Anda di halaman 1dari 20

BASIC PRICE TAHUN ANGGARAN 2012

NO. M A T E R I A L SATUAN JUMLAH HARGA

( Rp.)
1 2 3 4

HARGA UPAH KERJA


1 Mandor Lapangan Oh 117,852.00
2 Kepala Tukang Oh 106,066.80
3 Tukang Oh 94,281.60
4 Buruh / Pekerja tak Terlatih Oh 58,926.00
5 Buruh / Pekerja kurang Terlatih Oh 58,926.00

A. MATERIAL LOKAL :
GALIAN C / BATU CETAK
1 Pasir Beton M3 329,538.00
2 Pasir Pasang M3 385,440.00
3 Pasir plester halus / dari Aromarea M3 762,300.00
3 Koral / kerikil beton M3 305,580.00
4 Batu Kali M3 305,580.00
5 Batu karang / gunung M3 305,580.00
6 Pasir / sirtu urug M3 305,580.00
7 Karang urug M3 305,580.00
8 Tanah urug M3 305,580.00
9 Batu Pecah 3 - 5 Cm M3 704,880.00
10 Batu Pecah 2 - 3 Cm M3 864,600.00
11 Batu Pecah 1 - 2 Cm M3 864,600.00
12 Batu Tela 17 x 24 x 7 cm Bh 3,524.40
13 Paving Block segi 6 (Ø 20) Cm tebal 8 Cm Bh 5,920.20

KAYU
1 Kayu balok / papan tinang M3 2,195,600.00
2 Kayu balok / papan besi (Klas I) M3 4,724,500.00
3 Kayu balok / papan matoa (Klas II) M3 2,728,000.00

B. MATERIAL NON LOKAL :


MATERIAL PENGIKAT
1 Semen / PC @ 50 Kg Zak 105,001.12
2 Semen / PC @ 40 Kg Zak 91,623.88
3 Semen Warna Kg 13,478.06
4 Semen abu-abu Kg 20,133.06

KERAMIK / PORSELIN
1 Keramik 20 X 25 M2 80,223.00
2 Keramik 20 X 20 M2 80,223.00
3 Keramik 40 X 40 ROMAN M2 96,180.48
4 Washtavel INA & aksesoris + Cermin BH 1,137,400.00
5 Washtavel Aluminium ( 2 Lobang ) & aksesoris BH 804,650.00
6 Kloset Duduk INA & aksesoris BH 2,335,300.00
7 Floor Drain KM/WC BH 13,431.00
8 Floor Drain Bak Air BH 13,431.00
9 Kloset Jongkok Ina BH 245,630.00
KAYU LAPIS / DINDING & PLAFOND
1 Tripleks Tebal 3 MM Lbr 95,186.66
2 Tripleks Tebal 4 MM Lbr 121,806.66
3 Teak Wood 4mm Lbr 221,631.66
4 Playwood 4 MM Lbr 168,391.66

BESI BETON, KAWAT & PAKU


1 Besi Beton Kg 25,123.01
2 Kawat Ikat Beton Kg 37,570.50
3 Paku Tripleks Kg 33,577.50
4 Paku 3, 4, 5, 7 & 10 CM Kg 32,246.50
5 Paku Senk Kg 40,232.50
6 Paku Eternit Kg 33,577.50

7 Besi strip 2 x 0,3 x 400 Cm Kg 21,770.25

A T A P
1 Seng gelombang BJLS 30 LBR 94,682.50
2 Seng plat BJLS 30 LBR 101,337.50
3 Seng gelombang BJLS 20 LBR 68,062.50
4 Seng plat BJLS 20 LBR 74,717.50
3 Talang Paralon Dia. 4" M' 45,433.75
4 "T" Paralon BH 34,787.50
10 Aluminium Foil M2 55,000.00

C A T /MINYAK
1 Cat Kilap Kayu KG 46,887.50
2 Cat Besi KG 46,887.50
3 Teak Oil KG 66,852.50
4 Vernis Ltr 66,852.50
5 Minyak Cat LTR 46,887.50
6 Meni kayu KG 42,894.50
7 Cat Dinding / Tembok KG 20,267.50
8 Dempul KG 42,894.50
9 Amplas Kayu LBR 6,715.15
10 Lem kayu KG 46,887.50
11 Plamur kayu KG 42,894.50

INSTALASI LAMPU
1 Lampu TL 20 Watt BH 20,267.50
2 Lampu XL 18 Watt BH 66,852.50
3 Lampu XL 8 Watt BH 46,887.50
4 Stop Kontak BH 40,232.50
5 Sekring Kas 2 Group BH 66,852.50
6 Kabel NGA M' 13,612.50
7 Pipa Paralon 1/4 " M' 18,049.17
8 Saklar BH 40,232.50
9 Isolator BH 66,852.50
10 Instalasi TTK 86,817.50

AKSESORIS PINTU & JENDELA


1 Kunci tanam biasa BH 120,092.50
2 Kunci lemari BH 13,612.50
3 Engsel Pintu Ring Nilon BH 20,267.50
4 Engsel Jendela BH 46,887.50
5 Engsel Lemari BH 10,950.50
6 Grendel Pintu BH 20,267.50
7 Grendel Jendela BH 13,612.50
8 Kait Angin Biasa BH 26,922.50
9 Kait Angin Kancing BH 66,852.50
10 Tarikan Jendela BH 10,285.00
11 Kaca tebal 5 mm Bening M2 246,840.00

INSTALASI AIR MINUM & AKSESORIS


1 Pipa GIP 3/4 Medium A M' 76,672.42
2 Pipa GIP 8" Medium A M' 1,475,151.34
3 Pipa GIP 3/4 Medium B M' 60,567.32
4 Pipa PVC 1/2" M' 8,003.59
5 Pipa PVC 3/4 M' 9,412.55
6 Pipa PVC 2" M' 23,232.98
7 Pipa PVC 3" M' 37,359.46
8 Pipa PVC 4" M' 54,686.09
9 Alat Bantu SET 260,150.00
10 Kran Air Ø 1/2" BH 26,862.00
11 Kran Air Washtavel Ø 1/2" BH 113,377.00
ANALISA HARGA SATUAN DAN UPAH KERJA
TAHUN ANGGARAN 2012

KODE HARGA UPAH BAHAN BAHAN JUMLAH


ANA- SATUAN ( Rp.) LOKAL NON HARGA
NO. URAIAN PEKERJAAN
LISA ( Rp.) ( Rp.) LOKAL ( Rp.)
( Rp.)
1 2 3 4 5 6 7 8

PEKERJAAN PERSIAPAN
( Edisi Revisi SNI 03-2835-2002)

1 1.000 M' PENGUKURAN DAN PASANG 6.4


BOUWPLANK :
Bahan; 6.4.1
0.012 M3 Balok kayu Klas II 5/7 2,728,000.00 32,736.00
0.020 Kg Paku biasa 32,246.50 644.93
0.007 M3 Papan kayu Klas II 3/20 2,728,000.00 19,096.00
(1) 51,832.00 644.93 52,476.93
Tenaga ; 6.4.2
0.100 OH Tukang kayu 94,281.60 9,428.16
0.100 OH Pekerja 58,926.00 5,892.60
0.010 OH Kepala tukang 106,066.80 1,060.67
0.005 OH Mandor 117,852.00 589.26
(2) 16,970.69 16,970.69

Jumlah (1) + (2) 69,447.62


2 1.000 M2 MEMBERSIHKAN LOKASI 6.8
DAN PERATAAN :
Tenaga ; 6.8.1
0.100 OH Pekerja 58,926.00 5,892.60
0.050 OH Mandor 117,852.00 5,892.60
(1) 11,785.20 11,785.20

Jumlah (1) 11,785.20


3 1.000 M2 PEMBUATAN BEDENG / 6.9
BARAK BURUH :
Bahan; 6.9.1
1.250 Btg Dolken Kayu Ø 8-10/400 CM 50,833.33 63,541.66
0.186 M3 Kayu Klas II 2,728,000.00 507,408.00
0.300 Kg Paku biasa 32,246.50 9,673.95
18.000 Kg Semen portland 2,290.60 41,230.75
0.030 M3 Pasir beton 329,538.00 9,886.14
0.050 M3 Koral / Kerikil beton 305,580.00 15,279.00
1.500 Lbr Seng gelombang Bjls 0,20 68,062.50 102,093.75
1.350 Lbr Tripleks 4 mm 121,806.66 164,438.99
(1) 596,114.80 317,437.44 913,552.24
Tenaga ; 6.9.2
2.000 OH Tukang kayu 94,281.60 188,563.20
1.000 OH Pekerja 58,926.00 58,926.00
0.200 OH Kepala tukang 106,066.80 21,213.36
0.050 OH Mandor 117,852.00 5,892.60
(2) 274,595.16 274,595.16

Jumlah (1) + (2) 1,188,147.40

I. PEKERJAAN TANAH
( SNI DT 91-0006-2007)

1 1.000 M3 GALIAN TANAH BIASA 6.1


SEDALAM 75-1 M :
Tenaga ; 6.1.1
0.750 OH Pekerja 58,926.00 44,194.50
0.025 OH Mandor 117,852.00 2,946.30
(1) 47,140.80 47,140.80

Jumlah (1) 47,140.80


2 1.000 M3 URUGAN KEMBALI GALIAN 6.9
TANAH BIASA SEDALAM 75-1 M :
Tenaga ; 6.9.1
0.250 OH Pekerja 58,926.00 14,731.50
0.008 OH Mandor 117,852.00 982.10
(1) 15,713.60 15,713.60

a Jumlah (1) 15,713.60


3 1.000 M3 URUGAN PASIR 6.11
Bahan; 6.11.1
1.200 M3 Pasir Urug 305,580.00 366,696.00
(1) 366,696.00 366,696.00
Tenaga ; 6.11.2
0.300 OH Pekerja 58,926.00 17,677.80
0.010 OH Mandor 117,852.00 1,178.52
(2) 18,856.32 18,856.32

Jumlah (1) + (2) 385,552.32


KODE HARGA UPAH BAHAN BAHAN JUMLAH
ANA- SATUAN ( Rp.) LOKAL NON HARGA
NO. URAIAN PEKERJAAN
LISA ( Rp.) ( Rp.) LOKAL ( Rp.)
( Rp.)
1 2 3 4 5 6 7 8
4 1.000 M3 URUGAN SIRTU PADAT UNTUK 6.15
PENINGGIAN LANTAI BANGUNAN :
Bahan; 6.15.1
1.200 M3 Sirtu 305,580.00 366,696.00
(1) 366,696.00 366,696.00
Tenaga ; 6.15.2
0.250 OH Pekerja 58,926.00 14,731.50
0.025 OH Mandor 117,852.00 2,946.30
(2) 17,677.80 17,677.80

Jumlah (1) + (2) 384,373.80

II. PEKERJAAN PONDASI


( SNI DT 91-0007-2007)

1 1.000 M3 PASANG PONDASI 6.1


BATU BELAH / KALI 1PC : 3PS
Bahan; 6.1.1
1.200 M3 Batu Belah / kali 15/20 Cm 305,580.00 366,696.00
202.000 KG Semen Portland 2,290.60 462,700.59
0.485 M3 Pasir Pasang 385,440.00 186,938.40
(1) 553,634.40 462,700.59 1,016,334.99
Tenaga ; 6.1.2
1.500 OH Pekerja 58,926.00 88,389.00
0.750 OH Tukang Batu 94,281.60 70,711.20
0.075 OH Kepala Tukang 106,066.80 7,955.01
0.075 OH Mandor 117,852.00 8,838.90
(2) 175,894.11 175,894.11

Jumlah (1) + (2) 1,192,229.10


2 1.000 M3 PASANG BATU KOSONG 6.9
( AANSTAMPING ) :
Bahan; 6.9.1
1.200 M3 Batu Belah / kali 15/20 Cm 305,580.00 366,696.00
0.432 M3 Pasir urug 305,580.00 132,010.56
(1) 498,706.56 498,706.56
Tenaga ; 6.9.2
0.780 OH Pekerja 58,926.00 45,962.28
0.390 OH Tukang Batu 94,281.60 36,769.82
0.039 OH Kepala Tukang 106,066.80 4,136.61
0.039 OH Mandor 117,852.00 4,596.23
(2) 91,464.94 91,464.94

Jumlah (1) + (2) 590,171.50

III. PEKERJAAN BETON


( SNI DT 91-0008-2007)

1 1.000 M3 SLOOF BETON BERTULANG 6.29


(125 KG BESI + BEKISTING )

Bahan; 6.29.1
0.270 M3 Kayu Kls III 2,195,600.00 592,812.00
2.000 Kg Paku 5 Cm - 12 Cm 32,246.50 64,493.00
0.600 Ltr Minyak Bekisting 4,130.00 2,478.00
131.250 Kg Besi beton polos 25,123.01 3,297,395.06
3.000 Kg Kawat beton 37,570.50 112,711.50
336.000 Kg Sement Portland 2,290.60 769,640.59
0.540 M3 Pasir Beton 329,538.00 177,950.52
0.810 M3 Kerikil 305,580.00 247,519.80
(1) 1,018,282.32 4,246,718.15 5,265,000.47
Tenaga ; 6.29.2
5.650 OH Pekerja 58,926.00 332,931.90
0.275 OH Tukang Batu 94,281.60 25,927.44
1.560 OH Tukang Kayu 94,281.60 147,079.30
1.400 OH Tukang Besi 94,281.60 131,994.24
0.323 OH Kepala Tukang 106,066.80 34,259.58
0.283 OH Mandor 117,852.00 33,352.12
(2) 705,544.57 705,544.57

Jumlah (1) + (2) 5,970,545.04


2 1.000 M3 KOLOM BETON BERTULANG 6.30
( 150 KG BESI + BEKISTING )

Bahan; 6.30.1
0.400 M3 Kayu Kls III 2,195,600.00 878,240.00
4.000 Kg Paku 5 Cm - 12 Cm 32,246.50 128,986.00
2.000 Ltr Minyak Bekisting 4,130.00 8,260.00
157.500 Kg Besi beton polos 25,123.01 3,956,874.08
4.500 Kg Kawat beton 37,570.50 169,067.25
336.000 Kg Sement Portland 2,290.60 769,640.59
KODE HARGA UPAH BAHAN BAHAN JUMLAH
ANA- SATUAN ( Rp.) LOKAL NON HARGA
NO. URAIAN PEKERJAAN
LISA ( Rp.) ( Rp.) LOKAL ( Rp.)
( Rp.)
1 2 3 4 5 6 7 8
0.540 M3 Pasir Beton 329,538.00 177,950.52
0.810 M3 Kerikil 305,580.00 247,519.80
0.150 M3 Kayu Kelas II balok 2,728,000.00 409,200.00
3.500 Lbr Plywood 9 mm 85,400.00 298,900.00
20.000 Btg Dolken Kayu Galam, Ø (8-10) Cm 50,833.33 1,016,666.60
Panjang 4 mm
(1) 2,729,576.92 5,331,727.92 8,061,304.84
Tenaga ; 6.30.2
7.050 OH Pekerja 58,926.00 415,428.30
0.275 OH Tukang Batu 94,281.60 25,927.44
1.650 OH Tukang Kayu 94,281.60 155,564.64
2.100 OH Tukang Besi 94,281.60 197,991.36
0.403 OH Kepala Tukang 106,066.80 42,744.92
0.353 OH Mandor 117,852.00 41,601.76
(2) 879,258.42 879,258.42

Jumlah (1) + (2) 8,940,563.25


3 1.000 M3 BALOK BETON BERTULANG 6.31
( 125 KG BESI + BEKISTING )

Bahan; 6.31.1
0.320 M3 Kayu Kls III 2,195,600.00 702,592.00
3.200 Kg Paku 5 Cm - 12 Cm 32,246.50 103,188.80
1.600 Ltr Minyak Bekisting 4,130.00 6,608.00
131.250 Kg Besi beton polos 25,123.01 3,297,395.06
3.000 Kg Kawat beton 37,570.50 112,711.50
336.000 Kg Sement Portland 2,290.60 769,640.59
0.540 M3 Pasir Beton 329,538.00 177,950.52
0.810 M3 Kerikil 305,580.00 247,519.80
0.140 M3 Kayu Kelas II balok 2,728,000.00 381,920.00
2.800 Lbr Plywood 9 mm 85,400.00 239,120.00
16.000 Btg Dolken Kayu Galam, Ø (8-10) Cm 50,833.33 813,333.28
Panjang 4 mm
(1) 2,323,315.60 4,528,663.95 6,851,979.55
Tenaga ; 6.31.2
6.350 OH Pekerja 58,926.00 374,180.10
0.275 OH Tukang Batu 94,281.60 25,927.44
1.650 OH Tukang Kayu 94,281.60 155,564.64
1.400 OH Tukang Besi 94,281.60 131,994.24
0.333 OH Kepala Tukang 106,066.80 35,320.24
0.318 OH Mandor 117,852.00 37,476.94
(2) 760,463.60 760,463.60

Jumlah (1) + (2) 7,612,443.15

IV. PEKERJAAN DINDING


( SNI DT 91-0009-2007)

1 1.000 M2 PASANG BATU TELA 6.24


UKURAN (15x7x24) Cm 1Pc : 3Ps

Bahan; 6.24.1
35.000 Bh Batu Tela 3,524.40 123,354.00
14.000 Kg Semen portland 2,290.60 32,068.36
0.032 M3 Pasir Pasang 385,440.00 12,334.08
(1) 135,688.08 32,068.36 167,756.44
Tenaga ; 6.24.2
0.300 OH Pekerja 58,926.00 17,677.80
0.150 OH Tukang Batu 94,281.60 14,142.24
0.015 OH Kepala Tukang 106,066.80 1,591.00
0.015 OH Mandor 117,852.00 1,767.78
(2) 35,178.82 35,178.82

Jumlah (1) + (2) 202,935.26

1.000 M3 PASANG BATU TELA 2,029,352.60

V. PEKERJAAN PLESTERAN
( SNI DT 91-0010-2007)

1 1.000 M2 PLESTERAN 1PC : 2PS, TEBAL 15 MM 6.2

Bahan; 6.2.1
10.224 Kg Semen Portland 2,290.60 23,419.06
0.020 M3 Pasir Pasang 762,300.00 15,246.00
(1) 15,246.00 23,419.06 38,665.06
Tenaga ; 6.2.2
0.300 OH Pekerja 58,926.00 17,677.80
0.150 OH Tukang Batu 94,281.60 14,142.24
0.015 OH Kepala Tukang 106,066.80 1,591.00
0.010 OH Mandor 117,852.00 1,178.52
KODE HARGA UPAH BAHAN BAHAN JUMLAH
ANA- SATUAN ( Rp.) LOKAL NON HARGA
NO. URAIAN PEKERJAAN
LISA ( Rp.) ( Rp.) LOKAL ( Rp.)
( Rp.)
1 2 3 4 5 6 7 8
(2) 34,589.56 34,589.56

Jumlah (1) + (2) 73,254.63


2 1.000 M2 PLESTERAN 1PC : 3PS, TEBAL 15 MM 6.3

Bahan; 6.3.1
7.776 Kg Semen Portland 2,290.60 17,811.68
0.023 M3 Pasir Halus 762,300.00 17,532.90
(1) 17,532.90 17,811.68 35,344.58
Tenaga ; 6.3.2
0.300 OH Pekerja 58,926.00 17,677.80
0.150 OH Tukang Batu 94,281.60 14,142.24
0.015 OH Kepala Tukang 106,066.80 1,591.00
0.010 OH Mandor 117,852.00 1,178.52
(2) 34,589.56 34,589.56

Jumlah (1) + (2) 69,934.14


3 1.000 M2 FINISHING SIAR PASANGAN BATU 6.26
KALI ADUKAN 1 PC : 2 PS
Bahan; 6.26.1
6.340 Kg Semen portland 2,290.60 14,522.38
0.012 M3 Pasir Pasang 762,300.00 9,147.60
(1) 9,147.60 14,522.38 23,669.98
Tenaga ; 6.26.2
0.300 OH Pekerja 58,926.00 17,677.80
0.150 OH Tukang Batu 94,281.60 14,142.24
0.015 OH Kepala Tukang 106,066.80 1,591.00
0.015 OH Mandor 117,852.00 1,767.78
(2) 35,178.82 35,178.82

Jumlah (1) + (2) 58,848.81


4 1.000 M2 ACIAN 6.27
Bahan; 6.27.1
3.250 Kg Semen portland 2,290.60 7,444.44
(1) 7,444.44 7,444.44
Tenaga ; 6.27.2
0.200 OH Pekerja 58,926.00 11,785.20
0.100 OH Tukang Batu 94,281.60 9,428.16
0.010 OH Kepala Tukang 106,066.80 1,060.67
0.010 OH Mandor 117,852.00 1,178.52
(2) 23,452.55 23,452.55

Jumlah (1) + (2) 30,896.99

VI. PEKERJAAN KAYU


( SNI DT 91-0011-2007)

1 1.000 M3 PASANG KUSEN PINTU DAN KUSEN 6.1


JENDELA, KAYU KELAS I
Bahan; 6.1.1
1.200 M3 Balok kayu Kelas I 4,724,500.00 5,669,400.00
1.250 Kg Paku 10 cm 32,246.50 40,308.13
1.000 Kg Lem kayu 46,887.50 46,887.50
5,669,400.00 87,195.63 5,756,595.63
Tenaga ; 6.1.2 (1)
7.000 OH Pekerja 58,926.00 412,482.00
21.000 OH Tukang kayu 94,281.60 1,979,913.60
2.100 OH Kepala Tukang 106,066.80 222,740.28
0.035 OH Mandor 117,852.00 4,124.82
(2) 2,619,260.70 2,619,260.70

Jumlah (1) + (2) 8,375,856.33


2 1.000 M2 PASANG PINTU PANEL 6.5
KAYU KELAS I
Bahan; 6.5.1
0.087 M3 Papan kayu Kelas I 4,724,500.00 411,031.50
0.500 Kg Lem kayu 46,887.50 23,443.75
(1) 411,031.50 23,443.75 434,475.25
Tenaga ; 6.5.2
1.000 OH Pekerja 58,926.00 58,926.00
3.000 OH Tukang kayu 94,281.60 282,844.80
0.300 OH Kepala Tukang 106,066.80 31,820.04
0.050 OH Mandor 117,852.00 5,892.60
(2) 379,483.44 379,483.44

Jumlah (1) + (2) 813,958.69


3 1.000 M2 PASANG PINTU DAN JENDELA 6.6
KACA KAYU KELAS I
Bahan; 6.6.1
0.024 M3 Papan kayu Kelas I 4,724,500.00 113,388.00
0.300 Kg Lem kayu 46,887.50 14,066.25
KODE HARGA UPAH BAHAN BAHAN JUMLAH
ANA- SATUAN ( Rp.) LOKAL NON HARGA
NO. URAIAN PEKERJAAN
LISA ( Rp.) ( Rp.) LOKAL ( Rp.)
( Rp.)
1 2 3 4 5 6 7 8
0.500 Lbr Kaca Riben 5mm 250,000.00 125,000.00
(1) 113,388.00 139,066.25 252,454.25
Tenaga ; 6.6.2
1.000 OH Pekerja 58,926.00 58,926.00
3.000 OH Tukang kayu 94,281.60 282,844.80
0.300 OH Kepala Tukang 106,066.80 31,820.04
0.050 OH Mandor 117,852.00 5,892.60
(2) 379,483.44 379,483.44

Jumlah (1) + (2) 631,937.69


4 1.000 M2 PASANG PINTU DAN JENDELA 6.7
JALUSI KAYU KELAS I
Bahan; 6.7.1
0.064 M3 Papan kayu Kelas I 4,724,500.00 302,368.00
0.500 Kg Lem kayu 46,887.50 23,443.75
(1) 302,368.00 23,443.75 325,811.75
Tenaga ; 6.7.2
1.000 OH Pekerja 58,926.00 58,926.00
0.300 OH Tukang kayu 94,281.60 28,284.48
0.300 OH Kepala Tukang 106,066.80 31,820.04
0.050 OH Mandor 117,852.00 5,892.60
(2) 124,923.12 124,923.12

Jumlah (1) + (2) 450,734.87


5 1.000 M3 PASANG KONSTRUKSI KUDA-KUDA 6.14
EKSPOSE KAYU KELAS I
Bahan; 6.14.1
1.200 M3 Balok kayu Kelas I 4,724,500.00 5,669,400.00
15.000 Kg besi strip tebal 5 mm 21,770.25 326,553.75
5.600 Kg Paku 12 cm 32,246.50 180,580.40
(1) 5,669,400.00 507,134.15 6,176,534.15
Tenaga ; 6.14.2
6.700 OH Pekerja 58,926.00 394,804.20
20.100 OH Tukang kayu 94,281.60 1,895,060.16
2.010 OH Kepala Tukang 106,066.80 213,194.27
0.335 OH Mandor 117,852.00 39,480.42
(2) 2,542,539.05 2,542,539.05

Jumlah (1) + (2) 8,719,073.20


6 1.000 M3 PASANG KONSTRUKSI GORDENG 6.15
KAYU KELAS II
Bahan; 6.15.1
1.100 M3 Balok kayu Kelas II 2,728,000.00 3,000,800.00
15.000 Kg besi strip tebal 5 mm 21,770.25 326,553.75
3.000 Kg Paku 12 cm 32,246.50 96,739.50
(1) 3,000,800.00 423,293.25 3,424,093.25
Tenaga ; 6.15.2
2.400 OH Pekerja 58,926.00 141,422.40
7.200 OH Tukang kayu 94,281.60 678,827.52
0.720 OH Kepala Tukang 106,066.80 76,368.10
0.120 OH Mandor 117,852.00 14,142.24
(2) 910,760.26 910,760.26

Jumlah (1) + (2) 4,334,853.51


7 1.000 M2 PASANG KASO + RENG KAYU KLAS II
Bahan;
0.014 M3 Kayu balok Kelas II 2,728,000.00 38,192.00
0.150 Kg Paku 5 cm dan 10 cm 32,246.50 4,836.98
(1) 38,192.00 4,836.98 43,028.98
Tenaga ;
0.100 OH Pekerja 58,926.00 5,892.60
0.100 OH Tukang kayu 94,281.60 9,428.16
0.010 OH Kepala Tukang 106,066.80 1,060.67
0.005 OH Mandor 117,852.00 589.26
(2) 16,970.69 16,970.69

Jumlah (1) + (2) 59,999.66


8 1.000 M2 PASANG RANGKA LANGIT-LANGIT
(1,00 X 1,00) M, KAYU KELAS II
Bahan;
0.012 M3 Kayu balok Kelas II 2,728,000.00 32,736.00
0.100 Kg Paku 5 cm dan 10 cm 32,246.50 3,224.65
(1) 32,736.00 3,224.65 35,960.65
Tenaga ;
0.150 OH Pekerja 58,926.00 8,838.90
0.250 OH Tukang kayu 94,281.60 23,570.40
0.025 OH Kepala Tukang 106,066.80 2,651.67
0.075 OH Mandor 117,852.00 8,838.90
(2) 43,899.87 43,899.87

Jumlah (1) + (2) 79,860.52


KODE HARGA UPAH BAHAN BAHAN JUMLAH
ANA- SATUAN ( Rp.) LOKAL NON HARGA
NO. URAIAN PEKERJAAN
LISA ( Rp.) ( Rp.) LOKAL ( Rp.)
( Rp.)
1 2 3 4 5 6 7 8
9 1.000 M' PASANG LISPLANG UKURAN 6.21
(3 X 20) CM, KAYU KELAS I
Bahan; 6.21.1
0.0108 M3 Papan kayu Kelas I 4,724,500.00 51,024.60
0.100 Kg Paku 5 cm dan 7 cm 32,246.50 3,224.65
(1) 51,024.60 3,224.65 54,249.25
Tenaga ; 6.21.2
0.100 OH Pekerja 58,926.00 5,892.60
0.200 OH Tukang kayu 94,281.60 18,856.32
0.020 OH Kepala Tukang 106,066.80 2,121.34
0.005 OH Mandor 117,852.00 589.26
(2) 27,459.52 27,459.52

Jumlah (1) + (2) 81,708.77


10 1.000 M2 PASANG DINDING PEMISAH 6.24
TEAKWOOD RANGKAP, RANGKA
KAYU KELAS II
Bahan; 6.24.1
0.028 M3 Balok kayu Kelas II ( 6 x 12) cm 2,728,000.00 76,384.00
0.150 Kg Paku 5 cm dan 10 cm 32,246.50 4,836.98
0.860 Lbr teakwood tebal 4 mm ( 120 x 240 ) cm 130,400.00 112,144.00
0.560 Kg Lem Kayu 46,887.50 26,257.00
(1) 76,384.00 143,237.98 219,621.98
Tenaga ; 6.24.2
0.200 OH Pekerja 58,926.00 11,785.20
0.600 OH Tukang kayu 94,281.60 56,568.96
0.060 OH Kepala Tukang 106,066.80 6,364.01
0.010 OH Mandor 117,852.00 1,178.52
(2) 75,896.69 75,896.69

Jumlah (1) + (2) 295,518.66


11 1.000 M3 PASANG GELAGAR LANTAI
RANGKA EKSPOSE KAYU KELAS I
Bahan;
1.0000 M3 kayu Kelas I 4,724,500.00 4,724,500.00
0.350 Kg Paku 32,246.50 11,286.28
(1) 4,724,500.00 11,286.28 4,735,786.28
Tenaga ;
8.000 OH Pekerja 58,926.00 471,408.00
10.000 OH Tukang kayu 94,281.60 942,816.00
0.442 OH Kepala Tukang 106,066.80 46,881.53
0.400 OH Mandor 117,852.00 47,140.80
(2) 1,508,246.33 1,508,246.33

Jumlah (1) + (2) 6,244,032.60


12 1.000 M3 PASANG DINDING/LANTAI PAPAN
KAYU KELAS II
Bahan;
0.0250 M3 Papan Kelas II 2,728,000.00 68,200.00
0.0130 M3 kayu Kelas II 2,728,000.00 35,464.00
0.200 Kg Paku 32,246.50 6,449.30
(1) 103,664.00 6,449.30 110,113.30
Tenaga ;
0.200 OH Pekerja 58,926.00 11,785.20
0.080 OH Tukang kayu 94,281.60 7,542.53
0.008 OH Kepala Tukang 106,066.80 848.53
0.100 OH Mandor 117,852.00 11,785.20
(2) 31,961.46 31,961.46

Jumlah (1) + (2) 142,074.76


13 1.000 M3 PASANG LANTAI PAPAN
KAYU KELAS I
Bahan;
0.0250 M3 Papan Kelas I 4,724,500.00 118,112.50
0.0130 M3 kayu Kelas I 4,724,500.00 61,418.50
0.200 Kg Paku 87,550.00 17,510.00
(1) 179,531.00 17,510.00 197,041.00
Tenaga ;
0.200 OH Pekerja 58,926.00 11,785.20
0.080 OH Tukang kayu 94,281.60 7,542.53
0.008 OH Kepala Tukang 106,066.80 848.53
0.100 OH Mandor 117,852.00 11,785.20
(2) 31,961.46 31,961.46

Jumlah (1) + (2) 229,002.46


14 1.000 M' PASANG LIST PLAFOND
KAYU PROFIL
Bahan;
1.0500 M' Kayu Profil 30,000.00 31,500.00
(1) 31,500.00 31,500.00
Tenaga ;
KODE HARGA UPAH BAHAN BAHAN JUMLAH
ANA- SATUAN ( Rp.) LOKAL NON HARGA
NO. URAIAN PEKERJAAN
LISA ( Rp.) ( Rp.) LOKAL ( Rp.)
( Rp.)
1 2 3 4 5 6 7 8
0.021 OH Pekerja 58,926.00 1,237.45
0.021 OH Tukang kayu 94,281.60 1,979.91
0.002 OH Kepala Tukang 106,066.80 212.13
0.001 OH Mandor 117,852.00 117.85
(2) 3,547.35 3,547.35

Jumlah (1) + (2) 35,047.35


1.000 M3 PASANG TIANG KAYU KELAS I 6.14
EKSPOSE KAYU KELAS I
Bahan; 6.14.1
1.200 M3 Balok kayu Kelas I 4,724,500.00 5,669,400.00
0.250 Kg Paku Biasa 32,246.50 8,061.63
(1) 5,669,400.00 8,061.63 5,677,461.63
Tenaga ; 6.14.2
4.000 OH Pekerja 58,926.00 235,704.00
12.000 OH Tukang kayu 94,281.60 1,131,379.20
1.200 OH Kepala Tukang 106,066.80 127,280.16
0.500 OH Mandor 117,852.00 58,926.00
(2) 1,553,289.36 1,553,289.36

Jumlah (1) + (2) 7,230,750.99

VII. PEKERJAAN BETON (LANTAI)


( Edisi Revisi SNI 03-2835-2002)

1 1.000 M3 MEMBUAT BETON TUMBUK, 6.1


1PC : 3PS : 5KR
Bahan; 6.1.1
218.000 Kg Semen Portland 2,290.60 499,350.15
0.520 M3 Pasir beton 329,538.00 171,359.76
0.870 M3 Koral beton 305,580.00 265,854.60
(1) 437,214.36 499,350.15 936,564.51
Tenaga ; 6.1.2
1.650 OH Pekerja 58,926.00 97,227.90
0.250 OH Tukang Batu 94,281.60 23,570.40
0.025 OH Kepala Tukang 106,066.80 2,651.67
0.080 OH Mandor 117,852.00 9,428.16
(2) 132,878.13 132,878.13

Jumlah (1) + (2) 1,069,442.64


2 1.000 M2 MEMBUAT LANTAI BETON TUMBUK, 6.4
1PC : 3PS : 5KR, TEBAL 5 CM
Bahan; 6.4.1
10.000 Kg Semen Portland 2,290.60 22,905.97
0.026 M3 Pasir beton 329,538.00 8,567.99
0.044 M3 Koral beton 305,580.00 13,445.52
(1) 22,013.51 22,905.97 44,919.48
Tenaga ; 6.4.2
1.150 OH Pekerja 58,926.00 67,764.90
0.020 OH Tukang Batu 94,281.60 1,885.63
0.002 OH Kepala Tukang 106,066.80 212.13
0.006 OH Mandor 117,852.00 707.11
(2) 70,569.78 70,569.78

Jumlah (1) + (2) 115,489.26


VIII. PEKERJAAN PENUTUP ATAP
( Edisi Revisi SNI 03-2835-2002)
1 1.000 M2 PASANG ATAP SENG GELOMBANG 6.38

Bahan; 6.38.1
0.700 Lbr Seng gelombang 3" x 6" bjls 28 94,682.50 66,277.75
0.020 Kg paku biasa 1/2" - 1" 40,232.50 804.65
(1) 67,082.40 67,082.40
Tenaga ; 6.38.2
0.120 OH Pekerja 58,926.00 7,071.12
0.060 OH Tukang Kayu 94,281.60 5,656.90
0.006 OH Kepala Tukang 106,066.80 636.40
0.006 OH Mandor 117,852.00 707.11
(2) 14,071.53 14,071.53

Jumlah (1) + (2) 81,153.93


2 1.000 M2 PASANG ATAP NOK SENG 6.39

Bahan; 6.39.1
0.300 Lbr Seng plat 3" x 6" bjls 28 94,682.50 28,404.75
0.040 Kg paku biasa 1/2" - 1" 40,232.50 1,609.30
(1) 30,014.05 30,014.05
Tenaga ; 6.39.2
0.150 OH Pekerja 58,926.00 8,838.90
0.070 OH Tukang Kayu 94,281.60 6,599.71
KODE HARGA UPAH BAHAN BAHAN JUMLAH
ANA- SATUAN ( Rp.) LOKAL NON HARGA
NO. URAIAN PEKERJAAN
LISA ( Rp.) ( Rp.) LOKAL ( Rp.)
( Rp.)
1 2 3 4 5 6 7 8
0.008 OH Kepala Tukang 106,066.80 848.53
0.006 OH Mandor 117,852.00 707.11
(2) 16,994.26 16,994.26

Jumlah (1) + (2) 47,008.31


3 1.000 M2 PASANG ROOF LIGHT FIBREGLASS 6.7
( 180 X 90 ) CM
Bahan; 6.7.1
1.000 Lbr Roof light fibreglass 61,600.00 61,600.00
0.050 Kg paku biasa 1/2" - 1" 40,232.50 2,011.63
(1) 63,611.63 63,611.63
Tenaga ; 6.7.2
0.140 OH Pekerja 58,926.00 8,249.64
0.067 OH Tukang Kayu 94,281.60 6,316.87
0.007 OH Kepala Tukang 106,066.80 742.47
0.007 OH Mandor 117,852.00 824.96
(2) 16,133.94 16,133.94

Jumlah (1) + (2) 79,745.56


4 1.000 M2 PASANG ATAP GENTENG METAL 6.32

Bahan; 6.32.1
2.041 Lbr genteng metal 61,600.00 125,714.29
0.200 Kg paku biasa 2" - 5" 40,232.50 8,046.50
(1) 133,760.79 133,760.79
Tenaga ; 6.32.2
0.200 OH Pekerja 58,926.00 11,785.20
0.100 OH Tukang Kayu 94,281.60 9,428.16
0.010 OH Kepala Tukang 106,066.80 1,060.67
0.010 OH Mandor 117,852.00 1,178.52
(2) 23,452.55 23,452.55

Jumlah (1) + (2) 157,213.33


5 1.000 M' PASANG NOK GENTENG METAL 6.36

Bahan; 6.36.1
1.100 Bh genteng dectra bond 67,760.00 74,536.00
0.050 Kg paku biasa 1/2" - 1" 40,232.50 2,011.63
(1) 76,547.63 76,547.63
Tenaga ; 6.36.2
0.250 OH Pekerja 58,926.00 14,731.50
0.150 OH Tukang Kayu 94,281.60 14,142.24
0.015 OH Kepala Tukang 106,066.80 1,591.00
0.013 OH Mandor 117,852.00 1,532.08
(2) 31,996.82 31,996.82

Jumlah (1) + (2) 108,544.44

IX. PEKERJAAN LANGIT - LANGIT


( SNI DT 91-0013-2007)

1 1.000 M2 LANGIT - LANGIT TRIPLEKS 6.5


( 120 X 240 ) CM TEBAL 3 MM
Bahan; 6.5.1
0.375 Lbr Tripleks tebal 3 mm 95,186.66 35,695.00
0.030 Kg Paku tripleks 33,577.50 1,007.33
(1) 36,702.32 36,702.32
Tenaga ; 6.5.2
0.100 OH Pekerja 58,926.00 5,892.60
0.100 OH Tukang kayu 94,281.60 9,428.16
0.010 OH Kepala Tukang 106,066.80 1,060.67
0.005 OH Mandor 117,852.00 589.26
(2) 16,970.69 16,970.69

Jumlah (1) + (2) 53,673.01

X. PEKERJAAN KUNCI DAN KACA


( Edisi Revisi SNI 03-2835-2002)

1 1.000 BH PASANG KUNCI TANAM BIASA 6.2

Bahan; 6.2.1
1.000 Bh Kunci tanam biasa 120,092.50 120,092.50
(1) 120,092.50 120,092.50
Tenaga ; 6.2.2
0.010 OH Pekerja 58,926.00 589.26
0.500 OH Tukang Kayu 94,281.60 47,140.80
0.010 OH Kepala Tukang 106,066.80 1,060.67
0.005 OH Mandor 117,852.00 589.26
(2) 49,379.99 49,379.99
KODE HARGA UPAH BAHAN BAHAN JUMLAH
ANA- SATUAN ( Rp.) LOKAL NON HARGA
NO. URAIAN PEKERJAAN
LISA ( Rp.) ( Rp.) LOKAL ( Rp.)
( Rp.)
1 2 3 4 5 6 7 8
Jumlah (1) + (2) 169,472.49
2 1.000 BH PASANG ENGSEL PINTU 6.5

Bahan; 6.5.1
1.000 Bh Engsel pintu 20,267.50 20,267.50
(1) 20,267.50 20,267.50
Tenaga ; 6.5.2
0.015 OH Pekerja 58,926.00 883.89
0.150 OH Tukang Kayu 94,281.60 14,142.24
0.015 OH Kepala Tukang 106,066.80 1,591.00
0.00075 OH Mandor 117,852.00 88.39
(2) 16,705.52 16,705.52

Jumlah (1) + (2) 36,973.02


3 1.000 BH PASANG ENGSEL JENDELA 6.6
KUPU-KUPU
Bahan; 6.6.1
1.000 Bh Engsel jendela 46,887.50 46,887.50
(1) 46,887.50 46,887.50
Tenaga ; 6.6.2
0.010 OH Pekerja 58,926.00 589.26
0.100 OH Tukang Kayu 94,281.60 9,428.16
0.010 OH Kepala Tukang 106,066.80 1,060.67
0.00050 OH Mandor 117,852.00 58.93
(2) 11,137.01 11,137.01

Jumlah (1) + (2) 58,024.51


4 1.000 BH PASANG KAIT ANGIN 6.9

Bahan; 6.9.1
1.000 Bh Kait Angin 26,922.50 26,922.50
(1) 26,922.50 26,922.50
Tenaga ; 6.9.2
0.015 OH Pekerja 58,926.00 883.89
0.150 OH Tukang Kayu 94,281.60 14,142.24
0.015 OH Kepala Tukang 106,066.80 1,591.00
0.00075 OH Mandor 117,852.00 88.39
(2) 16,705.52 16,705.52

Jumlah (1) + (2) 43,628.02

5 1.000 BH PASANG KUNCI SELOT 6.11

Bahan; 6.11.1
1.000 Bh Kunci Selot 13,612.50 13,612.50
(1) 13,612.50 13,612.50
Tenaga ; 6.11.2
0.020 OH Pekerja 58,926.00 1,178.52
0.200 OH Tukang Kayu 94,281.60 18,856.32
0.020 OH Kepala Tukang 106,066.80 2,121.34
0.001 OH Mandor 117,852.00 117.85
(2) 22,274.03 22,274.03

Jumlah (1) + (2) 35,886.53


6 1.000 M2 PASANG KACA, TEBAL 5 MM 6.17

Bahan; 6.17.1
1.100 M2 Kaca 246,840.00 271,524.00
(1) 271,524.00 271,524.00
Tenaga ; 6.17.2
0.015 OH Pekerja 58,926.00 883.89
0.150 OH Tukang Kayu 94,281.60 14,142.24
0.015 OH Kepala Tukang 106,066.80 1,591.00
0.00075 OH Mandor 117,852.00 88.39
(2) 16,705.52 16,705.52

Jumlah (1) + (2) 288,229.52

XI. PEKERJAAN PENUTUP LANTAI


DAN DINDING
( Edisi Revisi SNI 03-2835-2002)
1 1.000 M2 PASANG LANTAI KERAMIK 6.35
40 X 40 CM
Bahan; 6.34.1
1.100 Bh Ubin keramik 40 x 40 cm 96,180.48 105,798.53
10.000 Kg Semen portland 2,290.60 22,905.97
0.045 M3 Pasir pasang 385,440.00 17,344.80
1.500 Kg Semen warna 13,478.06 20,217.09
(1) 17,344.80 148,921.59 166,266.39
Tenaga ; 6.34.2
0.700 OH Pekerja 58,926.00 41,248.20
KODE HARGA UPAH BAHAN BAHAN JUMLAH
ANA- SATUAN ( Rp.) LOKAL NON HARGA
NO. URAIAN PEKERJAAN
LISA ( Rp.) ( Rp.) LOKAL ( Rp.)
( Rp.)
1 2 3 4 5 6 7 8
0.350 OH Tukang Batu 94,281.60 32,998.56
0.035 OH Kepala Tukang 106,066.80 3,712.34
0.035 OH Mandor 117,852.00 4,124.82
(2) 82,083.92 82,083.92

Jumlah (1) + (2) 248,350.31


XI. PEKERJAAN PENUTUP LANTAI
DAN DINDING
( Edisi Revisi SNI 03-2835-2002)
1 1.000 M2 PASANG LANTAI KERAMIK 6.35
20 X 20 CM
Bahan; 6.34.1
1.100 Bh Ubin keramik 20 x 20 cm 80,223.00 88,245.30
10.000 Kg Semen portland 2,290.60 22,905.97
0.045 M3 Pasir pasang 385,440.00 17,344.80
1.500 Kg Semen warna 13,478.06 20,217.09
(1) 17,344.80 131,368.36 148,713.16
Tenaga ; 6.34.2
0.700 OH Pekerja 58,926.00 41,248.20
0.350 OH Tukang Batu 94,281.60 32,998.56
0.035 OH Kepala Tukang 106,066.80 3,712.34
0.035 OH Mandor 117,852.00 4,124.82
(2) 82,083.92 82,083.92

Jumlah (1) + (2) 230,797.08


XI. PEKERJAAN PENUTUP LANTAI
DAN DINDING
( Edisi Revisi SNI 03-2835-2002)
1 1.000 M2 PASANG LANTAI KERAMIK 6.35
20 X 25 CM
Bahan; 6.34.1
1.100 Bh Ubin keramik 20 x 25 cm 80,223.00 88,245.30
10.000 Kg Semen portland 2,290.60 22,905.97
0.045 M3 Pasir pasang 385,440.00 17,344.80
1.500 Kg Semen warna 13,478.06 20,217.09
(1) 17,344.80 131,368.36 148,713.16
Tenaga ; 6.34.2
0.700 OH Pekerja 58,926.00 41,248.20
0.350 OH Tukang Batu 94,281.60 32,998.56
0.035 OH Kepala Tukang 106,066.80 3,712.34
0.035 OH Mandor 117,852.00 4,124.82
(2) 82,083.92 82,083.92

Jumlah (1) + (2) 230,797.08

XII. PEKERJAAN PENGECATAN

1 1.000 M2 PENGECATAN BIDANG KAYU 6.8


BARU ( 1 LAPIS PLAMIR), 1 LAPIS
CAT DASAR, 2 LAPIS CAT PENUTUP :
Bahan; 6.8.1
0.200 Kg Cat meni 42,894.50 8,578.90
0.150 Kg Plamir 42,894.50 6,434.18
0.170 Kg Cat dasar 46,887.50 7,970.88
0.260 Kg Cat penutup 2 kali 46,887.50 12,190.75
(1) 35,174.70 35,174.70
Tenaga ; 6.8.2
0.070 OH Pekerja 58,926.00 4,124.82
0.009 OH Tukang Cat 94,281.60 848.53
0.006 OH Kepala Tukang 106,066.80 636.40
0.0025 OH Mandor 117,852.00 294.63
(2) 5,904.39 5,904.39

Jumlah (1) + (2) 41,079.09


2 1.000 M2 PELABURAN BIDANG KAYU 6.10
DENGAN TEAK OIL :
Bahan; 6.10.1
0.360 Ltr Teak oil 66,852.50 24,066.90
(1) 24,066.90 24,066.90
Tenaga ; 6.10.2
0.040 OH Pekerja 58,926.00 2,357.04
0.063 OH Tukang Cat 94,281.60 5,939.74
0.063 OH Kepala Tukang 106,066.80 6,682.21
0.0025 OH Mandor 117,852.00 294.63
(2) 15,273.62 15,273.62

Jumlah (1) + (2) 39,340.52


3 1.000 M2 PELABURAN BIDANG KAYU 6.12
DENGAN CAT RESIDU DAN TER :
Bahan; 6.12.1
KODE HARGA UPAH BAHAN BAHAN JUMLAH
ANA- SATUAN ( Rp.) LOKAL NON HARGA
NO. URAIAN PEKERJAAN
LISA ( Rp.) ( Rp.) LOKAL ( Rp.)
( Rp.)
1 2 3 4 5 6 7 8
0.350 Ltr Residu atau ter 23,694.40 8,293.04
(1) 8,293.04 8,293.04
Tenaga ; 6.12.2
0.100 OH Pekerja 58,926.00 5,892.60
0.006 OH Mandor 94,281.60 565.69
(2) 6,458.29 6,458.29

Jumlah (1) + (2) 14,751.33


4 1.000 M2 PENGECATAN TEMBOK BARU 6.14
(1 LAPIS PLAMIR, 1 LAPIS CAT DASAR,
2 LAPIS CAT PENUTUP) :
Bahan; 6.14.1
0.100 Kg Plamir 42,894.50 4,289.45
0.100 Kg Cat dasar 46,887.50 4,688.75
0.260 Kg Cat penutup 2 x 46,887.50 12,190.75
(1) 21,168.95 21,168.95
Tenaga ; 6.14.2
0.020 OH Pekerja 58,926.00 1,178.52
0.063 OH Tukang Cat 94,281.60 5,939.74
0.0063 OH Kepala Tukang 106,066.80 668.22
0.0025 OH Mandor 117,852.00 294.63
(2) 8,081.11 8,081.11

Jumlah (1) + (2) 29,250.06

XIII. PEKERJAAN ELEKTRIKAL

1 1 TITIK PAS. LAMPU XL 18 WATT


Bahan;
1.000 Bh Lampu XL 18 Watt 66,852.50 66,852.50
10.000 M' Kabel NGA 13,612.50 136,125.00
10.000 M' Pipa paralon 1/4" 18,049.17 180,491.70
1.000 Bh Saklar 40,232.50 40,232.50
4.000 Bh Isolator 66,852.50 267,410.00
1.000 Instalasi 86,817.50 86,817.50
(1) 777,929.20 777,929.20
Tenaga ;
0.063 OH Tukang Listrik 94,281.60 5,939.74
(2) 5,939.74 5,939.74

Jumlah (1) + (2) 783,868.94


1 1 TITIK PAS. LAMPU XL 8 WATT
Bahan;
1.000 Bh Lampu XL 8 Watt 46,887.50 46,887.50
10.000 M' Kabel NGA 13,612.50 136,125.00
10.000 M' Pipa paralon 1/4" 18,049.17 180,491.70
1.000 Bh Saklar 40,232.50 40,232.50
4.000 Bh Isolator 66,852.50 267,410.00
1.000 Instalasi 86,817.50 86,817.50
(1) 757,964.20 757,964.20
Tenaga ;
0.063 OH Tukang Listrik 86,817.50 5,469.50
(2) 5,469.50 5,469.50

Jumlah (1) + (2) 763,433.70

2 1 TITIK PAS. STOP KONTAK


Bahan;
1.000 Bh Stop kontak 40,232.50 40,232.50
5.000 M' Kabel NGA 13,612.50 68,062.50
3.000 M' Pipa paralon 1/4" 18,049.17 54,147.51
4.000 Bh Isolator 66,852.50 267,410.00
1.000 Instalasi 86,817.50 86,817.50
(1) 516,670.01 516,670.01
Tenaga ;
0.063 OH Tukang Listrik 94,281.60 5,939.74
(2) 5,939.74 5,939.74

Jumlah (1) + (2) 522,609.75


3 1 TITIK PAS. SEKERING KAS 2 GROUP
Bahan;
1.000 Bh Sekring Kas 2 group 66,852.50 66,852.50
3.000 M' Kabel NGA 13,612.50 40,837.50
2.000 M' Pipa paralon 1/4" 18,049.17 36,098.34
1.000 Instalasi 86,817.50 86,817.50
(1) 230,605.84 230,605.84
Tenaga ;
0.063 OH Tukang Listrik 94,281.60 5,939.74
(2) 5,939.74 5,939.74

Jumlah (1) + (2) 236,545.58


KODE HARGA UPAH BAHAN BAHAN JUMLAH
ANA- SATUAN ( Rp.) LOKAL NON HARGA
NO. URAIAN PEKERJAAN
LISA ( Rp.) ( Rp.) LOKAL ( Rp.)
( Rp.)
1 2 3 4 5 6 7 8
XIV. PEKERJAAN PASANGAN
1 1M2 PASANGAN PAVING BLOK
Bahan;
33.0000 Bh Paving Blok Segi 6 5,920.20 195,366.60
0.1000 M3 Pasir Urug (Pasir Pasang) 385,440.00 38,544.00
(1) 233,910.60 233,910.60
Tenaga ;
0.1000 OH Pekerja 58,926.00 5,892.60
0.1000 OH Tukang 94,281.60 9,428.16
0.0100 OH Kepala Tukang 106,066.80 1,060.67
0.0150 OH Mandor 117,852.00 1,767.78
(2) 18,149.21 18,149.21

Jumlah (1) + (2) 252,059.81


ENGGINER ESTIMATE
( EE )
PROGRAM :
PEKERJAAN : PENATAAN LANDSCAPE PERPUSTAKAAN DAN ARSIP DAERAH KAB. KEPULAUAN YAPEN
LOKASI : SERUI, KAB. KEPULAUAN YAPEN
T/A : 2012
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME
( Rp ) ( Rp )

A. PEKERJAAN PERSIAPAN
1 Pembuatan Papan Nama Proyek 1.00 bh 1,000,000.00 1,000,000.00
2 Pembuatan direksi keet dan gudang bahan 18.00 m2 1,188,147.40 21,386,653.19
3 Pembersihan Lokasi Proyek 841.00 m2 11,785.20 9,911,353.20
4 Pas. Bouwplank 223.60 m' 69,447.62 15,528,487.38
5 Dokumentasi Proyek 3.00 paket 500,000.00 1,500,000.00
Sub Total 49,326,493.78
B. PEKERJAAN PENATAAN HALAMAN
1 Urugan Pasir 84.10 m3 385,552.32 32,424,950.11
2 Pas. Paving Blok 642.00 m2 252,059.81 161,822,396.74
3 Cor Kerb 4.28 m3 1,069,442.64 4,578,283.92
4 Galian Tanah Saluran Air Hujan 6.00 m3 47,140.80 282,844.80
5 Pas. Batu Tela Saluran Air hujan Camp. 1 : 3 40.00 m2 202,935.26 8,117,410.40
6 Pas. Batu Tela Pembatas Taman Camp. 1 : 3 12.08 m3 2,029,352.60 24,514,579.41
7 Plesteran Dinding Saluran Air Hujan Camp. 1 : 2 80.00 m2 73,254.63 5,860,370.06
8 Plesteran Dinding Pembatas taman Camp. 1 : 3 151.00 m2 69,934.14 10,560,055.79
9 Acian Dinding Saluran Air Hujan dan Pembatas Taman 231.00 m2 30,896.99 7,137,204.29
10 Cor Lantai Saluran Air Hujan tebal 5 cm 10.00 m2 115,489.26 1,154,892.56
11 Pas. Batu tela kaki kursi taman 3.00 m2 202,935.26 608,805.78
12 Cor plat tempat duduk dan sandaran kursi taman 0.86 m3 7,612,443.15 6,577,150.89
13 Plesteran kursi taman 7.80 m2 69,934.14 545,486.33
14 Acian kursi taman 7.80 m2 30,896.99 240,996.51
Sub Total 264,425,427.57
C. PEKERJAAN RUANG PERTEMUAN
1 Pekerjaan Tanah Dan Pondasi
Galian tanah pondasi 45.00 m3 47,140.80 2,121,336.00
Urugan pasir bawah pondasi 2.25 m3 385,552.32 867,492.72
Pas. Batu kosong 6.75 m3 590,171.50 3,983,657.61
Pas. Pondasi camp. 1 : 3 21.00 m3 1,192,229.10 25,036,811.18
Urugan kembali 1/4 galian 11.25 m3 15,713.60 176,778.00
Urugan tanah bawah lantai 14.98 m3 384,373.80 5,755,997.66
Urugan pasir bawah lantai 3.00 m3 385,552.32 1,154,729.20
2 Pekerjaan Beton Dan Dinding
Pas. Sloof praktis 15/20 1.50 m3 5,970,545.04 8,955,817.56
Pek. Kolom 20/20 1.92 m3 8,940,563.25 17,165,881.45
Pek. Kolom praktis 10/10 0.40 m3 8,940,563.25 3,576,225.30
Pek. Ringbalk praktis 10/20 2.44 m3 7,612,443.15 18,574,361.30
Pek. Dak beton 2.60 m3 7,612,443.15 19,822,801.98
Pas. Dinding batu tela camp. 1 : 3 104.40 m2 202,935.26 21,186,441.14
Plesteran dinding camp. 1 : 3 223.15 m2 69,934.14 15,605,804.29
Acian dinding 223.15 m2 30,896.99 6,894,662.93
Pas. Keramik dinding KM/WC uk. 20x25 18.00 m2 230,797.08 4,154,347.40
3 Pekerjaan Lantai
Cor lantai kerja tebal 5 cm 62.60 m2 115,489.26 7,229,627.40
Pas. Keramik lantai uk. 40x40 58.10 m2 248,350.31 14,429,152.78
Pas. Keramik lantai uk. 20x20 4.50 m2 230,797.08 1,038,586.85
ENGGINER ESTIMATE
( EE )
PROGRAM :
PEKERJAAN : PENATAAN LANDSCAPE PERPUSTAKAAN DAN ARSIP DAERAH KAB. KEPULAUAN YAPEN
LOKASI : SERUI, KAB. KEPULAUAN YAPEN
T/A : 2012
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME
( Rp ) ( Rp )
4 Pekerjaan Kayu Dan Atap
Pek. Kuda-kuda kayu kls. I 5/10 1.81 m3 8,719,073.20 15,759,724.81
Pek. Gording kayu kls. II 5/10 1.33 m3 4,334,853.51 5,748,015.75
Pek. Lesplank kayu kls. I 20.52 m2 81,708.77 1,676,663.88
Pas. Atap seng BJLS 30 127.59 m2 81,153.93 10,354,429.78
Pas. Nok seng plat BJLS 30 15.17 m2 47,008.31 713,022.02
Pek. Ornamen kayu kls. I 5/10 0.97 m3 8,375,856.33 8,082,701.35
Pas. Ornamen kayu kls. I 2/10 0.37 m3 8,375,856.33 3,077,289.61
Pek. Kusen kayu kls. I 5/10 0.10 m3 8,375,856.33 837,585.63
Pas. Pintu panil kayu kls. I 2.94 m2 813,958.69 2,393,038.55
Pas. Kaca mati 5 mm 0.70 m2 288,229.52 201,760.66
Pas. Rangka plafond kayu kls. II 99.00 m2 79,860.52 7,906,191.48
Pas. Plafond tripleks 3 mm 99.00 m2 53,673.01 5,313,628.04
5 Pek. Sanitair
Pas. Closed jongkok 2.00 bh 245,630.00 491,260.00
Pas. Pipa air bersih pipa PVC 1/2" 12.00 m' 8,003.59 96,043.08
Pas. Kran air 1/2" 2.00 bh 26,862.00 53,724.00
Pas. Floor drain 2.00 bh 13,431.00 26,862.00
Pas. Bak air fiber 2.00 bh 1,000,000.00 2,000,000.00
Pas. Pipa pembuangan air kotor PVC 3" 6.00 m' 37,359.46 224,156.76
Pas. Pipa septic tank PVC 4" 12.00 m' 54,686.09 656,233.08
Pek. Septic tank 1.00 unit 1,500,000.00 1,500,000.00
6 Pek. Penggantung Dan Asesoris
Pas. Engsel pintu panil 6.00 bh 36,973.02 221,838.13
Pas. Kunci 2 slaag 2.00 bh 169,472.49 338,944.98
7 Pekerjaan Pengecatan
Pek. cat dinding 223.15 m2 29,250.06 6,527,151.25
Pek. cat plafond 99.00 m2 29,250.06 2,895,756.10
Pek. Cat kayu 344.76 m2 41,079.09 14,162,220.02
8 Pekerjaan Instalasi Listrik
Pas. Stop kontak 2.00 ttk 522,609.75 1,045,219.50
Pas. Lampu XL 18 watt 3.00 ttk 783,868.94 2,351,606.82
Pas. Lampu XL 8 watt 3.00 ttk 763,433.70 2,290,301.11
Sub Total 274,675,881.14
D. PEKERJAAN GASEBO UKURAN 2 X 2 M ( 3 BUAH )
1 Pekerjaan Tanah Dan Pondasi
Galian tanah pondasi 21.60 m3 47,140.80 1,018,241.28
Urugan pasir bawah pondasi 1.08 m3 385,552.32 416,396.51
Pas. Batu kosong 3.24 m3 590,171.50 1,912,155.65
Pas. Pondasi camp. 1 : 3 10.08 m3 1,192,229.10 12,017,669.37
Urugan kembali 1/4 galian 5.40 m3 15,713.60 84,853.44
Urugan tanah bawah lantai 7.20 m3 384,373.80 2,767,491.36
Urugan pasir bawah lantai 0.60 m3 385,552.32 231,331.39
2 Pekerjaan Beton Dan Dinding
Pas. Sloof praktis 15/20 0.72 m3 5,970,545.04 4,298,792.43
Pek. Meja beton bertulang 0.11 m3 7,612,443.15 822,143.86
Pas. batu tela untuk tangga camp. 1 : 3 0.75 m3 2,029,352.60 1,522,014.45
ENGGINER ESTIMATE
( EE )
PROGRAM :
PEKERJAAN : PENATAAN LANDSCAPE PERPUSTAKAAN DAN ARSIP DAERAH KAB. KEPULAUAN YAPEN
LOKASI : SERUI, KAB. KEPULAUAN YAPEN
T/A : 2012
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME
( Rp ) ( Rp )
Pas. Batu tela kaki meja camp. 1 : 3 0.11 m3 2,029,352.60 219,170.08
Plesteran dinding camp. 1 : 3 18.84 m2 69,934.14 1,317,559.28
Acian dinding 18.84 m2 30,896.99 582,099.26
3 Pekerjaan Lantai
Cor lantai kerja tebal 5 cm 12.00 m2 115,489.26 1,385,871.07
Pas. Keramik lantai uk. 40x40 12.00 m2 248,350.31 2,980,203.67
4 Pekerjaan Kayu Dan Atap
Pek. Kolom kayu kls. I 10/10 0.12 m3 7,230,750.99 867,690.12
Pek. Mur plat kayu kls. I 5/10 0.12 m3 8,719,073.20 1,046,288.78
Pek. Kuda-kuda kayu kls. I 5/10 0.60 m3 8,719,073.20 5,231,443.92
Pek. Gording kayu kls. II 5/10 0.48 m3 4,334,853.51 2,080,729.68
Pek. Lesplank kayu kls. I 14.26 m2 81,708.77 1,164,840.17
Pas. Atap seng BJLS 30 58.32 m2 81,153.93 4,732,897.13
Pas. Nok seng plat BJLS 30 15.02 m2 47,008.31 706,252.83
Pek. Ornamen kayu kls. I 5/10 0.87 m3 8,375,856.33 7,286,995.00
Pas. Ornamen kayu kls. I 2/10 0.08 m3 8,375,856.33 688,495.39
Pas. Rangka plafond kayu kls. II 27.00 m2 79,860.52 2,156,234.04
Pas. Plafond tripleks 3 mm 27.00 m2 53,673.01 1,449,171.28
5 Pekerjaan Pengecatan
Pek. cat dinding 18.84 m2 29,250.06 551,071.16
Pek. cat plafond 27.00 m2 29,250.06 789,751.66
Pek. Cat kayu 110.19 m2 41,079.09 4,526,381.16
Sub Total 64,854,235.42
E. PEKERJAAN POS PENITIPAN BARANG UK. 2 x 3 M
1 Pekerjaan Tanah Dan Pondasi
Galian tanah pondasi 9.00 m3 47,140.80 424,267.20
Urugan pasir bawah pondasi 0.45 m3 385,552.32 173,498.54
Pas. Batu kosong 1.35 m3 590,171.50 796,731.52
Pas. Pondasi camp. 1 : 3 4.20 m3 1,192,229.10 5,007,362.24
Urugan kembali 1/4 galian 2.25 m3 15,713.60 35,355.60
Urugan tanah bawah lantai 2.00 m3 384,373.80 767,978.85
Urugan pasir bawah lantai 0.50 m3 385,552.32 192,583.38
2 Pekerjaan Beton Dan Dinding
Pas. Sloof praktis 15/20 0.30 m3 5,970,545.04 1,791,163.51
Pek. Kolom praktis 10/10 0.24 m3 8,940,563.25 2,145,735.18
Pek. Ringbalk praktis 10/20 0.30 m3 7,612,443.15 2,283,732.95
Pas. Dinding batu tela camp. 1 : 3 31.00 m2 202,935.26 6,290,993.06
Pas. Retaining wall batu tela camp. 1 : 3 2.72 m2 202,935.26 551,983.91
Plesteran dinding camp. 1 : 3 64.72 m2 69,934.14 4,526,137.82
Acian dinding 64.72 m2 30,896.99 1,999,653.08
3 Pekerjaan Lantai
Cor lantai kerja tebal 5 cm 9.99 m2 115,489.26 1,153,737.66
Plesteran lantai camp. 1 : 3 9.99 m2 69,934.14 698,642.10
Acian lantai 9.99 m2 30,896.99 308,660.91
4 Pekerjaan Kayu Dan Atap
Pek. Kuda-kuda kayu kls. I 5/10 0.24 m3 8,719,073.20 2,092,577.57
Pek. Gording kayu kls. II 5/10 0.20 m3 4,334,853.51 866,970.70
ENGGINER ESTIMATE
( EE )
PROGRAM :
PEKERJAAN : PENATAAN LANDSCAPE PERPUSTAKAAN DAN ARSIP DAERAH KAB. KEPULAUAN YAPEN
LOKASI : SERUI, KAB. KEPULAUAN YAPEN
T/A : 2012
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN VOLUME
( Rp ) ( Rp )
Pek. Lesplank kayu kls. I 5.33 m2 81,708.77 435,344.31
Pas. Atap seng BJLS 30 24.68 m2 81,153.93 2,002,878.96
Pas. Nok seng plat BJLS 30 5.47 m2 47,008.31 257,229.46
Pek. Ornamen kayu kls. I 5/10 0.05 m3 8,375,856.33 439,732.46
Pas. Ornamen kayu kls. I 2/10 0.02 m3 8,375,856.33 184,268.84
Pas. Rangka plafond kayu kls. II 17.39 m2 79,860.52 1,388,774.44
Pas. Plafond tripleks 3 mm 17.39 m2 53,673.01 933,373.65
5 Pekerjaan Pengecatan
Pek. cat dinding 64.72 m2 29,250.06 1,893,063.99
Pek. cat plafond 17.39 m2 29,250.06 508,658.57
Pek. Cat kayu 16.56 m2 41,079.09 680,105.33
Sub Total 40,831,195.81
F. PEKERJAAN POS PEMERIKSAAN BARANG UKURAN 2 x 2 M
1 Pekerjaan Tanah Dan Pondasi
Galian tanah pondasi 7.20 m3 47,140.80 339,413.76
Urugan pasir bawah pondasi 0.36 m3 385,552.32 138,798.84
Pas. Batu kosong 1.08 m3 590,171.50 637,385.22
Pas. Pondasi camp. 1 : 3 3.36 m3 1,192,229.10 4,005,889.79
Urugan kembali 1/4 galian 1.80 m3 15,713.60 28,284.48
Urugan tanah bawah lantai 1.46 m3 384,373.80 560,417.00
Urugan pasir bawah lantai 0.36 m3 385,552.32 140,533.82
2 Pekerjaan Beton Dan Dinding
Pas. Sloof praktis 15/20 0.24 m3 5,970,545.04 1,432,930.81
Pek. Kolom praktis 10/10 0.24 m3 8,940,563.25 2,145,735.18
Pek. Ringbalk praktis 10/20 0.20 m3 7,612,443.15 1,522,488.63
Pas. Dinding batu tela camp. 1 : 3 30.32 m2 202,935.26 6,152,997.08
Pas. Retaining wall batu tela camp. 1 : 3 2.32 m2 202,935.26 470,809.80
Plesteran dinding camp. 1 : 3 62.96 m2 69,934.14 4,403,053.72
Acian dinding 62.96 m2 30,896.99 1,945,274.38
3 Pekerjaan Lantai
Cor lantai kerja tebal 5 cm 7.29 m2 115,489.26 841,916.67
Plesteran lantai camp. 1 : 3 7.29 m2 69,934.14 509,819.91
Acian lantai 7.29 m2 30,896.99 225,239.04
4 Pekerjaan Kayu Dan Atap
Pek. Kuda-kuda kayu kls. I 5/10 0.22 m3 8,719,073.20 1,918,196.10
Pek. Gording kayu kls. II 5/10 0.16 m3 4,334,853.51 693,576.56
Pek. Lesplank kayu kls. I 4.75 m2 81,708.77 388,280.06
Pas. Atap seng BJLS 30 19.44 m2 81,153.93 1,577,632.38
Pas. Nok seng plat BJLS 30 5.01 m2 47,008.31 235,417.61
Pas. Rangka plafond kayu kls. II 9.00 m2 79,860.52 718,744.68
Pas. Plafond tripleks 3 mm 9.00 m2 53,673.01 483,057.09
5 Pekerjaan Pengecatan
Pek. cat dinding 62.96 m2 29,250.06 1,841,583.88
Pek. cat plafond 9.00 m2 29,250.06 263,250.55
Pek. Cat kayu 9.50 m2 41,079.09 390,415.63
Sub Total 34,011,142.68
ENGGINER ESTIMATE
( EE )
PROGRAM :
PEKERJAAN : PENATAAN LANDSCAPE PERPUSTAKAAN DAN ARSIP DAERAH KAB. KEPULAUAN YAPEN
LOKASI : SERUI, KAB. KEPULAUAN YAPEN
T/A : 2012

REKAPITULASI AKHIR
1 BIAYA FISIK

A PEKERJAAN PERSIAPAN 49,326,493.78

B PEKERJAAN PENATAAN HALAMAN 264,425,427.57

C PEKERJAAN RUANG PERTEMUAN 274,675,881.14

D PEKERJAAN GASEBO UKURAN 2 X 2 M ( 3 BUAH ) 64,854,235.42

E PEKERJAAN POS PENITIPAN BARANG UK. 2 x 3 M 40,831,195.81

F PEKERJAAN POS PEMERIKSAAN BARANG UK. 2 x 2 M 34,011,142.68

Real Cost 728,124,376.40


PPN 10 % 72,812,437.64
Total Cost 800,936,814.04
Dibulatkan 800,936,000.00
2 BIAYA PERENCANAAN (6.11 %) 48,937,000.00
3 BIAYA PENGAWASAN (4.19 %) 33,559,000.00
4 BIAYA AP (7.4 %) 59,269,000.00
GRAND TOTAL 942,701,000.00
Terbilang :
Sembilan ratus empat puluh dua juta tujuh ratus satu ribu rupiah

* Dasar perhitungan biaya Perencanaan, Pengawasan, dan Administrasi Proyek diambil


dari Peraturan Menteri PU No. 45 Tahun 2007

Serui, Juni 2012


Disetujui oleh, Disusun oleh,
KEPALA PERPUSTAKAAN DAN ARSIP DAERAH PT. CIPTA GRAHA ADIMATRA
KABUPATEN KEPULAUAN YAPEN

Ir. Edi Noca Mudumi, M.Si. Ir. Hj. Asmawati M.


Nip. 19651130 199203 1 013 Kep. Cabang

Anda mungkin juga menyukai