Jumlah Harga
Harga Satuan
Bahan / Upah Jumlah
Bahan / Upah Rp.
Rp. Rp. Rp.
5 6 7
2,182,500.00 26,190.00
18,400.00 368.00 41,835.50
2,182,500.00 15,277.50
79,860.00 7,986.00
95,590.00 9,559.00
19,039.35
111,320.00 1,113.20
76,230.00 381.15
60,874.85
-
60,874.85
60,875.00
79,860.00 59,895.00
61,800.75
76,230.00 1,905.75
61,800.75
-
61,800.75
61,801.00
79,860.00 71,874.00
75,304.35
76,230.00 3,430.35
75,304.35
-
75,304.35
75,305.00
79,860.00 83,853.00
88,960.41
76,230.00 5,107.41
88,960.41
-
88,960.41
88,961.00
79,860.00 79,860.00
82,299.36
76,230.00 2,439.36
82,299.36
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
PEKERJAAN PERSIAPAN
430504216.xlsx 3
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Total
Dibulatkan
4 1M3 Pekerjaan Pengerukan Lumpur
Pekerja 1.1250
Mandor 0.0313
Alat bantu 0.0450
Truk 0.3125
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
430504216.xlsx 4
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
5 1M Pekerjaan Buangan Sisa Galian
3
Pekerja 0.4000
Mandor 0.0400
Alat Angkut 1.0000
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
6 1M1 Pekerjaan Pasangan Bouplank
Kayu Papan Terentang 0.0100
Paku 5 - 7 0.0380
Ongkos Pasang 1.0000
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
7 1M1 Pekerjaan Pengukuran & Pemasangan Bowplank (SNI Rev. 2002)
Kayu Kaso 5 / 7 (kayu kls. III) 0.0120
Paku Biasa 2" - 5" 0.0200
Kayu Papan 3 / 20 (Kayu kls. III) 0.0070
Pekerja 0.0170
Tukang Kayu 0.0020
Kepala Tukang Kayu 0.2500
Mandor 0.0130
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
430504216.xlsx 5
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
3 1M3 Pekerjaan Galian Tanah Biasa sedalam 3 m (SNI 2835:2008)
Pekerja 1.0500
Mandor 0.0670
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
430504216.xlsx 6
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
2 1M Pekerjaan Urugan Tanah Dipadatkan
3
430504216.xlsx 7
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Dibulatkan
PEKERJAAN BETON
1 1M3 Pekerjaan Beton Mutu fc 9,8 MPa K-125, Slump 12±2 cm, w/c=0,78 (SNI 7394-2008)
Semen PC (50 Kg) 5.5200
Pasir Beton 0.5914
Batu Pecah 2/3 0.7496
Air 215.0000
Pekerja 1.6500
Tukang Batu Terampil 0.2750
Kepala Tukang Batu 0.0280
Mandor 0.0830
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
430504216.xlsx 8
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
2 1M Pekerjaan Beton Mutu fc 14,5 MPa K-175, Slump 12±2 cm, w/c=0,66 (SNI 7394-2008)
3
430504216.xlsx 9
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Dibulatkan
5 1 Kg Pekerjaan Besi Polos atau Ulir (SNI 7394-2008)
Besi Beton (polos/ulir) 1.0500
Kawat Beton 0.0150
Pekerja 0.0070
Tukang Besi Terampil 0.0070
Kepala Tukang Besi 0.0007
Mandor 0.0004
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
430504216.xlsx 10
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
6 1 Kg Pekerjaan Kabel Presstressed Besi Polos atau Strands (SNI 7394-2008)
Besi Beton (polos/ulir) 1.0500
Kawat Beton 0.0100
Pekerja 0.0050
Tukang Besi Terampil 0.0050
Kepala Tukang Besi 0.0005
Mandor 0.0003
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
7 1 Kg Pekerjaan Jaring Kawat Baja/Wire Mesh (SNI 7394-2008)
Jaring Kawat Baja di las 1.0200
Kawat Beton 0.0500
Pekerja 0.0250
Tukang Besi Terampil 0.0250
Kepala Tukang Besi 0.0020
Mandor 0.0010
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
8 1 Kg Pekerjaan Memasang Besi Profil (SNI 7393-2008)
Besi Profil 1.1500
Pekerja 0.0600
Tukang Las Konstruksi 0.0600
Kepala Tukang 0.0060
Mandor 0.0030
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
9 1 Kg Pekerjaan Memasang Rangka Baja IWF (SNI 7393-2008)
Besi IWF 1.1500
Pekerja 0.0600
Tukang Las Konstruksi 0.0600
Kepala Tukang 0.0060
Mandor 0.0030
Jumlah
Keuntungan dan Overhead 15 %
430504216.xlsx 11
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Total
Dibulatkan
10 1 Kg Pekerjaan Perakitan (SNI 7393-2008)
Solar 0.0100
Minyak Pelumas 0.0010
Pekerja 0.0010
Tukang Besi Konstruksi 0.0010
Kepala Tukang 0.0000
Mandor 0.0001
Sewa Alat (Genset, Weldingset, Takel, Bor tangan, Bor duduk, Grinder) 0.0080
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
11 1 M Pekerjaan Besi Kabel/Sling Utama 1 1/4"
Besi Kabel/Sling 1 1/4" 1.0000
Tukang 0.2500
Kepala Tukang 0.0700
Pekerja 0.5000
Mandor 0.0700
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
12 1 M Pekerjaan Besi Kabel/Sling Utama 1"
Besi Kabel/Sling 1" 1.0000
Tukang 0.2500
Kepala Tukang 0.0700
Pekerja 0.5000
Mandor 0.0700
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
13 1 M Pekerjaan Besi Kabel/Sling Utama 7/8"
Besi Kabel/Sling 7/8" 1.0000
Tukang 0.2500
Kepala Tukang 0.0700
Pekerja 0.5000
Mandor 0.0700
430504216.xlsx 12
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
14 1 M Pekerjaan Besi Kabel/Sling Utama 5/8"
Besi Kabel/Sling 5/8" 1.0000
Tukang 0.2500
Kepala Tukang 0.0700
Pekerja 0.5000
Mandor 0.0700
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
15 1 M Pekerjaan Besi Kabel/Sling Utama 3/4"
Besi Kabel/Sling 3/4" 1.0000
Tukang 0.2500
Kepala Tukang 0.0700
Pekerja 0.5000
Mandor 0.0700
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
16 1 M Pekerjaan Besi Kabel/Sling Utama 1/2"
Besi Kabel/Sling 1/2" 1.0000
Tukang 0.2500
Kepala Tukang 0.0700
Pekerja 0.5000
Mandor 0.0700
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
17 1 M Pekerjaan Besi Kabel/Sling Utama 3/8"
Besi Kabel/Sling 3/8" 1.0000
Tukang 0.2500
Kepala Tukang 0.0700
Pekerja 0.5000
Mandor 0.0700
430504216.xlsx 13
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
18 1 Buah Pasang Klem Kabel 1 1/4"
Klem Kabel 1 1/4" 1.0000
Tukang 0.1500
Kepala Tukang 0.0150
Pekerja 0.0150
Mandor 0.0050
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
19 1 Buah Pasang Klem Kabel 1"
Klem Kabel 1" 1.0000
Tukang 0.1500
Kepala Tukang 0.0150
Pekerja 0.0150
Mandor 0.0050
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
20 1 Buah Pasang Klem Kabel 7/8"
Klem Kabel 7/8" 1.0000
Tukang 0.1500
Kepala Tukang 0.0150
Pekerja 0.0150
Mandor 0.0050
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
21 1 Buah Pasang Klem Kabel 5/8"
Klem Kabel 5/8" 1.0000
Tukang 0.1500
Kepala Tukang 0.0150
Pekerja 0.0150
Mandor 0.0050
430504216.xlsx 14
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
430504216.xlsx 15
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
24 1 Buah Pasang Klem Kabel 3/8"
Klem Kabel 3/8" 1.0000
Tukang 0.1500
Kepala Tukang 0.0150
Pekerja 0.0150
Mandor 0.0050
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
25 1 Buah Pasang Waltermur 1 1/2"
Waltermur 1 1/2" 1.0000
Tukang 0.0500
Kepala Tukang 0.0250
Pekerja 0.1000
Mandor 0.0130
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
25 1 Buah Pasang Waltermur 1 1/4"
Waltermur 1 1/4" 1.0000
Tukang 0.0500
Kepala Tukang 0.0250
Pekerja 0.1000
Mandor 0.0130
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
26 1 Buah Pasang Waltermur 1"
Waltermur 1" 1.0000
Tukang 0.0500
Kepala Tukang 0.0250
Pekerja 0.1000
Mandor 0.0130
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
430504216.xlsx 16
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
27 1 Buah Pasang Waltermur 7/8"
Waltermur 7/8" 1.0000
Tukang 0.0500
Kepala Tukang 0.0250
Pekerja 0.1000
Mandor 0.0130
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
28 1 Buah Pasang Waltermur 5/8"
Waltermur 5/8" 1.0000
Tukang 0.0500
Kepala Tukang 0.0250
Pekerja 0.1000
Mandor 0.0130
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
29 1 Buah Pasang Waltermur 3/4"
Waltermur 3/4" 1.0000
Tukang 0.0500
Kepala Tukang 0.0250
Pekerja 0.1000
Mandor 0.0130
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
30 1 Buah Pasang Waltermur 1/2"
Waltermur 1/2" 1.0000
Tukang 0.0500
Kepala Tukang 0.0250
Pekerja 0.1000
Mandor 0.0130
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
430504216.xlsx 17
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
31 1 Buah Pasang Waltermur 3/8"
Waltermur 3/8" 1.0000
Tukang 0.0500
Kepala Tukang 0.0250
Pekerja 0.1000
Mandor 0.0130
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
32 1 Buah Pasang Causen 1 1/4"
Causen 1 1/4" 1.0000
Tukang 0.0500
Kepala Tukang 0.0250
Pekerja 0.1000
Mandor 0.0130
Jumlah
Keuntungan dan Overhead 15 %
430504216.xlsx 18
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Total
Dibulatkan
33 1 Buah Pasang Causen 1"
Causen 1" 1.0000
Tukang 0.0500
Kepala Tukang 0.0250
Pekerja 0.1000
Mandor 0.0130
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
34 1 Buah Pasang Causen 7/8"
Causen 7/8" 1.0000
Tukang 0.0500
Kepala Tukang 0.0250
Pekerja 0.1000
Mandor 0.0130
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
35 1 Buah Pasang Causen 5/8"
Causen 5/8" 1.0000
Tukang 0.0500
Kepala Tukang 0.0250
Pekerja 0.1000
Mandor 0.0130
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
36 1 Buah Pasang Causen 3/4"
Causen 3/4" 1.0000
Tukang 0.0500
Kepala Tukang 0.0250
Pekerja 0.1000
Mandor 0.0130
Jumlah
Keuntungan dan Overhead 15 %
430504216.xlsx 19
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Total
Dibulatkan
37 1 Buah Pasang Causen 1/2"
Causen 1/2" 1.0000
Tukang 0.0500
Kepala Tukang 0.0250
Pekerja 0.1000
Mandor 0.0130
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
38 1 Buah Pasang Causen 3/8"
Causen 3/8" 1.0000
Tukang 0.0500
Kepala Tukang 0.0250
Pekerja 0.1000
Mandor 0.0130
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
430504216.xlsx 20
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
39 1 Cm Pekerjaan Pengelasan dengan las listrik (SNI 7393-2008)
Kawat Las Listrik 0.0400
Solar 0.0300
Minyak Pelumas 0.0040
Pekerja 0.0040
Tukang Besi Konstruksi 0.0020
Kepala Tukang 0.0002
Mandor 0.0002
Sewa Alat 0.0170
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
40 1M2 Pekerjaan Bekisting untuk Pondasi (SNI 7394-2008)
Kayu kelas III 0.0400
Paku 5 - 10 cm 0.3000
Minyak bekisting 0.1000
Pekerja 0.5200
Tukang Kayu Terampil 0.2600
Kepala Tukang Kayu 0.0260
Mandor 0.0260
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
41 1M2 Pekerjaan Bekisting untuk Sloof (SNI 7394-2008)
Kayu kelas III 0.0450
Paku 5 - 10 cm 0.3000
Minyak bekisting 0.1000
Pekerja 0.5200
Tukang Kayu Terampil 0.2600
Kepala Tukang Kayu 0.0260
Mandor 0.0260
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
42 1M2 Pekerjaan Bekisting untuk Kolom (SNI 7394-2008)
Kayu kelas III 0.0400
Paku 5 - 12 cm 0.4000
430504216.xlsx 21
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Minyak bekisting 0.2000
Balok kayu kelas II 0.0150
Plywood tebal 9 mm 0.3500
Dolken kayu galam, ø(8-10)cm, panjang 4 m 2.0000
Pekerja 0.6600
Tukang Kayu Terampil 0.3300
Kepala Tukang Kayu 0.0330
Mandor 0.0330
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
430504216.xlsx 22
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
43 1M Pekerjaan Bekisting untuk Balok (SNI 7394-2008)
2
430504216.xlsx 23
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Kepala Tukang Kayu 0.0330
Mandor 0.0330
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
430504216.xlsx 24
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
46 1M Pekerjaan Pondasi Beton Bertulang, 150 Kg Besi + Bekisting (SNI 7394-2008)
3
430504216.xlsx 25
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
48 1M Pekerjaan Kolom Beton Bertulang, 300 Kg Besi + Bekisting (SNI 7394-2008)
3
430504216.xlsx 26
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
430504216.xlsx 27
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
50 1M Pekerjaan Plat Beton Bertulang, 150 Kg Besi + Bekisting (SNI 7394-2008)
3
430504216.xlsx 28
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
430504216.xlsx 29
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
52 1M Pekerjaan Dinding Beton Bertulang, 200 Kg Besi + Bekisting (SNI 7394-2008)
3
430504216.xlsx 30
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
54 1M Pekerjaan Pasangan Stoot Werk 5 s/d 7
2
430504216.xlsx 31
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
55 1M Pekerjaan Pasangan Stoot Werk 7 s/d 10
2
430504216.xlsx 32
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Peralatan 1.0000
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
59 1 M1 Pekerjaan Pemasangan Buis Beton Dia 50 cm
Pekerja Setengah Terampil 0.5960
Mandor 0.0140
Buis Beton Dia 50 cm 1.0000
Pasir Urug 0.0020
Semen PC (50 Kg) 0.0256
Peralatan 1.0000
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
430504216.xlsx 33
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
60 1 M Pekerjaan Pemasangan Gravel 1/2 Dia 20 cm
1
430504216.xlsx 34
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Beton K. 175 1.0100
Besi Beton Rata-rata 120.000
Bekisting 33.3333
Jumlah
Dibulatkan
65 1M3 Pekerjaan Ring Balok 15/20 K 175
Beton K. 175 1.0000
Besi Beton Rata-rata 160.000
Bekisting 13.3333
Jumlah
Dibulatkan
430504216.xlsx 35
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
PEKERJAAN PASANGAN
430504216.xlsx 36
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Pekerja Terampil 0.2000
Mandor 0.0200
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
5 1M2 Pekerjaan Pasangan Bata Merah ukuran 5x11x22, tebal 1/2 bata, camp spesi 1 : 3 (SNI 6897-2008
Bata Merah 70.0000
Semen PC (50 Kg) 0.2874
Pasir Pasang 0.0400
Pekerja 0.3000
Tukang Batu Setengah Terampil 0.1000
Kepala Tukang Batu 0.0100
Mandor 0.0150
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
6 1M2 Pekerjaan Pasangan Bata Merah ukuran 5x11x22, tebal 1/2 bata, camp spesi 1 : 5 (SNI 6897-2008
Bata Merah 70.0000
Semen PC (50 Kg) 0.1936
Pasir Pasang 0.0045
Pekerja 0.3000
Tukang Batu Setengah Terampil 0.1000
Kepala Tukang Batu 0.0100
Mandor 0.0015
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
7 1M2 Pekerjaan Pasangan Bata Merah ukuran 5x11x22, tebal 1 bata, camp spesi 1 : 3 (SNI 6897-2008)
Bata Merah 140.0000
Semen PC (50 Kg) 0.6590
Pasir Pasang 0.0091
Pekerja 0.6000
Tukang Batu Setengah Terampil 0.2000
Kepala Tukang Batu 0.0200
Mandor 0.0030
Jumlah
Keuntungan dan Overhead 15 %
430504216.xlsx 37
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Total
Dibulatkan
8 1M2 Pekerjaan Pasangan Bata Merah ukuran 5x11x22, tebal 1 bata, camp spesi 1 : 5 (SNI 6897-2008)
Bata Merah 140.0000
Semen PC (50 Kg) 0.4440
Pasir Pasang 0.1020
Pekerja 0.6000
Tukang Batu Setengah Terampil 0.2000
Kepala Tukang Batu 0.0200
Mandor 0.0030
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
9 1M2 Pekerjaan Pasangan Batu Tempel Hitam (SNI 7395-2008)
Batu Tempel Hitam 1.1000
Semen PC (50 Kg) 0.2350
Pasir Pasang 0.0350
Pekerja 0.7000
Tukang Batu Terampil 0.3500
Kepala Tukang Batu 0.0350
Mandor 0.0350
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
430504216.xlsx 38
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
10 1M Pekerjaan Pasangan Batu Kosong (SNI 2836-2008)
3
430504216.xlsx 39
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Keuntungan dan Overhead 15 %
Total
Dibulatkan
14 1M2 Pekerjaan Finishing Siaran Batu Kali 1:2 (SNI 2837-2008)
Semen PC (50 Kg) 0.1268
Pasir Pasang 0.0120
Pekerja 0.3000
Tukang Batu Terampil 0.1500
Kepala Tukang Batu 0.0150
Mandor 0.0150
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
430504216.xlsx 40
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
430504216.xlsx 41
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Pasir Beton 0.1000
Pekerja 0.2500
Tukang Batu Setengah Terampil 0.5000
Kepala Tukang Batu 0.0250
Mandor 0.0030
Peralatan 1.0000
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
430504216.xlsx 42
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
5 1M Pekerjaan Pasangan Lantai Keramik (20/20) Warna/Polos Sekualitas " MULIA " (SNI 7395-2008)
2
430504216.xlsx 43
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Keramik KW 1 (33/33) Warna/Corak, Grace Roman 1.0100
Semen PC (50 Kg) 0.1638
Pasir Pasang 0.0450
Semen Warna 1.6200
Pekerja 0.7000
Tukang Batu Terampil 0.3500
Kepala Tukang Batu 0.0350
Mandor 0.0350
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
430504216.xlsx 44
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
9 1M Pekerjaan Pasangan Lantai Keramik (40/40) Warna/Corak Sekualitas " MULIA " (SNI 7395-2008)
2
430504216.xlsx 45
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Semen PC (50 Kg) 3.7330
Pasir Beton 0.5500
Batu Pecah 2/3 0.9300
Peralatan 1.0000
Pekerja 1.1570
Tukang Batu Setengah Terampil 0.6000
Kepala Tukang Batu 0.0500
Mandor 0.0100
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
430504216.xlsx 46
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
13 1M Pekerjaan Rabat Batu Sikat (Ditabur)
2
430504216.xlsx 47
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Mandor 0.0188
Jumlah
Keuntungan dan Overhead 15 %
Jumlah
Dibulatkan
430504216.xlsx 48
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
PEKERJAAN PENGECATAN
430504216.xlsx 49
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Dibulatkan
430504216.xlsx 50
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
2 1 M3 Pekerjaan Lapis Pondasi Bawah ( Telford )
Batu Belah 0.9750
Batu pecah 5 - 7 cm 0.2150
Pasir urug 0.3500
Alat bantu 1.0000
Three Wheel Roller / Stoom Wall 0.0250
Pekerja 0.2343
Mandor 0.0335
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
3 1 M3 Pekerjaan Lapis Pondasi Agregat Kelas B
Agregat Kls. B 1.2000
Alat bantu 1.0000
Three Wheel Roller / Stoom Wall 0.0446
Pekerja 0.0446
Mandor 0.4462
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
4 1 Liter Pekerjaan Lapis Resap Pengikat ( Prime Coat )
Asphalt 0.6420
Minyak tanah 0.4890
Alat bantu 1.0000
Asphalt Sprayer 0.0016
Pekerja 0.0016
Mandor 0.0080
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
5 1 Liter Pekerjaan Lapis Perekat ( Teack Coat )
Asphalt 0.4375
Minyak tanah 0.2540
Alat bantu 1.0000
Asphalt Sprayer 0.0016
Compresor 0.0031
Pekerja 0.0080
430504216.xlsx 51
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Mandor 0.0016
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
430504216.xlsx 52
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
6 1 M2 Pekerjaan LAPEN
Batu pecah 3 - 5 cm 0.0480
Batu pecah 1 - 2 cm 0.0220
Pasir aspal/beton 0.0080
Asphalt 5.0000
Alat bantu 1.0000
Mesin Gilas 3 Roda 6 - 8 Ton 0.0167
Asphalt Sprayer 0.0167
Pekerja 0.0191
Tukang 0.0026
Mandor 0.0013
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
7 1 Ton Pekerjaan Laston Lapis Pondasi ( AC - BASE ) Leveling
Hotmix ( AC-BASE ) 1.0000
Alat bantu 1.0000
Asphalt Finisher 0.0028
Tandem Roller 0.0017
Pneumatic Tire Roller 8-10 Ton 0.0016
Pekerja 0.0554
Tukang 0.0139
Mandor 0.0028
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
8 1 M2 Pekerjaan Agregat Penutup BURTU
Batu pecah 0,5 - 1 cm 0.0120
Asphalt 1.5000
Alat bantu 1.0000
Pekerja 0.0583
Mandor 0.0039
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
9 1 M2 Pekerjaan Agregat Penutup BURDA
Batu pecah 2 - 3 cm 0.0220
430504216.xlsx 53
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Batu pecah 1 - 2 cm 0.0111
Agregat Penutup / Pasir asphalt 0.0030
Asphalt 3.1000
Dump Truck 0.0061
Three Wheel Roller / Stomm Wall 0.0021
Alat bantu 1.0000
Pekerja 0.0321
Mandor 0.0021
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
430504216.xlsx 54
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
10 1 M2 Pekerjaan Agregat Penutup BURAS
Abu batu 0.0110
Asphalt 1.2000
Alat bantu 1.0000
Pekerja 0.0170
Mandor 0.0010
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
11 1 Ton Pekerjaan Lataston Lapis Aus (HRS-WC) Leveling
Hotmix (HRS-WC) 1.0000
Tandem Roller 0.0017
Aspal Finisher 0.0021
Pneumatik Tyre Roller 8-10 Ton 0.0016
Alat bantu 1.0000
Pekerja 0.0208
Tukang 0.0104
Mandor 0.0021
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
12 1 Ton Pekerjaan Lataston Lapis Antara (AC-BC) Leveling
Hotmix (AC-BC) 1.0000
Tandem Roller 0.0017
Aspal Finisher 0.0021
Pneumatik Tyre Roller 8-10 Ton 0.0016
Alat bantu 1.0000
Pekerja 0.0339
Tukang 0.0034
Mandor 0.0034
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
13 1 Ton Pekerjaan Lataston Lapis Antara (AC-WC) Leveling
Hotmix (AC-WC) 1.0000
Tandem Roller 0.0017
Aspal Finisher 0.0021
430504216.xlsx 55
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
Pneumatik Tyre Roller 8-10 Ton 0.0016
Alat bantu 1.0000
Pekerja 0.0339
Tukang 0.0034
Mandor 0.0034
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
430504216.xlsx 56
Standar Harga di Bidang Praskim untuk Wilayah Selatan
1 2 3
14 1 Unit/4 M Pekerjaan Guard Rail
Lempengan besi baja profil desain galvanis (Beam) 1.0000
Tiang penyangga besi st.32 galvanis (post) 1800x320x6 3.0000
Besi pengikat baja profil desain (blocking) 3.0000
Mur baut beam 12 x 25 mm 10.0000
Mur baut blocking 16 x 30 mm 3.0000
Mur baut post 16 x 48 mm 3.0000
Besi angkur 30 x 30 x 3 mm 2.2500
Terminal end (sleeve Beam) 2.0000
Galian tanah dan urugan kembali 1.6800
Urugan pasir bawah pondasi 0.2000
Bekisting pondasi 5.8400
Cor pondasi beton K-175 0.5100
Ongkos angkut bahan guard rail ke lokasi 1.0000
Jumlah
Keuntungan dan Overhead 15 %
Total
Dibulatkan
Mengetahui ;
Kepala Dinas Tata Ruang dan Permukiman Kepala Bidang Penata
Kabupaten Garut
430504216.xlsx 57
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
PEKERJAAN PERSIAPAN
430504216.xlsx 58
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
58,390.10
58,390.00
430504216.xlsx 59
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
M3 1,776,000.00 17,760.00
kg 15,300.00 581.40
ls 500.00 500.00
18,841.40
2,826.21
21,667.61
21,660.00
M3 1,776,000.00 21,312.00
kg 15,300.00 306.00
M3 1,776,000.00 12,432.00
Org 57,000.00 969.00
Org 70,000.00 140.00
Org 75,000.00 18,750.00
Org 80,000.00 1,040.00
54,949.00
8,242.35
63,191.35
63,190.00
430504216.xlsx 60
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
54,900.00
8,235.00
63,135.00
63,130.00
430504216.xlsx 61
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
M3 60,000.00 60,600.00
Org 57,000.00 28,500.00
Org 80,000.00 4,000.00
Ls 1,000.00 1,000.00
94,100.00
14,115.00
108,215.00
108,210.00
M3 132,000.00 158,400.00
Org 57,000.00 8,550.00
Org 80,000.00 800.00
167,750.00
25,162.50
192,912.50
192,910.00
M3 144,000.00 172,800.00
Org 57,000.00 8,550.00
Org 80,000.00 800.00
182,150.00
27,322.50
209,472.50
209,470.00
M3 207,500.00 249,000.00
Org 57,000.00 8,550.00
Org 80,000.00 800.00
258,350.00
38,752.50
297,102.50
430504216.xlsx 62
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
297,100.00
PEKERJAAN BETON
430504216.xlsx 63
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
Slump 12±2 cm, w/c=0,66 (SNI 7394-2008)
Zak 80,000.00 521,600.00
M3 260,000.00 141,154.00
M3 293,000.00 223,324.60
Liter 150.00 32,250.00
Org 57,000.00 94,050.00
Org 70,000.00 19,250.00
Org 75,000.00 2,100.00
Org 80,000.00 6,640.00
1,040,368.60
156,055.29
1,196,423.89
1,196,420.00
Slump 12±2 cm, w/c=0,58 (SNI 7394-2008)
Zak 80,000.00 593,600.00
M3 260,000.00 129,636.00
M3 293,000.00 227,250.80
Liter 150.00 32,250.00
Org 57,000.00 94,050.00
Org 70,000.00 19,250.00
Org 75,000.00 2,100.00
Org 80,000.00 6,640.00
1,104,776.80
165,716.52
1,270,493.32
1,270,490.00
mpuran 1 PC:2PB:3KR dan 40% Batu Belah (SNI 2836-2008)
M3 174,000.00 83,520.00
Zak 80,000.00 310,400.00
M3 260,000.00 81,120.00
M 3
293,000.00 137,124.00
Kg 10,000.00 1,260,000.00
Kg 19,600.00 35,280.00
OH 57,000.00 193,800.00
OH 70,000.00 59,500.00
OH 75,000.00 6,375.00
OH 80,000.00 13,600.00
2,180,719.00
327,107.85
2,507,826.85
430504216.xlsx 64
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
2,507,820.00
Kg 10,000.00 10,500.00
Kg 19,600.00 294.00
Org 57,000.00 399.00
Org 70,000.00 490.00
Org 75,000.00 52.50
Org 80,000.00 32.00
11,767.50
1,765.13
13,532.63
13,530.00
430504216.xlsx 65
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
Kg 10,000.00 10,500.00
Kg 19,600.00 196.00
OH 57,000.00 285.00
OH 70,000.00 350.00
OH 75,000.00 37.50
OH 80,000.00 24.00
11,392.50
1,708.88
13,101.38
13,100.00
Kg 13,200.00 13,464.00
Kg 19,600.00 980.00
OH 57,000.00 1,425.00
OH 70,000.00 1,750.00
OH 75,000.00 150.00
OH 80,000.00 80.00
17,849.00
2,677.35
20,526.35
20,520.00
Kg 12,750.00 14,662.50
OH 57,000.00 3,420.00
OH 70,000.00 4,200.00
OH 75,000.00 450.00
OH 80,000.00 240.00
22,972.50
3,445.88
26,418.38
26,410.00
Kg 12,750.00 14,662.50
OH 57,000.00 3,420.00
OH 70,000.00 4,200.00
OH 75,000.00 450.00
OH 80,000.00 240.00
22,972.50
3,445.88
430504216.xlsx 66
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
26,418.38
26,410.00
M 178,750.00 178,750.00
Org 70,000.00 17,500.00
Org 75,000.00 5,250.00
Org 57,000.00 28,500.00
Org 80,000.00 5,600.00
235,600.00
35,340.00
270,940.00
270,940.00
M 151,250.00 151,250.00
Org 70,000.00 17,500.00
Org 75,000.00 5,250.00
Org 57,000.00 28,500.00
Org 80,000.00 5,600.00
208,100.00
31,215.00
239,315.00
239,310.00
M 107,520.00 107,520.00
Org 70,000.00 17,500.00
Org 75,000.00 5,250.00
Org 57,000.00 28,500.00
Org 80,000.00 5,600.00
430504216.xlsx 67
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
164,370.00
24,655.50
189,025.50
189,020.00
M 71,500.00 71,500.00
Org 70,000.00 17,500.00
Org 75,000.00 5,250.00
Org 57,000.00 28,500.00
Org 80,000.00 5,600.00
128,350.00
19,252.50
147,602.50
147,600.00
M 35,750.00 35,750.00
Org 70,000.00 17,500.00
Org 75,000.00 5,250.00
Org 57,000.00 28,500.00
Org 80,000.00 5,600.00
92,600.00
13,890.00
106,490.00
106,490.00
M 22,880.00 22,880.00
Org 70,000.00 17,500.00
Org 75,000.00 5,250.00
Org 57,000.00 28,500.00
Org 80,000.00 5,600.00
79,730.00
11,959.50
91,689.50
91,680.00
M 19,250.00 19,250.00
Org 70,000.00 17,500.00
Org 75,000.00 5,250.00
Org 57,000.00 28,500.00
Org 80,000.00 5,600.00
430504216.xlsx 68
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
76,100.00
11,415.00
87,515.00
87,510.00
Bh 277,475.00 277,475.00
Org 70,000.00 10,500.00
Org 75,000.00 1,125.00
Org 57,000.00 855.00
Org 80,000.00 400.00
290,355.00
43,553.25
333,908.25
333,900.00
Bh 215,875.00 215,875.00
Org 70,000.00 10,500.00
Org 75,000.00 1,125.00
Org 57,000.00 855.00
Org 80,000.00 400.00
228,755.00
34,313.25
263,068.25
263,060.00
Bh 115,500.00 115,500.00
Org 70,000.00 10,500.00
Org 75,000.00 1,125.00
Org 57,000.00 855.00
Org 80,000.00 400.00
128,380.00
19,257.00
147,637.00
147,630.00
Bh 88,165.00 88,165.00
Org 70,000.00 10,500.00
Org 75,000.00 1,125.00
Org 57,000.00 855.00
Org 80,000.00 400.00
430504216.xlsx 69
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
101,045.00
15,156.75
116,201.75
116,200.00
Bh 60,775.00 60,775.00
Org 70,000.00 10,500.00
Org 75,000.00 1,125.00
Org 57,000.00 855.00
Org 80,000.00 400.00
73,655.00
11,048.25
84,703.25
84,700.00
Bh 19,250.00 19,250.00
Org 70,000.00 10,500.00
Org 75,000.00 1,125.00
Org 57,000.00 855.00
Org 80,000.00 400.00
32,130.00
4,819.50
36,949.50
36,940.00
430504216.xlsx 70
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
Bh 17,050.00 17,050.00
Org 70,000.00 10,500.00
Org 75,000.00 1,125.00
Org 57,000.00 855.00
Org 80,000.00 400.00
29,930.00
4,489.50
34,419.50
34,410.00
Bh 4,070,000.00 4,070,000.00
Bh 70,000.00 3,500.00
Org 75,000.00 1,875.00
Org 57,000.00 5,700.00
Org 80,000.00 1,040.00
4,082,115.00
612,317.25
4,694,432.25
4,694,430.00
Bh 2,062,500.00 2,062,500.00
Bh 70,000.00 3,500.00
Org 75,000.00 1,875.00
Org 57,000.00 5,700.00
Org 80,000.00 1,040.00
2,074,615.00
311,192.25
2,385,807.25
2,385,800.00
Bh 1,705,000.00 1,705,000.00
Bh 70,000.00 3,500.00
Org 75,000.00 1,875.00
Org 57,000.00 5,700.00
Org 80,000.00 1,040.00
1,717,115.00
257,567.25
1,974,682.25
1,974,680.00
430504216.xlsx 71
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
Bh 907,500.00 907,500.00
Bh 70,000.00 3,500.00
Org 75,000.00 1,875.00
Org 57,000.00 5,700.00
Org 80,000.00 1,040.00
919,615.00
137,942.25
1,057,557.25
1,057,550.00
Bh 495,000.00 495,000.00
Bh 70,000.00 3,500.00
Org 75,000.00 1,875.00
Org 57,000.00 5,700.00
Org 80,000.00 1,040.00
507,115.00
76,067.25
583,182.25
583,180.00
Bh 70,675.00 70,675.00
Bh 70,000.00 3,500.00
Org 75,000.00 1,875.00
Org 57,000.00 5,700.00
Org 80,000.00 1,040.00
82,790.00
12,418.50
95,208.50
95,200.00
Bh 57,750.00 57,750.00
Bh 70,000.00 3,500.00
Org 75,000.00 1,875.00
Org 57,000.00 5,700.00
Org 80,000.00 1,040.00
69,865.00
10,479.75
80,344.75
80,340.00
430504216.xlsx 72
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
Bh 49,500.00 49,500.00
Bh 70,000.00 3,500.00
Org 75,000.00 1,875.00
Org 57,000.00 5,700.00
Org 80,000.00 1,040.00
61,615.00
9,242.25
70,857.25
70,850.00
Bh 431,200.00 431,200.00
Bh 70,000.00 3,500.00
Org 75,000.00 1,875.00
Org 57,000.00 5,700.00
Org 80,000.00 1,040.00
443,315.00
66,497.25
430504216.xlsx 73
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
509,812.25
509,810.00
Bh 290,400.00 290,400.00
Bh 70,000.00 3,500.00
Org 75,000.00 1,875.00
Org 57,000.00 5,700.00
Org 80,000.00 1,040.00
302,515.00
45,377.25
347,892.25
347,890.00
Bh 203,500.00 203,500.00
Bh 70,000.00 3,500.00
Org 75,000.00 1,875.00
Org 57,000.00 5,700.00
Org 80,000.00 1,040.00
215,615.00
32,342.25
247,957.25
247,950.00
Bh 121,000.00 121,000.00
Bh 70,000.00 3,500.00
Org 75,000.00 1,875.00
Org 57,000.00 5,700.00
Org 80,000.00 1,040.00
133,115.00
19,967.25
153,082.25
153,080.00
Bh 38,500.00 38,500.00
Bh 70,000.00 3,500.00
Org 75,000.00 1,875.00
Org 57,000.00 5,700.00
Org 80,000.00 1,040.00
50,615.00
7,592.25
430504216.xlsx 74
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
58,207.25
58,200.00
Bh 24,750.00 24,750.00
Bh 70,000.00 3,500.00
Org 75,000.00 1,875.00
Org 57,000.00 5,700.00
Org 80,000.00 1,040.00
36,865.00
5,529.75
42,394.75
42,390.00
Bh 16,500.00 16,500.00
Bh 70,000.00 3,500.00
Org 75,000.00 1,875.00
Org 57,000.00 5,700.00
Org 80,000.00 1,040.00
28,615.00
4,292.25
32,907.25
32,900.00
430504216.xlsx 75
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
Kg 37,500.00 1,500.00
Ltr 5,650.00 169.50
Ltr 3,000.00 12.00
OH 57,000.00 228.00
OH 70,000.00 140.00
OH 75,000.00 15.00
OH 80,000.00 16.00
Jam 28,721.00 488.26
2,568.76
385.31
2,954.07
2,950.00
M3 1,776,000.00 35,520.00
Kg 12,500.00 3,750.00
Liter 3,000.00 300.00
OH 57,000.00 29,640.00
OH 70,000.00 18,200.00
OH 75,000.00 1,950.00
OH 80,000.00 2,080.00
91,440.00
13,716.00
105,156.00
105,150.00
M3 1,776,000.00 39,960.00
Kg 12,500.00 3,750.00
Liter 3,000.00 300.00
OH 57,000.00 29,640.00
OH 70,000.00 18,200.00
OH 75,000.00 1,950.00
OH 80,000.00 2,080.00
95,880.00
14,382.00
110,262.00
110,260.00
M3 1,776,000.00 35,520.00
Kg 12,500.00 5,000.00
430504216.xlsx 76
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
Liter 3,000.00 600.00
M 3
3,960,000.00 59,400.00
Lbr 172,800.00 60,480.00
Batang 58,800.00 117,600.00
OH 57,000.00 37,620.00
OH 70,000.00 23,100.00
OH 75,000.00 2,475.00
OH 80,000.00 2,640.00
344,435.00
51,665.25
396,100.25
396,100.00
430504216.xlsx 77
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
M3 1,776,000.00 35,520.00
Kg 12,500.00 5,000.00
Liter 3,000.00 600.00
M 3
3,960,000.00 71,280.00
Lbr 172,800.00 60,480.00
Batang 58,800.00 117,600.00
OH 57,000.00 37,620.00
OH 70,000.00 23,100.00
OH 75,000.00 2,475.00
OH 80,000.00 2,640.00
356,315.00
53,447.25
409,762.25
409,760.00
M3 1,776,000.00 35,520.00
Kg 12,500.00 5,000.00
Liter 3,000.00 600.00
M3 3,960,000.00 59,400.00
Lbr 172,800.00 60,480.00
Batang 58,800.00 352,800.00
OH 57,000.00 37,620.00
OH 70,000.00 23,100.00
OH 75,000.00 2,475.00
OH 80,000.00 2,640.00
579,635.00
86,945.25
666,580.25
666,580.00
M3 1,776,000.00 26,640.00
Kg 12,500.00 5,000.00
Liter 3,000.00 600.00
M3 3,960,000.00 79,200.00
Lbr 172,800.00 60,480.00
Batang 58,800.00 176,400.00
Bh 355.20 1,420.80
OH 57,000.00 37,620.00
OH 70,000.00 23,100.00
430504216.xlsx 78
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
OH 75,000.00 2,475.00
OH 80,000.00 2,640.00
415,575.80
62,336.37
477,912.17
477,910.00
430504216.xlsx 79
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
M3 1,776,000.00 177,600.00
Kg 12,500.00 18,750.00
Liter 3,000.00 1,200.00
Kg 10,000.00 1,575,000.00
Kg 19,600.00 44,100.00
Zak 80,000.00 537,600.00
M 3
260,000.00 140,400.00
M 3
293,000.00 237,330.00
OH 57,000.00 302,100.00
Org 70,000.00 19,250.00
OH 70,000.00 91,000.00
OH 70,000.00 73,500.00
OH 75,000.00 19,650.00
OH 80,000.00 21,200.00
3,258,680.00
488,802.00
3,747,482.00
3,747,480.00
M3 1,776,000.00 239,760.00
Kg 12,500.00 25,000.00
Liter 3,000.00 1,800.00
Kg 10,000.00 2,100,000.00
Kg 19,600.00 58,800.00
Zak 80,000.00 537,600.00
M 3
260,000.00 140,400.00
M 3
293,000.00 237,330.00
OH 57,000.00 322,050.00
Org 70,000.00 19,250.00
OH 70,000.00 109,200.00
OH 70,000.00 98,000.00
OH 75,000.00 24,225.00
OH 80,000.00 22,640.00
3,936,055.00
590,408.25
4,526,463.25
4,526,460.00
430504216.xlsx 80
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
M3 1,776,000.00 355,200.00
Kg 12,500.00 50,000.00
Liter 3,000.00 6,000.00
Kg 10,000.00 3,150,000.00
Kg 19,600.00 88,200.00
Zak 80,000.00 537,600.00
M 3
260,000.00 140,400.00
M 3
293,000.00 237,330.00
M3 3,960,000.00 594,000.00
Lbr 172,800.00 604,800.00
Batang 58,800.00 1,176,000.00
OH 57,000.00 401,850.00
Org 70,000.00 19,250.00
OH 70,000.00 109,200.00
OH 70,000.00 147,000.00
OH 75,000.00 30,225.00
OH 80,000.00 28,240.00
7,675,295.00
1,151,294.25
8,826,589.25
8,826,580.00
M3 1,776,000.00 284,160.00
Kg 12,500.00 40,000.00
Liter 3,000.00 4,800.00
Kg 10,000.00 2,100,000.00
Kg 19,600.00 58,800.00
Zak 80,000.00 537,600.00
M3 260,000.00 140,400.00
M 3
293,000.00 237,330.00
M3 3,960,000.00 554,400.00
Lbr 172,800.00 483,840.00
Batang 58,800.00 940,800.00
OH 57,000.00 361,950.00
Org 70,000.00 19,250.00
OH 70,000.00 109,200.00
OH 70,000.00 98,000.00
OH 75,000.00 24,975.00
OH 80,000.00 25,440.00
430504216.xlsx 81
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
6,020,945.00
903,141.75
6,924,086.75
6,924,080.00
430504216.xlsx 82
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
M3 1,776,000.00 284,160.00
Kg 12,500.00 40,000.00
Liter 3,000.00 4,800.00
Kg 10,000.00 1,575,000.00
Kg 19,600.00 44,100.00
Zak 80,000.00 537,600.00
M 3
260,000.00 140,400.00
M 3
293,000.00 237,330.00
M3 3,960,000.00 475,200.00
Lbr 172,800.00 483,840.00
Batang 58,800.00 1,881,600.00
OH 57,000.00 302,100.00
Org 70,000.00 19,250.00
OH 70,000.00 91,000.00
OH 70,000.00 73,500.00
OH 75,000.00 19,875.00
OH 80,000.00 21,200.00
6,230,955.00
934,643.25
7,165,598.25
7,165,590.00
M3 1,776,000.00 213,120.00
Kg 12,500.00 40,000.00
Liter 3,000.00 4,800.00
Kg 10,000.00 1,575,000.00
Kg 19,600.00 44,100.00
Zak 80,000.00 537,600.00
M3 260,000.00 140,400.00
M 3
293,000.00 237,330.00
M3 3,960,000.00 633,600.00
Lbr 172,800.00 483,840.00
Batang 58,800.00 1,411,200.00
OH 57,000.00 302,100.00
Org 70,000.00 19,250.00
OH 70,000.00 91,000.00
OH 70,000.00 73,500.00
OH 75,000.00 19,875.00
OH 80,000.00 21,200.00
430504216.xlsx 83
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
5,847,915.00
877,187.25
6,725,102.25
6,725,100.00
430504216.xlsx 84
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
M3 1,776,000.00 222,000.00
Kg 12,500.00 37,500.00
Liter 3,000.00 3,600.00
Kg 10,000.00 2,100,000.00
Kg 19,600.00 58,800.00
Zak 80,000.00 537,600.00
M 3
260,000.00 140,400.00
M 3
293,000.00 237,330.00
M3 3,960,000.00 415,800.00
Lbr 172,800.00 432,000.00
Batang 58,800.00 823,200.00
OH 57,000.00 322,050.00
Org 70,000.00 19,250.00
OH 70,000.00 109,200.00
OH 70,000.00 98,000.00
OH 75,000.00 24,225.00
OH 80,000.00 22,640.00
5,603,595.00
840,539.25
6,444,134.25
6,444,130.00
M3 1,776,000.00 1,776.00
Kg 12,500.00 125.00
Kg 10,000.00 30,000.00
Kg 19,600.00 882.00
Zak 80,000.00 4,800.00
M3 260,000.00 1,560.00
M3 293,000.00 2,637.00
OH 57,000.00 10,260.00
Org 70,000.00 1,400.00
OH 70,000.00 1,400.00
OH 70,000.00 1,400.00
OH 75,000.00 450.00
OH 80,000.00 720.00
57,410.00
8,611.50
66,021.50
66,020.00
430504216.xlsx 85
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
430504216.xlsx 86
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
430504216.xlsx 87
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
Ls 500.00 500.00
115,172.00
17,275.80
132,447.80
132,440.00
430504216.xlsx 88
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
M3 1,196,420.00 1,208,384.20
Kg 13,530.00 2,164,800.00
M2
105,150.00 1,402,000.00
4,775,184.20
4,775,180.00
430504216.xlsx 89
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
M3
1,196,420.00 1,208,384.20
Kg 13,530.00 1,623,600.00
M2 110,260.00 3,675,333.33
6,507,317.53
6,507,310.00
M3 1,196,420.00 1,196,420.00
Kg 13,530.00 2,164,800.00
M2
409,760.00 5,463,466.67
8,824,686.67
8,824,680.00
430504216.xlsx 90
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
PEKERJAAN PASANGAN
M3 174,000.00 208,800.00
Zak 80,000.00 323,200.00
M3 204,000.00 98,940.00
Org 57,000.00 85,500.00
Org 70,000.00 52,500.00
Org 75,000.00 5,625.00
Org 80,000.00 600.00
775,165.00
116,274.75
891,439.75
891,430.00
M3 174,000.00 208,800.00
Zak 80,000.00 260,800.00
M3
204,000.00 110,976.00
Org 57,000.00 85,500.00
Org 70,000.00 52,500.00
Org 75,000.00 5,625.00
Org 80,000.00 6,000.00
730,201.00
109,530.15
839,731.15
839,730.00
M3 174,000.00 208,800.00
Kg 38,500.00 288,750.00
Org 57,000.00 85,500.00
430504216.xlsx 91
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
Org 70,000.00 14,000.00
Org 80,000.00 1,600.00
598,650.00
89,797.50
688,447.50
688,440.00
5x11x22, tebal 1/2 bata, camp spesi 1 : 3 (SNI 6897-2008)
Buah 800.00 56,000.00
Zak 80,000.00 22,992.00
M3 204,000.00 8,160.00
Org 57,000.00 17,100.00
Org 65,000.00 6,500.00
Org 75,000.00 750.00
Org 80,000.00 1,200.00
112,702.00
16,905.30
129,607.30
129,600.00
5x11x22, tebal 1/2 bata, camp spesi 1 : 5 (SNI 6897-2008)
Buah 800.00 56,000.00
Zak 80,000.00 15,488.00
M3 204,000.00 918.00
Org 57,000.00 17,100.00
Org 65,000.00 6,500.00
Org 75,000.00 750.00
Org 80,000.00 120.00
96,876.00
14,531.40
111,407.40
111,400.00
5x11x22, tebal 1 bata, camp spesi 1 : 3 (SNI 6897-2008)
Buah 800.00 112,000.00
Zak 80,000.00 52,720.00
M 3
204,000.00 1,856.40
Org 57,000.00 34,200.00
Org 65,000.00 13,000.00
Org 75,000.00 1,500.00
Org 80,000.00 240.00
215,516.40
32,327.46
430504216.xlsx 92
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
247,843.86
247,840.00
5x11x22, tebal 1 bata, camp spesi 1 : 5 (SNI 6897-2008)
Buah 800.00 112,000.00
Zak 80,000.00 35,520.00
M3 204,000.00 20,808.00
Org 57,000.00 34,200.00
Org 65,000.00 13,000.00
Org 75,000.00 1,500.00
Org 80,000.00 240.00
217,268.00
32,590.20
249,858.20
249,850.00
M2 144,000.00 158,400.00
Zak 80,000.00 18,800.00
M 3
204,000.00 7,140.00
Org 57,000.00 39,900.00
Org 65,000.00 22,750.00
Org 75,000.00 2,625.00
Org 80,000.00 2,800.00
252,415.00
37,862.25
290,277.25
290,270.00
430504216.xlsx 93
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
M3 174,000.00 208,800.00
M3 132,000.00 57,024.00
Org 57,000.00 44,460.00
Org 70,000.00 27,300.00
Org 75,000.00 292.50
Org 80,000.00 3,120.00
340,996.50
51,149.48
392,145.98
392,140.00
430504216.xlsx 94
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
3,772.50
28,922.50
28,920.00
430504216.xlsx 95
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
M2 108,000.00 109,080.00
M3
260,000.00 26,000.00
Org 57,000.00 14,250.00
Org 65,000.00 32,500.00
Org 75,000.00 1,875.00
Org 80,000.00 240.00
Ls 750.00 750.00
184,695.00
27,704.25
212,399.25
212,390.00
M2 118,000.00 119,180.00
M3 260,000.00 26,000.00
Org 57,000.00 14,250.00
Org 65,000.00 32,500.00
Org 75,000.00 1,875.00
Org 80,000.00 240.00
Ls 750.00 750.00
194,795.00
29,219.25
224,014.25
224,010.00
M2 56,700.00 57,267.00
M3 260,000.00 26,000.00
Org 57,000.00 14,250.00
Org 65,000.00 32,500.00
Org 75,000.00 1,875.00
Org 80,000.00 240.00
Ls 750.00 750.00
132,882.00
19,932.30
152,814.30
152,810.00
M2 59,600.00 60,196.00
430504216.xlsx 96
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
M3
260,000.00 26,000.00
Org 57,000.00 14,250.00
Org 65,000.00 32,500.00
Org 75,000.00 1,875.00
Org 80,000.00 240.00
Ls 750.00 750.00
135,811.00
20,371.65
156,182.65
156,180.00
430504216.xlsx 97
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
20) Warna/Polos Sekualitas " MULIA " (SNI 7395-2008)
M2 54,000.00 54,540.00
Zak 80,000.00 16,640.00
M3 204,000.00 9,180.00
Kg 6,000.00 9,720.00
Org 57,000.00 39,900.00
Org 70,000.00 24,500.00
Org 75,000.00 2,625.00
Org 80,000.00 2,800.00
159,905.00
23,985.75
183,890.75
183,890.00
20) Warna/Corak Sekualitas " MULIA " (SNI 7395-2008)
M2 57,600.00 58,176.00
Zak 80,000.00 16,640.00
M3 204,000.00 9,180.00
Kg 6,000.00 9,720.00
Org 57,000.00 39,900.00
Org 70,000.00 24,500.00
Org 75,000.00 2,625.00
Org 80,000.00 2,800.00
163,541.00
24,531.15
188,072.15
188,070.00
30) Putih/Polos Sekualitas " MULIA " (SNI 7395-2008)
M2 50,000.00 50,500.00
Zak 80,000.00 16,000.00
M3 204,000.00 9,180.00
Kg 6,000.00 9,000.00
Org 57,000.00 39,900.00
Org 70,000.00 24,500.00
Org 75,000.00 2,625.00
Org 80,000.00 2,800.00
154,505.00
23,175.75
177,680.75
177,680.00
33) Warna/Corak Sekualitas " ROMAN GRESS " (SNI 7395-2008)
430504216.xlsx 98
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
M2
70,000.00 70,700.00
Zak 80,000.00 13,104.00
M3 204,000.00 9,180.00
Kg 6,000.00 9,720.00
Org 57,000.00 39,900.00
Org 70,000.00 24,500.00
Org 75,000.00 2,625.00
Org 80,000.00 2,800.00
172,529.00
25,879.35
198,408.35
198,400.00
430504216.xlsx 99
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
40) Warna/Corak Sekualitas " MULIA " (SNI 7395-2008)
M2 60,000.00 60,600.00
Zak 80,000.00 15,680.00
M3 204,000.00 9,180.00
Kg 6,000.00 9,720.00
Org 57,000.00 14,250.00
Org 70,000.00 8,750.00
Org 75,000.00 975.00
Org 80,000.00 1,040.00
120,195.00
18,029.25
138,224.25
138,220.00
0/20) Warna/ Polos Sekualitas " MULIA " (SNI 7395-2008)
M2 54,000.00 54,540.00
Zak 80,000.00 14,880.00
M3 204,000.00 3,672.00
Kg 6,000.00 11,640.00
Org 57,000.00 51,300.00
Org 70,000.00 31,500.00
Org 75,000.00 3,375.00
Org 80,000.00 3,600.00
174,507.00
26,176.05
200,683.05
200,680.00
0/20) Warna/Corak Sekualitas " MULIA " (SNI 7395-2008)
M2 57,600.00 58,176.00
Zak 80,000.00 14,880.00
M3 204,000.00 3,672.00
Kg 6,000.00 11,640.00
Org 57,000.00 51,300.00
Org 70,000.00 31,500.00
Org 75,000.00 3,375.00
Org 80,000.00 3,600.00
178,143.00
26,721.45
204,864.45
204,860.00
430504216.xlsx 100
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
Zak 80,000.00 298,640.00
M3
260,000.00 143,000.00
M3 293,000.00 272,490.00
Ls 2,500.00 2,500.00
Org 57,000.00 65,949.00
Org 65,000.00 39,000.00
Org 75,000.00 3,750.00
Org 80,000.00 800.00
826,129.00
123,919.35
950,048.35
950,040.00
430504216.xlsx 101
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
M3 110,000.00 5,500.00
Ls 1,750.00 1,750.00
Ls 2,750.00 2,750.00
10,000.00
1,500.00
11,500.00
11,500.00
m2 165,000.00 181,500.00
zak 80,000.00 9,600.00
m3 204,000.00 6,324.00
org 57,000.00 10,687.50
org 75,000.00 16,875.00
org 75,000.00 2,812.50
org 80,000.00 2,704.00
ls 2,500.00 1,875.00
232,378.00
34,856.70
267,234.70
267,230.00
m2 110,000.00 111,100.00
zak 80,000.00 12,800.00
m3 204,000.00 6,120.00
org 57,000.00 10,687.50
org 70,000.00 21,000.00
org 75,000.00 2,812.50
org 80,000.00 1,504.00
166,024.00
24,903.60
190,927.60
190,920.00
m2 165,000.00 166,650.00
zak 80,000.00 12,800.00
m3 204,000.00 6,120.00
org 57,000.00 10,687.50
org 70,000.00 21,000.00
org 75,000.00 2,812.50
430504216.xlsx 102
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
org 80,000.00 1,504.00
221,574.00
33,236.10
254,810.10
254,810.00
430504216.xlsx 103
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
PEKERJAAN PENGECATAN
Kg 57,500.00 11,500.00
Kg 7,000.00 1,050.00
Buah 11,600.00 580.00
Org 57,000.00 5,871.00
Org 70,000.00 14,000.00
Org 75,000.00 2,250.00
Org 80,000.00 800.00
36,051.00
5,407.65
41,458.65
41,450.00
Kg 21,100.00 3,692.50
Kg 16,200.00 2,592.00
Buah 26,400.00 264.00
Lembar 4,900.00 2,450.00
Org 57,000.00 5,928.00
Org 70,000.00 12,740.00
Org 75,000.00 1,462.50
Org 80,000.00 800.00
lot 29,929.00 1,346.81
31,275.81
4,691.37
35,967.18
35,960.00
Kg 19,000.00 3,800.00
Kg 49,900.00 12,974.00
Lbr 4,900.00 1,960.00
Bh 11,600.00 580.00
Org 57,000.00 3,990.00
Org 70,000.00 630.00
Org 75,000.00 450.00
Org 80,000.00 200.00
24,584.00
3,687.60
28,271.60
430504216.xlsx 104
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
28,270.00
m3 144,000.00 187,200.00
ls 250.00 250.00
jam 74,412.00 892.94
jam 8,142.86 784.97
jam 11,428.57 137.14
189,265.06
28,389.76
217,654.82
217,650.00
430504216.xlsx 105
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
m3 81,000.00 78,975.00
m3 300,000.00 64,500.00
m3 132,000.00 46,200.00
ls 250.00 250.00
jam 74,412.00 1,860.30
jam 8,142.86 1,907.87
jam 11,428.57 382.86
194,076.03
29,111.40
223,187.43
223,180.00
m3 148,500.00 178,200.00
ls 250.00 250.00
jam 74,412.00 3,318.78
jam 8,142.86 363.17
jam 11,428.57 5,099.43
187,231.38
28,084.71
215,316.08
215,310.00
kg 11,612.90 7,455.48
ltr 20,000.00 9,780.00
ls 100.00 100.00
jam 49,608.00 79.37
jam 8,142.86 13.03
jam 11,428.57 91.43
17,519.31
2,627.90
20,147.21
20,140.00
kg 11,612.90 5,080.65
ltr 20,000.00 5,080.00
ls 100.00 100.00
jam 49,608.00 79.37
Jam 57,060.00 176.89
Jam 8,142.86 65.14
430504216.xlsx 106
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
Jam 11,428.57 18.29
10,600.33
1,590.05
12,190.38
12,190.00
430504216.xlsx 107
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
m3 291,000.00 13,968.00
m3 275,000.00 6,050.00
m3 260,000.00 2,080.00
kg 11,612.90 58,064.52
ls 2,200.00 2,200.00
jam 74,412.00 1,240.20
jam 49,608.00 826.80
jam 8,142.86 155.77
jam 10,000.00 26.00
jam 11,428.57 14.86
84,626.15
12,693.92
97,320.07
97,320.00
m3 325,000.00 3,900.00
kg 11,612.90 17,419.35
ls 100.00 100.00
jam 8,142.86 474.73
jam 11,428.57 44.57
21,938.65
3,290.80
25,229.45
25,220.00
m3 293,000.00 6,446.00
430504216.xlsx 108
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
m3 275,000.00 3,052.50
m3 260,000.00 780.00
kg 11,612.90 36,000.00
jam 105,744.00 645.04
jam 74,412.00 156.27
ls 1,000.00 1,000.00
jam 8,142.86 261.39
jam 11,428.57 24.00
48,365.19
7,254.78
55,619.97
55,610.00
430504216.xlsx 109
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
m3 220,000.00 2,420.00
ltr 11,612.90 13,935.48
ls 1,000.00 1,000.00
org 57,000.00 969.00
org 80,000.00 80.00
18,404.48
2,760.67
21,165.16
21,160.00
430504216.xlsx 110
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
Jam 104,438.00 167.10
Ls 3,500.00 3,500.00
Jam 8,142.86 276.04
Jam 10,000.00 34.00
Jam 11,428.57 38.86
1,215,708.32
182,356.25
1,398,064.57
1,398,060.00
430504216.xlsx 111
Standar Harga di Bidang Praskim untuk Wilayah Selatan
4 5 6
Diperiksa ;
Kepala Bidang Penataan Prasarana Permukiman
430504216.xlsx 112
PERHITUNGAN VOLUME/KUANTITAS PEK
DESA PANYINDANGAN KECAMATAN CISOMPET KA
TAHUN ANGGARAN 2017
0.4 0.2
3 Pek. Plesteran m2
4 Acian
:
: Drainase
: .......... m
:......................
0.4
0.4
`
65.00 0.05 0.30 0.10 58.50
(...........................)
REKAP VOLUME PEKERJAAN
DESA PANYINDANGAN KECAMATAN CISOMPET KABUPATEN GARUT
TAHUN ANGGARAN 2017
B PEKERJAAN PASANGAN
1 Pas. Batu Kali 53.30 m3
C PEKERJAAN PLESTERAN
1 Plesteran 58.50 m2
2 Acian 58.50 m2
Garut, ..............................2016
Tim Penyusun RKPDes
Ketua
(...........................)
ANALISA HARGA SATUAN PEKERJAAN
DESA PANYINDANGAN KECAMATAN CISOMPET KABUPATEN GARUT
TAHUN ANGGARAN 2017
1 2 3 4 5
VOLUME PEKERJAAN 20.80 m3
A PEK. GALIAN TANAH
1 Bahan
Pekerja Oh 0.7500 15.60
Mandor Oh 0.0250 0.52
( …………………….. )
RENCANA ANGGARAN BIAYA
DESA PANYINDANGAN KECAMATAN CISOMPET KABUPATEN GARUT
TAHUN ANGGARAN 2017
I BAHAN
1 Pasir Pasang 31.80 m3 350,000 11,131,120
2 Semen Portland 197.19 Zak 80,000 15,774,824
3 Batu Belah 63.96 m3 150,000 9,594,000
4 Bambu 8.00 btg 5,000 40,000
PERALATAN KERJA
1 Sendok Tembok 23,000 20,909 2,091 314
2 Cangkul 68,000 61,818 6,182 927
3 Sekop 68,000 61,818 6,182 927
4 Ember 14,000 12,727 1,273 191
5 Meteran 14,000 12,727 1,273 191
6 Benang 3,000 2,727 273 41
7 Waterpass 2,000 1,818 182 27
8 Palu Kecil 41,000 37,273 3,727 559
9 Palu 5 kg 68,000 61,818 6,182 927
10 Linggis 68,500 62,273 6,227 934
Upah
1 Pekerja
2 Tukang
3 Mandor
TERIAL
DIBLATKAN
HARGA
HARGA RAB
10 11
150,218 150,000
350,141 350,000
350,141 350,000
353,455 353,000
350,141 350,000
350,141 350,000
350,141 350,000
249,627 250,000
350,141 350,000
1,767,273 1,767,000
9,941 10,000
9,941 10,000
99,961 100,000
79,527 80,000
276,136 276,000
276,136 276,000
4,970 5,000
25,405 25,000
75,109 75,000
75,109 75,000
15,464 15,000
15,464 15,000
3,314 3,000
2,209 2,000
45,286 45,000
75,109 75,000
75,661 75,700
80,000
100,000
90,000