1 2 3 4
I KONTRUKSI
1 - Poliklinik 314.00 M2
2 - Garasi Tank 400.00 M2
II PRASARANA
1 - BP. Listrik 1300 watt 2.00 bh
2 - Instalasi Air Bersih
- Rumah Pompa 4.00 Bh
- Ground Tank 50.000 liter 2.00 Bh
3 - Pipa Distribusi 1.00 Ls
4 - Pematangan lahan 1.00 Pkt
5 - Penyiapan Badan Jalan 4,169.05 M2
6 - Pas. Plat deuker Uk. 8 x 1 M tbl. 18 cm (10 Bh) 19.01 M3
7 - Urugan Sirtu + Pemadatan Tbl 30 Cm 1,737.11 M3
TOTAL
DIBULATKAN
LIAR DELAPAN RATUS DELAPAN PULUH DUA JUTA DUA RATUS ENAM PULUH RUPIAH
Nama Direktur
Jabatan
HARGA
SESUDAH
(Rp)
8
1,181,860,257.50
1,492,052,187.38
2,673,912,444.88
7,700,000.00
385,000,000.00
189,329,412.80
715,000,000.00
273,702,000.00
691,562,743.87
96,504,566.40
849,549,060.36
3,208,347,783.43
5,882,260,228.31
5,882,260,000.00
April 2017
RENCANA ANGGARAN BIAYA
HARGA
NO PEKERJAAN VOLUME SAT
(Rp)
1 2 3 4 5
I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 463.00 M2 9,600.00
2 Pengukuran bouwplank 153.00 M1 37,900.00
Sub Total
II PEKERJAAN TANAH
1 Galian tanah pondasi 106.08 M3 70,200.00
2 Urugan tanah kembali 36.47 M3 23,400.00
3 Urugan pasir bwh pondasi/lantai 24.54 M3 134,400.00
4 Urugan tanah bawah lantai 157.00 M3 146,900.00
5 Pancang kayu bulat 8 - 10 panj. 4 M 628.00 Btg 24,700.00
Sub Total
III PEKERJAAN PASANGAN
1 Pondasi bt kosong/aanstamping 15.47 M3 486,000.00
2 Pondasi batu gunung 59.67 M3 831,200.00
3 Pasang bataco trasram 1:2 190.57 M2 88,200.00
4 Pasang bataco 1:4 495.31 M2 88,200.00
5 Kolom 15/15 5.76 M3 3,984,500.00
7 Sloof beton 15/20 6.63 M3 4,615,500.00
8 Ring balk beton 10/20 4.42 M3 4,970,000.00
9 Plester dinding 1:2 381.13 M2 71,100.00
10 Plester dinding 1:4 990.62 M2 59,900.00
11 Pas. Batu tempel alam 78.47 M2 349,400.00
Sub Total
IV PENUTUP ATAP BJ. RINGAN
1 Kuda-kuda atap baja Ringan 534.64 M2 226,000.00
2 Pasang atap genteng metal 534.64 M2 100,900.00
3 Pasang Nok genteng metal 105.30 M1 82,900.00
4 Talang jurai 18.74 M1 77,400.00
Sub Total
V PEKERJAAN KAYU
1 Kusen pintu / jendela / BV ky. Klas I 1.35 M3 11,221,700.00
2 Lysplank GRC Uk. 0.8/20 153.00 M1 106,100.00
3 Daun pintu km/wc aluminium 7.00 Bh 800,000.00
4 Pintu panil papan 16.70 M2 737,600.00
5 Jendela kaca panil 36.86 M2 639,000.00
6 Pas. Rangka plafond metal furing 463.00 M2 201,500.00
7 Penutup Plafond Gypsum 463.00 M2 42,800.00
8 List plafond gypsum 442.00 M1 72,100.00
9 Ventilasi Kaca / BV km/wc 2.34 M2 255,600.00
Sub Total
VI PEKERJAAN LANTAI
1 Lantai cor beton 29.92 M3 983,600.00
2 Pas. Keramik lantai 40/40 436.00 M2 189,900.00
3 Pas. Keramik km/wc 20/20 27.00 M2 194,300.00
4 Krmk dndng km/wc 20/25 t.1,5 69.60 M2 194,300.00
5 Cor lantai rabatz selasar beton 14.90 M3 983,600.00
6 Parit cucuran atap 153.00 M1 72,200.00
Sub Total
VII PEKERJAAN SANITASI
1 Closet jongkok 7.00 Bh 452,700.00
2 Bak air fibreglass uk. 55x55x60 cm 7.00 Bh 1,030,700.00
3 Pipa PVC @ 4" 56.00 M1 197,000.00
4 Pipa PVC @ 2" 56.00 M1 119,900.00
5 Floor drain 9.00 Bh 28,600.00
6 Washtafel 7.00 Bh 597,600.00
7 Septictank+resapan kap. 3 M3 3.00 Unit 10,253,300.00
Sub Total
VIII PEK. ALAT GANTUNG
1 Kunci pintu 9.00 Bh 221,300.00
2 Engsel pintu 27.00 Psg 29,200.00
3 Engsel jendela 96.00 Psg 21,300.00
4 Hak angin 48.00 Bh 26,200.00
5 Grendel jendela 48.00 Bh 32,700.00
6 Handle jendela 48.00 Bh 41,900.00
Sub Total
IX PEKERJAAN LISTRIK + AIR
1 Instalasi titik mata lampu 34.00 Ttk 106,200.00
2 Instalasi stop kontak 30.00 Ttk 106,200.00
3 Stop Kontak 30.00 Bh 39,100.00
4 Saklat tunggal 14.00 Bh 51,500.00
5 Saklar ganda 10.00 Bh 51,400.00
6 Lampu XL 18 watt 34.00 Bh 76,400.00
7 Kast zekering 4 group 3.00 Bh 46,000.00
8 Arde BC draad 6 mm 18.00 M1 34,000.00
9 Kran air 14.00 Ttk 26,300.00
Sub Total
X PEKERJAAN PENGECATAN
1 Cat dinding tembok+plafond 1,722.92 M2 32,200.00
2 Cat kayu / kilap 109.199 M2 51,200.00
Sub Total
JUMLAH I s/d XI
PPN 10 %
TOTAL
DIBULATKAN
Nama Direktur
Jabatan
JUMLAH
(Rp)
6
4,444,800.00
5,798,700.00
Panjang Dinding
10,243,500.00 C
Tembok Kotor
7,446,816.00 ##
853,281.00 ##
3,298,176.00 ##
23,063,300.00 ##
15,511,600.00 ##
50,173,173.00 ##
##
7,518,420.00 ##
49,597,704.00 #
16,807,833.00 total p tembok
43,686,342.00 ##
22,950,720.00 ##
30,600,765.00 total p tembok
21,967,400.00 TOTAL L tembok
27,098,343.00
59,338,138.00
27,418,291.50###
306,983,956.50
120,829,099.31###
53,945,381.06
8,729,436.32
1,450,476.00
184,954,392.69
15,104,408.20
16,233,300.00
5,600,000.00
12,314,232.00
23,550,345.00
93,294,500.00
19,816,400.00
31,868,200.00
598,104.00
218,379,489.20
29,432,207.72
82,796,400.00
5,246,100.00
13,523,280.00
14,655,640.00
11,046,600.00
156,700,227.72
3,168,900.00
7,214,900.00
11,032,000.00
6,714,400.00
257,400.00
4,183,200.00
30,759,900.00
63,330,700.00
1,991,700.00
788,400.00
2,044,800.00
1,257,600.00
1,569,600.00
2,011,200.00
9,663,300.00
3,610,800.00
3,186,000.00
1,173,000.00
721,000.00
514,000.00
2,597,600.00
138,000.00
612,000.00
368,200.00
12,920,600.00
55,478,088.00
5,590,988.80
61,069,076.80
1,074,418,415.91
107,441,841.59
1,181,860,257.50
1,287,753,000.00
, 11 April 2017
usahaan
ektur
RENCANA ANGGARAN BIAYA
I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 550.40 M
2 Pengukuran / bowplank 122.00 M
II PEKERJAAN PONDASI
1 Galian Tanah Pondasi 99.88 M
2 Urugan tanah kembali 33.29 M
3 Urugan tanah bawah lantai 373.77 M
4 Urugan Pasir bawah pondasi 55.63 M
5 Lantai kerja pondasi tbl. 5 cm 1.42 M
6 Aanstamping 12.58 M
7 Pancang ky bulat dia. 8-10 panj. 4 m 322.00 Btg
8 Pancang cerucuk ky bulat dia. 15 panj. 12 m 360.00 Btg
9 Pondasi plat setempat P1 14.20 M
10 Pondasi plat setempat P2 5.44 M
11 Pondasi batu gunung 30.51 M
12 Sloof uk. 20 x 40 cm 17.60 M
VI PEKERJAAN ATAP
1 Atap genteng spandek zincalume 588.00 M
2 Bubungan/ nok spandek zincalume 43.00 M
3 Lisplank kalsiplank lbr. 20 cm 12 mm 113.84 M
X PEKERJAAN LISTRIK
1 Instalasi titik mata lampu 27.00 Ttk
2 Instalasi stop kontak 2.00 Ttk
3 Stop kontak 2.00 Bh
4 Kast Zekreng 1.00 Bh
5 Lampu TL 2 x 18 watt grille 18.00 Bh
6 Lampu XL 18 watt 6.00 Bh
7 Arde BC Draad 1.00 Set
XI PEKERJAAN PENGECATAN
1 Cat dinding tembok 712.30 M
2 Cat kilat besi 437.99 M
TOTAL
PPN 10 %
JUMLAH
DIBULATKAN
N BIAYA
2 / BC KAB MEMPAWAH
9,600.00 5,283,840.00
37,900.00 4,623,800.00
Sub total 9,907,640.00
70,200.00 7,011,226.62
23,400.00 779,025.18
146,900.00 54,907,506.48
134,400.00 7,476,321.48
983,600.00 1,393,649.10
486,000.00 6,113,743.99
24,700.00 7,953,400.00
108,400.00 39,024,000.00
3,582,900.00 50,890,788.09
3,582,900.00 19,492,767.45
831,200.00 25,362,889.98###
4,615,500.00 81,232,800.00###
Sub total 301,638,118.36 #
3,984,500.00 1,377,043.20###
4,970,000.00 19,681,200.00
Sub total 21,058,243.20
33,400.00 31,743,360.00
33,400.00 60,127,014.00
33,400.00 24,849,600.00
33,400.00 92,584,800.00
33,400.00 1,482,626.00
33,400.00 14,955,852.00###
33,400.00 13,178,304.00
33,400.00 5,997,972.00
5,150.00 2,410,200.00
8,400.00 604,800.00 #
Sub total 247,934,528.00
11,221,700.00 1,239,997.85
737,600.00 1,394,064.00
737,600.00 2,788,128.00
639,000.00 1,252,440.00
Sub total 6,674,629.85
98,200.00 57,741,600.00
44,700.00 1,922,100.00
106,100.00 12,078,424.00
Sub total 71,742,124.00
###
88,200.00 2,116,800.00
88,200.00 28,278,860.40
71,100.00 3,412,800.00
59,900.00 38,410,515.60
Sub total 72,218,976.00
#
4,615,500.00 461,529,691.80###
4,615,500.00 97,071,626.73
983,600.00 6,358,584.30###
72,200.00 8,230,800.00
Sub total 573,190,702.83
221,300.00 663,900.00
29,200.00 262,800.00
21,300.00 85,200.00
26,200.00 52,400.00
32,700.00 65,400.00
41,900.00 83,800.00
Sub total 1,213,500.00###
106,200.00 2,867,400.00
106,200.00 212,400.00
39,100.00 78,200.00 ###
46,000.00 46,000.00
98,600.00 1,774,800.00
76,400.00 458,400.00
34,000.00 34,000.00
Sub total 5,471,200.00###
32,200.00 22,936,124.40
51,200.00 22,425,292.80
Sub total 45,361,417.20
1,356,411,079.44###
135,641,107.94
1,492,052,187.38
1,492,052,000.00###
###
PEMBANGUNAN : PRASARANA
LUAS : 1 PAKET
PPN 10%
Sub Total-3
PPN 10%
Sub Total-6
TOTAL 1 - 7
DIBULATKAN
N BIAYA
###
87,500,000 350,000,000
35,000,000
385,000,000###
9,600.00 470,400###
37,900.00 1,061,200###
70,200.00 3,580,200###
983,600.00 1,229,500###
134,400.00 504,000
24,700.00 2,988,700
4,615,500.00 21,268,224 #
3,984,500.00 23,907,000 ##
4,721,700.00 14,165,100
71,100.00 7,465,500
500,000.00 1,000,000
1,500,000.00 1,500,000
27,800.00 2,919,000
4,000,000.00 4,000,000
Total 1 Bh 86,058,824
Total 2 Bh 172,117,648###
17,211,765
189,329,413
650,000,000 650,000,000###
65,000,000
715,000,000
150,800 248,820,000
24,882,000
273,702,000
###
150,800 628,693,403.52 ###
4,615,500 87,731,424
Total 716,424,828
71,642,483
788,067,310
###
444,600 772,317,328###
77,231,733
849,549,060
###
3,208,347,783.43###
3,208,347,000.00###
###
Nama Direktur
Jabatan
PEMBANGUNAN :
LOKASI :
TA. :
I KONTRUKSI
1 - Poliklinik
2 - Garasi Tank
II PRASARANA
1 - BP. Listrik 1300 watt
2 - Instalasi Air Bersih
- Rumah Pompa
- Ground Tank 50.000 liter
3 - Pipa Distribusi
4 - Pematangan lahan
5 - Penyiapan Badan Jalan
6 - Pas. Plat deuker Uk. 8 x 1 M tbl. 18 cm (10 Bh)
7 - Urugan Sirtu + Pemadatan Tbl 30 Cm
TOTAL
Bobot Kumulatif Rencana
Bobot Realisasi Per Minggu
NOTE :
JANGKA WAKTU PELAKSANAAN 210 HARI KALENDER KERJA
YONKAV 12/BC KODAM XII/TPR
KAB MEMPAWAH
2017
BOBOT
URAIAN PEKERJAAN
% 1
20.09
25.37
0.13
6.55
3.22
12.16
4.65 1.16
11.76
cm (10 Bh) 1.64
14.44
100.00
### 1.16
### 1.16
2 3 4 5 6 7 8 9
MINGGU
10 11 12 13 14 15 16 17
1.20 1.20
Nama Direktur
Jabatan
KET.
26 27 28 29 30
0.07 0.07
100%
ama Direktur
F BENTUK PRA RENCANA KESELAMATAN DAN KESEHATAN KERJA KONTRAK ( PRA - RK3K )
1 KEBIJAKAN K3
Adalah untuk mencegah kecelakaan kerja, melaksanakan k3 konstruksi, mengembangkan kesehata
dan memeriksa pelaksanaan konstruksi K3 kontruksi
Penerapan K3 dalam pekerjaan konstruksi sangat diperlukan hal ini untuk mencegah kecelakaan da
dan kelancaran dalam pekerjaan dan memberikan kesehatan pada pekerja tersebut.
Dalam hal ini pihak kontraktor berkomitmen untuk menerapkan k3
tujuan dari k3 dalam pelaksanaan pekerjaan adalah sebagai berikut;
1 Mengidentifikasi dan mengantipasi kecelakaan kerja
2 Menyusun dan menetapkan program k3 konstruksi
3 Membuat instruksi kerja
4 Memberikan penyuluhan dan pelatihan k3 konstruksi
5 Melakukan pengawasan pelaksanaan k3 konstruksi
6 Mengenalkan dan mengusulkan peningkatan metode kerja ditinjau dari K3 konstruksi
7 Mengadakan penyellidikan kecelakaan kerja dan penanggulangan keadaann daruruta
8 memeriksa pelaksanaan keselamatan dan kesehatan kerja ( Audit K3 )
2 PERENCANAAN
1) Identifikasi Bahaya dan Pengendalian Resiko Bahaya
I KONTRUKSI
1 - Poliklinik
2 - Garasi Tank
II PRASARANA
1 - BP. Listrik 1300 watt
2 - Instalasi Air Bersih
- Rumah Pompa
- Ground Tank 50.000 liter
3 - Pipa Distribusi
4 - Pematangan lahan
5 - Penyiapan Badan Jalan
6 - Pas. Plat deuker Uk. 8 x 1 M tbl. 18 cm (10 Bh)
7 - Urugan Sirtu + Pemadatan Tbl 30 Cm
Sasaran K3
a Tidak ada kecelakaan kerja yang berdampak korban jiwa ( Zero Fatal Accident )
b. Tingkat penerapan elemen SMK3 minimal 80%
c Semua pekerja wajib memakai APD yang sesuai bahaya dan resiko pekerjaannya m
d Dstnya
Program K3
a Melaksanakan rencana K3 dengan menyediakan sumber daya K3 (APD,Rambu-ram
Jaring Pengaman, Dsb ) secara konsisten
b Melakukan inspeksi secara rutin terhadap kondisi dan cara kerja berbahaya
c Memastikan semua pekerja untuk mematuhi peraturan yang telah ditetapkan
d. dst
RAK ( PRA - RK3K )
( PRA - RK3K )
onstruksi
daruruta
IDENTIFIKASI
JENIS & BAHAYA RESIKO K3
a K3 (APD,Rambu-rambu,Spanduk,Poster,Pagar Pengaman,
erja berbahaya
telah ditetapkan
AMATAN DAN KESEHATAN KERJA KONTRAK
( PRA - RK3K )
PENGENDALIAN RESIKO K3
PENGENDALIAN RESIKO K3
a. Menggunakan Sepatu Bot
b.Menggunakan sarung tangan
c.Menggunakan Helm
d.Memasang Spanduk & Petunjuk K3
e.Melengkapi Pekerja dengan APD
f.Menggunakan Safety Bell pada Ketinggian
PENGENDALIAN RESIKO K3
a. Menggunakan Sepatu Bot
b.Menggunakan sarung tangan
c.Menggunakan Helm
d.Memasang Spanduk & Petunjuk K3
e.Melengkapi Pekerja dengan APD
f.Menggunakan Safety Bell pada Ketinggian
rja (SMK3)
engaman,
Nama Direktur
Jabatan
DIAGRAM K3
Hasil Analisis Intruksional
Prosedur
Keselamatan & Kesehatan Kerja
( K3 )
Mengikuti
Prosedur Keselamatan Kerja
Mengidentifikasi
Macam-Macam Prosedur
Keselamatan
Mulai
Menindaklanjuti k
terkait hasil pen
# TUGAS & TANGGUNG JAWAB #
PENGAWAS K3 ;
Organisasi harus menyusun planning KESELAMATAN DAN KESEHATAN KERJA yang meliputi
a Identifikasi bahaya ( hazard identiication ) penilaian dan pengendalian resiko ( risk assessment and risk
b Pemenuhan terhadap peraturan perundangan - perundangan dan persyaratan lainnya
c Penentuan tujuan dan sasaran
d Program kerja secara umum dan program kerja secara khusus
e Indikator kinerja sebagai dasar penilaian kinerja K3
Prosedur perencanaan, identifikasi bahaya, penilaian resiko dan pngendaliannya, dikendalikan dan didokumen
Assesment dan pngendalian resiko ini harus telah dipertimbangkan dalam penetapan target K3
Beberapa hal perlu diperhatikan dalam menyusun identifikasi bahaya :
a. Identifikasi bahaya, penilaian resiko dan pengedaliannya bersifat proaktif bukan reaktif.
b. Buat identifikasi dan klasifikasi resiko kemudian dikontrol dan diminimalisir, dikaitkan dengan objective
c. konsisten diterapkan
d. Bisa memberikan masukan dalam penentuan fasilitas fasilitas yang diperlukan oleh organisasi, identifik
pengembangan kontrol terhadap organisasi.
e. Bisa menjadi alat pemantau terhadap tindakan - tindakan yang diperlukan, sehingga terwujud efektifita
Penetapan tujuan dan sasaran kebijakan K3 harus dikonsultasikan dengan wakil tenaga kerja, Ahli K3 dan piha
pekerjaan.
Tujuan dan sasaran ini harus konsisten terhadap kebijakan K3 termasuk kebijakan tentang perbaikan berkelan
Indikator Kinerja
Dalam menetapkan tujuan dan sasaran kebijakan keselamatan dan kesehatan kerja perusahaan harus mengg
Kinerja Keselamatan dan kesehatan kerja, yang sekaligus merupakan informasi mengenai keberhasilan menca
kesehatan kerja.
Program kerja memuat penanggung jawab dan otoritas pada fungsi-fugsi dan level dalam organisasi dan targe
organisasi tersebut.
Program kerja ini harus dievaluasi secara periodik dan terencana, bila diperlukan, bisa diamandemen sehubun
hasil jasa atau kondisi operasi dalam organisasi.
Elemen Program K3
a. Untuk menerapkan dan mengembangkan sistem manajemen keselamatan dan kesehatan kerja disusun pro
kesehatan kerja, dengan menetapkan system pertanggung jawaban dalam pencapaian tujuan da
tingkatan manajemen perusahaan yang bersangkutan
b. Elemen keselamatan dan kesehatan kerja disesuaikan dengan kebutuhan masing-masing perusahaan berd
sasaran yang ingin dicapai perusahaan termasuk dalam menetapkan sarana dan jangka waktu untuk
PENERAPAN RENCANA K3
Secara efektif dengan Mengembangkan Kemampuan dan Mekanisme Pendukung yang diperlukan untuk Menc
dan kesehatan kerja.
Jaminan Kemampuan
Sumber Daya Manusia, Sarana dan Dana
Organisasi (Perusahaan) harus menyediakan Sumber Daya Manusia (SDM), sarana dan dana yang memadai u
persyaratan system SMK3 yang ditetapkan.
Dalam memenuhi ketentuan diatas, organisasi harus membuat prosedur dan menyediakan biaya, sehingga da
a. Sumber daya yang memadai sesuai dengan tingkat keperluannya.
b. Melakukan identifikasi kompetensi kerja termasuk pelaksanaan pelatihan yang dibutuhkan,
c. Membuat ketentuan untuk mengkomunikasikan informasi K3 secara efektif.
d. Membuat ketentuan / Peraturan untuk mendapatkan saran-saran dari para ahli
e. Membuat ketentuan / Peraturan untuk pelaksanaan konsultasi dan keterlibatan pekerja.
Integrasi
Organisasi menjamin system SMK3 yang dilaksanakan dapat terintegrasi dengan system manajemen perusah
nal
Pengendalaian
Keselamtan Kerja
Pekerjaan,
digunakan,
Nomor
t kerja
rdasarkan
an dengan
asarkan
erdasarkan
Selesai
ngan / pelepasan rambu )
A yang meliputi
( risk assessment and risk control ) yang dapat diukur
n target K3
perusahaan harus menggunakan indikator kinerja yang dapat diukur sebagai dasar penilaia
ngenai keberhasilan mencapai system manajemen keselamatan dan
dalam organisasi dan target waktu dalam pencapaian tujuan dan sasaran
-masing perusahaan berdasarkan hasil telaah awal dan penetapan tujuan dan
dan jangka waktu untuk pencapaian tujuan dan sasaran tersebut.
dan dana yang memadai untuk menjamin pelaksanaan SMK3 sesuai dengan
Project Manager
Site Manager
Kurir
Pelaksana Pelaksana
Bag. ME Bag. Struktur
I LAPANGAN KONTRAKTOR
ct Manager
Gudang
ksana Pelaksana
truktur Bag. Arsitektur
REKAPITULASI PERHITUN
NILAI GABUNGAN BA
Dalam
URAIAN PEKERJAAN Negeri
(Rp.)
[ DN ]
x a
I. BARANG
1). Material Langsung (bahan baku) 3,989,241,937
2). Peralatan Barang Jadi -
Sub Total I 3,989,241,937
II. JASA
3). Menejemen proyek dan perekayasaan -
4). Alat kerja/ Fasilitas kerja -
5). Konstruksi dan fabrikasi 823,516,432
6). Jasa umum 534,750,930
Sub Total II 1,358,267,362
Nama Direktur
Jabatan
ANALISA TEKNIS
Analisa Teknis Pekerjaan Tentang
Yang Menguraikan Tentang Kebutuhan Bahan, Tenaga Kerja, Peralatan d
I Data Lapangan / Asumsi / Anggapan : Data Lapangan Teknis Berdasarkan dari hasil survei
perencanaan konsultan perencana yang telah mendapat persetujuan dari Pejabat Pembua
Kepala Satuan Daerah Tugas Pembantuan ( SKPD - TP )
II Urutan Kerja : Sesuai Dengan Bestek Kontrak, Spesifikasi Gambar & Metode Pe
1 Perhitungan Bahan : Sesuai Dengan Item Pekerjaan yang Dikerjakan dan Pekerjaan
Sesuai Dengan Volume Kontrak yang ada
2 Perhitungan Alat : Sesuai Dengan Item Pekerjaan yang Dikerjakan dan Pekerjaan
Sesuai Dengan Volume Kontrak yang ada
3 Perhitungan Tenaga : Sesuai Dengan Item Pekerjaan yang Dikerjakan dan Pekerjaan
Sesuai Dengan Volume Kontrak yang ada
an Kontrak
No. Mata
Pembayaran Jenis Pekerjaan
DEVISI STRUKTUR
TOTAL %
DAFTAR USULAN PEKERJAAN YANG DISUB - KONTRAKKAN
Persentase dari
Jenis Pekerjaan Total harga Mata
Pembayaran
TOTAL %
KKAN
Persentase
Total Harga Nama Sub
Penawaran ( % ) Kontraktor
29.79
29.792
Nama Direktur
Jabatan
Berdasarkan SNI 2007 / 2008
I.
SNI -2008.07.30 UNTUK 1 M3 KOLOM BETON DENGAN BESI 200 KG/M3 ADALAH :
7.0500 org/hr
0.2750 org/hr
1.6500 org/hr
1.4000 org/hr
0.4030 org/hr
0.3530 org/hr
0.4000 M3
4.0000 Kg
2.0000 Liter
210.0000 Kg
3.0000 Kg
336.0000 Kg
0.5400 M3
0.8100 M3
SNI -2008.07.32 Membuat tangga beton bertulang (150 kg besi + bekisting) tiap 1m
5.6 org/hr
0.35 org/hr
2.3 org/hr
1.4 org/hr
0.405 org/hr
0.202 org/hr
0.250 m
3.000 kg
1.200 lt
150.000 kg
3.000 kg
323.000 kg
0.520 m
0.780 m
0.105 m
0.108 m
14.000 btg
Membuat pelat lantai beton bertulang tebal 12 cm tiap 1 m
0.647 org/hr
0.330 org/hr
0.087 org/hr
0.042 org/hr
0.046 org/hr
0.022 org/hr
0.040 m
0.015 m
0.400 kg
0.200 lt
4.500 btg
12.950 kg
0.185 kg
42.000 kg
0.058 m
0.087 m
SNI -2008.07.35 MEMBUAT 1 M' KOLOM PRAKTIS BETON BERTULANG (12 X 12 CM)
0.1800 org/hr
0.0200 org/hr
0.0200 org/hr
0.0200 org/hr
0.0060 org/hr
0.0090 org/hr
0.0020 M3
0.0100 Kg
1.8000 Kg
0.4500 Kg
4.0000 Kg
0.0060 M3
0.0090 M3
SNI -2008.07.36 MEMBUAT 1 M' RING BALOK BETON BERTULANG (10 X 15 CM)
0.2970 org/hr
0.0330 org/hr
0.0330 org/hr
0.0330 org/hr
0.0100 org/hr
0.0150 org/hr
0.0030 M3
0.0200 Kg
3.6000 Kg
0.0500 Kg
5.5000 Kg
0.0090 M3
0.0150 M3
M2 Pas. Rangka besi hollow 1x40.40.2 mm modul 60x120 cm, dind. Spa
3.5000 M1
1.0000 Ls
1.0500 M2
0.2500 Org/Hr
0.2500 Org/Hr
0.0250 Org/Hr
0.0130 Org/Hr
M2 Pas. Rangka besi hollow 1x40.40.2 mm modul 60x120 cm, dind. Kaw
3.5000 M1
1.0000 Ls
1.0500 M2
0.2500 Org/Hr
0.2500 Org/Hr
0.0250 Org/Hr
0.0130 Org/Hr
1 M2 PLESTERAN CIPRAT/KAMPROT 1 Pc : 2 Ps
0.250 Oh
0.100 Oh
0.010 Oh
0.015 Oh
0.108 zak
0.016 m3
NEW M1
0.450 m2
0.100 kg
0.100 org/hr
0.200 org/hr
0.020 org/hr
0.005 org/hr
NEW M1
0.900 m2
0.100 kg
0.100 org/hr
0.200 org/hr
0.020 org/hr
0.005 org/hr
SNI -2008.06.17 1 M2 RANGKA ATAP KASAU 5/7 DAN RENG 3/5 KAYU KLAS II
UNTUK GENTENG METAL ROOF
0.1000 org/hr
0.1000 org/hr
0.0100 org/hr
0.0050 org/hr
0.0140
0.0072
0.2500
SNI -2008.06.21 1 M' LISPLANK 3/20 CM PAPAN KAYU KLAS. I ATAU KLAS. II
0.0500 org/hr
0.0200 org/hr
0.0200 org/hr
0.1000 org/hr
0.0108
0.1000
0.0108
0.1000
SNI -2008.06.5 1 M2 MEMBUAT & MEMASANG DAUN PINTU PANEL KY KLAS I / KLAS II
1.0000 org/hr
3.0000 org/hr
0.3000 org/hr
0.0500 org/hr
0.0400
0.0400
0.5000
SNI -2008.06.6 1 M2 MEMBUAT DAN MEMASANG DAUN PINTU PANEL KACA KAYU KLAS I
0.8000 org/hr
2.4000 org/hr
0.2400 org/hr
0.0400 org/hr
0.0240
0.0240
0.3000
0.7500
SNI DT 91-0011-2007 M2 Daun Pintu double teakwood; rangka kayu KW.II tertutup
0.025 m3
0.500 kg
0.030 kg
2.000 lbr
0.600 org/hr
2.000 org/hr
0.200 org/hr
0.300 org/hr
SNI DT 91-0011-2007 M2 Daun Pintu double triplex; rangka kayu KW.II tertutup
0.025 m3
0.500 kg
0.030 kg
2.000 lbr
0.800 org/hr
2.400 org/hr
0.240 org/hr
0.040 org/hr
SNI.-2002.14.9 1 M2 MENGECAT KILAP KAYU (1 LPS PLAMIR, 1 LPS CAT DASAR DAN 2 LP
0.0025 org/hr
0.0040 org/hr
0.1050 org/hr
0.0700 org/hr
0.2000
0.1500
0.1700
0.2600
PT T-30-2000-C BH
1.000 bh
0.000 org/hr
0.500 org/hr
0.050 org/hr
0.000 org/hr
BH
1.000 bh
0.000 org/hr
0.600 org/hr
0.060 org/hr
0.000 org/hr
BH
1.000 bh
0.000 org/hr
0.600 org/hr
0.060 org/hr
0.000 org/hr
RSNI T-15-2002 BH
1.000 bh
1.000 bh
1.200 org/hr
1.450 org/hr
0.150 org/hr
0.100 org/hr
RSNI T-15-2002 BH
1.000 bh
1.000 tb
3.300 org/hr
1.100 org/hr
0.110 org/hr
0.016 org/hr
RSNI T-15-2002 BH
1.000 bh
1.000 tb
3.300 org/hr
1.100 org/hr
0.110 org/hr
0.016 org/hr
RSNI T-15-2002 BH
1.000 bh
0.120 zak
0.000 org/hr
1.100 org/hr
0.110 org/hr
0.016 org/hr
RSNI T-15-2002 BH
1.000 bh
1.800 org/hr
2.700 org/hr
0.540 org/hr
0.110 org/hr
0.180 harga
RSNI T-15-2002 BH
1.000 bh
0.025 bh
0.000 org/hr
0.100 org/hr
0.010 org/hr
0.000 org/hr
RSNI T-15-2002 BH
1.000 bh
0.025 bh
0.000 org/hr
1.100 org/hr
0.110 org/hr
0.016 org/hr
RSNI T-15-2002 BH
1.000 bh
0.025 bh
0.000 org/hr
0.100 org/hr
0.010 org/hr
0.000 org/hr
1.000 bh
0.100 org/hr
0.010 org/hr
0.010 org/hr
0.005 org/hr
RSNI T-15-2002 M1
1.200 m
0.350 m
0.081 org/hr
0.135 org/hr
0.014 org/hr
0.004 org/hr
RSNI T-15-2002 M1
1.200 m
0.350 m
0.081 org/hr
0.135 org/hr
0.014 org/hr
0.004 org/hr
RSNI T-15-2002 M1
1.200 m
0.350 m
0.054 org/hr
0.090 org/hr
0.009 org/hr
0.003 org/hr
RSNI T-15-2002 M1
1.200 m
0.350 m
0.036 org/hr
0.060 org/hr
0.006 org/hr
0.002 org/hr
RSNI T-15-2002 M1
1.200 m
0.350 m
0.036 org/hr
0.060 org/hr
0.006 org/hr
0.002 org/hr
RSNI T-15-2002 M1
1.200 m
0.350 m
0.036 org/hr
0.060 org/hr
0.006 org/hr
0.002 org/hr
M1
1.000 bh
0.350 bh
0.036 org/hr
0.060 org/hr
0.006 org/hr
0.002 org/hr
1 Ttk
12.0000 M1
12.0000 M1
1.0000 Bh
1.0000 Bh
3.0000 Bh
9.0000 Bh
3.0000 Bh
1.0000 M1
10.0000 %
2.0000 Bh
0.3000 Org/Hr
0.1500 Org/Hr
0.0150 Org/Hr
1 Ttk
12.0000 Ml
12.0000 Ml
1.0000 Bh
1.0000 Bh
3.0000 Bh
9.0000 Bh
3.0000 Bh
10.0000 %
2.0000 Bh
0.3000 Org/Hr
0.1500 Org/Hr
0.0150 Org/Hr
TTK TTK
6.000 m
0.500 bh
3.000 bh
0.050 org/hr
0.020 org/hr
0.100 org/hr
0.100 org/hr
TTK TTK
6.000 m
0.500 bh
3.000 bh
0.050 org/hr
0.020 org/hr
0.100 org/hr
0.100 org/hr
BH BH
1.000 bh
1.000 bh
0.250 bh
0.100 org/hr
0.100 org/hr
0.050 org/hr
0.025 org/hr
BH BH
1.000 bh
1.000 bh
0.250 bh
0.100 org/hr
0.100 org/hr
0.050 org/hr
0.025 org/hr
BH
1.000 bh
1.000 bh
0.250 bh
0.100 org/hr
0.100 org/hr
0.050 org/hr
0.025 org/hr
BH BH
1.000 bh
1.000 bh
0.250 bh
0.100 org/hr
0.100 org/hr
0.050 org/hr
0.025 org/hr
BH BH
1.000 bh
0.250 bh
0.100 org/hr
0.100 org/hr
0.050 org/hr
0.025 org/hr
BH BH
1.000 bh
0.250 bh
0.100 org/hr
0.100 org/hr
0.050 org/hr
0.025 org/hr
1 Kg PEKERJAAN BAJA WF
1.025 kg
0.025 kg
0.02 ltr
0.0025 ltr
0.0025 uit
0.02 org/hr
0.005 org/hr
0.075 org/hr
0.0015 org/hr
M2
25.000 kg
0.050 kg
1.050 org/hr
1.050 org/hr
0.105 org/hr
0.052 org/hr
M2
1.200 m2
0.050 kg
1.050 org/hr
1.050 org/hr
0.105 org/hr
0.052 org/hr
M 133.333
1.050 m
1.000 bh
0.045 org/hr
0.135 org/hr
0.014 org/hr
0.002 org/hr
M 133.333
1.050 m
1.000 bh
0.045 org/hr
0.135 org/hr
0.014 org/hr
0.002 org/hr
unt 133.333
1.000 m
6.000 bh
0.045 org/hr
0.135 org/hr
0.014 org/hr
0.002 org/hr
M1 Parit cucuran atap pasang bata
0.16 M3
0.008 M2
0.80 M2
M1 Pekerjaan kansteen
0.070 m3
0.100 m1
0.018 m3
2.500 bh
0.015 m3
0.100 zak
0.050 m3
0.100 org/hr
0.005 org/hr
M1 Pagar BRC 0,9m t. jadi 1,2 m (pond. bt kali,sloof beton, 1/2 bata 30 c
1.1880 Org/Hr
0.1040 Org/Hr
0.0720 Org/Hr
0.3410 Org/Hr
0.07245 Org/Hr
0.0590 Org/Hr
0.0710 Org/Hr
0.2740 M3
0.0022 M3
15.0000 Biji
0.8752 Zak
0.0250 M3
0.1200 M3
0.0146 M3
0.0060 M3
0.1200 Kg
4.4400 Kg
0.0640 Kg
1.0000 M1
0.5550 Bh
0.1150 Kg
0.1150 Kg
0.2990 Kg
URAIAN HARGA
PEKERJAAN PERSIAPAN :
AN PASANG BOUWPLANK
Kayu klas III 5/7 2,514,200
Papan klas III 2,095,300
Paku 4 s/d 7 cm 18,600
Pekerja 89,100
Tukang Kayu Kasar 115,900
Kepala Tukang Kayu 133,700
Mandor 133,700
PEKERJAAN TANAH :
H TEBAL 20 CM
Pekerja 89,100
Mandor 133,700
M3 GALIAN
Pekerja 89,100
Mandor 133,700
H (PER 20 CM)
Pekerja 89,100
Mandor 133,700
Pekerja 89,100
Mandor 133,700
Pasir urug 88,600
PEMADATAN
sirtu 303,300
pekerja 89,100
mandor 133,700
pemadatan 51,200
ENGAN EXCAVATOR
Pekerja 89,100
Mandor 133,700
Excavator 80-140 HP 783,993
Dump Truck 3-4m3/ 6 ton 189,896
Pekerja 89,100
Mandor 133,700
PEKERJAAN BETON :
2x12 cm tiap 1 m3
Kolom Penguat/praktis beton bertulang 12x12 72,300
BETON U-24
Besi Beton U-24 15,100
Kawat Benrat 19,400
Pekerja 89,100
Tukang Besi Tulangan 115,900
Kepala Tukang Besi 133,700
Mandor 133,700
BETON U-39
Besi Beton U-39 15,900
Kawat Benrat 19,400
Pekerja 89,100
Tukang Besi Tulangan 115,900
Kepala Tukang Besi 133,700
Mandor 133,700
Sitemix
Semen PC 66,500
Pasir Beton 146,200
Batu Split Pecah Mesin 1/2 363,300
Pekerja 89,100
Tukang Batu Kasar 115,900
Kepala Tukang Batu 133,700
Mandor 133,700
Sitemix
Semen PC 66,500
Pasir Beton 146,200
Batu Split Pecah Mesin 1/2 363,300
Pekerja 89,100
Tukang Batu Kasar 115,900
Kepala Tukang Batu 133,700
Mandor 133,700
Sitemix
Semen PC 66,500
Pasir Beton 146,200
Batu Split Pecah Mesin 1/2 363,300
Pekerja 89,100
Tukang Batu Kasar 115,900
Kepala Tukang Batu 133,700
Mandor 133,700
Sitemix
Semen PC 66,500
Pasir Beton 146,200
Batu Split Pecah Mesin 1/2 363,300
Pekerja 89,100
Tukang Batu Kasar 115,900
Kepala Tukang Batu 133,700
Mandor 133,700
PEKERJAAN DINDING
rangka kayu
Paku biasa 18,600
Balok kayu 2,769,300
Pekerja 89,100
Mandor 133,700
Tukang kayu 115,900
Kepala tukang 133,700
PEKERJAAN PLESTERAN :
AL 15 MM CAMP. 1 PC : 4 PSR
Pekerja 89,100
Tukang batu 115,900
Kepala tukang 133,700
Mandor 133,700
Kg Semen PC 1,330
M3 Pasir pasang 146,200
15 MM CAMP. 1 PC : 5 PSR
Pekerja 89,100
Tukang batu 115,900
Kepala tukang 133,700
Mandor 133,700
Kg Semen PC 1,330
M3 Pasir pasang 146,200
semen 66,500
pasir pasang 146,200
tukang batu 115,900
kepala tukang batu 133,700
pekerja 89,100
mandor 133,700
Pekerja 89,100
Tukang batu 115,900
Kepala tukang 133,700
Mandor 133,700
Kg Semen PC 1,330
CIPRAT/KAMPROT 1 Pc : 2 Ps
Pekerja 89,100
Tukang batu 115,900
Kepala tukang 133,700
Mandor 133,700
Semen 66,500
Pasir pasang 146,200
KERAMIK 40X40 CM
Pekerja 89,100
Tukang batu 115,900
Kepala tukang 133,700
Mandor 133,700
Buah Keramik 40x40 cm 9,920
Kg Semen PC 1,330
M3 Pasir pasang 146,200
TU TEMPEL
Batu tempel 203,800
Semen PC 66,500
Pasir Pasang 146,200
Pekerja 89,100
Tukang Batu Kasar 115,900
Kepala Tukang Batu 133,700
Mandor 133,700
RAT / KAMPROT 1 Pc : 2 Ps
Semen Portland 66,500
Pasir pasang 146,200
Pekerja 89,100
Tukang batu 115,900
Kepala tukang 133,700
Mandor 133,700
PEKERJAAN LANGIT-LANGIT
ANGIT PLYWOOD 3 MM
Mandor 133,700
Kepala tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
Kg paku plywood 26,500
Lbr Plywood 3 mm 102,600
ANGIT TRIPLEKS 3 MM
Mandor 133,700
Kepala tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
Kg paku tripleks 26,500
Lbr Tripleks 3 mm 62,800
ANGIT GYPSUM
Mandor 133,700
Kepala tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
Kg paku skerup 22,100
Lbr papan gypsum 66,800
ANGIT GRC
Mandor 133,700
Kepala tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
Kg paku skerup 22,100
GRC 71,300
KAYU PROFIL
Mandor 133,700
Kepala tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
Kg paku plywood 18,600
m' list profil 6,325
Mandor 133,700
Kepala tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
Kg paku skrup 22,100
m' list profil Gypsum 57,700
balok 2,095,300
kaso 5/7 2,514,200
paku rata-rata 18,600
GRC 4x8 ft, 4 mm 71,300
paku triplek 26,500
tukang kayu 115,900
kepala tukang kayu 133,700
pekerja 89,100
mandor 133,700
nutup plafon Gypsum 9 mm + rangka hollow tb. 0,3 mm
Pekerja 89,100
Mandor 133,700
Tukang Gypsum 115,900
Tukang Alumunium 115,900
Kepala tukang 133,700
Paku peluru ramset 5,000
Hollow 4x4 cm tb. 0,35 mm 252,500
Hollow 2x4 cm tb. 0,35 mm 188,300
Paku beton 28,300
Sekrup 6 x 1-1,5 300
Gypsum board 120x240 9 mm 66,800
Sekrup Gypsum 300
Textile tape 25,000
Compound Gypsum 54,000
Amplas 6,200
TENG METAL
Genteng Metal 51,524
paku anti karat 11,300
Mandor Prima 0,35 mm 133,700
Kepala tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
P GENTENG METAL
Nok/Bumbungan Genteng Metal 1/2 lingk 35,400
Paku 11,300
Pekerja 89,100
Tukang Kayu 115,900
Kepala Tukang Kayu 133,700
Mandor 133,700
G GELOMBANG
Mandor 133,700
Kepala tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
Lbr Seng Gelombang BJLS 0.3 57,100
Paku seng 20,300
Mandor 133,700
Kepala tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
Seng Plat 42,400
paku kayu 20,300
AT ALUMUNIUM 0,30
Mandor 133,700
Kepala tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
Seng Plat Alumunium 59,200
Baut skrup 1" 600
PEKERJAAN KAYU
ank kalsiplank
Pekerja 89,100
Mandor 133,700
Tukang 115,900
Kepala tukang 133,700
Kalsiplank 20 cm 75,000
Paku 18,600
PEKERJAAN PENGECATAN
AYU (1 LPS PLAMIR, 1 LPS CAT DASAR DAN 2 LPS CAT KILAP)
Mandor 133,700
Kepala tukang cat 133,700
Tukang cat 115,900
Pembantu tukang cat 89,100
Kg cat menie kayu 48,700
Kg plamur kayu 29,700
Kg cat dasar 23,000
Kg Cat Kilap 53,100
TEMBOK (1 LPS PLAMIR, 1 LPS CAT DASAR DAN 2 LPS CAT TEMBOK)
Mandor 133,700
Kepala tukang cat 133,700
Tukang cat 115,900
Pembantu tukang cat 89,100
Kg plamur tembok 29,700
Kg cat dasar tembok 23,000
Kg cat tembok 64,100
ENGSEL PINTU
Engsel pintu 4" 8,400
Mandor 133,700
kepala Tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
ENGSEL JENDELA
Engsel jendela 3" 7,500
Mandor 133,700
kepala Tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
HAK ANGIN
Mandor 133,700
kepala Tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
Bh Hak angin 4,400
PEKERJAAN KACA
KACA TEBAL 5 MM
Mandor 133,700
kepala Tukang kayu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
m2 kaca bening tebal 5mm 132,900
m2 kaca ryben tebal 5mm 203,800
1 M2 PASANG KACA POLOS
1 M2 PASANG KACA RAYBEN
PEKERJAAN SANITASI
PEKERJAAN PIPA
PEKERJAAN ELEKTRIKAL
Pekerja 89,100
Mandor 133,700
Tukang las 115,900
Kepala tukang 133,700
Besi profil 15,900
baja WF 20,200
kawat las 101,900
solar 4,600
oli / pelumas 25,700
sewa alat 57,826
tukang las 115,900
kepala tukang besi 133,700
pekerja 89,100
mandor 133,700
Mandor 133,700
Kepala tukang Batu 133,700
Tukang kayu 115,900
Pembantu tukang kayu 89,100
Kawat simpai 18,600
Kg Paku Kayu 18,600
TERALIS BESI
besi hollow 20 x 20 mm 55,400
Pengelasan 5,942
Mandor 133,700
kepala Tukang las 133,700
Tukang las 115,900
Pembantu tukang besi 89,100
PEKERJAAN PRASARANA
p pasang bata
Galian tanah 70,200
Pas batu bata 1:2 516,900
plesteran 1:2 71,100
0 x/60 x 40 tebal 20 cm
Galian tanah ( 0,35 x L 29 ) 24,570
Pas batu gunung ( 0,32X L.186 ) 277,664
plesteran 1:2 ( 2 X L. 624 ) 142,200
t. 6 cm
Paving Blok Type Segi Enam t. 6 cm ( 20x20 cm ) Natural 2,300
Pasir Pasang 146,200
Semen Warna 2,990
Pekerja 89,100
Tukang Batu Kasar 115,900
Kepala Tukang Batu 133,700
Mandor 133,700
jalan setapak
; uk 8 x 10,5 x 21 )
cm dan urugan sirtu 20 cm
Pekerjaan galian tanah 70,200
Pekerjaan urugan pasir urug 5 cm 134,400
Pek. Urugan sirtu 20 cm 88,920
Pemadatan 51,200
Paving block 2,300
Pasir pasang untuk pengisian 146,200
tukang batu 115,900
Kepala tukang batu 133,700
Pekerja 89,100
Mandor 133,700
ir kendaraan
; 8x10.5x21, urugan pasir 5 cm dan urugan sirtu 20 cm)
Tamper/ Hand compactor -
Plate compactor -
Sirtu -
Abu batu -
Paving -
Pasir urug -
Tukang -
Kepala tukang -
Pekerja -
Mandor -
Pekerja -
Mandor -
Bambu panjang 4 m -
Gebalan rumput -
p pasang bata
Pek. galian tanah -
Pek. Urugan pasir -
Pek. Pasangan bata 1 : 4 -
Plesteran 1 : 4 -
Urugan tanah kembali -
U KALI (tinggi 2 M)
pek. galian tanah -
pek.urugan pasir -
pondasi batu kali 1:3 -
dinding turap batu kali 1:3 -
brapen 1:4 -
plesteran 1:4 -
alat bantu -
uk 1 x 1 m tebal 10 cm
Galian tanah ( 0,32 x B.1a ) 22,464
Pas. Batu gunung ( 0,8 x D.2 ) 664,960
Plat beton ( 0,1 x SUV.E.3b ) 441,760
Plesteran 1 : 2 ( 0,6 x D.6b ) 42,660
Jumlah
uk 1,5 x 1,5 m tebal 10 cm
Galian tanah ( 0,62 x B.Ia ) 43,524
Pas. Batu gunung ( 1,1 x D.2 ) 914,320
Plat beton ( 0,4 x SUV.E.3b ) 1,767,040
Plesteran 1 : 2 ( 0.9 x D.6b ) 63,990
6 mm+ atap
asbes
Kayu klas III 5/7 gelombang+ 2,514,200
Triplex t. 4 mm plafond
Dinding asbes 65,500
Triplex t. 4 mm Plafond 65,500
Paku 4 s/d 7 cm 18,600
Paku payung 20,300
Triplex t. 9 mm Pintu 137,300
Cat plafond acrylic emulsion KW.III 64,100
Pekerja 89,100
Tukang Kayu Kasar 115,900
Kepala Tukang Kayu 133,700
Mandor 133,700
n nama proyek
Papan kayu klas II -
Balok Kayu klas II -
Paku 4 s/d 7 cm -
Meni kayu ex Nippon -
Plamir Kayu -
Amplas Kayu -
Kwas cat -
Cat kayu synthetic -
Semen PC Gresik (50 Kg) -
Pasir Beton -
Batu Split Pecah Mesin 3/5 -
Pekerja -
Tukang Kayu Kasar -
Tukang Cat Biasa -
Kepala Tukang Kayu -
Mandor -
semen 66,500
pasir pasang 146,200
Batu splite 2/3 288,000
besi siku 50.50.5 76,154
kawat duri 20,200
paku rata-rata 18,600
tukang batu 115,900
pekerja 89,100
ap.250 watt
Mesin Jet Pump kap.250 watt 1
Pekerja -
Tukang Listrik -
Kepala Tukang Listrik -
Mandor -
. jadi 1,2 m (pond. bt kali,sloof beton, 1/2 bata 30 cm, plester dan cat)
Pekerja -
Tukang kayu -
Tukang besi -
Tukang batu -
Tukang cat -
Kepala tukang -
Mandor -
Batu belah -
Batu pecah split 2/3 -
Bata merah -
Semen -
Pasir urug -
Pasir pasang -
Pasir beton -
Kayu balok -
Paku -
Besi beton polos -
Kawat -
Pagar BRC tinggi 0,9m
Tiang pagar BRC t. 0,9m
Plamir tembok -
Cat tembok (cat dasar) -
Cat tembok (cat penutup) -
PEKERJAAN JALAN
s Agregat kelas A
Pekerja -
Mandor -
Batu pecah 2/3 -
Pasir urug -
Three wheel roller 8-10 ton -
Water tank truck 3000-4500 Ltr -
Pekerja -
Mandor -
Aspal polimer lokal -
Minyak tanah -
Asphalt Sprayer -
Air Compressor -
Dump Truck 3-4 M2 / 6 Ton -
al beton tbl. 3 cm
Pekerja -
Mandor -
Batu pecah / split 1/2 -
Abu batu -
Filler utk hotmix (semen) -
Aspal polimer lokal -
Wheel Loader 1,0 - 1,6 M3 -
Asphalt Mixing Plant (AMP) -
Generator Set 125 KVA -
Dump Truck 3-4 M2 / 6 Ton -
Asphalt Finisher -
Tandem roller 6-8 Ton -
Pneumatic Tyre Roller 8 - 12 Ton -
aspal biasa
gregat kelas A tb. 20 cm & Permukaan macadam tb. 5 cm
Pekerja -
Mandor -
Tukang aspal -
Sirtu -
Batu pecah / split 3/5 -
Batu pecah / split 2/3 -
Batu pecah / split 1/2 -
Abu batu -
Aspal polimer lokal -
Pasir urug -
Minyak tanah -
Vibrating roller 6-8 ton -
Water tank truck 3000-4500 ltr -
Three wheel roller 8-10 ton -
Asphalt Sprayer -
Dump Truck 3-4 M2 / 6 Ton -
aspal beton tb. 5 cm
Agregat kelas A tb. 20 cm, Laston AC tb. 5 cm)
Pekerja -
Mandor -
Sirtu -
Batu pecah / split 2/3 -
Pasir urug -
Aspal polimer lokal -
Minyak tanah -
Batu pecah / split 1/2 -
Abu batu -
Filler utk hotmix (semen) -
Vibrating roller 6-8 ton -
Water tank truck 3000-4500 ltr -
Three wheel roller 8-10 ton -
Asphalt Sprayer -
Air Compressor -
Dump Truck 3-4 M2 / 6 Ton -
Wheel Loader 1,0 - 1,6 M3 -
Asphalt Mixing Plant (AMP) -
Generator Set 125 KVA -
Asphalt Finisher -
Tandem roller 6-8 Ton -
Pneumatic Tyre Roller 8 - 12 Ton -
AN
JUMLAH HARGA
TOTAL
Material Upah
- 9,579 9,579
8,910
669
5,124 5,124
4,455
669
70,168 70,168
66,825
3,343
-
140,335 140,335
133,650
6,685
23,389 23,389
22,275
1,114
-
51,235 51,235
44,550
6,685
-
106,320 28,067 134,387
26,730
1,337
106,320
-
123,240 23,612 146,852
123,240
22,275
1,337
-
363,960 80,604 444,564
363,960
26,730
2,674
51,200
- - -
-
-
-
-
9,579 9,579
8,910
669
3,345 3,345
3,000
345
9,579 9,579
8,910
669
4,721,667 - 4,721,667
4,721,667
5,020,512 - 5,020,512
5,020,512
8,910
11,590
1,337
669
48,740
21,269
4,650
37,329.20 11,252.75 48,581.95
37,329.20 11,252.75 48,581.95
6,685
2,674
2,318
8,910
74,672
1,860
66,463
1,860
20,587.00 78,392.28 98,979.28
20,587.00 70,183.20 90,770.20
89,100
347,700
40,110
6,685
276,564
246,160
7,850
483,595.00 284,414.00 768,009.00
483,595.00 254,010.00 737,605.00
71,280
278,160
32,088
5,348
165,938
147,696
4,710
99,675
386,876.00 270,323.40 657,199.40
386,876.00 252,081.00 638,957.00
6,853,990
4,188,580
111,600
2,781,600
712,800
320,880
53,480
6,965,590.00 3,868,760.00 10,834,350.00
4,300,180.00 3,868,760.00 8,168,940.00
334.25
534.80
12,169.50
6,237.00
9,740.00
4,455.00
3,910.00
13,806.00
19,276 31,911.00 51,187
334.25
842.31
7,301.70
1,782.00
2,970.00
2,300.00
16,666.00
10,260 21,936.00 32,196
138,000
25,000
900
3,960
3,300
9,900
4,950
20,833
1,320
34,770
13,365
2,006
208,163 50,141 258,304
-
18,285 13,503 31,788
5,346
401
6,954
802
18,285
-
23,553 9,870 33,423
20,705
2,548
92
64
145
2,318
669
6,683
201
444,434 - 444,434
24,570
277,664
142,200
- - -
-
-
-
-
- - -
-
-
-
-
-
-
-
-
-
- - -
-
-
-
-
-
-
-
-
17,550
8,064
44,460
10,240
57,500
3,947
27,816
3,209
14,256
1,070
- - -
-
-
-
-
-
-
-
-
-
-
-
- - -
-
-
-
-
-
- - -
-
-
-
-
-
- - -
-
-
-
-
-
-
-
1,171,844 - 1,171,844
22,464
664,960
441,760
42,660
2,788,874 - 2,788,874
43,524
914,320
1,767,040
63,990
- - -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
13,300
3,801
12,672
25,131
40,400
3,720
28,975
44,550
- - -
-
-
-
-
1 - 1
1
-
-
-
-
1 - 1
1
-
-
-
-
1 - 1
1
-
-
-
-
- - -
-
-
-
-
-
1 - 1
1
-
-
-
-
58 - 58
58
-
-
-
-
6,445,983 - 6,445,983
140,400
17,720
150,463
2,400,000
205,395
1,063,800
66,120
236,925
35,100
330,734
1,773,000
26,325
10,253,282 - 10,253,282
210,600
26,580
255,600
5,427,450
436,800
364,248
1,063,800
66,120
236,925
35,100
330,734
1,773,000
26,325
14,114,932 - 14,114,932
421,200
26,580
255,600
8,787,300
728,000
364,248
1,063,800
66,120
236,925
35,100
330,734
1,773,000
26,325
-
-
-
-
-
-
-
- - -
- - -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- - -
- - -
-
-
-
-
-
- - -
-
-
-
-
-
-
- - -
-
-
-
-
-
-
-
- - -
-
-
-
-
-
-
-
- - -
-
-
-
-
-
-
-
-
- - -
-
-
-
-
-
-
-
-
-
-
- - -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- - -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- - -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
- - -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
DIBULATKAN
9,600
37,900
890,100
###
5,100
70,200
140,300
23,400
51,200
134,400
146,900
444,600
104,800
150,800
392,100
24,700
###
108,400
###
49,100
696,900
124,600
7,400
9,600
3,300
9,600
867,700
831,200
798,800
486,000
4,417,600
###
###
###
3,582,900
###
###
###
4,615,500
4,970,000
###
5,764,300
4,874,400
3,984,500
4,900,300
#
566,600
4,721,700
72,300
5,020,500
113,600###
###
159,100
858,000
862,300
18,200
19,000
1,768,000
983,600
1,011,800
1,059,100
1,069,600
85,200
112,100
88,200
516,900
101,947
53,242
376,200
400,100
39,227
152,937
359,400
272,800
71,100
59,900
58,800
37,000
36,400
46,700
351,300
189,900
###
181,100
###
194,300
63,700
204,400
349,400
535,500
#
46,700
201,500
107,700
58,900
44,000###
42,800
44,400
18,100
72,100
145,500
301,400
303,000
226,000.00
1,404,700
140,500
1,009,900
101,000
59,400
36,900
98,200
###
44,700
###
57,400
77,400
13,145,000
15,873,200
12,768,700
13,875,200
11,221,700
5,692,100
7,535,300
97,200
48,600.00
48,600.00
99,000.00
90,800.00
106,100
768,000.00
737,600.00
657,200.00
639,000.00
764,000
680,100
652,900.00
735,100.00
10,834,400.00
8,168,900.00
51,200
43,100
32,200
34,300
27,800
28,400
221,300
133,300
29,200
21,300
26,200
-
32,700
41,900
160,700
210,300
157,300
277,000
153,700
-
153,700
224,600
387,200
597,600
2,478,200
2,151,600
452,700
400,500
1,030,700
1,981,700
313,400
1,615,400
26,300
28,600
197,000
196,900
119,900
55,100
44,100
37,200
29,200
260,400
258,300
106,200
106,200
51,500
51,400
52,000
39,100
76,400
98,600
31,800
33,400
36,500
44,300
59,500
728,725
5,942
314,400
1,202,800
634,700
256,300
138,600
143,200
399,800
72,200
444,400
###
109,000
###
181,100
188,100
-
-
1,171,800
2,788,900
654,900
-
172,500
-
-
100
6,446,000
10,253,300
14,114,900
-
-
-
-
-
-
-
-
STANDAR HARGA SATUAN UPAH DAN BAHAN
WILAYAH I
1 2 3 4 5
A. UPAH
1 Mandor Lapangan L 061 Hari 133,700.00
2 Mekanik L 071 Hari 120,400.00
3 Mekanik Pembantu L 072 Hari 89,100.00
4 Kepala Tukang L 073 Hari 133,700.00
5 Tukang L 079 Hari 115,900.00
6 Operator Terlatih *) L 081 Hari 133,700.00
7 Operator Kurang Terlatih **) L 082 Hari 98,100.00
8 Pembantu Operator L 083 Hari 89,100.00
9 Supir Material / Truck L 091 Hari 107,000.00
10 Supir Personil L 092 Hari 107,000.00
11 Pembantu Supir / Kernet L 099 Hari 89,100.00
12 Buruh Lapangan Terlatih L 106 Hari 107,000.00
13 Buruh Lapangan Agak Terlatih L 103 Hari 98,100.00
14 Buruh Lapangan Tak Terlatih L 101 Hari 89,100.00
15 Penjaga Api - Hari 80,200.00
16 Penjaga Malam - Hari 80,200.00
Catatan : *) Operator yang sudah biasa dan terampil mengoperasikan
jenis peralatan untuk melayani pekerjaan berat
Misal : Bulldozer, Grader, Wheel, Loader, Asphalt Finisher, dll
1 2 3 4 5
B. BAHAN PENGISI
1 Batu Kong M.101 M 174,600.00
2 Batu Sap Pinang - M 194,900.00
3 Batu pecah 15-20 cm - M 240,100.00
4 Batu pecah 10-15 cm M.020 M 248,100.00
5 Batu pecah 5-7 cm M.022 M 310,100.00
6 Batu pecah 3-5 cm M.023 M 256,900.00
7 Batu pecah 2-3 cm M.024 M 288,000.00
8 Batu pecah 1-2 cm M.025 M 363,300.00
9 Batu pecah 0,5 - 1 cm M.026 M 398,700.00
10 Stone Dust - M 303,300.00
11 Aspal Bitumen 60/70 - Kg 12,900.00
12 Pasir Urug M.040 M 88,600.00
13 Pasir Ayak Untuk Beton (Pasir Kasar/Merah) M.041 M 146,200.00
14 Semen PC (50 Kg) M.080 Zak 66,500.00
15 Semen Putih (40 Kg) - Zak 119,600.00
16 Timbunan Tanah Biasa M 69,100.00
17 Timbunan Tanah Pilihan M.050.a M 102,700.00
18 Paving Block - Buah 2,300.00
19 Batu Bata 5 cm x 11 cm x 22 cm Buah 2,600.00
20 Batako 7 cm x 15 cm x 30 cm - Buah 1,400.00
21 Batako 6 cm x 15 cm x 30 cm - Buah 1,300.00
1 2 3 4 5
22 Batako 7 cm x 20 cm x 40 cm (press) - Buah 2,300.00
23 Batako 9 cm x 20 cm x 40 cm (press) - Buah 2,400.00
24 Kerawang ( roster ) uk.18 x 18 cm - Buah 22,100.00
25 Kerawang press (roster) uk.30 x 30 cm - Buah 47,800.00
26 Keramik uk. 10 cm x 20 cm - Kotak 54,900.00
27 Keramik uk. 20 cm x 20 cm (polos) - Kotak 65,500.00
1 2 3 4 5
28 Keramik uk. 20 cm x 20 cm ( Corak ) - Kotak 68,200.00
29 Keramik uk. 25 cm x 33 cm Kotak 69,500.00
30 Keramik uk. 30 cm x 30 cm (polos biasa) - Kotak 53,100.00
31 Keramik uk. 30 cm x 30 cm (corak biasa) - Kotak 60,200.00
32 Keramik uk. 30 cm x 30 cm Artistik (setaraf Decogress) Kotak 108,100.00
33 Keramik uk. 40 cm x 40 cm (polos biasa) - Kotak 62,000.00
34 Keramik uk. 40 cm x 40 cm (corak biasa) - Kotak 74,400.00
35 Keramik uk. 40 cm x 40 cm (granite tile) - Kotak 199,400.00
36 Keramik uk. 60 cm x 60 cm Polished (setaraf Indogress) - Kotak 287,100.00
37 Keramik uk. 60 cm x 60 cm Polished (setaraf Decogress) - Kotak 208,200.00
38 Plint Keramik 10 x 30 cm - Bh 12,400.00
39 Plint Keramik 10 x 40 cm - Bh 15,900.00
40 Wood Flooring - M 261,400.00
41 List Keramik uk 2 cm x 10 cm - Bh 900.00
42 List Keramik WC. Uk. 8 cm x 20 cm - Bh 10,600.00
43 Plint Kayu uk. 2 cm x 10 cm - Bh 54,900.00
44 Batu Tempel Hitam uk.5 x 10 cm - M 203,800.00
45 Batu Paras uk. 5 x 10 cm - M 203,800.00
46 Floor Hardener - Kg 14,700.00
47 Beton Ready Mix B 0 - M 837,400.00
48 Beton Ready Mix K-125 - M 886,100.00
49 Beton Ready Mix K-150 - M 908,300.00
50 Beton Ready Mix K-175 - M 939,300.00
51 Beton Ready Mix K-200 - M 1,004,900.00
52 Beton Ready Mix K-225 - M 1,027,900.00
53 Beton Ready Mix K-250 - M 1,085,600.00
54 Beton Ready Mix K-275 - M 1,098,800.00
1 2 3 4 5
55 Beton Ready Mix K-300 - M 1,116,500.00
56 Beton Ready Mix K-325 - M 1,157,800.00
57 Beton Ready Mix K-350 - M 1,178,600.00
1 2 3 4 5
58 Beton Ready Mix K-375 - M 1,220,700.00
59 Beton Ready Mix K-400 - M 1,246,400.00
60 Beton Ready Mix K-425 - M 1,269,400.00
61 Beton Ready Mix K-450 - M 1,284,900.00
62 Beton Ready Mix K-475 - M 1,332,800.00
63 Beton Ready Mix K-500 - M 1,361,600.00
64 Additive Ready Mix - Liter 44,300.00
65 Karung Goni Curing Beton ( 0.7m ) - Lembar 12,100.00
66 Mini Pile Segi Empat Ukuran 20 x 20 CM K 350, Pj = 6 m - M' 1,156,400.00
67 Mini Pile Segi Empat Ukuran 25 x 25 CM K 350, Pj = 6 m - M' 1,513,200.00
68 Mini Pile Segitiga Ukuran 28 x 28 CM K 350, Pj = 6 m - M' 838,700.00
69 Mini Pile Segitiga Ukuran 32 x 32 CM K 350, Pj = 6 m - M' 951,900.00
70 Sewa Pompa Ready Mix (Min. 100 M) - M 35,400.00
71 Bahan Plastik Cor Beton - M 3,800.00
-
C. BAHAN KAYU -
1 Kayu Belian Tidak Ketam uk. 4 cm x 8 cm x 4 m - M 8,550,200.00
2 Kayu Belian Tidak Ketam uk. 6 cm x 6 cm x 4 m - M 12,000,300.00
3 Kayu Belian Tidak Ketam uk. 7 cm x 7 cm x 4 m - M 9,698,200.00
4 Kayu Belian Tidak Ketam uk. 8 cm x 8 cm x 4 m - M 8,325,200.00
5 Kayu Belian Tidak Ketam uk. 8 cm x 16 cm x 4 m - M 6,490,600.00
6 Kayu Belian Tidak Ketam uk. 9 cm x 9 cm x 4 m - M 8,355,800.00
7 Kayu Belian Tidak Ketam uk.10 cm x 10 cm x 4 m - M 9,360,200.00
8 Kayu Belian Tidak Ketam uk.12 cm x 12 cm x 4 m - M 11,963,300.00
9 Kayu Belian Tidak Ketam uk.15 cm x 15 cm x 4 m - M 14,178,700.00
10 Kayu Belian Tidak Ketam uk.5 cm x 10 cm x 4 m - M 8,773,100.00
11 Kayu Belian Ketam uk. 6 cm x 6 cm x 4 m - M 13,200,300.00
1 2 3 4 5
12 Kayu Belian Ketam uk. 7 cm x 7 cm x 4 m - M 10,579,900.00
13 Kayu Belian Ketam uk. 8 cm x 8 cm x 4 m - M 9,000,200.00
14 Kayu Belian Ketam uk. 3 cm x 7 cm x 4 m - M 12,765,200.00
15 Kayu Belian Ketam uk. 4 cm x 8 cm x 4 m - M 9,900,200.00
16 Kayu Belian Ketam uk. 5 cm x 10 cm x 4 m - M 9,504,200.00
17 Papan Belian Tidak Ketam uk.2,5 cm x 16 cm x 4 m M.181.d M 11,908,000.00
1 2 3 4 5
18 Papan Belian Ketam uk. 2 cm x 16 cm x 4 m M.181.e M 15,231,100.00
19 Kayu kls I Bengkirai Tidak Ketam uk. 7 cm x 7 cm x 4 m - M 5,877,800.00
20 Kayu kls I Bengkirai Tidak Ketam uk. 8 cm x 8 cm x 4 m M.181.g M 6,057,800.00
21 Papan kls I Tidak Ketam - M 8,307,900.00
22 Kayu kls I Bengkirai Ketam uk. 7 cm x 7 cm x 4 m - M 6,103,800.00
23 Kayu kls I Bengkirai Ketam uk. 8 cm x 8 cm x 4 m M.181.f M 6,230,900.00
24 Papan kls I Ketam - M 6,914,100.00
25 Kayu kls I Bengkirai Ketam uk. 5 cm x 10 cm x 4 m - M 6,203,200.00
26 Kayu kls II Tidak Ketam uk.3 cm x 5 cm x 4 m - M 2,954,000.00
27 Kayu kls II Tidak Ketam uk.4 cm x 6 cm x 4 m - M 2,769,300.00
28 Kayu kls II Tidak Ketam uk.4 cm x 8 cm x 4 m - M 3,461,700.00
29 Kayu kls II Tidak Ketam uk.5 cm x 7 cm x 4 m - M 3,481,400.00
30 Kayu kls II Tidak Ketam uk.5 cm x 10 cm x 4 m - M 5,538,500.00
31 Kayu kls II Tidak Ketam uk.6 cm x 10 cm x 4 m - M 4,984,700.00
32 Kayu kls II Tidak Ketam uk.6 cm x 12 cm x 4 m - M 4,153,900.00
33 Kayu kls II Tidak Ketam uk.7 cm x 7 cm x 4 m - M 4,069,200.00
34 Kayu kls II Tidak Ketam uk.8 cm x 8 cm x 4 m - M 3,288,600.00
35 Kayu kls II Tidak Ketam uk.8 cm x 12 cm x 4 m - M 3,115,500.00
36 Kayu kls II Tidak Ketam uk.8 cm x 15 cm x 4 m - M 3,230,900.00
37 Kayu kls II Tidak Ketam uk.10 cm x 10 cm x 4 m - M 3,142,900.00
38 Papan kls II Tidak Ketam uk.2,5 cm x 20 cm x 4 m M.181.j M 6,646,300.00
39 Kayu kls II Ketam uk.5 cm x 10 cm x 4 m - M 6,203,200.00
40 Kayu kls II Ketam uk.8 cm x 8 cm x 4 m - M 3,807,800.00
41 Kayu kls II Ketam uk.7 cm x 7 cm x 4 m - M 4,521,400.00
42 Kayu kls II Ketam uk.6 cm x 6 cm x 4 m - M 5,230,900.00
43 Kayu kls II Ketam uk.3 cm x 7 cm x 4 m - M 6,857,300.00
44 Kayu kls II Ketam uk.3 cm x 5 cm x 4 m - M 5,907,900.00
1 2 3 4 5
45 Papan kls II Ketam uk.1,8 cm x 18 cm x 4 m M.181.k M 6,154,000.00
46 Papan kls II Ketam uk.1 cm x 7 cm x 4 m M.181.k M 7,279,300.00
47 Kayu kls III Tidak Ketam uk.3 cm x 5 cm x 4 m - M 2,514,200.00
48 Kayu kls III Tidak Ketam uk.4 cm x 6 cm x 4 m - M 2,095,300.00
49 Kayu kls III Tidak Ketam uk.5 cm x 7 cm x 4 m - M 2,514,200.00
1 2 3 4 5
50 Kayu kls III Tidak Ketam uk.5 cm x 10 cm x 4 m - M 2,765,700.00
51 Kayu kls III Tidak Ketam uk.6 cm x 12 cm x 4 m - M 1,781,000.00
52 Kayu kls III Tidak Ketam uk.8 cm x 8 cm x 4 m - M 1,964,400.00
53 Kayu kls III Tidak Ketam uk.8 cm x 12 cm x 4 m - M 2,095,300.00
54 Papan kls III Tidak Ketam uk.2 cm x 18 cm x 4 m M.181.l M 2,095,300.00
55 Papan Simpiran - M 963,900.00
56 Kayu Profil - Batang 25,300.00
57 Kayu cerucuk /dolken 4 - 6 - Pj. 4 M - Batang 7,200.00
58 Kayu cerucuk /dolken 6 - 8 - Pj. 4 M - Batang 10,200.00
59 Kayu cerucuk /dolken 8 - 10 - Pj. 4 M - Batang 13,200.00
60 Kayu cerucuk /dolken 10 - 12 - Pj. 12 M - Batang 80,200.00
61 Kayu cerucuk /dolken 12 - 15 Pj. 12 M - Batang 98,200.00
62 Kayu untuk Perancah - M 859,900.00
63 Kayu Simpiran - M 177,200.00
64 Kayu Bakar - M 79,300.00
65 Alat-alat Bantu M. 170 Set 89,500.00
66 Alas laci - Btg 15,200.00
-
D. BAHAN CAT -
1 Amplas Besi - Lembar 3,500.00
2 Amplas Kayu - Lembar 6,200.00
3 Plamur - Kg 29,700.00
4 Cat Dasar - Kg 23,000.00
5 Cat Kilat - Kg 53,100.00
6 Cat Tembok - Kg 64,100.00
7 Cat tembok type weather shield - Kg 88,900.00
8 Cat tembok type weather coat (acrylic) - Kg 85,500.00
1 2 3 4 5
9 Cat seng - Kg 40,600.00
10 Cat Marka Jalan - Kg 59,300.00
11 Cat Weatherbond - Kg 36,300.00
12 Cat Water Proofing - Kg 44,300.00
13 Dempul - Kg 33,500.00
14 Plitur - Kg 47,800.00
1 2 3 4 5
15 Thiner M.090.f Ltr 23,500.00
16 Cat Melamic - Ltr 57,100.00
17 Cat Pilox - Klg 23,100.00
18 Meni - Kg 48,700.00
19 Teer - Liter 53,500.00
20 Oker Warna ( Induk ) - Kg 66,500.00
21 Oker Warna ( Biasa ) - Kg 12,400.00
22 Lem Fox ( Putih ) - Kg 15,700.00
23 Lem Fox ( Kuning ) - Kg 42,100.00
24 Sealent - Tube 44,300.00
25 Soda Api - Kg 20,400.00
26 Sabun / cream pembersih kotoran - Kg 19,400.00
27 Teak Oil - Liter 54,900.00
28 Kuas 4" - Buah 21,200.00
-
E. BAHAN BESI DAN ALUMINIUM -
1 Besi Beton Polos - Kg 15,100.00
2 Besi Beton Ulir - Kg 15,900.00
3 Besi wire mesh 5 - Kg 10,600.00
4 Kawat baja/bendrat M.168 Kg 19,400.00
5 Kawat Simpai Roll - Kg 18,600.00
6 Kawat Nyamuk Besi - M 15,900.00
7 Kawat Nyamuk Plastik - M 8,800.00
8 Kawat Saringan Pasir - M 10,600.00
9 Kawat harmonika - M 23,800.00
10 Kawat Kasa - M 14,600.00
11 Baut Baja 4" Panjang 20 cm - Buah 4,900.00
1 2 3 4 5
12 Baut Baja 4" Panjang 30 cm - Buah 6,700.00
13 Baut Baja 4" Panjang 40 cm - Buah 8,400.00
14 Beugel plat L. 3 cm - bh 15,900.00
15 Besi Penahan Buah 15,900.00
16 Besi Plat Tebal 2 mm - Lembar 407,600.00
17 Besi Plat Tebal 2,5 mm - Lembar 451,900.00
1 2 3 4 5
18 Besi Konstruksi (I, H) - Kg 20,400.00
19 Besi Konstruksi ( C ) - Kg 20,200.00
20 Besi Konstruksi (Siku ) - Kg 20,200.00
21 Kawat Las - Kg 101,900.00
22 Folding gate - M 620,300.00
23 Kusen Alumunium 3" - M' 110,800.00
24 Kusen Alumunium 4" - M' 115,200.00
25 Kusen dan Pintu PVC Toilet - Unit 310,100.00
26 Pintu Alumunium + Engsel Tanam - uk. 90 x 215 cm - Unit 2,481,200.00
27 Pintu Alumunium + Engsel Kupu-kupu - uk. 90 x 215 cm - Unit 1,595,100.00
28 Rangka Baja Ringan Zincalume (truss/color) (Tanpa Jurai Dalam - Bentang s/d 16 m) - M 212,900.00
29 Rangka Baja Ringan Zincalume (truss/color) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m) - M 250,800.00
30 Rangka Baja Ringan Zincalume (truss/color) (Dengan Jurai Dalam - Bentang s/d 16m) - M 226,000.00
31 Rangka Baja Ringan Zincalume (truss/color) (Dengan Jurai Dalam - Bentang 17 m s/d 30 m) - M 285,300.00
32 Rangka Baja Ringan Zincalume (truss/polos) (Tanpa Jurai Dalam - Bentang s/d 16 m) - M 167,500.00
33 Rangka Baja Ringan Zincalume (truss/polos) (Tanpa Jurai Dalam - Bentang 17 m s/d 30 m) - M 211,800.00
34 Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang s/d 16m) - M 177,200.00
35 Rangka Baja Ringan Zincalume (truss/polos) (Dengan Jurai Dalam - Bentang 17 m s/d 30 m) - M 232,100.00
36 Alumunium Komposit + Rangka Besi - M 886,100.00
37 Rangka Plafond Metal Furing + Pemasangan - M 132,900.00
38 Besi Hollow stainless steel 20 x 20 - Batang 132,900.00
39 Besi Hollow stainless steel 30 x 30 - Batang 188,300.00
40 Besi Hollow stainless steel 20 x 40 - Batang 194,900.00
41 Besi Hollow stainless steel 40 x 40 - Batang 252,500.00
42 Besi Hollow biasa 20 x 20 - Batang 55,400.00
43 Besi Hollow biasa 30 x 30 - Batang 83,100.00
44 Besi Hollow biasa 20 x 40 - Batang 69,300.00
1 2 3 4 5
45 Besi Hollow biasa 40 x 40 - Batang 98,600.00
46 Besi Pipa Stainless Stell /2 "
1
- Batang 61,000.00
47 Besi Pipa Stainless Stell 3/4 " - Batang 90,800.00
48 Besi Pipa Stainless Stell 1 " - Batang 117,400.00
1 2 3 4 5
49 Besi Pipa Stainless Stell 1 1/2 " - Batang 182,800.00
50 Besi Pipa Stainless Stell 2 " - Batang 239,200.00
51 Besi Pipa Stainless Stell 2 1/2 " - Batang 318,000.00
52 Besi Pipa Stainless Stell 3 " - Batang 387,700.00
-
F. BAHAN PENGANTUNG -
1 Engsel Kupu-kupu 3" ( biasa ) - Kotak 7,500.00
2 Engsel Kupu-kupu 3" ( Stainles ) - Kotak 13,300.00
3 Engsel Kupu-kupu 4" ( biasa ) - Kotak 8,400.00
4 Engsel Kupu-kupu 4" ( Stainles ) - Kotak 26,100.00
5 Slot Jendela ( Biasa ) - Buah 5,700.00
6 Slot Jendela ( Stainles ) - Buah 7,500.00
7 Slot Pintu ( Biasa ) - Buah 4,900.00
8 Slot Pintu ( Stainles ) - Buah 16,800.00
9 Kunci tanam 2 slag (setaraf Belluci) - Buah 160,500.00
10 Kunci tanam 1 slag - Buah 145,700.00
11 Kunci silinder - Buah 55,700.00
12 Kunci Tanam Kecil - Buah 53,100.00
13 Door Closer - Buah 199,400.00
14 Door Stoper - Buah 79,700.00
15 Pegangan Pintu ( Biasa ) - Buah 75,300.00
16 Pegangan Pintu ( Stainles ) - Buah 132,900.00
17 Pegangan Jendela ( Biasa ) - Buah 4,400.00
18 Pegangan Jendela ( Stainles ) - Buah 14,100.00
19 Kait Angin ( Biasa ) - Buah 4,400.00
20 Kait Angin ( Stainles ) - Buah 17,700.00
21 Paku Campuran M.166.b Kg 18,600.00
1 2 3 4 5
22 Paku Seng M.166.a Kg 20,300.00
23 Paku Atap Metal - Kg 11,300.00
24 Paku GRC - kg 22,100.00
25 Paku / sekrup Gypsum - Buah 300.00
26 Paku Triplek - Kg 26,500.00
27 Paku Beton - Kg 28,300.00
1 2 3 4 5
28 Sekrup Fixer - Buah 2,200.00
29 Sekrup Steel Sheet - Buah 500.00
30 Sekrup Zincalume Buah 600.00
-
G. BAHAN ATAP -
1 Genteng Metal Permata 0,25 mm (720 mm x 770 mm) Lembar 46,200.00
2 Genteng Metal Permata 0,30 mm (720 mm x 770 mm) Lembar 56,300.00
3 Genteng Metal Permata 0,35 mm (720 mm x 770 mm) Lembar 52,000.00
4 Genteng Metal Classic 0,25 mm (800 mm x 770 mm) Lembar 31,000.00
5 Genteng Metal Classic 0,30 mm (800 mm x 770 mm) Lembar 39,900.00
6 Genteng Metal Classic 0,35 mm (800 mm x 770 mm) Lembar 45,200.00
7 Genteng Metal Stone Permata 2 x 5 (875 mm x 770 mm) Lembar 93,000.00
8 Genteng Metal Color Permata 2 x 5 (875 mm x 770 mm) Lembar 78,900.00
9 Genteng Metal Stone Classic 2 x 5 (1000 mm x 770 mm) Lembar 86,400.00
10 Genteng Metal Stone Royal 2 x 4 (760 mm x 770 mm) Lembar 69,800.00
11 Genteng Metal Color Royal 2 x 4 (760 mm x 770 mm) Lembar 51,000.00
12 Genteng Metal Stone Permata 2 x 4 (720 mm x 770 mm) Lembar 69,800.00
13 Genteng Metal Color Permata 2 x 4 (720 mm x 770 mm) Lembar 51,000.00
14 Genteng Metal Stone Classic 2 x 4 (800 mm x 770 mm) Lembar 63,400.00
15 Genteng Metal ColorClassic 2 x 4 (800 mm x 770 mm) Lembar 46,300.00
16 Nok Genteng Metal Raja stone panjang 104 cm Lembar 48,700.00
17 Nok Genteng Metal Raja color panjang 104 cm Lembar 42,500.00
18 Nok Genteng Metal Ratu stone panjang 91 cm Lembar 42,500.00
19 Nok Genteng Metal Ratu color panjang 91 cm Lembar 37,200.00
20 Nok Genteng Metal Putri stone panjang 109 cm Lembar 40,700.00
21 Nok Genteng Metal Putri color panjang 109 cm Lembar 35,400.00
22 Seng Gelombang Bjls 20 - Lembar 42,400.00
1 2 3 4 5
23 Seng Gelombang Bjls 30 - Lembar 57,100.00
24 Seng Plat Bjls 20 - Lembar 44,600.00
25 Seng Plat Bjls 30 - Lembar 59,200.00
26 Zincalume Gelombang Persegi 0.35 (polos) - M 119,600.00
27 Zincalume Gelombang Persegi 0.30 (polos) - M 106,300.00
28 Zincalume Gelombang Persegi 0.35 (color) - M 137,300.00
1 2 3 4 5
29 Zincalume Gelombang Persegi 0.30 (color) - M 106,300.00
30 Zincalume Plat 0.2 - Lembar 124,000.00
31 Aluminium Foil - M 53,100.00
32 Atap Plastik Gelombang - Lembar 62,000.00
-
H. BAHAN KACA -
1 Kaca Bening uk 8 mm - M 334,500.00
2 Kaca Bening uk. 5 mm - M 132,900.00
3 Kaca Bening uk. 3 mm - M 119,600.00
4 Kaca Bening uk. 2 mm - M 62,000.00
5 Kaca Rayban uk. 5 mm - M 203,800.00
6 Kaca Rayban uk. 3 mm - M 181,700.00
7 Kaca Cermin uk. 2 mm - M 230,400.00
-
I. BAHAN TRIPLEK -
1 Triplek t uk 3 mm - Lembar 62,800.00
2 Triplek t uk 4 mm - Lembar 65,500.00
3 Triplek t uk 6 mm - Lembar 128,500.00
4 Triplek t uk 9 mm - Lembar 137,300.00
5 Multiplek t uk 10 mm - Lembar 247,100.00
6 Multiplek t uk 12 mm - Lembar 250,700.00
7 Poliwood uk 4 mm x 122 cm x 244 cm - Lembar 102,600.00
8 Teakwood uk 3 mm x 122 cm x 244 cm - Lembar 124,800.00
9 Papan GRC uk 4 mm x 122 cm x 244 cm - Lembar 53,100.00
10 Panel GRC 120 x 240 x 40 - Lembar 71,300.00
11 Gypsum Board uk. 9 x 120 x 240 cm - Lembar 66,800.00
12 Tepung Gypsum - Kg 5,400.00
1 2 3 4 5
13 List profil gypsum - M' 57,700.00
1 2 3 4 5
-
J. BAHAN SANITASI -
1 Kloset duduk monoblok - Buah 2,629,900.00
2 Kloset duduk (setaraf TOTO) - Buah 1,995,500.00
3 Kloset jongkok (setaraf TOTO) - Buah 300,400.00
4 Kloset jongkok (setaraf INA) - Buah 169,900.00
5 Urinoir (setaraf TOTO) - Buah 1,668,900.00
6 Wastafel Alumunium - Buah 221,500.00
7 Wastafel Keramik - Buah 310,100.00
8 Bak Cuci Stainles 1 Lubang - Buah 265,800.00
9 Bak Cuci Stainles 2 lubang - Buah 443,000.00
10 Keran air 1/2" (RRC) - Buah 31,000.00
11 Keran air 1/2" (Lokal) - Buah 13,300.00
12 Shower Spray (setaraf TOTO) - Buah 300,400.00
13 Shower Set - Buah 1,471,000.00
14 Seal Tape - Buah 2,200.00
15 Lem PVC - Tube 6,200.00
16 Floor Drain - Buah 14,100.00
17 Bak air fibreglass uk. 55x55x60 cm - Buah 398,700.00
18 Pipa GIV Dia 1/2" Panjang 6 m - Batang 97,400.00
19 Pipa GIV Dia 3/4" Panjang 6 m - Batang 128,500.00
20 Pipa GIV Dia 1 " Panjang 6 m - Batang 163,900.00
21 Pipa GIV Dia 1 1/2" Panjang 6 m - Batang 239,200.00
22 Pipa GIV 2"/Btg - 6 M Tebal 1,8 - Batang 274,700.00
23 Pipa GIV 2 1/2"/Btg - 6 M Tebal 2 - Batang 302,200.00
24 Pipa GIV 3"/Btg - 6 M Tebal 2,3 - Batang 526,300.00
25 Pipa GIV 4"/Btg - 6 M Tebal 2,3 - Batang 682,300.00
1 2 3 4 5
26 Pipa Paralon PVC uk. 1/2" (AW) Panjang : 4 M - Batang 16,800.00
27 Pipa paralon PVC uk. 3/4" (AW)Panjang : 4 M - Batang 21,200.00
28 Pipa Paralon PVC uk.1" (AW) Panjang : 4 M - Batang 28,300.00
29 Pipa Paralon PVC uk.1 1/2" (AW) Panjang : 4 M - Batang 47,800.00
30 Pipa Paralon PVC uk.2" (AW) Panjang : 4 M - Batang 66,500.00
1 2 3 4 5
31 Pipa Paralon PVC uk.2 1/2" (AW) Panjang :4 M - Batang 88,600.00
32 Pipa Paralon PVC uk.3" (AW) Panjang : 4 M - Batang 110,800.00
33 Pipa Paralon PVC uk.4" (AW) Panjang : 4 M - Batang 186,000.00
34 Pipa Paralon PVC uk.1/2" ( C ) Panjang : 4 M - Batang 12,000.00
35 Pipa Paralon PVC uk.3/4" ( C ) Panjang : 4 M - Batang 14,600.00
36 Pipa Paralon PVC uk.1" ( C ) Panjang : 4 M - Batang 18,600.00
37 Pipa Paralon PVC uk.1 1/2" ( D ) Panjang : 4 M - Batang 39,900.00
38 Pipa Paralon PVC uk.2" ( D ) Panjang : 4 M - Batang 50,500.00
39 Pipa Paralon PVC uk.2.5" ( D ) Panjang : 4 M - Batang 60,200.00
40 Pipa Paralon PVC uk.3" ( D ) Panjang : 4 M - Batang 75,300.00
41 Pipa Paralon PVC uk.4" ( D ) Panjang : 4 M - Batang 110,800.00
42 Piber Glas 0,5 M3 - Buah 797,500.00
43 Piber Glas 1 M3 - Buah 1,284,900.00
44 Piber Glas 1,5 M3 - Buah 2,082,500.00
45 Piber Glas 2 M3 - Buah 2,747,100.00
46 Piber Glas 3 M3 - Buah 4,076,400.00
47 Ball Valve 16 mm - Buah 19,400.00
48 Double Niple GI 16 mm - Buah 6,000.00
49 F. Elbouw PVC 16 mm - Buah 10,600.00
50 Elbouw PVC 16 mm - Buah 3,500.00
51 Reducer PVC 20 x 16 mm - Buah 5,300.00
52 DOV PVC 16 mm - Buah 1,700.00
-
K. BAHAN MINYAK -
1 Minyak Tanah Non Subsidi M 065 Liter 8,500.00
2 Minyak Diesel/Solar (Industri) M 183 Liter 4,600.00
3 Bensin Premium (Industri) M 184 Liter 5,700.00
1 2 3 4 5
4 Minyak Pelumas M 185 Liter 25,700.00
5 Oli BEO 154W40/Cat - Liter 50,500.00
6 Gas Elpiji - Kg 15,900.00
7 Sewa Alat Untuk Pengelasan - Set 67,300.00
8 Sewa kuali termasuk angkutan - Set 69,100.00
1 2 3 4 5
-
L. BAHAN ALAT-ALAT LISTRIK -
1 Tiang Besi ukuran 5,4,3 Inchi tebal 3 mm Panjang 9 M - Batang 2,658,500.00
2 Tiang Besi ukuran 4,3,2.5 Inchi tebal 3 mm Panjang 7 M - Batang 2,304,000.00
3 Fourt Clamp - Buah 2,200.00
4 Traffo HPiT 250 watt - Buah 230,400.00
5 Capasitor HPI 250 watt - Buah 37,700.00
6 Bola Lampu HPI 250 watt - Buah 172,300.00
7 Traffo TL 10 Watt - Buah 35,400.00
8 HPL 400 Watt - Buah 77,900.00
9 HPL 250 Watt - Buah 62,000.00
10 HPL 125 Watt - Buah 32,800.00
11 SOX 135 Watt - Buah 443,000.00
12 SOX 180 Watt - Buah 567,100.00
13 MLL 160 Watt - Buah 44,300.00
14 SON T 400 Watt - Buah 114,300.00
15 SON T 250 Watt - Buah 106,300.00
16 SON T 150 Watt - Buah 94,800.00
17 SON T 70 Watt - Buah 73,500.00
18 Box Besi Ukuran 50 x 40 x 20 - Buah 221,500.00
19 Pijar 5 Watt - Buah 2,400.00
20 Pijar 20 Watt - Buah 3,900.00
21 Pijar 25 Watt - Buah 3,900.00
22 Pijar 40 Watt - Buah 3,900.00
23 Pijar 60 Watt - Buah 5,500.00
24 Pijar 75 Watt - Buah 5,500.00
25 Pijar 80 Watt - Buah 4,400.00
1 2 3 4 5
26 Pijar 100 Watt - Buah 6,900.00
27 Pijar 200 Watt - Buah 15,100.00
28 Lampu XL 14 Watt - Buah 34,100.00
29 Lampu Sorot 300 Watt - Buah 28,300.00
30 Lampu Mercury 125 Watt - Buah 57,600.00
31 Lampu Mercury 250 Watt - Buah 124,000.00
1 2 3 4 5
32 Lampu LX Ukuran 11 Watt - Buah 31,900.00
33 Lampu LX Ukuran 18 Watt - Buah 35,400.00
34 Lampu LX (Spiral)Uk. 19 Watt - Buah 43,400.00
35 Lampu LX (Spiral)Uk. 25 Watt - Buah 47,400.00
36 Lampu LX (Spiral)Uk. 32 Watt - Buah 55,400.00
37 Lampu LX (Spiral)Uk. 42 Watt - Buah 66,500.00
38 Lampu Neon (TL Panjang) 10 Watt - Buah 8,800.00
39 Lampu Neon (TL Panjang) 20 Watt - Buah 11,500.00
40 Lampu Neon (TL Panjang) 40 Watt - Buah 13,300.00
41 Lampu Neon Essential 5 watt - Buah 23,400.00
42 Lampu Neon Essential 8 watt - Buah 25,500.00
43 Lampu Neon Essential 11 watt - Buah 29,800.00
44 Lampu Neon Essential 14 watt - Buah 31,900.00
45 Lampu Neon Essential 18 watt - Buah 32,900.00
46 Lampu Neon Essential 23 watt - Buah 39,300.00
47 Lampu Hologen 500 Watt - Buah 53,100.00
48 Lampu Hologen 1.000 Watt - Buah 110,800.00
49 Lampu Hologen 1.500 Watt - Buah 124,000.00
50 Lampu Spot Light - Buah 70,800.00
51 Kap Lampu Kobra Bahan Besi Cor - Buah 354,400.00
52 Kap Lampu Kobra Bahan Fiber Buah 177,200.00
53 NYY 1 x 1.5 mm - Meter 3,600.00
54 NYY 1 x 2.5 mm - Meter 2,900.00
55 NYY 1 x 4 mm - Meter 4,400.00
56 NYY 1 x 6 mm - Meter 6,300.00
57 NYY 2 x 2.5 mm - Meter 11,600.00
58 NYY 2 x 4 mm - Meter 15,300.00
1 2 3 4 5
59 NYY 2 x 6 mm - Meter 19,900.00
60 NYY 3 x 4 mm - Meter 20,800.00
61 NYY 4 x 2.5 mm - Meter 15,900.00
62 NYY 4 x 4 mm - Meter 24,800.00
63 NYY 4 x 6 mm - Meter 37,600.00
64 NYY 4 x 10 mm - Meter 52,500.00
1 2 3 4 5
65 NYY 4 x 16 mm - Meter 78,400.00
66 NYY 4 x 25 mm - Meter 123,200.00
67 NYY 4 x 35 mm - Meter 159,900.00
68 NYY 4 x 50 mm - Meter 220,200.00
69 NYA 1 x 1,5 mm - Meter 3,100.00
70 NYA 1 x 2,5 mm - Meter 4,400.00
71 NYA 1 x 4 mm - Meter 5,700.00
72 NYA 1 x 6 mm - Meter 9,500.00
73 NYM 4 mm - Meter 5,100.00
74 NYM 3 x 4 mm - Meter 16,600.00
75 NYM 2 x 2 mm - Meter 8,400.00
76 NYM 2 x 4 mm - Meter 12,800.00
77 NYM 2 x 2,5 mm - Meter 9,100.00
78 NYM 2 x 1,5 mm - Meter 7,500.00
79 NYM 3 x 1,5 mm - Meter 8,800.00
80 NYM 3 x 2,5 mm - Meter 11,500.00
81 NYM 3 x 10 mm - Meter 38,100.00
82 NYM 4 x 2,5 mm - Meter 13,700.00
83 NYM 4 x 4 mm - Meter 21,200.00
84 Kabel Senur - Roll 57,600.00
85 Kabel Tester - Meter 28,800.00
86 Kabel Box - Box 56,700.00
87 Kabel Mic Transparan - Roll 177,200.00
88 Kabel Antena - Roll 106,300.00
89 Kabel Telepon - Meter 1,700.00
90 Kabel TC 2 x 10 mm - Meter 4,200.00
91 Kabel TC 2 x 16 mm - Meter 6,200.00
1 2 3 4 5
92 Box TL 20 Watt - Buah 33,200.00
93 Box MCB 1 Group - Buah 3,500.00
94 Magnetick Contactor 25 A - Buah 221,500.00
95 Magnetick Contactor 50 A - Buah 309,300.00
96 Magnetick Contactor 100 A - Buah 596,200.00
97 Fitting Gantung E 27 - Buah 13,300.00
1 2 3 4 5
98 Fitting Duduk (Plafond) - Buah 8,800.00
99 Fitting Kombinasi - Buah 7,000.00
100 Fitting Hologen - Buah 28,300.00
101 Icnitor SN 58 - Buah 50,000.00
102 Insulock - Buah 500.00
103 Kapasitor - Buah 159,500.00
104 Kap Hijau E 27 - Buah 12,400.00
105 Kap Hijau E 40 - Buah 15,900.00
106 Kap Lampu - Buah 100,100.00
107 k. Skum 10-8 - Buah 1,000.00
108 MCB 1 A - Buah 32,800.00
109 MCB 2 A - Buah 29,800.00
110 MCB 4 A - Buah 46,000.00
111 MCB 6 A - Buah 54,000.00
112 MCB 10 A - Buah 56,700.00
113 MCB 16 A - Buah 61,100.00
114 MCB 25 A - Buah 27,500.00
115 MCB 32 A - Buah 75,800.00
116 MCB 45 A - Buah 77,500.00
117 MCB 50 A - Buah 81,900.00
118 MCB 63 A - Buah 56,800.00
119 MCB Box - Buah 3,500.00
120 Multi Tester - Buah 99,200.00
121 Full Bracket - Buah 15,900.00
122 Ornamen Gantung - Buah 49,600.00
123 Obeng Plus - Buah 36,300.00
124 Obeng Minus - Buah 36,300.00
1 2 3 4 5
125 Opstic 1/2" lengkap klem - Batang 221,500.00
126 Pipa Besi - Batang 85,900.00
127 Pipa Ornamen dia 1,25" x 1 m - Batang 54,000.00
128 Pipa Ornamen dia 1,5" x 2 m - Batang 132,900.00
129 Pipa Ornamen dia 2" x 3 m - Batang 155,100.00
130 Pipa Ornamen dia 2" x 4 m - Batang 168,300.00
1 2 3 4 5
131 Pipa Ornamen dia 2" x 6 m Batang 177,200.00
132 Pres Conector - Buah 3,100.00
133 Rangka Ring 32 Watt - Buah 14,100.00
134 Rel MCB - Buah 21,200.00
135 Saklar Double - Buah 16,700.00
136 Saklar Engkel - Buah 16,800.00
137 Saklar Tripel - Buah 17,300.00
138 Terminal Blok 25 amp - Buah 9,500.00
139 Solder Pistol - Buah 316,800.00
140 Solder - Buah 21,700.00
141 Stop Kontak - Buah 4,400.00
142 Steker Arde - Buah 8,700.00
143 Steker T - Buah 10,200.00
144 Steker PH - Buah 3,100.00
145 Sadel No. 6 - Bungkus 4,400.00
146 Sadel No. 8 - Bungkus 4,900.00
147 Sadel No. 9 - Bungkus 5,700.00
148 Sadel No. 10 - Bungkus 6,200.00
149 Sadel No. 12 - Bungkus 7,300.00
150 Sadel No. 14 - Bungkus 11,500.00
151 Sadel No. 19 - Bungkus 16,800.00
152 Sadel No. 22 - Bungkus 12,800.00
153 Skun RS-16 - Buah 1,500.00
154 Stater - Buah 3,700.00
155 Tedus Hitam - Buah 900.00
156 Tali Tester - Buah 21,700.00
157 Tang Amper - Buah 886,100.00
1 2 3 4 5
158 Tang Buaya - Buah 28,300.00
159 Tang Potong - Buah 28,300.00
160 Tang Kombinasi - Buah 28,300.00
161 Tang Jepit - Buah 28,300.00
162 Tang Skun - Buah 265,800.00
163 Time Swicht Theben - Buah 354,400.00
1 2 3 4 5
164 Taping Conector 1 baut - Buah 17,100.00
165 Taping Conector 2 baut - Buah 24,100.00
166 Tespen - Buah 18,100.00
167 Timah Solder - Buah 21,200.00
168 Terminal 25 ml - Buah 35,400.00
169 Wait Clam - Buah 6,200.00
170 Klem Tiang uk. Lebar 1,5" x dia 3" lengkap - Set 37,200.00
171 Klem Tiang uk. Lebar 1,5" x dia 5" lengkap - Set 41,600.00
172 Fhoto Shell 10 A merk Selcon - Buah 123,200.00
173 Dead And - Buah 5,300.00
174 Isolasi - Buah 6,700.00
175 Rel Alumunium (dudukan MCB) - Meter 30,100.00
-
N. TANAMAN HIAS -
1 Palm Ponik - Batang 39,900.00
2 Palm Raja 2,5 m - Batang 345,600.00
3 Palm Raja 2 m - Batang 310,100.00
4 Palm Raja 1 m - Batang 234,800.00
5 Palm Raja 1,5 m - Batang 150,600.00
6 Palm Raja 0,5 m - Batang 115,200.00
7 Palm Ekor Tupai 2,5 m - Batang 491,800.00
8 Palm Ekor Tupai 2 m - Batang 389,900.00
9 Palm Ekor Tupai 1 m - Batang 372,100.00
10 Palm Ekor Tupai 0,5 m - Batang 217,100.00
11 Palm Kamdoria 1 m - Batang 132,900.00
12 Palm Kamdoria - Batang 75,300.00
13 Palm Putri 1,5 m - Batang 323,400.00
1 2 3 4 5
14 Serut 2 m - Batang 3,544,600.00
15 Serut 1,5 m - Batang 2,215,400.00
16 Serut 1 m - Batang 1,152,000.00
17 Cemara Udang 2 m - Batang 3,633,300.00
1 2 3 4 5
18 Cemara Udang 1,5 m - Batang 2,215,400.00
19 Cemara Udang 1 m - Batang 1,152,000.00
20 Cemara Tiang 2 m - Batang 194,400.00
21 Cemara Tiang 1,5 m - Batang 147,400.00
22 Cemara Tiang 1 m - Batang 112,000.00
23 Cemara Mas 80 cm - Batang 312,300.00
24 Cemara Mas 50 cm - Batang 100,200.00
25 Cemara Norflok 70 cm - Batang 100,200.00
26 Cemara Norflok 1 m - Batang 170,900.00
27 Cemara Pinus 1,5 m - Batang 194,400.00
28 Cemara Pinus 1 m - Batang 123,800.00
29 Bougenvil - Batang 135,600.00
30 Nolima 2 m - Batang 771,700.00
31 Nolima 1 m - Batang 382,900.00
32 Sirlon 120 cm - Batang 265,100.00
33 Sirlon 60 cm - Batang 83,700.00
34 Tri Color - Batang 35,400.00
35 Asoka - Batang 17,800.00
36 Sambangdara - Batang 53,000.00
37 Pedang - Pedangan - Batang 14,800.00
38 Ki Hujan Bongkol - Batang 135,600.00
39 Ki Hujan Bulat - Batang 24,100.00
40 Nusa Indah - Batang 13,000.00
41 Sikas 1 m - Batang 1,655,100.00
42 Sikas 50 cm - Batang 1,066,100.00
43 Sikas 30 cm - Batang 536,000.00
44 Agave - Batang 82,500.00
1 2 3 4 5
45 Wali Songo - Batang 653,800.00
46 Lantana - Batang 10,600.00
47 Rambusa - Batang 41,300.00
48 Miramta - Batang 17,800.00
49 Asam Keranji - Batang 23,700.00
50 Heli Konia - Batang 11,900.00
51 Song Of India - Batang 53,000.00
52 Beringin Korea - Batang 2,597,400.00
53 Tombak Raja - Batang 217,900.00
54 Pandan Bali Persit - Batang 335,800.00
55 Pandan Bali Cabang - Batang 653,800.00
56 Pandan Kuning - Batang 16,600.00
57 Tanjung 1 m - Batang 15,300.00
58 Tanjung 2 m - Batang 82,500.00
59 Tanjung 3 m - Batang 194,400.00
60 Sapu Tangan 2 m - Batang 112,000.00
61 Kasia Golden 1,5 m - Batang 94,300.00
62 Rumput Golf - M2 20,800.00
63 Rumput Manila - M2 23,700.00
64 Puring - Batang 20,200.00
65 Melati Kosta - Batang 94,300.00
66 Anggrek Tanah - Batang 16,600.00
67 Lili Bombai - Batang 17,800.00
68 Lili Bakung - Batang 16,600.00
69 Lili Paris Putih - Batang 13,000.00
70 Nanas Merah - Batang 23,700.00
71 Amander - Batang 17,800.00
1 2 3 4 5
72 Puring Z - Batang 23,700.00
73 Anjuang - Batang 11,900.00
74 Pakis Kelabang - Batang 11,900.00
75 Lidah Mertua - Batang 11,900.00
76 Lapender - Batang 17,800.00
77 Batavia - Batang 23,700.00
78 Sambang Dara - Batang 29,500.00
79 Pillo Denrum - Batang 17,800.00
80 Evorria - Batang 23,700.00
81 Bayam - bayaman - Batang 9,600.00
82 Aglonema Lokal - Batang 29,500.00
1 2 3 4 5
83 Katus Kodok - Batang 10,600.00
84 Kipranrus - Batang 29,500.00
85 Siklok Besar - Batang 100,200.00
86 Siklok Kecil - Batang 53,000.00
87 Helokomin - Batang 11,900.00
88 Pisang Betet - Batang 17,800.00
89 Kana - Batang 11,900.00
90 Adenium - Batang 64,800.00
91 Bromedia - Batang 11,900.00
92 Echinacea/pucuk merah 50 cm - Batang 49,300.00
-
M. LAIN-LAIN -
1 Pintu Air Sorong Uk. 0,40 s/d 0,60 m - Unit 2,835,700.00
2 Pintu Air Ulir Uk. 0,60 s/d 0,80 m - Unit 6,380,400.00
3 Pintu Air Ulir Uk. 0,90 s/d 1,20 m - Unit 7,621,000.00
4 Gorong2 Beton 40 cm Tanpa Tulang - M1 163,900.00
5 Gorong2 Beton 60 cm Tanpa Tulang M 031 M1 261,400.00
6 Gorong2 Beton 80 cm Tanpa Tulang M 033 M1 354,400.00
7 Gorong2 Beton 100 cm Tanpa Tulang M 035 M1 483,000.00
AR HARGA SATUAN UPAH DAN BAHAN
WILAYAH I
KETERANGAN
BENSIN
SOLAR
CRF pada i PELUMAS
sebesar 12,5 % i
HARGA PERALATAN
Wilayah I
5,700.00
4,600.00 CATATAN :
25,700.00 - HARGA BAHAN BAKAR DAN PELUMAS MENGIKUTI PEDOMAN HARGA SK BUPATI (PER WILAYAH)
12.5% - KONSTANTA MENGIKUTI PANDUAN ANALISIS HARGA SATUAN 008/BM/2008 (NOPEMBER 2008)
PENDUKUNG SPESIFIKASI UMUM EDISI DESEMBER 2006 (kolom 9 s/d 15)
- ANALISA HARGA ALAT PER JAM INI DIGUNAKAN UNTUK PERHITUNGAN HARGA SATUAN
PEKERJAAN DENGAN ANALISA K ( PETUNJUK TEKNIK NOMOR : 015/T/Bt/1995)
- KHUSUS ALAT ASPHALT MIXING PLANT DITAMBAH BIAYA BAHAN BAKAR PEMANASAN MATERIAL
DENGAN RUMUS 12 X 0,7 X KAPASITAS X BAHAN BAKAR
STANDAR HARGA SATUAN UPAH DAN BAHAN
WILAYAH II
1 2 3 4 5
A. UPAH
1 Mandor Lapangan L 061 Hari 172,500.00
2 Mekanik L 071 Hari 155,250.00
3 Mekanik Pembantu L 072 Hari 115,000.00
4 Kepala Tukang L 073 Hari 172,500.00
5 Tukang L 079 Hari 149,500.00
6 Operator Terlatih *) L 081 Hari 172,500.00
7 Operator Kurang Terlatih **) L 082 Hari 126,500.00
8 Pembantu Operator L 083 Hari 115,000.00
9 Supir Material / Truck L 091 Hari 138,000.00
10 Supir Personil L 092 Hari 138,000.00
11 Pembantu Supir / Kernet L 099 Hari 115,000.00
12 Buruh Lapangan Terlatih L 106 Hari 138,000.00
13 Buruh Lapangan Agak Terlatih L 103 Hari 126,500.00
14 Buruh Lapangan Tak Terlatih L 101 Hari 115,000.00
15 Penjaga Api - Hari 103,500.00
16 Penjaga Malam - Hari 103,500.00
Catatan : *) Operator yang sudah biasa dan terampil mengoperasikan
jenis peralatan untuk melayani pekerjaan berat
Misal : Bulldozer, Grader, Wheel, Loader, Asphalt Finisher, dll
1 2 3 4 5
B. BAHAN PENGISI
1 Batu Kong M.101 M 232,300.00
2 Batu Sap Pinang - M 259,400.00
3 Batu pecah 15-20 cm - M 319,500.00
4 Batu pecah 10-15 cm M.020 M 330,100.00
5 Batu pecah 5-7 cm M.022 M 412,700.00
6 Batu pecah 3-5 cm M.023 M 341,900.00
7 Batu pecah 2-3 cm M.024 M 383,200.00
8 Batu pecah 1-2 cm M.025 M 483,400.00
9 Batu pecah 0,5 - 1 cm M.026 M 530,500.00
10 Stone Dust - M 403,400.00
11 Aspal Bitumen 60/70 - Kg 17,300.00
12 Pasir Urug M.040 M 117,900.00
13 Pasir Ayak Untuk Beton (Pasir Kasar/Merah) M.041 M 194,600.00
14 Semen PC (50 Kg) M.080 Zak 88,500.00
15 Semen Putih (40 Kg) - Zak 159,200.00
16 Timbunan Tanah Biasa M 92,000.00
17 Timbunan Tanah Pilihan M.050.a M 136,800.00
18 Paving Block - Buah 3,200.00
19 Batu Bata 5 cm x 11 cm x 22 cm Buah 3,500.00
20 Batako 7 cm x 15 cm x 30 cm - Buah 2,000.00
21 Batako 6 cm x 15 cm x 30 cm - Buah 1,900.00
22 Batako 7 cm x 20 cm x 40 cm (press) - Buah 3,200.00
1 2 3 4 5
23 Batako 9 cm x 20 cm x 40 cm (press) - Buah 3,300.00
24 Kerawang ( roster ) uk.18 x 18 cm - Buah 29,600.00
25 Kerawang press (roster) uk.30 x 30 cm - Buah 63,800.00
26 Keramik uk. 10 cm x 20 cm - Kotak 73,200.00
27 Keramik uk. 20 cm x 20 cm (polos) - Kotak 87,300.00
28 Keramik uk. 20 cm x 20 cm ( Corak ) - Kotak 90,900.00
1 2 3 4 5
29 Keramik uk. 25 cm x 33 cm Kotak 92,600.00
30 Keramik uk. 30 cm x 30 cm (polos biasa) - Kotak 70,800.00
31 Keramik uk. 30 cm x 30 cm (corak biasa) - Kotak 80,200.00
32 Keramik uk. 30 cm x 30 cm Artistik (setaraf Decogress) Kotak 143,900.00
33 Keramik uk. 40 cm x 40 cm (polos biasa) - Kotak 82,600.00
34 Keramik uk. 40 cm x 40 cm (corak biasa) - Kotak 99,100.00
35 Keramik uk. 40 cm x 40 cm (granite tile) - Kotak 265,400.00
36 Keramik uk. 60 cm x 60 cm Polished (setaraf Indogress) - Kotak 382,000.00
37 Keramik uk. 60 cm x 60 cm Polished (setaraf Decogress) - Kotak 277,100.00
38 Plint Keramik 10 x 30 cm - Bh 16,600.00
39 Plint Keramik 10 x 40 cm - Bh 21,300.00
40 Wood Flooring - M 347,800.00
41 List Keramik uk 2 cm x 10 cm - Bh 1,300.00
42 List Keramik WC. Uk. 8 cm x 20 cm - Bh 14,200.00
43 Plint Kayu uk. 2 cm x 10 cm - Bh 73,200.00
44 Batu Tempel Hitam uk.5 x 10 cm - M 271,200.00
45 Batu Paras uk. 5 x 10 cm - M 271,200.00
46 Floor Hardener - Kg 19,700.00
47 Beton Ready Mix B 0 - M 1,114,100.00
48 Beton Ready Mix K-125 - M 1,178,800.00
49 Beton Ready Mix K-150 - M 1,208,400.00
50 Beton Ready Mix K-175 - M 1,249,500.00
51 Beton Ready Mix K-200 - M 1,336,800.00
52 Beton Ready Mix K-225 - M 1,367,400.00
53 Beton Ready Mix K-250 - M 1,444,100.00
54 Beton Ready Mix K-275 - M 1,461,700.00
55 Beton Ready Mix K-300 - M 1,485,300.00
1 2 3 4 5
56 Beton Ready Mix K-325 - M 1,540,100.00
57 Beton Ready Mix K-350 - M 1,567,800.00
58 Beton Ready Mix K-375 - M 1,623,800.00
59 Beton Ready Mix K-400 - M 1,658,000.00
60 Beton Ready Mix K-425 - M 1,688,700.00
61 Beton Ready Mix K-450 - M 1,709,300.00
1 2 3 4 5
62 Beton Ready Mix K-475 - M 1,772,900.00
63 Beton Ready Mix K-500 - M 1,811,300.00
64 Additive Ready Mix - Liter 59,000.00
65 Karung Goni Curing Beton ( 0.7m ) - Lembar 16,300.00
66 Mini Pile Segi Empat Ukuran 20 x 20 CM K 350, Pj = 6 m - M' 1,538,400.00
67 Mini Pile Segi Empat Ukuran 25 x 25 CM K 350, Pj = 6 m - M' 2,012,800.00
68 Mini Pile Segitiga Ukuran 28 x 28 CM K 350, Pj = 6 m - M' 1,115,800.00
69 Mini Pile Segitiga Ukuran 32 x 32 CM K 350, Pj = 6 m - M' 1,266,200.00
70 Sewa Pompa Ready Mix (Min. 100 M) - M 47,200.00
71 Bahan Plastik Cor Beton - M 5,200.00
C. BAHAN KAYU
1 Kayu Belian Tidak Ketam uk. 4 cm x 8 cm x 4 m - M 11,373,200.00
2 Kayu Belian Tidak Ketam uk. 6 cm x 6 cm x 4 m - M 15,962,400.00
3 Kayu Belian Tidak Ketam uk. 7 cm x 7 cm x 4 m - M 12,900,200.00
4 Kayu Belian Tidak Ketam uk. 8 cm x 8 cm x 4 m - M 11,073,900.00
5 Kayu Belian Tidak Ketam uk. 8 cm x 16 cm x 4 m - M 8,633,600.00
6 Kayu Belian Tidak Ketam uk. 9 cm x 9 cm x 4 m - M 11,114,600.00
7 Kayu Belian Tidak Ketam uk.10 cm x 10 cm x 4 m - M 12,450,600.00
8 Kayu Belian Tidak Ketam uk.12 cm x 12 cm x 4 m - M 15,913,200.00
9 Kayu Belian Tidak Ketam uk.15 cm x 15 cm x 4 m - M 18,860,000.00
10 Kayu Belian Tidak Ketam uk.5 cm x 10 cm x 4 m - M 11,669,700.00
11 Kayu Belian Ketam uk. 6 cm x 6 cm x 4 m - M 17,558,600.00
12 Kayu Belian Ketam uk. 7 cm x 7 cm x 4 m - M 14,072,900.00
13 Kayu Belian Ketam uk. 8 cm x 8 cm x 4 m - M 11,971,800.00
14 Kayu Belian Ketam uk. 3 cm x 7 cm x 4 m - M 16,979,700.00
15 Kayu Belian Ketam uk. 4 cm x 8 cm x 4 m - M 13,168,900.00
1 2 3 4 5
16 Kayu Belian Ketam uk. 5 cm x 10 cm x 4 m - M 12,642,200.00
17 Papan Belian Tidak Ketam uk.2,5 cm x 16 cm x 4 m M.181.d M 15,839,600.00
18 Papan Belian Ketam uk. 2 cm x 16 cm x 4 m M.181.e M 20,259,800.00
19 Kayu kls I Bengkirai Tidak Ketam uk. 7 cm x 7 cm x 4 m - M 7,818,300.00
1 2 3 4 5
20 Kayu kls I Bengkirai Tidak Ketam uk. 8 cm x 8 cm x 4 m M.181.g M 8,058,000.00
21 Papan kls I Tidak Ketam - M 11,050,900.00
22 Kayu kls I Bengkirai Ketam uk. 7 cm x 7 cm x 4 m - M 8,119,000.00
23 Kayu kls I Bengkirai Ketam uk. 8 cm x 8 cm x 4 m M.181.f M 8,288,200.00
24 Papan kls I Ketam - M 9,196,900.00
25 Kayu kls I Bengkirai Ketam uk. 5 cm x 10 cm x 4 m - M 8,251,300.00
26 Kayu kls II Tidak Ketam uk.3 cm x 5 cm x 4 m - M 3,929,300.00
27 Kayu kls II Tidak Ketam uk.4 cm x 6 cm x 4 m - M 3,683,700.00
28 Kayu kls II Tidak Ketam uk.4 cm x 8 cm x 4 m - M 4,604,600.00
29 Kayu kls II Tidak Ketam uk.5 cm x 7 cm x 4 m - M 4,630,900.00
30 Kayu kls II Tidak Ketam uk.5 cm x 10 cm x 4 m - M 7,367,300.00
31 Kayu kls II Tidak Ketam uk.6 cm x 10 cm x 4 m - M 6,630,600.00
32 Kayu kls II Tidak Ketam uk.6 cm x 12 cm x 4 m - M 5,525,500.00
33 Kayu kls II Tidak Ketam uk.7 cm x 7 cm x 4 m - M 5,412,800.00
34 Kayu kls II Tidak Ketam uk.8 cm x 8 cm x 4 m - M 4,374,400.00
35 Kayu kls II Tidak Ketam uk.8 cm x 12 cm x 4 m - M 4,144,200.00
36 Kayu kls II Tidak Ketam uk.8 cm x 15 cm x 4 m - M 4,297,600.00
37 Kayu kls II Tidak Ketam uk.10 cm x 10 cm x 4 m - M 4,180,600.00
38 Papan kls II Tidak Ketam uk.2,5 cm x 20 cm x 4 m M.181.j M 8,840,700.00
39 Kayu kls II Ketam uk.5 cm x 10 cm x 4 m - M 8,251,300.00
40 Kayu kls II Ketam uk.8 cm x 8 cm x 4 m - M 5,065,000.00
41 Kayu kls II Ketam uk.7 cm x 7 cm x 4 m - M 6,014,100.00
42 Kayu kls II Ketam uk.6 cm x 6 cm x 4 m - M 6,958,000.00
43 Kayu kls II Ketam uk.3 cm x 7 cm x 4 m - M 9,121,400.00
44 Kayu kls II Ketam uk.3 cm x 5 cm x 4 m - M 7,858,500.00
45 Papan kls II Ketam uk.1,8 cm x 18 cm x 4 m M.181.k M 8,185,900.00
46 Papan kls II Ketam uk.1 cm x 7 cm x 4 m M.181.k M 9,682,700.00
1 2 3 4 5
47 Kayu kls III Tidak Ketam uk.3 cm x 5 cm x 4 m - M 3,344,400.00
48 Kayu kls III Tidak Ketam uk.4 cm x 6 cm x 4 m - M 2,787,200.00
49 Kayu kls III Tidak Ketam uk.5 cm x 7 cm x 4 m - M 3,344,400.00
50 Kayu kls III Tidak Ketam uk.5 cm x 10 cm x 4 m - M 3,678,900.00
51 Kayu kls III Tidak Ketam uk.6 cm x 12 cm x 4 m - M 2,369,200.00
1 2 3 4 5
52 Kayu kls III Tidak Ketam uk.8 cm x 8 cm x 4 m - M 2,613,000.00
53 Kayu kls III Tidak Ketam uk.8 cm x 12 cm x 4 m - M 2,787,200.00
54 Papan kls III Tidak Ketam uk.2 cm x 18 cm x 4 m M.181.l M 2,787,200.00
55 Papan Simpiran - M 1,282,200.00
56 Kayu Profil - Batang 33,700.00
57 Kayu cerucuk /dolken 4 - 6 - Pj. 4 M - Batang 9,600.00
58 Kayu cerucuk /dolken 6 - 8 - Pj. 4 M - Batang 13,600.00
59 Kayu cerucuk /dolken 8 - 10 - Pj. 4 M - Batang 17,600.00
60 Kayu cerucuk /dolken 10 - 12 - Pj. 12 M - Batang 106,800.00
61 Kayu cerucuk /dolken 12 - 15 Pj. 12 M - Batang 135,600.00
62 Kayu untuk Perancah - M 1,144,000.00
63 Kayu Simpiran - M 235,800.00
64 Kayu Bakar - M 105,600.00
65 Alat-alat Bantu M. 170 Set 119,200.00
66 Alas laci - Btg 20,300.00
D. BAHAN CAT
1 Amplas Besi - Lembar 4,800.00
2 Amplas Kayu - Lembar 8,300.00
3 Plamur - Kg 39,600.00
4 Cat Dasar - Kg 30,800.00
5 Cat Kilat - Kg 70,800.00
6 Cat Tembok - Kg 85,500.00
7 Cat tembok type weather shield - Kg 118,400.00
8 Cat tembok type weather coat (acrylic) - Kg 113,900.00
9 Cat seng - Kg 54,200.00
10 Cat Marka Jalan - Kg 78,977.00
1 2 3 4 5
11 Cat Weatherbond - Kg 48,500.00
12 Cat Water Proofing - Kg 59,000.00
13 Dempul - Kg 44,800.00
14 Plitur - Kg 63,800.00
15 Thiner M.090.f Ltr 31,300.00
16 Cat Melamic - Ltr 76,100.00
1 2 3 4 5
17 Cat Pilox - Klg 30,900.00
18 Meni - Kg 64,900.00
19 Teer - Liter 71,300.00
20 Oker Warna ( Induk ) - Kg 88,500.00
21 Oker Warna ( Biasa ) - Kg 16,600.00
22 Lem Fox ( Putih ) - Kg 21,100.00
23 Lem Fox ( Kuning ) - Kg 56,100.00
24 Sealent - Tube 59,000.00
25 Soda Api - Kg 27,300.00
26 Sabun / cream pembersih kotoran - Kg 26,000.00
27 Teak Oil - Liter 73,200.00
28 Kuas 4" - Buah 28,300.00
F. BAHAN PENGANTUNG
1 Engsel Kupu-kupu 3" ( biasa ) - Kotak 10,200.00
2 Engsel Kupu-kupu 3" ( Stainles ) - Kotak 17,800.00
3 Engsel Kupu-kupu 4" ( biasa ) - Kotak 11,300.00
4 Engsel Kupu-kupu 4" ( Stainles ) - Kotak 34,900.00
5 Slot Jendela ( Biasa ) - Buah 7,800.00
6 Slot Jendela ( Stainles ) - Buah 10,200.00
7 Slot Pintu ( Biasa ) - Buah 6,600.00
8 Slot Pintu ( Stainles ) - Buah 22,500.00
9 Kunci tanam 2 slag (setaraf Belluci) - Buah 213,600.00
10 Kunci tanam 1 slag - Buah 194,100.00
11 Kunci silinder - Buah 74,100.00
12 Kunci Tanam Kecil - Buah 70,800.00
13 Door Closer - Buah 265,400.00
14 Door Stoper - Buah 106,200.00
15 Pegangan Pintu ( Biasa ) - Buah 100,300.00
16 Pegangan Pintu ( Stainles ) - Buah 176,900.00
17 Pegangan Jendela ( Biasa ) - Buah 6,000.00
18 Pegangan Jendela ( Stainles ) - Buah 18,800.00
19 Kait Angin ( Biasa ) - Buah 6,000.00
20 Kait Angin ( Stainles ) - Buah 23,600.00
21 Paku Campuran M.166.b Kg 24,900.00
1 2 3 4 5
22 Paku Seng M.166.a Kg 27,100.00
23 Paku Atap Metal - Kg 15,100.00
24 Paku GRC - kg 29,600.00
25 Paku / sekrup Gypsum - Buah 500.00
26 Paku Triplek - Kg 35,500.00
27 Paku Beton - Kg 37,800.00
1 2 3 4 5
28 Sekrup Fixer - Buah 3,000.00
29 Sekrup Steel Sheet - Buah 900.00
30 Sekrup Zincalume Buah 1,000.00
G. BAHAN ATAP
1 Genteng Metal Permata 0,25 mm (720 mm x 770 mm) Lembar 61,600.00
2 Genteng Metal Permata 0,30 mm (720 mm x 770 mm) Lembar 74,900.00
3 Genteng Metal Permata 0,35 mm (720 mm x 770 mm) Lembar 69,300.00
4 Genteng Metal Classic 0,25 mm (800 mm x 770 mm) Lembar 41,300.00
5 Genteng Metal Classic 0,30 mm (800 mm x 770 mm) Lembar 53,200.00
6 Genteng Metal Classic 0,35 mm (800 mm x 770 mm) Lembar 60,200.00
7 Genteng Metal Stone Permata 2 x 5 (875 mm x 770 mm) Lembar 123,900.00
8 Genteng Metal Color Permata 2 x 5 (875 mm x 770 mm) Lembar 105,000.00
9 Genteng Metal Stone Classic 2 x 5 (1000 mm x 770 mm) Lembar 115,000.00
10 Genteng Metal Stone Royal 2 x 4 (760 mm x 770 mm) Lembar 92,900.00
11 Genteng Metal Color Royal 2 x 4 (760 mm x 770 mm) Lembar 67,900.00
12 Genteng Metal Stone Permata 2 x 4 (720 mm x 770 mm) Lembar 92,900.00
13 Genteng Metal Color Permata 2 x 4 (720 mm x 770 mm) Lembar 67,900.00
14 Genteng Metal Stone Classic 2 x 4 (800 mm x 770 mm) Lembar 84,300.00
15 Genteng Metal ColorClassic 2 x 4 (800 mm x 770 mm) Lembar 61,700.00
16 Nok Genteng Metal Raja stone panjang 104 cm Lembar 64,900.00
17 Nok Genteng Metal Raja color panjang 104 cm Lembar 56,600.00
18 Nok Genteng Metal Ratu stone panjang 91 cm Lembar 56,600.00
19 Nok Genteng Metal Ratu color panjang 91 cm Lembar 49,600.00
20 Nok Genteng Metal Putri stone panjang 109 cm Lembar 54,300.00
21 Nok Genteng Metal Putri color panjang 109 cm Lembar 47,200.00
22 Seng Gelombang Bjls 20 - Lembar 56,500.00
1 2 3 4 5
23 Seng Gelombang Bjls 30 - Lembar 76,200.00
24 Seng Plat Bjls 20 - Lembar 59,500.00
25 Seng Plat Bjls 30 - Lembar 78,800.00
26 Zincalume Gelombang Persegi 0.35 (polos) - M 159,200.00
27 Zincalume Gelombang Persegi 0.30 (polos) - M 141,500.00
28 Zincalume Gelombang Persegi 0.35 (color) - M 182,800.00
1 2 3 4 5
29 Zincalume Gelombang Persegi 0.30 (color) - M 161,600.00
30 Zincalume Plat 0.2 - Lembar 165,100.00
31 Aluminium Foil - M 70,800.00
32 Atap Plastik Gelombang - Lembar 82,600.00
H. BAHAN KACA
1 Kaca Bening uk 8 mm - M 445,100.00
2 Kaca Bening uk. 5 mm - M 176,900.00
3 Kaca Bening uk. 3 mm - M 159,200.00
4 Kaca Bening uk. 2 mm - M 82,600.00
5 Kaca Rayban uk. 5 mm - M 271,200.00
6 Kaca Rayban uk. 3 mm - M 241,800.00
7 Kaca Cermin uk. 2 mm - M 306,500.00
I. BAHAN TRIPLEK
1 Triplek t uk 3 mm - Lembar 83,500.00
2 Triplek t uk 4 mm - Lembar 87,300.00
3 Triplek t uk 6 mm - Lembar 171,100.00
4 Triplek t uk 9 mm - Lembar 182,800.00
5 Multiplek t uk 10 mm - Lembar 328,700.00
6 Multiplek t uk 12 mm - Lembar 333,500.00
7 Poliwood uk 4 mm x 122 cm x 244 cm - Lembar 136,600.00
8 Teakwood uk 3 mm x 122 cm x 244 cm - Lembar 166,100.00
9 Papan GRC uk 4 mm x 122 cm x 244 cm - Lembar 70,800.00
10 Panel GRC 120 x 240 x 40 - Lembar 95,000.00
11 Gypsum Board uk. 9 x 120 x 240 cm - Lembar 88,900.00
12 Tepung Gypsum - Kg 7,300.00
1 2 3 4 5
J. BAHAN SANITASI
1 Kloset duduk monoblok - Buah 3,498,200.00
2 Kloset duduk (setaraf TOTO) - Buah 2,654,400.00
3 Kloset jongkok (setaraf TOTO) - Buah 399,700.00
1 2 3 4 5
4 Kloset jongkok (setaraf INA) - Buah 226,100.00
5 Urinoir (setaraf TOTO) - Buah 2,220,000.00
6 Wastafel Alumunium - Buah 294,800.00
7 Wastafel Keramik - Buah 412,700.00
8 Bak Cuci Stainles 1 Lubang - Buah 353,700.00
9 Bak Cuci Stainles 2 lubang - Buah 589,400.00
10 Keran air 1/2" (RRC) - Buah 41,300.00
11 Keran air 1/2" (Lokal) - Buah 17,800.00
12 Shower Spray (setaraf TOTO) - Buah 399,700.00
13 Shower Set - Buah 1,956,800.00
14 Seal Tape - Buah 3,000.00
15 Lem PVC - Tube 8,300.00
16 Floor Drain - Buah 18,900.00
17 Bak air fibreglass uk. 55x55x60 cm - Buah 530,500.00
18 Pipa GIV Dia 1/2" Panjang 6 m - Batang 129,800.00
19 Pipa GIV Dia 3/4" Panjang 6 m - Batang 171,100.00
20 Pipa GIV Dia 1 " Panjang 6 m - Batang 218,200.00
21 Pipa GIV Dia 1 1/2" Panjang 6 m - Batang 318,400.00
22 Pipa GIV 2"/Btg - 6 M Tebal 1,8 - Batang 365,500.00
23 Pipa GIV 2 1/2"/Btg - 6 M Tebal 2 - Batang 402,100.00
24 Pipa GIV 3"/Btg - 6 M Tebal 2,3 - Batang 700,300.00
25 Pipa GIV 4"/Btg - 6 M Tebal 2,3 - Batang 907,700.00
26 Pipa Paralon PVC uk. 1/2" (AW) Panjang : 4 M - Batang 22,500.00
27 Pipa paralon PVC uk. 3/4" (AW)Panjang : 4 M - Batang 28,300.00
28 Pipa Paralon PVC uk.1" (AW) Panjang : 4 M - Batang 37,800.00
29 Pipa Paralon PVC uk.1 1/2" (AW) Panjang : 4 M - Batang 63,800.00
30 Pipa Paralon PVC uk.2" (AW) Panjang : 4 M - Batang 88,500.00
1 2 3 4 5
31 Pipa Paralon PVC uk.2 1/2" (AW) Panjang :4 M - Batang 117,900.00
32 Pipa Paralon PVC uk.3" (AW) Panjang : 4 M - Batang 147,500.00
33 Pipa Paralon PVC uk.4" (AW) Panjang : 4 M - Batang 247,600.00
34 Pipa Paralon PVC uk.1/2" ( C ) Panjang : 4 M - Batang 16,000.00
35 Pipa Paralon PVC uk.3/4" ( C ) Panjang : 4 M - Batang 19,600.00
36 Pipa Paralon PVC uk.1" ( C ) Panjang : 4 M - Batang 24,900.00
1 2 3 4 5
37 Pipa Paralon PVC uk.1 1/2" ( D ) Panjang : 4 M - Batang 53,200.00
38 Pipa Paralon PVC uk.2" ( D ) Panjang : 4 M - Batang 67,300.00
39 Pipa Paralon PVC uk.2.5" ( D ) Panjang : 4 M - Batang 80,200.00
40 Pipa Paralon PVC uk.3" ( D ) Panjang : 4 M - Batang 100,300.00
41 Pipa Paralon PVC uk.4" ( D ) Panjang : 4 M - Batang 147,500.00
42 Piber Glas 0,5 M3 - Buah 1,060,900.00
43 Piber Glas 1 M3 - Buah 1,709,300.00
44 Piber Glas 1,5 M3 - Buah 2,770,200.00
45 Piber Glas 2 M3 - Buah 3,654,200.00
46 Piber Glas 3 M3 - Buah 5,422,300.00
47 Ball Valve 16 mm - Buah 26,000.00
48 Double Niple GI 16 mm - Buah 8,000.00
49 F. Elbouw PVC 16 mm - Buah 14,200.00
50 Elbouw PVC 16 mm - Buah 4,800.00
51 Reducer PVC 20 x 16 mm - Buah 7,200.00
52 DOV PVC 16 mm - Buah 2,500.00
K. BAHAN MINYAK
1 Minyak Tanah Non Subsidi M 065 Liter 11,400.00
2 Minyak Diesel/Solar (Industri) M 183 Liter 6,100.00
3 Bensin Premium (Industri) M 184 Liter 7,800.00
4 Minyak Pelumas M 185 Liter 34,300.00
5 Oli BEO 154W40/Cat - Liter 67,300.00
6 Gas Elpiji - Kg 21,300.00
7 Sewa Alat Untuk Pengelasan - Set 89,600.00
8 Sewa kuali termasuk angkutan - Set 92,000.00
1 2 3 4 5
N. TANAMAN HIAS
1 Palm Ponik - Batang 53,200.00
2 Palm Raja 2,5 m - Batang 459,800.00
3 Palm Raja 2 m - Batang 412,700.00
4 Palm Raja 1 m - Batang 312,500.00
5 Palm Raja 1,5 m - Batang 200,500.00
6 Palm Raja 0,5 m - Batang 153,300.00
7 Palm Ekor Tupai 2,5 m - Batang 654,300.00
1 2 3 4 5
8 Palm Ekor Tupai 2 m - Batang 518,700.00
9 Palm Ekor Tupai 1 m - Batang 495,100.00
10 Palm Ekor Tupai 0,5 m - Batang 288,900.00
11 Palm Kamdoria 1 m - Batang 176,900.00
12 Palm Kamdoria - Batang 100,300.00
13 Palm Putri 1,5 m - Batang 430,400.00
1 2 3 4 5
14 Serut 2 m - Batang 4,715,000.00
15 Serut 1,5 m - Batang 2,946,900.00
16 Serut 1 m - Batang 1,532,400.00
17 Cemara Udang 2 m - Batang 4,832,900.00
18 Cemara Udang 1,5 m - Batang 2,946,900.00
19 Cemara Udang 1 m - Batang 1,532,400.00
20 Cemara Tiang 2 m - Batang 258,700.00
21 Cemara Tiang 1,5 m - Batang 196,100.00
22 Cemara Tiang 1 m - Batang 149,100.00
23 Cemara Mas 80 cm - Batang 415,500.00
24 Cemara Mas 50 cm - Batang 133,400.00
25 Cemara Norflok 70 cm - Batang 133,400.00
26 Cemara Norflok 1 m - Batang 227,500.00
27 Cemara Pinus 1,5 m - Batang 258,700.00
28 Cemara Pinus 1 m - Batang 164,700.00
29 Bougenvil - Batang 180,500.00
30 Nolima 2 m - Batang 1,026,500.00
31 Nolima 1 m - Batang 509,500.00
32 Sirlon 120 cm - Batang 352,800.00
33 Sirlon 60 cm - Batang 111,500.00
34 Tri Color - Batang 47,200.00
35 Asoka - Batang 23,900.00
36 Sambangdara - Batang 70,700.00
37 Pedang - Pedangan - Batang 19,800.00
38 Ki Hujan Bongkol - Batang 180,500.00
39 Ki Hujan Bulat - Batang 32,200.00
40 Nusa Indah - Batang 17,400.00
1 2 3 4 5
41 Sikas 1 m - Batang 2,201,600.00
42 Sikas 50 cm - Batang 1,418,100.00
43 Sikas 30 cm - Batang 713,200.00
44 Agave - Batang 109,900.00
45 Wali Songo - Batang 869,800.00
1 2 3 4 5
46 Lantana - Batang 14,200.00
47 Rambusa - Batang 55,000.00
48 Miramta - Batang 23,900.00
49 Asam Keranji - Batang 31,600.00
50 Heli Konia - Batang 15,900.00
51 Song Of India - Batang 70,700.00
52 Beringin Korea - Batang 3,455,100.00
53 Tombak Raja - Batang 290,100.00
54 Pandan Bali Persit - Batang 446,700.00
55 Pandan Bali Cabang - Batang 869,800.00
56 Pandan Kuning - Batang 22,100.00
57 Tanjung 1 m - Batang 20,500.00
58 Tanjung 2 m - Batang 109,900.00
59 Tanjung 3 m - Batang 258,700.00
60 Sapu Tangan 2 m - Batang 149,100.00
61 Kasia Golden 1,5 m - Batang 125,500.00
62 Rumput Golf - M2 27,600.00
63 Rumput Manila - M2 31,600.00
64 Puring - Batang 27,000.00
65 Melati Kosta - Batang 125,500.00
66 Anggrek Tanah - Batang 22,100.00
67 Lili Bombai - Batang 23,900.00
68 Lili Bakung - Batang 22,100.00
69 Lili Paris Putih - Batang 17,400.00
70 Nanas Merah - Batang 31,600.00
71 Amander - Batang 23,900.00
72 Puring Z - Batang 31,600.00
1 2 3 4 5
73 Anjuang - Batang 15,900.00
74 Pakis Kelabang - Batang 15,900.00
75 Lidah Mertua - Batang 15,900.00
76 Lapender - Batang 23,900.00
77 Batavia - Batang 31,600.00
78 Sambang Dara - Batang 39,400.00
1 2 3 4 5
79 Pillo Denrum - Batang 23,900.00
80 Evorria - Batang 31,600.00
81 Bayam - bayaman - Batang 12,800.00
82 Aglonema Lokal - Batang 39,400.00
83 Katus Kodok - Batang 14,200.00
84 Kipranrus - Batang 39,400.00
85 Siklok Besar - Batang 133,400.00
86 Siklok Kecil - Batang 70,700.00
87 Helokomin - Batang 15,900.00
88 Pisang Betet - Batang 23,900.00
89 Kana - Batang 15,900.00
90 Adenium - Batang 86,400.00
91 Bromedia - Batang 15,900.00
92 Echinacea/pucuk merah 50 cm - Batang 65,700.00
M. LAIN-LAIN
1 Pintu Air Sorong Uk. 0,40 s/d 0,60 m - Unit 3,772,000.00
2 Pintu Air Ulir Uk. 0,60 s/d 0,80 m - Unit 8,487,000.00
3 Pintu Air Ulir Uk. 0,90 s/d 1,20 m - Unit 10,137,300.00
4 Gorong2 Beton 40 cm Tanpa Tulang - M1 218,200.00
5 Gorong2 Beton 60 cm Tanpa Tulang M 031 M1 347,800.00
6 Gorong2 Beton 80 cm Tanpa Tulang M 033 M1 471,500.00
7 Gorong2 Beton 100 cm Tanpa Tulang M 035 M1 642,600.00
AR HARGA SATUAN UPAH DAN BAHAN
WILAYAH II
KETERANGAN
BENSIN
SOLAR
CRF pada i PELUMAS
sebesar 12,5 % i
HARGA PERALATAN
Wilayah II
7,800.00
6,100.00 CATATAN :
34,300.00 - HARGA BAHAN BAKAR DAN PELUMAS MENGIKUTI PEDOMAN HARGA SK BUPATI (PER WILAYAH)
12.5% - KONSTANTA MENGIKUTI PANDUAN ANALISIS HARGA SATUAN 008/BM/2008 (NOPEMBER 2008)
PENDUKUNG SPESIFIKASI UMUM EDISI DESEMBER 2006 (kolom 9 s/d 15)
- ANALISA HARGA ALAT PER JAM INI DIGUNAKAN UNTUK PERHITUNGAN HARGA SATUAN
PEKERJAAN DENGAN ANALISA K ( PETUNJUK TEKNIK NOMOR : 015/T/Bt/1995)
- KHUSUS ALAT ASPHALT MIXING PLANT DITAMBAH BIAYA BAHAN BAKAR PEMANASAN MATERIAL
DENGAN RUMUS 12 X 0,7 X KAPASITAS X BAHAN BAKAR
STANDAR HARGA SATUAN UPAH DAN BAHAN
WILAYAH III
1 2 3 4 5
A. UPAH
1 Mandor Lapangan L 061 Hari 172,500.00
2 Mekanik L 071 Hari 155,250.00
3 Mekanik Pembantu L 072 Hari 115,000.00
4 Kepala Tukang L 073 Hari 172,500.00
5 Tukang L 079 Hari 149,500.00
6 Operator Terlatih *) L 081 Hari 172,500.00
7 Operator Kurang Terlatih **) L 082 Hari 126,500.00
8 Pembantu Operator L 083 Hari 115,000.00
9 Supir Material / Truck L 091 Hari 138,000.00
10 Supir Personil L 092 Hari 138,000.00
11 Pembantu Supir / Kernet L 099 Hari 115,000.00
12 Buruh Lapangan Terlatih L 106 Hari 138,000.00
13 Buruh Lapangan Agak Terlatih L 103 Hari 126,500.00
14 Buruh Lapangan Tak Terlatih L 101 Hari 115,000.00
15 Penjaga Api - Hari 103,500.00
16 Penjaga Malam - Hari 103,500.00
Catatan : *) Operator yang sudah biasa dan terampil mengoperasikan
jenis peralatan untuk melayani pekerjaan berat
Misal : Bulldozer, Grader, Wheel, Loader, Asphalt Finisher, dll
1 2 3 4 5
B. BAHAN PENGISI
1 Batu Kong M.101 M 238,000.00
2 Batu Sap Pinang - M 265,700.00
3 Batu pecah 15-20 cm - M 327,300.00
4 Batu pecah 10-15 cm M.020 M 338,100.00
5 Batu pecah 5-7 cm M.022 M 422,700.00
6 Batu pecah 3-5 cm M.023 M 350,200.00
7 Batu pecah 2-3 cm M.024 M 392,500.00
8 Batu pecah 1-2 cm M.025 M 495,100.00
9 Batu pecah 0,5 - 1 cm M.026 M 543,400.00
10 Stone Dust - M 413,200.00
11 Aspal Bitumen 60/70 - Kg 17,600.00
12 Pasir Urug M.040 M 120,800.00
13 Pasir Ayak Untuk Beton (Pasir Kasar/Merah) M.041 M 199,300.00
14 Semen PC (50 Kg) M.080 Zak 90,700.00
15 Semen Putih (40 Kg) - Zak 163,100.00
16 Timbunan Tanah Biasa M 94,200.00
17 Timbunan Tanah Pilihan M.050.a M 140,100.00
18 Paving Block - Buah 3,300.00
19 Batu Bata 5 cm x 11 cm x 22 cm Buah 3,600.00
20 Batako 7 cm x 15 cm x 30 cm - Buah 2,000.00
21 Batako 6 cm x 15 cm x 30 cm - Buah 1,900.00
22 Batako 7 cm x 20 cm x 40 cm (press) - Buah 3,300.00
1 2 3 4 5
23 Batako 9 cm x 20 cm x 40 cm (press) - Buah 3,400.00
24 Kerawang ( roster ) uk.18 x 18 cm - Buah 30,300.00
1 2 3 4 5
25 Kerawang press (roster) uk.30 x 30 cm - Buah 65,300.00
26 Keramik uk. 10 cm x 20 cm - Kotak 74,900.00
27 Keramik uk. 20 cm x 20 cm (polos) - Kotak 89,400.00
28 Keramik uk. 20 cm x 20 cm ( Corak ) - Kotak 93,100.00
29 Keramik uk. 25 cm x 33 cm Kotak 94,900.00
30 Keramik uk. 30 cm x 30 cm (polos biasa) - Kotak 72,500.00
31 Keramik uk. 30 cm x 30 cm (corak biasa) - Kotak 82,200.00
32 Keramik uk. 30 cm x 30 cm Artistik (setaraf Decogress) Kotak 147,400.00
33 Keramik uk. 40 cm x 40 cm (polos biasa) - Kotak 84,600.00
34 Keramik uk. 40 cm x 40 cm (corak biasa) - Kotak 101,500.00
35 Keramik uk. 40 cm x 40 cm (granite tile) - Kotak 271,800.00
36 Keramik uk. 60 cm x 60 cm Polished (setaraf Indogress) - Kotak 391,300.00
37 Keramik uk. 60 cm x 60 cm Polished (setaraf Decogress) - Kotak 283,900.00
38 Plint Keramik 10 x 30 cm - Bh 17,000.00
39 Plint Keramik 10 x 40 cm - Bh 21,800.00
40 Wood Flooring - M 356,300.00
41 List Keramik uk 2 cm x 10 cm - Bh 1,300.00
42 List Keramik WC. Uk. 8 cm x 20 cm - Bh 14,500.00
43 Plint Kayu uk. 2 cm x 10 cm - Bh 74,900.00
44 Batu Tempel Hitam uk.5 x 10 cm - M 277,800.00
45 Batu Paras uk. 5 x 10 cm - M 277,800.00
46 Floor Hardener - Kg 20,200.00
47 Beton Ready Mix B 0 - M 1,141,200.00
48 Beton Ready Mix K-125 - M 1,207,500.00
49 Beton Ready Mix K-150 - M 1,237,800.00
50 Beton Ready Mix K-175 - M 1,280,000.00
51 Beton Ready Mix K-200 - M 1,369,400.00
1 2 3 4 5
52 Beton Ready Mix K-225 - M 1,400,700.00
1 2 3 4 5
53 Beton Ready Mix K-250 - M 1,479,300.00
54 Beton Ready Mix K-275 - M 1,497,300.00
55 Beton Ready Mix K-300 - M 1,521,500.00
56 Beton Ready Mix K-325 - M 1,577,700.00
57 Beton Ready Mix K-350 - M 1,606,000.00
58 Beton Ready Mix K-375 - M 1,663,400.00
59 Beton Ready Mix K-400 - M 1,698,500.00
60 Beton Ready Mix K-425 - M 1,729,900.00
61 Beton Ready Mix K-450 - M 1,750,900.00
62 Beton Ready Mix K-475 - M 1,816,100.00
63 Beton Ready Mix K-500 - M 1,855,500.00
64 Additive Ready Mix - Liter 60,400.00
65 Karung Goni Curing Beton ( 0.7m ) - Lembar 16,600.00
66 Mini Pile Segi Empat Ukuran 20 x 20 CM K 350, Pj = 6 m - M' 1,575,900.00
67 Mini Pile Segi Empat Ukuran 25 x 25 CM K 350, Pj = 6 m - M' 2,061,900.00
68 Mini Pile Segitiga Ukuran 28 x 28 CM K 350, Pj = 6 m - M' 1,143,000.00
69 Mini Pile Segitiga Ukuran 32 x 32 CM K 350, Pj = 6 m - M' 1,297,100.00
70 Sewa Pompa Ready Mix (Min. 100 M) - M 48,300.00
71 Bahan Plastik Cor Beton - M 5,300.00
C. BAHAN KAYU
1 Kayu Belian Tidak Ketam uk. 4 cm x 8 cm x 4 m - M 11,650,600.00
2 Kayu Belian Tidak Ketam uk. 6 cm x 6 cm x 4 m - M 16,351,700.00
3 Kayu Belian Tidak Ketam uk. 7 cm x 7 cm x 4 m - M 13,214,800.00
4 Kayu Belian Tidak Ketam uk. 8 cm x 8 cm x 4 m - M 11,344,000.00
5 Kayu Belian Tidak Ketam uk. 8 cm x 16 cm x 4 m - M 8,844,100.00
6 Kayu Belian Tidak Ketam uk. 9 cm x 9 cm x 4 m - M 11,385,600.00
1 2 3 4 5
7 Kayu Belian Tidak Ketam uk.10 cm x 10 cm x 4 m - M 12,754,400.00
1 2 3 4 5
8 Kayu Belian Tidak Ketam uk.12 cm x 12 cm x 4 m - M 16,301,300.00
9 Kayu Belian Tidak Ketam uk.15 cm x 15 cm x 4 m - M 19,320,000.00
10 Kayu Belian Tidak Ketam uk.5 cm x 10 cm x 4 m - M 11,954,300.00
11 Kayu Belian Ketam uk. 6 cm x 6 cm x 4 m - M 17,986,900.00
12 Kayu Belian Ketam uk. 7 cm x 7 cm x 4 m - M 14,416,200.00
13 Kayu Belian Ketam uk. 8 cm x 8 cm x 4 m - M 12,263,800.00
14 Kayu Belian Ketam uk. 3 cm x 7 cm x 4 m - M 17,393,800.00
15 Kayu Belian Ketam uk. 4 cm x 8 cm x 4 m - M 13,490,100.00
16 Kayu Belian Ketam uk. 5 cm x 10 cm x 4 m - M 12,950,500.00
17 Papan Belian Tidak Ketam uk.2,5 cm x 16 cm x 4 m M.181.d M 16,225,900.00
18 Papan Belian Ketam uk. 2 cm x 16 cm x 4 m M.181.e M 20,754,000.00
19 Kayu kls I Bengkirai Tidak Ketam uk. 7 cm x 7 cm x 4 m - M 8,009,000.00
20 Kayu kls I Bengkirai Tidak Ketam uk. 8 cm x 8 cm x 4 m M.181.g M 8,254,500.00
21 Papan kls I Tidak Ketam - M 11,320,400.00
22 Kayu kls I Bengkirai Ketam uk. 7 cm x 7 cm x 4 m - M 8,317,100.00
23 Kayu kls I Bengkirai Ketam uk. 8 cm x 8 cm x 4 m M.181.f M 8,490,400.00
24 Papan kls I Ketam - M 9,421,200.00
25 Kayu kls I Bengkirai Ketam uk. 5 cm x 10 cm x 4 m - M 8,452,500.00
26 Kayu kls II Tidak Ketam uk.3 cm x 5 cm x 4 m - M 4,025,000.00
27 Kayu kls II Tidak Ketam uk.4 cm x 6 cm x 4 m - M 3,773,500.00
28 Kayu kls II Tidak Ketam uk.4 cm x 8 cm x 4 m - M 4,716,900.00
29 Kayu kls II Tidak Ketam uk.5 cm x 7 cm x 4 m - M 4,743,800.00
30 Kayu kls II Tidak Ketam uk.5 cm x 10 cm x 4 m - M 7,546,900.00
31 Kayu kls II Tidak Ketam uk.6 cm x 10 cm x 4 m - M 6,792,300.00
32 Kayu kls II Tidak Ketam uk.6 cm x 12 cm x 4 m - M 5,660,200.00
33 Kayu kls II Tidak Ketam uk.7 cm x 7 cm x 4 m - M 5,544,800.00
34 Kayu kls II Tidak Ketam uk.8 cm x 8 cm x 4 m - M 4,481,000.00
1 2 3 4 5
35 Kayu kls II Tidak Ketam uk.8 cm x 12 cm x 4 m - M 4,245,300.00
1 2 3 4 5
36 Kayu kls II Tidak Ketam uk.8 cm x 15 cm x 4 m - M 4,402,500.00
37 Kayu kls II Tidak Ketam uk.10 cm x 10 cm x 4 m - M 4,282,600.00
38 Papan kls II Tidak Ketam uk.2,5 cm x 20 cm x 4 m M.181.j M 9,056,300.00
39 Kayu kls II Ketam uk.5 cm x 10 cm x 4 m - M 8,452,500.00
40 Kayu kls II Ketam uk.8 cm x 8 cm x 4 m - M 5,188,600.00
41 Kayu kls II Ketam uk.7 cm x 7 cm x 4 m - M 6,160,800.00
42 Kayu kls II Ketam uk.6 cm x 6 cm x 4 m - M 7,127,700.00
43 Kayu kls II Ketam uk.3 cm x 7 cm x 4 m - M 9,343,800.00
44 Kayu kls II Ketam uk.3 cm x 5 cm x 4 m - M 8,050,000.00
45 Papan kls II Ketam uk.1,8 cm x 18 cm x 4 m M.181.k M 8,385,500.00
46 Papan kls II Ketam uk.1 cm x 7 cm x 4 m M.181.k M 9,918,800.00
47 Kayu kls III Tidak Ketam uk.3 cm x 5 cm x 4 m - M 3,425,900.00
48 Kayu kls III Tidak Ketam uk.4 cm x 6 cm x 4 m - M 2,855,200.00
49 Kayu kls III Tidak Ketam uk.5 cm x 7 cm x 4 m - M 3,425,900.00
50 Kayu kls III Tidak Ketam uk.5 cm x 10 cm x 4 m - M 3,768,700.00
51 Kayu kls III Tidak Ketam uk.6 cm x 12 cm x 4 m - M 2,426,900.00
52 Kayu kls III Tidak Ketam uk.8 cm x 8 cm x 4 m - M 2,676,700.00
53 Kayu kls III Tidak Ketam uk.8 cm x 12 cm x 4 m - M 2,855,200.00
54 Papan kls III Tidak Ketam uk.2 cm x 18 cm x 4 m M.181.l M 2,855,200.00
55 Papan Simpiran - M 1,313,300.00
56 Kayu Profil - Batang 34,500.00
57 Kayu cerucuk /dolken 4 - 6 - Pj. 4 M - Batang 9,800.00
58 Kayu cerucuk /dolken 6 - 8 - Pj. 4 M - Batang 14,000.00
59 Kayu cerucuk /dolken 8 - 10 - Pj. 4 M - Batang 18,000.00
60 Kayu cerucuk /dolken 10 - 12 - Pj. 12 M - Batang 109,400.00
61 Kayu cerucuk /dolken 12 - 15 Pj. 12 M - Batang 139,000.00
62 Kayu untuk Perancah - M 1,171,900.00
1 2 3 4 5
63 Kayu Simpiran - M 241,500.00
1 2 3 4 5
64 Kayu Bakar - M 108,100.00
65 Alat-alat Bantu M. 170 Set 122,100.00
66 Alas laci - Btg 20,700.00
D. BAHAN CAT
1 Amplas Besi - Lembar 4,900.00
2 Amplas Kayu - Lembar 8,600.00
3 Plamur - Kg 40,500.00
4 Cat Dasar - Kg 31,400.00
5 Cat Kilat - Kg 72,500.00
6 Cat Tembok - Kg 87,600.00
7 Cat tembok type weather shield - Kg 121,300.00
8 Cat tembok type weather coat (acrylic) - Kg 116,700.00
9 Cat seng - Kg 55,500.00
10 Cat Marka Jalan - Kg 80,903.00
11 Cat Weatherbond - Kg 49,600.00
12 Cat Water Proofing - Kg 60,400.00
13 Dempul - Kg 45,800.00
14 Plitur - Kg 65,300.00
15 Thiner M.090.f Ltr 32,100.00
16 Cat Melamic - Ltr 77,900.00
17 Cat Pilox - Klg 31,700.00
18 Meni - Kg 66,500.00
19 Teer - Liter 73,100.00
20 Oker Warna ( Induk ) - Kg 90,700.00
21 Oker Warna ( Biasa ) - Kg 17,000.00
22 Lem Fox ( Putih ) - Kg 21,600.00
1 2 3 4 5
23 Lem Fox ( Kuning ) - Kg 57,400.00
1 2 3 4 5
24 Sealent - Tube 60,400.00
25 Soda Api - Kg 28,000.00
26 Sabun / cream pembersih kotoran - Kg 26,600.00
27 Teak Oil - Liter 74,900.00
28 Kuas 4" - Buah 29,000.00
F. BAHAN PENGANTUNG
1 Engsel Kupu-kupu 3" ( biasa ) - Kotak 10,400.00
2 Engsel Kupu-kupu 3" ( Stainles ) - Kotak 18,200.00
3 Engsel Kupu-kupu 4" ( biasa ) - Kotak 11,500.00
4 Engsel Kupu-kupu 4" ( Stainles ) - Kotak 35,700.00
5 Slot Jendela ( Biasa ) - Buah 8,000.00
6 Slot Jendela ( Stainles ) - Buah 10,400.00
7 Slot Pintu ( Biasa ) - Buah 6,700.00
8 Slot Pintu ( Stainles ) - Buah 23,000.00
9 Kunci tanam 2 slag (setaraf Belluci) - Buah 218,800.00
10 Kunci tanam 1 slag - Buah 198,800.00
11 Kunci silinder - Buah 75,900.00
12 Kunci Tanam Kecil - Buah 72,500.00
13 Door Closer - Buah 271,800.00
14 Door Stoper - Buah 108,700.00
15 Pegangan Pintu ( Biasa ) - Buah 102,700.00
16 Pegangan Pintu ( Stainles ) - Buah 181,200.00
17 Pegangan Jendela ( Biasa ) - Buah 6,100.00
18 Pegangan Jendela ( Stainles ) - Buah 19,300.00
19 Kait Angin ( Biasa ) - Buah 6,100.00
20 Kait Angin ( Stainles ) - Buah 24,200.00
21 Paku Campuran M.166.b Kg 25,500.00
1 2 3 4 5
22 Paku Seng M.166.a Kg 27,800.00
1 2 3 4 5
23 Paku Atap Metal - Kg 15,500.00
24 Paku GRC - kg 30,300.00
25 Paku / sekrup Gypsum - Buah 500.00
26 Paku Triplek - Kg 36,300.00
27 Paku Beton - Kg 38,700.00
28 Sekrup Fixer - Buah 3,200.00
29 Sekrup Steel Sheet - Buah 900.00
30 Sekrup Zincalume Buah 1,000.00
G. BAHAN ATAP
1 Genteng Metal Permata 0,25 mm (720 mm x 770 mm) Lembar 63,100.00
2 Genteng Metal Permata 0,30 mm (720 mm x 770 mm) Lembar 76,800.00
3 Genteng Metal Permata 0,35 mm (720 mm x 770 mm) Lembar 70,900.00
4 Genteng Metal Classic 0,25 mm (800 mm x 770 mm) Lembar 42,400.00
5 Genteng Metal Classic 0,30 mm (800 mm x 770 mm) Lembar 54,400.00
6 Genteng Metal Classic 0,35 mm (800 mm x 770 mm) Lembar 61,700.00
7 Genteng Metal Stone Permata 2 x 5 (875 mm x 770 mm) Lembar 126,900.00
8 Genteng Metal Color Permata 2 x 5 (875 mm x 770 mm) Lembar 107,600.00
9 Genteng Metal Stone Classic 2 x 5 (1000 mm x 770 mm) Lembar 117,800.00
10 Genteng Metal Stone Royal 2 x 4 (760 mm x 770 mm) Lembar 95,000.00
11 Genteng Metal Color Royal 2 x 4 (760 mm x 770 mm) Lembar 69,500.00
12 Genteng Metal Stone Permata 2 x 4 (720 mm x 770 mm) Lembar 95,000.00
13 Genteng Metal Color Permata 2 x 4 (720 mm x 770 mm) Lembar 69,500.00
14 Genteng Metal Stone Classic 2 x 4 (800 mm x 770 mm) Lembar 86,400.00
15 Genteng Metal ColorClassic 2 x 4 (800 mm x 770 mm) Lembar 63,200.00
16 Nok Genteng Metal Raja stone panjang 104 cm Lembar 66,500.00
17 Nok Genteng Metal Raja color panjang 104 cm Lembar 58,000.00
1 2 3 4 5
18 Nok Genteng Metal Ratu stone panjang 91 cm Lembar 58,000.00
1 2 3 4 5
19 Nok Genteng Metal Ratu color panjang 91 cm Lembar 50,800.00
20 Nok Genteng Metal Putri stone panjang 109 cm Lembar 55,600.00
21 Nok Genteng Metal Putri color panjang 109 cm Lembar 48,300.00
22 Seng Gelombang Bjls 20 - Lembar 57,900.00
23 Seng Gelombang Bjls 30 - Lembar 78,000.00
24 Seng Plat Bjls 20 - Lembar 61,000.00
25 Seng Plat Bjls 30 - Lembar 80,800.00
26 Zincalume Gelombang Persegi 0.35 (polos) - M 163,100.00
27 Zincalume Gelombang Persegi 0.30 (polos) - M 144,900.00
28 Zincalume Gelombang Persegi 0.35 (color) - M 187,300.00
29 Zincalume Gelombang Persegi 0.30 (color) - M 165,500.00
30 Zincalume Plat 0.2 - Lembar 169,100.00
31 Aluminium Foil - M 72,500.00
32 Atap Plastik Gelombang - Lembar 84,600.00
H. BAHAN KACA
1 Kaca Bening uk 8 mm - M 455,900.00
2 Kaca Bening uk. 5 mm - M 181,200.00
3 Kaca Bening uk. 3 mm - M 163,100.00
4 Kaca Bening uk. 2 mm - M 84,600.00
5 Kaca Rayban uk. 5 mm - M 277,800.00
6 Kaca Rayban uk. 3 mm - M 247,600.00
7 Kaca Cermin uk. 2 mm - M 314,000.00
I. BAHAN TRIPLEK
1 Triplek t uk 3 mm - Lembar 85,600.00
2 Triplek t uk 4 mm - Lembar 89,400.00
1 2 3 4 5
3 Triplek t uk 6 mm - Lembar 175,200.00
1 2 3 4 5
4 Triplek t uk 9 mm - Lembar 187,300.00
5 Multiplek t uk 10 mm - Lembar 336,800.00
6 Multiplek t uk 12 mm - Lembar 341,700.00
7 Poliwood uk 4 mm x 122 cm x 244 cm - Lembar 139,900.00
8 Teakwood uk 3 mm x 122 cm x 244 cm - Lembar 170,100.00
9 Papan GRC uk 4 mm x 122 cm x 244 cm - Lembar 72,500.00
10 Panel GRC 120 x 240 x 40 - Lembar 97,300.00
11 Gypsum Board uk. 9 x 120 x 240 cm - Lembar 91,100.00
12 Tepung Gypsum - Kg 7,500.00
J. BAHAN SANITASI
1 Kloset duduk monoblok - Buah 3,583,600.00
2 Kloset duduk (setaraf TOTO) - Buah 2,719,100.00
3 Kloset jongkok (setaraf TOTO) - Buah 409,400.00
4 Kloset jongkok (setaraf INA) - Buah 231,700.00
5 Urinoir (setaraf TOTO) - Buah 2,274,200.00
6 Wastafel Alumunium - Buah 301,900.00
7 Wastafel Keramik - Buah 422,700.00
8 Bak Cuci Stainles 1 Lubang - Buah 362,300.00
9 Bak Cuci Stainles 2 lubang - Buah 603,800.00
10 Keran air 1/2" (RRC) - Buah 42,400.00
11 Keran air 1/2" (Lokal) - Buah 18,200.00
12 Shower Spray (setaraf TOTO) - Buah 409,400.00
13 Shower Set - Buah 2,004,500.00
14 Seal Tape - Buah 3,200.00
15 Lem PVC - Tube 8,600.00
16 Floor Drain - Buah 19,400.00
1 2 3 4 5
17 Bak air fibreglass uk. 55x55x60 cm - Buah 543,400.00
1 2 3 4 5
18 Pipa GIV Dia 1/2" Panjang 6 m - Batang 132,900.00
19 Pipa GIV Dia 3/4" Panjang 6 m - Batang 175,200.00
20 Pipa GIV Dia 1 " Panjang 6 m - Batang 223,500.00
21 Pipa GIV Dia 1 1/2" Panjang 6 m - Batang 326,100.00
22 Pipa GIV 2"/Btg - 6 M Tebal 1,8 - Batang 374,400.00
23 Pipa GIV 2 1/2"/Btg - 6 M Tebal 2 - Batang 411,900.00
24 Pipa GIV 3"/Btg - 6 M Tebal 2,3 - Batang 717,300.00
25 Pipa GIV 4"/Btg - 6 M Tebal 2,3 - Batang 929,800.00
26 Pipa Paralon PVC uk. 1/2" (AW) Panjang : 4 M - Batang 23,000.00
27 Pipa paralon PVC uk. 3/4" (AW)Panjang : 4 M - Batang 29,000.00
28 Pipa Paralon PVC uk.1" (AW) Panjang : 4 M - Batang 38,700.00
29 Pipa Paralon PVC uk.1 1/2" (AW) Panjang : 4 M - Batang 65,300.00
30 Pipa Paralon PVC uk.2" (AW) Panjang : 4 M - Batang 90,700.00
31 Pipa Paralon PVC uk.2 1/2" (AW) Panjang :4 M - Batang 120,800.00
32 Pipa Paralon PVC uk.3" (AW) Panjang : 4 M - Batang 151,000.00
33 Pipa Paralon PVC uk.4" (AW) Panjang : 4 M - Batang 253,600.00
34 Pipa Paralon PVC uk.1/2" ( C ) Panjang : 4 M - Batang 16,400.00
35 Pipa Paralon PVC uk.3/4" ( C ) Panjang : 4 M - Batang 20,100.00
36 Pipa Paralon PVC uk.1" ( C ) Panjang : 4 M - Batang 25,500.00
37 Pipa Paralon PVC uk.1 1/2" ( D ) Panjang : 4 M - Batang 54,400.00
38 Pipa Paralon PVC uk.2" ( D ) Panjang : 4 M - Batang 68,900.00
39 Pipa Paralon PVC uk.2.5" ( D ) Panjang : 4 M - Batang 82,200.00
40 Pipa Paralon PVC uk.3" ( D ) Panjang : 4 M - Batang 102,700.00
41 Pipa Paralon PVC uk.4" ( D ) Panjang : 4 M - Batang 151,000.00
42 Piber Glas 0,5 M3 - Buah 1,086,800.00
43 Piber Glas 1 M3 - Buah 1,750,900.00
44 Piber Glas 1,5 M3 - Buah 2,837,700.00
1 2 3 4 5
45 Piber Glas 2 M3 - Buah 3,743,300.00
1 2 3 4 5
46 Piber Glas 3 M3 - Buah 5,554,500.00
47 Ball Valve 16 mm - Buah 26,600.00
48 Double Niple GI 16 mm - Buah 8,200.00
49 F. Elbouw PVC 16 mm - Buah 14,500.00
50 Elbouw PVC 16 mm - Buah 4,900.00
51 Reducer PVC 20 x 16 mm - Buah 7,300.00
52 DOV PVC 16 mm - Buah 2,500.00
K. BAHAN MINYAK
1 Minyak Tanah Non Subsidi M 065 Liter 11,700.00
2 Minyak Diesel/Solar (Industri) M 183 Liter 6,400.00
3 Bensin Premium (Industri) M 184 Liter 7,900.00
4 Minyak Pelumas M 185 Liter 35,100.00
5 Oli BEO 154W40/Cat - Liter 68,900.00
6 Gas Elpiji - Kg 21,800.00
7 Sewa Alat Untuk Pengelasan - Set 91,800.00
8 Sewa kuali termasuk angkutan - Set 94,200.00
N. TANAMAN HIAS
1 Palm Ponik - Batang 54,400.00
2 Palm Raja 2,5 m - Batang 471,000.00
3 Palm Raja 2 m - Batang 422,700.00
4 Palm Raja 1 m - Batang 320,100.00
5 Palm Raja 1,5 m - Batang 205,300.00
6 Palm Raja 0,5 m - Batang 157,000.00
7 Palm Ekor Tupai 2,5 m - Batang 670,300.00
8 Palm Ekor Tupai 2 m - Batang 531,300.00
9 Palm Ekor Tupai 1 m - Batang 507,200.00
10 Palm Ekor Tupai 0,5 m - Batang 295,900.00
11 Palm Kamdoria 1 m - Batang 181,200.00
12 Palm Kamdoria - Batang 102,700.00
13 Palm Putri 1,5 m - Batang 440,800.00
14 Serut 2 m - Batang 4,830,000.00
15 Serut 1,5 m - Batang 3,018,800.00
16 Serut 1 m - Batang 1,569,800.00
17 Cemara Udang 2 m - Batang 4,950,800.00
18 Cemara Udang 1,5 m - Batang 3,018,800.00
19 Cemara Udang 1 m - Batang 1,569,800.00
20 Cemara Tiang 2 m - Batang 265,000.00
21 Cemara Tiang 1,5 m - Batang 201,000.00
22 Cemara Tiang 1 m - Batang 152,800.00
23 Cemara Mas 80 cm - Batang 425,700.00
24 Cemara Mas 50 cm - Batang 136,700.00
25 Cemara Norflok 70 cm - Batang 136,700.00
1 2 3 4 5
26 Cemara Norflok 1 m - Batang 233,000.00
1 2 3 4 5
27 Cemara Pinus 1,5 m - Batang 265,000.00
28 Cemara Pinus 1 m - Batang 168,800.00
29 Bougenvil - Batang 184,900.00
30 Nolima 2 m - Batang 1,051,600.00
31 Nolima 1 m - Batang 521,900.00
32 Sirlon 120 cm - Batang 361,400.00
33 Sirlon 60 cm - Batang 114,200.00
34 Tri Color - Batang 48,300.00
35 Asoka - Batang 24,400.00
36 Sambangdara - Batang 72,400.00
37 Pedang - Pedangan - Batang 20,300.00
38 Ki Hujan Bongkol - Batang 184,900.00
39 Ki Hujan Bulat - Batang 33,100.00
40 Nusa Indah - Batang 17,900.00
41 Sikas 1 m - Batang 2,255,300.00
42 Sikas 50 cm - Batang 1,452,700.00
43 Sikas 30 cm - Batang 730,500.00
44 Agave - Batang 112,500.00
45 Wali Songo - Batang 891,000.00
46 Lantana - Batang 14,500.00
47 Rambusa - Batang 56,400.00
48 Miramta - Batang 24,400.00
49 Asam Keranji - Batang 32,400.00
50 Heli Konia - Batang 16,300.00
51 Song Of India - Batang 72,400.00
52 Beringin Korea - Batang 3,539,400.00
53 Tombak Raja - Batang 297,100.00
1 2 3 4 5
54 Pandan Bali Persit - Batang 457,600.00
1 2 3 4 5
55 Pandan Bali Cabang - Batang 891,000.00
56 Pandan Kuning - Batang 22,700.00
57 Tanjung 1 m - Batang 21,000.00
58 Tanjung 2 m - Batang 112,500.00
59 Tanjung 3 m - Batang 265,000.00
60 Sapu Tangan 2 m - Batang 152,800.00
61 Kasia Golden 1,5 m - Batang 128,600.00
62 Rumput Golf - M2 28,300.00
63 Rumput Manila - M2 32,400.00
64 Puring - Batang 27,600.00
65 Melati Kosta - Batang 128,600.00
66 Anggrek Tanah - Batang 22,700.00
67 Lili Bombai - Batang 24,400.00
68 Lili Bakung - Batang 22,700.00
69 Lili Paris Putih - Batang 17,900.00
70 Nanas Merah - Batang 32,400.00
71 Amander - Batang 24,400.00
72 Puring Z - Batang 32,400.00
73 Anjuang - Batang 16,300.00
74 Pakis Kelabang - Batang 16,300.00
75 Lidah Mertua - Batang 16,300.00
76 Lapender - Batang 24,400.00
77 Batavia - Batang 32,400.00
78 Sambang Dara - Batang 40,300.00
79 Pillo Denrum - Batang 24,400.00
80 Evorria - Batang 32,400.00
81 Bayam - bayaman - Batang 13,200.00
1 2 3 4 5
82 Aglonema Lokal - Batang 40,300.00
1 2 3 4 5
83 Katus Kodok - Batang 14,500.00
84 Kipranrus - Batang 40,300.00
85 Siklok Besar - Batang 136,700.00
86 Siklok Kecil - Batang 72,400.00
87 Helokomin - Batang 16,300.00
88 Pisang Betet - Batang 24,400.00
89 Kana - Batang 16,300.00
90 Adenium - Batang 88,500.00
91 Bromedia - Batang 16,300.00
92 Echinacea/pucuk merah 50 cm - Batang 67,300.00
M. LAIN-LAIN
1 Pintu Air Sorong Uk. 0,40 s/d 0,60 m - Unit 3,864,000.00
2 Pintu Air Ulir Uk. 0,60 s/d 0,80 m - Unit 8,694,000.00
3 Pintu Air Ulir Uk. 0,90 s/d 1,20 m - Unit 10,384,500.00
4 Gorong2 Beton 40 cm Tanpa Tulang - M1 223,500.00
5 Gorong2 Beton 60 cm Tanpa Tulang M 031 M1 356,300.00
6 Gorong2 Beton 80 cm Tanpa Tulang M 033 M1 483,000.00
7 Gorong2 Beton 100 cm Tanpa Tulang M 035 M1 658,200.00
AR HARGA SATUAN UPAH DAN BAHAN
WILAYAH III
KETERANGAN
No PENGALAMAN GAJI S2 / S3
1 2
1 1 5,200,000.00 900,000.00
2 2 5,500,000.00 300,000.00
3 3 5,800,000.00 300,000.00
4 4 6,100,000.00
5 5 6,500,000.00 1,300,000.00
6 6 6,933,000.00 433,333.33
7 7 7,366,000.00 433,000.00
8 8 7,800,000.00
9 9 8,200,000.00 1,300,000.00
10 10 8,633,333.33 433,333.33
11 11 9,066,666.67
12 12 9,500,000.00
13 13 10,400,000.00 2,700,000.00
14 14 11,300,000.00 900,000.00
15 15 12,200,000.00 900,000.00
16 16 13,100,000.00
17 17 14,300,000.00 4,300,000.00
18 18 15,733,000.00 1,433,333.33
19 19 17,166,000.00 1,433,000.00
20 20 18,600,000.00
PPN / INFLASI TOTAL GAJI
10% ( Rp.)
3 4
280,000.00 2,520,000.00
300,000.00 2,700,000.00
320,000.00 2,880,000.00
340,000.00 3,060,000.00