Anda di halaman 1dari 37

RENCANA ANGGARAN BIAYA

(RAB)
PROGRAM : -
PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL
LOKASI : KAMPUNG HARAPAN-SERUI

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6 = (4 x 5)
I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi Ls 1.00 500,000.00 500,000.00
2 Pas. Bouwplank M' 74.00 75,245.00 5,568,130.00
Sub Total 6,068,130.00
II PEKERJAAN TANAH DAN PASIR
1 Pekerjaan Galian Pondasi M3 47.63 46,752.00 2,226,564.00
2 Urugan kembali 1/4 Galian M3 11.91 22,402.00 266,723.81
3 Urugan Tanah Bawah Lantai M3 40.95 497,376.00 20,367,547.20
4 Urugan Pasir Bawah Lantai M3 13.65 497,376.00 6,789,182.40
Sub Total 29,650,017.41
III PEKERJAAN PASANGAN, BATU DAN BETON
1 Pasangan Pondasi Camp. 1 : 3 M3 38.10 1,255,217.00 47,823,767.70
2 Pekerjaan Sloef beton bertulang 15x20 M 3
5.72 6,678,968.00 38,170,302.12
3 Pekerjaan Murplat Ky. Kls. I 5/10 M' 0.88 7,287,766.00 6,395,014.67
4 Pekerjaan Kolom Ky. Kls. I 10/10 M3 2.01 7,329,981.00 14,733,261.81
5 Pekerjaan Pasangan Dinding Batu Tela M2 435.16 150,476.00 65,481,512.35
6 Pekerjaan Plesteran dinding Camp. 1 : 3 M2 821.58 82,069.00 67,425,838.68
7 Pasang Keramik Dinding KM/WC 20x25 M2 48.75 242,111.00 11,802,911.25
8 Pas. Batu tela penahan tanah rabat keliling 24.09 150,476.00 3,624,966.84
Sub Total 255,457,575.41
IV PEKERJAAN KAYU DAN ATAP
1 Pekerjaan Kuda-Kuda Kayu Kls. II 5/10 M3 3.10 6,077,766.00 18,841,074.60
2 Pekerjaan Gording Kayu Kls II 5/10 M3 2.43 6,077,766.00 14,768,971.38
3 Pekerjaan Lesplank Papan Kayu Kls. II M' 75.00 43,679.00 3,275,925.00
4 Pekerjaan Pasang Atap Seng BJLS 30 M2 299.00 99,979.00 29,893,721.00
5 Pas. Nok Seng Plat BJLS 30 M2 26.00 75,953.00 1,974,778.00
6 Pasang Rangka Plafond Ky. Kls. II M2 273.00 110,461.00 30,155,853.00
7 Pekerjaan Plafond Tripleks 3 mm M2 273.00 53,694.00 14,658,462.00
8 Pekerjaan Kusen Ky. Kls. I 5/10 M2 1.39 8,865,422.00 12,334,018.36
9 Pekerjaan Jalusi Ky. Kls. II 2/10 M2 11.40 418,871.00 4,775,129.40
10 Top Gevel ky. Kls. II M2 20.54 184,152.00 3,782,482.08
Sub Total 134,460,414.82
V PEKERJAAN LANTAI
1 Cor Lantai dan Rabat tebal 5 cm M3 13.65 1,465,432.00 20,003,146.80
2 Pasang Keramik Lantai uk. 30x30 M 2
224.38 247,611.00 55,557,718.13
3 Pasang Keramik Lantai KM/WC uk. 20x20 M2 13.13 236,611.00 3,105,519.38
Sub Total 78,666,384.30
VI PEKERJAAN DAUN PINTU DAN JENDELA
1 Pasang Jendela Lover M3 25.00 397,168.00 9,929,200.00
2 Pekerjaan Pintu Double Tripleks M2 33.60 591,131.00 19,862,001.60
3 Pekerjaan Daun Pintu Tripleks Lapis Seng Plat M2 7.35 662,465.00 4,869,117.75
Sub Total 34,660,319.35
VII PEKERJAAN KUNCI DAN PENGGANTUNG
1 Pas. Engsel Daun Pintu Bh 50.00 71,612.00 3,580,600.00
2 Pas. Kunci Tanam 2 Slag Bh 25.00 166,621.00 4,165,525.00
Sub Total 7,746,125.00
VIII PEKERJAAN PENGECATAN
1 Pengecatan Dinding M2 772.83 24,371.00 18,834,518.08
2 Pengecatan Kusen dan Jalusi M2 78.45 62,136.00 4,874,569.20
3 Pengecatan Daun Pintu Tripleks M2 67.20 62,136.00 4,175,539.20
4 Pengecatan Lesplank M2 15.00 62,136.00 932,040.00
5 Pengecatan Plafond M2 273.00 59,246.00 16,174,158.00
Sub Total 44,990,824.48
IX PEKERJAAN INSTALASI LISTRIK
1 Pas. Sekring Khas 2 Group Titik 5.00 92,402.00 462,010.00
2 Pas. Lampu XL 18 Watt Titik 25.00 435,240.00 10,881,000.00
3 Pas. Lampu XL 8 Watt Titik 15.00 424,240.00 6,363,600.00
4 Pas. Saklar Tunggal Titik 10.00 375,147.00 3,751,470.00
5 Pas. Saklar Ganda Titik 15.00 375,147.00 5,627,205.00
6 Pas. Stop Kontak Titik 15.00 375,147.00 5,627,205.00
Sub Total 32,712,490.00
X PEKERJAAN SANITAIR
1 Pembuatan Septic Tank Unit 3.00 4,297,686.00 12,893,058.00
2 Pembuatan Bak Air Bh 5.00 345,277.30 1,726,386.50
3 Pasang Kran Air Bersih1/2 " Bh 10.00 60,762.00 607,620.00
4 Pas. Pipa Air Bersih PVC 1/2" M' 40.00 30,505.00 1,220,200.00
5 Pas. Pipa 3" Pembuangan Air Bekas KM/WC M' 15.00 131,118.00 1,966,770.00
6 Pas. Pipa 4" Pembuangan Air Kotor Septic Tank M' 20.00 176,786.00 3,535,720.00
7 Pas. Floor drain KM/WC Bh 5.00 59,285.00 296,425.00
8 Pas. Closed Jongkok Bh 5.00 885,727.00 4,428,635.00
Sub Total 26,674,814.50
XI PEKERJAAN AKHIR
1 Pembersihan Sisa Proyek Ls 1.00 500,000.00 500,000.00
Sub Total 500,000.00
REKAPITULASI

I PEKERJAAN PERSIAPAN 6,068,130.00


II PEKERJAAN TANAH DAN PASIR 29,650,017.41
III PEKERJAAN PASANGAN, BATU DAN BETON 255,457,575.41
IV PEKERJAAN KAYU DAN ATAP 134,460,414.82
V PEKERJAAN LANTAI 78,666,384.30
VI PEKERJAAN DAUN PINTU DAN JENDELA 34,660,319.35
VII PEKERJAAN KUNCI DAN PENGGANTUNG 7,746,125.00
VIII PEKERJAAN PENGECATAN 44,990,824.48
IX PEKERJAAN INSTALASI LISTRIK 32,712,490.00
X PEKERJAAN SANITAIR 26,674,814.50
XI PEKERJAAN AKHIR 500,000.00

Real Cost 651,587,095.27


Dibulatkan 651,587,000.00

TERBILANG : ENAM RATUS DELAPAN PULUH SATU JUTA ENAM RATUS TUJUH RIBU RUPIAH
ANALISA SATUAN PEKERJAAN PENDAHULUAN DAN TANAH
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)

PEKERJAAN PERSIAPAN

SNI 1.0000 m1 Pengukuran dan pemasangan bouwplank untuk gedung dan saluran
6.4 0.0120 m3 Kayu Kls. III @ Rp. 2,452,857.14 29,434.29
03-2835-2002 0.0200 kg Paku reng @ Rp. 29,500.00 590.00
0.0070 m3 Kayu papan Ky. III @ Rp. 2,452,857.14 17,170.00
0.1000 org Tukang kayu @ Rp. 155,840.00 15,584.00
0.0100 org Kepala tukang kayu @ Rp. 175,320.00 1,753.20
0.1000 org Pekerja @ Rp. 97,400.00 9,740.00
0.0050 org Mandor @ Rp. 194,800.00 974.00
JUMLAH 28,051.20 47,194.29 75,245.49
DIBULATKAN 28,051.00 47,194.00 75,245.00

SNI 1.0000 m2 Membersihkan lapangan dan perataan


6.8 0.1000 org Pekerja @ Rp. 97,400.00 9,740.00
03-2835-2002 0.0500 org Mandor @ Rp. 194,800.00 9,740.00
JUMLAH 19,480.00 19,480.00
DIBULATKAN 19,480.00 19,480.00

1.0000 m2 Membongkar plafond untuk tidak dipakai lagi


0.150 org Pekerja @ Rp. 97,400.00 14,610.00
0.015 org Mandor @ Rp. 194,800.00 2,922.00
JUMLAH 17,532.00 17,532.00
DIBULATKAN 17,532.00 17,532.00

1.0000 m2 Membongkar atap seng untuk tidak dipakai lagi


0.050 org Pekerja @ Rp. 97,400.00 4,870.00
0.010 org Mandor @ Rp. 194,800.00 1,948.00
JUMLAH 6,818.00 6,818.00
DIBULATKAN 6,818.00 6,818.00

PEKERJAAN TANAH
SNI 1.0000 m3 Galian tanah biasa sedalam sampai 1 meter
6.1 0.4000 org Pekerja @ Rp. 97,400.00 38,960.00
0.0400 org Mandor @ Rp. 194,800.00 7,792.00
JUMLAH 46,752.00 46,752.00
DIBULATKAN 46,752.00 46,752.00

SNI 1.0000 m3 Galian tanah biasa sedalam 1 - 2 meter


6.2 0.5260 org Pekerja @ Rp. 97,400.00 51,232.40
0.0526 org Mandor @ Rp. 194,800.00 10,246.48
JUMLAH 61,478.88 61,478.88
DIBULATKAN 61,478.00 61,478.00

SNI 1.0000 m3 Galian tanah biasa sedalam 2 - 3 meter


6.3 0.7350 org Pekerja @ Rp. 97,400.00 71,589.00
0.0735 org Mandor @ Rp. 194,800.00 14,317.80
JUMLAH 85,906.80 85,906.80
DIBULATKAN 85,906.00 85,906.00

SNI 1.0000 m3 Galian tanah keras sedalam sampai 1 meter


6.4 0.6250 org Pekerja @ Rp. 97,400.00 60,875.00
ANALISA SATUAN PEKERJAAN PENDAHULUAN DAN TANAH
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
0.0620 org Mandor @ Rp. 194,800.00 12,077.60
JUMLAH 72,952.60 72,952.60
DIBULATKAN 72,952.00 72,952.00

SNI 1.0000 m3 Galian tanah cadas sedalam sampai 1 meter


6.5 1.2500 org Pekerja @ Rp. 97,400.00 121,750.00
0.1250 org Mandor @ Rp. 194,800.00 24,350.00
JUMLAH 146,100.00 146,100.00
DIBULATKAN 146,100.00 146,100.00

SNI 1.0000 m3 Galian tanah lumpur sedalam 1 meter


6.6 0.8230 org Pekerja @ Rp. 97,400.00 80,160.20
0.0830 org Mandor @ Rp. 194,800.00 16,168.40
JUMLAH 96,328.60 96,328.60
DIBULATKAN 96,328.00 96,328.00

A6 1.0000 m3 Mengangkut tanah sejauh 30 meter


0.3300 org Pekerja @ Rp. 97,400.00 32,142.00
0.0100 org Mandor @ Rp. 194,800.00 1,948.00
JUMLAH 34,090.00 34,090.00
DIBULATKAN 34,090.00 34,090.00

SNI 1.0000 m3 Pembuangan tanah sejauh 150 meter


6.8 0.5160 org Pekerja @ Rp. 97,400.00 50,258.40
0.0500 org Mandor @ Rp. 194,800.00 9,740.00
JUMLAH 59,998.40 59,998.40
DIBULATKAN 59,998.00 59,998.00

A14 1.0000 m3 Membuang tanah dengan menghampar


0.2500 org Pekerja @ Rp. 97,400.00 24,350.00
0.0100 org Mandor @ Rp. 194,800.00 1,948.00
JUMLAH 26,298.00 26,298.00
DIBULATKAN 26,298.00 26,298.00

SNI 1.0000 m3 Urug kembali bekas galian


6.9 0.1920 org Pekerja @ Rp. 97,400.00 18,700.80
0.0190 org Mandor @ Rp. 194,800.00 3,701.20
JUMLAH 22,402.00 22,402.00
DIBULATKAN 22,402.00 22,402.00

1.0000 m2 Meratakan tanah ditumbuk halus


0.2500 org Pekerja @ Rp. 97,400.00 24,350.00
0.0100 org Mandor @ Rp. 194,800.00 1,948.00
JUMLAH 26,298.00 26,298.00
DIBULATKAN 26,298.00 26,298.00

A18 1.0000 m3 Urug pasir


1.2000 m3 Pasir urug @ Rp. 388,506.94 466,208.33
0.3000 org Pekerja @ Rp. 97,400.00 29,220.00
0.0100 org Mandor @ Rp. 194,800.00 1,948.00
JUMLAH 31,168.00 466,208.33 497,376.33
DIBULATKAN 31,168.00 466,208.00 497,376.00

MOD 1.0000 m3 Urug tanah mendatangkan


ANALISA SATUAN PEKERJAAN PENDAHULUAN DAN TANAH
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
A18 1.2000 m 3
Tanah urug @ Rp. 388,506.94 466,208.33
0.3000 org Pekerja @ Rp. 97,400.00 29,220.00
0.0100 org Mandor @ Rp. 194,800.00 1,948.00
JUMLAH 31,168.00 466,208.33 497,376.33
DIBULATKAN 31,168.00 466,208.00 497,376.00
ANALISA SATUAN PEKERJAAN BATU DAN PASANGAN
No. Macam Pekerjaan Upah Bahan
(1) (2) (3) (4)

PEKERJAAN PASANGAN

SNI 1.0000 m3 Pasangan pondasi batu kosong


6.14 1.2000 m3 Batu belah 15/20 cm @ Rp. 328,506.94 394,208.33
03-2836-2002 0.3000 m3 Pasir urug @ Rp. 388,506.94 116,552.08
0.3900 org Tukang batu @ Rp. 155,840.00 60,777.60
0.0390 org Kepala tukang batu @ Rp. 175,320.00 6,837.48
0.7800 org Pekerja @ Rp. 97,400.00 75,972.00
0.0390 org Mandor @ Rp. 194,800.00 7,597.20
JUMLAH 151,184.28 510,760.42
DIBULATKAN 151,184.00 510,760.00

SNI 1.0000 m3 Pasangan pondasi 1 Pc : 3 Ps


6.5 1.200 m3 Batu belah 15/20 cm @ Rp. 328,506.94 394,208.33
03-2836-2002 202.000 kg PC @ Rp. 1,875.00 378,750.00
0.485 m 3
Pasir pasang @ Rp. 448,506.94 217,525.87
0.6000 org Tukang batu @ Rp. 155,840.00 93,504.00
0.0600 org Kepala tukang batu @ Rp. 175,320.00 10,519.20
1.5000 org Pekerja @ Rp. 97,400.00 146,100.00
0.0750 org Mandor @ Rp. 194,800.00 14,610.00
JUMLAH 264,733.20 990,484.20
DIBULATKAN 264,733.00 990,484.00

1.0000 m2 Pasangan bata Tela, 1 Pc : 3 Ps


20.0000 bh Batu Tela @ Rp. 2,000.00 40,000.00
12.6400 kg PC @ Rp. 1,875.00 23,700.00
0.0280 m3 Pasir pasang @ Rp. 448,506.94 12,558.19
0.1500 org Tukang batu @ Rp. 155,840.00 23,376.00
0.0150 org Kepala tukang batu @ Rp. 175,320.00 2,629.80
0.4500 org Pekerja @ Rp. 97,400.00 43,830.00
0.0225 org Mandor @ Rp. 194,800.00 4,383.00
JUMLAH 74,218.80 76,258.19
DIBULATKAN 74,218.00 76,258.00
1.0000 m 2
Pasangan Rolag bata Tela, 1 Pc : 3 Ps

SNI 1.0000 m2 Plesteran dinding 1 Pc : 3 Ps, tebal 15 mm


6.30 7.7760 kg PC @ Rp. 1,875.00 14,580.00
03-2837-2002 0.0230 m 3
Pasir pasang @ Rp. 448,506.94 10,315.66
0.1500 org Tukang batu @ Rp. 155,840.00 23,376.00
0.0150 org Kepala tukang batu @ Rp. 175,320.00 2,629.80
0.3000 org Pekerja @ Rp. 97,400.00 29,220.00
0.0100 org Mandor @ Rp. 194,800.00 1,948.00
JUMLAH 57,173.80 24,895.66
DIBULATKAN 57,173.00 24,895.00

Analisa ZAZ 1.0000 m2 Acian dinding bata


3.5000 kg PC @ Rp. 1,875.00 6,562.50
0.0330 org Tukang batu @ Rp. 155,840.00 5,142.72
0.0033 org Kep. Tk. Batu @ Rp. 175,320.00 578.56
0.0700 org Pekerja @ Rp. 97,400.00 6,818.00
0.0035 org Mandor @ Rp. 194,800.00 681.80
JUMLAH 13,221.08 6,562.50
ANALISA SATUAN PEKERJAAN BATU DAN PASANGAN
No. Macam Pekerjaan Upah Bahan
(1) (2) (3) (4)
DIBULATKAN 13,221.00 6,562.00

1.0000 m2 Pasangan keramik 20 x 20 campuran 1 PC : 3 PP


1.1000 m2 Keramik 20 x 20 @ Rp. 80,000.00 88,000.00
14.1500 kg Semen PC @ Rp. 1,875.00 26,531.25
0.0390 m 3
Pasir pasang @ Rp. 448,506.94 17,491.77
0.2000 kg Semen nat (tile grout) @ Rp. 15,000.00 3,000.00
0.3500 org Tukang batu @ Rp. 155,840.00 54,544.00
0.0350 org Kep. Tk. Batu @ Rp. 175,320.00 6,136.20
0.3500 org Pekerja @ Rp. 97,400.00 34,090.00
0.0350 org Mandor @ Rp. 194,800.00 6,818.00
JUMLAH 101,588.20 135,023.02
DIBULATKAN 101,588.00 135,023.00

1.0000 m2 Pasangan keramik 20 x 25 campuran 1 PC : 3 PP


1.1000 m2 Keramik 20 x 25 @ Rp. 85,000.00 93,500.00
14.1500 kg Semen PC @ Rp. 1,875.00 26,531.25
0.0390 m3 Pasir pasang @ Rp. 448,506.94 17,491.77
0.2000 kg Semen nat (tile grout) @ Rp. 15,000.00 3,000.00
0.3500 org Tukang batu @ Rp. 155,840.00 54,544.00
0.0350 org Kep. Tk. Batu @ Rp. 175,320.00 6,136.20
0.3500 org Pekerja @ Rp. 97,400.00 34,090.00
0.0350 org Mandor @ Rp. 194,800.00 6,818.00
JUMLAH 101,588.20 140,523.02
DIBULATKAN 101,588.00 140,523.00

1.0000 m2 Pasangan keramik polos uk. 30 x 30 ex. Asia Tile campuran 1 PC : 3 PP


1.1000 m2 Keramik 30 x 30 ex. Asia Tile @ Rp. 90,000.00 99,000.00
14.1500 kg Semen PC @ Rp. 1,875.00 26,531.25
0.0390 m3 Pasir pasang @ Rp. 448,506.94 17,491.77
0.2000 kg Semen nat (tile grout) @ Rp. 15,000.00 3,000.00
0.3500 org Tukang batu @ Rp. 155,840.00 54,544.00
0.0350 org Kep. Tk. Batu @ Rp. 175,320.00 6,136.20
0.3500 org Pekerja @ Rp. 97,400.00 34,090.00
0.0350 org Mandor @ Rp. 194,800.00 6,818.00
JUMLAH 101,588.20 146,023.02
DIBULATKAN 101,588.00 146,023.00

1.0000 m' Selokan pas. Batu tela camp. 1 : 3 uk. 25x25 cm diplester camp. 1 : 3
0.0900 m3 Galian saluran @ Rp. 46,752.00
0.6000 m2 Pasangan batu tela @ Rp. 150,476.00
0.0125 m3 Cor lantai 1 : 3 : 6 @ Rp. 1,451,828.00
0.5000 m 2
Plesteran saluran @ Rp. 82,069.00
JUMLAH 244,084.20 494,446.02
DIBULATKAN 244,084.00 494,446.00

1 BH PASANGAN BAK AIR Uk. 0.60x0.60X0.60 TANPA KERAMIK


0.6600 m2 Pasangan batu tela @ Rp. 300,952.00
1.3200 m2 Plesteran @ Rp. 82,069.00
m2 Acian @ Rp. 19,783.00
0.0125 m3 Cor lantai @ Rp. 1,465,432.00
1.0000 bh Resapan Bak mandi @ Rp. 20,000.00
TUAN PEKERJAAN BATU DAN PASANGAN
Jumlah
(5)

661,944.70
661,944.00

1,255,217.40
1,255,217.00

150,476.99
150,476.00
300,952.00

82,069.46
82,069.00

19,783.58
TUAN PEKERJAAN BATU DAN PASANGAN
Jumlah
(5)
19,783.00

236,611.22
236,611.00

242,111.22
242,111.00

247,611.22
247,611.00

4,207.68
90,285.60
18,147.85
41,034.50
153,675.63
153,675.00

198,628.32
108,331.08
-
18,317.90
20,000.00
345,277.30
ANALISA SATUAN PEKERJAAN BETON
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)

PEKERJAAN BETON
SNI 1.0000 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
6.13 336.0000 kg PC @ Rp. 1,875.00 630,000.00
0.5400 m3 Pasir beton @ Rp. 448,506.94 242,193.75
0.8100 m 3
Kerikil beton @ Rp. 688,506.94 557,690.63
0.2750 org Tukang batu @ Rp. 155,840.00 42,856.00
0.0275 org Kepala tukang batu @ Rp. 175,320.00 4,821.30
1.6500 org Pekerja @ Rp. 97,400.00 160,710.00
0.0825 org Mandor @ Rp. 194,800.00 16,071.00
JUMLAH 224,458.30 1,429,884.38 1,654,342.68
DIBULATKAN 224,458.00 1,429,884.00 1,654,342.00

SNI 1.0000 m3 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr


6.1 218.0000 kg PC @ Rp. 1,875.00 408,750.00
0.5200 m 3
Pasir beton @ Rp. 448,506.94 233,223.61
0.8700 m3 Kerikil beton @ Rp. 688,506.94 599,001.04
0.2750 org Tukang batu @ Rp. 155,840.00 42,856.00
0.0275 org Kepala tukang batu @ Rp. 175,320.00 4,821.30
1.6500 org Pekerja @ Rp. 97,400.00 160,710.00
0.0825 org Mandor @ Rp. 194,800.00 16,071.00
JUMLAH 224,458.30 1,240,974.65 1,465,432.95
DIBULATKAN 224,458.00 1,240,974.00 1,465,432.00

SNI 1.0000 m3 Membuat beton tumbuk, 1 Pc : 3 Ps : 6 Kr


6.1 197.0000 kg PC @ Rp. 1,875.00 369,375.00
0.4700 m3 Pasir beton @ Rp. 448,506.94 210,798.26
0.9400 m 3
Kerikil beton @ Rp. 688,506.94 647,196.53
0.2750 org Tukang batu @ Rp. 155,840.00 42,856.00
0.0275 org Kepala tukang batu @ Rp. 175,320.00 4,821.30
1.6500 org Pekerja @ Rp. 97,400.00 160,710.00
0.0825 org Mandor @ Rp. 194,800.00 16,071.00
JUMLAH 224,458.30 1,227,369.79 1,451,828.09
DIBULATKAN 224,458.00 1,227,369.00 1,451,828.00

1.0000 m2 Membuat lantai beton tanpa tulangan, 1 Pc : 3 Ps : 6 Kr tebal 7 cm dan finishing plester
18.2000 kg PC @ Rp. 1,875.00 34,125.00
0.0440 m3 Pasir pasang @ Rp. 448,506.94 19,734.31
0.0700 m 3
Kerikil beton @ Rp. 688,506.94 48,195.49
0.1350 org Tukang batu @ Rp. 155,840.00 21,038.40
0.0135 org Kepala tukang batu @ Rp. 175,320.00 2,366.82
0.7200 org Pekerja @ Rp. 97,400.00 70,128.00
0.0360 org Mandor @ Rp. 194,800.00 7,012.80
JUMLAH 100,546.02 102,054.79 202,600.81
DIBULATKAN 100,546.00 102,054.00 202,600.00

AK 1.0000 m3 Beton cyclope 1pc:3ps:5kr


0.7000 m 3
Batu kali (hitam) @ Rp. 328,506.94 229,954.86
61.2500 kg PC @ Rp. 1,875.00 114,843.75
0.4000 m3 Pasir pasang @ Rp. 448,506.94 179,402.78
0.6500 m 3
Kerikil beton @ Rp. 688,506.94 447,529.51
0.2750 org Tukang batu @ Rp. 155,840.00 42,856.00
0.0275 org Kep. Tk. Batu @ Rp. 175,320.00 4,821.30
1.6500 org Pekerja @ Rp. 97,400.00 160,710.00
ANALISA SATUAN PEKERJAAN BETON
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
0.0825 org Mandor @ Rp. 194,800.00 16,071.00
JUMLAH 224,458.30 971,730.90 1,196,189.20
DIBULATKAN 224,458.00 971,730.00 1,196,189.00

SNI 1.0000 kg Pembesian dengan besi polos


6.25 1.0500 kg Besi beton polos @ Rp. 16,592.57 17,422.20
0.0150 kg Kawat beton @ Rp. 31,850.00 477.75
0.0070 org Tukang besi @ Rp. 155,840.00 1,090.88
0.0007 org Kepala tukang besi @ Rp. 175,320.00 122.72
0.0070 org Pekerja @ Rp. 97,400.00 681.80
0.0004 org Mandor @ Rp. 194,800.00 68.18
JUMLAH 1,963.58 17,899.95 19,863.53
DIBULATKAN 1,963.00 17,899.00 19,863.00

SNI 1.0000 kg Pembesian dengan besi ulir


6.25 1.0500 kg Besi beton ulir @ Rp. 19,701.18 20,686.24
0.0150 kg Kawat beton @ Rp. 31,850.00 477.75
0.0070 org Tukang besi @ Rp. 155,840.00 1,090.88
0.0007 org Kepala tukang besi @ Rp. 175,320.00 122.72
0.0070 org Pekerja @ Rp. 97,400.00 681.80
0.0004 org Mandor @ Rp. 194,800.00 68.18
JUMLAH 1,963.58 21,163.99 23,127.57
DIBULATKAN 1,963.00 21,163.00 23,127.00

F.8 1.0000 m2 Cetakan beton / begisting memakai papan


0.0170 m 3
Usuk ky. Kls. III @ Rp. 2,452,857.14 41,698.57
0.0240 m 3
Papan cetakan ky. Kls. III @ Rp. 2,452,857.14 58,868.57
0.4000 kg Paku @ Rp. 29,500.00 11,800.00
0.5000 org Tukang kayu @ Rp. 155,840.00 77,920.00
0.0500 org Kep. Tk. Kayu @ Rp. 175,320.00 8,766.00
0.2000 org Pekerja @ Rp. 97,400.00 19,480.00
0.0100 org Mandor @ Rp. 194,800.00 1,948.00
JUMLAH 108,114.00 112,367.14 220,481.14
DIBULATKAN 108,114.00 112,367.00 220,481.00

F.8 1.0000 m2 Cetakan beton / begisting memakai multiplek


0.0170 m 3
Usuk ky. Kls. III @ Rp. 2,452,857.14 41,698.57
0.3470 lbr Tripleks 9 mm @ Rp. 220,077.70 76,366.96
0.4000 kg Paku @ Rp. 29,500.00 11,800.00
0.5000 org Tukang kayu @ Rp. 155,840.00 77,920.00
0.0500 org Kep. Tk. Kayu @ Rp. 175,320.00 8,766.00
0.2000 org Pekerja @ Rp. 97,400.00 19,480.00
0.0100 org Mandor @ Rp. 194,800.00 1,948.00
JUMLAH 108,114.00 129,865.53 237,979.53
DIBULATKAN 108,114.00 129,865.00 237,979.00

1.0000 m3 Kolom praktis beton bertulang (10x10 cm) camp. 1 : 2 : 3


1.0000 m3 Beton camp. 1 : 2 : 3 @ Rp. 1,654,342.00 1,654,342.00
275.0000 kg Besi Beton @ Rp. 19,863.00 5,462,325.00
20.0000 m2 Papan Bekisting @ Rp. 220,481.00 4,409,620.00
JUMLAH 11,526,287.00
DIBULATKAN 11,526,287.00
1.0000 m' Kolom praktis beton bertulang (10x10 cm) 115,262.87

1.0000 m3 Ring balok beton bertulang (10x15 cm)


1.0000 m3 Beton camp. 1 : 2 : 3 @ Rp. 1,654,342.00 1,654,342.00
ANALISA SATUAN PEKERJAAN BETON
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
190.0000 kg Besi Beton @ Rp. 19,863.00 3,773,970.00
20.0000 m2 Papan Bekisting @ Rp. 220,481.00 4,409,620.00
JUMLAH 9,837,932.00
DIBULATKAN 9,837,932.00
1.0000 m' Ringbalk praktis beton bertulang (10x15 cm) 147,583.74
ANALISA SATUAN PEKERJAAN BETON
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)

1.0000 m3 Balok praktis beton bertulang (10x20 cm)


1.0000 m3 Beton camp. 1 : 2 : 3 @ Rp. 1,654,342.00 1,654,342.00
170.0000 kg Besi Beton @ Rp. 19,863.00 3,376,710.00
20.0000 m2 Papan Bekisting @ Rp. 220,481.00 4,409,620.00
JUMLAH 9,440,672.00
DIBULATKAN 9,440,672.00
1.0000 m' Ringbalk praktis beton bertulang (10x20 cm) 188,813.44

1.0000 m3 Soof Beton Bertulang camp. 1 : 2 : 3 uk. 15x20 cm pembesian 105 kg


1.0000 m3 Beton camp. 1 : 2 : 3 @ Rp. 1,654,342.00 1,654,342.00
105.0000 kg Besi Beton @ Rp. 19,863.00 2,085,615.00
13.3300 m2 Papan Bekisting @ Rp. 220,481.00 2,939,011.73
JUMLAH 6,678,968.73
DIBULATKAN 6,678,968.00
ANALISA SATUAN PEKERJAAN KAYU
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)

PEKERJAAN RANGKA ATAP

SNI 1.000 m3 Membuat kuda-kuda kayu kelas I


6.28 1.100 m3 Kayu kls. I @ Rp. 4,322,857.14 4,755,142.86
03-3434-2002 0.800 kg Paku biasa 2" - 5" @ Rp. 29,500.00 23,600.00
12.000 OH Tukang kayu @ Rp. 155,840.00 1,870,080.00
1.200 OH Kepala tukang kayu @ Rp. 175,320.00 210,384.00
4.000 OH Pekerja @ Rp. 97,400.00 389,600.00
0.200 OH Mandor @ Rp. 194,800.00 38,960.00
JUMLAH 2,509,024.00 4,778,742.86 7,287,766.86
DIBULATKAN 2,509,024.00 4,778,742.00 7,287,766.00

SNI 1.000 m3 Pasang kuda-kuda kayu lama


03-3434-2002 0.800 kg Paku biasa 2" - 5" @ Rp. 29,500.00 23,600.00
12.000 OH Tukang kayu @ Rp. 155,840.00 1,870,080.00
1.200 OH Kepala tukang kayu @ Rp. 175,320.00 210,384.00
4.000 OH Pekerja @ Rp. 97,400.00 389,600.00
0.200 OH Mandor @ Rp. 194,800.00 38,960.00
JUMLAH 2,509,024.00 23,600.00 2,532,624.00
DIBULATKAN 2,509,024.00 23,600.00 2,532,624.00

SNI 1.000 m3 Pasang Nook,Goording dan Jurai kayu kelas II


1.100 m3 Kayu kls. II @ Rp. 3,222,857.14 3,545,142.86
0.800 kg Paku biasa 2" - 5" @ Rp. 29,500.00 23,600.00
12.000 OH Tukang kayu @ Rp. 155,840.00 1,870,080.00
1.200 OH Kepala tukang kayu @ Rp. 175,320.00 210,384.00
4.000 OH Pekerja @ Rp. 97,400.00 389,600.00
0.200 OH Mandor @ Rp. 194,800.00 38,960.00
JUMLAH 2,509,024.00 3,568,742.86 6,077,766.86
DIBULATKAN 2,509,024.00 3,568,742.00 6,077,766.00

SNI 1.000 m3 Pasang Kolom Kayu Kelas I


1.100 m3 Kayu kls. I @ Rp. 4,322,857.14 4,755,142.86
0.250 kg Paku biasa 2" - 5" @ Rp. 29,500.00 7,375.00
12.000 OH Tukang kayu @ Rp. 155,840.00 1,870,080.00
1.200 OH Kepala tukang kayu @ Rp. 175,320.00 210,384.00
4.000 OH Pekerja @ Rp. 97,400.00 389,600.00
0.500 OH Mandor @ Rp. 194,800.00 97,400.00
JUMLAH 2,567,464.00 4,762,517.86 7,329,981.86
DIBULATKAN 2,567,464.00 4,762,517.00 7,329,981.00

SNI 1.000 m3 Pasang Murplat kayu kelas I


1.100 m3 Kayu kls. I @ Rp. 4,322,857.14 4,755,142.86
0.800 kg Paku biasa 2" - 5" @ Rp. 29,500.00 23,600.00
12.000 OH Tukang kayu @ Rp. 155,840.00 1,870,080.00
1.200 OH Kepala tukang kayu @ Rp. 175,320.00 210,384.00
4.000 OH Pekerja @ Rp. 97,400.00 389,600.00
0.200 OH Mandor @ Rp. 194,800.00 38,960.00
JUMLAH 2,509,024.00 4,778,742.86 7,287,766.86
DIBULATKAN 2,509,024.00 4,778,742.00 7,287,766.00
ANALISA SATUAN PEKERJAAN KAYU
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)

1.000 m2 Pasang Dinding Papan Kayu Kls. II 2/20


0.022 m3 Kayu kls. II @ Rp. 3,222,857.14 70,902.86
0.200 kg Paku biasa 2" - 5" @ Rp. 29,500.00 5,900.00
0.013 m 3
Balok Kayu kls. II 5/10 @ Rp. 3,222,857.14 41,897.14
0.080 OH Tukang kayu @ Rp. 155,840.00 12,467.20
0.080 OH Kepala tukang kayu @ Rp. 175,320.00 14,025.60
0.200 OH Pekerja @ Rp. 97,400.00 19,480.00
0.100 OH Mandor @ Rp. 194,800.00 19,480.00
JUMLAH 65,452.80 118,700.00 184,152.80
DIBULATKAN 65,452.00 118,700.00 184,152.00

PEKERJAAN PINTU DAN JENDELA

SNI 1.000 m3 Membuat kusen pintu / jendela kayu kelas I


6.1 1.100 m3 Kayu kls. I @ Rp. 4,322,857.14 4,755,142.86
03-3434-2002 20.000 OH Tukang kayu @ Rp. 155,840.00 3,116,800.00
2.000 OH Kepala tukang kayu @ Rp. 175,320.00 350,640.00
6.000 OH Pekerja @ Rp. 97,400.00 584,400.00
0.300 OH Mandor @ Rp. 194,800.00 58,440.00
JUMLAH 4,110,280.00 4,755,142.86 8,865,422.86
DIBULATKAN 4,110,280.00 4,755,142.00 8,865,422.00

SNI 1.000 m2 Pasang pintu tripleks rangkap, rangka kayu kelas II


6.19 0.020 m3 Papan kayu kls. II @ Rp. 3,222,857.14 63,168.00
03-3434-2002 0.030 kg Paku biasa 1/2" - 1" @ Rp. 29,500.00 885.00
0.300 kg Lem kayu @ Rp. 49,475.00 14,842.50
1.000 lbr Tripleks 4 mm @ Rp. 101,208.33 101,208.33
2.000 OH Tukang kayu @ Rp. 155,840.00 311,680.00
0.200 OH Kepala tukang kayu @ Rp. 175,320.00 35,064.00
0.600 OH Pekerja @ Rp. 97,400.00 58,440.00
0.030 OH Mandor @ Rp. 194,800.00 5,844.00
JUMLAH 411,028.00 180,103.83 591,131.83
DIBULATKAN 411,028.00 180,103.00 591,131.00

SNI 1.000 m2 Pasang pintu tripleks rangkap lapis seng plat BJLS 20, rangka kayu kelas II
6.19 0.020 m3 Papan kayu kls. II @ Rp. 3,222,857.14 63,168.00
03-3434-2002 0.030 kg Paku biasa 1/2" - 1" @ Rp. 29,500.00 885.00
0.300 kg Lem kayu @ Rp. 49,475.00 14,842.50
1.000 lbr Tripleks 4 mm @ Rp. 101,208.33 101,208.33
1.000 lbr Seng Plat bjls 20 @ Rp. 71,333.33 71,333.33
2.000 OH Tukang kayu @ Rp. 155,840.00 311,680.00
0.200 OH Kepala tukang kayu @ Rp. 175,320.00 35,064.00
0.600 OH Pekerja @ Rp. 97,400.00 58,440.00
0.030 OH Mandor @ Rp. 194,800.00 5,844.00
JUMLAH 411,028.00 251,437.17 662,465.17
DIBULATKAN 411,028.00 251,437.00 662,465.00

SNI 1.000 m2 Pasang Jalusi dan reiling kayu kelas II


6.12 0.022 m3 Kayu Kls II @ Rp. 3,222,857.14 70,902.86
0.200 Kg Paku @ Rp. 29,500.00 5,900.00
03-3434-2002 1.800 OH Tukang kayu @ Rp. 155,840.00 280,512.00
ANALISA SATUAN PEKERJAAN KAYU
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
0.180 OH Kepala tukang kayu @ Rp. 175,320.00 31,557.60
0.280 OH Pekerja @ Rp. 97,400.00 27,272.00
0.014 OH Mandor @ Rp. 194,800.00 2,727.20
JUMLAH 342,068.80 76,802.86 418,871.66
DIBULATKAN 342,068.00 76,802.00 418,871.00

PEKERJAAN PLAFOND
SNI 1.000 m2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu lama
03-3434-2002 0.100 kg Paku biasa 2" - 5" @ Rp. 29,500.00 2,950.00
0.250 OH Tukang kayu @ Rp. 155,840.00 38,960.00
0.025 OH Kepala tukang kayu @ Rp. 175,320.00 4,383.00
0.150 OH Pekerja @ Rp. 97,400.00 14,610.00
0.008 OH Mandor @ Rp. 194,800.00 1,461.00
JUMLAH 59,414.00 0.00 59,414.00
DIBULATKAN 59,414.00 0.00 59,414.00

SNI 1.000 m2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu kelas II


6.39 0.012 m3 Kayu kls. II @ Rp. 3,222,857.14 38,674.29
03-3434-2002 0.100 kg Paku biasa 2" - 5" @ Rp. 29,500.00 2,950.00
0.250 OH Tukang kayu @ Rp. 155,840.00 38,960.00
0.025 OH Kepala tukang kayu @ Rp. 175,320.00 4,383.00
0.150 OH Pekerja @ Rp. 97,400.00 14,610.00
0.008 OH Mandor @ Rp. 194,800.00 1,461.00
JUMLAH 59,414.00 41,624.29 101,038.29
DIBULATKAN 59,414.00 41,624.00 101,038.00

1.000 m2 Pasang rangka langit-langit (60 x 120) m, kayu kelas II


0.013 m3 Kayu kls. II @ Rp. 3,222,857.14 41,897.14
0.120 kg Paku @ Rp. 29,500.00 3,540.00
0.270 OH Tukang kayu @ Rp. 155,840.00 42,076.80
0.027 OH Kepala tukang kayu @ Rp. 175,320.00 4,733.64
0.170 OH Pekerja @ Rp. 97,400.00 16,558.00
0.009 OH Mandor @ Rp. 194,800.00 1,655.80
JUMLAH 65,024.24 45,437.14 110,461.38
DIBULATKAN 65,024.00 45,437.00 110,461.00

1.000 m2 Langit-langit tripleks t; 3 mm


0.336 Lbr Tripleks 4 mm @ Rp. 83,250.00 27,972.00
0.030 kg Paku @ Rp. 29,500.00 885.00
0.100 OH Tukang kayu @ Rp. 155,840.00 15,584.00
0.010 OH Kepala tukang kayu @ Rp. 175,320.00 1,753.20
0.070 OH Pekerja @ Rp. 97,400.00 6,818.00
0.004 OH Mandor @ Rp. 194,800.00 681.80
JUMLAH 24,837.00 28,857.00 53,694.00
DIBULATKAN 24,837.00 28,857.00 53,694.00

1.000 m2 Langit-langit tripleks t; 3 mm, rangka 60 x 120 kayu kls. II


0.336 Lbr Tripleks 3 mm @ Rp. 83,250.00 27,972.00
0.017 M3 Kayu Matoa @ Rp. 3,222,857.14 54,788.57
0.200 Kg Paku @ Rp. 29,500.00 5,900.00
0.020 Kg Paku Tripleks @ Rp. 35,375.00 707.50
ANALISA SATUAN PEKERJAAN KAYU
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
0.400 OH Tukang kayu @ Rp. 155,840.00 62,336.00
0.040 OH Kepala tukang kayu @ Rp. 175,320.00 7,012.80
0.280 OH Pekerja @ Rp. 97,400.00 27,272.00
0.014 OH Mandor @ Rp. 194,800.00 2,727.20
JUMLAH 99,348.00 89,368.07 188,716.07
DIBULATKAN 99,348.00 89,368.00 188,716.00

PEKERJAAN LISPLANK
SNI 1.000 m1 Pasang lisplank ukuran 1 x (2 x 20) cm, kayu kelas II
0.004 m3 Kayu kls. II papan @ Rp. 3,222,857.14 13,858.29
03-3434-2002 0.060 kg Paku biasa 2" - 5" @ Rp. 29,500.00 1,770.00
0.100 OH Tukang kayu @ Rp. 155,840.00 15,584.00
0.010 OH Kepala tukang kayu @ Rp. 175,320.00 1,753.20
0.100 OH Pekerja @ Rp. 97,400.00 9,740.00
0.005 OH Mandor @ Rp. 194,800.00 974.00
JUMLAH 28,051.20 15,628.29 43,679.49
DIBULATKAN 28,051.00 15,628.00 43,679.00

PEKERJAAN ATAP
1.000 m2 Pasang genteng lama
0.100 OH Tukang batu @ Rp. 155,840.00 15,584.00
0.010 OH Kep. Tk. Batu @ Rp. 175,320.00 1,753.20
0.200 OH Pekerja @ Rp. 97,400.00 19,480.00
0.010 OH Mandor @ Rp. 194,800.00 1,948.00
JUMLAH 38,765.20 0.00 38,765.20
DIBULATKAN 38,765.00 0.00 38,765.00
SNI 1.000 m2 Pasang atap Seng gelombang BJLS 30
6.21 0.870 Lbr Seng gelombang BJLS 30 @ Rp. 83,250.00 72,427.50
03-3436-2002 0.025 Kg Paku seng @ Rp. 35,375.00 884.38
0.067 OH Tukang kayu @ Rp. 155,840.00 10,441.28
0.007 OH Kepala tukang kayu @ Rp. 175,320.00 1,227.24
0.140 OH Pekerja @ Rp. 97,400.00 13,636.00
0.007 OH Mandor @ Rp. 194,800.00 1,363.60
JUMLAH 26,668.12 73,311.88 99,980.00
DIBULATKAN 26,668.00 73,311.00 99,979.00

SNI 1.000 m1 Pasang nok Seng plat BJLS 30


6.22 0.380 Lbr Seng Plat BJLS 30 @ Rp. 83,250.00 31,635.00
03-3436-2002 0.004 M3 Kayu Matoa @ Rp. 3,222,857.14 12,891.43
0.020 Kg Paku Seng @ Rp. 35,375.00 707.50
0.125 OH Tukang kayu @ Rp. 155,840.00 19,480.00
0.013 OH Kepala tukang kayu @ Rp. 175,320.00 2,279.16
0.084 OH Pekerja @ Rp. 97,400.00 8,181.60
0.004 OH Mandor @ Rp. 194,800.00 779.20
JUMLAH 30,719.96 45,233.93 75,953.89
DIBULATKAN 30,719.00 45,233.00 75,953.00

SNI 1.000 set Pasang jendela louver lengkap teralis


1.100 set jendela louver lengkap teralis @ Rp. 279,000.00 306,900.00
6.17 0.020 kg Paku skrup @ Rp. 17,825.00 356.50
0.025 m2 Besi strip @ Rp. 1,422,500.00 35,562.50
0.200 OH Tukang kayu @ Rp. 155,840.00 31,168.00
ANALISA SATUAN PEKERJAAN KAYU
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
0.020 OH Kepala tukang kayu @ Rp. 175,320.00 3,506.40
0.200 OH Pekerja @ Rp. 97,400.00 19,480.00
0.001 OH Mandor @ Rp. 194,800.00 194.80
JUMLAH 54,349.20 342,819.00 397,168.20
DIBULATKAN 54,349.00 342,819.00 397,168.00

PEKERJAAN KUNCI DAN KACA

6.2 1.000 bh Pasang kunci tanam biasa


1.000 bh Kunci tanam biasa @ Rp. 85,000.00 85,000.00
0.500 OH Tukang kayu @ Rp. 155,840.00 77,920.00
0.010 OH Kepala tukang kayu @ Rp. 175,320.00 1,753.20
0.010 OH Pekerja @ Rp. 97,400.00 974.00
0.005 OH Mandor @ Rp. 194,800.00 974.00
JUMLAH 81,621.20 85,000.00 166,621.20
DIBULATKAN 81,621.00 85,000.00 166,621.00

6.5 1.000 bh Pasang engsel pintu


1.000 bh Engsel pintu @ Rp. 44,000.00 44,000.00
0.150 OH Tukang kayu @ Rp. 155,840.00 23,376.00
0.015 OH Kepala tukang kayu @ Rp. 175,320.00 2,629.80
0.015 OH Pekerja @ Rp. 97,400.00 1,461.00
0.001 OH Mandor @ Rp. 194,800.00 146.10
JUMLAH 27,612.90 44,000.00 71,612.90
DIBULATKAN 27,612.00 44,000.00 71,612.00
ANALISA SATUAN PEKERJAAN
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)

PEKERJAAN RANGKA BAJA


SNI 1.0000 kg Pasang rangka atap baja
1.1000 kg Besi baja @ Rp. #REF! #REF!
0.0050 kg Elektroda @ Rp. 60,000.00 300.00
0.0600 org @ Rp. #REF! #REF!
0.0060 org @ Rp. #REF! #REF!
0.0600 org @ Rp. #REF! #REF!
0.0030 org @ Rp. #REF! #REF!
JUMLAH #REF! #REF! #REF!
DIBULATKAN #REF! #REF! #REF!

SNI 1.0000 m3 Pasang Gording baja


6.1 1.1000 kg Gording baja @ Rp. #REF! #REF!
0.0050 kg Elektroda @ Rp. 60,000.00 300.00
0.0600 org Tukang besi @ Rp. #REF! #REF!
0.0060 org Kepala tukang besi @ Rp. #REF! #REF!
0.0600 org Pekerja @ Rp. #REF! #REF!
0.0030 org Mandor @ Rp. #REF! #REF!
JUMLAH #REF! #REF! #REF!
DIBULATKAN #REF! #REF! #REF!

1.0000 M2 Atap Superdeks


0.8700 Lbr Superdeks @ Rp. #REF! #REF!
0.0250 kg Paku Ardeks @ Rp. #REF! #REF!
0.2000 org Tukang @ Rp. #REF! #REF!
0.0200 org Kepala Tukang @ Rp. #REF! #REF!
0.1000 org Pekerja @ Rp. #REF! #REF!
0.0050 org Mandor @ Rp. #REF! #REF!
JUMLAH #REF! #REF! #REF!
DIBULATKAN #REF! #REF! #REF!
ANALISA SATUAN PEKERJAAN SANITAIR
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)

PEKERJAAN SANITASI

SNI 1.0000 bh Memasang kloset jongkok porselen


1.0000 bh Kloset jongkok porselen @ Rp. 436,562.50 436,562.50
6.2 6.0000 kg PC @ Rp. 1,875.00 11,250.00
0.0100 m3 Pasir pasang @ Rp. 448,506.94 4,485.07
1.0000 org Tukang batu @ Rp. 155,840.00 155,840.00
1.0000 org Kepala tukang batu @ Rp. 175,320.00 175,320.00
0.7500 org Pekerja @ Rp. 97,400.00 73,050.00
0.1500 org Mandor @ Rp. 194,800.00 29,220.00
JUMLAH 433,430.00 452,297.57 885,727.57
DIBULATKAN 433,430.00 452,297.00 885,727.00

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 1/2"


1.2000 m1 Pipa PVC @ Rp. 10,481.25 12,577.50
6.25 35% x Harga pipa (Perlengkapan) @ Rp. 10,481.25 3,668.44
0.0600 org Tukang batu @ Rp. 155,840.00 9,350.40
0.0060 org Kepala tukang batu @ Rp. 175,320.00 1,051.92
0.0360 org Pekerja @ Rp. 97,400.00 3,506.40
0.0018 org Mandor @ Rp. 194,800.00 350.64
JUMLAH 14,259.36 16,245.94 30,505.30
DIBULATKAN 14,259.00 16,245.00 30,505.00

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 3/4"


1.2000 m1 Pipa PVC @ Rp. 12,000.00 14,400.00
6.26 35% x Harga pipa (Perlengkapan) @ Rp. 12,000.00 4,200.00
0.0600 org Tukang batu @ Rp. 155,840.00 9,350.40
0.0060 org Kepala tukang batu @ Rp. 175,320.00 1,051.92
0.0360 org Pekerja @ Rp. 97,400.00 3,506.40
0.0018 org Mandor @ Rp. 194,800.00 350.64
JUMLAH 14,259.36 18,600.00 32,859.36
DIBULATKAN 14,259.00 18,600.00 32,859.00

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 1"


1.2000 m1 Pipa PVC @ Rp. 15,020.83 18,025.00
6.27 35% x Harga pipa (Perlengkapan) @ Rp. 15,020.83 5,257.29
0.0600 org Tukang batu @ Rp. 155,840.00 9,350.40
0.0060 org Kepala tukang batu @ Rp. 175,320.00 1,051.92
0.0360 org Pekerja @ Rp. 97,400.00 3,506.40
0.0018 org Mandor @ Rp. 194,800.00 350.64
JUMLAH 14,259.36 23,282.29 37,541.65
DIBULATKAN 14,259.00 23,282.00 37,541.00

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 1 1/2"


1.2000 m1 Pipa PVC @ Rp. 23,900.00 28,680.00
6.28 35% x Harga pipa (Perlengkapan) @ Rp. 23,900.00 8,365.00
0.0600 org Tukang batu @ Rp. 155,840.00 9,350.40
0.0060 org Kepala tukang batu @ Rp. 175,320.00 1,051.92
0.0360 org Pekerja @ Rp. 97,400.00 3,506.40
0.0018 org Mandor @ Rp. 194,800.00 350.64
JUMLAH 14,259.36 37,045.00 51,304.36
DIBULATKAN 14,259.00 37,045.00 51,304.00
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 2"


1.2000 m1 Pipa PVC @ Rp. 39,187.50 47,025.00
6.29 35% x Harga pipa (Perlengkapan) @ Rp. 39,187.50 13,715.63
0.0900 org Tukang batu @ Rp. 155,840.00 14,025.60
0.0090 org Kepala tukang batu @ Rp. 175,320.00 1,577.88
0.0544 org Pekerja @ Rp. 97,400.00 5,298.56
0.0027 org Mandor @ Rp. 194,800.00 525.96
JUMLAH 21,428.00 60,740.63 82,168.63
DIBULATKAN 21,428.00 60,740.00 82,168.00

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 2 1/2"


1.2000 m1 Pipa PVC @ Rp. 39,187.50 47,025.00
6.30 35% x Harga pipa (Perlengkapan) @ Rp. 39,187.50 13,715.63
0.0900 org Tukang batu @ Rp. 155,840.00 14,025.60
0.0090 org Kepala tukang batu @ Rp. 175,320.00 1,577.88
0.0544 org Pekerja @ Rp. 97,400.00 5,298.56
0.0027 org Mandor @ Rp. 194,800.00 525.96
JUMLAH 21,428.00 60,740.63 82,168.63
DIBULATKAN 21,428.00 60,740.00 82,168.00

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 3"


1.2000 m1 Pipa PVC @ Rp. 59,250.00 71,100.00
6.31 35% x Harga pipa (Perlengkapan) @ Rp. 59,250.00 20,737.50
0.1350 org Tukang batu @ Rp. 155,840.00 21,038.40
0.0135 org Kepala tukang batu @ Rp. 175,320.00 2,366.82
0.0810 org Pekerja @ Rp. 97,400.00 7,889.40
0.0410 org Mandor @ Rp. 194,800.00 7,986.80
JUMLAH 39,281.42 91,837.50 131,118.92
DIBULATKAN 39,281.00 91,837.00 131,118.00

SNI 1.0000 m1 Memasang pipa PVC tipe AW diameter 4"


1.2000 m1 Pipa PVC @ Rp. 88,713.24 106,455.88
6.32 35% x Harga pipa (Perlengkapan) @ Rp. 88,713.24 31,049.63
0.1350 org Tukang batu @ Rp. 155,840.00 21,038.40
0.0135 org Kepala tukang batu @ Rp. 175,320.00 2,366.82
0.0810 org Pekerja @ Rp. 97,400.00 7,889.40
0.0410 org Mandor @ Rp. 194,800.00 7,986.80
JUMLAH 39,281.42 137,505.51 176,786.93
DIBULATKAN 39,281.00 137,505.00 176,786.00

SNI 1.0000 bh Memasang kran diameter 3/4" atau 1/2"


1.0000 bh Kran air @ Rp. 41,325.00 41,325.00
6.35 0.0250 bh Seal tape @ Rp. 6,075.00 151.88
0.1000 org Tukang batu @ Rp. 155,840.00 15,584.00
0.0100 org Kepala tukang batu @ Rp. 175,320.00 1,753.20
0.0100 org Pekerja @ Rp. 97,400.00 974.00
0.0050 org Mandor @ Rp. 194,800.00 974.00
JUMLAH 19,285.20 41,476.88 60,762.08
DIBULATKAN 19,285.00 41,476.00 60,762.00

SNI 1.0000 bh Memasang floor drain


1.0000 bh Floor drain @ Rp. 40,000.00 40,000.00
6.35 0.1000 org Tukang batu @ Rp. 155,840.00 15,584.00
0.0100 org Kepala tukang batu @ Rp. 175,320.00 1,753.20
0.0100 org Pekerja @ Rp. 97,400.00 974.00
0.0050 org Mandor @ Rp. 194,800.00 974.00
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
JUMLAH 19,285.20 40,000.00 59,285.20
DIBULATKAN 19,285.00 40,000.00 59,285.00
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)

1.0000 UNIT SEPTIC TANK DAN RESAPAN UK. 1.5x2x1.5 M


3.9000 M3 Galian Tanah @ Rp. 46,752.00 182,332.80
11.0500 M2 Pas. Batu Tela @ Rp. 150,476.00 1,662,759.80
9.1000 M2 Plesteran Camp. 1 : 3 @ Rp. 82,069.00 746,827.90
27.5900 Kg Pembesian @ Rp. 19,863.00 548,020.17
0.3000 M3 Cor Beton Camp. 1 : 2 : 3 @ Rp. 1,654,342.00 496,302.60
3.0000 M2 Papan Bekisting @ Rp. 220,481.00 661,443.00
JUMLAH 4,297,686.27
DIBULATKAN 4,297,686.00
ANALISA SATUAN PEKERJAAN PENGECATAN
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)

PEKERJAAN CAT-CATAN

SNI 1.0000 m2 Pengecatan bidang kayu lama


6.7 0.1500 kg Plamir @ Rp. 41,250.00 6,187.50
0.1700 kg Cat dasar @ Rp. 58,875.00 10,008.75
0.1700 kg Cat penutup @ Rp. 58,875.00 10,008.75
0.0750 org Tukang cat @ Rp. 155,840.00 11,688.00
0.0075 org Kepala tukang cat @ Rp. 175,320.00 1,314.90
0.0700 org Pekerja @ Rp. 97,400.00 6,818.00
0.0025 org Mandor @ Rp. 194,800.00 487.00
JUMLAH 20,307.90 26,205.00 46,512.90
DIBULATKAN 20,307.00 26,205.00 46,512.00

SNI 1.0000 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
6.8 0.2000 kg Cat meni @ Rp. 41,250.00 8,250.00
0.1500 kg Plamir @ Rp. 41,250.00 6,187.50
0.1700 kg Cat dasar @ Rp. 58,875.00 10,008.75
0.2600 kg Cat penutup @ Rp. 58,875.00 15,307.50
0.0900 org Tukang cat @ Rp. 155,840.00 14,025.60
0.0060 org Kepala tukang cat @ Rp. 175,320.00 1,051.92
0.0700 org Pekerja @ Rp. 97,400.00 6,818.00
0.0025 org Mandor @ Rp. 194,800.00 487.00
JUMLAH 22,382.52 39,753.75 62,136.27
DIBULATKAN 22,382.00 39,753.00 62,136.00

SNI 1.0000 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup
6.9 0.2000 kg Cat meni @ Rp. 41,250.00 8,250.00
0.1500 kg Plamir @ Rp. 41,250.00 6,187.50
0.1700 kg Cat dasar @ Rp. 58,875.00 10,008.75
0.3500 kg Cat penutup @ Rp. 58,875.00 20,606.25
0.1050 org Tukang cat @ Rp. 155,840.00 16,363.20
0.0040 org Kepala tukang cat @ Rp. 175,320.00 701.28
0.0700 org Pekerja @ Rp. 97,400.00 6,818.00
0.0025 org Mandor @ Rp. 194,800.00 487.00
JUMLAH 24,369.48 45,052.50 69,421.98
DIBULATKAN 24,369.00 45,052.00 69,421.00

SNI 1.0000 m2 Pelaburan bidang kayu dengan politur


6.11 0.1500 ltr Politur @ Rp. 70,625.00 10,593.75
0.3720 ltr Politur jadi @ Rp. 70,625.00 26,272.50
2.0000 lbr Amplas @ Rp. 5,975.00 11,950.00
0.0600 org Tukang cat @ Rp. 155,840.00 9,350.40
0.0160 org Kepala tukang cat @ Rp. 175,320.00 2,805.12
0.0025 org Mandor @ Rp. 194,800.00 487.00
JUMLAH 12,642.52 48,816.25 61,458.77
DIBULATKAN 12,642.00 48,816.00 61,458.00

SNI 1.0000 m2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
6.14 0.1000 kg Plamir tembok @ Rp. 41,250.00 4,125.00
0.1000 kg Cat dasar @ Rp. 22,743.75 2,274.38
0.2600 kg Cat penutup 2 x @ Rp. 17,750.00 4,615.00
ANALISA SATUAN PEKERJAAN PENGECATAN
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
0.0630 org Tukang cat @ Rp. 155,840.00 9,817.92
0.0063 org Kepala tukang cat @ Rp. 175,320.00 1,104.52
0.0200 org Pekerja @ Rp. 97,400.00 1,948.00
0.0025 org Mandor @ Rp. 194,800.00 487.00
JUMLAH 13,357.44 11,014.38 24,371.81
DIBULATKAN 13,357.00 11,014.00 24,371.00

SNI 1.0000 m2 Pengecatan tembok tidak terlindung dari panas dan hujan
6.14 0.1000 kg Cat alkali resisting primer @ Rp. 26,562.50 2,656.25
0.3600 kg Cat ICI Weathershield @ Rp. 141,125.00 50,805.00
0.0630 org Tukang cat @ Rp. 155,840.00 9,817.92
0.0063 org Kepala tukang cat @ Rp. 175,320.00 1,104.52
0.0200 org Pekerja @ Rp. 97,400.00 1,948.00
0.0025 org Mandor @ Rp. 194,800.00 487.00
JUMLAH 13,357.44 53,461.25 66,818.69
DIBULATKAN 13,357.00 53,461.00 66,818.00

SNI 1.0000 m2 Pengecatan plafond baru (1 lapis plamir, 1 lapis cat dasar, 1 lapis cat penutup)
6.14 0.1100 kg Plamir tembok @ Rp. 41,250.00 4,537.50
0.1300 kg Cat tembok @ Rp. 26,562.50 3,453.13
0.3300 lbr Amplas @ Rp. 5,975.00 1,971.75
0.2000 org Tukang cat @ Rp. 155,840.00 31,168.00
0.0200 org Kepala tukang cat @ Rp. 175,320.00 3,506.40
0.1300 org Pekerja @ Rp. 97,400.00 12,662.00
0.0100 org Mandor @ Rp. 194,800.00 1,948.00
JUMLAH 49,284.40 9,962.38 59,246.78
DIBULATKAN 49,284.00 9,962.00 59,246.00
ANJALISA PEKERJAAN LISTRIK
No. Macam Pekerjaan Upah Bahan
(1) (2) (3) (4)

23. 1.0000 bh Pasang sekering khas dua grup


1.0000 bh Sekering khas dua grup @ Rp. 70,000.00 70,000.00
0.0500 org Tukang listrik @ Rp. 155,840.00 7,792.00
0.1000 org Pekerja @ Rp. 97,400.00 9,740.00
0.0250 org Mandor @ Rp. 194,800.00 4,870.00
JUMLAH 22,402.00 70,000.00
DIBULATKAN 22,402.00 70,000.00

1.0000 TITIK PASANG LAMPU XL 8 WATT


1.0000 Bh Fitting 35,000.00 35,000.00
1.0000 Bh Lampu Pijar XL-8 Watt 47,000.00 47,000.00
5.0000 M1 Kabel NYY 3x2½ 14,300.00 71,500.00
5.0000 M1 Pipa Paralon instalasi 5/8" 5,850.00 29,250.00
Bh Saklar 35,450.00 0.00
2.0000 Bh Isolator 17,825.00 35,650.00
1.0000 H/O Tukang Listrik 155,840.00 155,840.00
1.0000 TTK Instalasi 50,000.00 50,000.00
JUMLAH 268,400.00 155,840.00
DIBULATKAN 268,400.00 155,840.00

1.0000 TITIK PASANG LAMPU XL 18 WATT


1.0000 Bh Fitting 35,000.00 35,000.00
1.0000 Bh Lampu Pijar XL 18 Watt 58,000.00 58,000.00
5.0000 M1 Kabel NYY 3x2½ 14,300.00 71,500.00
5.0000 M1 Pipa Paralon instalasi 5/8" 5,850.00 29,250.00
Bh Saklar 35,450.00 0.00
2.0000 Bh Isolator 17,825.00 35,650.00
1.0000 H/O Tukang Listrik 155,840.00 155,840.00
1.0000 TTK Instalasi 50,000.00 50,000.00
JUMLAH 279,400.00 155,840.00
DIBULATKAN 279,400.00 155,840.00

1.0000 TITIK PASANG LAMPU TL 40 WATT


1.0000 Set Lampu TL 40 Watt + Box lampu 235,000.00 235,000.00
5.0000 M1 Kabel NYY 3x2½ 14,300.00 71,500.00
5.0000 M1 Pipa Paralon instalasi 5/8" 5,850.00 29,250.00
Bh Saklar 35,450.00 0.00
2.0000 Bh Isolator 17,825.00 35,650.00
1.0000 H/O Tukang Listrik 155,840.00 155,840.00
1.0000 TTK Instalasi 50,000.00 50,000.00
JUMLAH 421,400.00 155,840.00
DIBULATKAN 421,400.00 155,840.00

1.0000 TITIK PASANG STOP KONTAK


1.0000 Bh Stop Kontak 35,450.00 35,450.00
5.0000 M1 Kabel NYY 2x2½ 14,300.00 71,500.00
3.0000 M1 Pipa Paralon instalasi 5/8" 5,850.00 17,550.00
4.0000 Bh Isolator 17,825.00 71,300.00
0.8300 H/O Tukang Listrik 155,840.00 129,347.20
1.0000 TTK Instalasi 50,000.00 50,000.00
ANJALISA PEKERJAAN LISTRIK
No. Macam Pekerjaan Upah Bahan
(1) (2) (3) (4)
JUMLAH 245,800.00 129,347.20
DIBULATKAN 245,800.00 129,347.00
ANJALISA PEKERJAAN LISTRIK
No. Macam Pekerjaan Upah Bahan
(1) (2) (3) (4)

1.0000 TITIK PASANG SAKLAR TUNGGAL


1.0000 Bh Saklar Tunggal 35,450.00 35,450.00
5.0000 M1 Kabel NYY 2x2½ 14,300.00 71,500.00
3.0000 M1 Pipa Paralon instalasi 5/8" 5,850.00 17,550.00
4.0000 Bh Isolator 17,825.00 71,300.00
0.8300 H/O Tukang Listrik 155,840.00 129,347.20
1.0000 TTK Instalasi 50,000.00 50,000.00
JUMLAH 245,800.00 129,347.20
DIBULATKAN 245,800.00 129,347.00

1.0000 TITIK PASANG SAKLAR GANDA


1.0000 Bh Saklar Ganda 35,450.00 35,450.00
5.0000 M1 Kabel NYY 2x2½ 14,300.00 71,500.00
3.0000 M1 Pipa Paralon instalasi 5/8" 5,850.00 17,550.00
4.0000 Bh Isolator 17,825.00 71,300.00
0.8300 H/O Tukang Listrik 155,840.00 129,347.20
1.0000 TTK Instalasi 50,000.00 50,000.00
JUMLAH 245,800.00 129,347.20
DIBULATKAN 245,800.00 129,347.00
ANJALISA PEKERJAAN LISTRIK
Jumlah
(5)

92,402.00
92,402.00

424,240.00
424,240.00

435,240.00
435,240.00

577,240.00
577,240.00
ANJALISA PEKERJAAN LISTRIK
Jumlah
(5)
375,147.20
375,147.00
ANJALISA PEKERJAAN LISTRIK
Jumlah
(5)

375,147.20
375,147.00

375,147.20
375,147.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH KABUPATEN KEPULAUAN YAPEN

HARGA SATUAN
DISTRIK
NO URAIAN SATUAN KETERANGAN
YAPEN SELATAN
ZONA A (Rp.)

1 2 3 16

I UPAH KERJA
Mandor OH Harga di Lokasi
1 194,800.00
Kepala Tukang OH Harga di Lokasi
2 175,320.00
Tukang OH Harga di Lokasi
3 155,840.00
Pekerja Terlatih OH Harga di Lokasi
4 116,880.00
Pekerja Tidak Terlatih OH Harga di Lokasi
5 97,400.00
Operator OH Harga di Lokasi
6 194,800.00
Pembantu Operator OH Harga di Lokasi
7 175,320.00
Sopir OH Harga di Lokasi
8 155,840.00
Pembantu Sopir OH Harga di Lokasi
9 116,880.00
Mekanik OH Harga di Lokasi
10 175,320.00
Pembantu Mekanik OH Harga di Lokasi
11 155,840.00

II MATERIAL LOKAL
A BAHAN GALIAN
A.2 Cipta Karya / Analisa SNI
Pasir Beton (Sudah diayak ) M3 Harga di Lokasi
1 448,506.94
Pasir Pasang M3 Harga di Lokasi
2 448,506.94
Pasir Plester halus M3 Harga di Lokasi
3 418,506.94
Koral / Kerikil Beton (sudah diayak) M3 Harga di Lokasi
4 688,506.94
Batu Kali M3 Harga di Lokasi
5 328,506.94
Batu Karang / Gunung M3 Harga di Lokasi
6 328,506.94
Pasir Urug / Sirtu M3 Harga di Lokasi
7 388,506.94
Karang Urug M3 Harga di Lokasi
8 388,506.94
Tanah Urug M3 Harga di Lokasi
9 388,506.94
Batu Pecah 5 - 7 cm M3 Harga di Lokasi
10 528,506.94
Batu Pecah 3 - 5 cm M3 Harga di Lokasi
11 583,506.94
Batu Pecah 2 - 3 cm M3 Harga di Lokasi
12 583,506.94
Batu Pecah 1 - 2 cm M3 Harga di Lokasi
13 693,506.94
Batu Pecah 0,5 - 1 cm M3 Harga di Lokasi
14 693,506.94
Abu Batu M3 Harga di Lokasi
15 638,506.94
Batu Tela 17 x 24 x 7 cm Bh Harga di Lokasi
16 2,000.00

B BAHAN KAYU
Kayu Balok / Papan Klas III M3 Harga di Lokasi
1 2,452,857.14
Kayu Balok / Papan Klas II ( Matoa) M3 Harga di Lokasi
2 3,222,857.14
Papan Klas I ( Kayu Besi ) M3 Harga di Lokasi
3 5,642,857.14
Kayu Balok 5/10 & 10/10 ( Kayu Besi ) M3 Harga di Lokasi
4 4,322,857.14

III MATERIAL NON LOKAL


A Material Pengikat
Semen / PC 40 Kg (Tonasa) Kg Harga di Lokasi
1 1,875.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH KABUPATEN KEPULAUAN YAPEN

HARGA SATUAN
DISTRIK
NO URAIAN SATUAN KETERANGAN
YAPEN SELATAN
ZONA A (Rp.)

1 2 3 16
Semen Warna Kg Harga di Lokasi
2 15,000.00
Semen Putih Kg Harga di Lokasi
3 6,000.00

B Keramik / Porselin
Porselin 20 x20 warna M2 Harga di Lokasi
1 122,500.00
Mozaik 30x30 cm M2 Harga di Lokasi
2 110,600.00
Keramik 20 x 20 cm M2 Harga di Lokasi
3 80,000.00
Keramik 20 x 25 cm M2 Harga di Lokasi
4 85,000.00
Keramik 30 x 30 xm M2 Harga di Lokasi
5 90,000.00
Sealt Tape Bh Harga di Lokasi
13 6,675.00
Klosed Jongkok INA Bh Harga di Lokasi
14 436,562.50
Klosed Duduk INA & Assesoris Bh Harga di Lokasi
15 2,331,250.00
Urinoir Porselin & Assesoris Bh -
16
Floor Drain KM/WC Kuningan Bh Harga di Lokasi
17 40,000.00
Floor Drain Bak KM Bh Harga di Lokasi
18 20,000.00

C Kayu Lapis
Tripleks 3 mm Lbr Harga di Lokasi
1 83,250.00
Tripleks 4 mm Lbr Harga di Lokasi
2 101,208.33
Triplek 6 mm Lbr
3 219,375.00
Tripleks 9 mm Lbr Harga di Lokasi
4 220,077.70

D Besi Beton , Kawat dan Paku


Besi Beton (Polos) U24 Kg Harga di Lokasi
1 16,592.57
Besi Beton (Ulir) U32 Kg Harga di Lokasi
2 19,701.18
Kawat Ikat Beton Kg Harga di Lokasi
3 31,850.00
Paku Triplek Kg Harga di Lokasi
12 35,375.00
Paku 3, 5, 7, 10, 12 Kg Harga di Lokasi
13 29,500.00
Paku Jembatan Kg Harga di Lokasi
14 29,500.00
Paku Seng Kg Harga di Lokasi
15 35,375.00
Paku Iternit Kg Harga di Lokasi
16 41,250.00
Paku Ardek Kg Harga di Lokasi
17 4,825.00

E Bahan Atap
Seng Gelombang Warna BJLS 25 Lbr Harga di Lokasi
1 83,250.00
Seng Plat BJLS 30 Lbr Harga di Lokasi
2 83,250.00
Seng Gelombang BJLS 20 Lbr Harga di Lokasi
3 65,458.33
Seng Plat BJLS 20 Lbr Harga di Lokasi
4 71,333.33
Talang Seng BJLS 20 lebar 40 cm M Harga di Lokasi
5 33,066.67
Talang Seng BJLS 30 lebar 40 cm M Harga di Lokasi
6 44,816.67
Talang Seng BJLS 20 lebar 80 cm M Harga di Lokasi
7 47,333.33
Talang Seng BJLS 30 lebar 80 cm M Harga di Lokasi
8 82,583.33
Atap Seng Alumunium Tebal 0,25 mm Lbr Harga di Lokasi
9 82,750.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH KABUPATEN KEPULAUAN YAPEN

HARGA SATUAN
DISTRIK
NO URAIAN SATUAN KETERANGAN
YAPEN SELATAN
ZONA A (Rp.)

1 2 3 16
Atap Alumunium tebal 0,55 mm Lbr Harga di Lokasi
10 82,750.00
Atap Seng Galvalum 0,25 mm Lbr Harga di Lokasi
11 88,625.00

F Cat / Minyak
Cat Kilap Kayu Kg Harga di Lokasi
1 58,875.00
Cat Besi Kg Harga di Lokasi
2 58,875.00
Teak Oil Kg Harga di Lokasi
3 53,000.00
Vernis Kg Harga di Lokasi
4 76,500.00
Pelitur Kg Harga di Lokasi
5 70,625.00
Residu / Teer Kg Harga di Lokasi
6 45,950.00
Aspal Kg Harga di Lokasi
7 16,575.00
Minyak Solar Ltr Harga di Lokasi
8 7,703.75
Premium Ltr Harga di Lokasi
9 8,056.25
Minyak Tanah Ltr Harga di Lokasi
10 8,232.50
Pelumas/Oli Ltr Harga di Lokasi
11 47,125.00
Minyak Bekesting Ltr Harga di Lokasi
12 29,500.00
Minyak Cat Ltr Harga di Lokasi
13 53,000.00
Meni Kayu Kg Harga di Lokasi
14 41,250.00
Meni Besi Kg Harga di Lokasi
15 41,250.00
Cat Tembok Merk Kunci Mas Kg Harga di Lokasi
16 17,750.00
Cat Tembok Merk Fukuda Kg Harga di Lokasi
17 11,875.00
Cat Tembok Merk Altex Biasa Kg Harga di Lokasi
18 22,743.75
Cat Tembok Merk Altex Bintang Kg Harga di Lokasi
19 26,562.50
Cat Tembok Merk Marlin Kg Harga di Lokasi
20 14,812.50
Cat Tembok Merk Dulux Pentalite Kg Harga di Lokasi
21 117,625.00
Cat Tembok Merk Dulux Wheater shield Kg Harga di Lokasi
22 141,125.00
Cat Genteng Kg Harga di Lokasi
23 58,875.00
Dempul Kayu Kg Harga di Lokasi
26 41,250.00
Ampelas Kayu Lbr Harga di Lokasi
27 5,975.00
Plamur Tembok Kg Harga di Lokasi
28 41,250.00
Lem Kayu / Fox Kg Harga di Lokasi
29 49,475.00

G Instalasi Lampu
Lampu TL 20 Watt + Box Bh Harga di Lokasi
1 140,000.00
Lampu TL 40 Watt + Box Bh Harga di Lokasi
2 235,000.00
Lampu Xl 8 Watt ( SNI ) Bh Harga di Lokasi
3 47,000.00
Lampu Xl 14 Watt ( SNI ) Bh Harga di Lokasi
4 53,000.00
Lampu Xl 18 Watt ( SNI ) Bh Harga di Lokasi
5 58,000.00
Lampu Xl 23 Watt ( SNI ) Bh Harga di Lokasi
6 88,000.00
Lampu Xl 40 Watt ( SNI ) Bh Harga di Lokasi
7 235,000.00
Vitting Lampu Tempel / Putih Bh Harga di Lokasi
8 35,000.00
Vitting Lampu Gantung / Hitam Bh Harga di Lokasi
9 11,950.00
Saklar Dinding Tunggal Bh Harga di Lokasi
10 35,450.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH KABUPATEN KEPULAUAN YAPEN

HARGA SATUAN
DISTRIK
NO URAIAN SATUAN KETERANGAN
YAPEN SELATAN
ZONA A (Rp.)

1 2 3 16
Saklar Dinding Dobel Bh Harga di Lokasi
11 35,450.00
Stop Kontak Dinding Bh Harga di Lokasi
12 35,450.00
Sekring Kas Lokal 1 Grup Bh Harga di Lokasi
13 41,000.00
Sekring Kas Lokal 2 Grup Bh Harga di Lokasi
14 70,000.00
Sekring Kas Lokal 3 Grup Bh Harga di Lokasi
15 105,000.00
Kabel Serat Tunggal 2 x 1 mm M Harga di Lokasi
16 11,950.00
Kabel Serat Tunggal 2 x 1,5 mm M Harga di Lokasi
17 11,950.00
Kabel Serat Tunggal 2 x 2 mm M Harga di Lokasi
18 14,300.00
Kabel Serat Tunggal 2 x 2,5 mm M Harga di Lokasi
19 14,300.00
Kabel Serat Serabut 2 x 1 mm M Harga di Lokasi
20 8,425.00
Kabel Serat Serabut 2 x 1,5 mm M Harga di Lokasi
21 11,950.00
Kabel Serat Serabut 2 x 2 mm M Harga di Lokasi
22 11,950.00
Klamp Kabel Pak Harga di Lokasi
23 29,575.00
Isolatipe Bh Harga di Lokasi
24 17,825.00
M Harga di Lokasi
25 Pipa listrik Ø 5/8" - 4 m 5,850.00
Harga di Lokasi
26 Instalasi Titik 50,000.00

H Aksesoris Pintu dan Jendela


Kunci Pintu 2 Slag Kecil Bh Harga di Lokasi
1 85,000.00
Kunci Pintu 2 Slag Besar Bh Harga di Lokasi
2 125,000.00
Kunci Pintu Bulat Bh Harga di Lokasi
3 75,000.00
Engsel Pintu ring Nilon Bh Harga di Lokasi
4 20,000.00
Rangka Jendela Lover / Nako 8 Klip + Terali Set Harga di Lokasi
11 304,000.00
Rangka Jendela Lover / Nako 7 Klip + Terali Set Harga di Lokasi
12 279,000.00

I Instalasi Air Minum dan Aksesoris


Pipa PVC 1/2" M' Harga di Lokasi
21 10,481.25
Pipa PVC 3/4" M' Harga di Lokasi
22 12,000.00
Pipa PVC 1" M' Harga di Lokasi
23 15,020.83
Pipa PVC 1,5" M' Harga di Lokasi
24 23,900.00
Pipa PVC 2" M' Harga di Lokasi
25 39,187.50
Pipa PVC 3" M' Harga di Lokasi
26 59,250.00
Pipa PVC 4" M' Harga di Lokasi
27 88,713.24
Pipa PVC 5" M'
28 44,895.83
Tee PVC 1/2" Bh Harga di Lokasi
36 6,075.00
Tee PVC 3/4" Bh Harga di Lokasi
37 7,250.00
Tee PVC 1" Bh Harga di Lokasi
38 8,425.00
Tee PVC 1,5" Bh Harga di Lokasi
39 17,825.00
Tee PVC 2" Bh Harga di Lokasi
40 23,700.00
Tee PVC 3" Bh Harga di Lokasi
41 29,575.00
Tee PVC 4" Bh Harga di Lokasi
42 41,325.00
Sock 1/2" Pipa GIP Bh Harga di Lokasi
43 11,950.00
Sock 3/4" Pipa GIP Bh Harga di Lokasi
44 17,825.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH KABUPATEN KEPULAUAN YAPEN

HARGA SATUAN
DISTRIK
NO URAIAN SATUAN KETERANGAN
YAPEN SELATAN
ZONA A (Rp.)

1 2 3 16
Sock 1" Pipa GIP Bh Harga di Lokasi
45 17,825.00
Sock 1,5" Pipa GIP Bh Harga di Lokasi
46 41,325.00
Sock 2" Pipa GIP Bh Harga di Lokasi
47 53,075.00
Sock 3" Pipa Gip Bh Harga di Lokasi
48 152,950.00
Sock 4" Pipa GIP Bh Harga di Lokasi
49 176,450.00
Sock 1/2" Pipa PVC Bh Harga di Lokasi
50 217,575.00
Sock 3/4" Pipa PVC Bh Harga di Lokasi
51 6,075.00
Sock 1" Pipa PVC Bh Harga di Lokasi
52 8,425.00
Sock 1,5" Pipa PVC Bh Harga di Lokasi
53 15,475.00
Sock 2" Pipa PVC Bh Harga di Lokasi
54 15,475.00
Sock 3" Pipa PVC Bh Harga di Lokasi
55 23,700.00
Sock 4" Pipa PVC Bh Harga di Lokasi
56 41,325.00
Keni 1/2" Pipa PVC Bh Harga di Lokasi
65 6,075.00
Keni 3/4" Pipa PVC Bh Harga di Lokasi
66 8,425.00
Keni 1" Pipa PVC Bh Harga di Lokasi
67 11,950.00
Keni 1,5" Pipa PVC Bh Harga di Lokasi
68 15,475.00
Keni 2" Pipa PVC Bh Harga di Lokasi
69 17,825.00
Keni 3" Pipa PVC Bh Harga di Lokasi
70 29,575.00
Keni 4" Pipa PVC Bh Harga di Lokasi
71 41,325.00
Keni 5" Pipa PVC Bh
72 35,450.00
Kran Air Ø 1/2" Bh Harga di Lokasi
73 41,325.00
Kran Air Ø 3/4" Bh Harga di Lokasi
74 58,950.00
Kran Air Ø 1" Bh
75 47,200.00
Kran Air Ø 1,5" Bh
76 41,325.00
Kran Air Ø 2" Bh
77 58,950.00
Kran Air wastefel Bh -
Assesoris Pipa Set
78 1,116,450.00
Lem Pipa PVC Bh Harga di Lokasi
79 14,300.00
Sealtipe Pipa Bh Harga di Lokasi
80 6,075.00

Anda mungkin juga menyukai