HARGA
DIVISI URAIAN PEKERJAAN
(Rp.)
I UMUM 18,755,007.65
TERBILANG : Lima Ratus Empat Juta Dua Ratus Enam Puluh Satu Ribu Rupiah
Perkiraan
Nomor Uraian Pekerjaan Sat. Kuantitas
a b c d
I UMUM
II PEKERJAAN TANAH
a b c d
I UMUM
II PEKERJAAN TANAH
a b c d
I UMUM
II PEKERJAAN TANAH
a b c d
I UMUM
II PEKERJAAN TANAH
a b c d
I UMUM
II PEKERJAAN TANAH
170,000.00
1,143,580,000.00
Harga Harga
Satuan Pekerjaan
(Rp.) (Rp.)
e f = (d x e)
Rp 18,755,007.65 Rp 18,755,007.65
Rp - Rp -
Rp 277,803.83 Rp 61,350,197.27
Rp - Rp -
Rp 18,755,007.65 Rp 18,755,007.65
Rp - Rp -
Rp 277,803.83 Rp 61,350,197.27
Rp - Rp -
Rp 1,679,108.24 Rp 370,814,262.63
Rp 2,500,000.00 Rp 2,500,000.00
Rp 5,000,000.00 Rp 5,000,000.00
Rp -
Jumlah Harga Pekerjaan Bab IV Rp 7,500,000.00
Harga Harga
Satuan Pekerjaan
(Rp.) (Rp.)
e f = (d x e)
Rp 18,755,007.65 Rp 18,755,007.65
Rp - Rp -
Rp 277,803.83 Rp 61,350,197.27
Rp - Rp -
Rp 1,679,108.24 Rp 370,814,262.63
Rp 2,500,000.00 Rp 2,500,000.00
Rp 5,000,000.00 Rp 5,000,000.00
Rp -
Jumlah Harga Pekerjaan Bab IV Rp 7,500,000.00
Harga Harga
Satuan Pekerjaan
(Rp.) (Rp.)
e f = (d x e)
Rp 18,755,007.65 Rp 18,755,007.65
Rp - Rp -
Rp 277,803.83 Rp 61,350,197.27
Rp - Rp -
Rp 1,679,108.24 Rp 370,814,262.63
Rp 2,500,000.00 Rp 2,500,000.00
Rp 5,000,000.00 Rp 5,000,000.00
Rp -
Jumlah Harga Pekerjaan Bab IV Rp 7,500,000.00
Harga Harga
Satuan Pekerjaan
(Rp.) (Rp.)
e f = (d x e)
Rp 18,755,007.65 Rp 18,755,007.65
Rp - Rp -
Rp 277,803.83 Rp 61,350,197.27
Rp - Rp -
Rp 1,679,108.24 Rp 370,814,262.63
Rp 2,500,000.00 Rp 2,500,000.00
Rp 5,000,000.00 Rp 5,000,000.00
Rp -
Jumlah Harga Pekerjaan Bab IV Rp 7,500,000.00
TIME SCHEDULE
KEGIATAN : PEMBANGUNAN JALAN
PEKERJAAN : PEMBANGUNAN JALAN LINGKUNGAN JALAN MASUK SMPN 7
LOKASI : 0
PROPINSI : PAPUA
TH. ANGGARAN 2015
100%
90%
UMUM Rp 18,755,007.65 4.09% 1.295% 1.295%
I
80%
70%
PEKERJAAN TANAH Rp 61,350,197.27 13.38% 2.667% 8.002% 8.002% 5.335% 2.667% 60%
II
50%
40%
III PEKERJAAN PERKERASAN JALAN BETON Rp 370,814,262.63 80.89% 30%
20%
10%
IV PEKERJAAN AKHIR Rp 7,500,000.00 1.64% 0.678% 1.357% 2.035% 2.713%
0%
Rp 458,419,467.56 -10%
Tiap Minggu 0.00 1.30% 1.30% 0.00% 3.35% 9.36% 10.04% 8.05% 2.67% 0.00% 0.00% 0.00% 0.00% 0.00%
R E N CANA
Kumulatif 0% 1.30% 2.59% 2.59% 5.94% 15.30% 25.33% 33.38% 36.05% 36.05% 36.05% 36.05% 36.05% 36.05%
Tiap Minggu
R EAL I SAS I
Kumulatif
D E V IAS I
ATINUS ALOM
Direktur
2 2
2.59% 1.295% 1.295%
1 1 1
3.26% 1.085% 1.085% 1.085%
1 3 3 2 1
26.67% 2.667% 8.002% 8.002% 5.335% 2.667%
1 2
5.42% 1.806% 3.612%
1 2 3 4
6.78% 0.678% 1.357% 2.035% 2.713%
1 2 3 4 3 2 1
54.57% 3.410% 6.821% 10.231% 13.642% 10.231% 6.821% 3.410%
1 2
0.71% 0.237% 0.475%
100.00%
0.00
1.295% 4.187% 4.697% 4.431% 9.359% 13.447% 14.869% 12.899% 13.642% 10.231% 6.821% 3.648% 0.475%
0.00 1.295% 5.482% 10.180% 14.611% 23.970% 37.417% 52.286% 65.184% 78.826% 89.057% 95.878% 99.525% 100.000%
PERUSAHAAN CV. Angin ribut
TAHUN 2015
TANGGAL Kota, 2 mei 2015
DIREKTUR DEDI
JABATAN Direktur
ALAMAT Jl. Kemenangan
Kepada Yth :
Panitia Pengadaan Barang / Jasa
Bidang Tata Ruang dan Perumahan Dinas Pekerjaan Umum
Suka Hati
Di,-
Suka Hati
DEDI
Direktur
PEMBANGUNAN JALAN LINGKUNGAN JALAN MASUK
SMPN 7
DAFTAR KWANTITAS DAN HARGA
0
0
Jumlah Biaya
No Uraian / Item Pekerjaan Keterangan
(Rp)
I PEKERJAAN PERSIAPAN 9,000,000.00
JUMLAH 270,517,654.84
PAJAK PERTAMBAHAN NILAI (PPN) = 10 % 27,051,765.48
JUMLAH TOTAL 297,569,420.32
DIBULATKAN 297,570,000.00
Terbilang :
Dua Ratus Sembilan Puluh Tujuh Juta Lima Ratus Tujuh Puluh Ribu Rupiah
DEDI
Direktur
DAFTAR KWANTITAS DAN HARGA
I PEKERJAAN PERSIAPAN
1 Pengukuran Km 1.00 2,000,000.00 2,000,000.00
2 Direksikeet / Gudang Kerja Ls Ls 3,500,000.00 3,500,000.00
3 Dokumentasi dan Pelaporan Ls Ls 3,000,000.00 3,000,000.00
4 Papan Nama Kegiatan Buah 1.00 500,000.00 500,000.00
Sub Total
II PEKERJAAN TANAH
1 Galian Tanah untuk Konstruksi K.224 M3 9.88 42,800.00 422,864.00
2 Penimbunan Badan Jalan K.310.a M3 27.33 59,051.63 1,613,880.91
Sub Total
III PEKERJAAN PERKERASAN
1 Perkerasan Beton K.175 K.724.a M3 135.66 1,254,571.46 170,195,164.22
2 Plastik M2 953.04 12,000.00 11,436,480.00
3 Tulangan K.715 Kg 805.80 29,347.99 23,648,608.69
4 Begisting K.710 M2 91.59 137,512.35 12,594,756.14
5 Joint Sealer M' 627.00 18,000.00 11,286,000.00
6 Curing Compound SUPL.IX M2 798.00 5,266.67 4,202,800.00
7 Aditif Beton Liter 244.19 25,000.00 6,104,750.00
Sub Total
VI PEKERJAAN STRUKTUR
1 Pasangan Batu K.810.A M3 21.78 751,209.60 16,361,345.09
3 Plesteran G.50.q M2 72.66 50,247.81 3,651,005.79
Sub Total
JUMLAH
PAJAK PERTAMBAHAN NILAI (PPN) = 10 % x (A)
JUMLAH TOTAL
DIBULATKAN
7
TOTAL HARGA
( Rp. )
9,000,000.00
2,036,744.91
239,468,559.05
20,012,350.88
270,517,654.84
27,051,765.48
297,569,420.32
297,570,000.00
ANALISA HARGA SATUAN
PRODUKSI BATU PECAH TERSARING MEMPERGUNAKAN BATU SUNGAI
(MENGGUNAKAN ALAT)
80,000.00 80,000.00
82,000.00 246,000.00
65,000.00 130,000.00
82,000.00 328,000.00
50,000.00 200,000.00
60,000.00 240,000.00
JUMLAH 1,224,000.00
HARGA SATUAN BIAYA SUB TOTAL
(Rp) (Rp) (Rp)
227,467.09 18,197,366.86
110,000.00 22,000.00
JUMLAH 18,219,367.00
HARGA BIAYA SUB TOTAL
(Rp/Jam) (Rp) (Rp)
352,945.00 705,890.00
817,684.00 3,270,736.00
247,930.00 1,487,580.00
152,754.00 3,666,096.00
JUMLAH 9,130,302.00
T O T A L (Rp) 28,573,669.00
476,227.82 per M3
ANALISA HARGA SATUAN
MEMBUAT PARIT GALIAN TANAH
(MENGGUNAKAN BURUH)
Truk bak terbuka 3,5 ton 2.00 1.00 E 221 10.00 130,362.00
K 110
80,000.00
164,000.00
1,800,000.00
JUMLAH 2,044,000.00
BIAYA SUB TOTAL
(Rp) (Rp)
165,000.00
JUMLAH 165,000.00
BIAYA SUB TOTAL
(Rp) (Rp)
1,303,620.00
JUMLAH 1,303,620.00
T O T A L (Rp) 3,512,620.00
per M3
ANALISA HARGA SATUAN
GALIAN TANAH UNTUK KONSTRUKSI
(MENGGUNAKAN BURUH)
E
R
J
A
P
E
R
A
L
A
T
A
N
anusia (40m3/hari)
50,000.00 1,500,000.00
80,000.00 80,000.00
JUMLAH 1,580,000.00
HARGA SATUAN BIAYA SUB TOTAL
(Rp) (Rp) (Rp)
110,000.00 132,000.00
JUMLAH 132,000.00
HARGA BIAYA SUB TOTAL
(Rp/Jam) (Rp) (Rp)
JUMLAH -
T O T A L (Rp) 1,712,000.00
42,800.00 per M 3
ANALISA HARGA SATUAN
PENIMBUNAN BADAN JALAN
(MENGGUNAKAN BURUH)
M
A Alat bantu Set M 170 2.40
T
E
R
I
A
L
JUMLAH BIAYA UNTUK MATERIAL
JUMLAH HARI
PERALATAN KODE JAM KERJA
ALAT KERJA
R
A
L
A
T
A
N
nusia ( 60 M3/hari )
murah untuk timbunan dikirim kelokasi pekerjaan
50,000.00 3,000,000.00
80,000.00 160,000.00
82,000.00 82,000.00
JUMLAH 3,242,000.00
HARGA SATUAN BIAYA SUB TOTAL
(Rp) (Rp) (Rp)
110,000.00 264,000.00
JUMLAH 264,000.00
HARGA BIAYA SUB TOTAL
(Rp/Jam) (Rp) (Rp)
14,839.00 37,097.50
JUMLAH 37,097.50
T O T A L (Rp) 3,543,097.50
59,051.63 per M3
ANALISA HARGA SATUAN
PENYIAPAN TANAH DASAR
(MENGGUNAKAN BURUH)
E
R
J
A
K - 341.A
1 bulan/orang/set @ 3 alat
50,000.00 4,000,000.00
80,000.00 80,000.00
JUMLAH 4,080,000.00
HARGA SATUAN BIAYA SUB TOTAL
(Rp) (Rp) (Rp)
110,000.00 352,000.00
JUMLAH 352,000.00
HARGA BIAYA SUB TOTAL
(Rp/Jam) (Rp) (Rp)
176,752.00 883,760.00
JUMLAH 883,760.00
T O T A L (Rp) 5,315,760.00
P
E
R
A
L
A
T
A
N
dibuang sejauh 1 km
50,000.00 1,250,000.00
80,000.00 80,000.00
JUMLAH 1,330,000.00
HARGA SATUAN BIAYA SUB TOTAL
(Rp) (Rp) (Rp)
110,000.00 110,000.00
JUMLAH 110,000.00
HARGA BIAYA SUB TOTAL
(Rp/Jam) (Rp) (Rp)
JUMLAH -
T O T A L (Rp) 1,440,000.00
960.00 per M2
ANALISA HARGA SATUAN
LAPIS PONDASI BAWAH (LPB) KLAS B KERIKIL TERSARING
(MENGGUNAKAN ALAT)
berat (150m3/hari)
sepanjang jalan oleh pemasok
n/sungai tersaring/bergradasi yang termurah
datkan sampai tebal padat 15 cm
datkan 1000 m2/hari
50,000.00 200,000.00
80,000.00 80,000.00
82,000.00 164,000.00
55,000.00 -
82,000.00 82,000.00
JUMLAH 526,000.00
HARGA SATUAN BIAYA SUB TOTAL
(Rp) (Rp) (Rp)
476,227.82 59,528,477.08
110,000.00 22,000.00
77,984.00 5,068,960.00
JUMLAH 64,619,437.00
HARGA BIAYA SUB TOTAL
(Rp/Jam) (Rp) (Rp)
441,671.00 2,208,355.00
176,752.00 883,760.00
271,083.00 1,355,415.00
JUMLAH 4,447,530.00
T O T A L (Rp) 69,592,967.00
463,953.11 per M3
ANALISA HARGA SATUAN
LAPIS PONDASI BAWAH (LPB) KLAS C SIRTU
(MENGGUNAKAN ALAT)
erat (150m3/hari)
sepanjang jalan oleh pemasok
n/sungai tidak disaring yang termurah
kuran lebih dipisah pada saat penghamparan dengan grader
ah dipadatkan sampai tebal 15 cm
adatkan 1000 m2/hari
50,000.00 300,000.00
80,000.00 80,000.00
82,000.00 164,000.00
55,000.00 -
82,000.00 82,000.00
JUMLAH 626,000.00
HARGA SATUAN BIAYA SUB TOTAL
(Rp) (Rp) (Rp)
564,920.88 90,387,341.00
110,000.00 22,000.00
JUMLAH 90,409,341.00
HARGA BIAYA SUB TOTAL
(Rp/Jam) (Rp) (Rp)
441,671.00 2,208,355.00
176,752.00 883,760.00
271,083.00 1,355,415.00
JUMLAH 4,447,530.00
T O T A L (Rp) 95,482,871.00
795,690.59 per M3
ANALISA HARGA SATUAN
LAPIS PONDASI ATAS (LPA) KLAS A AGREGAT PECAH TERSARING
(MENGGUNAKAN ALAT)
berat (150m3/hari)
sepanjang jalan oleh pemasok
/Kerikil sungai pecah tersaring yang termurah
datkan Sampai tebal padat 10 Cm
datkan 1000 m2/hari
pondasi atas klas A semua harus melalui saringan
.Spek.Umum B.M.Maret 1989-buku 3
50,000.00 200,000.00
80,000.00 80,000.00
82,000.00 164,000.00
55,000.00 -
82,000.00 82,000.00
JUMLAH 526,000.00
HARGA SATUAN BIAYA SUB TOTAL
(Rp) (Rp) (Rp)
476,227.82 71,434,172.50
77,984.00 1,169,760.00
110,000.00 22,000.00
JUMLAH 72,625,933.00
HARGA BIAYA SUB TOTAL
(Rp/Jam) (Rp) (Rp)
441,671.00 2,208,355.00
176,752.00 883,760.00
271,083.00 1,355,415.00
JUMLAH 4,447,530.00
T O T A L (Rp) 77,599,463.00
646,662.19 per M3
ANALISA HARGA SATUAN
MENGHAMPAR LAPIS PERMUKAAN ASPAL BETON 5 Cm (LASTON)
(MENGGUNAKAN ALAT)
50,000.00 600,000.00
80,000.00 80,000.00
82,000.00 328,000.00
55,000.00 -
70,000.00 560,000.00
JUMLAH 1,568,000.00
HARGA SATUAN BIAYA SUB TOTAL
(Rp) (Rp) (Rp)
221,967.09 -
17,161.77 6,178,236.15
16,661.77 4,998,530.13
110,000.00 88,000.00
JUMLAH
HARGA BIAYA SUB TOTAL
(Rp/Jam) (Rp) (Rp)
176,752.00 883,760.00
192,677.00 963,385.00
258,860.00 1,294,300.00
36,016.00 108,048.00
155,469.00 777,345.00
87,441.00 349,764.00
JUMLAH 4,376,602.00
T O T A L (Rp)
per M2
ANALISA HARGA SATUAN
PERANCAH (BEGISTING) UNTUK BETON BERTULANG
(MENGGUNAKAN BURUH)
K 710
80,000.00
340,000.00
350,000.00
180,000.00
JUMLAH 950,000.00
BIAYA SUB TOTAL
(Rp) (Rp)
88,647.07
1,650,000.00
61,600.00
JUMLAH 1,800,247.00
BIAYA SUB TOTAL
(Rp) (Rp)
JUMLAH -
T O T A L (Rp) 2,750,247.00
per M2
ANALISA HARGA SATUAN
PENULANGAN BETON (MEMOTONG, MEMBENGKOK DAN MEMASANG BESI TULANGAN
(MENGGUNAKAN BURUH)
80,000.00
85,000.00
150,000.00
60,000.00
JUMLAH 375,000.00
BIAYA SUB TOTAL
(Rp) (Rp)
5,481,397.59
13,200.00
JUMLAH 5,494,597.59
BIAYA SUB TOTAL
(Rp) (Rp)
JUMLAH -
T O T A L (Rp) 5,869,597.59
per Kg
ANALISA HARGA SATUAN
BETON STRUKTUR KLAS K.175
(MENGGUNAKAN ALAT PENGADUK BETON 250 LITER)
K - 724.A
ng sudah dipasang
asi palt, dinding Dll
6,250,000.00
400,000.00
1,050,000.00
JUMLAH 7,700,000.00
BIAYA SUB TOTAL
(Rp) (Rp)
5,784,462.25
26,898,912.00
550,000.00
17,425,175.81
JUMLAH 50,658,550.07
BIAYA SUB TOTAL
(Rp) (Rp)
784,200.00
957,120.00
119,560.00
JUMLAH 1,860,880.00
T O T A L (Rp) 60,219,430.07
per M3
ANALISA HARGA SATUAN
KONSTRUKSI PASANGAN BATU
(MENGGUNAKAN BURUH)
K - 810.A
80,000.00
320,000.00
600,000.00
JUMLAH 1,000,000.00
BIAYA SUB TOTAL
(Rp) (Rp)
1,082,335.43
266,360.50
1,306,440.00
77,000.00
JUMLAH 2,732,136.00
BIAYA SUB TOTAL
(Rp) (Rp)
23,912.00
JUMLAH 23,912.00
T O T A L (Rp) 3,756,048.00
per m3
ANALISA HARGA SATUAN
MENGURUG PASIR DIBAWAH LANTAI PONDASI
(MENGGUNAKAN BURUH)
M
A Pasir urug M3 M 040 120.00
T
E
R
I
A
L
JUMLAH BIAYA UNTUK MATERIAL
PERALATAN JUMLAH HARI KODE JAM KERJA
ALAT KERJA
P
E
R
A
L
A
T
A
N
100 m3/hari
tempat pekerjaan oleh leveransir
50,000.00 1,500,000.00
80,000.00 80,000.00
77,984.00 9,358,080.00
MATERIAL (I+II) 9,358,080.00
HARGA BIAYA SUB TOTAL
(Rp/Jam) (Rp) (Rp)
109,380.80 per M3
ANALISA HARGA SATUAN
PEKERJAAN PLESTERAN ADK 1 : 3 + ACIAN
(MENGGUNAKAN BURUH)
KODE KOTA
PROPINSI LAMPUNG
[18] BANDAR LAMP
M
A Semen Zak
T Pasir pasang M3
E
R
I
A
L
JUMLAH BIAYA UNTUK MATERIAL
PERALATAN JUMLAH HARI
ALAT KERJA
P
E
R
A
L
A
T
A
N
TOTAL
p)
TOTAL
p)
ANALISA HARGA SATUAN
PASANG PAVING BLOK (INTER BLOK)
(MENGGUNAKAN BURUH)
P
E
R
A
L
A
T
A
N
P
E
R
A
L
A
T
A
N
P
E
R
A
L
A
T
A
N
Analisa M.54
50,000.00 6,000,000.00
80,000.00 2,400,000.00
85,000.00 255,000.00
80,000.00 960,000.00
3,300.00 40,095,000.00
77,984.00 2,339,520.00
MATERIAL (I+II) 42,434,520.00
HARGA BIAYA SUB TOTAL
(Rp/Jam) (Rp) (Rp)
173,498.40 per M2
KODE
5
Analisa M.62
eton K-175
50,000.00 700,000.00
80,000.00 80,000.00
85,000.00 85,000.00
80,000.00 480,000.00
1,156,789.31 1,156,789.31
46,739.98 46,739.98
137,512.35 825,074.10
MATERIAL (I+II) 2,028,603.39
HARGA BIAYA SUB TOTAL
(Rp/Jam) (Rp) (Rp)
50,000.00 700,000.00
80,000.00 80,000.00
85,000.00 85,000.00
80,000.00 480,000.00
1,326,975.12 26,539.50
137,512.35 16,501.48
MATERIAL (I+II) 43,040.98
HARGA BIAYA SUB TOTAL
(Rp/Jam) (Rp) (Rp)
P
E Buruh tak terampil 1 1 L 101 1.00
K Mandor 1 1 L 061 1.00
E
R
J
A
SUPL.IX
50,000.00 50,000.00
80,000.00 80,000.00
15,000.00 900,000.00
MATERIAL (I+II) 900,000.00
HARGA BIAYA SUB TOTAL
(Rp/Jam) (Rp) (Rp)
110,000.00 550,000.00
Jumlah 50,247.81
DAFTAR UPAH TENAGA KERJA DAN HARGA SATUAN MATE
UPAH
NO. TENAGA KERJA KODE TENAGA KERJA NO. TENAGA KERJA
(Rp./Hari)
1 Buruh tak terampil L 101 50,000.00 8 Supir terampil
2 Mandor Lapangan L 061 80,000.00 9 Pembantu Supir
3 Mekanik terampil L 071 75,000.00 10 Kepala Tukang
4 Mekanik Semi terampil L 072 60,000.00 11 Tukang
5 Operator terampil L 081 82,000.00 12 Buruh terampil
6 Operator semi terampil L 082 65,000.00 13 Buruh Semi terampil
7 Pembantu Operator L 083 55,000.00 14
61 Joint Siler M
UPAH
TENAGA KERJA KODE TENAGA KERJA
(Rp./Hari)
L 091 82,000.00
L 099 55,000.00
L 073 85,000.00
L 079 80,000.00
L 106 70,000.00
Buruh Semi terampil L 103 60,000.00
DEDI
Direktur
PERHITUNGAN BIAYA ONGKOS ANGKUT MATERI
I. JARAK ANGKUT 30 KM
1 -. Jarak Angkut Rata-rata dari Quarry kelokai pekerjaan = 30.00 km
2 -. Kapasitas Truck = 3.50 m3
= 3.50 Ton
3 -. Kecepatan Rata-rata = 25.00 km/jam
4 -. Biaya Sewa Dump truck 5 ton= Rp. 763,770.00 / 5 jam = Rp.
5 -. Supir terampil = Rp. 82,000.00 / 5 jam = Rp.
6 -. Pembantu Supir = Rp. 55,000.00 / 5 jam = Rp.
= Rp.
= Rp.
= Rp.
= Rp.
AN BIAYA ONGKOS ANGKUT MATERIAL
152,754.00 / Jam
16,400.00 / Jam
11,000.00 / Jam
180,154.00 / Jam
51,472.57 x 30.00
25.00
61,767.09 / M3
51.47 x 30.00
25.00
61.77 / Kg
150,000.00 / Jam
16,400.00 / Jam
11,000.00 / Jam
177,400.00 / Jam
177,400.00 x 5.00
10.00
88,700.00 / M3
177.40 x 5.00
10.00
88.70 / Kg
UMUR KERJA
HP Harga Alat
(Rp) Tahun Hari Jam
No JENIS ALAT Kode
1 2 4 3 6 7 8 9
27
Alat baru
Alat baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
Alat Baru
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN
SUB. DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN
DAN KABUPATEN
1.
Depresiasi = 90% x Harga Alat x CRF
90% x 299,403,300.00 x 0.30071
2.
Lain-Lain :
Asuransi 3 % + PPn 10 % = 3.30% x Harga Alat / (Jam/Tahun)
3.30% x 299,403,300.00 / 1,300
Sub Total - A
Sub Total - B
A+ B = 69,930.00 + 114,557.00
Atau = 184,487.00 x 5
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN
SUB. DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN
DAN KABUPATEN
1.
Depresiasi = 90% x Harga Alat x CRF
90% x 9,548,700.00 x 0.38629
2.
Lain-Lain :
Asuransi 3 % + PPn 10 % = 3.30% x Harga Alat / (Jam/Tahun)
3.30% x 9,548,700.00 / 750
Sub Total - A
Sub Total - B
A+ B = 4,846.00 + 7,110.00
Atau = 11,956.00 x 5
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN
SUB. DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN
DAN KABUPATEN
1.
Depresiasi = 90% x Harga Alat x CRF
90% x 11,782,050.00 x 0.33438
2.
Lain-Lain :
Asuransi 3 % + PPn 10 % = 3.30% x Harga Alat / (Jam/Tahun)
3.30% x 11,782,050.00 / 600
Sub Total - A
Sub Total - B
A+ B = 6,558.00 + 6,512.00
Atau = 13,070.00 x 5
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN
SUB. DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN
DAN KABUPATEN
1.
Depresiasi = 90% x Harga Alat x CRF
90% x 71,623,650.00 x 0.33438
2.
Lain-Lain :
Asuransi 3 % + PPn 10 % = 3.30% x Harga Alat / (Jam/Tahun)
3.30% x 71,623,650.00 / 1,500
Sub Total - A
Sub Total - B
A+ B = 15,946.00 + 15,958.00
Atau = 31,904.00 x 5
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN
SUB. DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN
DAN KABUPATEN
1.
Depresiasi = 90% x Harga Alat x CRF
90% x 295,770,300.00 x 0.30071
2.
Lain-Lain :
Asuransi 3 % + PPn 10 % = 3.30% x Harga Alat / (Jam/Tahun)
3.30% x 295,770,300.00 / 700
Sub Total - A
Sub Total - B
A+ B = 128,294.00 + 142,789.00
Atau = 271,083.00 x 5
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN
SUB. DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN
DAN KABUPATEN
1.
Depresiasi = 90% x Harga Alat x CRF
90% x 1,001,345,100.00 x 0.26061
2.
Lain-Lain :
Asuransi 3 % + PPn 10 % = 3.30% x Harga Alat / (Jam/Tahun)
3.30% x 1,001,345,100.00 / 1,500
Sub Total - A
Sub Total - B
A+ B = 178,606.00 + 174,339.00
Atau = 352,945.00 x 5
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN
SUB. DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN
DAN KABUPATEN
1.
Depresiasi = 90% x Harga Alat x CRF
90% x 550,762,050.00 x 0.23852
2.
Lain-Lain :
Asuransi 3 % + PPn 10 % = 3.30% x Harga Alat / (Jam/Tahun)
3.30% x 550,762,050.00 / 1,500
Sub Total - A
Sub Total - B
A+ B = 90,939.00 + 85,813.00
Atau = 176,752.00 x 5
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN
SUB. DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN
DAN KABUPATEN
1.
Depresiasi = 90% x Harga Alat x CRF
90% x 236,609,100.00 x 0.30071
2.
Lain-Lain :
Asuransi 3 % + PPn 10 % = 3.30% x Harga Alat / (Jam/Tahun)
3.30% x 236,609,100.00 / 1,300
Sub Total - A
Sub Total - B
A+ B = 55,263.00 + 75,099.00
Atau = 130,362.00 x 5
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN
SUB. DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN
DAN KABUPATEN
1.
Depresiasi = 90% x Harga Alat x CRF
90% x 1,001,345,100.00 x 0.26061
2.
Lain-Lain :
Asuransi 3 % + PPn 10 % = 3.30% x Harga Alat / (Jam/Tahun)
3.30% x 1,001,345,100.00 / 1,500
Sub Total - A
Sub Total - B
A+ B = 178,606.00 + 174,339.00
Atau = 352,945.00 x 5
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN
SUB. DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN
DAN KABUPATEN
1.
Depresiasi = 90% x Harga Alat x CRF
90% x 2,701,033,600.00 x 0.23852
2.
Lain-Lain :
Asuransi 3 % + PPn 10 % = 3.30% x Harga Alat / (Jam/Tahun)
3.30% x 2,701,033,600.00 / 1,500
Sub Total - A
Sub Total - B
A+ B = 445,978.00 + 371,706.00
Atau = 817,684.00 x 5
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN
SUB. DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN
DAN KABUPATEN
1.
Depresiasi = 90% x Harga Alat x CRF
90% x 647,934,000.00 x 0.26061
2.
Lain-Lain :
Asuransi 3 % + PPn 10 % = 3.30% x Harga Alat / (Jam/Tahun)
3.30% x 647,934,000.00 / 1,500
Sub Total - A
Sub Total - B
A+ B = 115,570.00 + 132,360.00
Atau = 247,930.00 x 5
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN
SUB. DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN
DAN KABUPATEN
1.
Depresiasi = 90% x Harga Alat x CRF
90% x 18,824,400.00 x 0.30071
2.
Lain-Lain :
Asuransi 3 % + PPn 10 % = 3.30% x Harga Alat / (Jam/Tahun)
3.30% x 18,824,400.00 / 750
Sub Total - A
Sub Total - B
A+ B = 7,621.00 + 7,218.00
Atau = 14,839.00 x 5
DIREKTORAT BINA PROGRAM JALAN BIAYA ALAT UNTUK PERHITUNGAN
SUB. DIT. PERENC. JALAN LOKAL ANALISA BIAYA PEKERJAAN
DAN KABUPATEN
1.
Depresiasi = 90% x Harga Alat x CRF
90% x 125,613,600.00 x 0.30071
2.
Lain-Lain :
Asuransi 3 % + PPn 10 % = 3.30% x Harga Alat / (Jam/Tahun)
3.30% x 125,613,600.00 / 1,500
Sub Total - A
Sub Total - B
A+ B = 25,427.00 + 23,485.00
Atau = 48,912.00 x 5
YA ALAT UNTUK PERHITUNGAN KODE
ANALISA BIAYA PEKERJAAN E 212
Tahun
2015
Tenaga 145 HP
/ (Jam/Tahun)
/ 1,300 = 62,330.00
= 7,600.00
= 30,241.00
= 34,452.00
= 49,864.00
= 184,487.00 /Jam
= 922,435.00 /Hari
YA ALAT UNTUK PERHITUNGAN KODE
ANALISA BIAYA PEKERJAAN E 341
Tahun
2015
Tenaga 8 HP
/ (Jam/Tahun)
/ 750 = 4,426.00
= 420.00
= 1,668.00
= 1,901.00
= 3,541.00
= 11,956.00 /Jam
= 59,780.00 /Hari
YA ALAT UNTUK PERHITUNGAN KODE
ANALISA BIAYA PEKERJAAN E 089
Tahun
2015
Tenaga 4 HP
/ (Jam/Tahun)
/ 600 = 5,910.00
= 648.00
= 834.00
= 950.00
= 4,728.00
= 13,070.00 /Jam
= 65,350.00 /Hari
YA ALAT UNTUK PERHITUNGAN KODE
ANALISA BIAYA PEKERJAAN E 252
Tahun
2015
Tenaga 10 HP
/ (Jam/Tahun)
/ 1,500 = 14,370.00
= 1,576.00
= 2,086.00
= 2,376.00
= 11,496.00
= 31,904.00 /Jam
= 159,520.00 /Hari
YA ALAT UNTUK PERHITUNGAN KODE
ANALISA BIAYA PEKERJAAN E 182
Tahun
2015
Tenaga 115 HP
/ (Jam/Tahun)
/ 700 = 114,351.00
= 13,943.00
= 23,984.00
= 27,324.00
= 91,481.00
= 271,083.00 /Jam
= 1,355,415.00 /Hari
YA ALAT UNTUK PERHITUNGAN KODE
ANALISA BIAYA PEKERJAAN E 008
Tahun
2015
Tenaga 110 HP
/ (Jam/Tahun)
/ 1,500 = 156,576.00
= 22,030.00
= 22,942.00
= 26,136.00
= 125,261.00
= 352,945.00 /Jam
= 1,764,725.00 /Hari
YA ALAT UNTUK PERHITUNGAN KODE
ANALISA BIAYA PEKERJAAN E 080
Tahun
2015
Tenaga 51 HP
/ (Jam/Tahun)
/ 1,500 = 78,822.00
= 12,117.00
= 10,637.00
= 12,118.00
= 63,058.00
= 176,752.00 /Jam
= 883,760.00 /Hari
YA ALAT UNTUK PERHITUNGAN KODE
ANALISA BIAYA PEKERJAAN E 221
Tahun
2015
Tenaga 80 HP
/ (Jam/Tahun)
/ 1,300 = 49,257.00
= 6,006.00
= 16,685.00
= 19,008.00
= 39,406.00
= 130,362.00 /Jam
= 651,810.00 /Hari
YA ALAT UNTUK PERHITUNGAN KODE
ANALISA BIAYA PEKERJAAN E 001
Tahun
2015
Tenaga 110 HP
/ (Jam/Tahun)
/ 1,500 = 156,576.00
= 22,030.00
= 22,942.00
= 26,136.00
= 125,261.00
= 352,945.00 /Jam
= 1,764,725.00 /Hari
YA ALAT UNTUK PERHITUNGAN KODE
ANALISA BIAYA PEKERJAAN E 031
Tahun
2015
Tenaga 140 HP
/ (Jam/Tahun)
/ 1,500 = 386,555.00
= 59,423.00
= 29,198.00
= 33,264.00
= 309,244.00
= 817,684.00 /Jam
= 4,088,420.00 /Hari
YA ALAT UNTUK PERHITUNGAN KODE
ANALISA BIAYA PEKERJAAN E 052
Tahun
2015
Tenaga 115 HP
/ (Jam/Tahun)
/ 1,500 = 101,315.00
= 14,255.00
= 23,984.00
= 27,324.00
= 81,052.00
= 247,930.00 /Jam
= 1,239,650.00 /Hari
YA ALAT UNTUK PERHITUNGAN KODE
ANALISA BIAYA PEKERJAAN E 088
Tahun
2015
Tenaga 4 HP
/ (Jam/Tahun)
/ 750 = 6,793.00
= 828.00
= 834.00
= 950.00
= 5,434.00
= 14,839.00 /Jam
= 74,195.00 /Hari
YA ALAT UNTUK PERHITUNGAN KODE
ANALISA BIAYA PEKERJAAN E 087
Tahun
2015
Tenaga 12 HP
/ (Jam/Tahun)
/ 1,500 = 22,664.00
= 2,763.00
= 2,503.00
= 2,851.00
= 18,131.00
= 48,912.00 /Jam
= 244,560.00 /Hari
METODE PELAKSANAAN
I PEKERJAAN PERSIAPAN
1 Err:509
2 Pengukuran
3 Direksikeet / Gudang Kerja
4 Dokumentasi dan Pelaporan
5 Papan Nama Kegiatan
II Err:509
1 Err:509
URAIAN ASUMSI
1. Galian parit dengan tenaga manusia 1. Menggunakan tenaga manusia ( 100 m / hari )
2. Pembuangan sisa galian menggunakan 2. Dimensi saluran :
truk bak terbuka. - Lebar bawah = 0,50 m
- Lebar atas = 1,30 m
- Kedalaman = 0,6 m ( Volume = 0,54 m3 / m)
3. 25 % hasil galian dibuang ditempat
4. Hasil galian dibuang sejauh 2 Km
5 Menggali dan membuang rata-rata 1,5 m3/hari/orang
6. Menggunakan alat bantu rata-rata 1 bulan/orang/set @ 3 alat
-
III PEKERJAAN TANAH
1 Penyiapan Tanah Dasar
URAIAN ASUMSI
1. Potong semak belukar yang tumbuh pada 1. Menggunakan tenaga manusia ( 2 x1,5 x 500 m/hari )
bahu jalan 2. Dengan lebar 1,5 m dari tepi jalan rata-rata luas yang
2. Bersihkan rumput/semak dari bahu jalan dan dibersihkan 3000 m2/Km satu sisi
aspal 3. Hasil kerja 60 m2/orang-hari
4. Sampah/reruntuhan dibuang sejauh 1 km
5. Umur alat bantu rata-rata 1 bulan
IV PEKERJAAN PERKERASAN
1 Perkerasan Beton K.175
URAIAN ASUMSI
1. Agregat tersaring/bergradasi ditimbun 1. Menggunakan alat berat (150m3/hari)
di sepanjang jalan oleh pemasok 2. Material ditimbun di sepanjang jalan oleh pemasok
2. Grader membentuk Ulang permukaan lama 3. Dikirim kerikil galian/sungai tersaring/bergradasi yang termur
jalan 4. Dihampar dan dipadatkan sampai tebal padat 15 cm
3. Grader menghampar agreat 5. Dihampar dan dipadatkan 1000 m2/hari
4. Jalan disiram air dengan truk air 6. Koefisien pemadatan = 1,2
5. Pemadatan dengan mesin gilas 6-8 ton 7. Gradasi bahan lapis pondasi bawah klas B semua harus melalu
sampai 100 % MDD 62,5 mm sesuai rev.Spek.Umum.B.M.Maret 1989-Buku 3
2 Err:509
URAIAN ASUMSI
1. Matrial dikirim oleh leveransir 1. Bahan-bahan dasar dikirim ke lokasi pekerjaan oleh leveransir
2. Pencampuran beton ditempat pekerjaan 2. Dipakai agregat pecah dan tersaring
3. Hasil kerja 6,0m3/hari - 6 Jam (9 campuran per jam)
4. Campuran 1 Pc : 3 Ps : 5 Kr (yaitu 1 : 8)
5. Dalam 1 M3beton dibutuhkan 5 Zak (50 kg/zak) PC (250 Kg/m
6. Setiap campuran memerlukan ± 30 Kg Semen
7. Diperlukan untuk alas Pondasi Beton
3 Plastik
URAIAN ASUMSI
1. Matrial dikirim oleh leveransir 1. Bahan-bahan dasar dikirim ke lokasi pekerjaan oleh leveransir
2. Penghamparan Plastik cor dilakukan oleh pekerj 2. Dipakai plastic cor
sebelum pekerjaan beton dimulai 3. Hasil kerja 100 m/hari
4 Tulangan
URAIAN ASUMSI
1. Pemotongan dan pembengkokan dan 1. 200 Kg tulangan jadi disiapkan dalam 1 hari
perakitan tulangan dilakukan ditempat 2. Besi tulangan dikirim ketempat pekerjaan oleh pemasok
pekerjaan bersama sama persiapan 3. Batang - batang tulangan dibengkok ditempat pekerjaan
pekerjaan beton 4. Penyusutan akibat pemotongan 10 % dan pakai
kawat baja dll dianggap 1 %
5 Begisting
URAIAN ASUMSI
1. Pengadaan bahan oleh pemasok 1. Kelompok tukang kayu memasang 100 m2 dalam 1 hari kerja
2. Kelompok tukang kayu memotong dan 2. 1/3 materal dapat dipakai kembali
membuat acuan 3. Pengadaan bahan oleh pemasok
3. Kelompok tukang kayu membongkar 4. Untuk 1 m3 beton dipakai 20 lbr plywood (120 cm x 240 cm x
acuan setelah disetujui oleh direksi 5. Kelompok tukang kayu membongkar acuan
6 Joint Sealer
URAIAN ASUMSI
1. Material dan peralatan disiapkan 1 Lokasi pekerjaan : sepanjang area pekerjaan beton
2. Join Filler dipasang dengan seksama 2 Bahan / material diterima seluruhnya di lokasi
3. Penyelesaian dan perapihan pekerjaan proyek
setelah pemasangan 3. Bahan yang digunakan Jion Filler
4. Setelah pekerjaan dilakukan setiap pekerja merapihkan hasil a
V PEKERJAAN STRUKTUR
1 Pasangan Batu
URAIAN ASUMSI
1. Material disiapkan dilokasi oleh levelansir 1. Dilakukan untuk pekerjaan gorong-gorong, jembatan, dinding
oleh pemasok dan struktur lainnya yang menggunakan konstruksi pasangan b
2. Pekerja membawa batu pecah ketempat 2. Material-material dikirim ketempat pekerjaan oleh levelansir
tukang batu pekerja 3. Tidak termasuk galian / timbunan
3. Tukang batu memasang batu pecah 4. Bagian M.170 diperbolehkan pakai bambu
2 Err:509
URAIAN ASUMSI
1. Matrial dikirim oleh leveransir 1. Bahan-bahan dasar dikirim ke lokasi pekerjaan oleh leveransir
2. Pencampuran beton ditempat pekerjaan 2. Dipakai agregat pecah dan tersaring
3. Hasil kerja 6,0m3/hari - 6 Jam (9 campuran per jam)
4. Campuran 1 Pc : 3 Ps : 5 Kr (yaitu 1 : 8)
5. Dalam 1 M3beton dibutuhkan 5 Zak (50 kg/zak) PC (250 Kg/m
6. Setiap campuran memerlukan ± 30 Kg Semen
7. Diperlukan untuk alas Pondasi Beton
3 Plesteran
URAIAN ASUMSI
1. Material disiapkan di lokasi pekerjaan 1. Menggunakan Tenaga Manusia 200 m2/hari
2. Semen telah siap di lokasi pekerjaan 2. Tebal plesteran kering 10 mm rata
3. Pasir disiapkan di lokasi oleh levaransir 3. Pasir yg digunakan berbutir tajam dan keras, kadar lumpur
tidak boleh lebih 5 %
4. Khusus Acian semen setelah plesteran kering 1 Zak semen @
5. Adukan 1 Pc : 4 Psr = 0,0725 Zak Pc : 0,0116 Psr
6. Acian tebal 2 - 5 mm
Finishing Pkekerjaan
DEDI
Direktur
Err:509
e = 0,54 m3 / m)
,5 m3/hari/orang
bulan/orang/set @ 3 alat
K.342
K - 224
K 321
K.724.a
n oleh pemasok
ng/bergradasi yang termurah
bal padat 15 cm
Err:509
K.715
K.710
K.810.A
K - 723.A
G.50.q
I PEKERJAAN PERSIAPAN
1 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
2 Pengukuran Km 1.00 2,000,000.00 2,000,000.00 Err:509
3 Direksikeet / Gudang Kerja Ls Ls 3,500,000.00 3,500,000.00 Err:509
4 Dokumentasi dan Pelaporan Ls Ls 3,000,000.00 3,000,000.00 Err:509
5 Papan Nama Kegiatan Buah 1.00 500,000.00 500,000.00 Err:509
Total I
Err:509Err:509
1 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Total II
II PEKERJAAN TANAH
1 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
2 Galian Tanah untuk Konstruksi M3 9.88 42,800.00 422,864.00 Err:509
3 Penimbunan Badan Jalan M3 27.33 59,051.63 1,613,880.91 Err:509
Total III
IIIPEKERJAAN PERKERASAN
1 Perkerasan Beton K.175 M3 135.66 1,254,571.46 170,195,164.22 Err:509
2 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
3 Plastik M2 953.04 12,000.00 11,436,480.00 Err:509
4 Tulangan Kg 805.80 29,347.99 23,648,608.69 Err:509
5 Begisting M2 91.59 137,512.35 12,594,756.14 Err:509
6 Joint Sealer M' 627.00 18,000.00 11,286,000.00 Err:509
Total IV Err:509
VI PEKERJAAN STRUKTUR
1 Pasangan Batu M3 21.78 751,209.60 16,361,345.09 Err:509
2 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
3 Plesteran M2 72.66 50,247.81 3,651,005.79 Err:509
Total V Err:509
JUMLAH TOTAL Err:509
JUMLAH BOBOT RENCANA
JUMLAH BOBOT KOMULATIF -
WAL WAKTU PELAKSANAAN PEKERJAAN
PELAKSANAAN PEKERJAAN
Err:509
Err:509
Err:509
Err:509 Err:509
Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
N PEKERJAAN
KET
BULAN KE - 5 BULAN KE - 6
3 4 1 2 3 4
Err:509 100
Err:509
50
DEDI
Direktur
DAFTAR PERALATAN YANG DIPERGUNAKAN
7 Mesin gilas tiga roda 6 - 8 ton 1 51 Hitachi 2005 Baik B.Lampung Sewa
8 Truk bak terbuka 3,5 ton 1 80 Mitsubishi 2005 Baik B.Lampung Sewa
DEDI
Direktur
PERHITUNGAN BIAYA ONGKOS ANGKUT MATERIAL
Lampiran Analisa Bahan
- Dibulatkan Rp 88,000.00
- Dibulatkan Rp 89,000.00
PERHITUNGAN BIAYA ONGKOS ANGKUT MATERIAL
Lampiran Analisa Bahan
- Dibulatkan Rp 155,000.00
- Dibulatkan Rp 43,000.00
PERHITUNGAN BIAYA ONGKOS ANGKUT MATERIAL
Lampiran Analisa Bahan
c. Biaya angkut
- Biaya angkut per 4000 Kg = 0.92 X Rp 239,887.71 = Rp 221,496.32
- Biaya angkut per 1 Kg = 0.0003 X 221,496.32 Rp 55.37
- Dibulatkan Rp 55.00
Jam
Jam
Jam
Jam
Jam
0
0.00
DAFTAR HARGA SATUAN MATERIAL
BIDANG JALAN DAN JEMBATAN
Tahun Anggaran 2008
HARGA SATUAN
No JENIS MATERIAL KODE SATUAN KETERANGAN
(Rp)
0.00
0.00 (Rp)
DEDI
Direktur
DAFTAR UPAH KERJA PERORANG PERHARI
BIDANG JALAN DAN JEMBATAN
Tahun Anggaran 2008
(Rp)
DEDI
Direktur
REKAPITULASI HARGA SATUAN PEKERJAAN
JALAN DAN JEMBATAN
TAHUN ANGGARAN 2006
JUMLAH
TOTAL
(Rp)
8 = (5+6+7)
295,313.06
365,084.75
564,920.88
626,048.08
439,663.57
797,587.81
476,227.82
65,048.52
23,940.26
683,818.38
JUMLAH
TOTAL
(Rp)
8 = (5+6+7)
458,738.52
698,587.36
5,964,669.49
1,566,433.78
224,266.67
87,105.21
176,877.67
111,655.17
42,800.00
916,527.44
59,051.63
207,986.89
109,563.13
45,969.05
1,661.18
1,043.03
816,651.43
695,635.44
112,734.17
57,269.54
960.00
4,295.22
7,232.04
JUMLAH
TOTAL
(Rp)
8 = (5+6+7)
463,953.11
1,051,181.63
795,690.59
849,293.95
525,562.93
449,906.87
646,662.19
671,320.50
1,031,717.63
19,862.25
56,192.83
28,979.02
132,963.29
JUMLAH
TOTAL
(Rp)
8 = (5+6+7)
816,029.20
684,062.20
137,512.35
29,347.99
960,648.81
1,156,789.31
1,231,031.10
1,254,571.46
1,229,056.27
19,754.51
123,446.35
109,380.80
46,739.98
130,469.75
216,917.82
256,981.37
130,469.75
JUMLAH
TOTAL
(Rp)
8 = (5+6+7)
3,865,617.97
1,326,975.12
29,443.90
29,637.50
173,498.40
0.00
SPESIFIKASI TEKNIS
PEMENUHAN SPESIFIKASI TEKNIS
1 MOBILISASI
1 Umum SPESIFIKASI TEKNIS
2 Jangka Waktu Mobilisasi
3 Penyiapan Lapangan SESUAI DENGAN YANG TELAH DITETAPKAN
4 Pengukuran dan pembayaran
3 PELAKSANAAN PEKERJAAN
1 Umum SPESIFIKASI TEKNIS
2 Pengendalian Mutu Bahan dan Keterampilan Kerja
3 Pengelola Lapangan dari kontraktor SESUAI DENGAN YANG TELAH DITETAPKAN
4 Pengendalian Lingkungan
5 Pengaturan Pekerjaan dilapangan
6 Pengukuran dan Pembayaran
8 PEKERJAAN HARIAN
1 Umum SPESIFIKASI TEKNIS
2 Bahan-bahan dan Peralatan
3 Pelaksanaan Pekerjaan Harian SESUAI DENGAN YANG TELAH DITETAPKAN
4 Cara Pengukuran dan Pembayaran Pekerjaan Harian
DEDI
Direktur
PESIFIKASI TEKNIS
UHAN SPESIFIKASI TEKNIS
KUANTITAS BAHAN
DALAM CAMPURAN
PERSATUAN VOLUME
SPESIFIKASI TEKNIS
SPESIFIKASI TEKNIS
SPESIFIKASI TEKNIS
SPESIFIKASI TEKNIS
SPESIFIKASI TEKNIS
SPESIFIKASI TEKNIS
SPESIFIKASI TEKNIS
SPESIFIKASI TEKNIS
DEDI
Direktur
REKAPITULASI PERHITUNGAN TKDN
I. BARANG
1). Material Langsung (bahan baku) 212,201,093 - 212,201,093
2). Peralatan Barang Jadi - - -
Sub Total I 212,201,093 - 212,201,093
II. JASA
3). Menejemen proyek dan perekayasaan 6,450,023 - 6,450,023
4). Alat kerja/ Fasilitas kerja 40,480,908 - 40,480,908
5). Konstruksi dan fabrikasi 11,386,211 - 11,386,211
6). Jasa umum 27,051,765 - 27,051,765
Sub Total II 85,368,907 - 85,368,907
5 6 7
DEDI
Direktur