B BAHAN TOKO
1 Semen PC, ( Tonasa 50 Kg ) Kg 1,800
2 Semen Warna / Putih Kg 3,000
3 Besi Beton Kg 11,526
4 Besi Plat 3 mm Lbr 1,625,000
5 Besi Plat 2 mm Lbr 1,300,000
6 Besi Plat 1,2 mm Lbr 690,625
7 Besi Plat 1.4 mm Lbr 804,375
8 Besi Beugel / Baut Bh 3,906
9 Besi Siku Uk. 30 x 3 mm - 6 m' Btg 121,875
10 Besi Siku Uk. 40 x 3 mm - 6 m' Btg 159,250
11 Besi Siku Uk. 40 x 4 mm - 6 m' Btg 227,500
12 Besi Siku Uk. 50 x 4 mm - 6 m' Btg 260,000
13 Besi Siku Uk. 50 x 5 mm - 6 m' Btg 316,875
NO URAIAN SA HARGA KETERANGAN
TUAN ( RP)
70 Tiner A Kg 39,063
71 Plamur Tembok Kg 13,500
72 Plamur Kayu Kg 32,500
73 Dempul Jadi Kg 23,438
74 Kertas Pasir Lbr 4,875
75 Kuas cat 2" Bh 5,688
76 Kuas cat 5" Bh 21,125
77 Kuas Rool Bh 24,375
78 Pisau Dempul Set 24,375
79 Foons m2 20,313
80 Lem Profil Kg 97,500
81 Lem Kayu Kg 24,375
82 Paving Block M2 60,000
83 Kloset Jongkok Biasa ( INA ) Bh 203,125
84 Kloset Jongkok Standar ( INA ) Bh 186,875
85 Kloset Duduk Standar ( INA ) Bh 650,000
86 Kloset Duduk Monoblok Lengkap Set 1,750,000
87 Wastafel Set 487,500
88 Bak Cuci Stainless Steel 1 Lobang Set 250,000
89 Bak Cuci Stainless Steel 2 Lobang Set 475,000
90 Dop Bak Air Bh 15,000
91 Floor Drain Plastik Bh 20,000
92 Kran air 1/2" Bh 40,625
93 Pipa PVC ( SC ) 1/2" - 4 m M1 8,531
94 Pipa PVC ( SC ) 3/4" - 4 m M1 12,188
95 Pipa PVC ( SC ) 1" - 4 m M1 15,235
96 Pipa PVC ( SC ) 3" - 6 m M1 95,000
97 Pipa Besi 3/4" Btg 85,000
98 Pipa GIV 1/2 " Btg 121,875
99 Pipa GIV 1 " Btg 146,485
100 Pipa GIV 1 1/4 " Btg 219,375
101 Pipa GIV 3/4 " Btg 146,250
102 Pipa GIV 1.5 " Btg 268,125
103 Pipa GIV 2" Btg 225,000
104 Pipa GIV 2 1/2" Btg 275,000
105 Sel Tipe Pipa Bh 3,900
106 Kerosen/Minyak Tanah Ltr 7,800
107 Fiting Plafond Bh 9,750
108 Lampu Pijar 25 Watt Bh 3,125
109 Lampu Neon TL 20 Watt Bh 39,000
110 Lampu Neon TL 40 Watt Bh 19,500
111 Lampu Philips 40 Watt Bh 55,000
112 Lampu Philips 25 Watt Bh 35,000
113 Lampu Philips 18 Watt Bh 30,000
114 Saklar Tunggal Bh 10,156
115 Saklar Double Bh 13,813
116 Stop Kontak Bh 13,813
117 Saklar + Stop Kontak Bh 15,235
118 Box Sekring 1 Fase Bh 24,375
119 Box Sekring 2 Fase Bh 32,500
120 Box Saklar Bh 6,000
121 The Dos Bh 3,000
122 Pipa Listrik Btg 7,500
123 Kabel NYM 2 x 1,5 mm (Full) Roll 718,750
124 Papan Flooring Lbr 121,875
125 Roster M2 171,875
NO URAIAN SA HARGA KETERANGAN
TUAN ( RP)
C UPAH PEKERJA
1 Pekerja Org/hari 40,000
2 Mandor Org/hari 70,000
3 Tukang Org/hari 75,000
4 Kepala Tukang Org/hari 80,000
DAFTAR HARGA SATUAN BAHAN DAN UPAH
NAMA INSTANSI : KANTOR KECAMATAN BUKO KABUPATEN BANGGAI KEPULAUAN
PROGRAM : PENINGKATAN SARANA DAN PRASARANA APARATUR
PEKERJAAN : REHABILITASI BERAT RUMAH DINAS CAMAT
LOKASI : TATABA KECAMATAN BUKO KABUPATEN BANGGAI KEPULAUAN
TAHUN ANGGARAN : 2011
B BAHAN TOKO
1 Semen PC, ( Tonasa 50 Kg ) Kg 1,800
2 Semen Warna / Putih Kg 3,000
3 Besi Beton Kg 11,526
4 Besi Plat 3 mm Lbr 1,625,000
5 Besi Plat 2 mm Lbr 1,300,000
6 Besi Plat 1,2 mm Lbr 690,625
7 Besi Plat 1.4 mm Lbr 804,375
8 Besi Beugel / Baut Bh 3,906
9 Besi Siku Uk. 30 x 3 mm - 6 m' Btg 121,875
10 Besi Siku Uk. 40 x 3 mm - 6 m' Btg 159,250
11 Besi Siku Uk. 40 x 4 mm - 6 m' Btg 227,500
12 Besi Siku Uk. 50 x 4 mm - 6 m' Btg 260,000
13 Besi Siku Uk. 50 x 5 mm - 6 m' Btg 316,875
NO URAIAN SA HARGA KETERANGAN
TUAN ( RP)
70 Tiner A Kg 39,063
71 Plamur Tembok Kg 13,500
72 Plamur Kayu Kg 32,500
73 Dempul Jadi Kg 23,438
74 Kertas Pasir Lbr 4,875
75 Kuas cat 2" Bh 5,688
76 Kuas cat 5" Bh 21,125
77 Kuas Rool Bh 24,375
78 Pisau Dempul Set 24,375
79 Foons m2 20,313
80 Lem Profil Kg 97,500
81 Lem Kayu Kg 24,375
82 Paving Block M2 60,000
83 Kloset Jongkok Biasa ( INA ) Bh 203,125
84 Kloset Jongkok Standar ( INA ) Bh 186,875
85 Kloset Duduk Standar ( INA ) Bh 650,000
86 Kloset Duduk Monoblok Lengkap Set 1,750,000
87 Wastafel Set 487,500
88 Bak Cuci Stainless Steel 1 Lobang Set 250,000
89 Bak Cuci Stainless Steel 2 Lobang Set 475,000
90 Dop Bak Air Bh 15,000
91 Floor Drain Plastik Bh 20,000
92 Kran air 1/2" Bh 40,625
93 Pipa PVC ( SC ) 1/2" - 4 m M1 8,531
94 Pipa PVC ( SC ) 3/4" - 4 m M1 12,188
95 Pipa PVC ( SC ) 1" - 4 m M1 15,235
96 Pipa PVC ( SC ) 3" - 6 m M1 95,000
97 Pipa Besi 3/4" Btg 85,000
98 Pipa GIV 1/2 " Btg 121,875
99 Pipa GIV 1 " Btg 146,485
100 Pipa GIV 1 1/4 " Btg 219,375
101 Pipa GIV 3/4 " Btg 146,250
102 Pipa GIV 1.5 " Btg 268,125
103 Pipa GIV 2" Btg 225,000
104 Pipa GIV 2 1/2" Btg 275,000
105 Sel Tipe Pipa Bh 3,900
106 Kerosen/Minyak Tanah Ltr 7,800
107 Fiting Plafond Bh 9,750
108 Lampu Pijar 25 Watt Bh 3,125
109 Lampu Neon TL 20 Watt Bh 39,000
110 Lampu Neon TL 40 Watt Bh 19,500
111 Lampu Philips 40 Watt Bh 55,000
112 Lampu Philips 25 Watt Bh 35,000
113 Lampu Philips 18 Watt Bh 30,000
114 Saklar Tunggal Bh 10,156
115 Saklar Double Bh 13,813
116 Stop Kontak Bh 13,813
117 Saklar + Stop Kontak Bh 15,235
118 Box Sekring 1 Fase Bh 24,375
119 Box Sekring 2 Fase Bh 32,500
120 Box Saklar Bh 6,000
121 The Dos Bh 3,000
122 Pipa Listrik Btg 7,500
123 Kabel NYM 2 x 1,5 mm (Full) Roll 718,750
124 Papan Flooring Lbr 121,875
125 Roster M2 171,875
NO URAIAN SA HARGA KETERANGAN
TUAN ( RP)
C UPAH PEKERJA
1 Pekerja Org/hari 40,000
2 Mandor Org/hari 70,000
3 Tukang Org/hari 75,000
4 Kepala Tukang Org/hari 80,000
CV. …………………………
………………………………
Direktur
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
I. PEKERJAAN PERSIAPAN
1 M1 Pengukuran dan Pemasangan Bouwplank
0.100 Org/ Hr Pekerja Rp. 40,000.00 = Rp. 4,000.00
0.005 Org/ Hr Mandor Rp. 70,000.00 = Rp. 350.00
0.100 Org/ Hr Tukang Rp. 75,000.00 = Rp. 7,500.00
0.010 Org/ Hr Kepala Tukang Rp. 80,000.00 = Rp. 800.00
0.012 M3 Kayu 5/7 Rp. 2,153,125.00 = Rp. 25,837.50
0.020 Kg Paku Biasa Rp. 24,375.00 = Rp. 487.50
0.007 M3 Kayu Papan 3/20 Rp. 2,153,125.00 = Rp. 15,071.88
Rp. 54,046.88
1 M2 Membersihkan Lapangan dan Perataan
0.100 Org/ Hr Pekerja Rp. 40,000.00 = Rp. 4,000.00
0.050 Org/ Hr Mandor Rp. 70,000.00 = Rp. 3,500.00
Rp. 7,500.00
1 M3 Bongkaran Beton Bertulang
6.667 Org/ Hr Pekerja Rp. 40,000.00 = Rp. 266,680.00
0.333 Org/ Hr Mandor Rp. 70,000.00 = Rp. 23,310.00
Rp. 289,990.00
1 M3 Bongkaran Dinding Tembok Bata Merah
6.667 Org/ Hr Pekerja Rp. 40,000.00 = Rp. 266,680.00
0.033 Org/ Hr Mandor Rp. 70,000.00 = Rp. 2,310.00
Rp. 268,990.00
1 M2 Mengupas Plesteran Lama
0.035 Org/ Hr Pekerja Rp. 40,000.00 = Rp. 1,400.00
0.002 Org/ Hr Mandor Rp. 70,000.00 = Rp. 122.50
Rp. 1,522.50
1 M2 Membongkar Lantai Beton Lama
0.160 Org/ Hr Pekerja Rp. 40,000.00 = Rp. 6,400.00
0.008 Org/ Hr Mandor Rp. 70,000.00 = Rp. 560.00
Rp. 6,960.00
1 M2 Membongkar dan Menurunkan Atap Seng
0.015 Org/ Hr Pekerja Rp. 40,000.00 = Rp. 600.00
0.001 Org/ Hr Mandor Rp. 70,000.00 = Rp. 52.50
Rp. 652.50
1 M2 Membongkar dan menurunkan Rangka Atap
0.070 Org/ Hr Pekerja Rp. 40,000.00 = Rp. 2,800.00
0.004 Org/ Hr Mandor Rp. 70,000.00 = Rp. 245.00
Rp. 3,045.00
1 M2 Membongkar Rangka / Plafond
0.045 Org/ Hr Tukang Kayu Rp. 75,000.00 = Rp. 3,375.00
0.005 Org/ Hr Kepala Tukang Rp. 80,000.00 = Rp. 360.00
0.150 Org/ Hr Pekerja Rp. 40,000.00 = Rp. 6,000.00
0.008 Org/ Hr Mandor Rp. 70,000.00 = Rp. 525.00
Rp. 10,260.00
CV. ………………………………….
……………………………….
Direktur
REKAPITULASI
NAMA INSTANSI : KANTOR KECAMATAN BUKO KABUPATEN BANGGAI KEPULAUAN
PROGRAM : PENINGKATAN SARANA DAN PRASARANA APARATUR
PEKERJAAN : REHABILITASI BERAT RUMAH DINAS CAMAT
LOKASI : TATABA KECAMATAN BUKO KABUPATEN BANGGAI KEPULAUAN
TAHUN ANGGARAN : 2011