TUGAS RAB PERENCANAAN PEKERJAAN JALAN,PEDESTRIAN,LANDSCAPE DAN STREET FURNITURE

NO URAIAN PEKERJAAN Analisa Kode Volume Sat Harga Satuan (Rp) Sub Jumlah (Rp)

1 2 3 4 5 6 7
A PEKERJAAN STRUKTUR
I PEKERJAAN PENDAHULUAN
1 Papan Nama Proyek Ls 350,000.00 350,000.00
2 Pagar Sementara Seng Gelombang M 428,591.83 428,591.83
Sub Jumlah 778,591.83
II Pek. Jalan Lingkungan Beton k 300 t 50 cm
Fin Aspal
1 Beton ready mix k 300, t 50cm, p 100 m M3 1,554,830.27 1,554,830.27
2 Urugan Pasir t 50 cm p 100 m 300 M3 175,000.00 52,500,000.00
3 Pembesian 16 mm 66.25 MM 10,000.00 662,500.00
4 Dinding beton penahan jalan k 300 0.5 M3 140,000.00 70,000.00
5 Cerucuk Dolken 8 cm 362.5 Batang 17,000.00 6,162,500.00
6 Aspal 60 M3 450,000.00 27,000,000.00
Sub Jumlah 87,949,830.27
III Pembuatan Landscape Tanaman
1 Ketapang Kencana 20 Buah 100,000.00 2,000,000.00
2 Cemara Udang 10 Buah 650,000.00 6,500,000.00
3 Rumput Gajah Mini 10 M2 40,000.00 1,600,000.00
Sub Jumlah 10,100,000.00
IV Pedestrian Ways
1 Paving Block 169.67 M2 98,400.00 16,695,528.00
2 Urugan Pasir t 50 cm p 100 m 100 M3 175,000.00 52,500,000.00
3 Pembesian 16 mm 100 M3 10,000.00 1,000,000.00
4 Cerucuk Dolken 8 cm 300 Batang 17,000.00 5,100,000.00
Sub Jumlah 75,295,528.00
V Street Furniture
1 Lampu Jalan 4 Unit 2,500,000.00 10,000,000.00
Sub Jumlah 10,000,000.00
Jumlah Total Pekerjaan 184,123,950.10