I PEKERJAAN PENDAHULUAN
1 Pek. Bongkar + Buang Komponen Site/Bangunan Lama Ls 1,210.50 8,550,000.00 10,349,781,412.50
10,349,781,412.50
II PEKERJAAN PONDASI
1 Pek. Pengukuran dan Pas. Bouplank M1 52.00 54,450.55 2,831,428.60
2 Pek. Galian Tanah M3 48.16 69,025.00 3,324,244.00
3 Pek. Urugan Kembali Galian Tanah M3 12.04 23,008.33 277,020.33
4 Pek. Lantai Kerja Beton Cor K.100 M3 3.28 605,599.80 1,985,640.63
5 Pas. Aanstampang batu kali M3 10.16 389,839.00 3,960,764.24
6 Pondasi Batu Kali M3 17.60 747,263.00 13,151,828.80
7 Pas. Pondasi Batu Bata M2 8.05 104,218.65 838,751.71
8 Pas. Angkur Pondasi Pergola Unit 5.00 325,000.00 1,625,000.00
27,994,678.31
III PEKERJAAN BETON, DINDING DAN PLESTERAN
A Pekerjaan Beton Bertulang
1 Pek. Sloof Beton 15 x 20 cm M3 1.32 3,885,500.00 5,128,860.00
2 Pek. Sloof Beton 20 x 25 cm M3 0.53 3,651,800.00 1,928,150.40
3 Pek. Kolom Beton 13 x 13 cm M3 0.22 5,229,700.00 1,131,288.70
4 Pek. Kolom Beton 20 x 20 cm M3 1.82 5,132,800.00 9,362,227.20
5 Pek. Balok Beton 20 x 25 cm M3 1.58 3,651,800.00 5,751,585.00
6 Pek. Plat Beton Teras M3 7.79 3,885,500.00 30,250,948.80
Page 1
JUMLAH HARGA
NO URAIAN PEKERJAAN SAT VOLUME HARGA SAT. (Rp.) TOTAL HARGA (Rp.)
(Rp.)
VIII PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Tembok/Beton (Cat Air) M2 1,221.20 18,922.20 23,107,790.64
2 Pek. Cat Plafon Gipsum + Les (Cat Air) M2 1,310.10 18,922.20 24,789,988.41
3 Pek. Cat Lisplank GRC (Cat Minyak) M2 117.69 35,363.90 4,162,012.75
4 Pek Cat. Kayu Kozen, Pintu dan Jendela M2 124.21 35,363.90 4,392,550.02
5 Pek. Cat Kayu Pergola dengan Cat Melamic 4x jalan M2 25.95 65,300.00 1,694,665.60
58,147,007.43
IX PEKERJAAN PERLENGKAPAN DAN INTERIOR
1 Pas. Instalasi Titik Lampu + Fitting Ttk 56.00 200,000.00 11,200,000.00
2 Pas. Sakelar Bh 41.00 50,000.00 2,050,000.00
3 Pas. Stop Kontak Bh 35.00 50,000.00 1,750,000.00
4 Pas. Downlight 3" + Lampu SL 18 Watt Bh 56.00 110,000.00 6,160,000.00
5 Pek. Interior Bahan dan Rangka Multiplek Fin. HPL M2 147.26 1,850,000.00 272,438,030.00
6 Pas. Wallpaper Dinding M2 311.60 121,000.00 37,703,600.00
331,301,630.00
Page 2
REKAPITULASI BIAYA HPS
nihil.
Dibuat Oleh :
PEJABAT PEMBUAT KOMITMEN
BALAI PENGKAJIAN TEKNOLOGI PERTANIAN
A Z W A R, SP
NIP : 19601231 199903 1 002
REKAPITULASI BIAYA
nihil.
Kepada Yth.
Pokja ULP Balai Pengkajian Teknologi Pertanian Sumatera Barat
di Jl. Raya Padang Solok KM 40 Sukarami, Kec. Gunung Talang, Kabupaten Solok - Sumatera Barat
Sehubungan dengan pengumuman Pemilihan Langsung dengan Pascakualifikasi dan Dokumen Pengadaan
nomor : B-1928/ PL.040/H.12.3/07/2017 Tanggal : 21 Agustus 2018 dan setelah kami pelajari dengan saksama
Dokumen Pengadaan dan Berita Acara Pemberian Penjelasan, dengan ini kami mengajukan penawaran untuk
pekerjaan Renovasi Ruang Pelatihan dan Guest House.
Sebesar : Rp. -
TERBILANG : nihil.
termasuk PPN.
Penawaran ini sudah memperhatikan ketentuan dan persyaratan yang tercantum dalam Dokumen
Pengadaan untuk melaksanakan pekerjaan tersebut di atas.
Penawaran ini berlaku 90 (sembilan puluh ) Hari sejak batas akhir pemasukan Dokumen Penawaran
Dengan disampaikannya Surat Penawaran ini, maka kami menyatakan sanggup dan akan tunduk pada semua
ketentuan yang tercantum dalam Dokumen Pengadaan.
Penawar
CV. PRALAKSANA
H. DJUSMAN AMIR
Direktur
REKAPITULASI BIAYA
Kegiatan : Revitalisasi KP Sukarami
Pekerjaan : Renovasi Ruang Pelatihan dan Guest House
Lokasi : Kantor BPTP Sumatera Barat
nihil.
H. DJUSMAN AMIR
Direktur
RENCANA ANGGARAN BIAYA - FULL DESAIN
I PEKERJAAN PENDAHULUAN
1 Pek. Bongkar + Buang Komponen Site/Bangunan Lama Ls 1.00 2,500,000.00 2,500,000.00
2,500,000.00
II PEKERJAAN PONDASI
1 Pek. Pengukuran dan Pas. Bouplank M1 8.00 54,450.55 435,604.40
2 Pek. Galian Tanah M3 5.31 69,025.00 366,522.75
3 Pek. Urugan Kembali Galian Tanah M3 1.33 23,008.33 30,543.56
4 Pek. Lantai Kerja Beton Cor K.100 M3 0.73 605,599.80 442,087.86
5 Pas. Pondasi Batu Bata 1 : 4 (Teras dan Dudukan Closed) M2 4.10 104,218.65 427,296.47
1,702,055.04
III PEKERJAAN BETON, DINDING DAN PLESTERAN
A Pekerjaan Beton Bertulang
1 Pek. Sloof Beton 20 x 30 cm
a. Pembesian Kg 190.32 10,562.06 2,010,171.74
b. Cetakan M2 19.89 #REF! #REF!
c. Beton K.175 M3 1.99 744,814.65 1,482,181.16
C JUMLAH A+ B #REF!
D DIBULATKAN #REF!
E HPS ###
F SELISIH #REF!
PERHITUNGAN MUTUAL CHECK
(MC 0%)
KEGIATAN
REVITALISASI KP SUKARAMI
PEKERJAAN
RENOVASI RUANG PELATIHAN DAN GUEST HOUSE
KANTOR BPTP SUMATERA BARAT
BPTP SUMATERA BARAT
LOKASI
SUKARAMI, SOLOK
PELAKSANA
AMANDEMEN I
CONTRACT CHANGE ORDER
(CCO)
KEGIATAN
REVITALISASI KP SUKARAMI
PEKERJAAN
RENOVASI RUANG PELATIHAN DAN GUEST HOUSE
KANTOR BPTP SUMATERA BARAT
BPTP SUMATERA BARAT
LOKASI
SUKARAMI, SOLOK
PELAKSANA
ACTUAL CHECK MUTUAL CHECK (MC 0%) (BACK UP DATA)
PEKERJAAN PERUBAHAN
I PEKERJAAN PENDAHULUAN
1 Pek. Bongkar Atap M2 ### 12,760.00 15,445,989.57 1.51 - - 1,210.50 15,445,989.57 1.49
2 Pek. Bongkar Plafond M2 965.35 12,012.00 11,595,784.20 1.14 - - 965.35 11,595,784.20 1.12
3 Pek. Bongkar Lantai Keramik M2 839.14 18,810.00 15,784,223.40 1.55 - - 839.14 15,784,223.40 1.52
- - - -
II PEKERJAAN PONDASI - - - -
1 Pek. Pengukuran dan Pas. Bouplank M1 52.00 54,450.55 2,831,428.60 0.28 - - 52.00 2,831,428.60 0.27
2 Pek. Galian Tanah M3 48.16 69,025.00 3,324,244.00 0.33 - - 48.16 3,324,244.00 0.32
3 Pek. Urugan Kembali Galian Tanah M3 12.04 23,008.33 277,020.33 0.03 - - 12.04 277,020.33 0.03
4 Pek. Lantai Kerja Beton Cor K.100 M3 3.28 605,599.80 1,985,640.63 0.19 - - 3.28 1,985,640.63 0.19
5 Pas. Aanstampang batu kali M3 10.16 389,839.00 3,960,764.24 0.39 - - 10.16 3,960,764.24 0.38
6 Pondasi Batu Kali M3 17.60 747,263.00 13,151,828.80 1.29 - - 17.60 13,151,828.80 1.27
7 Pas. Pondasi Batu Bata M2 8.05 104,218.65 838,751.71 0.08 - - 8.05 838,751.71 0.08
8 Pas. Angkur Pondasi Pergola Unit 5.00 325,000.00 1,625,000.00 0.16 - - 5.00 1,625,000.00 0.16
- - - -
III PEKERJAAN BETON, DINDING DAN PLESTERAN - - - -
A Pekerjaan Beton Bertulang - - - -
1 Pek. Sloof Beton 15 x 20 cm M3 1.32 ### 5,128,860.00 0.50 - - 1.32 5,128,860.00 0.49
2 Pek. Sloof Beton 20 x 25 cm M3 0.53 ### 1,928,150.40 0.19 - - 0.53 1,928,150.40 0.19
3 Pek. Kolom Beton 13 x 13 cm M3 0.22 ### 1,131,288.70 0.11 - - 0.22 1,131,288.70 0.11
4 Pek. Kolom Beton 20 x 20 cm M3 1.82 ### 9,362,227.20 0.92 - - 1.82 9,362,227.20 0.90
5 Pek. Balok Beton 20 x 25 cm M3 1.58 ### 5,751,585.00 0.56 - - 1.58 5,751,585.00 0.55
6 Pek. Plat Beton M3 7.79 ### 30,250,948.80 2.96 - - 7.79 30,250,948.80 2.92
- - -
B Pekerjaan Dinding dan Plesteran - - -
1 Pas. Dinding Bata 1 : 4 1/2 bata M2 113.60 104,218.65 11,839,238.78 1.16 - - 113.60 11,839,238.78 1.14
2 Pas. Dinding Bata 1 : 4 teb 20cm M2 24.32 208,437.30 5,069,195.20 0.50 - - 24.32 5,069,195.20 0.49
3 Pek. Plesteran 1 : 4 Tebal 15 mm M2 227.20 47,907.05 10,884,480.75 1.07 - - 227.20 10,884,480.75 1.05
4 Pek. Acian Pada Plesteran M2 227.20 30,814.59 7,001,073.99 0.69 - - 227.20 7,001,073.99 0.67
5 Pek. Afwerking Pada Beton M2 4.80 110,560.34 530,689.63 0.05 - - 4.80 530,689.63 0.05
6 Pas. Keramik motif Batu Alam Pada Dinding M2 119.37 98,262.00 11,729,534.94 1.15 - - 119.37 11,729,534.94 1.13
7 Pas. Keramik motif Batu Alam Pada Kolom Entrance M2 34.32 98,262.00 3,372,351.84 0.33 - - 34.32 3,372,351.84 0.32
8 Pekerjaan Kolom Pergola Kayu 15x15x2,62 Diketam Hal M3 0.29 ### 840,921.75 0.08 - - 0.29 840,921.75 0.08
9 Pekerjaan Balok Pergola Kayu 8x15 Diketam Halus M3 0.57 ### 1,622,786.40 0.16 - - 0.57 1,622,786.40 0.16
- - -
IV PEKERJAAN KOZEN DAN PINTU - - -
1 Pas. Pintu Panil 1 Unit 20.00 371,700.00 7,434,000.00 0.73 - 12.00 4,460,400.00 8.00 2,973,600.00 0.29
2 Pas. Pintu Panil 2 Unit 4.00 743,400.00 2,973,600.00 0.29 - - 4.00 2,973,600.00 0.29
- - -
V PEKERJAAN KAP / ATAP - - -
1 Mengganti Kuda-kuda dan Gording yang Rusak M3 2.40 ### 9,169,089.60 0.90 - - 2.40 9,169,089.60 0.88
2 Pas. Angkur + Mour Baut Kg 8.24 28,000.00 230,720.00 0.02 - - 8.24 230,720.00 0.02
3 Pas. Lisplank GRC Double tbl. 8 mm M1 336.26 52,552.50 17,671,303.65 1.73 - - 336.26 17,671,303.65 1.70
Page 13
Menurut Kontrak Pekerjaan Tambah Pekerjaan Kurang MC 0%
NO URAIAN PEKERJAAN SAT Bobot Bobot Ket.
Volume H. Satuan Jumlah Volume Jumlah Volume Jumlah Volume Jumlah
(%) (%)
4 Pekerjaan Papan Pergola Kayu 2,5x20 Diketam Halus M3 0.60 ### 1,711,800.00 0.17 - - 0.60 1,711,800.00 0.16
5 Pekerjaan Kuda-kuda Kanopi Selasar 6/12 M3 0.27 ### 780,580.80 0.08 - - 0.27 780,580.80 0.08
6 Pekerjaan Rangka Kuda-kuda Kanopi Selasar 5/10 M3 0.05 ### 136,944.00 0.01 - - 0.05 136,944.00 0.01
7 Pas. Atap Spandek M2 ### 147,121.70 178,090,928.19 17.43 - - 1,210.50 178,090,928.19 17.16
8 Pas. Atap Polycarbonate Pergola M2 42.80 325,000.00 13,910,000.00 1.36 - - 42.80 13,910,000.00 1.34
9 Pas. Atap Polycarbonate Selasar M2 30.00 325,000.00 9,750,000.00 0.95 - - 30.00 9,750,000.00 0.94
- - -
VI PEKERJAAN PLAFON - - -
1 Pas. Rangka Besi Hollow 20 x 40 x 0,4 mm M2 ### 60,989.50 79,902,389.69 7.82 - - 1,310.10 79,902,389.69 7.70
2 Pas. Gipsum Board tebal 9 mm M2 ### 47,515.33 62,249,862.92 6.09 - - 1,310.10 62,249,862.92 6.00
3 Pas. Les Gipsum tebal 9 mm M2 67.90 47,515.33 3,226,290.57 0.32 - - 67.90 3,226,290.57 0.31
- - -
VII PEKERJAAN LANTAI - - -
1 Pas. Keramik Lantai 60 x 60 cm Polished M2 637.90 112,002.75 71,446,554.23 6.99 - - 637.90 71,446,554.23 6.88
2 Pas. Keramik Lantai 60 x 60 cm Unpolished M2 201.24 112,002.75 22,539,433.41 2.21 34.50 ### - 235.74 26,403,528.29 2.54 Dapur
3 Pas. Keramik Dinding 20x40 di Toilet M2 258.46 98,262.00 25,397,189.57 2.49 - - 258.46 25,397,189.57 2.45
4 Pas. Keramik Lantai 40x40 M2 205.47 98,262.00 20,189,893.14 1.98 - - 205.47 20,189,893.14 1.95
5 Pas. Keramik lantai motif Batu Alam M3 115.70 98,262.00 11,368,913.40 1.11 - - 115.70 11,368,913.40 1.10
- - -
VIII PEKERJAAN PENGECATAN - - -
1 Pek. Cat Dinding Tembok/Beton (Cat Air) M2 ### 18,922.20 23,107,790.64 2.26 - - 1,221.20 23,107,790.64 2.23
2 Pek. Cat Plafon Gipsum + Les (Cat Air) M2 ### 18,922.20 24,789,988.41 2.43 - - 1,310.10 24,789,988.41 2.39
3 Pek. Cat Lisplank GRC (Cat Minyak) M2 117.69 35,363.90 4,162,012.75 0.41 - - 117.69 4,162,012.75 0.40
4 Pek Cat. Kayu Kozen, Pintu dan Jendela M2 124.21 35,363.90 4,392,550.02 0.43 - - 124.21 4,392,550.02 0.42
5 Pek. Cat Kayu Pergola dengan Cat Melamic 4x jalan M2 25.95 65,300.00 1,694,665.60 0.17 - - 25.95 1,694,665.60 0.16
- - -
IX PEKERJAAN PERLENGKAPAN DAN INTERIOR - - -
1 Pas. Instalasi Titik Lampu Ttk 56.00 145,000.00 8,120,000.00 0.79 - - 56.00 8,120,000.00 0.78
2 Pas. Sakelar Bh 41.00 36,250.00 1,486,250.00 0.15 - - 41.00 1,486,250.00 0.14
3 Pas. Stop Kontak Bh 35.00 36,250.00 1,268,750.00 0.12 - - 35.00 1,268,750.00 0.12
4 Pas. Downlight 3" + Lampu SL 18 Watt Bh 56.00 79,750.00 4,466,000.00 0.44 - - 56.00 4,466,000.00 0.43
5 Pas. Washtafel Set Unit 2.00 ### 3,168,250.00 0.31 9.00 ### - 11.00 17,425,375.00 1.68
6 Pas. Closet Duduk Komplit Unit 2.00 ### 3,335,000.00 0.33 - - 2.00 3,335,000.00 0.32
7 Pas. Jet Washer Unit 2.00 90,625.00 181,250.00 0.02 4.00 362,500.00 - 6.00 543,750.00 0.05
8 Pas. Kaca Cermin Set Unit 2.00 543,750.00 1,087,500.00 0.11 4.00 ### - 6.00 3,262,500.00 0.31
9 Pek. Interior Bahan dan Rangka Multiplek Fin. HPL M2 147.26 ### 197,517,571.75 19.33 - - 147.26 197,517,571.75 19.03
10 Pas. Wallpaper Dinding M2 311.60 87,725.00 27,335,110.00 2.68 - - 311.60 27,335,110.00 2.63
Page 14
AMANDEMEN RAB
Kegiatan : Revitalisasi KP Sukarami
Pekerjaan : Renovasi Ruang Pelatihan dan Guest House
Lokasi : Kantor BPTP Sumatera Barat
I PEKERJAAN PENDAHULUAN
1 Pek. Bongkar Atap M2 ### 12,760.00 15,445,989.57 1.51 - - 1,210.50 15,445,989.57 1.38
2 Pek. Bongkar Plafond M2 965.35 12,012.00 11,595,784.20 1.14 - - 965.35 11,595,784.20 1.04
3 Pek. Bongkar Lantai Keramik M2 839.14 18,810.00 15,784,223.40 1.55 - - 839.14 15,784,223.40 1.41
- - - -
II PEKERJAAN PONDASI - - - -
1 Pek. Pengukuran dan Pas. Bouplank M1 52.00 54,450.55 2,831,428.60 0.28 - - 52.00 2,831,428.60 0.25
2 Pek. Galian Tanah M3 48.16 69,025.00 3,324,244.00 0.33 - - 48.16 3,324,244.00 0.30
3 Pek. Urugan Kembali Galian Tanah M3 12.04 23,008.33 277,020.33 0.03 - - 12.04 277,020.33 0.02
4 Pek. Lantai Kerja Beton Cor K.100 M3 3.28 605,599.80 1,985,640.63 0.19 - - 3.28 1,985,640.63 0.18
5 Pas. Aanstampang batu kali M3 10.16 389,839.00 3,960,764.24 0.39 - - 10.16 3,960,764.24 0.35
6 Pondasi Batu Kali M3 17.60 747,263.00 13,151,828.80 1.29 - - 17.60 13,151,828.80 1.18
7 Pas. Pondasi Batu Bata M2 8.05 104,218.65 838,751.71 0.08 - - 8.05 838,751.71 0.08
8 Pas. Angkur Pondasi Pergola Unit 5.00 325,000.00 1,625,000.00 0.16 - - 5.00 1,625,000.00 0.15
- - - -
III PEKERJAAN BETON, DINDING DAN PLESTERAN - - - -
A Pekerjaan Beton Bertulang - - - -
1 Pek. Sloof Beton 15 x 20 cm M3 1.32 ### 5,128,860.00 0.50 - - 1.32 5,128,860.00 0.46
2 Pek. Sloof Beton 20 x 25 cm M3 0.53 ### 1,928,150.40 0.19 - - 0.53 1,928,150.40 0.17
3 Pek. Kolom Beton 13 x 13 cm M3 0.22 ### 1,131,288.70 0.11 - - 0.22 1,131,288.70 0.10
4 Pek. Kolom Beton 20 x 20 cm M3 1.82 ### 9,362,227.20 0.92 - - 1.82 9,362,227.20 0.84
5 Pek. Balok Beton 20 x 25 cm M3 1.58 ### 5,751,585.00 0.56 - - 1.58 5,751,585.00 0.52
6 Pek. Plat Beton M3 7.79 ### 30,250,948.80 2.96 - - 7.79 30,250,948.80 2.71
- - -
B Pekerjaan Dinding dan Plesteran - - -
1 Pas. Dinding Bata 1 : 4 1/2 bata M2 113.60 104,218.65 11,839,238.78 1.16 - - 113.60 11,839,238.78 1.06
2 Pas. Dinding Bata 1 : 4 teb 20cm M2 24.32 208,437.30 5,069,195.20 0.50 - - 24.32 5,069,195.20 0.45
3 Pek. Plesteran 1 : 4 Tebal 15 mm M2 227.20 47,997.05 10,904,929.76 1.07 - - 227.20 10,904,929.76 0.98
4 Pek. Acian Pada Plesteran M2 227.20 30,818.59 7,001,983.65 0.69 - - 227.20 7,001,983.65 0.63
5 Pek. Afwerking Pada Beton M2 4.80 110,560.34 530,689.63 0.05 - - 4.80 530,689.63 0.05
6 Pas. Keramik motif Batu Alam Pada Dinding M2 119.37 98,262.00 11,729,534.94 1.15 - - 119.37 11,729,534.94 1.05
7 Pas. Keramik motif Batu Alam Pada Kolom Entrance M2 34.32 98,262.00 3,372,351.84 0.33 - - 34.32 3,372,351.84 0.30
8 Pekerjaan Kolom Pergola Kayu 15x15x2,62 Diketam Hal M3 0.29 ### 840,921.75 0.08 - - 0.29 840,921.75 0.08
9 Pekerjaan Balok Pergola Kayu 8x15 Diketam Halus M3 0.57 ### 1,622,786.40 0.16 - - 0.57 1,622,786.40 0.15
- - -
IV PEKERJAAN KOZEN DAN PINTU - - -
1 Pas. Pintu Panil 1 Unit 20.00 371,700.00 7,434,000.00 0.73 - 12.00 4,460,400.00 8.00 2,973,600.00 0.27
2 Pas. Pintu Panil 2 Unit 4.00 743,400.00 2,973,600.00 0.29 - - 4.00 2,973,600.00 0.27
3 Penggantian Kozen Kayu yang Rusak M3 ### 0.32 2,361,046.26 0.32 2,361,046.26 0.21
4 Penggantian Kozen dan Pintu Toilet Unit ### 7.00 12,992,000.00 7.00 12,992,000.00 1.16
5 Pas. Kozen Kayu Penghubung Dapur - Ruang Makan M3 ### 0.08 608,148.28 0.08 608,148.28 0.05
6 Pas. Pintu Panil l = 90 cm Penghubung Dapur - Ruang M2 537,533.15 1.89 1,015,937.65 1.89 1,015,937.65 0.09
7 Rehab Daun Jendela menjadi Pintu Panil di Ruang Maka Unit 850,000.00 1.00 850,000.00 1.00 850,000.00 0.08
8 Rehab Arah Bukaan Kozen dan Pintu Double Ruang Mak Unit 350,000.00 1.00 350,000.00 1.00 350,000.00 0.03
9 Rehab. Kaca Naco Unit 185,000.00 28.00 5,180,000.00 28.00 5,180,000.00 0.46
Page 15
Menurut Kontrak Pekerjaan Tambah Pekerjaan Kurang CCO / ADD
NO URAIAN PEKERJAAN SAT Bobot Bobot Ket.
Volume H. Satuan Jumlah Volume Jumlah Volume Jumlah Volume Jumlah
(%) (%)
- - -
V PEKERJAAN KAP / ATAP - - -
1 Mengganti Kuda-kuda dan Gording yang Rusak M3 2.40 ### 9,169,089.60 0.90 - - 2.40 9,169,089.60 0.82
2 Pas. Angkur + Mour Baut Kg 8.24 28,000.00 230,720.00 0.02 - - 8.24 230,720.00 0.02
3 Pas. Lisplank GRC Double tbl. 8 mm M1 336.26 52,552.50 17,671,303.65 1.73 - 336.26 ### - - -
4 Penggantian Lisplank Papan tbl. 4 cm M3 ### 0.95 2,247,716.04 0.95 2,139,825.67 0.19
5 Pekerjaan Papan Pergola Kayu 2,5x20 Diketam Halus M3 0.60 ### 1,711,800.00 0.17 - - 0.60 1,711,800.00 0.15
6 Pekerjaan Kuda-kuda Kanopi Selasar 6/12 M3 0.27 ### 780,580.80 0.08 - - 0.27 780,580.80 0.07
7 Pekerjaan Rangka Kuda-kuda Kanopi Selasar 5/10 M3 0.05 ### 136,944.00 0.01 - - 0.05 136,944.00 0.01
8 Pas. Atap Spandek 0,4 M2 ### 147,121.70 178,090,928.19 17.43 - 1,210.50 ### - - -
9 Pas. Atap Spandek 0,3 M2 - 121,971.30 - - ### 147,646,350.13 - 1,210.50 147,646,350.13 13.22
10 Pas Bola-bola/Nok Samping Atap M1 55,943.25 - 135.22 7,564,646.27 135.22 7,564,646.27 0.68
11 Pas Perabung Atap M1 63,203.25 - 93.00 5,877,902.25 93.00 5,877,902.25 0.53
12 Pas. Atap Polycarbonate Pergola M2 42.80 325,000.00 13,910,000.00 1.36 - - 42.80 13,910,000.00 1.25
13 Pas. Atap Polycarbonate Selasar M2 30.00 325,000.00 9,750,000.00 0.95 - - 30.00 9,750,000.00 0.87
- - -
VI PEKERJAAN PLAFON - - -
1 Pas. Rangka Besi Hollow 20 x 40 x 0,4 mm M2 ### 60,989.50 79,902,389.69 7.82 - 405.60 ### 904.50 55,165,048.49 4.94
2 Pas. Gipsum Board tebal 9 mm M2 ### 47,515.33 62,249,862.92 6.09 - - 1,310.10 62,249,862.92 5.57
3 Pas. Les Gipsum tebal 9 mm M2 67.90 47,515.33 3,226,290.57 0.32 - - 67.90 3,226,290.57 0.29
4 Rehab dan droping up Rangka Plafon M2 60,989.50 16.80 1,024,623.60 16.80 1,024,623.60 0.09
- - -
VII PEKERJAAN LANTAI - - -
1 Pas. Keramik Lantai 60 x 60 cm Polished M2 637.90 112,002.75 71,446,554.23 6.99 - - 637.90 71,446,554.23 6.40
2 Pas. Keramik Lantai 60 x 60 cm Unpolished M2 201.24 112,002.75 22,539,433.41 2.21 34.50 3,864,094.88 - 235.74 26,403,528.29 2.36 Dapur
3 Pas. Keramik Dinding 20x40 di Toilet M2 258.46 98,262.00 25,397,189.57 2.49 - - 258.46 25,397,189.57 2.27
4 Pas. Keramik Lantai 40x40 M2 205.47 98,262.00 20,189,893.14 1.98 - - 205.47 20,189,893.14 1.81
5 Pas. Keramik lantai motif Batu Alam M3 115.70 98,262.00 11,368,913.40 1.11 - - 115.70 11,368,913.40 1.02
- - -
VIII PEKERJAAN PENGECATAN - - -
1 Pek. Cat Dinding Tembok/Beton (Cat Air) M2 ### 18,922.20 23,107,790.64 2.26 - - 1,221.20 23,107,790.64 2.07
2 Pek. Cat Plafon Gipsum + Les (Cat Air) M2 ### 18,922.20 24,789,988.41 2.43 - - 1,310.10 24,789,988.41 2.22
3 Pek. Cat Lisplank GRC (Cat Minyak) M2 117.69 35,363.90 4,162,012.75 0.41 - - 117.69 4,162,012.75 0.37
4 Pek Cat. Kayu Kozen, Pintu dan Jendela M2 124.21 35,363.90 4,392,550.02 0.43 - - 124.21 4,392,550.02 0.39
5 Pek. Cat Kayu Pergola dengan Cat Melamic 4x jalan M2 25.95 65,300.00 1,694,665.60 0.17 - - 25.95 1,694,665.60 0.15
- - -
IX PEKERJAAN PERLENGKAPAN DAN INTERIOR - - -
1 Pas. Instalasi Titik Lampu Ttk 56.00 145,000.00 8,120,000.00 0.79 - - 56.00 8,120,000.00 0.73
2 Pas. Sakelar Bh 41.00 36,250.00 1,486,250.00 0.15 - - 41.00 1,486,250.00 0.13
3 Pas. Stop Kontak Bh 35.00 36,250.00 1,268,750.00 0.12 - - 35.00 1,268,750.00 0.11
4 Pas. Downlight 3" + Lampu SL 18 Watt Bh 56.00 79,750.00 4,466,000.00 0.44 - - 56.00 4,466,000.00 0.40
5 Pas. Washtafel Set Unit 2.00 ### 3,168,250.00 0.31 9.00 14,257,125.00 - 11.00 17,425,375.00 1.56
6 Pas. Closet Duduk Komplit Unit 2.00 ### 3,335,000.00 0.33 - - 2.00 3,335,000.00 0.30
7 Pas. Jet Washer Unit 2.00 90,625.00 181,250.00 0.02 4.00 362,500.00 - 6.00 543,750.00 0.05
8 Pas. Kaca Cermin Set Unit 2.00 543,750.00 1,087,500.00 0.11 4.00 2,175,000.00 - 6.00 3,262,500.00 0.29
9 Pek. Interior Bahan dan Rangka Multiplek Fin. HPL M2 147.26 ### 197,517,571.75 19.33 25.60 34,338,830.04 - 172.87 231,856,401.79 20.76
10 Pas. Wallpaper Dinding M2 311.60 87,725.00 27,335,110.00 2.68 - - 311.60 27,335,110.00 2.45
11 Instalasi Stop Kontak Ttk 145,000.00 2.00 290,000.00 - 2.00 290,000.00 0.03
12 Instalasi Air Panas Selang Pipa Flexibel 1/2" + Acc M1 78,000.00 28.00 2,184,000.00 28.00 2,184,000.00 0.20
13 Instalasi Air Bersih PVC 3/4" + Acc M1 39,909.10 65.00 2,594,091.50 65.00 2,594,091.50 0.23
14 Instalasi Pipa PVC 3" + Acc M1 79,949.10 32.00 2,558,371.20 32.00 2,558,371.20 0.23
15 Instalasi Pipa PVC 4" + Acc M1 110,133.10 28.00 3,083,726.80 28.00 3,083,726.80 0.28
Page 16
Menurut Kontrak Pekerjaan Tambah Pekerjaan Kurang CCO / ADD
NO URAIAN PEKERJAAN SAT Bobot Bobot Ket.
Volume H. Satuan Jumlah Volume Jumlah Volume Jumlah Volume Jumlah
(%) (%)
16 Penggantian Kran Air Stainless Steel Unit 67,808.13 22.00 1,491,778.75 22.00 1,491,778.75 0.13
17 Pas. Kran Air Dingin/Panas Stainless Steel Unit 438,508.13 4.00 1,754,032.50 4.00 1,754,032.50 0.16
18 Pemindahan Kitchen Zink + Perbaikan kembali Unit 455,000.00 3.00 1,365,000.00 3.00 1,365,000.00 0.12
19 Meja Beton Dapur M1 245,000.00 5.60 1,372,000.00 5.60 1,372,000.00 0.12
20 Pembuatan Pintu Meja Dapur Rangka Multiplek Fin, HPL M2 ### 6.94 9,304,921.88 6.94 9,304,921.88 0.83
21 Pas. Top table Granit Marmer untuk meja Dapur M2 ### 12.60 17,010,000.00 12.60 17,010,000.00 1.52
22 Pas. Kran Zink Stainless Steel Unit 218,508.13 3.00 655,524.38 3.00 655,524.38 0.06
23 Pas. Closet Jongkok Unit 700,221.77 7.00 4,901,552.42 7.00 4,901,552.42 0.44
24 Pas. Closet Duduk Type A Untuk Ruang Kelas I dan II Unit ### 4.00 14,307,568.00 4.00 14,307,568.00 1.28
25 Pas. Floor Drain Stainless Steel Bh 78,705.00 22.00 1,731,510.00 22.00 1,731,510.00 0.16
26 Pas. Bak Air ex walrus/setara Bh 485,000.00 11.00 5,335,000.00 11.00 5,335,000.00 0.48
27 Pas Unit Septicktank Unit ### 1.00 7,500,000.00 1.00 7,500,000.00 0.67
Page 17
ACTUAL CHECK ADDENDUM RAB (BACK UP DATA)
I PEKERJAAN PENDAHULUAN
1 Pek. Bongkar Atap ### M2 = ###
2 Pek. Bongkar Plafond 965.35 M2 = 965.35
3 Pek. Bongkar Lantai Keramik 839.14 M2 = 839.14
II PEKERJAAN PONDASI
1 Pek. Pengukuran dan Pas. Bouplank 52.00 M1 26.00 x 2.00 = 52.00
4 Pek. Lantai Kerja Beton Cor K.100 3.28 M3 2.00 x 12.00 x 0.70 x 0.07 = 1.18 = 3.28
2.00 x 8.00 x 0.70 x 0.07 = 0.78
4.00 x 2.40 x 1.00 x 0.07 = 0.67
1.00 x 13.20 x 0.70 x 0.07 = 0.65
3.28
5 Pas. Aanstampang batu kali 10.16 M3 2.00 x 12.00 x 0.70 x 0.20 = 3.36 = 10.16
2.00 x 8.00 x 0.70 x 0.20 = 2.24
4.00 x 2.40 x 1.00 x 0.20 = 1.92
1.00 x 13.20 x 1.00 x 0.20 = 2.64
10.16
6 Pondasi Batu Kali 17.60 M3 0.20 + 0.60 / 2.00 x 0.60 = 0.24 = 17.60
0.20 + 0.80 / 2.00 x 0.80 = 0.40
6 Pas. Keramik motif Batu Alam Pada Dinding 119.37 M2 Ddg Bgn 9.00 x 3.80 x 2.00 = 68.40 = 119.37
9.00 x 3.80 x 0.15 = 5.13
2.00 x 3.80 x 0.40 = 3.04
1.00 x 6.00 x 1.50 = 9.00
2.00 x 0.70 x 3.00 = 4.20
Ddg Tangga 4.00 x 0.21 x 2.00 = 1.68
2.00 x 0.70 x 0.40 = 0.56
2.00 x 2.40 x 1.50 = 7.20
4.00 x 2.10 x 2.40 = 20.16
119.37
7 Pas. Keramik motif Batu Alam Pada Kolom Entrance 34.32 M2 4.00 x 2.00 x 3.90 = 31.20 = 34.32
4.00 x 0.20 x 3.90 = 3.12
34.32
8 Pekerjaan Kolom Pergola Kayu 15x15x2,62 Diketam 0.29 M3 5.00 x 0.15 x 0.15 x 2.62 = 0.29
9 Pekerjaan Balok Pergola Kayu 8x15 Diketam Halus 0.57 M3 2.00 x 17.20 x 0.08 x 0.15 = 0.41 = 0.57
5.00 x 2.60 x 0.08 x 0.15 = 0.16
0.57
5 Pekerjaan Papan Pergola Kayu 2,5x20 Diketam Halu 0.60 M3 0.20 x 0.025 x 120.00 = 0.60
6 Pekerjaan Kuda-kuda Kanopi Selasar 6/12 0.27 M3 10.00 x 3.80 x 0.06 x 0.12 = 0.27
7 Pekerjaan Rangka Kuda-kuda Kanopi Selasar 5/10 0.05 M3 2.00 x 4.80 x 0.05 x 0.10 = 0.05
Selasar
2.00 x 20.60 x 3.27 = 134.72
R. Boarding
1.00 x 11.15 x 2.20 = 24.54
2.00 x 15.00 x 6.13 = 183.90
2.00 x 10.65 x 4.20 = 89.46
###
12 Pas. Atap Polycarbonate Pergola 42.80 M2 17.12 x 2.50 = 42.80
VI PEKERJAAN PLAFON
1 Pas. Rangka Besi Hollow 20 x 40 x 0,4 mm ### M2 = ###
R. Guest House
2.00 x 21.50 x 6.54 = 281.22
1.00 x 5.15 x 1.80 = 9.27
2.00 x 3.82 x 6.74 = 51.49
Selasar
2.00 x 20.60 x 3.27 = 134.72
R. Boarding
1.00 x 11.15 x 2.20 = 24.54
2.00 x 15.00 x 8.13 = 243.90
2.00 x 10.65 x 4.20 = 89.46
###
Selasar
2.00 x 20.60 x 3.27 = 134.72
R. Boarding
1.00 x 11.15 x 2.20 = 24.54
2.00 x 15.00 x 8.13 = 243.90
2.00 x 10.65 x 4.20 = 89.46
###
3 Pek. Cat Lisplank GRC (Cat Minyak) 117.69 M2 336.26 x 0.35 = 117.69
5 Pek. Cat Kayu Pergola dengan Cat Melamic 4x jalan 25.95 M2 5.00 x 4.00 x 2.62 x 0.15 = 7.86 = 25.95
2.00 x 2.00 x 5.60 x 0.08 = 1.79
2.00 x 2.00 x 17.20 x 0.15 = 10.32
5.00 x 2.00 x 2.60 x 0.08 = 2.08
5.00 x 2.00 x 2.60 x 0.15 = 3.90
25.95
9 Pek. Interior Bahan dan Rangka Multiplek Fin. HPL 147.26 M2 = 147.26
R. Guest House
3.00 x 0.20 x 5.00 = 3.00
1.00 x 0.20 x 3.75 = 0.75
1.00 x 0.87 x 8.00 = 6.98
3.00 x 1.70 x 1.20 = 6.12
3.00 x 4.00 x 0.80 = 9.60
R. Rapat
1.00 x 8.94 x 2.50 = 22.35
1.00 x 7.60 x 0.20 = 1.52
R. Makan
1.00 x 3.10 x 0.20 = 0.62
R. Display Boarding
1.52 x 1.25 x 1.20 = 2.28
1.00 x 3.20 x 0.20 = 0.64
R. Boarding
12.00 x 2.00 x 2.10 = 50.40
12.00 x 2.50 x 0.10 = 3.00
12.00 x 2.08 x 1.60 = 40.01
147.26
PEKERJAAN PERUBAHAN
3 Penggantian Kozen Kayu yang Rusak 0.32 M3 6.60 x 0.08 x 0.15 x 4.00 = 0.32
5 Pas. Kozen Kayu Penghubung Dapur - Ruang Makan 0.08 Unit 6.80 x 0.08 x 0.15 x 1.00 = 0.08
7 Rehab Daun Jendela menjadi Pintu Panil di Ruang 1.00 Unit = 1.00
8 Rehab Arah Bukaan Kozen dan Pintu Double Ruang 1.00 Unit = 1.00
VI PEKERJAAN PLAFON
1 Pas. Rangka Besi Hollow 20 x 40 x 0,4 mm 904.50 M2 = 904.50
R. Guest House
2.00 x 21.50 x 6.54 = 281.22
1.00 x 5.15 x 1.80 = 9.27
R. Boarding
5.00 x 8.48 x 4.20 = 178.12
904.50
12 Instalasi Air Panas Selang Pipa Flexibel 1/2" + Acc 28.00 M1 = 28.00
20 Pembuatan Pintu Meja Dapur Rangka Multiplek Fin, 6.94 M2 1.85 x 0.75 x 5.00 = 6.94
21 Pas. Top table Granit Marmer untuk meja Dapur 12.60 M2 5.60 x 0.60 = 3.36
4.90 x 0.60 = 2.94
3.40 x 0.60 = 6.30
= 12.60
24 Pas. Closet Duduk Type A Untuk Ruang Kelas I dan II 4.00 Unit = 4.00
I PEKERJAAN PENDAHULUAN
1 Pek. Bongkar Atap 1,210.50 M2 = 1,210.50
2 Pek. Bongkar Plafond 965.35 M2 = 965.35
3 Pek. Bongkar Lantai Keramik 839.14 M2 = 839.14
II PEKERJAAN PONDASI
1 Pek. Pengukuran dan Pas. Bouplank 52.00 M1 26.00 x 2.00 = 52.00
4 Pek. Lantai Kerja Beton Cor K.100 3.28 M3 2.00 x 12.00 x 0.70 x 0.07 = 1.18 = 3.28
2.00 x 8.00 x 0.70 x 0.07 = 0.78
4.00 x 2.40 x 1.00 x 0.07 = 0.67
1.00 x 13.20 x 0.70 x 0.07 = 0.65
3.28
5 Pas. Aanstampang batu kali 10.16 M3 2.00 x 12.00 x 0.70 x 0.20 = 3.36 = 10.16
2.00 x 8.00 x 0.70 x 0.20 = 2.24
4.00 x 2.40 x 1.00 x 0.20 = 1.92
1.00 x 13.20 x 1.00 x 0.20 = 2.64
10.16
6 Pondasi Batu Kali 17.60 M3 0.20 + 0.60 / 2.00 x 0.60 = 0.24 = 17.60
0.20 + 0.80 / 2.00 x 0.80 = 0.40
6 Pas. Keramik motif Batu Alam Pada Dinding 119.37 M2 Ddg Bgn 9.00 x 3.80 x 2.00 = 68.40 = 119.37
9.00 x 3.80 x 0.15 = 5.13
2.00 x 3.80 x 0.40 = 3.04
1.00 x 6.00 x 1.50 = 9.00
2.00 x 0.70 x 3.00 = 4.20
Ddg Tangga 4.00 x 0.21 x 2.00 = 1.68
2.00 x 0.70 x 0.40 = 0.56
2.00 x 2.40 x 1.50 = 7.20
4.00 x 2.10 x 2.40 = 20.16
119.37
7 Pas. Keramik motif Batu Alam Pada Kolom Entrance 34.32 M2 4.00 x 2.00 x 3.90 = 31.20 = 34.32
4.00 x 0.20 x 3.90 = 3.12
34.32
8 Pekerjaan Kolom Pergola Kayu 15x15x2,62 Diketam Halus 0.29 M3 5.00 x 0.15 x 0.15 x 2.62 = 0.29
9 Pekerjaan Balok Pergola Kayu 8x15 Diketam Halus 0.57 M3 2.00 x 17.20 x 0.08 x 0.15 = 0.41 = 0.57
5.00 x 2.60 x 0.08 x 0.15 = 0.16
0.57
5 Pekerjaan Papan Pergola Kayu 2,5x20 Diketam Halus 0.60 M3 0.20 x 0.025 x 120.00 = 0.60
6 Pekerjaan Kuda-kuda Kanopi Selasar 6/12 0.27 M3 10.00 x 3.80 x 0.06 x 0.12 = 0.27
7 Pekerjaan Rangka Kuda-kuda Kanopi Selasar 5/10 0.05 M3 2.00 x 4.80 x 0.05 x 0.10 = 0.05
Selasar
2.00 x 20.60 x 3.27 = 134.72
R. Boarding
1.00 x 11.15 x 2.20 = 24.54
2.00 x 15.00 x 6.13 = 183.90
2.00 x 10.65 x 4.20 = 89.46
1,210.50
12 Pas. Atap Polycarbonate Pergola 42.80 M2 17.12 x 2.50 = 42.80
VI PEKERJAAN PLAFON
1 Pas. Rangka Besi Hollow 20 x 40 x 0,4 mm 1,310.10 M2 = 1,310.10
R. Guest House
2.00 x 21.50 x 6.54 = 281.22
1.00 x 5.15 x 1.80 = 9.27
2.00 x 3.82 x 6.74 = 51.49
Selasar
2.00 x 20.60 x 3.27 = 134.72
R. Boarding
1.00 x 11.15 x 2.20 = 24.54
2.00 x 15.00 x 8.13 = 243.90
2.00 x 10.65 x 4.20 = 89.46
1,310.10
Selasar
2.00 x 20.60 x 3.27 = 134.72
R. Boarding
1.00 x 11.15 x 2.20 = 24.54
2.00 x 15.00 x 8.13 = 243.90
2.00 x 10.65 x 4.20 = 89.46
1,310.10
3 Pek. Cat Lisplank GRC (Cat Minyak) 117.69 M2 336.26 x 0.35 = 117.69
5 Pek. Cat Kayu Pergola dengan Cat Melamic 4x jalan 25.95 M2 5.00 x 4.00 x 2.62 x 0.15 = 7.86 = 25.95
2.00 x 2.00 x 5.60 x 0.08 = 1.79
2.00 x 2.00 x 17.20 x 0.15 = 10.32
5.00 x 2.00 x 2.60 x 0.08 = 2.08
5.00 x 2.00 x 2.60 x 0.15 = 3.90
25.95
9 Pek. Interior Bahan dan Rangka Multiplek Fin. HPL 147.26 M2 = 147.26
R. Guest House
3.00 x 0.20 x 5.00 = 3.00
1.00 x 0.20 x 3.75 = 0.75
1.00 x 0.87 x 8.00 = 6.98
3.00 x 1.70 x 1.20 = 6.12
3.00 x 4.00 x 0.80 = 9.60
R. Rapat
1.00 x 8.94 x 2.50 = 22.35
1.00 x 7.60 x 0.20 = 1.52
R. Makan
1.00 x 3.10 x 0.20 = 0.62
R. Display Boarding
1.52 x 1.25 x 1.20 = 2.28
1.00 x 3.20 x 0.20 = 0.64
R. Boarding
12.00 x 2.00 x 2.10 = 50.40
12.00 x 2.50 x 0.10 = 3.00
12.00 x 2.08 x 1.60 = 40.01
147.26
PEKERJAAN TAMBAHAN
IV PEKERJAAN KOZEN DAN PINTU
3 Penggantian Kozen Kayu yang Rusak
4 Penggantian Kozen dan Pintu Toilet
#REF! #REF!
5 Pas. Kozen Kayu Penghubung Dapur - Ruang Makan
6 Pas. Pintu Panil l = 90 cm Penghubung Dapur - Ruang Makan
7 Rehab Daun Jendela menjadi Pintu Panil di Ruang Makan
8 Rehab Arah Bukaan Kozen dan Pintu Double Ruang Makan
9 Rehab. Kaca Naco
ANALISA HARGA SATUAN PEKERJAAN
Kegiatan : Revitalisasi KP Sukarami
Pekerjaan : Renovasi Ruang Pelatihan dan Guest House
Lokasi : Kantor BPTP Sumatera Barat
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
1 1 M1 Pengukuran dan Pemasangan Bouplank
Upah :
0.005 OH Mandor 110,000.00 550.00
0.010 OH Kepala Tukang 120,000.00 1,200.00
0.100 OH Tukang 110,000.00 11,000.00
0.100 OH Pekerja 80,000.00 8,000.00
Bahan :
0.012 M3 Kayu Balok Kelas IV ### 18,000.00
0.020 Kg Paku Kayu 12,525.00 250.50
0.007 M3 Kayu Papan Kelas IV ### 10,500.00
Jumlah 20,750.00 28,750.50 49,500.50
Keuntungan & Overhead 10% 4,950.05
Jumlah 54,450.55
Page 30
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
6 1 M3 Membuat 1 M3 Beton Mutu Fc = 7,4 MPa (K.100), Slump (12 ± 2 ) cm, w/c = 0,87
Upah :
1.600 OH Pekerja 80,000.00 128,000.00
0.275 OH Tukang 110,000.00 30,250.00
0.028 OH Kepala Tukang 120,000.00 3,360.00
0.083 OH Mandor 110,000.00 9,130.00
Bahan :
247.000 Kg Semen Portland (50 Kg) 902.54 222,927.78
869.000 Kg Pasir Beton 75.00 65,175.00
999.000 Kg Kerikil Beton 88.89 88,800.00
215.000 Ltr Air 13.50 2,902.50
Jumlah 170,740.00 379,805.28 550,545.28
Keuntungan & Overhead 10% 55,054.53
Jumlah 605,599.80
7 1 M3 Membuat Beton Mutu FC = 14,5 MPa (K.175), Slump (12 ± 2) cm, W/C = 0,66
Upah :
1.650 OH Pekerja 80,000.00 132,000.00
0.275 OH Tukang 110,000.00 30,250.00
0.028 OH Kepala Tukang 120,000.00 3,360.00
0.083 OH Mandor 110,000.00 9,130.00
Bahan :
326.000 Kg Semen Portland (50 Kg) 902.54 294,228.56
760.000 Kg Pasir Beton 75.00 57,000.00
### Kg Kerikil Split 0,5 - 1 cm 144.06 148,233.17
215.000 Ltr Air 13.50 2,902.50
Jumlah 174,740.00 502,364.23 677,104.23
Keuntungan & Overhead 10% 67,710.42
Jumlah 744,814.65
Page 31
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
10 1 M2 Memasang Bekisting Untuk Kolom
Upah :
0.660 OH Pekerja 80,000.00 52,800.00
0.330 OH Tukang 110,000.00 36,300.00
0.033 OH Kepala Tukang 120,000.00 3,960.00
0.033 OH Mandor 110,000.00 3,630.00
Bahan :
0.040 M3 Kayu Papan Kelas IV ### 60,000.00
0.400 Kg Paku Kayu 12,525.00 5,010.00
0.200 Ltr Minyak Bekisting 10,350.00 2,070.00
0.015 M3 Kayu Balok Kelas IV ### 22,500.00
2.000 Btg Dolken Kayu Galam Ø8 - 10 cm Panjang 3 m 25,633.10 51,266.19
Jumlah 96,690.00 140,846.19
Untuk 2 x Pemakaian = 1/2 x 70,423.10 167,113.10
Keuntungan & Overhead 10% 16,711.31
Jumlah 183,824.40
Page 32
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
14 Anal. Beton Balok BL uk 13 x 20 / M3
1.0000 M3 Beton Mutu f'c = 14,5 Mpa ( K175 ) 744,814.65 744,814.65
15.3606 M2 Cetakan Balok 186,299.40 2,861,670.63
### Kg Pembesian Besi Polos/Ulir 10,562.06 1,292,926.36
Jumlah 4,899,411.65
Dibulatkan 4,899,400.00
15 Anal. Beton Balok RB uk 13 x 20 / M3
1.0000 M3 Beton Mutu f'c = 14,5 Mpa ( K175 ) 744,814.65 744,814.65
15.3606 M2 Cetakan Balok 186,299.40 2,861,670.63
### Kg Pembesian Besi Polos/Ulir 10,562.06 1,969,289.16
Jumlah 5,575,774.44
Dibulatkan 5,575,700.00
16 1 M2 Memasang Dinding Bata Merah Tebal 1/2 Bata, Campuran 1 PC : 4 PP
Upah :
0.300 OH Pekerja 80,000.00 24,000.00
0.100 OH Tukang 110,000.00 11,000.00
0.010 OH Kepala Tukang 120,000.00 1,200.00
0.015 OH Mandor 110,000.00 1,650.00
Bahan :
70.000 Bh Bata Merah 600.00 42,000.00
11.500 Kg Semen Portland (50 Kg) 902.54 10,379.23
0.043 M3 Pasir Pasang 105,000.00 4,515.00
Jumlah 37,850.00 56,894.23 94,744.23
Keuntungan & Overhead 10% 9,474.42
Jumlah 104,218.65
14 1 M2 Memasang Acian
Upah :
0.150 OH Pekerja 80,000.00 12,000.00
0.100 OH Tukang 110,000.00 11,000.00
0.010 OH Kepala Tukang 120,000.00 1,200.00
0.008 OH Mandor 110,000.00 880.00
Bahan :
3.250 Kg Semen Portland (50 Kg) 902.54 2,933.26
Jumlah 25,080.00 2,933.26 28,013.26
Keuntungan & Overhead 10% 2,801.33
Jumlah 30,814.59
15 1 M2 Afwerking Beton
Upah :
0.640 Oh Pekerja 80,000.00 51,200.00
0.300 Oh Tukang 110,000.00 33,000.00
0.030 Oh Kepala Tukang 120,000.00 3,600.00
0.032 Oh Mandor 110,000.00 3,520.00
Bahan :
0.192 Zak Semen Portland (50 Kg) 45,127.08 8,664.40
0.005 M3 Pasir Pasang 105,000.00 525.00
Jumlah 91,320.00 9,189.40 100,509.40
Keuntungan & Overhead 10% 10,050.94
Jumlah 110,560.34
Page 33
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
16 1 M3 Pekerjaan Kontruksi Kuda kuda Expose Kayu Kelas I
Upah :
6.000 Oh Pekerja 80,000.00 480,000.00
20.000 Oh Tukang 110,000.00 ###
2.000 Oh Kepala Tukang 120,000.00 240,000.00
0.300 Oh Mandor 110,000.00 33,000.00
Bahan :
0.200 M3 Balok Kayu Kelas II ### 450,000.00
5.600 Kg Paku Kayu 12,525.00 70,140.00
Jumlah ### 520,140.00 3,473,140.00
Keuntungan & Overhead 10% 347,314.00
Jumlah 3,820,454.00
Page 34
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
Jumlah 124,978.70
Page 35
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
21 1 M2 Memasang Rangka Plafon Besi Hollow
Upah :
0.200 Oh Pekerja 80,000.00 16,000.00
0.025 Oh Tukang 110,000.00 2,750.00
0.008 Oh Kepala Tukang 120,000.00 960.00
0.001 Oh Mandor 110,000.00 110.00
Bahan :
6.000 M1 Besi Hollow 20 x 40 mm 5,625.00 33,750.00
0.100 Kg Paku Sekrup 18,750.00 1,875.00
Jumlah 19,820.00 35,625.00 55,445.00
Keuntungan & Overhead 10% 5,544.50
Jumlah 60,989.50
29 1 M2 Pengecatan Bidang Kayu/Cat Minyak (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Upah :
0.070 OH Pekerja 80,000.00 5,600.00
0.009 OH Tukang 110,000.00 990.00
0.006 OH Kepala Tukang 120,000.00 720.00
0.003 OH Mandor 110,000.00 275.00
Bahan :
0.200 Kg Menie Kayu 22,800.00 4,560.00
0.150 Kg Plammer Kayu 20,700.00 3,105.00
0.170 Kg Cat Dasar/Cat Minyak 39,300.00 6,681.00
0.260 Kg Cat Penutup/Cat Minyak 39,300.00 10,218.00
Jumlah 7,585.00 24,564.00 32,149.00
Keuntungan & Overhead 10% 3,214.90
Jumlah 35,363.90
30 1 M2 Pengecatan Bidang Tembok/Beton (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Upah :
0.020 OH Pekerja 80,000.00 1,600.00
0.063 OH Tukang 110,000.00 6,930.00
0.006 OH Kepala Tukang 120,000.00 756.00
0.003 OH Mandor 110,000.00 275.00
Bahan :
0.100 Kg Plammer Tembok 12,150.00 1,215.00
0.100 Kg Cat Dasar (Dulux Catylac) 17,850.00 1,785.00
0.260 Kg Cat Penutup (Dulux Catylac) 17,850.00 4,641.00
Jumlah 9,561.00 7,641.00 17,202.00
Keuntungan & Overhead 10% 1,720.20
Jumlah 18,922.20
Page 36
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
31 1 M2 Bongkar Atap
Upah :
0.100 OH Pekerja 80,000.00 8,000.00
0.025 OH Tukang 110,000.00 2,750.00
0.003 OH Kepala Tukang 120,000.00 300.00
0.005 OH Mandor 110,000.00 550.00
Jumlah 11,600.00 - 11,600.00
Keuntungan & Overhead 10% 1,160.00
Jumlah 12,760.00
32 1 M2 Bongkar Plafond
Upah :
0.120 OH Pekerja 80,000.00 9,600.00
0.012 OH Mandor 110,000.00 1,320.00
Jumlah 10,920.00 - 10,920.00
Keuntungan & Overhead 10% 1,092.00
Jumlah 12,012.00
Page 37
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
0.010 M3 Pasir Pasang 105,000.00 1,050.00
Jumlah 442,600.00 193,965.25 636,565.25
Keuntungan & Overhead 10% 63,656.52
Jumlah 700,221.77
Page 38
HARGA JUMLAH
UPAH BAHAN
NO URAIAN SATUAN HARGA
Rp. Rp. Rp. Rp.
0.006 OH Mandor 110,000.00 660.00
Bahan :
1.100 M1 Perabung Atap Spandek 32,000.00 35,200.00
0.050 Kg Paku / Screw 18,750.00 937.50
Jumlah 21,320.00 36,137.50 57,457.50
Keuntungan & Overhead 10% 5,745.75
Jumlah 63,203.25
44 Memasang 1 M1 Nok Samping Atap Spandek
Upah :
0.150 OH Pekerja 80,000.00 12,000.00
0.070 OH Tukang 110,000.00 7,700.00
0.008 OH Kepala Tukang 120,000.00 960.00
0.006 OH Mandor 110,000.00 660.00
Bahan :
1.100 M1Nok Samping 26,000.00 28,600.00
0.050 KgPaku / Screw 18,750.00 937.50
Jumlah 21,320.00 29,537.50 50,857.50
Keuntungan & Overhead 10% 5,085.75
Jumlah 55,943.25
45 1 M2 Membuat Dan memasang Daun Pintu Panil lebar 90 cm, Kayu Kelas II
Upah :
1.000 OH Pekerja 80,000.00 80,000.00
2.500 OH Tukang 110,000.00 275,000.00
0.250 OH Kepala Tukang 120,000.00 30,000.00
0.050 OH Mandor 110,000.00 5,500.00
Bahan :
0.040 M1 Papan Kayu Klas II ### 90,000.00
0.500 Kg Lem kayu 16,333.00 8,166.50
Jumlah 390,500.00 98,166.50 488,666.50
Keuntungan & Overhead 10% 48,866.65
Jumlah 537,533.15
46 1 M3 Membuat Dan memasang Kuzen Kayu Kelas I
Upah :
7.000 OH Pekerja 80,000.00 560,000.00
21.000 OH Tukang 110,000.00 ###
2.100 OH Kepala Tukang 120,000.00 252,000.00
0.350 OH Mandor 110,000.00 38,500.00
Bahan :
1.100 M1 Balok Kayu Klas I ### ###
1.000 Kg Lem kayu 16,333.00 16,333.00
1.250 Kg Paku 18,750.00 23,437.50
Jumlah ### ### 6,775,270.50
Keuntungan & Overhead 10% 677,527.05
Jumlah 7,452,797.55
Page 39
HARGA SATUAN UPAH DAN BAHAN
Kegiatan : Revitalisasi KP Sukarami ###
Pekerjaan : Renovasi Ruang Pelatihan dan Guest House
Lokasi : Kantor BPTP Sumatera Barat
Page 40
JADWAL WAKTU PELAKSANAAN PEKERJAAN
3 Pek. Bongkar Lantai Keramik 1.545 0.31 0.31 0.31 0.31 0.31
II PEKERJAAN PONDASI -
6 Pas. Keramik motif Batu Alam Pada Dinding 1.148 0.38 0.38 0.38
7 Pas. Keramik motif Batu Alam Pada Kolom Entrance 0.330 0.17 0.17
8 Pekerjaan Kolom Pergola Kayu 15x15x2,62 Diketam Halus 0.082 0.03 0.03 0.03
9 Pekerjaan Balok Pergola Kayu 8x15 Diketam Halus 0.159 0.03 0.03 0.03 0.03 0.03
-
IV PEKERJAAN KOZEN DAN PINTU -
1 Pas. Pintu Panil 1 0.728 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08 0.08
2 Pas. Pintu Panil 2 0.291 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
1 Mengganti Kuda-kuda dan Gording yang Rusak 0.898 0.30 0.30 0.30
3 Pas. Lisplank GRC Double tbl. 8 mm 1.730 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22
4 Pekerjaan Papan Pergola Kayu 2,5x20 Diketam Halus 0.168 0.06 0.06 0.06
7 Pas. Atap Spandek 0,45 17.433 1.45 1.45 1.45 1.45 1.45 1.45 1.45 1.45 1.45 1.45 1.45 1.45 50
VI PEKERJAAN PLAFON -
1 Pas. Rangka Besi Hollow 20 x 40 x 0,4 mm 7.821 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78 0.78
2 Pas. Gipsum Board tebal 9 mm 6.094 0.61 0.61 0.61 0.61 0.61 0.61 0.61 0.61 0.61 0.61
1 Pas. Keramik Lantai 60 x 60 cm Polished 6.994 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58
2 Pas. Keramik Lantai 60 x 60 cm Unpolished 2.206 0.37 0.37 0.37 0.37 0.37 0.37
3 Pas. Keramik Dinding 20x40 di Toilet 2.486 0.41 0.41 0.41 0.41 0.41 0.41
4 Pas. Keramik Lantai 40x40 1.976 0.28 0.28 0.28 0.28 0.28 0.28 0.28
5 Pas. Keramik lantai motif Batu Alam 1.113 0.14 0.14 0.14 0.14 0.14 0.14 0.14 0.14
1 Pek. Cat Dinding Tembok/Beton (Cat Air) 2.262 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16
2 Pek. Cat Plafon Gipsum + Les (Cat Air) 2.427 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20
3 Pek. Cat Lisplank GRC (Cat Minyak) 0.407 0.08 0.08 0.08 0.08 0.08
4 Pek Cat. Kayu Kozen, Pintu dan Jendela 0.430 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
5 Pek. Cat Kayu Pergola dengan Cat Melamic 4x jalan 0.166 0.04 0.04 0.04 0.04
-
IX PEKERJAAN PERLENGKAPAN DAN INTERIOR -
1 Pas. Instalasi Titik Lampu + Fitting 0.795 0.13 0.13 0.13 0.13 0.13 0.13
9 Pek. Interior Bahan dan Rangka Multiplek Fin. HPL 19.335 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21 1.21
10 Pas. Wallpaper Dinding 2.676 0.45 0.45 0.45 0.45 0.45 0.45 0
100.000
1 Bobot Rencana Per Minggu 0.89 2.94 3.68 4.93 5.86 7.51 7.80 8.58 7.79 8.31 8.66 8.69 7.37 7.04 4.22 3.15 2.58
2 Bobot Rencana Komulatif 0.89 3.84 7.52 12.45 18.31 25.82 33.62 42.20 49.98 58.29 66.95 75.64 83.01 90.05 94.27 97.42 100.00
Jangka waktu pelaksanaan pekerjaan pisik = 120 (seratus dua puluh) hari kalender
Penawar :
CV. PRALAKSANA
H. DJUSMAN AMIR
Direktur
DAFTAR PERSONIL INTI
H. DJUSMAN AMIR
Direktur
FORMULIR REKAPITULASI PERHITUNGAN TINGKAT
KOMPONEN DALAM NEGERI (TKDN)
Kegiatan : Revitalisasi KP Sukarami
Pekerjaan : Renovasi Ruang Pelatihan dan Guest House
Lokasi : Kantor BPTP Sumatera Barat
Nilai Gabungan Barang/Jasa (Rp.) TKDN
Total
Uraian Pekerjaan
DN LN Ribu % Barang/Jasa Gabungan
(Rp.) KDN
Barang
I. Material Langsung - ### - 100.00 - -
(Bahan Baku)
II. Peralatan (Barang Jadi) - ### - 100.00 - -
A. Sub Total Barang - ### - 100.00 - -
Jasa
III. Manajemen Proyek - ### - 100.00 - -
dan Perekayasaan
IV. Alat Kerja/Fasilitas Kerja - ### - 100.00 - -
V. Konstruksi dan Fabrikasi - ### - 100.00 - -
VI. Jasa Umum - ### - 100.00 - -
B. Sub Total Barang - ### - 100.00 - -
0.00 - 0.00 -
#DIV/0! #DIV/0!
0.00 -
Padang, 30 Agustus 2018
Penawar :
CV. PRALAKSANA
H. DJUSMAN AMIR
Direktur
PENGALAMAN PERUSAHAAN
Kegiatan : Revitalisasi KP Sukarami
Pekerjaan : Renovasi Ruang Pelatihan dan Guest House
Lokasi : Kantor BPTP Sumatera Barat
3105/UN35/PS
Rehabilitasi Labor MIPA ( Labor Kampus UNP Air tawar Universitas Negeri 18 Agustus
1 DIPA/BOPTN/201 ### 12/15/2015
Fisika) Universitas negeri Padang Padang Padang 2015
5
42.02/2257/Dikm
e
Dinas Pendidkan 14 Desember n 2016
Biaya konstruksi Fisik Pembanguna Nagari Koto Gaek Kab. 011/01.430/DIKM
2 dan Kebudayaan ### 2016 01-Sep-16 Tgl. 5
Masjid SMAN 2 Sumbar Solok EN/2016
Prov. Sumbar Desember
2016
B.894.a/Kk.03.11
Pembangunan Gedung Balai Kantor Kementerian B1296.a/Kk.03.11
- 11 Desember
3 Nikah Dan manasik Haji Kec. Talawi Kota Sawahlunto Agama ### /f/ KS.00/12/2017
f/KS00/08/2017 2017
Kec. talawi Kota sawahlunto Tgl. 11 Des-2017
14 Agustus 2017
Pemeliharaan/Perbaikan kamar,
Universitas Negeri 2888/UN35/PS-
5 Ruang Rapat dan Dapur Mess Kampus UNP Bukittinggi ### 29 juli 2016 17 Agustus 2016
Padang DIPA/PNBP/2016
Disamping Labor Perhotelan UNP
Pemeliharaan/Perbaikan Halaman Universitas Negeri 2327/UN35/PS-
6 Kampus UNP Bukittinggi ### 22 Juni 2015 5 Agustus 2015
Parkir Kampus Bukittinggi UNP Padang DIPA/PNBP/2015
359/REGIONAL
Renovasi dan Standarisasi KPRK
8 KPRK Sungai Penuh PT POS INDONESIA III/DEPUM/HK/10 ### 2/10/2017 3/12/2017
Sungai Penuh 37100
17
H. DJUSMAN AMIR
Direktur
JADWAL PELAKSANAAN PEKERJAAN
2 Bobot Rencana Komulatif #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Konsultan Perencana
CV. INTIKARYA TIGAMITRA (INKATIM)
Kegiatan :
Pekerjaan : Rehab Gedung Kantor Dinas Kebudayaan Dan Pariwisata Provinsi Sumatera Barat
Lokasi : Jln. Khatib Sulaiman No. Padang
I PEKERJAAN PENDAHULUAN
1 Pembuatan Job Mix Formula (JMF) + Laporan Ls 1.00 750,000.00 750,000.00
2 Pek. Bongkar + Buang Komponen Site/Bangunan Lama Ls 1.00 2,500,000.00 2,500,000.00
3,250,000.00
II PEKERJAAN PONDASI
1 Pek. Pengukuran dan Pas. Bouplank M1 8.00 54,450.55 435,604.40
2 Pek. Galian Tanah M3 5.32 69,025.00 367,213.00
3 Pek. Urugan Kembali Galian Tanah M3 1.33 23,008.33 30,601.08
4 Pek. Lantai Kerja Beton Cor K.100 M3 0.82 605,599.80 496,591.84
5 Pas. Pondasi Batu Bata 1 : 4 (Teras dan Dudukan Closed) M2 4.41 104,218.65 459,604.25
1,789,614.57
III PEKERJAAN BETON, DINDING DAN PLESTERAN
A Pekerjaan Beton Bertulang
1 Pek. Sloof Beton 20 x 30 cm
a. Pembesian Kg 201.25 10,562.06 2,125,615.08
b. Cetakan M2 19.32 #REF! #REF!
c. Beton K.175 M3 1.93 744,814.65 1,437,492.28