Anda di halaman 1dari 43

STANDAR SATUAN HARGA UPAH, BAHAN BANGUNAN,JALAN JEMBATAN DAN BENDUNGAN

MENURUT JENIS BARANG DAN JASA SEMESTER 1 TAHUN ANGGARAN 2017

NO JENIS BARANG DAN JASA SATUAN HARGA (Rp)


KABANJAHE
I HARGA UPAH
1 Pekerja (Buruh tak terlatih) oh 96,000.00
2 Buruh semi terlatih oh 101,000.00
3 Tukang/Buruh terlatih oh 115,000.00
4 Mandor oh 126,000.00
5 Kepala tukang oh 126,000.00
6 Operator terlatih oh 171,000.00
7 Operator semi terlatih oh 144,000.00
8 Asisten Operator oh 138,000.00
9 Masinis mesin gilas oh 138,000.00
10 Supir oh 143,000.00
11 Pembantu supir oh 132,000.00
12 Juru Ukur oh 138,000.00
13 Asisten juru ukur oh 121,000.00
14 Pemasak aspal oh 121,000.00
15 Upah relief m 131,000.00
16 Upah relief ornamen karo m 171,000.00

II HARGA BAHAN
A Bahan Galian
1 Batu kali m 260,000.00
2 Pasir sungai m 211,500.00
3 Pasir gunung m 205,000.00
4 Sirtu (Kelas c) m 232,000.00
5 Batu Kerikil m 415,000.00
6 Batu pecah 1 - 2 cm m 418,000.00
7 Batu pecah 2 - 3 cm m 415,000.00
8 Batu pecah 3 - 5 cm m 370,000.00
9 Batu pecah 5 - 7 cm m 345,000.00
10 Abu Batu m 400,000.00
11 Agregat basa course klas A m 450,000.00
12 Agregat basa course klas B m 440,000.00
13 Batu kacang m 420,000.00
14 Batu bata kwalitas mesin bh 985.00
15 Batu bata kwalitas lokal bh 750.00
16 Bata ringan tebal 7,5 cm bh 9,500.00
17 Bata ringan tebal 10 cm bh 12,500.00
18 Batu koral m 220,000.00
19 Batu Mangga m 220,000.00
20 Batu pukul m 220,000.00
21 Batu kelapa m 220,000.00

B Bahan Adukan
1 Semen putih 40 Kg zak 155,250.00
2 Semen Portland (PC) 40 Kg zak 63,250.00
3 Kapur Pasang aduk zak 39,000.00
4 Kapur zak 30,000.00
5 Bodem bh 47,300.00

C Bahan Atap
- seng
1 Seng gelombang BJLS 20 - 6 kaki (9 Parit) Lbr 42,000.00
2 Seng gelombang BJLS 20 - 7 kaki (9 Parit) Lbr 52,000.00
3 Seng gelombang BJLS 20 - 8 kaki (9 Parit) Lbr 55,800.00
4 Seng gelombang BJLS 30 - 6 kaki (11 Parit) Lbr 89,700.00
5 Seng gelombang BJLS 30 - 7 kaki (11 Parit) Lbr 96,500.00
6 Seng gelombang BJLS 30 - 8 kaki (11 Parit) Lbr 110,000.00
7 Seng gelombang BJLS 35 - 6 kaki (11 Parit) Lbr 93,150.00
8 Seng gelombang BJLS 35 - 7 kaki (11 Parit) Lbr 105,600.00
9 Seng gelombang BJLS 35 - 8 kaki (11 Parit) Lbr 121,000.00
10 Seng plat BJLS 20 - 7 kaki Lbr 90,000.00
11 Seng plat BJLS 30 - 8 kaki Lbr 125,000.00
12 Seng plat BJLS 35 - 8 kaki Lbr 158,000.00
13 Nok/Rabung BJLS 20 Li Lbr 30,000.00

- Genteng
1 Atap genteng semen polos bh 8,000.00
2 Atap genteng semen warna bh 11,000.00
3 Atap genteng keramik bh 14,500.00
4 Atap zincalum Gelombang tebal 0.35 mm lbr 76,000.00
5 Atap sky light poly carbonat m 105,000.00
6 Atap sirap mastik dan berpasir lbr 306,000.00
7 Genteng metal (4 tingkat) lbr 73,500.00
8 genteng fiber bh 76,000.00
9 Atap genteng aspal m 400,000.00
10 nok genteng aspal m 200,000.00
11 Atap asbes gelombang 11 paret x 6 kaki lbr 54,000.00
12 Atap asbes gelombang 11 paret x 7 kaki lbr 63,500.00
13 Atap asbes gelombang 11 paret x 8 kaki lbr 72,000.00
14 Rabung zinc alumunium tebal 0.35 mm m 54,000.00
15 Rabung genteng keramik lbr 29,000.00
16 rabung genteng semen polos bh 9,700.00
17 rabung genteng semen warna lbr 21,000.00
18 rabung genteng metal tebal 0.25 mm m 45,500.00
19 rabung genteng metal tebal 0.35 mm m 54,000.00
20 rabung sirap mastik dan berpasir lbr 138,200.00
21 rabung asbes gelombang lbr 15,000.00
22 rangka atap baja ringan (C75 dan C100) m 222,000.00

D Bahan Plafon dan Kayu Olahan Pabrik


- Plafond
1 Asbes semen lokal 4 mm lbr 32,500.00
2 Asbes atrisco lbr 23,000.00
1 asbes semen lokal 4 mm lbr 270,000.00
2 Asbes atrisco lbr 200,000.00

- Gypsum
1 Rangka furing plafond gypsum btg 16,000.00
2 Gypsum 9 mm lbr 88,000.00
3 Gypsum 12 mm lbr 108,600.00
4 Profil Gypsum btg 61,300.00
5 Calsiboard Uk.4 mm lbr 180,000.00
6 Papan GRC tebal 4 mm lbr 87,500.00
7 Papan GRC tebal 6 mm lbr 125,000.00
8 Papan GRC tebal 9 mm lbr 187,500.00
9 Alumunium Composite panel tebal 2 mm m 425,000.00
10 Alumunium Composite panel tebal 3 mm m 475,000.00

- Triplek
1 Tripleks 3 mm polos Lbr 58,000.00
2 Tripleks 4 mm polos Lbr 72,000.00
3 Tripleks 6 mm polos Lbr 98,000.00
4 Tripleks 9 mm polos Lbr 149,500.00
5 Tripleks 12 mm polos Lbr 210,000.00
6 Tripleks 15 mm polos Lbr 300,000.00

- Plywood
1 Ply wood tbl 3 mm Lbr 86,250.00
2 Ply wood tbl 4 mm Lbr 93,500.00
3 Ply wood tbl 6 mm Lbr 117,000.00
4 Ply wood tbl 9 mm Lbr 162,500.00
5 Ply wood tbl 12 mm Lbr 214,500.00
6 Treak wood bahan lokal tebal 3 mm Lbr 83,500.00
7 Treak wood bahan lokal tebal 4 mm Lbr 101,250.00

E Bahan Besi / Kawat


1 Besi beton ulir Kg 13,750.00
2 Besi beton Kg 13,750.00
3 Besi plat polos Kg 13,750.00
4 Besi wiremesh Diameter 6 m 38,000.00
Diameter 8 m 66,000.00
Diameter 10 m 105,000.00
5 Selling Baja Diameter 6 m 15,400.00
Diameter 8 m 15,950.00
Diameter 10 m 18,000.00
6 Baja WF 200 Kg 15,900.00

- Besi Plat Strip


1 2" x " x 6 m Btg 136,500.00
2 1" x 1/8" x 6 m Btg 60,500.00
3 " x 1/8" x 6 m Btg 46,000.00

- Besi Siku
1 L30.30.3 Btg 77,500.00
2 L40.40.3 Btg 103,400.00
3 L40.40.4 Btg 139,000.00
4 L50.50.4 Btg 172,000.00
5 L50.50.5 Btg 215,400.00
6 L50.50.6 Btg 258,500.00
7 L60.60.6 Btg 325,000.00
8 L70.70.6 Btg 440,000.00
9 L70.70.7 Btg 510,000.00
10 L80.80.8 Btg 667,000.00

- Besi Profil
1 WF 900.300.13.24 Kg 21,700.00
2 WF 800.300.14.26 Kg 19,000.00
3 WF 700.300.13.24 Kg 18,200.00
4 WF 500.200.10.16 Kg 17,600.00
5 WF 200.100.5,5.8 Kg 15,900.00
6 H Beam 200.200.8 Kg 14,500.00
7 CNP 100.50.20.3,2 Kg 14,000.00
8 UNP 100.50.5 Kg 14,000.00
9 Besi Hollow Uk 20 x 20 Btg 93,500.00
10 Besi Hollow Uk 20 x 40 Btg 143,000.00
11 Besi Hollow Uk 40 x 40 Btg 192,500.00
12 Besi Hollow Uk 40 x 80 Btg 290,000.00

- Skrup
1 Kecil Kg 27,000.00
2 Besar Kg 25,000.00

- Kawat
1 Kawat Beton/bindar Kg 25,000.00
2 Kawat Bronjong Galvanis Kg 28,500.00
3 Kawat duri lokal (10 kg) Gulung 143,750.00
4 Kawat nyamuk lokal m 18,600.00
5 Kawat harmonika 0,2 mm Kg 44,000.00
6 Kawat las RD 26 Kg 36,800.00
7 Kawat las karbide Kg 23,000.00

- Paku/Baut
1 Paku biasa
- Ukuran 1" Kg 32,200.00
- Ukuran 2" Kg 24,500.00
- Ukuran 3" Kg 20,000.00
- Ukuran 4" Kg 19,000.00
- Ukuran 5" Kg 18,000.00
2 Paku Beton Bh 700.00
3 Paku genteng metal Bh 700.00
4 Pake seng Kg 38,500.00
5 Kuku Kambing Bh 20,000.00
6 Baut baja uk. 1" panjang 4" Bh 17,000.00
7 Baut baja uk. 1" panjang 3" Bh 16,000.00
8 Baut baja uk. 3/4" panjang 7" Bh 12,000.00
9 Angker jembatan Baut 1" x 40 cm Bh 64,500.00

F Keramik/Ubin/Kanstin/Con Block
1 Bonbon Porselin m 37,500.00
2 Keramik Putih 30 x 30 cm m 84,900.00
3 keramik Putih 40 x 40 cm m 89,500.00
4 Keramik warna 20 x 25 cm m 89,500.00
5 Keramik Warna 20 x 20 cm m 81,000.00
6 Keramik warna 40 x 40 cm m 98,600.00
7 Plint Keramik 10 x 30 cm Bh 4,000.00
8 Plint Keramik 10 x 40 cm Bh 4,000.00
9 Plint Keramik 15 x 30 cm Bh 4,000.00
10 Plint Keramik 15 x 40 cm Bh 6,000.00
11 Granit 60 x 90 cm m 400,000.00
12 Kanstin Ukuran 20 x 30 m 80,000.00
13 Kanstin Ukuran 15 x 35 m 69,000.00
14 Kanstin Ukuran 15 x 30 m 60,000.00
15 Batu Con Blok # 8 cm mutu K-175 Bh 3,500.00
16 batu Con Blok # 6 vm mutu K-125 Bh 3,000.00
17 Batu Templek m 300,000.00
18 Batu Candi m 276,000.00
19 Batu Alam Palingan m 276,000.00
20 Batu Alam Paris Jogja m 276,000.00
21 Batu Alam Batu Candi m 300,000.00
22 Batu Alam Andesit m 336,000.00
23 Batu Kacang Multi Colour Kg 25,000.00
24 Batu Kacang Warna Hitam Kg 40,000.00
25 Batu Kacang Putih Kg 40,000.00

- Riol Bangunan
1 Riol Beton 1/2 dia 15 cm P=1 m Bh 60,500.00
2 Riol Beton Diameter 10 cm panjang 1m Bh 47,500.00
3 Riol Beton Diameter 20 cm panjang 1m Bh 85,000.00
4 Riol Beton Diameter 30 cm panjang 1m Bh 114,600.00
5 Riol Beton Diameter 40 cm panjang 1m Bh 164,900.00
6 Riol Beton Diameter 50 cm panjang 1m Bh 230,000.00
7 Riol Beton Diameter 60 cm panjang 1m Bh 329,700.00
8 Riol Beton Diameter 70 cm panjang 1m Bh 365,000.00
9 Riol Beton Diameter 80 cm panjang 1m Bh 420,000.00
10 Riol Beton Diameter 100cm panjang 1m Bh 490,000.00

G Kayu Olahan Pabrik


1 Kayu Damar laut (Kelas I) Ton 11,800,000.00
2 Meranti (Kelas II) Ton 9,125,000.00
3 Kayu Sembarang (Kelas III dan IV) Ton 6,500,000.00
4 Las Asbes tidak Ketam Btg 11,500.00
5 Kayu Api m 256,500.00
6 Kayu List Profil Btg 27,800.00
7 Bambu Besar Btg 27,500.00
8 bambu Sedang Btg 18,700.00
9 Bambu Kecil Btg 10,700.00

H Kaca
1 Kaca Polos t = 3mm m 58,900.00
2 Kaca Polos t = 5mm m 84,000.00
3 Kaca Riben t = 3mm m 65,000.00
4 Kaca Riben t = 5mm m 85,000.00
5 Glass Block Bh 28,750.00
6 Kaca Tempered 8 mm + Rangka + Upah Pasang m 1,000,000.00
7 Kaca tempered 10 mm + Rangka + Upah Pasang m 1,200,000.00
8 Kaca Tempered 12 mm + Rangka + Upah Pasang m 1,500,000.00

I Bahan Aspal
1 Aspal Cutback Pertamina Pan 60/70 Kg 14,650.00
2 Ceret Aspal Bh 180,000.00
3 Sekop + Gagang Bh 66,000.00
4 Gayung Aspal Bh 53,000.00
5 Emulsi Ltr 15,000.00
J Bahan Cat
1 Cat Perak Kg 68,100.00
2 Cat Manie Kayu Kg 49,200.00
3 Cat manie Besi Kg 43,500.00
4 Cat Melamine Kg 57,500.00
5 Cat Pernis Kg 60,500.00
6 Teak Oli Kg 86,250.00
7 Thiner Ltr 27,500.00
8 Cat Dasar Kg 27,000.00
9 Oker Kg 29,400.00
10 Cat papan Tulis Kg 54,500.00
11 Cat Tembok Mutu Biasa Kg 29,000.00
12 Cat Tembok Mutu Baik Kg 38,200.00
13 Cat Tembok Tahan Cuaca Kg 100,000.00
14 Kolter/Residu Kg 8,250.00
15 Cat Kilat Mutu Biasa Kg 61,900.00
16 Cat kilat Mutu Baik Kg 69,000.00
17 Plingkut Kg 57,500.00
18 Tepung Dempul Kg 8,300.00

K Pipa PVC SNI


- Pipa PVC SNI S-8
1 Pipa PVC 1/2" m 8,000.00
2 Pipa PVC 3/4" m 10,000.00
3 Pipa PVC 1" m 12,500.00
4 Pipa PVC 1 1/4" m 18,750.00
5 Pipa PVC 1 1/2" m 28,500.00
6 Pipa PVC 2 m 47,500.00
7 Pipa PVC 3" m 96,000.00
8 Pipa PVC 4 m 143,000.00
9 Pipa PVC 6 m 301,000.00
10 Pipa PVC 8 m 494,000.00

- Pipa PVC SNI S-10


1 Pipa PVC 1 1/2" m 22,800.00
2 Pipa PVC 2 m 37,600.00
3 Pipa PVC 3" m 75,000.00
4 Pipa PVC 4 m 113,000.00
5 Pipa PVC 6 m 240,000.00
6 Pipa PVC 8 m 384,000.00

- Pipa PVC S - 12,5


1 Pipa PVC 2 m 30,400.00
2 Pipa PVC 3" m 62,000.00
3 Pipa PVC 4 m 91,000.00
4 Pipa PVC 6 m 167,000.00
5 Pipa PVC 8 m 331,000.00

L Bahan Lainnya
1 Engsel Kecil Bh 6,600.00
2 Engsel Besar Bh 16,000.00
3 Engsel Pintu 4" Bh 25,500.00
4 Engsel jendela 3" Bh 7,800.00
5 Jendela Kecil Bh 250,000.00
6 Jendela Besar Bh 350,000.00
7 Pintu Panel Bh 544,500.00
8 Pintu Fiber Bh 303,000.00
9 Closed Duduk dengan tangki mutu baik Bh 2,300,000.00
10 Closed Duduk tanpa tangki mutu baik Bh 1,000,000.00
11 Closed Jongkok Bh 175,000.00
12 Wastafel Type standart Bh 500,000.00
13 Urinoir Komplet Unit 2,800,000.00
14 Bak Fiber Glass kap. 1 m Bh 500,000.00
15 Tempat sabun keramik uk. 10 x 20 m Bh 86,250.00
16 Tempat sabun tanam keramik Bh 160,000.00
17 Pintu kaca gelap hidrolik Uk. 90 cm x 200 cm Bh 6,750,000.00

- Grendel
1 Kecil Bh 15,000.00
2 Besar Bh 20,000.00
3 Grendel Sorong Atas 6" Bh 20,000.00
4 Grendel Sorong Bawah 6" Bh 20,000.00
5 Grendel Tanam set 86,250.00
6 Handle 3" Bh 8,000.00

- Kunci Tanam
1 Kecil Mutu biasa Bh 51,750.00
2 Kecil Mutu Baik Bh 90,000.00
3 Besar Mutu biasa Bh 75,000.00
4 Besar Mutu baik Bh 150,000.00
5 Kunci Antik Bh 350,000.00
6 Kunci Wing Bh 61,000.00

- Linggis
1 Besar Bh 172,500.00
2 Kecil Bh 50,000.00

- Amplas
1 Kayu Lbr 6,250.00
2 Besi Lbr 8,700.00
- Martil
1 Besar Bh 57,500.00
2 Kecil Bh 35,000.00

M Aksesoris
1 Plengki Bh 23,000.00
2 Cangkul + Gagang Bh 120,000.00
3 Goni Plastik Bh 3,600.00
4 Kikir Bh 14,000.00
5 Air Ltr 38.00
6 Ijuk Kg 17,000.00
7 Anyaman bambu m 20,000.00
8 Tanduk Kerbau Asli Unit 650,000.00
9 Tanduk Kerbau Buatan Unit 450,000.00
10 Ayo ayo anyaman Bambu m 550,000.00
11 Ret-ret m 170,000.00
12 Kayu Ukiran Sudut (Rumah adat karo) Bh 250,000.00
13 Lem kayu Kg 44,000.00
14 Sealant Klg 180,000.00
15 Profil alumunium m 30,000.00
16 Allumunium Strip Lbr 47,250.00
17 Allumunium Foil m 20,000.00
18 Lat Alumunium m 27,000.00
19 Soda Api Kg 66,000.00
20 Sabun Kg 27,500.00
21 Kuas 2" Bh 20,700.00
22 Kuas 3" Bh 25,000.00
23 Kuas 5" Bh 40,250.00
24 Atap Nipah m 25,000.00
25 Dinding Tepas m 30,000.00

N Pipa GIP Medium


1 1/2" Btg 107,000.00
2 3/4" Btg 140,800.00
3 1" Btg 180,200.00
4 1 1/4" Btg 236,500.00
5 1 1/2" Btg 293,200.00

O Pipa Air GIP


1 1/2" Btg 41,700.00
2 3/4" Btg 56,400.00
3 1" Btg 73,200.00
4 1 1/4" Btg 78,900.00
5 1 1/2" Btg 89,000.00
6 2" Btg 118,300.00

P Pipa PVC Maspion class AW


1 1" Btg 87,300.00
2 1/2" Btg 59,200.00
3 3/4" Btg 76,200.00
4 2" Btg 253,400.00
5 3" Btg 461,800.00
6 4" Btg 670,100.00

Q Pipa PVC Wavin Class AW


1 1" Bh 64,800.00
2 1/2" Bh 36,600.00
3 3/4" Bh 53,500.00
4 2" Bh 143,600.00
5 3" Bh 259,100.00
6 4" Bh 433,600.00

R Elbow GIP
1 1/2" Bh 6,200.00
2 3/4" Bh 9,100.00
3 1" Bh 15,300.00
4 1 1/4" Bh 20,900.00
5 1 1/2" Bh 21,400.00
6 2" Bh 31,000.00
7 2 1/2" Bh 70,400.00
8 3" Bh 109,800.00
9 4" Bh 171,800.00

S Bocthen GIP
1 1/2" Bh 11,300.00
2 3/4" Bh 18,100.00
3 1" Bh 25,400.00
4 1 1/4" Bh 37,800.00
5 1 1/2" Bh 53,500.00
6 2" Bh 70,500.00
7 2 1/2" Bh 145,300.00

T Tee GIP
1 1/2" Bh 8,500.00
2 3/4" Bh 15,300.00
3 1" Bh 21,400.00
4 1 1/4" Bh 36,600.00
5 1 1/2" Bh 31,000.00
6 2" Bh 50,700.00
7 2 1/2" Bh 118,300.00
8 3" Bh 157,700.00
9 4" Bh 242,200.00

U W Mur GIP
1 1/2" Bh 19,800.00
2 3/4" Bh 26,500.00
3 1" Bh 36,600.00
4 1 1/4" Bh 42,300.00
5 1 1/2" Bh 62,000.00
6 2" Bh 76,100.00
7 2 1/2" Bh 143,600.00
8 3" Bh 205,600.00

V D Nippel GIP
1 1/2" Bh 5,700.00
2 3/4" Bh 8,200.00
3 1" Bh 11,900.00
4 1 1/4" Bh 16,900.00
5 1 1/2" Bh 20,900.00
6 2" Bh 32,300.00
7 2 1/2" Bh 55,800.00
8 3" Bh 79,400.00
9 4" Bh 125,000.00

W Socket GIP
1 1/2" Bh 5,100.00
2 3/4" Bh 8,500.00
3 1" Bh 12,400.00
4 1 1/4" Bh 14,100.00
5 1 1/2" Bh 16,900.00
6 2" Bh 28,200.00
7 2 1/2" Bh 57,500.00
8 3" Bh 78,900.00
9 4" Bh 115,500.00

X Plug GIP
1 1/2" Bh 5,100.00
2 3/4" Bh 8,500.00
3 1" Bh 11,900.00
4 1 1/4" Bh 13,600.00
5 1 1/2" Bh 14,700.00
6 2" Bh 16,400.00
7 2 1/2" Bh 32,700.00
8 3" Bh 44,500.00
Y Dop GIP
1 1/2" Bh 6,200.00
2 3/4" Bh 7,900.00
3 1" Bh 11,300.00
4 1 1/4" Bh 13,600.00
5 1 1/2" Bh 16,400.00
6 2" Bh 21,400.00
7 2 1/2" Bh 27,100.00
8 3" Bh 53,500.00
9 4" Bh 95,800.00

Z V Socket GIP
1 3/4" Bh 9,100.00
2 1" Bh 13,000.00
3 1 1/4" Bh 16,900.00
4 1 1/2" Bh 25,400.00
5 2" Bh 33,800.00
6 2 1/2" Bh 59,200.00
7 3" Bh 91,800.00
8 4" Bh 126,700.00

AA V Ring GIP
1 3/4" Bh 5,700.00
2 1" Bh 9,600.00
3 1 1/4" Bh 15,800.00
4 1 1/2" Bh 18,100.00
5 2" Bh 24,300.00
6 2 1/2" Bh 39,500.00
7 3" Bh 55,800.00
8 4" Bh 112,700.00

AB Elbow PVC
1 1/2" Bh 3,400.00
2 3/4" Bh 4,600.00
3 1" Bh 9,100.00
4 1 1/4" Bh 10,700.00
5 1 1/2" Bh 13,600.00
6 2" Bh 22,000.00
7 2 1/2" Bh 28,200.00
7 3" Bh 39,500.00
8 4" Bh 73,200.00

AC Socket PVC
1 1/2" Bh 3,100.00
2 3/4" Bh 4,000.00
3 1" Bh 6,200.00
4 1 1/4" Bh 9,100.00
5 1 1/2" Bh 11,900.00
6 2" Bh 16,900.00
7 2 1/2" Bh 21,400.00
7 3" Bh 32,700.00
8 4" Bh 59,200.00

AD Tee PVC
1 1/2" Bh 4,000.00
2 3/4" Bh 5,700.00
3 1" Bh 9,100.00
4 1 1/4" Bh 13,600.00
5 1 1/2" Bh 16,400.00
6 2" Bh 22,000.00
7 2 1/2" Bh 32,700.00
7 3" Bh 55,200.00
8 4" Bh 109,800.00

AE F Sock PVC
1 1/2" Bh 4,000.00
2 3/4" Bh 5,100.00
3 1" Bh 6,200.00
4 1 1/4" Bh 9,100.00
5 1 1/2" Bh 11,300.00
6 2" Bh 14,100.00
7 2 1/2" Bh 27,600.00

AF V Sock PVC
1 1/2" Bh 3,400.00
2 3/4" Bh 5,100.00
3 1" Bh 6,800.00
4 1 1/4" Bh 8,800.00
5 1 1/2" Bh 10,200.00
6 2" Bh 11,900.00
7 2 1/2" Bh 22,000.00

AG Cap PVC
1 1/2" Bh 3,100.00
2 3/4" Bh 3,700.00
3 1" Bh 4,600.00

AH F Elbow PVC
1 1/2" Bh 3,700.00
2 3/4" Bh 4,600.00
3 1" Bh 7,400.00

AI R Sock PVC
1 1/2" Bh 4,000.00
2 3/4" Bh 5,100.00
3 1" Bh 5,100.00

AJ Keran Air China


1 1/2" Bh 33,300.00
2 3/4" Bh 40,600.00

AK Ball Val. VF (Screw End) (Stop Kran Engkol)


1 1/2" Bh 109,800.00
2 3/4" Bh 163,300.00
3 1" Bh 199,900.00

AL Gate Valve (Screw End)


1 1/2" Bh 101,400.00
2 3/4" Bh 112,700.00
3 1" Bh 157,700.00

AM U-Stuck (Collar)
1 2" Bh 281,600.00
2 3" Bh 422,300.00
3 4" Bh 455,000.00

AN Clamp Sanddle
1 2" x 3/4 Bh 42,800.00
2 2" Bh 53,500.00
3 2" 1/2 Bh 81,700.00

AO Lem PVC Tube 11,300.00

AP Senai uk 1/2" s/d 1 1/4" Bh 394,200.00

AQ Theben - Time Switch SUL 181 d 220 Volt Bh 507,400.00

AR Cable Skun
1 25 mm Bh 5,100.00
2 50 mm Bh 8,500.00

AS SKF Bearing
1 No. 6307 RS Bh 310,100.00
2 No. 6309 RS Bh 546,800.00
3 No. 6312 RS Bh 1,011,900.00

AT Karet Coupling
1 B. 140 Bh 56,400.00
2 B. 160 Bh 62,000.00
3 B. 180 Bh 79,000.00
4 B. 200 Bh 112,800.00

AU Coupling
1 N. 140 Bh 535,600.00
2 N. 160 Bh 746,900.00
3 N. 180 Bh 972,400.00
4 N. 200 Bh 1,409,300.00

AV SACI - Ampere Meter uk. 96 x 96 mm Bh 194,500.00

AW Flender Karet Coupling


1 B. 140 Bh 321,350.00
2 B. 160 Bh 422,800.00
3 B. 180 Bh 535,550.00
4 B. 200 Bh 659,550.00

AX Karet Coupling
1 N. 140 Bh 73,300.00
2 N. 160 Bh 90,200.00
3 N. 180 Bh 112,800.00
4 N. 200 bb 135,300.00

AY GAE - Torishima Centrifugal Pump


Type :ETA-N 125x100-250.1
Kapasitas :50 L/det (180 m/H)
Total Head :95 Meter
Efficiency :73%
NPSH :4.8
Impeller :Full Size
Power :75 Kw/100Hp, 2950 Rpm
Terkopel pada common base plate dan TECO-Elektromotor 75kw/100
hp.2950 Rpm 380/660 Volt dan Flender Coupling B 180
- Harga Pompa
- Harga Elektromotor
- Harga Baseplate + Flender Coupling B 180
- Harga GAE - Panel Star Delta da Komponennya
- Accesoris Pipa
- Pekerjaan Penjelasan dan pemasangan, Transportasi
dan Akomodasi
AZ Torishima Centrifugal Single Stage End Suction Pump + Teco Unit 73,279,500.00
Electromotor
Type :ETA-N 125 x 100 x 250.1
Power :75kw/3 x 380v/50hz/2900 rpm
Kapasitas :180 m3/h (50l/s
Head :95 meter

BA Centrifugal Single Stage End Suction Pump Lengkap dengan Unit 174,361,960.00
Elektromotor, panel dan instalasi

BB Ebara Centrifugal Single Stage End Suction Pump Unit 70,461,100.00

BC Grundfos Jet PUMP Unit 8,370,800.00

BD Jet PUMP Unit 31,702,200.00

BE Ebara Jet PUMP Unit 20,923,450.00

BF Bahan Sanitasi
1 Rubber Packing 4 mm Meter 202,930.00
2 Elbow PVC 6" Bh 281,600.00
3 U-Stuck
8" Bh 1,368,500.00
6" Bh 1,064,200.00
4 F-Sock PVC
4" Bh 67,600.00
3" Bh 39,450.00
5 Reducer 6 x 4 Bh 135,150.00
6 Pipa GIV 4" Batang 675,700.00
7 Pipa GIV 6" Batang 1,689,150.00
8 Pipa PVC Maspion AW 6" Batang 1,240,150.00
9 Pipa PVC Maspion AW 8" Batang 2,254,800.00
10 Pipa PVC Wavin AW 6" Batang 1,069,800.00
11 Pipa PVC Wavin AW 8" Batang 1,773,700.00
12 Pipa PVC Invilon 4" Batang 391,900.00
13 Pipa PVC Invilon 6" Batang 788,300.00
14 Pipa PVC Invilon 8" Batang 1,407,700.00
15 Tee PVC 6 x 2" Bh 281,600.00
16 Opsleter 2" Bh 563,100.00
17 Opsleter 3" Bh 1,499,900.00
18 Gagang Gergaji Bh 52,400.00
19 Mata Gergaji Super/Besi Bh 18,600.00
20 Lem Keybon Kaleng 39,500.00
21 Linggis panjang + gagang Bh 143,600.00
22 Kabel Listrik Meter 11,300.00
23 Kunci gigi Sedang Bh 100,300.00
24 Kunci gigi Kecil Bh 45,100.00
25 Kunci Monyet besar Bh 225,300.00
26 Kunci Monyet Kecil Bh 61,400.00
27 Kunci Inggris Besar Bh 278,800.00
28 Meter Gulung 15 Meter Bh 77,800.00
29 Kunci Angin (Pintu) Bh 45,100.00
30 Cat Minyak Kaleng 76,600.00
31 Bola Lampu 23 Wat Bh 33,800.00
32 Kunci Gigi No.18 Bh 91,800.00
33 Gembok Stainless Bh 45,100.00
34 Tank Bh 33,800.00
35 Kunci Gigi No.14 Bh 67,600.00
36 Klem Sadle 6 x 2" Bh 104,200.00
37 Kunci Pas 32 Bh 45,100.00
38 Kunci ring 28 Bh 55,800.00
39 Kunci Ring 24 Bh 45,700.00
40 Kunci Ring 22 Bh 40,600.00
41 Kunci Ring 19 Bh 33,800.00
42 Kunci Ring 17 Bh 28,200.00
43 Kunci Ring 14 Bh 27,100.00
44 Kunci Ring 12 Bh 14,700.00
45 Kunci Pas 28 Bh 33,800.00
46 Kunci Paas 24 Bh 28,200.00
47 Kunci Pas 22 Bh 28,200.00
48 Kunci pas 17 Bh 16,900.00
49 Kunci Pas 14 Bh 16,900.00
50 Kunci Pas 12 Bh 13,600.00
51 Cuduk + gagang Bh 91,300.00
52 Pocok + Gagang Bh 87,300.00
53 Karet Ustuk 8" Bh 112,750.00
54 Karet Ustuk 6" Bh 90,200.00
55 Karet Ustuk 4" Bh 67,650.00
56 Karet ustuk 3" Bh 56,400.00
57 Kawat Licin Gulung 16,950.00
58 Tee PVC 3 x 2" Bh 62,100.00
59 Tee PVC 6 x 4" Bh 140,950.00
60 Water Meter 1/2" Bh 169,150.00
61 Air Valve 2" Bh 563,700.00
62 Air Valve 4" Bh 789,200.00
63 Gate Valve 8" Bh 3,382,300.00
64 Gate Valve 6" Bh 2,029,300.00
65 Gate Valve 4" Bh 845,600.00
66 Gate Valve 2" Bh 507,400.00
BENDUNGAN

192,000.00
131,500.00
125,000.00
167,000.00
360,000.00
353,000.00
345,000.00
300,000.00
300,000.00
330,000.00
400,000.00
390,000.00
360,000.00
analisa tahun 2010

PT 6.5. 1 m Galian tanah cadas sedalam 1 meter

6.5.1. Tenaga
- Pekerja 1.250 Oh x
- Mandor 0.125 Oh x

PT 6.9. 1 m Urugan kembali

6.9.1. Tenaga
- Pekerja 0.192 Oh x
- Mandor 0.019 Oh x

PD 6.11 1 m Pasangan bata merah tebal 1/2 bata, 1Pc : 4 Ps

6.11.1 Bahan
- Bata merah 5 x 10 x 20 cm 70.000 Bh x
- Semen portland 11.500 Kg x
- Pasir pasang 0.043 M x

6.11.2 Tenaga
- Pekerja 0.320 Oh x
- Tukang batu 0.100 Oh x
- Kepala tukang 0.010 Oh x
- Mandor 0.015 Oh x

PA 6.8 1 m Membersihkan lapangan dan perataan

6.8.1 Tenaga
- Pekerja 0.100 Oh
- Mandor 0.050 Oh

PPL 6.2. 1 M Plesteran 1 Pc : 2 Ps, tebal 15 mm

6.2.1. Bahan
- Semen portland 8.520 Kg x
- Pasir pasang 0.017 M x

6.2.2. Tenaga
- Pekerja 0.200 Oh x
- Tukang batu 0.150 Oh x
- Kepala tukang 0.015 Oh x
- Mandor 0.010 Oh x

PPL 6.49 1 M Pasang lantai keramik 40 x 40 cm

6.49.1 Bahan
- Ubin keramik 40 x 40 cm 6.250 Bh x
- Semen portland 11.380 Kg x
- Pasir pasang 0.042 M x
- Semen warna 1.500 Kg x

6.49.2 Tenaga
- Pekerja 0.620 Oh x
- Tukang batu 0.350 Oh x
- Kepala tukang 0.035 Oh x
- Mandor 0.030 Oh x

PC 6.14 1M Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )

6.14.1 Bahan
- Plamir 0.120 Kg x
- Cat dasar 0.120 Kg x
- Cat tembok 2 x 0.260 Kg x

6.14.2 Tenaga
- Pekerja 0.040 Oh x
- Tukang cat 0.120 Oh x
- Kepala tukang 0.0120 Oh x
- Mandor 0.002 Oh x

PS 6.2. Memasang 1 buah kloset jongkok porselen


6.2.1. Bahan
- Klosed jongkok porselin 1.000 Bh
- Semen portland 6.000 Kg
- Pasir pasang 0.010 M

6.2.2. Tenaga
- Pekerja 1.100 Oh
- Tukang batu 1.500 Oh
- Kepala tukang 0.150 Oh
- Mandor 0.110 Oh

PS 6.35. Memasang 1 bh kran diameter " atau "

6.35.1. Bahan
- Kran air 1.000 Bh
- Seal tape 0.025 Bh

6.35.2. Tenaga
- Pekerja 0.010 Oh
- Tukang batu 0.100 Oh
- Kepala tukang 0.010 Oh
- Mandor 0.005 Oh

PS 6.36. Memasang 1 bh Floor drain

6.36.1. Bahan
- Floor drain 1.000 Bh

6.36.2. Tenaga
- Pekerja 0.010 Oh
- Tukang batu 0.100 Oh
- Kepala tukang 0.010 Oh
- Mandor 0.005 Oh

PS 6.32. Memasang 1 m' pipa PVC tipe AW diameter 4"


6.32.1. Bahan
- Pipa PVC 1.200 M
- Perlengkapan 35% harga pipa

6.32.2. Tenaga
- Pekerja 0.081 Oh
- Tukang batu 0.135 Oh
- Kepala tukang 0.0135 Oh
- Mandor 0.0041 Oh

PS 6.26. Memasang 1 m' pipa PVC tipe AW diameter "

6.26.1. Bahan
- Pipa PVC 1.200 M
- Perlengkapan 35% harga pipa

6.26.2. Tenaga
- Pekerja 0.036 Oh
- Tukang batu 0.060 Oh
- Kepala tukang 0.006 Oh
- Mandor 0.0018 Oh

PD 6.9 1 m Pasangan bata merah tebal 1/2 bata, 1Pc : 2 Ps

6.9.1 Bahan
- Bata merah 5 x 10 x 20 cm 70.000 Bh x
- Semen portland 18.950 Kg x
- Pasir pasang 0.038 M x

6.9.2 Tenaga
- Pekerja 0.320 Oh x
- Tukang batu 0.100 Oh x
- Kepala tukang 0.010 Oh x
- Mandor 0.015 Oh x

PB 6.36. 1 M Pasang beton dengan mutu K 275


6.36.1. Bahan
- Semen portland 400.000 Kg x Rp.
- Pasir beton 0.400 M x Rp.
- Koral beton 0.820 M x Rp.

6.36.2. Tenaga
- Pekerja 6.000 Oh x Rp.
- Tukang batu 1.000 Oh x Rp.
- Kepala tukang 0.100 Oh x Rp.
- Mandor 0.300 Oh x Rp.

PPL 6.13. 1 M Plesteran 1 Pc : 2 Ps, tebal 20 mm

6.13.1. Bahan
- Semen Portland 14.280 Kg x
- Pasir pasang 0.023 M x

6.13.2. Tenaga
- Pekerja 0.250 Oh x
- Tukang batu 0.200 Oh x
- Kepala tukang 0.020 Oh x
- Mandor 0.0125 Oh x

PC 6.15 1M Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup )

6.15.1 Bahan
- cat dasar 0.120 Kg x
- cat tembok 2 x 0.260 Kg x

6.15.2 Tenaga
- Pekerja 0.030 Oh x
- Tukang cat 0.090 Oh x
- Kepala tukang 0.0090 Oh x
- Mandor 0.0015 Oh x

PLL 6.24 1 M Langit - langit gypsum board, tebal 9 mm


6.24.1 Bahan
- Gypsum board (120 x 240 x 9) mm 0.364 Lbr x
- Rangka Fusirng 1.500 btg x
- Paku sekrup 0.110 Kg x

6.24.2 Tenaga
- Pekerja 0.100 Oh x
- Tukang kayu 0.050 Oh x
- Kepala tukang 0.005 Oh x
- Mandor 0.005 Oh x

PPA 6.32 1 M Pasang atap genteng metal / multi roof

6.32.1 Bahan
- Atap genteng metal 1.020 Bh x
- Rangka Atap Baja ringan 1.000 m2 x
- Paku 0.200 Kg x

6.32.2 Tenaga
- Pekerja 0.200 Oh x
- Tukang Kayu 0.100 Oh x
- Kepala Tukang 0.010 Oh x
- Mandor 0.010 Oh x

PB 6.39. 1 M Membuat sloof beton bertulang (200 kg besi + bekisting)

6.38.1. Bahan
- Kayu sembarang 0.2700 M x Rp.
- Paku biasa 2" - 5 " 2.000 Kg x Rp.
- Besi beton polos 200.000 Kg x Rp.
- Kawat beton 3.000 Kg x Rp.
- Semen portland 323.000 Kg x Rp.
- Pasir beton 0.520 M x Rp.
- Koral beton 0.780 M x Rp.

6.38.2. Tenaga
- Pekerja 4.850 Oh x Rp.
- Tukang batu 0.350 Oh x Rp.
- Tukang kayu 1.560 Oh x Rp.
- Tukang besi 1.400 Oh x Rp.
- Kepala tukang 0.331 Oh x Rp.
- Mandor 0.170 Oh x Rp.

PPL 6.44 1 M Pasang lantai keramik 20 x 20 cm

6.44.1 Bahan
- Ubin keramik 20 x 20 cm 25.000 Bh x
- Semen portland 11.380 Kg x
- Pasir pasang 0.042 M x
- Semen warna 1.500 Kg x

6.44.2 Tenaga
- Pekerja 0.620 Oh x
- Tukang batu 0.350 Oh x
- Kepala tukang 0.035 Oh x
- Mandor 0.030 Oh x

PK 6.3. 1 M Pasang kusen pintu dan jendela kayu meranti :

6.3.1. Bahan
- Kayu kapur, balok 1.200 M x

6.3.2. Tenaga
- Pekerja 6.000 Oh x
- Tukang kayu 18.000 Oh x
- Kepala tukang 2.000 Oh x
- Mandor 0.300 Oh x

PK 6.8. 1 M Pasang pintu panel kayu meranti batu

6.8.1. Bahan
- Kayu meranti batu, papan 0.040 M x

6.8.2. Tenaga
- Pekerja 1.000 Oh x
- Tukang kayu 2.500 Oh x
- Kepala tukang 0.250 Oh x
- Mandor 0.050 Oh x

PK 6.10. 1 M Pasang pintu dan jendela kaca panel kayu meranti batu :

6.10.1. Bahan
- kayu meranti 0.035 M x
- Kaca polos 5 mm 0.800 M x

6.10.2. Tenaga
- Pekerja 0.800 Oh x
- Tukang kayu 2.000 Oh x
- Kepala tukang 0.200 Oh x
- Mandor 0.040 Oh x
010

Rp. 96,000 = Rp. 120,000.00


Rp. 126,000 = Rp. 15,750.00
Jumlah = Rp. 135,750.00

Rp. 96,000 = Rp. 18,432.00


Rp. 126,000 = Rp. 2,394.00
Jumlah = Rp. 20,826.00

Rp. 985 = Rp 68,950.00


Rp. 1,581 = Rp 18,184.38
Rp. 211,500 = Rp 9,094.50
Jumlah (1) = Rp 96,228.88

Rp. 96,000 = Rp 30,720.00


Rp. 115,000 = Rp 11,500.00
Rp. 126,000 = Rp 1,260.00
Rp. 126,000 = Rp 1,890.00
Jumlah (2) = Rp 45,370.00
Jumlah (1) + (2) = Rp 141,598.88

x Rp 96,000 = Rp 9,600.00
x Rp 126,000 = Rp 6,300.00
Jumlah = Rp 15,900.00
Rp. 1,581 = Rp. 13,472.25
Rp. 211,500 = Rp. 3,595.50
Jumlah (1) = Rp. 17,067.75

Rp. 96,000 = Rp. 19,200.00


Rp. 115,000 = Rp. 17,250.00
Rp. 126,000 = Rp. 1,890.00
Rp. 126,000 = Rp. 1,260.00
Jumlah (2) = Rp. 39,600.00
Jumlah (1) + (2) = Rp. 56,667.75

Rp. 14,917 = Rp. 93,229.17 89,500.00 14,916.67


Rp. 1,581 = Rp. 17,994.63 63,250.00 1,581.25
Rp. 211,500 = Rp. 8,883.00
Rp. 3,881 = Rp. 5,821.88 155,250.00 3,881.25
Jumlah (1) = Rp. 125,928.67

Rp. 96,000 = Rp. 59,520.00


Rp. 115,000 = Rp. 40,250.00
Rp. 126,000 = Rp. 4,410.00
Rp. 126,000 = Rp. 3,780.00
Jumlah (2) = Rp. 107,960.00
Jumlah (1) + (2) = Rp. 233,888.67

asar, 2 lapis cat penutup )

Rp. 57,500 = Rp. 6,900.00


Rp. 27,000 = Rp. 3,240.00
Rp. 38,200 = Rp. 9,932.00
Jumlah (1) = Rp. 20,072.00

Rp. 96,000 = Rp. 3,840.00


Rp. 115,000 = Rp. 13,800.00
Rp. 126,000 = Rp. 1,512.00
Rp. 126,000 = Rp. 252.00
Jumlah (2) = Rp. 19,404.00
Jumlah (1) + (2) = Rp. 39,476.00
x Rp. 175,000 = Rp. 175,000.00
x Rp. 1,581 = Rp. 9,487.50
x Rp. 211,500 = Rp. 2,115.00
Jumlah (1) = Rp. 186,602.50

x Rp. 96,000 = Rp. 105,600.00


x Rp. 115,000 = Rp. 172,500.00
x Rp. 126,000 = Rp. 18,900.00
x Rp. 126,000 = Rp. 13,860.00
Jumlah (2) = Rp. 310,860.00
Jumlah (1) = Rp. 497,462.50

x Rp. 40,600 = Rp. 40,600.00


x Rp. 11,300 = Rp. 282.50
Jumlah (1) = Rp. 40,882.50

x Rp. 96,000 = Rp. 960.00


x Rp. 115,000 = Rp. 11,500.00
x Rp. 126,000 = Rp. 1,260.00
x Rp. 126,000 = Rp. 630.00
Jumlah (2) 14,350.00
Jumlah (1) +(2) 55,232.50

x Rp. 10,000 = Rp. 10,000.00


Jumlah (1) = Rp. 10,000.00

x Rp. 96,000 = Rp. 960.00


x Rp. 115,000 = Rp. 11,500.00
x Rp. 126,000 = Rp. 1,260.00
x Rp. 126,000 = Rp. 630.00
Jumlah (2) 14,350.00
Jumlah (1) +(2) 24,350.00
x Rp. 97,975 = Rp. 117,570.00 391,900.00
x Rp. 97,975 = Rp. 34,291.25
Jumlah (1) = Rp. 151,861.25

x Rp. 96,000 = Rp. 7,776.00


x Rp. 115,000 = Rp. 15,525.00
x Rp. 126,000 = Rp. 1,701.00
x Rp. 126,000 = Rp. 516.60
Jumlah (2) = Rp. 25,518.60
Jumlah (1) = Rp. 177,379.85

x Rp. 19,050 = Rp. 22,860.00 76,200.00


x Rp. 19,050 = Rp. 6,667.50
Jumlah (1) = Rp. 29,527.50

x Rp. 96,000 = Rp. 3,456.00


x Rp. 115,000 = Rp. 6,900.00
x Rp. 126,000 = Rp. 756.00
x Rp. 126,000 = Rp. 226.80
Jumlah (2) = Rp. 11,338.80
Jumlah (1) = Rp. 40,866.30

Rp. 985 = Rp 68,950.00


Rp. 1,581 = Rp 29,964.69
Rp. 211,500 = Rp 8,037.00
Jumlah (1) = Rp 106,951.69

Rp. 96,000 = Rp 30,720.00


Rp. 115,000 = Rp 11,500.00
Rp. 126,000 = Rp 1,260.00
Rp. 126,000 = Rp 1,890.00
Jumlah (2) = Rp 45,370.00
Jumlah (1) + (2) = Rp 152,321.69
1,581 = Rp. 632,500.00
211,500 = Rp. 84,600.00
220,000 = Rp. 180,400.00
Jumlah (1)= Rp. 897,500.00

96,000 = Rp. 576,000.00


115,000 = Rp. 115,000.00
126,000 = Rp. 12,600.00
126,000 = Rp. 37,800.00
Jumlah (2)= Rp. 741,400.00
Jumlah (1) = Rp. 1,638,900.00

Rp. 1,581 = Rp. 22,580.25


Rp. 211,500 = Rp. 4,864.50
Jumlah (1) = Rp. 27,444.75

Rp. 96,000 = Rp. 24,000.00


Rp. 115,000 = Rp. 23,000.00
Rp. 126,000 = Rp. 2,520.00
Rp. 126,000 = Rp. 1,575.00
Jumlah (2) = Rp. 51,095.00
Jumlah (1) + (2) = Rp. 78,539.75
t penutup )

Rp. 27,000 = Rp. 3,240.00


Rp. 38,200 = Rp. 9,932.00
Jumlah (1) = Rp. 13,172.00

Rp. 96,000 = Rp. 2,880.00


Rp. 115,000 = Rp. 10,350.00
Rp. 126,000 = Rp. 1,134.00
Rp. 126,000 = Rp. 189.00
Jumlah (2) = Rp. 14,553.00
Jumlah (1) + (2) = Rp. 27,725.00
Rp. 88,000 = Rp. 32,032.00
R[. 16,000 = Rp. 24,000.00
Rp. 25,000 = Rp. 2,750.00
Jumlah (1) = Rp. 58,782.00

Rp. 96,000 = Rp. 9,600.00


Rp. 115,000 = Rp. 5,750.00
Rp. 126,000 = Rp. 630.00
Rp. 126,000 = Rp. 630.00
Jumlah (2) = Rp. 16,610.00
Jumlah (1) +(2) = Rp. 75,392.00

Rp. 73,500 = Rp. 74,970.00


Rp. 222,000 = Rp. 222,000.00
Rp. 25,000 = Rp. 5,000.00
Jumlah (1) = Rp. 301,970.00

Rp. 96,000 = Rp. 19,200.00


Rp. 115,000 = Rp. 11,500.00
Rp. 126,000 = Rp. 1,260.00
Rp. 126,000 = Rp. 1,260.00
Jumlah (2) = Rp. 33,220.00
Jumlah (1) + (2) = Rp. 335,190.00

6,500,000 = Rp. 1,755,000.00


18,000 = Rp. 36,000.00
13,750 = Rp. 2,750,000.00
25,000 = Rp. 75,000.00
1,581 = Rp. 510,743.75 63,250.00 1581.250
211,500 = Rp. 109,980.00
220,000 = Rp. 171,600.00
Jumlah (1)= Rp. 5,408,323.75

96,000 = Rp. 465,600.00


115,000 = Rp. 40,250.00
115,000 = Rp. 179,400.00
115,000 = Rp. 161,000.00
126,000 = Rp. 41,706.00
126,000 = Rp. 21,420.00
Jumlah (2)= Rp. 909,376.00
Jumlah (1) = Rp. 6,317,699.75

Rp. 3,240 = Rp. 81,000.00 3240


Rp. 1,581 = Rp. 17,994.63
Rp. 211,500 = Rp. 8,883.00
Rp. 3,881 = Rp. 5,821.88
Jumlah (1) = Rp. 113,699.50

Rp. 96,000 = Rp. 59,520.00


Rp. 115,000 = Rp. 40,250.00
Rp. 126,000 = Rp. 4,410.00
Rp. 126,000 = Rp. 3,780.00
Jumlah (2) = Rp. 107,960.00
Jumlah (1) + (2) = Rp. 221,659.50

Rp. 9,125,000.00 = Rp. 10,950,000.00


Jumlah (1) = Rp. 10,950,000.00

Rp. 96,000.00 = Rp. 576,000.00


Rp. 115,000.00 = Rp. 2,070,000.00
Rp. 126,000.00 = Rp. 252,000.00
Rp. 126,000.00 = Rp. 37,800.00
Jumlah (2) = Rp. 2,935,800.00
Jumlah (1) +(2) = Rp. 13,885,800.00
Rp. 9,125,000.00 = Rp. 365,000.00
Jumlah (1) = Rp. 365,000.00

Rp. 96,000.00 = Rp. 96,000.00


Rp. 115,000.00 = Rp. 287,500.00
Rp. 126,000.00 = Rp. 31,500.00
Rp. 126,000.00 = Rp. 6,300.00
Jumlah (2) = Rp. 421,300.00
Jumlah (1) +(2) = Rp. 786,300.00

Rp. 9,125,000.00 = Rp. 319,375.00


Rp. 84,000.00 = Rp. 67,200.00
Jumlah (1) = Rp. 386,575.00

Rp. 96,000.00 = Rp. 76,800.00


Rp. 115,000.00 = Rp. 230,000.00
Rp. 126,000.00 = Rp. 25,200.00
Rp. 126,000.00 = Rp. 5,040.00
Jumlah (2) = Rp. 337,040.00
Jumlah (1) +(2) = Rp. 723,615.00
97,975.00

19,050.00
beton pondasi pancang
0.09 6 0.54 m3

Beton pile cap


1.5 0.4 0.6 m3
total beton pondasi 1.14 m3
kanankiri 1 1.14 m3
Beton Sloof 1
0.05 1.2 0.06 m3
Beton Balok 2 2 0.12 m3
0.05 1.2 0.06 m3
2 0.12 m3
Beton Balok 3
0.05 4.4 0.22 m3
2 0.44 m3
beton balok 4
0.05 1 0.05 m3
2 0.1 m3

total beton sloof 0.78 m3

Beton kolom 1
0.09 4 0.36 m3
4 1.44 m3
Beton Kolom 2
0.04 3 0.12 m3
8 0.96 m3
total beton kolom 2.4 m3

beton bentuk tiang gapura


1 0.72 0.2 0.144 m2
2 0.288 m3

2 1.2 0.2 0.24 m3


2 0.48 m3
3 4.4 0.15 0.66 m3

total beton bntuk gapura 1.428 m3


Dinding 1
1.22 1.6 1.952 m2
2 3.904 m2
Dinding 2
1.75 1.6 2.8 m2
2 5.6 m2
Dinding satpam
3.7 1.6 5.92 m2
2 11.84 m2
Dinding satpam
3.7 2.5 9.25 m2
2 18.5 m2 total 39.844
Dinding tiang 2
1 0.4 0.4 m2
2 0.8 m2
Dinding tiang 3
0.8 0.2 0.16 m2
2 0.32 m2
Dinding balok atas
1 0.4 0.4 m2
2 0.8 m2
Dinding Balok atas 2
4.4 0.4 1.76 m2
2 3.52 m2

total dinding bata 45.284 m2

plesteran tugu 45.284 m2


45.284 1 58.8692 m2

ATAP
aa 7 aa 2
ab 5.2 ab 1
t 1.7 t 1.8
luas 10.37 m2 luas 2.7 m2
2 20.74 m2 2 5.4 m2
total atap 26.14 m2

ayo ayo relief


2.7 1
luas 1.35 m2
2 2.7 m2
0.8 1.6
luas 0.64 m2
2 1.28 m2
total ayo relief 3.98 m2

ret ret
1.2 4 4.8 m'

relief
1.4 0.4
0.56 m2
4 2.24 m2
4.4 0.4
1.76 2 3.52
TOTAL 5.76 M2

pengecatan tugu
58.8692 m2

0.4

Plafond
49
49
9
107 m2

atap
tr1 t 2.5 tr2 t 1.82
a.atas 4.94 a.atas 2.85
a.bawah 7.02 a.bawah 6.84
luas 1 14.95 m2 luas 1 8.8179 m2

47.5358 m2
lvl 1 62.8814 m2

t 1.08 t 1.2
a.atas 1.79 a.atas 3.83
a.bawah 3.57 a.bawah 5.27
luas 1 2.8944 m2 luas 1 5.46 m2
lvl2 16.7088 m2

t 1.7 segitiga
a.atas 3.83 1.11375
a.bawah 4.56 4
luas 1 7.1315 m2 4.455 m2
14.263 m2
lvl 3
18.718 m2

total luas atap kantor


98.3082 m2

teras
tr1 t 1.08 tr2 t 1.19
a.atas 1.75 a.atas 1.9
a.bawah 3.5 a.bawah 2.86
luas 1 2.835 m2 luas 1 2.8322 2
5.6644
total luas atap teras
16.1889 m2

total pekerjaan atap


114.4971 m2

pintu jendela
0.006 2.1 0.0126 m3 0.006 1 0.006
2 0.0252 m3 2 0.012
0.006 0.9 0.0054 m3 0.006 0.4 0.0024
kusen 1 unit 0.0306 m3 2 0.0048
unit 3 0.0918 m3 1 unit kusen 0.0168
unit 4 0.0672

total kusen jendela dan pintu 0.159 m3

daun pintu panel jendela panel kaca


1.89 m2 0.4 m2
unit 3 5.67 m2 unit 4 1.6 m2

septictank
3
bata 4 12 m2
1,699,186.50
plester 12 942,477.00
beton 4 m2
0.15 0.6 m3
Err:509
total Err:509

MCB Box 2 group 1 bh 55,000


MCB 10A 2 bh 35,000
Lampu downlight 25 wat + bola 11 bh 150,000
Saklar 4 bh 55,000
Stop kontak 10 A 2 bh 50,000
Kabel tunggal NYA1,5 mm (100m) 2 rol 225,000
Kabel tunggal NYA 2,5 mm (100m) 1 rol 275,000
Kabel NYM 3x2.5 mm (100m) 1 rol 325,000

AYO AYO
0.6 10
6 m2
m2

6 2.4 14.4
2
28.8 m2

2.9 1.9 5.51


2
11.02 m2
total 39.82 m2
segitiga
1.2788
12
15.3456 m2
tr3 t 1.69
a.atas 2.15
a.bawah 2.4
luas 1 3.84475 2
m2 7.6895 m2

m3
m3
m3
m3
m3
m3

Anda mungkin juga menyukai