A PAGAR KELILING
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6 = (4 x 5)
I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi M2 800.00 17,136.00 13,708,800.00
2 Pas. Bouwplank M' 800.00 84,811.00 67,848,800.00
3 Pembuatan Direksi Keet M2 12.00 2,166,557.00 25,998,684.00
4 Papan Nama Proyek Bh 1.00 1,163,867.00 1,163,867.00
5 Dokumentasi Proyek Ls 3.00 500,000.00 1,500,000.00
Sub Total 110,220,151.00
II PEKERJAAN TANAH DAN PASIR
1 Pekerjaan Galian Pondasi M3 480.00 41,126.00 19,740,480.00
2 Urugan kembali 1/4 Galian M3 120.00 19,706.00 2,364,720.00
3 Urugan Pasir Bawah Pondasi M 3
24.00 575,817.00 13,819,608.00
Sub Total 35,924,808.00
III PEKERJAAN STRUKTUR DAN PASANGAN BATU
1 Pas. Batu Kosongan M3 95.28 818,492.00 77,985,917.76
2 Pasangan Pondasi Camp. 1 : 4 M3 283.29 1,506,513.00 426,780,067.77
3 Pekerjaan Sloof 15/20 M3 23.82 7,692,053.00 183,224,702.46
4 Pekerjaan Kolom 30/30 M 3
36.00 7,903,412.00 284,522,832.00
5 Pekerjaan Kolom Hias Pagar Depan M 3
9.37 7,903,412.00 74,021,874.90
6 Pas. Batu Tela Camp. 1 : 3 Penebalan Kolom Hias M 2
66.00 258,155.00 17,038,230.00
7 Pekerjaan Ringbalk 15/20 M 3
18.00 8,879,983.00 159,839,694.00
8 Pekerjaan ringbalk praktis 10/15 M' 194.00 114,071.07 22,129,787.58
9 Pas. Batu Tela Camp. 1 : 3 M2 1,029.70 258,155.00 265,822,203.50
10 Pekerjaan Plesteran dinding Camp. 1 : 3 M 2
2,125.40 86,105.00 183,007,567.00
11 Pekerjaan Acian dinding M 2
2,125.40 22,210.00 47,205,134.00
12 Pekerjaan Pagar Besi Hollow M' 120.00 1,500,000.00 180,000,000.00
13 Pekerjaan Pintu Pagar Besi Hollow Unit 2.00 9,000,000.00 18,000,000.00
Sub Total 1,939,578,010.97
1 Pengecatan Dinding Luar M2 2,125.40 85,298.00 181,292,369.20
2 Pengecatan Ukiran Kolom Depan Bh 70.00 300,000.00 21,000,000.00
Sub Total 202,292,369.20
XI PEKERJAAN AKHIR
1 Pembersihan Sisa Proyek Ls 1.00 1,000,000.00 1,000,000.00
Sub Total 1,000,000.00
OWNER ESTIMATE
( OE )
PROGRAM : -
PEKERJAAN : PEMBANGUNAN PAGAR KELILING DAN PAPAN NAMA KANTOR BUPATI
LOKASI : BOTAWA, DISTRIK OUDATE-KABUPATEN WAROPEN
T/A : 2014
A PAGAR KELILING
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SAT VOLUME
( Rp ) ( Rp )
1 2 3 4 5 6 = (4 x 5)
I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi M2 858.00 17,136.00 14,702,688.00
2 Pas. Bouwplank M' 143.00 84,811.00 12,127,973.00
Sub Total 26,830,661.00
II PEKERJAAN TANAH DAN PASIR
1 Urugan Pasir Bawah Paving Blok M3 24.00 575,817.00 13,819,608.00
2 Pekerjaan Galian Kaki Kerb M 3
2.86 41,126.00 117,414.73
Sub Total 13,937,022.73
III PEKERJAAN PASANGAN
1 Pas. Kerb Beton tak Bertulang Camp. 1 : 3 : 5 M' 285.50 180,308.00 51,477,934.00
2 Pasang Paving Blok uk. 10x20x6 cm M 2
858.00 317,430.00 272,354,940.00
Sub Total 323,832,874.00
XI PEKERJAAN AKHIR
1 Pembersihan Sisa Proyek Ls 1.00 500,000.00 500,000.00
Sub Total 500,000.00
REKAPITULASI
A PEKERJAAN PAGAR KELILING
I PEKERJAAN PERSIAPAN 110,220,151.00
II PEKERJAAN TANAH DAN PASIR 35,924,808.00
III PEKERJAAN STRUKTUR DAN PASANGAN BATU 1,939,578,010.97
IV PEKERJAAN PENGECATAN 202,292,369.20
V PEKERJAAN AKHIR 1,000,000.00
TERBILANG : Tiga Milyar Seratus Dua Puluh Tiga Juta Sembilan Ratus Delapan Ribu Rupiah
………………………………………….. …………………………………..
NIP. …………………………….. Ka. Perwakilan
MENGETAHUI :
KEPALA DINAS PEKERJAAN UMUM DAN PERUMAHAN
KABUPATEN WAROPEN
PEKERJAAN BETON
SNI 1.0000 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
6.13 336.0000 kg PC @ Rp. 3,022.92 1,015,699.98
0.5400 m 3
Pasir beton @ Rp. 491,666.67 265,500.00
0.8100 m3 Kerikil beton @ Rp. 512,058.82 414,767.64
0.2750 org Tukang batu @ Rp. 137,088.00 37,699.20
0.0275 org Kepala tukang batu @ Rp. 154,224.00 4,241.16
1.6500 org Pekerja @ Rp. 85,680.00 141,372.00
0.0825 org Mandor @ Rp. 171,360.00 14,137.20
JUMLAH 197,449.56 1,695,967.62 1,893,417.18
DIBULATKAN 197,449.00 1,695,967.00 1,893,417.00
1.0000 m2 Membuat lantai beton tanpa tulangan, 1 Pc : 3 Ps : 6 Kr tebal 7 cm dan finishing plester
18.2000 kg PC @ Rp. 3,022.92 55,017.08
0.0440 m3 Pasir pasang @ Rp. 535,000.00 23,540.00
0.0700 m 3
Kerikil beton @ Rp. 512,058.82 35,844.12
0.1350 org Tukang batu @ Rp. 137,088.00 18,506.88
0.0135 org Kepala tukang batu @ Rp. 154,224.00 2,082.02
0.7200 org Pekerja @ Rp. 85,680.00 61,689.60
0.0360 org Mandor @ Rp. 171,360.00 6,168.96
JUMLAH 88,447.46 114,401.20 202,848.66
DIBULATKAN 88,447.00 114,401.00 202,848.00
1.0000 m3 Ring Balok Beton Bertulang Camp. 1 : 2 : 3 uk. 15x20 cm pembesian 105 kg
1.0000 m3 Beton Camp. 1 ; 2 : 3 @ Rp. 1,893,417.00 1,893,417.00
105.0000 kg Besi Beton @ Rp. 25,063.00 2,631,615.00
18.3300 m2 Papan Bekisting @ Rp. 237,586.00 4,354,951.38
JUMLAH 8,879,983.38
DIBULATKAN 8,879,983.00
1.0000 m3 Ring Balok Beton Bertulang Camp. 1 : 2 : 3 uk. 10x30 cm pembesian 110 kg
1.0000 m3 Beton Camp. 1 ; 2 : 3 @ Rp. 1,893,417.00 1,893,417.00
110.0000 kg Besi Beton @ Rp. 25,063.00 2,756,930.00
10.0000 m2 Papan Bekisting @ Rp. 237,586.00 2,375,860.00
JUMLAH 7,026,207.00
DIBULATKAN 7,026,207.00
ANALISA SATUAN PEKERJAAN
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
PEKERJAAN PERSIAPAN
SNI 1.0000 m1 Pengukuran dan pemasangan bouwplank untuk gedung dan saluran
6.4 0.0120 m3 Kayu meranti 5/7 @ Rp. 3,127,500.00 37,530.00
03-2835-2002 0.0200 kg Paku reng @ Rp. 35,636.25 712.73
0.0070 m3 Kayu meranti papan 3/20 @ Rp. 3,127,500.00 21,892.50
0.1000 org Tukang kayu @ Rp. 137,088.00 13,708.80
0.0100 org Kepala tukang kayu @ Rp. 154,224.00 1,542.24
0.1000 org Pekerja @ Rp. 85,680.00 8,568.00
0.0050 org Mandor @ Rp. 171,360.00 856.80
JUMLAH 24,675.84 60,135.23
DIBULATKAN 24,675.00 60,135.00
SNI 1.0000 m1 Pembuatan pagar sementara dari seng gelombang tinggi 2 meter
6.2 1.2500 btg Dolken kayu Ø 8 - 10/400 cm @ Rp. 58,984.38 73,730.47
03-2835-2002 2.5000 kg PC @ Rp. 3,022.92 7,557.29
1.2000 lbr Seng gelombang 2"-5" BJLS 24 @ Rp. 85,312.50 102,375.00
0.0050 m3 Pasir beton @ Rp. 1,155,000.00 5,775.00
0.0090 m3 Kerikil beton @ Rp. 512,058.82 4,608.53
0.0250 m3
Kaso 5/7 kayu meranti @ Rp. 3,127,500.00 78,187.50
0.0600 kg Paku biasa 2" - 5" @ Rp. 35,636.25 2,138.18
0.4000 kg Meni besi @ Rp. 99,620.00 39,848.00
0.2000 org Tukang kayu @ Rp. 137,088.00 27,417.60
0.0200 org Kepala tukang kayu @ Rp. 154,224.00 3,084.48
0.4000 org Pekerja @ Rp. 85,680.00 34,272.00
0.0200 org Mandor @ Rp. 171,360.00 3,427.20
JUMLAH 68,201.28 314,219.96
DIBULATKAN 68,201.00 314,219.00
PEKERJAAN TANAH
SNI 1.0000 m3 Galian tanah biasa sedalam sampai 1 meter
6.1 0.4000 org Pekerja @ Rp. 85,680.00 34,272.00
0.0400 org Mandor @ Rp. 171,360.00 6,854.40
JUMLAH 41,126.40
DIBULATKAN 41,126.00
84,811.07
84,811.00
17,136.00
17,136.00
1,163,867.47
1,163,867.00
648,118.57
648,118.00
Jumlah
(5)
2,166,557.84
2,166,557.00
382,421.24
382,421.00
41,126.40
41,126.00
54,081.22
54,081.00
75,569.76
75,569.00
64,174.32
64,174.00
Jumlah
(5)
128,520.00
128,520.00
84,737.52
84,737.00
29,988.00
29,988.00
52,778.88
52,778.00
23,133.60
23,133.00
19,706.40
19,706.00
23,133.60
23,133.00
575,817.60
575,817.00
388,617.60
388,617.00
Jumlah
(5)
766,704.00
766,704.00
ANALISA SATUAN PEKERJAAN BATU DAN PASANGAN
No. Macam Pekerjaan Upah Bahan
(1) (2) (3) (4)
PEKERJAAN PASANGAN
10.0000 m' Selokan pas. Batu tela camp. 1 : 3 uk. 25x25 cm diplester camp. 1 : 3
111.0000 Bh Batu tela @ Rp. 6,983.87 775,209.57
0.2100 m3 Pasir @ Rp. 535,000.00 112,350.00
44.8000 kg Semen PC @ Rp. 3,022.92 135,426.66
8.5000 m2 Plesteran @ Rp. 86,105.00 731,892.50
1.1250 org Tukang batu @ Rp. 137,088.00 154,224.00
0.1900 org Kep. Tk. Batu @ Rp. 154,224.00 29,302.56
3.1500 org Pekerja @ Rp. 85,680.00 269,892.00
0.1690 org Mandor @ Rp. 171,360.00 28,959.84
JUMLAH 482,378.40 1,754,878.73
DIBULATKAN 482,378.00 1,754,878.00
1.0000 m' Selokan pas. Batu tela camp. 1 : 3 uk. 25x25 cm diplester camp. 1 : 3
Jumlah
(5)
818,492.50
818,492.00
1,506,513.65
1,506,513.00
386,593.68
386,593.00
258,155.23
258,155.00
516,310.00
Jumlah
(5)
790,893.22
790,893.00
99,064.99
99,064.00
68,145.33
68,145.00
86,105.36
86,105.00
18,877.79
18,877.00
46,517.61
46,517.00
Jumlah
(5)
60,860.44
60,860.00
22,210.41
22,210.00
535,955.71
535,955.00
163,229.87
163,229.00
317,430.23
317,430.00
Jumlah
(5)
156,691.01
156,691.00
156,691.01
156,691.00
156,691.01
156,691.00
156,691.01
156,691.00
1,839,628.69
1,839,628.00
Jumlah
(5)
1,124,691.01
1,124,691.00
2,237,257.13
2,237,257.00
223,725.70
ANALISA SATUAN PEKERJAAN SANITAIR
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
PEKERJAAN SANITASI
SNI 1.0000 bh Memasang kloset duduk/monoblock
1.0000 bh Kloset duduk / monoblock @ Rp. 1,455,300.00 1,455,300.00
6.1 6% x Harga kloset (Perlengkapan) @ Rp. 1,455,300.00 87,318.00
1.1000 org Tukang batu @ Rp. 137,088.00 150,796.80
0.0010 org Kepala tukang batu @ Rp. 154,224.00 154.22
3.3000 org Pekerja @ Rp. 85,680.00 282,744.00
0.1600 org Mandor @ Rp. 171,360.00 27,417.60
JUMLAH 461,112.62 1,542,618.00 2,003,730.62
DIBULATKAN 461,112.00 1,542,618.00 2,003,730.00
Analisa Gedung - 32
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
1.2000 m1 Pipa PVC @ Rp. 13,387.00 16,064.40
6.25 35% x Harga pipa (Perlengkapan) @ Rp. 13,387.00 4,685.45
0.0600 org Tukang batu @ Rp. 137,088.00 8,225.28
0.0060 org Kepala tukang batu @ Rp. 154,224.00 925.34
0.0360 org Pekerja @ Rp. 85,680.00 3,084.48
0.0018 org Mandor @ Rp. 171,360.00 308.45
JUMLAH 12,543.55 20,749.85 33,293.40
DIBULATKAN 12,543.00 20,749.00 33,293.00
Analisa Gedung - 33
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
0.0018 org Mandor @ Rp. 171,360.00 308.45
JUMLAH 12,543.55 103,230.00 115,773.55
DIBULATKAN 12,543.00 103,230.00 115,773.00
Analisa Gedung - 35
ANALISA SATUAN PEKERJAAN PENGECATAN
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
PEKERJAAN CAT-CATAN
SNI 1.0000 m2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
6.14 0.1000 kg Plamir tembok @ Rp. 41,621.50 4,162.15
0.1000 kg Cat dasar @ Rp. 22,375.00 2,237.50
0.2600 kg Cat penutup 2 x @ Rp. 22,375.00 5,817.50
0.0630 org Tukang cat @ Rp. 137,088.00 8,636.54
0.0063 org Kepala tukang cat @ Rp. 154,224.00 971.61
0.0200 org Pekerja @ Rp. 85,680.00 1,713.60
0.0025 org Mandor @ Rp. 171,360.00 428.40
JUMLAH 11,750.16 12,217.15 23,967.31
DIBULATKAN 11,750.00 12,217.00 23,967.00
SNI 1.0000 m2 Pengecatan tembok tidak terlindung dari panas dan hujan
6.14 0.1000 kg Cat alkali resisting primer @ Rp. 89,692.50 8,969.25
0.3600 kg Cat ICI Weathershield @ Rp. 179,385.00 64,578.60
0.0630 org Tukang cat @ Rp. 137,088.00 8,636.54
0.0063 org Kepala tukang cat @ Rp. 154,224.00 971.61
0.0200 org Pekerja @ Rp. 85,680.00 1,713.60
0.0025 org Mandor @ Rp. 171,360.00 428.40
JUMLAH 11,750.16 73,547.85 85,298.01
DIBULATKAN 11,750.00 73,547.00 85,298.00
ANALISA SATUAN PEKERJAAN KAYU
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
PEKERJAAN PLAFOND
PEKERJAAN LISPLANK
SNI 1.000 m1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu kelas I
0.009 m3 Kayu kls. I papan @ Rp. 4,220,000.00 36,292.00
03-3434-2002 0.060 kg Paku biasa 2" - 5" @ Rp. 35,636.25 2,138.18
0.100 OH Tukang kayu @ Rp. 137,088.00 13,708.80
0.010 OH Kepala tukang kayu @ Rp. 154,224.00 1,542.24
0.100 OH Pekerja @ Rp. 85,680.00 8,568.00
0.005 OH Mandor @ Rp. 171,360.00 856.80
JUMLAH ( BELUM PPN ) 24,675.84 38,430.18 63,106.02
DIBULATKAN 24,675.00 38,430.00 63,106.00
PEKERJAAN TALANG
SNI 1.000 m1 Pasang talang datar, seng BJLS 30, papan kayu kelas II
6.18 0.500 lbr Seng plat 3' x 6' BJLS 30 @ Rp. 101,350.00 50,675.00
0.015 kg Paku biasa 1/2" - 1" @ Rp. 35,636.25 534.54
0.010 m 3
Kayu kls. II papan @ Rp. 3,127,500.00 30,024.00
0.400 OH Tukang kayu @ Rp. 137,088.00 54,835.20
0.025 OH Kepala tukang kayu @ Rp. 154,224.00 3,855.60
0.150 OH Pekerja @ Rp. 85,680.00 12,852.00
0.001 OH Mandor @ Rp. 171,360.00 214.20
JUMLAH ( BELUM PPN ) 71,757.00 81,233.54 152,990.54
DIBULATKAN 71,757.00 81,233.00 152,990.00
PEKERJAAN ATAP
SNI 1.000 m2 Pasang atap Superdek 6 kaki
6.21 0.870 Lbr Superdeks @ Rp. 138,600.00 120,582.00
03-3436-2002 0.025 Kg Paku Ardeks @ Rp. 45,475.00 1,136.88
0.067 OH Tukang kayu @ Rp. 137,088.00 9,184.90
0.007 OH Kepala tukang kayu @ Rp. 154,224.00 1,079.57
0.140 OH Pekerja @ Rp. 85,680.00 11,995.20
0.007 OH Mandor @ Rp. 171,360.00 1,199.52
JUMLAH 23,459.18 121,718.88 145,178.06
DIBULATKAN 23,459.00 121,718.00 145,178.00
SNI 1.000 m2 Pasang atap Seng gelombang BJLS 30
6.21 0.870 Lbr Seng gelombang BJLS 30 @ Rp. 89,350.00 77,734.50
03-3436-2002 0.025 Kg Paku seng @ Rp. 44,406.25 1,110.16
0.067 OH Tukang kayu @ Rp. 137,088.00 9,184.90
0.007 OH Kepala tukang kayu @ Rp. 154,224.00 1,079.57
0.140 OH Pekerja @ Rp. 85,680.00 11,995.20
0.007 OH Mandor @ Rp. 171,360.00 1,199.52
JUMLAH 23,459.18 78,844.66 102,303.84
DIBULATKAN 23,459.00 78,844.00 102,303.00
SNI 1.000 m1 Pasang nok Seng plat BJLS 30
6.22 0.380 Lbr Seng Plat BJLS 30 @ Rp. 41,800.00 15,884.00
03-3436-2002 0.004 M3 Kayu Matoa @ Rp. 3,127,500.00 12,510.00
0.020 Kg Paku Seng @ Rp. 44,406.25 888.13
0.125 OH Tukang kayu @ Rp. 137,088.00 17,136.00
0.013 OH Kepala tukang kayu @ Rp. 154,224.00 2,004.91
0.084 OH Pekerja @ Rp. 85,680.00 7,197.12
0.004 OH Mandor @ Rp. 171,360.00 685.44
JUMLAH 27,023.47 29,282.13 56,305.60
DIBULATKAN 27,023.00 29,282.00 56,305.00
123,530.40
123,530.00
683,028.00
683,028.00
721,153.00
721,153.00
763,228.00
763,228.00
389,547.04
(5)
389,547.00
387,110.04
387,110.00
390,235.04
390,235.00
DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE
SUB DINAS BINA MARGA MEMBUAT PARIT K110
KABUPATEN WAROPEN (MENGGUNAKAN BURUH)
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
PAPUA WAROPEN ( 10 ) CV. MADYA Consultant MEI. 2007
PROSES : ANGGAPAN :
1. Gali parit dengan tenaga manusia 1. Menggunakan tenaga manusia ( 100 m/hari)
2. Membuang sisa galian menggunaka 2. Dimensi parit : lebar bawah : 0,5 m
truk bak terbuka lebar atas : 1.3 m
kedalaman : 0,6 m ( vol: 0,54 m3 )
3. 25 % hasil galian dibuang setempat
4. Sisa galian dibuang sejauh 2 km
5. Menggali dan membuang dihitung 1, 5 m3/org-hari
6. umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
PEKERJA 3,769,920
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 475,200
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
PEKERJA 3,512,880
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 54,076,110
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
P Truk bak terbuka 3,5 t/115 HP 1 1 E221 6.00 280,001 1,680,008
E
R
A
L
A
T
A
N
PERALATAN 1,680,008
TOTAL 59,268,999
PEKERJA 4,284,000.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit) (Rp.) (Rp.)
MATERIAL 633,600.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
P
E
R
A
L
A
T
A
N
PERALATAN 0.00
TOTAL 4,917,600.00
PEKERJA 2,741,760.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 396,000.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
P
E
R
A
L
A
T
A
N
N PERALATAN 0.00
TOTAL 3,137,760.00
PEKERJA 1,388,016.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 65,860,800.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
PEKERJA 1,645,056.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 181,678,248.44
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
MATERIAL 144,622,786.05
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
PEKERJA 8,396,640.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 188,622,647.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
P
E Mesin gilas 3RD 6-8 ton 1 1 E080 13.00 102,969.45 1,338,602.81
R
A
L
A
T
A
N
PERALATAN 1,338,602.81
TOTAL 198,357,889.81
|::
DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE
SUB DINAS BINA MARGA LAPIS PONDASI ATAS MENGGUNAKAN KARANG DARI SERUI K522
KABUPATEN PANGKEP (MENGGUNAKAN ALAT)
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
SUL-SEL PANGKEP CV. MADYA Consultant
PROSES : ANGGAPAN :
1. Kerikil tersaring ditimbun disepanjang 1. Menggunakan alat berat (150 m3/hari)
jalan oleh pemasok 2. Material ditimbun disepanjang jalan oleh pemasok
2. Grader menghampar agregat 3. Dikirim kerikil galian/sungai tersaring yang murah
3. Jalan disiram air dengan truk air 4. Dihampar dan dipadatkan sampai tebal padat 10 cm
4. Pemadatan dengan mesin gilas 6-8 ton 5. Dihampar dan dipadatkan 1000 m2/hari; koefisien pemadatan = 1,25
6. Gradasi Macadam 75 mm dan agregat halus semua harus melalui saringan 9,5 mm
sesuai rev. spek umum B.M 1989-Buku 3
PEKERJA 1,559,376.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 157,856,700.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
PEKERJA 21,231,504.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOLUME SATUAN Rp. (Rp.) (Rp.)
MATERIAL 284,086,109.63
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
|::
DINAS PEKERJAAN UMUM ANALISA HARGA SATUAN KODE
SUB DINAS BINA MARGA PENGHAMPARAN LAPIS PERMUKAAN ASPAL BETON LASTON (4 cm) K 6 4 1
KABUPATEN PANGKEP (MENGGUNAKAN ALAT)
PROPINSI : KODE KABUPATEN : KODE DISIAPKAN OLEH ; TANGGAL :
SUL-SEL ( 73 ) PANGKEP ( 10 ) CV. MADYA Consultant
PROSES ANGGAPAN :
PEKERJA 4,026,960
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 131,616,896
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
Pengisian
1. material sampai kebin spreader 1. Menggunakan alat berat 1500m2/hari
oleh pemasok 2. Hot Rolled Sheet (LATASTON) dikirim kelokasi pakerjaan oleh pemasok dari AMP
Material
2. dihampar dgn mesin spreader, 3. Tebal padat rata-rata 3 cm
dipadatkan dengan mesin gilas roda 4. BJ LATASTON padat 2,2 ton/m3
baja dan mesin gilas pneumatic 5. Sesuai Spek.B.M.No. 12/PT/B/1983 (tabel 3,3) rev.spek. Umum B.M.
roda karet
Hamparkan
3 lapis tack/pangikat aspal
cutback @ 0,5 m/m2
PEKERJA 3,255,840
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 172,056,535
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
PEKERJA 1,610,784.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 1,459,845.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
P
E
R
A
L
A
T
A
N
PERALATAN
TOTAL 3,070,629.00
VOLUME : 20.00 SATUAN : m2 HARGA SATUAN Rp. 153,531.45 Per M2
PEKERJA 685,440.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 4,927,567.50
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
P
E
R
A
L
A
T
A
N
PERALATAN
TOTAL 5,613,007.50
PEKERJA 7,865,424.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 43,320,790.23
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
PEKERJA 1,730,736.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 7,161,685.42
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
PEKERJA 2,638,944.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOLUME SATUAN Rp. (Rp.) (Rp.)
MATERIAL 79,200.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
PEKERJA 6,408,864.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 222,405,600.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
Bulldozer 2 1 E001 9.00 438,927.80 3,950,350.20
P Wheel Loader 115HP 1 1 E052 6.00 345,141.14 2,070,846.85
E Dump Truk 5 ton/145HP 18 1 E212 108.00 348,171.40 37,602,511.61
R
A
L
A
T
A
N
PERALATAN 43,623,708.66
TOTAL 272,438,172.66
PEKERJA 2,673,216.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 49,479,200.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
Bulldozer 110 HP 1 1 E001 2.00 438,927.80 877,855.60
P Mesin Penyaring 80 HP 1 1 E040 6 176,142.74 1,056,856.46
E Wheel Loader 115HP 1 1 E052 5.00 345,141.14 1,725,705.71
R Dump Truk 5 ton/145HP 4 1 E212 24.00 348,171.40 8,356,113.69
A
L
A
T
A
N
PERALATAN 12,016,531.46
TOTAL 64,168,947.46
PEKERJA 3,272,976.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 41,030,705.60
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
PEKERJA 2,947,392
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 139,188,960
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
VOLUME : 100.0 SATUAN : ton HARGA SATUAN Rp. 1,580,265.59 Per ton
PEKERJA 6,768,720.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
MATERIAL 37,842,000.00
PERALATAN JUMLAH HARI KODE JAM HARGA BIAYA SUB TOTAL
KERJA KERJA (Rp./JAM (Rp.) (Rp.)
PEKERJA 2,673,216.00
MATERIAL SATUAN KODE TOTAL HARGA BIAYA SUB TOTAL
VOL (Rp. / Unit (Rp.) (Rp.)
###
A + B = Rp. 438,927.80
###
|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 010
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA WAROPEN CV. MADYA Consultant MEI. 2007
### 2. Lain-lain :
### Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn
###
### = 0.033 x 404,550,000.00 / 1,500.00 = Rp. 8,900.10
Sub Total = Rp. 58,619.02
A + B = Rp. 300,737.30
###
|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 0 20
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA WAROPEN CV. MADYA Consultant MEI. 2007
### 2. Lain-lain :
### Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn
A + B = Rp. 246,541.08
###
|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 031
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
A + B = Rp. 460,494.47
###
|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 040
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
###
|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 052
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
###
###
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp. 345,141.14
###
|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 080
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
###
###
### TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp. 102,969.45
###
|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 084
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH T TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
###
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp. 325,798.47
###
|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 087
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
###
###
###
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp. 70,313.71
###
###
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 088
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH T TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
A + B = Rp. 11,181.83
###
###
|::
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 089
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH T TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
###
###
###
### TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
###
###
A + B = Rp. 11,438.66
###
###
DINAS PU KODE
KAB. WAROPEN ANALISA BIAYA PERALATAN E 152
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
###
###
###
### TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
###
A + B = Rp. 173,874.31
###
###
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 153
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH T TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
A + B = Rp. 64,468.38
###
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 182
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
A + B = Rp. 287,059.72
###
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 212
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH T TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
###
###
### TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp. 348,171.40
###
###
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 221
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
Jenis Alat : FLAT BAD TRUCK 3:5 T TENAGA = 115 HP
Harga : Rp. 138,600,000.00
Umur Kerja 6 tahun (A) 0.24668
Jam Kerja/Hr 5 Jam FAKTOR ( CRF ) : 0.24668
hari kerja/Thn 300 HK pada 12.50%
1500 Jam/Tahun (W)
###
A + B = Rp. 280,001.40
###
|::
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 251
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
###
###
### TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
###
A + B = Rp. 14,082.39
###
###
|::
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 253
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
###
###
###
TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp. 52,919.89
###
###
|::
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 301
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
A + B = Rp. 87,752.21
###
###
|::
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 341
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
###
###
### TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
###
A + B = Rp. 20,531.80
###
###
|::
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 081
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
###
###
### TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT :
A + B = Rp. 196,628.07
###
###
|::
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 155
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
2. Lain-lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn
A + B = Rp. 1,161,677.63
|::
DINAS PU KODE
KAB. PANGKEP ANALISA BIAYA PERALATAN E 157
SUB. DINAS
BINA MARGA
PROPINSI KODE KABUPATEN KODE DISIAPKAN OLEH TANGGAL
PAPUA CV. MADYA Consultant MEI. 2007
2. Lain-lain :
Asuransi 3 % thn + PPN 10 % = 0.033 x Harga alat / Jam/Thn
BACHTIAR HASYM, ST
Ka. Perwakilan
DAFTAR HARGA BAHAN DAN UPAH KERJA
TAHUN ANGGARAN 2007
K. 9
DINAS PEKERJAAN UMUM PROPINSI : SULAWESI SELATAN
SUB DINAS BINA MARGA KABUPATEN : PANGKEP
BACHTIAR HASYM, ST
Ka. Perwakilan
DAFTAR HARGA SATUAN PEKERJAAN
TAHUN ANGGARAN 2003
I. PRODUKSI DAN PENGADAAN BAHAN - BAHAN
1 PENGADAAN KERIKIL SUNGAI (TIDAK DISARING) ALAT m3 K 012 756,772.70
2 PENGADAAN KERIKIL SUNGAI (TIDAK DISARING) BURUH M3 K 013 883,512.70
3 PENGADAAN KERIKIL GALIAN (TERSARING) ALAT M3 K 014 936,649.68
4 PENGADAAN KERIKIL SUNGAI TERSARING ALAT M3 K 016 1,069,482.46
5 PRODUKSI BATU PECAH TERSARING ALAT M3 K 017 957,507.93
6 PRODUKSI BATU PECAH TERSARING ALAT M3 K 018 901,426.64
7 LAPIS TIPIS ASPAL PASIR (LATASIR) ALAT Ton K 020 1,996,963.66
8 LAPIS TIPIS ASPAL DAN AGREGAT HALUS (LATASAG) BURUH Ton K 024 1,512,958.75
9 ASPAL BETON UNTUK LAPIS PONDASI ATAS (LASTON ATAS) ALAT Ton K 026 1,497,567.46
10 LAPIS TIPIS ASPAL BETON (LATASTON) ALAT Ton K 035 1,631,363.67
11 ASPAL BETON (LASTON) PRODUKSI DAN SUPLAI ALAT Ton K 040 1,580,265.59
12 BATU KARANG DARI SERUI ALAT M3 K 017 862,000.00
13 BATU KARANG LAUT ALAT M3 K 018 515,000.00
II. DRAINASE
12 MEMBUAT PARIT BURUH M3 K 110 140,835.87
13 MEMBUAT PASANGAN BATU PADA PARIT BURUH M K 112 987,816.64
14 KONSTRUKSI PASANGAN BATU BURUH M3 K 705 1,786,697.00
15 KONSTRUKSI PASANGAN BATU BURUH M3 K 115 302,396.77
III. PEMBERSIHAN LAPANGAN DAN PEKERJAAN TANAH
16 PENGUPASAN DAN PEMBERSIHAN SEMAK PADA DAMIJA BURUH m2 K 210 4,098.00
17 PENGUPASAN DAN PEMBERSIHAN SEMAK PADA DAMIJA ALAT m2 K 211 1,196.75
18 GALIAN TANAH UNTUK KONSTRUKSI BURUH M3 K 224 78,444.00
19 PENGURUGAN KEMBALI DAN DIPADATKAN BURUH M3 K 225 1,306,816.59
20 PENIMBUNAN BADAN JALAN ALAT M3 K 311 598,473.28
21 GALIAN TANAH & PEMBUANGAN ALAT M3 K 321 75,528.02
IV.BAHU JALAN DAN SALURAN TEPI JALAN
22 PEMBENTUKAN BAHU JALAN KERAS BURUH M3 K 410 1,185,539.00
23 PEMBENTUKAN BAHU JALAN KERAS ALAT M3 K 411 927,650.64
24 PEMBERSIHAN SEMAK DAN LAIN-LAIN PADA BAHU JALAN BURUH m2 K 422 1,762.24
25 MEMBERSIHKAN PARIT BURUH M1 K 424 14,090.27
26 MEMETONG BAHU JALAN TINGGI BURUH M3 K 420 224,057.25
27 MEMOTONG BAHU JALAN TINGGI ALAT M3 K 420 93,301.35
28 CERUCUK KAYU DIRAWA BURUH M K 232 105,947.21
29 PEKERJAAN BRONJONG PENAHAN BURUH M3 K 815 1,772,969.36
V. PEMBUATAN LPB DAN LPA
30 LAPIS PONDASI BAWAH KELAS C SIRTU ALAT M3 K 514 997,573.30
31 LAPIS PONDASI BAWAH KLS A AGREGAT PECAH TERSARING BURUH M3 K 511 1,011,205.43
32 LAPIS PONDASI ATAS MENGGUNAKAN KARANG DARI SERUI ALAT M3 K 522 1,085,799.39
33 LAPIS PONDASI BAWAH (LPB) - TELFORD BURUH M2 K 516 495,894.72
VI. PELAPISAN PERMUKAAN PERKERASAN
34 LABURAN ASPAL PASIR BURAS ALAT M2 K 612 20,094.63
35 LABURAN ASPAL SATU LAPIS ( BURTU 1) BURUH M2 K 615 53,167.24
36 LABURAN ASPAL LAPIS KEDUA ( BURTU 2) ALAT M2 K 616 28,117.82
37 LABURAN ASPAL DUA LAPIS ( BURDA ) ALAT M2 K 617 81,285.06
38 LAPIS PENETRASI MAKADAM (LAPEN) BURUH M2 K 618 224,050.21
39 PENGHAMPARAN LAPIS TIPIS ASPAL PASIR 20 MM (LATASIR) ALAT M2 K 621 85,348.71
40 PENGHAMPARAN LAPIS TIPIS ASPAL PASIR 20 MM (LATASIR) BURUH M2 K 638 85,769.27
41 PENGHAMPARAN LAPIS PERMUKAAN ASPAL BETON LASTON ( 5 cm ) ALAT M2 K 641 192,647.84
PENGHAMPARAN LAPIS PERMUKAAN ASPAL BETON LASTON ( 5 cm ) ALAT M2 K 641 156,131.60
42 PENGHAMPARAN LAPIS TIPIS ASPAL BETON ( 3 cm ) ALAT M2 K 636 119,867.36
VII. BETON STRUKTUR
37 ACUAN UNTUK BETON STRUKTUR BURUH M2 K 710 153,531.45
38 BETON STRUKTUR KLAS K225 ALAT M3 K 725 1,574,990.30
39 MEMOTONG MEMBENGKOK DAN MEMASANG TULANGAN BESI BURUH M3 K 715 28,065.04
40 BETON NON STRUKTUR/RABAT BURUH M3 K 719 1,562,743.16
VIII. PEMELIHARAAN JALAN
41 PERATAAN DAN PEMADATAN JALAN TANAH ALAT KM K 850 3,274,598.76
42 PEMBENTUKAN DAN PERATAAN BAHU JALAN ALAT M3 K 855 475,802.90
43 PERATAAN KEMBALI JALAN KERIKIL ALAT KM K 860 1,476,570.86
44 PERBAIKAN AMBELAS JALAN KERIKIL BURUH M2 K 870 593,490.34
45 PENGKERIKILAN ULANG JALAN KERIKIL PADAT 50 MM ALAT KM K 877 60,981.19
46 PERBAIKAN AMBLES JALAN ASPAL BURUH M2 K 885 617,561.96
47 PERBAIKAN LUBANG JALAN ASPAL BURUH M2 K 880 234,003.09
48 BIAYA PEMELIHARAAN RUTIN TAHUNAN JALAN ASPAL (KRLL I ) BURUH KM K 803 33,416,411.18
49 BIAYA PEMELIHARAAN RUTIN TAHUNAN JALAN ASPAL ( KRLL 2 ) BURUH KM K 884 45,920,049.64
50 BIAYA PEMELIHARAAN RUTIN TAHUNAN JALAN ASPAL (KRLL 3 ) BURUH KM K 885 59,238,724.65
Disusun Oleh :
CV. MADYA Consultant
BACHTIAR HASYM, ST
Ka. Perwakilan
3
DAFTAR HARGA BAHAN BANGUNAN DAN UPAH KABUPATEN WAROPEN
1687
1.25 A. DAFTAR HARGA UPAH
UPAH TENAGA
NO. TENAGA KERJA KERJA (Rp. /
HARI)
1 Mandor Rp 171,360.00
2 Mekanik Rp 154,224.00
3 Mekanik Pembantu Rp 137,088.00
4 Kepala Tukang Rp 154,224.00
5 Tukang Rp 137,088.00
6 Operator Terampil Rp 171,360.00
7 Operator Kurang Terampil Rp 154,224.00
8 Pembantu Opearator Rp 137,088.00
9 Sopir Truck Rp 137,088.00
10 Sopir Pribadi Rp 119,952.00
11 Pembantu Sopir Rp 119,952.00
12 Buruh Tak Terampil Rp 85,680.00
13 Buruh Kurang Terampil Rp 94,248.00
14 Buruh Terampil Rp 102,816.00
BAHAN DASAR
1 Batu
Batu Gunung/Karang Laut M3 Rp 1,082,600.00
Batu Karang dari Serui M 3
Rp 1,050,000.00
Batu Kali dari Botawa M 3
Rp 457,000.00
Batu Kali dari Serui M 3
Rp 1,045,000.00
Batu Pecah 7-10 Cm M3 Rp 1,692,426.47
Batu Pecah 5-7 Cm M3 Rp 1,692,426.47
Batu Pecah 3-5 Cm M3 Rp 1,718,676.47
Batu Pecah 2-3 Cm M 3
Rp 1,771,176.47
Batu Pecah 1-2 Cm M 3
Rp 1,797,426.47
Batu Pecah 0,5-1 Cm M 3
Rp 1,823,676.47
2 Kerikil
Kerikil / Tidak Tersaring dari Waren M3 Rp 847,500.00
Kerikil / Tersaring dari Botawa M 3
Rp 512,058.82
Kerikil / Tersaring dari Serui M 3
Rp 1,130,000.00
3 Pasir
Pasir Beton Dari Serui M3 Rp 1,155,000.00
Pasir Pasang Dari Serui M 3
Rp 1,180,000.00
Pasir Beton (dari Botawa) M 3
Rp 491,666.67
Pasir Pasang dari Botawa M 3
Rp 535,000.00
Pasir Batu / Kerikil dari Laut M 3
Rp 617,500.00
Pasir Urug/Timbunan M 3
Rp 457,000.00
4 Tanah Urug/Timbunan M 3
Rp 301,000.00
5 Batu Merah Bh Rp 4,051.23
6 Batu Tela Bh Rp 6,983.87
7 Conblok Bh Rp 23,415.00
8 Kanstin 15x20x40 bh Rp 42,415.37
9 Paving Block 10x20 Tebal 7 cm Bh Rp 4,948.46
10 Paving Block Segi enam Tebal 7 cm Bh Rp 8,728.57
12 Semen
Semen 1 Zak = 50 Kg Zak Rp 151,145.83
Semen 1 Zak = 40 Kg kg Rp 3,022.92
Semen Putih/Warna Kg Rp 18,437.50
BAHAN KAYU
1 Balok/Papan Kayu Besi (Klas I) M3 Rp 4,220,000.00
2 Balok/Papan Kayu Matoa (Klas II) M 3
Rp 3,127,500.00
3 Balok/Papan Kayu Tinang (Klas III) M 3
Rp 2,527,500.00
4 Kayu Bakar M 3
Rp 667,500.00
5 Kayu Perancah M 3
Rp 1,887,500.00
BAHAN LANTAI
Homogenous Tile Tipe Black Onix 60x60 Ex. Indogress M2 Rp 880,000.00
Granit Alam Ex. Gestock M 2
Rp 1,500,000.00
Batu Tempel/Batu Candi M 2
Rp 350,000.00
BAHAN BESI
1 Besi Beton
Besi Beton Polos Kg Rp 21,724.30
Besi Beton Ulir Kg Rp 23,896.74
2 Paku
Paku Seng Kg Rp 44,406.25
Paku Campur Kg Rp 35,636.25
Paku Beton Kg Rp 35,636.25
Paku Jembatan Kg Rp 50,656.25
Paku Skrup 3,5" Dos Rp 35,756.25
Paku Tripleks Kg Rp 38,156.25
3 Kawat
Kawat Ikat / Beton Kg Rp 35,054.25
BAHAN LANGIT-LANGIT
2 Tripleks
122x244x0,3 cm Lbr Rp 93,500.00
122x244x0,4 cm Lbr Rp 106,666.67
122x244x0,6 cm Lbr Rp 155,500.00
122x244x0,9 cm Lbr Rp 221,585.53
122x244x1.2 cm Lbr Rp 262,631.67
BAHAN ATAP
4 Seng Gelombang
BWG 34" BJLS 0,20 mm Lbr Rp 73,312.00
BWG 33" BJLS 0,22 mm Lbr Rp 89,921.88
BWG 32" BJLS 0,30 mm Lbr Rp 89,350.00
BWG 28" BJLS 0,35 mm Lbr Rp 105,875.00
5 Seng Plat
BJLS 0,30 mm Lbr Rp 101,350.00
BJLS 0,20 mm Lbr Rp 85,312.50
BAHAN FINISHING/CAT
1 Cat Tembok Kg Rp 22,375.00
2 Cat Alkali resisting primer Kg Rp 89,692.50
3 Cat ICI Weathershield Kg Rp 179,385.00
13 Plamur Tembok Kg Rp 41,621.50
PROYEK : PEMBANGUNAN GEDUNG PUSAT PELAYANAN AKADEMIK
UNIVERSITAS NEGERI MAKASSAR TAHAP III
LOKASI : JL. A.P. PETTARANI, GUNUNGSARI BARU, RAPPOCINI, MAKASAR
3 Besi
3.1 Besi beton kg 8,575.00
3.2 Wire mesh M8 m2 59,413.58
3.3 Besi beton ulir kg 8,575.00
3.4 Besi Hollow 40x40 kg 17,150.00
3.5 Besi plat sandaran 10x100 kg 17,150.00
3.6 Besi railing sandaran 10x50 kg 17,150.00
4 Kawat
4.1 Bendrat kg 12,740.00
4.2 Anyam m2 6,125.00
5 Keramik
5.1 Keramik 40x40 dos 112,500.00
5.2 Keramik 30x30 dos 100,000.00
5.3 Keramik 20x20 dos 100,000.00
5.4 Keramik 20x25 dos 92,500.00
5.5 Keramik step nossing 10x30 bj 8,000.00
6 Marmer
6.1 Marmer Pangkep 60x60 dinding m2 325,000.00
6.2 Marmer Pangkep 60x60 lantai m2 325,000.00
7 Paku
7.1 Paku kg 14,976.91
8 Pasir
8.1 Pasir beton m3 104,187.20
8.2 Pasir pasang m3 104,187.20
8.3 pasir urug m3 78,140.40
8.4 Sirtu m3 110,698.90
9 Semen
9.1 Semen PC kg 1,237.22
9.2 Semen hardener kg 2,604.68
9.3 Semen nat ( tile grout ) kg 19,535.10
10 Batako
10.1 Batako bj 3,255.85
10.2 Batako roster bj 3,907.02
11 Batu
11.1 Batu kali m3 117,210.60
11.2 Batu pecah 2-3 cm m3 123,722.30
12 Kayu
12.1 Balok klas I m3 2,344,212.00
12.2 Papan klas I m3 2,409,329.00
12.3 Balok klas II m3 2,213,978.00
12.4 Papan klas II m3 2,279,095.00
12.5 Balok klas III m3 1,953,510.00
12.6 Papan klas III m3 2,018,627.00
12.7 Kayu begisting m3 1,953,510.00
12.8 Multipleks 9 mm lbr 240,932.90
13 Cat
13.1 Cat besi kg 2,205.00
13.2 Cat Zincromate m2 -
14 Bahan khusus
14.1 Curing compound ltr 240,932.90
14.2 Minyak begisting ltr 240,932.90
14.3 Spacer ( untuk begisting dinding ) bh 240,932.90
14.4 Skimcoat kg 240,932.90
14.5 Waterproofing membran m2 110,698.90
14.6 Screed m2 45,581.90
14.7 Mortar utama kg 1,627.93
15 Bata
15.1 Bata merah bj 520.94
15.2 Bata ringan hebel m3 1,126,524.10
15.3 Bata tempel UNM m2
16 Granite
16.1 Granite tile 60x60 m2 211,250.00
16.2 Granite tile 40x40 m2 186,250.00
16.3 Granite tile 30x30 m2 187,500.00
19 Baja
19.1 Baja WF kg 11,147.50
19.2 Baja gording kg 9,555.00
19.3 Elektroda kg 30,625.00
PROYEK : PEMBANGUNAN GEDUNG PUSAT PELAYANAN AKADEMIK
UNIVERSITAS NEGERI MAKASSAR TAHAP III
LOKASI : JL. A.P. PETTARANI, GUNUNGSARI BARU, RAPPOCINI, MAKASAR
I Tenaga Kerja
Mandor org/ hr 98,000.00
Kepala Tukang Batu org/ hr 85,750.00
Kepala Tukang Kayu org/ hr 85,750.00
Kepala Tukang Besi org/ hr 85,750.00
Kepala Tukang Las org/ hr 85,750.00
Tukang Batu org/ hr 67,375.00
Tukang Kayu org/ hr 67,375.00
Tukang Besi org/ hr 67,375.00
Tukang Las org/ hr 67,375.00
Pekerja org/ hr 49,000.00