Anda di halaman 1dari 70

BIAYA BPJS KETENAGAKERJAAN = Rp 1,297,584.

39

BPJS KETENAGAKERJAAN NILAI FISIK = Rp 656,623,362.91


Jumlah
NO. Uraian Program Koefisien Satuan Harga Satuan Harga
(%) Persen ( Rp ) ( Rp )

1 NKKK ≥ Rp. 100.000.000,- JKK 0.21% Persen 100,000,000.00 210,000.00


JKM 0.03% Persen 100,000,000.00 30,000.00

2 Rp. 100.000.000 < NKKK <= Rp. 500.000.000,- JKK 0.17% Persen 556,623,362.91 946,259.72
JKM 0.02% Persen 556,623,362.91 111,324.67

3 Rp. 500.000.000 < NKKK <= Rp. 1,000.000.000,- JKK 0.13% Persen -
JKM 0.02% Persen -

4 Rp. 1.000.000.000 < NKKK <= Rp. 5.000.000.000,- -


-

Sub Total Biaya BPJS Ketenagakerjaan 1,297,584.39


RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN : REHABILITASI BERAT PEMBANGUNAN PAGAR PELABUHAN PALIPI
LOKASI : KAB. MAJENE
TAHUN ANGGARAN : 2023

NO. URAIAN PEKERJAAN Vol. Perkiraan

I. PEKERJAAN PENDAHULUAN
I.1 PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan Bowplank 1.00
2 Pemasangan papan nama proyek 1.00
3 Pembuatan direksi keet / kantor sementara & gudang alat dan bahan 9.00
4 Perlengkapan K3 1.00
II. PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1 PEKERJAAN PEMBONGKARAN
1 Bobok beton bertulang 16.50

II.2 PEKERJAAN TANAH


1 Galian Tanah
- Sloef Uk. 20 x 30 cm 24.75
- Kolom Type 40x40 cm (untuk dudukan tiang pagar) 9.02
2 Urugan Pasir Kembali
- Sloef Uk. 20 x 30 cm 4.11
- Kolom Type 40x40 cm (untuk dudukan tiang pagar) 1.50

II.2 STRUKTUR BAWAH


1 Sloof uk. 20x30 cm
- Cor beton fc =21.7 Mpa / Mutu K.250 24.75
- Bekesting (2 x Pakai) 247.50
- Besi beton 2,821.10
2 Kolom Type 40x40 cm (untuk dudukan tiang pagar)
- Cor beton fc =21.7 Mpa / Mutu K.250 18.05
- Bekesting (2 x Pakai) 180.48
- Besi beton 1,291.47

III. PEKERJAAN ARSITEKTUR


1 Plester Acian Sloef + Kolom 497.52
2 Pengecetan Sloef + Kolom 497.52
3 Pengecetan Pagar Lama 190.95
4 Pengecetan Pagar + Pintu Gerbang 850.44

IV. PENGADAAN DAN PEMASANGAN PAGAR


1 Pengadaan dan pemasangan Pintu + pagar BRC 98.16
(Uk 1.90 x 2.40, Diameter 6 mm)
2 Pengadaan dan pemasangan tiang pintu dan pagar (Pipa Galvanis 2,5 Inch) 446.20
(Pipa Galvanis 2,5 Inch)

Terbilang : Tujuh Ratus Tiga Puluh Juta Seratus Ribu


NGGARAN BIAYA ( RAB )

Sat. Harga Satuan (Rp) Total Harga (Rp)

29,931,964.00

Ls 10,000,000.00 10,000,000.00
Ls 390,000.00 390,000.00
m2 1,337,996.00 12,041,964.00
Ls 7,500,000.00 7,500,000.00
241,990,863.38

m3 1,532,643.00 25,288,609.50

m3 84,425.00 2,089,518.75
m3 84,425.00 761,851.20

m3 343,970.00 1,412,340.82
m3 343,970.00 517,330.88

m3 1,370,587.62 33,922,043.52
m2 143,096.25 35,416,321.88
Kg 22,375.38 63,123,259.91
-
m3 1,370,587.62 24,736,365.31
m2 143,096.25 25,826,011.20
Kg 22,375.38 28,897,210.40

138,517,865.23
m2 75,486.00 37,555,794.72
m2 59,969.80 29,836,174.90
m2 68,299.00 13,041,694.05
m2 68,299.00 58,084,201.56

246,182,670.31
Bh 1,832,367.00 179,861,287.11
m1 148,636.00 66,321,383.20

JUMLAH TOTAL 656,623,362.91


PPN 11% 72,228,569.92
Jumlah + PPN 728,851,932.83
BPJS 1,297,584.39
Jumlah Total 730,149,517.22
DI BULATKAN 730,100,000.00
h Ratus Tiga Puluh Juta Seratus Ribu Rupiah
RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN : REHABILITASI BERAT LAMPU SOLAR CELL DAN
PAGAR PELABUHAN PALIPI DAN BANGGAE
LOKASI : KAB. MAJENE
TAHUN ANGGARAN : 2022

NO. URAIAN PEKERJAAN Vol. Perkiraan Sat. Harga Satuan (Rp) Total Harga (Rp)

I. PEKERJAAN PERSIAPAN DAN PONDASI 755,621,593.85

1 Mobilisasi Dan Demobilisasi 1.00 Ls 30,000,000.00 30,000,000.00


2 Biaya SMK3 1.00 Ls 13,000,000.00 13,000,000.00
3 Pembongkaran 1.00 Ls 10,000,000.00 10,000,000.00
4 Pekerjaan Beton Batas Pagar -
- Pek. Beton (Camp. 1:2:3) 41.58 M3 1,370,587.62 56,989,033.12
- Pek. Pembesian 3,094.74 KG 22,375.38 69,245,968.03
- Pek. Bekisting 247.50 M2 143,096.25 35,416,321.88
-
5 Pekerjaan Beton Tiang Pagar -
- Pek. Beton (Camp. 1:2:3) 345.07 M3 1,370,587.62 472,946,349.59
- Pek. Bekisting 188.80 M2 143,096.25 27,016,572.00

6 Pekerjaan Pengecatan 683.80 M2 59,969.80 41,007,349.24

II. PENGADAAN DAN PEMASANGAN PAGAR 276,558,229.00

1 Pengadaan dan pemasangan 127.00 Lmbr 1,832,367.00 232,710,609.00


pagar BRC Uk 1.90 x 2.40, Diameter 8 mm
2 Pengadaan dan pemasangan tiang pagar 295.00 M1 148,636.00 43,847,620.00

II. PENGADAAN DAN PEMASANGAN LAMPU SOLAR CELL ALL IN ONE STREET 100 WATT 631,150,000.00

1 Pengadaan Lampu Solar Cell 38.00 Set 8,500,000.00 323,000,000.00


Type : All In One Street kap. 100 Watt -
2 Instalasi dan Setting Lampu Solar Cell 38.00 Set 2,550,000.00 96,900,000.00
3 Pengadaan tiang Lampu Solar Cell 13.00 Ttk 12,500,000.00 162,500,000.00
Type : Galvanis Oktagonal T 9 meter -
4 Instalasi dan Setting Tiang Lampu Solar Cell 13.00 Ttk 3,750,000.00 48,750,000.00

JUMLAH TOTAL 1,663,329,822.85


PPN 10% 166,332,982.29
Jumlah + PPN 1,829,662,805.14
BPJS 1,297,584.39
Jumlah Total 1,830,960,389.53
DI BULATKAN 1,830,900,000.00

TERBILANG
#NAME?
ANALISA HARGA SATUAN PEKERJAAN

Analisa : AHSP A.2.2.1.5.


Item : Pembuatan 1 m² kantor sementara lantai plesteran
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 2.000 Rp. 98,000.00 Rp. 196,000.00
Tukang Kayu L.02 OH 2.000 Rp. 130,000.00 Rp. 260,000.00
Tukang Batu L.02 OH 1.000 Rp. 130,000.00 Rp. 130,000.00
kepala tukang L.03 OH 0.300 Rp. 160,000.00 Rp. 48,000.00
Mandor L.04 OH 0.050 Rp. 130,000.00 Rp. 6,500.00
Jumlah Tenaga Kerja (A) Rp. 640,500.00
B BAHAN
Dolken kayu ɸ 8-10/400 cm Batang 1.250 Rp. 17,000.00 Rp. 21,250.00
Kayu m³ 0.180 Rp. 1,875,000.00 Rp. 337,500.00
Paku biasa Kg 0.080 Rp. 20,000.00 Rp. 1,600.00
Besi strip Kg 1.100 Rp. 13,000.00 Rp. 14,300.00
Semen Portland Kg 35.000 Rp. 1,560.00 Rp. 54,600.00
Pasir pasang m³ 0.150 Rp. 235,000.00 Rp. 35,250.00
Pasir beton m³ 0.100 Rp. 235,000.00 Rp. 23,500.00
Koral beton m³ 0.150 Rp. 240,000.00 Rp. 36,000.00
Bata merah Bh 30.000 Rp. 800.00 Rp. 24,000.00
Seng plat Lbr 0.250 Rp. 13,000.00 Rp. 3,250.00
Jendela naco Bh 0.200 Rp -
Kaca polos m² 0.080 Rp. 167,000.00 Rp. 13,360.00
Kunci tanam Bh 0.150 Rp. 75,000.00 Rp. 11,250.00
Plywood 4mm Lbr 0.060 Rp -
Jumlah Harga Bahan (B) Rp. 575,860.00
C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,216,360.00
E Overhead & Profit 10% x D Rp. 121,636.00
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,337,996.00
G Dibulatkan Rp. 1,337,996.00
Analisa : AHSP A.4.1.1.8
Item : Membuat Beton Mutu f'c = 21.7 MPa (K-250), Slump (12 ± 2 ) cm, w/c = 0.56
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 1.650 Rp. 98,000.00 Rp. 161,700.00
Tukang Batu L.02 OH 0.275 Rp. 130,000.00 Rp. 35,750.00
Kepala Tukang L.03 OH 0.028 Rp. 160,000.00 Rp. 4,480.00
Mandor L.04 OH 0.083 Rp. 130,000.00 Rp. 10,790.00
Jumlah Tenaga Kerja (A) Rp. 212,720.00
B BAHAN
Semen @ 40 Kg Kg 384.000 Rp. 1,560.00 Rp. 599,040.00
Pasir Beton (1400 kg/m3) Kg 692.000 Rp. 167.86 Rp. 116,157.14
Batu pecah 2-3 cm Kg 1,039.000 Rp. 254.40 Rp. 264,321.60
Air Liter 215.000 Rp. 250.00 Rp. 53,750.00

Jumlah Harga Bahan (B) Rp. 1,033,268.74


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,245,988.74
E Overhead & Profit 10% x D Rp. 124,598.87
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,370,587.62
G Dibulatkan Rp. 1,370,587.62
Analisa : AHSP A.4.1.1.17
Item : Pembesian 10 Kg Dengan Besi Beton Polos
Satuan : Kg

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.070 Rp. 98,000.00 Rp. 6,860.00
Tukang Besi L.02 OH 0.070 Rp. 130,000.00 Rp. 9,100.00
Kepala Tukang L.03 OH 0.007 Rp. 160,000.00 Rp. 1,120.00
Mandor L.04 OH 0.004 Rp. 130,000.00 Rp. 520.00
Jumlah Tenaga Kerja (A) Rp. 17,600.00
B BAHAN
Besi Beton Polos Kg 10.500 Rp. 17,220.00 Rp. 180,810.00
Kawat Beton Kg 0.150 Rp. 33,350.00 Rp. 5,002.50

Jumlah Harga Bahan (B) Rp. 185,812.50


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 203,412.50
E Overhead & Profit 10% x D Rp. 20,341.25
F Harga Satuan Pekerjaan ( D + E ) Rp. 223,753.75
G Harga Satuan Pekerjaan Besi Untuk 1 Kg F / 10 Rp. 22,375.38
H Dibulatkan Rp. 22,375.38
Analisa : AHSP 4.1.1.21
Item : Pemasangan 1 m² bekisting untuk sloof
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.520 Rp. 98,000.00 Rp. 50,960.00
Tukang Kayu L.02 OH 0.260 Rp. 130,000.00 Rp. 33,800.00
Kepala Tukang L.03 OH 0.026 Rp. 160,000.00 Rp. 4,160.00
Mandor L.04 OH 0.026 Rp. 130,000.00 Rp. 3,380.00
Jumlah Tenaga Kerja (A) Rp. 92,300.00
B BAHAN
Kayu Kelas III M3 0.045 Rp. 1,875,000.00 Rp. 84,375.00
Triplekx 122x244 cm Tebal 9 Mm Lbr 0.500 Rp. 155,000.00 Rp. 77,500.00
Paku 5-10 cm Kg 0.300 Rp. 20,000.00 Rp. 6,000.00
Minyak Bekisting Liter 0.100 Rp -

Jumlah Harga Bahan (B) Rp. 167,875.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 260,175.00
E Overhead & Profit 10% x D Rp. 26,017.50
F Harga Satuan Pekerjaan ( D + E ) Rp. 286,192.50
G Untuk 2x Pemakaian Rp. 143,096.25
H Dibulatkan Rp. 143,096.25
Analisa : AHSP A.4.7.1.10
Item : Pengecatan 1 m2 Tembok Baru ( 1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) Exterior
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.020 Rp. 98,000.00 Rp. 1,960.00
Tukang Cat L.02 OH 0.063 Rp. 130,000.00 Rp. 8,190.00
Kepala Tukang L.03 OH 0.006 Rp. 160,000.00 Rp. 1,008.00
Mandor L.04 OH 0.003 Rp. 130,000.00 Rp. 390.00
Jumlah Tenaga Kerja (A) Rp. 11,548.00
B BAHAN
Plamur Kg 0.100 Rp. 60,600.00 Rp. 6,060.00
Cat Dasar Kg 0.100 Rp. 48,000.00 Rp. 4,800.00
Cat Penutup Kg 0.260 Rp. 123,500.00 Rp. 32,110.00

Jumlah Harga Bahan (B) Rp. 42,970.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 54,518.00
E Overhead & Profit 10% x D Rp. 5,451.80
F Harga Satuan Pekerjaan ( D + E ) Rp. 59,969.80
G Dibulatkan Rp. 59,969.80
Analisa : AHSP A. 4.7.1.19.
Item : Pengecatan 1m2 permukaan baja galvanis secara manual sistim 1 lapis cat mutakhir
Satuan : m2

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.060 Rp. 98,000.00 Rp. 5,880.00
Tukang Cat L.02 OH 0.060 Rp. 130,000.00 Rp. 7,800.00
Kepala Tukang L.03 OH 0.012 Rp. 160,000.00 Rp. 1,920.00
Mandor L.04 OH 0.003 Rp. 130,000.00 Rp. 390.00
Jumlah Tenaga Kerja (A) Rp. 15,990.00
B BAHAN
Cat Kg 0.300 Rp. 75,000.00 Rp. 22,500.00
Kuas Bh 1.000 Rp. 20,000.00 Rp. 20,000.00
Pengencer L 0.100 Rp. 36,000.00 Rp. 3,600.00

Jumlah Harga Bahan (B) Rp. 46,100.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 62,090.00
E Overhead & Profit 10% x D Rp. 6,209.00
F Harga Satuan Pekerjaan ( D + E ) Rp. 68,299.00
G Dibulatkan Rp. 68,299.00
Analisa : AHSP A.5.5.1.23
Item : Pemasangan 1 m' Pipa Galvanis Diameter 3"
Satuan : m'

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.135 Rp. 98,000.00 Rp. 13,230.00
Tukang Batu L.02 OH 0.225 Rp. 130,000.00 Rp. 29,250.00
Kepala Tukang L.03 OH 0.023 Rp. 160,000.00 Rp. 3,600.00
Mandor L.04 OH 0.007 Rp. 130,000.00 Rp. 877.50
Jumlah Tenaga Kerja (A) Rp. 46,957.50
B BAHAN
Pipa Galvanis Ø 2.5" m' 1.200 Rp. 66,666.67 Rp. 80,000.00
Perlengkapan % 35% Rp. 23,333.33 Rp. 8,166.67

Jumlah Harga Bahan (B) Rp. 88,166.67


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 135,124.17
E Overhead & Profit 10% x D Rp. 13,512.42
F Harga Satuan Pekerjaan ( D + E ) Rp. 148,636.58
G Dibulatkan Rp. 148,636.00
Analisa : AHSP A.5.5.1.1
Item : Pemasangan 1 Set Pagar BRC
Satuan : bh

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 3.300 Rp. 98,000.00 Rp. 323,400.00
Tukang Batu L.02 OH 1.100 Rp. 130,000.00 Rp. 143,000.00
Kepala Tukang L.03 OH 0.01 Rp. 160,000.00 Rp. 1,760.00
Mandor L.04 OH 0.16 Rp. 130,000.00 Rp. 20,428.57
Jumlah Tenaga Kerja (A) Rp. 488,588.57
B BAHAN
Pagar BRC Buah 1.000 Rp. 1,080,000.00 Rp. 1,080,000.00
Perlengkapan Ls 30% Rp. 324,000.00 Rp. 97,200.00

Jumlah Harga Bahan (B) Rp. 1,177,200.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,665,788.57
E Overhead & Profit 10% x D Rp. 166,578.86
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,832,367.43
G Dibulatkan Rp. 1,832,367.00
Analisa : AHSP A.4.4.2.4
Item : Pemasangan 1 m² plesteran 1 Sp : 4 Pp tebal 15 mm
Satuan : m²

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 Rp. 98,000.00 Rp. 29,400.00
Tukang Batu L.02 OH 0.150 Rp. 130,000.00 Rp. 19,500.00
Kepala Tukang L.03 OH 0.015 Rp. 160,000.00 Rp. 2,400.00
Mandor L.04 OH 0.015 Rp. 130,000.00 Rp. 1,950.00
Jumlah Tenaga Kerja (A) Rp. 53,250.00
B BAHAN
Semen Portland Kg 6.240 Rp. 1,560.00 Rp. 9,734.40
Pasir Pasang m3 0.024 Rp. 235,000.00 Rp. 5,640.00

Jumlah Harga Bahan (B) Rp. 15,374.40


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 68,624.40
E Overhead & Profit 10% x D Rp. 6,862.44
F Harga Satuan Pekerjaan ( D + E ) Rp. 75,486.84
G Dibulatkan Rp. 75,486.00
Analisa : AHSP A.2.2.1.13.
Item : Pembongkaran 1 m³ beton bertulang
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 13.334 Rp. 98,000.00 Rp. 1,306,732.00
Mandor L.04 OH 0.666 Rp. 130,000.00 Rp. 86,580.00
Jumlah Tenaga Kerja (A) Rp. 1,393,312.00
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 1,393,312.00
E Overhead & Profit 10% x D Rp. 139,331.20
F Harga Satuan Pekerjaan ( D + E ) Rp. 1,532,643.20
G Dibulatkan Rp. 1,532,643.00
Analisa : AHSP A.2.3.1.1
Item : Penggalian 1 m³ tanah biasa sedalam 1 m
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.750 Rp. 98,000.00 Rp. 73,500.00
Mandor L.04 OH 0.025 Rp. 130,000.00 Rp. 3,250.00
Jumlah Tenaga Kerja (A) Rp. 76,750.00
B BAHAN

Jumlah Harga Bahan (B) Rp -


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 76,750.00
E Overhead & Profit 10% x D Rp. 7,675.00
F Harga Satuan Pekerjaan ( D + E ) Rp. 84,425.00
G Dibulatkan Rp. 84,425.00
Analisa : AHSP A.2.3.1.11
Item : Pengurugan 1 m³ dengan pasir / tanah urug
Satuan : m3

Jumlah Harga
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.300 Rp. 98,000.00 Rp. 29,400.00
Mandor L.04 OH 0.010 Rp. 130,000.00 Rp. 1,300.00
Jumlah Tenaga Kerja (A) Rp. 30,700.00
B BAHAN
Pasir Urug m3 1.200 Rp. 235,000.00 Rp. 282,000.00

Jumlah Harga Bahan (B) Rp. 282,000.00


C PERALATAN

Jumlah Harga Alat (C) Rp -


D Jumlah ( A + B + C ) Rp. 312,700.00
E Overhead & Profit 10% x D Rp. 31,270.00
F Harga Satuan Pekerjaan ( D + E ) Rp. 343,970.00
G Dibulatkan Rp. 343,970.00
DAFTAR HARGA BAHAN DAN UPAH

No. BAHAN SATUAN HARGA SATUAN (Rp)

I. BAHAN DASAR

1 Aspal
- Aspal Cair (Drum) Rp. 2,532,400
- Aspal Beton (Ton) Rp. 2,532,400
- Aspal Bitumen (Kg) Rp. 61,797
2 Batu Gunung (M³) Rp. 211,900
3 Batu Kali (M³) Rp. 211,900
4 Batu Pecah 10 - 15 Cm (M³) Rp. 324,480
5 Batu Pecah 7 - 10 Cm (M³) Rp. 339,729
6 Batu Pecah 5 - 7 Cm (M³) Rp. 373,277
7 Batu Pecah 3 - 5 Cm (M³) Rp. 396,825
8 Batu Pecah 2 - 3 Cm (M³) Rp. 442,572
9 Batu Pecah 2 - 3 Cm (Kg) Rp. 328
10 Batu Pecah 1 - 2 Cm (M³) Rp. 526,110
11 Kerikil Sungai (M³) Rp. 206,700
12 Pasir Pasangan, Pasir Beton, Pasir Urug, dan Timbunan (M³) Rp. 206,700
13 Pasir Beton (Kg) Rp. 148
14 Sirtu (Tak diayak) (M³) Rp. 199,433
15 Tanah Timbunan (M³) Rp. 99,320
Rp. -
II. BAHAN BANGUNAN Rp. -
Rp. -
1 Batu Bata/ Batu Merah (Bh) Rp. 1,040
2 Kapur Pasangan (3 Kg) Rp. 12,350
3 Semen PC (@ 50 Kg/Zak) Rp. -
- Merk Tonasa (Zak) Rp. 97,500
(Kg) Rp. 1,950
4 Semen PC (@ 40 Kg/Zak) Rp. -
- Merk Bosowa (Zak) Rp. 62,400
(Kg) Rp. 1,560
- Merk Tonasa (Zak) Rp. 78,000
(Kg) Rp. 1,950
5 Semen Putih Rp. -
- Merk Tiga Roda (@ 50 Kg/Zak) (Zak) Rp. 261,625
(Kg) Rp. 5,233
- Merk Gajah (@ 40 Kg/Zak) (Zak) Rp. 149,500
(Kg) Rp. 3,738
6 Semen Warna (Bungkus) (Kg) Rp. 47,840
7 Skin Coat (@ 25 Kg/Zak) (Zak) Rp. 75,582
Rp. -
No. BAHAN SATUAN HARGA SATUAN (Rp)
III BAHAN KAYU Rp. -
Rp. -
1 Kayu Kelas I ( Balok ) Rp. -
kayu Ulin (M³) Rp. 15,249,000
Kayu Bayam (M³) Rp. 13,724,100
Kayu Nyamu' (M³) Rp. 12,199,200
2 Kayu Kelas I ( Papan ) Rp. -
kayu Ulin (M³) Rp. 15,249,000
Kayu Bayam (M³) Rp. 13,724,100
Kayu Nyamu' (M³) Rp. 12,199,200
3 Kayu Kelas II ( Balok ) (M³) Rp. 3,978,000
4 Kayu Kelas II ( Papan ) (M³) Rp. 3,978,000
5 Kayu Kelas III ( Balok ) (M³) Rp. 2,652,000
6 Kayu Kelas III ( Papan ) (M³) Rp. 2,652,000
7 Kayu Mangga / Kemiri (Papan) (M³) Rp. 2,386,800
8 Dolken kayu 8- 10cm – panjang 4 m (Btg) Rp. 24,826
9 GRC Board (Lbr) Rp. 156,000
10 Hight Preasure Laminating (HPL) (Lbr) Rp. 267,020
11 Lem (standar Aica Aibond) (Ltr) Rp. 37,700
Rp. -
IV BAHAN BAMBU DAN IJUK Rp. -
Rp. -
1 Bambu (Btg) Rp. 19,890
2 Ijuk Biasa (Ikat) Rp. 39,780
Rp. -
V BETON CETAK Rp. -
Rp. -
1 Bataco / Conblok (Bh) Rp. 5,980
2 Besi Beton Rp. -
- Diameter 4 Panjang 12 m (Btg) Rp. 38,123
- Diameter 6 Panjang 12 m (0.22 kg/M') (Btg) Rp. 37,128
- Diameter 8 Panjang 12 m (0.39 kg/M') (Btg) Rp. 59,670
- Diameter 10 Panjang 12 m (0.62 kg/M') (Btg) Rp. 86,190
- Diameter 12 Panjang 12 m (0.89 kg/M') (Btg) Rp. 129,948
- Diameter 14 Panjang 12 m (1.21 kg/M') (Btg) Rp. 175,032
- Diameter 16 Panjang 12 m (1.39 kg/M') (Btg) Rp. 259,233
- Diameter 18 Panjang 12 m (1.81 kg/M') (Btg) Rp. 564,213
- Diameter 19 Panjang 12 m (2.23 kg/M') (Btg) Rp. 609,960
- Diameter 20 Panjang 12 m (2.49 kg/M') (Btg) Rp. 579,462
- Diameter 22 Panjang 12 m (Btg) Rp. 869,193
3 Buis Beton 0.30 - 0.50 m (M') Rp. 121,992
4 Gorong - gorong Beton @100 cm (M') Rp. 373,750
5 Gorong - gorong Beton @60 cm (M') Rp. 119,340
6 Gorong - gorong Beton @80 cm (M') Rp. 198,900
7 Loster Beton 20 x 20 cm (Dos/Biji) Rp. 46,410
8 Loster Biasa 20 x 20 cm (Dos/Biji) Rp. 26,520
9 Loster Keramik 20 x 20 cm (Dos/Biji) Rp. 59,670
No. BAHAN SATUAN HARGA SATUAN (Rp)
10 Loster Keramik 30 x 30 cm (Dos/Biji) Rp. 59,670
11 Paving Block Biasa (Bh) Rp. 3,315
12 Paving Block Mutu Baik (Bh) Rp. 4,575
13 Paving Block Warna (Bh) Rp. 89,700
14 Paving Block Mic (Roll) Rp. 99,450
Rp. -
VI BAHAN KACA Rp. -
Rp. -
1 Glass Block (Bh) Rp. 52,325
2 Kaca Bening 2 Mm (M²) Rp. 194,350
3 Kaca Bening 3 Mm (M²) Rp. 209,300
4 Kaca Bening 5 Mm (M²) Rp. 343,850
5 Kaca Rayben 3 Mm (M²) Rp. 261,625
6 Kaca Rayben 5 Mm (M²) Rp. 351,325
7 Rangka Nako 5 mm Lengkap stand (Lbr) Rp. 366,275
8 Rangka Nako Lengkap Terali (7 Daun) Rp. 433,550
Rp. -
VII BAHAN PAKU Rp. -
Rp. -
1 Paku Atap Genteng Asbes (Biasa) (Dos) Rp. 53,040
2 Paku Atap Genteng Asbes (Ulir) (Dos) Rp. 59,670
3 Paku Asbes dan Karet (Kg) Rp. 139,230
4 Paku Beton 5 cm (Dos) Rp. 39,780
5 Paku Beton 6 cm (Dos) Rp. 59,670
6 Paku Beton 7 cm (Dos) Rp. 59,670
7 Paku Beton 8 - 10 cm (Dos) Rp. 86,190
8 Paku Campuran ( 5 - 10 Cm ) (Kg) Rp. 19,890
9 Paku Biasa (1.5 - 2.5 Cm ) (Kg) Rp. 26,520
10 Paku Biasa (2 - 3 Cm ) (Kg) Rp. 26,520
11 Paku Biasa (4 - 10 Cm ) (Kg) Rp. 23,868
12 Paku Biasa (5 - 10 Cm ) (Kg) Rp. 19,890
13 Paku Gypsum (Kg) Rp. 195,000
14 Paku Galvanized (Bh) Rp. 39,000
15 Paku Eternit RRC (Kg) Rp. 39,000
16 Paku Jembatan (Kg) Rp. 60,450
17 Paku Kaso (Kg) Rp. 67,600
18 Paku Seng Biasa (Kg) Rp. 27,300
19 Paku Seng Ulir (Kg) Rp. 36,400
20 Paku Sirap (Kg) Rp. 36,400
21 Paku Sumbat (Bh) Rp. 66,300
22 Paku Triplex (Kg) Rp. 66,300
Rp. -
No. BAHAN SATUAN HARGA SATUAN (Rp)
VIII BAHAN LAIN - LAIN Rp. -
Rp. -
1 Multipleks 8 mm (Lbr) Rp. 145,860
2 Multipleks 18 mm (Lbr) Rp. 331,500
3 Cat Kayu (Kg) Rp. 79,560
4 Kawat Beton (Kg) Rp. 26,520
5 Baut 12 mm (Bh) Rp. 4,641
6 Kawat Bronjong Manual (Kg) Rp. 26,520
7 Kawat Bronjong Pabrikasi (Keranjang) Rp. 395,148
8 Solar Industri (Ltr) Rp. 15,912
9 Mur, Baut, Angker (Set) Rp. 66,300
10 Plastik Beton Mic (P.90m) (Roll) Rp. 99,450
11 oli (Ltr) Rp. 65,000
12 Air (Ltr) Rp. 260
13 Minyak Bekisting (Ltr) Rp. 12,610
14 Plat Bondek T= 0,75 mm (m2) Rp. 156,000
15 Screw Cteks 12-4x50 (Bh) Rp. 845
16 Aluminium Composit Panel Merk Seven (m2) Rp. 1,690,000
17 Spigot/braket (Btg) Rp. 75,400
18 Sealant ACP (Gr) Rp. 260
19 Mata Gurinda (Bh) Rp. 10,400
20 Mata Bor (Bh) Rp. 78,000
21 Kawat Las (Bh) Rp. 97,500
22 Oksigen (Tbg) Rp. 845,000
23 Acetyline (Tbg) Rp. 975,000
24 Rp. -
25 Rp. -
Rp. -
IX BAHAN BESI / ALUMINIUM Rp. -
Rp. -
1 Alat - alat Bantu (Set) Rp. 261,625
2 Aluminium CA (Btg) Rp. 366,275
3 Aluminium U 5 1/2 CA (Btg) Rp. 249,665
4 Baja H BEAM (Termasuk Cat Manie) (Kg) Rp. 15,600
5 Baja IWF (Termasuk Cat Manie) (Kg) Rp. 15,600
6 Baja Plat (Termasuk Cat Manie) (Kg) Rp. 15,600
7 Baja 1 300/250/6mm-6m+Samb. Las (M') Rp. 4,477,525
8 Baja C (Termasuk Cat Manie) (Kg) Rp. 15,600
9 Baja L 60.60.6 (Kg) Rp. 44,850
10 Baja Kontruksi (Kg) Rp. 63,538
11 Baja Tulangan Beton (Kg) Rp. 35,133
12 Baja Siku L 30 x 30 x 3 cm (Termasuk Cat Manie) (Btg) Rp. 156,975
13 Baja Siku L 40 x 40 x 4 cm (Termasuk Cat Manie) (Btg) Rp. 201,825
14 Baja Siku L 40 x 40 x 4 cm (Termasuk Cat Manie) (m') Rp. 16,819
15 Baja Tralis (Kg) Rp. 59,800
16 Baut + Viser (Bh) Rp. 10,465
17 Sekrup fixer (Bh) Rp. 1,118
18 Baut Baja (Kg) Rp. 57,558
No. BAHAN SATUAN HARGA SATUAN (Rp)
19 Baut 12 mm (Bh) Rp. 12,708
20 Baut 14 mm (Bh) Rp. 14,950
21 Baut 19 mm, Pjg 25 Cm (Bh) Rp. 17,550
22 Baut Pitser dia. 8 mm (Dos) Rp. 169,683
23 Besit Strip 3 cm (Btg) Rp. 104,650
24 Besit Galvanisir (Kg) Rp. 67,275
25 Box Rolling Door (Dos) Rp. 224,250
26 Door Close Set (Bh) Rp. 491,108
27 Handle Rolling (Unit) Rp. 20,183
28 Jarum Penyetel (Kg) Rp. 33,638
29 Karet Rolling (Roll) Rp. 198,088
30 Kawat Beton (Kg) Rp. 43,355
31 Kawat Bronjong (Roll) Rp. 1,128,725
32 Kawat Raam (M') Rp. 57,558
33 Kawat Duri (Roll) Rp. 325,163
34 Kawat Licin (Kg) Rp. 59,800
35 Kawat Las (Kg) Rp. 209,300
36 Kusen Pintu dan Jendela Aluminium (Bh) Rp. 575,575
37 Kusen Pintu dan Jendela 4" (Btg) Rp. 676,000
38 Kusen Pintu dan Jendela 4" (m) Rp. 169,000
39 Kunci Rolling (Bh) Rp. 133,055
40 Mur, Baut, Angker (Set) Rp. 48,588
41 Profil Kaca (m) Rp. 3,900
42 Pully (Bh) Rp. 52,325
43 Rolling Door (Lengkap Terpasang) (M²) Rp. 1,465,100
44 Slat Aluminium (Btg) Rp. 167,440
45 Skop Kualitas Baik (Bh) Rp. 186,875
46 Treak Stand (Bracing) dia. 16 mm (Kg) Rp. 33,638
47 Veer Baja 40 cm (Bh) Rp. 187,623
48 Kawat nyamuk (M²) Rp. 44,616
49 Besi Beton Polos/Ulir (Kg) Rp. 16,900
50 Dina bolt / ramset (Bh) Rp. 3,250
51 Hollow galvanis 20 x 40 x 2 mm (Termasuk Cat Manie) (Btg) Rp. 31,200
52 Hollow galvanis 20 x 40 x 2 mm (Termasuk Cat Manie) (m') Rp. 7,800
53 Hollow galvanis 40 x 40 x 2 mm (Termasuk Cat Manie) (Btg) Rp. 41,600
54 Hollow galvanis 40 x 40 x 2 mm (Termasuk Cat Manie) (m') Rp. 10,400
55 Hollow galvanis 60 x 40 x 2 mm (Termasuk Cat Manie) (Btg) Rp. 78,000
56 Hollow galvanis 60 x 40 x 2 mm (Termasuk Cat Manie) (m') Rp. 19,500
57 Sekrup 1/2" (Bh) Rp. 650
58 Aluminium Foil (m2) Rp. 119,600
59 Besi Wiremesh (Kg) Rp. 26,650
60 Trusses C-75 t = 0.80 m mm Zincalume (m') Rp. 35,100
61 Trusses C-75 t = 0.60 mm Zincalume (m') Rp. 22,100
62 Roof botom/reng 32.45 Zincalume (m') Rp. 16,250
63 Door Closer (Buah) Rp. 325,000
64 Handle Pintu (Psg) Rp. 163,800
65 Plat strip allumunium lebar 8 cm standar (m') Rp. 26,000
No. BAHAN SATUAN HARGA SATUAN (Rp)
66 Kusen Pintu Frame Alumunium Ex. Alexindo (Powder Coating) (m') Rp. 143,000
67 Baja H-Beam (Kg) Rp. 10,399
68 Jarum Keras (Bh) Rp. 58,500
69 Kusen Jendela Frame Alumunium Ex. Alexindo (Powder Coating) (m') Rp. 117,000
70 Pagar BRC uk 190 x 240 Dia 8 Lmbr Rp. 1,700,000

Rp. -
X BAHAN PLAFOND Rp. -
Rp. -
1 Akustik 30 x 60 x 9 (Lbr) Rp. 92,690
2 Eternit 3 mm Uk. 100 x 100 cm (Lbr) Rp. 32,143
3 Gamacca (Lbr) Rp. 41,860
4 Gypsum Plat (Lbr) Rp. 267,605
5 Gypsum board polos uk. 1.22 x 2.44 (m), tebal 9 mm (Lbr) Rp. 109,200
6 Karpet Plint (M²) Rp. 355,063
7 Les Kayu (Kls.II) (M') Rp. 38,870
8 Les Plint Profile (M') Rp. 52,325
9 Les Plint Sunkai Ukir (M') Rp. 119,600
10 Les Profil 1/2 Busur (M') Rp. 82,225
11 Les Plafond Gypsum 10 Cm (M') Rp. 14,560
12 Les Profil Ukuran 4/5 (Kls.I) (M') Rp. 97,175
13 Multipleks 8 mm (Lbr) Rp. 186,875
14 Multipleks 18 mm (Lbr) Rp. 261,625
15 Papan Blis (M') Rp. 381,225
16 Sirap (Ikat) Rp. 156,975
17 Sungkar Paper (Gulung) Rp. 336,375
18 Teakwood 3 x 7 (Lbr) Rp. 209,300
19 Teakwood 4 x 8 (Lbr) Rp. 234,715
20 Teakwood Lapis Aluminium (Bh) Rp. 355,810
21 Teakwood Melamin (Lbr) Rp. 40,365
22 Triplex Biasa 3 mm (Lbr) Rp. 147,258
23 Triplex Melamin (Lbr) Rp. 221,260
24 Triplex Sungkai (Pilihan) (M²) Rp. 328,900
25 Wall Paper (Lbr) Rp. 134,550
26 Triplex 3 mm (Lbr) Rp. 85,150
27 Triplex 4 mm (Lbr) Rp. 107,640
28 Triplex 6 mm (Lbr) Rp. 127,075
29 Triplex / Plywood 9 mm (Lbr) Rp. 209,300
30 Triplex / Plywood 12 mm (Lbr) Rp. 254,150
31 Kalsyboard (Lbr) Rp. 88,400
Rp. -
XI BAHAN ATAP Rp. -
Rp. -
1 Asbes Gelombang 6 Ft (Lbr) Rp. 127,075
2 Asbes Genteng Uk. 75 x 110 cm (Lbr) Rp. 109,135
3 Asbes Plat Haples 200 x 100 x 0.5 cm (Lbr) Rp. 183,885
4 Atap TLS Color 0.35 (M²) Rp. 201,825
5 Atap Spandok Rp. -
6 Atap Spandok (Silver) (M²) Rp. 104,650
No. BAHAN SATUAN HARGA SATUAN (Rp)
7 Atap Spandok (Warna) (M²) Rp. 128,570
8 Bubungan Asbes Gelombang (Lbr) Rp. 89,700
9 Bubungan Asbes Gentang (Lbr) Rp. 89,700
10 Bubungan Asbes Gentang Warna (Bh) Rp. 115,115
11 Bubungan Genteng Beton (Bh) Rp. 17,940
12 Bubungan Genteng Beton Keramik (Bh) Rp. 44,850
13 Bubungan Genteng Kodok (Lbr) Rp. 22,425
14 Bubungan Genteng Metal (Lbr) Rp. 85,215
15 Bubungan Genteng Verge Standar (Lbr) Rp. 111,800
16 Bubungan Seng (Lbr) Rp. 112,125
17 Bubungan TLS Color 0.35 (M') Rp. 119,600
18 Genteng Beton (Bh) Rp. 14,950
19 Genteng Beton Keramik (Bh) Rp. 37,375
20 Genteng Haples Semen Gelombang 5 mm (Lbr) Rp. 164,450
21 Genteng Haples Semen Warna 11 x 85 x 5 mm (Lbr) Rp. 164,450
22 Genteng Kodok (Bh) Rp. 14,950
23 - Genteng Metal (Merk Multiroof) (Lbr) Rp. 179,400
24 - Genteng Metal (Merk Suryaroof) (Lbr) Rp. 82,225
25 - Genteng Metal (Merk Sakura roof) (Lbr) Rp. 74,750
26 - Genteng Metal (Merk Gajah) (Lbr) Rp. 77,740
27 Karet Alas atap (M') Rp. 17,940
28 Karet Laiyang (M') Rp. 149,500
29 Seng Alumunium licin 031 (Lbr) Rp. 1,053,975
30 Seng Gajah (Lbr) Rp. 17,940
31 Seng BJLS 020 (Lbr) Rp. 22,425
32 Seng BJLS 022 (Kaki) Rp. 26,910
33 Seng BJLS 029 (Kaki) Rp. 26,910
34 Seng BJLS 031 (Kaki) Rp. 17,940
35 Seng Gelombang 6 feet BWG 34 (Lbr) Rp. 127,075
36 Seng Licin BJLS 020 (M²) Rp. 112,125
37 Seng Licin BJLS 035 (Lbr) Rp. 231,725
38 Seng Onduline (Lbr) Rp. 273,585
39 Seng Plastik 6 Feet (Kaki) Rp. 22,425
40 Seng Plat BJLS 020 (Lbr) Rp. 100,165
41 Seng Plat BJLS 022 (Lbr) Rp. 142,025
42 Seng Superdek 6 feet (Lbr) Rp. 101,660
Rp. -
XII KUNCIAN DAN PENGGANTUNG Rp. -
Rp. -
1 Engsel Pintu (Pasang) Rp. 74,750
1 Engsel Pintu (Bh) Rp. 37,375
2 Engsel Pintu Otomatis (Pasang) Rp. 179,400
3 Engsel Pintu Lemari Mutu Baik (Pasang) Rp. 67,275
4 Engsel Jendela (Pasang) Rp. 59,800
4 Engsel Jendela (Bh) Rp. 29,900
5 Grendel (Bh) Rp. 26,910
6 Casement/Engsel Kait Angin (Bh) Rp. 195,000
No. BAHAN SATUAN HARGA SATUAN (Rp)
7 Kuncian ex. RRT (Pasang) Rp. 179,400
8 Kuncian Otomatis + Tarikan (Pasang) Rp. 433,550
9 Kuncian Lemari Mutu Baik (Pasang) Rp. 67,275
10 Kunci Tanam Baik (Bh) Rp. 326,040
11 Kunci Tanam Biasa (Bh) Rp. 274,560
12 Kunci tanam KM (Bh) Rp. 82,550
Rp. -
XIII BAHAN BESI SANITASI Rp. -
Rp. -
1 Bak Mandi Fiber (Bh) Rp. 373,750
2 Bak Mandi Porselin (Bh) Rp. 814,775
3 Bak Mandi Plastik (Kecil) (Bh) Rp. 680,973
4 Bath Tub (Unit) Rp. 455,975
5 Kloset Jongko Merek KIA (Bh) Rp. 5,116,638
6 Kloset Jongko Merek TOTO (Bh) Rp. 448,500
7 Kloset Jongko (Mutu Baik) Duduk & Tutup (Bh) Rp. 1,823,900
8 Kloset Duduk TOTO Kls. I (Bh) Rp. 3,250,000
9 Kloset Duduk + Kran Nilas (Mutu Baik) (Set) Rp. 1,345,500
10 Centrifugal Horizontal Pump 30 M, Type : CH -4 (Unit) Rp. 15,249,000
11 Centrifugal Horizontal Pump 30 M - 40 M, Type : CH -8 (Unit) Rp. 24,099,400
12 Centrifugal Horizontal Pump 30 M, Type : CH -12 (Unit) Rp. 36,612,550
13 Centrifugal Pump 120 M, Type : CR - 3 (Unit) Rp. 40,827,703
14 Centrifugal Pump 30 M - 40 M, Type : CR - 5 (Unit) Rp. 48,737,000
15 Centrifugal Pump 100 M, Type : CR - 10 (Unit) Rp. 58,671,275
16 Expanyolet Tanam (Bh) Rp. 186,875
17 Exhouse Fan (Unit) Rp. 642,850
18 Flug Kran dia. 1/2' (Bh) Rp. 104,650
19 Flug Gip dia. 1/2' (Bh) Rp. 104,650
20 Kitchen sink Stainles (Unit) Rp. 1,270,750
21 Kran Shower Mandi (Set) Rp. 142,025
22 Kran Air Bersih (Ganda) (Bh) Rp. 403,650
23 Kran Air 3/4" merk Onda BL (Bh) Rp. 44,850
24 Kran Air 1/2" merk Onda BL (Bh) Rp. 37,375
25 Kran Air Gip Standar SNI Ø 3/4" (Bh) Rp. 149,500
26 Kran Air Gip Standar SNI Ø 1/2" (Bh) Rp. 48,588
27 Pemanas Air Tenaga Matahari WIKA (Unit) Rp. 11,848,623
28 Penutup Stop Kran dia. 4" (Set) Rp. 276,575
29 Penguras Air (Set) Rp. 133,803
30 Shower (Setara Merk TOTO) (Bh) Rp. 174,915
31 Soap Wall Box (Bh) Rp. 164,450
32 Stop Kran Air Ø 6" (Bh) Rp. 3,019,900
33 Stop Kran Air dia. 1/2" (Bh) Rp. 12,708
34 Stop Kran Air dia. 3/4" (Bh) Rp. 28,405
35 Stop Kran Air dia. 1" (Bh) Rp. 89,700
36 Stop Kran Air dia. 1.5" (Bh) Rp. 236,958
37 Stop Kran Air dia. 2" (Bh) Rp. 373,750
38 Stop Kran Air dia. 3" (Bh) Rp. 328,900
No. BAHAN SATUAN HARGA SATUAN (Rp)
39 Stop Kran Air dia. 4" (Bh) Rp. 680,225
40 Saringan Air Pipa PVC dia. 4" (Set) Rp. 485,875
41 Saringan Air Pipa PVC dia. 3" (Set) Rp. 236,210
42 Septic Tank Fiber Semen 106 x 115 x 1.2 (Unit) Rp. 1,794,000
43 Submersible Deep Well Pump, Type SP-2A, Head Max. 110 Mtr (Unit) Rp. 33,375,875
44 Submersible Deep Well Pump, Type SP-3A, Head Max. 100 Mtr (Unit) Rp. 31,021,250
45 Submersible Deep Well Pump, Type SP-5A, Head Max. 70 Mtr (Unit) Rp. 32,105,125
46 Submersible Deep Well Pump, Type SP-8A, Head Max. 50 Mtr (Unit) Rp. 41,224,625
47 Tangki Fiberglas Kap. 6 m3 (Bh) Rp. 16,871,075
48 Tangki Fiberglas Kap. 3 m3 (Bh) Rp. 10,612,258
49 Tangki Fiberglas Kap. 2 m3 (Bh) Rp. 4,268,225
50 Tangki Fiberglas Kap. 1 m3 (Bh) Rp. 2,179,710
51 Urinoir Keramik TOTO Kls. I (Bh) Rp. 1,560,000
52 Urinoir Traso (Bh) Rp. 1,024,075
53 Sekat Urinoir (Unit) Rp. 524,680
53 Vertical Multistage Centrifugal Pump, Type CHV -2, Head 72 m (Unit) Rp. 21,632,650
54 Vertical Multistage Centrifugal Pump, Type CHV -4, Head 65 m (Unit) Rp. 26,767,975
55 Wastafel KW II (Bh) Rp. 420,095
56 Wastafel KW I (Bh) Rp. 620,425
57 Wastafel Set + Meja (Set) Rp. 5,083,000
58 Wastafel TOTO Kls. I (Bh) Rp. 1,248,000
58 Floor Drain Stainless steel (Bh) Rp. 245,700
59 Jet Washer (Bh) Rp. 174,200
60 Sealtape (Bh) Rp. 1,430
61 Water Drain (Set) Rp. 258,115
62 Kran Zink 'T 30 AR13NV7N ex. TOTO (Bh) Rp. 304,818
Rp. -
Rp. -
Rp. -
XIV BAHAN PERPIPAAN Rp. -
Rp. -
1 Air Valve Gip Standar SNI Ø 3" (Bh) Rp. 672,750
2 Air Valve Gip Standar SNI Ø 2½" (Bh) Rp. 659,295
3 Air Valve Gip Standar SNI Ø 2" (Bh) Rp. 515,775
4 Air Valve Gip Standar SNI Ø 1½" (Bh) Rp. 496,340
5 Air Valve Gip Standar SNI Ø 1" (Bh) Rp. 485,875
6 Box Meter (25 m) Rp. 59,800
7 Box Meter (100 m) Rp. 164,450
8 Gerobak (Unit) Rp. 767,683
9 Isolasi Pipa (Roll) Rp. 10,465
10 Jerigen Kap 20 Liter (Unit) Rp. 97,175
11 Jerigen Kap 10 Liter (Unit) Rp. 59,800
12 Kunci Slot (Bh) Rp. 32,890
13 Lem Pipa (Kg) Rp. 179,400
14 Pelampung (Bh) Rp. 313,950
15 Pipa Gip Medium A dia. 6" (Btg) Rp. 3,535,675
16 Pipa Gip Medium A dia. 4" (Btg) Rp. 3,481,108
No. BAHAN SATUAN HARGA SATUAN (Rp)
17 Pipa Gip Medium A dia. 3" (Btg) Rp. 2,294,825
18 Pipa Gip Medium A dia. 2" (Btg) Rp. 968,760
19 Pipa Gip Medium A dia. 1 1/2" (Btg) Rp. 762,450
20 Pipa Gip Medium A dia. 1 " (Btg) Rp. 500,825
21 Pipa Gip Medium A dia. 3/4 " (Btg) Rp. 396,175
22 Pipa Gip Medium A dia. 1/2 " (Btg) Rp. 303,485
23 Pipa Gip Medium B dia. 4" (Btg) Rp. 1,958,450
24 Pipa Gip Medium B dia. 3" (Btg) Rp. 1,495,000
25 Pipa Gip Medium B dia. 2" (Btg) Rp. 657,800
26 Pipa Gip Medium B dia. 1 1/2" (Btg) Rp. 400,660
27 Pipa Gip Medium B dia. 1 " (Btg) Rp. 258,635
28 Pipa Gip Medium B dia. 3/4 " (Btg) Rp. 209,300
29 Pipa Gip Medium B dia. 1/2 " (Btg) Rp. 180,895
30 Pipa Gip dia. 8 ", Merk Bakrie Std. SIO - Medium, 6 Meter (Btg) Rp. 9,503,715
31 Pipa Gip dia. 6 ", Merk Bakrie Std. SIO - Medium, 6 Meter (Btg) Rp. 4,260,750
32 Pipa Gip dia. 4 ", Merk Bakrie Std. SIO - Medium, 6 Meter (Btg) Rp. 3,060,265
33 Pipa Gip dia. 3 ", Merk Bakrie Std. SIO - Medium, 6 Meter (Btg) Rp. 2,347,150
34 Pipa Gip dia. 2 1/2 ", Merk Bakrie Std. SIO - Medium, 6 Meter (Btg) Rp. 1,397,825
35 Pipa Gip dia. 2 ", Merk Bakrie Std. SIO - Medium, 6 Meter (Btg) Rp. 1,113,775
36 Pipa Gip dia. 1 1/2 ", Merk Bakrie Std. SIO - Medium, 6 Meter (Btg) Rp. 882,050
37 Pipa Gip dia. 1 1/4 ", Merk Bakrie Std. SIO - Medium, 6 Meter (Btg) Rp. 769,925
38 Pipa Gip dia. 1 ", Merk Bakrie Std. SIO - Medium, 6 Meter (Btg) Rp. 632,385
39 Pipa Gip dia. 3/4 ", Merk Bakrie Std. SIO - Medium, 6 Meter (Btg) Rp. 493,350
40 Pipa Gip dia. 1/2 ", Merk Bakrie Std. SIO - Medium, 6 Meter (Btg) Rp. 400,660
41 Pipa Gip dia. 8 ", Standar Medium A Sup SNI, 6 Meter (Btg) Rp. 9,609,113
42 Pipa Gip dia. 6 ", Standar Medium A Sup SNI, 6 Meter (Btg) Rp. 3,834,675
43 Pipa Gip dia. 4 ", Standar Medium A Sup SNI, 6 Meter (Btg) Rp. 2,586,350
44 Pipa Gip dia. 3 ", Standar Medium A Sup SNI, 6 Meter (Btg) Rp. 1,853,800
45 Pipa Gip dia. 2 1/2 ", Standar Medium A Sup SNI, 6 Meter (Btg) Rp. 1,537,608
46 Pipa Gip dia. 2 ", Standar Medium A Sup SNI, 6 Meter (Btg) Rp. 1,042,015
47 Pipa Gip dia. 1 1/2 ", Standar Medium A Sup SNI, 6 Meter (Btg) Rp. 829,725
48 Pipa Gip dia. 1 1/4 ", Standar Medium A Sup SNI, 6 Meter (Btg) Rp. 777,400
49 Pipa Gip dia. 1 ", Standar Medium A Sup SNI, 6 Meter (Btg) Rp. 598,000
50 Pipa Gip dia. 3/4 ", Standar Medium A Sup SNI, 6 Meter (Btg) Rp. 411,125
51 Pipa Gip dia. 1/2 ", Standar Medium A Sup SNI, 6 Meter (Btg) Rp. 313,950
52 Pipa Gip dia. 6 ", Standar Medium A SNI, 6 Meter (Btg) Rp. 3,528,200
53 Pipa Gip dia. 4 ", Standar Medium A SNI, 6 Meter (Btg) Rp. 1,836,608
54 Pipa Gip dia. 3 ", Standar Medium A SNI, 6 Meter (Btg) Rp. 1,532,375
55 Pipa Gip dia. 2 1/2 ", Standar Medium A SNI, 6 Meter (Btg) Rp. 1,255,800
56 Pipa Gip dia. 2 ", Standar Medium A SNI, 6 Meter (Btg) Rp. 892,515
57 Pipa Gip dia. 1 1/2 ", Standar Medium A SNI, 6 Meter (Btg) Rp. 717,600
58 Pipa Gip dia. 1 1/4 ", Standar Medium A SNI, 6 Meter (Btg) Rp. 593,515
59 Pipa Gip dia. 1 ", Standar Medium A SNI, 6 Meter (Btg) Rp. 538,200
60 Pipa Gip dia. 3/4 ", Standar Medium A SNI, 6 Meter (Btg) Rp. 343,850
61 Pipa Gip dia. 1/2 ", Standar Medium A SNI, 6 Meter (Btg) Rp. 281,808
62 Pipa Gip dia. 4 ", Standar Medium B SNI, 6 Meter (Btg) Rp. 1,495,000
63 Pipa Gip dia. 3 ", Standar Medium B SNI, 6 Meter (Btg) Rp. 1,160,120
No. BAHAN SATUAN HARGA SATUAN (Rp)
64 Pipa Gip dia. 2 1/2 ", Standar Medium B SNI, 6 Meter (Btg) Rp. 956,800
65 Pipa Gip dia. 2 ", Standar Medium B SNI, 6 Meter (Btg) Rp. 722,085
66 Pipa Gip dia. 1 1/2 ", Standar Medium B SNI, 6 Meter (Btg) Rp. 598,000
67 Pipa Gip dia. 1 1/4 ", Standar Medium B SNI, 6 Meter (Btg) Rp. 502,320
68 Pipa Gip dia. 1 ", Standar Medium B SNI, 6 Meter (Btg) Rp. 444,015
69 Pipa Gip dia. 3/4 ", Standar Medium B SNI, 6 Meter (Btg) Rp. 299,000
70 Pipa Gip dia. 1/2 ", Standar Medium B SNI, 6 Meter (Btg) Rp. 261,625
71 Pipa PVC AW Type D, 4 M Maspion 10" (Btg) Rp. 2,514,590
72 Pipa PVC AW Type D, 4 M Maspion 8" (Btg) Rp. 1,472,575
73 Pipa PVC AW Type D, 4 M Maspion 6" (Btg) Rp. 889,525
74 Pipa PVC AW Type D, 4 M Maspion 5" (Btg) Rp. 730,308
75 Pipa PVC AW Type D, 4 M Maspion 4" (Btg) Rp. 438,035
76 Pipa PVC AW 4 M Maspion 3/4" (Btg) Rp. 109,135
77 Pipa PVC AW 4 M Maspion 1/2" (Btg) Rp. 97,175
78 Pipa PVC AW Rubber Ring Joint. 6 Mtr wavin 4" (Btg) Rp. 775,158
79 Pipa PVC AW Rubber Ring Joint. 6 Mtr wavin 3" (Btg) Rp. 429,065
80 Pipa PVC AW Rubber Ring Joint. 6 Mtr wavin 2" (Btg) Rp. 299,000
81 Pipa PVC AW 4 Meter Merk Wavin 1/2" (Btg) Rp. 44,850
82 Pipa PVC AW 4 Meter Merk Wavin 3/4" (Btg) Rp. 59,800
83 Pipa PVC AW 4 Meter Merk Wavin 1" (Btg) Rp. 82,225
83 Pipa PVC AW 4 Meter Merk Wavin 1" (m') Rp. 20,556
84 Pipa PVC AW 4 Meter Merk Wavin 2" (Btg) Rp. 149,500
85 Pipa PVC AW 4 Meter Merk Wavin 3" (Btg) Rp. 254,150
86 Pipa PVC AW 4 Meter Merk Wavin 4" (Btg) Rp. 500,825
87 Pipa PVC AW 4 Meter Merk Wavin 6" (Btg) Rp. 1,169,090
88 Pipa PVC AW + MOF Type D, 4 mtr Jaya 10" (Btg) Rp. 1,567,508
89 Pipa PVC AW + MOF Type D, 4 mtr Jaya 8" (Btg) Rp. 907,465
90 Pipa PVC AW + MOF Type D, 4 mtr Jaya 6" (Btg) Rp. 530,725
91 Pipa PVC AW + MOF Type D, 4 mtr Jaya 5" (Btg) Rp. 444,015
92 Pipa PVC AW + MOF Type D, 4 mtr Jaya 4" (Btg) Rp. 281,808
93 Pipa PVC AW + MOF Type D, 4 mtr Jaya 3" (Btg) Rp. 184,633
94 Pipa PVC AW + MOF Type D, 4 mtr Jaya 2 1/2" (Btg) Rp. 147,258
95 Pipa PVC AW + MOF Type D, 4 mtr Jaya 2" (Btg) Rp. 117,358
96 Pipa PVC AW + MOF Type D, 4 mtr Jaya 1 1/2" (Btg) Rp. 92,690
97 Pipa PVC AW + MOF Type D, 4 mtr Jaya 1 1/4" (Btg) Rp. 82,225
98 Pipa PVC AW + MOF , 4 mtr Jaya 1/2" (Btg) Rp. 52,325
99 Pipa PVC dia. 8", S - 12.5. Merk Pralon, 6 Mtr (Btg) Rp. 3,323,385
100 Pipa PVC dia. 6", S - 12.5. Merk Pralon, 6 Mtr (Btg) Rp. 2,165,508
101 Pipa PVC dia. 4", S - 12.5. Merk Pralon, 6 Mtr (Btg) Rp. 1,049,490
102 Pipa PVC dia. 3", S - 12.5. Merk Pralon, 6 Mtr (Btg) Rp. 720,590
103 Pipa PVC dia. 2 1/2", S - 12.5. Merk Pralon, 6 Mtr (Btg) Rp. 511,290
104 Pipa PVC dia. 2", S - 12.5. Merk Pralon, 6 Mtr (Btg) Rp. 369,265
105 Pipa PVC dia. 1 1/2", S - 10. Merk Pralon, 6 Mtr (Btg) Rp. 281,808
106 Pipa PVC dia. 1 1/4", S - 10. Merk Pralon, 6 Mtr (Btg) Rp. 189,865
107 Pipa PVC dia. 1", S - 10. Merk Pralon, 6 Mtr (Btg) Rp. 134,550
108 Pipa PVC dia. 3/4", S - 10. Merk Pralon, 6 Mtr (Btg) Rp. 89,700
109 Pipa PVC dia. 1/2", S - 10. Merk Pralon, 6 Mtr (Btg) Rp. 67,275
No. BAHAN SATUAN HARGA SATUAN (Rp)
110 Pipa PVC dia. 1/2", S - 12.5. SNI Merk Wavin, 6 Mtr (Btg) Rp. 95,680
111 Pipa PVC dia. 3/4", S - 12.5. SNI Merk Wavin, 6 Mtr (Btg) Rp. 132,308
112 Pipa PVC dia. 1", S - 12.5. SNI Merk Wavin, 6 Mtr (Btg) Rp. 192,108
113 Pipa PVC dia. 1 1/4", S - 12.5. SNI Merk Wavin, 6 Mtr (Btg) Rp. 280,313
114 Pipa PVC dia. 6", S - 12.5. SNI Merk Wavin, 6 Mtr (Btg) Rp. 3,176,875
115 Pipa PVC dia. 4", S - 12.5. SNI Merk Wavin, 6 Mtr (Btg) Rp. 1,537,608
116 Pipa PVC dia. 3", S - 12.5. SNI Merk Wavin, 6 Mtr (Btg) Rp. 1,024,075
117 Pipa PVC dia. 2", S - 12.5. SNI Merk Wavin, 6 Mtr (Btg) Rp. 527,735
118 Pipa PVC dia. 1 1/2", S - 12.5. SNI Merk Wavin, 6 Mtr (Btg) Rp. 343,850
119 Pipa PVC dia. 1 1/4", S - 10. SNI Merk Wavin, 6 Mtr (Btg) Rp. 236,210
120 Pipa PVC dia. 1", S - 10. SNI Merk Wavin, 6 Mtr (Btg) Rp. 169,683
121 Pipa PVC dia. 3/4", S - 10. SNI Merk Wavin, 6 Mtr (Btg) Rp. 112,125
122 Pipa PVC dia. 1/2", S - 10. SNI Merk Wavin, 6 Mtr (Btg) Rp. 85,215
123 Pipa PVC dia. 6", S - 12.5. SNI Merk Wavin, 6 Mtr (Btg) Rp. 2,598,310
124 Pipa PVC dia. 4", S - 12.5. SNI Merk Wavin, 6 Mtr (Btg) Rp. 1,252,810
125 Pipa PVC dia. 3", S - 12.5. SNI Merk Wavin, 6 Mtr (Btg) Rp. 864,110
126 Pipa PVC dia. 2", S - 12.5. SNI Merk Wavin, 6 Mtr (Btg) Rp. 448,500
127 Pipa PVC dia. 4", S - 12.5. SNI Merk Unilon, 6 Mtr (Btg) Rp. 820,008
128 Pipa PVC dia. 3", S - 12.5. SNI Merk Unilon, 6 Mtr (Btg) Rp. 598,000
129 Pipa PVC dia. 2 1/2", S - 12.5. SNI Merk Unilon, 6 Mtr (Btg) Rp. 396,175
130 Pipa PVC dia. 2", S - 12.5. SNI Merk Unilon, 6 Mtr (Btg) Rp. 301,990
131 Pipa PVC dia. 1 1/2", S - 12.5. SNI Merk Unilon, 6 Mtr (Btg) Rp. 209,300
132 Pipa PVC dia. 1 1/4", S - 10. SNI Merk Unilon, 6 Mtr (Btg) Rp. 168,935
133 Pipa PVC dia. 1", S - 10. SNI Merk Unilon, 6 Mtr (Btg) Rp. 122,590
134 Pipa PVC dia. 3/4", S - 10. SNI Merk Unilon, 6 Mtr (Btg) Rp. 82,225
135 Pipa PVC dia. 1/2", S - 10. SNI Merk Unilon, 6 Mtr (Btg) Rp. 62,790
136 Pipa PVC dia. 4", S - 12.5. SNI Merk Maspion, 6 Mtr (Btg) Rp. 814,775
137 Pipa PVC dia. 3", S - 12.5. SNI Merk Maspion, 6 Mtr (Btg) Rp. 595,758
138 Pipa PVC dia. 2 1/2", S - 12.5. SNI Merk Maspion, 6 Mtr (Btg) Rp. 386,458
139 Pipa PVC dia. 2", S - 12.5. SNI Merk Maspion, 6 Mtr (Btg) Rp. 294,515
140 Pipa PVC dia. 1 1/2", S - 12.5. SNI Merk Maspion, 6 Mtr (Btg) Rp. 209,300
141 Pipa PVC dia. 1 1/4", S - 10. SNI Merk Maspion, 6 Mtr (Btg) Rp. 167,440
142 Pipa PVC dia. 1", S - 10. SNI Merk Maspion, 6 Mtr (Btg) Rp. 119,600
143 Pipa PVC dia. 3/4", S - 10. SNI Merk Maspion, 6 Mtr (Btg) Rp. 79,235
144 Pipa PVC dia. 1/2", S - 10. SNI Merk Maspion, 6 Mtr (Btg) Rp. 62,790
145 Water Meter dia. 1/2" (Bh) Rp. 488,865
146 Water Meter dia. 3/4" Merk Onda Brass (Bh) Rp. 772,915
147 Water Meter dia. 1/2" Merk Onda Brass (Bh) Rp. 805,058
148 Water Meter GIP Standar SNI Ø 3/4" (Bh) Rp. 388,700
149 Water Meter GIP Standar SNI Ø 3/4" (Bh) Rp. 376,740
Rp. -
No. BAHAN SATUAN HARGA SATUAN (Rp)
XV BAHAN ASSESORIES PIPA Rp. -
Rp. -
1 Blind Flange PVC 200 mm (Bh) Rp. 862,615
2 Blind Flange PVC 250 mm (Bh) Rp. 1,300,650
3 Blind Flange PVC 300 mm (Bh) Rp. 1,650,480
4 Bend PVC 45 derajat - dia. 4", Merk Pralon (Bh) Rp. 258,635
5 Bend PVC 45 derajat - 3", Merk Pralon (Bh) Rp. 156,975
6 Bend PVC 45 derajat - 2 1/2", Merk Pralon (Bh) Rp. 118,105
7 Bend PVC 45 derajat - 2", Merk Pralon (Bh) Rp. 66,528
8 Bend PVC 45 derajat - 1 1/2", Merk Pralon (Bh) Rp. 26,910
9 Bend PVC 45 derajat - 1 1/4", Merk Pralon (Bh) Rp. 18,688
10 Bend PVC 45 derajat - 1", Merk Pralon (Bh) Rp. 13,455
11 Bend PVC 45 derajat - 3/4", Merk Pralon (Bh) Rp. 12,708
12 Bend PVC 45 derajat - 1/2", Merk Pralon (Bh) Rp. 11,213
13 Bend PVC 90 derajat - 4", Merk Pralon (Bh) Rp. 343,850
14 Bend PVC 90 derajat - 3", Merk Pralon (Bh) Rp. 193,603
15 Bend PVC 90 derajat - 2 1/2", Merk Pralon (Bh) Rp. 130,065
16 Bend PVC 90 derajat - 2", Merk Pralon (Bh) Rp. 79,983
17 Bend PVC 90 derajat - 1 1/2", Merk Pralon (Bh) Rp. 27,658
18 Bend PVC 90 derajat - 1 1/4", Merk Pralon (Bh) Rp. 22,425
19 Bend PVC 90 derajat - 1", Merk Pralon (Bh) Rp. 16,445
20 Bend PVC 90 derajat - 3/4", Merk Pralon (Bh) Rp. 12,708
21 Bend PVC 90 derajat - 1/2", Merk Pralon (Bh) Rp. 9,718
22 Bend PVC Standar SNI 45 derajat - 4" (Bh) Rp. 168,188
23 Bend PVC Standar SNI 45 derajat - 3" (Bh) Rp. 85,963
24 Bend PVC Standar SNI 45 derajat - 2 1/2" (Bh) Rp. 66,528
25 Bend PVC Standar SNI 45 derajat - 2" (Bh) Rp. 40,365
26 Bend PVC Standar SNI 45 derajat - 1 1/2" (Bh) Rp. 35,133
27 Bend PVC Standar SNI 45 derajat - 1 1/2" (Bh) Rp. 27,658
28 Bend PVC Standar SNI 45 derajat - 1" (Bh) Rp. 22,425
29 Bend PVC Standar SNI 90 derajat - 4" (Bh) Rp. 193,603
30 Bend PVC Standar SNI 90 derajat - 3" (Bh) Rp. 99,418
31 Bend PVC Standar SNI 90 derajat - 2 1/2" (Bh) Rp. 79,983
32 Bend PVC Standar SNI 90 derajat - 2" (Bh) Rp. 47,093
33 Bend PVC Standar SNI 90 derajat - 1 1/2" (Bh) Rp. 35,133
34 Bend PVC Standar SNI 90 derajat - 1 1/2" (Bh) Rp. 22,425
35 Bend PVC Standar SNI 90 derajat - 1" (Bh) Rp. 20,183
36 Bend PVC Standar SNI 90 derajat - 3/4" (Bh) Rp. 14,203
37 Bend PVC Standar SNI 90 derajat - 1/2" (Bh) Rp. 12,708
38 Bend GIP Standar SNI 45 derajat - 4" (Bh) Rp. 320,678
39 Bend GIP Standar SNI 45 derajat - 3" (Bh) Rp. 187,623
40 Bend GIP Standar SNI 45 derajat - 2 1/2" (Bh) Rp. 105,398
41 Bend GIP Standar SNI 45 derajat - 2" (Bh) Rp. 62,043
42 Bend GIP Standar SNI 45 derajat - 1 1/2" (Bh) Rp. 41,113
43 Bend GIP Standar SNI 45 derajat - 1 1/2" (Bh) Rp. 35,133
44 Bend GIP Standar SNI 45 derajat - 1" (Bh) Rp. 22,425
45 Bend GIP Standar SNI 45 derajat - 3/4" (Bh) Rp. 16,445
No. BAHAN SATUAN HARGA SATUAN (Rp)
46 Bend GIP Standar SNI 45 derajat - 1/2" (Bh) Rp. 12,708
47 Bend GIP Standar SNI 90 derajat - 4" (Bh) Rp. 285,545
48 Bend GIP Standar SNI 90 derajat - 3" (Bh) Rp. 159,218
49 Bend GIP Standar SNI 90 derajat - 2 1/2" (Bh) Rp. 105,398
50 Bend GIP Standar SNI 90 derajat - 2" (Bh) Rp. 56,810
51 Bend GIP Standar SNI 90 derajat - 1 1/2" (Bh) Rp. 37,375
52 Bend GIP Standar SNI 90 derajat - 1 1/2" (Bh) Rp. 29,900
53 Bend GIP Standar SNI 90 derajat - 1" (Bh) Rp. 20,183
54 Bend GIP Standar SNI 90 derajat - 3/4" (Bh) Rp. 14,203
55 Bend GIP Standar SNI 90 derajat - 1/2" (Bh) Rp. 11,213
56 Ball Valve dia. 1/2" (Bh) Rp. 285,545
57 Ball Kran dia. 1/2" (Bh) Rp. 118,853
58 Cap (RR) PVC dia. 2 (Bh) Rp. 74,003
59 Cap (RR) PVC dia. 3 (Bh) Rp. 126,328
60 Cap (RR) PVC dia. 4 (Bh) Rp. 239,200
61 Cap 4", Merk Pralon (Bh) Rp. 423,833
62 Cap 3", Merk Pralon (Bh) Rp. 308,718
63 Cap 2 1/2", Merk Pralon (Bh) Rp. 239,200
64 Cap 2", Merk Pralon (Bh) Rp. 168,188
65 Cap 1 1/2", Merk Pralon (Bh) Rp. 66,528
66 Cap 1 1/4", Merk Pralon (Bh) Rp. 54,568
67 Cap 1", Merk Pralon (Bh) Rp. 35,133
68 Cap 3/4", Merk Pralon (Bh) Rp. 22,425
69 Cap 1/2", Merk Pralon (Bh) Rp. 18,688
70 Cap PVC Standar SNI Ø 4" (Bh) Rp. 141,278
71 Cap PVC Standar SNI Ø 3" (Bh) Rp. 118,853
72 Cap PVC Standar SNI Ø 2 1/2" (Bh) Rp. 79,983
73 Cap PVC Standar SNI Ø 2" (Bh) Rp. 37,375
74 Cap PVC Standar SNI Ø 1 1/2" (Bh) Rp. 32,143
75 Cap PVC Standar SNI Ø 1 1/2" (Bh) Rp. 24,668
76 Cap PVC Standar SNI Ø 1" (Bh) Rp. 17,940
77 Cap PVC Standar SNI Ø 3/4" (Bh) Rp. 12,708
78 Cap PVC Standar SNI Ø 1/2" (Bh) Rp. 11,213
79 Clamp Saddle PVC dia. 2" x 1/2" (Bh) Rp. 137,540
80 Clamp Saddle PVC dia. 2" x 3/4" (Bh) Rp. 148,753
81 Clamp Saddle PVC dia. 2" x 1" (Bh) Rp. 207,058
82 Clamp Saddle PVC 3" - 3/4 Cl, Merk Pralon (Bh) Rp. 60,548
83 Clamp Saddle PVC 3" - 1/2 Cl, Merk Pralon (Bh) Rp. 60,548
84 Clamp Saddle PVC 2" - 3/4 Cl, Merk Pralon (Bh) Rp. 49,335
85 Clamp Saddle PVC 2" - 1/2 Cl, Merk Pralon (Bh) Rp. 49,335
86 Clamp Saddle PVC Standar SNI Ø 3" x 3/4" (Bh) Rp. 79,983
87 Clamp Saddle PVC Standar SNI Ø 3" x 1/2" (Bh) Rp. 79,983
88 Clamp Saddle PVC Standar SNI Ø 2 1/2" x 3/4" (Bh) Rp. 66,528
89 Clamp Saddle PVC Standar SNI Ø 2 1/2" x 1/2" (Bh) Rp. 66,528
90 Clamp Saddle PVC Standar SNI Ø 2" x 3/4" (Bh) Rp. 54,568
91 Clamp Saddle PVC Standar SNI Ø 2" x 1/2" (Bh) Rp. 54,568
92 Clamp Saddle PVC Standar SNI Ø 1 1/2" x 3/4" (Bh) Rp. 49,335
No. BAHAN SATUAN HARGA SATUAN (Rp)
93 Clamp Saddle PVC Standar SNI Ø 1 1/2" x 1/2" (Bh) Rp. 49,335
94 Chek Valve 4" Merk Onda Brass (Bh) Rp. 4,715,230
95 Chek Valve 3" Merk Onda Brass (Bh) Rp. 2,356,120
96 Chek Valve 2 1/2" Merk Onda Brass (Bh) Rp. 1,738,685
97 Chek Valve 2" Merk Onda Brass (Bh) Rp. 871,585
98 Chek Valve 1 1/2" Merk Onda Brass (Bh) Rp. 550,908
99 Chek Valve 1 1/4" Merk Onda Brass (Bh) Rp. 429,813
100 Chek Valve GIP Standar SNI Ø 4'' (Bh) Rp. 3,190,330
101 Chek Valve GIP Standar SNI Ø 3'' (Bh) Rp. 1,659,450
102 Chek Valve GIP Standar SNI Ø 2 1/2'' (Bh) Rp. 1,287,195
103 Chek Valve GIP Standar SNI Ø 2'' (Bh) Rp. 652,568
104 Chek Valve GIP Standar SNI Ø 1 1/2'' (Bh) Rp. 448,500
105 Chek Valve GIP Standar SNI Ø 1 1/2'' (Bh) Rp. 308,718
106 Double Socket (rubber Ring) PVC dia. 2" (Bh) Rp. 112,873
107 Double Socket (rubber Ring) PVC dia. 3" (Bh) Rp. 114,368
108 Double Socket (rubber Ring) PVC dia. 4" (Bh) Rp. 154,733
109 Dop PVC dia. 4" (Bh) Rp. 103,155
110 Dop PVC dia. 3" (Bh) Rp. 24,668
111 Dop PVC dia. 2" (Bh) Rp. 24,668
112 Dop PVC dia. 1.5" (Bh) Rp. 20,183
113 Dop PVC dia. 1" (Bh) Rp. 16,445
114 Duoble Nipple dia. 1/2" (Bh) Rp. 93,438
115 Faucet Socket dia. 3" (Bh) Rp. 54,568
116 Faucet Socket dia. 2" (Bh) Rp. 33,638
117 Faucet Socket dia. 1.5" (Bh) Rp. 20,183
118 Faucet Socket dia. 1" (Bh) Rp. 16,445
119 Faucet Socket PVC dia. 3/4" (Bh) Rp. 8,223
120 Faucet Socket PVC dia. 1/2" (Bh) Rp. 8,223
121 Faucet Knie dia. 3/4" (Bh) Rp. 62,043
122 Flange GIP dia. 2" (Bh) Rp. 103,155
123 Flange GIP dia. 3" (Bh) Rp. 121,843
124 Flange GIP dia. 4" (Bh) Rp. 175,663
125 Flange GIP dia. 4" Steel/Las (Bh) Rp. 241,443
126 Flange GIP dia. 3" Steel/Las (Bh) Rp. 195,098
127 Flange GIP dia. 2" Steel/Las (Bh) Rp. 154,733
128 Flange GIP Standar SNI Ø 4'' (Bh) Rp. 168,188
129 Flange GIP Standar SNI Ø 3'' (Bh) Rp. 142,773
130 Flange GIP Standar SNI Ø 2 1/2'' (Bh) Rp. 133,803
131 Flange GIP Standar SNI Ø 2'' (Bh) Rp. 118,105
132 Flange GIP Standar SNI Ø 1 1/2'' (Bh) Rp. 91,195
133 Flange GIP Standar SNI Ø 1 1/2'' (Bh) Rp. 79,983
134 Flange PVC dia. 2" (Bh) Rp. 177,905
135 Flange PVC dia. 3" (Bh) Rp. 239,200
136 Flange PVC dia. 4" (Bh) Rp. 247,423
137 Flange Socket (RBR) PVC dia. 2" (Bh) Rp. 308,718
138 Flange Socket (RBR) PVC dia. 3" (Bh) Rp. 426,823
139 Flange Socket (RBR) PVC dia. 4" (Bh) Rp. 500,825
No. BAHAN SATUAN HARGA SATUAN (Rp)
140 Flange Spigot PVC dia. 2" (Bh) Rp. 287,040
141 Flange Spigot PVC dia. 3" (Bh) Rp. 390,943
142 Flange Spigot PVC dia. 4" (Bh) Rp. 489,613
143 Get Valve C1 dia. 2" (Bh) Rp. 180,148
144 Get Valve C1 dia. 3" (Bh) Rp. 1,323,823
145 Get Valve C1 dia. 4" (Bh) Rp. 2,129,628
146 Get Valve GIP dia. 2" (Bh) Rp. 1,531,628
147 Get Valve GIP dia. 3" (Bh) Rp. 1,793,253
148 Get Valve GIP dia. 4" (Bh) Rp. 2,346,403
149 Get Valve GIP dia. 6" (Bh) Rp. 7,671,593
150 Get Valve GIP dia. 4" Merk Onda Brass (Bh) Rp. 3,508,018
151 Get Valve GIP dia. 3" Merk Onda Brass (Bh) Rp. 1,825,395
152 Get Valve GIP dia. 2 1/2" Merk Onda Brass (Bh) Rp. 1,333,540
153 Get Valve GIP dia. 2" Merk Onda Brass (Bh) Rp. 657,053
154 Get Valve GIP dia. 1 1/2" Merk Onda Brass (Bh) Rp. 461,955
155 Get Valve GIP dia. 1 1/4" Merk Onda Brass (Bh) Rp. 355,063
156 Get Valve GIP dia. 1" Merk Onda Brass (Bh) Rp. 239,948
157 Get Valve GIP dia. 3/4" Merk Onda Brass (Bh) Rp. 148,005
158 Get Valve GIP dia. 1/2" Merk Onda Brass (Bh) Rp. 100,165
159 Get Valve GIP Standar SNI Ø 4" (Bh) Rp. 2,285,108
160 Get Valve GIP Standar SNI Ø 3" (Bh) Rp. 1,404,553
161 Get Valve GIP Standar SNI Ø 2 1/2" (Bh) Rp. 1,175,818
162 Get Valve GIP Standar SNI Ø 2" (Bh) Rp. 614,445
163 Get Valve GIP Standar SNI Ø 1 1/2" (Bh) Rp. 410,378
164 Get Valve GIP Standar SNI Ø 1 1/2" (Bh) Rp. 275,828
165 Get Valve GIP Standar SNI Ø 1" (Bh) Rp. 193,603
166 Get Valve GIP Standar SNI Ø 3/4" (Bh) Rp. 118,853
167 Get Valve GIP Standar SNI Ø 1/2" (Bh) Rp. 83,720
168 Giboult Join PVC DN. Dia. 2" (Bh) Rp. 564,363
169 Giboult Join PVC DN. Dia. 3" (Bh) Rp. 1,283,458
170 Giboult Join PVC DN. Dia. 4" (Bh) Rp. 2,344,160
171 Giboult Join PVC DN. Dia. 6" (Bh) Rp. 3,465,410
172 GIP All Flange Bend 45° dia. 2" (Bh) Rp. 352,820
173 GIP All Flange Bend 45° dia. 3" (Bh) Rp. 344,598
174 GIP All Flange Bend 45° dia. 4" (Bh) Rp. 606,970
175 GIP All Flange Bend 90° dia. 2" (Bh) Rp. 341,608
176 GIP All Flange Bend 90° dia. 3" (Bh) Rp. 456,723
177 GIP All Flange Bend 90° dia. 4" (Bh) Rp. 639,846
178 Knee GIP dia. 1.5" (Bh) Rp. 97,175
179 Knee GIP dia. 3/4" (Bh) Rp. 79,983
180 Knee GIP dia. 1/2" (Bh) Rp. 26,163
181 Knee PVC dia. 2" (Bh) Rp. 93,438
182 Knee PVC dia. 1.5" (Bh) Rp. 20,183
183 Knee PVC dia. 1" (Bh) Rp. 20,183
184 Knee PVC dia. 3/4" (Bh) Rp. 16,445
185 Knee PVC dia. 1/2" (Bh) Rp. 7,475
186 Knee GIP / Elbow 90' - 4" (Bh) Rp. 344,598
No. BAHAN SATUAN HARGA SATUAN (Rp)
187 Knee GIP / Elbow 90' - 3" (Bh) Rp. 191,360
188 Knee GIP / Elbow 90' - 2 1/2" (Bh) Rp. 125,580
189 Knee GIP / Elbow 90' - 2" (Bh) Rp. 67,275
190 Knee GIP / Elbow 90' - 1 1/2'" (Bh) Rp. 43,355
191 Knee GIP / Elbow 90' - 1 1/4" (Bh) Rp. 35,133
192 Knee GIP / Elbow 90' - 1" (Bh) Rp. 23,920
193 Knee GIP / Elbow 90' - 3/4'" (Bh) Rp. 17,940
194 Knee GIP / Elbow 90' - 1/2" (Bh) Rp. 13,455
195 Knee GIP / Elbow 45' - 4" (Bh) Rp. 385,710
196 Knee GIP / Elbow 45' - 3" (Bh) Rp. 227,988
197 Knee GIP / Elbow 45' - 2 1/2" (Bh) Rp. 150,995
198 Knee GIP / Elbow 45' - 2" (Bh) Rp. 74,003
199 Knee GIP / Elbow 45' - 1 1/2'" (Bh) Rp. 50,830
200 Knee GIP / Elbow 45' - 1 1/4" (Bh) Rp. 41,113
201 Knee GIP / Elbow 45' - 1" (Bh) Rp. 26,163
202 Knee GIP / Elbow 45' - 3/4'" (Bh) Rp. 18,688
203 Knee GIP / Elbow 45' - 1/2" (Bh) Rp. 14,203
204 Plat Penyambung Flange (Bh) Rp. 43,355
205 Reducer PVC dia. 4" x 2" (Bh) Rp. 72,508
206 Reducer PVC dia. 3" x 2" (Bh) Rp. 62,043
207 Reducer PVC dia. 2" x 1.5" (Bh) Rp. 53,073
208 Reducer PVC dia. 4" - 3" Merk Pralon (Bh) Rp. 168,188
209 Reducer PVC dia. 4" - 2" Merk Pralon (Bh) Rp. 193,603
210 Reducer PVC dia. 3" - 2 1/2" Merk Pralon (Bh) Rp. 118,105
211 Reducer PVC dia. 2 1/2" - 2" Merk Pralon (Bh) Rp. 91,195
212 Reducer PVC dia. 2 1/2" - 1 1/2" Merk Pralon (Bh) Rp. 100,913
213 Reducer PVC dia. 2" - 1 1/2" Merk Pralon (Bh) Rp. 66,528
214 Reducer PVC dia. 2" - 1 1/4" Merk Pralon (Bh) Rp. 68,023
215 Reducer PVC dia. 1 1/2" - 1 1/4" Merk Pralon (Bh) Rp. 20,183
216 Reducer PVC dia. 1" - 1 1/4" Merk Pralon (Bh) Rp. 16,445
217 Reducer PVC dia. 1" - 3/4" Merk Pralon (Bh) Rp. 12,708
218 Reducer PVC dia. 1" - 1/2" Merk Pralon (Bh) Rp. 12,708
219 Reducer PVC dia. 3/4" - 1/2" Merk Pralon (Bh) Rp. 10,465
220 Reducer PVC Standar SNI Ø 4" x 3" (Bh) #VALUE!
221 Reducer PVC Standar SNI Ø 4" x 2 1/2" (Bh) Rp. 296,758
222 Reducer PVC Standar SNI Ø 4" x 2" (Bh) Rp. 269,100
223 Reducer PVC Standar SNI Ø 3" x 2 1/2" (Bh) Rp. 231,725
224 Reducer PVC Standar SNI Ø 3" x 2" (Bh) Rp. 193,603
225 Reducer PVC Standar SNI Ø 2 1/2" x 2" (Bh) Rp. 156,975
226 Reducer PVC Standar SNI Ø 2 1/2" x 1 1/2" (Bh) Rp. 133,803
227 Reducer PVC Standar SNI Ø 2" x 1 1/2" (Bh) Rp. 59,053
228 Reducer PVC Standar SNI Ø 2" x 1 1/2" (Bh) Rp. 59,053
229 Reducer PVC Standar SNI Ø 1 1/2" x 1 1/2" (Bh) Rp. 39,618
230 Reducer PVC Standar SNI Ø 1 1/2" x 1" (Bh) Rp. 39,618
231 Reducer PVC Standar SNI Ø 1 1/2" x 1" (Bh) Rp. 37,375
232 Reducer PVC Standar SNI Ø 1 1/2" x 3/4" (Bh) Rp. 35,133
233 Reducer PVC Standar SNI Ø 1" x 3/4" (Bh) Rp. 18,688
No. BAHAN SATUAN HARGA SATUAN (Rp)
234 Reducer PVC Standar SNI Ø 1" x 1/2" (Bh) Rp. 18,688
235 Reducer PVC Standar SNI Ø 3/4" x 1/2" (Bh) Rp. 12,708
236 Reducer Socket (Rubber Ring) PVC dia. 3 x 2" (Bh) Rp. 141,278
237 Reducer Socket (Rubber Ring) PVC dia. 4 x 3" (Bh) Rp. 242,938
238 Reducer Socket (Rubber Ring) PVC dia. 4 x 2" (Bh) Rp. 198,835
239 Reducer Socket (Rubber Ring) PVC dia. 6 x 4" (Bh) Rp. 377,488
240 Reducer Socket (Rubber Ring) PVC dia. 6 x 3" (Bh) Rp. 362,538
241 Repair Socket (RR) PVC dia. 2" (Bh) Rp. 564,363
242 Repair Socket (RR) PVC dia. 3" (Bh) Rp. 304,980
243 Repair Socket (RR) PVC dia. 4" (Bh) Rp. 3,055,780
244 Rubber Ring (SBR) PVC dia. 2" (Bh) Rp. 14,203
245 Rubber Ring (SBR) PVC dia. 3" (Bh) Rp. 14,203
246 Rubber Ring (SBR) PVC dia. 4" (Bh) Rp. 18,688
247 Socket All PVC dia. 2" (Bh) Rp. 153,238
248 Socket All PVC dia. 3" (Bh) Rp. 89,700
249 Socket All PVC dia. 4" (Bh) Rp. 64,285
250 Socket GIP dia. 3" (Bh) Rp. 98,670
251 Socket GIP dia. 2" (Bh) Rp. 89,700
252 Socket GIP dia. 1" (Bh) Rp. 81,478
253 Socket GIP dia. 3/4" (Bh) Rp. 77,740
254 Socket GIP dia. 1/2" (Bh) Rp. 73,255
255 Socket 1/2" (Bh) Rp. 7,475
256 Socket 3/4" (Bh) Rp. 10,465
257 Socket 1" (Bh) Rp. 13,455
258 Socket 2" (Bh) Rp. 16,445
259 Socket 3" (Bh) Rp. 25,415
260 Socket 4" (Bh) Rp. 46,345
261 Socket Long Bend (RR) 22.5° PVC 2" (Bh) Rp. 100,913
262 Socket Long Bend (RR) 22.5° PVC 3" (Bh) Rp. 189,118
263 Socket Long Bend (RR) 22.5° PVC 4" (Bh) Rp. 291,525
264 Socket Long Bend (RR) 45° PVC 2" (Bh) Rp. 108,388
265 Socket Long Bend (RR) 45° PVC 3" (Bh) Rp. 222,008
266 Socket Long Bend (RR) 45° PVC 4" (Bh) Rp. 350,578
267 Socket Long Bend (RR) 90° PVC 2" (Bh) Rp. 130,065
268 Socket Long Bend (RR) 90° PVC 3" (Bh) Rp. 250,413
269 Socket Long Bend (RR) 90° PVC 4" (Bh) Rp. 471,673
270 Socket Drat Dalam 2", Merk Pralon (Bh) Rp. 37,375
271 Socket Drat Dalam 1 1/2", Merk Pralon (Bh) Rp. 27,658
272 Socket Drat Dalam 1 1/4", Merk Pralon (Bh) Rp. 20,183
273 Socket Drat Dalam 1", Merk Pralon (Bh) Rp. 14,203
274 Socket Drat Dalam 3/4", Merk Pralon (Bh) Rp. 11,213
275 Socket Drat Dalam 1/2", Merk Pralon (Bh) Rp. 7,475
276 Socket Drat Dalam PVC Standar SNI Ø 4" (Bh) Rp. 94,933
277 Socket Drat Dalam PVC Standar SNI Ø 3" (Bh) Rp. 79,983
278 Socket Drat Dalam PVC Standar SNI Ø 2 1/2" (Bh) Rp. 65,780
279 Socket Drat Dalam PVC Standar SNI Ø 2" (Bh) Rp. 37,375
280 Socket Drat Dalam PVC Standar SNI Ø 1 1/2" (Bh) Rp. 27,658
No. BAHAN SATUAN HARGA SATUAN (Rp)
281 Socket Drat Dalam PVC Standar SNI Ø 1 1/2" (Bh) Rp. 22,425
282 Socket Drat Dalam PVC Standar SNI Ø 1" (Bh) Rp. 20,183
283 Socket Drat Dalam PVC Standar SNI Ø 1/4" (Bh) Rp. 14,203
284 Socket Drat Dalam PVC Standar SNI Ø 1/2" (Bh) Rp. 12,708
285 Tee All Socket (RR) PVC dia. 2" x 2 " x 2" (Bh) Rp. 482,138
286 Tee All Socket (RR) PVC dia. 3" x 3 " x 3" (Bh) Rp. 810,290
287 Tee All Socket (RR) PVC dia. 3" x 2 " x 3" (Bh) Rp. 758,713
288 Tee All Socket (RR) PVC dia. 4" x 3 " x 4" (Bh) Rp. 873,828
289 Tee All Socket (RR) PVC dia. 4" x 2 " x 4" (Bh) Rp. 873,828
290 Tee 1/2" (Bh) Rp. 7,475
291 Tee 3/4" (Bh) Rp. 10,465
292 Tee 1" (Bh) Rp. 13,455
293 Tee 2" (Bh) Rp. 19,435
294 Tee 3" (Bh) Rp. 31,395
295 Tee 4" (Bh) Rp. 46,345
296 Tee PVC dia. 4" x 4" (Bh) Rp. 229,483
297 Tee PVC dia. 4" x 3" (Bh) Rp. 66,528
298 Tee PVC dia. 4" x 2" (Bh) Rp. 66,528
299 Tee PVC dia. 3" x 3" (Bh) Rp. 27,658
300 Tee PVC dia. 4" x 2" (Bh) Rp. 66,528
301 Tee PVC dia. 2" x 2" (Bh) Rp. 23,920
302 Tee PVC dia. 1.5" x 1.5" (Bh) Rp. 19,435
303 Tee PVC dia. 1,5" x 1" (Bh) Rp. 19,435
304 Tee PVC dia. 1" x 3/4" (Bh) Rp. 16,445
305 Tee PVC dia. 3/4" x 3/4" (Bh) Rp. 8,223
306 Tee PVC dia. 3/4" x 1/2" (Bh) Rp. 11,213
307 Tee PVC dia. 1/2" x 1/2" (Bh) Rp. 8,223
308 Tee 4" x 4" x 4" Merk Pralon (Bh) Rp. 767,683
309 Tee 4" x 3" x 4" Merk Pralon (Bh) Rp. 767,683
310 Tee 3" x 3" x 3" Merk Pralon (Bh) Rp. 482,138
311 Tee 3" x 2" x 3" Merk Pralon (Bh) Rp. 482,138
312 Tee 2" x 2" x 2" Merk Pralon (Bh) Rp. 193,603
313 Tee 1 1/2" 1 1/2" x 1 1/2" Merk Pralon (Bh) Rp. 43,355
314 Tee 1 1/2" 1 1/4" x 1 1/2" Merk Pralon (Bh) Rp. 43,355
315 Tee 1 1/4" 1 1/4" x 1 1/2" Merk Pralon (Bh) Rp. 33,638
316 Tee 1 1/4" 1" x 1 1/4" Merk Pralon (Bh) Rp. 32,143
317 Tee 1" 1" x 1" Merk Pralon (Bh) Rp. 23,920
318 Tee 3/4" 3/4" x 3/4" Merk Pralon (Bh) Rp. 14,203
319 Tee 4" x 4" x 4" Merk Pralon (Bh) Rp. 767,683
320 Tee 1/2" 1/2" x 1/2" Merk Pralon (Bh) Rp. 12,708
321 Tee GIP 2" x 2" x 2" (Bh) Rp. 85,963
322 Tee GIP 2" x 1 1/2" x 2" (Bh) Rp. 85,963
323 Tee GIP 1 1/2" x 1 1/2" x 1 1/2" (Bh) Rp. 59,053
324 Tee GIP 1 1/2" x 1 1/4" x 1 1/2" (Bh) Rp. 74,003
325 Tee GIP 1 1/4" x 1 1/4" x 1 1/4" (Bh) Rp. 47,093
326 Tee GIP 1 1/4" x 1" x 1 1/4" (Bh) Rp. 59,053
327 Tee GIP 1" x 1" x 1" (Bh) Rp. 32,143
No. BAHAN SATUAN HARGA SATUAN (Rp)
328 Tee GIP 3/4" x 3/4" x 3/4" (Bh) Rp. 22,425
329 Tee GIP 1/2" x 1/2" x 1/2" (Bh) Rp. 16,445
330 Tee GIP Standar SNI Ø 2" x 2" x 2" (Bh) Rp. 72,508
331 Tee GIP Standar SNI Ø 2" x 1 1/2" x 2" (Bh) Rp. 85,963
332 Tee GIP Standar SNI Ø 1 1/2" x 1 1/2" x 1 1/2" (Bh) Rp. 49,335
333 Tee GIP Standar SNI Ø 1 1/2" x 1 1/2" x 1 1/2" (Bh) Rp. 62,043
334 Tee GIP Standar SNI Ø 1 1/2" x 1 1/2" x 1 1/2" (Bh) Rp. 39,618
335 Tee GIP Standar SNI Ø 1 1/2" x 1" x 1 1/2" (Bh) Rp. 49,335
336 Tee GIP Standar SNI Ø 1" x 1" x 1" (Bh) Rp. 26,163
337 Tee GIP Standar SNI Ø 3/4" x 3/4" x 3/4" (Bh) Rp. 17,940
338 Tee GIP Standar SNI Ø 1/2" x 1/2" x 1/2" (Bh) Rp. 12,708
339 Tee PVC Standar SNI Ø 4" x 4" x 4" (Bh) Rp. 666,023
340 Tee PVC Standar SNI Ø 4" x 3" x 4" (Bh) Rp. 627,900
341 Tee PVC Standar SNI Ø 3" x 3" x 3" (Bh) Rp. 410,378
342 Tee PVC Standar SNI Ø 2" x 2" x 2" (Bh) Rp. 390,943
343 Tee PVC Standar SNI Ø 2" x 1 1/2" x 2" (Bh) Rp. 239,948
344 Tee PVC Standar SNI Ø 1 1/2" x 1 1/2" x 1 1/2" (Bh) Rp. 226,493
345 Tee PVC Standar SNI Ø 1 1/2" x 1 1/2" x 1 1/2" (Bh) Rp. 62,043
346 Tee PVC Standar SNI Ø 1 1/2" x 1 1/2" x 1 1/2" (Bh) Rp. 59,053
347 Tee PVC Standar SNI Ø 1 1/2" x 1" x 1 1/2" (Bh) Rp. 45,598
348 Tee PVC Standar SNI Ø 1" x 1" x 1" (Bh) Rp. 37,375
349 Tee PVC Standar SNI Ø 3/4" x 3/4" x 3/4" (Bh) Rp. 20,183
350 Tee PVC Standar SNI Ø 1/2" x 1/2" x 1/2" (Bh) Rp. 14,203
351 Valve Socket PVC dia. 4" (Bh) Rp. 368,518
352 Valve Socket PVC dia. 3" (Bh) Rp. 53,073
353 Valve Socket PVC dia. 2" (Bh) Rp. 43,355
354 Valve Socket PVC dia. 1.5" (Bh) Rp. 35,133
355 Valve Socket PVC dia. 1" (Bh) Rp. 35,133
356 Valve Socket PVC dia. 3/4" (Bh) Rp. 35,133
357 Valve Socket PVC dia. 1/2" (Bh) Rp. 26,163
358 Water Mor 4" (Bh) Rp. 708,630
359 Water Mor 3" (Bh) Rp. 373,750
360 Water Mor 2 1/2" (Bh) Rp. 236,958
361 Water Mor 2" (Bh) Rp. 137,540
362 Water Mor 1 1/2" (Bh) Rp. 97,175
363 Water Mor 1 1/4" (Bh) Rp. 74,003
364 Water Mor GIP Standar SNI Ø 4" (Bh) Rp. 587,535
365 Water Mor GIP Standar SNI Ø 3" (Bh) Rp. 310,213
366 Water Mor GIP Standar SNI Ø 2 1/2" (Bh) Rp. 197,340
367 Water Mor GIP Standar SNI Ø 2" (Bh) Rp. 114,368
368 Water Mor GIP Standar SNI Ø 1 1/2" (Bh) Rp. 81,478
369 Water Mor GIP Standar SNI Ø 1 1/2" (Bh) Rp. 62,043
Rp. -
No. BAHAN SATUAN HARGA SATUAN (Rp)
XVI BAHAN INSTALASI Rp. -
Rp. -
1 Pasangan Instalasi Listrik (Titik) Rp. 225,745
2 Biaya Penyambungan Instalasi Listrik (Unit) Rp. 7,987,127
3 Saklar Phase Engkel Krem (Bh) Rp. 30,648
4 Saklar Phase Engkel Putih (Bh) Rp. 32,890
5 Saklar Phase Duoble Krem (Bh) Rp. 36,628
6 Saklar Phase Duoble Putih (Bh) Rp. 47,093
7 Steker Krem (Bh) Rp. 17,940
8 Steker Putih (Bh) Rp. 22,425
9 Stop Kontak Krem (Bh) Rp. 30,648
10 Stop Kontak Putih (Bh) Rp. 32,890
11 Fitting (Bh) Rp. 22,425
12 Sekring Kost Lokal 1 Group (Bh) Rp. 9,718
13 Sekring Kost Lokal 2 Group (Bh) Rp. 11,960
14 Lampu Pijar 15 Watt (Phillips) (Bh) Rp. 43,355
15 Lampu Pijar 25 Watt (Phillips) (Bh) Rp. 53,820
16 Lampu Pijar 40 Watt (Phillips) (Bh) Rp. 64,285
17 Lampu TL 25 Watt (Phillips) (Bh) Rp. 133,892
18 Lampu TL 40 Watt (Phillips) (Bh) Rp. 85,215
19 Briket Dowligt Halogen Ukuran Besar (Bh) Rp. 312,754
20 Bohlam Garpu 32 Watt (Bh) Rp. 356,886
21 Bohlam Sorot Mini Hologen (Bh) Rp. 135,866
22 Lampu Hias Melankonis (Bh) Rp. 1,066,234
23 Lampu Ornamen HPLN 350 W Putih (Phillips) (Bh) Rp. 266,469
24 Kabel NYM 3 x 2.5 mm 2 (M') Rp. 28,405
25 Kabel NYM 3 x 4 mm 2 (M') Rp. 36,400
26 Kabel NYFGBY 4 x 25 mm 2 (M') Rp. 32,890
27 Kabel NYFGBY 4 x 10 mm 2 (M') Rp. 166,722
28 MCB 6A/220 Volt (Bh) Rp. 53,820
29 Panel Box 600 x 400 x 200 x 60A.c/w contractor & Timer (Set) Rp. 15,204,030
30 Panel Box 500 x 300 x 200 x 60A.c/w contractor & Timer (Set) Rp. 9,669,182
31 Tiang PJU 9 m Oct Baso Plate T = 3.2 mm ornament Parabola Cal 1 Galv (Bh) Rp. 9,025,315
32 Exhaust Fan, Kapasitas 21 W / Ceiling Type (Bh) Rp. 546,000
33 Air Conditioning Merk General 1 PK (Bh) Rp. 12,531,867
34 Exhaust Fun (Bh) Rp. 465,693
35 Tiang PJU 9 m Oct Baso Plate T = 3.2 mm ornament Parabola Cal (Bh) Rp. 9,192,516
36 Tiang PJU 9 m Oct Baso Plate T = 3.2 mm ornament Parabola Cal (Bh) Rp. 11,631,638
37 Kabel Twist (Kabel Udara) 4 x 25 mm (M') Rp. 210,675
38 Stabllizert 5 KVA (Unit) Rp. 7,850,604
39 Stabllizert 10 KVA (Unit) Rp. 18,635,773
40 Control Panel (Unit) Rp. 6,870,183
41 Control Panel (Unit) Rp. 7,850,604
42 Drop Cable Power (Rol) Rp. 3,928,920
43 Drop Cable Power (Rol) Rp. 5,497,414
44 Drop Cable Sensor (Rol) Rp. 2,948,499
45 MCCB EZC100 N 3 Kutub 100 A (Kap. 20 KA) (Bh) Rp. 1,818,960
No. BAHAN SATUAN HARGA SATUAN (Rp)
46 MCCB EZC100 F 3 Kutub 10 A (Kap. 10 KA) (Bh) Rp. 789,360
47 MCB Domae 3 Kutub 10 A (Kap. 6 KA) (Bh) Rp. 495,495
48 Arrester (Bh) Rp. 1,430,000
49 Pilot Lamp (Bh) Rp. 167,525
50 Fuse & Indicator (Bh) Rp. 262,691
51 Box Panel (40 x 60 x 20) cm (Bh) Rp. 1,040,000
52 BC 6-10 mm2 (M') Rp. 19,500
53 Lampu RM 300 GLOSS 2 x 18 W (Bh) Rp. 1,282,378
54 Lampu LED 18 Watt Philips (Bh) Rp. 130,000
55 Lampu LED 8 Watt Philips (Bh) Rp. 71,500
56 Fitting Downlight (Bh) Rp. 92,300
57 Mangkok Listrik (Bh) Rp. 3,900
58 Isolasi Ban (Bh) Rp. 22,880
59 Pipa Conduit (Ex. Ega) (M') Rp. 8,450
60 Socket Pipa (Bh) Rp. 1,573
61 Tee Doos (Bh) Rp. 4,290
62 Klem Pipa (Bh) Rp. 715
63 Fisher (Bh) Rp. 429
64 Las Doop (Bh) Rp. 572
65 Penangkal Petir System Elektrostatik Radius 100 M (Unit) Rp. 25,350,000
66 L645B Lampu Gantung Kap Industrial Retro Decor Vintage (Bh) Rp. 193,050
Rp. -
XVII BAHAN LANTAI Rp. -
Rp. -
1 Dryer Lantai (Dos) Rp. 52,325
2 Tegel Badak 20 x 20 (Dos) Rp. 118,105
3 Tegel Badak 40 x 40 Warna (Dos) Rp. 136,045
4 Tegel Keramik Polos 10 x 20 cm (Dos) Rp. 131,919
5 Tegel Keramik Polos 20 x 20 cm (Dos) Rp. 100,913
6 Tegel Keramik Polos 25 x 20 cm (Dos) Rp. 98,670
7 Tegel Keramik 25 x 20 cm (m2) Rp. 98,670
8 Tegel Keramik 30 x 50 cm (m2) Rp. 156,000
9 Tegel Keramik Polos 30 x 30 cm (Dos) Rp. 88,953
10 Tegel Keramik Polos 40 x 40 cm (Dos) Rp. 100,165
11 Tegel Keramik Warna 10 x 20 cm (Dos) Rp. 131,919
12 Tegel Keramik Warna 25 x 25 cm (Dos) Rp. 117,000
13 Tegel Keramik Warna 25 x 40 cm (Dos) Rp. 123,500
14 Tegel Keramik Warna 30 x 30 cm (Dos) Rp. 117,000
15 Tegel Keramik Warna 40 x 40 cm (Dos) Rp. 118,105
16 Tegel PC 25 x 25 cm (Dos) Rp. 128,151
17 Tegel PC 20 x 20 cm (Dos) Rp. 151,115
18 Tegel Plint 15 x 20 cm (Dos) Rp. 110,750
19 Tegel Plint 15 x 15 cm (Dos) Rp. 110,750
20 Tegel Plint 10 x 30 cm (Dos) Rp. 110,750
21 Tegel Plint 15 x 25 cm (Dos) Rp. 110,750
22 Tegel Plint 15 x 30 cm (Dos) Rp. 131,919
23 Tegel Porselen 11 x 11 cm (Dos) Rp. 120,437
No. BAHAN SATUAN HARGA SATUAN (Rp)
24 Tegel Teraso Warna 30 x 30 cm (Dos) Rp. 172,284
25 Paving Block (Bh) Rp. 3,432
26 Tegel Keramik 60 x 60 (m2) Rp. 175,500
27 Tegel Granito 60 x 60 (m2) Rp. 260,000
Rp. -
XVIII BAHAN FINISHING Rp. -
Rp. -
1 Amplas Halus (M') Rp. 19,435
2 Amplas Halus (Lbr) Rp. 10,465
3 Amplas Kasar (M') Rp. 19,435
4 Amplas Kasar (Lbr) Rp. 10,465
5 Meni Kayu (Kg) Rp. 73,255
6 Meni Besi (Kg) Rp. 73,255
7 Vernis (Kg) Rp. 91,195
8 Minyak Cat Rp. -
- Avian (Kaleng) Rp. 97,923
- Glotex (Kg) Rp. 101,062
- Jarum (Kg) Rp. 76,245
9 Cat Minyak Wood Filter SH - 113 Sungkai (Kg) Rp. 97,474
10 Cat Minyak Wood Stain WS - 16213i (Kg) Rp. 141,606
11 Cat Dasar (Kg) Rp. 46,345
12 Cat Penutup (Glotex) (Kg) Rp. 123,500
12 Cat Penutup (Nippon Paint/Vinilex) (Kg) Rp. 65,000
13 Weather Shield (Kg) Rp. 104,000
14 Dempul (Kg) Rp. 46,345
15 Plitur (Kg) Rp. 91,195
16 Cat Tembok Rp. -
- Aries Rp. -
5 Kg (Kg) Rp. 73,255
25 Kg (Kg) Rp. 207,805
- Metrolite Rp. -
5 Kg (Kg) Rp. 164,450
25 Kg (Kg) Rp. 635,375
- No drop Rp. -
5 Kg (Kg) Rp. 294,515
25 Kg (Kg) Rp. 1,291,680
- No Odos (Kg) Rp. 145,374
- Avian (Kg) Rp. 94,185
17 Sabun (Kg) Rp. 26,520
18 Plamur (Kg) Rp. 68,640
19 Tenner (Kg) Rp. 48,048
20 Tenner (Ltr) Rp. 48,048
21 Sealent GE / Dow Coming Non Asan Tube Rp. 49,563
22 Waterprofing (Kg) Rp. 97,500
22 Lem Kayu (Kg) Rp. 32,500
24 Membrane Bakar Bostic Granule 3mm (m2) Rp. 156,585
26 Primer Membrane Bakar (m2) Rp. 13,585
No. BAHAN SATUAN HARGA SATUAN (Rp)
XIX HARGA SATUAN UPAH TENAGA KERJA

1 Mandor (O/H) Rp. 130,000


2 Kepala Tukang (O/H) Rp. 140,000
3 Tukang Batu (O/H) Rp. 130,000
4 Tukang Listrik (O/H) Rp. 130,000
5 Tukang Besi (O/H) Rp. 130,000
6 Tukang Kayu (O/H) Rp. 130,000
7 Tukang Cat (O/H) Rp. 130,000
8 Tukang Anyam / Pengayam Kawat Besi / Bronjong (O/H) Rp. 130,000
9 Operator Alat Berat (O/H) Rp. 328,550
10 Pembantu Operator (O/H) Rp. 169,850
11 Pekerja Terampil (O/H) Rp. 90,000
12 Pekerja tidak Terampil (O/H) Rp. 80,000
DAFTAR HARGA BAHAN DAN UPAH

No. BAHAN SATUAN HARGA SATUAN (Rp)

I. HARGA SATUAN UPAH TENAGA KERJA

1 Mandor (O/H) Rp. 130,000


2 Kepala Tukang (O/H) Rp. 160,000
3 Tukang Batu (O/H) Rp. 130,000
4 Tukang Listrik (O/H) Rp. 130,000
5 Tukang Besi (O/H) Rp. 130,000
6 Tukang Kayu (O/H) Rp. 130,000
7 Tukang Cat (O/H) Rp. 130,000
8 Tukang Anyam / Pengayam Kawat Besi / Bronjong (O/H) Rp. 130,000
9 Operator Alat Berat (O/H) Rp. 320,000
10 Pembantu Operator (O/H) Rp. 160,000
11 Pekerja Terampil (O/H) Rp. 98,000
12 Pekerja tidak Terampil (O/H) Rp. 85,000

II. BAHAN DASAR

1 Pasir Pasangan, Pasir Beton, Pasir Urug, dan Timbunan (M³) Rp. 235,000
2 Pasir Beton (Kg) Rp. 168
3 Batu Gunung (M³) Rp. 197,000
4 Batu Kali (M³) Rp. 197,000
5 Batu Pecah 5 - 7 Cm (M³) Rp. 253,000
6 Batu Pecah 3 - 5 Cm (M³) Rp. 253,000
7 Batu Pecah 2 - 3 Cm (M³) Rp. 343,440
8 Batu Pecah 2 - 3 Cm (Kg) Rp. 254.40
9 Batu Pecah 1 - 2 Cm (M³) Rp. 407,700
10 Kerikil Sungai (M³) Rp. 240,000
11 Sirtu (Tak diayak) (M³) Rp. 130,000
12 Tanah Timbunan (M³) Rp. 50,000
13 Batu Bata/ Batu Merah (Bh) Rp. 800
14 Kapur Pasangan (3 Kg) Rp. 9,500
15 Semen PC (Zak) Rp. 78,000
16 Semen PC (Kg) Rp. 1,560
17 Semen Warna (Bungkus) (Kg) Rp. 36,800
18 Kayu Mangga / Kemiri (Papan) (M³) Rp. 1,650,000
19 Dolken kayu 8- 10cm – panjang 4 m (Btg) Rp. 17,000
20 GRC Board (Lbr) Rp. 120,000
21 Hight Preasure Laminating (HPL) (Lbr) Rp. 220,000
22 Lem (standar Aica Aibond) (Ltr) Rp. 29,000
23 Kayu Kelas I ( Balok ) (M³) Rp. 10,550,000
24 Kayu Kelas I ( Papan ) (M³) Rp. 10,550,000
25 Kayu Kelas II ( Balok ) (M³) Rp. 2,855,000
26 Kayu Kelas II ( Papan ) (M³) Rp. 2,855,000
27 Kayu Kelas III ( Balok ) (M³) Rp. 1,875,000
28 Kayu Kelas III ( Papan ) (M³) Rp. 1,875,000
29 Bataco / Conblok (Bh) Rp. 4,500
30 Loster Beton 20 x 20 cm (Dos/Biji) Rp. 30,000
31 Paving block 8 cm natural (m2) Rp. 110,000
32 Kaca Bening 2 Mm (M²) Rp. 148,500
33 Kaca Bening 5 Mm (M²) Rp. 165,000
34 Rangka Nako 5 mm Lengkap stand (Lbr) Rp. 281,550
35 Paku Campuran ( 5 - 10 Cm ) (Kg) Rp. 20,000
36 Paku Biasa (2 - 3 Cm ) (Kg) Rp. 23,000
37 Paku Biasa (4 - 10 Cm ) (Kg) Rp. 20,000
38 Paku Biasa (5 - 10 Cm ) (Kg) Rp. 15,300
39 Paku Gypsum (Kg) Rp. 150,000
40 Paku Triplex (Kg) Rp. 35,000
41 Air (Ltr) Rp. 250
42 Minyak Bekisting (Ltr) Rp. 9,700
43 Plat Bondek T= 0,45 mm (m2) Rp. 134,500
DAFTAR HARGA BAHAN DAN UPAH

No. BAHAN SATUAN HARGA SATUAN (Rp)


44 Screw Cteks 12-4x50 (Bh) Rp. 650
45 Aluminium Composit Panel Merk Seven (m2) x
46 Spigot/braket (Btg) Rp. 58,000
47 Sealant ACP (Gr) Rp. 200
48 Mata Gurinda (Bh) Rp. 8,000
49 Mata Bor (Bh) Rp. 60,000
50 Kawat Las (Bh) Rp. 75,000
51 Oksigen (Tbg) Rp. 650,000
52 Acetyline (Tbg) Rp. 750,000
53 Baja Siku L 3 x 3 x 3 cm (Termasuk Cat Manie) (Btg) Rp. 105,000
54 Baja Siku L 3 x 3 x 3 cm (Termasuk Cat Manie) (m') Rp. 17,500
55 Baja Tralis (Kg) Rp. 46,000
56 Sekrup fixer (Bh) Rp. 860
57 Besit Strip Kg Rp. 13,000
58 Kawat Beton (Kg) Rp. 33,350
59 Kusen Pintu dan Jendela 4" (Btg) Rp. 520,000
60 Kusen Pintu dan Jendela 4" (m) Rp. 115,000
61 Profil Kaca (m) Rp. 3,000
62 Besi Beton Polos/Ulir (Kg) Rp. 17,220
63 Dina bolt / ramset (Bh) Rp. 2,500
64 Hollow galvanis 40 x 40 x 2 mm (Termasuk Cat Manie) (m') Rp. 7,600
65 Hollow Metal 40 x 40 x 2 mm (Termasuk Cat Manie) (m') Rp. 22,000
66 Sekrup 1/2" (Bh) Rp. 500
67 Aluminium Foil (m2) Rp. 92,000
68 Besi Wiremesh (Kg) Rp. 20,500
69 Wire Clip (Buah) Rp. 25,000
70 Wire Sling (Buah) Rp. 112,500
71 Hollow Block (Buah) Rp. 2,000
72 Trusses C-75 t = 0.80 m mm Zincalume (m') Rp. 26,500
73 Trusses C-75 t = 0.60 mm Zincalume (m') Rp. 16,500
74 Roof botom/reng 32.45 Zincalume (m') Rp. 12,300
75 Plat strip allumunium lebar 8 cm standar (m') Rp. 20,000
76 Jarum Keras (Bh) Rp. 45,000
77 Kusen Jendela Frame Alumunium Ex. Alexindo (Powder Coating) (m') Rp. 90,000
78 Gypsum board polos uk. 1.22 x 2.44 (m), tebal 9 mm (Lbr) Rp. 82,000
79 Les Plafond Gypsum 10 Cm (M') Rp. 10,200
80 Multipleks 8 mm (Lbr) Rp. 145,000
81 Triplex 4 mm (Lbr) Rp. 82,000
82 Triplex / Plywood 9 mm (Lbr) Rp. 155,000
83 Kalsyboard (Lbr) Rp. 66,000
84 Bubungan Genteng Verge Standar (Lbr) Rp. 85,000
85 Seng Gajah (Lbr) Rp. 13,800
86 Seng Onduline (Lbr) Rp. 250,000
87 Seng Plat (Lbr) Rp. 20,000
88 Engsel Pintu (Pasang) Rp. 57,500
89 Engsel Pintu (Bh) Rp. 28,750
89 Engsel Jendela (Bh) Rp. 23,000
90 Grendel (Bh) Rp. 20,700
91 Casement/Engsel Kait Angin (Bh) Rp. 150,000
92 Kuncian ex. RRT (Pasang) Rp. 138,000
93 Kunci Tanam Biasa (Bh) Rp. 75,000
94 Kunci tanam KM (Bh) Rp. 63,500
95 Handle Pintu (Psg) Rp. 126,000
96 Kloset Duduk TOTO Kls. I (Bh) Rp. 2,500,000
97 Clean Out 3" (Bh) Rp. 130,000
98 Clean Out 4" (Bh) Rp. 151,500
99 Water Level Control (Bh) Rp. 220,000
100 Mesin Pompa Booster bh Rp. 5,650,000
101 Kitchen sink Stainles (Unit) Rp. 977,500
102 Kran Air Gip Standar SNI Ø 3/4" (Bh) Rp. 115,000
103 Floor Drain Stainless steel (Bh) Rp. 189,000
DAFTAR HARGA BAHAN DAN UPAH

No. BAHAN SATUAN HARGA SATUAN (Rp)


104 Sealtape (Bh) Rp. 1,100
105 Water Drain (Set) Rp. 198,550
106 Kran Zink 'T 30 AR13NV7N ex. TOTO (Bh) Rp. 234,475
107 Alat Bending Pipa (M) Rp. 50,000
108 Check Valve Ø 60mm (Bh) Rp. 310,500
109 Check Valve Ø 60mm (Bh) Rp. 965,000
110 Ball Valve Ø 60mm (Bh) Rp. 810,500
111 Ball Valve Ø 60mm (Bh) Rp. 3,650,000
112 Pipa Gip dia. 6 ", Standar Medium A Sup SNI, 6 Meter (Btg) Rp. 2,455,000
113 Pipa Gip dia. 2 ", Standar Medium A SNI, 6 Meter (Btg) Rp. 655,000
114 Pipa PVC AW 4 Meter Merk Wavin 3/4" (Btg) Rp. 82,500
115 Pipa PVC AW 4 Meter Merk Wavin 1" (Btg) Rp. 102,500
116 Pipa PVC AW 4 Meter Merk Wavin 1" (m') Rp. 25,625
117 Pipa PVC AW 4 Meter Merk Wavin 2" (m') Rp. 122,000
118 Pipa PVC AW 4 Meter Merk Wavin 3" (m') Rp. 215,000
119 Pipa PVC AW 4 Meter Merk Wavin 4" (Btg) Rp. 320,000
120 Pipa PVC AW 4 Meter Merk Wavin 6" (Btg) Rp. 642,000
121 Saklar Phase Engkel Putih (Bh) Rp. 23,500
122 Saklar Phase Duoble Krem (Bh) Rp. 28,000
123 Saklar Phase Duoble Putih (Bh) Rp. 26,000
124 Steker Krem (Bh) Rp. 13,500
125 Stop Kontak Putih (Bh) Rp. 25,200
126 Stop Kontak AC (Bh) Rp. 48,000
127 Fitting (Bh) Rp. 17,200
128 Kabel FRC 2 x 2.5 mm2 (M') Rp. 72,000
129 Kabel Rod Grounding 5/8" (M') Rp. 415,000
130 Kabel NYY 1 x 0,8 mm2 (M') Rp. 68,000
131 Kabel NYA 2 x 1,5 mm (M') Rp. 17,000
132 Kabel NYY 4 x 10 mm2 (M') Rp. 59,500
133 Kabel NYY 4 x 16 mm2 (M') Rp. 172,000
134 Kabel NYY 2 x 1,5 mm (M') Rp. 32,000
135 Kabel NYY 3 x 2,5 mm (M') Rp. 22,000
136 Kabel NYM 3 x 2.5 mm 2 (M') Rp. 17,000
137 Kabel NYM 3 x 4 mm 2 (M') Rp. 27,500
138 Kabel RG (M') Rp. 17,000
139 Kabel NYM 2 x 1,5 mm 2 (M') Rp. 14,500
140 Kabel NYFGBY 4 x 10 mm 2 (M') Rp. 128,000
141 Exhaust Fan, Kapasitas 21 W / Ceiling Type (Bh) Rp. 445,000
142 Box Panel PVC MCB, 6 Group (Bh) Rp. 83,000
143 MCB 10 A/1 Phase (Bh) Rp. 78,000
144 Kabel BC 35 mm (M') Rp. 72,000
145 Electroda Tembaga 3/4" (M') Rp. 355,000
146 Lampu RM 300 GLOSS 2 x 18 W (Bh) Rp. 1,140,000
147 Lampu Santos/Baret LED 10 Watt (Bh) Rp. 320,000
148 Lampu SCB ACR LED, 10 Watt (Bh) Rp. 270,000
149 Lampu Emergency (Bh) Rp. 270,000
150 Lampu GMS TP G13, 1 x 36 Watt (Bh) Rp. 270,000
151 Mangkok Listrik (Bh) Rp. 3,000
152 Isolasi Ban (Bh) Rp. 6,000
153 Pipa Conduit 20 mm2 (M') Rp. 20,000
154 Socket Pipa (Bh) Rp. 1,210
155 Tee Doos (Bh) Rp. 3,300
156 Klem Pipa (Bh) Rp. 550
157 Fisher (Bh) Rp. 330
158 Las Doop (Bh) Rp. 440
159 Instalasi Dan Pemasangan (Ls) Rp. 73,000
160 Tegel Keramik Warna 25 x 25 cm (Dos) Rp. 85,000
161 Tegel Plint 10 x 60 cm (Bh) Rp. 40,000
162 Tegel Granito 60 x 60 (m2) Rp. 246,000
163 Amplas Halus (Lbr) Rp. 8,050
164 Meni Kayu (Kg) Rp. 53,300
165 Meni Besi (Kg) Rp. 55,350
DAFTAR HARGA BAHAN DAN UPAH

No. BAHAN SATUAN HARGA SATUAN (Rp)


166 Cat Dasar (Kg) Rp. 48,000
167 Cat Penutup (Kg) Rp. 52,000
DAFTAR HARGA BAHAN DAN UPAH

No. BAHAN SATUAN HARGA SATUAN (Rp)


168 Cat Penutup Eksterior (Kg) Rp. 123,500
169 Cat Penutup Interior (Kg) Rp. 64,000
170 Cat Kayu/Besi (Kg) Rp. 75,000
171 Pagar BRC Uk. (1.9 m x 2.4 m) Lbr Rp. 1,080,000
172 Pipa Galvanis 2.5 " Btg Rp. 400,000
173 Kuas (Bh) Rp. 20,000
174 Plamur (Kg) Rp. 60,600
175 Tenner (Kg) Rp. 36,000
176 Sealent GE / Dow Coming Non Asan Tube Rp. 37,000
177 Waterprofing (Kg) Rp. 78,000
178 Lem Kayu (Kg) Rp. 25,000
179 Membrane Bakar Bostic Granule 3mm (m2) Rp. 122,250
180 Primer Membrane Bakar (m2) Rp. 10,450
KEGIATAN : - PEMBANGUNAN PAGAR
PEKERJAAN : - REHABILITASI BERAT PEMBANGUNAN PAGAR PELABUHAN PALIPI
OWNER :-
LOKASI PEKERJAAN : - KAB. MAJENE
TAHUN ANGGARAN : - 2022

NO URAIAN PEKERJAAN SAT


I PEKERJAAN PENDAHULUAN
I.1 PEKERJAAN PERSIAPAN
- Pengukuran dan Pemasangan Bowplank ls
- Pemasangan papan nama proyek ls
- Pembuatan direksi keet / kantor sementara & gudang alat dan bahan m2
- Perlengkapan K3 ls

NO URAIAN PEKERJAAN SAT


II PEKERJAAN TANAH DAN STRUKTUR BAWAH
II.1 PEKERJAAN PEMBONGKARAN
- Bobok beton bertulang m3

II.2 PEKERJAAN TANAH


1 Galian Tanah
- Sloef uk. 20x30 cm m3
- Kolom Type Uk. 40 x 40 cm m3
2 Urugan Pasir Kembali
- Sloef uk. 20x30 cm m3
- Kolom Type 40x40 cm (untuk dudukan tiang pagar) m3
II.3 STRUKTUR BAWAH
1 Sloef uk. 20x30 cm
- Cor beton fc =21.7 Mpa / Mutu K.250 m3
- Bekesting m2
- Besi beton Kg

2 Kolom Type 40x40 cm (untuk dudukan tiang pagar)


- Cor beton fc =21.7 Mpa / Mutu K.250 m3
- Bekesting m2
- Besi beton kg

III PEKERJAAN ARSITEKTUR


1 Plester Acian Sloef + Kolom m2

2 Pengecetan Sloef + Kolom m2


3 Pengecetan Pagar Lama m2
4 Pengecetan Pagar + Pintu Gerbang m2
IV PENGADAAN DAN PEMASANGAN PAGAR
1 Pengadaan dan pemasangan Pintu + pagar BRC (Uk 1.90 x 2.40, Diameter 6 mm) Lbr
(Uk 1.90 x 2.40, Diameter 6 mm)
2 Pengadaan dan pemasangan tiang pintu dan pagar (Pipa Galvanis 2,5 Inch) m1
(Pipa Galvanis 2,5 Inch)
BACKUP KUANTITAS
PAGAR PELABUHAN PALIPI

SKETSA

DIMENSI DIA Qtul. JARAK JUMLAH PANJANG


VOL
P (m) L (m) T (m) mm kg/m' m bh m

1.00
1.00
3.00 3.00
1.00

SKETSA

DIMENSI DIA Qtul. JARAK JUMLAH PANJANG


VOL
P (m) L (m) T (m) mm kg/m' m bh m

16.50 412.50 0.20 0.20


188.00 0.40 0.40

24.75 412.50 0.20 0.30


9.02 188.00 0.16 0.30

4.11 410.60 0.20 0.05


1.50 188.00 0.16 0.05
24.75 412.50 0.20 0.30
247.50 412.50 0.20 0.30
2,821.10
40.50 0.20 0.30 12.00 0.89 4.00 40.50
8.00 0.39 0.10 202.50 1.00
8.00 0.39 0.15 135.00 1.00
55.00 0.20 0.30 12.00 0.89 4.00 55.00
8.00 0.39 0.10 275.00 1.00
8.00 0.39 0.15 183.33 1.00
141.00 0.20 0.30 12.00 0.89 4.00 141.00
8.00 0.39 0.10 705.00 1.00
8.00 0.39 0.15 470.00 1.00
60.00 0.20 0.30 12.00 0.89 4.00 60.00
8.00 0.39 0.10 300.00 1.00
8.00 0.39 0.15 200.00 1.00
116.00 0.20 0.30 12.00 0.89 4.00 116.00
8.00 0.39 0.10 580.00 1.00
8.00 0.39 0.15 386.67 1.00

18.05 0.40 0.40 0.60 188.00


180.48 112.80 0.40 0.40 1.60
1,291.47
112.80 0.40 0.60 12.00 0.89 4.00 112.80
8.00 0.39 0.10 1,129.00 2.00

497.52
528.40 0.20 0.30
112.80 0.40 0.40 1.60
497.52
190.95 100.50 1.90
850.44 447.60 1.90

98.16 447.60 2.40 1.90

446.20 194.00 2.30

14.4
PJG TOTAL BERAT VOLUME
KET
m kg m3

9.00

PJG TOTAL BERAT VOLUME


KET
m kg m3

16.50

24.75
9.02

4.11
1.50
24.75
247.50

162.00 143.82 - Samping kiri arah vertikal ke-1 16.88 17


202.50 79.90
135.00 53.27
220.00 195.31 - Samping kiri arah horizontal ke-1 22.92 23
275.00 108.50
183.33 72.34
564.00 500.70 - Samping kiri arah vertikal ke-2&3
705.00 278.16 58.75 59
470.00 185.44
240.00 213.06 - dekat dermaga arah horizontal
300.00 118.37 25.00 25
200.00 78.91
464.00 411.92 - Samping kanan arah vertikal
580.00 228.84 48.33 49
386.67 152.56
15.4 7
18.05 180
180.48

451.20 400.56
2,258.00 890.92
40.5
46.1
317.04 - Sloef 77.5
180.48 - Kolom 60
116
190.95 - Bagian depan 55 12.7
850.44 - S. kiri, kanan, & belakang 15.4
45.5
98.16 456 538.7

446.20
TIME SCHEDULE (KURVA S)
PEKERJAAN REHABILITASI BERAT PEMBANGUNAN PAGAR PELABUHAN PALIPI

BOBOT (%) M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 KET.


JUMLAH TOTAL
No URAIAN PEKERJAAN HARGA
JANGKA WAKTU PELAKSANAAN = 120 HARI KALENDER

I PEKERJAAN PENDAHULUAN 29,931,964.00 4.558 1.140 1.140 1.140 1.140

II PEKERJAAN TANAH DAN STRUKTUR BAWAH 241,990,863.38 36.854 4.607 4.607 4.607 4.607 4.607 4.607 4.607 4.607

III PEKERJAAN ARSITEKTUR 138,517,865.23 21.095 3.516 3.516 3.516 3.516 3.516 3.516

IV PENGADAAN DAN PEMASANGAN PAGAR 246,182,670.31 37.492 4.166 4.166 4.166 4.166 4.166 4.166 4.166 4.166 4.166

656,623,362.91

BOBOT TOTAL 100.00

A PROGRES RENCANA PERMINGGU 1.14 5.75 5.75 9.91 8.77 8.77 12.29 12.29 12.29 7.68 7.68 7.68

B KOMULATIF PROGRES RENCANA PERMINGGU - 1.14 6.89 12.63 22.54 31.32 40.09 52.38 64.67 76.95 84.64 92.32 100.00
FOTO DOKUMENTASI LOKASI

CATATAN :
- KONDISI PAGAR DAN PONDASI RUSAK BERAT
- LOKASI PELABUHAN PALIPI
FOTO DOKUMENTASI LOKASI

CATATAN :
- KONDISI PAGAR DAN PONDASI RUSAK BERAT
- LOKASI PELABUHAN PALIPI
FOTO DOKUMENTASI LOKASI

CATATAN :
- KONDISI PAGAR DAN PONDASI RUSAK BERAT
- LOKASI PELABUHAN PALIPI
FOTO DOKUMENTASI LOKASI

CATATAN :
- KONDISI PAGAR SUDAH KARATAN DAN
TIANG SUDAH KROPOS/KARAT
- LOKASI PELABUHAN PALIPI
FOTO DOKUMENTASI LOKASI

CATATAN :
- KONDISI PONDASI DAN ANGKER KARATAN DAN SUDAH
TIDAK LAYAK, SEWAKTU - WAKTU BISA ROBOH
- LOKASI PELABUHAN PALIPI
FOTO DOKUMENTASI LOKASI

CATATAN :
- KONDISI TIANG MIRING, BOX BATERAY RUSAK
- BATERAY TDK ADA, CONTROLER, DAN LAMPU RUSAK
- LOKASI PELABUHAN PALIPI
FOTO DOKUMENTASI LOKASI

CATATAN :
- KONDISI TIDAK NYALA, BOX BATERAY RUSAK
- BATERAY TDK ADA, CONTROLER, DAN LAMPU RUSAK
- LOKASI PELABUHAN BANGGAE MAJENE
FOTO DOKUMENTASI LOKASI

CATATAN :
- KONDISI TIDAK NYALA, BOX BATERAY RUSAK
- BATERAY TDK ADA, CONTROLER, DAN LAMPU RUSAK
- LOKASI PELABUHAN BANGGAE MAJENE

Anda mungkin juga menyukai