Anda di halaman 1dari 116

e

m
e
n
u
HARGA SATUAN MATERIAL DAN UPAH t
KABUPATEN ………………………… k
s
p
e
em
No. MATERIAL DAN UPAH SATUAN HARGA SATUAN (Rp.) re
en
I. HARGA DASAR BAHAN k
aI
1. SEMEN Semen PC Zak 70,000.00 tn
d
Semen PC kg 1,400.00 b
o
an
Floor hardener kg 7,900.00 te
as
Semen instan Zak 89,000.00
i
Semen putih/warna kg 2,966.67 ra
i
Cornis Zak 70,235.00 n
g
Cornis kg 3,511.75 a
n
;
2. PASIR Pasir Beton / Pasang m3 118,900.00 1
Pasir Beton / Pasang kg 84.93
Z
Pasir Urug m3 100,000.00 a
k
Pasir Urug kg 71.43
@

3. BATU KALI Batu kali m3 495,000.00 50


u
Batu koral m3 400,000.00 k
.K
Batu koral kg 296.30 g
u
9
Batu split m3 495,000.00 kx
.
1
Batu split kg 366.67 9
5
x
x
3
4. BATU BATA Batu bata merah bh 700.00 191
Batu bata ringan / hebel bh 7,560.00 xc
2
m
2
e
5. TANAH Tanah urug / bahan tanah timbunan m3 80,000.00 cx
Tanah Sirtu m3 135,600.00 .m
C
e
6. LAIN-LAIN Aspal kg 9,215.35 l
c
o
n
II. BAHAN PENUTUP ATAP
1. SENG BJLS Seng gelombang uk. 5' Lbr 45,000.00
Seng gelombang uk. 7' Lbr 62,000.00
s
Seng gelombang uk. 10' Lbr 62,100.00 e
t
Seng polos m 33,350.00 sa
er
ta
a
2. ASBES Asbes gelombang 5' kpg 44,600.00 rS
a
Nok asbes lbr 34,200.00
k
sSu
ear
3. GENTENG KERAMIK Keramik warna natural bh 13,400.00 tka
au
Keramik warna special bh 19,600.00 rM
ae
Nok keramik warna natural bh 25,000.00 sr
eM
Ep
Nok Keramik warna special bh 38,500.00 tu
la
lat
rtn
i
4. GENTENG METAL Genteng metal uk. 2x4 (0.25mm) lbr 35,600.00 aig
rr
Genteng metal uk. 2x4 (0.3mm) lbr 48,200.00 o
Tro
o
w
o
Genteng metal berpasir 2x5 (0,45mm) lbr 102,800.00 ifo
f
;f;
n
Nok genteng metal bh 25,100.00 l;
i1
1
Nok genteng metal berpasir bh 49,400.00 tm
1
e2
m
;m
2
5. GENTENG TANAH LIAT Genteng tanah liat bh 1,300.00 @
2
1
@
Nok genteng tanah liat bh 1,900.00 1
@
,r1
3
o
1
,
l,6
6. GENTENG BETON Genteng Beton bh 13,500.00 l6
2
Nok Genteng Beton bh 12,100.00 b
2
rl
@
lb
5
b
r
m
r
m
x

2
,
1
m
u
u
ks
l.e
it
n
1
a
e6
r
;0
No. MATERIAL DAN UPAH SATUAN HARGA SATUAN (Rp.) sa0
sew
7. ATAP ZINCALUME Atap Zincalume (t.0,35 mm) m' 66,600.00 sb
etam
eltar
m
tu
Atap Zincalume warna (t. 0,35 mm) m' 75,500.00 arn
eraa
Atap Alkan (t.0,35 mm) m' 65,000.00 xrc
a
s
ao
Nok Zincalume 0,30 m' 26,900.00 m
7
o
In
eo
4
Atap Zincalume warna (t.022mm) lbr 54,500.00 kd
rp
0
n
au
ae
Atap Zincalume warna (t.045mm) m' 101,700.00 d
lh
m
;Su
i/m
ln
u
,iu
n
ec
8. ATAP BITUMEN Atap bitumen motif gelombang lbr 156,780.00 kin
;o
s.
leke
Atap bitumen motif genteng lbr 47,700.00 la;u
lte
;tka
Nok atap bitumen bh 83,900.00 b
e.tr
a;u
/ra
k1
h
9. LAIN-LAIN Aluminium foil m2 48,800.00 .1
0
is1
5
to
Kalsiplank btg 48,200.00 0
9
rxak
5
0
o
4
Karpet talang m` 18,900.00 m
ac
l0
;c
lm
x
m
0
III BAHAN KAYU x,u
@
3
k
1. MERAWAN, KULIM Kayu Kelas I m3 6,000,000.00 5
1
.
,0
c
Balok kayu m3 6,000,000.00 2
m
2
c3
0
m
0
2. MERANTI Kayu Kelas II m3 4,000,000.00 m
x
9
Balok kayu m3 4,000,000.00 x5
x
4
0
s0
,
4. RACUK Kayu Kelas III m3 3,000,000.00 e3
m
t
Balok kayu m3 1,505,250.00
ac
srm
Papan racuk t.20 cm kpg 44,600.00 ea
t
am
3. LAIN-LAIN Gelam 6-8 cm pj. 4m btg 12,000.00 ru
al
Gelam 8-10 cm pj. 4m btg 15,000.00 i
m
a
Gelam 10-12 cm pj. 4m btg 18,000.00 su
,
le
Bambu dia.6-8/ 600cm btg 38,500.00
tia
ar
r,w
IV BAHAN PENUTUP DINDING/LANTAI aa
an
1. KERAMIK PUTIH 20 x 25 kotak 50,300.00 ra
M
siw
;
buah 2,515.00 eal
tan
1
30 x 30 kotak 58,000.00 an
buah 5,272.73 r;k
ao
40 x 40 kotak 68,800.00 1
t
Ia
buah 11,466.67 m
kk
p
o
50x50 kotak 134,200.00 rt@
buah 33,550.00 sea
esk2
st0
ao
@
r;k
2. KERAMIK WARNA/TEKSTUR 20 x 25 kotak 58,700.00 1
a6
p
s1
ge
A
k
bh 2,935.00 tskp
aio
gp
20 x 20 (KM/WC) kotak 83,900.00 rtga
aa
bh 3,356.00
sTk
30 x 30 (tekstur) kotak 147,800.00 eR
i
to
@
l
bh 13,436.36 am
e
ar;2
30 x 30 kotak 58,700.00 an
0
;1
bh 5,336.36 P
k
1
lkp
33,5x33,5 (tekstur) kotak 110,100.00
ao
g
bh 13,762.50 tkt
io
a
40 x 40 kotak 74,000.00 tn
k
a
u
bh 12,333.33 k@
m
;
50x50 kotak 91,000.00 @
1
bh 22,750.00 1
1
k8
k
o
p
tkg
ap
kg

@
4

k
r
aR
o
Em
u
a
srn
No. MATERIAL DAN UPAH SATUAN HARGA SATUAN (Rp.) o
;e
tg
50x50 (tekstur) kotak 127,500.00 ar1
sre
bh 31,875.00 eska
to
30x50 ktk 169,800.00 aIN
str
bh 33,960.00 a
en
an
ktd
o
aE
@
rgp
3. GRANITE TILE 60 x 60 kotak 310,000.00 lro
ae
l4
e
bh 77,500.00 gsi
ee
60 x 60 (tekstur) kotak 558,800.00 l;skn
p
h
ez
bh 139,700.00 ;g1
ga
e;
80 x 80 kotak 695,500.00 k1
n
zo
1
bh 347,750.00 kat
ao
;k
80 x 80 (tekstur) kotak 878,600.00 kt
o
a1
bh 439,300.00 tk@
a
Granite Pola uk. 1,2 x 1,2 m ls 2,637,500.00 kk
@
4
o
Step nosing 30 x 60 bh 97,100.00 t@
4
ak
Step nosing 20 x 60 bh 61,500.00 p
k2
gk
p
s@
skg
4. BATU ALAM Batu candi uk. 10x20 m2 178,200.00 eep
tt2
g
Granit alam m2 1,834,800.00 aa
rkr
Andesit uk. 10x30 dinding m2 183,500.00 ap
a
g
Andesit uk. 10 x 20 lantai m2 157,300.00
rr
Palimanan uk. 10x20 m2 167,700.00 aa
ii
Palimanan uk. 15x30 m2 188,700.00 n
n
b
b
Lempeng (kecil) m2 104,800.00 so
o
ew
Lempeng (besar) m2 136,300.00 tw
s
aet
Andesit + bevel m2 204,400.00 tr
tii
asap
p
ere
R
ta
5. LAIN-LAIN Karpet biasa m2 18,300.00
ao
cc
Karpet tebal 4 - 4,5mm m2 91,700.00 yrs
aa
aero
Karpet t. 4- 6 mm m2 249,000.00 lvw
p
sen
rM
Lantai vinyl 3 mm m2 255,000.00 ;i
en
av
Lantai Laminate t=0,8 mm m2 220,500.00 cn
le
eu
se
n
Lapis foam Lantai laminate m 18,300.00 ;i
tb
Plint laminate m 139,400.00 o
lan
u
ker
n
Adaptation laminate m 87,000.00 t;b
i3
ua
Wallpaper m2 36,700.00 u
r,k
kn
Nat keramik kg 17,300.00 t9
e.5
3
kr,
Aluminium Composite Panel (ACP) tipe PE untuk dalam m2 200,800.00 1
-
si9
to
5
rer4
o
r-
Aluminium Composite Panel (ACP) tipe PVDF untuk luar m2 265,900.00 li;m
o
4
@
ru
km
V BAHAN CETAK 1
;.
0
1. BUIS BETON Buis beton dia. 100cm m 786,300.00 m
u
1
k,
Buis beton dia. 80cm m 681,500.00 x.2
Buis beton dia. 60cm m 419,400.00 2
5
1
0
,m
Buis beton dia. 40cm m 314,500.00
2
Buis beton dia. 30cm m 262,100.00 c2
x
m
Buis beton dia. 20cm m 157,400.00 m
2
,
x4
1 ROSTER Roster keramik uk.30x30 bh 60,000.00 4
2
Roster keramik uk. 20x20 bh 40,000.00 ,m
4
Roster terawang bh 8,000.00 4
Roster beton bh 4,900.00 m
No. MATERIAL DAN UPAH SATUAN HARGA SATUAN (Rp.)

3. GLASS BLOK Glass block uk. 20x20 bh 24,200.00

4. PAGAR BETON Panel beton lebar 50 bh 173,000.00


Panel beton lebar 40 bh 144,200.00
Kolom beton pracetak m 104,800.00
Pagar catur t. 60 bh 21,000.00

5. PAVING BLOK Segi enam t. 6 cm bh 2,300.00


Persegi panjang t. 6 cm bh 2,000.00
Segi enam t.8 cm bh 2,600.00
Persegi panjang t. 8 cm bh 2,200.00
Segi enam warna t. 6 cm bh 2,700.00
Persegi panjang warna t. 6 cm bh 2,300.00
Segi enam warna t.8 cm bh 3,000.00
Persegi panjang warna t. 8 cm bh 2,500.00 u
k
.
2 KANSTEIN Uk. 60x30x20/12 bh 57,700.00 2
,
Uk. 60x30x10/15 bh 55,000.00 1
Uk.40x20x10/13 bh 35,000.00 m
Uk. 60x35x18/21 bh 68,100.00
x
3 BATACO BETON Bataco uk. 20x40 bh 2,400.00
5
,
4
4 JENDELA UPVC Jendela kaca dan kusen UPVC (uk. 1 m x 1,2 m) bh 1,552,700.00
Jendela kaca dan kusen UPVC (uk. 0.6 m x 1,5 m) bh 1,043,200.00 m
;
sj
VI BAHAN BESI /BAJA /ALUMINIUM /BAJA RINGAN ea
str
1. BESI BETON Besi beton kg 10,750.00 eaa
str
ke
Kawat beton kg 22,900.00 aa1
str
5
eaa
Wiremesh kg 10,140.00
tC
0rA
Tam
aC
;erm
A
2. BAJA Baja WF, IWF, H kg 111,706.50 gaC
;w
xaA
Baja Siku, CNP kg 10,100.00 Tan
1
C
e;w
rgA 5
Kawat las kg 35,450.00 gan
0
a;w
ram
Tn
ann
m
w
egras
3. ALUMINIUM Profil daun pintu kaca m 56,800.00 lan
gai
(era
sTn
l6
Profil kusen 3" m 34,900.00 ln
n
ievm
eagsl
Profil kusen 4" m 48,900.00 legm
ah
ievr
)an
sleT
Aluminium strip m 34,600.00 l;n
ivr
em
egil@
Sunscreen aluminium m2 467,100.00 e;p
glh
an
vera
4. BAJA RINGAN Profil C channel 100.75 btg 118,400.00 3
n
lie;p
n
m
4
ra
gem
m 19,733.33 lij7
;h
u
p
n
an
a.n
em
ij5
Profil C channel 80.75 btg 90,000.00 lm
p
n
am
gea0
m 15,000.00 li5
jn u
0
h
n
5
aen
g6
m
jn
0
Profil C channel 75.75 btg 79,500.00 lim
ag6
m
e5
m
in
m 13,250.00 M
u
h
5
n
gm
P
6
0
Profil C channel 75.65 btg 71,000.00 ia
m
m
;6
m
5
iu
m 11,833.33 M
p
5
n
P
m
.i0
Reng R.40.45 btg 37,500.00 a
m
;5
6,250.00 6
M
u
p
5
p
m
.m
Skrup fixer bh 255.00 0
a
;6
5
Dynabolt bh 1,600.00 M
p
5
p
Talang Jurai dalam m 41,000.00 .m
0
a
;6
M
p
p
.m
a
;6
p
.m
6
m
m
2
;

p
a
No. MATERIAL DAN UPAH SATUAN HARGA SATUAN (Rp.) n
j
5. PINTU BESI Folding Gate t.0,4 mm m2 450,800.00 a
n
Folding Gate t.0,6mm m2 529,500.00 g
Folding Gate t.0,8mm (jumbo) m2 686,700.00 +
Rolling door aluminum t.0,8 mm m2 629,100.00 5
Rolling door besi t.± 0,5 mm m2 576,600.00 0
Rolling door galvanum t.± 0,5 mm m2 419,400.00 c
m
;

PEGANGAN TANGGA f
6. STAINLESS Pegangan tangga stainless kombinasi acylic (3/4", 1" & 2") m' 331,600.00 i
n
Pegangan tangga stainless (3/4" & 2") m' 705,300.00 i
s
h
c
7. LAIN-LAIN Kawat jaring galvanis lbr 203,800.00 at
Kawat duri roll 175,000.00
s
Kawat duri m' 3,500.00 t
a
n
d
VII. BAHAN PIPA a
1. PIPA PVC Pipa PVC AW 1/2" btg 30,000.00 r
Pipa PVC AW 3/4" btg 36,000.00
Pipa PVC AW 3" btg 225,000.00
Pipa PVC AW 4" btg 273,000.00
Pipa PVC DW 3" btg 105,700.00
Pipa PVC DW 4" btg 166,200.00

2. PIPA GALVANIS Pipa galvanis 1/2" t.1,9-2,3 mm btg 182,800.00


Pipa galvanis 3/4" t.1,9-2,3 mm btg 234,800.00
Pipa galvanis 4 t.1,9 - 2,3 mm btg 250,145.00
3. LAIN-LAIN Lem pipa btl 38,300.00

VIII. BAHAN LANGIT-LANGIT


1. PLYWOOD Plywood 3 mm lbr 60,000.00
Plywood 4 mm lbr 75,000.00
Plywood 6 mm lbr 100,000.00
Plywood 9 mm lbr 150,000.00 se
Plywood 12 mm lbr 185,000.00 t
a
r
a
2. SOFT BOARD Gypsum 9 mm uk. 1,2 x 2,4 m kpg 82,500.00
S
Akustik lbr 155,000.00 h
3. HARD BOARD Calsiboard 4,5mm kpg 99,000.00 un
Eternit kpg 68,100.00 d
a

p
4. PLAFOND PVC Plafond PVC putih m2 173,500.00 l
a
Plafond PVC warna m2 242,000.00 f
Ornamen PVC unit 3,669,500.00 on
d
;
5. LIST PLAFOND List plafond 1x4 btg 8,400.00
u
List plafond besar btg 17,600.00 k
.
List gypsum kecil btg 35,000.00
List gypsum sedang btg 50,000.00 1,
List PVC btg 125,800.00 2
m

x
1
,
6
m
No. MATERIAL DAN UPAH SATUAN HARGA SATUAN (Rp.)

6. LAIN-LAIN Skrup gypsum 1" dus 43,000.00


Lakban gypsum roll 15,700.00
Paku tripleks kg 26,200.00
Hollow galvanis 20x40 m 4,200.00
Hollow galvanis 40x40 m 5,600.00

IX. BAHAN FINISHING


1. KAYU Menie kayu kg 48,300.00 s
e
Plamir kayu kg 9,800.00 st
ea
Cat dasar kg 32,500.00 rt
Cat penutup kg 54,500.00 ar
Teak Oil ltr 60,300.00 aN
i
Politur ltr 66,100.00 D
p
u
p
Residu/Ter ltr 4,700.00 lo
u
n
Dempul kayu kg 9,800.00 x
Vernis ltr 60,300.00 BW
o
ed
s
aee
2. BESI Menie kg 34,500.00 tstl
eh
aa
Cat penutup liter 78,600.00 tecr
ara
r;
3. TEMBOK Cat tembok eksterior liter 100,600.00 aSa
h
1
q
Cat tembok interior kg 23,300.00 iu
C
eo
ag
Plamir dinding/kayu kg 9,800.00 lap
b
rd
lr
Cat dasar/sealer interior kg 34,600.00 a;o
o
n
o
Cat dasar/sealer eksterior liter 50,300.00 1
H
f
Cat antibocor kg 54,500.00 i@
;
tg
a1
5
lk
m
4. THINNER Thinner liter 30,900.00 :o
gk
n
a
1
l
@
e
5. LAIN-LAIN Kuas 1" bh 10,500.00 kn
Kuas 1 1/2" bh 12,100.00 a2
g
,l
Kuas 2" bh 14,700.00 e5
@
n
Kuas 3" bh 26,100.00 gl1
Kuas 4" bh 37,600.00 @
k
Kual roll bh 48,100.00 g0
Baki cat bh 16,800.00 ,
9
Coating batu alam liter 76,000.00 5
l
X. BAHAN KACA
1. KACA POLOS Kaca polos 3 mm m2 150,000.00
Kaca polos 5 mm m2 200,000.00
Kaca polos 8 mm m2 250,000.00
Kaca polos 10 mm m2 465,400.00
Kaca polos 12 mm m2 568,900.00
No. MATERIAL DAN UPAH SATUAN HARGA SATUAN (Rp.)

2. KACA RYBEN/HITAM Kaca polos 8 mm m2 471,800.00


Kaca polos 10 mm m2 524,200.00

3. LAIN-LAIN Sunblast polos m2 102,200.00


Kaca film m2 68,100.00
Kaca patri m2 2,096,900.00
Lem kaca btl 26,200.00
Jendela nako 5mm ryben (8 daun) unit 218,100.00

XI BAHAN INSTALASI LISTRIK


1. KABEL LISTRIK NYM 2 x 1,5 mm m 8,100.00
NYM 2 x 2,5 mm m 10,000.00
NYM 3 x 2,5 mm m 12,500.00
NYA 2,5 mm m 2,700.00

2. SAKELAR Saklar tunggal bh 16,000.00


Saklar seri bh 26,000.00

3. STOP KONTAK Stop kontak bh 20,000.00


Stop kontak AC bh 67,900.00

4. LAMPU Downlight 4" bh 200,000.00


Lampu SL bh 75,000.00
Lampu LED bh 55,800.00
Lampu T5 p. 60 cm bh 38,800.00
Lampu TL RAM 2 x 28 watt bh 251,600.00
Lampu Taman t. 1m bh 733,000.00

5. LAIN-LAIN Pipa listrik btg 10,500.00


T dus, L bh 4,200.00
Lakban listrik roll 11,300.00
Klem kabel bks 8,600.00
Mangkok inbow bh 5,200.00
Fitting bh 9,000.00
Klem pipa bh 700.00
Fleksibel m 4,200.00
MCB 10A bh 58,000.00
s
L bow listrik bh 2,500.00 e
t
XII. BAHAN PENGUNCI DAN PENGGANTUNG a
1. KUNCI TANAM Kunci tanam stainless bh 292,500.00 r
a
Kunci tanam biasa bh 166,700.00
p
Kunci tanam kecil bh 68,100.00 a
l
Kunci bulat (KM/WC) bh 157,300.00 o
Handle pintu stainless steel bh 249,500.00 m
a
Cylinder kunci bh 183,500.00 ;
1
2. ENGSEL/GRENDEL Engsel 3" stainless steel ktk 47,200.00 k
t
Engsel 3" biasa ktk 15,700.00 k
Engsel 4" stainless steel ktk 73,400.00 @
Engsel 4" biasa ktk 19,900.00
2
Engsel tanam set 1,192,600.00
p
Grendel 2" stainless steel bh 24,100.00 c
s
Grendel 3" stainless steel bh 31,500.00
Grendel 8 " bh 104,800.00 (u
Grendel 12 " bh 209,700.00 n
t
Grendel tanam bh 194,000.00 u
k
Rambucis bh 75,000.00
p
i
n
t
u
)
No. MATERIAL DAN UPAH SATUAN HARGA SATUAN (Rp.)
3. LAIN-LAIN Gembok bh 90,600.00
Door closer bh 522,100.00
Door stop bh 94,400.00
Door holder bh 115,300.00
s
Kait angin bh 62,900.00 e
t
Spring knip bh 60,800.00 a
r
Pull Handle ps 471,800.00 a
Kunci slot stainless steel bh 73,400.00 T
Casement 12' bh 10,000.00 o
t
XIII. BAHAN SANITAIR o
1. CLOSED Closed jongkok bh 325,000.00 C
W
Closed duduk bh 1,250,000.00
Closed duduk bh 2,358,300.00 66
0
J
2. JET SHOWER Jet shower bh 217,200.00 /
4
Jet shower bh 94,600.00 2
1

3. KRAN TEMBOK Kran air 1/2 - 3/4" bh 204,800.00 Ec


Kran air 1/2 - 3/4" bh 59,500.00 o
f
l
u
4. WASTAFEL Wastafel bh 800,000.00 s
h
Siphon stainless bh 250,400.00
kran wastafel bh 593,500.00
Stop Kran bh 50,000.00
Selang Flexsibel p.40 cm bh 101,750.00

5. URINOIR Urinoir bh 2,135,500.00


Pembatas Urinoir bh 578,000.00

6. BATHUBE Bathube uk. 820x470 bh 3,984,000.00

7. PENAMPUNG AIR Penampung air fiber kap. 250L unit 563,456.00


Penampung air fiber kap. 550 L unit 563,456.00
Penampung air fiber kap. 1100 L unit 563,456.00
Penampung air fiber kap. 2000 L unit 563,456.00
Penampung air fiber kap. 3000 L unit 563,456.00
Penampung air stainless kap. 550 L unit -
Penampung air stainless kap. 1100 L unit -
Penampung air stainless kap. 2000 L unit -

8. LAIN-LAIN Bak Air fiberglass uk. 1 m3 bh 400,000.00


Bak Air Marble uk. 56x56 cm bh 2,041,000.00
Bak Air Marble uk. 66x66 cm bh 2,230,000.00
Kitchen siknk stainless steel bh 1,426,000.00
Waterdrain bh 92,300.00
Floor drain bh 275,200.00
Floor drain plastik bh 26,000.00
Sealtape bh 4,200.00
Pintu KM/WC PVC bh 795,000.00
Pelampung 1/2" bh 196,400.00
Pelampung 3/4" bh 238,700.00
No. MATERIAL DAN UPAH SATUAN HARGA SATUAN (Rp.)
XIV. BAHAN PENGIKAT
1. PAKU Paku bermacam ukuran kg 16,500.00
Beton ktk 12,380.00
Paku seng kg 20,300.00
Paku atap bitumen bh 1,000.00
Skrup fixer bh 600.00

2. LEM Lem kayu kg 27,875.00


Lem aica aibon kg 54,100.00
Sealent tube 69,130.00

XV. LAIN-LAIN
1 Amplas lbr 11,150.00
2 Diamond wheel bh 136,300.00
3 Tali Ijuk kg 39,800.00
4 Air ltr 450.00
5 Minyak Bekesting ltr 70,000.00
6 Minyak Pelumas ltr 36,700.00
7 Solar ltr 5,742.25
8 Soda api kg 22,300.00
9 Sewa alat las jam 7,000.00
10 Sewa scafolding unit 328,500.00
11 Sewa molen unit/hari 625,000.00
12 Karung goni lbr 10,200.00
13 Plastik m2 3,300.00
14 Geotekstil m2 23,100.00
15 Ijuk kg 4,800.00

HARGA UPAH
1 Pekerja L.01 OH 55,000.00
2 Tukang L.02 OH 80,000.00
3 Kepala Tukang L.03 OH 100,000.00
4 Mandor L.04 OH 100,000.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN (AHSP)

NO. AHSP NAMA PEKERJAAN SATUAN HARGA (Rp.)

A.2.2.1. HARGA SATUAN PEKERJAAN PERSIAPAN


A.2.2.1.1 Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter m2 201,770.25
A.2.2.1.2 Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter m2 300,011.25
A.2.2.1.3 Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter m2 164,432.95
A.2.2.1.4 Pengukuran dan Pemasangan 1 m' Bouwplank m' 59,832.30
A.2.2.1.5 Pembuatan 1 m2 kantor sementara lantai plesteran m2 1,022,474.75
A.2.2.1.6 Pembuatan 1 m2 rumah jaga (Konstruksi kayu) m2 836,163.90
A.2.2.1.7 Pembuatan 1 m2 gudang semen dan peralatan m2 770,722.70
A.2.2.1.8 Pembuatan 1 m2 bedeng pekerja m2 837,312.85
A.2.2.1.9 Pembersihan 1 m2 lapangan dan perataan m2 11,550.00
A.2.2.1.10 Pembuatan 1 m2 Steger/perancah dari bambu m2 325,080.58
A.2.2.1.11 Pembuatan 1 buah kotak adukan ukuran 40 cm x 50 cm x 25 cm buah 173,132.85
A.2.2.1.12 Pembuatan 1 m2 jalan sementara m2 177,362.90
A.2.2.1.13 Pembongkaran 1 m3 beton bertulang m3 879,967.00
A.2.2.1.14 Pembongkaran 1 m3 dinding tembok bata m3 439,983.50
A.2.2.1.15 Pembuatan 1 m2 pagar kawat jaring galvanis panjang 240 cm m2 39,880.41
A.2.2.1.16 Pembuatan 1 m2 panel beton pracetak 5x50x240 cm untuk pagar m2 428,473.76
An.2.2.1.17 Pemasangan 1 unit scafolding (sewa) unit 379,621.00
An.2.2.1.18 Pembongkaran 1 m2 Lantai Keramik m2 7,150.00
An.2.2.1.19 Pembongkaran 1 m2 Plesteran m2 3,355.00
An.2.2.1.20 Pembongkaran 1 m2 Atap Genteng m2 2,310.00
An.2.2.1.21 Pembongkaran 1 m2 Atap Seng/Asbes m2 5,274.50
An.2.2.1.22 Pembongkaran 1 m2 Rangka Atap Kuda-kuda Kayu m2 20,625.00
An.2.2.1.23 Pembongkaran 1 m2 Plafond + rangka m2 4,620.00
An.2.2.1.24 Pembongkaran 1 m3 Pasangan Batu Kali m3 236,500.00
An.2.2.1.25 Pembongkaran 1 m2 Kusen Pintu m2 71,500.00
An.2.2.1.26 Pembongkaran 1 m2 Daun Pintu m2 71,500.00
An.2.2.1.27 Pembongkaran 1 m2 Rabat Beton m2 3,355.00
An.2.2.1.28 Pembongkaran 1 m2 Kaso & Reng Kayu m2 9,075.00
An.2.2.1.29 Pembersihan Akhir Lapangan 1 m2 m2 4,950.00
A.2.3.1. HARGA SATUAN PEKERJAAN PERSIAPAN
A.2.3.1.1 Menggali 1 m3 tanah biasa sedalam 1 m m3 48,125.00
A.2.3.1.2 Menggali 1 m3 tanah biasa sedalam 2 m m3 59,400.00
A.2.3.1.3 Menggali 1 m3 tanah biasa sedalam 3 m m3 70,895.00
A.2.3.1.4 Menggali 1 m3 tanah keras sedalam 1 m m3 64,020.00
A.2.3.1.5 Menggali 1 m3 tanah cadas sedalam 1 m m3 97,350.00
A.2.3.1.6 Menggali 1 m3 tanah lumpur sedalam 1 m m3 77,550.00
A.2.3.1.7 Pengerjaan stripping 1 m2 tanah tebing setinggi 1 m m2 3,575.00
A.2.3.1.8 Pembuangan 1 m3 tanah sejauh 30 meter m3 21,065.00
A.2.3.1.9 Pengurugan kembali 1 m3 galian tanah m3 35,750.00
A.2.3.1.10 Pemadatan tanah 1 m3 tanah (per 20 cm) m3 35,750.00
A.2.3.1.11 Pengurugan 1 m3 dengan pasir urug m3 151,250.00
A.2.3.1.12 Pemasangan 1 m3 lapisan pudel campuran 1 KP : 3 PP : 7 TL m3 232,540.00
A.2.3.1.13 Pemasangan 1 m3 lapisan ijuk tebal 10 cm untuk bidang resapan m3 42,405.00
A.2.3.1.14 Pengurugan 1 m3 sirtu padat m3 196,867.00
A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI
A.3.2.1.1 Pemasangan 1 m3 pondasi batu belah / kali campuran 1 SP: 3 PP m3 1,201,163.15
A.3.2.1.2 Pemasangan 1 m3 pondasi batu belah /kali campuran 1 SP: 4 PP m3 1,145,680.80
A.3.2.1.3 Pemasangan 1 m3 pondasi batu belah /kali campuran 1 SP: 5 PP m3 1,107,239.76
A.3.2.1.4 Pemasangan 1 m3 pondasi batu belah /kali campuran 1 SP: 6 PP m3 1,080,203.19
A.3.2.1.5 Pemasangan 1 m3 pondasi batu belah /kali campuran 1 SP: 8 PP m3 1,043,171.36
A.3.2.1.6 Pemasangan 1 m3 pondasi batu belah /kali campuran 1 SP: 1 KP : 2 PP m3 871,380.40
A.3.2.1.9 Pemasangan 1 M3 Batu Kosong ( AANSTAMPING ) m3 791,010.00
A.3.2.1.10 Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3Kr dan 40% batu belah m3 2,650,688.48
A.3.2.1.11 Pemasangan 1 m3 pondasi sumuran diameter 100 cm m3 1,028,001.48
A.3.2.1.12 1 m2 pasang cerucup gelam untuk pondasi (p.1,5m-20 cm) m2 100,650.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN (AHSP)

NO. AHSP NAMA PEKERJAAN SATUAN HARGA (Rp.)

A.4.1.1. HARGA SATUAN PEKERJAAN BETON


A.4.1.1.1 Membuat 1 m3 beton mutu f'c = 7,4 Mpa m3 1,107,153.22
A.4.1.1.2 Membuat 1 m3 beton mutu f'c = 9,8 Mpa m3 1,153,226.28
A.4.1.1.3 Membuat 1 m3 beton mutu f'c = 12,2 Mpa m3 1,187,953.72
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa, slump (3-6) cm, w/c=0,87 m3 1,049,848.67
A.4.1.1.5 Membuat 1 m3 beton mutu f'c = 14,5 Mpa, slump (120±20) mm m3 1,230,730.29
A.4.1.1.6 Membuat 1 m3 beton mutu f'c = 16,9 Mpa m3 1,268,867.73
A.4.1.1.7 Membuat 1 m3 beton mutu f'c = 19,3 Mpa m3 1,301,498.16
A.4.1.1.8 Membuat 1 m3 beton mutu f'c = 21,7 Mpa m3 1,317,730.96
A.4.1.1.9 Membuat 1 m3 beton mutu f'c = 24 Mpa m3 1,345,620.26
A.4.1.1.10 Membuat 1 m3 beton mutu f'c = 26,4 Mpa m3 1,354,103.33
A.4.1.1.11 Membuat 1 m3 beton mutu f'c = 28,8 Mpa m3 1,424,080.69
A.4.1.1.12 Membuat 1 m3 beton mutu f'c = 31,2 Mpa, Slump (120 ± 20) mm m3 1,435,240.43
A.4.1.1.13 Membuat 1 m3 beton kedap air dengan strorox - 100 m3 1,287,629.20
A.4.1.1.14 Pemasangan 1 m' PVC Waterstop lebar 150 mm m' 6,930.00
A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir kg 13,954.60
A.4.1.1.18 Pemasangan 10 Kg kabel prategang (prestressed) polos / strands kg 13,828.65
A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh) kg 12,160.28
A.4.1.1.20 Pemasangan 1 m2 bekesting untuk pondasi m2 139,436.00
A.4.1.1.21 Pemasangan 1 m2 bekesting untuk sloof m2 147,714.88
A.4.1.1.22 Pemasangan 1 m2 bekesting untuk kolom m2 280,707.63
A.4.1.1.23 Pemasangan 1 m2 bekesting untuk balok m2 285,674.95
A.4.1.1.24 Pemasangan 1 m2 bekesting untuk lantai m2 346,707.63
A.4.1.1.25 Pemasangan 1 m2 bekesting untuk dinding m2 354,928.75
A.4.1.1.26 Pemasangan 1 m2 bekesting untuk tangga m2 260,299.88
A.4.1.1.27 Pemasangan 1 m2 jembatan untuk pengecoran beton m2 121,165.00
A.4.1.1.35 Membuat 1 m' kolom praktis beton bertulang (11x11) cm m' 87,668.79
A.4.1.1.36 Membuat 1 m' ring balok beton bertulang (10x15) cm m' 104,104.94
A.4.1.2. HARGA SATUAN PEKERJAAN BETON PRACETAK
A.4.1.2.1 Pembuatan 1 m2 lahan produksi tebal 8 cm beton f'c = 14,5 Mpa, slump (120 ± 20) mm m2 98,471.62
A.4.1.2.2 Pembuatan 1 m2 lahan produksi tebal 10 cm beton f'c = 14,5 Mpa, slump (120 ± 20) mm m2 123,106.03
A.4.1.2.3 Pembuatan 1 m2 lahan produksi tebal 12 cm beton f'c = 14,5 Mpa, slump (120 ± 20) mm m2 147,652.43
A.4.1.2.4 Pembuatan 1 m2 lahan produksi tebal 15 cm beton f'c = 14,5 Mpa, slump (120 ± 20) mm m2 184,656.29
A.4.1.2.5 Pembuatan 1 m2 bekisting untuk pelat beton pracetak ( 5 Kali pakai ) m2 160,343.37
A.4.1.2.6 Pembuatan 1 m2 bekisting untuk balok beton pracetak (10 - 12 Kali pakai) m2 38,619.96
A.4.1.2.7 Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10 - 12 Kali pakai) m2 37,981.68
A.4.1.2.8 Pemasangan dan membuka bekisting 1 buah komponen pelat beton pracetak buah 5,340.50
A.4.1.2.9 Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak buah 8,574.50
A.4.1.2.10 Pemasangan dan membuka bekisting 1 buah komponen kolom beton pracetak buah 6,957.50
A.4.1.2.11 Penuangan / menebar beton 1 m3 komponen untuk pelat pracetak m3 48,378.00
A.4.1.2.12 Penuangan / menebar beton 1 m3 komponen untuk balok pracetak m3 49,714.50
A.4.1.2.13 Penuangan / menebar beton 1 m3 komponen untuk kolom pracetak m3 44,830.50
A.4.1.2.14 Ereksi 1 buah komponen untuk pelat pracetak buah 664,466.54
A.4.1.2.15 Ereksi 1 buah komponen untuk balok pracetak buah 648,302.84
A.4.1.2.16 Ereksi 1 buah komponen untuk kolom pracetak buah 1,189,874.06
A.4.1.1.17 Langsir 1 buah komponen untuk pelat pracetak ( ± 20 m ) buah 21,032.05
A.4.1.2.18 Langsir 1 buah komponen untuk balok pracetak ( ± 20 m ) buah 22,997.09
A.4.1.2.19 Langsir 1 buah komponen untuk kolom pracetak ( ± 20 m ) buah 22,997.09
A.4.1.2.20 Bahan 1 m3 grout campuran m3 6,600,151.25
A.4.1.2.21 Bahan 1 m3 grout (tidak campuran) m3 6,235,166.67
A.4.1.2.22 Upah 1 titik pekerjaan grout pada joint beton pracetak titik 44,506.00
A.4.1.2.23 Pemasangan 1 titik bekisting joint pracetak titik 48,886.64
A.4.1.2.24 Upah 1 titik joint dengan sling titik 35,816.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN (AHSP)

NO. AHSP NAMA PEKERJAAN SATUAN HARGA (Rp.)

A.4.2.1. HARGA SATUAN PEKERJAAN BESI & ALUMINIUM


A.4.2.1.1 Pemasangan 1 kg besi profil kg 23,498.75
A.4.2.1.2 Pemasangan 1 kg rangka kuda-kuda baja IWF kg 151,208.72
A.4.2.1.3 Pengerjaan 100 kg pekerjaan perakitan kg 32,023.48
A.4.2.1.4 Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku m2 706,202.75
A.4.2.1.5 Pengerjaan 10 cm pengelasan dengan las listrik cm 25,036.74
A.4.2.1.6 Pembuatan 1 m2 rangka jendela besi scuare tube m2 633,280.21
A.4.2.1.7 Pemasangan 1 m2 pintu rolling door besi m2 826,320.00
A.4.2.1.8 Pemasangan 1 m2 pintu lipat (folding door) t. 0,8 mm m2 827,970.00
A.4.2.1.9 Pemasangan 1 m2 sunscreen aluminium m2 598,290.00
A.4.2.1.10 Pemasangan 1 m2 rolling door aluminium m2 857,010.00
A.4.2.1.11 Pemasangan 1 m kusen pintu aluminium m 54,442.08
A.4.2.1.12 Pemasangan 1 m2 pintu aluminium strip lebar 8 cm m2 738,611.50
A.4.2.1.13 Pemasangan 1 m2 pintu kaca rangka aluminium m2 1,547,106.11
A.4.2.1.15 Pemasangan 1 m2 terali besi strip ( 2 x 3 ) mm m2 418,700.92
A.4.2.1.16 Pemasangan 1 m2 kawat nyamuk m2 90,821.96
A.4.2.1.17 Pemasangan 1 m2 jendela nako & tralis m2 1,260,105.00
A.4.2.1.18 Pemasangan 1 m' Talang datar/ jurai seng bjls 28 lebar 90 cm m' 102,261.23
A.4.2.1.20 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi m2 69,025.00
A.4.2.1.21 Pemasangan 1 m2 rangka besi hollow 1x40.20.2mm, modul 60 x 60 cm, untuk plafon m2 80,905.00
A.4.2.1.22 Pemasangan 1 m2 Atap pelana rangka atap baja canai dingin profil C75 m2 170,238.61
A.4.2.1.23 Pemasangan 1 m2 Atap jurai rangka atap baja canai dingin profil C75 m2 190,391.03
A.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING
A.4.4.1.1 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 2 PP m2 244,653.20
A.4.4.1.2 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3 PP m2 229,844.89
A.4.4.1.3 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 4 PP m2 220,250.47
A.4.4.1.4 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5 PP m2 214,728.58
A.4.4.1.5 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 6 PP m2 211,646.38
A.4.4.1.6 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3 KP : 10 PP m2 195,193.35
A.4.4.1.7 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 SP : 2 PP m2 117,753.02
A.4.4.1.8 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 SP : 3 PP m2 110,961.40
A.4.4.1.9 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 SP : 4 PP m2 106,933.97
A.4.4.1.16 Pemasangan 1 m2 dinding conblock HB20 campuran 1SP : 3PP m2 664,473.92
A.4.4.1.17 Pemasangan 1 m2 dinding conblock HB20 campuran 1SP : 4PP m2 660,896.28
A.4.4.1.22 Pemasangan 1 m2 dinding roster keramik 30x30 campuran 1 SP : 4 PP m2 784,477.65
A.4.4.1.23 Pemasangan 1 m2 dinding terawang (roster) 12x11x24 campuran 1 SP : 4 PP m2 292,777.65
A.4.4.1.24 Pemasangan 1 m2 dinding glass block 20x20 campuran 1 SP : 4 PP m2 756,647.65
A.4.4.1.25 Pemasangan 1 m2 dinding roster keramik 20x20 campuran 1 SP : 4 PP m2 1,151,217.65
A.4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN
A.4.4.2.2 Pemasangan 1 m2 plesteran 1 SP : 2 PP tebal 15 mm m2 53,010.76
A.4.4.2.3 Pemasangan 1 m2 plesteran 1 SP : 3 PP tebal 15 mm m2 49,633.21
A.4.4.2.4 Pemasangan 1 m2 plesteran 1 SP : 4 PP tebal 15 mm m2 47,398.56
A.4.4.2.13 Pemasangan 1 m2 plesteran 1 SP : 1 PP tebal 20 mm m2 70,944.61
A.4.4.2.14 Pemasangan 1 m2 plesteran 1 SP : 3 PP tebal 20 mm m2 56,981.21
A.4.4.2.15 Pemasangan 1 m2 plesteran 1 SP : 4 PP tebal 20 mm m2 63,418.08
A.4.4.2.19 Pemasangan 1 m2 berapen 1 SP : 5 PP tebal 15 mm m2 28,818.90
A.4.4.2.20 Pemasangan 1 m' plesteran skonig 1 SP : 3 PP lebar 10 cm m' 47,350.27
A.4.4.2.21 Pemasangan 1 m2 plesteran granit 1 SP : 2 Granit tebal 1 cm m2 97,759.20
A.4.4.2.22 Pemasangan 1 m2 plesteran traso 1 SP : 2 traso tebal 1 cm m2 70,252.05
A.4.4.2.23 Pemasangan 1 m2 plesteran ciprat 1 SP : 2 PP m2 37,137.54
A.4.4.2.24 Pemasangan 1 m2 finishing siar pasangan bata merah m2 22,221.32
A.4.4.2.26 Pemasangan 1 m2 finishing siar pasangan batu kali campuran 1 SP : 2 PP m2 45,983.08
A.4.4.2.27 Pemasangan 1 m2 acian m2 28,105.00
A.4.4.2.28 Pemasangan 1 m2 plesteran dengan mortar siap pakai (MSP) m2 41,460.76
DAFTAR ANALISA HARGA SATUAN PEKERJAAN (AHSP)

NO. AHSP NAMA PEKERJAAN SATUAN HARGA (Rp.)

A.4.4.3. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


A.4.4.3.35 Pemasangan 1 m2 lantai keramik putih ukuran 30 cm x 30 cm m2 170,757.22
A.4.4.3.36 Pemasangan 1 m2 lantai keramik KM/WC ukuran 20 cm x 20 cm m2 193,937.87
A.4.4.3.38 Pemasangan 1 m2 lantai keramik warna / mozaik ukuran 30 cm x 30 cm m2 284,642.70
A.4.4.3.39 Pemasangan 1 m' plint keramik ukuran 10 cm x 20 cm m' 24,882.04
A.4.4.3.40 Pemasangan 1 m' plint keramik ukuran 10 cm x 10 cm m' 29,851.10
A.4.4.3.41 Pemasangan 1 m' plint keramik ukuran 10 cm x 30 cm m' 30,241.22
A.4.4.3.35.a Pemasangan 1 m2 lantai keramik polish (putih) ukuran 40 cm x 40 cm m2 138,791.95
A.4.4.3.35.b Pemasangan 1 m2 lantai keramik Unpolish ukuran 40 cm x 40 cm m2 145,112.55
A.4.4.3.35.d Pemasangan 1 m' plint keramik ukuran 10 cm x 40 cm polish (putih) m' 28,040.38
A.4.4.3.35.e Pemasangan 1 m' plint keramik ukuran 10 cm x 40 cm unpolish m' 28,671.96
A.4.4.3.35.f Pemasangan 1 m2 dinding keramik warna ukuran 20 cm x 25cm m2 143,043.30
A.4.4.3.35.g Pemasangan 1 m2 dinding keramik putih ukuran 20 cm x 40 cm m2 132,879.30
A.4.4.3.58 Pemasangan 1 m2 dinding batu tempel hitam m2 107,963.35
A.4.4.3.59 Pemasangan 1 m2 lantai vynil uk. 30 cm x 30 cm m2 326,133.50
A.4.4.3.61 Pemasangan 1 m2 floor harderner m2 63,250.00
A.4.4.3.64 Pemasangan 1 m2 Paving block natural tebal 6 cm m2 74,772.28
A.4.4.3.65 Pemasangan 1 m2 Paving block natural tebal 8 cm m2 90,263.91
A.4.5.1. HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
A.4.5.1.1 Pemasangan 1 m2 langit-langit asbes semen (tebal 4 mm, 5 mm, 6 mm) m2 38,084.66
A.4.5.1.2 Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm m2 731,657.67
A.4.5.1.5 Pemasangan 1 m2 langit-langit triplek ukuran (120 x 240) cm (tebal 3 mm, 4 mm, 6 mm) m2 48,302.10
A.4.5.1.6 Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm m2 198,288.20
A.4.5.1.7 Pemasangan 1 m2 langit - langit gypsum board ukuran (120x24x9) mm, tebal 9 mm m2 49,786.00
A.4.5.1.8 Pemasangan 1 m2 Plafond PVC m2 89,487.75
A.4.5.1.9 Pemasangan 1 m' list langit-langit kayu profil m' 13,835.97
A.4.5.1.9.a Pemasangan 1 m' list profil PVC m' 45,102.75
A.4.5.1.9.b Pemasangan 1 m2 langit-langit kalsiboard ukuran (120 x 240 x 9) mm (tebal 3,5 mm) m2 58,760.38
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
A.4.5.2.8 Pemasangan 1 m2 atap asbes gelombang 0.92 m x 2,5 m x 5 mm m2 44,039.60
A.4.5.2.9 Pemasangan 1 m2 atap asbes gelombang 0.92 m x 2,25 m x 5 mm m2 48,945.60
A.4.5.2.10 Pemasangan 1 m2 atap asbes gelombang 0.92 m x 2,00 m x 5 mm m2 48,285.60
A.4.5.2.11 Pemasangan 1 m2 atap asbes gelombang 0.92 m x 1.80 m x 5 mm m2 55,644.60
A.4.5.2.12 Pemasangan 1 m2 atap asbes gelombang 1.05 m x 3,00 m x 4 mm m2 36,020.60
A.4.5.2.22 Pemasangan 1 m' nok asbes m' 56,465.20
A.4.5.2.30 Pemasangan 1 m2 genteng beton / keramik / tanah liat m2 190,905.00
A.4.5.2.32 Pemasangan 1 m2 genteng metal Ukuran 80 X 100 Atap m2 94,666.00
A.4.5.2.34 Pemasangan 1 m2 atap sirap kayu m2 171,303.00
A.4.5.2.35 Pemasangan 1 m' nok genteng beton m' 113,590.82
A.4.5.2.37 Pemasangan 1 m' nok genteng metal m' 62,683.50
A.4.5.2.39 Pemasangan 1 m2 atap seng gelombang m2 48,873.00
A.4.5.2.40 Pemasangan 1 m' nok atap seng m' 28,396.50
A.4.5.2.41 Pemasangan 1 m2 atap aluminium/alkan m2 160,056.60
A.4.5.2.42 Pemasangan 1 m' nok aluminium m' 146,951.20
A.4.5.2.43 Pemasangan 1 m2 aluminium foil m2 71,269.00
A.4.5.2.44 Pemasangan 1 m2 Atap spandek metal berpasir m2 205,793.50
A.4.6.1. HARGA SATUAN PEKERJAAN KAYU
A.4.6.1.1 Pembuatan dan Pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I m3 9,854,350.00
A.4.6.1.2 Pembuatan dan Pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II m3 7,511,350.00
A.4.6.1.5 Pembuatan dan pemasangan 1 m2 daun pintu panel kayu klas II m2 554,331.25
A.4.6.1.6 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, Kayu Kelas II m2 405,198.75
A.4.6.1.7 Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu, Kayu Kelas II m2 659,931.25
A.4.6.1.10 Pemasangan 1 m2 jalusi kusen, Kayu kelas I atau II m2 542,107.50
A.4.6.1.13 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II atau III bentang 6 meter m3 8,236,797.25
A.4.6.1.15 Pemasangan 1 m3 konstruksi gordeng, kayu kelas III m3 6,151,059.75
A.4.6.1.16 Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II m2 241,037.50
A.4.6.1.19 Pemasangan 1 m2 rangka langit-langit (50x100) cm, kayu kelas III m2 101,475.00
A.4.6.1.20 Pemasangan 1 m2 rangka langit-langit (60x60) cm, Kayu kelas III m2 101,227.50
A.4.6.1.21 Pemasangan 1 m' lisplank ukuran (3x20) cm, kayu kelas II m' 75,735.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN (AHSP)

NO. AHSP NAMA PEKERJAAN SATUAN HARGA (Rp.)

A.4.6.1.22 Pemasangan 1 m' lisplank ukuran (3x30) cm, kayu kelas II m' 75,707.50
A.4.6.1.23 Pemasangan 1 m2 rangka dinding pemisah (60x120) cm kayu kelas III m2 103,589.20
A.4.6.1.25 Pemasangan 1 m2 rangka dinding pemisah plywood rangkap, rangka kayu kelas II m2 286,643.50
A.4.6.1.26 Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas II m2 252,395.00
A.4.6.1.27 Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm m2 43,010.00
A.4.6.1.28 Pemasangan 1 m' kalsiplank m' 46,772.00
A.4.6.2. HARGA SATUAN PEKERJAAN KUNCI DAN KACA
A.4.6.2.2 Pemasangan 1 buah kunci tanam biasa buah 234,025.00
A.4.6.2.3 Pemasangan 1 buah kunci kamar mandi buah 223,162.50
A.4.6.2.4 Pemasangan 1 buah kunci silinder buah 223,162.50
A.4.6.2.5 Pemasangan 1 buah engsel pintu biasa 4" buah 37,735.50
A.4.6.2.6 Pemasangan 1 buah engsel jendela 3" buah 27,830.00
A.4.6.2.7 Pemasangan 1 buah engsel angin buah 77,825.00
A.4.6.2.8 Pemasangan 1 buah spring knip buah 83,517.50
A.4.6.2.9 Pemasangan 1 buah kait angin buah 85,827.50
A.4.6.2.10 Pemasangan 1 buah door closer buah 627,165.00
A.4.6.2.11 Pemasangan 1 buah kunci slot buah 101,860.00
A.4.6.2 .12 Pemasangan 1 buah Door handle (pegangan pintu) buah 179,685.00
A.4.6.2 .13 Pemasangan 1 buah door stop buah 114,895.00
A.4.6.2 .17 Pemasangan 1 m2 kaca tebal 5 mm m2 261,647.65
A.4.6.2 .18 Pemasangan 1 m2 kaca tebal 8 mm m2 325,780.51
A.4.6.2 .19 Pemasangan 1 m2 kaca buram tebal 12 mm m2 720,097.51
A.4.6.2 .23 Pemasangan 1 m2 kaca patri tebal 5 mm m2 2,560,878.65
A.4.7.1. HARGA SATUAN PEKERJAAN PENGECATAN
A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama m2 10,631.50
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) m2 43,530.30
A.4.7.1.5 1 m2 Pengecatan bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup) m2 57,153.80
A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil m2 39,102.80
A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur m2 62,985.12
A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter m2 8,519.50
A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis m2 37,565.00
A.4.7.1.10. Pengecatan 1 m2 tembok baru untuk interior ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) m2 19,324.80
A.4.7.1.11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup) m2 15,362.60
A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi m2 25,367.10
A. 4.7.1.19 Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat m2 37,125.00
A.4.7.1.10.a Pengecatan 1 m2 tembok baru untuk exterior ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) m2 41,432.60
A. 4.7.1.20 Pengecatan 1 m2 plafond (2 lapis cat penutup) m2 10,795.40
A.5.1.1. HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A.5.1.1.1. Pemasangan 1 buah closet duduk buah 1,772,650.00
A.5.1.1.2. Pemasangan 1 buah closet jongkok buah 594,647.90
A.5.1.1.4. Pemasangan 1 buah urinoir buah 3,229,312.90
A.5.1.1.5. Pemasangan 1 buah wastafel buah 1,219,447.90
A.5.1.1.6. Pemasangan 1 buah bathcuip porselen buah 5,337,997.50
A.5.1.1.7. Pemasangan 1 buah bak fibreglass vol 1 m3 buah 1,174,800.00
A.5.1.1.12. Pemasangan 1 buah bak cuci piring stainlessteel buah 1,703,295.00
A.5.1.1.14. Pemasangan 1 buah floor drain stainless steel buah 313,775.00
A.5.1.1.18. Pemasangan 1 m' pipa galvanis diameter 1/2" m' 67,092.67
A.5.1.1.19. Pemasangan 1 buah kran diameter 1/2" atau 3/4" buah 106,320.50
A.5.1.1.20. Pemasangan 1 m' pipa galvanis diameter 3/4" m' 81,869.33
A.5.1.1.24 Pemasangan 1 m' pipa galvanis diameter 4" m' 102,350.37
A.5.1.1.25. Pemasangan 1 m' pipa PVC tipe AW diameter 1/2" m' 21,125.50
A.5.1.1.26. Pemasangan 1 m' pipa PVC tipe AW diameter 3/4" m' 23,683.00
A.5.1.1.31. Pemasangan 1 m' pipa PVC tipe AW diameter 3" m' 114,611.75
A.5.1.1.32 Pemasangan 1 m' pipa PVC tipe AW diameter 4" m' 135,071.75
A.5.1.1.36. Pemasangan 1 m' pipa beton diameter 40 cm m' 456,288.69
A.8.4.6. HARGA SATUAN PEKERJAAN ELEKTRIKAL
A.8.4.6.1 Pemasangan 1 buah titik nyala lampu titik 381,535.00
A.8.4.6.2 Pemasangan 1 buah MCB buah 514,525.00
HARGA SATUAN PEKERJAAN LAIN-LAIN (TAKSIRAN)
DAFTAR ANALISA HARGA SATUAN PEKERJAAN (AHSP)

NO. AHSP NAMA PEKERJAAN SATUAN HARGA (Rp.)

Taksir 1 Pemasangan 1 m2 rangka atap baja ringan ex. TASO m2 171,575.80


Taksir 2 Pemasangan 1 titik nyala stop kontak titik 292,352.50
Taksir 3 1 m2 labur aspal + labur pasir m2 15,008.78
Taksir 4 Pemasangan 1 buah pintu KM/WC PVC buah 960,205.58
Taksir 5 Pemasangan 100 m2 karung goni basah untuk curing beton m2 367,664.00
Taksir 6 Menyirami 100 m2 karung goni dengan air selama 4 hari m2 1,003,200.00
Taksir 7 Pemasangan 1 m2 plastik untuk jalan cor beton m2 4,383.50
Taksir 8 Pemasangan 1 m2 geotekstil untuk timbunan m2 35,590.50
Taksir 9 Pemasangan 1 m2 ACP + rangka besi siku mm, modul 100x100cm eksterior m2 866,648.04
Taksir 10 Pemasangan Pintu Type P-1, P-2, P-3, P-4, P-5 dan Accessories sebanyak 1 unit unit 2,541,541.05
Taksir 11 Pemasangan Pintu Type PJ-1 dan Accessories unit 4,066,133.70
Taksir 12 Pemasangan Jendela Aluminium Warna + Accessories unit 3,090,991.73
A.2.2.1. HARGA SATUAN PEKERJAAN PERSIAPAN

A.2.2.1.1 Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.400 55,000.00 22,000.00
Tukang Kayu L.02 OH 0.200 80,000.00 16,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.020 100,000.00 2,000.00
JUMLAH TENAGA KERJA 42,000.00
B BAHAN
Dolken Kayu Ø 8-10/400 cm Batang 1.250 15,000.00 18,750.00
Semen Portland Kg 5.000 1,400.00 7,000.00
Pasir beton m3 0.005 118,900.00 594.50
Koral Beton m3 0.009 400,000.00 3,600.00
Kayu 5/7 m3 0.072 1,505,250.00 108,378.00
Paku biasa 2"-5" Kg 0.060 16,500.00 990.00
Residu Liter 0.450 4,700.00 2,115.00
JUMLAH HARGA BAHAN 141,427.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 183,427.50


### E. Overhead & Profit 10% x D 18,342.75
F. Harga Satuan Pekerjaan (D+E) 201,770.25

A.2.2.1.2 Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 55,000.00 11,000.00
Tukang Kayu L.02 OH 0.400 80,000.00 32,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.020 100,000.00 2,000.00
JUMLAH TENAGA KERJA 47,000.00
B BAHAN
Dolken Kayu Ø 8-10/400 cm Batang 1.250 15,000.00 18,750.00
Semen Portland Kg 2.500 1,400.00 3,500.00
Seng gelombang 7' Lbr 1.200 62,000.00 74,400.00
Pasir beton m2 0.005 118,900.00 594.50
Koral Beton m3 0.009 400,000.00 3,600.00
Kayu 5/7 m3 0.072 1,505,250.00 108,378.00
Paku biasa 2"-5" Kg 0.060 16,500.00 990.00
Meni besi Liter 0.450 34,500.00 15,525.00
JUMLAH HARGA BAHAN 225,737.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 272,737.50


### E. Overhead & Profit 10% x D 27,273.75
F. Harga Satuan Pekerjaan (D+E) 300,011.25

A.2.2.1.3 Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 55,000.00 11,000.00
Tukang Kayu L.02 OH 0.300 80,000.00 24,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.020 100,000.00 2,000.00
JUMLAH TENAGA KERJA 39,000.00
B BAHAN
Dolken Kayu Ø 8-10/400 cm Batang 1.000 15,000.00 15,000.00
Semen Portland Kg 2.000 1,400.00 2,800.00
Kawat duri M' 25.000 3,500.00 87,500.00
Pasir beton m3 0.005 118,900.00 594.50
Koral Beton m3 0.009 400,000.00 3,600.00
Paku biasa 2"-5" Kg 0.060 16,500.00 990.00

JUMLAH HARGA BAHAN 110,484.50


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 149,484.50


### E. Overhead & Profit 10% x D 14,948.45
F. Harga Satuan Pekerjaan (D+E) 164,432.95
A.2.2.1.4 Pengukuran dan Pemasangan 1 m' Bouwplank
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 55,000.00 5,500.00
Tukang Kayu L.02 OH 0.100 80,000.00 8,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 15,000.00
B BAHAN
Kayu Balok 5/7 m3 0.012 1,505,250.00 18,063.00
Paku 2"-3" Kg 0.020 16,500.00 330.00
Kayu papan 3/20 m3 0.007 3,000,000.00 21,000.00
JUMLAH HARGA BAHAN 39,393.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 54,393.00


### E. Overhead & Profit 10% x D 5,439.30
F. Harga Satuan Pekerjaan (D+E) 59,832.30

A.2.2.1.5 Pembuatan 1 m2 kantor sementara lantai plesteran


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 2.000 55,000.00 110,000.00
Tukang Kayu L.02 OH 2.000 80,000.00 160,000.00
Tukang batu L.02 OH 1.000 80,000.00 80,000.00
Kepala Tukang L.03 OH 0.300 100,000.00 30,000.00
Mandor L.04 OH 0.050 100,000.00 5,000.00
JUMLAH TENAGA KERJA 385,000.00
B BAHAN
Dolken Kayu Ø 8-10/400 cm Batang 1.250 15,000.00 18,750.00
Kayu m3 0.180 1,505,250.00 270,945.00
Paku biasa Kg 0.080 16,500.00 1,320.00
Besi strip Kg 1.100 10,100.00 11,110.00
Semen portland Kg 35.000 1,400.00 49,000.00
Pasir pasang m3 0.150 118,900.00 17,835.00
Pasir beton m3 0.100 118,900.00 11,890.00
Koral beton m3 0.150 400,000.00 60,000.00
Bata merah Bh 30.000 700.00 21,000.00
Seng plat Lbr 0.250 33,350.00 8,337.50
Jendela naco Bh 0.200 218,100.00 43,620.00
Kaca polos m2 0.080 200,000.00 16,000.00
Kunci tanam Bh 0.150 68,100.00 10,215.00
Plywood 4 mm Lbr 0.060 75,000.00 4,500.00
JUMLAH HARGA BAHAN 544,522.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 929,522.50


### E. Overhead & Profit 10% x D 92,952.25
F. Harga Satuan Pekerjaan (D+E) 1,022,474.75

A.2.2.1.6 Pembuatan 1 m2 rumah jaga (Konstruksi kayu)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 55,000.00 55,000.00
Tukang Kayu L.02 OH 1.500 80,000.00 120,000.00
Kepala Tukang L.03 OH 0.150 100,000.00 15,000.00
Mandor L.04 OH 0.050 100,000.00 5,000.00
JUMLAH TENAGA KERJA 195,000.00
B BAHAN
Dolken Kayu Ø 8-10/400 cm Batang 3.000 15,000.00 45,000.00
Kayu m3 0.276 1,505,250.00 415,449.00
Paku biasa Kg 0.700 16,500.00 11,550.00
Seng gelombang Lbr 1.500 62,100.00 93,150.00

JUMLAH HARGA BAHAN 565,149.00


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 760,149.00


### E. Overhead & Profit 10% x D 76,014.90
F. Harga Satuan Pekerjaan (D+E) 836,163.90
A.2.2.1.7 Pembuatan 1 m2 gudang semen dan peralatan
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 55,000.00 55,000.00
Tukang Kayu L.02 OH 2.000 80,000.00 160,000.00
Kepala Tukang L.03 OH 0.200 100,000.00 20,000.00
Mandor L.04 OH 0.050 100,000.00 5,000.00
JUMLAH TENAGA KERJA 240,000.00
B BAHAN
Dolken Kayu Ø 8-10/400 cm Batang 1.700 15,000.00 25,500.00
Kayu m3 0.210 1,505,250.00 316,102.50
Paku biasa Kg 0.300 16,500.00 4,950.00
Semen portland Kg 10.500 1,400.00 14,700.00
Pasir beton m3 0.030 118,900.00 3,567.00
Koral beton m3 0.050 400,000.00 20,000.00
Seng gelombang Lbr 1.500 45,000.00 67,500.00
Seng plat Lbr 0.250 33,350.00 8,337.50
JUMLAH HARGA BAHAN 460,657.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 700,657.00


### E. Overhead & Profit 10% x D 70,065.70
F. Harga Satuan Pekerjaan (D+E) 770,722.70

A.2.2.1.8 Pembuatan 1 m2 bedeng pekerja


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 55,000.00 55,000.00
Tukang Kayu L.02 OH 2.000 80,000.00 160,000.00
Kepala Tukang L.03 OH 0.200 100,000.00 20,000.00
Mandor L.04 OH 0.050 100,000.00 5,000.00
JUMLAH TENAGA KERJA 240,000.00
B BAHAN
Dolken Kayu Ø 8-10/400 cm Batang 1.250 15,000.00 18,750.00
Kayu m3 0.186 1,505,250.00 279,976.50
Paku biasa Kg 0.300 16,500.00 4,950.00
Semen portland Kg 18.000 1,400.00 25,200.00
Pasir beton m3 0.030 118,900.00 3,567.00
Koral beton m3 0.050 400,000.00 20,000.00
Seng gelombang Lbr 1.500 45,000.00 67,500.00
Plywood 4mm Lbr 1.350 75,000.00 101,250.00
JUMLAH HARGA BAHAN 521,193.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 761,193.50


### E. Overhead & Profit 10% x D 76,119.35
F. Harga Satuan Pekerjaan (D+E) 837,312.85

A.2.2.1.9 Pembersihan 1 m2 lapangan dan perataan


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 55,000.00 5,500.00
Mandor L.04 OH 0.050 100,000.00 5,000.00
JUMLAH TENAGA KERJA 10,500.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 10,500.00


### E. Overhead & Profit 10% x D 1,050.00
F. Harga Satuan Pekerjaan (D+E) 11,550.00
A.2.2.1.10 Pembuatan 1 m2 Steger/perancah dari bambu
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 55,000.00 55,000.00
Tukang Kayu L.02 OH 2.000 80,000.00 160,000.00
Kepala Tukang L.03 OH 0.200 100,000.00 20,000.00
Mandor L.04 OH 0.050 100,000.00 5,000.00
JUMLAH TENAGA KERJA 240,000.00
B BAHAN
Bambu dia. 6-8 / 600 cm Batang 1.250 38,500.00 48,125.00
Tali Ijuk m3 0.186 39,800.00 7,402.80

JUMLAH HARGA BAHAN 55,527.80


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 295,527.80


### E. Overhead & Profit 10% x D 29,552.78
F. Harga Satuan Pekerjaan (D+E) 325,080.58

A.2.2.1.11 Pembuatan 1 buah kotak adukan ukuran 40 cm x 50 cm x 25 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Tukang Kayu L.02 OH 0.300 80,000.00 24,000.00
Kepala Tukang L.03 OH 0.030 100,000.00 3,000.00
JUMLAH TENAGA KERJA 27,000.00
B BAHAN
Kayu papan kelas III m3 0.036 3,000,000.00 108,000.00
Kayu 5/7 klas III m3 0.014 1,505,250.00 21,073.50
Paku biasa kg 0.080 16,500.00 1,320.00
-
JUMLAH HARGA BAHAN 130,393.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 157,393.50


### E. Overhead & Profit 10% x D 15,739.35
F. Harga Satuan Pekerjaan (D+E) 173,132.85

A.2.2.1.12 Pembuatan 1 m2 jalan sementara


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 55,000.00 55,000.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 55,500.00
B BAHAN
Batu belah m3 0.150 400,000.00 60,000.00
Batu pecah m3 0.090 495,000.00 44,550.00
Pasir pasang m3 0.010 118,900.00 1,189.00
JUMLAH HARGA BAHAN 105,739.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 161,239.00


### E. Overhead & Profit 10% x D 16,123.90
F. Harga Satuan Pekerjaan (D+E) 177,362.90
A.2.2.1.13 Pembongkaran 1 m3 beton bertulang
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 13.334 55,000.00 733,370.00
Mandor L.04 OH 0.666 100,000.00 66,600.00
JUMLAH TENAGA KERJA 799,970.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 799,970.00


### E. Overhead & Profit 10% x D 79,997.00
F. Harga Satuan Pekerjaan (D+E) 879,967.00

A.2.2.1.14 Pembongkaran 1 m3 dinding tembok bata


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 6.667 55,000.00 366,685.00
Mandor L.04 OH 0.333 100,000.00 33,300.00
JUMLAH TENAGA KERJA 399,985.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 399,985.00


### E. Overhead & Profit 10% x D 39,998.50
F. Harga Satuan Pekerjaan (D+E) 439,983.50

A.2.2.1.15 Pembuatan 1 m2 pagar kawat jaring galvanis panjang 240 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.042 55,000.00 2,310.00
Tukang L.02 OH 0.004 80,000.00 320.00
Kepala Tukang L.03 OH 0.002 100,000.00 200.00
Mandor L.04 OH 0.042 100,000.00 4,200.00
JUMLAH TENAGA KERJA 7,030.00
B BAHAN
Kawat jaring Lbr 0.1434 203,800.00 29,224.92
JUMLAH HARGA BAHAN 29,224.92
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 36,254.92


### E. Overhead & Profit 10% x D 3,625.49
F. Harga Satuan Pekerjaan (D+E) 39,880.41
A.2.2.1.16 Pembuatan 1 m2 panel beton pracetak 5x50x240 cm untuk pagar
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.375 55,000.00 20,625.00
Tukang L.02 OH 0.125 80,000.00 10,000.00
Kepala Tukang L.03 OH 0.012 100,000.00 1,200.00
Mandor L.04 OH 0.019 100,000.00 1,900.00
JUMLAH TENAGA KERJA 33,725.00
B BAHAN
Panel beton pracetak Lbr 0.986 173,000.00 170,578.00
Kolom beton pracetak Batang 0.525 104,800.00 55,020.00
Semen PC Kg 45.00 1,400.00 63,000.00
Pasir beton m3 0.074 118,900.00 8,798.60
Koral m3 0.146 400,000.00 58,400.00
JUMLAH HARGA BAHAN 355,796.60
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 389,521.60


### E. Overhead & Profit 10% x D 38,952.16
F. Harga Satuan Pekerjaan (D+E) 428,473.76

An.2.2.1.17 Pemasangan 1 unit scafolding (sewa)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 55,000.00 13,750.00
Tukang L.02 OH 0.017 80,000.00 1,360.00
Kepala Tukang L.03 OH 0.002 100,000.00 200.00
Mandor L.04 OH 0.013 100,000.00 1,300.00
JUMLAH TENAGA KERJA 16,610.00
B BAHAN
Sewa scafolding unit 1.000 328,500.00 328,500.00
-
JUMLAH HARGA BAHAN 328,500.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 345,110.00


### E. Overhead & Profit 10% x D 34,511.00
F. Harga Satuan Pekerjaan (D+E) 379,621.00

An.2.2.1.18 Pembongkaran 1 m2 Lantai Keramik


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 55,000.00 5,500.00
Mandor L.04 OH 0.010 100,000.00 1,000.00
JUMLAH TENAGA KERJA 6,500.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 6,500.00


E. Overhead & Profit 10% x D 650.00
F. Harga Satuan Pekerjaan (D+E) 7,150.00
An.2.2.1.19 Pembongkaran 1 m2 Plesteran
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 55,000.00 2,750.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 3,050.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 3,050.00


E. Overhead & Profit 10% x D 305.00
F. Harga Satuan Pekerjaan (D+E) 3,355.00

An.2.2.1.20 Pembongkaran 1 m2 Atap Genteng


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.020 55,000.00 1,100.00
Mandor L.04 OH 0.010 100,000.00 1,000.00
JUMLAH TENAGA KERJA 2,100.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 2,100.00


E. Overhead & Profit 10% x D 210.00
F. Harga Satuan Pekerjaan (D+E) 2,310.00

An.2.2.1.21 Pembongkaran 1 m2 Atap Seng/Asbes


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.069 55,000.00 3,795.00
Mandor L.04 OH 0.010 100,000.00 1,000.00
JUMLAH TENAGA KERJA 4,795.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 4,795.00


E. Overhead & Profit 10% x D 479.50
F. Harga Satuan Pekerjaan (D+E) 5,274.50
An.2.2.1.22 Pembongkaran 1 m2 Rangka Atap Kuda-kuda Kayu
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 55,000.00 13,750.00
Mandor L.04 OH 0.050 100,000.00 5,000.00
JUMLAH TENAGA KERJA 18,750.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 18,750.00


E. Overhead & Profit 10% x D 1,875.00
F. Harga Satuan Pekerjaan (D+E) 20,625.00

An.2.2.1.23 Pembongkaran 1 m2 Plafond + rangka


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.040 55,000.00 2,200.00
Mandor L.04 OH 0.020 100,000.00 2,000.00
JUMLAH TENAGA KERJA 4,200.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 4,200.00


E. Overhead & Profit 10% x D 420.00
F. Harga Satuan Pekerjaan (D+E) 4,620.00

An.2.2.1.24 Pembongkaran 1 m3 Pasangan Batu Kali


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 3.000 55,000.00 165,000.00
Mandor L.04 OH 0.500 100,000.00 50,000.00
JUMLAH TENAGA KERJA 215,000.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 215,000.00


E. Overhead & Profit 10% x D 21,500.00
F. Harga Satuan Pekerjaan (D+E) 236,500.00
An.2.2.1.25 Pembongkaran 1 m2 Kusen Pintu
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 55,000.00 55,000.00
Mandor L.04 OH 0.100 100,000.00 10,000.00
JUMLAH TENAGA KERJA 65,000.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 65,000.00


E. Overhead & Profit 10% x D 6,500.00
F. Harga Satuan Pekerjaan (D+E) 71,500.00

An.2.2.1.26 Pembongkaran 1 m2 Daun Pintu


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 55,000.00 55,000.00
Mandor L.04 OH 0.100 100,000.00 10,000.00
JUMLAH TENAGA KERJA 65,000.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 65,000.00


E. Overhead & Profit 10% x D 6,500.00
F. Harga Satuan Pekerjaan (D+E) 71,500.00

An.2.2.1.27 Pembongkaran 1 m2 Rabat Beton


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 55,000.00 2,750.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 3,050.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 3,050.00


E. Overhead & Profit 10% x D 305.00
F. Harga Satuan Pekerjaan (D+E) 3,355.00
An.2.2.1.28 Pembongkaran 1 m2 Kaso & Reng Kayu
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 55,000.00 5,500.00
Tukang Kayu L.02 OH 0.025 80,000.00 2,000.00
Kepala Tukang L.03 OH 0.005 100,000.00 500.00
Mandor L.04 OH 0.003 100,000.00 250.00
JUMLAH TENAGA KERJA 8,250.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 8,250.00


E. Overhead & Profit 10% x D 825.00
F. Harga Satuan Pekerjaan (D+E) 9,075.00

An.2.2.1.29 Pembersihan Akhir Lapangan 1 m2


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.750 55,000.00 41,250.00
Tukang L.02 OH - - -
Kepala Tukang L.03 OH - - -
Mandor L.04 OH 0.038 100,000.00 3,750.00
JUMLAH TENAGA KERJA 45,000.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 45,000.00


E. Overhead & Profit 10% x D 4,500.00
F. Harga Satuan Pekerjaan (D+E) 49,500.00
Untuk per m2 4,950.00
A.2.3.1. HARGA SATUAN PEKERJAAN TANAH

A.2.3.1.1 Menggali 1 m3 tanah biasa sedalam 1 m


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.750 55,000.00 41,250.00
Mandor L.04 OH 0.025 100,000.00 2,500.00
JUMLAH TENAGA KERJA 43,750.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 43,750.00


E. Overhead & Profit 10% x D 4,375.00
F. Harga Satuan Pekerjaan (D+E) 48,125.00

A.2.3.1.2 Menggali 1 m3 tanah biasa sedalam 2 m


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.900 55,000.00 49,500.00
Mandor L.04 OH 0.045 100,000.00 4,500.00
JUMLAH TENAGA KERJA 54,000.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 54,000.00


E. Overhead & Profit 10% x D 5,400.00
F. Harga Satuan Pekerjaan (D+E) 59,400.00

A.2.3.1.3 Menggali 1 m3 tanah biasa sedalam 3 m


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.050 55,000.00 57,750.00
Mandor L.04 OH 0.067 100,000.00 6,700.00
JUMLAH TENAGA KERJA 64,450.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 64,450.00


E. Overhead & Profit 10% x D 6,445.00
F. Harga Satuan Pekerjaan (D+E) 70,895.00
A.2.3.1.4 Menggali 1 m3 tanah keras sedalam 1 m
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 55,000.00 55,000.00
Mandor L.04 OH 0.032 100,000.00 3,200.00
JUMLAH TENAGA KERJA 58,200.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 58,200.00


E. Overhead & Profit 10% x D 5,820.00
F. Harga Satuan Pekerjaan (D+E) 64,020.00

A.2.3.1.5 Menggali 1 m3 tanah cadas sedalam 1 m


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 55,000.00 82,500.00
Mandor L.04 OH 0.060 100,000.00 6,000.00
JUMLAH TENAGA KERJA 88,500.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 88,500.00


E. Overhead & Profit 10% x D 8,850.00
F. Harga Satuan Pekerjaan (D+E) 97,350.00

A.2.3.1.6 Menggali 1 m3 tanah lumpur sedalam 1 m


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.200 55,000.00 66,000.00
Mandor L.04 OH 0.045 100,000.00 4,500.00
JUMLAH TENAGA KERJA 70,500.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 70,500.00


E. Overhead & Profit 10% x D 7,050.00
F. Harga Satuan Pekerjaan (D+E) 77,550.00
A.2.3.1.7 Pengerjaan stripping 1 m2 tanah tebing setinggi 1 m
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 55,000.00 2,750.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 3,250.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 3,250.00


E. Overhead & Profit 10% x D 325.00
F. Harga Satuan Pekerjaan (D+E) 3,575.00

A.2.3.1.8 Pembuangan 1 m3 tanah sejauh 30 meter


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.330 55,000.00 18,150.00
Mandor L.04 OH 0.010 100,000.00 1,000.00
JUMLAH TENAGA KERJA 19,150.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 19,150.00


E. Overhead & Profit 10% x D 1,915.00
F. Harga Satuan Pekerjaan (D+E) 21,065.00

A.2.3.1.9 Pengurugan kembali 1 m3 galian tanah


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.500 55,000.00 27,500.00
Mandor L.04 OH 0.050 100,000.00 5,000.00
JUMLAH TENAGA KERJA 32,500.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 32,500.00


E. Overhead & Profit 10% x D 3,250.00
F. Harga Satuan Pekerjaan (D+E) 35,750.00
A.2.3.1.10 Pemadatan tanah 1 m3 tanah (per 20 cm)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.500 55,000.00 27,500.00
Mandor L.04 OH 0.050 100,000.00 5,000.00
JUMLAH TENAGA KERJA 32,500.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 32,500.00


E. Overhead & Profit 10% x D 3,250.00
F. Harga Satuan Pekerjaan (D+E) 35,750.00

A.2.3.1.11 Pengurugan 1 m3 dengan pasir urug


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 55,000.00 16,500.00
Mandor L.04 OH 0.010 100,000.00 1,000.00
JUMLAH TENAGA KERJA 17,500.00
B BAHAN
Pasir urug m3 1.200 100,000.00 120,000.00
-
JUMLAH HARGA BAHAN 120,000.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 137,500.00


E. Overhead & Profit 10% x D 13,750.00
F. Harga Satuan Pekerjaan (D+E) 151,250.00

A.2.3.1.12 Pemasangan 1 m3 lapisan pudel campuran 1 KP : 3 PP : 7 TL


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.800 55,000.00 44,000.00
Tukang L.02 OH 0.400 80,000.00 32,000.00
Kepala Tukang L.03 OH 0.040 100,000.00 4,000.00
Mandor L.04 OH 0.080 100,000.00 8,000.00
JUMLAH TENAGA KERJA 88,000.00
B BAHAN
Kapur Padam m3 0.135 - -
Pasir Pasang m3 0.400 118,900.00 47,560.00
Tanah Liat / timbunan m3 0.948 80,000.00 75,840.00
-
JUMLAH HARGA BAHAN 123,400.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 211,400.00


E. Overhead & Profit 10% x D 21,140.00
F. Harga Satuan Pekerjaan (D+E) 232,540.00
A.2.3.1.13 Pemasangan 1 m3 lapisan ijuk tebal 10 cm untuk bidang resapan
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 55,000.00 8,250.00
Mandor L.04 OH 0.015 100,000.00 1,500.00
JUMLAH TENAGA KERJA 9,750.00
B BAHAN
Ijuk m3 6.000 4,800.00 28,800.00
-
JUMLAH HARGA BAHAN 28,800.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 38,550.00


E. Overhead & Profit 10% x D 3,855.00
F. Harga Satuan Pekerjaan (D+E) 42,405.00

A.2.3.1.14 Pengurugan 1 m3 sirtu padat


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 55,000.00 13,750.00
Mandor L.04 OH 0.025 100,000.00 2,500.00
JUMLAH TENAGA KERJA 16,250.00
B BAHAN
Sirtu m3 1.200 135,600.00 162,720.00
JUMLAH HARGA BAHAN 162,720.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 178,970.00


E. Overhead & Profit 10% x D 17,897.00
F. Harga Satuan Pekerjaan (D+E) 196,867.00
A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI

A.3.2.1.1 Pemasangan 1 m3 pondasi batu belah / kali campuran 1 SP: 3 PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 55,000.00 82,500.00
Tukang Batu L.02 OH 0.750 80,000.00 60,000.00
Kepala Tukang L.03 OH 0.075 100,000.00 7,500.00
Mandor L.04 OH 0.075 100,000.00 7,500.00
JUMLAH TENAGA KERJA 157,500.00
B BAHAN
Batu kali / batu belah m3 1.200 495,000.00 594,000.00
Semen Portland kg 202.000 1,400.00 282,800.00
Pasir Pasang m3 0.485 118,900.00 57,666.50
JUMLAH HARGA BAHAN 934,466.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,091,966.50


E. Overhead & Profit 10% x D 109,196.65
F. Harga Satuan Pekerjaan (D+E) 1,201,163.15

A.3.2.1.2 Pemasangan 1 m3 pondasi batu belah /kali campuran 1 SP: 4 PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 55,000.00 82,500.00
Tukang Batu L.02 OH 0.750 80,000.00 60,000.00
Kepala Tukang L.03 OH 0.075 100,000.00 7,500.00
Mandor L.04 OH 0.075 100,000.00 7,500.00
JUMLAH TENAGA KERJA 157,500.00
B BAHAN
Batu kali / belah m3 1.200 495,000.00 594,000.00
Sement Portland kg 163.000 1,400.00 228,200.00
Pasir Pasang m3 0.520 118,900.00 61,828.00
JUMLAH HARGA BAHAN 884,028.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,041,528.00


E. Overhead & Profit 10% x D 104,152.80
F. Harga Satuan Pekerjaan (D+E) 1,145,680.80

A.3.2.1.3 Pemasangan 1 m3 pondasi batu belah /kali campuran 1 SP: 5 PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 55,000.00 82,500.00
Tukang Batu L.02 OH 0.750 80,000.00 60,000.00
Kepala Tukang L.03 OH 0.075 100,000.00 7,500.00
Mandor L.04 OH 0.075 100,000.00 7,500.00
JUMLAH TENAGA KERJA 157,500.00
B BAHAN
Batu kali / belah m3 1.200 495,000.00 594,000.00
Semen Portland kg 136.000 1,400.00 190,400.00
Pasir Pasang m3 0.544 118,900.00 64,681.60
JUMLAH HARGA BAHAN 849,081.60
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,006,581.60


E. Overhead & Profit 10% x D 100,658.16
F. Harga Satuan Pekerjaan (D+E) 1,107,239.76
A.3.2.1.4 Pemasangan 1 m3 pondasi batu belah /kali campuran 1 SP: 6 PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 55,000.00 82,500.00
Tukang Batu L.02 OH 0.750 80,000.00 60,000.00
Kepala Tukang L.03 OH 0.075 100,000.00 7,500.00
Mandor L.04 OH 0.075 100,000.00 7,500.00
JUMLAH TENAGA KERJA 157,500.00
B BAHAN
Batu kali / belah m3 1.200 495,000.00 594,000.00
Semen Portland kg 117.000 1,400.00 163,800.00
Pasir Pasang m3 0.561 118,900.00 66,702.90
JUMLAH HARGA BAHAN 824,502.90
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 982,002.90


E. Overhead & Profit 10% x D 98,200.29
F. Harga Satuan Pekerjaan (D+E) 1,080,203.19

A.3.2.1.5 Pemasangan 1 m3 pondasi batu belah /kali campuran 1 SP: 8 PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 55,000.00 82,500.00
Tukang Batu L.02 OH 0.750 80,000.00 60,000.00
Kepala Tukang L.03 OH 0.075 100,000.00 7,500.00
Mandor L.04 OH 0.075 100,000.00 7,500.00
JUMLAH TENAGA KERJA 157,500.00
B BAHAN
Batu kali / belah m3 1.200 495,000.00 594,000.00
Semen Portland kg 91.000 1,400.00 127,400.00
Pasir Pasang m3 0.584 118,900.00 69,437.60
JUMLAH HARGA BAHAN 790,837.60
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 948,337.60


E. Overhead & Profit 10% x D 94,833.76
F. Harga Satuan Pekerjaan (D+E) 1,043,171.36

A.3.2.1.6 Pemasangan 1 m3 pondasi batu belah /kali campuran 1 SP: 1 KP : 2 PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 55,000.00 82,500.00
Tukang Batu L.02 OH 0.750 80,000.00 60,000.00
Kepala Tukang L.03 OH 0.075 100,000.00 7,500.00
Mandor L.04 OH 0.075 100,000.00 7,500.00
JUMLAH TENAGA KERJA 157,500.00
B BAHAN
Batu kali / belah m3 1.200 495,000.00 594,000.00
Kapur m3 0.170 - -
Semen Portland kg 0.170 1,400.00 238.00
Pasir Pasang m3 0.340 118,900.00 40,426.00
JUMLAH HARGA BAHAN 634,664.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 792,164.00


E. Overhead & Profit 10% x D 79,216.40
F. Harga Satuan Pekerjaan (D+E) 871,380.40
A.3.2.1.9 Pemasangan 1 M3 Batu Kosong ( AANSTAMPING )
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.780 55,000.00 42,900.00
Tukang Batu L.02 OH 0.390 80,000.00 31,200.00
Kepala Tukang L.03 OH 0.039 100,000.00 3,900.00
Mandor L.04 OH 0.039 100,000.00 3,900.00
JUMLAH TENAGA KERJA 81,900.00
B BAHAN
Batu belah m3 1.200 495,000.00 594,000.00
Pasir urug m3 0.432 100,000.00 43,200.00
JUMLAH HARGA BAHAN 637,200.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 719,100.00


E. Overhead & Profit 10% x D 71,910.00
F. Harga Satuan Pekerjaan (D+E) 791,010.00

A.3.2.1.10 Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2PB : 3Kr dan 40% batu belah
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 3.400 55,000.00 187,000.00
Tukang Batu L.02 OH 0.850 80,000.00 68,000.00
Kepala Tukang L.03 OH 0.085 100,000.00 8,500.00
Mandor L.04 OH 0.170 100,000.00 17,000.00
JUMLAH TENAGA KERJA 280,500.00
B BAHAN
Batu belah m3 0.480 495,000.00 237,600.00
Semen Portland Kg 194.000 1,400.00 271,600.00
Pasir beton m3 0.312 118,900.00 37,096.80
Kerikil m3 0.468 400,000.00 187,200.00
Besi beton Kg 126.000 10,750.00 1,354,500.00
Kawat beton Kg 1.800 22,900.00 41,220.00
JUMLAH HARGA BAHAN 2,129,216.80
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 2,409,716.80


E. Overhead & Profit 10% x D 240,971.68
F. Harga Satuan Pekerjaan (D+E) 2,650,688.48

A.3.2.1.11 Pemasangan 1 m3 pondasi sumuran diameter 100 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 2.400 55,000.00 132,000.00
Tukang Batu L.02 OH 0.800 80,000.00 64,000.00
Kepala Tukang L.03 OH 0.080 100,000.00 8,000.00
Mandor L.04 OH 0.119 100,000.00 11,900.00
JUMLAH TENAGA KERJA 215,900.00
B BAHAN
Batu belah m3 0.450 495,000.00 222,750.00
Semen Portland Kg 194.000 1,400.00 271,600.00
Pasir beton m3 0.312 118,900.00 37,096.80
Kerikil m3 0.468 400,000.00 187,200.00
JUMLAH HARGA BAHAN 718,646.80
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 934,546.80


E. Overhead & Profit 10% x D 93,454.68
F. Harga Satuan Pekerjaan (D+E) 1,028,001.48
A.3.2.1.12 1 m2 pasang cerucup gelam untuk pondasi (p.1,5m-20 cm)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 55,000.00 16,500.00
Tukang Batu L.02 OH 0.000 80,000.00 -
Kepala Tukang L.03 OH 0.030 100,000.00 3,000.00
Mandor L.04 OH 0.000 100,000.00 -
JUMLAH TENAGA KERJA 19,500.00
B BAHAN
Gelam dia.6-8 btg 6.000 12,000.00 72,000.00
JUMLAH TENAGA BAHAN 72,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 91,500.00


E. Overhead & Profit 10% x D 9,150.00
F. Harga Satuan Pekerjaan (D+E) 100,650.00
A.4.1.1. HARGA SATUAN PEKERJAAN BETON

A.4.1.1.1 Membuat 1 m3 beton mutu f'c = 7,4 Mpa


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 55,000.00 90,750.00
Tukang Batu L.02 OH 0.275 80,000.00 22,000.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 100,000.00 8,300.00
JUMLAH TENAGA KERJA 123,850.00
B BAHAN
Semen Portland kg 247.000 1,400.00 345,800.00
Pasir Beton kg 869.000 84.93 73,802.93
Kerikil (Maks. 30 mm) kg 999.000 366.67 366,300.00
Air Liter 215.000 450.00 96,750.00
JUMLAH HARGA BAHAN 882,652.93
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,006,502.93


### E. Overhead & Profit 10% x D 100,650.29
F. Harga Satuan Pekerjaan (D+E) 1,107,153.22

A.4.1.1.2 Membuat 1 m3 beton mutu f'c = 9,8 Mpa


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 55,000.00 90,750.00
Tukang Batu L.02 OH 0.275 80,000.00 22,000.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 100,000.00 8,300.00
JUMLAH TENAGA KERJA 123,850.00
B BAHAN
Semen Portland kg 276.000 1,400.00 386,400.00
Pasir Beton kg 828.000 84.93 70,320.86
Kerikil (Maks. 30 mm) kg 1012.000 366.67 371,066.67
Air Liter 215.000 450.00 96,750.00
JUMLAH HARGA BAHAN 924,537.52
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,048,387.52


### E. Overhead & Profit 10% x D 104,838.75
F. Harga Satuan Pekerjaan (D+E) 1,153,226.28

A.4.1.1.3 Membuat 1 m3 beton mutu f'c = 12,2 Mpa


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 55,000.00 90,750.00
Tukang Batu L.02 OH 0.275 80,000.00 22,000.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 100,000.00 8,300.00
JUMLAH TENAGA KERJA 123,850.00
B BAHAN
Semen Portland kg 299.000 1,400.00 418,600.00
Pasir Beton kg 799.000 84.93 67,857.93
Kerikil (Maks. 30 mm) kg 1017.000 366.67 372,900.00
Air Liter 215.000 450.00 96,750.00
JUMLAH HARGA BAHAN 956,107.93
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,079,957.93


### E. Overhead & Profit 10% x D 107,995.79
F. Harga Satuan Pekerjaan (D+E) 1,187,953.72
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 Mpa, slump (3-6) cm, w/c=0,87
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.200 55,000.00 66,000.00
Tukang Batu L.02 OH 0.200 80,000.00 16,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.060 100,000.00 6,000.00
JUMLAH TENAGA KERJA 90,000.00
B BAHAN
Semen Portland kg 230.000 1,400.00 322,000.00
Pasir Beton kg 893.000 84.93 75,841.21
Kerikil (Maks. 30 mm) kg 1027.000 366.67 376,566.67
Air Liter 200.000 450.00 90,000.00
JUMLAH HARGA BAHAN 864,407.88
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 954,407.88


### E. Overhead & Profit 10% x D 95,440.79
F. Harga Satuan Pekerjaan (D+E) 1,049,848.67

A.4.1.1.5 Membuat 1 m3 beton mutu f'c = 14,5 Mpa, slump (120±20) mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 55,000.00 90,750.00
Tukang Batu L.02 OH 0.275 80,000.00 22,000.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 100,000.00 8,300.00
JUMLAH TENAGA KERJA 123,850.00
B BAHAN
Semen Portland kg 326.000 1,400.00 456,400.00
Pasir Beton kg 760.000 84.93 64,545.71
Kerikil (Maks. 30 mm) kg 1029.000 366.67 377,300.00
Air Liter 215.000 450.00 96,750.00
JUMLAH HARGA BAHAN 994,995.71
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,118,845.71


E. Overhead & Profit 10% x D 111,884.57
F. Harga Satuan Pekerjaan (D+E) 1,230,730.29
A.4.1.1.6 Membuat 1 m3 beton mutu f'c = 16,9 Mpa
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 55,000.00 90,750.00
Tukang Batu L.02 OH 0.275 80,000.00 22,000.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 100,000.00 8,300.00
JUMLAH TENAGA KERJA 123,850.00
B BAHAN
Semen Portland kg 352.000 1,400.00 492,800.00
Pasir Beton kg 731.000 84.93 62,082.79
Kerikil (Maks. 30 mm) kg 1031.000 366.67 378,033.33
Air Liter 215.000 450.00 96,750.00
JUMLAH HARGA BAHAN 1,029,666.12
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,153,516.12


E. Overhead & Profit 10% x D 115,351.61
F. Harga Satuan Pekerjaan (D+E) 1,268,867.73

A.4.1.1.7 Membuat 1 m3 beton mutu f'c = 19,3 Mpa


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 55,000.00 90,750.00
Tukang Batu L.02 OH 0.275 80,000.00 22,000.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 100,000.00 8,300.00
JUMLAH TENAGA KERJA 123,850.00
B BAHAN
Semen Portland kg 371.000 1,400.00 519,400.00
Pasir Beton kg 698.000 84.93 59,280.14
Kerikil (Maks. 30 mm) kg 1047.000 366.67 383,900.00
Air Liter 215.000 450.00 96,750.00
JUMLAH HARGA BAHAN 1,059,330.14
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,183,180.14


E. Overhead & Profit 10% x D 118,318.01
F. Harga Satuan Pekerjaan (D+E) 1,301,498.16

A.4.1.1.8 Membuat 1 m3 beton mutu f'c = 21,7 Mpa


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 55,000.00 90,750.00
Tukang Batu L.02 OH 0.275 80,000.00 22,000.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 100,000.00 8,300.00
JUMLAH TENAGA KERJA 123,850.00
B BAHAN
Semen Portland kg 384.000 1,400.00 537,600.00
Pasir Beton kg 692.000 84.93 58,770.57
Kerikil (Maks. 30 mm) kg 1039.000 366.67 380,966.67
Air Liter 215.000 450.00 96,750.00
JUMLAH HARGA BAHAN 1,074,087.24
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,197,937.24


E. Overhead & Profit 10% x D 119,793.72
F. Harga Satuan Pekerjaan (D+E) 1,317,730.96
A.4.1.1.9 Membuat 1 m3 beton mutu f'c = 24 Mpa
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 55,000.00 90,750.00
Tukang Batu L.02 OH 0.275 80,000.00 22,000.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 100,000.00 8,300.00
JUMLAH TENAGA KERJA 123,850.00
B BAHAN
Semen Portland kg 406.000 1,400.00 568,400.00
Pasir Beton kg 684.000 84.93 58,091.14
Kerikil (Maks. 30 mm) kg 1026.000 366.67 376,200.00
Air Liter 215.000 450.00 96,750.00
JUMLAH HARGA BAHAN 1,099,441.14
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,223,291.14


E. Overhead & Profit 10% x D 122,329.11
F. Harga Satuan Pekerjaan (D+E) 1,345,620.26

A.4.1.1.10 Membuat 1 m3 beton mutu f'c = 26,4 Mpa


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 55,000.00 90,750.00
Tukang Batu L.02 OH 0.275 80,000.00 22,000.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 100,000.00 8,300.00
JUMLAH TENAGA KERJA 123,850.00
B BAHAN
Semen Portland kg 413.000 1,400.00 578,200.00
Pasir Beton kg 681.000 84.93 57,836.36
Kerikil (Maks. 30 mm) kg 1021.000 366.67 374,366.67
Air Liter 215.000 450.00 96,750.00
JUMLAH HARGA BAHAN 1,107,153.02
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,231,003.02


E. Overhead & Profit 10% x D 123,100.30
F. Harga Satuan Pekerjaan (D+E) 1,354,103.33

A.4.1.1.11 Membuat 1 m3 beton mutu f'c = 28,8 Mpa


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 2.100 55,000.00 115,500.00
Tukang Batu L.02 OH 0.350 80,000.00 28,000.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.105 100,000.00 10,500.00
JUMLAH TENAGA KERJA 157,500.00
B BAHAN
Semen Portland kg 439.000 1,400.00 614,600.00
Pasir Beton kg 670.000 84.93 56,902.14
Kerikil (Maks. 30 mm) kg 1006.000 366.67 368,866.67
Air Liter 215.000 450.00 96,750.00
JUMLAH HARGA BAHAN 1,137,118.81
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,294,618.81


E. Overhead & Profit 10% x D 129,461.88
F. Harga Satuan Pekerjaan (D+E) 1,424,080.69
A.4.1.1.12 Membuat 1 m3 beton mutu f'c = 31,2 Mpa, Slump (120 ± 20) mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 2.100 55,000.00 115,500.00
Tukang Batu L.02 OH 0.350 80,000.00 28,000.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.105 100,000.00 10,500.00
JUMLAH TENAGA KERJA 157,500.00
B BAHAN
Semen Portland kg 448.000 1,400.00 627,200.00
Pasir Beton kg 667.000 84.93 56,647.36
Kerikil (Maks. 30 mm) kg 1000.000 366.67 366,666.67
Air Liter 215.000 450.00 96,750.00
JUMLAH HARGA BAHAN 1,147,264.02
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,304,764.02


E. Overhead & Profit 10% x D 130,476.40
F. Harga Satuan Pekerjaan (D+E) 1,435,240.43

A.4.1.1.13 Membuat 1 m3 beton kedap air dengan strorox - 100


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 2.100 55,000.00 115,500.00
Tukang Batu L.02 OH 0.350 80,000.00 28,000.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.105 100,000.00 10,500.00
JUMLAH TENAGA KERJA 157,500.00
B BAHAN
Semen Portland kg 400.000 1,400.00 560,000.00
Pasir Beton m3 0.480 118,900.00 57,072.00
Kerikil (2 cm/ 3 cm) m3 0.800 495,000.00 396,000.00
Strorox - 100 kg 1.200 - -
JUMLAH HARGA BAHAN 1,013,072.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,170,572.00


E. Overhead & Profit 10% x D 117,057.20
F. Harga Satuan Pekerjaan (D+E) 1,287,629.20

A.4.1.1.14 Pemasangan 1 m' PVC Waterstop lebar 150 mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.060 55,000.00 3,300.00
Tukang Batu/ Pipa L.02 OH 0.030 80,000.00 2,400.00
Kepala Tukang L.03 OH 0.003 100,000.00 300.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 6,300.00
B BAHAN
Waterstop lebar 150 mm m 1.050 - -

JUMLAH HARGA BAHAN -


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 6,300.00


E. Overhead & Profit 10% x D 630.00
F. Harga Satuan Pekerjaan (D+E) 6,930.00
A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.070 55,000.00 3,850.00
Tukang Besi L.02 OH 0.070 80,000.00 5,600.00
Kepala Tukang L.03 OH 0.007 100,000.00 700.00
Mandor L.04 OH 0.004 100,000.00 400.00
JUMLAH TENAGA KERJA 10,550.00
B BAHAN
Besi beton (polos/ulir) kg 10.500 10,750.00 112,875.00
Kawat beton kg 0.150 22,900.00 3,435.00
JUMLAH HARGA BAHAN 116,310.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 126,860.00


E. Overhead & Profit 10% x D 12,686.00
F. Harga Satuan Pekerjaan (D+E) 139,546.00
1 kg 13,954.60

A.4.1.1.18 Pemasangan 10 Kg kabel prategang (prestressed) polos / strands


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.070 55,000.00 3,850.00
Tukang Besi L.02 OH 0.070 80,000.00 5,600.00
Kepala Tukang L.03 OH 0.007 100,000.00 700.00
Mandor L.04 OH 0.004 100,000.00 400.00
JUMLAH TENAGA KERJA 10,550.00
B BAHAN
Besi beton (polos/ulir) kg 10.500 10,750.00 112,875.00
Kawat beton kg 0.100 22,900.00 2,290.00
JUMLAH HARGA BAHAN 115,165.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 125,715.00


E. Overhead & Profit 10% x D 12,571.50
F. Harga Satuan Pekerjaan (D+E) 138,286.50
1 kg 13,828.65

A.4.1.1.19 Pemasangan 10 kg jaring kawat baja (wiremesh)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.025 55,000.00 1,375.00
Tukang Besi L.02 OH 0.025 80,000.00 2,000.00
Kepala Tukang L.03 OH 0.025 100,000.00 2,500.00
Mandor L.04 OH 0.001 100,000.00 100.00
JUMLAH TENAGA KERJA 5,975.00
B BAHAN
Jaring kawat baja dilas kg 10.200 10,140.00 103,428.00
Kawat beton kg 0.050 22,900.00 1,145.00
JUMLAH HARGA BAHAN 104,573.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 110,548.00


E. Overhead & Profit 10% x D 11,054.80
F. Harga Satuan Pekerjaan (D+E) 121,602.80
1 kg 12,160.28
A.4.1.1.20 Pemasangan 1 m2 bekesting untuk pondasi
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.520 55,000.00 28,600.00
Tukang Kayu L.02 OH 0.260 80,000.00 20,800.00
Kepala Tukang L.03 OH 0.026 100,000.00 2,600.00
Mandor L.04 OH 0.026 100,000.00 2,600.00
JUMLAH TENAGA KERJA 54,600.00
B BAHAN
Kayu Kelas IV m3 0.040 1,505,250.00 60,210.00
Paku 5-10 cm kg 0.300 16,500.00 4,950.00
Minyak bekesting Liter 0.100 70,000.00 7,000.00
JUMLAH HARGA BAHAN 72,160.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 126,760.00


E. Overhead & Profit 10% x D 12,676.00
F. Harga Satuan Pekerjaan (D+E) 139,436.00

A.4.1.1.21 Pemasangan 1 m2 bekesting untuk sloof


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.520 55,000.00 28,600.00
Tukang Kayu L.02 OH 0.260 80,000.00 20,800.00
Kepala Tukang L.03 OH 0.026 100,000.00 2,600.00
Mandor L.04 OH 0.026 100,000.00 2,600.00
JUMLAH TENAGA KERJA 54,600.00
B BAHAN
Kayu Kelas IV m3 0.045 1,505,250.00 67,736.25
Paku 5-10 cm kg 0.300 16,500.00 4,950.00
Minyak bekesting Liter 0.100 70,000.00 7,000.00
JUMLAH HARGA BAHAN 79,686.25
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 134,286.25


E. Overhead & Profit 10% x D 13,428.63
F. Harga Satuan Pekerjaan (D+E) 147,714.88

A.4.1.1.22 Pemasangan 1 m2 bekesting untuk kolom


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.660 55,000.00 36,300.00
Tukang Kayu L.02 OH 0.330 80,000.00 26,400.00
Kepala Tukang L.03 OH 0.033 100,000.00 3,300.00
Mandor L.04 OH 0.033 100,000.00 3,300.00
JUMLAH TENAGA KERJA 69,300.00
B BAHAN
Kayu kelas IV m3 0.040 1,505,250.00 60,210.00
Paku 5-12 cm kg 0.400 16,500.00 6,600.00
Minyak bekesting Liter 0.200 70,000.00 14,000.00
Balok kayu kelas III m3 0.015 1,505,250.00 22,578.75
Plywood tebal 9 mm Lbr 0.350 150,000.00 52,500.00
Dolken Kayu Ø 8-10 cm p.4m Batang 2.000 15,000.00 30,000.00
JUMLAH HARGA BAHAN 185,888.75
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 255,188.75


E. Overhead & Profit 10% x D 25,518.88
F. Harga Satuan Pekerjaan (D+E) 280,707.63
A.4.1.1.23 Pemasangan 1 m2 bekesting untuk balok
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.660 55,000.00 36,300.00
Tukang Kayu L.02 OH 0.330 80,000.00 26,400.00
Kepala Tukang L.03 OH 0.033 100,000.00 3,300.00
Mandor L.04 OH 0.033 100,000.00 3,300.00
JUMLAH TENAGA KERJA 69,300.00
B BAHAN
Kayu kelas IV m3 0.040 1,505,250.00 60,210.00
Paku 5-12 cm kg 0.400 16,500.00 6,600.00
Minyak bekesting Liter 0.200 70,000.00 14,000.00
Balok kayu kelas III m3 0.018 1,505,250.00 27,094.50
Plywood tebal 9 mm Lbr 0.350 150,000.00 52,500.00
Dolken Kayu Ø 8-10 cm p.4m Batang 2.000 15,000.00 30,000.00
JUMLAH HARGA BAHAN 190,404.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 259,704.50


E. Overhead & Profit 10% x D 25,970.45
F. Harga Satuan Pekerjaan (D+E) 285,674.95

A.4.1.1.24 Pemasangan 1 m2 bekesting untuk lantai


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.660 55,000.00 36,300.00
Tukang Kayu L.02 OH 0.330 80,000.00 26,400.00
Kepala Tukang L.03 OH 0.033 100,000.00 3,300.00
Mandor L.04 OH 0.033 100,000.00 3,300.00
JUMLAH TENAGA KERJA 69,300.00
B BAHAN
Kayu kelas IV m3 0.040 1,505,250.00 60,210.00
Paku 5-12 cm kg 0.400 16,500.00 6,600.00
Minyak bekesting Liter 0.200 70,000.00 14,000.00
Balok kayu kelas III m3 0.015 1,505,250.00 22,578.75
Plywood tebal 9 mm Lbr 0.350 150,000.00 52,500.00
Dolken Kayu Ø 8-10 cm p.4m Batang 6.000 15,000.00 90,000.00
JUMLAH HARGA BAHAN 245,888.75
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 315,188.75


E. Overhead & Profit 10% x D 31,518.88
F. Harga Satuan Pekerjaan (D+E) 346,707.63
A.4.1.1.25 Pemasangan 1 m2 bekesting untuk dinding
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.660 55,000.00 36,300.00
Tukang Kayu L.02 OH 0.330 80,000.00 26,400.00
Kepala Tukang L.03 OH 0.033 100,000.00 3,300.00
Mandor L.04 OH 0.033 100,000.00 3,300.00
JUMLAH TENAGA KERJA 69,300.00
B BAHAN
Kayu kelas IV m3 0.030 1,505,250.00 45,157.50
Paku 5-12 cm kg 0.400 16,500.00 6,600.00
Minyak bekesting Liter 0.200 70,000.00 14,000.00
Balok kayu kelas II m3 0.020 1,505,250.00 30,105.00
Plywood tebal 9 mm Lbr 0.350 150,000.00 52,500.00
Dolken Kayu 8 - 10 cm p.4m Batang 3.000 15,000.00 45,000.00
Penjaga jarak bekesting/spacer Buah 4.000 15,000.00 60,000.00
JUMLAH HARGA BAHAN 253,362.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 322,662.50


E. Overhead & Profit 10% x D 32,266.25
F. Harga Satuan Pekerjaan (D+E) 354,928.75

A.4.1.1.26 Pemasangan 1 m2 bekesting untuk tangga


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.660 55,000.00 36,300.00
Tukang Kayu L.02 OH 0.330 80,000.00 26,400.00
Kepala Tukang L.03 OH 0.033 100,000.00 3,300.00
Mandor L.04 OH 0.033 100,000.00 3,300.00
JUMLAH TENAGA KERJA 69,300.00
B BAHAN
Kayu kelas IV m3 0.030 1,505,250.00 45,157.50
Paku 5-12 cm kg 0.400 16,500.00 6,600.00
Minyak bekesting Liter 0.150 70,000.00 10,500.00
Balok kayu kelas II m3 0.015 1,505,250.00 22,578.75
Plywood tebal 9 mm Lbr 0.350 150,000.00 52,500.00
Dolken Kayu Ø 8-10 cm p.4m Batang 2.000 15,000.00 30,000.00
JUMLAH HARGA BAHAN 167,336.25
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 236,636.25


E. Overhead & Profit 10% x D 23,663.63
F. Harga Satuan Pekerjaan (D+E) 260,299.88
A.4.1.1.27 Pemasangan 1 m2 jembatan untuk pengecoran beton
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 55,000.00 8,250.00
Tukang Kayu L.02 OH 0.050 80,000.00 4,000.00
Kepala Tukang L.03 OH 0.005 100,000.00 500.00
Mandor L.04 OH 0.008 100,000.00 800.00
JUMLAH TENAGA KERJA 13,550.00
B BAHAN
Kayu kelas (papan) m3 0.0264 3,000,000.00 79,200.00
Paku 5-12 cm kg 0.600 16,500.00 9,900.00
Dolken Kayu Ø8-10cm p.4m Batang 0.500 15,000.00 7,500.00
JUMLAH HARGA BAHAN 96,600.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 110,150.00


E. Overhead & Profit 10% x D 11,015.00
F. Harga Satuan Pekerjaan (D+E) 121,165.00

A.4.1.1.35 Membuat 1 m' kolom praktis beton bertulang (11x11) cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.180 55,000.00 9,900.00
Tukang Batu L.02 OH 0.020 80,000.00 1,600.00
Tukang Kayu L.02 OH 0.020 80,000.00 1,600.00
Tukang Besi L.02 OH 0.020 80,000.00 1,600.00
Kepala Tukang L.03 OH 0.006 100,000.00 600.00
Mandor L.04 OH 0.009 100,000.00 900.00
JUMLAH TENAGA KERJA 16,200.00
B BAHAN
Kayu kelas IV m3 0.002 1,505,250.00 3,010.50
Paku 5-12 cm kg 0.010 16,500.00 165.00
Minyak bekesting Liter 0.100 70,000.00 7,000.00
Besi beton polos kg 3.000 10,750.00 32,250.00
Kawat beton kg 0.450 22,900.00 10,305.00
Semen Portland kg 4.000 1,400.00 5,600.00
Pasir Beton m3 0.006 118,900.00 713.40
Kerikil m3 0.009 495,000.00 4,455.00
JUMLAH HARGA BAHAN 63,498.90
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 79,698.90


E. Overhead & Profit 10% x D 7,969.89
F. Harga Satuan Pekerjaan (D+E) 87,668.79
A.4.1.1.36 Membuat 1 m' ring balok beton bertulang (10x15) cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.297 55,000.00 16,335.00
Tukang Batu L.02 OH 0.033 80,000.00 2,640.00
Tukang Kayu L.02 OH 0.033 80,000.00 2,640.00
Tukang Besi L.02 OH 0.033 80,000.00 2,640.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 100,000.00 1,500.00
JUMLAH TENAGA KERJA 26,755.00
B BAHAN
Kayu kelas IV m3 0.003 1,505,250.00 4,515.75
Paku 5-12 cm kg 0.020 16,500.00 330.00
Minyak bekesting Liter 0.100 70,000.00 7,000.00
Besi beton polos kg 3.600 10,750.00 38,700.00
Kawat beton kg 0.050 22,900.00 1,145.00
Semen Portland kg 5.500 1,400.00 7,700.00
Pasir Beton m3 0.009 118,900.00 1,070.10
Kerikil m3 0.015 495,000.00 7,425.00
JUMLAH HARGA BAHAN 67,885.85
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 94,640.85


E. Overhead & Profit 10% x D 9,464.09
F. Harga Satuan Pekerjaan (D+E) 104,104.94
A.4.1.2. HARGA SATUAN PEKERJAAN BETON PRACETAK

A.4.1.2.1 Pembuatan 1 m2 lahan produksi tebal 8 cm beton f'c = 14,5 Mpa, slump (120 ± 20) mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.132 55,000.00 7,260.00
Tukang Batu L.02 OH 0.022 80,000.00 1,760.00
Kepala Tukang L.03 OH 0.002 100,000.00 200.00
Mandor L.04 OH 0.007 100,000.00 700.00
JUMLAH TENAGA KERJA 9,920.00
B BAHAN
Semen Portland Kg 26.080 1,400.00 36,512.00
Pasir Beton Kg 60.800 84.93 5,163.66
Kerikil (Maks. 30 mm) Kg 82.320 366.67 30,184.00
Air Liter 17.200 450.00 7,740.00
JUMLAH HARGA BAHAN 79,599.66
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 89,519.66


### E. Overhead & Profit 10% x D 8,951.97
F. Harga Satuan Pekerjaan (D+E) 98,471.62

A.4.1.2.2 Pembuatan 1 m2 lahan produksi tebal 10 cm beton f'c = 14,5 Mpa, slump (120 ± 20) mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.165 55,000.00 9,075.00
Tukang Batu L.02 OH 0.028 80,000.00 2,240.00
Kepala Tukang L.03 OH 0.003 100,000.00 300.00
Mandor L.04 OH 0.008 100,000.00 800.00
JUMLAH TENAGA KERJA 12,415.00
B BAHAN
Semen Portland kg 32.600 1,400.00 45,640.00
Pasir Beton kg 76.000 84.93 6,454.57
Kerikil (Maks. 30 mm) kg 102.900 366.67 37,730.00
Air Liter 21.500 450.00 9,675.00
JUMLAH HARGA BAHAN 99,499.57
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 111,914.57


### E. Overhead & Profit 10% x D 11,191.46
F. Harga Satuan Pekerjaan (D+E) 123,106.03

A.4.1.2.3 Pembuatan 1 m2 lahan produksi tebal 12 cm beton f'c = 14,5 Mpa, slump (120 ± 20) mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.198 55,000.00 10,890.00
Tukang Batu L.02 OH 0.033 80,000.00 2,640.00
Kepala Tukang L.03 OH 0.003 100,000.00 300.00
Mandor L.04 OH 0.010 100,000.00 1,000.00
JUMLAH TENAGA KERJA 14,830.00
B BAHAN
Semen Portland kg 39.120 1,400.00 54,768.00
Pasir Beton kg 91.200 84.93 7,745.49
Kerikil (Maks. 30 mm) kg 123.480 366.67 45,276.00
Air Liter 25.800 450.00 11,610.00
JUMLAH HARGA BAHAN 119,399.49
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 134,229.49


### E. Overhead & Profit 10% x D 13,422.95
F. Harga Satuan Pekerjaan (D+E) 147,652.43
A.4.1.2.4 Pembuatan 1 m2 lahan produksi tebal 15 cm beton f'c = 14,5 Mpa, slump (120 ± 20) mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.248 55,000.00 13,640.00
Tukang Batu L.02 OH 0.041 80,000.00 3,280.00
Kepala Tukang L.03 OH 0.004 100,000.00 400.00
Mandor L.04 OH 0.013 100,000.00 1,300.00
JUMLAH TENAGA KERJA 18,620.00
B BAHAN
Semen Portland kg 48.900 1,400.00 68,460.00
Pasir Beton kg 114.000 84.93 9,681.86
Kerikil (Maks. 30 mm) kg 154.350 366.67 56,595.00
Air Liter 32.250 450.00 14,512.50
JUMLAH HARGA BAHAN 149,249.36
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 167,869.36


### E. Overhead & Profit 10% x D 16,786.94
F. Harga Satuan Pekerjaan (D+E) 184,656.29

A.4.1.2.5 Pembuatan 1 m2 bekisting untuk pelat beton pracetak ( 5 Kali pakai )


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.007 55,000.00 385.00
Tukang Kayu L.02 OH 0.076 80,000.00 6,080.00
Kepala Tukang L.03 OH 0.008 100,000.00 800.00
Mandor L.04 OH 0.001 100,000.00 100.00
JUMLAH TENAGA KERJA 7,365.00
B BAHAN
Lantai kerja t=10 cm m3 0.008 123,106.03 984.85
Besi hollow (50 x 50 x 3) mm Kg 9.394 10,100.00 94,879.40
Kayu kaso 5/7 m3 0.005 1,505,250.00 7,526.25
Plywood 12 mm Lbr 0.080 185,000.00 14,800.00
Minyak bekisting L 0.200 70,000.00 14,000.00
Dinabolt ø 12 mm (10 s.d. 15 cm) buah 3.882 1,600.00 6,211.20
JUMLAH HARGA BAHAN 138,401.70
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 145,766.70


E. Overhead & Profit 10% x D 14,576.67
F. Harga Satuan Pekerjaan (D+E) 160,343.37

A.4.1.2.6 Pembuatan 1 m2 bekisting untuk balok beton pracetak (10 - 12 Kali pakai)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.004 55,000.00 220.00
Tukang Kayu L.02 OH 0.038 80,000.00 3,040.00
Kepala Tukang L.03 OH 0.004 100,000.00 400.00
Mandor L.04 OH 0.001 100,000.00 100.00
JUMLAH TENAGA KERJA 3,760.00
B BAHAN
Kayu kaso 5/7 m3 0.005 1,505,250.00 7,526.25
Plywood 12 mm Lbr 0.043 185,000.00 7,955.00
Minyak bekisting L 0.200 70,000.00 14,000.00
Paku 5 - 7 cm Kg 0.046 16,500.00 759.00
Dinabolt ø 12 mm (10 s.d. 15 cm) buah 0.693 1,600.00 1,108.80
JUMLAH HARGA BAHAN 31,349.05
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 35,109.05


E. Overhead & Profit 10% x D 3,510.91
F. Harga Satuan Pekerjaan (D+E) 38,619.96
A.4.1.2.7 Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10 - 12 Kali pakai)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.004 55,000.00 220.00
Tukang Kayu L.02 OH 0.038 80,000.00 3,040.00
Kepala Tukang L.03 OH 0.004 100,000.00 400.00
Mandor L.04 OH 0.001 100,000.00 100.00
JUMLAH TENAGA KERJA 3,760.00
B BAHAN
Kayu kaso 5/7 m3 0.004 1,505,250.00 6,021.00
Plywood 12 mm Lbr 0.048 185,000.00 8,880.00
Minyak bekisting L 0.200 70,000.00 14,000.00
Paku 5 - 7 cm Kg 0.046 16,500.00 759.00
Dinabolt ø 12 mm (10 s.d. 15 cm) buah 0.693 1,600.00 1,108.80
JUMLAH HARGA BAHAN 30,768.80
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 34,528.80


E. Overhead & Profit 10% x D 3,452.88
F. Harga Satuan Pekerjaan (D+E) 37,981.68

A.4.1.2.8 Pemasangan dan membuka bekisting 1 buah komponen pelat beton pracetak
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.053 55,000.00 2,915.00
Tukang Kayu L.02 OH 0.018 80,000.00 1,440.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 4,855.00
B BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 4,855.00


E. Overhead & Profit 10% x D 485.50
F. Harga Satuan Pekerjaan (D+E) 5,340.50

A.4.1.2.9 Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.089 55,000.00 4,895.00
Tukang Kayu L.02 OH 0.030 80,000.00 2,400.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 7,795.00
B BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 7,795.00


E. Overhead & Profit 10% x D 779.50
F. Harga Satuan Pekerjaan (D+E) 8,574.50
A.4.1.2.10 Pemasangan dan membuka bekisting 1 buah komponen kolom beton pracetak
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.071 55,000.00 3,905.00
Tukang Kayu L.02 OH 0.024 80,000.00 1,920.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 6,325.00
B BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 6,325.00


E. Overhead & Profit 10% x D 632.50
F. Harga Satuan Pekerjaan (D+E) 6,957.50

A.4.1.2.11 Penuangan / menebar beton 1 m3 komponen untuk pelat pracetak


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.064 55,000.00 3,520.00
Tukang Batu L.02 OH 0.244 80,000.00 19,520.00
Tukang Vibrator L.02 OH 0.128 80,000.00 10,240.00
Kepala Tukang L.03 OH 0.034 100,000.00 3,400.00
Mandor L.04 OH 0.073 100,000.00 7,300.00
JUMLAH TENAGA KERJA 43,980.00
B BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 43,980.00


E. Overhead & Profit 10% x D 4,398.00
F. Harga Satuan Pekerjaan (D+E) 48,378.00

A.4.1.2.12 Penuangan / menebar beton 1 m3 komponen untuk balok pracetak


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.069 55,000.00 3,795.00
Tukang Batu L.02 OH 0.242 80,000.00 19,360.00
Tukang Vibrator L.02 OH 0.138 80,000.00 11,040.00
Kepala Tukang L.03 OH 0.037 100,000.00 3,700.00
Mandor L.04 OH 0.073 100,000.00 7,300.00
JUMLAH TENAGA KERJA 45,195.00
B BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 45,195.00


E. Overhead & Profit 10% x D 4,519.50
F. Harga Satuan Pekerjaan (D+E) 49,714.50
A.4.1.2.13 Penuangan / menebar beton 1 m3 komponen untuk kolom pracetak
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.061 55,000.00 3,355.00
Tukang Batu L.02 OH 0.213 80,000.00 17,040.00
Tukang Vibrator L.02 OH 0.122 80,000.00 9,760.00
Kepala Tukang L.03 OH 0.033 100,000.00 3,300.00
Mandor L.04 OH 0.073 100,000.00 7,300.00
JUMLAH TENAGA KERJA 40,755.00
B BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 40,755.00


E. Overhead & Profit 10% x D 4,075.50
F. Harga Satuan Pekerjaan (D+E) 44,830.50

A.4.1.2.14 Ereksi 1 buah komponen untuk pelat pracetak


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Operator crane L.08 OH 0.067 150,000.00 10,050.00
Pembantu operator crane L.09 OH 0.067 68,000.00 4,556.00
Pekerja L.01 OH 0.067 55,000.00 3,685.00
Tukang batu L.02 OH 0.067 80,000.00 5,360.00
Tukang ereksi L.02 OH 0.134 80,000.00 10,720.00
Kepala Tukang L.03 OH 0.067 100,000.00 6,700.00
Mandor L.04 OH 0.067 100,000.00 6,700.00
JUMLAH TENAGA KERJA 47,771.00
B BAHAN
Solar L 6.676 5,742.25 38,335.26

JUMLAH HARGA BAHAN 38,335.26


C. PERALATAN
Sewa Crane unit hari 0.067 1,194,360.25 80,022.14
Sewa Pipe support buah hari 1.100 398,120.08 437,932.09
JUMLAH HARGA ALAT 517,954.23

D. Jumlah (A+B+C) 604,060.49


E. Overhead & Profit 10% x D 60,406.05
F. Harga Satuan Pekerjaan (D+E) 664,466.54

A.4.1.2.15 Ereksi 1 buah komponen untuk balok pracetak


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Operator crane L.08 OH 0.061 150,000.00 9,150.00
Pembantu operator crane L.09 OH 0.061 68,000.00 4,148.00
Pekerja L.01 OH 0.061 55,000.00 3,355.00
Tukang batu L.02 OH 0.061 80,000.00 4,880.00
Tukang ereksi L.02 OH 0.122 80,000.00 9,760.00
Kepala Tukang L.03 OH 0.061 100,000.00 6,100.00
Mandor L.04 OH 0.061 100,000.00 6,100.00
JUMLAH TENAGA KERJA 43,493.00
B BAHAN
Solar L 6.110 5,742.25 35,085.15

JUMLAH HARGA BAHAN 35,085.15


C. PERALATAN
Sewa Crane unit hari 0.061 1,194,360.25 72,855.98
Sewa Scaffolding unit hari 1.100 398,120.08 437,932.09
JUMLAH HARGA ALAT 510,788.07

D. Jumlah (A+B+C) 589,366.21


E. Overhead & Profit 10% x D 58,936.62
F. Harga Satuan Pekerjaan (D+E) 648,302.84
A.4.1.2.16 Ereksi 1 buah komponen untuk kolom pracetak
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Operator crane L.08 OH 0.083 150,000.00 12,450.00
Pembantu operator crane L.09 OH 0.083 68,000.00 5,644.00
Pekerja L.01 OH 0.083 55,000.00 4,565.00
Tukang batu L.02 OH 0.083 80,000.00 6,640.00
Tukang ereksi L.02 OH 0.166 80,000.00 13,280.00
Kepala Tukang L.03 OH 0.083 100,000.00 8,300.00
Mandor L.04 OH 0.083 100,000.00 8,300.00
JUMLAH TENAGA KERJA 59,179.00
B BAHAN
Solar L 8.277 5,742.25 47,528.60
JUMLAH HARGA BAHAN 47,528.60
C. PERALATAN
Sewa Crane unit hari 0.083 1,194,360.25 99,131.90
Sewa pipe support buah hari 2.200 398,120.08 875,864.18
JUMLAH HARGA ALAT 974,996.08

D. Jumlah (A+B+C) 1,081,703.69


E. Overhead & Profit 10% x D 108,170.37
F. Harga Satuan Pekerjaan (D+E) 1,189,874.06

A.4.1.1.17 Langsir 1 buah komponen untuk pelat pracetak ( ± 20 m )


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Operator crane L.08 OH 0.019 150,000.00 2,850.00
Pembantu operator crane L.09 OH 0.019 68,000.00 1,292.00
Pekerja L.01 OH 0.019 55,000.00 1,045.00
Tukang batu L.02 OH 0.038 80,000.00 3,040.00
JUMLAH TENAGA KERJA 8,227.00
B BAHAN
Solar Liter 1.897 5,742.25 10,893.05

JUMLAH HARGA BAHAN 10,893.05


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 19,120.05


E. Overhead & Profit 10% x D 1,912.00
F. Harga Satuan Pekerjaan (D+E) 21,032.05
A.4.1.2.18 Langsir 1 buah komponen untuk balok pracetak ( ± 20 m )
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Operator crane L.08 OH 0.019 150,000.00 2,850.00
Pembantu operator crane L.09 OH 0.019 68,000.00 1,292.00
Pekerja L.01 OH 0.019 55,000.00 1,045.00
Tukang batu L.02 OH 0.038 80,000.00 3,040.00
JUMLAH TENAGA KERJA 8,227.00
B BAHAN
Solar Liter 1.897 5,742.25 10,893.05

JUMLAH HARGA BAHAN 10,893.05


C. PERALATAN
Sewa crane unit hari 0.019 1,194,360.25 22,692.84
JUMLAH HARGA ALAT 22,692.84

D. Jumlah (A+B+C) 41,812.89


E. Overhead & Profit 10% x D 4,181.29
F. Harga Satuan Pekerjaan (D+E) 22,997.09

A.4.1.2.19 Langsir 1 buah komponen untuk kolom pracetak ( ± 20 m )


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Operator crane L.08 OH 0.019 150,000.00 2,850.00
Pembantu operator crane L.09 OH 0.019 68,000.00 1,292.00
Pekerja L.01 OH 0.019 55,000.00 1,045.00
Tukang batu L.02 OH 0.038 80,000.00 3,040.00
JUMLAH TENAGA KERJA 8,227.00
B BAHAN
Solar Liter 1.897 5,742.25 10,893.05
JUMLAH HARGA BAHAN 10,893.05
C. PERALATAN
Sewa crane unit hari 0.019 1,194,360.25 22,692.84
JUMLAH HARGA ALAT 22,692.84

D. Jumlah (A+B+C) 41,812.89


E. Overhead & Profit 10% x D 4,181.29
F. Harga Satuan Pekerjaan (D+E) 22,997.09

A.4.1.2.20 Bahan 1 m3 grout campuran


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA

JUMLAH TENAGA KERJA -


B BAHAN
Semen grout Kg 1200.00 2,966.67 3,560,000.00
Screening Kg 650.00 3,511.75 2,282,637.50
Air Liter 350.00 450.00 157,500.00

JUMLAH HARGA BAHAN 6,000,137.50


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 6,000,137.50


E. Overhead & Profit 10% x D 600,013.75
F. Harga Satuan Pekerjaan (D+E) 6,600,151.25
A.4.1.2.21 Bahan 1 m3 grout (tidak campuran)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA

JUMLAH TENAGA KERJA -


B BAHAN
Semen grout Kg 1850.00 2,966.67 5,488,333.33
Air Liter 400.00 450.00 180,000.00

JUMLAH HARGA BAHAN 5,668,333.33


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 5,668,333.33


E. Overhead & Profit 10% x D 566,833.33
F. Harga Satuan Pekerjaan (D+E) 6,235,166.67

A.4.1.2.22 Upah 1 titik pekerjaan grout pada joint beton pracetak


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Tukang L.01 OH 0.367 80,000.00 29,360.00
Kepala Tukang L.03 OH 0.074 100,000.00 7,400.00
Mandor L.04 OH 0.037 100,000.00 3,700.00
JUMLAH TENAGA KERJA 40,460.00
B BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 40,460.00


E. Overhead & Profit 10% x D 4,046.00
F. Harga Satuan Pekerjaan (D+E) 44,506.00

A.4.1.2.23 Pemasangan 1 titik bekisting joint pracetak


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.147 55,000.00 8,085.00
Tukang Kayu L.02 OH 0.147 80,000.00 11,760.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 21,845.00
B BAHAN
Kayu kaso 5/7 m3 0.012 1,505,250.00 18,063.00
Papan cor m3 0.004 44,600.00 178.40
Paku 5 - 7 cm Kg 0.264 16,500.00 4,356.00
JUMLAH HARGA BAHAN 22,597.40
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 44,442.40


E. Overhead & Profit 10% x D 4,444.24
F. Harga Satuan Pekerjaan (D+E) 48,886.64
A.4.1.2.24 Upah 1 titik joint dengan sling
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.220 55,000.00 12,100.00
Tukang Kayu L.02 OH 0.022 80,000.00 1,760.00
Tukang Besi L.02 OH 0.220 80,000.00 17,600.00
Mandor L.04 OH 0.011 100,000.00 1,100.00
JUMLAH TENAGA KERJA 32,560.00
B BAHAN

JUMLAH HARGA BAHAN -


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 32,560.00


E. Overhead & Profit 10% x D 3,256.00
F. Harga Satuan Pekerjaan (D+E) 35,816.00
A.4.2.1. HARGA SATUAN PEKERJAAN BESI & ALUMINIUM

A.4.2.1.1 Pemasangan 1 kg besi profil


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.060 55,000.00 3,300.00
Tukang L.02 OH 0.060 80,000.00 4,800.00
Kepala Tukang L.03 OH 0.006 100,000.00 600.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 9,000.00
B BAHAN
Besi Profil Kg 1.150 10,750.00 12,362.50
JUMLAH HARGA BAHAN 12,362.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 21,362.50


### E. Overhead & Profit 10% x D 2,136.25
F. Harga Satuan Pekerjaan (D+E) 23,498.75

A.4.2.1.2 Pemasangan 1 kg rangka kuda-kuda baja IWF


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.060 55,000.00 3,300.00
Tukang L.02 OH 0.060 80,000.00 4,800.00
Kepala Tukang L.03 OH 0.006 100,000.00 600.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 9,000.00
B BAHAN
Besi Baja IWF Kg 1.150 111,706.50 128,462.48
JUMLAH HARGA BAHAN 128,462.48
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 137,462.48


### E. Overhead & Profit 10% x D 13,746.25
F. Harga Satuan Pekerjaan (D+E) 151,208.72

A.4.2.1.3 Pengerjaan 100 kg pekerjaan perakitan


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 55,000.00 5,500.00
Tukang Besi Konstruksi L.02 OH 0.100 80,000.00 8,000.00
Kepala Tukang L.03 OH 0.001 100,000.00 100.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 14,100.00
B BAHAN
Solar Liter 1.000 5,742.25 5,742.25
Minyak Pelumas Liter 0.100 36,700.00 3,670.00
JUMLAH HARGA BAHAN 9,412.25
C. PERALATAN
Sewa alat Jam 0.800 7,000.00 5,600.00
JUMLAH HARGA ALAT 5,600.00

D. Jumlah (A+B+C) 29,112.25


E. Overhead & Profit 10% x D 2,911.23
F. Harga Satuan Pekerjaan (D+E) 32,023.48
A.4.2.1.4 Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.050 55,000.00 57,750.00
Tukang L.02 OH 1.050 80,000.00 84,000.00
Kepala Tukang L.03 OH 0.105 100,000.00 10,500.00
Mandor L.04 OH 0.052 100,000.00 5,200.00
JUMLAH TENAGA KERJA 157,450.00
B BAHAN
Besi siku L 30.30.3 kg 15.000 10,100.00 151,500.00
Besi plat baja kg 32.800 10,100.00 331,280.00
Kawat las kg 0.050 35,450.00 1,772.50
JUMLAH HARGA BAHAN 484,552.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 642,002.50


E. Overhead & Profit 10% x D 64,200.25
F. Harga Satuan Pekerjaan (D+E) 706,202.75

A.4.2.1.5 Pengerjaan 10 cm pengelasan dengan las listrik


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.040 55,000.00 2,200.00
Tukang Besi Konstruksi L.02 OH 0.020 80,000.00 1,600.00
Kepala Tukang L.03 OH 0.002 100,000.00 200.00
Mandor L.04 OH 0.002 100,000.00 200.00
JUMLAH TENAGA KERJA 4,200.00
B BAHAN
Kawat las listrik Kg 0.400 35,450.00 14,180.00
Solar Liter 0.300 5,742.25 1,722.68
Minyak pelumas Liter 0.040 36,700.00 1,468.00
JUMLAH HARGA BAHAN 17,370.68
C. PERALATAN
Sewa alat Jam 0.170 7,000.00 1,190.00
JUMLAH HARGA ALAT 1,190.00

D. Jumlah (A+B+C) 22,760.68


E. Overhead & Profit 10% x D 2,276.07
F. Harga Satuan Pekerjaan (D+E) 25,036.74

A.4.2.1.6 Pembuatan 1 m2 rangka jendela besi scuare tube


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.650 55,000.00 35,750.00
Tukang besi L.02 OH 0.650 80,000.00 52,000.00
Kepala Tukang L.03 OH 0.065 100,000.00 6,500.00
Mandor L.04 OH 0.032 100,000.00 3,200.00
JUMLAH TENAGA KERJA 97,450.00
B BAHAN
Besi scuare tube m 4.760 56,800.00 270,368.00
Besi lis kaca (1 x 1) cm m 4.522 34,900.00 157,817.80
Pengelasan cm 20 2,503.67 50,073.49
JUMLAH HARGA BAHAN 478,259.29
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 575,709.29


E. Overhead & Profit 10% x D 57,570.93
F. Harga Satuan Pekerjaan (D+E) 633,280.21
A.4.2.1.7 Pemasangan 1 m2 pintu rolling door besi
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.200 55,000.00 66,000.00
Tukang L.02 OH 1.200 80,000.00 96,000.00
Kepala Tukang L.03 OH 0.120 100,000.00 12,000.00
Mandor L.04 OH 0.006 100,000.00 600.00
JUMLAH TENAGA KERJA 174,600.00
B BAHAN
Rolling Door besi t. 0,5 mm m2 1.000 576,600.00 576,600.00
JUMLAH HARGA BAHAN 576,600.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 751,200.00


E. Overhead & Profit 10% x D 75,120.00
F. Harga Satuan Pekerjaan (D+E) 826,320.00

A.4.2.1.8 Pemasangan 1 m2 pintu lipat (folding door) t. 0,8 mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.440 55,000.00 24,200.00
Tukang L.02 OH 0.440 80,000.00 35,200.00
Kepala Tukang L.03 OH 0.044 100,000.00 4,400.00
Mandor L.04 OH 0.022 100,000.00 2,200.00
JUMLAH TENAGA KERJA 66,000.00
B BAHAN
Pintu lipat (Folding door) m2 1.000 686,700.00 686,700.00
JUMLAH HARGA BAHAN 686,700.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 752,700.00


E. Overhead & Profit 10% x D 75,270.00
F. Harga Satuan Pekerjaan (D+E) 827,970.00

A.4.2.1.9 Pemasangan 1 m2 sunscreen aluminium


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.080 55,000.00 4,400.00
Tukang L.02 OH 0.800 80,000.00 64,000.00
Kepala Tukang L.03 OH 0.080 100,000.00 8,000.00
Mandor L.04 OH 0.004 100,000.00 400.00
JUMLAH TENAGA KERJA 76,800.00
B BAHAN
Sunscreen aluminium m2 1.000 467,100.00 467,100.00
JUMLAH HARGA BAHAN 467,100.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 543,900.00


E. Overhead & Profit 10% x D 54,390.00
F. Harga Satuan Pekerjaan (D+E) 598,290.00
A.4.2.1.10 Pemasangan 1 m2 rolling door aluminium
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 55,000.00 55,000.00
Tukang khusus aluminium L.02 OH 1.000 80,000.00 80,000.00
Kepala Tukang L.03 OH 0.100 100,000.00 10,000.00
Mandor L.04 OH 0.050 100,000.00 5,000.00
JUMLAH TENAGA KERJA 150,000.00
B BAHAN
Rolling door aluminium m2 1.000 629,100.00 629,100.00
JUMLAH HARGA BAHAN 629,100.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 779,100.00


E. Overhead & Profit 10% x D 77,910.00
F. Harga Satuan Pekerjaan (D+E) 857,010.00

A.4.2.1.11 Pemasangan 1 m kusen pintu aluminium


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.0430 55,000.00 2,365.00
Tukang khusus aluminium L.02 OH 0.0430 80,000.00 3,440.00
Kepala Tukang L.03 OH 0.0043 100,000.00 430.00
Mandor L.04 OH 0.0021 100,000.00 210.00
JUMLAH TENAGA KERJA 6,445.00
B BAHAN
Profil alluminium m 1.100 34,900.00 38,390.00
Skrup fixer buah 2.000 255.00 510.00
Sealeant Tube 0.060 69,130.00 4,147.80
JUMLAH HARGA BAHAN 43,047.80
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 49,492.80


E. Overhead & Profit 10% x D 4,949.28
F. Harga Satuan Pekerjaan (D+E) 54,442.08

A.4.2.1.12 Pemasangan 1 m2 pintu aluminium strip lebar 8 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.0850 55,000.00 4,675.00
Tukang khusus aluminium L.02 OH 0.0850 80,000.00 6,800.00
Kepala Tukang L.03 OH 0.0085 100,000.00 850.00
Mandor L.04 OH 0.0042 100,000.00 420.00
JUMLAH TENAGA KERJA 12,745.00
B BAHAN
Profil aluminium m 4.400 34,900.00 153,560.00
Aluminium strip m 14.600 34,600.00 505,160.00
JUMLAH HARGA BAHAN 658,720.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 671,465.00


E. Overhead & Profit 10% x D 67,146.50
F. Harga Satuan Pekerjaan (D+E) 738,611.50
A.4.2.1.13 Pemasangan 1 m2 pintu kaca rangka aluminium
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.085 55,000.00 4,675.00
Tukang aluminium/kaca L.02 OH 0.085 80,000.00 6,800.00
Kepala Tukang L.03 OH 0.009 100,000.00 900.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 12,875.00
B BAHAN
Profil aluminium m 4.400 56,800.00 249,920.00
Kaca bening 8 mm m 4.500 250,000.00 1,125,000.00
Sealant Tube 0.270 69,130.00 18,665.10
JUMLAH HARGA BAHAN 1,393,585.10
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,406,460.10


E. Overhead & Profit 10% x D 140,646.01
F. Harga Satuan Pekerjaan (D+E) 1,547,106.11

A.4.2.1.15 Pemasangan 1 m2 terali besi strip ( 2 x 3 ) mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.670 55,000.00 91,850.00
Tukang las L.02 OH 1.670 80,000.00 133,600.00
Kepala Tukang L.03 OH 0.167 100,000.00 16,700.00
Mandor L.04 OH 0.083 100,000.00 8,300.00
JUMLAH TENAGA KERJA 250,450.00
B BAHAN
Besi strip kg 6.177 10,100.00 62,387.70
Pengelasan cm 27.080 2,503.67 67,799.50
JUMLAH HARGA BAHAN 130,187.20
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 380,637.20


E. Overhead & Profit 10% x D 38,063.72
F. Harga Satuan Pekerjaan (D+E) 418,700.92

A.4.2.1.16 Pemasangan 1 m2 kawat nyamuk


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 55,000.00 5,500.00
Tukang L.02 OH 0.100 80,000.00 8,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 15,000.00
B BAHAN
Kawat nyamuk m2 1.100 20,380.00 22,418.00
Pengelasan cm 11.110 2,503.67 27,815.82
Baja strip (0,2 x 2) cm kg 1.716 10,100.00 17,331.60
JUMLAH HARGA BAHAN 67,565.42
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 82,565.42


E. Overhead & Profit 10% x D 8,256.54
F. Harga Satuan Pekerjaan (D+E) 90,821.96
A.4.2.1.17 Pemasangan 1 m2 jendela nako & tralis
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 55,000.00 11,000.00
Tukang L.02 OH 0.200 80,000.00 16,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.001 100,000.00 100.00
JUMLAH TENAGA KERJA 29,100.00
B BAHAN
Jendela nako (rangka + kaca 5 mm) buah 1.000 1,043,200.00 1,043,200.00
Paku skrup 1 cm - 2,5 cm buah 10.000 255.00 2,550.00
Besi strip m 7.000 10,100.00 70,700.00
JUMLAH HARGA BAHAN 1,116,450.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,145,550.00


E. Overhead & Profit 10% x D 114,555.00
F. Harga Satuan Pekerjaan (D+E) 1,260,105.00

A.4.2.1.18 Pemasangan 1 m' Talang datar/ jurai seng bjls 28 lebar 90 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 55,000.00 11,000.00
Tukang L.02 OH 0.200 80,000.00 16,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.001 100,000.00 100.00
JUMLAH TENAGA KERJA 29,100.00
B BAHAN
Seng pelat m 1.050 33,350.00 35,017.50
Paku 1 cm - 2,5 cm kg 0.015 16,500.00 247.50
Papan kayu kelas III m3 0.019 1,505,250.00 28,599.75
JUMLAH HARGA BAHAN 63,864.75
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 92,964.75


E. Overhead & Profit 10% x D 9,296.48
F. Harga Satuan Pekerjaan (D+E) 102,261.23

A.4.2.1.20 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 55,000.00 13,750.00
Tukang Besi L.02 OH 0.250 80,000.00 20,000.00
Kepala Tukang L.03 OH 0.025 100,000.00 2,500.00
Mandor L.04 OH 0.013 100,000.00 1,300.00
JUMLAH TENAGA KERJA 37,550.00
B BAHAN
Rangka metal hollow 40.40.2 mm M' 3.500 5,600.00 19,600.00
100% x
Assesoris (perkuatan, las dll) Ls rangka 5,600.00

JUMLAH HARGA BAHAN 25,200.00


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 62,750.00


E. Overhead & Profit 10% x D 6,275.00
F. Harga Satuan Pekerjaan (D+E) 69,025.00
A.4.2.1.21 Pemasangan 1 m2 rangka besi hollow 1x40.20.2mm, modul 60 x 60 cm, untuk plafon
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.350 55,000.00 19,250.00
Tukang Besi L.02 OH 0.350 80,000.00 28,000.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.018 100,000.00 1,800.00
JUMLAH TENAGA KERJA 52,550.00
B BAHAN
Rangka metal hollow 40.20.2 mm M' 4.000 4,200.00 16,800.00

Assesoris (perkuatan, las dll) Ls 100% x 4,200.00


rangka
JUMLAH HARGA BAHAN 21,000.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 73,550.00


E. Overhead & Profit 10% x D 7,355.00
F. Harga Satuan Pekerjaan (D+E) 80,905.00

A.4.2.1.22 Pemasangan 1 m2 Atap pelana rangka atap baja canai dingin profil C75
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.734 55,000.00 40,370.00
Tukang L.02 OH 0.734 80,000.00 58,720.00
Kepala Tukang L.03 OH 0.073 100,000.00 7,300.00
Mandor L.04 OH 0.037 100,000.00 3,700.00
JUMLAH TENAGA KERJA 110,090.00
B BAHAN
Baja ringan canai dingin C75 Kg 3.065 13,250.00 40,611.25

JUMLAH HARGA BAHAN 40,611.25


C. PERALATAN
Peralatan % 0.1 40,611.25 4,061.13
JUMLAH HARGA ALAT 4,061.13

D. Jumlah (A+B+C) 154,762.38


E. Overhead & Profit 10% x D 15,476.24
F. Harga Satuan Pekerjaan (D+E) 170,238.61

A.4.2.1.23 Pemasangan 1 m2 Atap jurai rangka atap baja canai dingin profil C75
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.7604 55,000.00 41,822.00
Tukang Besi L.02 OH 0.7604 80,000.00 60,832.00
Kepala Tukang L.03 OH 0.0760 100,000.00 7,600.00
Mandor L.04 OH 0.0380 100,000.00 3,800.00
JUMLAH TENAGA KERJA 114,054.00
B BAHAN
Baja ringan canai dingin C75 Kg 4.05 13,250.00 53,662.50

JUMLAH HARGA BAHAN 53,662.50


C. PERALATAN
Peralatan % 0.1 53,662.50 5,366.25
JUMLAH HARGA ALAT 5,366.25

D. Jumlah (A+B+C) 173,082.75


E. Overhead & Profit 10% x D 17,308.28
F. Harga Satuan Pekerjaan (D+E) 190,391.03
A.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING

A.4.4.1.1 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 2 PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.600 55,000.00 33,000.00
Tukang Batu L.02 OH 0.200 80,000.00 16,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.030 100,000.00 3,000.00
JUMLAH TENAGA KERJA 54,000.00
B BAHAN
Bata merah buah 140.000 700.00 98,000.00
Semen Portland kg 43.500 1,400.00 60,900.00
Pasir pasang m3 0.080 118,900.00 9,512.00
JUMLAH HARGA BAHAN 168,412.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 222,412.00


### E. Overhead & Profit 10% x D 22,241.20
F. Harga Satuan Pekerjaan (D+E) 244,653.20

A.4.4.1.2 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3 PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.600 55,000.00 33,000.00
Tukang Batu L.02 OH 0.200 80,000.00 16,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.030 100,000.00 3,000.00
JUMLAH TENAGA KERJA 54,000.00
B BAHAN
Bata merah bh 140.000 700.00 98,000.00
Semen Portland kg 32.950 1,400.00 46,130.00
Pasir pasang m3 0.091 118,900.00 10,819.90
JUMLAH HARGA BAHAN 154,949.90
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 208,949.90


E. Overhead & Profit 10% x D 20,894.99
F. Harga Satuan Pekerjaan (D+E) 229,844.89

A.4.4.1.3 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 4 PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.600 55,000.00 33,000.00
Tukang Batu L.02 OH 0.200 80,000.00 16,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.030 100,000.00 3,000.00
JUMLAH TENAGA KERJA 54,000.00
B BAHAN
Bata merah bh 140.000 700.00 98,000.00
Semen Portland kg 26.550 1,400.00 37,170.00
Pasir pasang m3 0.093 118,900.00 11,057.70
JUMLAH HARGA BAHAN 146,227.70
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 200,227.70


### E. Overhead & Profit 10% x D 20,022.77
F. Harga Satuan Pekerjaan (D+E) 220,250.47
A.4.4.1.4 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5 PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.600 55,000.00 33,000.00
Tukang Batu L.02 OH 0.200 80,000.00 16,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.030 100,000.00 3,000.00
JUMLAH TENAGA KERJA 54,000.00
B BAHAN
Bata merah bh 140.000 700.00 98,000.00
Semen Portland kg 22.200 1,400.00 31,080.00
Pasir pasang m3 0.102 118,900.00 12,127.80
JUMLAH HARGA BAHAN 141,207.80
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 195,207.80


### E. Overhead & Profit 10% x D 19,520.78
F. Harga Satuan Pekerjaan (D+E) 214,728.58

A.4.4.1.5 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 6 PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.600 55,000.00 33,000.00
Tukang Batu L.02 OH 0.200 80,000.00 16,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.030 100,000.00 3,000.00
JUMLAH TENAGA KERJA 54,000.00
B BAHAN
Bata merah bh 140.000 700.00 98,000.00
Semen Portland kg 18.500 1,400.00 25,900.00
Pasir pasang m3 0.122 118,900.00 14,505.80
JUMLAH HARGA BAHAN 138,405.80
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 192,405.80


### E. Overhead & Profit 10% x D 19,240.58
F. Harga Satuan Pekerjaan (D+E) 211,646.38

A.4.4.1.6 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3 KP : 10 PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.600 55,000.00 33,000.00
Tukang Batu L.02 OH 0.200 80,000.00 16,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.030 100,000.00 3,000.00
JUMLAH TENAGA KERJA 54,000.00
B BAHAN
Bata merah buah 140.0000 700.00 98,000.00
Semen Portland kg 10.0800 1,400.00 14,112.00
Pasir pasang m3 0.0925 118,900.00 10,998.25
Kapur padam m3 0.0275 12,300.00 338.25
JUMLAH HARGA BAHAN 123,448.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 177,448.50


### E. Overhead & Profit 10% x D 17,744.85
F. Harga Satuan Pekerjaan (D+E) 195,193.35
A.4.4.1.7 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 SP : 2 PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 55,000.00 16,500.00
Tukang Batu L.02 OH 0.100 80,000.00 8,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 100,000.00 1,500.00
JUMLAH TENAGA KERJA 27,000.00
B BAHAN
Bata merah buah 70.000 700.00 49,000.00
Semen Portland kg 18.950 1,400.00 26,530.00
Pasir pasang m3 0.038 118,900.00 4,518.20
JUMLAH HARGA BAHAN 80,048.20
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 107,048.20


### E. Overhead & Profit 10% x D 10,704.82
F. Harga Satuan Pekerjaan (D+E) 117,753.02

A.4.4.1.8 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 SP : 3 PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 55,000.00 16,500.00
Tukang Batu L.02 OH 0.100 80,000.00 8,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 100,000.00 1,500.00
JUMLAH TENAGA KERJA 27,000.00
B BAHAN
Bata merah bh 70.000 700.00 49,000.00
Semen Portland kg 14.370 1,400.00 20,118.00
Pasir pasang m3 0.040 118,900.00 4,756.00
JUMLAH HARGA BAHAN 73,874.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 100,874.00


E. Overhead & Profit 10% x D 10,087.40
F. Harga Satuan Pekerjaan (D+E) 110,961.40

A.4.4.1.9 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 SP : 4 PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 55,000.00 16,500.00
Tukang Batu L.02 OH 0.100 80,000.00 8,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 100,000.00 1,500.00
JUMLAH TENAGA KERJA 27,000.00
B BAHAN
Bata merah bh 70.000 700.00 49,000.00
Semen Portland kg 11.500 1,400.00 16,100.00
Pasir pasang m3 0.043 118,900.00 5,112.70
JUMLAH HARGA BAHAN 70,212.70
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 97,212.70


### E. Overhead & Profit 10% x D 9,721.27
F. Harga Satuan Pekerjaan (D+E) 106,933.97
A.4.4.1.16 Pemasangan 1 m2 dinding conblock HB20 campuran 1SP : 3PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.350 55,000.00 19,250.00
Tukang Batu L.02 OH 0.150 80,000.00 12,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.018 100,000.00 1,800.00
JUMLAH TENAGA KERJA 34,550.00
B BAHAN
HB-20 m3 12.500 35,000.00 437,500.00
Semen Portland Kg 30.320 1,400.00 42,448.00
Pasir pasang m3 0.728 118,900.00 86,559.20
Besi angker diameter 8 Kg 0.280 10,750.00 3,010.00
JUMLAH HARGA BAHAN 569,517.20
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 604,067.20


### E. Overhead & Profit 10% x D 60,406.72
F. Harga Satuan Pekerjaan (D+E) 664,473.92

A.4.4.1.17 Pemasangan 1 m2 dinding conblock HB20 campuran 1SP : 4PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.350 55,000.00 19,250.00
Tukang Batu L.02 OH 0.150 80,000.00 12,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.018 100,000.00 1,800.00
JUMLAH TENAGA KERJA 34,550.00
B BAHAN
HB-20 m3 12.500 35,000.00 437,500.00
Semen Portland Kg 24.260 1,400.00 33,964.00
Pasir pasang m3 0.772 118,900.00 91,790.80
Besi angker diameter 8 Kg 0.280 10,750.00 3,010.00
JUMLAH HARGA BAHAN 566,264.80
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 600,814.80


### E. Overhead & Profit 10% x D 60,081.48
F. Harga Satuan Pekerjaan (D+E) 660,896.28

A.4.4.1.22 Pemasangan 1 m2 dinding roster keramik 30x30 campuran 1 SP : 4 PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 55,000.00 16,500.00
Tukang Batu L.02 OH 0.100 80,000.00 8,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 100,000.00 1,500.00
JUMLAH TENAGA KERJA 27,000.00
B BAHAN
Rooster Keramik 30x30 cm bh 11.110 60,000.00 666,600.00
Semen Portland kg 11.000 1,400.00 15,400.00
Pasir pasang m3 0.035 118,900.00 4,161.50
JUMLAH HARGA BAHAN 686,161.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 713,161.50


E. Overhead & Profit 10% x D 71,316.15
F. Harga Satuan Pekerjaan (D+E) 784,477.65
A.4.4.1.23 Pemasangan 1 m2 dinding terawang (roster) 12x11x24 campuran 1 SP : 4 PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 55,000.00 16,500.00
Tukang Batu L.02 OH 0.100 80,000.00 8,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 100,000.00 1,500.00
JUMLAH TENAGA KERJA 27,000.00
B BAHAN
Bata rooster bh 30.000 4,900.00 147,000.00
Rooster terawang kg 11.000 8,000.00 88,000.00
Pasir pasang m3 0.035 118,900.00 4,161.50
JUMLAH HARGA BAHAN 239,161.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 266,161.50


E. Overhead & Profit 10% x D 26,616.15
F. Harga Satuan Pekerjaan (D+E) 292,777.65

A.4.4.1.24 Pemasangan 1 m2 dinding glass block 20x20 campuran 1 SP : 4 PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 55,000.00 16,500.00
Tukang Batu L.02 OH 0.100 80,000.00 8,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 100,000.00 1,500.00
JUMLAH TENAGA KERJA 27,000.00
B BAHAN
Glass block bh 26.500 24,200.00 641,300.00
Semen Portland kg 11.000 1,400.00 15,400.00
Pasir pasang m3 0.035 118,900.00 4,161.50
JUMLAH HARGA BAHAN 660,861.50
C. PERALATAN
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 687,861.50


E. Overhead & Profit 10% x D 68,786.15
F. Harga Satuan Pekerjaan (D+E) 756,647.65

A.4.4.1.25 Pemasangan 1 m2 dinding roster keramik 20x20 campuran 1 SP : 4 PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 55,000.00 16,500.00
Tukang Batu L.02 OH 0.100 80,000.00 8,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 100,000.00 1,500.00
JUMLAH TENAGA KERJA 27,000.00
B BAHAN
Rooster keramik 20x20 cm bh 25.000 40,000.00 1,000,000.00
Semen Portland kg 11.000 1,400.00 15,400.00
Pasir pasang m3 0.035 118,900.00 4,161.50
JUMLAH HARGA BAHAN 1,019,561.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,046,561.50


E. Overhead & Profit 10% x D 104,656.15
F. Harga Satuan Pekerjaan (D+E) 1,151,217.65
A.4.4.2. HARGA SATUAN PEKERJAAN PLESTERAN

A.4.4.2.2 Pemasangan 1 m2 plesteran 1 SP : 2 PP tebal 15 mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 55,000.00 16,500.00
Tukang Batu L.02 OH 0.150 80,000.00 12,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.015 100,000.00 1,500.00
JUMLAH TENAGA KERJA 31,500.00
B BAHAN
Semen Portland kg 10.224 1,400.00 14,313.60
Pasir pasang m3 0.020 118,900.00 2,378.00
JUMLAH HARGA BAHAN 16,691.60
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 48,191.60


### E. Overhead & Profit 10% x D 4,819.16
F. Harga Satuan Pekerjaan (D+E) 53,010.76

A.4.4.2.3 Pemasangan 1 m2 plesteran 1 SP : 3 PP tebal 15 mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 55,000.00 16,500.00
Tukang Batu L.02 OH 0.150 80,000.00 12,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.015 100,000.00 1,500.00
JUMLAH TENAGA KERJA 31,500.00
B BAHAN
Semen Portland kg 7.776 1,400.00 10,886.40
Pasir pasang m3 0.023 118,900.00 2,734.70
JUMLAH HARGA BAHAN 13,621.10
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 45,121.10


### E. Overhead & Profit 10% x D 4,512.11
F. Harga Satuan Pekerjaan (D+E) 49,633.21

A.4.4.2.4 Pemasangan 1 m2 plesteran 1 SP : 4 PP tebal 15 mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 55,000.00 16,500.00
Tukang Batu L.02 OH 0.150 80,000.00 12,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.015 100,000.00 1,500.00
JUMLAH TENAGA KERJA 31,500.00
B BAHAN
Semen Portland kg 6.240 1,400.00 8,736.00
Pasir pasang m3 0.024 118,900.00 2,853.60
JUMLAH HARGA BAHAN 11,589.60
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 43,089.60


### E. Overhead & Profit 10% x D 4,308.96
F. Harga Satuan Pekerjaan (D+E) 47,398.56
A.4.4.2.13 Pemasangan 1 m2 plesteran 1 SP : 1 PP tebal 20 mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.400 55,000.00 22,000.00
Tukang Batu L.02 OH 0.200 80,000.00 16,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.022 100,000.00 2,200.00
JUMLAH TENAGA KERJA 42,200.00
B BAHAN
Semen Portland kg 13.632 1,400.00 19,084.80
Pasir pasang m3 0.027 118,900.00 3,210.30
JUMLAH HARGA BAHAN 22,295.10
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 64,495.10


### E. Overhead & Profit 10% x D 6,449.51
F. Harga Satuan Pekerjaan (D+E) 70,944.61

A.4.4.2.14 Pemasangan 1 m2 plesteran 1 SP : 3 PP tebal 20 mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.260 55,000.00 14,300.00
Tukang Batu L.02 OH 0.200 80,000.00 16,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.013 100,000.00 1,300.00
JUMLAH TENAGA KERJA 33,600.00
B BAHAN
Semen Portland kg 10.368 1,400.00 14,515.20
Pasir pasang m3 0.031 118,900.00 3,685.90
JUMLAH HARGA BAHAN 18,201.10
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 51,801.10


### E. Overhead & Profit 10% x D 5,180.11
F. Harga Satuan Pekerjaan (D+E) 56,981.21

A.4.4.2.15 Pemasangan 1 m2 plesteran 1 SP : 4 PP tebal 20 mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.400 55,000.00 22,000.00
Tukang Batu L.02 OH 0.200 80,000.00 16,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.022 100,000.00 2,200.00
JUMLAH TENAGA KERJA 42,200.00
B BAHAN
Semen Portland kg 8.320 1,400.00 11,648.00
Pasir pasang m3 0.032 118,900.00 3,804.80
JUMLAH HARGA BAHAN 15,452.80
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 57,652.80


E. Overhead & Profit 10% x D 5,765.28
F. Harga Satuan Pekerjaan (D+E) 63,418.08
A.4.4.2.19 Pemasangan 1 m2 berapen 1 SP : 5 PP tebal 15 mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 55,000.00 8,250.00
Tukang L.02 OH 0.075 80,000.00 6,000.00
Kepala Tukang L.03 OH 0.008 100,000.00 800.00
Mandor L.04 OH 0.008 100,000.00 800.00
JUMLAH TENAGA KERJA 15,850.00
B BAHAN
Semen Portland kg 5.184 1,400.00 7,257.60
Pasir pasang m3 0.026 118,900.00 3,091.40
JUMLAH HARGA BAHAN 10,349.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 26,199.00


E. Overhead & Profit 10% x D 2,619.90
F. Harga Satuan Pekerjaan (D+E) 28,818.90

A.4.4.2.20 Pemasangan 1 m' plesteran skonig 1 SP : 3 PP lebar 10 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.080 55,000.00 4,400.00
Tukang Batu L.02 OH 0.400 80,000.00 32,000.00
Kepala Tukang L.03 OH 0.040 100,000.00 4,000.00
Mandor L.04 OH 0.004 100,000.00 400.00
JUMLAH TENAGA KERJA 40,800.00
B BAHAN
Semen PC kg 0.500 1,400.00 700.00
Pasir pasang m3 0.013 118,900.00 1,545.70
JUMLAH HARGA BAHAN 2,245.70
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 43,045.70


### E. Overhead & Profit 10% x D 4,304.57
F. Harga Satuan Pekerjaan (D+E) 47,350.27

A.4.4.2.21 Pemasangan 1 m2 plesteran granit 1 SP : 2 Granit tebal 1 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.450 55,000.00 24,750.00
Tukang Batu L.02 OH 0.225 80,000.00 18,000.00
Kepala Tukang L.03 OH 0.023 100,000.00 2,300.00
Mandor L.04 OH 0.023 100,000.00 2,300.00
JUMLAH TENAGA KERJA 47,350.00
B BAHAN
Semen PC kg 10.000 1,400.00 14,000.00
Batu granit kg 15.000 1,834.80 27,522.00
JUMLAH HARGA BAHAN 41,522.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 88,872.00


### E. Overhead & Profit 10% x D 8,887.20
F. Harga Satuan Pekerjaan (D+E) 97,759.20
A.4.4.2.22 Pemasangan 1 m2 plesteran traso 1 SP : 2 traso tebal 1 cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.450 55,000.00 24,750.00
Tukang Batu L.02 OH 0.225 80,000.00 18,000.00
Kepala Tukang L.03 OH 0.023 100,000.00 2,300.00
Mandor L.04 OH 0.023 100,000.00 2,300.00
JUMLAH TENAGA KERJA 47,350.00
B BAHAN
Semen PC kg 10.000 1,400.00 14,000.00
Batu traso kg 15.000 167.70 2,515.50
JUMLAH HARGA BAHAN 16,515.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 63,865.50


### E. Overhead & Profit 10% x D 6,386.55
F. Harga Satuan Pekerjaan (D+E) 70,252.05

A.4.4.2.23 Pemasangan 1 m2 plesteran ciprat 1 SP : 2 PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 55,000.00 16,500.00
Tukang Batu L.02 OH 0.100 80,000.00 8,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.015 100,000.00 1,500.00
JUMLAH TENAGA KERJA 27,000.00
B BAHAN
Semen PC kg 4.320 1,400.00 6,048.00
Pasir pasang m3 0.006 118,900.00 713.40
JUMLAH HARGA BAHAN 6,761.40
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 33,761.40


### E. Overhead & Profit 10% x D 3,376.14
F. Harga Satuan Pekerjaan (D+E) 37,137.54

A.4.4.2.24 Pemasangan 1 m2 finishing siar pasangan bata merah


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 55,000.00 8,250.00
Tukang Batu L.02 OH 0.075 80,000.00 6,000.00
Kepala Tukang L.03 OH 0.008 100,000.00 800.00
Mandor L.04 OH 0.008 100,000.00 800.00
JUMLAH TENAGA KERJA 15,850.00
B BAHAN
Semen PC kg 3.108 1,400.00 4,351.20

JUMLAH HARGA BAHAN 4,351.20


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 20,201.20


### E. Overhead & Profit 10% x D 2,020.12
F. Harga Satuan Pekerjaan (D+E) 22,221.32
A.4.4.2.26 Pemasangan 1 m2 finishing siar pasangan batu kali campuran 1 SP : 2 PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 55,000.00 16,500.00
Tukang Batu L.02 OH 0.150 80,000.00 12,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.015 100,000.00 1,500.00
JUMLAH TENAGA KERJA 31,500.00
B BAHAN
Semen PC kg 6.340 1,400.00 8,876.00
Pasir pasang m3 0.012 118,900.00 1,426.80
JUMLAH HARGA BAHAN 10,302.80
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 41,802.80


### E. Overhead & Profit 10% x D 4,180.28
F. Harga Satuan Pekerjaan (D+E) 45,983.08

A.4.4.2.27 Pemasangan 1 m2 acian


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 55,000.00 11,000.00
Tukang Batu L.02 OH 0.100 80,000.00 8,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.010 100,000.00 1,000.00
JUMLAH TENAGA KERJA 21,000.00
B BAHAN
Semen PC kg 3.250 1,400.00 4,550.00
JUMLAH HARGA BAHAN 4,550.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 25,550.00


### E. Overhead & Profit 10% x D 2,555.00
F. Harga Satuan Pekerjaan (D+E) 28,105.00

A.4.4.2.28 Pemasangan 1 m2 plesteran dengan mortar siap pakai (MSP)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 55,000.00 11,000.00
Tukang Batu L.02 OH 0.100 80,000.00 8,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.010 100,000.00 1,000.00
JUMLAH TENAGA KERJA 21,000.00
B BAHAN
MSP kg 1.000 16,691.60 16,691.60
JUMLAH HARGA BAHAN 16,691.60
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 37,691.60


### E. Overhead & Profit 10% x D 3,769.16
F. Harga Satuan Pekerjaan (D+E) 41,460.76
A.4.4.3. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

A.4.4.3.35 Pemasangan 1 m2 lantai keramik putih ukuran 30 cm x 30 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 55,000.00 38,500.00
Tukang L.02 OH 0.350 80,000.00 28,000.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.035 100,000.00 3,500.00
JUMLAH TENAGA KERJA 73,500.00
B BAHAN
Keramik 30x30 (putih) buah 11.550 5,272.73 60,900.00
Semen Portland kg 10.000 1,400.00 14,000.00
Pasir pasang M3 0.045 118,900.00 5,350.50
Semen warna kg 0.500 2,966.67 1,483.33
JUMLAH HARGA BAHAN 81,733.83
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 155,233.83


### E. Overhead & Profit 10% x D 15,523.38
F. Harga Satuan Pekerjaan (D+E) 170,757.22

A.4.4.3.36 Pemasangan 1 m2 lantai keramik KM/WC ukuran 20 cm x 20 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 55,000.00 38,500.00
Tukang L.02 OH 0.350 80,000.00 28,000.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.035 100,000.00 3,500.00
JUMLAH TENAGA KERJA 73,500.00
B BAHAN
Keramik 20x20 (KM/WC) bh 26.250 3,356.00 88,095.00
Semen Portland kg 10.400 1,400.00 14,560.00
Pasir pasang kg 0.045 84.93 3.82
Semen warna kg 0.050 2,966.67 148.33
JUMLAH HARGA BAHAN 102,807.16
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 176,307.16


E. Overhead & Profit 10% x D 17,630.72
F. Harga Satuan Pekerjaan (D+E) 193,937.87

A.4.4.3.38 Pemasangan 1 m2 lantai keramik warna / mozaik ukuran 30 cm x 30 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 55,000.00 38,500.00
Tukang L.02 OH 0.350 80,000.00 28,000.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.035 100,000.00 3,500.00
JUMLAH TENAGA KERJA 73,500.00
B BAHAN
Keramik 30x30 warna bh 11.870 13,436.36 159,489.64
Semen Portland kg 14.150 1,400.00 19,810.00
Pasir pasang kg 0.390 84.93 33.12
Semen warna kg 2.000 2,966.67 5,933.33
JUMLAH HARGA BAHAN 185,266.09
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 258,766.09


E. Overhead & Profit 10% x D 25,876.61
F. Harga Satuan Pekerjaan (D+E) 284,642.70
A.4.4.3.39 Pemasangan 1 m' plint keramik ukuran 10 cm x 20 cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.090 55,000.00 4,950.00
Tukang L.02 OH 0.090 80,000.00 7,200.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 16,150.00
B BAHAN
Plint keramik uk. 10 cm x 20 cm buah 5.300 838.33 4,443.17
Semen Portland kg 1.140 1,400.00 1,596.00
Pasir pasang M3 0.003 118,900.00 356.70
Semen warna kg 0.025 2,966.67 74.17
JUMLAH HARGA BAHAN 6,470.03
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 22,620.03


### E. Overhead & Profit 10% x D 2,262.00
F. Harga Satuan Pekerjaan (D+E) 24,882.04

A.4.4.3.40 Pemasangan 1 m' plint keramik ukuran 10 cm x 10 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.090 55,000.00 4,950.00
Tukang L.02 OH 0.090 80,000.00 7,200.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 16,150.00
B BAHAN
Plint keramik uk. 10 cm x 10 cm buah 10.600 838.33 8,886.33
Semen Portland kg 1.140 1,400.00 1,596.00
Pasir pasang M3 0.003 118,900.00 356.70
Semen warna kg 0.050 2,966.67 148.33
JUMLAH HARGA BAHAN 10,987.37
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 27,137.37


### E. Overhead & Profit 10% x D 2,713.74
F. Harga Satuan Pekerjaan (D+E) 29,851.10

A.4.4.3.41 Pemasangan 1 m' plint keramik ukuran 10 cm x 30 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.090 55,000.00 4,950.00
Tukang L.02 OH 0.090 80,000.00 7,200.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 16,150.00
B BAHAN
Plint keramik uk. 10 cm x 30 cm buah 5.300 1,757.58 9,315.15
Semen Portland kg 1.140 1,400.00 1,596.00
Pasir pasang M3 0.003 118,900.00 356.70
Semen warna kg 0.025 2,966.67 74.17
JUMLAH HARGA BAHAN 11,342.02
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 27,492.02


### E. Overhead & Profit 10% x D 2,749.20
F. Harga Satuan Pekerjaan (D+E) 30,241.22
A.4.4.3.35.a Pemasangan 1 m2 lantai keramik polish (putih) ukuran 40 cm x 40 cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 55,000.00 13,750.00
Tukang L.02 OH 0.125 80,000.00 10,000.00
Kepala Tukang L.03 OH 0.013 100,000.00 1,300.00
Mandor L.04 OH 0.013 100,000.00 1,300.00
JUMLAH TENAGA KERJA 26,350.00
B BAHAN
Keramik 40x40 (putih) bh 6.630 11,466.67 76,024.00
Semen Portland kg 10.000 1,400.00 14,000.00
Pasir pasang M3 0.045 118,900.00 5,350.50
Semen warna kg 1.500 2,966.67 4,450.00
JUMLAH HARGA BAHAN 99,824.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 126,174.50


### E. Overhead & Profit 10% x D 12,617.45
F. Harga Satuan Pekerjaan (D+E) 138,791.95

A.4.4.3.35.b Pemasangan 1 m2 lantai keramik Unpolish ukuran 40 cm x 40 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 55,000.00 13,750.00
Tukang L.02 OH 0.125 80,000.00 10,000.00
Kepala Tukang L.03 OH 0.013 100,000.00 1,300.00
Mandor L.04 OH 0.013 100,000.00 1,300.00
JUMLAH TENAGA KERJA 26,350.00
B BAHAN
Keramik 40x40 warna bh 6.630 12,333.33 81,770.00
Semen Portland kg 10.000 1,400.00 14,000.00
Pasir pasang M3 0.045 118,900.00 5,350.50
Semen warna kg 1.500 2,966.67 4,450.00
JUMLAH HARGA BAHAN 105,570.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 131,920.50


### E. Overhead & Profit 10% x D 13,192.05
F. Harga Satuan Pekerjaan (D+E) 145,112.55

A.4.4.3.35.d Pemasangan 1 m' plint keramik ukuran 10 cm x 40 cm polish (putih)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.090 55,000.00 4,950.00
Tukang L.02 OH 0.090 80,000.00 7,200.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 16,150.00
B BAHAN
Plint keramik bh 2.650 2,866.67 7,596.67
Semen Portland kg 1.140 1,400.00 1,596.00
Pasir pasang kg 0.003 84.93 0.25
Semen warna kg 0.050 2,966.67 148.33
JUMLAH HARGA BAHAN 9,341.25
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 25,491.25


### E. Overhead & Profit 10% x D 2,549.13
F. Harga Satuan Pekerjaan (D+E) 28,040.38
A.4.4.3.35.e Pemasangan 1 m' plint keramik ukuran 10 cm x 40 cm unpolish
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.090 55,000.00 4,950.00
Tukang L.02 OH 0.090 80,000.00 7,200.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 16,150.00
B BAHAN
Plint keramik bh 2.650 3,083.33 8,170.83
Semen Portland kg 1.140 1,400.00 1,596.00
Pasir pasang kg 0.003 84.93 0.25
Semen warna kg 0.050 2,966.67 148.33
JUMLAH HARGA BAHAN 9,915.42
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 26,065.42


E. Overhead & Profit 10% x D 2,606.54
F. Harga Satuan Pekerjaan (D+E) 28,671.96

A.4.4.3.35.f Pemasangan 1 m2 dinding keramik warna ukuran 20 cm x 25cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.1875 55,000.00 10,312.50
Tukang L.02 OH 0.3750 80,000.00 30,000.00
Kepala Tukang L.03 OH 0.0450 100,000.00 4,500.00
Mandor L.04 OH 0.0188 100,000.00 1,880.00
JUMLAH TENAGA KERJA 46,692.50
B BAHAN
Keramik 20x25 warna bh 22.000 2,935.00 64,570.00
Semen Portland kg 9.300 1,400.00 13,020.00
Pasir pasang kg 0.018 84.93 1.53
Semen warna kg 1.940 2,966.67 5,755.33
JUMLAH HARGA BAHAN 83,346.86
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 130,039.36


### E. Overhead & Profit 10% x D 13,003.94
F. Harga Satuan Pekerjaan (D+E) 143,043.30

A.4.4.3.35.g Pemasangan 1 m2 dinding keramik putih ukuran 20 cm x 40 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.1875 55,000.00 10,312.50
Tukang L.02 OH 0.3750 80,000.00 30,000.00
Kepala Tukang L.03 OH 0.0450 100,000.00 4,500.00
Mandor L.04 OH 0.0188 100,000.00 1,880.00
JUMLAH TENAGA KERJA 46,692.50
B BAHAN
Keramik 20x40 putih bh 22.000 2,515.00 55,330.00
Semen Portland kg 9.300 1,400.00 13,020.00
Pasir pasang kg 0.018 84.93 1.53
Semen warna kg 1.940 2,966.67 5,755.33
JUMLAH HARGA BAHAN 74,106.86
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 120,799.36


### E. Overhead & Profit 10% x D 12,079.94
F. Harga Satuan Pekerjaan (D+E) 132,879.30
A.4.4.3.58 Pemasangan 1 m2 dinding batu tempel hitam
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 55,000.00 38,500.00
Tukang L.02 OH 0.350 80,000.00 28,000.00
Kepala Tukang L.03 OH 0.035 100,000.00 3,500.00
Mandor L.04 OH 0.035 100,000.00 3,500.00
JUMLAH TENAGA KERJA 73,500.00
B BAHAN
Batu tempel hitam / andesit buah 1.100 3,670.00 4,037.00
Semen Portland kg 11.750 1,400.00 16,450.00
Pasir pasang M3 0.035 118,900.00 4,161.50

JUMLAH HARGA BAHAN 24,648.50


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 98,148.50


### E. Overhead & Profit 10% x D 9,814.85
F. Harga Satuan Pekerjaan (D+E) 107,963.35

A.4.4.3.59 Pemasangan 1 m2 lantai vynil uk. 30 cm x 30 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 55,000.00 8,250.00
Tukang L.02 OH 0.150 80,000.00 12,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.008 100,000.00 800.00
JUMLAH TENAGA KERJA 22,550.00
B BAHAN
Vynil m2 1.00 255,000.00 255,000.00
Lem kg 0.35 54,100.00 18,935.00

JUMLAH HARGA BAHAN 273,935.00


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 296,485.00


### E. Overhead & Profit 10% x D 29,648.50
F. Harga Satuan Pekerjaan (D+E) 326,133.50

A.4.4.3.61 Pemasangan 1 m2 floor harderner


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.120 55,000.00 6,600.00
Tukang L.02 OH 0.120 80,000.00 9,600.00
Kepala Tukang L.03 OH 0.012 100,000.00 1,200.00
Mandor L.04 OH 0.006 100,000.00 600.00
JUMLAH TENAGA KERJA 18,000.00
B BAHAN
Floor harderner Kg 5.00 7,900.00 39,500.00

JUMLAH HARGA BAHAN 39,500.00


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 57,500.00


### E. Overhead & Profit 10% x D 5,750.00
F. Harga Satuan Pekerjaan (D+E) 63,250.00
A.4.4.3.64 Pemasangan 1 m2 Paving block natural tebal 6 cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 55,000.00 13,750.00
Tukang Batu L.02 OH 0.500 80,000.00 40,000.00
Kepala Tukang L.03 OH 0.050 100,000.00 5,000.00
Mandor L.04 OH 0.0013 100,000.00 130.00
JUMLAH TENAGA KERJA 58,880.00
B BAHAN
Paving block 6 cm m2 1.010 2,300.00 2,323.00
Pasir beton M3 0.050 118,900.00 5,945.00
JUMLAH HARGA BAHAN 8,268.00
C. PERALATAN
Peralatan % 0.1 8,268.00 826.80

JUMLAH HARGA ALAT 826.80

D. Jumlah (A+B+C) 67,974.80


### E. Overhead & Profit 10% x D 6,797.48
F. Harga Satuan Pekerjaan (D+E) 74,772.28

A.4.4.3.65 Pemasangan 1 m2 Paving block natural tebal 8 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.500 55,000.00 27,500.00
Tukang Batu L.02 OH 0.500 80,000.00 40,000.00
Kepala Tukang L.03 OH 0.050 100,000.00 5,000.00
Mandor L.04 OH 0.0013 100,000.00 130.00
JUMLAH TENAGA KERJA 72,630.00
B BAHAN
Paving block 8 cm m2 1.010 2,600.00 2,626.00
Pasir beton M3 0.050 118,900.00 5,945.00
JUMLAH HARGA BAHAN 8,571.00
C. PERALATAN
Peralatan % 0.1 8,571.00 857.10

JUMLAH HARGA ALAT 857.10

D. Jumlah (A+B+C) 82,058.10


### E. Overhead & Profit 10% x D 8,205.81
F. Harga Satuan Pekerjaan (D+E) 90,263.91
A.4.5.1. HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

A.4.5.1.1 Pemasangan 1 m2 langit-langit asbes semen (tebal 4 mm, 5 mm, 6 mm)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.030 55,000.00 1,650.00
Tukang L.02 OH 0.070 80,000.00 5,600.00
Kepala Tukang L.03 OH 0.007 100,000.00 700.00
Mandor L.04 OH 0.004 100,000.00 400.00
JUMLAH TENAGA KERJA 8,350.00
B BAHAN
Asbes semen m2 1.100 23,645.83 26,010.42
Paku tripleks kg 0.010 26,200.00 262.00
JUMLAH HARGA BAHAN 26,272.42
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 34,622.42


### E. Overhead & Profit 10% x D 3,462.24
F. Harga Satuan Pekerjaan (D+E) 38,084.66

A.4.5.1.2 Pemasangan 1 m2 langit-langit akustik ukuran (30 x 30) cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.120 55,000.00 6,600.00
Tukang L.02 OH 0.120 80,000.00 9,600.00
Kepala Tukang L.03 OH 0.012 100,000.00 1,200.00
Mandor L.04 OH 0.006 100,000.00 600.00
JUMLAH TENAGA KERJA 18,000.00
B BAHAN
Akustik Lembar 12.000 53,819.44 645,833.33
Paku tripleks kg 0.050 26,200.00 1,310.00
JUMLAH HARGA BAHAN 647,143.33
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 665,143.33


### E. Overhead & Profit 10% x D 66,514.33
F. Harga Satuan Pekerjaan (D+E) 731,657.67

A.4.5.1.5 Pemasangan 1 m2 langit-langit triplek ukuran (120 x 240) cm (tebal 3 mm, 4 mm, 6 mm)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 55,000.00 5,500.00
Tukang L.02 OH 0.100 80,000.00 8,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 15,000.00
B BAHAN
Plywood 4mm Lembar 0.375 75,000.00 28,125.00
Paku tripleks kg 0.030 26,200.00 786.00
JUMLAH HARGA BAHAN 28,911.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 43,911.00


### E. Overhead & Profit 10% x D 4,391.10
F. Harga Satuan Pekerjaan (D+E) 48,302.10
A.4.5.1.6 Pemasangan 1 m2 langit-langit lambrisering kayu, tebal 9 mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.800 55,000.00 44,000.00
Tukang kayu L.02 OH 0.800 80,000.00 64,000.00
Kepala Tukang L.03 OH 0.080 100,000.00 8,000.00
Mandor L.04 OH 0.040 100,000.00 4,000.00
JUMLAH TENAGA KERJA 120,000.00
B BAHAN
Kayu papan m3 0.015 4,000,000.00 60,000.00
Paku tripleks kg 0.010 26,200.00 262.00
JUMLAH HARGA BAHAN 60,262.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 180,262.00


### E. Overhead & Profit 10% x D 18,026.20
F. Harga Satuan Pekerjaan (D+E) 198,288.20

A.4.5.1.7 Pemasangan 1 m2 langit - langit gypsum board ukuran (120x24x9) mm, tebal 9 mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 55,000.00 5,500.00
Tukang L.02 OH 0.050 80,000.00 4,000.00
Kepala Tukang L.03 OH 0.005 100,000.00 500.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 10,500.00
B BAHAN
Gypsum board lembar 0.364 82,500.00 30,030.00
Paku skrup kg 0.110 43,000.00 4,730.00
JUMLAH HARGA BAHAN 34,760.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 45,260.00


### E. Overhead & Profit 10% x D 4,526.00
F. Harga Satuan Pekerjaan (D+E) 49,786.00

A.4.5.1.8 Pemasangan 1 m2 Plafond PVC


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 55,000.00 5,500.00
Tukang L.02 OH 0.100 80,000.00 8,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 15,000.00
B BAHAN
Plafond PVC Lembar 0.375 173,500.00 65,062.50
Paku skrup kg 0.030 43,000.00 1,290.00
JUMLAH HARGA BAHAN 66,352.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 81,352.50


### E. Overhead & Profit 10% x D 8,135.25
F. Harga Satuan Pekerjaan (D+E) 89,487.75
A.4.5.1.9 Pemasangan 1 m' list langit-langit kayu profil
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 55,000.00 2,750.00
Tukang kayu L.02 OH 0.050 80,000.00 4,000.00
Kepala Tukang L.03 OH 0.005 100,000.00 500.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 7,550.00
B BAHAN
List kayu profil m 1.050 4,631.58 4,863.16
Paku kg 0.010 16,500.00 165.00
JUMLAH HARGA BAHAN 5,028.16
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 12,578.16


### E. Overhead & Profit 10% x D 1,257.82
F. Harga Satuan Pekerjaan (D+E) 13,835.97

A.4.5.1.9.a Pemasangan 1 m' list profil PVC


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 55,000.00 2,750.00
Tukang L.02 OH 0.050 80,000.00 4,000.00
Kepala Tukang L.03 OH 0.005 100,000.00 500.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 7,550.00
B BAHAN
List Plafond PVC m 1.050 31,450.00 33,022.50
Paku skrup kg 0.010 43,000.00 430.00
JUMLAH HARGA BAHAN 33,452.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 41,002.50


### E. Overhead & Profit 10% x D 4,100.25
F. Harga Satuan Pekerjaan (D+E) 45,102.75

A.4.5.1.9.b Pemasangan 1 m2 langit-langit kalsiboard ukuran (120 x 240 x 9) mm (tebal 3,5 mm)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 55,000.00 5,500.00
Tukang L.02 OH 0.050 80,000.00 4,000.00
Kepala Tukang L.03 OH 0.005 100,000.00 500.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 10,500.00
B BAHAN
Kalsiboard Lembar 0.364 99,000.00 36,036.00
Paku skrup kg 0.110 43,000.00 4,730.00
Cornis kg 0.300 3,511.75 1,053.53
Lakban gypsum roll 0.070 15,700.00 1,099.00
JUMLAH HARGA BAHAN 42,918.53
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 53,418.53


### E. Overhead & Profit 10% x D 5,341.85
F. Harga Satuan Pekerjaan (D+E) 58,760.38
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP

A.4.5.2.8 Pemasangan 1 m2 atap asbes gelombang 0.92 m x 2,5 m x 5 mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.140 55,000.00 7,700.00
Tukang L.02 OH 0.075 80,000.00 6,000.00
Kepala Tukang L.03 OH 0.008 100,000.00 800.00
Mandor L.04 OH 0.008 100,000.00 800.00
JUMLAH TENAGA KERJA 15,300.00
B BAHAN
Asbes gelombang 92 x 250 Lbr 0.500 44,600.00 22,300.00
Paku pancing 6x23 kg 0.120 20,300.00 2,436.00
JUMLAH HARGA BAHAN 24,736.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 40,036.00


### E. Overhead & Profit 10% x D 4,003.60
F. Harga Satuan Pekerjaan (D+E) 44,039.60

A.4.5.2.9 Pemasangan 1 m2 atap asbes gelombang 0.92 m x 2,25 m x 5 mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.140 55,000.00 7,700.00
Tukang L.02 OH 0.075 80,000.00 6,000.00
Kepala Tukang L.03 OH 0.008 100,000.00 800.00
Mandor L.04 OH 0.008 100,000.00 800.00
JUMLAH TENAGA KERJA 15,300.00
B BAHAN
Asbes gelombang 92 x 250 Lbr 0.600 44,600.00 26,760.00
Paku pancing 6x23 kg 0.120 20,300.00 2,436.00
JUMLAH HARGA BAHAN 29,196.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 44,496.00


### E. Overhead & Profit 10% x D 4,449.60
F. Harga Satuan Pekerjaan (D+E) 48,945.60

A.4.5.2.10 Pemasangan 1 m2 atap asbes gelombang 0.92 m x 2,00 m x 5 mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.140 55,000.00 7,700.00
Tukang L.02 OH 0.070 80,000.00 5,600.00
Kepala Tukang L.03 OH 0.007 100,000.00 700.00
Mandor L.04 OH 0.007 100,000.00 700.00
JUMLAH TENAGA KERJA 14,700.00
B BAHAN
Asbes gelombang 92 x 250 Lbr 0.600 44,600.00 26,760.00
Paku pancing 6x23 kg 0.120 20,300.00 2,436.00
JUMLAH HARGA BAHAN 29,196.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 43,896.00


### E. Overhead & Profit 10% x D 4,389.60
F. Harga Satuan Pekerjaan (D+E) 48,285.60
A.4.5.2.11 Pemasangan 1 m2 atap asbes gelombang 0.92 m x 1.80 m x 5 mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.140 55,000.00 7,700.00
Tukang L.02 OH 0.070 80,000.00 5,600.00
Kepala Tukang L.03 OH 0.007 100,000.00 700.00
Mandor L.04 OH 0.007 100,000.00 700.00
JUMLAH TENAGA KERJA 14,700.00
B BAHAN
Asbes gelombang 92 x 250 Lbr 0.750 44,600.00 33,450.00
Paku pancing 6x23 kg 0.120 20,300.00 2,436.00
JUMLAH HARGA BAHAN 35,886.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 50,586.00


### E. Overhead & Profit 10% x D 5,058.60
F. Harga Satuan Pekerjaan (D+E) 55,644.60

A.4.5.2.12 Pemasangan 1 m2 atap asbes gelombang 1.05 m x 3,00 m x 4 mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.140 55,000.00 7,700.00
Tukang L.02 OH 0.070 80,000.00 5,600.00
Kepala Tukang L.03 OH 0.007 100,000.00 700.00
Mandor L.04 OH 0.007 100,000.00 700.00
JUMLAH TENAGA KERJA 14,700.00
B BAHAN
Asbes gelombang 92 x 250 Lbr 0.350 44,600.00 15,610.00
Paku pancing 6x23 kg 0.120 20,300.00 2,436.00
JUMLAH HARGA BAHAN 18,046.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 32,746.00


### E. Overhead & Profit 10% x D 3,274.60
F. Harga Satuan Pekerjaan (D+E) 36,020.60

A.4.5.2.22 Pemasangan 1 m' nok asbes


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.084 55,000.00 4,620.00
Tukang L.02 OH 0.125 80,000.00 10,000.00
Kepala Tukang L.03 OH 0.013 100,000.00 1,300.00
Mandor L.04 OH 0.004 100,000.00 400.00
JUMLAH TENAGA KERJA 16,320.00
B BAHAN
Nok asbes lbr 1.000 34,200.00 34,200.00
Paku seng kg 0.040 20,300.00 812.00
JUMLAH HARGA BAHAN 35,012.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 51,332.00


### E. Overhead & Profit 10% x D 5,133.20
F. Harga Satuan Pekerjaan (D+E) 56,465.20
A.4.5.2.30 Pemasangan 1 m2 genteng beton / keramik / tanah liat
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 55,000.00 11,000.00
Tukang L.02 OH 0.100 80,000.00 8,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.001 100,000.00 100.00
JUMLAH TENAGA KERJA 20,100.00
B BAHAN
Genteng tanah beton Bh 11.000 13,500.00 148,500.00
Paku biasa 2" - 5" kg 0.300 16,500.00 4,950.00
JUMLAH HARGA BAHAN 153,450.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 173,550.00


### E. Overhead & Profit 10% x D 17,355.00
F. Harga Satuan Pekerjaan (D+E) 190,905.00

A.4.5.2.32 Pemasangan 1 m2 genteng metal Ukuran 80 X 100 Atap


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 55,000.00 11,000.00
Tukang L.02 OH 0.100 80,000.00 8,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.001 100,000.00 100.00
JUMLAH TENAGA KERJA 20,100.00
B BAHAN
Genteng metal buah 1.300 48,200.00 62,660.00
Paku biasa 1/2"-1" kg 0.200 16,500.00 3,300.00
JUMLAH HARGA BAHAN 65,960.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 86,060.00


### E. Overhead & Profit 10% x D 8,606.00
F. Harga Satuan Pekerjaan (D+E) 94,666.00

A.4.5.2.34 Pemasangan 1 m2 atap sirap kayu


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.166 55,000.00 9,130.00
Tukang kayu L.02 OH 0.250 80,000.00 20,000.00
Kepala Tukang L.03 OH 0.025 100,000.00 2,500.00
Mandor L.04 OH 0.008 100,000.00 800.00
JUMLAH TENAGA KERJA 32,430.00
B BAHAN
Sirap kayu buah 30.000 4,000.00 120,000.00
Paku biasa 1/2"-1" kg 0.200 16,500.00 3,300.00
JUMLAH HARGA BAHAN 123,300.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 155,730.00


### E. Overhead & Profit 10% x D 15,573.00
F. Harga Satuan Pekerjaan (D+E) 171,303.00
A.4.5.2.35 Pemasangan 1 m' nok genteng beton
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.400 55,000.00 22,000.00
Tukang L.02 OH 0.200 80,000.00 16,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.020 100,000.00 2,000.00
JUMLAH TENAGA KERJA 42,000.00
B BAHAN
Nok genteng beton buah 3.500 12,100.00 42,350.00
Paku biasa 1/2"-1" kg 0.050 16,500.00 825.00
Semen PC kg 10.800 1,400.00 15,120.00
Pasir pasang m3 0.032 84.93 2.72
Semen warna kg 1.000 2,966.67 2,966.67

JUMLAH HARGA BAHAN 61,264.38


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 103,264.38


### E. Overhead & Profit 10% x D 10,326.44
F. Harga Satuan Pekerjaan (D+E) 113,590.82

A.4.5.2.37 Pemasangan 1 m' nok genteng metal


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 55,000.00 13,750.00
Tukang L.02 OH 0.150 80,000.00 12,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.013 100,000.00 1,300.00
JUMLAH TENAGA KERJA 28,550.00
B BAHAN
Nok genteng metal buah 1.100 25,100.00 27,610.00
Paku biasa 1/2"-1" kg 0.050 16,500.00 825.00
JUMLAH HARGA BAHAN 28,435.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 56,985.00


### E. Overhead & Profit 10% x D 5,698.50
F. Harga Satuan Pekerjaan (D+E) 62,683.50

A.4.5.2.39 Pemasangan 1 m2 atap seng gelombang


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.120 55,000.00 6,600.00
Tukang L.02 OH 0.060 80,000.00 4,800.00
Kepala Tukang L.03 OH 0.006 100,000.00 600.00
Mandor L.04 OH 0.006 100,000.00 600.00
JUMLAH TENAGA KERJA 12,600.00
B BAHAN
Seng gelombang Lbr 0.700 45,000.00 31,500.00
Paku biasa 1/2"-1" kg 0.020 16,500.00 330.00
JUMLAH HARGA BAHAN 31,830.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 44,430.00


### E. Overhead & Profit 10% x D 4,443.00
F. Harga Satuan Pekerjaan (D+E) 48,873.00
A.4.5.2.40 Pemasangan 1 m' nok atap seng
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 55,000.00 8,250.00
Tukang L.02 OH 0.070 80,000.00 5,600.00
Kepala Tukang L.03 OH 0.007 100,000.00 700.00
Mandor L.04 OH 0.006 100,000.00 600.00
JUMLAH TENAGA KERJA 15,150.00
B BAHAN
Seng plat 3"x6" bjls 28 Bh 0.300 33,350.00 10,005.00
Paku biasa 1/2"-1" kg 0.040 16,500.00 660.00
JUMLAH HARGA BAHAN 10,665.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 25,815.00


### E. Overhead & Profit 10% x D 2,581.50
F. Harga Satuan Pekerjaan (D+E) 28,396.50

A.4.5.2.41 Pemasangan 1 m2 atap aluminium/alkan


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 55,000.00 8,250.00
Tukang aluminium L.02 OH 0.750 80,000.00 60,000.00
Kepala Tukang L.03 OH 0.080 100,000.00 8,000.00
Mandor L.04 OH 0.006 100,000.00 600.00
JUMLAH TENAGA KERJA 76,850.00
B BAHAN
alkan t. 0,35 Lbr 1.050 65,000.00 68,250.00
Paku hak panj.15 cm kg 0.020 20,300.00 406.00
JUMLAH HARGA BAHAN 68,656.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 145,506.00


### E. Overhead & Profit 10% x D 14,550.60
F. Harga Satuan Pekerjaan (D+E) 160,056.60

A.4.5.2.42 Pemasangan 1 m' nok aluminium


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 55,000.00 5,500.00
Tukang L.02 OH 1.000 80,000.00 80,000.00
Kepala Tukang L.03 OH 0.100 100,000.00 10,000.00
Mandor L.04 OH 0.050 100,000.00 5,000.00
JUMLAH TENAGA KERJA 100,500.00
B BAHAN
Nok standar 40 x 18 buah 1.200 26,900.00 32,280.00
Paku hak panj.15 cm kg 0.040 20,300.00 812.00
JUMLAH HARGA BAHAN 33,092.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 133,592.00


### E. Overhead & Profit 10% x D 13,359.20
F. Harga Satuan Pekerjaan (D+E) 146,951.20
A.4.5.2.43 Pemasangan 1 m2 aluminium foil
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 55,000.00 8,250.00
Tukang aluminium L.02 OH 0.050 80,000.00 4,000.00
Kepala Tukang L.03 OH 0.005 100,000.00 500.00
Mandor L.04 OH 0.008 100,000.00 800.00
JUMLAH TENAGA KERJA 13,550.00
B BAHAN
Aluminium foil m2 1.050 48,800.00 51,240.00
JUMLAH HARGA BAHAN 51,240.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 64,790.00


### E. Overhead & Profit 10% x D 6,479.00
F. Harga Satuan Pekerjaan (D+E) 71,269.00

A.4.5.2.44 Pemasangan 1 m2 Atap spandek metal berpasir


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 55,000.00 8,250.00
Tukang aluminium L.02 OH 0.750 80,000.00 60,000.00
Kepala Tukang L.03 OH 0.080 100,000.00 8,000.00
Mandor L.04 OH 0.006 100,000.00 600.00
JUMLAH TENAGA KERJA 76,850.00
B BAHAN
Spandek berpasir t=0,4 mm m2 1.050 102,800.00 107,940.00
Screew rooffing 12x24x70 bh 9.000 255.00 2,295.00
JUMLAH HARGA BAHAN 110,235.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 187,085.00


### E. Overhead & Profit 10% x D 18,708.50
F. Harga Satuan Pekerjaan (D+E) 205,793.50
A.4.6.1. HARGA SATUAN PEKERJAAN KAYU

A.4.6.1.1 Pembuatan dan Pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 7.000 55,000.00 385,000.00
Tukang Kayu L.02 OH 21.000 80,000.00 1,680,000.00
Kepala Tukang L.03 OH 2.100 100,000.00 210,000.00
Mandor L.04 OH 0.350 100,000.00 35,000.00
JUMLAH TENAGA KERJA 2,310,000.00
B BAHAN
Balok kayu klas I m3 1.100 6,000,000.00 6,600,000.00
Paku 10 cm kg 1.250 16,500.00 20,625.00
Lem kayu kg 1.000 27,875.00 27,875.00
JUMLAH HARGA BAHAN 6,648,500.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 8,958,500.00


### E. Overhead & Profit 10% x D 895,850.00
F. Harga Satuan Pekerjaan (D+E) 9,854,350.00

A.4.6.1.2 Pembuatan dan Pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 6.000 55,000.00 330,000.00
Tukang Kayu L.02 OH 18.000 80,000.00 1,440,000.00
Kepala Tukang L.03 OH 1.800 100,000.00 180,000.00
Mandor L.04 OH 0.300 100,000.00 30,000.00
JUMLAH TENAGA KERJA 1,980,000.00
B BAHAN
Balok kayu klas II m3 1.200 4,000,000.00 4,800,000.00
Paku 10 cm kg 1.250 16,500.00 20,625.00
Lem kayu kg 1.000 27,875.00 27,875.00
JUMLAH HARGA BAHAN 4,848,500.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 6,828,500.00


### E. Overhead & Profit 10% x D 682,850.00
F. Harga Satuan Pekerjaan (D+E) 7,511,350.00

A.4.6.1.5 Pembuatan dan pemasangan 1 m2 daun pintu panel kayu klas II


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 55,000.00 55,000.00
Tukang Kayu L.02 OH 3.000 80,000.00 240,000.00
Kepala Tukang L.03 OH 0.300 100,000.00 30,000.00
Mandor L.04 OH 0.050 100,000.00 5,000.00
JUMLAH TENAGA KERJA 330,000.00
B BAHAN
Papan kayu klas II m3 0.040 4,000,000.00 160,000.00
Lem kayu kg 0.500 27,875.00 13,937.50
JUMLAH HARGA BAHAN 173,937.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 503,937.50


### E. Overhead & Profit 10% x D 50,393.75
F. Harga Satuan Pekerjaan (D+E) 554,331.25
A.4.6.1.6 Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, Kayu Kelas II
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.800 55,000.00 44,000.00
Tukang Kayu L.02 OH 2.400 80,000.00 192,000.00
Kepala Tukang L.03 OH 0.240 100,000.00 24,000.00
Mandor L.04 OH 0.040 100,000.00 4,000.00
JUMLAH TENAGA KERJA 264,000.00
B BAHAN
Papan kayu klas II m3 0.024 4,000,000.00 96,000.00
Lem kayu kg 0.300 27,875.00 8,362.50
JUMLAH HARGA BAHAN 104,362.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 368,362.50


### E. Overhead & Profit 10% x D 36,836.25
F. Harga Satuan Pekerjaan (D+E) 405,198.75

A.4.6.1.7 Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu, Kayu Kelas II
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 55,000.00 55,000.00
Tukang Kayu L.02 OH 3.000 80,000.00 240,000.00
Kepala Tukang L.03 OH 0.300 100,000.00 30,000.00
Mandor L.04 OH 0.050 100,000.00 5,000.00
JUMLAH TENAGA KERJA 330,000.00
B BAHAN
Papan kayu klas II m3 0.064 4,000,000.00 256,000.00
Lem kayu kg 0.500 27,875.00 13,937.50
JUMLAH HARGA BAHAN 269,937.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 599,937.50


### E. Overhead & Profit 10% x D 59,993.75
F. Harga Satuan Pekerjaan (D+E) 659,931.25

A.4.6.1.10 Pemasangan 1 m2 jalusi kusen, Kayu kelas I atau II


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.670 55,000.00 36,850.00
Tukang Kayu L.02 OH 2.000 80,000.00 160,000.00
Kepala Tukang L.03 OH 0.200 100,000.00 20,000.00
Mandor L.04 OH 0.335 100,000.00 33,500.00
JUMLAH TENAGA KERJA 250,350.00
B BAHAN
Papan kayu m3 0.060 4,000,000.00 240,000.00
Paku 1 - 2,5 cm kg 0.150 16,500.00 2,475.00
JUMLAH HARGA BAHAN 242,475.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 492,825.00


### E. Overhead & Profit 10% x D 49,282.50
F. Harga Satuan Pekerjaan (D+E) 542,107.50
A.4.6.1.13 Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II atau III bentang 6 meter
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 4.000 55,000.00 220,000.00
Tukang Kayu L.02 OH 12.000 80,000.00 960,000.00
Kepala Tukang L.03 OH 1.200 100,000.00 120,000.00
Mandor L.04 OH 0.200 100,000.00 20,000.00
JUMLAH TENAGA KERJA 1,320,000.00
B BAHAN
Balok kayu Kelas II m3 1.100 4,000,000.00 4,400,000.00
Besi strip tebal 5mm kg 15.000 111,706.50 1,675,597.50
Paku 12 cm kg 5.600 16,500.00 92,400.00
JUMLAH HARGA BAHAN 6,167,997.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 7,487,997.50


### E. Overhead & Profit 10% x D 748,799.75
F. Harga Satuan Pekerjaan (D+E) 8,236,797.25

A.4.6.1.15 Pemasangan 1 m3 konstruksi gordeng, kayu kelas III


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 6.700 55,000.00 368,500.00
Tukang Kayu L.02 OH 20.100 80,000.00 1,608,000.00
Kepala Tukang L.03 OH 2.010 100,000.00 201,000.00
Mandor L.04 OH 0.335 100,000.00 33,500.00
JUMLAH TENAGA KERJA 2,211,000.00
B BAHAN
Balok kayu klas III m3 1.100 1,505,250.00 1,655,775.00
Besi strip tebal 5mm kg 15.000 111,706.50 1,675,597.50
Paku 12 cm kg 3.000 16,500.00 49,500.00
JUMLAH HARGA BAHAN 3,380,872.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 5,591,872.50


### E. Overhead & Profit 10% x D 559,187.25
F. Harga Satuan Pekerjaan (D+E) 6,151,059.75

A.4.6.1.16 Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 55,000.00 5,500.00
Tukang Kayu L.02 OH 0.100 80,000.00 8,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 15,000.00
B BAHAN
Kaso 5 x 7 cm m3 0.014 4,000,000.00 56,000.00
Reng 2 x 3 cm m3 0.036 4,000,000.00 144,000.00
Paku 5 dan 10 cm kg 0.250 16,500.00 4,125.00
JUMLAH HARGA BAHAN 204,125.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 219,125.00


### E. Overhead & Profit 10% x D 21,912.50
F. Harga Satuan Pekerjaan (D+E) 241,037.50
A.4.6.1.19 Pemasangan 1 m2 rangka langit-langit (50x100) cm, kayu kelas III
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 55,000.00 8,250.00
Tukang Kayu L.02 OH 0.300 80,000.00 24,000.00
Kepala Tukang L.03 OH 0.030 100,000.00 3,000.00
Mandor L.04 OH 0.075 100,000.00 7,500.00
JUMLAH TENAGA KERJA 42,750.00
B BAHAN
Kaso 5 x 7 cm m3 0.0154 3,000,000.00 46,200.00
Paku kg 0.200 16,500.00 3,300.00
JUMLAH HARGA BAHAN 49,500.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 92,250.00


### E. Overhead & Profit 10% x D 9,225.00
F. Harga Satuan Pekerjaan (D+E) 101,475.00

A.4.6.1.20 Pemasangan 1 m2 rangka langit-langit (60x60) cm, Kayu kelas III


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 55,000.00 11,000.00
Tukang Kayu L.02 OH 0.300 80,000.00 24,000.00
Kepala Tukang L.03 OH 0.030 100,000.00 3,000.00
Mandor L.04 OH 0.010 100,000.00 1,000.00
JUMLAH TENAGA KERJA 39,000.00
B BAHAN
Kaso 5 x 7 cm m3 0.0163 3,000,000.00 48,900.00
Paku kg 0.250 16,500.00 4,125.00
JUMLAH HARGA BAHAN 53,025.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 92,025.00


### E. Overhead & Profit 10% x D 9,202.50
F. Harga Satuan Pekerjaan (D+E) 101,227.50

A.4.6.1.21 Pemasangan 1 m' lisplank ukuran (3x20) cm, kayu kelas II


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 55,000.00 5,500.00
Tukang Kayu L.02 OH 0.200 80,000.00 16,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 24,000.00
B BAHAN
Papan kayu klas II m3 0.0108 4,000,000.00 43,200.00
Paku kg 0.100 16,500.00 1,650.00
JUMLAH HARGA BAHAN 44,850.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 68,850.00


### E. Overhead & Profit 10% x D 6,885.00
F. Harga Satuan Pekerjaan (D+E) 75,735.00
A.4.6.1.22 Pemasangan 1 m' lisplank ukuran (3x30) cm, kayu kelas II
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 55,000.00 5,500.00
Tukang Kayu L.02 OH 0.200 80,000.00 16,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 24,000.00
B BAHAN
Papan kayu klas II m3 0.0110 4,000,000.00 44,000.00
Paku kg 0.050 16,500.00 825.00
JUMLAH HARGA BAHAN 44,825.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 68,825.00


### E. Overhead & Profit 10% x D 6,882.50
F. Harga Satuan Pekerjaan (D+E) 75,707.50

A.4.6.1.23 Pemasangan 1 m2 rangka dinding pemisah (60x120) cm kayu kelas III


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 55,000.00 8,250.00
Tukang Kayu L.02 OH 0.450 80,000.00 36,000.00
Kepala Tukang L.03 OH 0.045 100,000.00 4,500.00
Mandor L.04 OH 0.008 100,000.00 800.00
JUMLAH TENAGA KERJA 49,550.00
B BAHAN
Balok kayu klas III m3 0.0280 1,505,250.00 42,147.00
Paku kg 0.150 16,500.00 2,475.00
JUMLAH HARGA BAHAN 44,622.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 94,172.00


### E. Overhead & Profit 10% x D 9,417.20
F. Harga Satuan Pekerjaan (D+E) 103,589.20

A.4.6.1.25 Pemasangan 1 m2 rangka dinding pemisah plywood rangkap, rangka kayu kelas II
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 55,000.00 11,000.00
Tukang Kayu L.02 OH 0.600 80,000.00 48,000.00
Kepala Tukang L.03 OH 0.060 100,000.00 6,000.00
Mandor L.04 OH 0.010 100,000.00 1,000.00
JUMLAH TENAGA KERJA 66,000.00
B BAHAN
Balok kayu uk. 6 x 12 m3 0.028 4,000,000.00 112,000.00
Paku kg 0.150 16,500.00 2,475.00
Plywood 4 mm Lembar 0.860 75,000.00 64,500.00
Lem kayu kg 0.560 27,875.00 15,610.00
JUMLAH HARGA BAHAN 194,585.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 260,585.00


### E. Overhead & Profit 10% x D 26,058.50
F. Harga Satuan Pekerjaan (D+E) 286,643.50
A.4.6.1.26 Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas II
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.600 55,000.00 33,000.00
Tukang Kayu L.02 OH 1.800 80,000.00 144,000.00
Kepala Tukang L.03 OH 0.180 100,000.00 18,000.00
Mandor L.04 OH 0.030 100,000.00 3,000.00
JUMLAH TENAGA KERJA 198,000.00
B BAHAN
Papan kayu klas II m3 0.007 4,000,000.00 28,000.00
Paku kg 0.100 16,500.00 1,650.00
Paku skrup kg 0.150 12,000.00 1,800.00
JUMLAH HARGA BAHAN 31,450.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 229,450.00


### E. Overhead & Profit 10% x D 22,945.00
F. Harga Satuan Pekerjaan (D+E) 252,395.00

A.4.6.1.27 Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120 x 240) cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.025 55,000.00 1,375.00
Tukang Kayu L.02 OH 0.075 80,000.00 6,000.00
Kepala Tukang L.03 OH 0.008 100,000.00 800.00
Mandor L.04 OH 0.001 100,000.00 100.00
JUMLAH TENAGA KERJA 8,275.00
B BAHAN
Plywod 4 mm m3 0.400 75,000.00 30,000.00
Paku kg 0.050 16,500.00 825.00
JUMLAH HARGA BAHAN 30,825.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 39,100.00


### E. Overhead & Profit 10% x D 3,910.00
F. Harga Satuan Pekerjaan (D+E) 43,010.00

A.4.6.1.28 Pemasangan 1 m' kalsiplank


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 55,000.00 5,500.00
Tukang Kayu L.02 OH 0.200 80,000.00 16,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 24,000.00
B BAHAN
Kalsiplank btg 0.3500 48,200.00 16,870.00
Paku kg 0.100 16,500.00 1,650.00
JUMLAH HARGA BAHAN 18,520.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 42,520.00


### E. Overhead & Profit 10% x D 4,252.00
F. Harga Satuan Pekerjaan (D+E) 46,772.00
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A.4.6.2.2 Pemasangan 1 buah kunci tanam biasa


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 55,000.00 550.00
Tukang L.02 OH 0.500 80,000.00 40,000.00
Kepala Tukang L.03 OH 0.050 100,000.00 5,000.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 46,050.00
B BAHAN
Kunci tanam biasa bh 1.000 166,700.00 166,700.00
JUMLAH HARGA BAHAN 166,700.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 212,750.00


### E. Overhead & Profit 10% x D 21,275.00
F. Harga Satuan Pekerjaan (D+E) 234,025.00

A.4.6.2.3 Pemasangan 1 buah kunci kamar mandi


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.005 55,000.00 275.00
Tukang L.02 OH 0.500 80,000.00 40,000.00
Kepala Tukang L.03 OH 0.050 100,000.00 5,000.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 45,575.00
B BAHAN
Kunci Tanam KM bh 1.000 157,300.00 157,300.00
JUMLAH HARGA BAHAN 157,300.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 202,875.00


### E. Overhead & Profit 10% x D 20,287.50
F. Harga Satuan Pekerjaan (D+E) 223,162.50

A.4.6.2.4 Pemasangan 1 buah kunci silinder


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.005 55,000.00 275.00
Tukang L.02 OH 0.500 80,000.00 40,000.00
Kepala Tukang L.03 OH 0.050 100,000.00 5,000.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 45,575.00
B BAHAN
Kunci silinder bh 1.000 157,300.00 157,300.00
JUMLAH HARGA BAHAN 157,300.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 202,875.00


### E. Overhead & Profit 10% x D 20,287.50
F. Harga Satuan Pekerjaan (D+E) 223,162.50
A.4.6.2.5 Pemasangan 1 buah engsel pintu biasa 4"
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.015 55,000.00 825.00
Tukang Kayu L.02 OH 0.150 80,000.00 12,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 14,405.00
B BAHAN
Engsel 4" biasa bh 1.000 19,900.00 19,900.00
JUMLAH HARGA BAHAN 19,900.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 34,305.00


### E. Overhead & Profit 10% x D 3,430.50
F. Harga Satuan Pekerjaan (D+E) 37,735.50

A.4.6.2.6 Pemasangan 1 buah engsel jendela 3"


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 55,000.00 550.00
Tukang L.02 OH 0.100 80,000.00 8,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.0005 100,000.00 50.00
JUMLAH TENAGA KERJA 9,600.00
B BAHAN
Engsel 3" biasa bh 1.000 15,700.00 15,700.00
JUMLAH HARGA BAHAN 15,700.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 25,300.00


### E. Overhead & Profit 10% x D 2,530.00
F. Harga Satuan Pekerjaan (D+E) 27,830.00

A.4.6.2.7 Pemasangan 1 buah engsel angin


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 55,000.00 5,500.00
Tukang L.02 OH 0.200 80,000.00 16,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.0005 100,000.00 50.00
JUMLAH TENAGA KERJA 23,550.00
B BAHAN
Engsel angin bh 1.000 47,200.00 47,200.00
JUMLAH HARGA BAHAN 47,200.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 70,750.00


### E. Overhead & Profit 10% x D 7,075.00
F. Harga Satuan Pekerjaan (D+E) 77,825.00
A.4.6.2.8 Pemasangan 1 buah spring knip
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.015 55,000.00 825.00
Tukang L.02 OH 0.150 80,000.00 12,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.008 100,000.00 800.00
JUMLAH TENAGA KERJA 15,125.00
B BAHAN
Spring knip buah 1.000 60,800.00 60,800.00
JUMLAH HARGA BAHAN 60,800.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 75,925.00


### E. Overhead & Profit 10% x D 7,592.50
F. Harga Satuan Pekerjaan (D+E) 83,517.50

A.4.6.2.9 Pemasangan 1 buah kait angin


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.015 55,000.00 825.00
Tukang L.02 OH 0.150 80,000.00 12,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.008 100,000.00 800.00
JUMLAH TENAGA KERJA 15,125.00
B BAHAN
Kait angin buah 1.000 62,900.00 62,900.00
JUMLAH HARGA BAHAN 62,900.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 78,025.00


### E. Overhead & Profit 10% x D 7,802.50
F. Harga Satuan Pekerjaan (D+E) 85,827.50

A.4.6.2.10 Pemasangan 1 buah door closer


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 55,000.00 2,750.00
Tukang L.02 OH 0.500 80,000.00 40,000.00
Kepala Tukang L.03 OH 0.050 100,000.00 5,000.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 48,050.00
B BAHAN
Door closer bh 1.000 522,100.00 522,100.00
JUMLAH HARGA BAHAN 522,100.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 570,150.00


### E. Overhead & Profit 10% x D 57,015.00
F. Harga Satuan Pekerjaan (D+E) 627,165.00
A.4.6.2.11 Pemasangan 1 buah kunci slot
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.020 55,000.00 1,100.00
Tukang L.02 OH 0.200 80,000.00 16,000.00
Kepala Tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.001 100,000.00 100.00
JUMLAH TENAGA KERJA 19,200.00
B BAHAN
Kunci slot bh 1.000 73,400.00 73,400.00
JUMLAH HARGA BAHAN 73,400.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 92,600.00


### E. Overhead & Profit 10% x D 9,260.00
F. Harga Satuan Pekerjaan (D+E) 101,860.00

A.4.6.2 .12 Pemasangan 1 buah Door handle (pegangan pintu)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 55,000.00 2,750.00
Tukang L.02 OH 0.500 80,000.00 40,000.00
Kepala Tukang L.03 OH 0.050 100,000.00 5,000.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 48,050.00
B BAHAN
Door handle bh 1.000 115,300.00 115,300.00
JUMLAH HARGA BAHAN 115,300.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 163,350.00


### E. Overhead & Profit 10% x D 16,335.00
F. Harga Satuan Pekerjaan (D+E) 179,685.00

A.4.6.2 .13 Pemasangan 1 buah door stop


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 55,000.00 550.00
Tukang L.02 OH 0.100 80,000.00 8,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 10,050.00
B BAHAN
Door stop bh 1.000 94,400.00 94,400.00
JUMLAH HARGA BAHAN 94,400.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 104,450.00


### E. Overhead & Profit 10% x D 10,445.00
F. Harga Satuan Pekerjaan (D+E) 114,895.00
A.4.6.2 .17 Pemasangan 1 m2 kaca tebal 5 mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.015 55,000.00 825.00
Tukang Kaca L.02 OH 0.150 80,000.00 12,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 14,405.00
B BAHAN
Kaca tebal 5 mm m2 1.100 200,000.00 220,000.00
Sealent tube 0.050 69,130.00 3,456.50
JUMLAH HARGA BAHAN 223,456.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 237,861.50


### E. Overhead & Profit 10% x D 23,786.15
F. Harga Satuan Pekerjaan (D+E) 261,647.65

A.4.6.2 .18 Pemasangan 1 m2 kaca tebal 8 mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.017 55,000.00 935.00
Tukang kaca L.02 OH 0.170 80,000.00 13,600.00
Kepala Tukang L.03 OH 0.017 100,000.00 1,700.00
Mandor L.04 OH 0.0009 100,000.00 90.00
JUMLAH TENAGA KERJA 16,325.00
B BAHAN
Kaca tebal 8 mm m2 1.100 250,000.00 275,000.00
Sealent tube 0.070 69,130.00 4,839.10
JUMLAH HARGA BAHAN 279,839.10
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 296,164.10


### E. Overhead & Profit 10% x D 29,616.41
F. Harga Satuan Pekerjaan (D+E) 325,780.51

A.4.6.2 .19 Pemasangan 1 m2 kaca buram tebal 12 mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.025 55,000.00 1,375.00
Tukang Kaca L.02 OH 0.250 80,000.00 20,000.00
Kepala Tukang L.03 OH 0.025 100,000.00 2,500.00
Mandor L.04 OH 0.0013 100,000.00 130.00
JUMLAH TENAGA KERJA 24,005.00
B BAHAN
Kaca tebal 12 mm m2 1.100 568,900.00 625,790.00
Sealent tube 0.070 69,130.00 4,839.10
JUMLAH HARGA BAHAN 630,629.10
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 654,634.10


### E. Overhead & Profit 10% x D 65,463.41
F. Harga Satuan Pekerjaan (D+E) 720,097.51
A.4.6.2 .23 Pemasangan 1 m2 kaca patri tebal 5 mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.075 55,000.00 4,125.00
Tukang Kaca L.02 OH 0.150 80,000.00 12,000.00
Kepala Tukang L.03 OH 0.015 100,000.00 1,500.00
Mandor L.04 OH 0.004 100,000.00 400.00
JUMLAH TENAGA KERJA 18,025.00
B BAHAN
Kaca patri 5 mm m2 1.100 2,096,900.00 2,306,590.00
Sealent tube 0.050 69,130.00 3,456.50
JUMLAH HARGA BAHAN 2,310,046.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 2,328,071.50


### E. Overhead & Profit 10% x D 232,807.15
F. Harga Satuan Pekerjaan (D+E) 2,560,878.65
A.4.7.1. HARGA SATUAN PEKERJAAN PENGECATAN

A.4.7.1.1. 1 m2 Pengikisan/pengerokan permukaan cat lama


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 55,000.00 8,250.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 8,550.00
B BAHAN
Soda api kg 0.050 22,300.00 1,115.00
JUMLAH HARGA BAHAN 1,115.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 9,665.00


### E. Overhead & Profit 10% x D 966.50
F. Harga Satuan Pekerjaan (D+E) 10,631.50

A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.070 55,000.00 3,850.00
Tukang cat L.02 OH 0.009 80,000.00 720.00
Kepala tukang L.03 OH 0.006 100,000.00 600.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 5,470.00
B BAHAN
Cat menie kg 0.200 48,300.00 9,660.00
Plamir kg 0.150 9,800.00 1,470.00
Cat dasar kg 0.170 32,500.00 5,525.00
Cat penutup kg 0.260 54,500.00 14,170.00
Kuas buah 0.010 12,100.00 121.00
Pengencer kg 0.030 30,900.00 927.00
Amplas Lbr 0.200 11,150.00 2,230.00
JUMLAH HARGA BAHAN 34,103.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 39,573.00


### E. Overhead & Profit 10% x D 3,957.30
F. Harga Satuan Pekerjaan (D+E) 43,530.30

A.4.7.1.5 1 m2 Pengecatan bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.070 55,000.00 3,850.00
Tukang cat L.02 OH 0.105 80,000.00 8,400.00
Kepala tukang L.03 OH 0.004 100,000.00 400.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 12,950.00
B BAHAN
Cat menie kg 0.200 48,300.00 9,660.00
Plamir kg 0.150 9,800.00 1,470.00
Cat dasar kg 0.170 32,500.00 5,525.00
Cat penutup kg 0.350 54,500.00 19,075.00
Kuas buah 0.010 12,100.00 121.00
Pengencer kg 0.030 30,900.00 927.00
Amplas Lbr 0.200 11,150.00 2,230.00
JUMLAH HARGA BAHAN 39,008.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 51,958.00


### E. Overhead & Profit 10% x D 5,195.80
F. Harga Satuan Pekerjaan (D+E) 57,153.80
A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.040 55,000.00 2,200.00
Tukang cat L.02 OH 0.063 80,000.00 5,040.00
Kepala tukang L.03 OH 0.063 100,000.00 6,300.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 13,840.00
B BAHAN
Teak oil L 0.360 60,300.00 21,708.00
JUMLAH HARGA BAHAN 21,708.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 35,548.00


### E. Overhead & Profit 10% x D 3,554.80
F. Harga Satuan Pekerjaan (D+E) 39,102.80

A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.040 55,000.00 2,200.00
Tukang cat L.02 OH 0.060 80,000.00 4,800.00
Kepala tukang L.03 OH 0.016 100,000.00 1,600.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 8,900.00
B BAHAN
Politur L 0.150 9,800.00 1,470.00
Politur jadi L 0.372 66,100.00 24,589.20
Amplas Lbr 2.000 11,150.00 22,300.00
JUMLAH HARGA BAHAN 48,359.20
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 57,259.20


### E. Overhead & Profit 10% x D 5,725.92
F. Harga Satuan Pekerjaan (D+E) 62,985.12

A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 55,000.00 5,500.00
Mandor L.04 OH 0.006 100,000.00 600.00
JUMLAH TENAGA KERJA 6,100.00
B BAHAN
Residu atau ter L 0.350 4,700.00 1,645.00
JUMLAH HARGA BAHAN 1,645.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 7,745.00


### E. Overhead & Profit 10% x D 774.50
F. Harga Satuan Pekerjaan (D+E) 8,519.50
A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.160 55,000.00 8,800.00
Tukang cat L.02 OH 0.160 80,000.00 12,800.00
Kepala tukang L.03 OH 0.016 100,000.00 1,600.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 23,500.00
B BAHAN
Vernis L 0.150 60,300.00 9,045.00
Dempul Kg 0.050 9,800.00 490.00
Ampelas Lbr 0.100 11,150.00 1,115.00
JUMLAH HARGA BAHAN 10,650.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 34,150.00


### E. Overhead & Profit 10% x D 3,415.00
F. Harga Satuan Pekerjaan (D+E) 37,565.00

A.4.7.1.10. Pengecatan 1 m2 tembok baru untuk interior ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.020 55,000.00 1,100.00
Tukang cat L.02 OH 0.063 80,000.00 5,040.00
Kepala tukang L.03 OH 0.0063 100,000.00 630.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 7,070.00
B BAHAN
Plamir Kg 0.100 9,800.00 980.00
Cat dasar Kg 0.100 34,600.00 3,460.00
Cat penutup kg 0.260 23,300.00 6,058.00
JUMLAH HARGA BAHAN 10,498.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 17,568.00


### E. Overhead & Profit 10% x D 1,756.80
F. Harga Satuan Pekerjaan (D+E) 19,324.80

A.4.7.1.11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.028 55,000.00 1,540.00
Tukang cat L.02 OH 0.042 80,000.00 3,360.00
Kepala tukang L.03 OH 0.0042 100,000.00 420.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 5,620.00
B BAHAN
Cat dasar Kg 0.120 34,600.00 4,152.00
Cat penutup Kg 0.180 23,300.00 4,194.00
JUMLAH HARGA BAHAN 8,346.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 13,966.00


### E. Overhead & Profit 10% x D 1,396.60
F. Harga Satuan Pekerjaan (D+E) 15,362.60
A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.020 55,000.00 1,100.00
Tukang cat L.02 OH 0.200 80,000.00 16,000.00
Kepala tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.0025 100,000.00 250.00
JUMLAH TENAGA KERJA 19,350.00
B BAHAN
Menie besi kg 0.100 34,500.00 3,450.00
Kuas buah 0.010 26,100.00 261.00
JUMLAH HARGA BAHAN 3,711.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 23,061.00


### E. Overhead & Profit 10% x D 2,306.10
F. Harga Satuan Pekerjaan (D+E) 25,367.10

A. 4.7.1.19 Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.060 55,000.00 3,300.00
Tukang cat L.02 OH 0.060 80,000.00 4,800.00
Kepala tukang L.03 OH 0.012 100,000.00 1,200.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 9,600.00
B BAHAN
Cat kg 0.300 78,600.00 23,580.00
Kuas buah 0.010 26,100.00 261.00
Pengencer L 0.010 30,900.00 309.00
JUMLAH HARGA BAHAN 24,150.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 33,750.00


### E. Overhead & Profit 10% x D 3,375.00
F. Harga Satuan Pekerjaan (D+E) 37,125.00

A.4.7.1.10.a Pengecatan 1 m2 tembok baru untuk exterior ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.020 55,000.00 1,100.00
Tukang cat L.02 OH 0.063 80,000.00 5,040.00
Kepala tukang L.03 OH 0.0063 100,000.00 630.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 7,070.00
B BAHAN
Plamir Kg 0.100 9,800.00 980.00
Cat dasar Kg 0.100 34,600.00 3,460.00
Cat penutup Kg 0.260 100,600.00 26,156.00
JUMLAH HARGA BAHAN 30,596.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 37,666.00


### E. Overhead & Profit 10% x D 3,766.60
F. Harga Satuan Pekerjaan (D+E) 41,432.60
A. 4.7.1.20 Pengecatan 1 m2 plafond (2 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.028 55,000.00 1,540.00
Tukang cat L.02 OH 0.042 80,000.00 3,360.00
Kepala tukang L.03 OH 0.0042 100,000.00 420.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 5,620.00
B BAHAN
Cat penutup Kg 0.180 23,300.00 4,194.00
JUMLAH HARGA BAHAN 4,194.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 9,814.00


### E. Overhead & Profit 10% x D 981.40
F. Harga Satuan Pekerjaan (D+E) 10,795.40
A.5.1.1. HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.1. Pemasangan 1 buah closet duduk


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 3.300 55,000.00 181,500.00
Tukang L.02 OH 1.100 80,000.00 88,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.160 100,000.00 16,000.00
JUMLAH TENAGA KERJA 286,500.00
B BAHAN
Closet duduk unit 1.000 1,250,000.00 1,250,000.00
Perlengkapan Ls 6% x closet 75,000.00
JUMLAH HARGA BAHAN 1,325,000.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,611,500.00


### E. Overhead & Profit 10% x D 161,150.00
F. Harga Satuan Pekerjaan (D+E) 1,772,650.00

A.5.1.1.2. Pemasangan 1 buah closet jongkok


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 55,000.00 55,000.00
Tukang L.02 OH 1.500 80,000.00 120,000.00
Kepala Tukang L.03 OH 0.150 100,000.00 15,000.00
Mandor L.04 OH 0.160 100,000.00 16,000.00
JUMLAH TENAGA KERJA 206,000.00
B BAHAN
Closet jongkok unit 1.000 325,000.00 325,000.00
Semen Portland kg 6.000 1,400.00 8,400.00
Pasir pasang m3 0.010 118,900.00 1,189.00
JUMLAH HARGA BAHAN 334,589.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 540,589.00


### E. Overhead & Profit 10% x D 54,058.90
F. Harga Satuan Pekerjaan (D+E) 594,647.90

A.5.1.1.4. Pemasangan 1 buah urinoir


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 55,000.00 55,000.00
Tukang L.02 OH 1.000 80,000.00 80,000.00
Kepala Tukang L.03 OH 0.100 100,000.00 10,000.00
Mandor L.04 OH 0.050 100,000.00 5,000.00
JUMLAH TENAGA KERJA 150,000.00
B BAHAN
Urinoir unit 1.000 2,135,500.00 2,135,500.00
Semen Portland kg 6.000 1,400.00 8,400.00
Pasir pasang m3 0.010 118,900.00 1,189.00
Perlengkapan % 30.00 640,650.00
JUMLAH HARGA BAHAN 2,785,739.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 2,935,739.00


### E. Overhead & Profit 10% x D 293,573.90
F. Harga Satuan Pekerjaan (D+E) 3,229,312.90
A.5.1.1.5. Pemasangan 1 buah wastafel
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.200 55,000.00 66,000.00
Tukang L.02 OH 1.450 80,000.00 116,000.00
Kepala Tukang L.03 OH 0.150 100,000.00 15,000.00
Mandor L.04 OH 0.060 100,000.00 6,000.00
JUMLAH TENAGA KERJA 203,000.00
B BAHAN
Wastafel unit 1.000 800,000.00 800,000.00
Semen Portland kg 6.000 1,400.00 8,400.00
Pasir pasang m3 0.010 118,900.00 1,189.00
Perlengkapan (siphon, kran, stop kran, flexible) % 12.00 96,000.00
JUMLAH HARGA BAHAN 905,589.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,108,589.00


### E. Overhead & Profit 10% x D 110,858.90
F. Harga Satuan Pekerjaan (D+E) 1,219,447.90

A.5.1.1.6. Pemasangan 1 buah bathcuip porselen


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.075 55,000.00 4,125.00
Tukang L.02 OH 0.750 80,000.00 60,000.00
Kepala Tukang L.03 OH 0.075 100,000.00 7,500.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 71,925.00
B BAHAN
Bathube unit 1.000 3,984,000.00 3,984,000.00
Perlengkapan % 20.00 796,800.00
JUMLAH HARGA BAHAN 4,780,800.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 4,852,725.00


### E. Overhead & Profit 10% x D 485,272.50
F. Harga Satuan Pekerjaan (D+E) 5,337,997.50

A.5.1.1.7. Pemasangan 1 buah bak fibreglass vol 1 m3


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 3.000 55,000.00 165,000.00
Tukang L.02 OH 4.500 80,000.00 360,000.00
Kepala Tukang L.03 OH 0.050 100,000.00 5,000.00
Mandor L.04 OH 0.900 100,000.00 90,000.00
JUMLAH TENAGA KERJA 620,000.00
B BAHAN
Bak fibreglass unit 1.000 400,000.00 400,000.00
Perlengkapan Ls 12% x bak 48,000.00
JUMLAH HARGA BAHAN 448,000.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,068,000.00


### E. Overhead & Profit 10% x D 106,800.00
F. Harga Satuan Pekerjaan (D+E) 1,174,800.00
A.5.1.1.12. Pemasangan 1 buah bak cuci piring stainlessteel
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.030 55,000.00 1,650.00
Tukang L.02 OH 0.300 80,000.00 24,000.00
Kepala Tukang L.03 OH 0.030 100,000.00 3,000.00
Mandor L.04 OH 0.015 100,000.00 1,500.00
JUMLAH TENAGA KERJA 30,150.00
B BAHAN
Bak cuci piring stainless Steel unit 1.000 1,426,000.00 1,426,000.00
Waterdrain buah 1.000 92,300.00 92,300.00
JUMLAH HARGA BAHAN 1,518,300.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 1,548,450.00


### E. Overhead & Profit 10% x D 154,845.00
F. Harga Satuan Pekerjaan (D+E) 1,703,295.00

A.5.1.1.14. Pemasangan 1 buah floor drain stainless steel


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 55,000.00 550.00
Tukang L.02 OH 0.100 80,000.00 8,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 10,050.00
B BAHAN
Floor drain unit 1.000 275,200.00 275,200.00
JUMLAH HARGA BAHAN 275,200.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 285,250.00


### E. Overhead & Profit 10% x D 28,525.00
F. Harga Satuan Pekerjaan (D+E) 313,775.00

A.5.1.1.18. Pemasangan 1 m' pipa galvanis diameter 1/2"


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 55,000.00 2,970.00
Tukang L.02 OH 0.090 80,000.00 7,200.00
Kepala Tukang L.03 OH 0.009 100,000.00 900.00
Mandor L.04 OH 0.027 100,000.00 2,700.00
JUMLAH TENAGA KERJA 13,770.00
B BAHAN
Pipa galvanis 1/2" m 1.200 30,466.67 36,560.00
Perlenglapan Ls 35% x pipa 10,663.33
JUMLAH HARGA BAHAN 47,223.33
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 60,993.33


### E. Overhead & Profit 10% x D 6,099.33
F. Harga Satuan Pekerjaan (D+E) 67,092.67
A.5.1.1.19. Pemasangan 1 buah kran diameter 1/2" atau 3/4"
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 55,000.00 550.00
Tukang L.02 OH 0.400 80,000.00 32,000.00
Kepala Tukang L.03 OH 0.040 100,000.00 4,000.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 37,050.00
B BAHAN
Kran air m 1.000 59,500.00 59,500.00
Sealtape Buah 0.025 4,200.00 105.00
JUMLAH HARGA BAHAN 59,605.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 96,655.00


### E. Overhead & Profit 10% x D 9,665.50
F. Harga Satuan Pekerjaan (D+E) 106,320.50

A.5.1.1.20. Pemasangan 1 m' pipa galvanis diameter 3/4"


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.054 55,000.00 2,970.00
Tukang L.02 OH 0.090 80,000.00 7,200.00
Kepala Tukang L.03 OH 0.009 100,000.00 900.00
Mandor L.04 OH 0.027 100,000.00 2,700.00
JUMLAH TENAGA KERJA 13,770.00
B BAHAN
Pipa galvanis 3/4" m 1.200 39,133.33 46,960.00
Perlengkapan Ls 35% x pipa 13,696.67
JUMLAH HARGA BAHAN 60,656.67
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 74,426.67


### E. Overhead & Profit 10% x D 7,442.67
F. Harga Satuan Pekerjaan (D+E) 81,869.33

A.5.1.1.24 Pemasangan 1 m' pipa galvanis diameter 4"


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.135 55,000.00 7,425.00
Tukang L.02 OH 0.225 80,000.00 18,000.00
Kepala Tukang L.03 OH 0.023 100,000.00 2,300.00
Mandor L.04 OH 0.007 100,000.00 700.00
JUMLAH TENAGA KERJA 28,425.00
B BAHAN
Pipa galvanis 4" m 1.200 41,690.83 50,029.00
Perlengkapan Ls 35% x pipa 14,591.79
JUMLAH HARGA BAHAN 64,620.79
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 93,045.79


### E. Overhead & Profit 10% x D 9,304.58
F. Harga Satuan Pekerjaan (D+E) 102,350.37
A.5.1.1.25. Pemasangan 1 m' pipa PVC tipe AW diameter 1/2"
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.036 55,000.00 1,980.00
Tukang L.02 OH 0.060 80,000.00 4,800.00
Kepala Tukang L.03 OH 0.006 100,000.00 600.00
Mandor L.04 OH 0.002 100,000.00 200.00
JUMLAH TENAGA KERJA 7,580.00
B BAHAN
Pipa PVC tipe AW 1/2" m 1.200 7,500.00 9,000.00
Perlengkapan Ls 35% x pipa 2,625.00
JUMLAH HARGA BAHAN 11,625.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 19,205.00


### E. Overhead & Profit 10% x D 1,920.50
F. Harga Satuan Pekerjaan (D+E) 21,125.50

A.5.1.1.26. Pemasangan 1 m' pipa PVC tipe AW diameter 3/4"


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.036 55,000.00 1,980.00
Tukang L.02 OH 0.060 80,000.00 4,800.00
Kepala Tukang L.03 OH 0.006 100,000.00 600.00
Mandor L.04 OH 0.002 100,000.00 200.00
JUMLAH TENAGA KERJA 7,580.00
B BAHAN
Pipa PVC tipe AW 3/4" m 1.200 9,000.00 10,800.00
Perlengkapan Ls 35% x pipa 3,150.00
JUMLAH HARGA BAHAN 13,950.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 21,530.00


### E. Overhead & Profit 10% x D 2,153.00
F. Harga Satuan Pekerjaan (D+E) 23,683.00

A.5.1.1.31. Pemasangan 1 m' pipa PVC tipe AW diameter 3"


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.081 55,000.00 4,455.00
Tukang L.02 OH 0.135 80,000.00 10,800.00
Kepala Tukang L.03 OH 0.0135 100,000.00 1,350.00
Mandor L.04 OH 0.004 100,000.00 400.00
JUMLAH TENAGA KERJA 17,005.00
B BAHAN
Pipa PVC 3" m 1.200 56,250.00 67,500.00
Perlengkapan Ls 35% x pipa 19,687.50
JUMLAH HARGA BAHAN 87,187.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 104,192.50


### E. Overhead & Profit 10% x D 10,419.25
F. Harga Satuan Pekerjaan (D+E) 114,611.75
A.5.1.1.32 Pemasangan 1 m' pipa PVC tipe AW diameter 4"
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.081 55,000.00 4,455.00
Tukang batu L.02 OH 0.135 80,000.00 10,800.00
Kepala Tukang L.03 OH 0.0135 100,000.00 1,350.00
Mandor L.04 OH 0.004 100,000.00 400.00
JUMLAH TENAGA KERJA 17,005.00
B BAHAN
Pipa PVC 4" m 1.200 68,250.00 81,900.00
Perlengkapan Ls 35% x pipa 23,887.50
JUMLAH HARGA BAHAN 105,787.50
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 122,792.50


### E. Overhead & Profit 10% x D 12,279.25
F. Harga Satuan Pekerjaan (D+E) 135,071.75

A.5.1.1.36. Pemasangan 1 m' pipa beton diameter 40 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.380 55,000.00 20,900.00
Tukang batu L.02 OH 0.190 80,000.00 15,200.00
Kepala Tukang L.03 OH 0.019 100,000.00 1,900.00
Mandor L.04 OH 0.019 100,000.00 1,900.00
JUMLAH TENAGA KERJA 39,900.00
B BAHAN
Buis beton dia. 40 buah 1.100 314,500.00 345,950.00
Batu bata m3 0.550 700.00 385.00
Semen Portland kg 10.300 1,400.00 14,420.00
Pasir pasang m3 0.061 118,900.00 7,252.90
Pasir urug m3 0.069 100,000.00 6,900.00
JUMLAH HARGA BAHAN 374,907.90
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 414,807.90


### E. Overhead & Profit 10% x D 41,480.79
F. Harga Satuan Pekerjaan (D+E) 456,288.69
A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL

A.8.4.6.1 Pemasangan 1 buah titik nyala lampu


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Tukang Listrik L.02 OH 0.1350 80,000.00 10,800.00
Kepala Tukang L.03 OH 0.0135 100,000.00 1,350.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 12,650.00
B BAHAN
Pipa listrik 5/8" btg 3.00 10,500.00 31,500.00
Kabel NYM 2 x 2,5 mm m 24.00 10,000.00 240,000.00
T Dus buah 3.00 4,200.00 12,600.00
Lakban listrik roll 1.00 11,300.00 11,300.00
Klem buah 1.00 8,600.00 8,600.00
Mangkok buah 1.00 5,200.00 5,200.00
Saklar buah 1.00 16,000.00 16,000.00
Fitting buah 1.00 9,000.00 9,000.00
JUMLAH HARGA BAHAN 334,200.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 346,850.00


### E. Overhead & Profit 10% x D 34,685.00
F. Harga Satuan Pekerjaan (D+E) 381,535.00

A.8.4.6.2 Pemasangan 1 buah MCB


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Tukang Listrik L.02 OH 0.1350 80,000.00 10,800.00
Kepala Tukang L.03 OH 0.0135 100,000.00 1,350.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 12,650.00
B BAHAN
Pipa listrik 5/8" btg 3.00 10,500.00 31,500.00
Kabel NYM 2 x 2,5 mm m 15.00 10,000.00 150,000.00
T Dus buah 1.00 4,200.00 4,200.00
L Bow buah 2.00 2,500.00 5,000.00
Klem buah 24.00 8,600.00 206,400.00
MCB buah 1.00 58,000.00 58,000.00
JUMLAH HARGA BAHAN 455,100.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 467,750.00


### E. Overhead & Profit 10% x D 46,775.00
F. Harga Satuan Pekerjaan (D+E) 514,525.00
HARGA SATUAN PEKERJAAN LAIN-LAIN (TAKSIRAN)

1. Pemasangan 1 m2 rangka atap baja ringan ex. TASO


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 55,000.00 11,000.00
Tukang L.02 OH 0.450 80,000.00 36,000.00
Kepala Tukang L.03 OH 0.010 100,000.00 1,000.00
Mandor L.04 OH 0.050 100,000.00 5,000.00
JUMLAH TENAGA KERJA 53,000.00
B BAHAN
Profil C 75.80/81 m 1.488 15,000.00 22,320.00
Profil C 75.75 m 2.232 13,250.00 29,574.00
Reng AZ 0,55mm x 6m m 5.400 6,250.00 33,750.00
Screw bh 38.000 255.00 9,690.00
Dynabolt bh 1.600 1,600.00 2,560.00
Valery Gutter Talang Jurai m 0.124 41,000.00 5,084.00
JUMLAH HARGA BAHAN 102,978.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 155,978.00


E. Overhead & Profit 10% x D 15,597.80
F. Harga Satuan Pekerjaan (D+E) 171,575.80

2. Pemasangan 1 titik nyala stop kontak


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Tukang L.02 OH 0.1350 80,000.00 10,800.00
Kepala Tukang L.03 OH 0.0135 100,000.00 1,350.00
Mandor L.04 OH 0.0050 100,000.00 500.00
JUMLAH TENAGA KERJA 12,650.00
B BAHAN
NYM 3 x 2,5 mm2 m 15.000 12,500.00 187,500.00
Perlengkapan ( 35% harga
% 0.350 65,625.00
conduit,klem,isolasi)
JUMLAH HARGA BAHAN 253,125.00
C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 265,775.00


E. Overhead & Profit 10% x D 26,577.50
F. Harga Satuan Pekerjaan (D+E) 292,352.50
3. 1 m2 labur aspal + labur pasir
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.006 55,000.00 330.00
Tukang L.02 OH -
Kepala Tukang L.03 OH -
Mandor L.04 OH 0.00042 100,000.00 42.00
JUMLAH TENAGA KERJA 372.00
B BAHAN
Aspal bitumen kg 1.208 9,215.35 11,132.14
Pasir pasang m3 0.018 118,900.00 2,140.20

JUMLAH HARGA BAHAN 13,272.34


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 13,644.34


E. Overhead & Profit 10% x D 1,364.43
F. Harga Satuan Pekerjaan (D+E) 15,008.78

4. Pemasangan 1 buah pintu KM/WC PVC


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 55,000.00 2,750.00
Tukang L.02 OH 0.500 80,000.00 40,000.00
Kepala Tukang L.03 OH 0.050 100,000.00 5,000.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH TENAGA KERJA 48,050.00
B BAHAN
Pintu KM/WC PVC bh 1.000 795,000.00 795,000.00
Sealent tube 0.432 69,130.00 29,864.16

JUMLAH HARGA BAHAN 824,864.16


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 872,914.16


E. Overhead & Profit 10% x D 87,291.42
F. Harga Satuan Pekerjaan (D+E) 960,205.58
5. Pemasangan 100 m2 karung goni basah untuk curing beton
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.800 55,000.00 44,000.00
Tukang L.02 OH 80,000.00 -
Kepala Tukang L.03 OH 100,000.00 -
Mandor L.04 OH 0.080 100,000.00 8,000.00
JUMLAH TENAGA KERJA 52,000.00
B BAHAN
Karung goni lbr 102.000 10,200.00 1,040,400.00
Air liter 5000.000 450.00 2,250,000.00

JUMLAH HARGA BAHAN 3,290,400.00


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 3,342,400.00


E. Overhead & Profit 10% x D 334,240.00
F. Harga Satuan Pekerjaan (D+E) 3,676,640.00
Per 10 m2 367,664.00

6. Menyirami 100 m2 karung goni dengan air selama 4 hari


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 2.000 55,000.00 110,000.00
Tukang L.02 OH 80,000.00 -
Kepala Tukang L.03 OH 100,000.00 -
Mandor L.04 OH 0.1000 100,000.00 10,000.00
JUMLAH TENAGA KERJA 120,000.00
B BAHAN
Air liter 20,000 450.00 9,000,000.00

JUMLAH HARGA BAHAN 9,000,000.00


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 9,120,000.00


E. Overhead & Profit 10% x D 912,000.00
F. Harga Satuan Pekerjaan (D+E) 10,032,000.00
. Per 10 m2 1,003,200.00
7. Pemasangan 1 m2 plastik untuk jalan cor beton
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.008 55,000.00 440.00
Tukang L.02 OH 80,000.00 -
Kepala Tukang L.03 OH 100,000.00 -
Mandor L.04 OH 0.0008 100,000.00 80.00
JUMLAH TENAGA KERJA 520.00
B BAHAN
Plastik m2 1.05 3,300.00 3,465.00

JUMLAH HARGA BAHAN 3,465.00


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 3,985.00


E. Overhead & Profit 10% x D 398.50
F. Harga Satuan Pekerjaan (D+E) 4,383.50

8. Pemasangan 1 m2 geotekstil untuk timbunan


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 55,000.00 5,500.00
Tukang Batu L.02 OH 0.020 80,000.00 1,600.00
Mandor L.04 OH 0.010 100,000.00 1,000.00
JUMLAH TENAGA KERJA 8,100.00
B BAHAN
Geotekstil m2 1.05 23,100.00 24,255.00

JUMLAH HARGA BAHAN 24,255.00


C. PERALATAN
-
JUMLAH HARGA ALAT -

D. Jumlah (A+B+C) 32,355.00


E. Overhead & Profit 10% x D 3,235.50
F. Harga Satuan Pekerjaan (D+E) 35,590.50
9. Pemasangan 1 m2 ACP + rangka besi siku mm, modul 100x100cm eksterior
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 55,000.00 90,750.00
Tukang Besi L.02 OH 0.275 80,000.00 22,000.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 100,000.00 8,300.00
JUMLAH TENAGA KERJA 123,850.00
B BAHAN
Rangka besi siku 40.40.4mm m' 11.200 12,362.50 138,460.00
Alimunium Composite m2 1.118 265,900.00 297,329.38
sealent m' 2.000 13,826.00 27,652.00
Assesoris (perkuatan, las dll) cm 56.000 2,503.67 140,205.76
JUMLAH HARGA BAHAN 603,647.14
C. PERALATAN
Peralatan 10% 603,647.14 60,364.71
JUMLAH HARGA ALAT 60,364.71

D. Jumlah (A+B+C) 787,861.85


E. Overhead & Profit 10% x D 78,786.19
F. Harga Satuan Pekerjaan (D+E) 866,648.04

10. Pemasangan Pintu Type P-1, P-2, P-3, P-4, P-5 dan Accessories sebanyak 1 unit
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 2.0000 55,000.00 110,000.00
Tukang Aluminium L.02 OH 4.0000 80,000.00 320,000.00
Kepala Tukang L.03 OH 0.4000 100,000.00 40,000.00
Mandor L.04 OH 0.1333 100,000.00 13,330.00
JUMLAH TENAGA KERJA 483,330.00
B BAHAN
Profil daun pintu aluminium m2 2.3000 56,800.00 130,640.00
Profil kusen aluminium btg 2.3000 48,900.00 112,470.00
Lockcase + Cylinder Lock SES + Lever
handle set 2.0000 299,000.00 598,000.00

Engsel pintu 4x3 psg 3.0000 73,400.00 220,200.00


Plywood 6 mm lbr 2.0000 100,000.00 200,000.00
Kayu Klas II m2 0.0700 4,000,000.00 280,000.00
Kaca polos 5 mm m2 1.8525 200,000.00 370,500.00
Sealant tube 0.7000 69,130.00 48,391.00
JUMLAH HARGA BAHAN 1,960,201.00
C. PERALATAN
Peralatan 5% 1,960,201.00 98,010.05
JUMLAH HARGA ALAT 98,010.05

D. Jumlah (A+B+C) 2,541,541.05


E. Overhead & Profit -
F. Harga Satuan Pekerjaan (D+E) 2,541,541.05
11. Pemasangan Pintu Type PJ-1 dan Accessories
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 2.0000 55,000.00 110,000.00
Tukang Aluminium L.02 OH 4.0000 80,000.00 320,000.00
Kepala Tukang L.03 OH 0.4000 100,000.00 40,000.00
Mandor L.04 OH 0.1333 100,000.00 13,330.00
JUMLAH TENAGA KERJA 483,330.00
B BAHAN
Profil daun pintu aluminium m2 3.1500 56,800.00 178,920.00
Profil daun jendela aluminium m2 3.8300 56,800.00 217,544.00
Profil kusen aluminium btg 4.0000 48,900.00 195,600.00
Kaca Polos 5 mm bh 2.0000 200,000.00 400,000.00
Engsel 4x3 psg 6.0000 73,400.00 440,400.00
Full Handle 50 cm psg 2.0000 471,800.00 943,600.00
Lockcase + Cylinder Lock SES + Lever
handle set 2.0000 299,000.00 598,000.00

Grandel slot tanam bh 1.0000 194,000.00 194,000.00


Casement 12" bh 10.0000 10,000.00 100,000.00
Rambucis Dekson bh 1.0000 75,000.00 75,000.00
Sealant tube 1.0000 69,130.00 69,130.00
JUMLAH HARGA BAHAN 3,412,194.00
C. PERALATAN
Peralatan 5% 3,412,194.00 170,609.70
JUMLAH HARGA ALAT 170,609.70

D. Jumlah (A+B+C) 4,066,133.70


E. Overhead & Profit -
F. Harga Satuan Pekerjaan (D+E) 4,066,133.70

12. Pemasangan Jendela Aluminium Warna + Accessories


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 3.0000 55,000.00 165,000.00
Tukang Aluminium L.02 OH 3.0000 80,000.00 240,000.00
Kepala Tukang L.03 OH 0.3000 100,000.00 30,000.00
Mandor L.04 OH 0.1000 100,000.00 10,000.00
JUMLAH TENAGA KERJA 445,000.00
B BAHAN
Profil daun jendela aluminium m2 0.9120 200,000.00 182,400.00
Profil kusen aluminium btg 1.8231 73,400.00 133,815.54
Sponeng Coating white btg 1.8231 75,000.00 136,732.50
Rambucis bh 2.0000 299,000.00 598,000.00
Engsel 3" psg 2.0000 47,200.00 94,400.00
Kaca Polos 5 mm bh 6.4400 200,000.00 1,288,000.00
Karet rol 0.5067 34,565.00 17,514.09
Sealant tube 1.0000 69,130.00 69,130.00
JUMLAH HARGA BAHAN 2,519,992.13
C. PERALATAN
Peralatan 5% 2,519,992.13 125,999.61
JUMLAH HARGA ALAT 125,999.61

D. Jumlah (A+B+C) 3,090,991.73


E. Overhead & Profit -
F. Harga Satuan Pekerjaan (D+E) 3,090,991.73

Anda mungkin juga menyukai