I PEKERJAAN PERSIAPAN
II PEKERJAAN PAGAR
A PEKERJAAN TANAH
B PEKERJAAN PASANGAN
C PEKERJAAN BETON
1 Balok Sloof 20/25 4,63 M3 Sloof 20/25 1.293.339,00 5.988.159,57
2 Beton Kolom 40/20 2,32 M3 Beton Kolom 40/20 1.158.633,00 2.688.028,56
3 Ring Balk 10/13 1,17 M3 Ring Balk 10/13 945.026,00 1.105.680,42
Sub Total 9.781.868,55
D PEKERJAAN PENGECATAN
E PEKERJAAN PAGAR