RENCANA ANGGARAN BIAYA

PERENCANAAN PAVING BLOK


KANTOR PERTANAHAN RAJA AMPAT

KABUPATEN RAJA AMPAT


PROVINSI PAPUA BARAT
REKAPITULASI RENCANA ANGGARAN BIAYA

SATUAN KERJA :
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

NO URAIAN PEKERJAAN

1 PEKERJAAN PERSIAPAN
2 PEKERJAAN PEKERASAN
3 PEKERJAAN PEMBERSIHAN
REAL COST
PPN 10%
GRAND TOTAL
DIBULATKAN

TERBILANG : TIGA RATUS SEMBILAN BELAS JUTA DUA RATUS RIBU RUPIAH

Waisai, 07 Januari 2021


Mengetahui/ menyetujui : Disusun Oleh :

Disetujui Oleh :
PEJABAT PELAKSANA TEKNIS KEGIATAN

XX
NIP.
LASI RENCANA ANGGARAN BIAYA

JUMLAH HARGA
Rp

2,300,000.00
287,401,398.98
500,000.00
290,201,398.98
29,020,139.90
319,221,538.87
319,200,000.00
BELAS JUTA DUA RATUS RIBU RUPIAH

Waisai, 07 Januari 2021


RENCANA ANGGARAN BIAYA PEKERJAAN MEKANIKAL ELEKTRIKAL
0

SATUAN KERJ :

KEGIATAN :
PEKERJAAN :

NO URAIAN PEKERJAAN SAT VOL

1 2 3 4
NO URAIAN PEKERJAAN SAT VOL

1 2 3 4
E PEKERJAAN TATA UDARA
1 Pekerjaan Lantai Satu
1.1 Peralatan AC Dan Exhaust Fan
1.1.2 Peralatan AC (IO/OU) Wall Mounted 1/2 PK
1.1.3 Peralatan AC (IO/OU) Wall Mounted 1 PK
1.1.4 Peralatan AC (IO/OU) Wall Mounted 2 PK
1.1.5 Exhaust Fan

1.2 Pekerjaan Kabel Power Dan Pipa Refrigen


1.2.1 Instalasi Kabel Power AC 1/2 PK NYM 3 x 2,5 mm dalam conduit 20mm
1.2.1 Instalasi Kabel Power AC 1 PK NYM 3 x 2,5 mm dalam conduit 20mm
1.2.1 Pipa refrigen AC 1/2 PK
1.2.1 Pipa refrigen AC 2 PK
1.2.1 Drain pipa PVC 20mm

2 Pekerjaan Lantai Dua


1.1 Peralatan AC Dan Exhaust Fan
1.1.2 Peralatan AC (IO/OU) Wall Mounted 1/2 PK
1.1.3 Peralatan AC (IO/OU) Wall Mounted 1 PK
1.1.4 Peralatan AC (IO/OU) Wall Mounted 2 PK
1.1.5 Exhaust Fan

1.2 Pekerjaan Kabel Power Dan Pipa Refrigen


1.2.1 Instalasi Kabel Power AC 1/2 PK NYM 3 x 2,5 mm dalam conduit 20mm
1.2.1 Instalasi Kabel Power AC 1 PK NYM 3 x 2,5 mm dalam conduit 20mm
1.2.1 Pipa refrigen AC 1/2 PK
1.2.1 Pipa refrigen AC 2 PK
1.2.1 Drain pipa PVC 20mm

3 Pekerjaan Lantai Tiga


1.1 Peralatan AC Dan Exhaust Fan
1.1.2 Peralatan AC (IO/OU) Wall Mounted 1/2 PK
1.1.3 Peralatan AC (IO/OU) Wall Mounted 1 PK
1.1.4 Peralatan AC (IO/OU) Wall Mounted 2 PK
1.1.5 Exhaust Fan

1.2 Pekerjaan Kabel Power Dan Pipa Refrigen


1.2.1 Instalasi Kabel Power AC 1/2 PK NYM 3 x 2,5 mm dalam conduit 20mm
1.2.1 Instalasi Kabel Power AC 1 PK NYM 3 x 2,5 mm dalam conduit 20mm
1.2.1 Pipa refrigen AC 1/2 PK
1.2.1 Pipa refrigen AC 2 PK
1.2.1 Drain pipa PVC 20mm
KODE HARGA JUMLAH HARGA
SNI SATUAN (Rp) (Rp)

5 6 7=4x6
KODE HARGA JUMLAH HARGA
SNI SATUAN (Rp) (Rp)

5 6 7=4x6
RENCANA ANGGARAN BIAYA

SATUAN KERJA 0:
KEGIATAN 0:
PEKERJAAN 0:
LOKASI :
TAHUN ANGGARAN 0:

NO URAIAN PEKERJAAN SAT VOL

1 2 3 4

1 PEKERJAAN PERSIAPAN
1.1 Pek. Pembersihan lokasi Ls 1.00
1.2 Pengukuran dan Pemasangan Patok Ls 1.00
1.5 Dokumentasi dan Administrasi Ls 1.00
1.6 Papan Nama Proyek Ls 1.00

2 PEKERJAAN PEKERASAN
2.1 Pekerasan Jalan Paving Blok
2.1.1 Urugan Pasir T= 10 cm M3 85.00
2.1.2 Pemasangan Paving Blok Warna T= 8 cm K-300 M2 850.70

3 PEKERJAAN PEMBERSIHAN
3.1 Pembersihan lokasi
3.1.1 Pembersihan Lokasi Proyek Ls 1.00
CANA ANGGARAN BIAYA

HARGA SATUAN JUMLAH HARGA


(Rp) (Rp)
6 7=4x6

1,000,000.00 1,000,000.00
500,000.00 500,000.00
500,000.00 500,000.00
300,000.00 300,000.00

Jumlah 1 2,300,000.00

138,601.01 11,781,085.56
323,992.38 275,620,313.41
Jumlah 2 287,401,398.98

500,000.00 500,000.00

Jumlah 3 500,000.00
REKAPITULASI HARGA SATUAN PEKERJAAN
HARGA
NO. JENIS ALAT SAT
(Rp)

1 MENGGALI TANAH DENGAN ALAT BERAT M3 72,212.57


2 URUGAN PASIR M3 138,601.01
3 URUGAN SIRTU M4 248,135.50
4 URUGAN KEMBALI GALIAN TANAH M3 55,191.03
5 BETON MUTU SEDANG DENGAN fc' = 25 Mpa (K-300) M3 1,015,366.40
6 BETON MUTU RENDAH DENGAN fc' = 15 Mpa (K-175) M3 754,094.19
7 PEMASANGAN BOND BREAKER PLASTIK M2 18,069.95
8 BEKISTING 2 X PAKAI M2 226,229.15
9 FINISHING TROWEL BERGARIS DAN CURING BETON M2 31,507.87
10 PAVING BLOK WARNA T= 8 CM K- 300 M2 323,992.38
11 PJU SOLAR CELL LENGAN TUNGGAL GALVANIS Unit 23,989,544.26
12 POT BUNGAN BETON PRECAST Unit 341,388.08
13 TEMPAT SAMPAH Unit 897,691.58
14 TANAMAN Batang 79,085.50
15 U - DITCH K- 300 UK 80 X80 M1 1,015,000.00
16 COVER U- DITCH K- 300 80/100 M1 499,001.43
17 U - DITCH K- 300 UK 60 X60 M1 627,000.00
18 COVER U- DITCH K- 300 60/100 M1 319,601.43
19 U - DITCH K- 300 UK 40X60 M1 673,602.06
20 COVER U- DITCH K- 300 UK 40X100 M1 232,201.43
21 U - DITCH K- 300 UK 40X40 M1 505,932.06
22 COVER U- DITCH K- 300 UK 40X50 M1 223,001.43
23 U - DITCH K- 300 UK 20X30 M1 200,724.29
24 COVER U- DITCH K- 300 UK 20X50 M1 190,801.43
25 PENYIAPAN BADAN JALAN M2 Err:509
26 PEKERASAN JALAN BETON K- 300 M3 1,646,498.43
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

SATUAN KERJA
KEGIATAN
PROP / KAB / KODYA
JENIS PEKERJAAN
SATUAN PEMBAYARAN

PERKIRAAN HARGA JUM


NO. KOMPONEN SATUAN KUANTITAS SATUAN HAR
(Rp.) (Rp

A. TENAGA

1 Pekerja Jam 0.0302 12,142.86


2 Mandor Jam 0.0076 24,571.43

JUMLAH HARGA TENAGA

B. BAHAN

JUMLAH HARGA BAHAN

C. PERALATAN

1 Excavator Jam 0.0256 397,644.00


2 Dump Truck Jam 0.3344 155,683.00
3 Alat Bantu Ls 0.0000 0.00

JUMLAH HARGA PERALATAN


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : URUGAN PASIR


SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUM


NO. KOMPONEN SATUAN KUANTITAS SATUAN HAR
(Rp.) (Rp

A. TENAGA

1 Pekerja Jam 0.0511 12,142.86


2 Mandor Jam 0.0256 24,571.43

JUMLAH HARGA TENAGA

B. BAHAN

1 Pasir Urug Kualitas Sedang M3 1.2000 62,500.00

JUMLAH HARGA BAHAN

C. PERALATAN

1 Dump Truck Jam 0.2073 155,683.00


2 Alat Bantu LS 1.0000 12,000.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
JENIS PEKERJAAN : URUGAN KEMBALI GALIAN TANAH
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUM


NO. KOMPONEN SATUAN KUANTITAS SATUAN HAR
(Rp.) (Rp

A. TENAGA

1 Pekerja Oh 0.4030 85,000.00


2 Mandor Oh 0.0101 172,000.00

JUMLAH HARGA TENAGA

B. BAHAN

1
2
3
4
5

JUMLAH HARGA BAHAN

C. PERALATAN

1 Alat Bantu Ls 1.0000 12,000.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : BETON MUTU SEDANG DENGAN fc' = 25 Mpa (K-300)


SATUAN PEMBAYARAN : M3
PERKIRAAN HARGA JUM
NO. KOMPONEN SATUAN KUANTITAS SATUAN HAR
(Rp.) (Rp

A. TENAGA

1 Pekerja Jam 0.8032 12,142.86


2 Tukang Jam 0.1004 16,428.57
3 Mandor Jam 0.4016 24,571.43

JUMLAH HARGA TENAGA

B. BAHAN

1 Semen PC Kg 421.0000 1,200.00


2 Pasir Beton M3 0.5097 170,000.00
3 Agregat Kasar 2-3 cm M3 0.6440 263,900.00

JUMLAH HARGA BAHAN

C. PERALATAN

1 Cor Pan Mixer Jam 0.1004 219,284.00


2 Truck Mixer Jam 0.2162 279,763.00
3 Water Tanker Jam 0.0382 271,083.00
4 Alat Bantu LS 1.0000 7,000.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : BETON MUTU RENDAH DENGAN fc' = 15 Mpa (K-175)


SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUM


NO. KOMPONEN SATUAN KUANTITAS SATUAN HAR
(Rp.) (Rp

A. TENAGA

1 Pekerja Jam 0.8032 12,142.86


2 Tukang Jam 0.1004 16,428.57
3 Mandor Jam 0.4016 24,571.43

JUMLAH HARGA TENAGA

B. BAHAN

1 Semen PC KG 327.5400 1,200.00


2 Pasir Beton M3 0.4024 146,250.00
3 Agregat Kasar 2-3 cm M3 0.6053 263,900.00

JUMLAH HARGA BAHAN

C. PERALATAN

1 Conc Mixer Jam 0.3162 38,332.00


3 Water Tanker Jam 0.0382 271,083.00
4 Alat Bantu LS 0.0500 7,000.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : PEMASANGAN BOND BREAKER PLASTIK


SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA JUM


NO. KOMPONEN SATUAN KUANTITAS SATUAN HAR
(Rp.) (Rp
A. TENAGA

1 Pekerja Oh 0.0150 85,000.00


2 Mandor Oh 0.0040 172,000.00

JUMLAH HARGA TENAGA

B. BAHAN

1 Plastik Bond Breaker M2 1.1000 12,500.00

JUMLAH HARGA BAHAN

C. PERALATAN

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : BEKISTING 2 X PAKAI


SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA JUM


NO. KOMPONEN SATUAN KUANTITAS SATUAN HAR
(Rp.) (Rp

A. TENAGA

1 Pekerja Oh 0.5500 85,000.00


2 Tukang Kayu Oh 0.3300 115,000.00
3 Kepala Tukang Kayu Oh 0.0330 140,000.00
4 Mandor Oh 0.0330 172,000.00

JUMLAH HARGA TENAGA

B. BAHAN

1 Kayu Klas II (balok) 2x pakai M3 0.0250 2,500,000.00


2 Paku Biasa 2"-5" KG 0.4000 18,750.00
3 Minyak Bekisting Ltr 0.2000 5,500.00
4 Multipleks 6 mm (2 x pakai) Lmbr 0.1750 175,000.00

JUMLAH HARGA BAHAN

C. PERALATAN

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : FINISHING TROWEL BERGARIS DAN CURING BETON


SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA JUM


NO. KOMPONEN SATUAN KUANTITAS SATUAN HAR
(Rp.) (Rp

A. TENAGA

1 Pekerja Oh 0.0277 85,000.00


2 Mandor Oh 0.0067 172,000.00
JUMLAH HARGA TENAGA

B. BAHAN

1 Curing Compound Ltr 0.8700 18,500.00

JUMLAH HARGA BAHAN

C. PERALATAN

1 Mesin Trowel Jam 0.0567 137,500.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : PAVING BLOK WARNA T= 8 CM K- 300


SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA JUM


NO. KOMPONEN SATUAN KUANTITAS SATUAN HAR
(Rp.) (Rp

A. TENAGA

1 Pekerja Oh 0.1500 85,000.00


2 Tukang Batu Oh 0.2000 115,000.00
3 Kepala Tukang Oh 0.0200 140,000.00
4 Mandor Oh 0.0100 172,000.00

JUMLAH HARGA TENAGA


B. BAHAN

1 Paving Blok Bh 40.0000 6,000.00


2 Pasir Pasang M3 0.0100 146,250.00

JUMLAH HARGA BAHAN

C. PERALATAN

3 Alat Bantu Ls 1.0000 0.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : PASANGAN SIRTU


SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUM


NO. KOMPONEN SATUAN KUANTITAS SATUAN HAR
(Rp.) (Rp

A. TENAGA

1 Pekerja Oh 0.1500 85,000.00


2 Tukang Batu Oh 0.2000 115,000.00
3 Kepala Tukang Oh 0.0200 140,000.00
4 Mandor Oh 0.0100 172,000.00

JUMLAH HARGA TENAGA

B. BAHAN
1 Sirtu Bh 1.2000 146,250.00

JUMLAH HARGA BAHAN

C. PERALATAN

3 Alat Bantu Ls 1.0000 0.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
MULIR STANDAR UNTUK
LISA MASING-MASING HARGA SATUAN

JUMLAH
HARGA
(Rp.)

366.71
186.74

553.46

0.00

10,179.69
52,060.40
0.00

62,240.08
62,793.54
9,419.03
72,212.57

JUMLAH
HARGA
(Rp.)

620.50
629.03

1,249.53

75,000.00

75,000.00

32,273.09
12,000.00

44,273.09

120,522.61
18,078.39
138,601.01
JUMLAH
HARGA
(Rp.)

34,255.00
1,737.20

35,992.20

0.00

12,000.00

12,000.00

47,992.20
7,198.83
55,191.03
JUMLAH
HARGA
(Rp.)

9,753.14
1,649.43
9,867.89

21,270.46

505,200.00
86,649.00
169,951.60

761,800.60

22,016.11
60,484.76
10,355.37
7,000.00

99,856.24

882,927.30
132,439.10
1,015,366.40

JUMLAH
HARGA
(Rp.)

9,753.14
1,649.43
9,867.89

21,270.46

393,048.00
58,851.00
159,738.67

611,637.67

12,120.58
10,355.37
350.00

22,825.95

655,734.08
98,360.11
754,094.19

JUMLAH
HARGA
(Rp.)
1,275.00
688.00

1,963.00

13,750.00

13,750.00

0.00

15,713.00
2,356.95
18,069.95

JUMLAH
HARGA
(Rp.)

46,750.00
37,950.00
4,620.00
5,676.00

94,996.00

62,500.00
7,500.00
1,100.00
30,625.00

101,725.00

0.00

196,721.00
29,508.15
226,229.15

JUMLAH
HARGA
(Rp.)

2,354.50
1,152.40
3,506.90

16,095.00

16,095.00

7,796.25

7,796.25

27,398.15
4,109.72
31,507.87

JUMLAH
HARGA
(Rp.)

12,750.00
23,000.00
2,800.00
1,720.00

40,270.00
240,000.00
1,462.50

241,462.50

0.00

0.00

281,732.50
42,259.88
323,992.38

JUMLAH
HARGA
(Rp.)

12,750.00
23,000.00
2,800.00
1,720.00

40,270.00
175,500.00

175,500.00

0.00

0.00

215,770.00
32,365.50
248,135.50
JENIS PEKERJAAN LAMPU JALAN
SATUAN PEMBAYARAN BH

PERKIRAAN HARGA JU
NO. KOMPONEN SATUAN KUANTITAS SATUAN H
(Rp.) (

A. TENAGA

1 Pekerja Oh 0.8700 85,000.00


2 Tukang Listrik Oh 0.9700 115,000.00
3 Kepala Tukang Oh 0.0870 140,000.00
4 Mandor Oh 0.0870 172,000.00

JUMLAH HARGA TENAGA

B. BAHAN

Tiang PJU Bulat Galvanis H= 4 + Tiang


1 Penyangga Solar Panel Unit 1.0000 4,350,000.00

2 Lampu LED 40 Wat Unit 1.0000 6,158,000.00


3 Solar Panel 100 WP Polycrystalline WP 100.0000 14,500.00
4 Batery VRLA Panasonic 2V-150 Ah Unit 1.0000 3,250,000.00
5 BCR 12 VDC 10 A Digital Unit 1.0000 1,500,000.00
6 Box Batery Powder Coating + Bracket Set 1.0000 2,250,000.00
Kabel Instalasi Solar Panel & Batery NYYHY
7 M1 10.0000 56,000.00
2x4
8 Kabel Instalasi Lampu LED NYYHY 2x1.5 M1 10.0000 22,000.00
9 Aksesoris Set 1.0000 800,000.00

JUMLAH HARGA BAHAN

C. PERALATAN

1 Mobile Crane 3 Ton Jam 0.2762 397,644.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : POT BUNGA BETON PRECAST


SATUAN PEMBAYARAN : BUAH/UNIT

PERKIRAAN HARGA JU
NO. KOMPONEN SATUAN KUANTITAS SATUAN H
(Rp.) (

A. TENAGA

1 Pekerja Oh 0.5400 85,000.00


2 Tukang Batu Oh 0.5460 115,000.00
3 Kepala Tukang Oh 0.0540 140,000.00
2 Mandor Oh 0.0540 172,000.00

JUMLAH HARGA TENAGA

B. BAHAN

1 Pot Bunga Pracetak M3 0.0250 80,000.00


6 Fin Cat Tembok Eksterior Ltr 0.5280 184,150.00
7 Tanah Pilihan M3 0.8320 41,875.00

JUMLAH HARGA BAHAN

C. PERALATAN

1 Alat Bantu LS 1.0000 12,000.00


2 Kuas Bh 2.0000 12,625.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : TEMPAT SAMPAH


SATUAN PEMBAYARAN : UNIT/SET

PERKIRAAN HARGA JU
NO. KOMPONEN SATUAN KUANTITAS SATUAN H
(Rp.) (
A. TENAGA

1 Pekerja Oh 1.0500 85,000.00


2 Tukang Las Oh 0.1050 115,000.00
3 Kepala Tukang Oh 0.1100 140,000.00
4 Mandor Oh 0.0500 172,000.00

JUMLAH HARGA TENAGA

B. BAHAN

1 Besi Hollow 40x40x2 mm Btg 0.4540 178,000.00


2 Besi Hollow 40x20x2 mm Btg 0.5500 143,000.00
3 Besi siku 40.40,4 Tebal Btg 0.2300 121,250.00
4 Besi plat tebal 1 mm 120 x 240 mm Lmbr 0.7120 355,000.00
5 Dynabolt Bh 8.0000 12,500.00
6 Kawat Las Kg 0.2350 12,625.00
7 Fin Cat Besi Kg 0.8260 75,000.00

JUMLAH HARGA BAHAN

C. PERALATAN

1 Alat Bantu Ls 1.0000 25,000.00


2 Kuas Bh 2.0000 12,625.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : TANAMAN


SATUAN PEMBAYARAN : BATANG

PERKIRAAN HARGA JU
NO. KOMPONEN SATUAN KUANTITAS SATUAN H
(Rp.) (
A. TENAGA

1 Pekerja Jam 0.4200 12,142.86


3 Mandor jam 0.0700 24,571.43

JUMLAH HARGA TENAGA

B. BAHAN

1 Tanaman Bh 1.0000 45,000.00


2 Tanah Humus M3 0.2200 35,000.00
3 Pupuk Kg 0.5000 18,500.00

JUMLAH HARGA BAHAN

C. PERALATAN

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : U - DITCH K- 300 UK 80X80


SATUAN PEMBAYARAN : M1

PERKIRAAN HARGA JU
NO. KOMPONEN SATUAN KUANTITAS SATUAN H
(Rp.) (

A. TENAGA

1 Pekerja Jam 0.8000 12,142.86


2 Tukang Jam 0.2000 16,428.57
3 Mandor Jam 0.2000 24,571.43
JUMLAH HARGA TENAGA

B. BAHAN

1 U - Ditch K- 300 UK 80X80 Buah 0.8000 1,015,000.00

JUMLAH HARGA BAHAN

C. PERALATAN

1 Mobile Crane Jam 0.9036 178,427.00


2 Alat Bantu LS 1.0000 25,000.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : COVER U- DITCH K- 300 UK 80X100


SATUAN PEMBAYARAN : M1

PERKIRAAN HARGA JU
NO. KOMPONEN SATUAN KUANTITAS SATUAN H
(Rp.) (

A. TENAGA

1 Pekerja Jam 0.8000 12,142.86


2 Tukang Jam 0.2000 16,428.57
3 Mandor Jam 0.2000 24,571.43

JUMLAH HARGA TENAGA

B. BAHAN
1 Cover U- Ditch K- 300 80X100 M1 0.8000 520,000.00

JUMLAH HARGA BAHAN

C. PERALATAN

1 Crane Jam 0.9036 0.00


2 Alat Bantu LS 1.0000 0.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : U - DITCH K- 300 UK 60X60


SATUAN PEMBAYARAN : M1

PERKIRAAN HARGA JU
NO. KOMPONEN SATUAN KUANTITAS SATUAN H
(Rp.) (

A. TENAGA

1 Pekerja Jam 0.8000 12,142.86


2 Tukang Jam 0.2000 16,428.57
3 Mandor Jam 0.2000 24,571.43

JUMLAH HARGA TENAGA

B. BAHAN

1 U - Ditch K- 300 UK 60X60 Buah 0.8000 627,000.00


JUMLAH HARGA BAHAN

C. PERALATAN

1 Mobile Crane Jam 0.9036 0.00


2 Alat Bantu LS 1.0000 0.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : COVER U- DITCH K- 300 UK 60X60


SATUAN PEMBAYARAN : M1

PERKIRAAN HARGA JU
NO. KOMPONEN SATUAN KUANTITAS SATUAN H
(Rp.) (

A. TENAGA

1 Pekerja Jam 0.8000 12,142.86


2 Tukang Jam 0.2000 16,428.57
3 Mandor Jam 0.2000 24,571.43

JUMLAH HARGA TENAGA

B. BAHAN

1 Cover U- Ditch K- 300 60X100 M1 0.8000 325,000.00


JUMLAH HARGA BAHAN

C. PERALATAN

1 Crane Jam 0.9036 0.00


2 Alat Bantu LS 1.0000 0.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : U - DITCH K- 300 40X60


SATUAN PEMBAYARAN : M1

PERKIRAAN HARGA JU
NO. KOMPONEN SATUAN KUANTITAS SATUAN H
(Rp.) (

A. TENAGA

1 Pekerja Jam 0.8000 12,142.86


2 Tukang Jam 0.2000 16,428.57
3 Mandor Jam 0.2000 24,571.43

JUMLAH HARGA TENAGA

B. BAHAN

1 U - Ditch K- 300 UK 40X60 Buah 0.8000 477,000.00

JUMLAH HARGA BAHAN


C. PERALATAN

1 Mobile Crane Jam 0.9036 178,427.00


2 Alat Bantu LS 1.0000 25,000.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : COVER U- DITCH K- 300 UK 40X100


SATUAN PEMBAYARAN : M1

PERKIRAAN HARGA JU
NO. KOMPONEN SATUAN KUANTITAS SATUAN H
(Rp.) (

A. TENAGA

1 Pekerja Jam 0.8000 12,142.86


2 Tukang Jam 0.2000 16,428.57
3 Mandor Jam 0.2000 24,571.43

JUMLAH HARGA TENAGA

B. BAHAN

1 Cover U- Ditch K- 300 40 X100 M1 0.8000 230,000.00

JUMLAH HARGA BAHAN

C. PERALATAN

1 Crane Jam 0.9036 0.00


2 Alat Bantu LS 1.0000 0.00
JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : U - DITCH K- 300 40X40


SATUAN PEMBAYARAN : M1

PERKIRAAN HARGA JU
NO. KOMPONEN SATUAN KUANTITAS SATUAN H
(Rp.) (

A. TENAGA

1 Pekerja Jam 0.8000 12,142.86


2 Tukang Jam 0.2000 16,428.57
3 Mandor Jam 0.2000 24,571.43

JUMLAH HARGA TENAGA

B. BAHAN

1 U - Ditch K- 300 UK 40X40 Buah 0.6000 393,000.00

JUMLAH HARGA BAHAN

C. PERALATAN

1 Mobile Crane Jam 0.9036 178,427.00


2 Alat Bantu LS 1.0000 25,000.00
JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : COVER U- DITCH K- 300 UK 40X100


SATUAN PEMBAYARAN : M1

PERKIRAAN HARGA JU
NO. KOMPONEN SATUAN KUANTITAS SATUAN H
(Rp.) (

A. TENAGA

1 Pekerja Jam 0.8000 12,142.86


2 Tukang Jam 0.2000 16,428.57
3 Mandor Jam 0.2000 24,571.43

JUMLAH HARGA TENAGA

B. BAHAN

1 Cover U- Ditch K- 300 40 X100 M1 0.8000 220,000.00

JUMLAH HARGA BAHAN

C. PERALATAN

1 Crane Jam 0.9036 0.00


2 Alat Bantu LS 1.0000 0.00

JUMLAH HARGA PERALATAN


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )
E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : U - DITCH K- 300 20X30


SATUAN PEMBAYARAN : M1

PERKIRAAN HARGA JU
NO. KOMPONEN SATUAN KUANTITAS SATUAN H
(Rp.) (

A. TENAGA

1 Pekerja Jam 0.5000 12,142.86


2 Tukang Jam 0.1000 16,428.57
3 Mandor Jam 0.0500 24,571.43

JUMLAH HARGA TENAGA

B. BAHAN

1 U - Ditch K- 300 UK 20X30 Buah 0.6000 276,000.00

JUMLAH HARGA BAHAN

C. PERALATAN

1 Mobile Crane Jam 0.9036 0.00


2 Alat Bantu LS 1.0000 0.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : COVER U- DITCH K- 300 UK 40X100


SATUAN PEMBAYARAN : M1

PERKIRAAN HARGA JU
NO. KOMPONEN SATUAN KUANTITAS SATUAN H
(Rp.) (

A. TENAGA

1 Pekerja Jam 0.8000 12,142.86


2 Tukang Jam 0.2000 16,428.57
3 Mandor Jam 0.2000 24,571.43

JUMLAH HARGA TENAGA

B. BAHAN

1 Cover U- Ditch K- 300 20 X50 M1 0.8000 185,000.00

JUMLAH HARGA BAHAN

C. PERALATAN

1 Crane Jam 0.9036 0.00


2 Alat Bantu LS 1.0000 0.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN :
SATUAN PEMBAYARAN :
PERKIRAAN HARGA JU
NO. KOMPONEN SATUAN KUANTITAS SATUAN H
(Rp.) (

A. TENAGA

1 Pekerja OH 0.1500 85,000.00


2 Tukang Batu OH 0.2000 115,000.00
3 Kepala Tukang OH 0.0200 140,000.00
4 Mandor OH 0.0100 172,000.00

JUMLAH HARGA TENAGA

B. BAHAN

1 Paving Blok BH 50.0000 6,000.00


2 Pasir Pasang M3 0.0100 146,250.00

JUMLAH HARGA BAHAN

C. PERALATAN

3 Alat Bantu Ls 1.0000 0.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
JUMLAH
HARGA
(Rp.)

73,950.00
111,550.00
12,180.00
14,964.00

212,644.00

4,350,000.00

6,158,000.00
1,450,000.00
3,250,000.00
1,500,000.00
2,250,000.00

560,000.00

220,000.00
800,000.00

20,538,000.00

109,829.27

109,829.27

20,860,473.27
3,129,070.99
23,989,544.26

N PRECAST
JUMLAH
HARGA
(Rp.)

45,900.00
62,790.00
7,560.00
9,288.00

125,538.00

2,000.00
97,231.20
34,840.00

134,071.20

12,000.00
25,250.00

37,250.00

296,859.20
44,528.88
341,388.08

JUMLAH
HARGA
(Rp.)
89,250.00
12,075.00
15,400.00
8,600.00

125,325.00

80,812.00
78,650.00
27,887.50
252,760.00
100,000.00
2,966.88
61,950.00

605,026.38

25,000.00
25,250.00

50,250.00

780,601.38
117,090.21
897,691.58

JUMLAH
HARGA
(Rp.)
5,100.00
1,720.00

6,820.00

45,000.00
7,700.00
9,250.00

61,950.00

0.00

68,770.00
10,315.50
79,085.50

K 80X80

JUMLAH
HARGA
(Rp.)

9,714.29
3,285.71
4,914.29
17,914.29

812,000.00

812,000.00

161,226.64
25,000.00

186,226.64

1,016,140.92
152,421.14
1,168,562.06

300 UK 80X100

JUMLAH
HARGA
(Rp.)

9,714.29
3,285.71
4,914.29

17,914.29
416,000.00

416,000.00

0.00
0.00

0.00

433,914.29
65,087.14
499,001.43

K 60X60

JUMLAH
HARGA
(Rp.)

9,714.29
3,285.71
4,914.29

17,914.29

501,600.00
501,600.00

0.00
0.00

0.00

519,514.29
77,927.14
597,441.43

300 UK 60X60

JUMLAH
HARGA
(Rp.)

9,714.29
3,285.71
4,914.29

17,914.29

260,000.00
260,000.00

0.00
0.00

0.00

277,914.29
41,687.14
319,601.43

0X60

JUMLAH
HARGA
(Rp.)

9,714.29
3,285.71
4,914.29

17,914.29

381,600.00

381,600.00
161,226.64
25,000.00

186,226.64

585,740.92
87,861.14
673,602.06

300 UK 40X100

JUMLAH
HARGA
(Rp.)

9,714.29
3,285.71
4,914.29

17,914.29

184,000.00

184,000.00

0.00
0.00
0.00

201,914.29
30,287.14
232,201.43

0X40

JUMLAH
HARGA
(Rp.)

9,714.29
3,285.71
4,914.29

17,914.29

235,800.00

235,800.00

161,226.64
25,000.00
186,226.64

439,940.92
65,991.14
505,932.06

300 UK 40X100

JUMLAH
HARGA
(Rp.)

9,714.29
3,285.71
4,914.29

17,914.29

176,000.00

176,000.00

0.00
0.00

0.00
193,914.29
29,087.14
223,001.43

0X30

JUMLAH
HARGA
(Rp.)

6,071.43
1,642.86
1,228.57

8,942.86

165,600.00

165,600.00

0.00
0.00

0.00

174,542.86
26,181.43
200,724.29

300 UK 40X100
JUMLAH
HARGA
(Rp.)

9,714.29
3,285.71
4,914.29

17,914.29

148,000.00

148,000.00

0.00
0.00

0.00

165,914.29
24,887.14
190,801.43
JUMLAH
HARGA
(Rp.)

12,750.00
23,000.00
2,800.00
1,720.00

40,270.00

300,000.00
1,462.50

301,462.50

0.00

0.00

341,732.50
51,259.88
392,992.38
DAFTAR HARGA SATUAN BAHAN DAN UPAH KERJA
KABUPATEN MAMUJU UTARA SEMESTER I TAHUN 2016

NO. URAIAN SATUAN

A. HARGA SATUAN BAHAN


Bahan Dasar
1 Tanah Timbunan M3
2 Sirtu M3
3 Pasir Timbunan/ Pasir Urug M3
4 Pasir Pasangan M3
Pasir Beton M3
5
Pasir Beton (1 M3 = 1.400 Kg) Kg
Kerikil Split 2-3 Cm M3
6
Kerikil Split 2-3 Cm (1 M3 = 1.350 Kg) Kg
7 Batu Gunung M3
Semen PC - 50 Kg Zak
8
Semen PC Kg
9 Semen Warna Kg
10 Batu Merah Bh
12 Semen Putih Kg
13 Paving Block (T = 8cm) K-300 Bj
14 Kanstin Beton Pracetak 15x30x40 cm Bj
15 Batu Alam Andesit m2

Bahan Kayu
1 Kayu Balok, kelas I M3
2 Kayu Papan, kelas I M3
3 Kayu Balok, kelas II M3
4 Kayu Balok, kelas III M3
5 Kayu Papan, kelas III M3
6 Kayu Dolken/ Galam (Bambu), ø8 s/d 10 - 4 M Btg

Bahan Besi
1 Besi Beton Kg
2 Besi Strep 30.3 mm Btg
3 Kawat Beton Kg
4 Paku Biasa 1/2" s/d 5" Kg

Bahan Langit-langit
1 Tripleks 120 x 140, tbl 3 mm (Plywood) Lbr
2 Multipleks 120 x 140, tbl 9 mm (Plywood) Lbr

Bahan Finishing/ Cat


1 Cat Tembok Dasar Kg
2 Cat Tembok (setara METROLITE) Kg
3 Cat Anti Bocor setara No-Droop Kg
4 Cat Besi Kg
5 Sealant Tube
6 Plamur Kg
7 Cat Meni Kg
8 Minyak Bekisting Ltr

B HARGA SATUAN UPAH KERJA


DAFTAR HARGA SATUAN BAHAN DAN UPAH KERJA
KABUPATEN MAMUJU UTARA SEMESTER I TAHUN 2016

NO. URAIAN SATUAN

1 Pekerja Tidak Terampil Org/Hr


2 Pekerja Terampil Org/Hr
3 Penjaga Gudang Org/Hr
4 Penjaga Malam Org/Hr
5 Tukang Kayu Org/Hr
6 Tukang Batu Org/Hr
7 Tukang Cat Org/Hr
8 Tukang Listrik Org/Hr
9 Tukang Pipa Org/Hr
10 Tukang Besi Org/Hr
11 Kepala Tukang Org/Hr
12 Mandor Org/Hr

Waisai, 07 Januari 2021


Disusun Oleh :
Konsultan Perencana
0

0
Direktris
GA SATUAN BAHAN DAN UPAH KERJA

HARGA

41,875.00
146,250.00
62,500.00
146,250.00
229,375.00
163.84
256,620.00
190.09
187,500.00
88,000.00
1,760.00
18,750.00
1,050.00
1,875.00
2,756.00
20,350.00
250,000.00

8,670,000.00
10,200,000.00
3,125,000.00
2,000,000.00
2,000,000.00
27,500.00

35,000.00
43,199.00
25,000.00
18,750.00

65,000.00
106,600.00

33,000.00
17,760.00
32,450.00
55,000.00
40,000.00
10,120.00
1,857.14
3,200.00
GA SATUAN BAHAN DAN UPAH KERJA

HARGA

75,000.00
85,000.00
115,000.00
115,000.00
115,000.00
115,000.00
115,000.00
115,000.00
115,000.00
115,000.00
140,000.00
172,000.00

Waisai, 07 Januari 2021


Disusun Oleh :
Konsultan Perencana
VOLUME :

A. PEKERJAAN TANAH

VOL.1 1 M3 GALIAN TANAH BIASA SEDALAM 1 M


1 Bambalomutu
Lebar X Tinggi Luas
1 x 0.7 = 0.7

Panjang Saluran (m) = 3278 2294.6 M3


2 Bambira
Lebar X Tinggi Luas
1 x 0.7 = 0.7

Panjang Saluran (m) = 6022 4215.4 M3


3 Baras
Lebar X Tinggi Luas
1 x 0.7 = 0.7

Panjang Saluran (m) = 1384 968.8 M3


4 Doda
Lebar X Tinggi Luas
1 x 0.7 = 0.7

Panjang Saluran (m) = 286 200.2 M3


5 Lariang
Lebar X Tinggi Luas
1 x 0.7 = 0.7

Panjang Saluran (m) = 1498 1048.6 M3


6 Marta Jaya
Lebar X Tinggi Luas
1 x 0.7 = 0.7

Panjang Saluran (m) = 1050 735 M3


7 Muara Tikke
Lebar X Tinggi Luas
1 x 0.7 = 0.7

Hal 63
VOLUME :
Panjang Saluran (m) = 1160 812 M3
8 Pangiang
Lebar X Tinggi Luas
1 x 0.7 = 0.7

Panjang Saluran (m) = 3848 2693.6 M3


9 Sarudu
Lebar X Tinggi Luas
1 x 0.7 = 0.7

Panjang Saluran (m) = 1444 1010.8 M3


10 Taba
Lebar X Tinggi Luas
1 x 0.7 = 0.7

Panjang Saluran (m) = 726 508.2 M3


11 Tikke
Lebar X Tinggi Luas
1 x 0.7 = 0.7

Panjang Saluran (m) = 1840 1288 M3

Hal 64
VOLUME :

B. PEKERJAAN PONDASI

VOL.3 1 M3 PASANGAN PONDASI BATU GUNUNG, 1 Pc : 4 Ps


1 Bambalomutu
Lebar X Tinggi Luas
0.175 x 0.6 = 0.105

Panjang Saluran (m) = 3278 344.19 M3


Dikali Dua Ruas 688.38 M3
2 Bambira
Lebar X Tinggi Luas
0.175 x 0.6 = 0.105

Panjang Saluran (m) = 6022 632.31 M3


Dikali Dua Ruas 1264.62 M3
3 Baras
Lebar X Tinggi Luas
0.175 x 0.6 = 0.105

Panjang Saluran (m) = 1384 145.32 M3


Dikali Dua Ruas 290.64 M3
4 Doda
Lebar X Tinggi Luas
0.175 x 0.6 = 0.105

Panjang Saluran (m) = 286 30.03 M3


Dikali Dua Ruas 60.06 M3
5 Lariang
Lebar X Tinggi Luas
0.175 x 0.6 = 0.105

Panjang Saluran (m) = 1498 157.29 M3


Dikali Dua Ruas 314.58 M3
6 Marta Jaya
Lebar X Tinggi Luas
0.175 x 0.6 = 0.105

Panjang Saluran (m) = 1050 110.25 M3


Dikali Dua Ruas 220.5 M3
7 Muara Tikke

Hal 65
VOLUME :
Lebar X Tinggi Luas
0.175 x 0.6 = 0.105

Panjang Saluran (m) = 1160 121.8 M3


Dikali Dua Ruas 243.6 M3
8 Pangiang
Lebar X Tinggi Luas
0.175 x 0.6 = 0.105

Panjang Saluran (m) = 3848 404.04 M3


Dikali Dua Ruas 808.08 M3
9 Sarudu
Lebar X Tinggi Luas
0.175 x 0.6 = 0.105

Panjang Saluran (m) = 1444 151.62 M3


Dikali Dua Ruas 303.24 M3
10 Taba
Lebar X Tinggi Luas
0.175 x 0.6 = 0.105

Panjang Saluran (m) = 726 76.23 M3


Dikali Dua Ruas 152.46 M3
11 Tikke
Lebar X Tinggi Luas
0.175 x 0.6 = 0.105

Panjang Saluran (m) = 1840 193.2 M3


Dikali Dua Ruas 386.4 M3

Hal 66
VOLUME :

VOL.5 1 M3 RABAT BETON T= 5 CM


1 Bambalomutu
Lebar X Tinggi Luas
0.2 x 0.5 = 0.1

Panjang Saluran (m) = 3278 327.8 M3


2 Bambira
Lebar X Tinggi Luas
0.2 x 0.5 = 0.1

Panjang Saluran (m) = 6022 602.2 M3


3 Baras
Lebar X Tinggi Luas
0.3 x 0.5 = 0.15

Panjang Saluran (m) = 1384 207.6 M3


4 Doda
Lebar X Tinggi Luas
0.2 x 0.5 = 0.1

Panjang Saluran (m) = 286 28.6 M3


5 Lariang
Lebar X Tinggi Luas
0.2 x 0.5 = 0.1

Panjang Saluran (m) = 1498 149.8 M3


6 Marta Jaya
Lebar X Tinggi Luas
0.2 x 0.5 = 0.1

Panjang Saluran (m) = 1050 105 M3


7 Muara Tikke
Lebar X Tinggi Luas
0.2 x 0.5 = 0.1

Panjang Saluran (m) = 1160 116 M3


8 Pangiang
Lebar X Tinggi Luas
0.2 x 0.5 = 0.1

Hal 67
VOLUME :

Panjang Saluran (m) = 3848 384.8 M3


9 Sarudu
Lebar X Tinggi Luas
0.2 x 0.5 = 0.1

Panjang Saluran (m) = 1444 144.4 M3


10 Taba
Lebar X Tinggi Luas
0.2 x 0.5 = 0.1

Panjang Saluran (m) = 726 72.6 M3


11 Tikke
Lebar X Tinggi Luas
0.3 x 0.5 = 0.15

Panjang Saluran (m) = 1840 276 M3

Hal 68
VOL.2 1 M3 URUGAN PASIR
1 Bambalomutu
Lebar X Tinggi Luas
0.6 x 0.5 = 0.3

Panjang Saluran (m) = 3278 983.4 M3


2 Bambira
Lebar X Tinggi Luas
0.6 x 0.5 = 0.3

Panjang Saluran (m) = 6022 1806.6 M3


3 Baras
Lebar X Tinggi Luas
0.7 x 0.5 = 0.35

Panjang Saluran (m) = 1384 484.4 M3


4 Doda
Lebar X Tinggi Luas
0.6 x 0.5 = 0.3

Panjang Saluran (m) = 286 85.8 M3


5 Lariang
Lebar X Tinggi Luas
0.6 x 0.5 = 0.3

Panjang Saluran (m) = 1498 449.4 M3


6 Marta Jaya
Lebar X Tinggi Luas
0.6 x 0.5 = 0.3

Panjang Saluran (m) = 1050 315 M3


7 Muara Tikke
Lebar X Tinggi Luas
0.6 x 0.5 = 0.3

Hal 69
Panjang Saluran (m) = 1160 348 M3
8 Pangiang
Lebar X Tinggi Luas
0.6 x 0.5 = 0.3

Panjang Saluran (m) = 3848 1154.4 M3


9 Sarudu
Lebar X Tinggi Luas
0.6 x 0.5 = 0.3

Panjang Saluran (m) = 1444 433.2 M3


10 Taba
Lebar X Tinggi Luas
0.6 x 0.5 = 0.3

Panjang Saluran (m) = 726 217.8 M3


11 Tikke
Lebar X Tinggi Luas
0.7 x 0.5 = 0.35

Panjang Saluran (m) = 1840 644 M3

Hal 70
VOL.4 1 M3 PEKERJAAN PLESTERAN + ACIAN
1 Bambalomutu

Lebar (m) = 0.65

Panjang Saluran (m) = 3278 2130.7 M3


Dikali Dua Ruas 4261.4 M3
2 Bambira

Lebar (m) = 0.65

Panjang Saluran (m) = 6022 3914.3 M3


Dikali Dua Ruas 7828.6 M3
3 Baras

Lebar (m) = 0.65

Panjang Saluran (m) = 1384 899.6 M3


Dikali Dua Ruas 1799.2 M3
4 Doda

Lebar (m) = 0.65

Panjang Saluran (m) = 286 185.9 M3


Dikali Dua Ruas 371.8 M3
5 Lariang

Lebar (m) = 0.65

Panjang Saluran (m) = 1498 973.7 M3


Dikali Dua Ruas 1947.4 M3
6 Marta Jaya

Lebar (m) = 0.65

Panjang Saluran (m) = 1050 682.5 M3


Dikali Dua Ruas 1365 M3
7 Muara Tikke

Hal 71
Lebar (m) = 0.65

Panjang Saluran (m) = 1160 754 M3


Dikali Dua Ruas 1508 M3
8 Pangiang

Lebar (m) = 0.65

Panjang Saluran (m) = 3848 2501.2 M3


Dikali Dua Ruas 5002.4 M3
9 Sarudu

Lebar (m) = 0.65

Panjang Saluran (m) = 1444 938.6 M3


Dikali Dua Ruas 1877.2 M3
10 Taba

Lebar (m) = 0.65

Panjang Saluran (m) = 726 471.9 M3


Dikali Dua Ruas 943.8 M3
11 Tikke

Lebar (m) = 0.65

Panjang Saluran (m) = 1840 1196 M3


Dikali Dua Ruas 2392 M3

Hal 72
VOL.6 1 M3 URUGAN SIRTU
1 Bambalomutu
Lebar X Tinggi Luas
0.2 x 0.15 = 0.03

Panjang Saluran (m) = 3278 98.34 M3


2 Bambira
Lebar X Tinggi Luas
0.2 x 0.15 = 0.03

Panjang Saluran (m) = 6022 180.66 M3


3 Baras
Lebar X Tinggi Luas
0.6 x 0.15 = 0.09

Panjang Saluran (m) = 1384 124.56 M3


4 Doda
Lebar X Tinggi Luas
0.4 x 0.15 = 0.06

Panjang Saluran (m) = 286 17.16 M3


5 Lariang
Lebar X Tinggi Luas
0.7 x 0.15 = 0.105

Panjang Saluran (m) = 1498 157.29 M3


6 Marta Jaya
Lebar X Tinggi Luas
0.2 x 0.15 = 0.03

Panjang Saluran (m) = 1050 31.5 M3


7 Muara Tikke
Lebar X Tinggi Luas
0.7 x 0.15 = 0.105

Panjang Saluran (m) = 1160 121.8 M3


8 Pangiang
Lebar X Tinggi Luas
0.2 x 0.15 = 0.03

Hal 73
Panjang Saluran (m) = 3848 115.44 M3
9 Sarudu
Lebar X Tinggi Luas
0.2 x 0.15 = 0.03

Panjang Saluran (m) = 1444 43.32 M3


10 Taba
Lebar X Tinggi Luas
0.4 x 0.15 = 0.06

Panjang Saluran (m) = 726 43.56 M3


11 Tikke
Lebar X Tinggi Luas
0.5 x 0.15 = 0.075

Panjang Saluran (m) = 1840 138 M3

Hal 74
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

A. PEKERJAAN TANAH
DN-1 1 M3 GALIAN TANAH BIASA SEDALAM 1 M
1. Tenaga
0.750 Oh Pekerja @ Rp. 75,000.00 Rp.
0.025 Oh Mandor @ Rp. 172,000.00 Rp.
Rp.

DN-2 1 M3 GALIAN TANAH BIASA SEDALAM 2 M


1. Tenaga
0.900 Oh Pekerja @ Rp. 75,000.00 Rp.
0.045 Oh Mandor @ Rp. 172,000.00 Rp.
Rp.

DN-3 1 M3 URUGAN KEMBALI GALIAN BIASA SEDALAM 1 M


1. Tenaga
0.250 Oh Pekerja @ Rp. 75,000.00 Rp.
0.008 Oh Mandor @ Rp. 172,000.00 Rp.
Rp.

DN-4 1 M3 URUGAN PASIR


1. Bahan
1.200 M3 Pasir Urug @ Rp. 62,500.00 Rp.
2. Tenaga
0.300 Oh Pekerja @ Rp. 75,000.00 Rp.
0.010 Oh Mandor @ Rp. 172,000.00 Rp.
Rp.

DN-5 1 M3 TIMBUNAN TANAH


1. Bahan
1.200 M3 Tanah Timbunan @ Rp. 41,875.00 Rp.
2. Tenaga
0.500 Oh Pekerja @ Rp. 75,000.00 Rp.
0.050 Oh Mandor @ Rp. 172,000.00 Rp.
Rp.

DN-6 1 M3 PEK. URUGAN SIRTU


1. Bahan
1.200 M3 Sirtu @ Rp. 146,250.00 Rp.
2. Tenaga
0.250 Oh Pekerja @ Rp. 75,000.00 Rp.
0.025 Oh Mandor @ Rp. 172,000.00 Rp.
Rp.

B. PEKERJAAN PONDASI
DN-7 1 M3 PASANGAN PONDASI BATU GUNUNG, 1 Pc : 4 Ps
1. Bahan
1.200 M3 Batu Gunung @ Rp. 187,500.00 Rp.
163.000 Kg Semen PC @ Rp. 1,760.00 Rp.
0.520 M3 Pasir Pasangan @ Rp. 146,250.00 Rp.
2. Tenaga

Hal 75
1.500 Oh Pekerja @ Rp. 75,000.00 Rp.
0.750 Oh Tukang Batu @ Rp. 115,000.00 Rp.
0.075 Oh Kepala Tk. Batu @ Rp. 140,000.00 Rp.
0.075 Oh Mandor @ Rp. 172,000.00 Rp.
Rp.

DN-8 1 M3 PASANG PONDASI BATU KOSONG


1. Bahan
1.200 M3 Batu Gunung @ Rp. 187,500.00 Rp.
0.432 M3 Pasir Urug @ Rp. 62,500.00 Rp.
2. Tenaga
0.780 Oh Pekerja @ Rp. 75,000.00 Rp.
0.390 Oh Tukang Batu @ Rp. 115,000.00 Rp.
0.039 Oh Kepala Tk. Batu @ Rp. 140,000.00 Rp.
0.039 Oh Mandor @ Rp. 172,000.00 Rp.

Hal 76
Rp.

C. PEKERJAAN PLESTERAN
DN-9 1 M2 PLESTERAN 1 Pc : 2 Ps, TEBAL 15 MM
1. Bahan
10.224 Kg Semen PC @ Rp. 1,760.00 Rp.
0.020 M3 Pasir Pasang @ Rp. 146,250.00 Rp.
2. Tenaga
0.3000 Oh Pekerja @ Rp. 75,000.00 Rp.
0.1500 Oh Tukang Batu @ Rp. 115,000.00 Rp.
0.0150 Oh Kepala Tukang @ Rp. 140,000.00 Rp.
0.0150 Oh Mandor @ Rp. 172,000.00 Rp.
Rp.

DN-10 1 M2 PLESTERAN 1 Pc : 4 Ps, TEBAL 15 MM


1. Bahan
6.2400 Kg Semen PC @ Rp. 1,760.00 Rp.
0.0240 M3 Pasir Pasang @ Rp. 146,250.00 Rp.
2. Tenaga
0.3000 Oh Pekerja @ Rp. 75,000.00 Rp.
0.1500 Oh Tukang Batu @ Rp. 115,000.00 Rp.
0.0150 Oh Kepala Tukang @ Rp. 140,000.00 Rp.
0.0150 Oh Mandor @ Rp. 172,000.00 Rp.
Rp.

DN-11 1 M2 PLESTERAN 1 Pc : 3 Ps, TEBAL 15 MM


1. Bahan
7.7760 Kg Semen PC @ Rp. 1,760.00 Rp.
0.0230 M3 Pasir Pasang @ Rp. 146,250.00 Rp.
2. Tenaga
0.3000 Oh Pekerja @ Rp. 75,000.00 Rp.
0.1500 Oh Tukang Batu @ Rp. 115,000.00 Rp.
0.0150 Oh Kepala Tukang @ Rp. 140,000.00 Rp.
0.0150 Oh Mandor @ Rp. 172,000.00 Rp.
Rp.

DN-12 1 M2 ACIAN TEMBOK


1. Bahan
3.250 Kg Semen PC @ Rp. 1,760.00 Rp.
2. Tenaga
0.2000 Oh Pekerja @ Rp. 75,000.00 Rp.
0.1000 Oh Tukang Batu @ Rp. 115,000.00 Rp.
0.0100 Oh Kepala Tukang @ Rp. 140,000.00 Rp.
0.0100 Oh Mandor @ Rp. 172,000.00 Rp.
Rp.

D. PEKERJAAN BETON
DN-13 1 M3 MEMBUAT LANTAI KERJA BETON MUTU, K 100
1. Bahan
230.000 Kg Semen PC @ Rp. 1,760.00 Rp.
893.000 Kg Pasir Beton @ Rp. 163.84 Rp.
1,027.000 Kg Kerikil Split 2/3 @ Rp. 190.09 Rp.
200.000 Ltr Air @ Rp. - Rp.

Hal 77
2. Tenaga
1.200 Oh Pekerja @ Rp. 75,000.00 Rp.
0.200 Oh Tukang Batu @ Rp. 115,000.00 Rp.
0.020 Oh Kepala Tukang @ Rp. 140,000.00 Rp.
0.060 Oh Mandor @ Rp. 172,000.00 Rp.
Rp.

Hal 78
ARGA SATUAN PEKERJAAN

56,250.00
4,300.00
60,550.00

67,500.00
7,740.00
75,240.00

18,750.00
1,433.33
20,183.33

75,000.00

22,500.00
1,720.00
99,220.00

50,250.00

37,500.00
8,600.00
96,350.00

175,500.00

18,750.00
4,300.00
198,550.00

225,000.00
286,880.00
76,050.00

Hal 79
112,500.00
86,250.00
10,500.00
12,900.00
810,080.00

225,000.00
27,000.00

58,500.00
44,850.00
5,460.00
6,708.00

Hal 80
367,518.00

17,994.24
2,925.00

22,500.00
17,250.00
2,100.00
2,580.00
65,349.24

10,982.40
3,510.00

22,500.00
17,250.00
2,100.00
2,580.00
58,922.40

13,685.76
3,363.75

22,500.00
17,250.00
2,100.00
2,580.00
61,479.51

5,720.00

15,000.00
11,500.00
1,400.00
1,720.00
35,340.00

404,800.00
146,308.48
195,221.29
-

Hal 81
90,000.00
23,000.00
2,800.00
10,320.00
872,449.77

Hal 82
JENIS PEKERJAAN : PEKERASAN JALAN BETON K- 300
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUM


NO. KOMPONEN SATUAN KUANTITAS SATUAN HA
(Rp.) (R

A. TENAGA

1 Pekerja Jam 1.4056 85,000.00


2 Tukang Jam 0.7028 115,000.00
2 Mandor Jam 0.1506 172,000.00
JUMLAH HARGA TENAGA

B. BAHAN

1 Semen Kg 410.0000 1,200.00


2 Pasir M3 0.6237 170,000.00
3 Agregat Kasar M3 0.7885 263,900.00
4 Joint Sealent Kg 0.9900 27,800.00
5 Bond Breaker Plastik M2 0.4375 19,500.00
6 Curing Compound Ltr 0.8700 18,500.00
7 Multiplex 12 mm Lbr 0.1600 175,000.00
8 Kayu Acuan M3 0.0960 2,500,000.00
9 Paku Kg 1.0240 18,750.00
10 Additive Ltr 0.9139 38,500.00
JUMLAH HARGA BAHAN

C. PERALATAN

1 Con. Vibrator Jam 0.0502 13,070.00


2 Water Tank Truck Jam 0.0422 271,083.00
3 Conc. Paver Jam 0.0074 107,189.00
4 Alat Bantu LS 1.0000 12,000.00
JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : BETON MUTU SEDANG DENGAN fc' = 25 Mpa (K-300)


SATUAN PEMBAYARAN : M3
PERKIRAAN HARGA JUM
NO. KOMPONEN SATUAN KUANTITAS SATUAN HA
(Rp.) (R

A. TENAGA

1 Pekerja JAM 0.8032 12,142.86


2 Tukang JAM 1.1044 16,428.57
3 Mandor JAM 0.1004 24,571.43

JUMLAH HARGA TENAGA

B. BAHAN

1 Semen PC KG 469.6800 1,200.00


2 Pasir Beton M3 0.5097 170,000.00
3 Agregat Kasar 2-3 cm M3 0.7440 263,900.00
4 Air LTR 215.0000 8.88

JUMLAH HARGA BAHAN

C. PERALATAN

1 Cor Pan Mixer JAM 0.1004 219,284.00


2 Truck Mixer JAM 0.3162 279,763.00
3 Water Tanker JAM 0.0382 271,083.00
4 Alat Bantu LS 1.0000 7,000.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : BETON MUTU RENDAH DENGAN fc' = 15 Mpa (K-175)


SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUM


NO. KOMPONEN SATUAN KUANTITAS SATUAN HA
(Rp.) (R

A. TENAGA

1 Pekerja JAM 0.8032 12,142.86


2 Tukang JAM 1.1044 16,428.57
3 Mandor JAM 0.1004 24,571.43

JUMLAH HARGA TENAGA

B. BAHAN

1 Semen PC KG 281.5400 1,200.00


2 Pasir Beton M3 0.4024 170,000.00
3 Agregat Kasar 2-3 cm M3 0.7053 263,900.00
4 Air LTR 115.0000 8.88

JUMLAH HARGA BAHAN

C. PERALATAN

1 Conc Mixer JAM 0.6827 38,332.00


3 Water Tanker JAM 0.0382 271,083.00
4 Alat Bantu LS 1.0000 7,000.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : PEMASANGAN BOND BREAKER PLASTIK


SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA JUM


NO. KOMPONEN SATUAN KUANTITAS SATUAN HA
(Rp.) (R

A. TENAGA
1 Pekerja OH 0.0150 85,000.00
2 Mandor OH 0.0040 172,000.00

JUMLAH HARGA TENAGA

B. BAHAN

1 Bond Breaker Plastik M2 1.2000 6,500.00

JUMLAH HARGA BAHAN

C. PERALATAN

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : BEKISTING 2 X PAKAI


SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA JUM


NO. KOMPONEN SATUAN KUANTITAS SATUAN HA
(Rp.) (R

A. TENAGA

1 Pekerja OH 0.6600 85,000.00


2 Tukang Kayu OH 0.3300 115,000.00
3 Kepala Tukang Kayu OH 0.0330 140,000.00
4 Mandor OH 0.0330 172,000.00

JUMLAH HARGA TENAGA

B. BAHAN

1 Kayu Klas II (balok) 2x pakai M3 0.0250 2,500,000.00


2 Paku Biasa 2"-5" KG 0.4000 18,750.00
3 Minyak Bekisting LTR 0.2000 5,500.00
4 Multipleks 6 mm (2 x pakai) LBR 0.1750 175,000.00

JUMLAH HARGA BAHAN

C. PERALATAN

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : FINISHING TROWEL BERGARIS DAN CURING BETON


SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA JUM


NO. KOMPONEN SATUAN KUANTITAS SATUAN HA
(Rp.) (R

A. TENAGA

1 Pekerja OH 0.0277 85,000.00


2 Mandor OH 0.0067 172,000.00

JUMLAH HARGA TENAGA


B. BAHAN

1 Curing Compound LTR 0.8700 18,500.00

JUMLAH HARGA BAHAN

C. PERALATAN

1 Mesin Trowel JAM 0.0567 187,500.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )

JENIS PEKERJAAN : PAVING BLOK WARNA T= 8 CM K- 300


SATUAN PEMBAYARAN : M2

PERKIRAAN HARGA JUM


NO. KOMPONEN SATUAN KUANTITAS SATUAN HA
(Rp.) (R

A. TENAGA

1 Pekerja OH 0.1500 85,000.00


2 Tukang Batu OH 0.2000 115,000.00
3 Kepala Tukang OH 0.0200 140,000.00
4 Mandor OH 0.0100 172,000.00

JUMLAH HARGA TENAGA


B. BAHAN

1 Paving Blok BH 50.0000 6,000.00


2 Pasir Pasang M3 0.0100 146,250.00

JUMLAH HARGA BAHAN

C. PERALATAN

3 Alat Bantu Ls 1.0000 0.00

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT 15.0 % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
JUMLAH
HARGA
(Rp.)

119,476.00
80,822.00
25,903.20
226,201.20

492,000.00
106,029.00
208,085.15
27,522.00
8,531.25
16,095.00
28,000.00
240,000.00
19,200.00
35,185.15
1,180,647.55

656.11
11,439.70
793.20
12,000.00
24,889.02

1,431,737.77
214,760.66
1,646,498.43
JUMLAH
HARGA
(Rp.)

9,753.14
18,143.71
2,466.97

30,363.83

563,616.00
86,649.00
196,341.60
1,908.13

848,514.73

22,016.11
88,461.06
10,355.37
7,000.00

127,832.54

1,006,711.10
151,006.66
1,157,717.76

JUMLAH
HARGA
(Rp.)

9,753.14
18,143.71
2,466.97

30,363.83

337,848.00
68,408.00
186,128.67
1,020.63

593,405.30

26,169.26
10,355.37
7,000.00

43,524.63

667,293.75
100,094.06
767,387.81

JUMLAH
HARGA
(Rp.)
1,275.00
688.00

1,963.00

7,800.00

7,800.00

0.00

9,763.00
1,464.45
11,227.45

JUMLAH
HARGA
(Rp.)

56,100.00
37,950.00
4,620.00
5,676.00

104,346.00

62,500.00
7,500.00
1,100.00
30,625.00

101,725.00

0.00

206,071.00
30,910.65
236,981.65

JUMLAH
HARGA
(Rp.)

2,354.50
1,152.40

3,506.90
16,095.00

16,095.00

10,631.25

10,631.25

30,233.15
4,534.97
34,768.12

JUMLAH
HARGA
(Rp.)

12,750.00
23,000.00
2,800.00
1,720.00

40,270.00
300,000.00
1,462.50

301,462.50

0.00

0.00

341,732.50
51,259.88
392,992.38
DAFTAR HARGA SATUAN PERALATAN
HARGA BIAYA ALAT
NO. JENIS ALAT SAT
(Rp) PER JAM

1 Bulldozer Unit 1,001,345,100.00 352,945.00


2 Motor grader Unit 1,286,381,250.00 441,671.00
3 Excavator hydraulic Unit 1,178,055,900.00 397,644.00
4 Pemecah batu 30 ton/jam Unit 2,701,033,600.00 817,684.00
5 Mesin penyaring Unit 596,847,300.00 216,811.00
6 Loader tracked Unit 1,236,955,650.00 435,596.00
7 Loader wheeled Unit 647,934,000.00 247,930.00
8 Tractor wheeled Unit 239,002,050.00 93,595.00
9 Mesin gilas tiga roda 6 - 8 ton Unit 550,762,050.00 176,752.00
10 Mesin gilas tandem 6 - 10 ton Unit 625,276,050.00 192,677.00
11 Mesin gilas bergetar 6 - 7 ton Unit 595,701,750.00 203,525.00
12 Mesin gilas roda karet 8 - 15 Ton Unit 774,215,400.00 258,860.00
13 Mesin Gilas Bergetar 1 Ton Unit 125,613,600.00 48,912.00
14 Stamper, Vibrator Plate Unit 18,824,400.00 14,839.00
15 Alat penggetar beton Unit 11,782,050.00 13,070.00
16 Chip spreader Unit 47,798,100.00 43,221.00
17 Mesin penyemprot asphal 1000 lt Unit 57,357,300.00 36,016.00
18 Mesin penyemprot asphal 400 lt Unit 45,360,000.00 34,135.00
19 Mesin pencampur aspal 30 ton/jam Unit 2,948,400,000.00 1,086,252.00
20 Mesin Penghampar 1,82 M Unit 353,422,650.00 155,469.00
21 Truk tangki Air Unit 295,770,300.00 271,083.00
22 Dump truck 3,5 ton Unit 270,900,000.00 155,683.00
23 Dump truck 5 ton Unit 299,403,300.00 152,754.00
24 Dump truck 8 ton Unit 310,800,000.00 164,980.00
25 Truk bak terbuka 3,5 ton Unit 236,609,100.00 130,362.00
26 Truk pickup Unit 207,034,800.00 99,008.00
27 Mobil lapangan 4 ton Unit 131,250,000.00 68,336.00
28 Pengaduk Beton 0,125 m3 Unit 34,020,000.00 15,710.00
29 Pengaduk Beton 0,25 m3 Unit 71,623,650.00 31,904.00
30 Pengaduk Beton 0,50 m3 Unit 85,050,000.00 41,507.00
31 Kompresor udara 210 m3/jam Unit 118,344,450.00 87,441.00
32 Generator Unit 21,444,150.00 20,730.00
33 Pompa air diameter 5 cm 30 m3/jm Unit 9,548,700.00 11,956.00
34 Pompa air diameter 10 cm 40 m3/jm Unit 11,930,100.00 14,941.00
35 Peralatan jackhammer dll Unit 26,082,000.00 22,664.00
36 Peralatan traktor dll Unit 118,196,400.00 115,443.00

Waisai, 07 Januari 2
Disusun Oleh :
Konsultan Perenca
DAFTAR HARGA SATUAN PERALATAN
HARGA BIAYA ALAT
NO. JENIS ALAT SAT
(Rp) PER JAM

0
Direktris
ARGA SATUAN PERALATAN
BIAYA ALAT
PER HARI

1,764,725.00
2,208,355.00
1,988,220.00
4,088,420.00
1,084,055.00
2,177,980.00
1,239,650.00
467,975.00
883,760.00
963,385.00
1,017,625.00
1,294,300.00
244,560.00
74,195.00
65,350.00
216,105.00
180,080.00
170,675.00
5,431,260.00
777,345.00
1,355,415.00
778,415.00
763,770.00
824,900.00
651,810.00
495,040.00
341,680.00
78,550.00
159,520.00
207,535.00
437,205.00
103,650.00
59,780.00
74,705.00
113,320.00
577,215.00

Waisai, 07 Januari 2021


Disusun Oleh :
Konsultan Perencana
ARGA SATUAN PERALATAN
BIAYA ALAT
PER HARI

0
Direktris
ANALISA BIAYA SEWA PERALATAN PER JAM KERJA

UMUR KERJA BIAYA PEMILIKAN (OWNERS COST) (Rp/Jam)


HP Harga Alat Harga Alat Depresiasi Lain-lain
$ (Rp) Tahun Hari Jam Diesel
No JENIS ALAT Kode Asuransi + Rp 13,200
PPN (3% Jumlah (Rp)
90% Faktor CRF Jam/Tahun Jumlah +10%= 3,33
%) Ltr/HP/Jam

1 2 4 3 5 6 7 8 9 10 11 12 13 14 15 16

1. Bulldozer E 001 110 86,772.00 1,001,345,100.00 8 300 12,000 0.90 0.26061 1,500 156,576.00 0.033 22,030.00 0.0158
2. Motor grader E 010 115 111,472.00 1,286,381,250.00 8 300 12,000 0.90 0.26061 1,500 201,146.00 0.033 28,300.00 0.0158
3. Excavator hydraulic E 020 90 102,085.00 1,178,055,900.00 8 300 12,000 0.90 0.26061 1,500 184,207.00 0.033 25,917.00 0.0158
4. Pemecah batu 30 ton/jam E 031 140 234,058.00 2,701,033,600.00 10 300 15,000 0.90 0.23852 1,500 386,555.00 0.033 59,423.00 0.0158
5. Mesin penyaring E 040 80 51,720.00 596,847,300.00 8 300 12,000 0.90 0.26061 1,500 93,326.00 0.033 13,131.00 0.0158
6. Loader tracked E 051 135 107,189.00 1,236,955,650.00 8 300 12,000 0.90 0.26061 1,500 193,417.00 0.033 27,213.00 0.0158
7. Loader wheeled E 052 115 56,147.00 647,934,000.00 8 300 12,000 0.90 0.26061 1,500 101,315.00 0.033 14,255.00 0.0158
8. Tractor wheeled E 053 60 20,711.00 239,002,050.00 10 300 15,000 0.90 0.23852 1,500 34,204.00 0.033 5,258.00 0.0158
9. Mesin gilas tiga roda 6 - 8 ton E 080 51 47,726.00 550,762,050.00 10 300 15,000 0.90 0.23852 1,500 78,822.00 0.033 12,117.00 0.0158
10. Mesin gilas tandem 6 - 10 ton E 081 40 54,183.00 625,276,050.00 10 300 15,000 0.90 0.23852 1,500 89,486.00 0.033 13,756.00 0.0158
11. Mesin gilas bergetar 6 - 7 ton E 082 51 51,621.00 595,701,750.00 8 300 12,000 0.90 0.26061 1,500 93,147.00 0.033 13,105.00 0.0158
12. Mesin gilas roda karet 8 - 15 Ton E 084 95 67,090.00 774,215,400.00 10 300 15,000 0.90 0.23852 1,500 110,801.00 0.033 17,033.00 0.0158
13. Mesin Gilas Bergetar 1 Ton E 087 12 10,885.00 125,613,600.00 6 300 7,200 0.90 0.30071 1,500 22,664.00 0.033 2,763.00 0.0158
14. Stamper, Vibrator Plate E 088 4 1,631.00 18,824,400.00 6 300 4,500 0.90 0.30071 750 6,793.00 0.033 828.00 0.0158
15. Alat penggetar beton E 089 4 1,021.00 11,782,050.00 5 300 3,000 0.90 0.33438 600 5,910.00 0.033 648.00 0.0158
16. Chip spreader E 130 4 4,142.00 47,798,100.00 6 300 3,600 0.90 0.30071 600 21,560.00 0.033 2,629.00 0.0158
17. Mesin penyemprot asphal 1000 lt E 153 25 4,970.00 57,357,300.00 6 300 4,500 0.90 0.30071 1,200 12,936.00 0.033 1,577.00 0.0158
18. Mesin penyemprot asphal 400 lt E 154 6 3,931.00 45,360,000.00 6 300 4,500 0.90 0.30071 750 16,368.00 0.033 1,996.00 0.0158
19. Mesin pencampur aspal 30 ton/jam E 155 125 255,494.00 2,948,400,000.00 10 300 12,000 0.90 0.23852 1,200 527,445.00 0.033 81,081.00 0.0158
20. Mesin Penghampar 1,82 M E 157 30 30,626.00 353,422,650.00 7 300 8,400 0.90 0.27742 1,200 73,536.00 0.033 9,719.00 0.0158
21. Truk tangki Air E 182 115 25,630.00 295,770,300.00 6 300 9,000 0.90 0.30071 700 114,351.00 0.033 13,943.00 0.0158
22. Dump truck 3,5 ton E 211 106 23,475.00 270,900,000.00 6 300 9,000 0.90 0.30071 1,300 56,396.00 0.033 6,877.00 0.0158
23. Dump truck 5 ton E 212 145 25,945.00 299,403,300.00 6 300 9,000 0.90 0.30071 1,300 62,330.00 0.033 7,600.00 0.0158
24. Dump truck 8 ton E 213 175 26,932.00 310,800,000.00 10 300 9,000 0.90 0.23852 1,500 44,480.00 0.033 6,838.00 0.0158
25. Truk bak terbuka 3,5 ton E 221 80 20,503.00 236,609,100.00 6 300 9,000 0.90 0.30071 1,300 49,257.00 0.033 6,006.00 0.0158
26. Truk pickup E 222 61 17,941.00 207,034,800.00 6 300 9,000 0.90 0.30071 1,500 37,354.00 0.033 4,555.00 0.0158
27. Mobil lapangan 4 ton E 231 80 11,373.00 131,250,000.00 12 300 14,400 0.90 0.22526 1,600 16,631.00 0.033 2,707.00 0.0158
28. Pengaduk Beton 0,125 m3 E 251 6 2,948.00 34,020,000.00 5 300 7,500 0.90 0.33438 1,500 6,825.00 0.033 748.00 0.0158
29. Pengaduk Beton 0,25 m3 E 252 10 6,207.00 71,623,650.00 5 300 7,500 0.90 0.33438 1,500 14,370.00 0.033 1,576.00 0.0158
30 Pengaduk Beton 0,50 m3 E 253 20 7,370.00 85,050,000.00 5 300 7,500 0.90 0.33438 1,500 17,063.00 0.033 1,871.00 0.0158
31. Kompresor udara 210 m3/jam E 301 35 10,255.00 118,344,450.00 8 300 6,000 0.90 0.26061 750 37,010.00 0.033 5,207.00 0.0158
32. Generator E 311 10 1,858.00 21,444,150.00 8 300 4,800 0.90 0.26061 600 8,383.00 0.033 1,179.00 0.0158
33. Pompa air diameter 5 cm 30 m3/jm E 341 8 827.00 9,548,700.00 4 300 3,000 0.90 0.38629 750 4,426.00 0.033 420.00 0.0158
34. Pompa air diameter 10 cm 40 m3/jm E 342 10 1,034.00 11,930,100.00 4 300 3,000 0.90 0.38629 750 5,530.00 0.033 525.00 0.0158
35. Peralatan jackhammer dll E 351 6 2,260.00 26,082,000.00 5 300 3,750 0.90 0.33438 750 10,466.00 0.033 1,148.00 0.0158
36. Peralatan traktor dll E 401 5 10,242.00 118,196,400.00 5 300 3,000 0.90 0.33438 600 59,284.00 0.033 6,501.00 0.0158
SEWA PERALATAN PER JAM KERJA

B. BIAYA OPERASI (OPERATING COST) (Rp/Jam)


Bahan Bakar & Pelumas Perbaikan Biaya Alat Biaya Alat Kondisi
Diesel Bensin Pelumas & Spareparts Jumlah Per Jam Per Hari Alat
Rp 13,200.00 Rp 13,200.00 Rp 39,600.00
Jumlah
Biaya Ltr/HP/Jam Biaya Ltr/HP/Jam Biaya 0.80 (Rp)

17 18 19 20 21 22 23 24 25 26 27

22,942.00 0.0670 97,284.00 0.0060 26,136.00 49,078.00 125,261.00 174,339.00 352,945.00 1,764,725.00 Alat baru
23,984.00 0.0670 101,706.00 0.0060 27,324.00 51,308.00 160,917.00 212,225.00 441,671.00 2,208,355.00 Alat baru
18,770.00 0.0670 79,596.00 0.0060 21,384.00 40,154.00 147,366.00 187,520.00 397,644.00 1,988,220.00 Alat Baru
29,198.00 0.0670 123,816.00 0.0060 33,264.00 62,462.00 309,244.00 371,706.00 817,684.00 4,088,420.00 Alat Baru
16,685.00 0.0670 70,752.00 0.0060 19,008.00 35,693.00 74,661.00 110,354.00 216,811.00 1,084,055.00 Alat Baru
28,156.00 0.0670 119,394.00 0.0060 32,076.00 60,232.00 154,734.00 214,966.00 435,596.00 2,177,980.00 Alat Baru
23,984.00 0.0670 101,706.00 0.0060 27,324.00 51,308.00 81,052.00 132,360.00 247,930.00 1,239,650.00 Alat Baru
12,514.00 0.0670 53,064.00 0.0060 14,256.00 26,770.00 27,363.00 54,133.00 93,595.00 467,975.00 Alat Baru
10,637.00 0.0670 45,104.00 0.0060 12,118.00 22,755.00 63,058.00 85,813.00 176,752.00 883,760.00 Alat Baru
8,342.00 0.0670 35,376.00 0.0060 9,504.00 17,846.00 71,589.00 89,435.00 192,677.00 963,385.00 Alat Baru
10,637.00 0.0670 45,104.00 0.0060 12,118.00 22,755.00 74,518.00 97,273.00 203,525.00 1,017,625.00 Alat Baru
19,813.00 0.0670 84,018.00 0.0060 22,572.00 42,385.00 88,641.00 131,026.00 258,860.00 1,294,300.00 Alat Baru
2,503.00 0.0670 10,613.00 0.0060 2,851.00 5,354.00 18,131.00 23,485.00 48,912.00 244,560.00 Alat Baru
834.00 0.0670 3,538.00 0.0060 950.00 1,784.00 5,434.00 7,218.00 14,839.00 74,195.00 Alat Baru
834.00 0.0670 3,538.00 0.0060 950.00 1,784.00 4,728.00 6,512.00 13,070.00 65,350.00 Alat Baru
834.00 0.0670 3,538.00 0.0060 950.00 1,784.00 17,248.00 19,032.00 43,221.00 216,105.00 Alat Baru
5,214.00 0.0670 22,110.00 0.0060 5,940.00 11,154.00 10,349.00 21,503.00 36,016.00 180,080.00 Alat Baru
1,251.00 0.0670 5,306.00 0.0060 1,426.00 2,677.00 13,094.00 15,771.00 34,135.00 170,675.00 Alat Baru
26,070.00 0.0670 110,550.00 0.0060 29,700.00 55,770.00 421,956.00 477,726.00 1,086,252.00 5,431,260.00 Alat Baru
6,257.00 0.0670 26,532.00 0.0060 7,128.00 13,385.00 58,829.00 72,214.00 155,469.00 777,345.00 Alat Baru
23,984.00 0.0670 101,706.00 0.0060 27,324.00 51,308.00 91,481.00 142,789.00 271,083.00 1,355,415.00 Alat Baru
22,107.00 0.0670 93,746.00 0.0060 25,186.00 47,293.00 45,117.00 92,410.00 155,683.00 778,415.00 Alat Baru
30,241.00 0.0670 128,238.00 0.0060 34,452.00 64,693.00 18,131.00 82,824.00 152,754.00 763,770.00 Alat Baru
36,498.00 0.0670 154,770.00 0.0060 41,580.00 78,078.00 35,584.00 113,662.00 164,980.00 824,900.00 Alat Baru
16,685.00 0.0670 70,752.00 0.0060 19,008.00 35,693.00 39,406.00 75,099.00 130,362.00 651,810.00 Alat Baru
12,722.00 0.0670 53,948.00 0.0060 14,494.00 27,216.00 29,883.00 57,099.00 99,008.00 495,040.00 Alat Baru
16,685.00 0.0670 70,752.00 0.0060 19,008.00 35,693.00 13,305.00 48,998.00 68,336.00 341,680.00 Alat Baru
1,251.00 0.0670 5,306.00 0.0060 1,426.00 2,677.00 5,460.00 8,137.00 15,710.00 78,550.00 Alat Baru
2,086.00 0.0670 8,844.00 0.0060 2,376.00 4,462.00 11,496.00 15,958.00 31,904.00 159,520.00 Alat Baru
4,171.00 0.0670 17,688.00 0.0060 4,752.00 8,923.00 13,650.00 22,573.00 41,507.00 207,535.00 Alat Baru
7,300.00 0.0670 30,954.00 0.0060 8,316.00 15,616.00 29,608.00 45,224.00 87,441.00 437,205.00 Alat Baru
2,086.00 0.0670 8,844.00 0.0060 2,376.00 4,462.00 6,706.00 11,168.00 20,730.00 103,650.00 Alat Baru
1,668.00 0.0670 7,075.00 0.0060 1,901.00 3,569.00 3,541.00 7,110.00 11,956.00 59,780.00 Alat Baru
2,086.00 0.0670 8,844.00 0.0060 2,376.00 4,462.00 4,424.00 8,886.00 14,941.00 74,705.00 Alat Baru
1,251.00 0.0670 5,306.00 0.0060 1,426.00 2,677.00 8,373.00 11,050.00 22,664.00 113,320.00 Alat Baru
1,043.00 0.0670 4,422.00 0.0060 1,188.00 2,231.00 47,427.00 49,658.00 115,443.00 577,215.00 Alat Baru
DAFTAR HARGA BAHAN DAN UPAH KERJA

N0. JENIS BAHAN SATUAN

1 Semen
Tonasa 50 Kg Sak
Tonasa 50 Kg Sak
Bosowa 50 Kg Sak
Tiga Roda 40 Kg Sak
Semen Putih Panda Zak
Semen W arna Kg
Semen W arna Merk Kelinci Kg
Semen W arna Merk Prima Grout Kg
Nat Siku / Bungkus Bungkus
Planito / Bungkus Bungkus
LM 50 / Bungkus Bungkus
Putih / Sak Sak
2 Kapur Miu/Sak Sak
3 Besi Beton
-. 25 mm Btg
-. 22 mm Btg
-. 20 mm Btg
-. 19 mm Btg
-. 16 mm Btg
-. 14 mm Btg
-. 12 mm Btg
-. 10 mm Btg
-. 8 mm Btg
-. 6 mm Btg
4 Cat Tembok
Nippon Paint Dasar Luar Kaleng
Nippon Paint Luar 1 Liter Liter
Nippon Paint Luar 1,5 Liter Liter
Nippon Paint Luar 20 Liter Liter
- Virgo 20 Kg Kaleng
- Virgo 5 Kg Kaleng
- Aries 20 Kg goold Kaleng
- Aries 5 Kg Gold Kaleng
- Arta 25 Kg Kaleng
- Arta 5 Kg Kaleng

105
- Avitex 25 Kg Kaleng
- Avitex 5 Kg Kaleng
- Avitex 1 Kg Kaleng
- Kimex 1 Kg Kaleng
- Vinikex Nippon Paint 1 Kg Kaleng
Metrolite 25 Kg
5 Cat Kayu / Besi / Atap
Nippon Paint 1 Liter Liter
Nippon Paint 2,5 Liter Liter
- Avian / Kaleng kg
- Altex / Kaleng Kaleng
- Yoko / Kaleng Kaleng
- Glotex / Kaleng kg
- Aga / Kaleng (atap) 4 kg Kaleng
- Djarum / Kaleng kg
- Yoko / Kaleng (Atap) 4 kg Kaleng
Gelatik (Atap) 4 kg Kaleng
Dallas (Atap) 4 kg Kaleng
6 Multiipleks
- 3 mm/Lembar Lembar
- 6 mm/Lembar Lembar
- 9 mm/Lembar Lembar
7 Seng
- Fumira Gelombang B/C/U Kecil Lembar
- Plat 90 x 180 cm / Lbr Sang Plat Aluminium Lembar
- ASoka Jempol / Cristals Lembar
- Plat 45 Cm / M Meter
- Plat 38 Cm / M Meter
- Plat 30 Cm / M Meter
8 Kuas Buah
9 Paku
- Seri Biasa 2 Inchi s.d. 6 Inchi/kg Kg
- Seri Biasa 1 Inchi / Kg Kg
- Seri Biasa 3/4 Inchi / Kg Kg
10 Lem Pipa
- W afin 60 gr / Btl Batang
Tube
Kaleng
11 Tiner A
Spesial 1 Liter Avian Liter

106
Biasa 1 Liter ND Liter
Thiner Type A kg
Thiner Type B kg
12 Afduner B
Afduner B / kg Kaleng
Minyak Cat / Liter Avian Liter
13 Gerobak
Artec Buah
Sakai Buah
Global Buah
Arco Buah
14 Angker Baut Buah
15 Sekop
- Biasa Buah
- Cap Mata Buah
16 Sendok Tukang
- Ukuran Besar Buah
- Ukuran Kecil Buah
17 Selang
- Ukuran 5/8 Royal Meter
- Ukuran 1/2 Royal Meter
- Ukuran 3/4 Royal Buah
- Ukuran 5/8 Super Huk Roll
- Ukuran 1/2 Super Huk Roll
- Ukuran 3/4 Super Huk Roll
18 Pacul
- Cap Mata Buah
- Cap Buaya Buah
- Cap Ayam Buah
19 Tanah dan Pasir:
Pasir Timbunan M³
Pasir Pasangan Kualitas Sedang M³
Pasir Pasangan Kualitas Bagus M³
Pasir Beton/Cor M³
Sirtu M³
Tanah Timbunan M³
Tanah Timbunan Pilihan Berbutir M³
20 Kerikil
Kerikil Split 1 - 2 M³
Kerikil M³

107
Kerikil Sungai M³
21 Batu-Batuan
Utuh M³
Split 7 - 10 cm M³
Split 5 - 7 cm M³
Split 3 - 5 cm M³
Split 2 - 3 cm M³
Split 1 - 2 cm M³
Split 0.5 - 1 cm M³
22 Batu Gunung
Batu Gunung M³
Batu Alam 20 x 20 M³
Profil beton m1
Batu sugai M³
23 Batu Cetak
Batu Merah Ukuran Besar Buah
Batu Merah Ukuran Kecil Buah
Batako Press Buah
Roster Beton Kecil Buah
Roster Beton Sedang Buah
Kaca/ Lembar 5 ml Buah
5 mm / Lembar Buah
3 mm / Lembar Buah
2 mm / Lembar Buah
Roster Beton 20/20 Buah
Paving Blok Warna T= 8 cm K- 300 Buah
Paving Blok Warna T= 6 cm K- 300 Buah
Gorong-gorong Dia.100 cm Buah
Solar (Industri) Liter
Premium ( Bensin ) Liter
Kawat Las kg
Besi Baja Plat / Profil kg
Ijuk m3
Seal Tape bh
Air m3
Beton Cetak (Precast)
U- Ditch Type 80 x 80 x 100 K- 300 Buah
Cover U- Ditch Buah
U- Ditch Type 60 x 60 x 100 K- 300 Buah
Cover U- Ditch Buah

108
U- Ditch Type 40 x 60 x 100 K- 300 Buah
Cover U- Ditch Buah
U- Ditch Type 40 x 40 x 100 K- 300 Buah
Cover U- Ditch Buah
U- Ditch Type 20 x 30 x 100 K- 300 Buah
Cover U- Ditch Buah
Pot Beton Praacetak Buah
24 Kapur Pasang (Mil) M³
Halus Kg
Kasar Kg
25 Seng Gelombang Besar
BJLS 0.18 (FUMIRA) Lembar
BJLS 0.2 mm Lembar
Asoka Merah Lembar
26 Seng Plat / licin
BJLS 0,30 mm kaki
BJLS 0,28 mm kaki
BJLS 0,50 mm kaki
90 x 180 cm Lembar
27 Seng Gelombang Kecil
BJLS 0,18 mm Lembar
BJLS 0,20 mm Lembar
28 BAHAN BESI BETON
-. Besi Beton Ulir Uk. 25 mm Batang
-. Besi Beton Ulir Uk. 22 mm Batang
-. Besi Beton Ulir Uk. 20 mm Batang
-. Besi Beton Ulir Uk. 19 mm Batang
-. Besi Beton Ulir Uk. 18 mm Batang
-. Besi Beton Ulir Uk. 16 mm Batang
-. Besi Beton Ulir Uk. 14 mm Batang
-. Besi Beton Ulir Uk. 12 mm Batang
-. Besi Beton Ulir Uk. 10 mm Batang
-. Besi Beton Ulir Uk. 8 mm Batang
-. Besi Beton Ulir Uk. 6 mm Batang
29 BAHAN BESI PLAT/SIKU/PROFIL
Besi plat tebal 1 mm 120 x 240 mm Lembar
Besi plat tebal 2 mm 120 x 240 mm Lembar
Besi plat tebal 3 mm 120 x 240 mm Lembar
Besi siku 40.40,4 Tebal batang
Besi siku 50.50,5 Tebal batang

109
Besi siku 60.60.6 Tebal batang
Besi siku 70.70.7 Tebal batang
Besi siku 40.40.3 Tipis batang
Besi siku 50.50.4 Tipis batang
Besi strep 35 mm Tipis batang
Besi strep 40,4 mm batang
Besi strep 50,6 mm batang
30 BAHAN MEKANIKAL ELEKTRIKAL
Instalasi Listrik Utama :
Panel MDP Unit
MCB Box Unit
MFCA 4 Zona Sistem Unit
MFCA 6 Zona Unit
Panel Lantai Unit
Kabel Listrik :
1 x 2 1/2 mm 1 Roll Rolll
NYN ( 2 X 1 1/2 mm ) Meter
NLK 1 1/2 mm Roll
NYK 2 1/2 mm Roll
NYK 2 X 1 1/2 mm Roll
NYK 2 X 1 1/2 mm Roll
NYK 2 X 4 mm Roll
Instalatur :
Titik Lampu tk
Instalasi KKB tk
instalasi AC tk
Instalasai Exhaus Fan tk
Instalasi Telepon tk
Instalasi Titik Detektor tk
Lampu TL :
1 X 20 wat
18 wat
- Biasa Buah
- Philips Buah
Tiang Lampu buah
Tang Lampu Mercury Galvanised buah
31 PJU Solar Cell Lengan Tunggal Galvanis
Tiang PJU Bulat Galvanis H= 4 + Tiang Penyangga Solar Panel Unit
Lampu LED 40 Wat unit
Solar Panel 100 WP Polycrystalline WP

110
Batery VRLA Panasonic 2V-150 Ah
BCR 12 VDC 10 A Digital
Box Batery Powder Coating + Bracket
Kabel Instalasi Solar Panel & Batery NYYHY 2x4
Kabel Instalasi Lampu LED NYYHY 2x1.5
Aksesoris Set
32 Kawat
Kawat Beton Kg
Kawat Duri (30M) Roll
Kawat Nyamuk Dari Logam M'
Kawat Nyamuk dari Plastik M'
Kawat Saringan / Ayakan kecil M'
Kawat Brojong Roll
Ream Nyamuk M2
33 BAHAN PIPA
Pipa GIP
GIP (Pipa Besi
Pipa (Pipa Besi Gakvanisisr)
Galvanisir) GIP Dia ½" Panjang 6 m' Kuas GIP Dia
¾" Panjang 6 m'
PipaGIP
Stainless StellPanjang
Stainless6 dia.
GIP Dia.Panjang
1/2" m 2,5" Stainless dia. 2" Stainless dia. 1"
BolaDia 1"
penutup tiang 6 m' Batang
GIP 3GIP
Inch - Panjang
Dia. 6 mm
1" Panjang 6 mGIP Dia 1½" Panjang 6 m' GIP Dia 2"
Panjang 6 m' Batang
GIP Dia. 1 1/2" Panjang 6 m Batang
GIP Dia. 2" Panjang 6 m Batang
GIP Dia. 2 1/2" Panjang 6 m Batang
GIP Dia. 3" Panjang 6 m Batang
GIP Dia. 4" Panjang 6 m Batang
GIP Dia. 5" Panjang 6 m Batang
Pipa Stainless Stell
Satainless Still dia. 2,5" m1
Satainless Still dia. 2" m1

111
Satainless Still dia. 1" m1
Bola Penutup Tiang bh
Besi Hollow
Besi Hollow 40x40x2 mm Btg
Besi Hollow 40x20x2 mm Btg
34 Paku
Paku Beton Dos
Paku Beton 2.5" - 3.5" Dos
Paku Beton 4" - 6" Dos
Paku Tripleks Kg
Paku Biasa , 5 - 10 cm Kg
Paku Biasa 2.5" - 3.5" Kg
Paku Biasa 4" - 6" Kg
Paku Tindis Kecil Dos
Paku Gipsum 4 Inch dos
Paku Payung berulir 75 mm kg
Paku Seng Kg
Dynabolt Buah
Bond Breaker Plastik M2
Join Sealent Kg

35 Tanaman
Pangkas Kuning Phn
Bayam Merah Phn
Pucuk Merah Phn
Tanah Humus M3
Pupuk Kg
36 Bahan Kayu
Kayu Klas I (Bayam / Ulin )
-. Balok Gergaji Sawmil M3
-. Papan Gergaji Sawmil M3
-. Balok Gergaji Chainsaw M3
-. Papan Gergaji Chainsaw M3
Kayu Klas II (Palapi / Tipulu )
-. Lokal (Kala-Kala) M3
-. Lokal (Palapi) M3
Kayu Klas III
-. Balok M3
-. Papan M3
Minyak Bekisting Liter

112
37 ASPAL
Lapis Resap Pengikat Liter
Laston Lapis Aus (AC-W C) (Gradasi Agregat Halus Liter
Kasar)
Aspal Ton
Aditif Anti Pengelupasan Kg
Curing Compound Liter
Bahan Pengisi (Filler) Tambahan Kg

N0. UPAH KERJA SATUAN

1 Pekerja
Pekerja Tidak Terampil Org/Hr
Pekerja Terampil Org/Hr
Pembantu Masinis Org/Hr
Penjaga Gudang Org/Hr
Penjaga Malam Org/Hr
2 Tukang
Tukang Kayu Org/Hr
Tukang Batu Org/Hr
Tukang Cat Org/Hr
Tukang Listrik Org/Hr
Tukang Pipa Org/Hr
Tukang Besi Org/Hr
3 Kepala Tukang
Kepala Tukang Kayu Org/Hr
Kepala Tukang Batu Org/Hr
Kepala Tukang Cat Org/Hr
Kepala Tukang Listrik Org/Hr
Kepala Tukang Pipa Org/Hr
Kepala Tukang Besi Org/Hr
Mandor Org/Hr

Waisai, 07 Januari 20

Disusun Oleh :
Konsultan Perencan

0
Direktris

113
R HARGA BAHAN DAN UPAH KERJA

HARGA (Rp)

60000
65000
57000
70000
66950
18,750
18,025
18,750
18,750
12,750
21,888
43,750
56,250

487,500
401,250
352,500
298,750
260,000
175,000
118,750
78,750
53,750
37,500

171,450
184,150
397,510
3,022,600
325,000
81,250
298,450
82,550
206,250
59,690

114
606,250
131,250
22,860
21,844
88,900
603,250

181,610
200,000
75,000
50,800
56,250
67,310
206,250
62500
118,750
67,000
83,240

68,750
118,750
175,000

56,250
81,250
68,750
21,250
18,750
15,000
12,625

18,750
37,500
37,500

15,000
10,000
68,750

43,750

115
31,250
40,000
31,250

21,250
69,850

285,600
357,000
441,000
562,500
31,875

93,750
106,250

35,000
31,250

17,500
15,000
22,500
212,925
212,925
127,500

62,500
62,500
62,500

62,500
146,250
170,000
170,000
146,250
41,875
140,000

170,000
171,990

116
220,000

194,922
196,560
218,400
245,700
263,900
275,184
292,384

187,500
200,656
171,990
546,000

650
650
4,410
5,513
8,269
210,000
229,688
203,438
177,188
5,250
6,000
6,000
82,688
7,166
7,166
105,000
15,750
165,375
5,513
88,750

1,015,000
520,000
627,000
325,000

117
477,000
230,000
393,000
220,000
276,000
185,000
80,000
50,000
56,250
33,075

56,250
58,750
68,750

32,000
42,000
52,000
65,625

57,881
44,888

643,750
600,000
565,000
477,500
427,500
268,750
193,750
143,750
106,250
93,750
75,000
-
355,000
750,000
1,000,000
121,250
250,000

118
456,250
481,250
87,500
125,000
43,199
92,273
95,708

339,900
33,750
6,798,000
7,931,000
9,630,500

412,750
10,160
535,909
691,697
844,368
903,568
1,065,587

72,930
72,930
106,590
72,930
95,370
140,250

52,500
43,750
12,750
52,080
45,887
1,114,872

4,350,000
6,158,000
14,500

119
3,250,000
1,500,000
2,250,000
56,000
22,000
800,000

25,000
106,250
12,500
12,500
28,125
937,500
12,500

218,875
250,000
375,000
500,000
562,500
668,750
798,250
1,236,000

189,803
143,299

120
72,461
70,298

178,000
143,000

75,000
406,250
406,250
37,500
18,750
22,500
18,750
3,750
31,250
31,250
43,750
12,500
12,500
27,800

12,500
12,500
45,000
35,000
18,500

8,670,000
10,200,000
8,415,000
9,945,000

2,500,000
2,500,000

2,000,000
2,000,000
5,500

121
2,792
382
24
71
18,500
4,095

HARGA (Rp)

75000
85000
115000
115000
115000

115,000
115,000
115,000
115,000
115,000
115,000

140,000
140,000
140,000
140,000
140,000
140,000
172,000

Waisai, 07 Januari 2021

Disusun Oleh :
Konsultan Perencana

0
Direktris

122
DAFTAR ANALISA HARGA SATUAN PEKERJAAN JALAN ASPAL DAN BETON

A. PEKERASAN JALAN BETON

AHSB-1 1 M3 PEKERJAAN LAPISAN PONDASI BAWAH (LPB) KLAS C T=20 cm


1. Peralatan
0.0357 jam Loader wheeled @ Rp. 247,930.00 Rp.
0.2510 jam Dump Truck @ Rp. 152,754.00 Rp.
0.0117 jam Motor Grader @ Rp. 441,671.00 Rp.
0.0178 jam Tandem Roller @ Rp. 192,677.00 Rp.
0.0141 jam Water Tanker @ Rp. 271,083.00 Rp.
1.0000 Ls Alat bantu @ Rp. 25,000.00 Rp.
1. Bahan
1.2586 M3 Sirtu Klas C @ Rp. 256,620.00 Rp.
2. Tenaga
0.0666 Oh Pekerja @ Rp. 75,000.00 Rp.
0.0666 Oh Mandor @ Rp. 172,000.00 Rp.
Rp.

AHSB-2 1 M2 PEKERJAAN BEKISTING UNTUK BETON


1. Bahan
0.0400 M3 Kayu Acuan @ Rp. 2,000,000.00 Rp.
0.2000 Kg Paku Biasa @ Rp. 18,750.00 Rp.
1.0000 Set Alat bantu @ Rp. 35,000.00 Rp.
2. Tenaga
1.5000 Oh Pekerja @ Rp. 75,000.00 Rp.
0.0750 Oh Mandor @ Rp. 172,000.00 Rp.
Rp.

AHSB-3 1 M2 PEKERJAAN PEMASANGAN BOND BREAKER PLASTIK


1. Bahan
1.0000 M2 Bond Breaker @ Rp. 6,500.00 Rp.
2. Tenaga
0.0150 Oh Pekerja @ Rp. 75,000.00 Rp.
0.0040 Oh Mandor @ Rp. 172,000.00 Rp.
Rp.

AHSB-4 1 M1 PEKERJAAN PENULANGAN DOWEL BESI Ø 12


1. Bahan
0.2570 Kg Besi Beton Polos Ø 12 @ Rp. 35,000.00 Rp.
2. Tenaga
0.0644 Oh Pekerja @ Rp. 75,000.00 Rp.
0.0060 Oh Mandor @ Rp. 172,000.00 Rp.

Hal 125
Rp.

AHSB-5 1 M3 PEKERJAAN PENGHAMPARAN BETON K-300 T=10 CM (Ready Mix)


1. Bahan
1.1000 M3 Beton K-300 (Ready Mix) @ Rp. 982,000.00 Rp.
2. Tenaga
2.0000 Oh Pekerja @ Rp. 75,000.00 Rp.
0.1200 Oh Mandor @ Rp. 172,000.00 Rp.
Rp.

AHSB-6 1 M2 PEKERJAAN FINISHING TROWEL BERGARIS DAN CURING BETON


1. Peralatan
0.0467 jam Mesin Trowel @ Rp. 187,500.00 Rp.
2. Tenaga
0.0277 Oh Pekerja @ Rp. 75,000.00 Rp.
0.0067 Oh Mandor @ Rp. 172,000.00 Rp.
Rp.

Hal 126
B. PEKERJAAN JALAN ASPAL

AHSA-1 1 M3 PEKERJAAN LAPISAN PONDASI BAWAH (LPB) KLAS C T=20 cm


1. Peralatan
0.0357 jam Loader wheeled @ Rp. 247,930.00 Rp.
0.2510 jam Dump Truck @ Rp. 152,754.00 Rp.
0.0117 jam Motor Grader @ Rp. 441,671.00 Rp.
0.0178 jam Tandem Roller @ Rp. 192,677.00 Rp.
0.0141 jam Water Tanker @ Rp. 271,083.00 Rp.
1.0000 Ls Alat bantu @ Rp. 25,000.00 Rp.
1. Bahan
1.2586 M3 Sirtu Klas C @ Rp. 256,620.00 Rp.
2. Tenaga
0.0666 Oh Pekerja @ Rp. 75,000.00 Rp.
0.0666 Oh Mandor @ Rp. 172,000.00 Rp.
Rp.

AHSA-2 1 M3 PEKERJAAN PONDASI ATAS (LPA) KLAS B T=10 cm


1. Peralatan
0.0357 jam Loader wheeled @ Rp. 247,930.00 Rp.
0.2510 jam Dump Truck @ Rp. 152,754.00 Rp.
0.0117 jam Motor Grader @ Rp. 441,671.00 Rp.
0.0178 jam Tandem Roller @ Rp. 192,677.00 Rp.
0.0141 jam Water Tanker @ Rp. 271,083.00 Rp.
1.0000 Ls Alat bantu @ Rp. 25,000.00 Rp.
1. Bahan
1.3586 M3 Sirtu Klas B @ Rp. 256,620.00 Rp.
2. Tenaga
0.0666 Oh Pekerja @ Rp. 75,000.00 Rp.
0.0666 Oh Mandor @ Rp. 172,000.00 Rp.
Rp.

AHSA-3 1 M2 PEKERJAAN LAPISAN ASPAL PEREKAT (Tack Coat)


1. Peralatan
0.0063 jam Compressor @ Rp. 113,320.00 Rp.
0.0030 jam Dump Truck @ Rp. 763,770.00 Rp.
1. Bahan
0.8724 Ltr Aspal Pengikat @ Rp. 2,792.00 Rp.
0.2530 Ltr Minyak Tanah @ Rp. 14,100.00 Rp.
2. Tenaga
0.0301 Oh Pekerja @ Rp. 75,000.00 Rp.
0.0060 Oh Mandor @ Rp. 172,000.00 Rp.
Rp.

AHSA-3 1 M2 PEKERJAAN LAPISAN ASPAL HOTMIX T=5 CM

Hal 127
1. Peralatan
0.0300 jam Wheel Loader @ Rp. 247,930.00 Rp.
0.0130 jam Tandem Roller @ Rp. 192,677.00 Rp.
0.0040 jam P. Tyre Roller @ Rp. 258,860.00 Rp.
0.0122 jam Dump Truck @ Rp. 152,754.00 Rp.
0.0070 jam Genset @ Rp. 20,730.00 Rp.
1.0000 jam Alat Bantu @ Rp. 45,000.00 Rp.
1. Bahan
0.7724 M3 Aspal Hotmix @ Rp. 1,214,000.00 Rp.
2. Tenaga
0.0301 Oh Pekerja @ Rp. 75,000.00 Rp.
0.0060 Oh Mandor @ Rp. 172,000.00 Rp.
Rp.

Hal 128
N PEKERJAAN JALAN ASPAL DAN BETON

8,851.10
38,341.25
5,167.55
3,429.65
3,822.27
25,000.00

322,981.93

4,995.00
11,455.20
424,043.96

80,000.00
3,750.00
35,000.00

112,500.00
12,900.00
244,150.00

6,500.00

1,125.00
688.00
8,313.00

8,995.00

4,830.00
1,032.00

Hal 129
14,857.00

1,080,200.00

150,000.00
20,640.00
1,250,840.00

8,756.25

2,077.50
1,152.40
11,986.15

Hal 130
8,851.10
38,341.25
5,167.55
3,429.65
3,822.27
25,000.00

322,981.93

4,995.00
11,455.20
424,043.96

8,851.10
38,341.25
5,167.55
3,429.65
3,822.27
25,000.00

348,643.93

4,995.00
11,455.20
449,705.96

713.92
2,291.31

2,435.74
3,567.30

2,257.50
1,032.00
12,297.77

Hal 131
7,437.90
2,504.80
1,035.44
1,863.60
145.11
45,000.00

937,693.60

2,257.50
1,032.00
998,969.95

Hal 132
PERHITUNGAN BIAYA ONGKOS ANGKUT MATERIAL
1 JARAK ANGKUT 70 KM
1 . Jarak Angkut Rata-rata = 70.00 km
2 . Kapasitas Truck = 3.50 m3
= 5.00 Ton
3 . Kecepatan Rata-rata = 25.00 km/jam
4 . Biaya Sewa Dump truck 5 ton = Rp. 152,754.00 / 5 jam = Rp.
5 . Supir terampil = Rp. 115,000.00 / 5 jam = Rp.
6 . Pembantu Supir = Rp. 75,000.00 / 5 jam = Rp.

Biaya Kendaraan/Jam = Rp. 342,754.00 = Rp.

7 . Perhitungan Ongkos angkut rata - rata / jam

Dalam M3 = Rp. 68,550.80 / 3.50 = Rp.

= Rp.

Dalam Kg = Rp. 68,550.80 / 5,000.00 = Rp.

= Rp.

2 JARAK ANGKUT 60 KM
1 . Jarak Angkut Rata-rata = 60.00 km
2 . Kapasitas Truck = 3.50 m3
= 5.00 Ton
3 . Kecepatan Rata-rata = 25.00 km/jam
4 . Biaya Sewa Dump truck 5 ton = Rp. 152,754.00 / 5 jam = Rp.
5 . Supir terampil = Rp. 115,000.00 / 5 jam = Rp.
6 . Pembantu Supir = Rp. 75,000.00 / 5 jam = Rp.

Biaya Kendaraan/Jam = Rp. 342,754.00 = Rp.

7 . Perhitungan Ongkos angkut rata - rata / jam

Dalam M3 = Rp. 68,550.80 / 3.50 = Rp.


= Rp.

Dalam Kg = Rp. 68,550.80 / 5,000.00 = Rp.

= Rp.

3 JARAK ANGKUT 40 KM
1 . Jarak Angkut Rata-rata = 40.00 km
2 . Kapasitas Truck = 3.50 m3
= 5.00 Ton
3 . Kecepatan Rata-rata = 25.00 km/jam
4 . Biaya Sewa Dump truck 5 ton = Rp. 152,754.00 / 5 jam = Rp.
5 . Supir terampil = Rp. 115,000.00 / 5 jam = Rp.
6 . Pembantu Supir = Rp. 75,000.00 / 5 jam = Rp.

Biaya Kendaraan/Jam = Rp. 342,754.00 = Rp.

7 . Perhitungan Ongkos angkut rata - rata / jam

Dalam M3 = Rp. 68,550.80 / 3.50 = Rp.

= Rp.

Dalam Kg = Rp. 68,550.80 / 5,000.00 = Rp.

= Rp.

4 JARAK ANGKUT 20 KM
1 . Jarak Angkut Rata-rata = 20.00 km
2 . Kapasitas Truck = 3.50 m3
= 5.00 Ton
3 . Kecepatan Rata-rata = 25.00 km/jam
4 . Biaya Sewa Dump truck 5 ton = Rp. 152,754.00 / 5 jam = Rp.
5 . Supir terampil = Rp. 115,000.00 / 5 jam = Rp.
6 . Pembantu Supir = Rp. 75,000.00 / 5 jam = Rp.
Biaya Kendaraan/Jam = Rp. 342,754.00 = Rp.

7 . Perhitungan Ongkos angkut rata - rata / jam

Dalam M3 = Rp. 68,550.80 / 3.50 = Rp.

= Rp.

Dalam Kg = Rp. 68,550.80 / 5,000.00 = Rp.

= Rp.
BIAYA ONGKOS ANGKUT MATERIAL

30,550.80 / Jam
23,000.00 / Jam
15,000.00 / Jam

68,550.80 / Jam

19,585.94 x 70.00
25.00
54,841.00 / M3

13.71 x 70.00
25.00
38.00 / Kg

30,550.80 / Jam
23,000.00 / Jam
15,000.00 / Jam

68,550.80 / Jam

19,585.94 x 60.00
25.00
47,006.00 / M3

13.71 x 60.00
25.00
33.00 / Kg

30,550.80 / Jam
23,000.00 / Jam
15,000.00 / Jam

68,550.80 / Jam

19,585.94 x 40.00
25.00
31,338.00 / M3

13.71 x 40.00
25.00
22.00 / Kg

30,550.80 / Jam
23,000.00 / Jam
15,000.00 / Jam
68,550.80 / Jam

19,585.94 x 20.00
25.00
15,669.00 / M3

13.71 x 20.00
25.00
11.00 / Kg