ATHAAYAA
KONSTRUKSI Pusat Kolaka
Jln. Jend. Sudirman No.37 Kec. Latambaga, K
HARGA JUMLAH
NO URAIAN VOL SAT
SATUAN (Rp.) HARGA (Rp.)
D Pekerjaan Beton
1 Sloof 15/20 (1 m3=200 kg Besi) 0.48 M3 5,087,500.00 2,442,000.00
2 Balok Beton Bertulang 15/20 (200 kg Besi+Bekisting) 0.57 M 3
4,301,929.82 2,452,100.00
3 Kolom Beton Bertulang 15/20 (350 kg Besi+Bekisting) 0.63 M 3
9,608,888.89 6,053,600.00
4 Pelat Beton Bertulang 2.70 M3 7,661,148.15 20,685,100.00
5 Listplank Beton 0.18 M3 4,301,666.67 774,300.00
6 Beton Rabat (Dasar Lantai) 1.50 M 3
984,666.67 1,477,000.00
G Pekerjaan Pengecatan
1 Pengecatan Dinding ex. Vinilex 73.80 M2 23,098.92 1,704,700.00
2 Cat Waterproofing Untuk Dinding Luar 27.00 M2 122,951.85 3,319,700.00
3 Cat Plat Beton Exoose Ruang ATM 15.00 M2 23,100.00 346,500.00
I Pekerjaan Pasangan
1 Pasangan Ornamen Minimalis Warna Dark Grey di 0.88 M2 172,386.36 151,700.00
Kolom Tampak Depan
J Pekerjaan Elektrikal
1 Instalasi Listrik (Fitting, Lampu & Perlengkapan) 5.00 Ttk 218,980.00 1,094,900.00
2 Pasangan Stop Kontak ex. Broco 5.00 Ttk 35,960.00 179,800.00
3 Saklar Triple 1.00 Ttk 113,400.00 113,400.00
4 Saklar Ganda 1.00 Ttk 54,600.00 54,600.00
5 Perlengkapan Listrik (Kabel, Instalasi AC, T-Dos, Dll.) 1.00 Ls 2,100,000.00 2,100,000.00
6 AC Split 1PK Setara Daikin 1.00 Unit 2,100,000.00 2,100,000.00
7 Box MCB 1.00 Bh 152,200.00 152,200.00
JUMLAH
HARGA (Rp.)
158,800.00
2,696,800.00
1,050,000.00
1,102,500.00
220,600.00
263,500.00
7,382,100.00
704,900.00
481,900.00
2,442,000.00
2,452,100.00
6,053,600.00
20,685,100.00
774,300.00
1,477,000.00
589,800.00
6,277,300.00
4,157,500.00
2,390,000.00
96,600.00
1,704,700.00
3,319,700.00
346,500.00
7,515,200.00
7,774,700.00
4,196,800.00
151,700.00
1,094,900.00
179,800.00
113,400.00
54,600.00
2,100,000.00
2,100,000.00
152,200.00
92,260,600.00
9,226,060.00
101,486,660.00
101,486,000.00
MOH. SYARKAWI
Staff Teknik
RENCANA ANGGARAN GERAI
BIA ATM PELABUHAN KOLAK
PEMBANGUNAN GERAI ATM UKURAN 2. CABANG BAJOE
A Pekerjaan Persiapan
1 Pembersihan Lokasi 15.00 M2 10,986.67 164,800.00
2 Pembersihan & Pemasangan Bouwplank 24.00 M2 116,645.83 2,799,500.00
3 Mobilisasi & Demobilisasi Personil & Peralatan 1.00 Ls 1,090,000.00 1,090,000.00
D Pekerjaan Beton
1 Sloof 15/20 (1 m3=200 kg Besi) 0.48 M3 5,281,458.33 2,535,100.00
2 Balok Beton Bertulang 15/20 (200 kg Besi+Bek.) 0.57 M3 4,465,789.47 2,545,500.00
3 Kolom Beton Bertulang 15/20 (350 kg Besi+Bek.) 0.63 M3 9,974,920.63 6,284,200.00
4 Pelat Beton Bertulang 2.70 M3 7,953,000.00 21,473,100.00
5 Listplank Beton 0.18 M3 4,465,555.56 803,800.00
6 Beton Rabat (Dasar Lantai) 1.50 M3 1,022,200.00 1,533,300.00
I Pekerjaan Pasangan
1 Pasangan Ornamen Minimalis Warna Dark Grey di 0.88 M2 178,977.27 157,500.00
Kolom Tampak Depan
J Pekerjaan Elektrikal
1 Instalasi Listrik (Fitting, Lampu & Perlengkapan) 5.00 Ttk 227,340.00 1,136,700.00
2 Pasangan Stop Kontak ex. Broco 5.00 Ttk 37,320.00 186,600.00
3 Saklar Triple 1.00 Ttk 117,700.00 117,700.00
4 Saklar Ganda 1.00 Ttk 56,700.00 56,700.00
5 Perlengkapan Listrik (Kabel, Instalasi AC, T-Dos, Dll.) 1.00 Ls 2,180,000.00 2,180,000.00
6 AC Split 1PK Setara Daikin 1.00 Unit 2,180,000.00 2,180,000.00
7 Box MCB 1.00 Bh 158,000.00 158,000.00
JUMLAH HARGA
(Rp.)
164,800.00
2,799,500.00
1,090,000.00
1,144,500.00
229,000.00
273,500.00
7,663,300.00
731,800.00
500,200.00
2,535,100.00
2,545,500.00
6,284,200.00
21,473,100.00
803,800.00
1,533,300.00
612,300.00
6,516,400.00
4,315,900.00
2,481,100.00
100,300.00
1,769,700.00
JUMLAH HARGA
(Rp.)
3,446,200.00
359,700.00
7,801,500.00
8,070,900.00
4,356,600.00
157,500.00
1,136,700.00
186,600.00
117,700.00
56,700.00
2,180,000.00
2,180,000.00
158,000.00
95,775,400.00
9,577,540.00
105,352,940.00
105,352,000.00