HARGA SATUAN MATERIAL DAN UPAH t
KABUPATEN ………………………… k
s
p
e
em
No. MATERIAL DAN UPAH SATUAN HARGA SATUAN (Rp.) re
en
I. HARGA DASAR BAHAN k
aI
1. SEMEN Semen PC Zak 70,000.00 tn
d
Semen PC kg 1,400.00 b
o
an
Floor hardener kg 7,900.00 te
as
Semen instan Zak 89,000.00
i
Semen putih/warna kg 2,966.67 ra
i
Cornis Zak 70,235.00 n
g
Cornis kg 3,511.75 a
n
;
2. PASIR Pasir Beton / Pasang m3 118,900.00 1
Pasir Beton / Pasang kg 84.93
Z
Pasir Urug m3 100,000.00 a
k
Pasir Urug kg 71.43
@
2
,
1
m
u
u
ks
l.e
it
n
1
a
e6
r
;0
No. MATERIAL DAN UPAH SATUAN HARGA SATUAN (Rp.) sa0
sew
7. ATAP ZINCALUME Atap Zincalume (t.0,35 mm) m' 66,600.00 sb
etam
eltar
m
tu
Atap Zincalume warna (t. 0,35 mm) m' 75,500.00 arn
eraa
Atap Alkan (t.0,35 mm) m' 65,000.00 xrc
a
s
ao
Nok Zincalume 0,30 m' 26,900.00 m
7
o
In
eo
4
Atap Zincalume warna (t.022mm) lbr 54,500.00 kd
rp
0
n
au
ae
Atap Zincalume warna (t.045mm) m' 101,700.00 d
lh
m
;Su
i/m
ln
u
,iu
n
ec
8. ATAP BITUMEN Atap bitumen motif gelombang lbr 156,780.00 kin
;o
s.
leke
Atap bitumen motif genteng lbr 47,700.00 la;u
lte
;tka
Nok atap bitumen bh 83,900.00 b
e.tr
a;u
/ra
k1
h
9. LAIN-LAIN Aluminium foil m2 48,800.00 .1
0
is1
5
to
Kalsiplank btg 48,200.00 0
9
rxak
5
0
o
4
Karpet talang m` 18,900.00 m
ac
l0
;c
lm
x
m
0
III BAHAN KAYU x,u
@
3
k
1. MERAWAN, KULIM Kayu Kelas I m3 6,000,000.00 5
1
.
,0
c
Balok kayu m3 6,000,000.00 2
m
2
c3
0
m
0
2. MERANTI Kayu Kelas II m3 4,000,000.00 m
x
9
Balok kayu m3 4,000,000.00 x5
x
4
0
s0
,
4. RACUK Kayu Kelas III m3 3,000,000.00 e3
m
t
Balok kayu m3 1,505,250.00
ac
srm
Papan racuk t.20 cm kpg 44,600.00 ea
t
am
3. LAIN-LAIN Gelam 6-8 cm pj. 4m btg 12,000.00 ru
al
Gelam 8-10 cm pj. 4m btg 15,000.00 i
m
a
Gelam 10-12 cm pj. 4m btg 18,000.00 su
,
le
Bambu dia.6-8/ 600cm btg 38,500.00
tia
ar
r,w
IV BAHAN PENUTUP DINDING/LANTAI aa
an
1. KERAMIK PUTIH 20 x 25 kotak 50,300.00 ra
M
siw
;
buah 2,515.00 eal
tan
1
30 x 30 kotak 58,000.00 an
buah 5,272.73 r;k
ao
40 x 40 kotak 68,800.00 1
t
Ia
buah 11,466.67 m
kk
p
o
50x50 kotak 134,200.00 rt@
buah 33,550.00 sea
esk2
st0
ao
@
r;k
2. KERAMIK WARNA/TEKSTUR 20 x 25 kotak 58,700.00 1
a6
p
s1
ge
A
k
bh 2,935.00 tskp
aio
gp
20 x 20 (KM/WC) kotak 83,900.00 rtga
aa
bh 3,356.00
sTk
30 x 30 (tekstur) kotak 147,800.00 eR
i
to
@
l
bh 13,436.36 am
e
ar;2
30 x 30 kotak 58,700.00 an
0
;1
bh 5,336.36 P
k
1
lkp
33,5x33,5 (tekstur) kotak 110,100.00
ao
g
bh 13,762.50 tkt
io
a
40 x 40 kotak 74,000.00 tn
k
a
u
bh 12,333.33 k@
m
;
50x50 kotak 91,000.00 @
1
bh 22,750.00 1
1
k8
k
o
p
tkg
ap
kg
@
4
k
r
aR
o
Em
u
a
srn
No. MATERIAL DAN UPAH SATUAN HARGA SATUAN (Rp.) o
;e
tg
50x50 (tekstur) kotak 127,500.00 ar1
sre
bh 31,875.00 eska
to
30x50 ktk 169,800.00 aIN
str
bh 33,960.00 a
en
an
ktd
o
aE
@
rgp
3. GRANITE TILE 60 x 60 kotak 310,000.00 lro
ae
l4
e
bh 77,500.00 gsi
ee
60 x 60 (tekstur) kotak 558,800.00 l;skn
p
h
ez
bh 139,700.00 ;g1
ga
e;
80 x 80 kotak 695,500.00 k1
n
zo
1
bh 347,750.00 kat
ao
;k
80 x 80 (tekstur) kotak 878,600.00 kt
o
a1
bh 439,300.00 tk@
a
Granite Pola uk. 1,2 x 1,2 m ls 2,637,500.00 kk
@
4
o
Step nosing 30 x 60 bh 97,100.00 t@
4
ak
Step nosing 20 x 60 bh 61,500.00 p
k2
gk
p
s@
skg
4. BATU ALAM Batu candi uk. 10x20 m2 178,200.00 eep
tt2
g
Granit alam m2 1,834,800.00 aa
rkr
Andesit uk. 10x30 dinding m2 183,500.00 ap
a
g
Andesit uk. 10 x 20 lantai m2 157,300.00
rr
Palimanan uk. 10x20 m2 167,700.00 aa
ii
Palimanan uk. 15x30 m2 188,700.00 n
n
b
b
Lempeng (kecil) m2 104,800.00 so
o
ew
Lempeng (besar) m2 136,300.00 tw
s
aet
Andesit + bevel m2 204,400.00 tr
tii
asap
p
ere
R
ta
5. LAIN-LAIN Karpet biasa m2 18,300.00
ao
cc
Karpet tebal 4 - 4,5mm m2 91,700.00 yrs
aa
aero
Karpet t. 4- 6 mm m2 249,000.00 lvw
p
sen
rM
Lantai vinyl 3 mm m2 255,000.00 ;i
en
av
Lantai Laminate t=0,8 mm m2 220,500.00 cn
le
eu
se
n
Lapis foam Lantai laminate m 18,300.00 ;i
tb
Plint laminate m 139,400.00 o
lan
u
ker
n
Adaptation laminate m 87,000.00 t;b
i3
ua
Wallpaper m2 36,700.00 u
r,k
kn
Nat keramik kg 17,300.00 t9
e.5
3
kr,
Aluminium Composite Panel (ACP) tipe PE untuk dalam m2 200,800.00 1
-
si9
to
5
rer4
o
r-
Aluminium Composite Panel (ACP) tipe PVDF untuk luar m2 265,900.00 li;m
o
4
@
ru
km
V BAHAN CETAK 1
;.
0
1. BUIS BETON Buis beton dia. 100cm m 786,300.00 m
u
1
k,
Buis beton dia. 80cm m 681,500.00 x.2
Buis beton dia. 60cm m 419,400.00 2
5
1
0
,m
Buis beton dia. 40cm m 314,500.00
2
Buis beton dia. 30cm m 262,100.00 c2
x
m
Buis beton dia. 20cm m 157,400.00 m
2
,
x4
1 ROSTER Roster keramik uk.30x30 bh 60,000.00 4
2
Roster keramik uk. 20x20 bh 40,000.00 ,m
4
Roster terawang bh 8,000.00 4
Roster beton bh 4,900.00 m
No. MATERIAL DAN UPAH SATUAN HARGA SATUAN (Rp.)
p
a
No. MATERIAL DAN UPAH SATUAN HARGA SATUAN (Rp.) n
j
5. PINTU BESI Folding Gate t.0,4 mm m2 450,800.00 a
n
Folding Gate t.0,6mm m2 529,500.00 g
Folding Gate t.0,8mm (jumbo) m2 686,700.00 +
Rolling door aluminum t.0,8 mm m2 629,100.00 5
Rolling door besi t.± 0,5 mm m2 576,600.00 0
Rolling door galvanum t.± 0,5 mm m2 419,400.00 c
m
;
PEGANGAN TANGGA f
6. STAINLESS Pegangan tangga stainless kombinasi acylic (3/4", 1" & 2") m' 331,600.00 i
n
Pegangan tangga stainless (3/4" & 2") m' 705,300.00 i
s
h
c
7. LAIN-LAIN Kawat jaring galvanis lbr 203,800.00 at
Kawat duri roll 175,000.00
s
Kawat duri m' 3,500.00 t
a
n
d
VII. BAHAN PIPA a
1. PIPA PVC Pipa PVC AW 1/2" btg 30,000.00 r
Pipa PVC AW 3/4" btg 36,000.00
Pipa PVC AW 3" btg 225,000.00
Pipa PVC AW 4" btg 273,000.00
Pipa PVC DW 3" btg 105,700.00
Pipa PVC DW 4" btg 166,200.00
p
4. PLAFOND PVC Plafond PVC putih m2 173,500.00 l
a
Plafond PVC warna m2 242,000.00 f
Ornamen PVC unit 3,669,500.00 on
d
;
5. LIST PLAFOND List plafond 1x4 btg 8,400.00
u
List plafond besar btg 17,600.00 k
.
List gypsum kecil btg 35,000.00
List gypsum sedang btg 50,000.00 1,
List PVC btg 125,800.00 2
m
x
1
,
6
m
No. MATERIAL DAN UPAH SATUAN HARGA SATUAN (Rp.)
XV. LAIN-LAIN
1 Amplas lbr 11,150.00
2 Diamond wheel bh 136,300.00
3 Tali Ijuk kg 39,800.00
4 Air ltr 450.00
5 Minyak Bekesting ltr 70,000.00
6 Minyak Pelumas ltr 36,700.00
7 Solar ltr 5,742.25
8 Soda api kg 22,300.00
9 Sewa alat las jam 7,000.00
10 Sewa scafolding unit 328,500.00
11 Sewa molen unit/hari 625,000.00
12 Karung goni lbr 10,200.00
13 Plastik m2 3,300.00
14 Geotekstil m2 23,100.00
15 Ijuk kg 4,800.00
HARGA UPAH
1 Pekerja L.01 OH 55,000.00
2 Tukang L.02 OH 80,000.00
3 Kepala Tukang L.03 OH 100,000.00
4 Mandor L.04 OH 100,000.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN (AHSP)
A.4.6.1.22 Pemasangan 1 m' lisplank ukuran (3x30) cm, kayu kelas II m' 75,707.50
A.4.6.1.23 Pemasangan 1 m2 rangka dinding pemisah (60x120) cm kayu kelas III m2 103,589.20
A.4.6.1.25 Pemasangan 1 m2 rangka dinding pemisah plywood rangkap, rangka kayu kelas II m2 286,643.50
A.4.6.1.26 Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas II m2 252,395.00
A.4.6.1.27 Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm m2 43,010.00
A.4.6.1.28 Pemasangan 1 m' kalsiplank m' 46,772.00
A.4.6.2. HARGA SATUAN PEKERJAAN KUNCI DAN KACA
A.4.6.2.2 Pemasangan 1 buah kunci tanam biasa buah 234,025.00
A.4.6.2.3 Pemasangan 1 buah kunci kamar mandi buah 223,162.50
A.4.6.2.4 Pemasangan 1 buah kunci silinder buah 223,162.50
A.4.6.2.5 Pemasangan 1 buah engsel pintu biasa 4" buah 37,735.50
A.4.6.2.6 Pemasangan 1 buah engsel jendela 3" buah 27,830.00
A.4.6.2.7 Pemasangan 1 buah engsel angin buah 77,825.00
A.4.6.2.8 Pemasangan 1 buah spring knip buah 83,517.50
A.4.6.2.9 Pemasangan 1 buah kait angin buah 85,827.50
A.4.6.2.10 Pemasangan 1 buah door closer buah 627,165.00
A.4.6.2.11 Pemasangan 1 buah kunci slot buah 101,860.00
A.4.6.2 .12 Pemasangan 1 buah Door handle (pegangan pintu) buah 179,685.00
A.4.6.2 .13 Pemasangan 1 buah door stop buah 114,895.00
A.4.6.2 .17 Pemasangan 1 m2 kaca tebal 5 mm m2 261,647.65
A.4.6.2 .18 Pemasangan 1 m2 kaca tebal 8 mm m2 325,780.51
A.4.6.2 .19 Pemasangan 1 m2 kaca buram tebal 12 mm m2 720,097.51
A.4.6.2 .23 Pemasangan 1 m2 kaca patri tebal 5 mm m2 2,560,878.65
A.4.7.1. HARGA SATUAN PEKERJAAN PENGECATAN
A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama m2 10,631.50
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) m2 43,530.30
A.4.7.1.5 1 m2 Pengecatan bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup) m2 57,153.80
A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil m2 39,102.80
A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur m2 62,985.12
A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter m2 8,519.50
A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis m2 37,565.00
A.4.7.1.10. Pengecatan 1 m2 tembok baru untuk interior ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) m2 19,324.80
A.4.7.1.11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup) m2 15,362.60
A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi m2 25,367.10
A. 4.7.1.19 Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat m2 37,125.00
A.4.7.1.10.a Pengecatan 1 m2 tembok baru untuk exterior ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) m2 41,432.60
A. 4.7.1.20 Pengecatan 1 m2 plafond (2 lapis cat penutup) m2 10,795.40
A.5.1.1. HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A.5.1.1.1. Pemasangan 1 buah closet duduk buah 1,772,650.00
A.5.1.1.2. Pemasangan 1 buah closet jongkok buah 594,647.90
A.5.1.1.4. Pemasangan 1 buah urinoir buah 3,229,312.90
A.5.1.1.5. Pemasangan 1 buah wastafel buah 1,219,447.90
A.5.1.1.6. Pemasangan 1 buah bathcuip porselen buah 5,337,997.50
A.5.1.1.7. Pemasangan 1 buah bak fibreglass vol 1 m3 buah 1,174,800.00
A.5.1.1.12. Pemasangan 1 buah bak cuci piring stainlessteel buah 1,703,295.00
A.5.1.1.14. Pemasangan 1 buah floor drain stainless steel buah 313,775.00
A.5.1.1.18. Pemasangan 1 m' pipa galvanis diameter 1/2" m' 67,092.67
A.5.1.1.19. Pemasangan 1 buah kran diameter 1/2" atau 3/4" buah 106,320.50
A.5.1.1.20. Pemasangan 1 m' pipa galvanis diameter 3/4" m' 81,869.33
A.5.1.1.24 Pemasangan 1 m' pipa galvanis diameter 4" m' 102,350.37
A.5.1.1.25. Pemasangan 1 m' pipa PVC tipe AW diameter 1/2" m' 21,125.50
A.5.1.1.26. Pemasangan 1 m' pipa PVC tipe AW diameter 3/4" m' 23,683.00
A.5.1.1.31. Pemasangan 1 m' pipa PVC tipe AW diameter 3" m' 114,611.75
A.5.1.1.32 Pemasangan 1 m' pipa PVC tipe AW diameter 4" m' 135,071.75
A.5.1.1.36. Pemasangan 1 m' pipa beton diameter 40 cm m' 456,288.69
A.8.4.6. HARGA SATUAN PEKERJAAN ELEKTRIKAL
A.8.4.6.1 Pemasangan 1 buah titik nyala lampu titik 381,535.00
A.8.4.6.2 Pemasangan 1 buah MCB buah 514,525.00
HARGA SATUAN PEKERJAAN LAIN-LAIN (TAKSIRAN)
DAFTAR ANALISA HARGA SATUAN PEKERJAAN (AHSP)
A.2.2.1.3 Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 55,000.00 11,000.00
Tukang Kayu L.02 OH 0.300 80,000.00 24,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.020 100,000.00 2,000.00
JUMLAH TENAGA KERJA 39,000.00
B BAHAN
Dolken Kayu Ø 8-10/400 cm Batang 1.000 15,000.00 15,000.00
Semen Portland Kg 2.000 1,400.00 2,800.00
Kawat duri M' 25.000 3,500.00 87,500.00
Pasir beton m3 0.005 118,900.00 594.50
Koral Beton m3 0.009 400,000.00 3,600.00
Paku biasa 2"-5" Kg 0.060 16,500.00 990.00
A.3.2.1.10 Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3Kr dan 40% batu belah
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 3.400 55,000.00 187,000.00
Tukang Batu L.02 OH 0.850 80,000.00 68,000.00
Kepala Tukang L.03 OH 0.085 100,000.00 8,500.00
Mandor L.04 OH 0.170 100,000.00 17,000.00
JUMLAH TENAGA KERJA 280,500.00
B BAHAN
Batu belah m3 0.480 495,000.00 237,600.00
Semen Portland Kg 194.000 1,400.00 271,600.00
Pasir beton m3 0.312 118,900.00 37,096.80
Kerikil m3 0.468 400,000.00 187,200.00
Besi beton Kg 126.000 10,750.00 1,354,500.00
Kawat beton Kg 1.800 22,900.00 41,220.00
JUMLAH HARGA BAHAN 2,129,216.80
C. PERALATAN
-
JUMLAH HARGA ALAT -
A.4.1.2.1 Pembuatan 1 m2 lahan produksi tebal 8 cm beton f'c = 14,5 Mpa, slump (120 ± 20) mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.132 55,000.00 7,260.00
Tukang Batu L.02 OH 0.022 80,000.00 1,760.00
Kepala Tukang L.03 OH 0.002 100,000.00 200.00
Mandor L.04 OH 0.007 100,000.00 700.00
JUMLAH TENAGA KERJA 9,920.00
B BAHAN
Semen Portland Kg 26.080 1,400.00 36,512.00
Pasir Beton Kg 60.800 84.93 5,163.66
Kerikil (Maks. 30 mm) Kg 82.320 366.67 30,184.00
Air Liter 17.200 450.00 7,740.00
JUMLAH HARGA BAHAN 79,599.66
C. PERALATAN
-
JUMLAH HARGA ALAT -
A.4.1.2.2 Pembuatan 1 m2 lahan produksi tebal 10 cm beton f'c = 14,5 Mpa, slump (120 ± 20) mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.165 55,000.00 9,075.00
Tukang Batu L.02 OH 0.028 80,000.00 2,240.00
Kepala Tukang L.03 OH 0.003 100,000.00 300.00
Mandor L.04 OH 0.008 100,000.00 800.00
JUMLAH TENAGA KERJA 12,415.00
B BAHAN
Semen Portland kg 32.600 1,400.00 45,640.00
Pasir Beton kg 76.000 84.93 6,454.57
Kerikil (Maks. 30 mm) kg 102.900 366.67 37,730.00
Air Liter 21.500 450.00 9,675.00
JUMLAH HARGA BAHAN 99,499.57
C. PERALATAN
-
JUMLAH HARGA ALAT -
A.4.1.2.3 Pembuatan 1 m2 lahan produksi tebal 12 cm beton f'c = 14,5 Mpa, slump (120 ± 20) mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.198 55,000.00 10,890.00
Tukang Batu L.02 OH 0.033 80,000.00 2,640.00
Kepala Tukang L.03 OH 0.003 100,000.00 300.00
Mandor L.04 OH 0.010 100,000.00 1,000.00
JUMLAH TENAGA KERJA 14,830.00
B BAHAN
Semen Portland kg 39.120 1,400.00 54,768.00
Pasir Beton kg 91.200 84.93 7,745.49
Kerikil (Maks. 30 mm) kg 123.480 366.67 45,276.00
Air Liter 25.800 450.00 11,610.00
JUMLAH HARGA BAHAN 119,399.49
C. PERALATAN
-
JUMLAH HARGA ALAT -
A.4.1.2.6 Pembuatan 1 m2 bekisting untuk balok beton pracetak (10 - 12 Kali pakai)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.004 55,000.00 220.00
Tukang Kayu L.02 OH 0.038 80,000.00 3,040.00
Kepala Tukang L.03 OH 0.004 100,000.00 400.00
Mandor L.04 OH 0.001 100,000.00 100.00
JUMLAH TENAGA KERJA 3,760.00
B BAHAN
Kayu kaso 5/7 m3 0.005 1,505,250.00 7,526.25
Plywood 12 mm Lbr 0.043 185,000.00 7,955.00
Minyak bekisting L 0.200 70,000.00 14,000.00
Paku 5 - 7 cm Kg 0.046 16,500.00 759.00
Dinabolt ø 12 mm (10 s.d. 15 cm) buah 0.693 1,600.00 1,108.80
JUMLAH HARGA BAHAN 31,349.05
C. PERALATAN
-
JUMLAH HARGA ALAT -
A.4.1.2.8 Pemasangan dan membuka bekisting 1 buah komponen pelat beton pracetak
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.053 55,000.00 2,915.00
Tukang Kayu L.02 OH 0.018 80,000.00 1,440.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 4,855.00
B BAHAN
A.4.1.2.9 Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.089 55,000.00 4,895.00
Tukang Kayu L.02 OH 0.030 80,000.00 2,400.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 7,795.00
B BAHAN
A.4.2.1.20 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 55,000.00 13,750.00
Tukang Besi L.02 OH 0.250 80,000.00 20,000.00
Kepala Tukang L.03 OH 0.025 100,000.00 2,500.00
Mandor L.04 OH 0.013 100,000.00 1,300.00
JUMLAH TENAGA KERJA 37,550.00
B BAHAN
Rangka metal hollow 40.40.2 mm M' 3.500 5,600.00 19,600.00
100% x
Assesoris (perkuatan, las dll) Ls rangka 5,600.00
A.4.2.1.22 Pemasangan 1 m2 Atap pelana rangka atap baja canai dingin profil C75
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.734 55,000.00 40,370.00
Tukang L.02 OH 0.734 80,000.00 58,720.00
Kepala Tukang L.03 OH 0.073 100,000.00 7,300.00
Mandor L.04 OH 0.037 100,000.00 3,700.00
JUMLAH TENAGA KERJA 110,090.00
B BAHAN
Baja ringan canai dingin C75 Kg 3.065 13,250.00 40,611.25
A.4.2.1.23 Pemasangan 1 m2 Atap jurai rangka atap baja canai dingin profil C75
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.7604 55,000.00 41,822.00
Tukang Besi L.02 OH 0.7604 80,000.00 60,832.00
Kepala Tukang L.03 OH 0.0760 100,000.00 7,600.00
Mandor L.04 OH 0.0380 100,000.00 3,800.00
JUMLAH TENAGA KERJA 114,054.00
B BAHAN
Baja ringan canai dingin C75 Kg 4.05 13,250.00 53,662.50
A.4.4.1.8 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 SP : 3 PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 55,000.00 16,500.00
Tukang Batu L.02 OH 0.100 80,000.00 8,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 100,000.00 1,500.00
JUMLAH TENAGA KERJA 27,000.00
B BAHAN
Bata merah bh 70.000 700.00 49,000.00
Semen Portland kg 14.370 1,400.00 20,118.00
Pasir pasang m3 0.040 118,900.00 4,756.00
JUMLAH HARGA BAHAN 73,874.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
A.4.4.1.9 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 SP : 4 PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 55,000.00 16,500.00
Tukang Batu L.02 OH 0.100 80,000.00 8,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 100,000.00 1,500.00
JUMLAH TENAGA KERJA 27,000.00
B BAHAN
Bata merah bh 70.000 700.00 49,000.00
Semen Portland kg 11.500 1,400.00 16,100.00
Pasir pasang m3 0.043 118,900.00 5,112.70
JUMLAH HARGA BAHAN 70,212.70
C. PERALATAN
-
JUMLAH HARGA ALAT -
A.4.5.1.5 Pemasangan 1 m2 langit-langit triplek ukuran (120 x 240) cm (tebal 3 mm, 4 mm, 6 mm)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 55,000.00 5,500.00
Tukang L.02 OH 0.100 80,000.00 8,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 15,000.00
B BAHAN
Plywood 4mm Lembar 0.375 75,000.00 28,125.00
Paku tripleks kg 0.030 26,200.00 786.00
JUMLAH HARGA BAHAN 28,911.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
A.4.5.1.7 Pemasangan 1 m2 langit - langit gypsum board ukuran (120x24x9) mm, tebal 9 mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 55,000.00 5,500.00
Tukang L.02 OH 0.050 80,000.00 4,000.00
Kepala Tukang L.03 OH 0.005 100,000.00 500.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 10,500.00
B BAHAN
Gypsum board lembar 0.364 82,500.00 30,030.00
Paku skrup kg 0.110 43,000.00 4,730.00
JUMLAH HARGA BAHAN 34,760.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
A.4.5.1.9.b Pemasangan 1 m2 langit-langit kalsiboard ukuran (120 x 240 x 9) mm (tebal 3,5 mm)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 55,000.00 5,500.00
Tukang L.02 OH 0.050 80,000.00 4,000.00
Kepala Tukang L.03 OH 0.005 100,000.00 500.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 10,500.00
B BAHAN
Kalsiboard Lembar 0.364 99,000.00 36,036.00
Paku skrup kg 0.110 43,000.00 4,730.00
Cornis kg 0.300 3,511.75 1,053.53
Lakban gypsum roll 0.070 15,700.00 1,099.00
JUMLAH HARGA BAHAN 42,918.53
C. PERALATAN
-
JUMLAH HARGA ALAT -
A.4.6.1.1 Pembuatan dan Pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 7.000 55,000.00 385,000.00
Tukang Kayu L.02 OH 21.000 80,000.00 1,680,000.00
Kepala Tukang L.03 OH 2.100 100,000.00 210,000.00
Mandor L.04 OH 0.350 100,000.00 35,000.00
JUMLAH TENAGA KERJA 2,310,000.00
B BAHAN
Balok kayu klas I m3 1.100 6,000,000.00 6,600,000.00
Paku 10 cm kg 1.250 16,500.00 20,625.00
Lem kayu kg 1.000 27,875.00 27,875.00
JUMLAH HARGA BAHAN 6,648,500.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
A.4.6.1.2 Pembuatan dan Pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 6.000 55,000.00 330,000.00
Tukang Kayu L.02 OH 18.000 80,000.00 1,440,000.00
Kepala Tukang L.03 OH 1.800 100,000.00 180,000.00
Mandor L.04 OH 0.300 100,000.00 30,000.00
JUMLAH TENAGA KERJA 1,980,000.00
B BAHAN
Balok kayu klas II m3 1.200 4,000,000.00 4,800,000.00
Paku 10 cm kg 1.250 16,500.00 20,625.00
Lem kayu kg 1.000 27,875.00 27,875.00
JUMLAH HARGA BAHAN 4,848,500.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
A.4.6.1.7 Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu, Kayu Kelas II
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 55,000.00 55,000.00
Tukang Kayu L.02 OH 3.000 80,000.00 240,000.00
Kepala Tukang L.03 OH 0.300 100,000.00 30,000.00
Mandor L.04 OH 0.050 100,000.00 5,000.00
JUMLAH TENAGA KERJA 330,000.00
B BAHAN
Papan kayu klas II m3 0.064 4,000,000.00 256,000.00
Lem kayu kg 0.500 27,875.00 13,937.50
JUMLAH HARGA BAHAN 269,937.50
C. PERALATAN
-
JUMLAH HARGA ALAT -
A.4.6.1.25 Pemasangan 1 m2 rangka dinding pemisah plywood rangkap, rangka kayu kelas II
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 55,000.00 11,000.00
Tukang Kayu L.02 OH 0.600 80,000.00 48,000.00
Kepala Tukang L.03 OH 0.060 100,000.00 6,000.00
Mandor L.04 OH 0.010 100,000.00 1,000.00
JUMLAH TENAGA KERJA 66,000.00
B BAHAN
Balok kayu uk. 6 x 12 m3 0.028 4,000,000.00 112,000.00
Paku kg 0.150 16,500.00 2,475.00
Plywood 4 mm Lembar 0.860 75,000.00 64,500.00
Lem kayu kg 0.560 27,875.00 15,610.00
JUMLAH HARGA BAHAN 194,585.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.070 55,000.00 3,850.00
Tukang cat L.02 OH 0.009 80,000.00 720.00
Kepala tukang L.03 OH 0.006 100,000.00 600.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 5,470.00
B BAHAN
Cat menie kg 0.200 48,300.00 9,660.00
Plamir kg 0.150 9,800.00 1,470.00
Cat dasar kg 0.170 32,500.00 5,525.00
Cat penutup kg 0.260 54,500.00 14,170.00
Kuas buah 0.010 12,100.00 121.00
Pengencer kg 0.030 30,900.00 927.00
Amplas Lbr 0.200 11,150.00 2,230.00
JUMLAH HARGA BAHAN 34,103.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
A.4.7.1.5 1 m2 Pengecatan bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.070 55,000.00 3,850.00
Tukang cat L.02 OH 0.105 80,000.00 8,400.00
Kepala tukang L.03 OH 0.004 100,000.00 400.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 12,950.00
B BAHAN
Cat menie kg 0.200 48,300.00 9,660.00
Plamir kg 0.150 9,800.00 1,470.00
Cat dasar kg 0.170 32,500.00 5,525.00
Cat penutup kg 0.350 54,500.00 19,075.00
Kuas buah 0.010 12,100.00 121.00
Pengencer kg 0.030 30,900.00 927.00
Amplas Lbr 0.200 11,150.00 2,230.00
JUMLAH HARGA BAHAN 39,008.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
A.4.7.1.10. Pengecatan 1 m2 tembok baru untuk interior ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.020 55,000.00 1,100.00
Tukang cat L.02 OH 0.063 80,000.00 5,040.00
Kepala tukang L.03 OH 0.0063 100,000.00 630.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 7,070.00
B BAHAN
Plamir Kg 0.100 9,800.00 980.00
Cat dasar Kg 0.100 34,600.00 3,460.00
Cat penutup kg 0.260 23,300.00 6,058.00
JUMLAH HARGA BAHAN 10,498.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
A.4.7.1.11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.028 55,000.00 1,540.00
Tukang cat L.02 OH 0.042 80,000.00 3,360.00
Kepala tukang L.03 OH 0.0042 100,000.00 420.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 5,620.00
B BAHAN
Cat dasar Kg 0.120 34,600.00 4,152.00
Cat penutup Kg 0.180 23,300.00 4,194.00
JUMLAH HARGA BAHAN 8,346.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
A. 4.7.1.19 Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.060 55,000.00 3,300.00
Tukang cat L.02 OH 0.060 80,000.00 4,800.00
Kepala tukang L.03 OH 0.012 100,000.00 1,200.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 9,600.00
B BAHAN
Cat kg 0.300 78,600.00 23,580.00
Kuas buah 0.010 26,100.00 261.00
Pengencer L 0.010 30,900.00 309.00
JUMLAH HARGA BAHAN 24,150.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
A.4.7.1.10.a Pengecatan 1 m2 tembok baru untuk exterior ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.020 55,000.00 1,100.00
Tukang cat L.02 OH 0.063 80,000.00 5,040.00
Kepala tukang L.03 OH 0.0063 100,000.00 630.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 7,070.00
B BAHAN
Plamir Kg 0.100 9,800.00 980.00
Cat dasar Kg 0.100 34,600.00 3,460.00
Cat penutup Kg 0.260 100,600.00 26,156.00
JUMLAH HARGA BAHAN 30,596.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
10. Pemasangan Pintu Type P-1, P-2, P-3, P-4, P-5 dan Accessories sebanyak 1 unit
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 2.0000 55,000.00 110,000.00
Tukang Aluminium L.02 OH 4.0000 80,000.00 320,000.00
Kepala Tukang L.03 OH 0.4000 100,000.00 40,000.00
Mandor L.04 OH 0.1333 100,000.00 13,330.00
JUMLAH TENAGA KERJA 483,330.00
B BAHAN
Profil daun pintu aluminium m2 2.3000 56,800.00 130,640.00
Profil kusen aluminium btg 2.3000 48,900.00 112,470.00
Lockcase + Cylinder Lock SES + Lever
handle set 2.0000 299,000.00 598,000.00