Permata 0,25 mm (720 mm x 770 mm) Lembar 63,100.00
2 Genteng Metal Permata 0,30 mm (720 mm x 770 mm) Lembar 76,800.00
3 Genteng Metal Permata 0,35 mm (720 mm x 770 mm) Lembar 70,900.00
4 Genteng Metal Classic 0,25 mm (800 mm x 770 mm) Lembar 42,400.00
5 Genteng Metal Classic 0,30 mm (800 mm x 770 mm) Lembar 54,400.00
6 Genteng Metal Classic 0,35 mm (800 mm x 770 mm) Lembar 61,700.00
7 Genteng Metal Stone Permata 2 x 5 (875 mm x 770 mm) Lembar 126,900.00
8 Genteng Metal Color Permata 2 x 5 (875 mm x 770 mm) Lembar 107,600.00
9 Genteng Metal Stone Classic 2 x 5 (1000 mm x 770 mm) Lembar 117,800.00
10 Genteng Metal Stone Royal 2 x 4 (760 mm x 770 mm) Lembar 95,000.00
11 Genteng Metal Color Royal 2 x 4 (760 mm x 770 mm) Lembar 69,500.00
12 Genteng Metal Stone Permata 2 x 4 (720 mm x 770 mm) Lembar 95,000.00
13 Genteng Metal Color Permata 2 x 4 (720 mm x 770 mm) Lembar 69,500.00
14 Genteng Metal Stone Classic 2 x 4 (800 mm x 770 mm) Lembar 86,400.00
15 Genteng Metal ColorClassic 2 x 4 (800 mm x 770 mm) Lembar 63,200.00
16 Nok Genteng Metal Raja stone panjang 104 cm Lembar 66,500.00
17 Nok Genteng Metal Raja color panjang 104 cm Lembar 58,000.00
1 2 3 4 5
18 Nok Genteng Metal Ratu stone panjang 91 cm Lembar 58,000.00
1 2 3 4 5
19 Nok Genteng Metal Ratu color panjang 91 cm Lembar 50,800.00
20 Nok Genteng Metal Putri stone panjang 109 cm Lembar 55,600.00
21 Nok Genteng Metal Putri color panjang 109 cm Lembar 48,300.00
22 Seng Gelombang Bjls 20 - Lembar 57,900.00
23 Seng Gelombang Bjls 30 - Lembar 78,000.00
24 Seng Plat Bjls 20 - Lembar 61,000.00
25 Seng Plat Bjls 30 - Lembar 80,800.00
26 Zincalume Gelombang Persegi 0.35 (polos) - M 163,100.00
27 Zincalume Gelombang Persegi 0.30 (polos) - M 144,900.00
28 Zincalume Gelombang Persegi 0.35 (color) - M 187,300.00
29 Zincalume Gelombang Persegi 0.30 (color) - M 165,500.00
30 Zincalume Plat 0.2 - Lembar 169,100.00
31 Aluminium Foil - M 72,500.00
32 Atap Plastik Gelombang - Lembar 84,600.00

H. BAHAN KACA
1 Kaca Bening uk 8 mm - M 455,900.00
2 Kaca Bening uk. 5 mm - M 181,200.00
3 Kaca Bening uk. 3 mm - M 163,100.00
4 Kaca Bening uk. 2 mm - M 84,600.00
5 Kaca Rayban uk. 5 mm - M 277,800.00
6 Kaca Rayban uk. 3 mm - M 247,600.00
7 Kaca Cermin uk. 2 mm - M 314,000.00

I. BAHAN TRIPLEK
1 Triplek t uk 3 mm - Lembar 85,600.00
2 Triplek t uk 4 mm - Lembar 89,400.00
1 2 3 4 5
3 Triplek t uk 6 mm - Lembar 175,200.00
1 2 3 4 5
4 Triplek t uk 9 mm - Lembar 187,300.00
5 Multiplek t uk 10 mm - Lembar 336,800.00
6 Multiplek t uk 12 mm - Lembar 341,700.00
7 Poliwood uk 4 mm x 122 cm x 244 cm - Lembar 139,900.00
8 Teakwood uk 3 mm x 122 cm x 244 cm - Lembar 170,100.00
9 Papan GRC uk 4 mm x 122 cm x 244 cm - Lembar 72,500.00
10 Panel GRC 120 x 240 x 40 - Lembar 97,300.00
11 Gypsum Board uk. 9 x 120 x 240 cm - Lembar 91,100.00
12 Tepung Gypsum - Kg 7,500.00

J. BAHAN SANITASI
1 Kloset duduk monoblok - Buah 3,583,600.00
2 Kloset duduk (setaraf TOTO) - Buah 2,719,100.00
3 Kloset jongkok (setaraf TOTO) - Buah 409,400.00
4 Kloset jongkok (setaraf INA) - Buah 231,700.00
5 Urinoir (setaraf TOTO) - Buah 2,274,200.00
6 Wastafel Alumunium - Buah 301,900.00
7 Wastafel Keramik - Buah 422,700.00
8 Bak Cuci Stainles 1 Lubang - Buah 362,300.00
9 Bak Cuci Stainles 2 lubang - Buah 603,800.00
10 Keran air 1/2" (RRC) - Buah 42,400.00
11 Keran air 1/2" (Lokal) - Buah 18,200.00
12 Shower Spray (setaraf TOTO) - Buah 409,400.00
13 Shower Set - Buah 2,004,500.00
14 Seal Tape - Buah 3,200.00
15 Lem PVC - Tube 8,600.00
16 Floor Drain - Buah 19,400.00
1 2 3 4 5
17 Bak air fibreglass uk. 55x55x60 cm - Buah 543,400.00
1 2 3 4 5
18 Pipa GIV Dia 1/2" Panjang 6 m - Batang 132,900.00
19 Pipa GIV Dia 3/4" Panjang 6 m - Batang 175,200.00
20 Pipa GIV Dia 1 " Panjang 6 m - Batang 223,500.00
21 Pipa GIV Dia 1 1/2" Panjang 6 m - Batang 326,100.00
22 Pipa GIV 2"/Btg - 6 M Tebal 1,8 - Batang 374,400.00
23 Pipa GIV 2 1/2"/Btg - 6 M Tebal 2 - Batang 411,900.00
24 Pipa GIV 3"/Btg - 6 M Tebal 2,3 - Batang 717,300.00
25 Pipa GIV 4"/Btg - 6 M Tebal 2,3 - Batang 929,800.00
26 Pipa Paralon PVC uk. 1/2" (AW) Panjang : 4 M - Batang 23,000.00
27 Pipa paralon PVC uk. 3/4" (AW)Panjang : 4 M - Batang 29,000.00
28 Pipa Paralon PVC uk.1" (AW) Panjang : 4 M - Batang 38,700.00
29 Pipa Paralon PVC uk.1 1/2" (AW) Panjang : 4 M - Batang 65,300.00
30 Pipa Paralon PVC uk.2" (AW) Panjang : 4 M - Batang 90,700.00
31 Pipa Paralon PVC uk.2 1/2" (AW) Panjang :4 M - Batang 120,800.00
32 Pipa Paralon PVC uk.3" (AW) Panjang : 4 M - Batang 151,000.00
33 Pipa Paralon PVC uk.4" (AW) Panjang : 4 M - Batang 253,600.00
34 Pipa Paralon PVC uk.1/2" ( C ) Panjang : 4 M - Batang 16,400.00
35 Pipa Paralon PVC uk.3/4" ( C ) Panjang : 4 M - Batang 20,100.00
36 Pipa Paralon PVC uk.1" ( C ) Panjang : 4 M - Batang 25,500.00
37 Pipa Paralon PVC uk.1 1/2" ( D ) Panjang : 4 M - Batang 54,400.00
38 Pipa Paralon PVC uk.2" ( D ) Panjang : 4 M - Batang 68,900.00
39 Pipa Paralon PVC uk.2.5" ( D ) Panjang : 4 M - Batang 82,200.00
40 Pipa Paralon PVC uk.3" ( D ) Panjang : 4 M - Batang 102,700.00
41 Pipa Paralon PVC uk.4" ( D ) Panjang : 4 M - Batang 151,000.00
42 Piber Glas 0,5 M3 - Buah 1,086,800.00
43 Piber Glas 1 M3 - Buah 1,750,900.00
44 Piber Glas 1,5 M3 - Buah 2,837,700.00
1 2 3 4 5
45 Piber Glas 2 M3 - Buah 3,743,300.00
1 2 3 4 5
46 Piber Glas 3 M3 - Buah 5,554,500.00
47 Ball Valve 16 mm - Buah 26,600.00
48 Double Niple GI 16 mm - Buah 8,200.00
49 F. Elbouw PVC 16 mm - Buah 14,500.00
50 Elbouw PVC 16 mm - Buah 4,900.00
51 Reducer PVC 20 x 16 mm - Buah 7,300.00
52 DOV PVC 16 mm - Buah 2,500.00

K. BAHAN MINYAK
1 Minyak Tanah Non Subsidi M 065 Liter 11,700.00
2 Minyak Diesel/Solar (Industri) M 183 Liter 6,400.00
3 Bensin Premium (Industri) M 184 Liter 7,900.00
4 Minyak Pelumas M 185 Liter 35,100.00
5 Oli BEO 154W40/Cat - Liter 68,900.00
6 Gas Elpiji - Kg 21,800.00
7 Sewa Alat Untuk Pengelasan - Set 91,800.00
8 Sewa kuali termasuk angkutan - Set 94,200.00

L. BAHAN ALAT-ALAT LISTRIK


1 Tiang Besi ukuran 5,4,3 Inchi tebal 3 mm Panjang 9 M - Batang 3,622,500.00
2 Tiang Besi ukuran 4,3,2.5 Inchi tebal 3 mm Panjang 7 M - Batang 3,139,500.00
3 Fourt Clamp - Buah 3,200.00
4 Traffo HPiT 250 watt - Buah 314,000.00
5 Capasitor HPI 250 watt - Buah 51,600.00
6 Bola Lampu HPI 250 watt - Buah 234,900.00
7 Traffo TL 10 Watt - Buah 48,300.00
8 HPL 400 Watt - Buah 106,300.00
1 2 3 4 5
9 HPL 250 Watt - Buah 84,600.00
1 2 3 4 5
10 HPL 125 Watt - Buah 44,800.00
11 SOX 135 Watt - Buah 603,800.00
12 SOX 180 Watt - Buah 772,800.00
13 MLL 160 Watt - Buah 60,400.00
14 SON T 400 Watt - Buah 155,900.00
15 SON T 250 Watt - Buah 144,900.00
16 SON T 150 Watt - Buah 129,300.00
17 SON T 70 Watt - Buah 100,300.00
18 Box Besi Ukuran 50 x 40 x 20 - Buah 301,900.00
19 Pijar 5 Watt - Buah 3,400.00
20 Pijar 20 Watt - Buah 5,500.00
21 Pijar 25 Watt - Buah 5,500.00
22 Pijar 40 Watt - Buah 5,500.00
23 Pijar 60 Watt - Buah 7,600.00
24 Pijar 75 Watt - Buah 7,600.00
25 Pijar 80 Watt - Buah 6,100.00
26 Pijar 100 Watt - Buah 9,500.00
27 Pijar 200 Watt - Buah 20,700.00
28 Lampu XL 14 Watt - Buah 46,600.00
29 Lampu Sorot 300 Watt - Buah 38,700.00
30 Lampu Mercury 125 Watt - Buah 78,600.00
31 Lampu Mercury 250 Watt - Buah 169,100.00
32 Lampu LX Ukuran 11 Watt - Buah 43,500.00
33 Lampu LX Ukuran 18 Watt - Buah 48,300.00
34 Lampu LX (Spiral)Uk. 19 Watt - Buah 59,300.00
35 Lampu LX (Spiral)Uk. 25 Watt - Buah 64,700.00
36 Lampu LX (Spiral)Uk. 32 Watt - Buah 75,600.00
1 2 3 4 5
37 Lampu LX (Spiral)Uk. 42 Watt - Buah 90,700.00
1 2 3 4 5
38 Lampu Neon (TL Panjang) 10 Watt - Buah 12,100.00
39 Lampu Neon (TL Panjang) 20 Watt - Buah 15,800.00
40 Lampu Neon (TL Panjang) 40 Watt - Buah 18,200.00
41 Lampu Neon Essential 5 watt - Buah 32,000.00
42 Lampu Neon Essential 8 watt - Buah 34,900.00
43 Lampu Neon Essential 11 watt - Buah 40,600.00
44 Lampu Neon Essential 14 watt - Buah 43,500.00
45 Lampu Neon Essential 18 watt - Buah 45,000.00
46 Lampu Neon Essential 23 watt - Buah 53,800.00
47 Lampu Hologen 500 Watt - Buah 72,500.00
48 Lampu Hologen 1.000 Watt - Buah 151,000.00
49 Lampu Hologen 1.500 Watt - Buah 169,100.00
50 Lampu Spot Light - Buah 96,600.00
51 Kap Lampu Kobra Bahan Besi Cor - Buah 483,000.00
52 Kap Lampu Kobra Bahan Fiber Buah 241,500.00
53 NYY 1 x 1.5 mm - Meter 5,000.00
54 NYY 1 x 2.5 mm - Meter 4,100.00
55 NYY 1 x 4 mm - Meter 6,100.00
56 NYY 1 x 6 mm - Meter 8,800.00
57 NYY 2 x 2.5 mm - Meter 15,900.00
58 NYY 2 x 4 mm - Meter 21,000.00
59 NYY 2 x 6 mm - Meter 27,300.00
60 NYY 3 x 4 mm - Meter 28,500.00
61 NYY 4 x 2.5 mm - Meter 21,800.00
62 NYY 4 x 4 mm - Meter 33,900.00
63 NYY 4 x 6 mm - Meter 51,500.00
64 NYY 4 x 10 mm - Meter 71,700.00
1 2 3 4 5
65 NYY 4 x 16 mm - Meter 107,000.00
1 2 3 4 5
66 NYY 4 x 25 mm - Meter 167,900.00
67 NYY 4 x 35 mm - Meter 218,100.00
68 NYY 4 x 50 mm - Meter 300,200.00
69 NYA 1 x 1,5 mm - Meter 4,200.00
70 NYA 1 x 2,5 mm - Meter 6,000.00
71 NYA 1 x 4 mm - Meter 7,800.00
72 NYA 1 x 6 mm - Meter 13,000.00
73 NYM 4 mm - Meter 7,100.00
74 NYM 3 x 4 mm - Meter 22,700.00
75 NYM 2 x 2 mm - Meter 11,500.00
76 NYM 2 x 4 mm - Meter 17,600.00
77 NYM 2 x 2,5 mm - Meter 12,600.00
78 NYM 2 x 1,5 mm - Meter 10,400.00
79 NYM 3 x 1,5 mm - Meter 12,100.00
80 NYM 3 x 2,5 mm - Meter 15,800.00
81 NYM 3 x 10 mm - Meter 52,000.00
82 NYM 4 x 2,5 mm - Meter 18,700.00
83 NYM 4 x 4 mm - Meter 29,000.00
84 Kabel Senur - Roll 78,600.00
85 Kabel Tester - Meter 39,400.00
86 Kabel Box - Box 77,300.00
87 Kabel Mic Transparan - Roll 241,500.00
88 Kabel Antena - Roll 144,900.00
89 Kabel Telepon - Meter 2,500.00
90 Kabel TC 2 x 10 mm - Meter 5,800.00
91 Kabel TC 2 x 16 mm - Meter 8,600.00
92 Box TL 20 Watt - Buah 45,400.00
1 2 3 4 5
93 Box MCB 1 Group - Buah 4,900.00
1 2 3 4 5
94 Magnetick Contactor 25 A - Buah 301,900.00
95 Magnetick Contactor 50 A - Buah 421,500.00
96 Magnetick Contactor 100 A - Buah 812,500.00
97 Fitting Gantung E 27 - Buah 18,200.00
98 Fitting Duduk (Plafond) - Buah 12,100.00
99 Fitting Kombinasi - Buah 9,700.00
100 Fitting Hologen - Buah 38,700.00
101 Icnitor SN 58 - Buah 68,400.00
102 Insulock - Buah 900.00
103 Kapasitor - Buah 217,400.00
104 Kap Hijau E 27 - Buah 17,000.00
105 Kap Hijau E 40 - Buah 21,800.00
106 Kap Lampu - Buah 136,600.00
107 k. Skum 10-8 - Buah 1,500.00
108 MCB 1 A - Buah 44,800.00
109 MCB 2 A - Buah 40,800.00
110 MCB 4 A - Buah 62,800.00
111 MCB 6 A - Buah 73,800.00
112 MCB 10 A - Buah 77,300.00
113 MCB 16 A - Buah 83,400.00
114 MCB 25 A - Buah 37,500.00
115 MCB 32 A - Buah 103,300.00
116 MCB 45 A - Buah 105,700.00
117 MCB 50 A - Buah 111,800.00
118 MCB 63 A - Buah 77,400.00
119 MCB Box - Buah 4,900.00
120 Multi Tester - Buah 135,300.00
1 2 3 4 5
121 Full Bracket - Buah 21,800.00
1 2 3 4 5
122 Ornamen Gantung - Buah 67,700.00
123 Obeng Plus - Buah 49,600.00
124 Obeng Minus - Buah 49,600.00
125 Opstic 1/2" lengkap klem - Batang 301,900.00
126 Pipa Besi - Batang 117,200.00
127 Pipa Ornamen dia 1,25" x 1 m - Batang 73,800.00
128 Pipa Ornamen dia 1,5" x 2 m - Batang 181,200.00
129 Pipa Ornamen dia 2" x 3 m - Batang 211,400.00
130 Pipa Ornamen dia 2" x 4 m - Batang 229,500.00
131 Pipa Ornamen dia 2" x 6 m Batang 241,500.00
132 Pres Conector - Buah 4,300.00
133 Rangka Ring 32 Watt - Buah 19,400.00
134 Rel MCB - Buah 29,000.00
135 Saklar Double - Buah 22,800.00
136 Saklar Engkel - Buah 23,000.00
137 Saklar Tripel - Buah 23,600.00
138 Terminal Blok 25 amp - Buah 13,000.00
139 Solder Pistol - Buah 431,800.00
140 Solder - Buah 29,700.00
141 Stop Kontak - Buah 6,100.00
142 Steker Arde - Buah 12,000.00
143 Steker T - Buah 14,000.00
144 Steker PH - Buah 4,300.00
145 Sadel No. 6 - Bungkus 6,100.00
146 Sadel No. 8 - Bungkus 6,700.00
147 Sadel No. 9 - Bungkus 8,000.00
148 Sadel No. 10 - Bungkus 8,600.00
1 2 3 4 5
149 Sadel No. 12 - Bungkus 10,100.00
1 2 3 4 5
150 Sadel No. 14 - Bungkus 15,800.00
151 Sadel No. 19 - Bungkus 23,000.00
152 Sadel No. 22 - Bungkus 17,600.00
153 Skun RS-16 - Buah 2,100.00
154 Stater - Buah 5,200.00
155 Tedus Hitam - Buah 1,300.00
156 Tali Tester - Buah 29,700.00
157 Tang Amper - Buah 1,207,500.00
158 Tang Buaya - Buah 38,700.00
159 Tang Potong - Buah 38,700.00
160 Tang Kombinasi - Buah 38,700.00
161 Tang Jepit - Buah 38,700.00
162 Tang Skun - Buah 362,300.00
163 Time Swicht Theben - Buah 483,000.00
164 Taping Conector 1 baut - Buah 23,400.00
165 Taping Conector 2 baut - Buah 32,900.00
166 Tespen - Buah 24,900.00
167 Timah Solder - Buah 29,000.00
168 Terminal 25 ml - Buah 48,300.00
169 Wait Clam - Buah 8,600.00
170 Klem Tiang uk. Lebar 1,5" x dia 3" lengkap - Set 50,800.00
171 Klem Tiang uk. Lebar 1,5" x dia 5" lengkap - Set 56,900.00
172 Fhoto Shell 10 A merk Selcon - Buah 167,900.00
173 Dead And - Buah 7,300.00
174 Isolasi - Buah 9,100.00
175 Rel Alumunium (dudukan MCB) - Meter 41,100.00
1 2 3 4 5

N. TANAMAN HIAS
1 Palm Ponik - Batang 54,400.00
2 Palm Raja 2,5 m - Batang 471,000.00
3 Palm Raja 2 m - Batang 422,700.00
4 Palm Raja 1 m - Batang 320,100.00
5 Palm Raja 1,5 m - Batang 205,300.00
6 Palm Raja 0,5 m - Batang 157,000.00
7 Palm Ekor Tupai 2,5 m - Batang 670,300.00
8 Palm Ekor Tupai 2 m - Batang 531,300.00
9 Palm Ekor Tupai 1 m - Batang 507,200.00
10 Palm Ekor Tupai 0,5 m - Batang 295,900.00
11 Palm Kamdoria 1 m - Batang 181,200.00
12 Palm Kamdoria - Batang 102,700.00
13 Palm Putri 1,5 m - Batang 440,800.00
14 Serut 2 m - Batang 4,830,000.00
15 Serut 1,5 m - Batang 3,018,800.00
16 Serut 1 m - Batang 1,569,800.00
17 Cemara Udang 2 m - Batang 4,950,800.00
18 Cemara Udang 1,5 m - Batang 3,018,800.00
19 Cemara Udang 1 m - Batang 1,569,800.00
20 Cemara Tiang 2 m - Batang 265,000.00
21 Cemara Tiang 1,5 m - Batang 201,000.00
22 Cemara Tiang 1 m - Batang 152,800.00
23 Cemara Mas 80 cm - Batang 425,700.00
24 Cemara Mas 50 cm - Batang 136,700.00
25 Cemara Norflok 70 cm - Batang 136,700.00
1 2 3 4 5
26 Cemara Norflok 1 m - Batang 233,000.00
1 2 3 4 5
27 Cemara Pinus 1,5 m - Batang 265,000.00
28 Cemara Pinus 1 m - Batang 168,800.00
29 Bougenvil - Batang 184,900.00
30 Nolima 2 m - Batang 1,051,600.00
31 Nolima 1 m - Batang 521,900.00
32 Sirlon 120 cm - Batang 361,400.00
33 Sirlon 60 cm - Batang 114,200.00
34 Tri Color - Batang 48,300.00
35 Asoka - Batang 24,400.00
36 Sambangdara - Batang 72,400.00
37 Pedang - Pedangan - Batang 20,300.00
38 Ki Hujan Bongkol - Batang 184,900.00
39 Ki Hujan Bulat - Batang 33,100.00
40 Nusa Indah - Batang 17,900.00
41 Sikas 1 m - Batang 2,255,300.00
42 Sikas 50 cm - Batang 1,452,700.00
43 Sikas 30 cm - Batang 730,500.00
44 Agave - Batang 112,500.00
45 Wali Songo - Batang 891,000.00
46 Lantana - Batang 14,500.00
47 Rambusa - Batang 56,400.00
48 Miramta - Batang 24,400.00
49 Asam Keranji - Batang 32,400.00
50 Heli Konia - Batang 16,300.00
51 Song Of India - Batang 72,400.00
52 Beringin Korea - Batang 3,539,400.00
53 Tombak Raja - Batang 297,100.00
1 2 3 4 5
54 Pandan Bali Persit - Batang 457,600.00
1 2 3 4 5
55 Pandan Bali Cabang - Batang 891,000.00
56 Pandan Kuning - Batang 22,700.00
57 Tanjung 1 m - Batang 21,000.00
58 Tanjung 2 m - Batang 112,500.00
59 Tanjung 3 m - Batang 265,000.00
60 Sapu Tangan 2 m - Batang 152,800.00
61 Kasia Golden 1,5 m - Batang 128,600.00
62 Rumput Golf - M2 28,300.00
63 Rumput Manila - M2 32,400.00
64 Puring - Batang 27,600.00
65 Melati Kosta - Batang 128,600.00
66 Anggrek Tanah - Batang 22,700.00
67 Lili Bombai - Batang 24,400.00
68 Lili Bakung - Batang 22,700.00
69 Lili Paris Putih - Batang 17,900.00
70 Nanas Merah - Batang 32,400.00
71 Amander - Batang 24,400.00
72 Puring Z - Batang 32,400.00
73 Anjuang - Batang 16,300.00
74 Pakis Kelabang - Batang 16,300.00
75 Lidah Mertua - Batang 16,300.00
76 Lapender - Batang 24,400.00
77 Batavia - Batang 32,400.00
78 Sambang Dara - Batang 40,300.00
79 Pillo Denrum - Batang 24,400.00
80 Evorria - Batang 32,400.00
81 Bayam - bayaman - Batang 13,200.00
1 2 3 4 5
82 Aglonema Lokal - Batang 40,300.00
1 2 3 4 5
83 Katus Kodok - Batang 14,500.00
84 Kipranrus - Batang 40,300.00
85 Siklok Besar - Batang 136,700.00
86 Siklok Kecil - Batang 72,400.00
87 Helokomin - Batang 16,300.00
88 Pisang Betet - Batang 24,400.00
89 Kana - Batang 16,300.00
90 Adenium - Batang 88,500.00
91 Bromedia - Batang 16,300.00
92 Echinacea/pucuk merah 50 cm - Batang 67,300.00

M. LAIN-LAIN
1 Pintu Air Sorong Uk. 0,40 s/d 0,60 m - Unit 3,864,000.00
2 Pintu Air Ulir Uk. 0,60 s/d 0,80 m - Unit 8,694,000.00
3 Pintu Air Ulir Uk. 0,90 s/d 1,20 m - Unit 10,384,500.00
4 Gorong2 Beton 40 cm Tanpa Tulang - M1 223,500.00
5 Gorong2 Beton 60 cm Tanpa Tulang M 031 M1 356,300.00
6 Gorong2 Beton 80 cm Tanpa Tulang M 033 M1 483,000.00
7 Gorong2 Beton 100 cm Tanpa Tulang M 035 M1 658,200.00
AR HARGA SATUAN UPAH DAN BAHAN
WILAYAH III

KETERANGAN

1. Harga Tahun 2017


Harga Belum Termasuk
PPn

2. Harga Sudah Termasuk


Keuntungan dan Overhead
*) Operator yang sudah biasa dan terampil mengoperasikan
jenis peralatan untuk melayani pekerjaan berat
Misal : Bulldozer, Grader, Wheel, Loader, Asphalt Finisher, dll

yang agak ringan


Misal : Steel Wheeled Roller, Stamper, Concrete Mixer/Mesin pengaduk beton dll
KETERANGAN

1. Harga Tahun 2017


Harga Belum Termasuk
PPn

2. Harga Sudah Termasuk


Keuntungan dan Overhead

3. Harga ini berlaku untuk


Wilayah III :
Kec. Mempawah Timur:
'-Desa Sejegi(Dusun Selayar)
Kec.Sadaniang:
'-Desa Suak Berangan
'-Desa Ansiap
'-Desa Bun Bun
Kec.Segedong:
'-Desa Peniti Dalam II
dan daerah lain yang
memiliki kesamaan
karakteristik wilayah yang
mempengaruhi harga
satuan.
6

5. Harga satuan merupakan


6
harga on side (di lapangan)

6. Untuk penentuan harga


satuan yang dipergunakan
dipengaruhi oleh asumsi
perencanaan yang dipakai.

7. Untuk Daerah yang me-


miliki karakteristik tertentu
dapat digunakan inter-
polasi
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
No PENGALAMAN GAJI ASISTEN S1
1 2
1 1 2,800,000.00 6,000,000.00
2 2 3,000,000.00 200,000.00
3 3 3,200,000.00 200,000.00
4 4 3,400,000.00

No PENGALAMAN GAJI TEKNISI SMK / D1 / D2


1 2
1 3 1,800,000.00 700,000.00
2 4 1,975,000.00 175,000.00
3 5 2,150,000.00 175,000.00
4 6 2,325,000.00
5 7 2,500,000.00
6 8 2,700,000.00 55,000.00
7 9 2,883,333.33 183,333.33
8 10 3,066,666.67
9 11 3,250,000.00
10 12 3,600,000.00 120,000.00
11 13 4,000,000.00 400,000.00
12 14 4,400,000.00 400,000.00
13 15 4,800,000.00
14 16 5,100,000.00 400,000.00
15 17 5,200,000.00 100,000.00
16 18 5,300,000.00 100,000.00
17 19 5,400,000.00
18 20 5,500,000.00

No PENGALAMAN GAJI S2 / S3
1 2
1 1 5,200,000.00 900,000.00
2 2 5,500,000.00 300,000.00
3 3 5,800,000.00 300,000.00
4 4 6,100,000.00
5 5 6,500,000.00 1,300,000.00
6 6 6,933,000.00 433,333.33
7 7 7,366,000.00 433,000.00
8 8 7,800,000.00
9 9 8,200,000.00 1,300,000.00
10 10 8,633,333.33 433,333.33
11 11 9,066,666.67
12 12 9,500,000.00
13 13 10,400,000.00 2,700,000.00
14 14 11,300,000.00 900,000.00
15 15 12,200,000.00 900,000.00
16 16 13,100,000.00
17 17 14,300,000.00 4,300,000.00
18 18 15,733,000.00 1,433,333.33
19 19 17,166,000.00 1,433,000.00
20 20 18,600,000.00
PPN / INFLASI TOTAL GAJI
10% ( Rp.)
3 4
280,000.00 2,520,000.00
300,000.00 2,700,000.00
320,000.00 2,880,000.00
340,000.00 3,060,000.00

PPN / INFLASI TOTAL GAJI


10% ( Rp.)
3 4
180,000.00 1,620,000.00
197,500.00 1,777,500.00
215,000.00 1,935,000.00
232,500.00 2,092,500.00
250,000.00 2,250,000.00
270,000.00 2,430,000.00
288,333.33 2,595,000.00
306,666.67 2,760,000.00
325,000.00 2,925,000.00
360,000.00 3,240,000.00
400,000.00 3,600,000.00
440,000.00 3,960,000.00
480,000.00 4,320,000.00
510,000.00 4,590,000.00
520,000.00 4,680,000.00
530,000.00 4,770,000.00
540,000.00 4,860,000.00
550,000.00 4,950,000.00

PPN / INFLASI TOTAL GAJI


10% ( Rp.)
3 4
520,000.00 4,680,000.00
550,000.00 4,950,000.00
580,000.00 5,220,000.00
610,000.00 5,490,000.00
650,000.00 5,850,000.00
693,300.00 6,239,700.00
736,600.00 6,629,400.00
780,000.00 7,020,000.00
820,000.00 7,380,000.00
863,333.33 7,770,000.00
906,666.67 8,160,000.00
950,000.00 8,550,000.00
1,040,000.00 9,360,000.00
1,130,000.00 10,170,000.00
1,220,000.00 10,980,000.00
1,310,000.00 11,790,000.00
1,430,000.00 12,870,000.00
1,573,300.00 14,159,700.00
1,716,600.00 15,449,400.00
1,860,000.00 16,740,000.00